JP2007247202A - Existing building extending method and building extended according to the method - Google Patents

Existing building extending method and building extended according to the method Download PDF

Info

Publication number
JP2007247202A
JP2007247202A JP2006070182A JP2006070182A JP2007247202A JP 2007247202 A JP2007247202 A JP 2007247202A JP 2006070182 A JP2006070182 A JP 2006070182A JP 2006070182 A JP2006070182 A JP 2006070182A JP 2007247202 A JP2007247202 A JP 2007247202A
Authority
JP
Japan
Prior art keywords
building
existing building
new
buildings
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006070182A
Other languages
Japanese (ja)
Inventor
Norifumi Konakawa
憲史 粉川
Masao Komori
正夫 小森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miracle Three Corp
Original Assignee
Miracle Three Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miracle Three Corp filed Critical Miracle Three Corp
Priority to JP2006070182A priority Critical patent/JP2007247202A/en
Priority to RU2008122780/03A priority patent/RU2008122780A/en
Priority to CNA2007800064285A priority patent/CN101389819A/en
Priority to PCT/JP2007/054831 priority patent/WO2007105690A1/en
Priority to BRPI0708869-8A priority patent/BRPI0708869A2/en
Publication of JP2007247202A publication Critical patent/JP2007247202A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an existing building extending method for a structure in which a plurality of building sections are connected together via connecting corridors, according to which the existing building can be extended upward while being used, exerts sufficient strength, and allows effective use of vacant spaces thereof. <P>SOLUTION: The existing building extending method is provided for the structure in which the plurality of building sections are connected together via the connecting corridors. According to the method, new structure sections are constructed on both sides of each connecting corridor so as to each have an upper story section that is higher than the existing building by a height corresponding to one story or more, and both the upper story sections of the respective new structure sections are connected together in a manner striding the connecting corridor, to thereby construct an upper story section on each connecting corridor. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、既設建物の増築方法及びこの方法により増築された建物に関し、より詳しくは、複数の建物が渡り廊下により接続された構造を有する既設建物において、既設建物を使用しながら上方に増築することができるとともに、充分な建物強度を確保することができ、しかも空きスペースを有効利用することを可能とする増築方法及びこの方法により増築された建物に関する。   The present invention relates to an extension method of an existing building and a building extended by this method, and more specifically, in an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, it is extended upward while using the existing building. Further, the present invention relates to an extension method that can secure sufficient building strength and that can effectively use an empty space, and a building extended by this method.

従来、例えば2階建ての建物を3階建てにするためには、柱や壁、梁等の強度の関係から、2階の上部に更に新規の3階部分を構築することはできず、先ず既設の2階建ての建物を全て撤去し、その跡地に3階建ての建物を構築する他はなかったが、このような従来の方法は、不経済であるばかりでなく、産業廃棄物の増加を引き起こし、また居住者は新規建物が完成するまで転居を強いられることとなっていた。   Conventionally, for example, in order to make a two-story building into a three-story building, a new three-story part cannot be built on the upper part of the second floor because of the strength of pillars, walls, beams, etc. There was no other way than removing all existing two-story buildings and building a three-story building on the site, but this conventional method is not only uneconomical, but also increases industrial waste. And the residents were forced to move until the new building was completed.

そこで、このような実情に鑑みて、本願発明者は、既設の建物を活用し、居住者が一時的にせよ転居することなく、そのまま鉛直方向上方に増築が可能な建築方法および建築物を提案している(特許文献1参照)。
この特許文献1に記載の発明は、既設の建物の周囲を囲うように新たな基礎を設け、新たな基礎の上部に鉄骨柱を立設して既設建物の上方に新規建物を構築するという斬新な発想に基づいたものであり、従来の増築方法に関わる問題点の多くを解決することができる優れた発明である。
Therefore, in view of such circumstances, the inventor of the present application proposes a construction method and a building that can be used for the extension in the vertical direction as it is without occupants moving temporarily, even if the occupants temporarily move. (See Patent Document 1).
The invention described in Patent Document 1 is a novel design in which a new foundation is provided so as to surround the existing building, and a new structure is constructed above the existing building by standing a steel column above the new foundation. This is an excellent invention that can solve many of the problems associated with conventional extension methods.

しかしながら、特許文献1に開示された増築方法は、戸建て住宅の増築方法に適用するには優れた方法であるが、例えば既設建物が平面的に大規模なものである場合、強度的な問題が生じる可能性があった。   However, the extension method disclosed in Patent Document 1 is an excellent method for applying to the extension method of a detached house. However, for example, when an existing building is large in plan, there is a problem of strength. Could have occurred.

すなわち、特許文献1に開示された増築方法は、既設建物の外側を囲うように立設された増築用の柱間に梁を架設し、この梁の上方に新規に上層階を構築する方法であるから、既設建物が平面的に大規模なものである場合には、既設建物の上方に架設される梁のスパンが長くなり、その結果、既設建物の上部に構築される上層階の重量に耐えるだけの充分な強度を確保することが困難となる場合があった。   In other words, the extension method disclosed in Patent Document 1 is a method in which a beam is installed between columns for extension that are erected so as to surround the outside of an existing building, and a new upper floor is built above the beam. Therefore, if the existing building is large in plan, the span of the beam constructed above the existing building becomes longer, resulting in the weight of the upper floor built on top of the existing building. In some cases, it is difficult to ensure sufficient strength to withstand.

例えば、既設の小中学校の校舎等には、複数の建物が渡り廊下によって接続されている構造の建物が比較的多い。
このような構造の建物は、建物自体の面積はそれほど広くなくても、渡り廊下によって建物同士の間が隔てられているために、特許文献1の開示技術をそのまま適用しようとすると、既設建物の上方に架設される梁のスパンが長くなり、充分な強度を確保することが困難であった。
更に、渡り廊下により隔てられた建物間には空間があるが、特許文献1の開示技術をそのまま適用した場合、この空間が増築された建物内部にそのまま取り込まれてしまうため、空間を有効利用することが困難であった。
For example, in existing elementary and junior high school buildings, there are relatively many buildings with a structure in which a plurality of buildings are connected by a corridor.
Even if the area of the building itself is not so large, the building having such a structure is separated from each other by a corridor. Therefore, if the technique disclosed in Patent Document 1 is applied as it is, it is located above the existing building. As a result, the span of the beam installed on the tube became long, and it was difficult to ensure sufficient strength.
Furthermore, there is a space between the buildings separated by the corridor, but when the technique disclosed in Patent Document 1 is applied as it is, this space will be taken into the expanded building as it is, so that the space should be used effectively. It was difficult.

一方、本願出願人は、上記した強度面の問題点に鑑みて、特許文献1の開示技術をコンビニエンスストア等の正面幅が広い店舗建築物に対して適用できるようにした技術を既に提案している(特許文献2参照)。   On the other hand, the applicant of the present application has already proposed a technique in which the disclosed technique of Patent Document 1 can be applied to a store building having a wide front width, such as a convenience store, in view of the above-described problems of strength. (See Patent Document 2).

すなわち、特許文献2には、梁を軸方向に補強材を内在したコンクリート梁から構成し、梁の間に掛け渡されるパネルを長さ方向に補強材を内在した複数枚のコンクリートパネルから構成する技術が開示されている。   That is, in Patent Document 2, the beam is composed of a concrete beam including a reinforcing material in the axial direction, and the panel spanned between the beams is composed of a plurality of concrete panels including the reinforcing material in the length direction. Technology is disclosed.

この特許文献2の開示技術によれば、上記した強度上の問題点を解決することが可能であるが、特別に強化された梁やパネルを用いるために、施工コストの面では好ましくなく、経済的な方法とはいえなかった。
しかも、この開示技術によっても、複数の建物が渡り廊下によって接続されている構造をもつ建物において、建物間の空間を有効利用することが困難であるという問題については、解決することはできなかった。
According to the technology disclosed in Patent Document 2, it is possible to solve the above-described problems in strength, but since a specially strengthened beam or panel is used, it is not preferable in terms of construction cost and economical. It was not an effective method.
Moreover, even with this disclosed technology, it has been impossible to solve the problem that it is difficult to effectively use the space between buildings in a building having a structure in which a plurality of buildings are connected by a passageway.

特開2002−180674号公報Japanese Patent Laid-Open No. 2002-180674 特開2004−353248号公報JP 2004-353248 A

本発明は、上記したような従来技術の問題点を解決すべくなされたものであって、複数の建物が渡り廊下により接続された構造を有する既設建物の増築において、既設建物を使用しながら上方に増築することができるとともに、充分な建物強度を確保することができ、しかも空きスペースの有効利用を図ることができる既設建物の増築方法及びこの方法により増築された建物を提供せんとするものである。   The present invention has been made to solve the above-described problems of the prior art, and in an extension of an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, the existing building is used upward. It is intended to provide an extension method of an existing building that can be expanded, can secure sufficient building strength, and can effectively utilize an empty space, and a building extended by this method. .

請求項1に係る発明は、複数の建物が渡り廊下により接続された構造を有する既設建物の増築方法であって、前記渡り廊下を挟んだ両側位置に既設建物の階数よりも1階以上高い上層階部分を有する新規構造物を夫々構築するとともに、これら新規構造物の上層階部分同士を前記渡り廊下を跨ぐように連結することにより、該渡り廊下の上方にも上層階部分を形成することを特徴とする既設建物の増築方法に関する。   The invention according to claim 1 is an extension method of an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, wherein the upper floor part is higher by one floor or more than the number of floors of the existing building on both sides of the crossing corridor Respectively, and connecting the upper floor portions of the new structures so as to straddle the crossing corridor, thereby forming an upper floor portion above the crossing corridor. It relates to how to extend the building.

請求項2に係る発明は、既設建物が互いに略平行に設けられた複数の渡り廊下を有し、該複数の渡り廊下に挟まれた空間に前記新規構造物の少なくとも1つを構築することを特徴とする請求項1記載の既設建物の増築方法に関する。   The invention according to claim 2 is characterized in that the existing building has a plurality of passageways provided substantially parallel to each other, and at least one of the new structures is constructed in a space sandwiched between the plurality of passageways. The present invention relates to an extension method for an existing building.

請求項3に係る発明は、前記複数の建物の外側に前記上層階部分と同じ高さまで至る新規柱を立設し、該新規柱と前記上層階部分とを梁により連結することにより、前記複数の建物の上方にも上層階部分を形成することを特徴とする請求項1又は2記載の既設建物の増築方法に関する。   According to a third aspect of the present invention, a plurality of the plurality of buildings are provided by erected a new column extending to the same height as the upper floor portion outside the plurality of buildings, and connecting the new column and the upper floor portion with a beam. 3. The method for extending an existing building according to claim 1, wherein an upper floor portion is also formed above the building.

請求項4に係る発明は、前記複数の渡り廊下が3つ以上の渡り廊下からなり、両端以外に位置する渡り廊下の少なくとも1つを撤去した後、この撤去された空間に前記新規構造物の少なくとも1つを構築することを特徴とする請求項2又は3記載の既設建物の増築方法に関する。   According to a fourth aspect of the present invention, the plurality of crossing corridors comprises three or more crossing corridors, and after removing at least one of the crossing corridors positioned other than both ends, at least one of the new structures is removed in the removed space. The present invention relates to a method for extending an existing building according to claim 2 or 3.

請求項5に係る発明は、前記上層階部分を形成した後、既設建物の一部又は全てを撤去し、この撤去された空間に、前記新規構造物と一体となる新たな新規構造物を構築することを特徴とする請求項1乃至4いずれかに記載の既設建物の増築方法に関する。   In the invention according to claim 5, after forming the upper floor part, a part or all of the existing building is removed, and a new new structure integrated with the new structure is constructed in the removed space. The present invention relates to an extension method for an existing building according to any one of claims 1 to 4.

請求項6に係る発明は、複数の建物が渡り廊下により接続された構造を有する既設建物を増築することにより得られる建物であって、請求項1乃至5いずれかに記載の方法により増築された建物に関する。   The invention according to claim 6 is a building obtained by extending an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, and is extended by the method according to any one of claims 1 to 5 About.

請求項1に係る発明によれば、複数の建物が渡り廊下により接続された構造を有する既設建物の増築において、既設建物を使用しながら上方に増築することができるとともに、既設建物の上部に長スパンの梁を架設する必要がないために充分な建物強度を確保することができ、しかも既設建物の間の空きスペースを有効利用することが可能となる。   According to the invention of claim 1, in the extension of an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, the building can be extended upward while using the existing building, and a long span is provided at the upper part of the existing building Therefore, it is possible to secure sufficient building strength and to effectively use the empty space between the existing buildings.

請求項2に係る発明によれば、複数の渡り廊下に挟まれた空間に新規構造物の少なくとも1つを構築することにより、この新規構造物を介して梁を架設することが可能となるとともに、新規構造物が既設建物の強度を補強するため、建物全体の強度の向上を図ることができる。また、複数の渡り廊下に挟まれた閉鎖空間を有効利用することが可能となる。   According to the invention according to claim 2, by constructing at least one of the new structures in a space sandwiched between a plurality of passageways, it is possible to construct a beam via the new structure, Since the new structure reinforces the strength of the existing building, the strength of the entire building can be improved. In addition, it is possible to effectively use a closed space sandwiched between a plurality of passageways.

請求項3に係る発明によれば、複数の建物の上方にも上層階部分を形成するため、建物の内部容積を大幅に増加させることができるとともに、複数の建物の外側に立設された新規柱同士の連結を新規構造物を介して行うことが可能であるため、長スパンの梁を必要とせず、建物強度を充分に確保することができる。   According to the invention according to claim 3, since the upper floor portion is also formed above the plurality of buildings, the internal volume of the building can be greatly increased, and the new standing upright outside the plurality of buildings Since the columns can be connected to each other via a new structure, a long-span beam is not required, and sufficient building strength can be secured.

請求項4に係る発明によれば、3つ以上の渡り廊下の両端以外に位置する渡り廊下を撤去した後、この撤去された空間に新規構造物を構築することにより、新規構造物の容積を大きくとることができ、建物の内部容積を大幅に増加させることができるとともに、渡り廊下の数が減ることによって、渡り廊下を跨いで構築される上層階部分が減り、建物強度を高めることができる。   According to the invention which concerns on Claim 4, after removing the passageway located in the other than the both ends of three or more passageways, the volume of a new structure is taken by constructing a new structure in this removed space In addition, the internal volume of the building can be greatly increased, and by reducing the number of crossing corridors, the upper floor portion constructed across the crossing corridors can be reduced, and the building strength can be increased.

請求項5に係る発明によれば、上層階部分を形成した後、既設建物の一部又は全てを撤去し、この撤去された空間に新規構造物と一体となる新たな新規構造物を構築することにより、既設建物が老朽化している場合において、耐震強度建物全体の耐震強度を大きく高めることが可能となる。   According to the invention which concerns on Claim 5, after forming an upper floor part, a part or all of the existing building is removed, and the new new structure united with a new structure is constructed in this removed space. This makes it possible to greatly increase the seismic strength of the entire building when the existing building is aged.

請求項6に係る発明によれば、複数の建物が渡り廊下により接続された構造を有する既設建物を使用しながら増築された建物であって、強度が高く、空きスペースを効率的に利用し、内部容積が大きく増加した建物が得られる。   According to the invention according to claim 6, the building is expanded while using an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, and has high strength and efficiently uses an empty space. A building with a large increase in volume is obtained.

以下、本発明に係る既設建物の増築方法及びこの方法により増築された建物の好適な実施形態について、図面を参照しつつ説明する。
図1乃至図4は本発明に係る既設建物の増築方法の第一実施形態を工程順に示す説明図であり、図1は施工前の状態、図4は施工完了の状態を示している。
本発明に係る既設建物の増築方法は、図1に示すような、複数の建物(2)が渡り廊下(3)により接続された構造を有する既設建物(1)の増築方法である。
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, a preferred embodiment of an extension method for an existing building and a building extended by this method according to the present invention will be described with reference to the drawings.
FIG. 1 to FIG. 4 are explanatory views showing a first embodiment of an extension method of an existing building according to the present invention in the order of steps, FIG. 1 shows a state before construction, and FIG. 4 shows a state of completion of construction.
The extension method of the existing building which concerns on this invention is an extension method of the existing building (1) which has a structure where the some building (2) was connected by the crossing corridor (3) as shown in FIG.

尚、図1では、建物(2)が2棟、渡り廊下(3)が3つである構造の既設建物(1)が示されているが、本発明が適用される既設建物(1)の構造はこれには限定されない。
例えば、建物(2)は複数であればよく、3棟や4棟以上の建物が渡り廊下により接続されているものでもよい。
また、隣り合う建物(2)同士を接続する渡り廊下(3)については、1つでもよいし、2つでもよいし、4つ以上でもよい。渡り廊下(3)が複数ある場合、各渡り廊下は図1に示すように互いに平行に設けられていることが好ましいが、必ずしも互いに平行に設けられていなくてもよい。
FIG. 1 shows an existing building (1) having two buildings (2) and three passages (3), but the structure of the existing building (1) to which the present invention is applied. Is not limited to this.
For example, there may be a plurality of buildings (2), and three or four or more buildings may be connected by a crossing corridor.
Moreover, about the passage corridor (3) which connects adjacent buildings (2), one may be sufficient, two may be sufficient, and four or more may be sufficient. When there are a plurality of crossing corridors (3), it is preferable that the crossing corridors are provided in parallel to each other as shown in FIG. 1, but they are not necessarily provided in parallel to each other.

既設建物(1)の平面視形状は、図1ではローマ数字のIIIの形状を呈しているが、この他にも、平面視形状がII、エ、コ、ロ、日、目、月、田、E、F等の形状である既設建物について本発明を適用することが可能である。
更に、既設建物(1)の階数についても限定されず、1階建てでも、2階建てでも、3階建て以上であってもよい。
The plan view shape of the existing building (1) is the Roman numeral III in FIG. 1, but the plan view shape is II, D, K, B, Day, Eye, Moon, The present invention can be applied to existing buildings having shapes such as E, F, and the like.
Further, the number of floors of the existing building (1) is not limited, and may be one, two, or three or more.

第一実施形態に係る既設建物の増築方法においては、先ず図2に示すように、渡り廊下(3)を挟んだ両側位置において、新たに基礎を設けてその上に柱(鉄骨柱等)を立設し、柱間に梁を架設することにより新規構造物(4)を夫々構築する。
渡り廊下(3)が複数ある場合には、渡り廊下(3)に挟まれた空間(5)に新規構造物(4)を構築する。渡り廊下(3)が3つ以上ある場合には、複数の空間(5)が形成されるので、この場合には、図2に示すように全ての空間(5)に新規構造物(4)を構築することが好ましいが、必ずしも全ての空間(5)に新規構造物(4)を構築する必要はない。
In the extension method of the existing building according to the first embodiment, first, as shown in FIG. 2, a new foundation is provided on both sides of the passageway (3), and columns (steel columns, etc.) are erected on it. And new structures (4) are constructed by laying beams between columns.
When there are a plurality of crossing corridors (3), a new structure (4) is constructed in a space (5) sandwiched between the crossing corridors (3). When there are three or more passage corridors (3), a plurality of spaces (5) are formed. In this case, as shown in FIG. 2, new structures (4) are placed in all the spaces (5). Although it is preferable to construct, it is not always necessary to construct a new structure (4) in every space (5).

渡り廊下(3)を挟んだ両側位置に設けられる新規構築物(4)は、上方に延長されて既設建物(1)の階数よりも1階以上高い上層階部分(6)を有するように構築される。そして、これら渡り廊下(3)を挟んで構築された新規構造物(4)の上層階部分(6)同士を、渡り廊下(3)を跨ぐように梁(7)によって接続することにより、渡り廊下(3)の上方にも上層階部分(6)を形成する(図3参照)。   The new structure (4) provided on both sides of the passageway (3) is constructed so as to have an upper floor part (6) that extends upward and is higher by one floor or more than the number of floors of the existing building (1). . Then, by connecting the upper floor portions (6) of the new structure (4) that is constructed with these passage corridors (3) sandwiched by the beams (7) so as to straddle the passage corridors (3), the passage corridors (3 The upper floor portion (6) is also formed above (see FIG. 3).

最後に、上層階部分(6)を含んで一体化された新規構築物(4)に、天井、床、外壁を設け、内装を施すことにより、既設建物(1)よりも上方へと増築された増築建物(12)が完成する(図4参照)。   Finally, the new structure (4), which includes the upper floor (6), was integrated with the ceiling, floor, and outer walls, and the interior was decorated, so that the building was extended upward from the existing building (1). The extension building (12) is completed (see FIG. 4).

以上説明した本発明の第一実施形態の増築方法によれば、一連の工程の間、若干の不便は生じるものの、基本的には既設建物(1)をそのまま使用し続けることが可能である。
また、新規構築物(4)を渡り廊下(3)を挟んだ両側位置に設けることにより、既設建物(1)の全体を跨ぐような長スパンの梁を架設する必要がなく、充分な建物強度を確保することができる。更に、渡り廊下(3)により隔てられた建物(2)の間にある空きスペースを有効利用することが可能となる。
According to the extension method of the first embodiment of the present invention described above, it is basically possible to continue using the existing building (1) as it is, although some inconvenience occurs during the series of steps.
In addition, by installing the new structure (4) on both sides across the corridor (3), there is no need to construct long span beams that span the entire existing building (1), ensuring sufficient building strength. can do. Furthermore, it becomes possible to effectively use the empty space between the buildings (2) separated by the crossing corridor (3).

また、図2に示すように、複数の渡り廊下(3)に挟まれた空間(5)に新規構造物(4)を構築することにより、この新規構造物を介して梁(7)を架設することが可能となって、建物強度の向上を図ることができるとともに、デッドスペースであった閉鎖空間(5)を有効利用することが可能となる。   In addition, as shown in FIG. 2, by constructing a new structure (4) in a space (5) sandwiched between a plurality of passageways (3), a beam (7) is erected through the new structure. This makes it possible to improve the building strength and to effectively use the closed space (5) that was a dead space.

本発明においては、複数の渡り廊下(3)が3つ以上の渡り廊下からなる場合、両端以外に位置する渡り廊下の少なくとも1つを撤去した後、この撤去された空間に新規構造物(4)を構築することもできる。
例えば、図2の場合には、中央の渡り廊下を撤去して、この撤去された空間と元々存在していた空間(5)とが合わさった広い空間に、新規構造物(4)を構築することができる。
このようにすると、新規構造物(4)の容積を大きくとることができ、新しく得られる建物の内部容積を大幅に増加させることができる。また、渡り廊下の数が減ることによって、渡り廊下を跨いで構築される上層階部分が減り、建物強度を高めることができる。
In the present invention, when the plurality of passageways (3) are composed of three or more passageways, after removing at least one of the passageways located at positions other than both ends, a new structure (4) is constructed in the removed space. You can also
For example, in the case of FIG. 2, the central passage corridor is removed, and a new structure (4) is constructed in a wide space in which the removed space and the originally existing space (5) are combined. Can do.
If it does in this way, the volume of a new structure (4) can be taken large and the internal volume of the building newly obtained can be increased significantly. Moreover, when the number of crossing corridors decreases, the upper floor part constructed across a crossing corridor decreases, and building strength can be raised.

図1乃至図3、図5乃至図7は、本発明に係る既設建物の増築方法の第二実施形態を工程順に示す説明図であり、図1は施工前の状態、図7は施工完了の状態を示している。
第二実施形態に係る増築方法は、図1乃至図3に示す工程については上述した第一実施形態と同じであり、その後の工程において異なっている。
FIGS. 1 to 3 and FIGS. 5 to 7 are explanatory views showing a second embodiment of the extension method of an existing building according to the present invention in the order of steps, FIG. 1 is a state before construction, and FIG. 7 is completion of construction. Indicates the state.
The extension method according to the second embodiment is the same as the first embodiment described above with respect to the steps shown in FIGS. 1 to 3, and is different in the subsequent steps.

第二実施形態に係る増築方法では、先ず、上述した第一実施形態と同様の施工手順で、渡り廊下(3)を挟んだ両側位置に、既設建物(1)の階数よりも1階以上高い上層階部分(6)を有する新規構造物(4)を構築し、その上層階部分(6)同士を、渡り廊下(3)を跨ぐように梁(7)によって接続することにより、渡り廊下(3)の上方にも上層階部分(6)を形成する(図1乃至図3参照)。   In the extension method according to the second embodiment, first, in the construction procedure similar to that of the first embodiment described above, the upper layer which is higher by one floor or more than the number of floors of the existing building (1) on both sides of the passageway (3). By constructing a new structure (4) having a floor part (6) and connecting the upper floor parts (6) to each other by a beam (7) so as to straddle the crossing corridor (3), An upper floor portion (6) is also formed above (see FIGS. 1 to 3).

続いて、既設建物(1)を構成する複数の建物(2)の外側(渡り廊下が無い側)に基礎を設けて、その上に上記した上層階部分(6)と同じ高さまで至る新規柱(8)を立設し、これら新規柱(8)同士を梁によって連結することにより、複数の建物(2)の外側の面に沿った平面状の新規構造物(9)を構築する(図5参照)。   Next, a new pillar (up to the same height as the upper floor part (6) above) is provided on the outside of the multiple buildings (2) constituting the existing building (1) (the side without the corridor). 8) is erected and the new pillars (8) are connected to each other by a beam, thereby constructing a planar new structure (9) along the outer surface of the plurality of buildings (2) (FIG. 5). reference).

そして、新規柱(8)と上層階部分(6)を梁(10)によって連結することにより、複数の建物(2)の上方にも上層階部分(11)を形成する(図6参照)。   And a new pillar (8) and an upper floor part (6) are connected by a beam (10), and an upper floor part (11) is also formed above a some building (2) (refer FIG. 6).

最後に、上層階部分(6)(11)を含んで一体化された新規構築物(4)(9)に、天井、床、外壁を設け、内装を施すことにより、既設建物(1)よりも上方へと増築された増築建物(12)が完成する(図7参照)。   Finally, the new structure (4) (9) including the upper floors (6) and (11) is integrated with the ceiling, floor, and outer walls, and the interior is given, so that it is more than the existing building (1). The extension building (12) extended upward is completed (refer FIG. 7).

以上説明した第二実施形態の増築方法によっても、第一実施形態と同様に、一連の工程の間、若干の不便は生じるものの、基本的には既設建物(1)をそのまま使用し続けることが可能であるし、渡り廊下(3)により隔てられた建物(2)の間にある空きスペースを有効利用することが可能となる。
また、第二実施形態特有の効果として、既設の複数の建物(2)の上方にも上層階部分(11)を形成するため、建物の内部容積を大幅に増加させることができる。
更に、複数の建物(2)の外側に立設された新規柱(8)同士の連結を、新規構造物(4)を介して行うことが可能であるため、長スパンの梁を必要とせず、建物強度を充分に確保することができる。
Even with the extension method of the second embodiment described above, it is basically possible to continue using the existing building (1) as it is, although some inconvenience occurs during the series of steps as in the first embodiment. It is possible, and it is possible to effectively use the empty space between the buildings (2) separated by the crossing corridor (3).
Moreover, as an effect peculiar to the second embodiment, the upper floor portion (11) is also formed above the plurality of existing buildings (2), so that the internal volume of the building can be greatly increased.
Furthermore, since it is possible to connect the new pillars (8) erected on the outside of the plurality of buildings (2) through the new structure (4), long span beams are not required. The building strength can be sufficiently secured.

上記した第一及び第二実施形態において、上層階部分(6)(11)を形成した後、既設建物(1)の一部又は全てを撤去し、この撤去された空間に、新規構造物(4)(9)と一体となる新たな新規構造物を構築することも可能である。
この場合において、既設建物(1)が撤去された空間に構築される新たな新規構造物と、新規構造物(4)(9)は、外壁及び建物内部の両方において一体化される。
また、既設建物(1)の一部を撤去する場合、渡り廊下(3)のみ(一部又は全部)を撤去することもできるし、複数の建物(2)のみ(一部又は全部)を撤去することもできる。
In the first and second embodiments described above, after the upper floor portion (6) (11) is formed, a part or all of the existing building (1) is removed, and a new structure ( 4) It is also possible to construct a new new structure integrated with (9).
In this case, the new new structure constructed in the space from which the existing building (1) is removed and the new structures (4) and (9) are integrated both on the outer wall and inside the building.
Moreover, when removing a part of an existing building (1), it is possible to remove only a part of the passage (3) (part or all), or remove only a part (all or part) of a plurality of buildings (2). You can also.

図8は、第一実施形態の増築方法において、既設建物(1)を撤去しなかった場合の縦断面図、即ち図4の縦断面図である。
一方、図9は、第一実施形態の増築方法において、図3に示した状態まで施工した後、既設建物(1)の渡り廊下(3)の一部(両端の渡り廊下)を撤去して、この撤去された空間に、新規構造物(4)と一体となる新たな新規構造物を構築することにより得られた増築建物(12)の縦断面図である。
また、図10は、第一実施形態の増築方法において、図4に示した状態まで施工した後、既設建物(1)の渡り廊下(3)の全部を撤去して、この撤去された空間に、新規構造物(4)と一体となる新たな新規構造物を構築することにより得られた増築建物(12)の縦断面図である。
FIG. 8 is a longitudinal sectional view in the case where the existing building (1) is not removed in the extension method of the first embodiment, that is, a longitudinal sectional view of FIG.
On the other hand, FIG. 9 shows the extension method of the first embodiment, after the construction to the state shown in FIG. 3, after removing a part of the passage (3) of the existing building (1) (the passage corridors at both ends) It is a longitudinal cross-sectional view of the extension building (12) obtained by building the new new structure united with the new structure (4) in the removed space.
Moreover, FIG. 10 is the extension method of 1st embodiment, after constructing to the state shown in FIG. 4, after removing all the corridors (3) of the existing building (1), in this removed space, It is a longitudinal cross-sectional view of the extension building (12) obtained by building a new new structure united with a new structure (4).

更に、図11は、第二実施形態において、図7に示した状態まで施工した後、既設建物(1)の全部を撤去して、この撤去された空間に、新規構造物(4)と一体となる新たな新規構造物を構築することにより得られた増築建物(12)の外観図を示している。   Further, FIG. 11 shows that in the second embodiment, after the construction to the state shown in FIG. 7 is completed, the entire existing building (1) is removed, and the new structure (4) is integrated into the removed space. The external view of the extension building (12) obtained by constructing | assembling the new novel structure which becomes will be shown.

このように、上層階部分を形成した後、既設建物の一部又は全てを撤去し、この撤去された空間に新規構造物と一体となる新たな新規構造物を構築することにより、既設建物が老朽化している場合には、建物全体の耐震強度を大きく高めることが可能となる。
尚、本発明において、既設建物の一部又は全てを撤去する場合、撤去される部分の居住者等は撤去前に新規構造物へと移動すればよい。
In this way, after forming the upper floor part, the existing building is removed by removing a part or all of the existing building and constructing a new structure that is integrated with the new structure in the removed space. When it is aged, it is possible to greatly increase the seismic strength of the entire building.
In the present invention, when a part or all of an existing building is to be removed, a resident or the like of the part to be removed may be moved to a new structure before the removal.

尚、図1乃至図11においては、新しく得られる増築建物(12)と既設建物(1)の平面位置が、建物(2)の桁行方向(渡り廊下に対して直角方向)について略同じ位置となっているが、本発明においては異ならせてもよい。
異ならせる場合には、増築建物(12)を、既設建物(1)と同じ長さで位置をずらして形成してもよいし、既設建物(1)と異なる長さで位置をずらして形成してもよい。
図12は、後者の場合を示しており、第一実施形態において、建物(2)の桁行方向において、増築建物(12)を既設建物(1)よりも短くなって、既設建物(1)と位置をずらして形成している。
図13は、前者の場合を示しており、第二実施形態において、建物(2)の桁行方向において、増築建物(12)を既設建物(1)と同じ長さで、既設建物(1)と位置をずらして形成している。
In FIG. 1 to FIG. 11, the newly obtained extension building (12) and the existing building (1) are in the same plane position in the direction of the building (2) (perpendicular to the corridor). However, it may be different in the present invention.
When different, the extension building (12) may be formed by shifting the position with the same length as the existing building (1), or by shifting the position with a different length from the existing building (1). May be.
FIG. 12 shows the latter case. In the first embodiment, the extension building (12) is shorter than the existing building (1) in the direction of the row of the building (2), and the existing building (1) The position is shifted.
FIG. 13 shows the former case. In the second embodiment, the extension building (12) has the same length as the existing building (1) in the direction of the line of the building (2), and the existing building (1) The position is shifted.

本発明においては、図12及び図13に示すように、新しく得られる増築建物(12)と既設建物(1)の平面位置をずらして形成した場合においても、その後に既設建物の一部又は全てを撤去し、この撤去された空間に新規構造物と一体となる新たな新規構造物を構築することができる。
図14は、図12に示した状態まで施工した後、既設建物(1)の全てを撤去し、この撤去された空間に新規構造物と一体となる新たな新規構造物を構築することにより完成した増築建物(12)を示す外観図である。
この場合、増築建物(12)は、新規構造物(4)(9)と、既設建物(1)が撤去された空間に構築される新たな新規構造物とが、外壁及び建物内部の両方において一体化されたものである。
In the present invention, as shown in FIGS. 12 and 13, even when the newly obtained extension building (12) and the existing building (1) are formed by shifting the plane positions, a part or all of the existing building is subsequently formed. Can be removed and a new structure integrated with the new structure can be constructed in the removed space.
FIG. 14 is completed by constructing a new structure that is integrated with the new structure in the removed space after the existing building (1) is removed after the construction shown in FIG. It is an external view which shows the added extension building (12).
In this case, the extension building (12) includes a new structure (4) (9) and a new structure constructed in the space where the existing building (1) has been removed, both on the outer wall and inside the building. It is integrated.

以上説明した本発明に係る増築方法が適用される既設建物の種類は特に限定されないが、学校の校舎には複数の建物が渡り廊下により接続された構造を有するものが多く存在しているため、本発明の適用対象として特に好適である。   The type of the existing building to which the extension method according to the present invention described above is applied is not particularly limited, but many school buildings have a structure in which a plurality of buildings are connected by a crossing corridor. It is particularly suitable as an application object of the invention.

本発明は、複数の建物が渡り廊下により接続された構造を有する既設建物を増築するために利用され、例えば学校建築物の増築に対して好適に利用されるものである。   The present invention is used for extending an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, and is preferably used for, for example, extension of a school building.

本発明に係る増築方法を工程順に示す外観図であり、施工前の状態を示している(第一及び第二実施形態共通図)。It is an external view which shows the extension method which concerns on this invention in order of a process, and has shown the state before construction (the 1st and 2nd embodiment common figure). 本発明に係る増築方法を工程順に示す外観図であり、施工途中の状態を示している(第一及び第二実施形態共通図)。It is an external view which shows the extension method which concerns on this invention in process order, and has shown the state in the middle of construction (1st and 2nd embodiment common figure). 本発明に係る増築方法を工程順に示す外観図であり、施工途中の状態を示している(第一及び第二実施形態共通図)。It is an external view which shows the extension method which concerns on this invention in process order, and has shown the state in the middle of construction (1st and 2nd embodiment common figure). 本発明に係る増築方法を工程順に示す外観図であり、第一実施形態における施工完了の状態を示している。It is an external view which shows the extension method which concerns on this invention in process order, and has shown the state of construction completion in 1st embodiment. 本発明に係る増築方法を工程順に示す外観図であり、第二実施形態における施工途中の状態を示している。It is an external view which shows the extension method which concerns on this invention in order of a process, and has shown the state in the middle of construction in 2nd embodiment. 本発明に係る増築方法を工程順に示す外観図であり、第二実施形態における施工途中の状態を示している。It is an external view which shows the extension method which concerns on this invention in order of a process, and has shown the state in the middle of construction in 2nd embodiment. 本発明に係る増築方法を工程順に示す外観図であり、第二実施形態における施工完了の状態を示している。It is an external view which shows the extension method which concerns on this invention in order of a process, and has shown the state of construction completion in 2nd embodiment. 第一実施形態の増築方法において、既設建物を撤去しなかった場合の縦断面図、即ち図4の縦断面図である。FIG. 5 is a longitudinal sectional view when an existing building is not removed in the extension method of the first embodiment, that is, a longitudinal sectional view of FIG. 4. 第一実施形態の増築方法において、図3に示した状態まで施工した後、既設建物の渡り廊下の一部を撤去して、この撤去された空間に、新規構造物と一体となる新たな新規構造物を構築することにより得られた増築建物の縦断面図である。In the extension method of the first embodiment, after the construction to the state shown in FIG. 3, a part of the transit hallway of the existing building is removed, and a new new structure integrated with the new structure in the removed space. It is a longitudinal cross-sectional view of the extension building obtained by building a thing. 第一実施形態の増築方法において、図4に示した状態まで施工した後、既設建物の渡り廊下の全部を撤去して、この撤去された空間に、新規構造物と一体となる新たな新規構造物を構築することにより得られた増築建物の縦断面図である。In the extension method of the first embodiment, after the construction to the state shown in FIG. 4 is completed, the entire passageway of the existing building is removed, and a new new structure integrated with the new structure in the removed space. It is a longitudinal cross-sectional view of the extension building obtained by constructing. 第二実施形態において、図7に示した状態まで施工した後、既設建物の全部を撤去して、この撤去された空間に、新規構造物と一体となる新たな新規構造物を構築することにより得られた増築建物の外観図である。In the second embodiment, after the construction shown in FIG. 7 is completed, the entire existing building is removed, and a new structure that is integrated with the new structure is built in the removed space. It is an external view of the obtained extension building. 第一実施形態において、建物の桁行方向において、増築建物を既設建物よりも短くなって、既設建物と位置をずらして形成した例を示す外観図である。In 1st embodiment, it is an external view which shows the example which formed the extension building shorter than the existing building, and shifted from the existing building in the crossing direction of the building. 第二実施形態において、建物の桁行方向において、増築建物を既設建物と同じ長さで、既設建物と位置をずらして形成した例を示す外観図である。In 2nd embodiment, it is an external view which shows the example which formed the extension building with the same length as the existing building, and shifted the position with the existing building in the row direction of the building. 図12に示した状態まで施工した後、既設建物の全てを撤去し、この撤去された空間に新規構造物と一体となる新たな新規構造物を構築することにより完成した増築建物を示す外観図である。After construction to the state shown in FIG. 12, all the existing buildings are removed, and an external view showing an extension building completed by constructing a new structure integrated with the new structure in the removed space It is.

符号の説明Explanation of symbols

1 既設建物
2 複数の建物
3 渡り廊下
4 渡り廊下を挟んだ両側位置に構築される新規構造物
5 渡り廊下に挟まれた空間
6 渡り廊下の上方の上層階部分
7 渡り廊下を跨ぐ梁
8 新規柱
9 複数の建物の外側に構築される新規構造物
10 新規柱と上層階部分を連結する梁
11 複数の建物の上方の上層階部分
12 増築建物
DESCRIPTION OF SYMBOLS 1 Existing building 2 Several buildings 3 Crossing corridor 4 New structure constructed on both sides across the crossing corridor 6 Space sandwiched by the crossing corridor 7 Upper floor part above the crossing corridor 7 Beam 8 straddling the crossing corridor New pillar 9 Multiple buildings New structure 10 constructed on the outside of the building Beam 11 connecting the new pillar and upper floor part 11 Upper floor part 12 above the multiple buildings Extension building

Claims (6)

複数の建物が渡り廊下により接続された構造を有する既設建物の増築方法であって、前記渡り廊下を挟んだ両側位置に既設建物の階数よりも1階以上高い上層階部分を有する新規構造物を夫々構築するとともに、これら新規構造物の上層階部分同士を前記渡り廊下を跨ぐように連結することにより、該渡り廊下の上方にも上層階部分を形成することを特徴とする既設建物の増築方法。   A method of extending an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, each of which has a new structure having an upper floor part higher than the number of floors of the existing building on both sides across the crossing corridor In addition, by connecting the upper floor portions of these new structures so as to straddle the crossing corridor, an upper floor portion is also formed above the crossing corridor, and an extension method of an existing building is characterized. 既設建物が互いに略平行に設けられた複数の渡り廊下を有し、該複数の渡り廊下に挟まれた空間に前記新規構造物の少なくとも1つを構築することを特徴とする請求項1記載の既設建物の増築方法。   The existing building according to claim 1, wherein the existing building has a plurality of passageways provided substantially parallel to each other, and at least one of the new structures is constructed in a space sandwiched between the plurality of passageways. Extension method. 前記複数の建物の外側に前記上層階部分と同じ高さまで至る新規柱を立設し、該新規柱と前記上層階部分とを梁により連結することにより、前記複数の建物の上方にも上層階部分を形成することを特徴とする請求項1又は2記載の既設建物の増築方法。   A new pillar extending up to the same height as the upper floor portion is erected on the outside of the plurality of buildings, and the new pillar and the upper floor portion are connected by a beam, so that the upper floor is also above the plurality of buildings. The method for extending an existing building according to claim 1, wherein a part is formed. 前記複数の渡り廊下が3つ以上の渡り廊下からなり、両端以外に位置する渡り廊下の少なくとも1つを撤去した後、この撤去された空間に前記新規構造物の少なくとも1つを構築することを特徴とする請求項2又は3記載の既設建物の増築方法。   The plurality of passageways are composed of three or more passageways, and after removing at least one of the passageways located at positions other than both ends, at least one of the new structures is constructed in the removed space. The method for extending an existing building according to claim 2 or 3. 前記上層階部分を形成した後、既設建物の一部又は全てを撤去し、この撤去された空間に、前記新規構造物と一体となる新たな新規構造物を構築することを特徴とする請求項1乃至4いずれかに記載の既設建物の増築方法。   After forming the upper floor part, a part or all of an existing building is removed, and a new new structure integrated with the new structure is constructed in the removed space. 5. A method for expanding an existing building according to any one of 1 to 4. 複数の建物が渡り廊下により接続された構造を有する既設建物を増築することにより得られる建物であって、請求項1乃至5いずれかに記載の方法により増築された建物。   6. A building obtained by extending an existing building having a structure in which a plurality of buildings are connected by a crossing corridor, and is extended by the method according to any one of claims 1 to 5.
JP2006070182A 2006-03-15 2006-03-15 Existing building extending method and building extended according to the method Pending JP2007247202A (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2006070182A JP2007247202A (en) 2006-03-15 2006-03-15 Existing building extending method and building extended according to the method
RU2008122780/03A RU2008122780A (en) 2006-03-15 2007-03-12 METHOD FOR EXTENDING AN EXISTING BUILDING AND BUILDING EXTENDED WITH THIS METHOD
CNA2007800064285A CN101389819A (en) 2006-03-15 2007-03-12 Existing building extending method and building extended according to the method
PCT/JP2007/054831 WO2007105690A1 (en) 2006-03-15 2007-03-12 Method of expanding existing building and building expanded by the method
BRPI0708869-8A BRPI0708869A2 (en) 2006-03-15 2007-03-12 Expansion Method of an Existing Building and a Building Expanded by the Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006070182A JP2007247202A (en) 2006-03-15 2006-03-15 Existing building extending method and building extended according to the method

Publications (1)

Publication Number Publication Date
JP2007247202A true JP2007247202A (en) 2007-09-27

Family

ID=38509510

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006070182A Pending JP2007247202A (en) 2006-03-15 2006-03-15 Existing building extending method and building extended according to the method

Country Status (5)

Country Link
JP (1) JP2007247202A (en)
CN (1) CN101389819A (en)
BR (1) BRPI0708869A2 (en)
RU (1) RU2008122780A (en)
WO (1) WO2007105690A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478706A (en) * 2022-09-05 2022-12-16 中建八局第三建设有限公司 Construction method for widening corridor with cantilever structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806448B (en) * 2012-11-12 2016-01-13 深圳市工勘岩土工程有限公司 Foundation pit reinforced concrete horizontal struts system column replacing structure and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61130566A (en) * 1984-11-30 1986-06-18 株式会社竹中工務店 Enlargement of rooftop while existing building is operated
JPH0593464A (en) * 1991-10-01 1993-04-16 Yutaka Komuro Extending method for sectionally owned apartment house with selectable propriety of extension
JP2004353209A (en) * 2003-05-27 2004-12-16 Miracle Three Corporation Three-dimensional land readjustment method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0230854A (en) * 1988-07-18 1990-02-01 Shimizu Corp Method for reconstructing multistoried building
JP2600489B2 (en) * 1990-05-18 1997-04-16 鹿島建設株式会社 Super high-rise building
JPH06323001A (en) * 1993-05-14 1994-11-22 Shimizu Corp Extension and reconstruction of building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61130566A (en) * 1984-11-30 1986-06-18 株式会社竹中工務店 Enlargement of rooftop while existing building is operated
JPH0593464A (en) * 1991-10-01 1993-04-16 Yutaka Komuro Extending method for sectionally owned apartment house with selectable propriety of extension
JP2004353209A (en) * 2003-05-27 2004-12-16 Miracle Three Corporation Three-dimensional land readjustment method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478706A (en) * 2022-09-05 2022-12-16 中建八局第三建设有限公司 Construction method for widening corridor with cantilever structure

Also Published As

Publication number Publication date
WO2007105690A1 (en) 2007-09-20
CN101389819A (en) 2009-03-18
BRPI0708869A2 (en) 2011-06-14
RU2008122780A (en) 2010-04-20

Similar Documents

Publication Publication Date Title
JP4933621B2 (en) Building structure
JP2008115567A (en) Seismic-control reinforcing method for building, and building with seismic-control reinforcing structure
KR100805732B1 (en) Building structure using modular unit
JP2007270598A (en) Structural wall
JP6339923B2 (en) How to build a building frame
JP2007247202A (en) Existing building extending method and building extended according to the method
JP5711897B2 (en) Seismic strengthening method and seismic strengthening frame for existing buildings
KR100633471B1 (en) The simultaneous construction method of upper ? lower stories&#39; frame, and the construction method of structure with cleanrooms thereof
JP3571914B2 (en) Building unit structure and method of manufacturing the same
KR102044986B1 (en) Modular unit and modular unit assembly for building
JP2007170085A (en) Omitted column unit garage
JP4772308B2 (en) How to build a unit building
JP6816941B2 (en) Foundation structure of seismic isolated building
JP5096979B2 (en) Reinforcement structure of ramen structure
JPS6314937A (en) Reinforcing bar composite pillar
KR100733837B1 (en) The plural story - one node precast concrete column and construction method using it
JP4193708B2 (en) Steel concrete composite floor
JP7243008B2 (en) Buildings and building construction methods
JP7229857B2 (en) building construction method
JP6108829B2 (en) Building, building construction method, and building seismic isolation method
JP5200962B2 (en) Underground wall structure, underground structure
JP7307600B2 (en) building
JP2000328652A (en) Multi-story building
JP4012197B2 (en) Building extension method and building constructed by this method
JP5541520B2 (en) Underground construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080722

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20090331

A131 Notification of reasons for refusal

Effective date: 20100525

Free format text: JAPANESE INTERMEDIATE CODE: A131

RD04 Notification of resignation of power of attorney

Effective date: 20100525

Free format text: JAPANESE INTERMEDIATE CODE: A7424

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100528

A02 Decision of refusal

Effective date: 20101004

Free format text: JAPANESE INTERMEDIATE CODE: A02