JP2006273483A - Load hoisting device for self-propelled crane - Google Patents

Load hoisting device for self-propelled crane Download PDF

Info

Publication number
JP2006273483A
JP2006273483A JP2005093716A JP2005093716A JP2006273483A JP 2006273483 A JP2006273483 A JP 2006273483A JP 2005093716 A JP2005093716 A JP 2005093716A JP 2005093716 A JP2005093716 A JP 2005093716A JP 2006273483 A JP2006273483 A JP 2006273483A
Authority
JP
Japan
Prior art keywords
sheave
load
additional
block
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005093716A
Other languages
Japanese (ja)
Other versions
JP4822395B2 (en
Inventor
Junji Saito
淳司 斎藤
Nobuaki Kaida
展彰 買田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kato Heavy Industries Construction Machinery Co Ltd
Original Assignee
Ishikawajima Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Construction Machinery Co Ltd filed Critical Ishikawajima Construction Machinery Co Ltd
Priority to JP2005093716A priority Critical patent/JP4822395B2/en
Publication of JP2006273483A publication Critical patent/JP2006273483A/en
Application granted granted Critical
Publication of JP4822395B2 publication Critical patent/JP4822395B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To simplify a structure and facilitate installation/removal by increasing the number of sheaves of a top sheave only when a load hoisting device is used in the vicinity of crane maximum hoisting load without installing additional sheaves on a regular basis. <P>SOLUTION: This load hoisting device 16A comprises the top sheave 11 which is provided at a tip of a boom 5 journaled to an upper turning body 4 of a self-propelled crane 1 to be capable of rising/falling and in which a plurality of rope sheaves are arranged on a support shaft 11a; and a hook block 13 suspended from the top sheave 11 via a large number of hoisting ropes 8. An additional sheave block 16 is detachably attached to and suspended from one end or both ends of the support shaft 11a of the top sheave 11 projecting to a side face of a boom top 7. The hoisting ropes 8 wound around between the top sheave 11 and a sheave 14 of the hock block 13 are also wound around an additional sheave 17 of the additional sheave block 16 to increase the number of the hoising ropes 8. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、自走式クレーンの荷重吊り上げ装置に係り、最大吊り上げ荷重付近の荷吊りと通常の低い荷重の荷吊りとに使い分け可能な自走式クレーンの荷重吊り上げ装置に関する。   The present invention relates to a load lifting device for a self-propelled crane, and more particularly to a load lifting device for a self-propelled crane that can be selectively used for lifting a load near a maximum lifting load and a normal low load.

自走式クレーンには、クローラ式のクレーンやトラック式のクレーンがある。   Self-propelled cranes include crawler cranes and truck cranes.

図8は特許文献1に開示されたクローラ式の自走式クレーンを示す側面図、図9(A)は同特許文献1に開示されたクレーンの最大吊り上げ荷重の50%以内の荷吊りを行なう場合の解説図、図9(B)は同特許文献1に開示されたクレーンの最大吊り上げ荷重の50%を超える荷吊りを行なう場合の解説図でる。 FIG. 8 is a side view showing the crawler type self-propelled crane disclosed in Patent Document 1, and FIG. 9A is used to lift the crane within 50% of the maximum lifting load of the crane disclosed in Patent Document 1. FIG. 9B is an explanatory diagram in the case of carrying a load that exceeds 50% of the maximum lifting load of the crane disclosed in Patent Document 1.

特開2000−118952号JP 2000-118952 A

図8において、aはクローラ式の自走式クレーンで、bはクローラ、cは下部走行体、dは上部旋回体、eはブームである。fはブームeの先端のブームトップである。gはライブマスト、hはハイマストで、ブーム角の調整のために上部旋回体dのブーム後方に軸支されている。ハイマストhはブームeの後方に前後回動可能に枢着された左右のアッパストラットiと、アッパストラットiの先端部j側を後方から支持する左右一対のバックステーkとから構成されている。mはペンダントロープで、ライブマストgの先端部とブームeの先端部とを連結している。nはライブマストgの先端部に枢着されたブライドル、oはアッパストラットiの先端部jに枢着されたベイルである。pはブーム起伏ロープで、ブライドルnとベイルoの各シーブの間に巻き回されて上部旋回体dのウインチqに接続されていて、ウインチqの巻き取り、繰り出しによってブーム角を調整する。rはブームeの先端に枢着された第1のトップシーブであり、sはガイドシーブである。t1、t2は巻き上げロープで、第1のトップシーブrおよびガイドシーブsに巻き回されて上部旋回体dのウインチu1、u2に接続されている。巻き上げロープt1、t2にはシーブwを介してフックブロックvが吊り下げられており、ウインチu1、u2の巻き取り、繰り出しによってフックブロックvを昇降させてフックyを昇降するようになっている。xは第1のトップシーブrを軸支するための支軸で、ブームeの先端に固着されたブームトップfにほぼ水平に固設されている。   In FIG. 8, a is a crawler type self-propelled crane, b is a crawler, c is a lower traveling body, d is an upper turning body, and e is a boom. f is the boom top at the tip of the boom e. g is a live mast, h is a high mast, and is pivotally supported behind the boom of the upper swing body d for adjusting the boom angle. The high mast h is composed of left and right upper trast i pivotally mounted to the rear of the boom e so as to be pivotable back and forth, and a pair of left and right back stays k that support the tip end j side of the upper trast i from the rear. m is a pendant rope that connects the tip of the live mast g and the tip of the boom e. n is a bridle pivotally attached to the tip of the live mast g, and o is a bail pivotally attached to the tip j of the uppastrat i. P is a boom hoisting rope, which is wound between the sheaves of the bridle n and the bail o and connected to the winch q of the upper swing body d, and adjusts the boom angle by winding and unwinding the winch q. r is a first top sheave pivotally attached to the tip of the boom e, and s is a guide sheave. t1 and t2 are hoisting ropes, wound around the first top sheave r and the guide sheave s, and connected to the winches u1 and u2 of the upper swing body d. A hook block v is suspended from the hoisting ropes t1 and t2 via a sheave w, and the hook block v is lifted and lowered by winding and unwinding the winches u1 and u2 to lift and lower the hook y. x is a support shaft for supporting the first top sheave r, and is fixed substantially horizontally to the boom top f fixed to the tip of the boom e.

通常、フックブロックvのシーブwの数は、クレーンaの吊り上げ荷重に対応して設定され、巻き上げロープt1、t2の強度は、フックブロックvのシーブ数に対応して決定される。また、トップシーブrの数は、フックブロックvのシーブ数によって決定される。クレーンaの使用状況は、一般にクレーン吊り上げ荷重の50%以下で使用されることが殆んどで、50%を超える荷吊りは殆んどされていない。   Usually, the number of sheaves w of the hook block v is set corresponding to the lifting load of the crane a, and the strength of the hoisting ropes t1 and t2 is determined corresponding to the number of sheaves of the hook block v. The number of top sheaves r is determined by the number of sheaves of the hook block v. In general, the crane a is used at 50% or less of the crane lifting load, and the load exceeding 50% is hardly used.

図8および図9(B)において、Aは第1のトップシーブrの支軸xの両端に吊り下げられたブラケットで、第1のトップシーブrと同数の第2のトップシーブCを備えたシーブブロックBを着脱可能に吊り下げている。Dはロープ係止部である。   In FIG. 8 and FIG. 9B, A is a bracket suspended at both ends of the support shaft x of the first top sheave r, and has the same number of second top sheaves C as the first top sheave r. The sheave block B is detachably suspended. D is a rope locking part.

上記ウインチu1、u2は、それぞれクレーン吊り上げ荷重の50%ずつを負担するように設置されている。また、第2のトップシーブCの数は、それぞれクレーン吊り上げ荷重の1/2を負担する数に設定されている。   The winches u1 and u2 are installed so as to bear 50% of the crane lifting load. The number of second top sheaves C is set to a number that bears half of the crane lifting load.

クレーン吊り上げ荷重の50%以下の荷吊りを行なうときは、図9(A)に示すように、ブームeにクレーン吊り上げ荷重の50%のフックブロックvを1基取り付け、第1のトップシーブrとフックブロックvのシーブwにウインチu1の巻き上げロープt1を巻き回して取り付け、巻き上げロープt1にフックブロックvを吊り上げて使用する。   When lifting 50% or less of the crane lifting load, as shown in FIG. 9A, one hook block v having 50% of the crane lifting load is attached to the boom e, and the first top sheave r The hoisting rope t1 of the winch u1 is wound around and attached to the sheave w of the hook block v, and the hook block v is lifted and used on the hoisting rope t1.

クレーン吊り上げ荷重の50%を超える荷吊りを行なうときは、図9(B)に示すように、支軸xの両端部に一対のブラケットAを取り付け、ブラケットAに第2のトップシーブCを有するシーブブロックBを吊り下げ、さらに、第1のトップシーブrの半数とシーブブロックBの第2のトップシーブCの半数を一対として、各対と各フックブロックvのシーブwとにそれぞれ各ウインチu1、u2の巻き上げロープt1、t2を巻き回して取り付けて使用する。   When carrying a load that exceeds 50% of the crane lifting load, as shown in FIG. 9B, a pair of brackets A are attached to both ends of the support shaft x, and the bracket A has a second top sheave C. The sheave block B is suspended. Further, a half of the first top sheave r and a half of the second top sheave C of the sheave block B are paired, and each winch u1 is connected to each pair and the sheave w of each hook block v. , U2 hoisting ropes t1 and t2 are wound and attached.

特許文献1に開示されたクローラ式の自走式クレーンでは、クレーン吊り上げ荷重の50%以下の荷吊りを行なうときと、クレーン吊り上げ荷重の50%を超える荷吊りを行なうときに区分し、50%を超える荷吊りを行なうときは、第1のトップシーブrの支軸xの両端に、第2のトップシーブCを有する一対のブラケットAを吊り下げて取り付け、第1のトップシーブrの半数とシーブブロックBの第2のトップシーブCの半数を一対として、各対と各フックブロックvのシーブwとにそれぞれ各ウインチu1、u2の巻き上げロープt1、t2を巻き回して使用するので、構造が複雑であるばかりか取り付け取り外しが難しく、ワイヤリングの関係上、特別のフックブロックを使用しなければならない。また、吊り上げ荷重の付近で使用する場合に、フックブロックを2個使用するので、トップシーブとフックブロックの荷重が大きくなり、その分吊り上げ荷重が小さくなるし、2つのフックに均等に荷重がかかるようにするためには、玉懸け作業がやっかいである。 The crawler type self-propelled crane disclosed in Patent Document 1 is divided into 50% or less when carrying a load of 50% or less of the crane lifting load and 50% or more of the crane lifting load. When hanging a load that exceeds the above, a pair of brackets A having the second top sheave C are attached to both ends of the support shaft x of the first top sheave r, and half of the first top sheave r is attached. Since half of the second top sheave C of the sheave block B is used as a pair, the hoists t1 and t2 of the winches u1 and u2 are wound around the pairs and the sheaves w of the hook blocks v, respectively. Not only is it complicated, it is difficult to attach and remove, and a special hook block must be used for wiring reasons. Also, when using near the lifting load, two hook blocks are used, so the load on the top sheave and the hook block increases, the lifting load decreases accordingly, and the two hooks are equally loaded. In order to do so, it is troublesome to work on the ball.

本発明は、従来技術のかかる問題点に鑑み案出されたものであり、常時は取り付けておかず、クレーン最大吊り上げ荷重の付近で使用するときだけトップシーブのシーブを増やすようにすることによって、構造が簡単で、取り付け取り外しが容易であるばかりか、ワイヤリングも単純な自走式クレーンの荷重吊り上げ装置を提供することを目的とする。 The present invention has been devised in view of such problems of the prior art, and is not always installed, but by increasing the sheave of the top sheave only when used near the crane maximum lifting load, It is an object of the present invention to provide a load lifting device for a self-propelled crane that is simple and easy to attach and detach, and also has a simple wiring.

上記目的を達成するため、本発明の自走式クレーンの荷重吊り上げ装置は、自走式クレーンの上部旋回体に起伏可能に軸支されたブームの先端に設けられ、複数のロープシーブを支軸上に並べて取り付けたトップシーブと、トップシーブから多条の巻き上げロープを介して吊り下げられたフックブロックを有してなる荷重吊り上げ装置であって、ブームトップの側面に突出したトップシーブの支軸の一端または両端に着脱可能に追加シーブブロックを吊り下げるように取り付け、トップシーブとフックブロックのシーブとの間で巻き回す巻き上げロープを追加シーブブロックの追加シーブにも巻き回して巻き上げロープの条数を増加するようにしたものである。   In order to achieve the above object, a load lifting device for a self-propelled crane according to the present invention is provided at the tip of a boom that is pivotably supported by an upper swing body of a self-propelled crane, and a plurality of rope sheaves are mounted on a support shaft. A load lifting device comprising a top sheave mounted side by side and a hook block suspended from the top sheave through a multi-row hoisting rope, wherein the support shaft of the top sheave protruding from the side of the boom top Attach the additional sheave block so that it is detachable at one or both ends, and wrap the hoisting rope that winds between the sheave of the top sheave and the hook block on the additional sheave of the additional sheave block to reduce the number of hoisting ropes It is intended to increase.

前記追加シーブブロックは、追加シーブを両側面で支持するシーブ支持部材の内の外側シーブ支持部材を上方に延伸させて、その上端に穿設した孔を上記トップシーブの支軸の端部に外嵌して固着し、内側シーブ支持部材と外側シーブ支持部材とは追加シーブの支軸、追加シーブの上方および下方の支持ピンによって固着されているものである。   The additional sheave block is formed by extending an outer sheave support member of a sheave support member that supports the additional sheave on both side surfaces upward, and removing a hole drilled at the upper end of the end sheave support shaft at the end of the support shaft of the top sheave. The inner sheave support member and the outer sheave support member are fixed by supporting shafts of the additional sheave and upper and lower support pins of the additional sheave.

次に本発明の作用を説明する。自走式クレーンにおいて、最大吊り上げ荷重付近で荷吊りを行うことは、作業半径も小さく不便であることもあって、めったにない。通常の低い荷重で荷吊りを行うときには、フックブロックも低荷重用のものを用い、トップシーブも追加シーブブロックのない状態で使用する。最大吊り上げ荷重で荷吊りを行うときには、フックブロックを最大吊り上げ荷重用のものに取り替えるとともに、トップシーブに追加シーブブロックを取り付け、巻き上げロープを両ブロックの間で巻き回す。   Next, the operation of the present invention will be described. In a self-propelled crane, it is rare to carry a load near the maximum lifting load because the working radius is small and inconvenient. When hanging with a normal low load, use a hook block for low load, and use the top sheave with no additional sheave block. When lifting with the maximum lifting load, replace the hook block with one for maximum lifting load, attach an additional sheave block to the top sheave, and wind the hoisting rope between both blocks.

本発明の自走式クレーンの荷重吊り上げ装置は、通常の作業ではほとんど使用せず、最大荷重付近の荷吊りのときしか使用しないシーブを、常時、ブームの先端に取り付けておくことは、ブームの先端が重くなってしまい、全体の吊り能力が低減してしまうので、最大荷重付近の荷吊りのときだけ追加シーブブロックを取り付けるようにして全体の荷吊り能力の向上が図れる。追加シーブブロックは、ブームトップの側面に突出したトップシーブの支軸の一端または両端に吊り下げるように取り付けたので、取り付け取り外しが容易である。また、巻き上げロープを追加シーブに巻き回して巻き上げロープの条数を増加するのも容易である。追加シーブは、外側支持部材の内側に支軸によってオーバーハングして支持されていて、追加シーブをトップシーブ側に接近させているので、巻き上げロープを追加シーブに巻き回す際にロープに無理な力がかからないし、強度的にも優れている。   The load lifting device for a self-propelled crane according to the present invention is rarely used in normal work, and a sheave that is used only when lifting near the maximum load is always attached to the tip of the boom. Since the tip becomes heavy and the overall suspension capacity is reduced, the entire load suspension capacity can be improved by attaching the additional sheave block only when the load is suspended near the maximum load. Since the additional sheave block is attached so as to be suspended from one end or both ends of the support shaft of the top sheave protruding from the side surface of the boom top, attachment and removal are easy. It is also easy to increase the number of hoisting ropes by winding the hoisting rope around an additional sheave. The additional sheave is supported by overhanging the support shaft inside the outer support member, and the additional sheave is moved closer to the top sheave, so that it is impossible to force the rope when winding the hoisting rope around the additional sheave. It does not take up and is superior in strength.

以下、本発明の最良の実施形態について図面を参照しつつ説明する。   Hereinafter, the best embodiment of the present invention will be described with reference to the drawings.

図1は本発明の自走式クレーンの荷重吊り上げ装置の側面図である。図2は図1のブーム先端の部分拡大図で、図1を裏側から見た図である。図3は図2のA−A矢視図である。図4(A)は図3の部分拡大図、(B)は図4(A)のA−A矢視図である。図5は最大荷重吊り上げ時のワイヤリングの説明用概略図である。図1ないし図5において、1はクローラ式の自走式クレーンである。2はクローラ、3は下部走行体、4は上部旋回体である。5は箱状の伸縮ブームで、ブーム5内に設けたブーム伸縮装置5bによって長手方向に伸縮可能になっている。ブーム5の最下段の下端部は、上部旋回体4に枢着していてブーム起伏装置(油圧シリンダ)6によって起伏可能になっている。7は最上段のブーム5aに設けたブームトップである。7aはブームトップ7に穿設したロープ係止孔で、追加シーブ17を使用しないときに使用する。8は巻き上げロープ、9は上部旋回体4に設けた巻き上げウインチである。10はブームトップ7の後側の上端に配設したガイドシーブ、10aは上部旋回体4に配設したガイドシーブである。11はブームトップ7の前側に配設したトップシーブである。11aはトップシーブ11の支軸で、両端はブームトップ7の両側にそれぞれ突出するように設けられている。12はブームトップ7の前側に配設した補助フックシーブで、トップシーブ11よりも前方に支持部材29、30によって支持されている。13は巻き上げロープ8に吊り下げられたフックブロックである。14はフックブロック13のフック用シーブで、14aは支軸である。13aはフック用シーブ14を支持する一対の支持板で、下方を支持ピン13bによって固着している。15はフックブロック13に取り付けたフックである。   FIG. 1 is a side view of a load lifting device for a self-propelled crane according to the present invention. FIG. 2 is a partially enlarged view of the boom tip of FIG. 1, and is a view of FIG. 1 viewed from the back side. FIG. 3 is an AA arrow view of FIG. 4A is a partially enlarged view of FIG. 3, and FIG. 4B is an AA arrow view of FIG. 4A. FIG. 5 is a schematic diagram for explaining the wiring at the time of lifting the maximum load. 1 to 5, reference numeral 1 denotes a crawler type self-propelled crane. 2 is a crawler, 3 is a lower traveling body, and 4 is an upper turning body. A box-shaped telescopic boom 5 is telescopic in the longitudinal direction by a boom telescopic device 5 b provided in the boom 5. The lowermost lower end of the boom 5 is pivotally attached to the upper swing body 4 and can be raised and lowered by a boom hoisting device (hydraulic cylinder) 6. Reference numeral 7 denotes a boom top provided on the uppermost boom 5a. Reference numeral 7a denotes a rope locking hole formed in the boom top 7, which is used when the additional sheave 17 is not used. 8 is a hoisting rope, and 9 is a hoisting winch provided on the upper swing body 4. Reference numeral 10 denotes a guide sheave disposed at the rear upper end of the boom top 7, and reference numeral 10 a denotes a guide sheave disposed on the upper swing body 4. Reference numeral 11 denotes a top sheave disposed on the front side of the boom top 7. Reference numeral 11 a denotes a support shaft of the top sheave 11, and both ends thereof are provided so as to protrude from both sides of the boom top 7. An auxiliary hook sheave 12 is provided on the front side of the boom top 7 and is supported by support members 29 and 30 in front of the top sheave 11. Reference numeral 13 denotes a hook block suspended from the hoisting rope 8. 14 is a hook sheave for the hook block 13, and 14a is a support shaft. Reference numeral 13a denotes a pair of support plates for supporting the hook sheave 14, and the lower part is fixed by support pins 13b. Reference numeral 15 denotes a hook attached to the hook block 13.

16Aは荷重吊り上げ装置で、自走式クレーン1の上部旋回体4に起伏可能に軸支されたブーム5の先端に設けられ、複数のロープシーブを支軸11a上に並べて取り付けたトップシーブ11と、トップシーブ11から多条の巻き上げロープ8を介して吊り下げられたフックブロック13を有している。   16A is a load lifting device, provided at the tip of the boom 5 that is pivotally supported by the upper swing body 4 of the self-propelled crane 1 so as to be raised and lowered, and a plurality of rope sheaves arranged side by side on the support shaft 11a; A hook block 13 is suspended from the top sheave 11 via a multi-row hoisting rope 8.

16は追加シーブブロックで、17は追加シーブブロック16の追加シーブである。追加シーブ17の両側面は外側支持部材16aと内側支持部材16bによって支持されている。外側支持部材16aは上方に延伸しており、その上端にブームトップ7の側面に突出するように設けたトップシーブ11の支軸11aの端部に外嵌する孔16dを穿設している。外側支持部材16a、内側支持部材16bは、追加シーブ17の上方を支持ピン19で、下方を支持ピン20によってそれぞれ固着し、さらに両支持部材16a、16bの左右に延出して配設した2対の水平部材16c、16cの各先端を着脱可能な連結ボルト22によって連結している。18は外側支持部材16aの延伸部の外面に固定した補強板で、上端には支持部材16aの孔16dに対応する孔18aが、下端には支持ピン19を貫通する孔18bが穿設されている。21は支持部材16aの上端に設けた吊り用孔で、追加シーブブロック16をブームトップ7に固定する際に追加シーブブロック16を吊り上げる際に使用する。23は外側支持部材16aの下端に設けたロープ係止部である。24は外側支持部材16aとフックブロック13との間に配設したロープ過巻き防止装置(リミットスイッチ)である。ロープ過巻き防止装置24は、図示しないリミットスイッチに錘が吊り下がっていて、巻き上げロープ8が巻き取られてフックブロック13が所定の位置まで上昇すると錘を持ち上げ、リミットスイッチを作動して巻き上げロープ8の過巻き取りを防止するようになっている。25は補助フックで、補助フックシーブ12を巻き回した補助ロープ26によって吊り下げられている。27はブーム5の上面に設けた巻き上げロープ8を案内するロープガイドである。   16 is an additional sheave block, and 17 is an additional sheave of the additional sheave block 16. Both side surfaces of the additional sheave 17 are supported by an outer support member 16a and an inner support member 16b. The outer support member 16a extends upward, and a hole 16d is formed at the upper end of the outer support member 16a so as to be fitted on the end of the support shaft 11a of the top sheave 11 provided so as to protrude from the side surface of the boom top 7. Two pairs of the outer support member 16a and the inner support member 16b are arranged such that the upper side of the additional sheave 17 is fixed by the support pin 19 and the lower side by the support pin 20, respectively, and is further extended to the left and right of the both support members 16a and 16b. The horizontal members 16c and 16c are connected at their respective ends by detachable connecting bolts 22. Reference numeral 18 denotes a reinforcing plate fixed to the outer surface of the extending portion of the outer support member 16a. A hole 18a corresponding to the hole 16d of the support member 16a is formed at the upper end, and a hole 18b penetrating the support pin 19 is formed at the lower end. Yes. Reference numeral 21 denotes a suspension hole provided at the upper end of the support member 16a, which is used when lifting the additional sheave block 16 when the additional sheave block 16 is fixed to the boom top 7. Reference numeral 23 denotes a rope locking portion provided at the lower end of the outer support member 16a. Reference numeral 24 denotes a rope overwinding prevention device (limit switch) disposed between the outer support member 16 a and the hook block 13. The rope overwinding prevention device 24 lifts the weight when the weight is suspended from a limit switch (not shown), the hoisting rope 8 is wound up and the hook block 13 is raised to a predetermined position, and the hoisting rope is operated by operating the limit switch. 8 is prevented from overwinding. An auxiliary hook 25 is suspended by an auxiliary rope 26 around which the auxiliary hook sheave 12 is wound. A rope guide 27 guides the hoisting rope 8 provided on the upper surface of the boom 5.

図6は本発明のブームの作業半径と荷重との関係を示す図で、最大吊り上げ荷重が90tの場合の例を示し、横軸に作業半径(m)を縦軸に荷重(t)を示している。斜線で示す部分は、トップシーブ11のみで吊り上げ可能な範囲で、通常の荷吊り作業は、この範囲で行なわれる。斜線の無い部分は、追加シーブブロック16を取り付けることによる吊り能力の向上分で、通常、この範囲の荷吊り作業は殆んどない。   FIG. 6 is a diagram showing the relationship between the working radius and load of the boom of the present invention, showing an example in which the maximum lifting load is 90 t, the working radius (m) on the horizontal axis and the load (t) on the vertical axis. ing. The hatched portion is within a range that can be lifted only by the top sheave 11, and normal load lifting work is performed within this range. The portion without the hatched line is an improvement in the lifting capacity by attaching the additional sheave block 16, and usually there is almost no load lifting work in this range.

図7は本発明について吊り上げ荷重と条数との関係を示す図で、最大吊り上げ荷重が90tの場合の例を示し、下欄に吊り上げ荷重(t)を上欄に条数を示している。吊り上げ荷重が7tから66tまでがトップシーブ11のみで吊り上げ可能な範囲であり、吊り上げ荷重が66tから90tまでが追加シーブブロック16を取り付けることによる吊り能力の向上分である。   FIG. 7 is a diagram showing the relationship between the lifting load and the number of strips according to the present invention, showing an example when the maximum lifting load is 90 t, and the lifting load (t) is shown in the lower column and the number of strips in the upper column. The lifting load from 7t to 66t is a range that can be lifted only by the top sheave 11, and the lifting load from 66t to 90t is an improvement in the lifting ability by attaching the additional sheave block 16.

巻き上げロープ8は、一端をウインチ9に固着し、他端はロープガイド27によって案内してガイドシーブ10を巻き回し、図5に示すように、補助フックシーブ12を巻き回し、フック用シーブ14およびトップシーブ11をそれぞれ巻き回し、さらに追加シーブブロック16の追加シーブ17を巻き回して支持部材16aの下端に設けたロープ係止部23に固着する。巻き上げロープ8を補助フックシーブ12に巻き回すことによって、巻き上げロープ8の条数を増やし、さらに追加シーブブロック16を設けることによって、巻き上げロープ8の条数を増やしている。   One end of the hoisting rope 8 is fixed to the winch 9, the other end is guided by a rope guide 27, and the guide sheave 10 is wound. As shown in FIG. 5, the auxiliary hook sheave 12 is wound, and the hook sheave 14 and the top Each of the sheaves 11 is wound, and the additional sheave 17 of the additional sheave block 16 is wound around and fixed to the rope locking portion 23 provided at the lower end of the support member 16a. By winding the hoisting rope 8 around the auxiliary hook sheave 12, the number of hoisting ropes 8 is increased, and by providing an additional sheave block 16, the number of hoisting ropes 8 is increased.

巻き上げロープ8は、通常の、クレーン最大吊り上げ荷重よりも低荷重の荷吊りのときは、トップシーブ11の支軸11aから追加シーブブロック16を取り外した後、一端をウインチ9に固着し、ガイドシーブ10、トップシーブ11およびフック用シーブ14を巻き回し、他端をブームトップ7のロープ係止孔7aに固着してトップシーブ11の下方にフックブロック13を吊り下げる。この際、フックブロック13は低荷重用のものに取り替える。   When the hoisting rope 8 is loaded with a load lower than the normal maximum lifting load of the crane, after removing the additional sheave block 16 from the support shaft 11a of the top sheave 11, one end is fixed to the winch 9, and the guide sheave 10. The top sheave 11 and the hook sheave 14 are wound, the other end is fixed to the rope locking hole 7a of the boom top 7, and the hook block 13 is suspended below the top sheave 11. At this time, the hook block 13 is replaced with one for low load.

次に本発明の実施形態の作用を説明する。自走式クレーン1において、最大吊り上げ荷重付近で荷吊りを行うことは、作業半径も小さく不便であることもあって、めったにない。通常の低い荷重で荷吊りを行うときには、フックブロック13も低荷重用のものを用い、トップシーブ11も追加シーブブロック16のない状態で使用する。この場合追加シーブブロック16の重さは約0.1tあるので、それを用いない状態ではそれだけ吊り上げ能力が向上するし、吊り上げ作業時のエネルギの消費も少なくなる。最大吊り上げ荷重付近で荷吊りを行うときには、フックブロック13を最大吊り上げ荷重用のものに取り替えるとともに、トップシーブ11に追加シーブブロック16を取り付け、巻き上げロープ8を両ブロック16、13の間で巻き回す。   Next, the operation of the embodiment of the present invention will be described. In the self-propelled crane 1, it is rare to carry a load near the maximum lifting load because the working radius is small and inconvenient. When hanging with a normal low load, the hook block 13 is also used for low load, and the top sheave 11 is also used without the additional sheave block 16. In this case, since the weight of the additional sheave block 16 is about 0.1 t, the lifting ability is improved as much as it is not used, and the energy consumption during the lifting work is also reduced. When lifting near the maximum lifting load, the hook block 13 is replaced with one for the maximum lifting load, an additional sheave block 16 is attached to the top sheave 11, and the hoisting rope 8 is wound between the blocks 16, 13. .

本発明は、以上述べた実施例に限定されるものではなく、本発明の要旨を逸脱しない範囲で種々の変更が可能である。たとえば、ブームは箱状の伸縮ブームに替えてラチスブーム式であってもよい。また、補助フックシーブ12を使用しないで、トップシーブ11からフックブロックシーブ14に巻き回してもよい。   The present invention is not limited to the embodiments described above, and various modifications can be made without departing from the gist of the present invention. For example, the boom may be a lattice boom type instead of a box-shaped telescopic boom. Further, the auxiliary hook sheave 12 may be wound around the hook block sheave 14 from the top sheave 11 without using the auxiliary hook sheave 12.

本発明の自走式クレーンの荷重吊り上げ装置の側面図である。It is a side view of the load lifting device of the self-propelled crane of the present invention. 図1のブーム先端の部分拡大図で、図1を裏側から見た図である。It is the elements on larger scale of the boom front-end | tip of FIG. 1, and the figure which looked at FIG. 1 from the back side. 図2のA−A矢視図である。It is an AA arrow line view of FIG. (A)は図3の部分拡大図、(B)は図4(A)のA−A矢視図である。(A) is the elements on larger scale of FIG. 3, (B) is the AA arrow line view of FIG. 4 (A). 本発明の最大荷重吊り上げ時のワイヤリングの説明用概略図である。It is the schematic for description of the wiring at the time of the maximum load lifting of this invention. 本発明のブームの作業半径と荷重との関係を示す図で、最大吊り上げ荷重が90tの場合の例を示し、横軸に作業半径(m)を縦軸に荷重(t)を示している。It is a figure which shows the relationship between the working radius of a boom of this invention, and a load, the example in case the maximum lifting load is 90t is shown, the working radius (m) is shown on the horizontal axis, and the load (t) is shown on the vertical axis | shaft. 本発明について吊り上げ荷重と条数との関係を示す図で、最大吊り上げ荷重が90tの場合の例を示し、下欄に吊り上げ荷重(t)を上欄に条数を示している。It is a figure which shows the relationship between a lifting load and the number of strips about this invention, the example in case the maximum lifting load is 90t is shown, and the lifting load (t) is shown in the lower column and the number of strips in the upper column. 特許文献1に開示されたクローラ式の自走式クレーンを示す側面図である。1 is a side view showing a crawler-type self-propelled crane disclosed in Patent Document 1. FIG. (A)は同特許文献1に開示されたクレーンの50%以内の荷吊りを行なう場合の構成を説明するための解説図、(B)は同特許文献1に開示されたクレーンの50%を超える荷吊りを行なう場合の構成を説明するための解説図でる。(A) is explanatory drawing for demonstrating the structure in the case of carrying out the load suspension within 50% of the crane disclosed by the patent document 1, (B) is 50% of the crane disclosed by the patent document 1. It is explanatory drawing for demonstrating the structure in the case of carrying over the load hanging.

符号の説明Explanation of symbols

1 自走式クレーン
2 クローラ
3 下部走行体
4 上部旋回体
5 ブーム
6 ブーム起伏装置
7 ブームトップ
8 巻き上げロープ
9 ウインチ
10、10a ガイドシーブ
11 トップシーブ
11a 支軸
12 補助フックシーブ
13 フックブロック
14 フックブロックシーブ
15 フック
16A 荷重吊り上げ装置
16 追加シーブブロック
16a 外側シーブ支持部材
16b 内側シーブ支持部材
16c 水平部材
16d 孔
17 追加シーブ
17a 支軸
18 補強板
18a 孔
19、20 支持ピン
21 吊り用孔
22 連結ボルト
23 ロープ係止部
24 過巻き防止装置
25 補助フック
26 補助フック巻き取りロープ
27 ガイドローラ
DESCRIPTION OF SYMBOLS 1 Self-propelled crane 2 Crawler 3 Lower traveling body 4 Upper turning body 5 Boom 6 Boom hoisting device 7 Boom top 8 Hoisting rope 9 Winch 10, 10a Guide sheave 11 Top sheave 11a Spindle 12 Auxiliary hook sheave 13 Hook block 14 Hook block sheave DESCRIPTION OF SYMBOLS 15 Hook 16A Load lifting apparatus 16 Additional sheave block 16a Outer sheave support member 16b Inner sheave support member 16c Horizontal member 16d Hole 17 Additional sheave 17a Support shaft 18 Reinforcement plate 18a Hole 19, 20 Support pin 21 Lifting hole 22 Connection bolt 23 Rope Locking portion 24 Overwinding prevention device 25 Auxiliary hook 26 Auxiliary hook winding rope 27 Guide roller

Claims (2)

自走式クレーンの上部旋回体に起伏可能に軸支されたブームの先端に設けられ、複数のロープシーブを支軸上に並べて取り付けたトップシーブと、トップシーブから多条の巻き上げロープを介して吊り下げられたフックブロックを有してなる荷重吊り上げ装置であって、トップシーブの支軸の一端または両端に着脱可能に追加シーブブロックを吊り下げるように取り付け、トップシーブとフックブロックのシーブとの間で巻き回す巻き上げロープを追加シーブブロックの追加シーブにも巻き回して巻き上げロープの条数を増加するようにしたことを特徴とする自走式クレーンの荷重吊り上げ装置。 A top sheave with a plurality of rope sheaves mounted side by side on the support shaft and suspended from the top sheave via multiple hoisting ropes. A load lifting device having a lowered hook block, which is detachably attached to one end or both ends of a support shaft of the top sheave so as to hang, and between the top sheave and the hook block sheave. A lifting device for a self-propelled crane, characterized in that the hoisting rope that is wound by the hoist is also wound around the additional sheave of the additional sheave block to increase the number of hoisting ropes. 前記追加シーブブロックは、追加シーブを両側面で支持するシーブ支持部材の内の外側シーブ支持部材を上方に延伸させて、その上端に穿設した孔を上記トップシーブの支軸の端部に外嵌して固着し、内側シーブ支持部材と外側シーブ支持部材とは追加シーブの支軸、追加シーブの上方および下方の支持ピンによって固着されている請求項1記載の自走式クレーンの荷重吊り上げ装置。 The additional sheave block is formed by extending an outer sheave support member of a sheave support member that supports the additional sheave on both side surfaces upward, and removing a hole drilled at the upper end of the end sheave support shaft at the end of the support shaft of the top sheave. The self-propelled crane load lifting device according to claim 1, wherein the inner sheave support member and the outer sheave support member are fixed by a support shaft of the additional sheave and support pins above and below the additional sheave. .
JP2005093716A 2005-03-29 2005-03-29 Self-propelled crane load lifting device Active JP4822395B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005093716A JP4822395B2 (en) 2005-03-29 2005-03-29 Self-propelled crane load lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005093716A JP4822395B2 (en) 2005-03-29 2005-03-29 Self-propelled crane load lifting device

Publications (2)

Publication Number Publication Date
JP2006273483A true JP2006273483A (en) 2006-10-12
JP4822395B2 JP4822395B2 (en) 2011-11-24

Family

ID=37208601

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005093716A Active JP4822395B2 (en) 2005-03-29 2005-03-29 Self-propelled crane load lifting device

Country Status (1)

Country Link
JP (1) JP4822395B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877455A (en) * 2012-10-25 2013-01-16 北京南车时代机车车辆机械有限公司 Dynamic compactor and upper knuckle arm device thereof
CN104057823A (en) * 2014-06-24 2014-09-24 徐州重型机械有限公司 Single-engine crane and power transmission device thereof
CN115401670A (en) * 2022-10-13 2022-11-29 武昌工学院 Mechanical arm for material grabbing

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102602822B (en) * 2012-03-26 2014-05-21 三一汽车起重机械有限公司 Crane superlift connection bracket and crane

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4849771A (en) * 1971-10-26 1973-07-13
JPS4967362A (en) * 1972-11-02 1974-06-29
JPS52112074A (en) * 1976-03-16 1977-09-20 Toshiba Mach Co Ltd Electromagnetic proportionate-control valve
JPS52132595A (en) * 1976-04-29 1977-11-07 Howmedica Prosthetic shoulder joint
JPS59176886A (en) * 1983-03-28 1984-10-06 富士通株式会社 Automatic calculator for road fare
JPH06183692A (en) * 1992-12-21 1994-07-05 Hitachi Constr Mach Co Ltd Crane boom
JP2000118952A (en) * 1998-10-06 2000-04-25 Sumitomo Constr Mach Co Ltd Crane device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4849771A (en) * 1971-10-26 1973-07-13
JPS4967362A (en) * 1972-11-02 1974-06-29
JPS52112074A (en) * 1976-03-16 1977-09-20 Toshiba Mach Co Ltd Electromagnetic proportionate-control valve
JPS52132595A (en) * 1976-04-29 1977-11-07 Howmedica Prosthetic shoulder joint
JPS59176886A (en) * 1983-03-28 1984-10-06 富士通株式会社 Automatic calculator for road fare
JPH06183692A (en) * 1992-12-21 1994-07-05 Hitachi Constr Mach Co Ltd Crane boom
JP2000118952A (en) * 1998-10-06 2000-04-25 Sumitomo Constr Mach Co Ltd Crane device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877455A (en) * 2012-10-25 2013-01-16 北京南车时代机车车辆机械有限公司 Dynamic compactor and upper knuckle arm device thereof
CN104057823A (en) * 2014-06-24 2014-09-24 徐州重型机械有限公司 Single-engine crane and power transmission device thereof
CN115401670A (en) * 2022-10-13 2022-11-29 武昌工学院 Mechanical arm for material grabbing
CN115401670B (en) * 2022-10-13 2024-05-03 武昌工学院 Mechanical arm for grabbing materials

Also Published As

Publication number Publication date
JP4822395B2 (en) 2011-11-24

Similar Documents

Publication Publication Date Title
JP4225344B2 (en) crane
US7565982B2 (en) Crane and boom hoisting device thereof
EP2492235B1 (en) Method of assembling a mobile lift crane
JP5117815B2 (en) Crane hook device
US10875748B2 (en) Marine crane vessel and method of operation
JP4822395B2 (en) Self-propelled crane load lifting device
JP6396256B2 (en) Jib crane
JP2012121719A (en) Quay crane
JP7253918B2 (en) Crane disassembly structure and method
JP4998505B2 (en) Winch mounting structure
JP4600374B2 (en) Crane boom head
JP4940619B2 (en) Self-propelled crane
JP6289918B2 (en) Earth drill machine
JP4430861B2 (en) Telescopic boom type work machine
JP4956286B2 (en) Winding drum wire winding method at crane installation
CN213231184U (en) Hoisting sling
JP7447613B2 (en) working machine
JP2009143710A (en) Auxiliary jib for movable crane
JP2019077541A (en) Crane and crane disassembling method
KR100261060B1 (en) An apparatus for self-handling of a crawler type crane
JP2016216205A (en) Crane and method of detaching crane constitution member
JP2010202361A (en) Heavy load hoisting device for crane
JP2019206404A (en) Scaffolding structure and working machine with it
JP2004067347A (en) Mobile working machine and its method for attaching and detaching counterweight
JP2005126228A (en) Derricking jib crane by hydraulic cylinder

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080303

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110304

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110308

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110328

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110902

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110902

R150 Certificate of patent or registration of utility model

Ref document number: 4822395

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140916

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250