JP2004301571A - Monitoring device of structure and its monitoring system - Google Patents

Monitoring device of structure and its monitoring system Download PDF

Info

Publication number
JP2004301571A
JP2004301571A JP2003092790A JP2003092790A JP2004301571A JP 2004301571 A JP2004301571 A JP 2004301571A JP 2003092790 A JP2003092790 A JP 2003092790A JP 2003092790 A JP2003092790 A JP 2003092790A JP 2004301571 A JP2004301571 A JP 2004301571A
Authority
JP
Japan
Prior art keywords
unit
power
measurement result
measurement
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003092790A
Other languages
Japanese (ja)
Other versions
JP3984185B2 (en
Inventor
Yasushi Takei
泰 武居
Seiji Yamada
聖治 山田
Kunihiro Kawasaki
邦弘 川崎
Ichiro Sugimoto
一朗 杉本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Original Assignee
Railway Technical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute filed Critical Railway Technical Research Institute
Priority to JP2003092790A priority Critical patent/JP3984185B2/en
Publication of JP2004301571A publication Critical patent/JP2004301571A/en
Application granted granted Critical
Publication of JP3984185B2 publication Critical patent/JP3984185B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)
  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a monitoring device of a structure and its monitoring system capable of transmitting a measurement result simultaneously by radio without requiring a special power source. <P>SOLUTION: This monitoring device 3 is a device for monitoring the state of the structure such as a bridge, and is installed on a plurality of measuring points on the bridge. When a train passes on the bridge, the bridge is vibrated and the power corresponding to the vibration is generated from a piezoelectric material 4. The power generated from the piezoelectric material 4 is accumulated in a power accumulator 7, and the power is measured by a control part 8 and the measurement result is stored in a storage part 9. When a transmission command of the measurement result is received from a communication device separated from the monitoring device 3 by a radio communication part 10, the measurement result is read out of the storage part 9 by the control part 8 and the measurement result is transmitted by the radio communication part 10. In this case, since the measurement result is transmitted by the radio communication part 10 by using the power accumulated in the power accumulator 7 as a power source, the state of the bridge can be monitored with no power source and the measurement result can be transmitted wirelessly. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
この発明は、構造物の状態を監視する構造物の監視装置とその監視システムに関する。
【0002】
【従来の技術】
従来、列車が通過する鋼橋やコンクリート橋などの長大構造物を維持管理する場合には、遠隔地の現場まで保守担当者が出向き目視や巡回によって危険箇所を点検して構造物の状態を監視する必要があった。このため、鉄道を運行休止や道路を交通規制して点検作業をしたり、列車が走行していない夜間などに点検作業をしたりする必要があり、保守担当者にとって非常に労力が大きかった。一方、このような長大構造物の状態を監視する構造物の監視システムが知られている。従来の構造物の監視システムは、船舶や橋梁などの大型構造物の複数の測定点における振動を測定する複数の振動測定器と、この大型構造物から離れた監視室内に設置されており複数の振動測定器から送信される測定結果を記録し分析するセンタ装置と、各振動測定器とセンタ装置とを接続する同軸ケーブルとを備えている(例えば、特許文献1)。
【0003】
【特許文献1】
特開平9−178547号公報(段落番号0012及び図1)
【0004】
【発明が解決しようとする課題】
このような従来の構造物の監視システムでは、通常、長大構造物から離れた位置に監視室が設置されており、各振動測定器とセンタ装置とを接続するために長大な同軸ケーブルや光ファイバケーブルなどを敷設する必要があった。その結果、従来の構造物の監視システムでは、システム全体が複雑で大規模になるとともに、ケーブルを敷設するための工事が必要になるという問題があった。
【0005】
この発明の課題は、特別な電源を必要とせず測定結果を無線でリアルタイムに送信することができる構造物の監視装置とその監視システムを提供することである。
【0006】
【課題を解決するための手段】
この発明は、以下に記載するような解決手段により、前記課題を解決する。
なお、この発明の実施形態に対応する符号を付して説明するが、この実施形態に限定するものではない。
請求項1の発明は、構造物(1)の状態を監視する構造物の監視装置であって、前記構造物の振動を電気信号に変換する機械電気変換手段(4,4A)と、前記機械電気変換手段が出力する前記電気信号を測定(S140)する測定手段(8c)と、前記測定手段の測定結果を送信(S170)する送信手段(10)とを備え、前記機械電気変換手段は、前記構造物の振動に応じて電力を発生し、前記送信手段は、前記電力を電源として前記測定結果を送信(S170)することを特徴とする構造物の監視装置(3)である。
【0007】
請求項2の発明は、請求項1に記載の構造物の監視装置において、前記電力を蓄積(S120)する蓄電手段(7)と、前記測定手段の測定結果を記録(S150)する記憶手段(9)とを備え、前記送信手段は、前記蓄電手段が蓄積する前記電力を電源として前記記憶手段が記憶する前記測定結果を送信(S170)することを特徴とする構造物の監視装置である。
【0008】
請求項3の発明は、請求項1又は請求項2に記載の構造物の監視装置において、前記機械電気変換手段は、前記蓄電手段が蓄積する前記電力を発生するとともに、前記測定手段が測定する前記電力を発生する圧電材料(4)を備えることを特徴とする構造物の監視装置である。
【0009】
請求項4の発明は、請求項1又は請求項2に記載の構造物の監視装置において、前記機械電気変換手段は、前記測定手段が測定する前記電力を発生する測定用圧電材料(4A)と、前記蓄電手段が蓄積する前記電力を発生する充電用圧電材料(4B)とを備えることを特徴とする構造物の監視装置である。
【0010】
請求項5の発明は、構造物(1)の状態を監視する構造物の監視システムであって、請求項1から請求項4までのいずれか1項に記載の構造物の監視装置(3)と、前記送信手段(10)が送信する前記測定結果を受信(S210)する通信装置(11b,13b)とを備え、前記送信手段は、前記通信装置からの前記測定結果の送信指令を受信(S160)し、前記通信装置は、前記監視装置が前記構造物に複数設置されているときに、この監視装置毎に前記測定結果を前記送信手段から受信(S160)することを特徴とする構造物の監視システム(2)である。
【0011】
請求項6の発明は、請求項5に記載の構造物の監視システムにおいて、前記通信装置が受信した前記測定結果を解析(S230)する解析装置(11c,14)を備えることを特徴とする構造物の監視システムである。
【0012】
【発明の実施の形態】
(第1実施形態)
以下、図面を参照して、この発明の第1実施形態について詳しく説明する。
図1は、この発明の第1実施形態に係る構造物の監視システムによって監視される橋梁の断面図である。図2は、この発明の第1実施形態に係る構造物の監視システムによって監視される橋梁の側面図である。
橋梁1は、鉄道車両が走行する線路の下部に空間を確保し列車の荷重を支持する構造物である。橋梁1は、図1及び図2に示すように、鋼板と山形鋼とを溶接などによって接合してI形の桁に組み立てて互いに平行に並べた主桁1a,1bと、主桁1aの上部と主桁1bの上部とを連結する上横構1cと、主桁1aの下部と主桁1bの下部とを連結する下横構1dと、主桁1aの上部と主桁1bの下部とを連結する中間対傾構1e,1fと、主桁1a,1bの下端部に接続された下フランジ1g,1hと、主桁1a,1bの上端部に接続された上フランジ1i,1jなどから構成された上路プレートガーダーである。
【0013】
監視システム2は、橋梁1の状態を監視するシステムである。監視システム2は、図1及び図2に示すように、監視装置3と測定装置11とから構成されている。監視システム2は、橋梁1上を列車が通過してこの橋梁1が振動したときに、この振動によって圧電材料4が発生する電力を監視装置3が測定して測定結果を記憶し、監視装置3から測定装置11にこの測定結果を送信する。
【0014】
図3は、この発明の第1実施形態に係る構造物の監視システムにおける監視装置の構成図である。
監視装置3は、橋梁1の状態を監視する装置である。監視装置3は、図3に示すように、圧電材料4と、整流/定電圧回路5と、逆流阻止回路6と、蓄電部7と、制御部8と、記憶部9と、無線通信部10とを備えている。監視装置3は、主桁1a,1b以外にも下フランジ1g,1hや上フランジ1i,1jなどのように橋梁1の任意の測定箇所に多数設置されている。
【0015】
図4は、この発明の第1実施形態に係る構造物の監視システムにおける圧電材料の取付状態を示す断面図である。
圧電材料4は、橋梁1の振動を電気信号に変換する機械電気変換部である。圧電材料4は、歪みを加えると電圧を発生する圧電効果と、電圧を加えると歪みを発生する逆圧電効果とを合わせ持つ圧電セラミックスなどである。圧電材料4は、橋梁1を列車が通過したときに発生するこの橋梁1の振動に応じて電力を発生する。圧電材料4は、蓄電部7が蓄積する電力を発生するとともに制御部8が測定する電力も発生する。圧電材料4としては、PZT(チタン酸ジルコン酸鉛)、PLZT(ジルコン酸チタン酸ランタン鉛)、PMN(マグネシウムニオブ酸鉛)、PVDF(ポリフッ化ビニリデン)などが使用される。圧電材料4は、図4に示すように、固定部4aによって橋梁1に固定されている。この固定部4aは、遮音板2と圧電材料6との間に形成された接着剤層であり、圧電材料4の一方の表面にエポキシ系接着剤などを塗布することによってこの圧電材料4を橋梁1の表面に全面接着し固定する。
【0016】
図3に示す整流/定電圧回路5は、圧電材料4が出力する電気信号を直流電流に変換するとともに一定の電圧を生成する回路である。逆流阻止回路6は、整流/定電圧回路5から蓄電部7への電流の流れを許容し、蓄電部7から整流/定電圧回路5への電流の流れを阻止する回路である。
【0017】
蓄電部7は、電力を蓄積するコンデンサである。蓄電部7は、例えば、制御部8が処理動作を実行したり、記憶部9がデータを書き込んだり、無線通信部10がデータを送信したりするときに必要となる電力を蓄積する。蓄電部7は、充電時には圧電材料4が発生する電力を電気エネルギーとして蓄積し、放電時にはこの電気エネルギーを放出して制御部8、記憶部9及び無線通信部10に電力を供給する。蓄電部7は、例えば、小型で大容量のバックアップ電源として利用される電気二重層コンデンサ(スーパーキャパシタ)である。
【0018】
図5は、この発明の第1実施形態に係る構造物の監視システムにおける中央処理部の構成図である。
制御部8は、監視装置3の種々の動作を制御する装置である。制御部8は、図5に示すように、中央処理部8aと、記憶部8bと、測定部8cと、切替部8dとを備えている。制御部8は、例えば、蓄電部7が蓄積する電力を電源として動作する低消費電力のマイクロプロセッサである。
【0019】
中央処理部(CPU)8aは、制御部8の種々の動作を指令する部分である。中央処理部8aには、記憶部8b、測定部8c、切替部8d、記憶部9及び無線通信部10が接続されている。中央処理部8aは、例えば、測定部8cの測定結果を記憶部9に記憶させたり、記憶部9からこの測定結果を読み出して無線通信部10に出力させたり、蓄電部7を充電及び放電させたりする。記憶部8bは、例えば、中央処理部8aが種々の動作を実行するためのプログラムを記憶する読み出し専用のメモリ(ROM)である。
【0020】
測定部8cは、圧電材料4が出力する電気信号を測定する部分である。測定部8cは、逆流阻止回路6が出力する電気信号を処理する処理回路と、アナログ信号をディジタル信号に変換するA/D変換部などを備えている。測定部8cは、圧電材料4が発生する電流や電圧を測定するとともに蓄電部7の電流や電圧を測定して、これらの電流値や電圧値を測定結果(測定データ)として中央処理部8aに出力する。
【0021】
切替部8dは、蓄電部7を充電状態と放電状態とに切り換える部分であり、例えばON動作及びOFF動作するスイッチ回路である。切替部8dは、通常時には蓄電部7が電気エネルギーを蓄積するように蓄電部7を切り替え、通信時などには蓄電部7が電気エネルギーを放出するように蓄電部7を切り替える。
【0022】
記憶部9は、測定部8cの測定結果を記憶するメモリである。記憶部9は、例えば、測定部8cが測定した測定データを書き込むことができるとともに、電源をOFFにしても測定データを記憶しておくことができる不揮発性メモリ(EEPROM)である。記憶部9は、橋梁1を列車が通過して圧電材料4が電力を発生したときに、測定部8cが測定した電圧値などを測定データとして時系列順に記録している。
【0023】
無線通信部10は、監視装置3と測定装置11との間で相互に無線通信をするための通信装置である。無線通信部10は、測定装置11からの測定データの送信指令を受信すると、蓄電部7が蓄積する電力を電源として記憶部9が記憶する測定データを測定装置11に送信する。無線通信部10は、記憶部9に記憶された測定データとともに監視装置3毎に付与された識別データ(ID情報)を送信する。無線通信部10は、例えば、橋梁1の所定の位置に設置された固定局として機能する低消費電力の無線機である。
【0024】
図6は、この発明の第1実施形態に係る構造物の監視システムにおける測定装置の構成図である。
測定装置11は、橋梁1に関する種々の情報を測定する装置である。測定装置11は、例えば、橋梁1を列車が通過してこの橋梁1が振動したときに発生する応力、撓み、歪み、変位、変形及び振動加速度などを測定する。測定装置11は、図6に示すように、制御部11aと、無線通信部11bと、解析部11cと、記憶部11dと、表示部11eと、操作部11fと、電源部11gとを備えている。
【0025】
制御部11aは、測定装置11の種々の動作を制御する中央処理部(CPU)である。制御部11aには、無線通信部11b、解析部11c、記憶部11d、表示部11e、操作部11f及び電源部11gが接続されている。制御部11aは、例えば、無線通信部11bが受信した測定データを記憶部11dに記録させたり、所定の診断項目を解析部11cに解析させたり、測定点毎に診断項目を表示部11eに表示させたりする。
【0026】
無線通信部11bは、測定装置11と監視装置3との間で相互に無線通信をするための通信装置である。無線通信部11bは、監視装置3が橋梁1に複数設置されているときに、この監視装置3毎に無線通信部10に測定データの送信を指令するとともに、この監視装置3毎に測定データを無線通信部10から受信する。無線通信部11bは、監視装置3毎に付与された識別データ(ID情報)を測定データの送信指令とともに送信し、各無線通信部10からの測定データを受信して制御部11aに出力する。無線通信部10は、橋梁1の周辺を移動又は橋梁1の付近で停止した状態で無線通信部10との間で通信が可能な移動局として機能する。
【0027】
解析部11cは、無線通信部11bが受信した測定結果を解析する部分である。解析部11cは、例えば、記憶部11dが記憶する測定結果に基づいて各測定点における応力の時間変化を表す応力波形を生成して、橋梁1の応力頻度、疲労損傷度、き裂発生寿命の予測及び余寿命などの診断項目を解析する。解析部11cは、圧電材料4が発生する電圧値と橋梁1に発生する応力、振動加速度、歪みなどとの相関関係を表す関数や、橋梁1に生ずる歪みと圧電材料4に生ずる歪との間のずれを校正する校正曲線などに基づいて、これらの診断項目を解析しこの解析結果(解析データ)を制御部11aに出力する。
【0028】
記憶部11dは、種々の情報を記憶するメモリである。記憶部11dは、制御部11aが所定の処理を実行するためのプログラムを記憶したり、無線通信部11bが受信した測定データを記憶したり、解析部11cが解析した解析データを記憶したりする不揮発性メモリ(EEPROM)である。記憶部11dは、例えば、測定部8cが測定した電圧値などを測定データとして時系列順に記憶するとともに、解析部11cが解析した診断項目を測定点毎に記憶する。
【0029】
表示部11eは、種々の情報を表示する装置である。表示部11eは、例えば、測定点毎に振動状態、応力波形、応力履歴及び累積疲労損傷度などを表示する。操作部11fは、保守担当者などが診断項目や表示項目などを選択するときに操作される入力装置であり、電源部11gは測定装置11に供給する電力を蓄積するバッテリである。
【0030】
次に、この発明の第1実施形態に係る構造物の監視システムの動作を説明する。図7は、この発明の第1実施形態に係る構造物の監視システムにおける監視装置側の動作を説明するためのフローチャートである。以下では、図5に示す中央処理部8aの動作を中心に説明する。
ステップ(以下、Sという)100において、蓄電部7の電圧が測定される。蓄電部7の電圧の測定を中央処理部8aが測定部8cに指令すると、測定部8cが蓄電部7の電圧を測定してこの測定結果を中央処理部8aに出力する。
【0031】
S110において、電圧値が所定値を超えるか否かが判断される。測定部8cが測定した蓄電部7の電圧値が所定値を超えるか否かを中央処理部8aが判断し、電圧値が所定値以下である場合にはS120に進み、電圧値が所定値を超える場合にはS130に進む。
【0032】
S120において、蓄電部7が充電される。蓄電部7の電圧値が低い場合には、中央処理部8aが切替部8dに切替動作を指令する。その結果、圧電材料4が発生する起電力を蓄電部7に蓄積するように切替部8dが蓄電部7を切り替え、蓄電部7の電圧値が所定値に達するまで圧電材料4の出力電圧が蓄電部7に蓄積される。
【0033】
S130において、蓄電部7が放電される。蓄電部7の電圧値が高い場合には、中央処理部8aが切替部8dに切替動作を指令し、蓄電部7に蓄積された電力がこの蓄電部7から放出するように切替部8dが蓄電部7を切り替える。
【0034】
S140において、圧電材料4の出力電圧が測定される。橋梁1を列車が通過するとこの橋梁1の振動に応じて圧電材料4が電気信号(起電力)を発生する。圧電材料4が発生する電力の測定を中央処理部8aが測定部8cに指令すると、測定部8cによって電圧値などが測定されてこの測定結果が測定部8cから中央処理部8aに出力される。このとき、圧電材料4が発生する電力は測定部8cによって測定されるとともに蓄電部7に蓄積される。
【0035】
S150において、測定結果が記憶される。中央処理部8aが測定結果を記憶部9に出力すると時系列順にこの測定結果を記憶部9が記憶する。
【0036】
S160において、送信指令を受信したか否かが判断される。図6に示す測定装置11から無線通信部10が送信指令を受信すると、この受信データに含まれる識別データと自己のID情報とが一致するか否かを中央処理部8aが照合する。照合結果が一致するときにはS170に進み、照合結果が不一致であるときにはS100に進み圧電材料4の出力電圧の測定などを継続する。
【0037】
S170において、測定結果が送信される。測定装置11からの送信指令を無線通信部10が受信すると、中央処理部8aが記憶部9から測定結果を読み出して無線通信部10に出力し、無線通信部10が測定装置11にこの測定結果を送信しS100に戻る。
【0038】
図8は、この発明の第1実施形態に係る構造物の監視システムにおける測定装置側の動作を説明するためのフローチャートである。以下では、図6に示す制御部11aの動作を中心に説明する。
S200において、測定結果の送信が指令される。測定結果の送信を無線通信部11bに制御部11aが指令すると、監視装置3毎に付与された識別データを無線通信部11bが送信するとともに、測定結果の送信を無線通信部11bが無線通信部10に指令する。
【0039】
S210において、測定結果が受信される。監視装置3毎に無線通信部11bが測定結果を受信するとこの測定結果を無線通信部11bが制御部11aに出力する。そして、S220において、測定結果が記憶される。制御部11aが測定結果を記憶部11dに出力するとこの測定結果を記憶部11dが測定点(ID情報)毎に記憶する。
【0040】
S230において、測定結果が解析される。制御部11aが記憶部11dから測定結果を読み出して解析部11cに出力するとともに、制御部11aが解析部11cに解析処理を指令すると、この測定結果に基づいて解析部11cが所定の診断項目を解析してこの解析結果を制御部11aに出力する。
【0041】
S240において、解析結果が記憶される。制御部11aが解析結果を記憶部11dに出力するとこの解析結果を記憶部11dが測定点(ID情報)毎に記憶する。そして、S250において、解析結果が表示される。操作部11fによって選択された診断項目に対応する解析結果を制御部11aが記憶部11dから読み出してこの解析結果を表示部11eに表示させる。
【0042】
この発明の第1実施形態に係る構造物の監視システムには、以下に記載するような効果がある。
(1) この第1実施形態では、橋梁1の振動を圧電材料4が電気信号に変換してこの電気信号を測定部8cが測定し、この橋梁1の振動に応じてこの圧電材料4が発生する電力を電源として無線通信部10が測定結果を送信する。このため、橋梁1の状態を無電源で監視して測定結果をワイヤレスで送信することができる。その結果、橋梁1などの長大構造物の振動加速度や歪みをリアルタイムで監視することができるため、鉄道を運転休止させたり道路を通行規制したりする必要がなくなり社会基盤を健全な状態で維持することができる。また、保守担当者が現場に頻繁に出向き危険箇所を巡回して目視で監視する必要がなくなり、保守担当者の作業負担や時間的な労力を軽減することができる。
【0043】
(2) この第1実施形態では、圧電材料4が発生する電力を蓄電部7が蓄積し、蓄電部7が蓄積する電力を電源として記憶部8bが記憶する測定結果を無線通信部10が送信する。その結果、橋梁1を列車が通過して橋梁1が振動したときに発生する電力を蓄電部7に予め蓄積しておき、無線通信用の電源としてこの電力を利用することができる。このため、太陽電池などを電源として利用することができないトンネルや地下構造物などの状態を無電源で監視することができる。
【0044】
(3) この第1実施形態では、無線通信部11bからの測定結果の送信指令を無線通信部10が受信し、監視装置3が橋梁1に複数設置されているときに、この監視装置3毎に測定結果を無線通信部10から無線通信部11bが受信する。このため、橋梁1の複数の測定点に設置された監視装置3から測定結果を1台の測定装置11によって受信することができる。その結果、測定装置11を携帯して橋梁1に沿って移動しながら各監視装置3から測定結果を収集したり、橋梁1の測定点に接近せずに橋梁1から離れた安全な位置に測定装置11を停止させて、各監視装置3から測定結果を収集したりすることができる。
【0045】
(4) この第1実施形態では、蓄電部7が蓄積する電力を圧電材料4が発生するとともに、測定部8cが測定する電力を圧電材料4が発生する。その結果、一つの圧電材料4を測定用圧電材料と充電用圧電材料として兼用することができる。
【0046】
(第2実施形態)
図9は、この発明の第2実施形態に係る構造物の監視システムにおける監視装置の構成図である。
図9に示す監視装置3は、測定部8cが測定する電力を発生する測定用圧電材料4Aと、蓄電部7が蓄積する電力を発生する充電用圧電材料4Bとを備えている。この第2実施形態では、一つの圧電材料4では発生する電力が小さい場合や監視装置3の負荷が大きい場合であっても、測定用圧電材料4A及び充電用圧電材料4Bがそれぞれ電力を発生するため十分な測定結果を得ることができる。
【0047】
(第3実施形態)
図10は、この発明の第3実施形態に係る構造物の監視システムにおける測定システムの構成図である。なお、図6に示す部分と同一の部分については、対応する符号を付して詳細な説明を省略する。
図10に示す測定システム12は、通信装置13と解析装置14とを備えている。通信装置13は、この通信装置13の種々の動作を制御する制御部13aと、図5に示す無線通信部10と相互に通信可能な無線通信部13bと、この無線通信部13bが受信した測定結果を記憶する記憶部13dと、通信装置13に電力を供給する電源部13gと、解析装置14との間で相互にデータを入出力する入出力部(インタフェース回路)13hとを備えている。解析装置14は、この解析装置14の種々の動作を制御する制御部14aと、測定結果を解析する解析部14cと、この解析部14cの解析結果を記憶する記憶部14dと、解析結果を表示する表示部14eと、診断項目などを選択する際に操作する操作部14fと、通信装置13との間で相互にデータを入出力する入出力部(インタフェース回路)14hとを備えている。この第3実施形態では、図6に示す測定装置11に比べて通信装置13が小型になり持ち運びに便利な携帯端末として通信装置13を利用することができる。また、この第3実施形態では、通信装置13によって現場で測定結果を収集した後に、中央司令室などに設置された解析装置14とこの通信装置13とを接続ケーブル15によって接続して測定結果を解析することができる。
【0048】
(他の実施形態)
この発明は、以上説明した実施形態に限定するものではなく、以下に記載するように種々の変形又は変更が可能であり、これらもこの発明の範囲内である。
(1) この実施形態では、橋梁1を例に挙げて説明したが、これに限定するものではない。例えば、列車が通過すると振動が発生するトンネルなどの他の鉄道構造物や、高層ビル、鉄塔などの固定構造物についてもこの発明を適用することができる。また、この実施形態では、圧電材料として圧電セラミックスを例に挙げて説明したが圧電セラミックス以外の圧電材料についてもこの発明を適用することができる。さらに、この実施形態では、測定結果を無線によって送信する場合を例に挙げて説明したが、測定結果を有線によって送信する場合についてもこの発明を適用することができる。
【0049】
(2) この実施形態では、図8に示すS160,S170及び図9に示すS260において、測定装置11から無線通信部10が送信指令を受信した後に無線通信部10から測定装置11にこの測定結果に送信しているが、通信方法をこれに限定するものではない。例えば、図3に示す無線通信部10として送信機能のみを有する無線送信装置を設置して、振動が起きる度にその時に発生した電気エネルギーを利用して電圧値を無線で送信することもできる。この場合には、この無線と周波数を同調させた通信装置によって必要なデータを受け取ることができる。このため、必要なデータのみをリアルタイムに計測することができる。また、図1及び図2に示す監視システム2を無線送信装置と受信装置とによって構成することができるため、受信装置を市販の通信装置によって対応することができる。
【0050】
【発明の効果】
以上説明したように、この発明によると、特別な電源を必要とせず測定結果を無線でリアルタイムに送信することができる。
【図面の簡単な説明】
【図1】この発明の第1実施形態に係る構造物の監視システムによって監視される橋梁の断面図である。
【図2】この発明の第1実施形態に係る構造物の監視システムによって監視される橋梁の側面図である。
【図3】この発明の第1実施形態に係る構造物の監視システムにおける監視装置の構成図である。
【図4】この発明の第1実施形態に係る構造物の監視システムにおける圧電材料の取付状態を示す断面図である。
【図5】この発明の第1実施形態に係る構造物の監視システムにおける中央処理部の構成図である。
【図6】この発明の第1実施形態に係る構造物の監視システムにおける測定装置の構成図である。
【図7】この発明の第1実施形態に係る構造物の監視システムにおける監視装置側の動作を説明するためのフローチャートである。
【図8】この発明の第1実施形態に係る構造物の監視システムにおける測定装置側の動作を説明するためのフローチャートである。
【図9】この発明の第2実施形態に係る構造物の監視システムにおける監視装置の構成図である。
【図10】この発明の第3実施形態に係る構造物の監視システムにおける測定システムの構成図である。
【符号の説明】
1 橋梁
2 監視システム
3 監視装置
4 圧電材料(機械電気変換手段)
4A 測定用圧電材料(機械電気変換手段)
4B 充電用圧電材料(機械電気変換手段)
7 蓄電部(蓄電手段)
8 制御部
8c 測定部(測定手段)
9 記憶部(記憶手段)
10 無線通信部(送信手段)
11 測定装置
11b 無線通信部(通信装置)
11c 解析部(解析装置)
12 測定システム
13 通信装置
13b 無線通信部(通信装置)
14 解析装置
14c 解析部
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a structure monitoring device for monitoring a state of a structure and a monitoring system for the same.
[0002]
[Prior art]
Conventionally, when maintaining and managing long structures such as steel bridges and concrete bridges through which trains pass, maintenance personnel go to remote sites to check the danger points by visual inspection and patrol and monitor the state of the structures I needed to. For this reason, it is necessary to perform inspection work by suspending the operation of the railroad and regulating the traffic on the road, and to perform inspection work at night when the train is not running, which has required a great deal of labor for maintenance personnel. On the other hand, a structure monitoring system for monitoring the state of such a long structure is known. Conventional structure monitoring systems consist of multiple vibration measuring instruments that measure vibrations at multiple measurement points on large structures such as ships and bridges, and multiple monitoring systems that are installed in a monitoring room that is separated from the large structures. The system includes a center device that records and analyzes measurement results transmitted from a vibration measuring device, and a coaxial cable that connects each vibration measuring device to the center device (for example, Patent Document 1).
[0003]
[Patent Document 1]
JP-A-9-17847 (paragraph number 0012 and FIG. 1)
[0004]
[Problems to be solved by the invention]
In such a conventional structure monitoring system, a monitoring room is usually installed at a position away from a long structure, and a long coaxial cable or optical fiber is used to connect each vibration measuring instrument to the center device. It was necessary to lay cables and the like. As a result, the conventional structure monitoring system has a problem that the whole system is complicated and large-scale, and that a construction work for laying cables is required.
[0005]
It is an object of the present invention to provide a structure monitoring apparatus and a monitoring system capable of transmitting a measurement result wirelessly in real time without requiring a special power supply.
[0006]
[Means for Solving the Problems]
The present invention solves the above-mentioned problems by the following means.
Note that description will be given with reference numerals corresponding to the embodiment of the present invention, but the present invention is not limited to this embodiment.
The invention according to claim 1 is a structure monitoring apparatus for monitoring a state of a structure (1), wherein the mechanical-electrical conversion means (4, 4A) for converting vibration of the structure into an electric signal; A measuring unit (8c) for measuring the electric signal output by the electric converting unit (S140), and a transmitting unit (10) for transmitting the measurement result of the measuring unit (S170), wherein the electromechanical converting unit includes: The structure monitoring device (3), wherein power is generated according to the vibration of the structure, and the transmitting unit transmits the measurement result using the power as a power source (S170).
[0007]
According to a second aspect of the present invention, in the structure monitoring apparatus according to the first aspect, a power storage unit (7) that stores the power (S120) and a storage unit (S150) that records a measurement result of the measurement unit (S150). 9), wherein the transmission unit transmits the measurement result stored in the storage unit using the power stored in the power storage unit as a power source (S170).
[0008]
According to a third aspect of the present invention, in the structure monitoring apparatus according to the first or second aspect, the electromechanical conversion unit generates the electric power stored in the power storage unit and measures the power by the measurement unit. An apparatus for monitoring a structure, comprising a piezoelectric material (4) for generating the electric power.
[0009]
According to a fourth aspect of the present invention, in the structure monitoring device according to the first or second aspect, the electromechanical conversion unit includes a measurement piezoelectric material (4A) that generates the power measured by the measurement unit. And a charging piezoelectric material (4B) for generating the electric power stored in the power storage means.
[0010]
According to a fifth aspect of the present invention, there is provided a structure monitoring system for monitoring a state of a structure, wherein the structure monitoring device according to any one of the first to fourth aspects. And a communication device (11b, 13b) for receiving the measurement result transmitted by the transmission unit (10) (S210). The transmission unit receives a transmission command of the measurement result from the communication device ( S160) Then, when a plurality of the monitoring devices are installed in the structure, the communication device receives the measurement result from the transmission unit for each of the monitoring devices (S160). Monitoring system (2).
[0011]
According to a sixth aspect of the present invention, in the structure monitoring system according to the fifth aspect, an analysis device (11c, 14) for analyzing (S230) the measurement result received by the communication device is provided. It is an object monitoring system.
[0012]
BEST MODE FOR CARRYING OUT THE INVENTION
(1st Embodiment)
Hereinafter, a first embodiment of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a sectional view of a bridge monitored by the structure monitoring system according to the first embodiment of the present invention. FIG. 2 is a side view of the bridge monitored by the structure monitoring system according to the first embodiment of the present invention.
The bridge 1 is a structure that secures a space below a railroad track on which railcars run and supports the load of a train. As shown in FIGS. 1 and 2, the bridge 1 is composed of main girder 1a, 1b in which a steel plate and an angle steel are joined by welding or the like, assembled into an I-shaped girder and arranged in parallel with each other, and an upper part of the main girder 1a. An upper horizontal structure 1c connecting the upper part of the main girder 1b to the upper part of the main girder 1b, a lower horizontal structure 1d connecting the lower part of the main girder 1a and the lower part of the main girder 1b, and the upper part of the main girder 1a and the lower part of the main girder 1b. It comprises a pair of intermediate pairs 1e, 1f to be connected, lower flanges 1g, 1h connected to lower ends of the main girders 1a, 1b, upper flanges 1i, 1j connected to upper ends of the main girders 1a, 1b, and the like. It is an upper plate girder.
[0013]
The monitoring system 2 is a system that monitors the state of the bridge 1. The monitoring system 2 includes a monitoring device 3 and a measuring device 11, as shown in FIGS. When a train passes over the bridge 1 and the bridge 1 vibrates, the monitoring system 2 measures the power generated by the piezoelectric material 4 due to the vibration, and the monitoring device 3 stores the measurement result. Transmits this measurement result to the measurement device 11.
[0014]
FIG. 3 is a configuration diagram of a monitoring device in the structure monitoring system according to the first embodiment of the present invention.
The monitoring device 3 is a device that monitors the state of the bridge 1. As shown in FIG. 3, the monitoring device 3 includes a piezoelectric material 4, a rectification / constant voltage circuit 5, a backflow prevention circuit 6, a power storage unit 7, a control unit 8, a storage unit 9, a wireless communication unit 10, And A large number of monitoring devices 3 are installed at arbitrary measuring points of the bridge 1 such as the lower flanges 1g and 1h and the upper flanges 1i and 1j in addition to the main girders 1a and 1b.
[0015]
FIG. 4 is a sectional view showing an attached state of the piezoelectric material in the structure monitoring system according to the first embodiment of the present invention.
The piezoelectric material 4 is a electromechanical converter that converts the vibration of the bridge 1 into an electric signal. The piezoelectric material 4 is, for example, a piezoelectric ceramic having both a piezoelectric effect of generating a voltage when a strain is applied and an inverse piezoelectric effect of generating a strain when a voltage is applied. The piezoelectric material 4 generates electric power in accordance with the vibration of the bridge 1 generated when a train passes through the bridge 1. The piezoelectric material 4 generates power stored in the power storage unit 7 and also generates power measured by the control unit 8. As the piezoelectric material 4, PZT (lead zirconate titanate), PLZT (lead lanthanum titanate zirconate), PMN (lead magnesium niobate), PVDF (polyvinylidene fluoride), or the like is used. As shown in FIG. 4, the piezoelectric material 4 is fixed to the bridge 1 by a fixing portion 4a. The fixing portion 4 a is an adhesive layer formed between the sound insulating plate 2 and the piezoelectric material 6. The piezoelectric material 4 is bridged by applying an epoxy-based adhesive or the like to one surface of the piezoelectric material 4. The whole surface is adhered and fixed to the surface of 1.
[0016]
The rectifier / constant voltage circuit 5 shown in FIG. 3 is a circuit that converts an electric signal output from the piezoelectric material 4 into a direct current and generates a constant voltage. The backflow prevention circuit 6 is a circuit that allows a current flow from the rectification / constant voltage circuit 5 to the power storage unit 7 and blocks a current flow from the power storage unit 7 to the rectification / constant voltage circuit 5.
[0017]
Power storage unit 7 is a capacitor that stores power. The power storage unit 7 stores, for example, power required when the control unit 8 executes a processing operation, when the storage unit 9 writes data, and when the wireless communication unit 10 transmits data. The power storage unit 7 stores the electric power generated by the piezoelectric material 4 as electric energy during charging, and discharges the electric energy during discharging to supply power to the control unit 8, the storage unit 9, and the wireless communication unit 10. The power storage unit 7 is, for example, an electric double layer capacitor (super capacitor) used as a small and large-capacity backup power supply.
[0018]
FIG. 5 is a configuration diagram of the central processing unit in the structure monitoring system according to the first embodiment of the present invention.
The control unit 8 is a device that controls various operations of the monitoring device 3. As shown in FIG. 5, the control unit 8 includes a central processing unit 8a, a storage unit 8b, a measuring unit 8c, and a switching unit 8d. The control unit 8 is, for example, a low power consumption microprocessor that operates using the power stored in the power storage unit 7 as a power supply.
[0019]
The central processing unit (CPU) 8a is a part that commands various operations of the control unit 8. The storage unit 8b, the measurement unit 8c, the switching unit 8d, the storage unit 9, and the wireless communication unit 10 are connected to the central processing unit 8a. The central processing unit 8a stores the measurement result of the measurement unit 8c in the storage unit 9, reads the measurement result from the storage unit 9 and outputs the measurement result to the wireless communication unit 10, and charges and discharges the power storage unit 7, for example. Or The storage unit 8b is, for example, a read-only memory (ROM) that stores programs for the central processing unit 8a to execute various operations.
[0020]
The measurement unit 8c is a unit that measures an electric signal output from the piezoelectric material 4. The measurement unit 8c includes a processing circuit that processes an electric signal output from the backflow prevention circuit 6, an A / D conversion unit that converts an analog signal into a digital signal, and the like. The measurement unit 8c measures the current and voltage generated by the piezoelectric material 4 and also measures the current and voltage of the power storage unit 7, and uses these current and voltage values as measurement results (measurement data) to the central processing unit 8a. Output.
[0021]
The switching unit 8d switches the power storage unit 7 between a charged state and a discharged state, and is, for example, a switch circuit that performs ON operation and OFF operation. The switching unit 8d switches the power storage unit 7 so that the power storage unit 7 stores electric energy during normal times, and switches the power storage unit 7 so that the power storage unit 7 discharges electric energy during communication or the like.
[0022]
The storage unit 9 is a memory that stores the measurement result of the measurement unit 8c. The storage unit 9 is, for example, a non-volatile memory (EEPROM) that can write the measurement data measured by the measurement unit 8c and can store the measurement data even when the power is turned off. The storage unit 9 records the voltage values and the like measured by the measuring unit 8c when the train passes the bridge 1 and the piezoelectric material 4 generates electric power as measurement data in chronological order.
[0023]
The wireless communication unit 10 is a communication device for mutually performing wireless communication between the monitoring device 3 and the measuring device 11. When receiving the transmission command of the measurement data from the measurement device 11, the wireless communication unit 10 transmits the measurement data stored in the storage unit 9 to the measurement device 11 using the power stored in the power storage unit 7 as a power supply. The wireless communication unit 10 transmits the identification data (ID information) assigned to each monitoring device 3 together with the measurement data stored in the storage unit 9. The wireless communication unit 10 is, for example, a low-power-consumption wireless device that functions as a fixed station installed at a predetermined position on the bridge 1.
[0024]
FIG. 6 is a configuration diagram of a measuring device in the structure monitoring system according to the first embodiment of the present invention.
The measuring device 11 is a device that measures various information related to the bridge 1. The measuring device 11 measures, for example, stress, deflection, distortion, displacement, deformation, vibration acceleration, and the like generated when a train passes through the bridge 1 and the bridge 1 vibrates. As shown in FIG. 6, the measurement device 11 includes a control unit 11a, a wireless communication unit 11b, an analysis unit 11c, a storage unit 11d, a display unit 11e, an operation unit 11f, and a power supply unit 11g. I have.
[0025]
The control unit 11a is a central processing unit (CPU) that controls various operations of the measurement device 11. The wireless communication unit 11b, the analysis unit 11c, the storage unit 11d, the display unit 11e, the operation unit 11f, and the power supply unit 11g are connected to the control unit 11a. The control unit 11a, for example, causes the storage unit 11d to record the measurement data received by the wireless communication unit 11b, causes the analysis unit 11c to analyze predetermined diagnosis items, and displays the diagnosis items for each measurement point on the display unit 11e. Or let it.
[0026]
The wireless communication unit 11b is a communication device for mutually performing wireless communication between the measurement device 11 and the monitoring device 3. When a plurality of monitoring devices 3 are installed on the bridge 1, the wireless communication unit 11 b instructs the wireless communication unit 10 to transmit measurement data for each monitoring device 3, and transmits the measurement data for each monitoring device 3. Received from the wireless communication unit 10. The wireless communication unit 11b transmits the identification data (ID information) assigned to each monitoring device 3 together with the measurement data transmission command, receives the measurement data from each wireless communication unit 10, and outputs the measurement data to the control unit 11a. The wireless communication unit 10 functions as a mobile station that can communicate with the wireless communication unit 10 while moving around the bridge 1 or stopping near the bridge 1.
[0027]
The analysis unit 11c is a unit that analyzes the measurement result received by the wireless communication unit 11b. The analysis unit 11c generates, for example, a stress waveform representing a time change of the stress at each measurement point based on the measurement result stored in the storage unit 11d, and generates the stress frequency, the fatigue damage degree, and the crack initiation life of the bridge 1. Analyze diagnostic items such as prediction and remaining life. The analysis unit 11c calculates a function representing the correlation between the voltage value generated by the piezoelectric material 4 and the stress, vibration acceleration, distortion, and the like generated in the bridge 1, and the relationship between the distortion generated in the bridge 1 and the distortion generated in the piezoelectric material 4. These diagnostic items are analyzed based on a calibration curve for calibrating the deviation, and the analysis result (analysis data) is output to the control unit 11a.
[0028]
The storage unit 11d is a memory that stores various information. The storage unit 11d stores a program for the control unit 11a to execute a predetermined process, stores measurement data received by the wireless communication unit 11b, and stores analysis data analyzed by the analysis unit 11c. It is a nonvolatile memory (EEPROM). The storage unit 11d stores, for example, voltage values measured by the measurement unit 8c as measurement data in chronological order, and stores diagnosis items analyzed by the analysis unit 11c for each measurement point.
[0029]
The display unit 11e is a device that displays various information. The display unit 11e displays, for example, a vibration state, a stress waveform, a stress history, a cumulative fatigue damage degree, and the like for each measurement point. The operation unit 11f is an input device operated when a maintenance person or the like selects a diagnostic item or a display item, and the power unit 11g is a battery that stores power to be supplied to the measuring device 11.
[0030]
Next, the operation of the structure monitoring system according to the first embodiment of the present invention will be described. FIG. 7 is a flowchart for explaining the operation of the monitoring device side in the structure monitoring system according to the first embodiment of the present invention. Hereinafter, the operation of the central processing unit 8a shown in FIG. 5 will be mainly described.
In step (hereinafter, referred to as S) 100, the voltage of power storage unit 7 is measured. When the central processing unit 8a instructs the measuring unit 8c to measure the voltage of the power storage unit 7, the measuring unit 8c measures the voltage of the power storage unit 7 and outputs the measurement result to the central processing unit 8a.
[0031]
In S110, it is determined whether the voltage value exceeds a predetermined value. The central processing unit 8a determines whether or not the voltage value of the power storage unit 7 measured by the measuring unit 8c exceeds a predetermined value. If the voltage value is equal to or less than the predetermined value, the process proceeds to S120, where the voltage value is set to the predetermined value. If it exceeds, go to S130.
[0032]
In S120, power storage unit 7 is charged. When the voltage value of power storage unit 7 is low, central processing unit 8a instructs switching unit 8d to perform a switching operation. As a result, the switching unit 8d switches the power storage unit 7 so that the electromotive force generated by the piezoelectric material 4 is stored in the power storage unit 7, and the output voltage of the piezoelectric material 4 is stored until the voltage value of the power storage unit 7 reaches a predetermined value. Stored in the unit 7.
[0033]
In S130, power storage unit 7 is discharged. When the voltage value of power storage unit 7 is high, central processing unit 8a instructs switching unit 8d to perform a switching operation, and switching unit 8d stores the power so that the power stored in power storage unit 7 is released from power storage unit 7. The unit 7 is switched.
[0034]
In S140, the output voltage of the piezoelectric material 4 is measured. When a train passes through the bridge 1, the piezoelectric material 4 generates an electric signal (electromotive force) according to the vibration of the bridge 1. When the central processing unit 8a instructs the measuring unit 8c to measure the power generated by the piezoelectric material 4, a voltage value or the like is measured by the measuring unit 8c, and the measurement result is output from the measuring unit 8c to the central processing unit 8a. At this time, the power generated by the piezoelectric material 4 is measured by the measuring unit 8c and stored in the power storage unit 7.
[0035]
In S150, the measurement result is stored. When the central processing unit 8a outputs the measurement results to the storage unit 9, the storage results are stored in the storage unit 9 in chronological order.
[0036]
In S160, it is determined whether a transmission command has been received. When the wireless communication unit 10 receives the transmission command from the measuring device 11 shown in FIG. 6, the central processing unit 8a checks whether or not the identification data included in the received data matches its own ID information. When the collation results match, the process proceeds to S170, and when the collation results do not match, the process proceeds to S100 to continue the measurement of the output voltage of the piezoelectric material 4 and the like.
[0037]
In S170, the measurement result is transmitted. When the wireless communication unit 10 receives the transmission command from the measurement device 11, the central processing unit 8a reads the measurement result from the storage unit 9 and outputs the measurement result to the wireless communication unit 10, and the wireless communication unit 10 transmits the measurement result to the measurement device 11. And returns to S100.
[0038]
FIG. 8 is a flowchart for explaining the operation on the measuring device side in the structure monitoring system according to the first embodiment of the present invention. Hereinafter, the operation of the control unit 11a shown in FIG. 6 will be mainly described.
In S200, transmission of the measurement result is instructed. When the control unit 11a instructs the wireless communication unit 11b to transmit the measurement result, the wireless communication unit 11b transmits the identification data assigned to each monitoring device 3, and the wireless communication unit 11b transmits the measurement result. Command 10
[0039]
At S210, a measurement result is received. When the wireless communication unit 11b receives the measurement result for each monitoring device 3, the wireless communication unit 11b outputs the measurement result to the control unit 11a. Then, in S220, the measurement result is stored. When the control unit 11a outputs the measurement result to the storage unit 11d, the storage unit 11d stores the measurement result for each measurement point (ID information).
[0040]
In S230, the measurement result is analyzed. When the control unit 11a reads out the measurement result from the storage unit 11d and outputs it to the analysis unit 11c, and when the control unit 11a instructs the analysis unit 11c to perform an analysis process, the analysis unit 11c determines a predetermined diagnosis item based on the measurement result. It analyzes and outputs the analysis result to the control unit 11a.
[0041]
In S240, the analysis result is stored. When the control unit 11a outputs the analysis result to the storage unit 11d, the storage unit 11d stores the analysis result for each measurement point (ID information). Then, in S250, the analysis result is displayed. The control unit 11a reads the analysis result corresponding to the diagnosis item selected by the operation unit 11f from the storage unit 11d, and causes the display unit 11e to display the analysis result.
[0042]
The structure monitoring system according to the first embodiment of the present invention has the following effects.
(1) In the first embodiment, the vibration of the bridge 1 is converted into an electric signal by the piezoelectric material 4, and the electric signal is measured by the measuring unit 8 c, and the piezoelectric material 4 is generated according to the vibration of the bridge 1. The wireless communication unit 10 transmits the measurement result using the generated power as a power source. For this reason, the state of the bridge 1 can be monitored without power supply and the measurement result can be transmitted wirelessly. As a result, it is possible to monitor the vibration acceleration and distortion of a long-sized structure such as the bridge 1 in real time, so that it is not necessary to suspend the operation of railroads or regulate the passage of roads, thereby maintaining a healthy social infrastructure. be able to. Further, it is not necessary for the maintenance person to frequently go to the site and visit the danger point and visually monitor the dangerous place, so that the work load and time labor of the maintenance person can be reduced.
[0043]
(2) In the first embodiment, the power storage unit 7 stores the power generated by the piezoelectric material 4, and the wireless communication unit 10 transmits the measurement result stored in the storage unit 8b using the power stored in the power storage unit 7 as a power supply. I do. As a result, electric power generated when the train passes through the bridge 1 and the bridge 1 vibrates is stored in the power storage unit 7 in advance, and this electric power can be used as a power supply for wireless communication. For this reason, it is possible to monitor the state of a tunnel, an underground structure, or the like in which a solar cell or the like cannot be used as a power supply without using a power supply.
[0044]
(3) In the first embodiment, when the wireless communication unit 10 receives the transmission command of the measurement result from the wireless communication unit 11b and the plurality of monitoring devices 3 are installed on the bridge 1, First, the wireless communication unit 11b receives the measurement result from the wireless communication unit 10. For this reason, the measurement result can be received by one measuring device 11 from the monitoring devices 3 installed at a plurality of measuring points of the bridge 1. As a result, the measurement result is collected from each monitoring device 3 while moving along the bridge 1 while carrying the measurement device 11, or the measurement is performed at a safe position away from the bridge 1 without approaching the measurement point of the bridge 1. The measurement result can be collected from each monitoring device 3 by stopping the device 11.
[0045]
(4) In the first embodiment, the piezoelectric material 4 generates the power stored in the power storage unit 7 and the piezoelectric material 4 generates the power measured by the measuring unit 8c. As a result, one piezoelectric material 4 can be used as both a piezoelectric material for measurement and a piezoelectric material for charging.
[0046]
(2nd Embodiment)
FIG. 9 is a configuration diagram of a monitoring device in a structure monitoring system according to a second embodiment of the present invention.
The monitoring device 3 illustrated in FIG. 9 includes a measurement piezoelectric material 4A that generates power measured by the measurement unit 8c, and a charging piezoelectric material 4B that generates power stored in the power storage unit 7. In the second embodiment, even when the power generated by one piezoelectric material 4 is small or when the load on the monitoring device 3 is large, the piezoelectric material for measurement 4A and the piezoelectric material for charging 4B each generate power. Therefore, a sufficient measurement result can be obtained.
[0047]
(Third embodiment)
FIG. 10 is a configuration diagram of a measurement system in the structure monitoring system according to the third embodiment of the present invention. The same parts as those shown in FIG. 6 are denoted by the same reference numerals, and detailed description will be omitted.
The measurement system 12 shown in FIG. 10 includes a communication device 13 and an analysis device 14. The communication device 13 includes a control unit 13a that controls various operations of the communication device 13, a wireless communication unit 13b that can communicate with the wireless communication unit 10 illustrated in FIG. 5, and a measurement unit that the wireless communication unit 13b receives. A storage unit 13d for storing results, a power supply unit 13g for supplying power to the communication device 13, and an input / output unit (interface circuit) 13h for inputting and outputting data to and from the analysis device 14 are provided. The analysis device 14 includes a control unit 14a that controls various operations of the analysis device 14, an analysis unit 14c that analyzes the measurement result, a storage unit 14d that stores the analysis result of the analysis unit 14c, and a display of the analysis result. The communication unit 13 includes an input / output unit (interface circuit) 14h for inputting / outputting data between the communication unit 13 and the display unit 14e. In the third embodiment, the communication device 13 is smaller than the measurement device 11 shown in FIG. 6 and can be used as a portable terminal that is convenient to carry. In the third embodiment, after the measurement results are collected on site by the communication device 13, the analysis device 14 installed in the central command room or the like and the communication device 13 are connected by the connection cable 15 and the measurement results are collected. Can be analyzed.
[0048]
(Other embodiments)
The present invention is not limited to the embodiments described above, and various modifications or changes can be made as described below, and these are also within the scope of the present invention.
(1) In this embodiment, the bridge 1 has been described as an example, but the present invention is not limited to this. For example, the present invention can be applied to other railway structures such as tunnels that generate vibration when a train passes, and fixed structures such as high-rise buildings and steel towers. Further, in this embodiment, the description has been given by taking the piezoelectric ceramics as an example of the piezoelectric material. However, the present invention can be applied to piezoelectric materials other than the piezoelectric ceramics. Furthermore, in this embodiment, the case where the measurement result is transmitted wirelessly has been described as an example, but the present invention can also be applied to the case where the measurement result is transmitted by wire.
[0049]
(2) In this embodiment, in S160 and S170 shown in FIG. 8 and S260 shown in FIG. 9, after the wireless communication unit 10 receives the transmission command from the measurement device 11, the measurement result is transmitted from the wireless communication unit 10 to the measurement device 11. , But the communication method is not limited to this. For example, it is also possible to install a wireless transmission device having only a transmission function as the wireless communication unit 10 shown in FIG. 3 and wirelessly transmit a voltage value using electric energy generated at the time of each occurrence of vibration. In this case, the required data can be received by the communication device whose frequency is tuned to that of the radio. Therefore, only necessary data can be measured in real time. Further, since the monitoring system 2 shown in FIGS. 1 and 2 can be configured by a wireless transmitting device and a receiving device, the receiving device can be handled by a commercially available communication device.
[0050]
【The invention's effect】
As described above, according to the present invention, a measurement result can be wirelessly transmitted in real time without requiring a special power supply.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view of a bridge monitored by a structure monitoring system according to a first embodiment of the present invention.
FIG. 2 is a side view of the bridge monitored by the structure monitoring system according to the first embodiment of the present invention.
FIG. 3 is a configuration diagram of a monitoring device in the structure monitoring system according to the first embodiment of the present invention.
FIG. 4 is a cross-sectional view showing an attached state of a piezoelectric material in the structure monitoring system according to the first embodiment of the present invention.
FIG. 5 is a configuration diagram of a central processing unit in the structure monitoring system according to the first embodiment of the present invention.
FIG. 6 is a configuration diagram of a measuring device in the structure monitoring system according to the first embodiment of the present invention.
FIG. 7 is a flowchart for explaining the operation of the monitoring device side in the structure monitoring system according to the first embodiment of the present invention.
FIG. 8 is a flowchart for explaining the operation of the measuring device side in the structure monitoring system according to the first embodiment of the present invention.
FIG. 9 is a configuration diagram of a monitoring device in a structure monitoring system according to a second embodiment of the present invention.
FIG. 10 is a configuration diagram of a measurement system in a structure monitoring system according to a third embodiment of the present invention.
[Explanation of symbols]
1 bridge
2 Monitoring system
3 monitoring equipment
4 Piezoelectric materials (mechanical-electrical conversion means)
4A Piezoelectric material for measurement (mechanical-electric conversion means)
4B Piezoelectric material for charging (mechanical-electric conversion means)
7 Power storage unit (power storage means)
8 Control part
8c Measuring unit (measuring means)
9 storage unit (storage means)
10. Wireless communication unit (transmission means)
11 Measuring device
11b Wireless communication unit (communication device)
11c Analysis unit (analysis device)
12 Measurement system
13 Communication device
13b Wireless communication unit (communication device)
14 Analyzer
14c Analysis unit

Claims (6)

構造物の状態を監視する構造物の監視装置であって、
前記構造物の振動を電気信号に変換する機械電気変換手段と、
前記機械電気変換手段が出力する前記電気信号を測定する測定手段と、
前記測定手段の測定結果を送信する送信手段とを備え、
前記機械電気変換手段は、前記構造物の振動に応じて電力を発生し、
前記送信手段は、前記電力を電源として前記測定結果を送信すること、
を特徴とする構造物の監視装置。
A structure monitoring device for monitoring a state of a structure,
Electromechanical conversion means for converting the vibration of the structure into an electric signal,
Measuring means for measuring the electric signal output by the electromechanical conversion means,
Transmitting means for transmitting a measurement result of the measuring means,
The electromechanical converter generates electric power in accordance with the vibration of the structure,
The transmitting unit transmits the measurement result using the power as a power source,
Structure monitoring device characterized by the above-mentioned.
請求項1に記載の構造物の監視装置において、
前記電力を蓄積する蓄電手段と、
前記測定手段の測定結果を記録する記憶手段とを備え、
前記送信手段は、前記蓄電手段が蓄積する前記電力を電源として前記記憶手段が記憶する前記測定結果を送信すること、
を特徴とする構造物の監視装置。
The structure monitoring device according to claim 1,
Power storage means for storing the power,
Storage means for recording a measurement result of the measurement means,
The transmitting unit transmits the measurement result stored in the storage unit using the power stored in the power storage unit as a power source,
Structure monitoring device characterized by the above-mentioned.
請求項1又は請求項2に記載の構造物の監視装置において、
前記機械電気変換手段は、前記蓄電手段が蓄積する前記電力を発生するとともに、前記測定手段が測定する前記電力を発生する圧電材料を備えること、
を特徴とする構造物の監視装置。
In the structure monitoring device according to claim 1 or 2,
The electromechanical conversion unit generates the power stored by the power storage unit, and includes a piezoelectric material that generates the power measured by the measurement unit,
Structure monitoring device characterized by the above-mentioned.
請求項1又は請求項2に記載の構造物の監視装置において、
前記機械電気変換手段は、
前記測定手段が測定する前記電力を発生する測定用圧電材料と、
前記蓄電手段が蓄積する前記電力を発生する充電用圧電材料とを備えること、
を特徴とする構造物の監視装置。
In the structure monitoring device according to claim 1 or 2,
The electromechanical conversion means,
A measuring piezoelectric material that generates the power measured by the measuring means,
A charging piezoelectric material that generates the power stored by the power storage means,
Structure monitoring device characterized by the above-mentioned.
構造物の状態を監視する構造物の監視システムであって、
請求項1から請求項4までのいずれか1項に記載の構造物の監視装置と、
前記送信手段が送信する前記測定結果を受信する通信装置とを備え、
前記通信装置は、前記監視装置が前記構造物に複数設置されているときに、この監視装置毎に前記測定結果を前記送信手段から受信すること、
を特徴とする構造物の監視システム。
A structure monitoring system for monitoring a state of a structure,
A structure monitoring device according to any one of claims 1 to 4,
A communication device for receiving the measurement result transmitted by the transmission means,
The communication device, when a plurality of the monitoring device is installed in the structure, receiving the measurement result from the transmission unit for each monitoring device,
A structure monitoring system characterized by the following.
請求項5に記載の構造物の監視システムにおいて、
前記通信装置が受信した前記測定結果を解析する解析装置を備えること、
を特徴とする構造物の監視システム。
The structure monitoring system according to claim 5,
Having an analysis device for analyzing the measurement result received by the communication device,
A structure monitoring system characterized by the following.
JP2003092790A 2003-03-28 2003-03-28 Structure monitoring device and monitoring system Expired - Fee Related JP3984185B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003092790A JP3984185B2 (en) 2003-03-28 2003-03-28 Structure monitoring device and monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003092790A JP3984185B2 (en) 2003-03-28 2003-03-28 Structure monitoring device and monitoring system

Publications (2)

Publication Number Publication Date
JP2004301571A true JP2004301571A (en) 2004-10-28
JP3984185B2 JP3984185B2 (en) 2007-10-03

Family

ID=33405738

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003092790A Expired - Fee Related JP3984185B2 (en) 2003-03-28 2003-03-28 Structure monitoring device and monitoring system

Country Status (1)

Country Link
JP (1) JP3984185B2 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008070329A (en) * 2006-09-15 2008-03-27 Railway Technical Res Inst Trouble-detecting sensor of ground coil for magnetic levitation transportation system and system thereof
JP2008209283A (en) * 2007-02-27 2008-09-11 Railway Technical Res Inst Apparatus and method for monitoring structure
JP2008292319A (en) * 2007-05-24 2008-12-04 Kobe Steel Ltd Vibration sensor system
JP2009225494A (en) * 2008-03-13 2009-10-01 Railway Technical Res Inst Power supply unit for sensor for detecting disorder in ground coil of magnetic levitation system of railway
JP2009294028A (en) * 2008-06-04 2009-12-17 Central Japan Railway Co Apparatus for measuring ground vibration
JP2011017605A (en) * 2009-07-08 2011-01-27 Jr Higashi Nippon Consultants Kk Non-electric power source measuring device and non-electric power source measuring system
JP2011081529A (en) * 2009-10-06 2011-04-21 National Institute Of Advanced Industrial Science & Technology Low-power consumption wireless sensor terminal and sensor network system
JP2011242390A (en) * 2010-05-13 2011-12-01 General Electric Co <Ge> System and apparatus for recovering energy
JP2013234945A (en) * 2012-05-10 2013-11-21 Kyushu Electric Power Co Inc Steel tower soundness evaluating device and method
JP2014094584A (en) * 2012-11-07 2014-05-22 Mitsubishi Heavy Ind Ltd Measuring system and measuring method
US8763461B2 (en) 2008-03-31 2014-07-01 Asahi Glass Company, Limited Acceleration sensor device and sensor network system
WO2014185080A1 (en) * 2013-05-17 2014-11-20 パナソニックIpマネジメント株式会社 Power-generating vibration sensor, tire using same, and electrical apparatus
JP2018077614A (en) * 2016-11-08 2018-05-17 公益財団法人鉄道総合技術研究所 Impact detection device, disaster monitoring system, and moving body detection system
CN111735532A (en) * 2020-06-24 2020-10-02 淮阴工学院 Bridge resonance testing device and method
WO2023026728A1 (en) * 2021-08-27 2023-03-02 Imv株式会社 Vibration test device
WO2023026729A1 (en) * 2021-08-27 2023-03-02 Imv株式会社 Vibration test support network system

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008070329A (en) * 2006-09-15 2008-03-27 Railway Technical Res Inst Trouble-detecting sensor of ground coil for magnetic levitation transportation system and system thereof
JP2008209283A (en) * 2007-02-27 2008-09-11 Railway Technical Res Inst Apparatus and method for monitoring structure
JP2008292319A (en) * 2007-05-24 2008-12-04 Kobe Steel Ltd Vibration sensor system
JP2009225494A (en) * 2008-03-13 2009-10-01 Railway Technical Res Inst Power supply unit for sensor for detecting disorder in ground coil of magnetic levitation system of railway
US8763461B2 (en) 2008-03-31 2014-07-01 Asahi Glass Company, Limited Acceleration sensor device and sensor network system
JP5541155B2 (en) * 2008-03-31 2014-07-09 旭硝子株式会社 Acceleration sensor device, wireless sensor network, and wide-range abnormal vibration recording system
JP2009294028A (en) * 2008-06-04 2009-12-17 Central Japan Railway Co Apparatus for measuring ground vibration
JP2011017605A (en) * 2009-07-08 2011-01-27 Jr Higashi Nippon Consultants Kk Non-electric power source measuring device and non-electric power source measuring system
JP2011081529A (en) * 2009-10-06 2011-04-21 National Institute Of Advanced Industrial Science & Technology Low-power consumption wireless sensor terminal and sensor network system
JP2011242390A (en) * 2010-05-13 2011-12-01 General Electric Co <Ge> System and apparatus for recovering energy
JP2013234945A (en) * 2012-05-10 2013-11-21 Kyushu Electric Power Co Inc Steel tower soundness evaluating device and method
JP2014094584A (en) * 2012-11-07 2014-05-22 Mitsubishi Heavy Ind Ltd Measuring system and measuring method
WO2014185080A1 (en) * 2013-05-17 2014-11-20 パナソニックIpマネジメント株式会社 Power-generating vibration sensor, tire using same, and electrical apparatus
JP2014228283A (en) * 2013-05-17 2014-12-08 パナソニック株式会社 Power generation vibration sensor, tire using the same and electrical apparatus
JP2018077614A (en) * 2016-11-08 2018-05-17 公益財団法人鉄道総合技術研究所 Impact detection device, disaster monitoring system, and moving body detection system
CN111735532A (en) * 2020-06-24 2020-10-02 淮阴工学院 Bridge resonance testing device and method
WO2023026728A1 (en) * 2021-08-27 2023-03-02 Imv株式会社 Vibration test device
WO2023026729A1 (en) * 2021-08-27 2023-03-02 Imv株式会社 Vibration test support network system
JP2023032979A (en) * 2021-08-27 2023-03-09 Imv株式会社 Vibration test support network system
JP2023032978A (en) * 2021-08-27 2023-03-09 Imv株式会社 Vibration testing device
JP7261270B2 (en) 2021-08-27 2023-04-19 Imv株式会社 Vibration test equipment
JP7261271B2 (en) 2021-08-27 2023-04-19 Imv株式会社 Vibration test support network system

Also Published As

Publication number Publication date
JP3984185B2 (en) 2007-10-03

Similar Documents

Publication Publication Date Title
JP3984185B2 (en) Structure monitoring device and monitoring system
JP6253056B2 (en) Vibration measuring apparatus and vibration measuring method
WO2016194375A1 (en) Bridge abnormality sensing device
JP2010095360A (en) Function variable type remote monitoring system and method
Abedin et al. Fracture detection in steel girder bridges using self-powered wireless sensors
JP4077269B2 (en) Prestressed concrete structure monitoring system
JP4227353B2 (en) Monitoring system for concrete structures
JP6110804B2 (en) PC sleeper deterioration determination system, PC sleeper deterioration determination method, and program
JP6481297B2 (en) MONITORING DEVICE, MONITORING SYSTEM, AND MONITORING METHOD
KR20130027939A (en) Multi-function inspection device of train and railroad using power generators including a piezoelectric
JP7368473B2 (en) monitoring device
US20210341352A1 (en) Diagnosis apparatus, diagnosis method, and computer readable recording medium
Moon et al. Holistic integration based on USN technology for monitoring safety during concrete placement
JP6167085B2 (en) Wireless measurement system, wireless sensor terminal, and device management method
WO2020100509A1 (en) Civil engineering structure monitoring system, civil engineering structure monitoring device, civil engineering structure monitoring method, and non-transitory computer-readable medium
JPH10132947A (en) Earthquake information system
Deng et al. Wireless monitoring of ballastless track slab deformation for high-speed railway
JP6565159B2 (en) MONITORING DEVICE, MONITORING SYSTEM, AND MONITORING METHOD
RU2698419C1 (en) System for monitoring high-speed highway artificial structures
Angrisani et al. An innovative embedded wireless sensor network system for the structural health monitoring of RC structures
Jang et al. A novel structural health monitoring system with wireless power and bi-directional data transfer
Reichenbach Evaluating vehicular-induced vibrations of typical highway bridges for energy harvesting applications
RU2717693C1 (en) Artificial structures control and diagnostics system
Moutinho et al. Reducing vibrations in a footbridge using a semi-active tuned mass damper
CN206670842U (en) Building body state monitoring device, pressure-sensitive reinforcing body, reinforcement and building structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050628

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070417

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070605

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070703

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070705

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110713

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120713

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120713

Year of fee payment: 5

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120713

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120713

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130713

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140713

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees