JP2004131981A - Excavation advancement control system for tunnel boring machine - Google Patents

Excavation advancement control system for tunnel boring machine Download PDF

Info

Publication number
JP2004131981A
JP2004131981A JP2002295637A JP2002295637A JP2004131981A JP 2004131981 A JP2004131981 A JP 2004131981A JP 2002295637 A JP2002295637 A JP 2002295637A JP 2002295637 A JP2002295637 A JP 2002295637A JP 2004131981 A JP2004131981 A JP 2004131981A
Authority
JP
Japan
Prior art keywords
excavation
data
tunnel excavator
machine
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002295637A
Other languages
Japanese (ja)
Inventor
Shigeaki Ashikaga
足利 重明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP2002295637A priority Critical patent/JP2004131981A/en
Publication of JP2004131981A publication Critical patent/JP2004131981A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To competently clear up the causes of a trouble and cope with it at the case of a machine trouble in a tunnel boring machine. <P>SOLUTION: The system is provided with a sequencer 4 controlling operations of various devices and implements of a shield machine 1 and an excavation advancement device 8 controlling operation data of the sequencer 4. The excavation advancement device 8 is provided with a hard disc storing operation hysteretic data of various devices and implements through the sequencer 4 during excavation and a display 9a treating the operation hysteretic data stored in the hard disc and displaying them. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、トンネル掘削機の掘進時にオペレータが操作したスイッチ等の各種機器類の稼動状態を管理するトンネル掘削機の掘進管理システムに関するものである。
【0002】
【従来の技術】
従来、トンネル掘削機を用いて地中にトンネルを掘削する際には、図5に示されるように、掘削機本体50を推進させるための各アクチュエータ(シールドジャッキ、カッタヘッド等)、カッタトルク等の機械状態を検出する各種センサ類および操作スイッチ、表示ランプ等51を、掘削機本体50内の坑内制御盤52に設置されたシーケンサ(PLC)53にて制御することにより、掘削機本体50を推進させるようにされている。
【0003】
また、前記掘削機本体50内には、その掘削機本体50の現在位置の測量および位置ずれ量の演算等を行う測量・線形管理装置54が設けられている。この測量・線形管理装置54は、前記シーケンサ53内の計算機リンクユニット53aに制御ケーブル(RS232C)55を介して接続される制御インターフェイス56と、この制御インターフェイス56に接続される操作用コンピュータ57と、位置計測システムを構成するレーザ(もしくは赤外線)投受光器58およびターゲット59とを備えて構成されている。そして、前記計算機リンクユニット53aは制御ケーブル(RS232C)60を介して機外の管理用コンピュータ61に接続され、この管理用コンピュータ61にて、トンネル掘進中のカッタトルク等の機械状態や、掘削機本体50の現在位置の計画線に対するずれ量などが管理され、必要に応じて所要データをその管理用コンピュータ61のディスプレイ61aに表示し、あるいは付設のプリンタ62にプリントアウトするようにされている。なお、掘進管理装置と坑内制御盤52との間の距離が長い場合には通信不良が生じるので、間にモデムなどを設けて通信不良が生じないようにされる。
【0004】
なお、本願発明に関連する先行技術として、例えば特許文献1に開示されるものがある。この文献に記載の技術は、掘進工事が実施される施工現場において操作制御盤を用いて掘進制御を行う方法では、土質などの急激な変化や機器の故障などのトラブルが発生した際にオペレータの対処困難な場合があることに鑑み、トンネル掘削機の掘進動作を制御する操作制御盤に通信制御手段を設けるとともに、遠隔制御装置を設け、この遠隔制御装置により遠隔地からトンネル掘削機の掘進動作をリアルタイムで制御するように構成したものである。また、この特許文献1に記載の発明と同様の主旨で、トンネル掘削機を遠隔管理するシステムが特許文献2,3においても提案されている。
【0005】
また、トンネル掘削機とは分野は異なるが、大型プレス等の産業機械の稼働状態を遠隔地の端末装置にて管理するようにした技術が特許文献4において提案されている。
【0006】
【特許文献1】
特開平11−36782号公報
【特許文献2】
特開2000−356094号公報
【特許文献3】
特許第3005605号公報
【特許文献4】
特開2000−210800号公報
【0007】
【発明が解決しようとする課題】
しかしながら、図5に示される従来システムにおいては、カッタトルク、ジャッキストローク、掘削機の現在位置等のデータのみを管理用コンピュータ61にリアルタイムで表示し、またその履歴をファイルに保存するものであるため、例えばトンネル掘削機の推進中にマシントラブルが発生した場合には、その保存された履歴データのみではそのトラブルの発生原因を見つけ出すことが困難であり、専門技術者を施工現場に派遣して再現テスト等を実施してそのトラブルの原因を究明し、対処しなければならないという問題点があった。
【0008】
一方、前記各特許文献には、施工現場から離れた遠隔地において機械の稼動状況を管理することについての技術思想は開示されているものの、前述のようなマシントラブル発生時におけるそのトラブルの原因究明の手助けになる手段については何ら開示されていない。
【0009】
本発明は、このような事情に鑑みてなされたもので、マシントラブルの発生時に、より適確にそのトラブルの原因究明と対処とを行うことのできるトンネル掘削機の掘進管理システムを提供することを目的とするものである。
【0010】
【課題を解決するための手段および作用・効果】
前記目的を達成するために、本発明によるトンネル掘削機の掘進管理システムは、
トンネル掘削機の各種機器類の操作を制御する操作制御手段と、この操作制御手段の稼動データを管理するデータ管理手段とを備えるトンネル掘削機の掘進管理システムであって、
前記データ管理手段は、掘進時における前記操作制御手段による各種機器類の操作履歴データを記憶する記憶手段と、この記憶手段に記憶された操作履歴データを処理して表示する表示手段とを備えることを特徴とするものである。
【0011】
本発明によれば、操作制御手段により制御される各種機器類の操作履歴データが記憶手段に記憶されていて、その記憶内容を表示手段に表示することができるので、マシントラブルの発生時にその操作履歴データを見ることで、オペレータがどのような操作をしてそのマシントラブルが発生したのかを容易に解析することができ、トラブルの原因究明と対処とを適確に行うことができる。
【0012】
ここで、前記表示手段は、入力手段から表示指令が入力されたときに前記操作履歴データを表示するのが好ましい。こうすることで、通常のマシン操作および掘進管理に支障を来たすことなく、トラブルの原因究明という所期の目的を達成することができる。
【0013】
本発明において、前記データ管理手段は、前記操作制御手段の制御プログラムの作成および編集を行う作成・編集手段を備えているのが好ましい。こうすることで、トラブルの種類に応じてデータ管理手段により不具合箇所の修正対応を容易に行うことができる。
【0014】
また、前記データ管理手段は、通信回線を介して遠隔監視手段に接続されているのが好ましい。このようにすれば、専門技術者が施工現場に出向かなくても、遠隔地の遠隔監視手段にて操作履歴データの内容が確認でき、遠隔地からトラブルの原因究明とその対応とを行うことができる。
【0015】
【発明の実施の形態】
次に、本発明によるトンネル掘削機の掘進管理システムの具体的な実施の形態について、図面を参照しつつ説明する。
【0016】
図1には、本発明の一実施形態に係る掘進管理システムのシステム構成図が示されている。
【0017】
本実施形態のトンネル掘削機(シールド掘進機)1においては、掘削機本体2内の坑内制御盤3にシーケンサ(本発明における操作制御手段に対応する。)4が設置され、このシーケンサ4によるシーケンス制御によって掘進のための各アクチュエータ、各種センサ類および操作スイッチ等の各種機器類が制御され、これによって掘削機本体2が推進するようにされている。また、前記掘削機本体2内には、その掘削機本体2の現在位置の測量および計画線に対する位置ずれ量の演算等を行う位置計測システム5が設けられており、この位置計測システム5によって掘進方向の制御がなされるようになっている。
【0018】
前記シーケンサ4は、中央処理装置(CPU)4a、A/D変換器4b、入出力装置(I/O)4cおよび計算機リンクユニット4dなどを備え、この計算機リンクユニット4dが通信ケーブル6を介して地上に設置された掘進管理装置8のホストコンピュータ(本発明におけるデータ管理手段に対応する。)9に接続され、また前記中央処理装置4aが通信ケーブル7を介して前記掘進管理装置8のホストコンピュータ9に接続されている。なお、通信ケーブル6,7は、その距離に応じて図示されないモデムなどを間に設けて、正常に通信が行われるようにされる。
【0019】
また、前記掘進管理装置8のホストコンピュータ9は、モデム10およびインターネット網11、さらにはモデム12を介して、トンネル施工現場から離れた遠隔地にある遠隔監視装置(本発明における遠隔監視手段に対応する。)13の遠隔モニタコンピュータ14に接続されている。
【0020】
前記掘進管理装置8のホストコンピュータ9は、前記掘削機本体2内のシーケンサ4に保有されているその掘削機本体2の稼動データに基づき、主としてシールド掘進機1の掘進管理に必要な以下の機能を備えている。
▲1▼データ収集・収録機能
▲2▼リアルタイムモニタ機能
▲3▼帳票管理機能
▲4▼その他(線形表示機能、各種設定機能等)
【0021】
以下、前記各機能についてより具体的に説明する。
▲1▼データ収集・収録機能
シールド掘進機1の稼動状態を表わす各種センサ信号等のデータのほか、オペレータにより操作される各種機器類の操作履歴データを、設定した時間間隔もしくは推進距離間隔ごとに収集してハードディスク(記憶手段)のフォルダに収録する機能である。図2には、この機能に基づき収集された収集データが例示されている。この図2に示されるデータにおいて、第1行目は収集年月日、掘進番号等のファイル名を示し、第2行目〜第4行目、第5行目〜第7行目、第8行目〜第10行目、…が各サンプリング時刻における一まとまりのデータ列▲1▼、▲2▼、▲3▼、…を示している。また、各データ列▲1▼、▲2▼、▲3▼、…において、羅列された数字データ(0.00で示す)は、例えばカッタヘッド回転速度(rpm)、マシン方角偏差(deg)、スクリューコンベア回転速度(rpm)、シールドジャッキ総推力(kN)等の各種センサデータであり、また16進数(fffb,3ff3,004b等)で示されるデータは、オペレータが操作したスイッチの状態やその操作履歴(例えばシールドジャッキポンプスイッチのON/OFF状態、カッタヘッド給脂ポンプスイッチのON/OFF状態等)およびリレーなどの制御盤内部機器の状態やその履歴などのユーザには直接関係のないデータ類を含む操作履歴データである。
【0022】
▲2▼リアルタイムモニタ機能
シールド掘進機1の掘進中に収集されつつある各種データを所定の表示形式に変換して、ホストコンピュータ9のディスプレイ9a上に数値もしくはグラフとして表示する機能である。図3には、このリアルタイムモニタ画面の一例として、ずれ量データモニタ画面が示されている。この図3に示されるデータは、各シールドジャッキ選択状況、ストロークや計画線からの位置ずれ量のデータ15、掘進機の推進軌跡を示すグラフ16、各種センサデータ17等よりなっている。このデータを見ることで、マシン状態や現在位置および計画線とのずれ量等を把握することができ、それによってシールド掘進機1の掘進状態を管理することができる。なお、このリアルタイムモニタ画面としては、このずれ量データモニタ画面のほかに、複数のセンサデータを折れ線グラフで表示する画面等がある。
【0023】
これらリアルタイムモニタ画面において、マウス(入力手段)の操作によってマシン操作モニタ画面表示用のコマンドボタンである操作モニタボタン18をクリックする(あるいはキーボード操作によって所定のボタン操作をする)と、ディスプレイ9aは図4に示される操作履歴データを表示する画面に切り換わる。この表示画面は、図3に示される画面の中央部が操作履歴データ18(オペレータが操作した例えばシールドジャッキポンプスイッチのON/OFF状態、カッタヘッド給脂ポンプスイッチのON/OFF状態等に関するデータ)に置き換わった画面である。このように表示切換え操作時に所望の操作履歴データ18が得られるので、通常のマシン操作および掘進管理に悪影響を及ぼすことはない。
【0024】
▲3▼帳票管理機能
ハードディスクのフォルダに収録されたテキスト形式のデータファイルを例えばExcelのような市販の表計算ソフトウェアで使用可能なデータに変換し、各種の記録表およびグラフ(ずれ量グラフ、掘進状況グラフ等)の作成を行う機能である。なお、通常は、シールド掘進機1の掘進中にハードディスク内にデータ保存を行い、掘進後にデータファイルに書き込まれるようにされている。
【0025】
このように、本実施形態の掘進管理システムにおいては、従来システムにおいて収集されるマシンの稼動状態に係るデータに加えて、オペレータによって操作された各種機器類の操作履歴データが収集され、このデータがリアルタイムにホストコンピュータ9のディスプレイ9a上に表示され、またファイルに保存されるので、マシントラブルが発生した際には、専門技術者はその操作履歴ファイルとマシンデータファイルとを見ることにより、オペレータがどのような操作をしてそのマシントラブルが発生したのかを容易に解析することができ、トラブルの原因究明と対処とを適確に行うことができる。なお、前記操作履歴ファイルとマシンデータファイルとは別ファイルであっても良いし、同一ファイルに保存されていても良い。
【0026】
また、前記ホストコンピュータ9と遠隔モニタコンピュータ14のそれぞれにリモートコントロールソフト19をインストールしておくことにより、ホストコンピュータ9はインターネット網11を介して遠隔監視装置13の遠隔モニタコンピュータ14に接続されているので、ホストコンピュータ9のディスプレイ9aを施工現場から離れた遠隔地の遠隔モニタコンピュータ14にてモニタすることができ、この遠隔モニタコンピュータ14においてマシン操作状況やマシン状態をリアルタイムで確認したり、あるいはホストコンピュータ9から遠隔モニタコンピュータ14に転送された履歴ファイルを遠隔地において得ることができる。したがって、マシントラブルの発生時に専門技術者が施工現場に行かなくても、そのトラブル発生の原因究明を容易に行うことができる。
【0027】
本実施形態においては、また、ホストコンピュータ9と遠隔モニタコンピュータ14のそれぞれにリモートコントロールソフト19がインストールされるとともに、シーケンサ4の中央処理装置4aに通信ケーブル7を介して接続されるホストコンピュータ9にシーケンサ4のラダープログラム作成・編集ソフト20がインストールされている。したがって、遠隔モニタコンピュータ14のリモートコントロールソフト19からホストコンピュータ9のラダープログラム作成・編集ソフト20を起動させてシーケンサ4のラダープログラム(制御プログラム)を必要に応じて追加・修正することができる。これにより不具合などの修正対応が遠隔地においても容易にかつ適確に行うことができる。勿論、このラダープログラムの作成・編集はホストコンピュータ9の操作によっても可能であることは言うまでもない。なお、このラダープログラムの作成・編集は、特定の関係者のみが行えるようにパスワードを設定するようにするのが好ましい。
【0028】
この結果、例えば海外の施工現場において稼動中のトンネル掘削機に対しても、マシントラブルの発生時に専門技術者が直接現地に赴かなくても、遠隔監視装置13によりそのマシントラブルの解析を行い、シーケンサ4のラダープログラムの作成・編集等を容易に行うことができるという優れた効果がある。
【図面の簡単な説明】
【図1】図1は、本発明の一実施形態に係る掘進管理システムのシステム構成図である。
【図2】図2は、収集データ例を示す図である。
【図3】図3は、ずれ量データモニタ画面を示す図である。
【図4】図4は、操作履歴の表示画面を示す図である。
【図5】図5は、従来の掘進管理システムのシステム構成図である。
【符号の説明】
1     トンネル掘削機(シールド掘進機)
2     掘削機本体
3     坑内制御盤
4     シーケンサ
6,7   通信ケーブル
8     掘進管理装置
9     ホストコンピュータ
11    インターネット網
13    遠隔監視装置
14    遠隔モニタコンピュータ
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a tunnel excavation machine excavation management system that manages the operating states of various devices such as switches operated by an operator when the tunnel excavator excavates.
[0002]
[Prior art]
Conventionally, when excavating a tunnel in the ground using a tunnel excavator, as shown in FIG. 5, each actuator (shield jack, cutter head, etc.) for propelling the excavator body 50, cutter torque, etc. The excavator main body 50 is controlled by controlling various sensors, operation switches, display lamps and the like 51 for detecting the mechanical state of the excavator main body with a sequencer (PLC) 53 installed in an underground control panel 52 in the excavator main body 50. It is being promoted.
[0003]
In addition, a surveying / linear management device 54 that measures the current position of the excavator body 50 and calculates the amount of displacement is provided in the excavator body 50. The surveying / linear management device 54 includes a control interface 56 connected to a computer link unit 53a in the sequencer 53 via a control cable (RS232C) 55, an operation computer 57 connected to the control interface 56, The position measuring system includes a laser (or infrared) light emitter / receiver 58 and a target 59. The computer link unit 53a is connected to a management computer 61 outside the machine via a control cable (RS232C) 60. The management computer 61 uses the computer link unit 53a to control a machine state such as a cutter torque during tunnel excavation and an excavator. The deviation amount of the current position of the main body 50 from the plan line is managed, and necessary data is displayed on the display 61a of the management computer 61 or printed out on the attached printer 62 as needed. If the distance between the excavation management device and the underground control panel 52 is long, a communication failure occurs. Therefore, a modem or the like is provided therebetween so that the communication failure does not occur.
[0004]
As a prior art related to the present invention, there is one disclosed in Patent Document 1, for example. The technique described in this document is based on a method of performing excavation control using an operation control panel at a construction site where excavation work is performed.When a problem such as a sudden change in soil quality or equipment failure occurs, In view of the fact that there are cases where it is difficult to cope with the problem, communication control means is provided on the operation control panel for controlling the excavation operation of the tunnel excavator, and a remote control device is provided. Is controlled in real time. Further, systems similar to the invention described in Patent Document 1 have been proposed in Patent Documents 2 and 3 to remotely control a tunnel excavator.
[0005]
Further, although the field is different from that of a tunnel excavator, Patent Literature 4 proposes a technique in which the operating state of an industrial machine such as a large press is managed by a remote terminal device.
[0006]
[Patent Document 1]
Japanese Patent Application Laid-Open No. H11-36682 [Patent Document 2]
Japanese Patent Application Laid-Open No. 2000-356094 [Patent Document 3]
Japanese Patent No. 3006055 [Patent Document 4]
JP 2000-210800 A
[Problems to be solved by the invention]
However, in the conventional system shown in FIG. 5, only data such as the cutter torque, jack stroke, and the current position of the excavator are displayed on the management computer 61 in real time, and the history is stored in a file. For example, if a machine trouble occurs while a tunnel excavator is being propelled, it is difficult to find the cause of the trouble using only the stored history data, and a specialist is dispatched to the construction site to reproduce the problem. There was a problem that the cause of the trouble had to be determined by performing tests and the like, and the problem had to be dealt with.
[0008]
On the other hand, although the above-mentioned patent documents disclose the technical idea of managing the operation state of the machine in a remote place remote from the construction site, the cause of the trouble when the machine trouble occurs as described above is investigated. There is no disclosure of any means to assist this.
[0009]
The present invention has been made in view of such circumstances, and provides an excavation management system for a tunnel excavator that can more accurately investigate and deal with the cause of a machine trouble when it occurs. The purpose is.
[0010]
[Means for Solving the Problems and Functions / Effects]
In order to achieve the above object, a tunnel excavator excavation management system according to the present invention includes:
An excavation management system for a tunnel excavator, comprising: an operation control unit configured to control operations of various devices of the tunnel excavator; and a data management unit configured to manage operation data of the operation control unit.
The data management means includes a storage means for storing operation history data of various devices by the operation control means at the time of excavation, and a display means for processing and displaying the operation history data stored in the storage means. It is characterized by the following.
[0011]
According to the present invention, the operation history data of various devices controlled by the operation control means is stored in the storage means, and the stored contents can be displayed on the display means. By looking at the history data, it is possible to easily analyze what kind of operation the operator has performed and that the machine trouble has occurred, and it is possible to properly investigate the cause of the trouble and deal with it.
[0012]
Here, it is preferable that the display unit displays the operation history data when a display command is input from an input unit. By doing so, the intended purpose of investigating the cause of the trouble can be achieved without hindering normal machine operation and excavation management.
[0013]
In the present invention, it is preferable that the data management unit includes a creation / editing unit that creates and edits a control program of the operation control unit. By doing so, it is possible to easily perform correction of a defective portion by the data management means according to the type of trouble.
[0014]
Preferably, the data management means is connected to a remote monitoring means via a communication line. In this way, the contents of the operation history data can be confirmed by the remote monitoring means at a remote location without having to go to the construction site by a specialized technician, and the cause of the trouble can be investigated and the response can be made from a remote location. Can be.
[0015]
BEST MODE FOR CARRYING OUT THE INVENTION
Next, a specific embodiment of the excavation management system for a tunnel excavator according to the present invention will be described with reference to the drawings.
[0016]
FIG. 1 shows a system configuration diagram of a digging management system according to an embodiment of the present invention.
[0017]
In a tunnel excavator (shield excavator) 1 of the present embodiment, a sequencer (corresponding to the operation control means in the present invention) 4 is installed in an underground control panel 3 in an excavator main body 2, and a sequence by the sequencer 4 is provided. The control controls various devices such as actuators, various sensors, and operation switches for excavation, whereby the excavator body 2 is propelled. In the excavator body 2, a position measurement system 5 for measuring the current position of the excavator body 2 and calculating the amount of displacement with respect to a plan line is provided. The direction is controlled.
[0018]
The sequencer 4 includes a central processing unit (CPU) 4a, an A / D converter 4b, an input / output device (I / O) 4c, a computer link unit 4d, and the like. The central processing unit 4a is connected to a host computer (corresponding to the data management means in the present invention) 9 of the digging management device 8 installed on the ground, and the central processing unit 4a is connected to the host computer of the digging management device 8 via a communication cable 7. 9 is connected. The communication cables 6 and 7 are provided with a modem or the like (not shown) in accordance with the distance, so that communication can be performed normally.
[0019]
Also, the host computer 9 of the excavation management device 8 is connected to a remote monitoring device (corresponding to the remote monitoring means in the present invention) at a remote location away from the tunnel construction site via the modem 10, the Internet network 11, and the modem 12. ) Are connected to a remote monitor computer 13.
[0020]
The host computer 9 of the excavator management device 8 mainly performs the following functions necessary for excavation management of the shield excavator 1 based on operation data of the excavator main body 2 held in the sequencer 4 in the excavator main body 2. It has.
(1) Data collection / recording function (2) Real-time monitor function (3) Form management function (4) Others (linear display function, various setting functions, etc.)
[0021]
Hereinafter, each of the functions will be described more specifically.
(1) Data collection / recording function In addition to data such as various sensor signals indicating the operating state of the shield machine 1 and operation history data of various devices operated by the operator, data is collected at set time intervals or propulsion distance intervals. This is the function of collecting and recording in a folder on the hard disk (storage means). FIG. 2 illustrates collected data collected based on this function. In the data shown in FIG. 2, the first line indicates a file name such as the collection date and the excavation number, and the second to fourth lines, the fifth to seventh lines, and the eighth line. The rows from the tenth row to the tenth row indicate a group of data strings (1), (2), (3),... At each sampling time. In each of the data strings (1), (2), (3),..., Numerical data (indicated by 0.00) are, for example, cutter head rotation speed (rpm), machine direction deviation (deg), Various sensor data such as the screw conveyor rotation speed (rpm) and the total thrust of the shield jack (kN), and the data represented by hexadecimal numbers (ffffb, 3ff3, 004b, etc.) indicate the state of the switch operated by the operator and the operation of the switch. Data that is not directly related to the user, such as the history (for example, the ON / OFF state of the shield jack pump switch, the ON / OFF state of the cutter head greasing pump switch, etc.) and the state of the control panel internal devices such as relays and their history. Is operation history data that includes.
[0022]
(2) Real-time monitoring function This is a function of converting various data being collected during the excavation of the shield excavator 1 into a predetermined display format and displaying the data on the display 9a of the host computer 9 as numerical values or graphs. FIG. 3 shows a shift amount data monitor screen as an example of the real-time monitor screen. The data shown in FIG. 3 includes data 15 on the selection status of each shield jack, the amount of displacement from the stroke and the planned line, a graph 16 showing the propulsion trajectory of the excavator, various sensor data 17, and the like. By looking at this data, the state of the machine, the current position, the amount of deviation from the planned line, and the like can be grasped, and thereby the state of excavation of the shield machine 1 can be managed. The real-time monitor screen includes a screen for displaying a plurality of sensor data in a line graph in addition to the shift amount data monitor screen.
[0023]
On the real-time monitor screen, when the operation monitor button 18 which is a command button for displaying the machine operation monitor screen is clicked by operating the mouse (input means) (or a predetermined button operation is performed by operating the keyboard), the display 9a is displayed as shown in FIG. The screen is switched to a screen displaying the operation history data shown in FIG. In this display screen, the center of the screen shown in FIG. 3 is the operation history data 18 (for example, data on the ON / OFF state of the shield jack pump switch, the ON / OFF state of the cutter head greasing pump switch, etc. operated by the operator). The screen has been replaced with. As described above, the desired operation history data 18 is obtained at the time of the display switching operation, so that there is no adverse effect on the normal machine operation and the excavation management.
[0024]
(3) Form management function Converts a text-format data file recorded in a folder on the hard disk into data that can be used with commercially available spreadsheet software such as Excel, for example, and converts various record tables and graphs (shift amount graph, excavation). This is a function for creating a situation graph. Normally, data is stored in the hard disk during excavation of the shield excavator 1, and is written into a data file after excavation.
[0025]
As described above, in the excavation management system of the present embodiment, in addition to the data related to the operation state of the machine collected in the conventional system, operation history data of various devices operated by the operator is collected, and this data is collected. Since the information is displayed on the display 9a of the host computer 9 in real time and stored in a file, when a machine trouble occurs, the expert engineer can see the operation history file and the machine data file so that the operator can see the operation history file and the machine data file. It is possible to easily analyze what kind of operation has caused the machine trouble, and to precisely investigate the cause of the trouble and deal with it. The operation history file and the machine data file may be different files, or may be stored in the same file.
[0026]
By installing remote control software 19 on each of the host computer 9 and the remote monitor computer 14, the host computer 9 is connected to the remote monitor computer 14 of the remote monitor 13 via the Internet network 11. Therefore, the display 9a of the host computer 9 can be monitored by the remote monitor computer 14 at a remote place remote from the construction site. The remote monitor computer 14 can check the machine operation status and the machine state in real time, or The history file transferred from the computer 9 to the remote monitor computer 14 can be obtained at a remote place. Therefore, the cause of the trouble can be easily investigated without the need for a specialist to go to the construction site when the machine trouble occurs.
[0027]
In the present embodiment, the remote control software 19 is installed in each of the host computer 9 and the remote monitor computer 14, and the host computer 9 is connected to the central processing unit 4 a of the sequencer 4 via the communication cable 7. A ladder program creation / editing software 20 for the sequencer 4 is installed. Therefore, the ladder program creation / editing software 20 of the host computer 9 can be started from the remote control software 19 of the remote monitor computer 14 to add or modify the ladder program (control program) of the sequencer 4 as needed. As a result, it is possible to easily and accurately correct a defect or the like even in a remote place. Of course, the ladder program can be created and edited by operating the host computer 9. It is preferable to set a password so that only a specific person can create and edit the ladder program.
[0028]
As a result, even for a tunnel excavator operating at an overseas construction site, for example, the machine trouble is analyzed by the remote monitoring device 13 even if a specialized technician does not go directly to the site when the machine trouble occurs. In addition, there is an excellent effect that the ladder program of the sequencer 4 can be easily created and edited.
[Brief description of the drawings]
FIG. 1 is a system configuration diagram of a digging management system according to an embodiment of the present invention.
FIG. 2 is a diagram illustrating an example of collected data.
FIG. 3 is a diagram illustrating a shift amount data monitor screen;
FIG. 4 is a diagram illustrating a display screen of an operation history.
FIG. 5 is a system configuration diagram of a conventional excavation management system.
[Explanation of symbols]
1 tunnel excavator (shield excavator)
2 Excavator body 3 Underground control panel 4 Sequencer 6, 7 Communication cable 8 Excavation management device 9 Host computer 11 Internet network 13 Remote monitoring device 14 Remote monitoring computer

Claims (4)

トンネル掘削機の各種機器類の操作を制御する操作制御手段と、この操作制御手段の稼動データを管理するデータ管理手段とを備えるトンネル掘削機の掘進管理システムであって、
前記データ管理手段は、掘進時における前記操作制御手段による各種機器類の操作履歴データを記憶する記憶手段と、この記憶手段に記憶された操作履歴データを処理して表示する表示手段とを備えることを特徴とするトンネル掘削機の掘進管理システム。
An excavation management system for a tunnel excavator, comprising: an operation control unit configured to control operations of various devices of the tunnel excavator; and a data management unit configured to manage operation data of the operation control unit.
The data management means includes a storage means for storing operation history data of various devices by the operation control means at the time of excavation, and a display means for processing and displaying the operation history data stored in the storage means. An excavation management system for a tunnel excavator.
前記表示手段は、入力手段から表示指令が入力されたときに前記操作履歴データを表示する請求項1に記載のトンネル掘削機の掘進管理システム。The excavation management system for a tunnel excavator according to claim 1, wherein the display unit displays the operation history data when a display command is input from an input unit. 前記データ管理手段は、前記操作制御手段の制御プログラムの作成および編集を行う作成・編集手段を備えている請求項1または2に記載のトンネル掘削機の掘進管理システム。The excavation management system for a tunnel excavator according to claim 1, wherein the data management unit includes a creation / editing unit that creates and edits a control program of the operation control unit. 前記データ管理手段は、通信回線を介して遠隔監視手段に接続されている請求項1〜3のいずれかに記載のトンネル掘削機の掘進管理システム。4. The excavation management system for a tunnel excavator according to claim 1, wherein said data management means is connected to a remote monitoring means via a communication line.
JP2002295637A 2002-10-09 2002-10-09 Excavation advancement control system for tunnel boring machine Pending JP2004131981A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002295637A JP2004131981A (en) 2002-10-09 2002-10-09 Excavation advancement control system for tunnel boring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002295637A JP2004131981A (en) 2002-10-09 2002-10-09 Excavation advancement control system for tunnel boring machine

Publications (1)

Publication Number Publication Date
JP2004131981A true JP2004131981A (en) 2004-04-30

Family

ID=32285818

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002295637A Pending JP2004131981A (en) 2002-10-09 2002-10-09 Excavation advancement control system for tunnel boring machine

Country Status (1)

Country Link
JP (1) JP2004131981A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888678A (en) * 2016-06-17 2016-08-24 韶关市铁友建设机械有限公司 Intelligent excavating and pipe jacking machine
JP2019007265A (en) * 2017-06-27 2019-01-17 鹿島建設株式会社 Shield construction method support system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888678A (en) * 2016-06-17 2016-08-24 韶关市铁友建设机械有限公司 Intelligent excavating and pipe jacking machine
JP2019007265A (en) * 2017-06-27 2019-01-17 鹿島建設株式会社 Shield construction method support system

Similar Documents

Publication Publication Date Title
US6651755B1 (en) Macro assisted control system and method for a horizontal directional drilling machine
US7574821B2 (en) Autonomous loading shovel system
KR100850843B1 (en) Indicator, and recording medium storing program for functioning computer as indicator
JP2020013526A (en) Programmable logic controller and main unit
JP2020013527A (en) Programmable logic controller and program formation assistance device
JP7219180B2 (en) Creation method of excavation prediction model in shield excavation method
US20180205905A1 (en) Structural health monitoring systems utilizing visual feedback and selective recording
DE102006007752A1 (en) System and method for monitoring machine performance
CN205952936U (en) A conveyor chain map for excavating system
JP7219181B2 (en) Construction management method for shield machine
CN102110317B (en) Construction storage system of rotary drilling rig
EP1582949B1 (en) Method for automatic modeling a process control system and corresponding process control system
Israel et al. Well Advisor-Integrating Real-time Data With Predictive Tools, Processes and Expertise to Enable More Informed Operational Decisions
JP2004131981A (en) Excavation advancement control system for tunnel boring machine
US20060041845A1 (en) Systems and methods for exchanging display data between machines
CN113366172B (en) Method, device and user interface for presenting information describing the running operating conditions of a demolition robot
JP2022143625A (en) Shield excavator construction management method
CN1497127A (en) Driving managing system of tunned excavator
JP2008038394A (en) Work control apparatus for pile driver and work execution method
JP7169244B2 (en) Control information output device and control information output method
JP6454088B2 (en) Shield drilling management system
JPH1169467A (en) Remote fault diagnosis supporting system
JP3247582B2 (en) Equipment failure cause tracking method
JP2024064276A (en) Underground excavation and thrust construction system
JP2022143626A (en) General purpose learned model for initial excavation

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20050607

Free format text: JAPANESE INTERMEDIATE CODE: A621

A131 Notification of reasons for refusal

Effective date: 20070703

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Effective date: 20071106

Free format text: JAPANESE INTERMEDIATE CODE: A02

A521 Written amendment

Effective date: 20080728

Free format text: JAPANESE INTERMEDIATE CODE: A523