JP2004238804A - Finishing stake device, and face of slope work execution method using the same - Google Patents

Finishing stake device, and face of slope work execution method using the same Download PDF

Info

Publication number
JP2004238804A
JP2004238804A JP2003025973A JP2003025973A JP2004238804A JP 2004238804 A JP2004238804 A JP 2004238804A JP 2003025973 A JP2003025973 A JP 2003025973A JP 2003025973 A JP2003025973 A JP 2003025973A JP 2004238804 A JP2004238804 A JP 2004238804A
Authority
JP
Japan
Prior art keywords
plate
slope
water
base end
end side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003025973A
Other languages
Japanese (ja)
Other versions
JP4189228B2 (en
Inventor
Kunihiro Nishimura
国弘 西村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2003025973A priority Critical patent/JP4189228B2/en
Publication of JP2004238804A publication Critical patent/JP2004238804A/en
Application granted granted Critical
Publication of JP4189228B2 publication Critical patent/JP4189228B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Retaining Walls (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a low-priced finishing stake device capable of easily stretching a slope plate and accurately fitting the slope plate to a designed grade of a slope. <P>SOLUTION: A nail 6 as a support member 5 is placed into a drain plate 2 arranged in a base end side of the slope plate 3 of the finishing stake device, and a fitting plate 9 is fitted to the base end part of the slope plate 3, and a bearing 8 fixed to the fitting plate 9 is inserted into a horizontal shaft 7 integrated with the nail 6 to support the base end part of the slope plate 3 freely to turn. Furthermore, a nail 16 as a fixing member 15 is placed into the drain plate 2 arranged in a tip end side of the slope plate 3, and a fitting plate 19 is fitted to the tip of the slope plate 3, and a bearing 18 fixed to the fitting plate 19 is inserted into a horizontal shaft 17 integrated with the nail 16, and the tip of the slope plate 3 is fixed along the designed grade of the face of slope N. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、地盤に形成される切土や盛土の法面の設計勾配と、該法面ののり肩位置やのり尻位置とを表示するための丁張装置、及び、丁張装置を用いた法面の施工方法に関する。
【0002】
【従来の技術】
一般に、切土又は盛土の法面を地盤に形成する場合、例えば、図5に示すように、設計上の計算値と、地盤Gの所定位置に設置された計量機器によって求められた計測値とで、切土や盛土の法面Nの施工を始める位置を地盤Gに設定し、のり肩やのり尻の位置に丁張装置を設置する。この丁張装置は、前後に立設される上下方向の水杭30,30と、該両水杭30,30に架設される水平方向の水ぬき板31と、後方の水杭30と水ぬき板31とに傾斜して架設されるのりぬき板32とから構成されている。なお、のりぬき板32の基端部側の水杭30に比して、のりぬき板32の先端部側の水杭30は低くなっている。
【0003】
そして、丁張装置ののりぬき板32の先端部により法面Nののり肩やのり尻の位置が示されることになり、のりぬき板32の傾斜角度により法面Nの設計勾配が示され、この丁張装置に基づいて法面Nが地盤Gに形成されるようになっている。
【0004】
また、従来の丁張装置としては、例えば、特開平5−10759号に示すように、傾斜角度が調整可能に構成されると共に、直立されたシャフトを上下動可能に構成されたレーザ発光装置と、該レーザ発光装置の傾斜角度の調整、及び、高さの位置調整を遠隔より自動制御する遠隔操作装置を具備したものが公知になっている。
【0005】
【発明が解決しようとする課題】
しかしながら、前者の場合、のりぬき板32を、後方の水杭30と水ぬき板31とに傾斜して架設する際、作業員が釘をのりぬき板32に直接打ち込んで固定しているため、その作業が煩雑であると共に、のりぬき板32を精度よく固定するのが困難で、法面Nの施工に支障をきたすという問題がある。
【0006】
また、後者の場合、レーザ発光装置を遠隔から自動制御する装置が必要となるため、非常に高価になるという問題がある。
【0007】
そこで、本発明は上記問題点に鑑み、のりぬき板を精度よく容易に架設できると共に、法面の施工精度を向上できる安価な丁張装置及び丁張装置を用いた法面の施工方法を提供することを目的とする。
【0008】
【課題を解決するための手段】
上記課題を解決するために、本発明の丁張装置は、請求項1に示す如く、切土や盛土の法面が形成される地盤に立設された水杭と、該水杭に架設される水平方向の水ぬき板と、水杭及び水ぬき板に傾斜して架設されるのりぬき板とを備え、のりぬき板の傾斜角度によって、前記法面の設計勾配が示されると共に、のりぬき板の先端部によって、法面ののり肩やのり尻の位置が示される丁張装置において、のりぬき板の基端部と、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板とに取り付けられた支持部材によって、のりぬき板の基端部を回動可能に支持すると共に、のりぬき板の先端部と、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板とに取り付けられた固定部材によって、のりぬき板の先端部を前記法面の設計勾配に合わせて固定するようにしたものである。
【0009】
したがって、のりぬき板の基端部及び先端部が、取り付けられた支持部材や固定部材を介して水杭や水ぬき板に取り付けられるため、のりぬき板を精度よく容易に取り付けられる。
【0010】
また、請求項2に示す如く、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板に打ち込まれる釘と、該釘に一体に形成された水平軸と、のりぬき板の基端部に取り付けられた水平軸の軸受けとで支持部材を構成し、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板に打ち込まれる釘と、該釘に一体に形成された水平軸と、のりぬき板の先端部に取り付けられた水平軸の軸受けとで固定部材を構成するようにしたものである。
【0011】
例えば、設計上の計算値、及び、計量機器の計測値によって求めたのり肩やのり尻の位置を、のりぬき板の基端部側の水杭や水ぬき板に線引きをし、この線上に釘を打ち込めば、のりぬき板の基端部の正確な位置が容易に確保されることになる。さらに、設計計算によって求めた法面の設計勾配に合った位置を、のりぬき板の先端部側の水杭や水ぬき板に線引きをし、この線上に釘を打ち込めば、のりぬき板の勾配を法面の設計勾配に正確且つ容易に合わせられる。
【0012】
さらに、請求項3に示す如く、支持部材及び固定部材の水平軸に、軸受けからの逸脱を防止するためのストッパを設けることが好ましい。
【0013】
そうすれば、法面の施工が完了するまで、のりぬき板が安定した状態で保持されることになる。
【0014】
加えて、請求項4に示す如く、丁張装置ののりぬき板の先端部の位置を調整する位置調整手段を固定部材に設けるようにしてもよい。
【0015】
例えば、丁張装置ののりぬき板の先端部に、該のりぬき板の軸線方向に沿って長穴を形成する。さらに、ボルトの軸線がのりぬき板の軸線に対して直交するように、ボルトを長穴に挿通して移動可能にする。つぎに、該ボルトをのりぬき板の両側から挟持すべく、該ボルトに二つのナットを螺合させる。そして、法面の設計勾配と一致するのりぬき板の位置を、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板に設定する。その後、のりぬき板のボルトの位置が前記設定位置に位置するように調整して、のりぬき板のボルトの位置を固定する。また、長穴の代わりに、法面の設計勾配に合わせて設定された複数のガイド穴をのりぬき板の先端部に予め形成するようにしてもよい。
【0016】
また、本発明の丁張装置を用いた法面の施工方法は、請求項5に示す如く、切土又は盛土の法面が形成される地盤に、設計上の計算値と、計量機器の計測値とで、前記法面ののり肩やのり尻の位置を設定し、つぎに、のり肩やのり尻の位置に水杭を前後に離間させて立設すると共に、該両水杭に、水ぬき板を上下に離間させて架設し、そして、支持部材を、のりぬき板の基端部と、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板とに取り付けて、のりぬき板の基端部を回動可能に支持すると共に、固定部材を、のりぬき板の先端部と、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板とに取り付けて、のりぬき板の先端部を前記法面の設計勾配に合わせて固定し、固定されたのりぬき板に基づいて前記法面を地盤に形成するようにしたものである。
【0017】
この場合、丁張装置の設置作業が短時間で行われ、しかも、正確な勾配を有する法面を地盤に形成することができると共に、法面の施工作業が円滑に行われる。
【0018】
【発明の実施の形態】
本発明の一実施形態につき、図1〜図4を参照して説明する。
本発明の丁張装置は、切土や盛土の法面Nが形成される地盤Gに前後に立設された二本の上下方向の水杭1,1と、該両水杭1,1に上下に架設される二本の水平方向の水ぬき板2,2と、上側の水ぬき板2と、下側の水ぬき板2とに傾斜して架設されるのりぬき板3と、のりぬき板3の基端部、及び、のりぬき板3の基端部側、即ち上側の水ぬき板2の後側に取り付けられた支持部材5と、のりぬき板3の先端部、及び、のりぬき板3の先端部側、即ち下側の水ぬき板2の前側に取り付けられた固定部材15とから構成されている。
【0019】
そして、上下の水ぬき板2,2は、図1に示すように、間隔Hが一定の寸法に保持されるように、水平に、且つ、平行に釘など(図示せず)によって取り付けられている。さらに、下側の水ぬき板2の前側の上面、及び、のりぬき板3の先端部側の下面には、のりぬき板3の傾斜角度を容易に設定できるように、複数のガイド穴13,…、23,…が予め形成されている。
【0020】
支持部材5は、上側の水ぬき板2の後側に打ち込まれる平釘6と、該平釘6の略中央部に一体に溶着された水平軸7と、該水平軸7が挿脱可能に且つ回動可能に支持される軸受け8と、該軸受け8が固着された平面視矩形状の取付板9とを備えている。そして、水平軸7の先端部には、軸受け8からの逸脱を防止する樹脂製の環状のストッパ10が嵌脱可能に嵌入されている。さらに、取付板9の両端部には、取付穴11,11が穿設され、該両取付穴11,11には、二重頭釘12,12が打ち込まれて取付板9がのりぬき板3の基端部側の下面に固定される。
【0021】
固定部材15は、支持部材5と同様の構成になっており、のりぬき板3の先端部側、即ち下側の水ぬき板2の前側に打ち込まれる平釘16と、該平釘16に一体化された水平軸17と、該水平軸17の軸受け18と、該軸受け18が固着された取付板19とを備え、水平軸17の先端部にストッパ20が嵌入されると共に、取付板19が二本の二重頭釘22によってのりぬき板3の先端部側の下面に固定される。
【0022】
つぎに本発明の丁張装置を用いた法面Nの施工方法について説明する。まず、従来と同様に、切土や盛土の法面Nが形成される地盤Gの所定位置に計量機器を設置し、該計量機器によって、計量機器の設置位置から法面ののり肩やのり尻の位置までの水平距離を求めると共に、計量機器の設置位置から法面ののり肩やのり尻の位置までの高さを求める。つぎに、計量機器の前記各計測値と、設計上の傾斜角度や計算値とで、法面ののり肩やのり尻の位置を地盤に設定する(図示せず)。
【0023】
その後、設定した法面ののり肩やのり尻の位置の近傍に、丁張装置の二本の水杭1,1を前後に離間させて立設し、続いて、水平方向の二本の水ぬき板2,2を上下に離間させて両水杭1,1に直交して架設する。この状態で、上側の水ぬき板2の後側に、支持部材5としての平釘6を打ち込む一方、のりぬき板3の基端部の下面に、軸受け8が固着された取付板9を固定する。つぎに、平釘6に一体化された水平軸7に取付板9の軸受け8を挿通し、軸受け8を貫通した水平軸7の先端部にストッパ10を嵌入し、のりぬき板3の基端部を回動可能に支持する。
【0024】
この際、のりぬき板3の基端部の位置は、上側の水ぬき板2に固定された支持部材5の水平軸7によって決定されているため、誤差を生じることがない。
【0025】
つぎに、法面Nの設計勾配に合わせてのりぬき板3の先端部を回動して調整し、下側の水ぬき板2のガイド穴23,…を適宜選択して、即ちのりぬき板3の傾斜角度と法面Nの設計勾配とが一致するガイド穴23,…を選択し、固定部材15としての平釘16を打ち込む一方、前記と同様に、のりぬき板3の先端部の下面のガイド穴13,…を適宜選択して、のりぬき板3の先端部の下面に取付板19を固定し、下側の水ぬき板2に固定された水平軸17に、のりぬき板3に固定された取付板19の軸受け18を介してのりぬき板3の先端部を固定する。なお、この場合も、軸受け18を貫通した水平軸17には、ストッパ20が嵌入されている。この際、のりぬき板3の先端部の位置は、下側の水ぬき板2に固定された固定部材15の水平軸17によって決定されているため、誤差を生じることがない。
【0026】
そして、のりぬき板3を固定すれば、法面ののり肩やのり尻における丁張装置の設置作業が完了する。
【0027】
なお、のりぬき板3の先端部の位置は、計量機器で求めた計測値、即ち計量機器の設置位置から法面ののり肩やのり尻の位置までの水平距離、及び、計量機器の設置位置から法面ののり肩やのり尻の位置までの高さと、設計計算で求めた法面Nの設計勾配とに基づき、三角関数を利用して容易に設定できる。
【0028】
このように、本発明の丁張装置によれば、のりぬき板3を水杭1,1や水ぬき板2,2に直接固定することがないため、のりぬき板3の固定が正確に且つ容易に行われることになる。また、のりぬき板3の支持部材5や固定部材15は、簡単な構成であり、安価である。
【0029】
なお、前記実施形態の場合、のりぬき板3を用いて丁張装置を設置するようにしたが、支持部材5及び固定部材15の平釘の代わりに二重頭釘を使用すると共に、のりぬき板3の代わりに糸や紐を用いてもよい。この場合、二重頭釘を、前後に立設された水杭1,1、又は、上下に配された水ぬき板2,2の所望の位置、即ち両二重頭釘に張設される糸や紐の傾斜角度と法面Nの設計勾配とが一致する位置に打ち込む。
【0030】
また、前記実施形態の場合、支持部材5及び固定部材15として、平釘6,16に一体化された水平軸7,17を用いたが、要するに、支持部材5及び固定部材15としては、水平軸7,17を、のりぬき板3の基端部側及び先端部側の水杭1,1や水ぬき板2,2に正確に固定できる構造のものであればよい。例えば、二つの固定穴を有する水平軸を使用し、のりぬき板3の基端部側及び先端部側の水杭1,1や水ぬき板2,2に固定するようにしてもよい。即ち、のりぬき板3を水杭1,1や水ぬき板2,2に直接固定しなければよい。さらに、前記実施形態の場合、図1において、のりぬき板3の基端部を上側、先端部を下側としたが、のりぬき板3の基端部を下側、先端部を上側としてもよい。この場合、下側の基端部を回動可能に支持した後、上側の先端部を固定するようにしてもよい。
【0031】
【発明の効果】
以上説明したように、本発明の丁張装置によれば、丁張装置ののりぬき板の基端部と、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板とに取り付けられた支持部材によって、のりぬき板の基端部を回動可能に支持すると共に、のりぬき板の先端部と、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板とに取り付けられた固定部材によって、のりぬき板の先端部を法面の設計勾配に合わせて固定するようにしたため、のりぬき板を誤差を生じることなく安定した状態で簡単に取り付けられる。
【0032】
また、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板に打ち込まれる釘と、該釘に一体に形成された水平軸と、のりぬき板の基端部に取り付けられた水平軸の軸受けとで支持部材を構成し、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板に打ち込まれる釘と、該釘に一体に形成された水平軸と、のりぬき板の先端部に取り付けられた水平軸の軸受けとで固定部材を構成するようにしたため、のりぬき板の基端部を正確な位置に容易に取り付けることができると共に、のりぬき板の勾配を、法面の設計勾配に正確且つ容易に合わせることができる。
【0033】
さらに、支持部材及び固定部材の水平軸に、軸受けからの逸脱を防止するためのストッパを設けるようにしたため、法面の施工が完了するまで、のりぬき板を安定した状態で保持することができる。
【0034】
加えて、丁張装置ののりぬき板の先端部の位置を、固定部材に設けられた位置調整手段によって調整するようにしたため、のりぬき板の先端部を、法面の設計勾配に合わせて容易に固定することができる。
【0035】
また、本発明の法面の施工方法によれば、本発明の丁張装置を使用して法面を地盤に形成するようにしたため、丁張装置の設置作業を短縮できると共に、法面の施工精度を向上することができる。
【図面の簡単な説明】
【図1】本発明の一実施形態にかかる丁張装置の斜視図である。
【図2】図1ののりぬき板の平面図である。
【図3】図1ののりぬき板の固定部材及び支持部材の斜視図である。
【図4】本発明の一実施形態にかかる丁張装置の施工実施例を示した図である。
【図5】従来例の丁張装置の施工実施例を示した図である。
【符号の説明】
1、30 水杭
2、31 水ぬき板
3、32 のりぬき板
5 支持部材
6、16 平釘
7、17 水平軸
8、18 軸受け
9、19 取付板
10、20 ストッパ
11、21 取付穴
12、22 二重頭釘
13、23 ガイド穴
15 固定部材
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention employs a tensioning device for displaying a design gradient of a slope of a cut or an embankment formed on the ground, and a position of a shoulder or a bottom of the slope of the slope, and a tensioning device. It relates to the construction method of the slope.
[0002]
[Prior art]
Generally, when the slope of the cut or embankment is formed on the ground, for example, as shown in FIG. 5, a calculated value on design and a measured value obtained by a measuring device installed at a predetermined position on the ground G Then, the position where the construction of the slope N of the cut or embankment is started is set to the ground G, and the towing device is installed at the position of the shoulder and the glue. This tensioning device comprises a vertical water pile 30, 30 standing up and down, a horizontal water drain board 31 erected on both water piles 30, 30, a rear water pile 30, and a water drain. And a gluing plate 32 which is erected on the plate 31 at an angle. In addition, the water pile 30 on the distal end side of the glue plate 32 is lower than the water pile 30 on the base end side of the glue plate 32.
[0003]
Then, the tip of the gluing plate 32 of the tensioning device indicates the positions of the shoulders and buttocks of the slope N, and the design gradient of the slope N is shown by the inclination angle of the gluing plate 32, The slope N is formed on the ground G based on the tensioning device.
[0004]
Further, as a conventional tensioning device, for example, as shown in JP-A-5-10759, a laser emitting device configured to be capable of adjusting an inclination angle and configured to be capable of moving an upright shaft up and down is used. 2. Description of the Related Art A device having a remote control device for automatically controlling a tilt angle and a height position of the laser light emitting device from a remote place is known.
[0005]
[Problems to be solved by the invention]
However, in the former case, when the glue board 32 is erected and installed on the rear water pile 30 and the water board 31 in an inclined manner, the worker directly nails the nail into the glue board 32 and fixes it. The work is complicated, and it is difficult to fix the glued plate 32 with high accuracy, which causes a problem in that the construction of the slope N is hindered.
[0006]
In the latter case, a device for automatically controlling the laser light emitting device from a remote place is required.
[0007]
In view of the above-mentioned problems, the present invention provides an inexpensive tensioning device and a method of constructing a slope using the tensioning device, which can easily and accurately install a glued plate and improve the accuracy of slope construction. The purpose is to do.
[0008]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, a towing device according to the present invention is, as set forth in claim 1, a water pile erected on the ground on which a slope of cut or embankment is formed, and a water pile installed on the water pile. A horizontal water faucet plate, and a glue board which is erected and installed on the water pile and the faucet board, and the design angle of the slope is indicated by the inclination angle of the glue board. In the tensioning device in which the position of the shoulder or the glue butt of the slope is indicated by the tip of the board, the base end of the glue board, and a water pile erected on the base end side of the glue board, or A supporting member attached to a water plate disposed on a base end side of the gluing plate, rotatably supporting the base end of the gluing plate, and a tip end of the gluing plate; Attached to a water pile installed upright on the tip side of the boring plate, or a water bobbin plate arranged on the tip side of the glued plate The fixing member, in which the distal end portion of the Norinuki plate was set to be fixed in accordance with the design gradient of the slopes.
[0009]
Therefore, the base end and the tip end of the gluing plate are attached to the water pile or the flushing plate via the attached supporting member or fixing member, so that the gluing plate can be easily and accurately attached.
[0010]
Further, as set forth in claim 2, a nail mounted on a water pile installed on the base end side of the seaming plate or a nail mounted on a waterboard arranged on the base end side of the seaming plate, and the nail A horizontal shaft integrally formed with a horizontal shaft bearing attached to the base end of the glue plate constitutes a support member, and a water pile standing upright on the tip end side of the glue plate, or A fixing member composed of a nail driven into a water plate disposed on the tip end side of the seaming plate, a horizontal shaft integrally formed with the nail, and a horizontal shaft bearing attached to the front end of the seaming plate. Is constituted.
[0011]
For example, the positions of the shoulders and buttocks determined by the design calculation values and the measurement values of the weighing equipment are drawn on a water pile or water board on the base end side of the glue board, and drawn on this line If the nail is driven in, the correct position of the base end of the glued plate can be easily secured. In addition, draw a position that matches the slope design slope obtained by the design calculation on the water pile or water board on the tip side of the seaming board, and drive a nail on this line to obtain the slope of the seaming board. Can be accurately and easily adjusted to the design slope of the slope.
[0012]
Further, as set forth in claim 3, it is preferable to provide a stopper on the horizontal shaft of the support member and the fixing member to prevent deviation from the bearing.
[0013]
By doing so, the glued sheet is held in a stable state until the slope construction is completed.
[0014]
In addition, as described in claim 4, the fixing member may be provided with a position adjusting means for adjusting the position of the leading end of the stripping plate of the tensioning device.
[0015]
For example, an elongated hole is formed at the tip of the gluing plate of the drawing device along the axial direction of the gluing plate. Further, the bolt is inserted into the elongated hole so as to be movable so that the axis of the bolt is orthogonal to the axis of the strip. Next, two nuts are screwed into the bolt so as to clamp the bolt from both sides of the gluing plate. Then, the position of the seaming plate that matches the slope of the slope is set to a water pile that is erected on the tip end side of the seaming plate or a seawater plate that is arranged on the front end side of the seaming plate. I do. Thereafter, the position of the bolt on the seaming plate is adjusted to be at the set position, and the position of the bolt on the seaming plate is fixed. Further, instead of the elongated holes, a plurality of guide holes set in accordance with the design gradient of the slope may be formed in advance at the tip of the strip.
[0016]
According to a fifth aspect of the present invention, there is provided a method of constructing a slope using a stretching device, wherein a calculated value of design and measurement of a measuring device are formed on a ground on which a slope of cut or embankment is formed. With the values, the positions of the shoulders and the buttocks on the slopes are set, and then the water piles are erected at the positions of the shoulders and the buttocks with the water piles separated from each other. The mounting plate is erected vertically apart, and the supporting member is provided at the base end of the mounting plate and a water pile or a base end of the mounting plate standing on the base end side of the mounting plate. Attached to the water plate arranged on the side of the unit, the base end of the seaming plate is rotatably supported, and the fixing member is attached to the tip end of the seaming plate and the front end side of the seaming plate. A water pile to be erected, or attached to the water plate arranged on the tip side of the glue board, the tip of the glue board according to the design slope of the slope Constant, and the slope face based on a fixed desizing plate is obtained so as to form the ground.
[0017]
In this case, the installation work of the staking device is performed in a short time, and a slope having an accurate slope can be formed on the ground, and the execution of the slope can be performed smoothly.
[0018]
BEST MODE FOR CARRYING OUT THE INVENTION
An embodiment of the present invention will be described with reference to FIGS.
The towing device of the present invention includes two vertical water piles 1, 1 erected in front and rear on a ground G on which a slope N of cut or embankment is formed, and the two water piles 1, 1 A glue board 3 erected at an angle to two horizontal water boards 2, 2 installed vertically and an upper water board 2 and a lower water board 2; A supporting member 5 attached to the base end of the plate 3 and the base end of the gluing plate 3, that is, the rear side of the upper drainage plate 2, the tip end of the gluing plate 3, and gluing The fixing member 15 is attached to the front end side of the plate 3, that is, the front side of the lower drainage plate 2.
[0019]
As shown in FIG. 1, the upper and lower water draining plates 2 and 2 are horizontally and parallel attached by nails or the like (not shown) so that the interval H is maintained at a constant size. I have. In addition, a plurality of guide holes 13 are provided on the upper surface on the front side of the lower water faucet plate 2 and on the lower surface on the front end side of the water faucet plate 3 so as to easily set the inclination angle of the adhesive plate 3. , 23, ... are formed in advance.
[0020]
The support member 5 includes a flat nail 6 driven into the rear side of the upper water-draining plate 2, a horizontal shaft 7 integrally welded to a substantially central portion of the flat nail 6, and the horizontal shaft 7 capable of being inserted and removed. The bearing 8 includes a bearing 8 that is rotatably supported, and a rectangular mounting plate 9 to which the bearing 8 is fixed. An annular stopper 10 made of resin for preventing the horizontal shaft 7 from deviating from the bearing 8 is removably fitted into the distal end of the horizontal shaft 7. Further, at both ends of the mounting plate 9, mounting holes 11, 11 are formed. Double-headed nails 12, 12 are driven into the mounting holes 11, 11, and the mounting plate 9 is provided with the mounting plate 3. It is fixed to the lower surface on the base end side.
[0021]
The fixing member 15 has the same configuration as that of the support member 5, and has a flat nail 16 driven into the front end side of the gluing plate 3, that is, a front side of the lower draining plate 2, and is integrated with the flat nail 16. A horizontal shaft 17, a bearing 18 for the horizontal shaft 17, and a mounting plate 19 to which the bearing 18 is fixed. A stopper 20 is fitted into the tip of the horizontal shaft 17, and the mounting plate 19 is It is fixed to the lower surface on the tip end side of the gluing plate 3 by two double head nails 22.
[0022]
Next, a method of constructing the slope N using the tensioning device of the present invention will be described. First, in the same manner as before, a weighing device is installed at a predetermined position on the ground G where the slope N of the cut or embankment is formed. In addition to calculating the horizontal distance to the position, the height from the installation position of the weighing device to the position of the shoulder and the buttocks on the slope is also found. Next, the positions of the shoulders and the buttocks on the slope are set on the ground based on the measured values of the weighing device and the designed inclination angles and calculated values (not shown).
[0023]
After that, two water piles 1, 1 of the tensioning device are erected in the vicinity of the set shoulder and the bottom of the set slope with the front and back separated from each other. The boring plates 2 and 2 are vertically separated from each other and are installed orthogonally to the water piles 1 and 1. In this state, a flat nail 6 serving as a support member 5 is driven into the rear side of the upper water-draining plate 2, and a mounting plate 9 to which a bearing 8 is fixed is fixed to a lower surface of a base end portion of the gluing plate 3. I do. Next, the bearing 8 of the mounting plate 9 is inserted into the horizontal shaft 7 integrated with the flat nail 6, and the stopper 10 is fitted into the distal end of the horizontal shaft 7 that has penetrated the bearing 8, and the base end of the stripping plate 3. The part is rotatably supported.
[0024]
At this time, since the position of the base end of the gluing plate 3 is determined by the horizontal shaft 7 of the support member 5 fixed to the upper flushing plate 2, no error occurs.
[0025]
Next, the tip of the piercing plate 3 is rotated and adjusted in accordance with the design gradient of the slope N, and the guide holes 23,... Of the lower piercing plate 2 are appropriately selected. Are selected and the flat nail 16 as the fixing member 15 is driven in, and the lower surface of the tip end of the glue-cutting plate 3 is driven in the same manner as described above. .. Are appropriately selected, the mounting plate 19 is fixed to the lower surface of the tip of the gluing plate 3, and the horizontal shaft 17 fixed to the lower draining plate 2 and the gluing plate 3 The front end of the stripping plate 3 is fixed via the bearing 18 of the fixed mounting plate 19. In this case as well, a stopper 20 is fitted on the horizontal shaft 17 penetrating the bearing 18. At this time, since the position of the tip end of the gluing plate 3 is determined by the horizontal shaft 17 of the fixing member 15 fixed to the lower flushing plate 2, no error occurs.
[0026]
Then, when the gluing plate 3 is fixed, the installation work of the tensioning device on the slope shoulder or the glue end of the slope is completed.
[0027]
In addition, the position of the tip of the gluing plate 3 is a measured value obtained by the weighing device, that is, the horizontal distance from the installation position of the weighing device to the position of the slope shoulder or the butt of the slope, and the installation position of the weighing device. Can be easily set using a trigonometric function based on the height from to the position of the shoulder and the buttocks of the slope, and the design gradient of the slope N obtained by the design calculation.
[0028]
As described above, according to the drawing device of the present invention, since the gluing plate 3 is not directly fixed to the water piles 1, 1 or the flipping plates 2, 2, the fixing of the gluing plate 3 can be performed accurately and accurately. It will be easily done. Further, the support member 5 and the fixing member 15 of the gluing plate 3 have a simple configuration and are inexpensive.
[0029]
In the case of the above-described embodiment, the tensioning device is installed by using the gluing plate 3. However, instead of using the flat nails of the support member 5 and the fixing member 15, a double-headed nail is used. A thread or a string may be used instead of 3. In this case, the double-headed nails are placed at desired positions of the water piles 1, 1 erected in front and rear, or the water-draining boards 2, 2 arranged vertically, that is, a thread stretched on the double-headed nails. It is driven into a position where the inclination angle of the string and the design slope of the slope N match.
[0030]
In the embodiment, the horizontal shafts 7, 17 integrated with the flat nails 6, 16 are used as the support members 5 and the fixing members 15, but in short, the support members 5 and the fixing members 15 are horizontal. Any structure may be used as long as the shafts 7 and 17 can be accurately fixed to the water piles 1 and 1 and the water plates 2 and 2 on the base end side and the distal end side of the glue board 3. For example, a horizontal shaft having two fixing holes may be used and fixed to the water piles 1, 1 and the waterboards 2, 2 on the base end side and the distal end side of the gluing plate 3. That is, it is not necessary to directly fix the glue board 3 to the water piles 1, 1 and the water board 2, 2. Furthermore, in the case of the above embodiment, in FIG. 1, the base end of the cutting plate 3 is set to the upper side and the tip end is set to the lower side, but the base end of the cutting plate 3 may be set to the lower side, and the tip end may be set to the upper side. Good. In this case, the lower end may be rotatably supported, and then the upper end may be fixed.
[0031]
【The invention's effect】
As described above, according to the tensioning device of the present invention, the base end of the gluing plate of the tensioning device and the water pile or the gluing plate standing on the base end side of the gluing plate A support member attached to a water plate disposed on a base end side of the base plate rotatably supports a base end portion of the seaming plate, a tip end of the seaming plate, and a front end of the seaming plate. With the fixing member attached to the water pile which is erected on the part side or the water plate which is arranged on the tip part side of the glue board, the tip part of the glue board is adjusted to the design slope of the slope. Since the fixing plate is fixed, the mounting plate can be easily mounted in a stable state without causing an error.
[0032]
Also, a nail piled up on a water pile installed on the base end side of the seaming plate or a nail plate arranged on the seaming plate arranged on the base end side of the seaming plate, and a horizontal formed integrally with the nail A shaft and a bearing of a horizontal shaft attached to the base end of the seaming plate constitute a support member, and a water pile or a tip end of the seaming plate standing on the front end side of the seaming plate. A nail that is driven into a cockpit plate, a horizontal shaft integrally formed with the nail, and a bearing for the horizontal shaft attached to the tip of the glue plate constitute a fixed member. The base end of the seaming plate can be easily attached to an accurate position, and the slope of the seaming plate can be accurately and easily adjusted to the design slope of the slope.
[0033]
Furthermore, since the horizontal shaft of the support member and the fixing member is provided with a stopper for preventing deviation from the bearing, the stripped plate can be held in a stable state until the slope construction is completed. .
[0034]
In addition, since the position of the tip of the stripping plate of the tensioning device is adjusted by the position adjusting means provided on the fixing member, the tip of the stripping plate can be easily adjusted to the design slope of the slope. Can be fixed to
[0035]
In addition, according to the slope construction method of the present invention, since the slope is formed on the ground using the tensioning device of the present invention, the installation work of the tensioning device can be shortened, and the slope construction can be performed. Accuracy can be improved.
[Brief description of the drawings]
FIG. 1 is a perspective view of a tensioning device according to an embodiment of the present invention.
FIG. 2 is a plan view of the gluing plate of FIG. 1;
FIG. 3 is a perspective view of a fixing member and a supporting member of the gluing plate of FIG. 1;
FIG. 4 is a diagram showing a working example of a tenter according to an embodiment of the present invention.
FIG. 5 is a view showing a working example of a conventional stretching device.
[Explanation of symbols]
1, 30 water pile 2, 31 water plate 3, 32 glue plate 5 support member 6, 16 flat nail 7, 17 horizontal shaft 8, 18 bearing 9, 19 mounting plate 10, 20 stopper 11, 21, mounting hole 12, 22 Double head nail 13, 23 Guide hole 15 Fixing member

Claims (5)

切土や盛土の法面が形成される地盤に立設された水杭と、該水杭に架設される水平方向の水ぬき板と、水杭及び水ぬき板に傾斜して架設されるのりぬき板とを備え、のりぬき板の傾斜角度によって、前記法面の設計勾配が示されると共に、のりぬき板の先端部によって、法面ののり肩やのり尻の位置が示される丁張装置において、
のりぬき板の基端部と、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板とに取り付けられた支持部材によって、のりぬき板の基端部が回動可能に支持されると共に、のりぬき板の先端部と、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板とに取り付けられた固定部材によって、のりぬき板の先端部が前記法面の設計勾配に合わせて固定されてなることを特徴とする丁張装置。
A water pile erected on the ground on which the slope of the cut or embankment is formed, a horizontal drainboard erected on the water stake, and a glue erected on the water stake and the drainboard. A tensioning device comprising a punching plate, wherein the design angle of the slope is indicated by the inclination angle of the gluing plate, and the position of the shoulder and the glue butt of the slope is indicated by the tip of the gluing plate. ,
By a supporting member attached to the base end of the seaming plate and a water pile erected on the base end side of the seaming plate or a seawater plate arranged on the base end side of the seaming plate , The base end of the gluing plate is rotatably supported, and the tip end of the gluing plate and a water pile standing upright on the tip end side of the gluing plate, or the tip end side of the gluing plate A tip end portion of the glued plate is fixed in accordance with a design slope of the slope by a fixing member attached to the flush plate arranged in the swash plate.
前記支持部材は、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板に打ち込まれる釘と、該釘に一体に形成された水平軸と、のりぬき板の基端部に取り付けられた水平軸の軸受けとを有し、前記固定部材は、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板に打ち込まれる釘と、該釘に一体に形成された水平軸と、のりぬき板の先端部に取り付けられた水平軸の軸受けとを有することを特徴とする請求項1に記載の丁張装置。The support member is formed integrally with a nail piled into a water pile or a water pile installed on the base end side of the seaming plate, or a water pile installed on the base end side of the seaming plate. A horizontal shaft, and a bearing for the horizontal shaft attached to the base end of the gluing plate, wherein the fixing member is a water pile or a glue standing upright on the tip end side of the gluing plate. A nail driven into a waterboard disposed on a tip end side of the board, a horizontal shaft integrally formed with the nail, and a bearing of a horizontal shaft attached to the tip of the glued plate are characterized by having: The tensioning device according to claim 1, wherein 前記支持部材及び前記固定部材の水平軸には、軸受けからの逸脱を防止するためのストッパが設けられてなることを特徴とする請求項1又は2に記載の丁張装置。3. The tensioning device according to claim 1, wherein a stopper is provided on a horizontal axis of the support member and the fixing member to prevent deviation from a bearing. 4. 前記固定部材には、前記のりぬき板の先端部の固定する位置を調整する位置調整手段が設けられてなることを特徴とする請求項1乃至3のいずれか1項に記載の丁張装置。The tensioning device according to any one of claims 1 to 3, wherein the fixing member is provided with a position adjusting unit that adjusts a position where the tip end of the gluing plate is fixed. 切土又は盛土の法面が形成される地盤に、設計上の計算値と、計量機器の計測値とで、前記法面ののり肩やのり尻の位置を設定し、つぎに、のり肩やのり尻の位置に水杭を前後に離間させて立設すると共に、該両水杭に、水ぬき板を上下に離間させて架設し、そして、支持部材を、のりぬき板の基端部と、のりぬき板の基端部側に立設される水杭、又は、のりぬき板の基端部側に配される水ぬき板とに取り付けて、のりぬき板の基端部を回動可能に支持すると共に、固定部材を、のりぬき板の先端部と、のりぬき板の先端部側に立設される水杭、又は、のりぬき板の先端部側に配される水ぬき板とに取り付けて、のりぬき板の先端部を前記法面の設計勾配に合わせて固定し、固定されたのりぬき板に基づいて前記法面を地盤に形成することを特徴とする丁張装置を用いた法面の施工方法。On the ground on which the slope of the cut or embankment is formed, the calculated values in the design and the measured values of the weighing device are used to set the position of the shoulder or the bottom of the slope on the slope, and then, A water pile is erected at the position of the glue butt with the water pile separated from front to back, and a water plate is erected on both water piles with the water pile vertically separated, and the support member is connected to the base end of the glue plate. Attached to a water pile installed on the base end side of the seaming plate, or a waterboard arranged on the base end side of the seaming plate, the base end of the seaming plate can be rotated. In addition to supporting the fixing member, the fixing member is connected to the front end of the seaming plate and a water pile erected on the front end side of the seaming plate, or to the seawater plate disposed on the front end side of the seaming plate. Attaching, fixing the tip of the glued plate according to the design slope of the slope, and forming the slope on the ground based on the fixed glued plate. Slope method construction using Zhang Zhang apparatus according to symptoms.
JP2003025973A 2003-02-03 2003-02-03 Tightening device and method of slope construction using the tensioning device Expired - Fee Related JP4189228B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003025973A JP4189228B2 (en) 2003-02-03 2003-02-03 Tightening device and method of slope construction using the tensioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003025973A JP4189228B2 (en) 2003-02-03 2003-02-03 Tightening device and method of slope construction using the tensioning device

Publications (2)

Publication Number Publication Date
JP2004238804A true JP2004238804A (en) 2004-08-26
JP4189228B2 JP4189228B2 (en) 2008-12-03

Family

ID=32954117

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003025973A Expired - Fee Related JP4189228B2 (en) 2003-02-03 2003-02-03 Tightening device and method of slope construction using the tensioning device

Country Status (1)

Country Link
JP (1) JP4189228B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3945282A1 (en) 2020-07-28 2022-02-02 Topcon Corporation Surveying system, staking assistance method, and staking assistance program
CN114111734A (en) * 2020-08-25 2022-03-01 株式会社拓普康 Surveying system, pile-setting assistance method, and storage medium
WO2022080307A1 (en) 2020-10-12 2022-04-21 株式会社トプコン Myopia progression analysis device, myopia progression analysis system, myopia progression analysis method, and myopia progression analysis program

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3945282A1 (en) 2020-07-28 2022-02-02 Topcon Corporation Surveying system, staking assistance method, and staking assistance program
US11808571B2 (en) 2020-07-28 2023-11-07 Topcon Corporation Surveying system, staking assistance method, and storage medium storing staking assistance program
CN114111734A (en) * 2020-08-25 2022-03-01 株式会社拓普康 Surveying system, pile-setting assistance method, and storage medium
EP3961151A1 (en) 2020-08-25 2022-03-02 Topcon Corporation Surveying system, staking assistance method, and staking assistance program
WO2022080307A1 (en) 2020-10-12 2022-04-21 株式会社トプコン Myopia progression analysis device, myopia progression analysis system, myopia progression analysis method, and myopia progression analysis program

Also Published As

Publication number Publication date
JP4189228B2 (en) 2008-12-03

Similar Documents

Publication Publication Date Title
US5778546A (en) Construction alignment apparatus and method
JP2011021392A (en) Perpendicular accuracy management method of under-ground piled column
JP2004238804A (en) Finishing stake device, and face of slope work execution method using the same
KR101531025B1 (en) Apparatus for protecting tripod in geodetic survey
US4932134A (en) Adjustable foundation locating device
US8943704B1 (en) Apparatus for locating fixture boxes and the like
JP6112705B2 (en) Positioning jig and installation method of support frame using positioning jig
KR200463389Y1 (en) Maker indicate staff
WO2007053888A1 (en) An apparatus and method to replace string lines especially in roadworks
CN214657298U (en) Linear construction leveling device
JP2003315044A (en) Level mount
JP2983971B1 (en) Right angle outgoing laser and basic construction method using the same laser
JP3117419B2 (en) Measurement and positioning tool for basic temporary frame
CN214308752U (en) Construction engineering cost on-site mapping device capable of achieving quick leveling
CN111749497B (en) Construction process of four-corner pavilion of ancient building
JP2573132B2 (en) Apparatus and method for forming base mortar for erecting column
KR20010067634A (en) Guide rail post setting device
KR20170045072A (en) Apparatus of slope batter board
CN203642911U (en) Leveling measuring scale balancing and stabilizing platform device
CN218758891U (en) Foundation bolt mounting and positioning die
JP3154027U (en) Boundary pile reclamation equipment
JP2967518B2 (en) How to see the pile driving position
JPH0222229Y2 (en)
JPS6243020Y2 (en)
JP2003105941A (en) Ruler for setting cutting line of roofing tile corresponding to roof pitch

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080314

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080319

RD12 Notification of acceptance of power of sub attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7432

Effective date: 20080512

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080519

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080514

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080820

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080912

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110919

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130919

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees