JP2007231518A - Curing method for lining concrete for tunnel, molded by using travelling form - Google Patents

Curing method for lining concrete for tunnel, molded by using travelling form Download PDF

Info

Publication number
JP2007231518A
JP2007231518A JP2006050924A JP2006050924A JP2007231518A JP 2007231518 A JP2007231518 A JP 2007231518A JP 2006050924 A JP2006050924 A JP 2006050924A JP 2006050924 A JP2006050924 A JP 2006050924A JP 2007231518 A JP2007231518 A JP 2007231518A
Authority
JP
Japan
Prior art keywords
lining concrete
curing
water
concrete
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006050924A
Other languages
Japanese (ja)
Other versions
JP4559373B2 (en
Inventor
Kazunori Mizote
一憲 溝手
Minoru Ono
稔 小野
Hidemasa Saka
英昌 坂
Masaomi Watase
将臣 渡瀬
Masao Nishimura
正生 西村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP2006050924A priority Critical patent/JP4559373B2/en
Publication of JP2007231518A publication Critical patent/JP2007231518A/en
Application granted granted Critical
Publication of JP4559373B2 publication Critical patent/JP4559373B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To prevent lining concrete from being cracked because the temperature of the lining concrete drops due to cooling by water or vapor for use in curing. <P>SOLUTION: The curing method for the lining concrete for the tunnel, which is molded by using a travelling form, comprises a first step of curing the lining concrete without adding moisture, after the removal of forms, and a second step of curing the lining concrete by adding the moisture. The first step is performed by covering a lining concrete surface with an impermeable sheet, and the second step is performed by supplying the water or the vapor to the lining concrete surface. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、移動式型枠を用いて成形されたトンネルの覆工コンクリートの養生方法に関する。   The present invention relates to a method for curing tunnel lining concrete formed using a mobile formwork.

移動式型枠を用いて覆工コンクリートの成形を行うトンネルでは、前記トンネルの掘削に伴って前記移動式型枠を移動させるため、通常、前記覆工コンクリートの打込みの約20時間後という比較的早い時期に脱型を行う。このため、脱型後、養生を行わずに前記覆工コンクリートを放置すると、前記覆工コンクリートは比較的早く乾燥するため、前記覆工コンクリートの水和反応が十分に行われなかったり、前記覆工コンクリートの乾燥収縮によるひび割れが発生する。そこで、脱型後、前記覆工コンクリートの乾燥を防止するために水または蒸気のような湿気を与えて前記覆工コンクリートの養生を行う。   In a tunnel in which lining concrete is formed using a mobile formwork, the mobile formwork is moved along with the excavation of the tunnel. Demold early. For this reason, after leaving the mold, if the lining concrete is left without being cured, the lining concrete dries relatively quickly, so that the hydration reaction of the lining concrete is not sufficiently performed, Cracking occurs due to drying shrinkage of the engineered concrete. Therefore, after demolding, the covering concrete is cured by applying moisture such as water or steam to prevent the covering concrete from drying.

移動式型枠を用いて成形されたトンネルの覆工コンクリートの従来の養生方法には、散水することにより前記覆工コンクリートの表面に水を供給するもの、前記覆工コンクリートの表面に透水性マットを密着させ、該透水性マットを経て前記覆工コンクリートの表面に水を供給するもの(特許文献1参照)、前記覆工コンクリートの表面に蒸気を供給するもの(特許文献2参照)がある。
特開平10−102773号公報 特開2000−73696号公報
A conventional curing method for tunnel lining concrete formed using a mobile formwork is to supply water to the surface of the lining concrete by spraying water, and a water-permeable mat on the surface of the lining concrete. And supplying water to the surface of the lining concrete through the water-permeable mat (see Patent Document 1) and supplying water to the surface of the lining concrete (see Patent Document 2).
Japanese Patent Laid-Open No. 10-102773 JP 2000-73696 A

ところで、前記覆工コンクリートの温度は、前記覆工コンクリートの打込み後、水和反応により上昇し、前記覆工コンクリートの打込みの約12時間後ないし約26時間後に最も高くなる。すなわち、脱型時の前記覆工コンクリートの温度は最も高い。このため、脱型後、すぐに湿気を与えて前記覆工コンクリートの養生を行うと、前記覆工コンクリートは、養生に用いる水または蒸気により冷却され、前記覆工コンクリートの温度は、前記覆工コンクリートに湿気を与えない場合と比較して非常に速く低下する。これにより、前記覆工コンクリートにひび割れが発生し、前記覆工コンクリートの品質を低下させるという問題が生じる。   By the way, the temperature of the lining concrete rises due to a hydration reaction after the lining concrete is placed, and becomes the highest after about 12 hours to about 26 hours after the placing of the lining concrete. That is, the temperature of the lining concrete at the time of demolding is the highest. For this reason, when the lining concrete is cured immediately after demolding, the lining concrete is cooled by water or steam used for curing, and the temperature of the lining concrete is determined by the temperature of the lining concrete. It drops very quickly compared to the case where moisture is not given to concrete. This causes a problem that cracking occurs in the lining concrete and the quality of the lining concrete is deteriorated.

本発明の目的は、養生に用いる水または蒸気による冷却により前記覆工コンクリートの温度が低下することに起因する前記覆工コンクリートのひび割れの発生を防止することである。   An object of the present invention is to prevent the occurrence of cracks in the lining concrete resulting from a decrease in the temperature of the lining concrete due to cooling with water or steam used for curing.

本発明は、湿気を与えて前記覆工コンクリートの養生を行うことに先立ち、湿気を与えないで前記覆工コンクリートの養生を行うことを特徴とする。   The present invention is characterized by curing the lining concrete without applying moisture prior to curing the lining concrete with moisture.

本発明に係る、移動式型枠を用いて成形されたトンネルの覆工コンクリートの養生方法は、脱型後、湿気を与えないで前記覆工コンクリートの養生を行う第1ステップと、湿気を与えて前記覆工コンクリートの養生を行う第2ステップとを含む。これにより、湿気を与えないで前記覆工コンクリートの養生を行う間に、水または蒸気により前記覆工コンクリートを冷却させることなく、前記覆工コンクリートの温度を時間をかけて低下させることができる。前記第1ステップを行う期間は約24時間ないし約96時間とし、前記第2ステップを行う期間は少なくとも約48時間とすることができる。   According to the present invention, a method for curing a lining concrete for a tunnel formed using a mobile formwork includes a first step of curing the lining concrete without dehumidification after demolding, and applying moisture. And a second step of curing the lining concrete. Thereby, the temperature of the lining concrete can be lowered over time without cooling the lining concrete with water or steam while curing the lining concrete without applying moisture. The period for performing the first step may be about 24 hours to about 96 hours, and the period for performing the second step may be at least about 48 hours.

前記第1ステップは、前記覆工コンクリートの表面を非透水性シートで覆うことにより行うことができる。前記非透水性シートで前記覆工コンクリートの表面を覆うことにより前記覆工コンクリートの表面から水分を逃がさないようにし、前記覆工コンクリートの乾燥を防止することができる。前記第2ステップは、前記覆工コンクリートの表面に水を供給することにより行うことができる。この場合、前記覆工コンクリートの表面に透水性マットを密着させ、該透水性マットを経て前記覆工コンクリートの表面に水を供給してもよいし、散水することにより前記覆工コンクリートの表面に水を供給してもよい。また、前記第2ステップは、前記覆工コンクリートの表面に蒸気を供給することにより行うこともできる。   The first step can be performed by covering the surface of the lining concrete with a water-impermeable sheet. By covering the surface of the lining concrete with the water-impermeable sheet, moisture can be prevented from escaping from the surface of the lining concrete, and drying of the lining concrete can be prevented. The second step can be performed by supplying water to the surface of the lining concrete. In this case, a water-permeable mat may be brought into close contact with the surface of the lining concrete, and water may be supplied to the surface of the lining concrete through the water-permeable mat, or by spraying water on the surface of the lining concrete. Water may be supplied. The second step can also be performed by supplying steam to the surface of the lining concrete.

本発明によれば、湿気を与えて前記覆工コンクリートの養生を行うことに先立ち、湿気を与えないで前記覆工コンクリートの養生を行うことによって、養生に用いる水または蒸気による冷却により前記覆工コンクリートの温度が低下することに起因する前記覆工コンクリートのひび割れの発生を防止することができる。   According to the present invention, prior to curing the lining concrete by applying moisture, curing the lining concrete without applying moisture, thereby cooling the lining by cooling with water or steam used for curing. Generation | occurrence | production of the crack of the said lining concrete resulting from the temperature of concrete falling can be prevented.

図1に示すように、移動式型枠10を用いて成形されたトンネル12の覆工コンクリート14の養生のための養生設備16は、湿気を与えないで覆工コンクリート14の養生を行う第1の養生装置18と、湿気を与えて覆工コンクリート14の養生を行う第2の養生装置20とを備える。   As shown in FIG. 1, the curing equipment 16 for curing the lining concrete 14 of the tunnel 12 formed by using the movable mold 10 is a first method for curing the lining concrete 14 without applying moisture. And a second curing device 20 for curing the lining concrete 14 by applying moisture.

第1の養生装置18は、図2に示すように、第1の台車22と、該第1の台車に固定された第1のフレーム24と、該第1のフレームに連結されたシート受台26と、該シート受台に取り付けられた非透水性シート28とを備える。   As shown in FIG. 2, the first curing device 18 includes a first carriage 22, a first frame 24 fixed to the first carriage, and a seat pedestal connected to the first frame. 26 and a water-impermeable sheet 28 attached to the sheet cradle.

第1の台車22は、それぞれがトンネル12の軸線方向に伸びる一対の第1台車桁22a、22bと、それぞれが一方の第1台車桁22aに取り付けられた複数の第1車輪22cと、それぞれが他方の第1台車桁22bに取り付けられた複数の第2車輪22dとを有する。第1車輪22cは第1のレール30a上を移動し、第2車輪22dは第2のレール30b上を移動する。各レール30a、30bは、トンネル12のインバート部12aに設けられた底部コンクリート12b上に設置されている。   The first carriage 22 includes a pair of first carriage girders 22a and 22b each extending in the axial direction of the tunnel 12, and a plurality of first wheels 22c each attached to one first carriage girder 22a. And a plurality of second wheels 22d attached to the other first bogie beam 22b. The first wheel 22c moves on the first rail 30a, and the second wheel 22d moves on the second rail 30b. The rails 30 a and 30 b are installed on the bottom concrete 12 b provided in the invert portion 12 a of the tunnel 12.

第1のフレーム24は、それぞれが一対の柱32a、32bおよび該柱を連結する横桁32cからなる複数の第1フレーム部材32を有する。各第1フレーム部材32は、第1の台車22上に配置され、一方の柱32aは一方の第1台車桁22aに固定され、他方の柱24bは他方の第1台車桁22bに固定されている。   The first frame 24 includes a plurality of first frame members 32 each including a pair of columns 32a and 32b and a cross beam 32c connecting the columns. Each first frame member 32 is disposed on the first carriage 22, one column 32 a is fixed to one first carriage beam 22 a, and the other column 24 b is fixed to the other first carriage beam 22 b. Yes.

シート受台26は、覆工コンクリート14の表面形状に対応する形状を有し、トンネル12の軸線に沿って配置された複数の上方に凸状の第1アーチ桁26aと、それぞれが該第1アーチ桁に連結された、トンネル12の軸線方向に伸びる複数の第1水平桁26bとを備える。各第1アーチ桁26aは、各第1フレーム部材32に固定されている。第1のフレーム24は、各第1アーチ桁26aの固定を強固にするために、それぞれの一端が第1フレーム部材32の1つに連結され、他端が第1アーチ桁26aの1つに連結された複数の第1固定部材24aを備えることができる。   The sheet pedestal 26 has a shape corresponding to the surface shape of the lining concrete 14, and a plurality of upwardly convex first arch girders 26 a arranged along the axis of the tunnel 12, each of which is the first A plurality of first horizontal girders 26b connected to the arch girder and extending in the axial direction of the tunnel 12; Each first arch girder 26 a is fixed to each first frame member 32. The first frame 24 has one end connected to one of the first frame members 32 and the other end connected to one of the first arch girders 26a in order to firmly fix the first arch girders 26a. A plurality of coupled first fixing members 24a can be provided.

非透水性シート28は、覆工コンクリート14の表面を覆うようにシート受台26上に配置され、アーチ桁26aまたは第1水平桁26bに固縛して固定されている。非透水性シート28はビニルシートとすることができる。   The water-impermeable sheet 28 is disposed on the sheet receiving base 26 so as to cover the surface of the lining concrete 14, and is fixed and fixed to the arch girder 26a or the first horizontal girder 26b. The water-impermeable sheet 28 can be a vinyl sheet.

また、図1に示した例では、第1の養生装置18は、トンネル12の軸線に沿って間隔を置いて配置された第1の閉塞手段34および第2の閉塞手段36であって、非透水性シート28のトンネル12の軸線方向における一端部と覆工コンクリート14との隙間を閉塞する第1の閉塞手段34と、非透水性シート28の他端部と覆工コンクリート14との隙間を閉塞する第2の閉塞手段36とを備える。   Further, in the example shown in FIG. 1, the first curing device 18 is a first closing means 34 and a second closing means 36 arranged at intervals along the axis of the tunnel 12, A first closing means 34 for closing a gap between one end portion of the water permeable sheet 28 in the axial direction of the tunnel 12 and the lining concrete 14, and a gap between the other end portion of the water-impermeable sheet 28 and the lining concrete 14. Second closing means 36 for closing.

第1の閉塞手段34は、非透水性シート28の前記一端部を覆工コンクリート14に押し付けるゴム製の第1バルーン34aであり、第2の閉塞手段36は、非透水性シート28の前記他端部を覆工コンクリート14に押し付けるゴム製の第2バルーン36aである。第1バルーン34aは、非透水性シート28の前記一端部と、非透水性シート28の前記一端部の下方に位置するアーチ桁26a’との間に配置され、該アーチ桁に固定されている。第2バルーン36aは、非透水性シート28の前記他端部と、非透水性シート28の前記他端部の下方に位置するアーチ桁26a”との間に配置され、該アーチ桁に固定されている。   The first closing means 34 is a first balloon 34 a made of rubber that presses the one end portion of the water-impermeable sheet 28 against the lining concrete 14, and the second closing means 36 is the other of the water-impermeable sheet 28. This is a second balloon 36 a made of rubber that presses the end against the lining concrete 14. The first balloon 34 a is disposed between the one end portion of the water-impermeable sheet 28 and the arch girder 26 a ′ located below the one end portion of the water-impermeable sheet 28, and is fixed to the arch beam. . The second balloon 36a is disposed between the other end portion of the water-impermeable sheet 28 and the arch girder 26a "positioned below the other end portion of the water-impermeable sheet 28, and is fixed to the arch beam. ing.

非透水性シート28の各端部と覆工コンクリート14との隙間の閉塞は、例えば、非透水性シート28の各端部を釘のような固定手段(図示せず)にて覆工コンクリート14に固定することによって行うこともできる。このように第1、第2の閉塞手段34、36を用いない場合、第1の養生装置18は、第1、第2の閉塞手段34、36を有しなくてもよい。   The gap between the end portions of the water-impermeable sheet 28 and the lining concrete 14 is blocked by, for example, fixing the end portions of the water-impermeable sheet 28 with fixing means (not shown) such as a nail. It can also be carried out by fixing to. Thus, when not using the 1st, 2nd obstruction | occlusion means 34 and 36, the 1st curing device 18 does not need to have the 1st and 2nd obstruction | occlusion means 34 and 36. FIG.

第2の養生装置20は、図3に示すように、第2の台車38と、該第2の台車に固定された第2のフレーム42と、該第2のフレームに連結されたマット受台44と、該マット受台に取り付けられた透水性マット46と、第2の台車38を昇降させる昇降手段40とを備える。   As shown in FIG. 3, the second curing device 20 includes a second carriage 38, a second frame 42 fixed to the second carriage, and a mat base connected to the second frame. 44, a water-permeable mat 46 attached to the mat base, and an elevating means 40 for raising and lowering the second carriage 38.

第2の台車38は、第1の台車22と同様、それぞれがトンネル12の軸線方向に伸びる一対の第2台車桁38a、38bと、それぞれが一方の第2台車桁38aに取り付けられた複数の第3車輪38cと、それぞれが他方の第2台車桁38bに取り付けられた複数の第4車輪38dとを有する(図1)。第3車輪38cは第1のレール30a上を移動し、第4車輪38dは第2のレール30b上を移動する。   Similarly to the first carriage 22, the second carriage 38 includes a pair of second carriage girders 38a and 38b each extending in the axial direction of the tunnel 12, and a plurality of second carriage girders 38a each attached to one second carriage girder 38a. It has the 3rd wheel 38c and the some 4th wheel 38d each attached to the other 2nd bogie beam 38b (FIG. 1). The third wheel 38c moves on the first rail 30a, and the fourth wheel 38d moves on the second rail 30b.

昇降手段40は、トンネル12の横断方向に間隔を置いて配置された第1ジャッキ40aおよび第2ジャッキ40bを有する。第1ジャッキ40aは、その一端が一方の第2台車桁38aに固定され、他端が地面に向けられており、第2ジャッキ40bは、その一端が他方の第2台車桁38bに固定され、他端が地面に向けられている。第1ジャッキ40aおよび第2ジャッキ40bは、透水性マット46を覆工コンクリート14の表面に密着させまたは密着を解除するのに使用される。   The elevating means 40 has a first jack 40 a and a second jack 40 b that are arranged at intervals in the transverse direction of the tunnel 12. One end of the first jack 40a is fixed to one second carriage girder 38a and the other end is directed to the ground, and one end of the second jack 40b is fixed to the other second carriage girder 38b, The other end is directed to the ground. The first jack 40 a and the second jack 40 b are used to bring the water-permeable mat 46 into close contact with the surface of the lining concrete 14 or release the close contact.

第2のフレーム42は、第1のフレーム24と同様、それぞれが一対の柱48a、48bおよび該柱を連結する横桁48cからなる複数の第2フレーム部材48を有する。各第2フレーム部材48は、第2の台車38上に配置され、一方の柱48aは一方の第2台車桁38aに固定され、他方の柱48bは他方の第1台車桁38bに固定されている。   Similar to the first frame 24, the second frame 42 includes a plurality of second frame members 48 each including a pair of columns 48 a and 48 b and a cross beam 48 c connecting the columns. Each second frame member 48 is disposed on the second carriage 38, one column 48a is fixed to one second carriage beam 38a, and the other column 48b is fixed to the other first carriage beam 38b. Yes.

マット受台44は、覆工コンクリート14の表面形状に対応する形状を有し、トンネル12の軸線に沿って配置された複数の上方に凸状の第2アーチ桁50と、それぞれが該第2アーチ桁に連結された、トンネル12の軸線方向に伸びる複数の第2水平桁52とを備える。各第2アーチ桁50は、各第2フレーム部材48に固定されている。第2のフレーム42は、各第2アーチ桁50の固定を強固にするために、それぞれの一端が第2フレーム部材48の1つに連結され、他端が第2アーチ桁50の1つに連結された複数の第2固定部材42aを備えることができる。   The mat cradle 44 has a shape corresponding to the surface shape of the lining concrete 14, and a plurality of upwardly projecting second arch girders 50 arranged along the axis of the tunnel 12, each of which is the second. And a plurality of second horizontal girders 52 connected to the arch girder and extending in the axial direction of the tunnel 12. Each second arch girder 50 is fixed to each second frame member 48. The second frame 42 has one end connected to one of the second frame members 48 and the other end connected to one of the second arch girders 50 in order to firmly fix the second arch girders 50. A plurality of second fixing members 42a connected may be provided.

また、マット受台44は、トンネル12のアーチ部12cの形状に対応する形状を有する頂部50aと、該頂部の一端に枢着された、トンネル12の第1の側壁部12dの形状に対応する形状を有する第1の側部50bと、頂部50aの他端に枢着された、トンネル12の第2の側壁部12eの形状に対応する形状を有する第2の側部50cとを有する。   The mat support 44 corresponds to the shape of the top portion 50a having a shape corresponding to the shape of the arch portion 12c of the tunnel 12 and the shape of the first side wall portion 12d of the tunnel 12 pivotally attached to one end of the top portion. The first side portion 50b has a shape, and the second side portion 50c has a shape corresponding to the shape of the second side wall portion 12e of the tunnel 12 and is pivotally attached to the other end of the top portion 50a.

第2の養生装置20は、トンネル12の横断方向に間隔を置いて配置された、第1の側部50bを頂部50aに関して回転させる第1の回転手段54および第2の側部50cを頂部50aに関して回転させる第2の回転手段56を有する。第1の回転手段54は、一端が第1の側部50bに連結され、他端が第2のフレーム42の一方の柱48aに連結された第3ジャッキ54aであり、第2の回転手段56は、一端が第2の側部50cに連結され、他端が第2のフレーム42の他方の柱38bに連結された第4ジャッキ56aである。   The second curing device 20 includes a first rotation means 54 and a second side portion 50c, which are spaced apart in the transverse direction of the tunnel 12 and rotate with respect to the top portion 50a. Second rotating means 56 for rotating with respect to. The first rotating means 54 is a third jack 54 a having one end connected to the first side portion 50 b and the other end connected to one pillar 48 a of the second frame 42, and the second rotating means 56. Is a fourth jack 56 a having one end connected to the second side portion 50 c and the other end connected to the other column 38 b of the second frame 42.

第3ジャッキ54aおよび第4ジャッキ56aは、昇降手段40とともに透水性マット46を覆工コンクリート14の表面に密着させまたは密着を解除するのに使用される。透水性マット46の密着および密着の解除が昇降手段40による第2の台車38の昇降のみによって行われる場合、マット受台44の各側部50b、50cは、頂部50aに剛に結合され、第2の養生装置20は、第1、第2の回転手段54、56を有しなくてもよい。   The third jack 54a and the fourth jack 56a are used for bringing the water permeable mat 46 into close contact with the surface of the lining concrete 14 together with the lifting means 40 or releasing the close contact. When the close contact of the water permeable mat 46 and the release of the close contact are performed only by the lifting and lowering of the second carriage 38 by the lifting and lowering means 40, the side portions 50b and 50c of the mat receiving base 44 are rigidly coupled to the top portion 50a, The second curing device 20 may not have the first and second rotating means 54 and 56.

透水性マット46は、覆工コンクリート14の表面を覆うように配置され、第2アーチ桁50または第2水平桁52にクランプのような固定手段(図示せず)により固定されている。透水性マット46は、図4に示すように、覆工コンクリート14の表面に密着させる不織布のような透水性シート46aと、該透水性シートに取り付けられた、トンネル12の軸線方向に伸びる穴付き給水管46bと、透水性シート46aが接着された合板46cとを有する。給水管46bは、透水性マット46の最も高い位置に配置されており、給水管46bによって供給された水は、該給水管の穴46b’を経て透水性シート46aに供給され、その後、流れ落ちつつ透水性シート46aを経て覆工コンクリート14の表面に供給される。覆工コンクリート14の表面への給水量を多くするために、透水性マット46は、給水管46bに加え、他の複数の給水管(図示せず)を備えることができる。   The water permeable mat 46 is disposed so as to cover the surface of the lining concrete 14, and is fixed to the second arch girder 50 or the second horizontal girder 52 by a fixing means (not shown) such as a clamp. As shown in FIG. 4, the water permeable mat 46 has a water permeable sheet 46 a such as a non-woven fabric to be in close contact with the surface of the lining concrete 14, and a hole attached to the water permeable sheet and extending in the axial direction of the tunnel 12. It has a water supply pipe 46b and a plywood 46c to which a water-permeable sheet 46a is bonded. The water supply pipe 46b is disposed at the highest position of the water permeable mat 46, and the water supplied by the water supply pipe 46b is supplied to the water permeable sheet 46a through the hole 46b 'of the water supply pipe, and then flows down. It is supplied to the surface of the lining concrete 14 through the water permeable sheet 46a. In order to increase the amount of water supplied to the surface of the lining concrete 14, the water-permeable mat 46 can include a plurality of other water supply pipes (not shown) in addition to the water supply pipe 46b.

図5に示す例では、第2の養生装置58は、マット受台44、透水性マット46および昇降手段40を有する図3の例に代え、それぞれが先端に散水ノズル60を備えた複数の配管62を有する。散水ノズル60は、覆工コンクリート14の表面に散水するのに使用される。配管62は、第2のフレーム42に連結された取付部材64に固定されている。配管62の数は、覆工コンクリート14の表面への給水量に応じて変更することができる。   In the example shown in FIG. 5, the second curing device 58 is replaced with the example of FIG. 62. The watering nozzle 60 is used for watering the surface of the lining concrete 14. The pipe 62 is fixed to an attachment member 64 connected to the second frame 42. The number of the pipes 62 can be changed according to the amount of water supplied to the surface of the lining concrete 14.

図6に示す例では、第2の養生装置66は、配管62を有する図5の例に代え、複数の加湿機68を有する。加湿機68は、第2のフレーム42に連結された取付部材64に固定されており、覆工コンクリート14の表面に蒸気を供給するのに使用される。また、第2の養生装置66は、覆工コンクリート14の表面の湿潤状態を効率よく維持するために、覆工コンクリート14の表面を覆うカバー70を備えることができる。この場合、加湿機68は、カバー70と覆工コンクリート14との間に配置されている。カバー70は、覆工コンクリート14の表面形状に対応する形状を有するカバー受台72に固定され、カバー受台72は、第2のフレーム42に連結されている。カバー70は、ビニルシートのような非透水性シートとすることができる。   In the example shown in FIG. 6, the second curing device 66 has a plurality of humidifiers 68 instead of the example of FIG. The humidifier 68 is fixed to an attachment member 64 connected to the second frame 42 and is used to supply steam to the surface of the lining concrete 14. Further, the second curing device 66 can include a cover 70 that covers the surface of the lining concrete 14 in order to efficiently maintain the wet state of the surface of the lining concrete 14. In this case, the humidifier 68 is disposed between the cover 70 and the lining concrete 14. The cover 70 is fixed to a cover cradle 72 having a shape corresponding to the surface shape of the lining concrete 14, and the cover cradle 72 is connected to the second frame 42. The cover 70 can be a water-impermeable sheet such as a vinyl sheet.

図1に示した例では、第1の養生装置18の長さ74は、移動式型枠10の長さ、すなわち一度に打込みを行う覆工コンクリート14の長さである10.5mとし、第2の養生装置20の長さ76は、第1の養生装置18の長さ74の2倍である21.0mとする。図示の例では、第2の養生装置20は、それぞれが同じ長さを有する前半部78および後半部80を有する。前半部78および後半部80は、連結部材82により連結されている。   In the example shown in FIG. 1, the length 74 of the first curing device 18 is 10.5 m, which is the length of the mobile formwork 10, that is, the length of the lining concrete 14 to be driven at a time. The length 76 of the second curing device 20 is 21.0 m, which is twice the length 74 of the first curing device 18. In the illustrated example, the second curing device 20 has a front half 78 and a rear half 80 each having the same length. The front half 78 and the rear half 80 are connected by a connecting member 82.

覆工コンクリート14の養生を行うとき、図1に示すように、まず、第1の養生装置18を移動式型枠10のトンネル12の掘削方向における後方(図面左方)に配置し、ワイヤーロープのような連結手段84により移動式型枠10に連結する。次に、第1の養生装置18の後方(図面左方)に第2の養生装置20を配置する。   When curing the lining concrete 14, as shown in FIG. 1, first, the first curing device 18 is arranged behind the movable mold 10 in the excavation direction of the tunnel 12 (left side of the drawing), and the wire rope It connects with the movable formwork 10 by the connection means 84 like this. Next, the second curing device 20 is disposed behind the first curing device 18 (left side of the drawing).

移動式型枠10により覆工コンクリート14の第1の部分を成形し、脱型した後、移動式型枠10をその長さ分だけ前方(図面右方)へ移動させることによって、第1の養生装置18を前記第1の部分の位置に移動させる。これにより、第1の養生装置18の非透水性シート28は、前記第1の部分に配置される。第1の養生装置18の移動は、移動式型枠10によるほか、トラックのような牽引用車両(図示せず)を用いてもよい。   The first part of the lining concrete 14 is formed by the movable mold 10, and after the mold is removed, the movable mold 10 is moved forward (to the right in the drawing) by the length, thereby the first part. The curing device 18 is moved to the position of the first part. Thereby, the water-impermeable sheet 28 of the 1st curing apparatus 18 is arrange | positioned in the said 1st part. The movement of the first curing device 18 may be performed by a towing vehicle (not shown) such as a truck in addition to the movable mold 10.

次に、前記第1の部分の表面から水分を逃がさないように非透水性シート28の周縁部と前記第1の部分との隙間を塞ぐ。非透水性シート28の周縁部のうち、トンネル12の軸線方向における2つの端部の閉塞は、第1バルーン34aおよび第2バルーン36aのそれぞれに空気を注入し、第1バルーン34aで非透水性シート28の一端部を、第2バルーン36aで非透水性シート28の他端部を前記第1の部分に押し付けることにより行う(図1)。また、図2に示すように、トンネル12の周方向における2つの端部の閉塞は、複数の木材のような錘86を載せて非透水性シート28の各端部を前記第1の部分または底部コンクリート12bに押さえ付けることにより行う。このようにして前記第1の部分の表面を透水性シート28で覆う。この状態で、湿気を与えないで前記第1の部分の養生を行う。   Next, the gap between the peripheral edge of the water-impermeable sheet 28 and the first portion is closed so as not to allow moisture to escape from the surface of the first portion. Of the peripheral edge of the water-impermeable sheet 28, the two end portions in the axial direction of the tunnel 12 are blocked by injecting air into each of the first balloon 34a and the second balloon 36a. One end portion of the sheet 28 is performed by pressing the other end portion of the water-impermeable sheet 28 against the first portion with the second balloon 36a (FIG. 1). As shown in FIG. 2, the two ends in the circumferential direction of the tunnel 12 are blocked by placing weights 86 such as a plurality of woods on the respective ends of the water-impermeable sheet 28 in the first portion or This is done by pressing against the bottom concrete 12b. In this way, the surface of the first portion is covered with the water permeable sheet 28. In this state, the first portion is cured without applying moisture.

湿気を与えないで前記第1の部分の養生を行う間、透水性シート28により前記第1の部分の表面をトンネル12内を流れる空気から隔離することによって前記第1の部分の乾燥を防止しつつ、前記第1の部分の温度を時間をかけて低下させることができる。前記第1の部分の乾燥を防止することによって、前記第1の部分に強度を発揮させる効果を高めることができる。また、前記第1の部分の温度を低下させることによって、後に水や蒸気を与えて前記第1の部分を養生するときに前記水や前記蒸気によって前記第1の部分が冷却されるのを防ぐことができる。これにより、前記水や前記蒸気による冷却によって前記第1の部分にひび割れが発生するのを防止することができる。前記第1の部分の温度を十分に低下させるために、湿気を与えないで前記第1の部分を養生する期間は、少なくとも約24時間とするのが望ましい。   During the curing of the first part without applying moisture, the surface of the first part is isolated from the air flowing through the tunnel 12 by the water permeable sheet 28 to prevent the drying of the first part. However, the temperature of the first portion can be lowered over time. By preventing drying of the first part, the effect of exerting strength on the first part can be enhanced. Further, by lowering the temperature of the first part, when the first part is cured by applying water or steam later, the first part is prevented from being cooled by the water or the steam. be able to. Thereby, it can prevent that a crack generate | occur | produces in the said 1st part by the cooling by the said water or the said steam. In order to sufficiently reduce the temperature of the first part, it is desirable that the period of curing the first part without applying moisture is at least about 24 hours.

第1の養生装置18により前記第1の部分の養生を行う間、移動式型枠10により覆工コンクリート14の第2の部分の成形を行う。移動式型枠10による前記第2の部分の成形を終えた後、前記第1の部分の成形を終えたときと同様、移動式型枠10の長さ分だけ移動式型枠10および第1の養生装置18を移動させる。   While the first portion is cured by the first curing device 18, the second portion of the lining concrete 14 is molded by the movable mold 10. After the molding of the second part by the movable mold 10, the movable mold 10 and the first part corresponding to the length of the movable mold 10 are the same as when the molding of the first part is finished. The curing device 18 is moved.

次に、第1の養生装置18による養生を終えた前記第1の部分に第2の養生装置20の前半部78が配置されるように第2の養生装置20を移動させる。第2の養生装置20の移動は、トラックのような牽引用車両(図示せず)で牽引することにより行う。第2の養生装置20の牽引に要する力が比較的小さいときは、第2の養生装置20を第1の養生装置18に連結し、第2の養生装置20を第1の養生装置18とともに移動させてもよい。また、第2の養生装置20の移動は、第3ジャッキ54aおよび第4ジャッキ56aを縮め、第2の台車38を下降させた状態で行う。   Next, the second curing device 20 is moved so that the first half 78 of the second curing device 20 is arranged in the first part after the curing by the first curing device 18 is completed. The second curing device 20 is moved by towing with a towing vehicle (not shown) such as a truck. When the force required to pull the second curing device 20 is relatively small, the second curing device 20 is connected to the first curing device 18 and the second curing device 20 is moved together with the first curing device 18. You may let them. The movement of the second curing device 20 is performed in a state where the third jack 54a and the fourth jack 56a are contracted and the second carriage 38 is lowered.

第2の養生装置20を移動させた後、第1ジャッキ40aおよび第2ジャッキ40bにより第2の台車38を上昇させる(図3)。このとき、各ジャッキ44a、44bが各レール30a、30bに接触しないように、第1ジャッキ40aの下には、第1のレール30aを跨ぐように底部コンクリート12b上に置かれた逆コの字状の第1の台座88を配置し、第2ジャッキ40bの下には、第2のレール30bを跨ぐように底部コンクリート12b上に置かれた逆コの字状の第2の台座90を配置する。第2の台車38の上昇は、第1ジャッキ40aが第1の台座88を介して底部コンクリート12bからの反力を受け、第2ジャッキ40bが第2の台座90を介して底部コンクリート12bからの反力を受けることによって行う。   After the second curing device 20 is moved, the second carriage 38 is raised by the first jack 40a and the second jack 40b (FIG. 3). At this time, an inverted U-shape placed on the bottom concrete 12b under the first jack 40a so as to straddle the first rail 30a so that the jacks 44a, 44b do not contact the rails 30a, 30b. A first pedestal 88 is disposed, and a second U-shaped second pedestal 90 placed on the bottom concrete 12b so as to straddle the second rail 30b is disposed under the second jack 40b. To do. When the second carriage 38 rises, the first jack 40a receives a reaction force from the bottom concrete 12b via the first pedestal 88, and the second jack 40b passes from the bottom concrete 12b via the second pedestal 90. This is done by receiving a reaction force.

その後、マット受台44の第1の側部50bをトンネル12の第1の側壁部12dに向けて回転させるように第3ジャッキ54aを伸ばし、マット受台44の第2の側部50cをトンネル12の第2の側壁部12eに向けて回転させるように第4ジャッキ56aを伸ばす。このように、第2の台車38の上昇と、マット受台44の第1、第2の側部50b、50cの回転とにより、透水性マット46を前記第1の部分の表面に密着させる。   Thereafter, the third jack 54a is extended so as to rotate the first side portion 50b of the mat base 44 toward the first side wall portion 12d of the tunnel 12, and the second side portion 50c of the mat base 44 is tunneled. The fourth jack 56a is extended so as to rotate toward the 12th second side wall portion 12e. Thus, the water-permeable mat 46 is brought into close contact with the surface of the first portion by the rising of the second carriage 38 and the rotation of the first and second side portions 50b and 50c of the mat receiving base 44.

透水性マット46を前記第1の部分の表面に密着させた後、透水性マット46の給水管46bに水を供給する。給水管46bによって供給された水は、該給水管の穴46b’を経て透水性シート46aに供給され、その後、透水性シート46aを経て前記第1の部分の表面に供給される。前記第1の部分の表面に水を供給することによって、前記第1の部分の硬化を促進し、前記第1の部分に十分な強度を与えることができる。   After the water permeable mat 46 is brought into close contact with the surface of the first portion, water is supplied to the water supply pipe 46 b of the water permeable mat 46. The water supplied by the water supply pipe 46b is supplied to the water permeable sheet 46a through the hole 46b 'of the water supply pipe, and then supplied to the surface of the first portion through the water permeable sheet 46a. By supplying water to the surface of the first portion, curing of the first portion can be promoted, and sufficient strength can be given to the first portion.

第2の養生装置20の前半部78により前記第1の部分の養生を行う間に、第1の養生装置18により前記第2の部分の養生を行い、移動式型枠10により覆工コンクリート14の第3の部分の成形を行う。移動式型枠10による前記第3の部分の成形を終えた後、前記第2の部分の成形を終えたときと同様、移動式型枠10の長さ分だけ移動式型枠10、第1の養生装置18および第2の養生装置20を移動させる。   While the first portion 78 is cured by the first half portion 78 of the second curing device 20, the second portion is cured by the first curing device 18, and the lining concrete 14 is moved by the movable mold 10. The third part is molded. After the molding of the third part by the movable mold 10, the movable mold 10, the first is the same as the length of the movable mold 10 as in the case of the molding of the second part. The second curing device 18 and the second curing device 20 are moved.

第2の養生装置20を移動させるとき、第3ジャッキ54aおよび第4ジャッキ56aを縮め、第1ジャッキ40aおよび第2ジャッキ40bにより第2の台車38を下降させる。これにより透水性マット46の密着を解除する。   When the second curing device 20 is moved, the third jack 54a and the fourth jack 56a are contracted, and the second carriage 38 is lowered by the first jack 40a and the second jack 40b. Thereby, the adhesion of the water-permeable mat 46 is released.

第2の養生装置20の移動によって、第2の養生装置20の後半部80は、第2の養生装置20の前半部78による養生を終えた前記第1の部分に配置される。その後、第2の養生装置20の前半部78によるときと同様、第2の養生装置20の後半部80により湿度を与えて前記第1の部分の養生を行う。このようにして、第1の養生装置18および第2の養生装置20を順に移動させて覆工コンクリート14の養生を行う。   Due to the movement of the second curing device 20, the latter half 80 of the second curing device 20 is arranged in the first portion after the curing by the first half 78 of the second curing device 20. Thereafter, as with the first half portion 78 of the second curing device 20, the first portion is cured by applying humidity to the second half portion 80 of the second curing device 20. In this manner, the first curing device 18 and the second curing device 20 are sequentially moved to cure the lining concrete 14.

図示の例では、第2の養生装置20の長さは第1の養生装置18の長さの2倍であるため、第2の養生装置20による前記第1の部分の養生期間は、第1の養生装置18による前記第1の部分の養生期間の2倍となる。例えば、第1の養生装置18による前記第1の部分の養生期間が2日であるとき、第2の養生装置20による前記第1の部分の養生期間は4日である。このように、第1の養生装置18の長さと第2の養生装置20の長さとの比は、湿気を与えないで養生を行う期間と湿気を与えて養生を行う期間との比に相当する。よって、予め第1の養生装置18の長さと第2の養生装置20の長さとの比を湿気を与えないで行う養生に要する日数と湿気を与えて行う養生に要する日数との比とすることにより、効率的に覆工コンクリート14の養生を行うことができる。   In the illustrated example, since the length of the second curing device 20 is twice the length of the first curing device 18, the curing period of the first portion by the second curing device 20 is the first The curing period of the first portion by the curing device 18 is twice as long. For example, when the curing period of the first part by the first curing apparatus 18 is 2 days, the curing period of the first part by the second curing apparatus 20 is 4 days. Thus, the ratio between the length of the first curing device 18 and the length of the second curing device 20 corresponds to the ratio between the period for curing without applying moisture and the period for performing curing with moisture. . Therefore, the ratio between the length of the first curing device 18 and the length of the second curing device 20 is a ratio of the number of days required for curing performed without applying moisture to the number of days required for curing performed with moisture. Thus, the lining concrete 14 can be efficiently cured.

湿気を与えて行う養生には、透水性マット46を有する第2の養生装置20を用いる図1、3の例に代え、図5に示した、散水ノズル60を有する配管62を備えた第2の養生装置58を用いることができる。この場合、前記第1の部分の養生は、配管62に水を供給し、散水ノズル60を経て前記第1の部分の表面に散水することにより行う。また、湿気を与えて行う養生には、散水ノズル60を有する配管62を備えた第2の養生装置58を用いる図5の例に代え、図6に示した、加湿機68を有する第2の養生装置66を用いることができる。この場合、前記第1の部分の養生は、加湿機68により前記第1の部分の表面に蒸気を供給することにより行う。   For the curing performed by applying moisture, the second curing device 20 having the water permeable mat 46 is used instead of the example of FIGS. The curing device 58 can be used. In this case, the curing of the first part is performed by supplying water to the pipe 62 and spraying the surface of the first part through the watering nozzle 60. Further, for curing performed by applying moisture, the second curing device 58 having the humidifier 68 shown in FIG. 6 is used instead of the example of FIG. 5 using the second curing device 58 having the pipe 62 having the watering nozzle 60. A curing device 66 can be used. In this case, curing of the first part is performed by supplying steam to the surface of the first part by the humidifier 68.

湿気を与えないで覆工コンクリート14の養生を行った後、湿気を与えて覆工コンクリート14の養生を行う養生方法では、湿気を与えないで覆工コンクリート14の養生を行う間も覆工コンクリート14の乾燥を防止することができる。このため、覆工コンクリート14の水和反応を促進し、覆工コンクリート14に十分な強度を発揮させることができる。前記養生方法によるコンクリートに強度を発揮させる効果を確認した実験によると、前記養生方法によりコンクリートの養生を行うことによって、脱型せずに養生を行う場合と同等の圧縮強度を前記コンクリートに発揮させることができる。   In the curing method of curing the lining concrete 14 after curing the lining concrete 14 without applying moisture, the lining concrete is also performed while curing the lining concrete 14 without applying moisture. 14 can be prevented from drying. For this reason, the hydration reaction of the lining concrete 14 can be promoted, and the lining concrete 14 can exhibit sufficient strength. According to the experiment confirming the effect of exerting strength on the concrete by the curing method, the concrete is exhibited the compressive strength equivalent to the case of curing without demolding by curing the concrete by the curing method. be able to.

前記実験は、脱型後の養生方法が異なる3つのコンクリートの供試体を用いて行った。各供試体は、材齢2日で脱型し、第1供試体は、脱型後、養生を行わなかった。第2供試体は、脱型後、湿気を与えずに2日間の養生を行い、その後、湿気を与えて4日間の養生を行った。第3供試体は、脱型後、湿気を与えずに4日間の養生を行い、その後、湿気を与えて2日間の養生を行った。湿気を与えない養生は、コンクリートの表面をビニルシートで覆うことにより行い、湿気を与える養生は、前記コンクリートの表面に水を供給することにより行った。各供試体の大きさは、縦が30cm、横が30cm、高さが30cmである。   The experiment was performed using three concrete specimens with different curing methods after demolding. Each specimen was demolded at the age of 2 days, and the first specimen was not cured after demolding. The second specimen was cured for 2 days without dehumidification after demolding, and then cured for 4 days with moisture. The third specimen was cured for 4 days without dehumidification after demolding, and then cured for 2 days with moisture. Curing without applying moisture was performed by covering the surface of the concrete with a vinyl sheet, and curing with applying moisture was performed by supplying water to the surface of the concrete. The size of each specimen is 30 cm in length, 30 cm in width, and 30 cm in height.

前記実験では、材齢29日の各供試体の前記コンクリートの表面からの深さが0cmないし5cmの部分、5cmないし10cmの部分、10cmないし15cmの部分の圧縮強度を測定し、測定した値を標準強度と比較した。前記標準強度は、材齢28日まで脱型せずに養生したコンクリートの供試体の圧縮強度である。   In the experiment, the compressive strength of each of the specimens with a material age of 29 days from the surface of the concrete having a depth of 0 cm to 5 cm, a portion of 5 cm to 10 cm, and a portion of 10 cm to 15 cm was measured, and the measured value was Comparison with standard intensity. The standard strength is the compressive strength of a concrete specimen cured without demolding until the age of 28 days.

各供試体の各部分の圧縮強度の前記標準強度に対する比率を示す図7によると、第2供試体の前記比率の平均値は0.99であり、第3供試体の前記比率の平均値は1.06であり、第2供試体および第3供試体の圧縮強度は、前記標準強度とほぼ等しい。このように、湿気を与えないでコンクリートの養生を行った後、湿気を与えて前記コンクリートの養生を行う養生方法によって、前記コンクリートに十分な強度を発揮させることができる。他方、脱型後に養生を行わない第1供試体の圧縮強度は、前記標準強度に対して1割以上低いことから、前記養生方法によるコンクリートに強度を発揮させる効果は、脱型後に養生を行わない場合と比較して非常に大きいといえる。   According to FIG. 7 showing the ratio of the compressive strength of each part of each specimen to the standard strength, the average value of the ratio of the second specimen is 0.99, and the average value of the ratio of the third specimen is 1.06, and the compressive strength of the second specimen and the third specimen is substantially equal to the standard strength. As described above, after the concrete is cured without applying moisture, the concrete can exhibit sufficient strength by a curing method in which the concrete is cured by applying moisture. On the other hand, since the compressive strength of the first specimen that is not cured after demolding is 10% or more lower than the standard strength, the effect of exerting strength on the concrete by the curing method is performed after demolding. It can be said that it is very large compared to the case without it.

本発明によれば、湿気を与えて覆工コンクリート14の養生を行うことに先立ち、湿気を与えないで覆工コンクリート14の養生を行うことによって、覆工コンクリート14に水や蒸気を供給する前に覆工コンクリート14の温度を低下させることができる。これにより、前記水や前記蒸気による冷却により覆工コンクリート14の温度が低下することに起因する覆工コンクリート14のひび割れの発生を防止することができる。   According to the present invention, prior to supplying the moisture and steam to the lining concrete 14 by curing the lining concrete 14 without applying moisture prior to curing the lining concrete 14 by applying moisture. In addition, the temperature of the lining concrete 14 can be lowered. Thereby, generation | occurrence | production of the crack of the lining concrete 14 resulting from the temperature of the lining concrete 14 falling by the cooling by the said water or the said steam can be prevented.

本発明に係る養生設備が配置されたトンネルの縦断面図。The longitudinal cross-sectional view of the tunnel by which the curing equipment which concerns on this invention is arrange | positioned. 本発明に係る第1の養生装置の正面図。The front view of the 1st curing apparatus which concerns on this invention. 本発明の第1の実施例における第2の養生装置の正面図。The front view of the 2nd curing device in the 1st example of the present invention. 図3の線4における拡大図。FIG. 4 is an enlarged view of line 4 in FIG. 3. 本発明の第2の実施例における第2の養生装置の正面図。The front view of the 2nd curing device in the 2nd example of the present invention. 本発明の第3の実施例における第2の養生装置の正面図。The front view of the 2nd curing device in the 3rd example of the present invention. 第1ないし第3供試体の圧縮強度の標準強度に対する比率。Ratio of the compressive strength of the first to third specimens to the standard strength.

符号の説明Explanation of symbols

10 移動式型枠
12 トンネル
14 覆工コンクリート
28 非透水性シート
46 透水性マット
DESCRIPTION OF SYMBOLS 10 Mobile formwork 12 Tunnel 14 Lining concrete 28 Water-impermeable sheet 46 Water-permeable mat

Claims (7)

移動式型枠を用いて成形されたトンネルの覆工コンクリートの養生方法であって、脱型後、湿気を与えないで前記覆工コンクリートの養生を行う第1ステップと、湿気を与えて前記覆工コンクリートの養生を行う第2ステップとを含む、トンネルの覆工コンクリートの養生方法。   A method for curing tunnel lining concrete formed using a mobile formwork, the first step of curing the lining concrete without dehumidification after demolding, and applying the moisture to cover the lining concrete. A method for curing tunnel lining concrete, comprising a second step of curing the concrete. 前記第1ステップを行う期間は、約24時間ないし約96時間であり、前記第2ステップを行う期間は、少なくとも約48時間である、請求項1に記載のトンネルの覆工コンクリートの養生方法。   2. The method of curing tunnel lining concrete according to claim 1, wherein the period for performing the first step is about 24 hours to about 96 hours, and the period for performing the second step is at least about 48 hours. 前記第1ステップは、前記覆工コンクリートの表面を非透水性シートで覆うことによる、請求項1に記載のトンネルの覆工コンクリートの養生方法。   The method for curing tunnel lining concrete according to claim 1, wherein the first step is to cover the surface of the lining concrete with a water-impermeable sheet. 前記第2ステップは、前記覆工コンクリートの表面に水を供給することによる、請求項1に記載のトンネルの覆工コンクリートの養生方法。   The method of curing tunnel lining concrete according to claim 1, wherein the second step is to supply water to the surface of the lining concrete. 前記第2ステップは、前記覆工コンクリートの表面に蒸気を供給することによる、請求項1に記載のトンネルの覆工コンクリートの養生方法。   The method of curing tunnel lining concrete according to claim 1, wherein the second step includes supplying steam to a surface of the lining concrete. 前記覆工コンクリートの表面に透水性マットを密着させ、該透水性マットを経て前記覆工コンクリートの表面に水を供給する、請求項4に記載のトンネルの覆工コンクリートの養生方法。   The lining concrete curing method for a tunnel according to claim 4, wherein a water-permeable mat is adhered to the surface of the lining concrete, and water is supplied to the surface of the lining concrete through the water-permeable mat. 散水することにより前記覆工コンクリートの表面に水を供給する、請求項4に記載のトンネルの覆工コンクリートの養生方法。

The method for curing tunnel lining concrete according to claim 4, wherein water is supplied to the surface of the lining concrete by sprinkling water.

JP2006050924A 2006-02-27 2006-02-27 Curing method for tunnel lining concrete formed using mobile formwork Active JP4559373B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006050924A JP4559373B2 (en) 2006-02-27 2006-02-27 Curing method for tunnel lining concrete formed using mobile formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006050924A JP4559373B2 (en) 2006-02-27 2006-02-27 Curing method for tunnel lining concrete formed using mobile formwork

Publications (2)

Publication Number Publication Date
JP2007231518A true JP2007231518A (en) 2007-09-13
JP4559373B2 JP4559373B2 (en) 2010-10-06

Family

ID=38552388

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006050924A Active JP4559373B2 (en) 2006-02-27 2006-02-27 Curing method for tunnel lining concrete formed using mobile formwork

Country Status (1)

Country Link
JP (1) JP4559373B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009127322A (en) * 2007-11-26 2009-06-11 Fukuda Corp Curing method of lining concrete and curing member thereof
JP2010084387A (en) * 2008-09-30 2010-04-15 Takenaka Doboku Co Ltd Apparatus and method for curing concrete continuous body
JP2013049963A (en) * 2011-08-30 2013-03-14 Sumitomo Mitsui Construction Co Ltd Curing device for tunnel lining concrete
JP2019085783A (en) * 2017-11-08 2019-06-06 大成建設株式会社 Curing formwork structure and construction method of tunnel lining
CN117780391A (en) * 2024-02-26 2024-03-29 洛阳腾誉隧道机械有限公司 Tunnel lining trolley

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0634095U (en) * 1992-09-30 1994-05-06 株式会社間組 Lining curing device
JPH10102773A (en) * 1996-09-26 1998-04-21 Ohbayashi Corp Wet curing device for concrete
JP2000073696A (en) * 1998-08-28 2000-03-07 Ohbayashi Corp Method and apparatus for curing lining concrete
JP2005054384A (en) * 2003-08-06 2005-03-03 Shimizu Corp Curing method of lining concrete by lining center
JP2005090146A (en) * 2003-09-19 2005-04-07 Nishimatsu Constr Co Ltd Curing method and curing balloon of lining concrete
JP2005188241A (en) * 2003-12-26 2005-07-14 Shimizu Corp Concrete curing device
JP2006291690A (en) * 2005-03-17 2006-10-26 Shimizu Corp Lining concrete curing equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0634095U (en) * 1992-09-30 1994-05-06 株式会社間組 Lining curing device
JPH10102773A (en) * 1996-09-26 1998-04-21 Ohbayashi Corp Wet curing device for concrete
JP2000073696A (en) * 1998-08-28 2000-03-07 Ohbayashi Corp Method and apparatus for curing lining concrete
JP2005054384A (en) * 2003-08-06 2005-03-03 Shimizu Corp Curing method of lining concrete by lining center
JP2005090146A (en) * 2003-09-19 2005-04-07 Nishimatsu Constr Co Ltd Curing method and curing balloon of lining concrete
JP2005188241A (en) * 2003-12-26 2005-07-14 Shimizu Corp Concrete curing device
JP2006291690A (en) * 2005-03-17 2006-10-26 Shimizu Corp Lining concrete curing equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009127322A (en) * 2007-11-26 2009-06-11 Fukuda Corp Curing method of lining concrete and curing member thereof
JP2010084387A (en) * 2008-09-30 2010-04-15 Takenaka Doboku Co Ltd Apparatus and method for curing concrete continuous body
JP2013049963A (en) * 2011-08-30 2013-03-14 Sumitomo Mitsui Construction Co Ltd Curing device for tunnel lining concrete
JP2019085783A (en) * 2017-11-08 2019-06-06 大成建設株式会社 Curing formwork structure and construction method of tunnel lining
CN117780391A (en) * 2024-02-26 2024-03-29 洛阳腾誉隧道机械有限公司 Tunnel lining trolley
CN117780391B (en) * 2024-02-26 2024-04-30 洛阳腾誉隧道机械有限公司 Tunnel lining trolley

Also Published As

Publication number Publication date
JP4559373B2 (en) 2010-10-06

Similar Documents

Publication Publication Date Title
JP4559373B2 (en) Curing method for tunnel lining concrete formed using mobile formwork
JP4722728B2 (en) Curing equipment for curing concrete lining in tunnels molded using mobile formwork
KR101939101B1 (en) A water permeability sidewalk-block manufacturing apparatus having a drainage hole and a drainage groove and a plurality of colors
CN105736016A (en) Tunnel secondary lining steel bar framework construction equipment and application thereof
US3523997A (en) Method of curing elongated concrete articles
CN105803946A (en) Quickly adjustable bracket for cap beam and construction method of quickly adjustable bracket for cap beam
CN106088588A (en) A kind of cast-in-situ stair is closed formwork erecting structure and pours in down a chimney the construction of concrete
JP6966853B2 (en) How to place concrete on an inclined surface and mobile formwork equipment
KR101206519B1 (en) Girder making method using moving apparatus and girder support device, the girder and bridge construction method using the same
KR102451260B1 (en) Clamp for sidewalk block manufacturing apparatus
JP2011190594A (en) Moving type arch center, curing device, lining concrete construction system, and construction method for lining concrete
CN106049878B (en) A kind of flooring concrete construction tamping equipment and vibrating method
JP7045004B2 (en) Construction method of tunnel lining body and formwork for tunnel lining concrete
DK2138289T3 (en) Process for producing a long-slatted grating element
JP7125056B2 (en) Tunnel repair method
JP5461867B2 (en) Curing method for tunnel lining concrete
JP5349992B2 (en) Curing system and curing method
JP6941537B2 (en) Construction method of curing formwork structure and tunnel lining body
JP6669524B2 (en) Invert concrete construction equipment
CN207988487U (en) The constructing device of diameter Silo conical shell
JP3569688B2 (en) Seedling raising system and its construction method
KR101827383B1 (en) Pipe support
JP7248258B2 (en) Tunnel repair method
CN215825581U (en) Soft mattress production line
JP2008149606A (en) Curing method of concrete product

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081114

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100707

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100720

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100722

R150 Certificate of patent or registration of utility model

Ref document number: 4559373

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130730

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350