JP2006022551A JP2004201371A JP2004201371A JP2006022551A JP 2006022551 A JP2006022551 A JP 2006022551A JP 2004201371 A JP2004201371 A JP 2004201371A JP 2004201371 A JP2004201371 A JP 2004201371A JP 2006022551 A JP2006022551 A JP 2006022551A
Authority
JP
Japan
Prior art keywords
ground
wall
deformation
back side
continuous underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004201371A
Other languages
Japanese (ja)
Other versions
JP4313263B2 (en
Inventor
Taizo Shimomura
泰造 下村
Toru Shimizu
徹 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2004201371A priority Critical patent/JP4313263B2/en
Publication of JP2006022551A publication Critical patent/JP2006022551A/en
Application granted granted Critical
Publication of JP4313263B2 publication Critical patent/JP4313263B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a continuous underground wall and an earth retaining method using the continuous underground wall restrained from deformation in conformity to the behavior of the ground after the start of excavation. <P>SOLUTION: The continuous underground wall suppressing the deformation of the back face side ground 1b left on the back face side, onto the excavated part 1c side when excavating the ground on the inner face side of a wall body 7 constructed underground beforehand, has bag bodies 8 arranged on the back face side of the wall body 7, and an injection pipe 10 for injecting a fluid 9 into the bag bodies 8. Based on the inclination of the wall body 7 caused by excavation, the fluid 9 is injected into the bag bodies 8 to suppress the deformation of the back face side ground 1b. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、地盤を掘削する際に山留めとして使用する連続地中壁及びそれを使用した山留め工法に関するものである。   The present invention relates to a continuous underground wall used as a mountain retaining when excavating the ground and a mountain retaining method using the same.

従来、図6に示すような地盤1を掘削する際の山留め工法が知られている(特許文献1など参照)。   Conventionally, a mountain-clamping method for excavating the ground 1 as shown in FIG. 6 is known (see Patent Document 1).

この山留め工法では、掘削前に地盤1の所定の位置に、山留め壁2としての鋼矢板2Aを打ち込んで壁体を形成し、順次、切梁3,・・・を設置しながら掘削面1aを掘り下げる。   In this mountain-clamping method, a steel sheet pile 2A as a mountain retaining wall 2 is driven into a predetermined position of the ground 1 before excavation to form a wall body, and the excavation surface 1a is formed while sequentially installing the beams 3,. Delve into.

この切梁3,・・は、通常、対面する山留め壁2(図6ではコンクリート壁2B)との間に介在させて、鋼矢板2Aを掘削部1c側から支持する部材であり、切梁3,・・・に発生する軸方向の力によって掘削部1c側への背側面側地盤1bの移動が制限される。   These cut beams 3,... Are members that support the steel sheet pile 2A from the excavation part 1c side, usually interposed between the facing retaining wall 2 (concrete wall 2B in FIG. 6). The movement of the back side ground 1b to the excavation part 1c side is limited by the axial force generated in.

ここで、図6には、説明のために左右で異なる山留め壁2を示した。通常、剛性の高いコンクリート壁2Bは、鋼矢板2Aよりも変形は小さいが、掘削面1aが掘り下がるに従って、山留め壁2A,2Bに背面から作用する土圧は大きくなるので、材質によって程度の差はあるものの変形は発生する。   Here, FIG. 6 shows different retaining walls 2 on the left and right for explanation. Usually, the rigid concrete wall 2B is less deformed than the steel sheet pile 2A, but as the excavation surface 1a is dug down, the earth pressure acting on the retaining walls 2A, 2B from the back increases, so the degree of difference depends on the material. Although there is a deformation, it occurs.

特に、背側面側地盤1b上に荷重の大きな建物4が建設されている場合などは、鋼矢板2Aに作用する土圧は大きくなるため、掘削によって背側面側地盤1bが大きく変形し、地表面が沈下して建物4が傾く場合もある。   In particular, when a building 4 with a large load is constructed on the back side ground 1b, the earth pressure acting on the steel sheet pile 2A increases, so that the back side ground 1b is greatly deformed by excavation, and the ground surface. May sink and the building 4 may tilt.

このような事態を避けるために、図7に示すような防護方法が知られている。この防護方法では、掘削を行なう前に、予め山留め壁2と建物4の間に防護壁5を設けておく。この防護壁5は、山留め壁2よりも下端部が深くなるように構築される。   In order to avoid such a situation, a protection method as shown in FIG. 7 is known. In this protection method, a protective wall 5 is provided in advance between the retaining wall 2 and the building 4 before excavation. The protective wall 5 is constructed so that the lower end is deeper than the mountain retaining wall 2.

この状態で掘削を行なうと、山留め壁2に作用するはずの背側面側地盤1bの土圧のほとんどは防護壁5によって受け止められ、掘削部1c側への背側面側地盤1bの変形を抑えることができる。   When excavation is performed in this state, most of the earth pressure of the back side ground 1b that should act on the retaining wall 2 is received by the protective wall 5, and the deformation of the back side ground 1b toward the excavation part 1c is suppressed. Can do.

さらに、特許文献2に示すように、油圧ジャッキを切梁3と山留め壁2との間に介在させて、変形が発生する前に予め油圧ジャッキを伸長させて、山留め壁2に支圧力(プレロード)を与えておく方法もある。
特開2003−166242号公報(図8,9、0002段落及び0003段落) 特開平8−193330号公報(0006段落)
Furthermore, as shown in Patent Document 2, a hydraulic jack is interposed between the beam 3 and the retaining wall 2, and the hydraulic jack is extended in advance before the deformation occurs, so that the supporting pressure (preload) is applied to the retaining wall 2. ) Is also available.
JP2003-166242A (FIGS. 8, 9, paragraphs 0002 and 0003) JP-A-8-193330 (paragraph 0006)

しかしながら、前記した鋼矢板2Aを山留め壁2として使用する場合は、剛性が小さいため変形も大きくなる傾向にあり、掘削深さや地盤状態によっては背側面側地盤1b上の建物4に掘削による影響を与えるおそれがある。   However, when using the steel sheet pile 2A as the retaining wall 2, the rigidity is small and the deformation tends to increase. Depending on the depth of excavation and the ground condition, the building 4 on the back side ground 1b may be affected by excavation. There is a risk of giving.

また、前記したコンクリート壁2Bを使用する場合であっても、変形がほとんど発生しない状態にするには、壁厚を相当程度厚くして剛性を高める必要があるが、工費または敷地の広さ等との関係によって厚くできない場合がある。   Moreover, even when the above-described concrete wall 2B is used, in order to make the deformation hardly occur, it is necessary to increase the rigidity by increasing the wall thickness to a considerable extent. Depending on the relationship, it may not be thick.

さらに、前記した防護壁5を設ける方法では、山留め壁2とは別に防護壁5を設ける必要があるので、工費及び工期が増加する。また、建設用地以外の敷地に防護壁5を設けるのは、用地取得の点から困難な場合が多い。   Furthermore, in the method of providing the protective wall 5 described above, it is necessary to provide the protective wall 5 separately from the retaining wall 2, so that the construction cost and the construction period increase. Also, it is often difficult to provide the protective wall 5 on a site other than the construction site from the viewpoint of site acquisition.

そして、前記した油圧ジャッキを使用する方法では、切梁3,・・・毎に油圧ジャッキを設置する工程が発生し、手間がかかる。また、重量の大きな油圧ジャッキが掘削面1aの上空に配置されることになるため、安全面の配慮が必要である。   And in the method of using the hydraulic jack mentioned above, the process of installing a hydraulic jack for every cut beam 3, ... generate | occur | produces, and it takes an effort. In addition, since a heavy hydraulic jack is disposed above the excavation surface 1a, safety considerations are necessary.

特に、上記した従来の方法では、予め背側面側地盤1bによって発生する背面土圧を予測し、その予測に従って山留め壁2の材質及び壁厚、又は防護壁5の壁厚及び深さ、又はプレロードの大きさを、掘削前に決定しておかなければならない。このため、掘削を開始して実際の背面土圧が予測以上に大きくなった場合には事後的な対応が難しい。   In particular, in the conventional method described above, the back earth pressure generated by the back side ground 1b is predicted in advance, and the material and wall thickness of the retaining wall 2 or the wall thickness and depth of the protective wall 5 or the preload according to the prediction. The size of the must be determined before drilling. For this reason, when excavation is started and the actual backside earth pressure becomes larger than expected, it is difficult to respond after the fact.

そこで、本発明は、掘削開始後の地盤の挙動に合わせて変形抑制をおこなうことができる連続地中壁及びそれを使用した山留め工法を提供することを目的としている。   Then, this invention aims at providing the continuous underground wall which can perform a deformation | transformation suppression according to the behavior of the ground after the start of excavation, and the mountain fastening method using the same.

前記目的を達成するために、請求項1の発明は、予め地中に構築された壁体の内側面側の地盤を掘削する際に、背側面側に残される地盤の前記内側面側への変形を抑制する連続地中壁であって、前記壁体の背側面側に配置されて、供給手段を介して流体を注入することによって前記背側面側地盤の変形を抑制する袋体を有する連続地中壁であることを特徴とする。   In order to achieve the above object, the invention according to claim 1 is directed to the inner surface side of the ground left on the back side when excavating the ground on the inner side of the wall body built in advance in the ground. A continuous underground wall that suppresses deformation and is disposed on the back side surface of the wall body and has a bag body that suppresses deformation of the back side surface ground by injecting fluid through a supply means. It is an underground wall.

また、請求項2に記載されたものは、前記袋体は、深度方向に分割されており、該分割された区画毎に前記流体の注入が可能である請求項1記載の連続地中壁であることを特徴している。   Moreover, what was described in Claim 2 is the continuous underground wall of Claim 1 in which the said bag body is divided | segmented into the depth direction and the injection | pouring of the said fluid is possible for every said division | segmentation. It is characterized by being.

そして、請求項3に記載されたものは、前記袋体の分割位置を、前記壁体の背側面側の予測された地層の境界位置に合わせた請求項2に記載の連続地中壁であることを特徴としている。   And what was described in Claim 3 is the continuous underground wall of Claim 2 which match | combined the division position of the said bag body with the boundary position of the predicted formation on the back side surface side of the said wall body. It is characterized by that.

さらに、請求項4に記載されたものは、前記壁体に、その傾き又は変形を計測する計測手段を設けた請求項1乃至請求項3のいずれかに記載の連続地中壁であることを特徴としている。   Furthermore, what is described in Claim 4 is the continuous underground wall in any one of Claim 1 thru | or 3 which provided the measurement means which measures the inclination or deformation | transformation in the said wall body. It is a feature.

また、請求項5に記載された発明は、地盤に請求項1乃至請求項4のいずれかに記載の連続地中壁を構築し、前記壁体の内側面側の地盤を掘削し、その掘削に伴って発生した前記壁体の傾き又は変形を測定し、該測定値に基づいて前記供給手段を介して前記袋体に流体を注入して前記背側面側地盤の変形を抑制する山留め工法であることを特徴としている。   According to a fifth aspect of the present invention, the continuous underground wall according to any one of the first to fourth aspects is constructed on the ground, the ground on the inner surface side of the wall body is excavated, and the excavation is performed. In the mountain-clamping method of measuring the inclination or deformation of the wall body that occurs along with, and injecting fluid into the bag body through the supply means based on the measured value to suppress deformation of the back side ground It is characterized by being.

このように構成された請求項1の発明は、前記壁体の背側面側に、前記供給手段を介して流体を注入する袋体が設けられている。   In the invention of claim 1 configured as described above, a bag body for injecting fluid through the supply means is provided on the back side surface side of the wall body.

このため、掘削によって背側面側地盤の変形が大きくなった場合には、前記流体を注入することによって前記袋体を膨張させて変形を抑制することができる。   For this reason, when the deformation | transformation of a back side ground becomes large by excavation, the said bag can be expanded by inject | pouring the said fluid, and a deformation | transformation can be suppressed.

また、前記袋体の流体圧が大きくなりすぎて、地盤が過剰に押し戻され、前記背側面側地盤に悪影響を与えるおそれがある場合には、前記袋体の流体圧を低下させて前記袋体を収縮させることができる。   In addition, when the fluid pressure of the bag body becomes excessively large and the ground is excessively pushed back, which may adversely affect the back side ground, the fluid pressure of the bag body is lowered to reduce the bag body. Can be shrunk.

そして、請求項2に記載されたものは、前記袋体を深度方向に分割し、区画毎に前記流体の注入が可能なように構成されている。このため、前記背側面側地盤の変形した箇所に応じて、前記袋体を膨張又は収縮させることができる。   And what was described in Claim 2 is comprised so that the said fluid can be inject | poured for every division, dividing the said bag body in the depth direction. For this reason, the said bag can be expanded or contracted according to the location which the said back side ground was deformed.

さらに、請求項3に記載されたものは、前記壁体の背側面側の予測された地盤状態から地層の境界位置を決定し、その予測結果に基づいて前記袋体の分割位置を決定する。このため、地層毎に変形量が変化する場合にも適切に対応することができる。   Further, according to a third aspect of the present invention, the boundary position of the formation is determined from the predicted ground state on the back side surface side of the wall body, and the division position of the bag body is determined based on the prediction result. For this reason, it is possible to appropriately cope with the case where the deformation amount changes for each formation.

また、請求項4に記載されたものは、前記壁体の傾き又は変形を計測する計測手段を設けている。このため、掘削によって前記壁体に実際に発生した傾き又は変形を容易に測定することができる。   Moreover, what is described in Claim 4 is provided with the measurement means which measures the inclination or deformation | transformation of the said wall body. For this reason, the inclination or the deformation | transformation actually generate | occur | produced in the said wall body by excavation can be measured easily.

そして、請求項5の発明は、前記壁体の傾き又は変形をリアルタイムで測定し、その測定値に基づいて前記袋体に流体を注入する。このため、掘削によって地盤が変形し始めても、迅速に対処することで前記背側面側地盤の変形を最小限に抑えることができる。   The invention according to claim 5 measures the tilt or deformation of the wall body in real time, and injects the fluid into the bag body based on the measured value. For this reason, even if the ground starts to be deformed by excavation, it is possible to minimize the deformation of the back side ground by dealing quickly.

以下、本発明の最良の実施の形態について図面を参照して説明する。   The best mode for carrying out the present invention will be described below with reference to the drawings.

なお、前記従来例と同一乃至均等な部分については、同一符号を付して説明する。   The same or equivalent parts as those in the conventional example will be described with the same reference numerals.

図1乃至図4は、本実施の形態による連続地中壁6の構成を示した図である。   1 to 4 are diagrams showing the configuration of the continuous underground wall 6 according to the present embodiment.

まず、構成から説明すると、このような本実施の形態の連続地中壁6は、地盤1内部に形成される構造体となる壁体7と、該壁体7の背側面側に配設される袋体8と、該袋体8に注入される流体9を供給する供給手段としての注入管10とから主に構成される。   First, in terms of configuration, the continuous underground wall 6 according to the present embodiment is arranged on the wall 7 serving as a structure formed inside the ground 1 and on the back side of the wall 7. Main body 8 and an injection pipe 10 as supply means for supplying fluid 9 injected into the bag body 8.

前記連続地中壁6は、地盤1の掘削を行なう前に予め地中に構築される。この連続地中壁6の壁体7は、例えば鉄筋コンクリートによって形成される。   The continuous underground wall 6 is constructed in the ground in advance before excavation of the ground 1. The wall body 7 of the continuous underground wall 6 is formed of, for example, reinforced concrete.

そして、前記壁体7は、掘削部1cと背側面側地盤1bを仕切るように境界部に形成され、その下端は図2に示すような掘削完了時の掘削面1aの位置よりも深くして前記壁体7が転倒することのないように構築される。   And the said wall body 7 is formed in a boundary part so that the excavation part 1c and the back side ground 1b may be divided, and the lower end is made deeper than the position of the excavation surface 1a at the time of excavation completion as shown in FIG. The wall body 7 is constructed so as not to fall down.

さらに、地盤1の掘削部1cを前記連続地中壁6で囲む場合は、円筒形や四角柱状に壁体7が形成される。   Furthermore, when the excavation part 1c of the ground 1 is surrounded by the continuous underground wall 6, the wall body 7 is formed in a cylindrical shape or a quadrangular prism shape.

また、本実施の形態の袋体8は、前記壁体7の背側面側に配設される。この袋体8は、内部に流体9を注入することによって膨張又は収縮するように構成される。例えば、繊維シートや塩化ビニルシート等の可撓性又は伸縮性のシート状材料を袋状に形成して製作される。   Further, the bag body 8 of the present embodiment is disposed on the back side surface side of the wall body 7. The bag body 8 is configured to expand or contract by injecting a fluid 9 therein. For example, a flexible or stretchable sheet material such as a fiber sheet or a vinyl chloride sheet is formed into a bag shape.

そして、この袋体8の深度方向の長さは、連続地中壁6が変形すると予想される範囲に相当する長さとする。例えば、掘削完了時の掘削面1aと地表との高低差(掘削深さ)と同程度の長さの前記袋体8が、前記壁体7の背側面側に配設される(図2参照)。   And the length of the depth direction of this bag body 8 is taken as the length corresponded to the range where the continuous underground wall 6 is estimated to deform | transform. For example, the bag body 8 having a length similar to the height difference (excavation depth) between the excavation surface 1a and the ground surface when excavation is completed is disposed on the back side surface of the wall body 7 (see FIG. 2). ).

さらに、この袋体8は、複数の区画8a,8b,・・・を有するように形成される。例えば、図2及び図3に示すように、袋状に形成された区画8a,8b,8c,8dを隣接するように一列に並べ、隣接する区画8a,8b,8c,8dの上縁と下縁を接合して前記袋体8とする。   Further, the bag body 8 is formed to have a plurality of sections 8a, 8b,. For example, as shown in FIG. 2 and FIG. 3, the compartments 8a, 8b, 8c, 8d formed in a bag shape are arranged in a row so as to be adjacent to each other, and the upper edge and the lower edge of the adjacent compartments 8a, 8b, 8c, 8d are arranged. The edges are joined to form the bag body 8.

また、図2に示すように、背側面側地盤1bが四種類の異なる地層10A,10B,10C,10Dから形成されていることがボーリング調査結果などによって予測された場合は、その地盤状態に合わせて各区画8a,8b,8c,8dの範囲が決定される。   In addition, as shown in FIG. 2, when it is predicted from a boring survey result that the back side surface ground 1b is formed from four different types of formations 10A, 10B, 10C, and 10D, it is adjusted to the ground condition. Thus, the ranges of the sections 8a, 8b, 8c, and 8d are determined.

さらに、前記袋体8の幅は、設置をする際に取り扱いが容易な程度の幅とし、前記壁体7の幅の方が前記袋体8の幅よりも広い場合は、図3に示すように横方向に複数の袋体8A,8B,8C,・・・を並べて配置する。   Furthermore, the width of the bag body 8 is such that it can be easily handled during installation, and when the width of the wall body 7 is wider than the width of the bag body 8, as shown in FIG. Are arranged side by side in a plurality of bags 8A, 8B, 8C,.

また、前記袋体8には、内部に流体9を充填するための注入管10が接続されている。この注入管10は、区画8a,8b,・・・毎に接続される注入管10a,10b,・・・によって構成される。   The bag 8 is connected to an injection tube 10 for filling the inside with a fluid 9. This injection tube 10 is constituted by injection tubes 10a, 10b,... Connected for each of the sections 8a, 8b,.

そして、前記注入管10a,10b,・・・は、可撓性の中空ホース、塩化ビニル管又は鋼管等によって形成される。   The injection pipes 10a, 10b,... Are formed by a flexible hollow hose, a vinyl chloride pipe, a steel pipe, or the like.

さらに、図1に示すように、前記注入管10aは最上部の区画8aに接続され、前記注入管10bは前記区画8aを貫通して二段目の区画8bに接続され、注入管10cは前記区画8a及び区画8bを貫通して三段目の区画8cに接続される。   Further, as shown in FIG. 1, the injection tube 10a is connected to the uppermost compartment 8a, the injection tube 10b is connected to the second-stage compartment 8b through the compartment 8a, and the injection tube 10c is connected to the injection tube 10c. It penetrates the section 8a and the section 8b and is connected to the section 8c in the third stage.

これらの注入管10a,10b,・・・の上端は、地表に突出されており、流体9を注入するポンプ(図示せず)に接続される。ここで、流体9としては、液体として使用でき使用後に固化することが可能な泥水、水若しくは油などの液体、又はガス若しくは空気等の気体が使用できる。なお、圧縮率の小さい流体9を使用するのが好ましい。   The upper ends of these injection pipes 10a, 10b,... Protrude from the ground surface and are connected to a pump (not shown) for injecting the fluid 9. Here, as the fluid 9, a liquid such as mud, water or oil that can be used as a liquid and can be solidified after use, or a gas such as gas or air can be used. In addition, it is preferable to use the fluid 9 having a small compressibility.

また、本実施の形態では、前記壁体7に計測手段としての傾斜計11が取り付けられる。この傾斜計11は、前記壁体7の鉛直面からの傾きを検出する計測器である。   In the present embodiment, an inclinometer 11 as a measuring means is attached to the wall body 7. The inclinometer 11 is a measuring instrument that detects the inclination of the wall 7 from the vertical plane.

例えば、前記傾斜計11は、前記袋体8を介して前記壁体7に取り付けられる。まず、図3に示すように、袋体8Bの側縁に沿って深度方向にガイド管12が延設される。このガイド管12を取り付ける前記袋体8Bの部分は、前記流体9を注入しても膨張しない部分でなければならない。   For example, the inclinometer 11 is attached to the wall body 7 through the bag body 8. First, as shown in FIG. 3, the guide tube 12 is extended in the depth direction along the side edge of the bag body 8B. The portion of the bag body 8B to which the guide tube 12 is attached must be a portion that does not expand even when the fluid 9 is injected.

そして、図4に示すように、このガイド管12の内側面に傾斜計11が貼り付けられ、測定値を伝達するためのケーブル11aが地表まで延設される。   And as shown in FIG. 4, the inclinometer 11 is affixed on the inner surface of this guide pipe 12, and the cable 11a for transmitting a measured value is extended to the ground surface.

さらに、前記傾斜計11は、前記区画8a,8b,・・・毎の傾きが計測できるように、各区画8a,8b,・・・に対応する位置に設置される。   Further, the inclinometer 11 is installed at a position corresponding to each section 8a, 8b,... So that the inclination of each section 8a, 8b,.

また、本実施の形態では、図3に示すように袋体8Cの背面に土圧計13が取り付けられている。この土圧計13は支圧力を計測する計器であり、前記袋体8Cの背面に貼り付けることによって、前記背側面側地盤1bから作用する土圧を知ることができる(図4参照)。   Moreover, in this Embodiment, as shown in FIG. 3, the earth pressure gauge 13 is attached to the back surface of the bag body 8C. The earth pressure gauge 13 is an instrument for measuring a supporting pressure, and can be known to the earth pressure acting from the back side ground 1b by being attached to the back surface of the bag body 8C (see FIG. 4).

そして、前記土圧計13は、前記区画8a,8b,・・・毎の土圧が計測できるように、各区画8a,8b,・・・の略中央にそれぞれ配置する(図3参照)。また、測定値を伝達するためのケーブル13aが地表まで延設される。   And the earth pressure gauge 13 is each arrange | positioned in the approximate center of each division 8a, 8b, ... so that the earth pressure for every division 8a, 8b, ... can be measured (refer FIG. 3). Moreover, the cable 13a for transmitting a measured value is extended to the ground surface.

次に、図5を参照しながら、本実施の形態の連続地中壁6の構築方法について説明する。   Next, the construction method of the continuous underground wall 6 of this Embodiment is demonstrated, referring FIG.

まず、図5(a)に示したように、地盤1に溝14を掘削する。この溝14の掘削は、掘削した溝14内に比重の大きい泥水15を満たしながら、バケット、オーガー掘削機、又は水平多軸掘削機などを使用しておこなう。   First, as shown in FIG. 5A, a groove 14 is excavated in the ground 1. The excavation of the groove 14 is performed using a bucket, an auger excavator, a horizontal multi-axis excavator, or the like while the excavated groove 14 is filled with muddy water 15 having a large specific gravity.

前記連続地中壁6の構築作業は、構築する連続地中壁6を平面的に複数のブロックに分割してブロック毎におこなう。このため、あるブロックにおいて所定の深さまでの前記溝14の掘削が完了した後には、前記壁体7を構築する工程に移行する。   The construction work of the continuous underground wall 6 is performed for each block by dividing the continuous underground wall 6 to be constructed into a plurality of blocks in a plane. For this reason, after the excavation of the groove 14 to a predetermined depth in a certain block is completed, the process proceeds to a step of constructing the wall body 7.

図5(b)は、前記溝14の内部に鉄筋籠16を挿入する作業工程を示した図である。   FIG. 5B is a view showing an operation process for inserting the reinforcing bar 16 into the groove 14.

前記鉄筋籠16は、工場などの作業ヤードで予め組み立てられる。そして、前記背側面側地盤1b側に配置される前記鉄筋籠16の側面には、鉄筋籠16の製作時に前記袋体8,8,8を取り付けておく。   The reinforcing bar 16 is assembled in advance in a work yard such as a factory. And the bag bodies 8, 8, and 8 are attached to the side surface of the reinforcing bar rod 16 arranged on the back side ground 1b side when the reinforcing bar rod 16 is manufactured.

この袋体8の取り付けは、前記袋体8がシート状に萎んだ状態でおこなう。前記シート状の袋体8の一側面を前記鉄筋籠16に設けた固定部に固定して取り付ける。   The bag body 8 is attached in a state where the bag body 8 is deflated into a sheet shape. One side surface of the sheet-like bag body 8 is fixed and attached to a fixing portion provided on the reinforcing bar 16.

このようにして製作した前記鉄筋籠16を、ワイヤ17を介してクレーンで吊り上げ、前記溝14内に吊り下ろす。   The rebar rod 16 manufactured in this way is lifted by a crane through the wire 17 and is suspended in the groove 14.

図5(c)は、前記鉄筋籠16の周囲にコンクリート19を打設する作業工程を示した図である。   FIG. 5 (c) is a view showing an operation process for placing concrete 19 around the reinforcing bar 16.

ここで、前記鉄筋籠16は、図5(c)に示すように、前記溝14の前記背側面側地盤1b側の内側面に前記袋体8が当接するように固定されている。また、前記注入管10の上端は、打設するコンクリート19によって埋没しないように地表側に突出させておく。   Here, as shown in FIG. 5 (c), the reinforcing bar 16 is fixed so that the bag body 8 is in contact with the inner surface of the groove 14 on the back side surface ground 1 b side. Further, the upper end of the injection pipe 10 is projected to the ground surface side so as not to be buried by the concrete 19 to be placed.

この状態で、トレミー管18によってコンクリート19を前記溝14内に打設すると、前記袋体8を除いた前記鉄筋籠16の周囲にコンクリート19が充填される。   In this state, when concrete 19 is driven into the groove 14 by the tremy tube 18, the concrete 19 is filled around the reinforcing bar 16 excluding the bag body 8.

以上の工程を前記した各ブロックにおいて繰り返すことによって、地盤1の内部に前記連続地中壁6を構築する。   The continuous underground wall 6 is constructed in the ground 1 by repeating the above steps in each block described above.

次に、本実施の形態の連続地中壁6を使用した山留め工法について説明すると共に、その作用について説明する。   Next, the mountain fastening method using the continuous underground wall 6 of the present embodiment will be described and the operation thereof will be described.

図2は、掘削が完了して掘削部1cが形成された状態の断面図である。本実施の形態の山留め工法では、この状態に至るまでに、地盤1を掘削し、切梁3を一段設置する作業を繰り返す。   FIG. 2 is a cross-sectional view in a state where excavation is completed and an excavation part 1c is formed. In the mountain fastening method of the present embodiment, the operation of excavating the ground 1 and installing the cut beams 3 in one stage is repeated until this state is reached.

このような山留め工法では、掘削を開始すると、前記連続地中壁6が掘削部1c側に変形し始める。この変形は、掘削当初は前記連続地中壁6の上端付近にのみ発生するが、掘削面1aが掘り下がるに従って、変形する範囲も下方に広がる。   In such a mountain retaining method, when excavation is started, the continuous underground wall 6 starts to deform toward the excavation part 1c. This deformation occurs only in the vicinity of the upper end of the continuous underground wall 6 at the beginning of excavation, but as the excavation surface 1a is dug down, the deformation range also extends downward.

ここで、従来の山留め壁2であれば、図6に示したように前記背側面側地盤1bが掘削部1c側に変形した分だけ地表面が沈下することになる。   Here, in the case of the conventional retaining wall 2, as shown in FIG. 6, the ground surface sinks as much as the back side ground 1b is deformed to the excavation part 1c side.

これに対して、本実施の形態では、前記傾斜計11によって前記壁体7の傾きが検出されると、傾いている箇所に配設された前記区画8a,8b,・・・に前記注入管10a,10b,・・・を介して前記流体9を注入し、前記区画8a,8b,・・・を膨張させる。   On the other hand, in this embodiment, when the inclination of the wall body 7 is detected by the inclinometer 11, the injection pipe is inserted into the sections 8a, 8b,. The fluid 9 is injected through 10a, 10b,... To expand the compartments 8a, 8b,.

このようにして前記区画8a,8b,・・・が膨張すると、一旦、掘削部1c側に変形してきた前記背側面側地盤1bは押し戻される。この結果、前記背側面側地盤1bの変形は抑制されることになる。   In this way, when the sections 8a, 8b,... Expand, the back side ground 1b that has been deformed to the excavation part 1c side is pushed back. As a result, deformation of the back side ground 1b is suppressed.

ここで、前記流体9を注入しても前記壁体7の剛性が高まるわけではないため、前記壁体7は注入前と同様に変形する。このため、傾斜計11の測定値は、絶対値のみならず変化量も検討することによって、更なる前記背側面側地盤1bの変形を把握できるようにする。   Here, since the rigidity of the wall body 7 does not increase even when the fluid 9 is injected, the wall body 7 is deformed in the same manner as before the injection. For this reason, the measured value of the inclinometer 11 is made to be able to grasp the further deformation of the back side ground 1b by considering not only the absolute value but also the amount of change.

また、前記背側面側地盤1bから発生する土圧の大きさは、前記土圧計13によって検出することができるので、この測定値を使用して前記背面側地盤1bの変形を検出することもできる。   Further, since the earth pressure generated from the back side ground 1b can be detected by the earth pressure gauge 13, the measured value can be used to detect the deformation of the back side ground 1b. .

そして、更に掘削が進むと、前記壁体7が変形する範囲及び変形量は大きくなるため、前記注入管10a,10b,・・・からの注入量(注入圧)を増加して対処する。   As the excavation progresses further, the range and amount of deformation of the wall 7 increases, so the amount of injection (injection pressure) from the injection pipes 10a, 10b,.

さらに、前記袋体8は、ある程度膨張すると、前記背側面側地盤1b及び前記壁体7による拘束によって、それ以上膨張しなくなる場合がある。この場合においても、前記流体9の注入圧を上げることによって前記背側面側地盤1bの更なる変形を抑制することができる。   Furthermore, when the bag body 8 is inflated to some extent, it may not expand further due to the restraint by the back side ground 1b and the wall body 7. Even in this case, further deformation of the back side ground 1b can be suppressed by increasing the injection pressure of the fluid 9.

また、前記背側面側地盤1bが変形した後に、新たな切梁3の設置や、前記背側面側地盤1bに薬液注入などの別の変形抑制工法が施工されることによって、前記背側面側地盤1bから生じる背面土圧が低下する場合がある。   Moreover, after the said back side ground 1b deform | transforms, another deformation | transformation control methods, such as chemical | medical solution injection | pouring etc., are installed in the said back side ground 1b by installation of a new cut beam 3, and the said back side ground. The back earth pressure resulting from 1b may decrease.

このような場合に、前記流体9の注入を続ければ、前記背側面側地盤1bは押し戻されすぎて、地表面が膨らんだり、建物4の下方に構築された基礎や地下室(図示せず)に過剰な土圧を作用させたりするおそれがある。   In such a case, if the injection of the fluid 9 is continued, the back side ground 1b is pushed back too much and the ground surface swells, or into a foundation or basement (not shown) constructed below the building 4. There is a risk of applying excessive earth pressure.

そこで、このような場合には注入圧を下げることによって、前記流体9を前記袋体8から排出して収縮させる。   Therefore, in such a case, the fluid 9 is discharged from the bag body 8 and contracted by lowering the injection pressure.

このような本実施の形態の山留め工法において、前記傾斜計11の測定値の検出、その測定値の解析、及びその結果に基づいた前記流体9の注入圧の制御を、コンピュータを介しておこなうことで、山留めの計測及び管理を自動化することができる。   In such a mountain fixing method of the present embodiment, detection of the measured value of the inclinometer 11, analysis of the measured value, and control of the injection pressure of the fluid 9 based on the result are performed via a computer. Thus, it is possible to automate the measurement and management of the dome.

以上に示したように、本実施の形態によれば、掘削によって前記背側面側地盤1bに変形が発生しても、変形量に応じて前記袋体8に前記流体9を注入することによって、前記背側面側地盤1bの変形を最小限に抑制することができる。   As described above, according to the present embodiment, even if the back side ground 1b is deformed by excavation, by injecting the fluid 9 into the bag body 8 according to the deformation amount, The deformation of the back side ground 1b can be minimized.

このため、前記背側面側地盤1bによる背面土圧が予測よりも大きくなった場合にも対応が可能である。また、過大な山留め壁を構築して構造体によって変形を抑制するわけではないので、予測より変形が小さい場合でも過大設計とされるおそれがない。   For this reason, it is possible to cope with the case where the back earth pressure by the back side ground 1b becomes larger than predicted. Moreover, since an excessive mountain retaining wall is not constructed and the deformation is not suppressed by the structure, there is no possibility that the design is excessive even if the deformation is smaller than predicted.

また、前記袋体8とその内部に注入する前記流体9という簡易な構成によって前記背側面側地盤1bの変形を抑制できるので、経済的である。   Moreover, since the deformation | transformation of the said back side ground 1b can be suppressed with the simple structure of the said bag 8 and the said fluid 9 inject | poured into the inside, it is economical.

そして、前記袋体8を深度方向に分割し、区画8a,8b,・・毎に膨張及び収縮が可能なため、前記背側面側地盤1bが変形した箇所だけ、その変形量に応じて効果的に変形を抑制することができる。   And since the said bag body 8 is divided | segmented into the depth direction and can expand | swell and shrink | contract for every division 8a, 8b, ..., only the location where the said back side ground 1b deform | transformed is effective according to the deformation amount. It is possible to suppress deformation.

さらに、変形が発生していない箇所を過剰に押し戻して、前記したように地表面を膨らませてしまう等の悪影響を前記背側面側地盤1bに与えることがない。   Furthermore, the back surface side ground 1b is not adversely affected by excessively pushing back a portion where no deformation has occurred and expanding the ground surface as described above.

また、前記背側面側地盤1bの地盤状態を予測し、予測された地層10A,10B,・・・の境界位置に合わせて前記袋体8の分割位置を決定するため、地質の違いによる変形量の差にも適切に対応することができる。   Further, since the ground state of the back side ground 1b is predicted and the division position of the bag body 8 is determined in accordance with the predicted boundary positions of the formations 10A, 10B,. It is possible to appropriately cope with the difference.

そして、前記傾斜計11によって前記壁体7の傾きをリアルタイムで計測することで、前記背側面側地盤1bの変形が大きくなる前に変形を最小限に抑制することができるので、実質的な被害を防ぐことができる。   And by measuring the inclination of the wall body 7 in real time by the inclinometer 11, the deformation can be suppressed to a minimum before the deformation of the back side ground 1b becomes large. Can be prevented.

以上、図面を参照して、本発明の最良の実施の形態を詳述してきたが、具体的な構成は、この実施の形態に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。   Although the best embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes that do not depart from the gist of the present invention are possible. Are included in the present invention.

例えば、前記実施の形態では、複数の袋によって区画8a,8b,8c,8dを形成したが、一つの袋を途中で縫いつけて流体9が他の区画8a,8b,8c,8dに流入しないように形成してもよい。   For example, in the above-described embodiment, the compartments 8a, 8b, 8c and 8d are formed by a plurality of bags. However, the fluid 9 does not flow into the other compartments 8a, 8b, 8c and 8d by sewing one bag halfway. You may form in.

また、前記傾斜計11は区画毎に配置したが、設置する数は任意であり、前記傾斜計11が設置されていない部分の傾きは、隣接する他の測定値によって推定させることもできる。   Moreover, although the said inclinometer 11 was arrange | positioned for every division, the number to install is arbitrary, The inclination of the part in which the said inclinometer 11 is not installed can also be estimated by another adjacent measured value.

そして、前記実施の形態では、設置式の傾斜計11を使用したが、前記ガイド管12のみ設置しておき、掘削開始後、適宜、挿入式傾斜計を前記ガイド管12に挿入して前記壁体7の傾きを計測することもできる。   In the embodiment, the installation type inclinometer 11 is used. However, only the guide pipe 12 is installed, and after the excavation is started, an insertion type inclinometer is inserted into the guide pipe 12 as appropriate. The inclination of the body 7 can also be measured.

さらに、前記実施の形態では、前記傾斜計11を設置するための前記ガイド管12を、前記袋体8Bの側縁に取り付けたが、前記ガイド管12を前記鉄筋籠16の固定部に直接固定してもよい。   Furthermore, in the said embodiment, although the said guide pipe | tube 12 for installing the said inclinometer 11 was attached to the side edge of the said bag body 8B, the said guide pipe | tube 12 is directly fixed to the fixing | fixed part of the said reinforcing bar rod 16 May be.

また、前記背側面側地盤1bに傾斜計11を埋設して、直接地盤の変形を計測したり、前記壁体7の内側面側の変位を測量手段によって計測したりして測定値を検出し、その測定値に基づいて前記流体9の注入を制御することもできる。   Further, an inclinometer 11 is embedded in the back side ground 1b to directly measure the deformation of the ground, or the displacement of the inner side of the wall 7 is measured by a surveying means to detect a measured value. The injection of the fluid 9 can be controlled based on the measured value.

そして、前記実施の形態では、計測手段として傾斜計11を使用したが、前記壁体7の変形を計測するひずみ計を使用してもよい。例えば、前記壁体7に沿って鉛直方向に配設された鋼管の内側面にひずみ計を貼り付け、前記壁体7の変形を前記鋼管を介して計測することができる。   In the embodiment described above, the inclinometer 11 is used as the measuring means, but a strain gauge that measures the deformation of the wall body 7 may be used. For example, a strain gauge can be attached to the inner surface of a steel pipe disposed in the vertical direction along the wall body 7, and the deformation of the wall body 7 can be measured via the steel pipe.

さらに、前記実施の形態では、前記壁体7を鉄筋コンクリートによって構築したが、前記壁体7の構築方法はこれに限定されるものではなく、例えば地盤1をセメント系固化材を注入しながら撹拌し、鉄骨などの芯材を挿入して構築するソイルミキシングウォール(SMW)であってもよい。この場合は、前記芯材に前記袋体8を固定すればよい。   Furthermore, in the said embodiment, although the said wall body 7 was constructed | assembled by the reinforced concrete, the construction method of the said wall body 7 is not limited to this, For example, the ground 1 is stirred, inject | pouring a cement-type solidification material. Alternatively, a soil mixing wall (SMW) constructed by inserting a core material such as a steel frame may be used. In this case, the bag body 8 may be fixed to the core material.

本発明の最良の実施の形態の連続地中壁の構成を説明する斜視図である。It is a perspective view explaining the structure of the continuous underground wall of the best embodiment of this invention. 本発明の最良の実施の形態の連続地中壁を使用した山留め工法を説明する断面図である。It is sectional drawing explaining the mountain fastening method using the continuous underground wall of the best embodiment of this invention. 本発明の最良の実施の形態の連続地中壁の構成を説明する背側面図である。It is a back side view explaining the composition of the continuous underground wall of the best embodiment of the present invention. 本発明の最良の実施の形態の連続地中壁の構成を説明する拡大断面図である。It is an expanded sectional view explaining the structure of the continuous underground wall of the best embodiment of this invention. 本発明の最良の実施の形態の連続地中壁の構築方法を説明する作業工程図である。It is a work process figure explaining the construction method of the continuous underground wall of the best embodiment of this invention. 従来例の山留め工法を説明する断面図である。It is sectional drawing explaining the mountain fastening method of a prior art example. 従来例の防護壁を用いた山留め工法を説明する断面図である。It is sectional drawing explaining the mountain fastening method using the protection wall of a prior art example.

符号の説明Explanation of symbols

1 地盤
1b 背側面側地盤
1c 掘削部(内側面側)
6 連続地中壁
7 壁体
8 袋体
8a,8b,・・・ 区画
9 流体
10 注入管(供給手段)
10a,10b,・・・ 注入管(供給手段)
11 傾斜計(計測手段)
1 ground 1b back side ground 1c excavation part (inside side)
6 Continuous underground wall 7 Wall body 8 Bag body 8a, 8b, ... Section 9 Fluid 10 Injection pipe (supply means)
10a, 10b, ... Injection pipe (supply means)
11 Inclinometer (measuring means)

Claims (5)

予め地中に構築された壁体の内側面側の地盤を掘削する際に、背側面側に残される地盤の前記内側面側への変形を抑制する連続地中壁であって、
前記壁体の背側面側に配置されて、供給手段を介して流体を注入することによって前記背側面側地盤の変形を抑制する袋体を有することを特徴とする連続地中壁。
When excavating the ground on the inner surface side of the wall body built in advance in the ground, it is a continuous underground wall that suppresses deformation to the inner surface side of the ground left on the back side surface,
A continuous underground wall having a bag body that is disposed on a back side surface of the wall body and suppresses deformation of the back side surface ground by injecting fluid through a supply means.
前記袋体は、深度方向に分割されており、該分割された区画毎に前記流体の注入が可能であることを特徴とする請求項1に記載の連続地中壁。   2. The continuous underground wall according to claim 1, wherein the bag body is divided in a depth direction, and the fluid can be injected into each of the divided sections. 前記袋体の分割位置を、前記壁体の背側面側の予測された地層の境界位置に合わせたことを特徴とする請求項2に記載の連続地中壁。   The continuous underground wall according to claim 2, wherein a division position of the bag body is matched with a predicted boundary position of the formation on the back side of the wall body. 前記壁体に、その傾き又は変形を計測する計測手段を設けたことを特徴とする請求項1乃至請求項3のいずれかに記載の連続地中壁。   The continuous underground wall according to any one of claims 1 to 3, wherein a measuring means for measuring the inclination or deformation of the wall body is provided. 地盤に請求項1乃至請求項4のいずれかに記載の連続地中壁を構築し、前記壁体の内側面側の地盤を掘削し、その掘削に伴って発生した前記壁体の傾き又は変形を測定し、該測定値に基づいて前記供給手段を介して前記袋体に流体を注入して前記背側面側地盤の変形を抑制することを特徴とする山留め工法。
The continuous underground wall according to any one of claims 1 to 4 is constructed on the ground, the ground on the inner surface side of the wall body is excavated, and the inclination or deformation of the wall body that occurs as a result of the excavation. , And injecting fluid into the bag body through the supply means based on the measured value to suppress deformation of the back side ground.
JP2004201371A 2004-07-08 2004-07-08 Continuous underground wall and mountain retaining method Expired - Fee Related JP4313263B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004201371A JP4313263B2 (en) 2004-07-08 2004-07-08 Continuous underground wall and mountain retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004201371A JP4313263B2 (en) 2004-07-08 2004-07-08 Continuous underground wall and mountain retaining method

Publications (2)

Publication Number Publication Date
JP2006022551A true JP2006022551A (en) 2006-01-26
JP4313263B2 JP4313263B2 (en) 2009-08-12

Family

ID=35796022

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004201371A Expired - Fee Related JP4313263B2 (en) 2004-07-08 2004-07-08 Continuous underground wall and mountain retaining method

Country Status (1)

Country Link
JP (1) JP4313263B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012082676A (en) * 2011-04-11 2012-04-26 Takenaka Komuten Co Ltd Displacement controlling method
JP5075209B2 (en) * 2007-12-18 2012-11-21 太陽誘電株式会社 Duplexer, module including duplexer, and communication device
CN108716223A (en) * 2018-06-28 2018-10-30 广州市设计院 Barricade drainage system
JP2018178483A (en) * 2017-04-11 2018-11-15 大成建設株式会社 Deformation measuring device for retaining wall, deformation measurement system, and retaining structure
CN111287200A (en) * 2020-03-27 2020-06-16 中煤第三建设(集团)有限责任公司 Back pressure system for restraining horizontal displacement of foundation pit support structure and construction method thereof
CZ309116B6 (en) * 2013-11-26 2022-02-09 Toyobo Co., Ltd. Aqueous dispersion composition containing a modified polyolefin
CN114197477A (en) * 2021-12-13 2022-03-18 中铁四局集团第四工程有限公司 Construction method for zero-distance crossing of high-speed rail viaduct under construction deep foundation pit

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5075209B2 (en) * 2007-12-18 2012-11-21 太陽誘電株式会社 Duplexer, module including duplexer, and communication device
JP2012082676A (en) * 2011-04-11 2012-04-26 Takenaka Komuten Co Ltd Displacement controlling method
CZ309116B6 (en) * 2013-11-26 2022-02-09 Toyobo Co., Ltd. Aqueous dispersion composition containing a modified polyolefin
JP2018178483A (en) * 2017-04-11 2018-11-15 大成建設株式会社 Deformation measuring device for retaining wall, deformation measurement system, and retaining structure
CN108716223A (en) * 2018-06-28 2018-10-30 广州市设计院 Barricade drainage system
CN108716223B (en) * 2018-06-28 2024-05-28 广州市设计院集团有限公司 Retaining wall drainage system
CN111287200A (en) * 2020-03-27 2020-06-16 中煤第三建设(集团)有限责任公司 Back pressure system for restraining horizontal displacement of foundation pit support structure and construction method thereof
CN114197477A (en) * 2021-12-13 2022-03-18 中铁四局集团第四工程有限公司 Construction method for zero-distance crossing of high-speed rail viaduct under construction deep foundation pit

Also Published As

Publication number Publication date
JP4313263B2 (en) 2009-08-12

Similar Documents

Publication Publication Date Title
KR100713787B1 (en) The underground structure assembly and the underground structure building method which it uses
CN104652418B (en) Diaphragm wall underground utilities position construction method
US20090269146A1 (en) Method for Construction of Piles and Caissons and Soil Improvement by Using Rubber Hoses
JP5696516B2 (en) Pile structure and pile construction method
JP6189597B2 (en) Columnar structure reinforcement structure and columnar structure reinforcement method
KR100805189B1 (en) Construction method of underground structure characterized by going side by side wall construction and excavation
JP4313263B2 (en) Continuous underground wall and mountain retaining method
JP5231889B2 (en) Method for protecting hole wall of cast-in-place pile
JP2717874B2 (en) Open caisson construction method and device
JP5351125B2 (en) Open shield machine start method of open shield method
KR20140082343A (en) Method for constructing tunnel by using pipe
CN113737780A (en) Underwater rock-socketed concrete pile and construction method thereof
JP2008208533A (en) Caisson and its construction method
US8690478B2 (en) Tunnel reinforcement structure and tunnel construction method capable of controlling ground displacement using pressurization
CN108999203A (en) A kind of construction method of steel cylinder well
CN114657974A (en) Method for quickly splicing cast-in-place pile under complex geological condition
CN105274984A (en) Double-casing-pipe full-circle-swinging erect column pile construction method
KR20130002797A (en) Reinforced concrete pile construction method for which steel pipe casing structure for steel pipe casing recovery this were used
JP2017197910A (en) Construction method of earth retaining wall structure, and earth retaining wall structure
EP1964981A1 (en) Reinforcement elements for in-situ cast walls and method to excavate in situ cast walls
CN212336065U (en) Guiding and sinking system suitable for underground shaft group construction
AU2018202809A1 (en) Improved Caisson Emplacement System and Method
CN114482072B (en) Soft soil close-connection double-foundation-pit combined anchor design method, supporting structure and construction method
JP5021049B2 (en) Reaction device for bottom plate and method for constructing bottom plate
JP3996162B2 (en) Propulsion pipe underground propulsion base and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070316

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090120

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090311

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090512

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090514

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120522

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150522

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees