JP2004355044A - Plant data estimation system and method, condenser vacuum monitoring method, data mining method, and program - Google Patents

Plant data estimation system and method, condenser vacuum monitoring method, data mining method, and program Download PDF

Info

Publication number
JP2004355044A
JP2004355044A JP2003148256A JP2003148256A JP2004355044A JP 2004355044 A JP2004355044 A JP 2004355044A JP 2003148256 A JP2003148256 A JP 2003148256A JP 2003148256 A JP2003148256 A JP 2003148256A JP 2004355044 A JP2004355044 A JP 2004355044A
Authority
JP
Japan
Prior art keywords
data
evaluation
deviation
plant
correlation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003148256A
Other languages
Japanese (ja)
Other versions
JP3748260B2 (en
Inventor
Satoru Yamamoto
悟 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2003148256A priority Critical patent/JP3748260B2/en
Publication of JP2004355044A publication Critical patent/JP2004355044A/en
Application granted granted Critical
Publication of JP3748260B2 publication Critical patent/JP3748260B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To efficiently extract and process data correlated with plant data that is a monitoring target to find out a sign of minute abnormality hiding in a normal range. <P>SOLUTION: This plant data estimation system has: a data registration means 22 storing the data on a plant; an estimation standard construction means 23 temporarily calculating a correlation approximate expression with the other data item in each a monitoring target data item, eliminating defective data on the basis of deviation between a value by the correlation approximate expression and actual data, and actually calculating at least a correlation approximate expression and an estimation standard including standard deviation, by use of the data after the elimination; a data estimation means 24 estimating the data on the plant by use of the estimation standard actually calculated by the estimation standard construction means 23; and a state display means 26 displaying an estimation result by the data estimation means 24. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、発電所などにおける異常監視を行う技術に係り、特にプラントデータの相関を演算することにより効率的かつ適切に異常監視を行うプラントデータ評価システムと方法、復水器真空度監視方法、データマイニング方法、および、プログラムに関する。
【0002】
【従来の技術】
従来、プラントデータの上下限値や標準偏差を用いた異常監視あるいは動作傾向に基づく異常監視の技術が提案されている。
特開2001−273007号公報に記載の「プラント最適運転制御システム」では、実データの平均値を基準として、標準偏差の算出など統計的処理の後、ある範囲外のデータを除外して運転制御のデータとして使用するシステムが提案されている。特開2001−175972号公報に記載の「異常監視装置」では、実データから平均値とσ(標準偏差)を計算し、3σを閾値として、その閾値内になるデータを用いて監視する装置が提案されている。また、特開平6−4789号公報に記載の「機器の異常監視方法および装置」では、複数の監視信号から重回帰分析により回帰係数を求め、この回帰係数の時間変化率と正常変化率により異常を判断する方法および装置が提案されている。さらに、特開平8−220278号公報に記載の「プラント監視装置及び監視方法」では、実データの変化率について、設定した閾値をN回連続して上昇・下降した場合、異常とする装置及び方法が提案されている。
【0003】
しかしながら、過去のデータから求めた標準偏差および上下限値を使ってデータの評価を行う手法は、標準偏差については、標準偏差の何倍を評価基準にするかで評価結果が分かれる。例えば、倍率を大きくすればデータの異常を検知しにくくなり、逆に小さくすれば正常データであるにもかかわらず異常判定にしてしまうという問題がある。
【0004】
また、上下限は、機器および系統の保護を目的とした値であり、一般に通常値との差が大きくなり、微小なデータ変動(異常の兆候)の判定には使用が困難であるという問題もある。
【0005】
【発明が解決しようとする課題】
本発明はかかる従来の事情に対処してなされたものであり、監視対象となるプラントデータに相関のあるデータを効率的に抽出・加工して、正常な範囲(従来、異常検出が困難な範囲)に潜んでいる微細な異常の兆候を発見可能なプラントデータ評価システムと方法、復水器真空度監視方法、データマイニング方法、および、プログラムを提供することを目的とする。
【0006】
【課題を解決するための手段】
上記目的を達成するため、請求項1の発明に係わるプラントデータ評価システムは、プラントのデータを保存するデータ登録手段と、監視対象データ項目ごとに他のデータ項目との相関近似式を仮算出し、当該相関近似式による値と実データとの偏差に基づき不良データを排除し、排除後のデータを用いて少なくとも相関近似式、および、標準偏差を含む評価基準を本算出する評価基準構築手段と、評価基準構築手段により本算出された評価基準を用いてプラントのデータの評価を実行するデータ評価手段と、データ評価手段による評価結果を表示する状態表示手段とを備えたことを特徴とする。
【0007】
請求項1記載の発明では、監視対象データ項目ごとに他のデータ項目との相関近似式を仮算出して、その相関近似式による値と実データとの偏差に基づき不良データを排除した後のデータを用いてデータ評価に用いる評価基準を本算出する。
【0008】
ここで、「実データ」(生データ)とは、プラント等の計測データまたはそれに一定の変換を施したデータを意味し、相関近似式との偏差(偏差データ)と区別して用いる趣旨である。また、「データ」は、特に指定しない限り実データと偏差データを含む。
【0009】
請求項2の発明に係わるプラントデータ評価システムは、プラントのデータを保存するデータ登録手段と、監視対象データ項目ごとに他のデータ項目との相関近似式を仮算出し、当該相関近似式による値と実データとの偏差に基づき不良データを排除し、排除後のデータを用いて少なくとも相関近似式、標準偏差、および、変化量の標準偏差を含む評価基準を本算出する評価基準構築手段と、評価基準構築手段により本算出された評価基準を用いてプラントのデータの評価を実行するデータ評価手段と、データ評価手段による評価結果を表示する状態表示手段とを備えたことを特徴とする。
【0010】
請求項2記載の発明では、さらに、データの変化量の標準偏差を用いてプラントを評価する。
【0011】
請求項3の発明に係わるプラントデータ評価システムでは、さらにデータ評価手段は、データの上昇または下降の連続回数に基づいて評価を実行することを特徴とする。
【0012】
請求項3記載の発明では、データが連続して上昇または下降しているか否かを監視する。特に、偏差データの変化方向の連続回数を用いて評価するようにすると微小な異常の兆候の検出効果が高まる。
【0013】
請求項4の発明に係わるプラントデータ評価システムでは、データ評価手段は、プラントの運転サイクルまたは時期に基づく補正値を用いて評価を実行することを特徴とする。
【0014】
請求項4記載の発明では、実データまたは相関近似式に対して、運転サイクルごとの補正値である初期補正値または週や季節ごとの補正値である時期補正値によって補正を施して評価を行う。
【0015】
請求項5の発明に係わるプラントデータ評価システムでは、さらに、評価基準構築手段は、プラントのデータと相関近似式による値の偏差を演算すると共に当該偏差を監視対象データ項目として該偏差についての評価基準を演算し、データ評価手段は、当該評価基準を用いてプラントのデータを評価することを特徴とする。
【0016】
請求項5記載の発明では、実データと相関近似式との差分に対して相関のあるデータを用いて監視を行う。
【0017】
請求項6の発明に係わるプラントデータ評価方法は、監視対象データ項目ごとに他のデータ項目との相関近似式を算出する評価基準構築段階と、当該相関近似式による値と実データ値との偏差を演算して、該偏差の値、該偏差の変化率、または、該偏差の変化方向の連続回数に基づいて異常の有無を監視するデータ評価段階とを含むことを特徴とする。
【0018】
請求項6記載の発明では、相関近似式による値と実データ値との偏差を演算して、該偏差の値、該偏差の変化率、または、該偏差の変化方向の連続回数に基づいて、事前に求めたそれぞれの標準偏差に基づいて異常の有無を監視する
【0019】
なお、事前に監視対象項目の相関近似式やそれぞれの標準偏差を求める場合は、5サイクル分のデータを用いるのが有効である。
【0020】
また、偏差の値を次の監視対象データ項目として、評価基準構築段階でこの偏差と相関の高い他のデータとの相関近似式やその式との標準偏差、偏差の変化率の標準偏差を求めておき、データ評価段階で、各標準偏差および偏差の変化方向の連続回数に基づいて異常を監視するようにすると、さらに微細な異常の兆候まで監視することが可能となる。
【0021】
特に偏差データと相関の高い他のデータとの相関近似式を求める場合は、その相関の強さが所定値γ以上の他のデータが存在するかどうかを判定し、存在する場合は、その中で最も相関の高いデータ項目との相関近似式を計算するようにすれば、有効な相関データの抽出と実質的に同質の(同じ動きをする)他のデータを効率よく排除することが可能となる。
【0022】
また、上記のように、まず、実データと他のデータとの相関を求め、順次、その偏差とさらに他のデータとの相関を求める場合は、その回数を最大N(Nは自然数)として上限を設定するようにしてもよい。
【0023】
なお各データに対し,相関データの影響がある程度除去されるまで自動的にN次相関までとるようにすると,基本的に通常フラットなトレンドとなり,評価基準算定用の5サイクルから判明するN個の影響要因以外の外乱があった場合のみピークが現れることになる。
【0024】
したがって、プラントの異常監視の手順は次のようになる。
a.評価基準算定用のある期間の過去データに対し,データの振れ幅がある基準(例えば±3%)に収まるまで,対象データから最も相関の高い要因データを引き,これにより得られたデータからその最も相関の高い要因データを引くという処理を順次N回繰り返す(N次相関の算出)。
b.何の要因データをどの順番で差し引いたかを記録する。
c.今回の監視対象データに対し,上記a、bと同様の手順で計算する。
d. 上記a.で定めた振れ幅の基準以内の値になれば、異常無しとし、基準外であれば異常有りとする。
e.同時に上記cの手順で求まるピークの波形に対し,相関が高い要因データを算出することにより、この要因データが外乱であると判定する。
【0025】
以上の手順でプラントの異常を監視することにより、プラントの自動運転が可能となる。また、この手順による異常監視は、プラント以外の対象、たとえば、気象予測や来客予測等にも適用可能である。
【0026】
請求項7の発明に係わるプラントデータ評価方法では、さらに、監視対象データ項目の実データと相関近似式による値との偏差を時期ごとに演算すると共に当該偏差と時期に基づく相関が所定値以上であるか否かを判定し、所定値以上の場合は、当該偏差を用いて時期補正値を演算し、当該時期補正値で相関近似式を補正することを特徴とする。
【0027】
請求項7記載の発明では、監視対象データ項目によって、その相関近似式を時期ごとに補正する。具体的には、監視対象データ項目の実データと相関近似式による値との偏差と時期(たとえば、曜日)との相関を演算して、所定値以上(たとえば、70%、80%)以上の相関があれば、時期ごとの偏差を補正値として用いる。これにより、時期によって生じる定常誤差を修正することができる。
【0028】
請求項8の発明に係わるプラントデータ評価方法では、さらに、監視対象データ項目の実データと相関近似式による値との偏差を複数の運転サイクルの夫々について演算すると共に当該偏差と運転サイクルに基づく相関が所定値以上であるか否かを判定し、所定値以上の場合は、プラント運転開始後、所定期間の実データを用いて初期補正値を演算し、初期補正値で相関近似式を補正することを特徴とする。
【0029】
請求項8記載の発明では、監視対象データ項目によって、その相関近似式を運転サイクルごとに補正する。これにより、運転サイクルごとにより生じる定常誤差を修正することができる。
また、運転サイクルごとに初期補正を行って得られたデータの偏差の平均値と当該サイクルの標準偏差とを比較して、所定値以上乖離している場合は、初期補正を行わないという処理を行うことにより、計器誤差以外の外乱による影響を排除することができる。
【0030】
なお、所定期間としては、プラント総合負荷試験直後の運転開始日のデータを用いるのがよい。さらに、週ごとなど、季節ごとなど時期により監視対象データが変動する場合は、時期補正値と共に相関近似式を補正すると効果が高い。
【0031】
ここで、プラント総合負荷試験とは、一般的にプラント運転前の試験を意味する。
【0032】
より具体的には、プラントの検査により、装置や計器類の交換、オーバーホールなどをすると、相関近似式の傾き自体の変動は比較的少ないものの、調整の仕方により、過去のデータを用いて求めた相関近似式による予測値と実データとの間に一定のずれ(誤差)が生じるという特徴がある。このため、収集した各データを総合試験直後の運用開始日の値をもとに補正値を計算して、以後その補正値を用いて、相関近似式と実データの比較の際に補正をするようにすれば、精度の高い監視が可能となる。
【0033】
なお、相関近似式の補正とは、実質的に相関近似式を補正することになれば足りる趣旨であり、相関近似式に対する補正と、実データに対する補正の両方を意味する。後者の場合、相関近似式による値と実データとの比較において、実データ側を補正して、その補正値と相関近似式の値とを比較あるいは偏差を演算することになる。
【0034】
請求項9の発明に係わるプラントデータ評価方法は、ユーザ側のデータ収集装置および端末装置と通信ネットワークを介して接続され、データ収集装置から送られてくるデータを処理するサーバ装置によりプラントのデータを評価するプラントデータ評価方法であって、サーバ装置は、少なくとも相関近似式、標準偏差、および、変化量標準偏差を含むプラントの標準の評価基準を記憶するステップと、データ収集装置から送られてくるプラントのデータをユーザごとに記憶するステップと、ユーザごとのデータに基づき、標準の評価基準を修正し、ユーザごとに記憶するステップと、ユーザごとの評価基準に基づいて、ユーザのプラントのデータを評価するステップと、当該評価結果をユーザの端末装置へ送信するステップとを含むことを特徴とする。
【0035】
請求項9記載の発明では、サーバでプラントデータを集中管理して、評価基準の構築やデータの評価を実行する。
【0036】
請求項10の発明に係わるプラントデータ評価方法は、さらに、プラントのデータと相関近似式による値の偏差を演算すると共に当該偏差についての評価基準を演算し、ユーザごとに当該評価基準を記憶するステップと、該評価基準に基づいて、プラントの異常の兆候を監視し、異常の兆候を発見したときはユーザの端末装置へ通知するステップとを含むことを特徴とする。
【0037】
請求項10記載の発明では、実データと相関近似式との差分(偏差)に対して相関のあるデータを用いて監視を行い、異常の兆候が発見されたときは、ユーザへ通知する。
【0038】
請求項11の発明に係わる復水器真空度監視方法は、復水器真空度データを収集するステップと、海水温度データを収集するステップと、収集した各データを用いて復水器真空度と海水温度の相関近似式を演算するステップと、各データと相関近似式との差である復水器真空度偏差を演算するステップと、復水器真空度偏差の標準偏差を演算するステップと、当該標準偏差および復水器真空度偏差を用いて復水器真空度を監視するステップとを含むことを特徴とする。
【0039】
請求項11記載の発明では、復水器真空度と海水温度との相関をもとに、海水温度の影響を減らして復水器真空度の監視を行う。
【0040】
請求項12の発明に係わる復水器真空度監視方法は、復水器真空度データを収集するステップと、海水温度データを収集するステップと、復水器真空度データを、特定曜日を基準とした曜日ごとの補正値で補正するステップと、補正後の復水器真空度データと収集した海水温度データを用いて相関近似式を演算するステップと、補正後のデータと相関近似式との差である復水器真空度偏差を演算するステップと、復水器真空度偏差の標準偏差を演算するステップと、当該標準偏差および復水器真空度偏差を用いて復水器真空度を監視するステップとを含むことを特徴とする。
【0041】
請求項12記載の発明では、復水器真空度データに曜日による補正を加えて監視を行う。
【0042】
なお、補正値は、曜日ごとの鉄イオン皮膜厚と真空低下量との関係を演算することにより求めることができる。
【0043】
請求項13の発明に係わるデータマイニング方法は、コンピュータを用いてデータ間の相関を演算するデータマイニング方法であって、データ間の相関近似式と標準偏差を仮算出するステップと、当該相関近似式による値と実データとの偏差を標準偏差と比較することにより不良データを検出し排除するステップと、排除後のデータを用いて、両データ間の相関係数を演算するステップとを含むことを特徴とする。
【0044】
請求項14の発明に係わるプログラムは、データ間の相関を演算するプログラムであって、データを入力する処理と、入力したデータ間の相関近似式と標準偏差を仮算出する処理と、当該相関近似式による値と実データとの偏差を標準偏差と比較することにより不良データを検出し排除する処理と、排除後のデータを用いて、両データ間の相関係数を演算する処理とをコンピュータに実行させることを特徴とする。
【0045】
請求項15の発明に係わるプログラムは、ユーザ側のデータ収集装置および端末装置と通信ネットワークを介して接続され、データ収集装置から送られてくるデータを処理するサーバ装置上で動作するプログラムであって、少なくとも相関近似式、標準偏差、および、変化量標準偏差を含むプラントの標準の評価基準を記憶する処理と、データ収集装置から送られてくるプラントのデータをユーザごとに記憶する処理と、ユーザごとのデータに基づき、標準の評価基準を修正し、ユーザごとに記憶する処理と、ユーザごとの評価基準に基づいて、ユーザのプラントのデータを評価する処理と、当該評価結果をユーザの端末装置へ送信する処理とをコンピュータに実行させることを特徴とする。
【0046】
【発明の実施の形態】
以下に本発明の実施の形態を説明する。図1は、第1の実施の形態にかかわるプラントデータ評価システムの機能ブロック図である。ここで、プラントデータ評価システム1は、プラントデータを入力する入力部12、入力されたデータを用いて演算処理を実行する演算部11、演算結果を表示する表示部13、プラントデータ等のデータを記憶する記憶部14で構成されている。
【0047】
演算部11は、入力部12または表示部13との間で入力または出力処理を行う入出力処理手段21、プラントデータを登録あるいは編集するデータ登録・編集手段22、プラントデータの評価基準を作成する評価基準構築手段23、評価基準に従ってプラントデータを評価するデータ評価手段24、評価に必要なデータの選別条件等を設定する評価条件補正手段25、および、評価結果を表示する状態表示手段26を有している。
【0048】
また、記憶部14は、プラントデータを保存するプラントデータファイル31、プラントデータの評価基準情報を保存する評価基準ファイル32、評価結果を保存する評価結果ファイル33を有している。
【0049】
次に、プラントデータ評価システム1の動作を説明する。
【0050】
<プラントデータ登録段階>
プラントデータは、キーボードなどの入力部12を通して入力され、入出力手段21、データ登録・編集手段22を介して、プラントデータファイル31に保存される。なお、このプラントデータは、CD−ROM等の記憶媒体やネットワークを通して入力してもよい。登録するデータとしては、プラントを評価・診断するための今回データのみでなく、評価基準を構築するために必要な過去一定期間のデータについても登録する。評価基準を構築するためのプラントデータとしては、一般に各データ項目に対して60回分(月に1回データを採取するとして5年分)のデータ数が有効である。
【0051】
図2は、プラントデータファイル31のデータ構成例である。データ採取日時、データ識別情報、データ値、プラント状態が保存されている。なお、データ識別情報ごとなど必要によりソート可能とする。
【0052】
また、プラントデータ採取ごとに、このデータ登録・編集手段22を通して逐次データが登録される。
【0053】
<評価基準の確立段階>
まず、データ登録・編集手段22により、プラントデータファイル31に保存されているプラントデータの中で、定検中や停止中のデータなどプラントの評価に使わない、いわゆる異常データを排除する。
【0054】
次に、図3を用いて評価基準構築手段23の動作を説明する。
【0055】
評価基準構築手段23は、入力部12により起動されると、監視対象のデータ項目を抽出する(S101)。そして、このデータ項目との相関の演算の対象となるデータ項目を選択して(S102)、監視対象データと相関データを用いて、相関近似式と標準偏差を仮算出する(S103)。なお、この段階の相関近似式と標準偏差は、プラントデータの評価に直接使用しないので、「仮算出」という。
【0056】
複数の種類のデータ項目との相関を個々に仮算出し、相関の高いデータ項目を所定の数(たとえば、10項目)だけ抽出する(S104)。そして、仮算出で求めた標準偏差を用いてプラントデータファイル31に保存されているデータのうち、所定の範囲に入らないデータ(例えば、±4σ以内に入らないデータ)を不良データとして排除する(S105)。
【0057】
次に、不良データ排除後のデータを用いて、それぞれのデータ項目について、相関近似式、標準偏差σ1、および、変化量標準偏差σ2を算出する(S106)。なお、この段階の算出を「本算出」という。ここで、変化量標準偏差とは、所定期間のデータの変化量に対する標準偏差を意味する。
【0058】
そして、相関の最も大きなデータ項目の相関近似式、標準偏差σ1、および、変化量標準偏差σ2を評価基準ファイル32に保存する(S107)。以上の処理を全ての監視対象のデータ項目に対して繰り返す(S108)。
【0059】
図4は、評価基準ファイル32のデータ構成例である。ここで、係数a、bは、相関近似式が、y=a・x+bの形式で表されるときの係数を示す。また、標準偏差σ1、変化量標準偏差σ2の値も格納されている。なお、相関近似式が、2次式など、他の形式で表されるような場合は、その形式情報(近似式パターン)や係数情報が格納される。
【0060】
<プラントデータの評価段階>
次に、図5を用いてデータ評価手段24の動作を説明する。データ評価手段24は、入力部12からの指示により、又は、定期的に起動されると、プラントデータの補正が必要かどうかを判定し(S201)、補正が必要な場合は、評価条件補正手段25を起動して、補正処理を実行する(S202)。ここで、補正処理の例としては、相関近似式を用いて今回データの予測値を算出するに際して、初期値を総合負荷検査直後の値に補正するとか、曜日ごとなど時期によりデータ値に一定の変動があり、その変動がプラントの正常動作によるものならば、採取したプラントの実データに補正値を加えることが挙げられる。なお、相関近似式との差異を実態に合わせて補正できればよいので、プラントの実データではなく、相関近似式の係数を補正するようにしてもよい。
【0061】
次に、相関近似式により今回データの予測値を算出する(S203)。そして、偏差による評価(S204)として、プラントの実データの補正値と予測値との差異を標準偏差σ1により評価して、所定の範囲内にあるときは正常、所定の範囲外のときは異常とする。このとき、評価結果を段階的に分け、例えば、±2σ1の範囲内にあるときは正常状態、±2σ1から±3σ1の範囲にある場合は注意状態、±3σ1以上離れているときは異常状態としてもよい。
【0062】
続いて、変化量による評価(S205)として、そのプラントデータの前回値と今回値の変化量を、変化量の標準偏差σ2により評価して、所定の範囲外ならば異常とする。
【0063】
さらに、傾向による評価(S206)として、プラントデータが連続して上昇または下降した場合は、その回数により正常・異常を判定する。プラントデータの場合は、数回、例えば4回連続で注意状態、5回連続で異常状態とするのが効果的である。
【0064】
図6は、評価結果ファイルのデータ例の説明図である。ここで、偏差欄の1.5は、偏差が1.5σ1にあることを意味する。
【0065】
次に、状態表示手段26を起動して、評価結果ファイル33に基づいて、表示部13に状態表示やグラフ表示を行う(S207)。
【0066】
本実施の形態では、評価基準の確立段階で、相関近似式や標準偏差を仮算出して、相関の強いデータ項目を抽出し、その後、標準偏差をもとにバラツキの大きなデータを排除して、最終的に評価に用いるデータ項目の相関近似式や標準偏差等の評価基準を算出するので、相関を求めるデータ量が多くても、簡便な手法で精度の高い評価基準を得ることができる。
【0067】
また、プラントデータの評価段階では、評価基準の確立段階で求めた評価基準を用いて、プラントの実データに補正を施して評価を実行するので、複雑な要素によって変動するプラントデータを計算機に負荷をかけず精度よく評価することができる。
【0068】
なお、本実施の形態では、監視対象のデータ項目について、相関データの項目を一種類に絞り込んで、相関近似式等の評価基準情報を保存することとしたが、必要により、所定値以上の相関のある複数の種類のデータ項目について評価基準情報を保存し、これを用いて評価を行うようにしてもよい。
【0069】
また、偏差、変化量、傾向による評価のうち監視項目によっては、一部の評価のみを実施することにしてもよい。
【0070】
次に、第2の実施の形態を説明する。
図7は、本実施の形態にかかわるプラントデータ評価システムの機能ブロック図である。
【0071】
図1との違いは、プラントデータ評価システム1にデータ収集装置2から送られてくるプラントデータを通信回線3を介して受信する通信部15と、演算部11に通信部15との間でデータの受け渡しを行う送受信処理手段27、および、記憶部14に収集したプラントデータを保存するデータ収集手段28を備え、また、記憶部14には、異常データを抽出するための条件を保存した異常データ抽出条件ファイル34を設けたことである。ここで、異常データ抽出条件ファイル34の例を図8に示す。この図において、定検中など、プラントデータ採取時のプラント状態であって、評価データとしては使用できないプラントの状態が保存されている。なお、データ項目ごとに評価データとして使用できないプラントの状態を設定可能にしておいてもよい。
【0072】
その他は、図1と同様であるので、同一要素には同一符号を付し、説明を省略する。
【0073】
次に、プラントデータ評価システム1の動作を第1の実施の形態との差異を中心に説明する。
【0074】
<プラントデータ登録段階>
評価基準を作成するための過去のデータは、入力部12を通して入力される。また、評価対象となるプラントの実データは、プラント側に設置されたデータ収集装置2を介して送られ、通信部15で受信され、送受信処理手段27、データ収集手段28を通して、記憶部14のプラントデータファイル31に保存される。
【0075】
なお、評価基準を作成するための過去のデータはデータ収集装置2から通信回線3経由で入力するようにしてもよい。
【0076】
<評価基準の確立段階>
次に、図9を用いて評価基準構築手段23の動作を説明する。評価基準構築手段23は、入力部12により起動されると、異常データ抽出条件ファイル34を参照して、評価データとしては使用しないプラントデータ、即ち異常データを排除する(S301)。次に、監視対象のデータ項目を抽出する(S302)。そして、このデータ項目との相関の演算の対象となるデータ項目を選択して(S303)、監視対象データと相関データを用いて、相関近似式と標準偏差を仮算出する(S304)。
【0077】
複数の種類のデータ項目との相関を個々に仮算出し、相関の高いデータ項目を所定の数だけ抽出する(S305)。そして、仮算出で求めた標準偏差を用いてプラントデータファイル31に保存されているデータのうち、所定の範囲に入らないデータを不良データとして排除する(S306)。
【0078】
次に、不良データ排除後のデータを用いて、それぞれのデータ項目について、相関近似式、標準偏差σ1、および、変化量標準偏差σ2を算出する(S307)。そして、相関の最も大きなデータ項目の相関近似式、標準偏差σ1、および、変化量標準偏差σ2を評価基準ファイル32に保存する(S308)。
【0079】
次にプラントの実データと相関近似式による値との偏差を計算する(S310)。そして、この偏差を監視対象データ項目としてステップS303からステップS308までの処理を実行する。相関の強さ(相関係数)が所定値γ以上かどうかを判定し(S312)、γ以上でなければ次の監視データ項目について実施し(S313)、γ以上のものがある限り、最大N回(Nは自然数)まで順次偏差の相関について評価基準を演算する(S309)。
【0080】
以上の処理により作成された評価基準ファイル32を図10に示す。ここで、1次とは、監視対象データ項目と相関データ項目との相関を意味し、2次とは、1次で求めた相関近似式による値と実データとの差(偏差)と別の相関データ項目との相関を意味する。このように、順次、前の段階で求められた相関近似式との偏差についての相関が計算され、その演算結果が保存される。
【0081】
このように監視データ項目ごとに保存されている相関のデータ数に相当する最大相関次数、および、各次数の相関のデータについては、相関データ項目、近似式パターン、近似式の各係数の値(a,b,c)、標準偏差σ1、変化量標準偏差σ2、および、相関の強さγの値が保存されている。
【0082】
ここで、図10中、近似式パターン「2」とは、2次式の相関近似式、すなわち、y=a・x+bx+cの形式で表されることを意味する。
【0083】
<プラントデータの評価段階>
プラントデータの評価手順は、基本的に第1の実施の形態と同様である。ただし、評価基準の確立段階で求めた2次、3次など必要により高次についての評価基準も用いて評価処理を実行する。
【0084】
本実施の形態では、実データと相関近似式との偏差を求め、その偏差についての相関を評価することとしたので、簡単な手法で異常の前兆の検出が可能となる。
【0085】
特に、多くのデータ項目との相関を一度に計算しようとすると、計算機の負荷が大きくなるが、本実施の形態によれば、パーソナルコンピュータ相当の性能で短時間に最も相関のあるデータ項目から順に相関データを求めることができる。
【0086】
さらに、データ項目の中には、項目名は変わっても実質的に同じデータ(全く同じ動きをするデータ)が存在する可能性があるが、本実施の形態の如く、順次、相関近似式による値との偏差を計算し、その偏差の相関データを抽出するようにすれば、このような実質的に同じデータを排除することができる。
【0087】
なお、本実施の形態で説明した評価基準構築手段の処理手順は、プラントデータのみでなく一般的なデータマイニングに対しても有効である。
【0088】
次に、第3の実施の形態を説明する。
図11は、プラントデータ評価システムおよびインターネット網を介して繋がるユーザ側装置の構成図である。ここで、プラントデータ評価システム1は、インターネット網4と接続するためのルータ61、複数のサーバをつなげるハブ62、Webサーバ63、プラントデータ評価のアプリケーションを実行するアプリケーションサーバ64、および、電子メールを送信するためのsmtpサーバ65から構成されている。このプラントデータ評価システムにより、アプリケーション・サービス・プロバイダ(ASP)として、プラントデータ評価サービスを提供する。
【0089】
一方、プラントデータ評価サービスの利用者のユーザ側装置5は、インターネット網4に繋がるユーザ端末51と、ユーザのプラントのデータを収集し、インターネット網4を通してデータを送信する機能を有するデータ収集装置52から構成されている。ユーザ端末51およびデータ収集装置52は、同じユーザに対して複数台存在する場合もある。
【0090】
また、このサービスの利用者とは無関係に設置され、海水温度データや気象データなどを収集するデータ収集装置6もインターネット網4に繋がっている。
【0091】
図12は、アプリケーションサーバ64(以下、サーバ64という)の機能ブロック図である。ここで、サーバ64は、ハブ62とデータの送受信を行う通信部16、アプリケーションプログラムを実行する演算部11、記憶部14を備えている。また、演算部11は、通信部16とデータの受け渡し処理を行う送受信処理手段27、ユーザ情報を登録するユーザ情報登録手段29、プラントデータの評価基準を作成する評価基準構築手段23、評価基準に従ってプラントデータを評価するデータ評価手段24、評価に必要なデータの選別条件等を設定する評価条件補正手段25、評価結果を表示する状態表示手段26、データ収集装置6、52から送られてくるデータを記憶部14へ保存するデータ収集手段28、および、ユーザがプラントの監視条件を設定するための監視条件設定手段30を有している。
【0092】
また、記憶部14は、プラントデータファイル31、評価基準ファイル32、評価結果ファイル33、異常データ抽出条件ファイル34に加えて、ユーザ情報を保存するユーザ情報ファイル35、プラントの種別を保存するプラントパターンファイル36、ユーザごとに監視項目等のデータを保存する監視データファイル37を有している。ここで、プラントパターンファイル36には、図13に例示するように、監視プラントごとにパターン番号、監視項目、その監視項目を監視するために必須のデータ、および、より高い精度で監視可能にするための任意データが保存されている。
【0093】
次に、プラントデータ評価システム1の動作を説明する。
【0094】
<ユーザ情報登録段階>
ユーザは、ユーザ端末51を通して、プラントデータ評価サービスへの申し込みを行い、ユーザ情報は、ユーザ情報登録手段29により、記憶部14のユーザ情報ファイル35に保存される。図14は、ユーザ情報ファイル35の一例である。ここで、ユーザ情報ファイルには、ユーザごとに発行されるユーザID(ユーザ識別情報)、パスワード等の他、異常発見時の通知先として、電子メールアドレスや電話番号等の情報が入力される。また、ユーザ側のデータ収集装置52の装置ID(装置識別情報)が保存される。この装置IDは、データ収集装置52からプラントデータを送信するときに、伝送データに付され、サーバ64において、どのデータ収集装置から送られてきたデータかを識別するために使われる。
【0095】
<監視項目設定段階>
ユーザは、ユーザ端末51を通して、監視項目の設定要求を送る。この要求により、監視条件設定手段30が起動される。監視条件設定手段30は、起動されると、Webサーバ63経由でユーザ端末51上に図15に例示する監視条件設定画面を表示する。この画面でユーザが、例えば、プラントパターン「1」を選択すると、プラントパターンファイル36を参照して、そのパターンに対応する、原子力発電所の監視項目として、復水器真空度や発電端効率などの項目が表示される。そして、ユーザが監視項目として、復水器真空度を選択すると、収集データとして、必須データと任意データが表示される。ユーザは、任意データのうち、収集してサーバ64へ送るデータをチェックし、確定ボタンをクリックする。これにより、設定情報がサーバ64に送られ、監視データファイル37に保存される。図16は、監視データファイル37の一例である。ここで、監視データファイル37には、ユーザID、プラントパターン、監視項目、および、収集データID(以下、データIDという)が保存されている。このデータIDは、収集データ項目と対応しており、データ収集装置52から送られる各データにそのデータに対応するデータIDおよび収集時刻が付される。
【0096】
なお、以上の説明では、ユーザが監視項目の設定を行うこととしたが、収集可能なデータ項目に対して自動的に常時監視するようにして、どれか一つでも異常が認められればユーザへ通知するようにしてもよい。
【0097】
<評価基準の確立段階>
ユーザは、過去のデータをサーバ64に送り、第1の実施の形態または第2の実施の形態で説明した手法により評価基準を演算させることも可能であるが、以下の手法を選択することもできる。
【0098】
まず、評価基準ファイル32には、予め、標準の評価基準データが格納されている。たとえば、復水器真空度データと海水温度データとの相関係数、相関近似曲線の係数、標準分散、変化量の標準分散が、一般データとして格納されている。ユーザは端末51を通してこれを確認し、編集を行い、自己の評価基準として保存する。特に、相関近似曲線の傾きは、プラントによりあまり変化しない場合が多いので、中心値を補正するのみで有効に活用可能である。
【0099】
<プラントデータの収集・評価段階>
データ収集装置52から定期的に送られてくるプラントデータは、通信部16および送受信処理手段27で受信処理され、データ収集手段28により、装置IDおよびデータIDごとにプラントデータファイル31に保存される。
【0100】
そして、データ評価手段24により、評価基準ファイル32に保存されている当該ユーザの評価基準に基づいて、監視対象のデータが評価される。このとき、評価基準構築手段23は、収集したデータをもとに初期設定された評価基準を逐次補正する。なお、評価手法は、第1の実施の形態または第2の実施の形態と同様なので説明を省略する。
【0101】
データ評価手段は、評価結果をユーザごとプラントごとに評価結果ファイル33に保存すると共に異常を検出したときは、ユーザ情報ファイル35に保存されている異常発見時の電子メールアドレスへsmtpサーバ65経由で通知する。また、電話通知の場合は、予め録音された音声または音声合成にて通知する。これによりユーザは、異常をリアルタイムで知ることができる。
【0102】
<プラント状態確認段階>
ユーザは、評価結果情報を入手するときは、端末51を通してプラントの状態表示要求を行う。ユーザから状態表示要求があると、状態表示手段26は、評価結果ファイル33およびプラントデータファイル31の情報をもとに、Webサーバ63経由でユーザ端末51上にプラントの状態を表示させる。たとえば、ユーザが偏差による評価を選択したときは図17や図20に示す偏差評価グラフを表示し、変化量による評価を選択したときは図18や図21に示す変化量評価グラフを表示し、また、傾向による評価を選択したときは図19や図22に示す傾向評価グラフを表示する。このとき異常があるときは、図22のA点のようにグラフ上に異常位置を表示する。特に図20、図21、図22に示すように、正常範囲と異常範囲を区分する線(情報)をグラフ上に表示してユーザに提供すれば、ユーザは、異常位置と共にプラントの各データ変動を視覚的に捉えることができ、また異常の原因分析等に利用することも可能である。
【0103】
<その他のサービス>.
プラントデータ評価システム1としては、標準の評価基準を作成する際に、独自に収集したデータあるいは各ユーザのプラントデータの実績値を利用するのみでなく、他の場所に設置されたデータ収集装置6からの情報を採取し、随時、ユーザのプラントデータとの相関を演算する。これにより、たとえば、地球の裏側の海水温度などが、ユーザのプラントに影響を与えるような場合もあり、本実施形態のサービスによりデータを集中管理することによってこれを効率的に発見することができる。
【0104】
本実施の形態によれば、プラントデータをサーバで収集して評価し、デフォルトで標準的な評価基準を設定可能にするので、データ数が少なく評価基準が直ちに得られないプラントに対しても評価が可能となる。また、収集したデータにより逐次ユーザごとプラントごとに評価基準を修正していくので、精度の高い評価も可能となる。
【0105】
なお、本実施の形態では、プラントデータについて説明したが、たとえば、農作物の収穫高データとか地震発実データなど、プラント以外にも適用可能であることは明白である。
【0106】
また、上記説明では、ユーザが監視項目の設定や評価基準確立のためのデータをサーバへ送ることとしたが、プラントデータ評価サービスを提供する業者などユーザ以外の者が行うようにしてもよい。
【0107】
本発明は、監視対象データと相関のあるデータを用いて、監視対象データの異常の兆候の検出を行うものであり、上述の各実施の形態に限られないのは明白である。たとえば、図23ないし図25は、児童の身長と体重の相関を分析するためのグラフであり、図24に示す身長と体重の相関近似式を用いて、図25の監視対象を身長とし、相関データを体重として、相関近似式による予測値と身長との偏差を児童ごとにプロットすることにより、その児童の身体的な変化傾向を知ることも可能である。同様に、小売店や飲食店等の売上予測、気象予測、交通量予測、株価予測などにも適用可能である。
【実施例】
原子力発電所のプラントデータの評価システムおよび評価方法について説明する。
【0108】
図26は、本実施例にかかわるプラントデータ評価システムの構成図である。所内LANに図1のファイル31〜33を保存したデータサーバを設け、コンピュータを通して各ファイルにアクセス可能とした。また、データ評価手段等の各手段21〜26を各コンピュータに設けた。
【0109】
次に図27を用いてプラントデータ評価の処理手順の概要を説明する。まず、プラントデータを入力して(S401)、評価を開始する(S402)。なお、この段階で評価基準は既に作成され、データサーバに保存されている。そして、偏差による評価を行い(S403)、偏差が3σの範囲外か否かを判定して(S406)、範囲外ならば異常表示をし(S410)、範囲内ならば異常表示をしない(S409)。変化量による評価として(S404)、変化量が基準値の範囲外ならば(S407)、異常表示を行う(S411)。また、変動の傾向による評価を行い(S405)、規定回数以上の連続した上昇または下降があれば(S408)、異常表示を行う(S412)。そして、グラフ表示の要求を受付け(SS413)、グラフ表示を行い(S414)、データの確認を行う(S415)。新たなグラフ表示要求に対してグラフ表示処理を行い、作業終了により処理を終える(S416)。
【0110】
<評価基準の確立段階>
次にプラントデータの評価処理の具体例として、原子炉で発生しタービンで仕事をした蒸気を冷却する復水器の真空度を用いて説明する。
【0111】
図28は、約1年間の復水器真空度の推移を示すグラフである。復水器真空度は、この期間中、約92KPa〜97KPaで変動している。変動幅は5KPaである。評価基準構築手段により図3に示す処理を実行することによって、これは、復水器を冷却する海水温度の変動、つまり外乱に伴うものであり、空気の漏洩、冷却管のつまり等の異常が発生したのではないことが分かった。
【0112】
<データ評価処理>
図29は、図28の復水器真空度を最大の外乱である海水温度との相関で表したものである。これにより、海水温度の影響をなくした状態で復水器真空度の変化を見ることができるようになった。
【0113】
図29中の曲線は過去の5サイクルのデータから求めたもので、データの中心線(近似曲線)は、(1)式になる。
【0114】
y=−0.00488x−0.0601x+97.92 ・・・(1)
【0115】
実績値と近似曲線との差をグラフ化すると図30の偏差グラフとなる。最大の外乱を除去したため、変動幅が図28の5KPaから1.5KPaに大幅に小さくなっている。これによって、図28では確認が困難な微小な変化が発見できるようになった。
【0116】
以下、具体的な評価方法について説明する。
【0117】
(偏差による評価)
実績値と近似式から求めた値の差(偏差データ)を標準偏差により評価する。異常の早期発見のため、±3σ(確率的に0.3%のデータを異常判定)と、注意喚起のため±2σ(確率的に4.5%のデータを注意判定)を判断基準とした。
【0118】
(変化量による評価)
偏差による評価の段階で求める偏差データについて、今回の偏差データと前回の偏差データとの差(変化量)を計算し、変化量の標準偏差により評価する。偏差の評価と同様に、±3σを異常判定、±2σを注意判定の基準とした。
【0119】
過去のデータ分析により、偏差による評価または変化量による評価に関しては、データが過去の変動範囲にあっても±3σ以上の変化があった場合、機器または計器の異常の可能性が高いことを確認した。
【0120】
(傾向評価)
偏差による評価の段階で求める偏差データについて、前回の偏差データに対して今回の偏差データが5回連続して上昇または下降した場合を異常判定基準とし、注意喚起のため4回連続を注意判定基準とした。
【0121】
プラントデータは、通常ある点を中心に絶えず変動しており、過去のデータ分析によって、データが5回以上連続で上昇、下降した場合、機器または計器の異常の可能性が高いことを確認した。
【0122】
以上、本実施例で説明したように、これまで、復水器真空度の異常警報は、海水温度(外乱)に影響を受けず、かつ機器の保護の観点から88KPaと通常値に余裕を持って設定することが一般的であった。このため、復水器真空度が僅かしか低下しない微小な空気漏洩が発生したような場合は、当然のことながら異常警報は発生しなかった。また、運転員によるデータ評価においても外乱による変動が大きいため、異常判定が極めて困難な状況であった。
【0123】
しかしながら、この海水温度の要因を除去した復水器真空度偏差の変動を監視することにより、従来の復水器真空度の異常警報が出る以前、もしくはプラントの運転に悪影響が出始める前に、その前兆となる微細な異常状態を検出することが可能となった。
【0124】
なお、復水器真空度は、復水器細管への鉄イオン供給量により変化するが、図30の復水器真空度偏差と鉄イオン皮膜厚との相関をとることにより、鉄イオン皮膜厚の変化に基づいて復水器真空度偏差も週のサイクルで変動していることが分かった。このため、曜日ごとの真空低下量(設計真空度との差)を求め、復水器真空度偏差の数値に対して、週の特定の曜日たとえば月曜日を基準(0)として差分を補正するようにすれば、鉄皮膜の要因も除去して、より高い精度で真空度の変動を監視することができる。
【0125】
また、評価基準構築手段の他の実施例として、図31に示す評価基準ファイルを用いるようにしてもよい。図31において、評価基準ファイルは、図4に示す評価基準ファイルの項目に対して、一または二以上の時期補正値、および、初期補正値が追加されている。
【0126】
ここで、時期補正値とは、曜日、月、季節、運転開始日からの運転日数などにより、規則的に誤差(相関近似式による予測値と実データとの差)の大きさが変化するような場合は、その規則あるいは周期に応じて相関近似式に付加する数値のことである。たとえば、復水器真空度偏差のように曜日により実データとの誤差が変化するような場合は、曜日ごとに時期補正値を保存しておき、監視日の曜日によって該当する時期補正値を抽出して、相関近似式を補正する。
【0127】
また、初期補正値とは、運転開始日の実データをもとに相関近似式を補正する数値のことで、通常、その運転サイクルにおいては、その補正値を用いる。これは、相関近似式は、過去のデータに基づいて算出されるものであるが、計器の調整や装置交換に伴う装置の特性の違い、あるいは、サイクルごとのプラント状態の変化などにより、相関近似式による予測値と実データとの間に定常的に差違が生ずる場合があるためである。
【0128】
なお、初期補正値を算出するタイミングは、プラント総合負荷試験直後に限られず、これを算出するタイミングについて一定の基準があればよい。また、初期補正値は、通常は運転開始日(運転サイクル初日)の実データをもとに計算するのが効率的で有効であるが、プラント総合負荷試験で実運転の環境が模擬できるならば、試験中のデータを用いて計算してもよい。
【0129】
図31の評価基準ファイルに基づく、相関近似式は以下のようになる。
y=a・x+b+時期補正値+初期補正値 ・・・(2)
【0130】
なお、プラントによっては、時期補正値または初期補正値のいずれか一方で足りる場合もある。
【0131】
この時期補正値または初期補正値は、すべてのパターンの相関近似式に用いることができる。たとえば、図10の評価基準ファイルに対して、これらの補正値の欄を設けるようにしてもよい。
【0132】
次に図33を用いて、時期補正値の計算手順を説明する。
まず、各相関近似式についてその相関近似式の時期ごとに相関近似式による予測値と過去に蓄積した実データとの差を計算する(S601)。時期ごととは、たとえば、曜日ごと、月ごと、季節ごと、イベントごとなどである。そして、その差が時期により有意差が有るかどうかを判定して(S602)、有意差がある場合は、その時期ごとの補正値を相関近似式に付加する(S603)。たとえば、曜日によって予測値と実データとの差が変動するならば、相関近似式の時期補正値には、曜日ことに異なる値が設定されることになる。以上のステップS601からS603までの処理を、計算対象となるすべての時期項目について実行する(S604)。
【0133】
なお、図33のフローチャートは、過去のデータに基づいて時期補正値を計算することとしたが、時期により有意差があるか否かを過去のデータで判定しておき、有意差があるものについてのみ、その補正値を運転中のプラントの実データを用いて計算するようにしてもよい。
【0134】
次に図32を用いて、初期補正値の計算手順を説明する。
まず、プラントの運転開始後、ある監視対象項目について相関近似式による予測値を計算する(S501)。次に、この予測値と実データとの差を計算する(S502)。そして、この差が所定の範囲内か否かを判定して(S503)、所定の範囲内ならば、この差を初期補正値として設定する(S504)。ステップS503で、所定の範囲外ならばプラント異常として処理する(S505)。以上、ステップS501からステップS505までの処理を初期補正値の計算対象となる監視対象項目について繰り返す(S506)。
【0135】
なお、ステップS503において、所定の範囲は3σを基準にするのがよい。通常、計器の調整や同種の装置の交換による差違は、3σ以内となるからである。
また、初期補正値の計算の際、当該日に採取した複数時点の監視項目データを平均化して、その平均値を用いるようにするのがよいが、サンプリング数が少ない場合は、この所定の範囲を広くし、サンプリング数が多くなるに従い、所定の範囲を狭くするようにすれば、サンプリング数が少ないときのデータのばらつきによって、本来正常であるにもかかわらず、異常と判定することを防ぐことができ、サンプリング数が多くなるに従い初期補正値の精度を高めることができる。
【0136】
初期補正の必要なデータ項目としては、タービン効率、主蒸気流量、給水温度、原子炉圧力などがあり、運用上、初期補正を行う必要のないデータ項目としては、復水器真空度、ドライウェル圧力、ドライウェル凝縮水流量などがある。過去データによって求めた相関近似式による値と実データとの偏差(複数ある場合はその平均)をプラントサイクルごとに、有意差があるかどうかを予め調べておき、所定値以上の有意差があるものについては、初期補正の必要なデータ項目として評価基準ファイルに初期補正値欄を設けておくとよい。時期補正値についても同様である。
【0137】
なお、原子力プラントの初期補正、時期補正として、過去5運転サイクルの夫々のサイクルごとに標準偏差と平均値を演算して評価を行うデータ項目の約8割(約50項目)を対象に補正処理を行った。5秒間隔で収集した一日分のデータの平均処理によって計器誤差(調整誤差を含む)を精度よく求めることができるため、プラント総合負荷試験終了後の通常運用開始日の一日データを用いて初期補正値を算出することができる。
【0138】
復水器真空度については、海水温度のみならず、採取していない他の海水性状、たとえば、海水の濁りや貝、藻などの繁殖状況等の影響も大きく、初期補正は不適であることが分かった。この場合、復水器真空度など初期補正に適さない項目については、予め初期補正演算の対象外としておくことにより、初期補正演算の負荷を軽減することができる。
【0139】
また、過去のデータを用いた検証において、夫々の運転サイクルごとにプラント総合負荷試験補正演算を行って得られたデータの偏差の平均値と予め求められている当該サイクルの標準偏差とを比較して、所定の割合(たとえば、50%もしくは100%)以上乖離している場合は、補正を行わないという処理を行うことも効果がある。誤差(乖離)が過大な場合は、計器誤差以外の外乱による影響を受けている可能性があるからである。すなわち、データの標準偏差、あるいは、偏差の絶対値ではなく、データの偏差の平均値を比較対象とすることによって、計器誤差の影響を排除して、海水性状といった大きな季節変動等の外乱の影響の有無を判定できるのである。
【0140】
なお、1週間周期の変動である鉄イオンによる影響(復水器逆洗による影響)は、プラント総合負荷試験による初期補正とは別に、対象となる復水器真空度のデータを曜日補正することにより排除可能である。
【0141】
また、1年周期の変動である海水温度および海水性状による影響は、曜日補正を行った復水器真空度データとの相関を取ることにより、除去可能である。
【0142】
本実施例によれば、相関近似式を時期補正値と初期補正値で修正するので、より精度の高い監視が可能となる。また、これらの補正値を用いれば、1サイクル分の過去データを用いて算出した相関近似式で実効ある監視が可能となる。
【0143】
特に、初期補正値による補正(以下、初期補正という)を行う監視と、初期補正を行わない監視を組み合わせることにより、計算機負荷を軽減しつつ精度の高い監視が可能となる。
【0144】
たとえば、発電所などのプラントにおいて、以下の2種類の監視を行う。
(1)実データを5秒ごとに計算機に取り込み、24時間分のデータの平均値を計算し、この「一日データ」を用いて初期補正値を求める。この初期補正値により補正された単サイクルの相関近似式を5つ(5サイクル分)求め、それぞれの相関近似式による予測値の平均値からの標準偏差を基準に監視を行う。
(2)初期補正値の演算の必要の無い場合(計器誤差等がほとんど無い場合など)は、5サイクル分の実データをもとに相関近似式を求め、その相関近似式による予測値からの標準偏差を基準に監視を行う。
上記(1)(2)のうちで監視のための計算機負荷は、(1)の方が大きいため、監視対象項目ごとに予め上記(1)(2)のいずれで監視を行うかを定めておき、それぞれの方法で監視を行うようにすれば、計算機負荷を軽減して、かつ精度の高い監視が可能となる。
【0145】
特に、監視対象項目によっては、月に1回の定例作業で、人間系で採取するデータもある。これらのいわゆる「一月データ」は、計器の調整誤差よりも人間の読み取り誤差の方が大きく、かつ偶発的に偏った状態のデータを採取してしまうことがある。このような人間系で採取するようなデータについては、上記(2)の監視方法の方が適している。
また、本実施例によれば、監視対象によって相関近似式の補正のしかたを変えるので、精度の高い監視を効率的に行うことができる。
【0146】
【発明の効果】
以上説明したように、本発明においては、監視対象となるデータに相関のあるデータを精度よく効率的に抽出でき、微小な変動を監視することができる。これにより、プラント等の異常の兆候を事前に発見することが可能となる。
【図面の簡単な説明】
【図1】本発明の第1の実施の形態におけるプラントデータ評価システムの機能ブロック図
【図2】図1のプラントデータファイルのデータ構成例の説明図
【図3】図1の評価基準構築手段の処理手順を表すフローチャート
【図4】図1の評価基準ファイルのデータ構成例の説明図
【図5】図1のデータ評価手段の処理手順を表すフローチャート
【図6】図1の評価結果ファイルのデータ構成例の説明図
【図7】本発明の第2の実施の形態におけるプラントデータ評価システムの機能ブロック図
【図8】図7の異常データ抽出条件ファイルのデータ構成例の説明図
【図9】図7の評価基準構築手段の処理手順を表すフローチャート
【図10】図7の評価基準ファイルのデータ構成例の説明図
【図11】本発明の第3の実施の形態におけるプラントデータ評価システムおよびユーザ側装置の装置構成図
【図12】図11のアプリケーションサーバの機能ブロック図
【図13】図12のプラントパターンファイルのデータ構成例の説明図
【図14】図12のユーザ情報ファイルのデータ構成例の説明図
【図15】本発明の第3の実施の形態における監視条件設定画面例の説明図
【図16】図12の監視データファイルのデータ構成例の説明図
【図17】本発明の第3の実施の形態における偏差評価グラフ
【図18】本発明の第3の実施の形態における変化量評価グラフ
【図19】本発明の第3の実施の形態における傾向グラフ
【図20】本発明の第3の実施の形態における他の偏差評価グラフ
【図21】本発明の第3の実施の形態における他の変化量評価グラフ
【図22】本発明の第3の実施の形態における他の傾向グラフ
【図23】本発明の第3の実施の形態における児童の身長グラフ
【図24】本発明の第3の実施の形態における児童の身長と体重の相関図
【図25】本発明の第3の実施の形態における児童の身長偏差グラフ
【図26】本発明の実施例におけるプラントデータ評価システムの構成図
【図27】本発明の実施例におけるプラントデータ評価の処理手順の概要の説明図
【図28】本発明の実施例における復水器真空度の推移を示すグラフ
【図29】本発明の実施例における復水器真空度と海水温度との相関図
【図30】本発明の実施例における復水器真空度の偏差の推移を示すグラフ
【図31】本発明の他の実施例における評価基準ファイルのデータ構成例の説明図
【図32】本発明の他の実施例における初期補正値の計算手順のフローチャート
【図33】本発明の他の実施例における時期補正値の計算手順のフローチャート
【符号の説明】
1…プラントデータ評価システム、2、6、52…データ収集装置、3…通信回線、4…インターネット網、5…ユーザ側装置、11…演算部、12…入力部、13…表示部、14…記憶部、15、16…通信部、21…入出力処理手段、22…データ登録・編集手段、23…評価基準構築手段、24…データ評価手段、25…評価条件補正手段、26…状態表示手段、27…送受信処理手段、28…データ収集手段、29…ユーザ情報登録手段、30…監視条件設定手段、31…プラントデータファイル、32…評価基準ファイル、33…評価結果ファイル、34…異常データ抽出条件ファイル、35…ユーザ情報ファイル、36…プラントパターンファイル、37…監視データファイル、51…ユーザ端末、61…ルータ、62…ハブ、63…Webサーバ、64…アプリケーションサーバ、65…smtpサーバ
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a technology for monitoring an abnormality in a power plant or the like, in particular, a plant data evaluation system and method for efficiently and appropriately monitoring an abnormality by calculating a correlation of plant data, a condenser vacuum degree monitoring method, It relates to a data mining method and a program.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, there has been proposed a technique of abnormality monitoring using upper and lower limit values and standard deviation of plant data or abnormality monitoring based on an operation tendency.
In the "plant optimal operation control system" described in Japanese Patent Application Laid-Open No. 2001-273007, operation control is performed by removing data outside a certain range after performing statistical processing such as calculation of a standard deviation on the basis of the average value of actual data. A system has been proposed for use as data. In the “abnormality monitoring device” described in Japanese Patent Application Laid-Open No. 2001-175972, a device that calculates an average value and σ (standard deviation) from actual data, sets 3σ as a threshold, and monitors using data falling within the threshold is used. Proposed. Further, in "Method and apparatus for monitoring abnormality of equipment" described in JP-A-6-4789, a regression coefficient is obtained from a plurality of monitoring signals by multiple regression analysis, and an abnormality is determined based on a time change rate and a normal change rate of the regression coefficient. A method and apparatus for determining is proposed. Further, in the "plant monitoring apparatus and monitoring method" described in Japanese Patent Application Laid-Open No. 8-220278, an apparatus and method for determining an abnormality when a set threshold value rises or falls N times continuously with respect to a change rate of actual data. Has been proposed.
[0003]
However, in the method of evaluating data using the standard deviation and the upper and lower limit values obtained from past data, the evaluation result varies depending on how many times the standard deviation is used as an evaluation standard. For example, if the magnification is increased, it becomes difficult to detect data abnormalities. Conversely, if the magnification is decreased, abnormalities are determined despite normal data.
[0004]
In addition, the upper and lower limits are values for the purpose of protecting devices and systems, and generally have a large difference from normal values, which makes it difficult to use for judging minute data fluctuations (signs of abnormality). is there.
[0005]
[Problems to be solved by the invention]
The present invention has been made in view of such a conventional situation, and efficiently extracts and processes data correlated with plant data to be monitored to a normal range (a range in which abnormality detection is conventionally difficult). It is an object of the present invention to provide a plant data evaluation system and method, a condenser vacuum monitoring method, a data mining method, and a program which can detect a sign of a minute abnormality lurking in (1).
[0006]
[Means for Solving the Problems]
In order to achieve the above object, a plant data evaluation system according to the first aspect of the present invention provides a data registration unit for storing plant data, and temporarily calculates a correlation approximation formula with other data items for each monitoring target data item. An evaluation criterion constructing unit that eliminates bad data based on a deviation between the value and the actual data based on the correlation approximation expression, and at least a correlation approximation expression using the excluded data, and an evaluation criterion including a standard deviation. The present invention is characterized by comprising: data evaluation means for executing evaluation of plant data using the evaluation criterion calculated by the evaluation criterion construction means; and state display means for displaying an evaluation result by the data evaluation means.
[0007]
According to the first aspect of the present invention, a correlation approximation formula with another data item is provisionally calculated for each monitoring target data item, and defective data is eliminated based on a deviation between a value based on the correlation approximation formula and actual data. The evaluation criteria used for data evaluation are calculated using the data.
[0008]
Here, the “actual data” (raw data) means measurement data of a plant or the like or data obtained by performing a certain conversion on the measurement data, and has a meaning of being used separately from a deviation from the correlation approximation formula (deviation data). “Data” includes actual data and deviation data unless otherwise specified.
[0009]
A plant data evaluation system according to a second aspect of the present invention includes a data registration unit for storing plant data, a provisional calculation of a correlation approximation formula for each data item to be monitored, and a value based on the correlation approximation formula. Eliminating the bad data based on the deviation between the actual data and the, and using the data after the exclusion, at least a correlation approximation formula, a standard deviation, and an evaluation criterion construction means for calculating an evaluation criterion including the standard deviation of the change amount, It is characterized by comprising: data evaluation means for executing evaluation of plant data using the evaluation criterion calculated by the evaluation criterion construction means; and state display means for displaying the evaluation result by the data evaluation means.
[0010]
In the second aspect of the present invention, the plant is further evaluated using the standard deviation of the data change amount.
[0011]
In the plant data evaluation system according to a third aspect of the present invention, the data evaluation means executes the evaluation based on the number of continuous data increases or decreases.
[0012]
According to the third aspect of the present invention, it is monitored whether the data continuously rises or falls. In particular, when the evaluation is performed by using the number of continuations in the change direction of the deviation data, the effect of detecting a small sign of abnormality is enhanced.
[0013]
In a plant data evaluation system according to a fourth aspect of the present invention, the data evaluation means executes the evaluation using a correction value based on the operation cycle or timing of the plant.
[0014]
According to the fourth aspect of the present invention, evaluation is performed by correcting the actual data or the correlation approximation formula with an initial correction value that is a correction value for each operation cycle or a timing correction value that is a correction value for each week or season. .
[0015]
In the plant data evaluation system according to the fifth aspect of the present invention, the evaluation criterion constructing means further calculates a deviation between the plant data and the value based on the correlation approximation expression, and uses the deviation as a monitoring target data item to evaluate the deviation. And the data evaluation means evaluates plant data using the evaluation criterion.
[0016]
According to the fifth aspect of the present invention, the monitoring is performed using data having a correlation with the difference between the actual data and the approximate correlation expression.
[0017]
A plant data evaluation method according to a sixth aspect of the present invention provides an evaluation criterion construction step of calculating a correlation approximation formula with another data item for each monitoring target data item, and a deviation between a value based on the correlation approximation formula and an actual data value. And a data evaluation step of monitoring the presence or absence of an abnormality based on the value of the deviation, the rate of change of the deviation, or the number of continuations in the direction of change of the deviation.
[0018]
In the invention according to claim 6, the deviation between the value by the correlation approximation formula and the actual data value is calculated, and based on the value of the deviation, the rate of change of the deviation, or the number of continuations in the direction of change of the deviation, Monitor for abnormalities based on each standard deviation obtained in advance
[0019]
When calculating the correlation approximation formula and the standard deviation of the monitoring target item in advance, it is effective to use data for five cycles.
[0020]
Also, using the value of the deviation as the next monitoring target data item, in the evaluation criterion construction stage, the approximate approximation formula with other data that is highly correlated with this deviation, the standard deviation with that formula, and the standard deviation of the rate of change of the deviation are obtained. In the data evaluation stage, if the abnormality is monitored based on the number of continuations in each standard deviation and the direction of change of the deviation, it is possible to monitor even finer signs of abnormality.
[0021]
In particular, when calculating a correlation approximation formula between the deviation data and other data having a high correlation, it is determined whether or not other data whose correlation strength is equal to or greater than a predetermined value γ is present. By calculating a correlation approximation formula with the data item having the highest correlation, it is possible to efficiently exclude other data of substantially the same quality (moving in the same manner) as the extraction of valid correlation data. Become.
[0022]
As described above, first, the correlation between the actual data and other data is obtained, and when the correlation between the deviation and the other data is sequentially obtained, the number of times is set to the maximum N (N is a natural number) and the upper limit is set. May be set.
[0023]
If the Nth order correlation is automatically taken for each data until the influence of the correlation data is removed to some extent, the trend becomes basically a flat trend. The peak appears only when there is a disturbance other than the influencing factors.
[0024]
Therefore, the procedure for monitoring the abnormality of the plant is as follows.
a. Until the fluctuation data falls within a certain standard (for example, ± 3%), the most correlated factor data is subtracted from the target data with respect to the past data for a certain period for calculating the evaluation standard. The process of subtracting the factor data having the highest correlation is sequentially repeated N times (calculation of the N-order correlation).
b. Record what factor data was subtracted and in what order.
c. The current monitoring target data is calculated in the same procedure as in the above a and b.
d. A. If the value falls within the standard of the swing width determined in the above, it is determined that there is no abnormality.
e. At the same time, by calculating factor data having a high correlation with respect to the waveform of the peak determined by the procedure c, it is determined that the factor data is a disturbance.
[0025]
By monitoring the abnormality of the plant according to the above procedure, the automatic operation of the plant can be performed. Further, the abnormality monitoring by this procedure can be applied to objects other than the plant, for example, weather forecast and visitor forecast.
[0026]
In the plant data evaluation method according to the seventh aspect of the present invention, the deviation between the actual data of the monitored data item and the value according to the correlation approximation formula is calculated for each period, and the correlation based on the deviation and the period is equal to or more than a predetermined value. It is characterized in that it is determined whether or not there is, and when it is equal to or more than a predetermined value, a timing correction value is calculated using the deviation, and the correlation approximation formula is corrected with the timing correction value.
[0027]
According to the seventh aspect of the present invention, the correlation approximation formula is corrected for each period according to the monitoring target data item. Specifically, the correlation between the deviation between the actual data of the monitored data item and the value according to the correlation approximation formula and the time (for example, day of the week) is calculated, and the correlation between the deviation and the predetermined value or more (for example, 70%, 80%) or more is calculated. If there is a correlation, the deviation for each period is used as a correction value. As a result, it is possible to correct the steady-state error caused by the timing.
[0028]
In the plant data evaluation method according to the eighth aspect of the present invention, the deviation between the actual data of the monitored data item and the value according to the correlation approximation formula is calculated for each of the plurality of operation cycles, and the correlation based on the deviation and the operation cycle is calculated. It is determined whether or not is greater than or equal to a predetermined value. If the value is greater than or equal to the predetermined value, an initial correction value is calculated using actual data for a predetermined period after the start of plant operation, and the correlation approximation equation is corrected with the initial correction value. It is characterized by the following.
[0029]
According to the eighth aspect of the invention, the correlation approximation formula is corrected for each operation cycle according to the monitoring target data item. As a result, it is possible to correct a steady-state error generated by each operation cycle.
Further, the average value of the deviation of the data obtained by performing the initial correction for each operation cycle is compared with the standard deviation of the cycle. By doing so, it is possible to eliminate the influence of disturbance other than the instrument error.
[0030]
As the predetermined period, it is preferable to use data on the operation start date immediately after the plant comprehensive load test. Further, when the monitoring target data fluctuates depending on the season, for example, every week, it is highly effective to correct the correlation approximation formula together with the time correction value.
[0031]
Here, the plant comprehensive load test generally means a test before plant operation.
[0032]
More specifically, when the equipment and instruments are replaced or overhauled by inspection of the plant, the variation of the slope of the correlation approximation formula itself is relatively small, but the variation is obtained using past data by an adjustment method. There is a feature that a certain deviation (error) occurs between a predicted value based on the correlation approximation formula and actual data. For this reason, a correction value is calculated for each collected data based on the value of the operation start date immediately after the comprehensive test, and then the correction value is used to correct the correlation approximation formula when comparing the actual data. By doing so, highly accurate monitoring can be performed.
[0033]
Note that the correction of the correlation approximation expression is sufficient to substantially correct the correlation approximation expression, and means both the correction for the correlation approximation expression and the correction for the actual data. In the latter case, the actual data is corrected in the comparison between the value based on the correlation approximation formula and the actual data, and the corrected value is compared with the value of the correlation approximation formula or the deviation is calculated.
[0034]
The plant data evaluation method according to the ninth aspect of the present invention provides a plant data evaluation method in which a plant data is connected to a user-side data collection device and a terminal device via a communication network, and the server device processes data transmitted from the data collection device. In the method for evaluating plant data to be evaluated, the server device stores at least a correlation approximation formula, a standard deviation, and a standard evaluation criterion of a plant including a variation standard deviation, and is transmitted from the data collection device. A step of storing plant data for each user; a step of correcting a standard evaluation criterion based on the data for each user; a step of storing for each user; and a step of storing the plant data of the user based on the evaluation criterion for each user. Evaluating, and transmitting the evaluation result to the user terminal device. And butterflies.
[0035]
According to the ninth aspect of the present invention, the server centrally manages the plant data, constructs an evaluation standard, and executes data evaluation.
[0036]
The plant data evaluation method according to the tenth aspect further comprises: calculating a deviation between the plant data and the value according to the correlation approximation formula, calculating an evaluation criterion for the deviation, and storing the evaluation criterion for each user. And a step of monitoring the plant for signs of abnormality based on the evaluation criterion, and notifying the user terminal device when the sign of abnormality is found.
[0037]
According to the tenth aspect, monitoring is performed using data correlated with the difference (deviation) between the actual data and the correlation approximation formula, and when a sign of abnormality is found, the user is notified.
[0038]
The method for monitoring the degree of vacuum of a condenser according to the invention of claim 11 includes a step of collecting condenser vacuum data, a step of collecting seawater temperature data, and a step of collecting condenser vacuum using the collected data. Calculating a seawater temperature correlation approximation formula, calculating a condenser vacuum deviation which is a difference between each data and the correlation approximation formula, and calculating a standard deviation of the condenser vacuum deviation, Monitoring the condenser vacuum using the standard deviation and the condenser vacuum deviation.
[0039]
According to the eleventh aspect of the invention, based on the correlation between the condenser vacuum degree and the seawater temperature, the influence of the seawater temperature is reduced to monitor the condenser vacuum degree.
[0040]
The condenser vacuum monitoring method according to the invention of claim 12 includes a step of collecting condenser vacuum data, a step of collecting seawater temperature data, and a step of collecting condenser vacuum data based on a specific day of the week. Correcting with the correction value for each day of the week, calculating the correlation approximation formula using the corrected condenser vacuum data and the collected seawater temperature data, and calculating the difference between the corrected data and the correlation approximation formula. Calculating the condenser vacuum deviation, and calculating the standard deviation of the condenser vacuum deviation, and monitoring the condenser vacuum using the standard deviation and the condenser vacuum deviation. And a step.
[0041]
According to the twelfth aspect of the invention, monitoring is performed by adding a correction based on the day of the week to the condenser vacuum data.
[0042]
The correction value can be obtained by calculating the relationship between the iron ion film thickness and the amount of vacuum reduction for each day of the week.
[0043]
A data mining method according to a thirteenth aspect of the present invention is a data mining method for calculating a correlation between data by using a computer, wherein a step of temporarily calculating a correlation approximation formula and a standard deviation between data, Detecting and eliminating bad data by comparing the deviation between the value of the actual data and the standard data with the standard deviation, and calculating the correlation coefficient between the two data using the excluded data. Features.
[0044]
A program according to the invention of claim 14 is a program for calculating a correlation between data, a process of inputting data, a process of temporarily calculating a correlation approximation formula and a standard deviation between the input data, and a process of calculating the correlation approximation. The process of detecting and eliminating bad data by comparing the deviation between the value according to the formula and the actual data with the standard deviation, and the process of calculating the correlation coefficient between the two data using the excluded data are performed by the computer. It is characterized by being executed.
[0045]
A program according to a fifteenth aspect of the present invention is a program that is connected to a user-side data collection device and a terminal device via a communication network and operates on a server device that processes data sent from the data collection device. A process of storing a plant standard evaluation criterion including at least a correlation approximation formula, a standard deviation, and a variation standard deviation; a process of storing plant data sent from a data collection device for each user; Processing of correcting a standard evaluation criterion based on data of each user and storing the data for each user; processing of evaluating data of a plant of the user based on the evaluation criterion of each user; And causing the computer to execute the process of transmitting to the computer.
[0046]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described. FIG. 1 is a functional block diagram of the plant data evaluation system according to the first embodiment. Here, the plant data evaluation system 1 includes an input unit 12 for inputting plant data, an operation unit 11 for executing an operation process using the input data, a display unit 13 for displaying an operation result, and data such as plant data. It comprises a storage unit 14 for storing.
[0047]
The calculation unit 11 performs input / output processing with the input unit 12 or the display unit 13 for input / output processing, data registration / editing unit 22 for registering or editing plant data, and creates evaluation criteria for plant data. An evaluation criterion construction unit 23, a data evaluation unit 24 for evaluating plant data according to the evaluation criterion, an evaluation condition correction unit 25 for setting conditions for selecting data necessary for the evaluation, and a status display unit 26 for displaying the evaluation result are provided. are doing.
[0048]
The storage unit 14 has a plant data file 31 for storing plant data, an evaluation criterion file 32 for storing evaluation criterion information of plant data, and an evaluation result file 33 for storing evaluation results.
[0049]
Next, the operation of the plant data evaluation system 1 will be described.
[0050]
<Plant data registration stage>
The plant data is input through the input unit 12 such as a keyboard, and is stored in the plant data file 31 via the input / output unit 21 and the data registration / editing unit 22. The plant data may be input through a storage medium such as a CD-ROM or a network. As the data to be registered, not only the current data for evaluating and diagnosing the plant, but also the data for the past fixed period necessary for constructing the evaluation standard is registered. In general, as the plant data for constructing the evaluation criteria, the number of data for each data item is 60 times (5 years assuming that data is collected once a month).
[0051]
FIG. 2 is a data configuration example of the plant data file 31. Data collection date and time, data identification information, data value, and plant status are stored. It should be noted that sorting can be performed as necessary, such as for each piece of data identification information.
[0052]
Further, every time plant data is collected, data is sequentially registered through the data registration / editing means 22.
[0053]
<Evaluation criteria establishment stage>
First, the data registration / editing unit 22 eliminates so-called abnormal data, which is not used for the evaluation of the plant, such as data during regular inspection and stoppage, from the plant data stored in the plant data file 31.
[0054]
Next, the operation of the evaluation criterion construction unit 23 will be described with reference to FIG.
[0055]
When activated by the input unit 12, the evaluation criterion construction unit 23 extracts a data item to be monitored (S101). Then, a data item to be subjected to the calculation of the correlation with the data item is selected (S102), and a correlation approximation formula and a standard deviation are provisionally calculated using the monitoring target data and the correlation data (S103). Note that the correlation approximation formula and the standard deviation at this stage are not directly used for evaluating the plant data, and are therefore referred to as “temporary calculations”.
[0056]
The correlations with a plurality of types of data items are individually provisionally calculated, and a predetermined number (for example, 10 items) of highly correlated data items are extracted (S104). Then, among the data stored in the plant data file 31 using the standard deviation obtained by the tentative calculation, data that does not fall within a predetermined range (for example, data that does not fall within ± 4σ) is excluded as defective data ( S105).
[0057]
Next, a correlation approximation formula, a standard deviation σ1, and a variation standard deviation σ2 are calculated for each data item using the data after the elimination of the defective data (S106). The calculation at this stage is referred to as “main calculation”. Here, the variation standard deviation means a standard deviation with respect to a variation of data in a predetermined period.
[0058]
Then, the correlation approximation formula, the standard deviation σ1, and the variation standard deviation σ2 of the data item having the largest correlation are stored in the evaluation reference file 32 (S107). The above processing is repeated for all data items to be monitored (S108).
[0059]
FIG. 4 is an example of the data configuration of the evaluation criterion file 32. Here, the coefficients a and b indicate the coefficients when the correlation approximation expression is expressed in the form of y = a · x + b. Further, the values of the standard deviation σ1 and the variation standard deviation σ2 are also stored. If the correlation approximation expression is expressed in another format such as a quadratic expression, the format information (approximation expression pattern) and coefficient information are stored.
[0060]
<Evaluation stage of plant data>
Next, the operation of the data evaluation means 24 will be described with reference to FIG. The data evaluation means 24 determines whether or not the plant data needs to be corrected in response to an instruction from the input unit 12 or is periodically activated (S201). 25 is started to execute the correction processing (S202). Here, as an example of the correction processing, when calculating the predicted value of the current data using the correlation approximation formula, the initial value is corrected to a value immediately after the comprehensive load inspection, or the data value is fixed to a certain value depending on a time period such as every day of the week. If there is a fluctuation and the fluctuation is due to the normal operation of the plant, a correction value may be added to the actual data of the collected plant. Note that it is sufficient that the difference from the correlation approximation formula can be corrected according to the actual situation, so that the coefficient of the correlation approximation formula may be corrected instead of the actual plant data.
[0061]
Next, a predicted value of the current data is calculated using a correlation approximation formula (S203). Then, as the evaluation based on the deviation (S204), the difference between the correction value and the predicted value of the actual data of the plant is evaluated based on the standard deviation σ1, and if it is within a predetermined range, it is normal, and if it is outside the predetermined range, it is abnormal. And At this time, the evaluation results are divided into stages, for example, a normal state when within the range of ± 2σ1, a caution state when within the range of ± 2σ1 to ± 3σ1, and an abnormal state when away from ± 3σ1 or more. Is also good.
[0062]
Subsequently, as the evaluation based on the amount of change (S205), the amount of change between the previous value and the current value of the plant data is evaluated based on the standard deviation σ2 of the amount of change.
[0063]
Further, as an evaluation based on the tendency (S206), when the plant data continuously rises or falls, whether the plant data is normal or abnormal is determined based on the number of times. In the case of plant data, it is effective to set the caution state several times, for example, four times in a row, and the abnormal state five times in a row.
[0064]
FIG. 6 is an explanatory diagram of a data example of the evaluation result file. Here, 1.5 in the deviation column means that the deviation is at 1.5σ1.
[0065]
Next, the status display unit 26 is activated, and a status display or a graph display is performed on the display unit 13 based on the evaluation result file 33 (S207).
[0066]
In this embodiment, at the stage of establishing the evaluation criterion, a correlation approximation formula and a standard deviation are provisionally calculated to extract data items having a strong correlation, and thereafter, data having a large variation is excluded based on the standard deviation. Finally, since the evaluation criteria such as the correlation approximation formula and the standard deviation of the data items used for the evaluation are calculated, even if the data amount for which the correlation is required is large, a highly accurate evaluation criterion can be obtained by a simple method.
[0067]
In addition, in the evaluation stage of plant data, the evaluation is performed by correcting the actual plant data using the evaluation criterion obtained in the stage of establishing the evaluation criterion. It is possible to evaluate with high accuracy without applying any cost.
[0068]
In this embodiment, for the data items to be monitored, correlation data items are narrowed down to one type, and evaluation reference information such as a correlation approximation formula is stored. It is also possible to store evaluation criteria information for a plurality of types of data items having an item and to perform evaluation using this information.
[0069]
In addition, depending on the monitoring item among the evaluations based on the deviation, the amount of change, and the tendency, only some evaluations may be performed.
[0070]
Next, a second embodiment will be described.
FIG. 7 is a functional block diagram of the plant data evaluation system according to the present embodiment.
[0071]
The difference from FIG. 1 is that the communication unit 15 receives plant data sent from the data collection device 2 to the plant data evaluation system 1 via the communication line 3 and the arithmetic unit 11 communicates data between the communication unit 15. Transmission / reception processing means 27 for transmitting and receiving data, and data collection means 28 for storing plant data collected in the storage unit 14, and the storage unit 14 stores in the storage unit 14 abnormal data in which conditions for extracting abnormal data are stored. That is, the extraction condition file 34 is provided. Here, an example of the abnormal data extraction condition file 34 is shown in FIG. In this figure, the plant state at the time of plant data collection, such as during regular inspection, and the state of the plant that cannot be used as evaluation data are stored. Note that a plant state that cannot be used as evaluation data for each data item may be settable.
[0072]
Other components are the same as those in FIG.
[0073]
Next, the operation of the plant data evaluation system 1 will be described focusing on differences from the first embodiment.
[0074]
<Plant data registration stage>
Past data for creating an evaluation criterion is input through the input unit 12. The actual data of the plant to be evaluated is sent via the data collection device 2 installed on the plant side, received by the communication unit 15, and transmitted and received by the storage unit 14 through the transmission / reception processing unit 27 and the data collection unit 28. It is stored in the plant data file 31.
[0075]
Note that past data for creating an evaluation criterion may be input from the data collection device 2 via the communication line 3.
[0076]
<Evaluation criteria establishment stage>
Next, the operation of the evaluation criterion construction unit 23 will be described with reference to FIG. When activated by the input unit 12, the evaluation criterion construction unit 23 refers to the abnormal data extraction condition file 34 and eliminates plant data that is not used as evaluation data, that is, abnormal data (S301). Next, data items to be monitored are extracted (S302). Then, a data item to be subjected to the calculation of the correlation with the data item is selected (S303), and a correlation approximation formula and a standard deviation are provisionally calculated using the monitoring target data and the correlation data (S304).
[0077]
The correlation with a plurality of types of data items is temporarily calculated individually, and a predetermined number of data items having a high correlation are extracted (S305). Then, by using the standard deviation obtained by the tentative calculation, among the data stored in the plant data file 31, data that does not fall within a predetermined range is excluded as defective data (S306).
[0078]
Next, using the data after the elimination of the defective data, a correlation approximation formula, a standard deviation σ1, and a variation standard deviation σ2 are calculated for each data item (S307). Then, the correlation approximation formula, the standard deviation σ1, and the variation standard deviation σ2 of the data item having the largest correlation are stored in the evaluation reference file 32 (S308).
[0079]
Next, the deviation between the actual data of the plant and the value according to the correlation approximation formula is calculated (S310). Then, the process from step S303 to step S308 is executed using this deviation as a monitoring target data item. It is determined whether the correlation strength (correlation coefficient) is equal to or more than a predetermined value γ (S312). If not, the next monitoring data item is executed (S313). The evaluation criterion is sequentially calculated for the correlation of the deviation until the number of times (N is a natural number) (S309).
[0080]
FIG. 10 shows the evaluation reference file 32 created by the above processing. Here, the primary means the correlation between the monitoring target data item and the correlation data item, and the secondary means the difference (deviation) between the value obtained by the primary approximated correlation approximation formula and the actual data and another value. Indicates the correlation with the correlation data item. As described above, the correlation with respect to the deviation from the correlation approximation equation obtained in the previous stage is sequentially calculated, and the calculation result is stored.
[0081]
As described above, regarding the maximum correlation order corresponding to the number of correlation data stored for each monitoring data item and the correlation data of each order, the value of each coefficient of the correlation data item, the approximate expression pattern, and the approximate expression ( a, b, c), the standard deviation σ1, the variation standard deviation σ2, and the value of the correlation strength γ are stored.
[0082]
Here, in FIG. 10, the approximate expression pattern “2” is a quadratic correlation approximate expression, that is, y = a · x 2 + Bx + c.
[0083]
<Evaluation stage of plant data>
The procedure for evaluating the plant data is basically the same as in the first embodiment. However, the evaluation process is executed by using an evaluation criterion for a higher order, such as the second or third order obtained in the stage of establishing the evaluation criterion, if necessary.
[0084]
In the present embodiment, the deviation between the actual data and the correlation approximation formula is determined, and the correlation with respect to the deviation is evaluated. Therefore, it is possible to detect the precursor of the abnormality by a simple method.
[0085]
In particular, when trying to calculate the correlation with many data items at once, the load on the computer increases, but according to the present embodiment, the data items with the highest correlation in a short time with the performance equivalent to a personal computer. Correlation data can be determined.
[0086]
Further, among the data items, there is a possibility that substantially the same data (data that moves exactly the same) exists even if the item name is changed. By calculating a deviation from the value and extracting correlation data of the deviation, such substantially identical data can be excluded.
[0087]
The processing procedure of the evaluation criterion construction means described in the present embodiment is effective not only for plant data but also for general data mining.
[0088]
Next, a third embodiment will be described.
FIG. 11 is a configuration diagram of a plant data evaluation system and a user-side device connected via the Internet. Here, the plant data evaluation system 1 includes a router 61 for connecting to the Internet 4, a hub 62 for connecting a plurality of servers, a Web server 63, an application server 64 for executing a plant data evaluation application, and an e-mail. It consists of an smtp server 65 for transmission. The plant data evaluation system provides a plant data evaluation service as an application service provider (ASP).
[0089]
On the other hand, the user device 5 of the user of the plant data evaluation service includes a user terminal 51 connected to the Internet 4 and a data collection device 52 having a function of collecting data of the user's plant and transmitting the data through the Internet 4. It is composed of A plurality of user terminals 51 and data collection devices 52 may exist for the same user.
[0090]
A data collection device 6 that is installed independently of the user of this service and collects seawater temperature data, weather data, and the like is also connected to the Internet network 4.
[0091]
FIG. 12 is a functional block diagram of the application server 64 (hereinafter, referred to as server 64). Here, the server 64 includes a communication unit 16 that transmits and receives data to and from the hub 62, an arithmetic unit 11 that executes an application program, and a storage unit 14. In addition, the calculation unit 11 includes a transmission / reception processing unit 27 that performs a data transfer process with the communication unit 16, a user information registration unit 29 that registers user information, an evaluation standard construction unit 23 that creates an evaluation standard for plant data, and Data evaluation means 24 for evaluating plant data, evaluation condition correction means 25 for setting data selection conditions necessary for evaluation, status display means 26 for displaying evaluation results, data sent from data collection devices 6 and 52 And a monitoring condition setting unit 30 for the user to set the monitoring condition of the plant.
[0092]
Further, the storage unit 14 includes a user information file 35 for storing user information in addition to a plant data file 31, an evaluation criterion file 32, an evaluation result file 33, and an abnormal data extraction condition file 34, and a plant pattern for storing a plant type. The file 36 has a monitoring data file 37 for storing data such as monitoring items for each user. Here, in the plant pattern file 36, as illustrated in FIG. 13, a pattern number, a monitoring item, data necessary for monitoring the monitoring item, and monitoring with higher accuracy are provided for each monitoring plant. Arbitrary data is stored.
[0093]
Next, the operation of the plant data evaluation system 1 will be described.
[0094]
<User information registration stage>
The user makes an application for the plant data evaluation service through the user terminal 51, and the user information is stored in the user information file 35 of the storage unit 14 by the user information registration unit 29. FIG. 14 is an example of the user information file 35. Here, in the user information file, in addition to a user ID (user identification information), a password, and the like issued for each user, information such as an e-mail address and a telephone number is input as a notification destination when an abnormality is found. Further, the device ID (device identification information) of the data collection device 52 on the user side is stored. The device ID is added to the transmission data when transmitting the plant data from the data collection device 52, and is used by the server 64 to identify which data collection device has sent the data.
[0095]
<Monitoring item setting stage>
The user sends a monitoring item setting request through the user terminal 51. In response to this request, the monitoring condition setting means 30 is started. When started, the monitoring condition setting means 30 displays a monitoring condition setting screen illustrated in FIG. 15 on the user terminal 51 via the Web server 63. When the user selects, for example, the plant pattern "1" on this screen, the plant pattern file 36 is referred to, and the monitoring items of the nuclear power plant corresponding to the pattern include the condenser vacuum degree and the power generation end efficiency. Items are displayed. Then, when the user selects the condenser vacuum degree as a monitoring item, essential data and optional data are displayed as collected data. The user checks the data to be collected and sent to the server 64 among the arbitrary data, and clicks a confirmation button. Thus, the setting information is sent to the server 64 and stored in the monitoring data file 37. FIG. 16 is an example of the monitoring data file 37. Here, the monitoring data file 37 stores a user ID, a plant pattern, a monitoring item, and a collected data ID (hereinafter, referred to as a data ID). The data ID corresponds to a collected data item, and each data sent from the data collection device 52 is provided with a data ID and a collection time corresponding to the data.
[0096]
In the above description, the user sets the monitoring items. However, the system automatically monitors the data items that can be collected automatically at all times. You may make it notify.
[0097]
<Evaluation criteria establishment stage>
The user can send the past data to the server 64 and cause the server 64 to calculate the evaluation criterion by the method described in the first embodiment or the second embodiment. Alternatively, the user can select the following method. it can.
[0098]
First, the evaluation criterion file 32 stores standard evaluation criterion data in advance. For example, the correlation coefficient between the condenser vacuum degree data and the seawater temperature data, the coefficient of the correlation approximation curve, the standard variance, and the standard variance of the variation are stored as general data. The user confirms this through the terminal 51, edits it, and saves it as his own evaluation standard. In particular, since the slope of the correlation approximation curve does not change much depending on the plant, it can be used effectively only by correcting the center value.
[0099]
<Plant data collection and evaluation stage>
The plant data periodically transmitted from the data collection device 52 is received and processed by the communication unit 16 and the transmission / reception processing unit 27, and is stored in the plant data file 31 by the data collection unit 28 for each device ID and data ID. .
[0100]
Then, the data to be monitored is evaluated by the data evaluation means 24 based on the evaluation criterion of the user stored in the evaluation criterion file 32. At this time, the evaluation criterion construction unit 23 sequentially corrects the initially set evaluation criterion based on the collected data. Note that the evaluation method is the same as that of the first embodiment or the second embodiment, and a description thereof will be omitted.
[0101]
The data evaluation means saves the evaluation result in the evaluation result file 33 for each user and each plant and, when an abnormality is detected, to the e-mail address at the time of finding the abnormality stored in the user information file 35 via the smtp server 65. Notice. In the case of a telephone notification, the notification is made by a pre-recorded voice or voice synthesis. Thus, the user can know the abnormality in real time.
[0102]
<Plant status confirmation stage>
When the user obtains the evaluation result information, the user makes a plant status display request through the terminal 51. When there is a status display request from the user, the status display means 26 displays the status of the plant on the user terminal 51 via the Web server 63 based on the information in the evaluation result file 33 and the plant data file 31. For example, when the user selects the evaluation based on the deviation, the deviation evaluation graph shown in FIGS. 17 and 20 is displayed. When the user selects the evaluation based on the variation, the variation evaluation graphs illustrated in FIGS. 18 and 21 are displayed. When the evaluation based on the tendency is selected, a trend evaluation graph shown in FIGS. 19 and 22 is displayed. At this time, if there is an abnormality, the abnormal position is displayed on the graph as shown at point A in FIG. In particular, as shown in FIG. 20, FIG. 21, and FIG. 22, if a line (information) for distinguishing between a normal range and an abnormal range is displayed on a graph and provided to the user, the user can change the data of the plant along with the abnormal position. Can be visually grasped, and can also be used for cause analysis of an abnormality.
[0103]
<Other services>.
When creating a standard evaluation standard, the plant data evaluation system 1 uses not only data collected independently or actual values of plant data of each user, but also a data collection device 6 installed in another location. , And calculates the correlation with the user's plant data as needed. As a result, for example, the seawater temperature on the backside of the earth may affect the user's plant, and this can be efficiently discovered by centrally managing data by the service of the present embodiment. .
[0104]
According to the present embodiment, the plant data is collected and evaluated by the server, and the standard evaluation standard can be set by default. Becomes possible. In addition, since the evaluation criteria are sequentially corrected for each user and each plant based on the collected data, highly accurate evaluation can be performed.
[0105]
Although the present embodiment has been described with reference to plant data, it is apparent that the present invention can be applied to other than plants, such as, for example, crop yield data and actual earthquake data.
[0106]
In the above description, the user sends data for setting monitoring items and establishing evaluation criteria to the server. However, a person other than the user, such as a company that provides a plant data evaluation service, may perform the processing.
[0107]
The present invention is to detect a sign of abnormality of the monitoring target data using data correlated with the monitoring target data, and it is obvious that the present invention is not limited to the above embodiments. For example, FIGS. 23 to 25 are graphs for analyzing the correlation between the height and the weight of the child. The monitoring target in FIG. 25 is set to the height using the approximate approximation formula of the height and the weight shown in FIG. By plotting the deviation between the predicted value based on the correlation approximation formula and the height using the data as the weight for each child, it is also possible to know the physical change tendency of the child. Similarly, the present invention can be applied to sales prediction, weather prediction, traffic volume prediction, stock price prediction, and the like of retail stores and restaurants.
【Example】
An evaluation system and an evaluation method for plant data of a nuclear power plant will be described.
[0108]
FIG. 26 is a configuration diagram of the plant data evaluation system according to the present embodiment. A data server storing the files 31 to 33 of FIG. 1 is provided in the office LAN, and each file can be accessed through a computer. In addition, each means 21 to 26 such as a data evaluation means is provided in each computer.
[0109]
Next, an outline of a processing procedure of the plant data evaluation will be described with reference to FIG. First, plant data is input (S401), and evaluation is started (S402). At this stage, the evaluation criteria have already been created and stored in the data server. Then, an evaluation based on the deviation is performed (S403), and it is determined whether or not the deviation is out of the range of 3σ (S406). If the deviation is outside the range, an abnormality is displayed (S410), and if it is within the range, no abnormality is displayed (S409). ). As the evaluation based on the amount of change (S404), if the amount of change is out of the range of the reference value (S407), an abnormal display is performed (S411). Further, an evaluation is made based on the tendency of the fluctuation (S405), and if there is a continuous increase or decrease more than a specified number of times (S408), an abnormal display is performed (S412). Then, a graph display request is accepted (SS413), a graph is displayed (S414), and data is confirmed (S415). The graph display processing is performed in response to the new graph display request, and the processing ends when the operation is completed (S416).
[0110]
<Evaluation criteria establishment stage>
Next, as a specific example of the plant data evaluation process, a description will be given using the degree of vacuum of a condenser that cools steam generated in a nuclear reactor and worked by a turbine.
[0111]
FIG. 28 is a graph showing a change in the condenser vacuum degree for about one year. The condenser vacuum fluctuates from about 92 KPa to 97 KPa during this period. The fluctuation width is 5 KPa. By executing the processing shown in FIG. 3 by the evaluation criterion construction means, this is due to the fluctuation of the seawater temperature for cooling the condenser, that is, disturbance, and abnormalities such as air leakage, clogging of the cooling pipe, etc. It turned out that it did not happen.
[0112]
<Data evaluation processing>
FIG. 29 shows the condenser vacuum of FIG. 28 in correlation with the maximum disturbance seawater temperature. As a result, the change in the degree of vacuum of the condenser can be observed without the influence of the seawater temperature.
[0113]
The curve in FIG. 29 is obtained from the past five cycles of data, and the center line (approximate curve) of the data is given by equation (1).
[0114]
y = -0.00488x 2 -0.0601x + 97.92 (1)
[0115]
When the difference between the actual value and the approximate curve is graphed, a deviation graph shown in FIG. 30 is obtained. Since the maximum disturbance has been removed, the fluctuation range is significantly reduced from 5 KPa in FIG. 28 to 1.5 KPa. As a result, a minute change that is difficult to confirm in FIG. 28 can be found.
[0116]
Hereinafter, a specific evaluation method will be described.
[0117]
(Evaluation by deviation)
The difference (deviation data) between the actual value and the value obtained from the approximate expression is evaluated based on the standard deviation. For early detection of abnormalities, ± 3σ (probably 0.3% of data is determined as abnormal) and for alerting ± 2σ (probably 4.5% of data are determined as caution). .
[0118]
(Evaluation based on the amount of change)
With respect to the deviation data obtained in the evaluation stage based on the deviation, the difference (change amount) between the current deviation data and the previous deviation data is calculated, and evaluation is performed based on the standard deviation of the change amount. As in the evaluation of the deviation, ± 3σ was used as a criterion for abnormality judgment and ± 2σ was used as a criterion for caution judgment.
[0119]
In the past data analysis, regarding the evaluation based on deviation or the amount of change, it is confirmed that if there is a change of ± 3σ or more even if the data is in the past fluctuation range, there is a high possibility that the equipment or meter is abnormal. did.
[0120]
(Trend evaluation)
Regarding the deviation data obtained in the evaluation stage based on the deviation, the case where the current deviation data rises or falls five times in succession with respect to the previous deviation data is regarded as an abnormality judgment criterion, and four consecutive times are used as a criterion for calling attention. And
[0121]
Plant data usually fluctuates around a certain point, and past data analysis has confirmed that if the data goes up and down five or more times in a row, there is a high possibility of equipment or instrument failure.
[0122]
As described above, as described in the present embodiment, the abnormality alert of the vacuum degree of the condenser has not been affected by the seawater temperature (disturbance) and has a margin of 88 KPa from the viewpoint of protection of the equipment. It was common to set. For this reason, in the case where a small air leak occurs in which the degree of vacuum of the condenser is only slightly reduced, the abnormality alarm is not generated as a matter of course. Also, in the data evaluation by the operator, the fluctuation due to the disturbance is large, so that it is extremely difficult to determine the abnormality.
[0123]
However, by monitoring the fluctuation of the condenser vacuum deviation, which removes the factor of seawater temperature, before the conventional condenser vacuum abnormality alarm is issued or before the operation of the plant begins to be adversely affected, It has become possible to detect a minute abnormal state that is a precursor to the situation.
[0124]
The vacuum degree of the condenser changes depending on the supply amount of iron ions to the condenser tubes. By correlating the condenser vacuum degree deviation and the iron ion film thickness shown in FIG. It was found that the condenser vacuum deviation also fluctuated in the weekly cycle based on the change in the temperature. For this reason, the amount of vacuum reduction (difference from the design vacuum degree) for each day of the week is obtained, and the difference is corrected with respect to the numerical value of the condenser vacuum degree deviation on the basis of a specific day of the week, for example, Monday (0). By doing so, the fluctuation of the degree of vacuum can be monitored with higher accuracy by removing the factor of the iron film.
[0125]
As another embodiment of the evaluation criterion construction means, an evaluation criterion file shown in FIG. 31 may be used. In FIG. 31, the evaluation reference file is obtained by adding one or more time correction values and initial correction values to the items of the evaluation reference file shown in FIG.
[0126]
Here, the timing correction value is such that the magnitude of the error (the difference between the predicted value by the correlation approximation formula and the actual data) changes regularly depending on the day of the week, the month, the season, the number of driving days from the driving start date, and the like. In this case, it is a numerical value added to the correlation approximation formula according to the rule or period. For example, when the error from the actual data changes depending on the day of the week, such as a condenser vacuum deviation, the time correction value is stored for each day of the week and the corresponding time correction value is extracted according to the day of the monitoring day. Then, the correlation approximation formula is corrected.
[0127]
The initial correction value is a numerical value for correcting the correlation approximation formula based on actual data on the operation start date, and usually uses the correction value in the operation cycle. This is because the correlation approximation formula is calculated based on past data, but the correlation approximation is due to differences in equipment characteristics due to instrument adjustment and equipment replacement, or changes in the plant state for each cycle. This is because there is a case where a difference constantly occurs between the predicted value based on the equation and the actual data.
[0128]
The timing at which the initial correction value is calculated is not limited to immediately after the plant comprehensive load test, and it suffices if there is a certain reference for the timing at which this is calculated. In addition, it is usually efficient and effective to calculate the initial correction value based on the actual data on the operation start date (the first day of the operation cycle). However, if the actual operation environment can be simulated by the plant comprehensive load test, , Using the data under test.
[0129]
The correlation approximation formula based on the evaluation criterion file of FIG. 31 is as follows.
y = a · x + b + timing correction value + initial correction value (2)
[0130]
In some plants, either the timing correction value or the initial correction value may be sufficient.
[0131]
The timing correction value or the initial correction value can be used for the correlation approximation formula of all patterns. For example, columns for these correction values may be provided in the evaluation reference file in FIG.
[0132]
Next, the calculation procedure of the timing correction value will be described with reference to FIG.
First, a difference between a predicted value of the correlation approximation formula and actual data accumulated in the past is calculated for each correlation approximation formula at each time of the correlation approximation formula (S601). The term “per time” is, for example, per day, per month, per season, per event, or the like. Then, it is determined whether or not the difference has a significant difference depending on time (S602). If there is a significant difference, a correction value for each time is added to the correlation approximation formula (S603). For example, if the difference between the predicted value and the actual data varies depending on the day of the week, a different value for the day of the week is set as the timing correction value of the correlation approximation formula. The processing from the above steps S601 to S603 is executed for all the timing items to be calculated (S604).
[0133]
In the flowchart of FIG. 33, the timing correction value is calculated based on the past data. However, it is determined in the past data whether or not there is a significant difference depending on the timing. Only the correction value may be calculated using the actual data of the operating plant.
[0134]
Next, the calculation procedure of the initial correction value will be described with reference to FIG.
First, after the operation of the plant is started, a predicted value of a certain monitoring target item by a correlation approximation formula is calculated (S501). Next, the difference between the predicted value and the actual data is calculated (S502). Then, it is determined whether or not the difference is within a predetermined range (S503). If the difference is within the predetermined range, the difference is set as an initial correction value (S504). If it is out of the predetermined range in step S503, it is processed as a plant abnormality (S505). As described above, the processes from step S501 to step S505 are repeated for the monitoring target item for which the initial correction value is to be calculated (S506).
[0135]
In step S503, the predetermined range is preferably based on 3σ. Usually, the difference due to adjustment of the instrument or replacement of the same type of device is within 3σ.
When calculating the initial correction value, it is preferable to average the monitoring item data collected at the plurality of points on the day and use the average value. If the sampling range is increased and the number of samplings is increased, the predetermined range is narrowed. Thus, the accuracy of the initial correction value can be increased as the number of samplings increases.
[0136]
Data items that require initial correction include turbine efficiency, main steam flow rate, feedwater temperature, and reactor pressure.Data items that do not require initial correction for operation include condenser vacuum and drywell. Pressure, drywell condensate flow rate, etc. The deviation between the value of the correlation approximation formula obtained from the past data and the actual data (the average of the data, if there is more than one) is checked in advance for each plant cycle to determine whether there is a significant difference. As for those items, an initial correction value column may be provided in the evaluation criterion file as a data item requiring initial correction. The same applies to the timing correction value.
[0137]
In addition, as an initial correction and a timing correction of a nuclear power plant, correction processing is performed on about 80% (about 50 items) of data items to be evaluated by calculating a standard deviation and an average value for each of the last five operation cycles. Was done. Instrument errors (including adjustment errors) can be accurately determined by averaging data for one day collected at 5-second intervals. An initial correction value can be calculated.
[0138]
Condenser vacuum is affected not only by seawater temperature, but also by other unsealed seawater conditions, such as turbidity of seawater and breeding conditions of shellfish, algae, etc., and initial correction may be inappropriate. Do you get it. In this case, the load of the initial correction calculation can be reduced by excluding items that are not suitable for the initial correction such as the condenser vacuum degree from the target of the initial correction calculation in advance.
[0139]
In the verification using the past data, the average value of the deviation of the data obtained by performing the plant comprehensive load test correction calculation for each operation cycle is compared with the standard deviation of the cycle previously obtained. In addition, when there is a deviation of a predetermined ratio (for example, 50% or 100%) or more, it is effective to perform a process of not performing correction. This is because if the error (deviation) is excessive, there is a possibility that the error is affected by disturbance other than the instrument error. In other words, by using the average value of the data deviation as a comparison target, not the standard deviation of the data or the absolute value of the deviation, the effects of instrument errors are eliminated and the effects of disturbances such as large seasonal variations such as seawater conditions are observed. Can be determined.
[0140]
In addition, the effect of iron ion, which is a one-week cycle fluctuation (effect of condenser backwashing), must be corrected on the day of the week for the applicable condenser vacuum degree data separately from the initial correction by the plant comprehensive load test. Can be eliminated.
[0141]
In addition, the influence of the seawater temperature and the seawater state, which are fluctuations in one-year cycle, can be removed by correlating with the condenser vacuum data corrected for the day of the week.
[0142]
According to the present embodiment, the correlation approximation equation is corrected with the timing correction value and the initial correction value, so that monitoring with higher accuracy can be performed. Further, if these correction values are used, effective monitoring can be performed using a correlation approximation formula calculated using past data for one cycle.
[0143]
In particular, by combining the monitoring that performs the correction with the initial correction value (hereinafter, referred to as the initial correction) and the monitoring that does not perform the initial correction, highly accurate monitoring can be performed while reducing the computer load.
[0144]
For example, in a plant such as a power plant, the following two types of monitoring are performed.
(1) The actual data is taken into the computer every 5 seconds, the average value of the data for 24 hours is calculated, and the initial correction value is obtained using the "one-day data". Five single-cycle correlation approximations (5 cycles) corrected by the initial correction values are obtained, and monitoring is performed based on the standard deviation from the average value of the predicted values based on each correlation approximation formula.
(2) When it is not necessary to calculate the initial correction value (for example, when there is almost no instrument error, etc.), a correlation approximation formula is obtained based on the actual data for 5 cycles, and the correlation approximation formula is used to calculate the correlation approximation formula. Monitor based on standard deviation.
Of the above (1) and (2), since the computer load for monitoring is larger in (1), it is necessary to determine in advance which of (1) and (2) above for each monitoring target item. If monitoring is performed by each method, computer load can be reduced and monitoring can be performed with high accuracy.
[0145]
In particular, depending on the items to be monitored, there is data collected by a human system in a regular operation once a month. In these so-called "monthly data", a human reading error is larger than an instrument adjustment error, and data in a biased state may be accidentally collected. For such data collected by a human system, the monitoring method (2) is more suitable.
Further, according to the present embodiment, since the method of correcting the correlation approximation equation is changed depending on the monitoring target, highly accurate monitoring can be efficiently performed.
[0146]
【The invention's effect】
As described above, according to the present invention, data correlated with data to be monitored can be accurately and efficiently extracted, and minute fluctuations can be monitored. Thus, it is possible to detect in advance signs of an abnormality in the plant or the like.
[Brief description of the drawings]
FIG. 1 is a functional block diagram of a plant data evaluation system according to a first embodiment of the present invention.
FIG. 2 is an explanatory diagram of a data configuration example of a plant data file of FIG. 1;
FIG. 3 is a flowchart showing a processing procedure of an evaluation criterion construction unit in FIG. 1;
FIG. 4 is an explanatory diagram of a data configuration example of an evaluation reference file in FIG. 1;
FIG. 5 is a flowchart showing a processing procedure of a data evaluation unit in FIG. 1;
FIG. 6 is an explanatory diagram of a data configuration example of an evaluation result file in FIG. 1;
FIG. 7 is a functional block diagram of a plant data evaluation system according to a second embodiment of the present invention.
8 is an explanatory diagram of a data configuration example of an abnormal data extraction condition file in FIG. 7;
FIG. 9 is a flowchart showing a processing procedure of an evaluation criterion construction unit in FIG. 7;
FIG. 10 is an explanatory diagram of a data configuration example of an evaluation reference file in FIG. 7;
FIG. 11 is a device configuration diagram of a plant data evaluation system and a user-side device according to a third embodiment of the present invention.
FIG. 12 is a functional block diagram of the application server of FIG. 11;
FIG. 13 is an explanatory diagram of a data configuration example of the plant pattern file of FIG. 12;
FIG. 14 is an explanatory diagram of a data configuration example of a user information file of FIG. 12;
FIG. 15 is an explanatory diagram of an example of a monitoring condition setting screen according to the third embodiment of the present invention.
16 is an explanatory diagram of a data configuration example of a monitoring data file in FIG.
FIG. 17 is a deviation evaluation graph according to the third embodiment of the present invention.
FIG. 18 is a graph showing a variation evaluation according to the third embodiment of the present invention.
FIG. 19 is a trend graph according to the third embodiment of the present invention.
FIG. 20 is another deviation evaluation graph according to the third embodiment of the present invention.
FIG. 21 is another change evaluation graph according to the third embodiment of the present invention.
FIG. 22 is another trend graph according to the third embodiment of the present invention.
FIG. 23 is a height graph of a child according to the third embodiment of the present invention.
FIG. 24 is a correlation diagram between height and weight of a child according to the third embodiment of the present invention.
FIG. 25 is a height deviation graph of a child according to the third embodiment of the present invention.
FIG. 26 is a configuration diagram of a plant data evaluation system according to an embodiment of the present invention.
FIG. 27 is an explanatory diagram of an outline of a processing procedure of plant data evaluation in the embodiment of the present invention.
FIG. 28 is a graph showing a change in the degree of vacuum of the condenser in the embodiment of the present invention.
FIG. 29 is a correlation diagram between the condenser vacuum degree and the seawater temperature in the embodiment of the present invention.
FIG. 30 is a graph showing a change in the condenser vacuum degree deviation in the embodiment of the present invention.
FIG. 31 is an explanatory diagram of a data configuration example of an evaluation reference file according to another embodiment of the present invention.
FIG. 32 is a flowchart of a procedure for calculating an initial correction value according to another embodiment of the present invention.
FIG. 33 is a flowchart of a procedure for calculating a timing correction value in another embodiment of the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Plant data evaluation system, 2, 6, 52 ... Data collection device, 3 ... Communication line, 4 ... Internet network, 5 ... User side device, 11 ... Operation unit, 12 ... Input unit, 13 ... Display unit, 14 ... Storage unit, 15, 16 communication unit, 21 input / output processing unit, 22 data registration / editing unit, 23 evaluation criteria construction unit, 24 data evaluation unit, 25 evaluation condition correction unit, 26 status display unit , 27 ... Transmission / reception processing means, 28 ... Data collection means, 29 ... User information registration means, 30 ... Monitoring condition setting means, 31 ... Plant data file, 32 ... Evaluation reference file, 33 ... Evaluation result file, 34 ... Abnormal data extraction Condition file, 35: user information file, 36: plant pattern file, 37: monitoring data file, 51: user terminal, 61: router, 62: hub, 3 ... Web server, 64 ... application server, 65 ... smtp server

Claims (15)

プラントのデータを保存するデータ登録手段と、監視対象データ項目ごとに他のデータ項目との相関近似式を仮算出し、当該相関近似式による値と実データとの偏差に基づき不良データを排除し、排除後のデータを用いて少なくとも相関近似式、および、標準偏差を含む評価基準を本算出する評価基準構築手段と、前記評価基準構築手段により本算出された評価基準を用いてプラントのデータの評価を実行するデータ評価手段と、前記データ評価手段による評価結果を表示する状態表示手段と、を備えたことを特徴とするプラントデータ評価システム。Data registration means for storing plant data, and provisional calculation of a correlation approximation formula with other data items for each monitoring target data item, and elimination of defective data based on a deviation between a value based on the correlation approximation formula and actual data. Using the data after exclusion, at least the correlation approximation formula, and an evaluation criterion constructing means for calculating the evaluation criterion including the standard deviation, and the data of the plant using the evaluation criterion thus calculated by the evaluation criterion constructing means. A plant data evaluation system comprising: data evaluation means for performing evaluation; and status display means for displaying an evaluation result by the data evaluation means. プラントのデータを保存するデータ登録手段と、監視対象データ項目ごとに他のデータ項目との相関近似式を仮算出し、当該相関近似式による値と実データとの偏差に基づき不良データを排除し、排除後のデータを用いて少なくとも相関近似式、標準偏差、および、変化量の標準偏差を含む評価基準を本算出する評価基準構築手段と、前記評価基準構築手段により本算出された評価基準を用いてプラントのデータの評価を実行するデータ評価手段と、前記データ評価手段による評価結果を表示する状態表示手段と、を備えたことを特徴とするプラントデータ評価システム。Data registration means for storing plant data, and provisional calculation of a correlation approximation formula with other data items for each monitoring target data item, and elimination of defective data based on a deviation between a value based on the correlation approximation formula and actual data. Using the data after the exclusion, at least a correlation approximation formula, a standard deviation, and an evaluation criterion constructing means for calculating an evaluation criterion including the standard deviation of the variation, and an evaluation criterion thus calculated by the evaluation criterion constructing means. A plant data evaluation system, comprising: data evaluation means for performing evaluation of plant data using the same; and state display means for displaying an evaluation result by the data evaluation means. 前記データ評価手段は、データの上昇または下降の連続回数に基づいて評価を実行することを特徴とする請求項1または2に記載のプラントデータ評価システム。3. The plant data evaluation system according to claim 1, wherein the data evaluation unit performs the evaluation based on a continuous number of data increases or decreases. 4. 前記データ評価手段は、プラントの運転サイクルまたは時期に基づく補正値を用いて評価を実行することを特徴とする請求項1ないし3のいずれか一に記載のプラントデータ評価システム。The plant data evaluation system according to any one of claims 1 to 3, wherein the data evaluation means performs the evaluation using a correction value based on a plant operation cycle or timing. 前記評価基準構築手段は、プラントのデータと相関近似式による値の偏差を演算すると共に当該偏差を監視対象データ項目として該偏差についての評価基準を演算し、前記データ評価手段は、当該評価基準を用いてプラントのデータを評価することを特徴とする請求項1ないし4のいずれか一に記載のプラントデータ評価システム。The evaluation criterion construction means calculates a deviation between the plant data and the value according to the correlation approximation formula, and calculates an evaluation criterion for the deviation using the deviation as a monitoring target data item. The plant data evaluation system according to any one of claims 1 to 4, wherein the plant data is evaluated using the system. 監視対象データ項目ごとに他のデータ項目との相関近似式を算出する評価基準構築段階と、当該相関近似式による値と実データ値との偏差を演算して、該偏差の値、該偏差の変化率、または、該偏差の変化方向の連続回数に基づいて異常の有無を監視するデータ評価段階とを含ことを特徴とするプラントデータ評価方法。An evaluation criterion construction step of calculating a correlation approximation formula with another data item for each monitoring target data item, and calculating a deviation between a value based on the correlation approximation formula and an actual data value, and calculating the deviation value and the deviation. A data evaluation step of monitoring the presence or absence of an abnormality based on the rate of change or the number of continuations of the deviation in the direction of change. 監視対象データ項目の実データと相関近似式による値との偏差を時期ごとに演算すると共に当該偏差と時期に基づく相関が所定値以上であるか否かを判定し、所定値以上の場合は、当該偏差を用いて時期補正値を演算し、当該時期補正値で前記相関近似式を補正することを特徴とする請求項6記載のプラントデータ評価方法。The deviation between the actual data of the monitored data item and the value according to the correlation approximation formula is calculated for each time period, and it is determined whether the correlation based on the deviation and the time is equal to or more than a predetermined value. 7. The plant data evaluation method according to claim 6, wherein a timing correction value is calculated using the deviation, and the correlation approximation formula is corrected with the timing correction value. 監視対象データ項目の実データと相関近似式による値との偏差を複数の運転サイクルの夫々について演算すると共に当該偏差と運転サイクルに基づく相関が所定値以上であるか否かを判定し、所定値以上の場合は、プラント運転開始後、所定期間の実データを用いて初期補正値を演算し、前記初期補正値で相関近似式を補正することを特徴とする請求項6または7に記載のプラントデータ評価方法。The deviation between the actual data of the monitored data item and the value according to the correlation approximation formula is calculated for each of a plurality of operation cycles, and it is determined whether or not the deviation and the correlation based on the operation cycle are equal to or greater than a predetermined value. In the above case, after the plant operation starts, an initial correction value is calculated using actual data for a predetermined period, and a correlation approximation formula is corrected with the initial correction value. Data evaluation method. ユーザ側のデータ収集装置および端末装置と通信ネットワークを介して接続され、前記データ収集装置から送られてくるデータを処理するサーバ装置によりプラントのデータを評価するプラントデータ評価方法であって、前記サーバ装置は、少なくとも相関近似式、標準偏差、および、変化量標準偏差を含むプラントの標準の評価基準を記憶するステップと、前記データ収集装置から送られてくるプラントのデータをユーザごとに記憶するステップと、前記ユーザごとのデータに基づき、前記標準の評価基準を修正し、ユーザごとに記憶するステップと、前記ユーザごとの評価基準に基づいて、前記ユーザのプラントのデータを評価するステップと、当該評価結果を前記ユーザの端末装置へ送信するステップと、を含むことを特徴とするプラントデータ評価方法。A plant data evaluation method for evaluating plant data by a server device connected to a user-side data collection device and a terminal device via a communication network and processing data transmitted from the data collection device, wherein the server data The apparatus stores at least a correlation approximation formula, a standard deviation, and a standard evaluation criterion of a plant including a variation standard deviation, and a step of storing plant data sent from the data collection device for each user. Correcting the standard evaluation criterion based on the data for each user, storing the standard evaluation criterion for each user, and evaluating the plant data of the user based on the evaluation criterion for each user; Transmitting the evaluation result to the terminal device of the user. Todeta evaluation method. プラントのデータと相関近似式による値の偏差を演算すると共に当該偏差についての評価基準を演算し、ユーザごとに当該評価基準を記憶するステップと、該評価基準に基づいて、プラントの異常の兆候を監視し、異常の兆候を発見したときは前記ユーザの端末装置へ通知するステップと、を含むことを特徴とする請求項9記載のプラントデータ評価方法。Calculating a deviation between values of the plant data and the correlation approximation formula and calculating an evaluation criterion for the deviation, storing the evaluation criterion for each user; and, based on the evaluation criterion, The plant data evaluation method according to claim 9, further comprising: monitoring, and notifying the user terminal device when a sign of abnormality is found. 復水器真空度データを収集するステップと、海水温度データを収集するステップと、前記収集した各データを用いて復水器真空度と海水温度の相関近似式を演算するステップと、前記各データと前記相関近似式との差である復水器真空度偏差を演算するステップと、前記復水器真空度偏差の標準偏差を演算するステップと、当該標準偏差および前記復水器真空度偏差を用いて復水器真空度を監視するステップと、を含むことを特徴とする復水器真空度監視方法。Collecting condenser vacuum degree data, collecting seawater temperature data, calculating a correlation approximation between condenser vacuum degree and seawater temperature using the collected data; and Calculating the condenser vacuum degree deviation that is the difference between the condenser approximation formula and the correlation approximation formula; calculating the standard deviation of the condenser vacuum degree deviation; and calculating the standard deviation and the condenser vacuum degree deviation. Monitoring the degree of vacuum of the condenser by using the method. 復水器真空度データを収集するステップと、海水温度データを収集するステップと、復水器真空度データを、特定曜日を基準とした曜日ごとの補正値で補正するステップと、前記補正後の復水器真空度データと前記収集した海水温度データを用いて相関近似式を演算するステップと、前記補正後のデータと前記相関近似式との差である復水器真空度偏差を演算するステップと、前記復水器真空度偏差の標準偏差を演算するステップと、当該標準偏差および前記復水器真空度偏差を用いて復水器真空度を監視するステップと、を含むことを特徴とする復水器真空度監視方法。Collecting condenser vacuum data, collecting seawater temperature data, correcting condenser vacuum data with a correction value for each day of the week based on a specific day of the week, Calculating a correlation approximation formula using the condenser vacuum data and the collected seawater temperature data; and calculating a condenser vacuum deviation which is a difference between the corrected data and the correlation approximation formula. Calculating the standard deviation of the condenser vacuum deviation, and monitoring the condenser vacuum using the standard deviation and the condenser vacuum deviation. Condenser vacuum monitoring method. コンピュータを用いてデータ間の相関を演算するデータマイニング方法であって、データ間の相関近似式と標準偏差を仮算出するステップと、当該相関近似式による値と実データとの偏差を前記標準偏差と比較することにより不良データを検出し排除するステップと、排除後のデータを用いて、両データ間の相関係数を演算するステップと、を含むことを特徴とするデータマイニング方法。A data mining method for calculating a correlation between data using a computer, wherein a step of temporarily calculating a correlation approximation formula between data and a standard deviation, and calculating a deviation between a value according to the correlation approximation formula and actual data by the standard deviation A data mining method, comprising: detecting and eliminating defective data by comparing with the data; and calculating a correlation coefficient between the two data by using the excluded data. データ間の相関を演算するプログラムであって、データを入力する処理と、入力したデータ間の相関近似式と標準偏差を仮算出する処理と、当該相関近似式による値と実データとの偏差を前記標準偏差と比較することにより不良データを検出し排除する処理と、排除後のデータを用いて、両データ間の相関係数を演算する処理と、をコンピュータに実行させるためのデータマイニング用プログラム。A program for calculating a correlation between data, a process of inputting data, a process of temporarily calculating a correlation approximation formula and a standard deviation between the input data, and a process of calculating a deviation between a value obtained by the correlation approximation formula and actual data. A data mining program for causing a computer to execute a process of detecting and eliminating bad data by comparing with the standard deviation, and a process of calculating a correlation coefficient between the two data using the excluded data. . ユーザ側のデータ収集装置および端末装置と通信ネットワークを介して接続され、前記データ収集装置から送られてくるデータを処理するサーバ装置上で動作するプログラムであって、少なくとも相関近似式、標準偏差、および、変化量標準偏差を含むプラントの標準の評価基準を記憶する処理と、前記データ収集装置から送られてくるプラントのデータをユーザごとに記憶する処理と、前記ユーザごとのデータに基づき、前記標準の評価基準を修正し、ユーザごとに記憶する処理と、前記ユーザごとの評価基準に基づいて、前記ユーザのプラントのデータを評価する処理と、当該評価結果を前記ユーザの端末装置へ送信する処理と、をコンピュータに実行させるためのプログラム。A program that is connected to a user-side data collection device and a terminal device via a communication network, and operates on a server device that processes data transmitted from the data collection device, comprising at least a correlation approximation formula, a standard deviation, And a process of storing a standard evaluation criterion of the plant including the variation standard deviation, a process of storing plant data sent from the data collection device for each user, and based on the data for each user, A process of correcting a standard evaluation criterion and storing for each user, a process of evaluating data of the user's plant based on the evaluation criterion of each user, and transmitting the evaluation result to the user's terminal device A program for causing a computer to execute the processing.
JP2003148256A 2003-05-26 2003-05-26 Plant data evaluation system and method, condenser vacuum monitoring method, data mining method, and program Expired - Fee Related JP3748260B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003148256A JP3748260B2 (en) 2003-05-26 2003-05-26 Plant data evaluation system and method, condenser vacuum monitoring method, data mining method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003148256A JP3748260B2 (en) 2003-05-26 2003-05-26 Plant data evaluation system and method, condenser vacuum monitoring method, data mining method, and program

Publications (2)

Publication Number Publication Date
JP2004355044A true JP2004355044A (en) 2004-12-16
JP3748260B2 JP3748260B2 (en) 2006-02-22

Family

ID=34044737

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003148256A Expired - Fee Related JP3748260B2 (en) 2003-05-26 2003-05-26 Plant data evaluation system and method, condenser vacuum monitoring method, data mining method, and program

Country Status (1)

Country Link
JP (1) JP3748260B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008158869A (en) * 2006-12-25 2008-07-10 Fujitsu Ltd Information change reporting program, information change reporting method, and information change reporting system
JP2015149431A (en) * 2014-02-07 2015-08-20 パナソニックIpマネジメント株式会社 Management device for photovoltaic power generation device
JP2016018526A (en) * 2014-07-11 2016-02-01 株式会社荏原製作所 Failure diagnosis system and failure diagnosis method
KR102248299B1 (en) * 2020-09-11 2021-05-04 김경환 User customized monitoring system and mehtod performing thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008158869A (en) * 2006-12-25 2008-07-10 Fujitsu Ltd Information change reporting program, information change reporting method, and information change reporting system
JP2015149431A (en) * 2014-02-07 2015-08-20 パナソニックIpマネジメント株式会社 Management device for photovoltaic power generation device
JP2016018526A (en) * 2014-07-11 2016-02-01 株式会社荏原製作所 Failure diagnosis system and failure diagnosis method
KR102248299B1 (en) * 2020-09-11 2021-05-04 김경환 User customized monitoring system and mehtod performing thereof

Also Published As

Publication number Publication date
JP3748260B2 (en) 2006-02-22

Similar Documents

Publication Publication Date Title
US6816811B2 (en) Method of intelligent data analysis to detect abnormal use of utilities in buildings
JP4799168B2 (en) Water distribution and pipeline information analysis system
JP4371933B2 (en) Plant data evaluation system and method, condenser vacuum monitoring method, data mining method, and program
KR100841876B1 (en) Automatic monitoring and statistical analysis of dynamic process metrics to expose meaningful changes
CN111259334B (en) Abnormal water consumption monitoring and early warning method for large users of industrial enterprises
US20120185184A1 (en) System and method for identifying likely geographical locations of anomalies in a water utility network
CN102576328A (en) System operation management device, system operation management method, and program storage medium
CN109948877B (en) Power consumption anomaly accurate analysis method based on anomaly event combination
JP5621967B2 (en) Abnormal data analysis system
JP2000029513A (en) Device and method for monitoring process data
JP2003303014A (en) Maintenance management method for plant equipment and device
JP2017002554A (en) Conduit failure detection device and method
CN113722557B (en) Method and device for determining fuel gas supply and distribution difference
JP2019053537A (en) Process monitoring device
JP2004355044A (en) Plant data estimation system and method, condenser vacuum monitoring method, data mining method, and program
KR20140109596A (en) Apparatus method for predicting and correcting meter reading data in a range not reading
JP7020876B2 (en) Decision device, correction device, decision system, decision method and computer program
EP3647744B1 (en) Gas meter management system
CN115774159A (en) Fault detection system for power unit of high-voltage frequency converter
JP2012099049A (en) Water distribution amount plan prediction system, and prediction method and program thereof
JP5402071B2 (en) Energy saving support system
JP2010224585A (en) Energy saving support device, method of reporting energy consumption, program and program medium for energy saving support device, method of updating statistic of energy consumption, method of updating normal range of energy consumption, and energy saving support system
KR101063202B1 (en) Method for collecting measurement data of water supply using stepwise filtering method and system with function thereof
JP2010102462A (en) Apparatus, method and program for estimating trouble
JP7489157B1 (en) Output method, output device, and program

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050726

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050728

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050926

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051124

R150 Certificate of patent or registration of utility model

Ref document number: 3748260

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081209

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091209

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091209

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101209

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101209

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101209

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111209

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111209

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121209

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121209

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121209

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121209

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131209

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees