JP2005054506A - Foundation block for guard fence, and construction method for guard fence - Google Patents

Foundation block for guard fence, and construction method for guard fence Download PDF

Info

Publication number
JP2005054506A
JP2005054506A JP2003288006A JP2003288006A JP2005054506A JP 2005054506 A JP2005054506 A JP 2005054506A JP 2003288006 A JP2003288006 A JP 2003288006A JP 2003288006 A JP2003288006 A JP 2003288006A JP 2005054506 A JP2005054506 A JP 2005054506A
Authority
JP
Japan
Prior art keywords
front wall
rear wall
wall
foundation block
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003288006A
Other languages
Japanese (ja)
Other versions
JP4198560B2 (en
Inventor
Tetsuya Matsuyama
哲也 松山
Takashi Kameyama
剛史 亀山
Isao Watanabe
功 渡邉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nihon Kogyo KK
Original Assignee
Nihon Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Kogyo KK filed Critical Nihon Kogyo KK
Priority to JP2003288006A priority Critical patent/JP4198560B2/en
Publication of JP2005054506A publication Critical patent/JP2005054506A/en
Application granted granted Critical
Publication of JP4198560B2 publication Critical patent/JP4198560B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Retaining Walls (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To rapidly construct a rock fall guard fence. <P>SOLUTION: A foundation block 1 is composed of a front wall 2 and a rear wall 3 erected with a set space, and a post erecting part 4 provided integrally with the front wall 2 and rear wall 3 in the projected state of the respective right and left tip parts of the front wall 2 and rear wall 3. A post hole 4a for erecting a post is formed in the post erecting part 4, and a connecting reinforcement 5 having end parts extended over the respective right and left end faces of the front wall 2 and rear wall 3 is embedded in the post erecting part 4. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、道路などへの落石を防止する防護柵用基礎ブロックおよび防護柵の施工方法に関するものである。   The present invention relates to a foundation block for a protective fence that prevents falling rocks on roads and the like, and a method for constructing the protective fence.

従来より、落石が発生するおそれのある法面などには、防護柵が設けられている。この防護柵は、法尻や道路端などに形成したコンクリート基礎に、サポート付きの端末支柱や、複数本の中間支柱を適宜な間隔をおいて建て込み、端末支柱および中間支柱に複数本の強靱なワイヤーロープを上下方向に適宜な間隔をおいてUボルトなどの金具で張設し、これらのワイヤーロープの全域にわたって金網を適宜連結して張設して構成される。このような防護柵により、法面などの山側から崩落する落石を緩衝して受け止め、防護するようにしている(例えば、特許文献1参照)。
特開平11−336025号公報
Conventionally, protective fences are provided on slopes where rockfalls may occur. This protective fence is built on a concrete foundation formed on the edge of a road or on the edge of a road, with built-in support terminal columns and multiple intermediate columns at appropriate intervals. A simple wire rope is stretched with metal fittings such as U bolts at appropriate intervals in the vertical direction, and a wire mesh is appropriately stretched over the entire area of these wire ropes. With such a protective fence, rocks falling from the mountain side such as a slope are buffered and received and protected (for example, see Patent Document 1).
Japanese Patent Laid-Open No. 11-336025

ところで、防護柵は、落石の危険が予想される箇所での作業となるため、作業者の安全確保の面から迅速な施工が要求される。また、既設道路の改良工事として防護柵を施工する場合についても、交通の障害や通行者の安全性の面から迅速な施工が要求される。   By the way, since the protective fence is a work at a place where a risk of falling rocks is expected, a rapid construction is required from the viewpoint of ensuring the safety of the worker. In addition, when a protective fence is constructed as an improvement work for an existing road, rapid construction is required from the viewpoint of traffic obstacles and the safety of passers-by.

しかしながら、前述した防護柵においては、防護柵を設置しようとする現場において、コンクリートを打設して支柱を立設するためのコンクリート基礎を形成する必要がある。すなわち、コンクリート基礎を形成するため、型枠の組立て、コンクリートの流し込み、養生、型枠の取外し、といった工程を経なければならず、完成するまでに多くの日数を必要とするものである。しかも、落石が予想される箇所は、急峻な地形であることから、作業環境が悪く、作業者の足場を確保したり、通行車両や通行者に対する安全対策を講じなければならず、コンクリート基礎を形成するのに先立っての予備工事や、その撤去工事といった付帯工事も必要となり、さらに多くの工期を必要とする、という問題があった。   However, in the above-described protective fence, it is necessary to form a concrete foundation for placing concrete and standing upright in a field where the protective fence is to be installed. In other words, in order to form a concrete foundation, it is necessary to go through the steps of assembling the formwork, pouring concrete, curing, removing the formwork, and it takes many days to complete. Moreover, the location where rockfalls are expected is steep terrain, so the work environment is bad, and it is necessary to secure a foothold for workers, and to take safety measures for passing vehicles and passers-by. There was a problem that additional work such as preliminary work and removal work prior to formation was required, and more work was required.

本発明は、このような問題点に鑑みてなされたもので、建設機械などを用いて短い工期で施工することのできる落石の防護柵用基礎ブロックおよび防護柵の施工方法を提供するものである。   The present invention has been made in view of such problems, and provides a foundation block for a falling rock protection fence that can be constructed in a short period of time using a construction machine or the like, and a method for constructing the protection fence. .

本発明は、設定間隔をおいて立設された前壁および後壁と、前壁の左右先端部および後壁の左右先端部がそれぞれ突出した状態で前壁および後壁と一体に設けられた支柱建込部と、からなり、支柱建込部には、支柱を建込可能な支柱穴が形成されるとともに、前壁の左右端面および後壁の左右端面をそれぞれ越えて延出する端部を有する連結鉄筋が埋設されていることを特徴とするものである。   The present invention is provided integrally with the front wall and the rear wall in a state where the front wall and the rear wall standing upright at a set interval, the left and right front end portions of the front wall, and the left and right front end portions of the rear wall protrude, respectively. The strut erected part is formed with a strut hole in which the strut can be erected, and extends beyond the left and right end surfaces of the front wall and the left and right end surfaces of the rear wall. The connection reinforcing bar which has is embedded.

本発明によれば、建設機械やクレーンなどを用いて基礎ブロックを左右方向に順に据え付けることができる。したがって、支柱を立設するためのコンクリート基礎に相当する部分を簡単に形成することができ、従来のコンクリート基礎を形成する場合のように、型枠の組立てや、型枠の取外しといった工程が不要となるとともに、その付帯工事も不要となり、工期を大幅に短縮することができ、また、コストを大きく削減することができる。   According to the present invention, the foundation block can be installed sequentially in the left-right direction using a construction machine, a crane, or the like. Therefore, it is possible to easily form the part corresponding to the concrete foundation for erecting the support column, and there is no need for processes such as assembly of the formwork and removal of the formwork as in the case of forming a conventional concrete foundation. In addition, the incidental work is not required, the construction period can be greatly shortened, and the cost can be greatly reduced.

ここで、左右方向に据え付けられた各基礎ブロックにおける前壁の内面および後壁の内面によって区画される空間は、左右方向に隣接する基礎ブロックにおける前壁の内面および後壁の内面によって区画される空間と連通されているとともに、各基礎ブロックの前壁の内面および後壁の内面によって区画される空間には、隣接する基礎ブロックの左右端縁を越えて突出する連結鉄筋の端部が入り込んでいる。したがって、各基礎ブロックにおける前壁と後壁との間に胴込めコンクリートを充填することにより、左右方向に隣接する一対の基礎ブロックを鉄筋コンクリートを介して強固に一体化することができる。   Here, the space defined by the inner surface of the front wall and the inner surface of the rear wall in each foundation block installed in the left-right direction is partitioned by the inner surface of the front wall and the inner surface of the rear wall in the foundation block adjacent in the left-right direction. The end of the connecting reinforcing bar that protrudes beyond the left and right edges of the adjacent foundation block enters the space that communicates with the space and is defined by the inner surface of the front wall and the rear wall of each foundation block. Yes. Therefore, a pair of foundation blocks adjacent to each other in the left-right direction can be firmly integrated through reinforced concrete by filling infilled concrete between the front wall and the rear wall of each foundation block.

本発明において、前記支柱建込部よりも外方の前壁の内面および後壁の内面に、それぞれ上端から下端近傍にかけて溝が形成されていると、各基礎ブロックにおける前壁と後壁との間に充填された胴込めコンクリートが溝に入り込むことにより、基礎ブロックに左右方向に引き抜き力が作用した際、アンカーとして機能し、引き抜き力に抗することができる。   In the present invention, when grooves are formed from the upper end to the vicinity of the lower end on the inner surface of the front wall and the inner surface of the rear wall outside the column erection part, the front wall and the rear wall of each foundation block When the concrete filled in between enters the groove, when a pulling force acts on the foundation block in the left-right direction, it functions as an anchor and can resist the pulling force.

本発明において、前記前壁の左右一方の端縁部および該前壁の左右一方の端縁部に対向する後壁の左右一方の端縁部に薄肉部が形成されていると、ハンマーなどを用いて薄肉部をノックアウトすることにより、前壁および後壁に開口を簡単に形成することができる。そして、前壁の開口と、前壁の開口と対向する後壁の開口にわたって水抜きパイプを配設することにより、基礎ブロックの表面側と背面側とが連通されるため、基礎ブロックの背後地からの水を積極的に基礎ブロックの表面側に排水することができる。   In the present invention, when a thin portion is formed on one of the left and right end edges of the front wall and one of the left and right end edges of the front wall, By using and knocking out the thin wall portion, openings can be easily formed in the front wall and the rear wall. Since the drainage pipe is disposed over the opening of the front wall and the opening of the rear wall opposite to the opening of the front wall, the surface side and the back side of the foundation block communicate with each other. Can be positively drained to the surface side of the foundation block.

この場合、基礎ブロックの背後地の盛土などが流出しないように、後壁の表面に沿って吸い出し防止材をあてがう必要がある。また、水抜きパイプを基礎ブロックの後壁から前壁にかけて下り勾配で配設して背後地からの水を基礎ブロックの表面側に円滑に排水できるように、後壁の薄肉部が前壁の薄肉部よりも相対的に高い位置に形成されることが好ましい。   In this case, it is necessary to apply a sucking prevention material along the surface of the rear wall so that the embankment behind the foundation block does not flow out. In addition, the thin wall part of the rear wall is located on the front wall so that the drainage pipe is arranged in a downward slope from the rear wall to the front wall of the foundation block and water from the back ground can be smoothly drained to the surface side of the foundation block. It is preferably formed at a position relatively higher than the thin portion.

本発明において、前記支柱建込部の上面に、前後方向に支柱の奥行きに略相当する間隔をおいて一対の横鉄筋用溝が形成されていると、複数個の基礎ブロックの支柱建込部の横鉄筋用溝にわたって長尺な横鉄筋を配設することができる。そして、基礎ブロックの支柱建込部の支柱穴に支柱を建て込む際、支柱を一対の横鉄筋によって挾持しつつ、横鉄筋を利用して移動しないように位置決めすることができる。また、連結鉄筋に加えて、隣接する一対の基礎ブロックにわたって横鉄筋が配設されることにより、左右方向に隣接する一対の基礎ブロックを鉄筋コンクリートによってより強固に一体化することができる。   In the present invention, when a pair of horizontal reinforcing bar grooves are formed on the upper surface of the column erected portion at an interval substantially corresponding to the depth of the column in the front-rear direction, the column erected portions of a plurality of foundation blocks A long horizontal reinforcing bar can be disposed over the horizontal reinforcing bar groove. And when installing a support | pillar in the support | pillar hole of the support | pillar installation part of a foundation block, it can position so that it may not move using a horizontal rebar, holding a support | pillar with a pair of horizontal rebar. Moreover, in addition to the connecting reinforcing bars, the horizontal reinforcing bars are arranged over the pair of adjacent foundation blocks, so that the pair of foundation blocks adjacent in the left-right direction can be more firmly integrated with the reinforced concrete.

本発明において、前記前壁および後壁の左右一方の各端面に、シール材用目地が上端から下端にかけて形成されていると、各基礎ブロックの前壁のシール材用目地および後壁のシール材用目地にシール材を配設して基礎ブロックを据え付けることにより、隣接する一対の基礎ブロックの突き合わせ部をシール材を介して密封することができる。   In the present invention, when sealing material joints are formed from the upper end to the lower end on each of the left and right end surfaces of the front wall and the rear wall, the sealing material joints for the front wall and the sealing material for the rear wall of each base block By disposing the sealing material on the joint and installing the foundation block, the butted portions of a pair of adjacent foundation blocks can be sealed via the sealing material.

本発明は、既設の擁壁または道路端などに基礎工を施工した後、請求項1乃至5のいずれかに記載の防護柵用基礎ブロックを据え付ける一方、設定間隔をおいて基礎ブロックの支柱建込部の支柱穴に支柱を建て込むとともに、各基礎ブロックにおける前壁と後壁との間に胴込めコンクリートを充填して養生した後、支柱間にわたってワイヤーロープを張設することを特徴とするものである。   The present invention installs the foundation block for a protective fence according to any one of claims 1 to 5 after constructing a foundation work on an existing retaining wall or road edge, etc. A strut is built in the strut hole of the insert part, and after filling and curing the infilled concrete between the front wall and the rear wall in each foundation block, a wire rope is stretched between the struts. Is.

本発明によれば、既設の擁壁または道路端などに基礎工を施工した後、建設機械やクレーンなどを用いて基礎ブロックを左右方向に順に据え付ける。次いで、設定間隔をおいて基礎ブロックの支柱建込部の支柱穴に支柱を建て込むとともに、各基礎ブロックにおける前壁と後壁との間に胴込めコンクリートを充填して養生した後、支柱間にわたってワイヤーロープを張設することにより、防護柵を構築することができる。   According to the present invention, after a foundation work is constructed on an existing retaining wall or a road edge, the foundation blocks are installed in order in the left-right direction using a construction machine or a crane. Next, after setting up the struts in the strut holes of the strut building part of the foundation block at a set interval, filling and curing the concrete between the front wall and the rear wall of each foundation block, between the struts A protective fence can be constructed by laying a wire rope across.

この結果、建設機械やクレーンなどを用いて基礎ブロックを左右方向に順に据え付けるだけで、支柱を立設するためのコンクリート基礎に相当する部分を簡単に形成することができることから、支柱を立設するためのコンクリート基礎を形成する必要がなく、それに伴って、コンクリート基礎を形成するための型枠の組立てや、型枠の取外しといった作業も不要となるとともに、その付帯工事も不要となり、工期を大幅に短縮することができ、また、コストを大きく削減することができる。そして、工期が短縮されることに伴って、より早期に落石などに対応することができるとともに、仮に落石などが発生したとしても、被害の拡大を防止することができる。   As a result, it is possible to easily form the part corresponding to the concrete foundation for erecting the column by simply installing the foundation block in the left-right direction in order using a construction machine or a crane. There is no need to form a concrete foundation for this purpose, and as a result, work such as assembling and removing the formwork to form the concrete foundation is no longer necessary, and the accompanying work is also unnecessary, greatly increasing the work period. In addition, the cost can be greatly reduced. As the construction period is shortened, falling rocks can be dealt with earlier, and even if falling rocks occur, the spread of damage can be prevented.

また、各基礎ブロックの前壁の内面および後壁の内面によって区画される空間には、隣接する基礎ブロックの左右端縁を越えて突出する連結鉄筋の端部が互いに入り込んでいることから、各基礎ブロックにおける前壁と後壁との間に胴込めコンクリートを充填することにより、左右方向に隣接する一対の基礎ブロックは、鉄筋コンクリートを介して強固に一体化される。このため、防護柵用基礎ブロックに落石などによって左右方向に引き抜き力が作用したとしても、コンクリート単独の場合に比較して、より大きな引き抜き力に抗することができる。   In addition, the space defined by the inner surface of the front wall and the inner surface of the rear wall of each foundation block includes the ends of the connecting reinforcing bars protruding beyond the left and right edges of the adjacent foundation blocks. By filling indwelling concrete between the front wall and the rear wall of the foundation block, the pair of foundation blocks adjacent in the left-right direction are firmly integrated via the reinforced concrete. For this reason, even if a pulling force acts in the left-right direction due to falling rocks or the like on the protective fence foundation block, it can resist a larger pulling force compared to the case of concrete alone.

以上のように本発明によれば、建設機械などの機械力を用いて落石の防護柵を施工することができ、工期を短縮することができるとともに、コストを削減することができる。   As described above, according to the present invention, it is possible to construct a rockfall protection fence using mechanical force of a construction machine or the like, and it is possible to shorten the construction period and reduce the cost.

以下、本発明の実施の形態を図面を参照して説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1乃至図4には、本発明の防護柵用基礎ブロック1の一実施形態が示されている。   1 to 4 show an embodiment of a foundation block 1 for a protective fence according to the present invention.

この基礎ブロック1は、設定間隔をおいて立設された前壁2および後壁3と、これらの前壁2の左右先端部と上半部および後壁3の左右先端部と上半部がそれぞれ突出した状態で前壁2および後壁3と一体に設けられた支柱建込部4と、支柱建込部4の下端部近傍に中間部が埋設された連結鉄筋5と、から構成されている。   The basic block 1 includes a front wall 2 and a rear wall 3 erected at a set interval, and left and right tip portions and upper half portions of the front wall 2 and left and right tip portions and upper half portions of the rear wall 3. It is comprised from the support | pillar erection part 4 provided integrally with the front wall 2 and the rear wall 3 in the state which each protruded, and the connection reinforcement 5 by which the intermediate part was embed | buried under the lower end part of the support | pillar erection part 4. Yes.

前壁2および後壁3は、正面より見て横長の方形に形成され、それぞれ垂直な外面を有するとともに、型を抜くためのテーパー状の内面を有している。また、前壁2の内面および後壁3の内面には、左右端部近傍において、それぞれ上端縁から下端近傍にかけて凹状の溝2a,3aが形成されているとともに、各右端縁部において、薄肉部2b,3bが対向して形成されている。また、前壁2の右端面および後壁3の右端面には、上端縁から下端縁にかけて凹状のシール材用目地2c,3cが形成されている。   The front wall 2 and the rear wall 3 are formed in a horizontally-oriented rectangular shape as viewed from the front, and each has a vertical outer surface and a tapered inner surface for removing a mold. In addition, concave grooves 2a and 3a are formed on the inner surface of the front wall 2 and the inner surface of the rear wall 3 in the vicinity of the left and right end portions from the upper edge to the vicinity of the lower end, respectively, and in each right end edge, a thin portion 2b and 3b are formed facing each other. Further, concave seal material joints 2c and 3c are formed on the right end surface of the front wall 2 and the right end surface of the rear wall 3 from the upper end edge to the lower end edge.

このため、基礎ブロック1の前壁2と後壁3との間に胴込めコンクリート14を充填した際、コンクリートが溝2a,3aに入り込み、基礎ブロック1に作用した引き抜き力にアンカーとして抗することができる(図5参照)。また、薄肉部2a,3bをハンマーなどによってノックアウトすることにより、簡単に開口2b’,3b’を形成することができる。この場合、前壁2の薄肉部2bが、後壁3の薄肉部3bよりも相対的に低い位置に形成されており、図6に示すように、薄肉部2b,3bをノックアウトして形成された開口2b’,3b’にわたって水抜きパイプ9を配設した際、水抜きパイプ9を基礎ブロック1の背面側から表面側にかけて下り勾配に配設することができる。   For this reason, when filling concrete 14 between the front wall 2 and the rear wall 3 of the foundation block 1, the concrete enters the grooves 2 a and 3 a and resists the pulling force acting on the foundation block 1 as an anchor. (See FIG. 5). Further, the openings 2b 'and 3b' can be easily formed by knocking out the thin portions 2a and 3b with a hammer or the like. In this case, the thin portion 2b of the front wall 2 is formed at a position relatively lower than the thin portion 3b of the rear wall 3, and is formed by knocking out the thin portions 2b and 3b as shown in FIG. When the drainage pipe 9 is disposed over the openings 2b ′ and 3b ′, the drainage pipe 9 can be disposed in a descending gradient from the back side to the surface side of the foundation block 1.

なお、開口2b’,3b’を通して基礎ブロック1の背後地の盛土が流失することがないように、後壁3の外面に沿って吸い出し防止材10(図6参照)を配設する必要がある。   In addition, it is necessary to arrange | position the anti-sucking material 10 (refer FIG. 6) along the outer surface of the rear wall 3 so that the embankment in the back ground of the foundation block 1 may not be washed away through the openings 2b ′ and 3b ′. .

さらに、各基礎ブロック1の前壁2および後壁3の各シール材用目地2c,3cにシール材(図示せず)を配設して、基礎ブロック1を突き合わせて据え付けることにより、隣接する一対の基礎ブロック1の突き合わせ部をシール材を介して密封することができる。   Further, a sealing material (not shown) is disposed on each of the sealing material joints 2c and 3c on the front wall 2 and the rear wall 3 of each foundation block 1, and the foundation block 1 is abutted and installed, so that adjacent pairs are installed. The butted portion of the foundation block 1 can be sealed via a sealing material.

また、前壁2の内面側上端部には、ナット6(図4参照)が埋め込まれており、後述するように、隣接する一対の基礎ブロック1にわたって配置された連結プレート11(図12参照)をボルトによって固定することにより、隣接する一対の基礎ブロック1を連結プレート11を介して連結することができる。   Further, a nut 6 (see FIG. 4) is embedded in the upper end on the inner surface side of the front wall 2, and, as will be described later, a connecting plate 11 (see FIG. 12) disposed across a pair of adjacent base blocks 1 Can be connected to each other via a connecting plate 11.

なお、前壁2は、後壁3よりも若干横寸法が大きく設定されており、基礎ブロック1を左右方向に据え付ける際、湾曲した地形に対応させることができる。また、擁壁などと調和するように、前壁2の表面には、石積み模様などの装飾が施されてもよい。   The front wall 2 is set to have a slightly larger lateral dimension than the rear wall 3, and can be made to correspond to a curved terrain when the foundation block 1 is installed in the left-right direction. Moreover, decorations, such as a masonry pattern, may be given to the surface of the front wall 2 so that it may harmonize with a retaining wall.

支柱建込部4は、前壁2および後壁3の横寸法の約1/3の横寸法と、設定間隔をおいて立設された前壁2および後壁3の内面間間隔に相当する奥行き寸法と、前壁2および後壁3の高さの略半分の高さと、からなるほぼ直方体状に形成され、その左右側面は、型抜き勾配のテーパー面に形成されている。また、支柱建込部4には、中央に位置して、設定深さの支柱穴4aが上下方向に形成されるとともに、その上面に前後方向に設定間隔をおいて一対の横鉄筋用溝4bが形成されている。   The strut erection part 4 corresponds to a lateral dimension of about 1/3 of the lateral dimension of the front wall 2 and the rear wall 3 and a distance between the inner surfaces of the front wall 2 and the rear wall 3 standing at a set interval. It is formed in a substantially rectangular parallelepiped shape composed of a depth dimension and a height that is substantially half of the height of the front wall 2 and the rear wall 3, and the left and right side surfaces thereof are formed as tapered surfaces with a die cutting gradient. In addition, a column hole 4a having a set depth is formed in the vertical direction in the column built-in portion 4, and a pair of horizontal reinforcing bar grooves 4b are set on the upper surface with a set interval in the front-rear direction. Is formed.

ここで、支柱穴4aの穴径は、一定勾配以下の傾斜地に基礎ブロック1を据え付けた場合においても(図7参照)、支柱7を鉛直に立設することができるように、支柱7の外形寸法よりも充分に大きく設定されている。また、支柱穴4aの深さは、支柱穴4aに支柱7を建て込んだ際、基礎ブロック1の上面から支柱7が設定高さだけ突出するように設定されている。   Here, the diameter of the support column 4a is such that the support column 7 can be erected vertically even when the foundation block 1 is installed on an inclined ground having a certain gradient or less (see FIG. 7). It is set sufficiently larger than the dimensions. The depth of the support hole 4a is set so that the support 7 protrudes from the upper surface of the foundation block 1 by a set height when the support 7 is built in the support hole 4a.

また、一対の横鉄筋用溝4bは、図8に示すように、据え付けられた複数個の基礎ブロック1にわたって長尺な横鉄筋8を配設するために形成され、その間隔は、該横鉄筋用溝4bに横鉄筋8を配設した場合に、支柱穴4aに建て込んだ支柱7を前後から挾持できるように、支柱7の奥行きに合わせて設定されている。   Further, as shown in FIG. 8, the pair of horizontal reinforcing bar grooves 4 b is formed to dispose the long horizontal reinforcing bars 8 over the plurality of installed base blocks 1, and the distance between the horizontal reinforcing bars 4 b When the horizontal reinforcing bar 8 is disposed in the groove 4b, the depth of the support 7 is set so that the support 7 built in the support hole 4a can be held from the front and rear.

連結鉄筋5は、鋼棒をU字状に折曲するとともに、その各端部外側にそれぞれ鋼棒を重ね合わせて形成され、U字状の基端部および先端部が前壁2および後壁3の各左右端面をそれぞれ越えて外方に延出する長さを有して、重ね合わされた中間部分が支柱建込部4に埋設されている。したがって、基礎ブロック1を左右方向に順に据え付けた際、隣接する一対の基礎ブロック1において、左方の基礎ブロック1における連結鉄筋5のU字状の基端部および右方の基礎ブロック1における連結鉄筋5の先端部が、それぞれ相手側基礎ブロック1の前壁2および後壁3との間に入り込み、その際、連結鉄器5のU字状の基端部が連結鉄筋5の先端部の内方に位置するようになっている(図9参照)。   The connecting rebar 5 is formed by bending a steel bar into a U-shape and superimposing steel bars on the outer sides of the respective ends, and the U-shaped base end and front end are the front wall 2 and the rear wall. 3, each of the intermediate portions overlapped with each other has a length extending outwardly beyond the respective left and right end surfaces. Therefore, when the foundation block 1 is installed in the left-right direction in order, in a pair of adjacent foundation blocks 1, the U-shaped base end portion of the connection reinforcing bar 5 in the left foundation block 1 and the connection in the right foundation block 1 are connected. The front ends of the reinforcing bars 5 enter between the front wall 2 and the rear wall 3 of the counterpart base block 1, respectively. At this time, the U-shaped base end portion of the connecting iron 5 is within the front end portion of the connecting rebar 5. (See FIG. 9).

次に、このように構成された基礎ブロック1を用いて防護柵を施工する場合について説明する。   Next, the case where a guard fence is constructed using the foundation block 1 thus configured will be described.

まず、既設の擁壁の天端に調整コンクリート12を打設し、基礎ブロック1に対応して設定間隔をおいてアンカー鉄筋13を埋設する(図10参照)。次いで、建設機械やクレーンなどを用いて基礎ブロック1を調整コンクリート12上に順に据え付けた後(図11参照)、隣接する一対の基礎ブロック1にわたって連結プレート11を配置するとともに、ナット6にボルトをねじ込み、隣接する一対の基礎ブロック1を連結する。また、複数個の基礎ブロック1における支柱建込部4の横鉄筋用溝4bにわたって横鉄筋8を配設する(図12参照)。   First, the adjusting concrete 12 is placed on the top end of the existing retaining wall, and the anchor reinforcing bars 13 are embedded at a set interval corresponding to the foundation block 1 (see FIG. 10). Next, after the foundation block 1 is installed on the adjustment concrete 12 in order using a construction machine, a crane, or the like (see FIG. 11), the connecting plate 11 is arranged over a pair of adjacent foundation blocks 1 and a bolt is attached to the nut 6. Screw and connect a pair of adjacent foundation blocks 1. Moreover, the horizontal reinforcement 8 is arrange | positioned over the groove | channel 4b for horizontal reinforcement of the support | pillar erection part 4 in the some basic block 1 (refer FIG. 12).

また、必要に応じて、薄肉部2b,3bをノックアウトして開口2b’,3b’を形成し、対向する開口2b’,3b’にわたって水抜きパイプ9を配設するとともに、基礎ブロック1の背面側に吸い出し防止材10を設置する(図13参照)。   Further, if necessary, the thin-walled portions 2b and 3b are knocked out to form openings 2b 'and 3b', a drain pipe 9 is disposed over the opposed openings 2b 'and 3b', and the back of the foundation block 1 The anti-suction material 10 is installed on the side (see FIG. 13).

この後、基礎ブロック1における支柱建込部4の支柱穴4aに端部支柱7、中間支柱7Aを設定間隔をおいて建て込む(図14参照)。この際、先に配設した横鉄筋8を利用して支柱7を固定すると、胴込めコンクリート14を打設する際、支柱7が安定するため、好ましい。   Thereafter, the end column 7 and the intermediate column 7A are built at a set interval in the column hole 4a of the column building portion 4 in the foundation block 1 (see FIG. 14). At this time, it is preferable to fix the column 7 by using the horizontal reinforcing bars 8 disposed in advance because the column 7 is stabilized when placing the indwelling concrete 14.

支柱7の建て込みが終了すれば、各基礎ブロック1における前壁2と後壁3との間に胴込めコンクリート14を打設し、養生する(図15参照)。胴込めコンクリート14の養生が終了すれば、複数本の支柱7,7Aにわたってワイヤーロープ15を張設するとともに、適宜間隔をおいて間隔保持材16をワイヤロープ15に取り付けることにより、防護柵を構築することができる(図16および図17参照)。   When the erection of the support column 7 is completed, the indwelling concrete 14 is placed between the front wall 2 and the rear wall 3 in each foundation block 1 and cured (see FIG. 15). When the curing of the indwelling concrete 14 is completed, the wire rope 15 is stretched over the plurality of support columns 7 and 7A, and the interval holding material 16 is attached to the wire rope 15 at an appropriate interval to construct a protective fence. (See FIGS. 16 and 17).

以上のように、建設機械などを利用して基礎ブロック1を調整コンクリート12上に据え付ければよいことから、支柱7を立設するためのコンクリート基礎を形成する必要がなく、それに伴って、コンクリート基礎を形成するための型枠の組立てや、型枠の取外しといった作業も不要となるとともに、その付帯工事も不要となり、工期を大幅に短縮することができ、また、コストを大きく削減することができる。また、工期が短縮されることに伴って、より早期に落石などに対応することができるとともに、仮に落石などが発生したとしても、被害の拡大を防止することができる。   As described above, it is only necessary to install the foundation block 1 on the adjustment concrete 12 using a construction machine or the like, so there is no need to form a concrete foundation for erecting the support column 7, and accordingly, the concrete Work such as assembling the formwork to form the foundation and removing the formwork is no longer necessary, and the incidental work is also unnecessary, significantly shortening the work period and greatly reducing costs. it can. Further, as the construction period is shortened, it is possible to cope with falling rocks at an earlier stage, and even if falling rocks occur, the spread of damage can be prevented.

また、各基礎ブロック1の前壁2および後壁3の各内面によって区画される空間には、隣接する基礎ブロック1の左右端縁を越えて突出する連結鉄筋5の端部が互いに入り込んでいることから、各基礎ブロック1における前壁2と後壁3との間に胴込めコンクリート14を充填することにより、左右方向に隣接する一対の基礎ブロック1は、鉄筋コンクリートを介して強固に一体化される。このため、図18に示すように、基礎ブロック1に落石などによって左右方向に引き抜き力が作用したとしても、コンクリート単独の場合に比較して、より大きな引き抜き力に抗することができる。   Further, in the space defined by the inner surfaces of the front wall 2 and the rear wall 3 of each foundation block 1, end portions of the connecting reinforcing bars 5 protruding beyond the left and right end edges of the adjacent foundation blocks 1 enter each other. Therefore, by filling the embedded concrete 14 between the front wall 2 and the rear wall 3 in each foundation block 1, the pair of foundation blocks 1 adjacent in the left-right direction are firmly integrated via the reinforced concrete. The For this reason, as shown in FIG. 18, even if a pulling force acts on the foundation block 1 in the left-right direction due to falling rocks or the like, it can resist a larger pulling force compared to the case of concrete alone.

一方、傾斜する擁壁上に防護柵を構築する場合も、図19に示すように、同様に作業すればよい。この場合、傾斜して設置された基礎ブロック1と、水平に設置された基礎ブロック1とのように、隣接する一対の基礎ブロック1間に隙間が発生するときには、その隙間に間詰めコンクリート14Aを充填し、両基礎ブロック1の一体化を確保する必要がある。   On the other hand, when a protective fence is constructed on an inclined retaining wall, the same operation may be performed as shown in FIG. In this case, when a gap occurs between a pair of adjacent foundation blocks 1 such as the foundation block 1 installed at an inclination and the foundation block 1 installed horizontally, the interstitial concrete 14A is placed in the gap. It is necessary to fill and ensure the integration of both foundation blocks 1.

なお、前述した実施形態においては、擁壁の天端に防護柵を施工する場合を説明したが、道路端に施工することもできる。この場合は、道路端に基礎ブロック1を埋設する深さの掘削坑を掘削し、掘削坑に基礎コンクリートを打設してアンカー鉄筋を埋設した後、以下、同様に作業すればよい。   In addition, in embodiment mentioned above, although the case where a guard fence was constructed in the top end of a retaining wall was demonstrated, it can also construct in a road end. In this case, after excavating an excavation pit having a depth for embedding the foundation block 1 at the road end, placing foundation concrete in the excavation mine and embedding anchor reinforcing bars, the same operation may be performed.

以上説明したように、本発明によれば、落石などの防護柵の工期を大幅に短縮することができるため、落石などの危険に速やかに対応することができる。   As described above, according to the present invention, the construction period of a protective fence such as a falling rock can be greatly shortened, so that it is possible to quickly cope with a danger such as a falling rock.

本発明の防護柵用基礎ブロックの一実施形態を一部破断して示す斜視図である。It is a perspective view which partially fractures and shows one Embodiment of the foundation block for guard fences of this invention. 図1の基礎ブロックの平面図である。It is a top view of the basic block of FIG. 図1の基礎ブロックの側面図である。It is a side view of the foundation block of FIG. 図2のA−A線断面図である。It is the sectional view on the AA line of FIG. 図1の基礎ブロックにおける前壁と後壁との間に胴込めコンクリートを充填した状態の平面図およびそのB−B線断面図である。It is the top view and the BB sectional view taken on the line which filled the concrete between the front wall and the rear wall in the foundation block of FIG. 図1の基礎ブロックの前壁と後壁にわたって水抜きパイプを配設した状態の断面図である。It is sectional drawing of the state which has arrange | positioned the drainage pipe over the front wall and rear wall of the foundation block of FIG. 傾斜地に据え付けられた基礎ブロックに支柱を建て込んだ状態を示す断面図である。It is sectional drawing which shows the state which built the support | pillar in the foundation block installed in the sloping ground. 隣接する一対の基礎ブロックにわたって横鉄筋を配設した状態を示す平面図である。It is a top view which shows the state which has arrange | positioned the horizontal reinforcement over a pair of adjacent foundation block. 隣接する一対の基礎ブロックにおける連結鉄筋の配置状況を説明する平面図である。It is a top view explaining the arrangement situation of a connecting reinforcing bar in a pair of adjacent foundation blocks. 基礎ブロックを用いた防護柵の施工要領を説明する正面図および側面図である。It is the front view and side view explaining the construction point of the guard fence using a foundation block. 基礎ブロックを用いた防護柵の施工要領を説明する正面図および側面図である。It is the front view and side view explaining the construction point of the guard fence using a foundation block. 基礎ブロックを用いた防護柵の施工要領を説明する断面図および側面図である。It is sectional drawing and a side view explaining the construction point of the protection fence using a foundation block. 基礎ブロックを用いた防護柵の施工要領を説明する断面図および側面図である。It is sectional drawing and a side view explaining the construction point of the protection fence using a foundation block. 基礎ブロックを用いた防護柵の施工要領を説明する断面図および側面図である。It is sectional drawing and a side view explaining the construction point of the protection fence using a foundation block. 基礎ブロックを用いた防護柵の施工要領を説明する正面図および側面図である。It is the front view and side view explaining the construction point of the guard fence using a foundation block. 防護柵の正面図である。It is a front view of a protection fence. 図16の防護柵を一部省略して示す断面図である。It is sectional drawing which abbreviate | omits and shows a part of protective fence of FIG. 防護柵に引き抜き力が作用した状態を説明する断面図である。It is sectional drawing explaining the state which the extraction force acted on the protective fence. 傾斜する擁壁上に施工された防護柵の正面図である。It is a front view of the protection fence constructed | assembled on the retaining wall which inclines.

符号の説明Explanation of symbols

1 基礎ブロック
2 前壁
3 後壁
4 支柱建込部
5 連結鉄筋
6 ナット
7 端部支柱
7A 中間支柱
8 横鉄筋
9 水抜きパイプ
10 吸い出し防止材
11 連結プレート
12 基礎コンクリート
13 アンカー鉄筋
14 胴込めコンクリート
15 ワイヤーロープ
16 間隔保持材
DESCRIPTION OF SYMBOLS 1 Base block 2 Front wall 3 Rear wall 4 Column built-in part 5 Connection reinforcement 6 Nut 7 End support column 7A Intermediate support column 8 Horizontal reinforcement 9 Drain pipe 10 Suction prevention material 11 Connection plate 12 Foundation concrete 13 Anchor reinforcement 14 Carved concrete 15 Wire rope 16 Spacing material

Claims (6)

設定間隔をおいて立設された前壁および後壁と、前壁の左右先端部および後壁の左右先端部がそれぞれ突出した状態で前壁および後壁と一体に設けられた支柱建込部と、からなり、支柱建込部には、支柱を建込可能な支柱穴が形成されるとともに、前壁の左右端面および後壁の左右端面をそれぞれ越えて延出する端部を有する連結鉄筋が埋設されていることを特徴とする防護柵用基礎ブロック。   Front and rear walls that stand upright at a set interval, and left and right front end portions of the front wall and left and right front end portions of the rear wall project from the front wall and the rear wall, respectively. The pillar building portion is formed with a pillar hole in which the pillar can be built, and has a connecting reinforcing bar having ends extending beyond the left and right end faces of the front wall and the left and right end faces of the rear wall, respectively. A basic block for protective fences, characterized in that is embedded. 前記支柱建込部よりも外方の前壁の内面および後壁の内面に、それぞれ上端から下端近傍にかけて溝が形成されていることを特徴とする請求項1記載の防護柵用基礎ブロック。   2. A protective fence foundation block according to claim 1, wherein grooves are formed on the inner surface of the front wall and the inner surface of the rear wall, which are outward from the column erection portion, from the upper end to the vicinity of the lower end. 前記前壁の左右一方の端縁部および該前壁の左右一方の端縁部に対向する後壁の左右一方の端縁部に薄肉部が形成されていることを特徴とする請求項1または2記載の防護柵用基礎ブロック。   The thin-walled portion is formed on one of the left and right end edges of the front wall and the left and right end edges of the rear wall opposite to the left and right end edges of the front wall. 2. Basic block for protective fence as described in 2. 前記支柱建込部の上面に、前後方向に支柱の奥行きに略相当する間隔をおいて一対の横鉄筋用溝が形成されていることを特徴とする請求項1乃至3のいずれかに記載の防護柵用基礎ブロック。   The pair of horizontal reinforcing bar grooves are formed on the upper surface of the support pillar erected portion at a distance substantially corresponding to the depth of the support pillar in the front-rear direction. Base block for protective fence. 前記前壁および後壁の左右一方の各端面に、シール材用目地が上端から下端にかけて形成されていることを特徴とする請求項1乃至4のいずれかに記載の防護柵用基礎ブロック。   The protective fence foundation block according to any one of claims 1 to 4, wherein joints for sealing material are formed from the upper end to the lower end on each of the left and right end faces of the front wall and the rear wall. 既設の擁壁または道路端などに基礎工を施工した後、請求項1乃至5のいずれかに記載の防護柵用基礎ブロックを据え付ける一方、設定間隔をおいて基礎ブロックの支柱建込部の支柱穴に支柱を建て込むとともに、各基礎ブロックにおける前壁と後壁との間に胴込めコンクリートを充填して養生した後、支柱間にわたってワイヤーロープを張設することを特徴とする防護柵の施工方法。   After constructing the foundation work on the existing retaining wall or road edge, etc., the foundation block for the protective fence according to any one of claims 1 to 5 is installed, while the support block is installed at a set interval. Construction of a protective fence characterized by laying struts in the holes and filling and curing the concrete between the front and rear walls of each foundation block, and then laying a wire rope between the struts Method.
JP2003288006A 2003-08-06 2003-08-06 Foundation block for protective fence and construction method of protective fence Expired - Fee Related JP4198560B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003288006A JP4198560B2 (en) 2003-08-06 2003-08-06 Foundation block for protective fence and construction method of protective fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003288006A JP4198560B2 (en) 2003-08-06 2003-08-06 Foundation block for protective fence and construction method of protective fence

Publications (2)

Publication Number Publication Date
JP2005054506A true JP2005054506A (en) 2005-03-03
JP4198560B2 JP4198560B2 (en) 2008-12-17

Family

ID=34366823

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003288006A Expired - Fee Related JP4198560B2 (en) 2003-08-06 2003-08-06 Foundation block for protective fence and construction method of protective fence

Country Status (1)

Country Link
JP (1) JP4198560B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009215754A (en) * 2008-03-10 2009-09-24 Taiheiyo Cement Corp Back face block for retaining wall

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04353141A (en) * 1991-05-30 1992-12-08 Yamatomi Sangyo Kk Block for construction
JPH07133617A (en) * 1993-11-10 1995-05-23 Maruei Concrete Kogyo Kk L-shaped block with logs installed
JPH08177059A (en) * 1994-12-21 1996-07-09 Ee C Ii Kenchiku Keikaku Jimusho:Kk Footing block, and integrated method for constructing continuous footing employing footing block
JPH11336025A (en) * 1998-05-25 1999-12-07 Tokyo Seiko Co Ltd Guard fence for falling stone or the like
JP2000282494A (en) * 1999-03-30 2000-10-10 Shimizu:Kk Block for retaining wall and retaining wall structure
JP2000336662A (en) * 1999-05-28 2000-12-05 Misawa Homes Co Ltd Foundation block connecting structure
JP2001295299A (en) * 2000-04-17 2001-10-26 Akemi Ishikawa Precast block foundation for guardrail traffic, sign, etc.
JP2003129500A (en) * 2001-10-25 2003-05-08 Erutetsuku:Kk Wooden panel
JP2003160916A (en) * 2001-11-27 2003-06-06 Maruei Concrete Industries Co Ltd Foundation block for sound insulating wall

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04353141A (en) * 1991-05-30 1992-12-08 Yamatomi Sangyo Kk Block for construction
JPH07133617A (en) * 1993-11-10 1995-05-23 Maruei Concrete Kogyo Kk L-shaped block with logs installed
JPH08177059A (en) * 1994-12-21 1996-07-09 Ee C Ii Kenchiku Keikaku Jimusho:Kk Footing block, and integrated method for constructing continuous footing employing footing block
JPH11336025A (en) * 1998-05-25 1999-12-07 Tokyo Seiko Co Ltd Guard fence for falling stone or the like
JP2000282494A (en) * 1999-03-30 2000-10-10 Shimizu:Kk Block for retaining wall and retaining wall structure
JP2000336662A (en) * 1999-05-28 2000-12-05 Misawa Homes Co Ltd Foundation block connecting structure
JP2001295299A (en) * 2000-04-17 2001-10-26 Akemi Ishikawa Precast block foundation for guardrail traffic, sign, etc.
JP2003129500A (en) * 2001-10-25 2003-05-08 Erutetsuku:Kk Wooden panel
JP2003160916A (en) * 2001-11-27 2003-06-06 Maruei Concrete Industries Co Ltd Foundation block for sound insulating wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009215754A (en) * 2008-03-10 2009-09-24 Taiheiyo Cement Corp Back face block for retaining wall

Also Published As

Publication number Publication date
JP4198560B2 (en) 2008-12-17

Similar Documents

Publication Publication Date Title
KR101274974B1 (en) Earth retaining wall and construction method thereof
KR100713787B1 (en) The underground structure assembly and the underground structure building method which it uses
KR100401279B1 (en) Method of building underground structure
KR20070075506A (en) Construction method of underground structure using concrete filled pipe roof and concrete wall
KR100877974B1 (en) Reverse removing method of underground retaining wall using bottom-up cut and gradual land infilling with struts
KR101255515B1 (en) The tunel execution method
CA3187101A1 (en) System, apparatus and method for installation of street furniture
JP4198560B2 (en) Foundation block for protective fence and construction method of protective fence
JP2009046942A (en) Foundation block for retaining wall
JP2008255632A (en) Construction method for guard fence or soundproof wall against avalanche and rock fall, precast concrete block constituting upper section of retaining wall or foundation block, and temporary fixing member for support for use in construction method for guard fence or soundproof wall against avalanche and rock fall
KR100473477B1 (en) Bridge guirail reinforcement method of non-dismantle for bridge curbstone
KR101524302B1 (en) Construction method for underground structure without temporary structure
KR101516746B1 (en) Construction method for girder and construction method for underground structure without temporary structure using the same
JP3188436B2 (en) Construction method of guard fence using precast guard fence block made of concrete and structure of guard fence using precast guard fence block constructed by the construction method
JP6543177B2 (en) Building method
KR100679866B1 (en) Equipment of steel mold for construction work
KR100488130B1 (en) Precast concrete counterforts retaining wall
KR100515789B1 (en) Shoring structure of concrete base slab for prefabricate structure
KR101186563B1 (en) Construction method and foundation structure used pile foundation of precast concrete for soundproofing fence
KR101107784B1 (en) Pile type protecting wall
KR200297480Y1 (en) Precast concrete counterforts retaining wall
CN111779487B (en) Construction method of end well of automatic footpath
KR102272494B1 (en) Slope reinforcement structure using support and tension and Its Construction method
JP4441736B2 (en) Avalanche or rockfall protective walls, sound barriers, protective wall or sound barrier columns, precast concrete blocks
KR101516745B1 (en) Column member and construction method for underground structure without temporary structure using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060306

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080201

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080701

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080825

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080924

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20081001

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111010

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111010

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141010

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees