JP2004092151A JP2002253705A JP2002253705A JP2004092151A JP 2004092151 A JP2004092151 A JP 2004092151A JP 2002253705 A JP2002253705 A JP 2002253705A JP 2002253705 A JP2002253705 A JP 2002253705A JP 2004092151 A JP2004092151 A JP 2004092151A
Authority
JP
Japan
Prior art keywords
joint
sheet pile
female
steel sheet
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002253705A
Other languages
Japanese (ja)
Other versions
JP3828846B2 (en
Inventor
Masataka Kinoshita
木下 雅敬
Hiroshi Onuki
大貫 博史
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2002253705A priority Critical patent/JP3828846B2/en
Publication of JP2004092151A publication Critical patent/JP2004092151A/en
Application granted granted Critical
Publication of JP3828846B2 publication Critical patent/JP3828846B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a structure and a method for longitudinally connecting cutoff joint portions of steel sheet piles having female joints filled with a inflammable viscoelastic material, wherein the female joints are longitudinally connected together in construction field while protecting the viscoelastic material from catching fire of welding arcs. <P>SOLUTION: In construction of the steel pipe sheet pile having a joint steel pipe 12 and a connection portion joint steel pipe 14 filled with the inflammable viscoelastic material, steel pipe sheet pile main bodies 11 are welded together, and then the connection portion joint steel pipe 14 is arranged in a gap (L) formed between the upper and lower joint steel pipes 12, followed by arranging longitudinally joint portion band plates 22 so as to cover connection portions 21 between the joint steel pipes 12, 14. Further, a lower edge 23, a side edge 24 closer to the steel pipe sheet pile main body 11, and an upper edge 25 of the longitudinally joint portion band plate 22 are welded. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、遮水性護岸工事、埋立工事、堤防構築工事に用いられる鋼矢板、鋼管矢板などの鋼製矢板の止水継手部の縦継ぎ構造と縦継ぎ方法の改良に関するものである。
【0002】
【従来の技術】
一般の鋼管矢板の継手方法では、鋼管矢板本体の外周面対称位置にスリット付き継手鋼管を溶接した鋼管矢板同士を接合するP−P型継手と、鋼管矢板本体の外周面対称位置にスリット付き継手鋼管とCT形鋼を用いたT型継手を溶接した鋼管矢板同士を接合するP−T型継手に大別される。また、通常の鋼矢板では、鋼矢板本体の両側部に爪部を有する嵌合継手同士を嵌合することで矢板同士を接合する継手方式である。なお、P−P型継手やP−T型継手において、先打ち側となる縦方向に嵌合用のスリットが入った円形または角形のポケットを構築する形状の継手部材が雌継手となり、後打ち側となるスリットの入った円形の継手鋼管やT型継手が雄継手となる。
【0003】
前記の鋼管矢板の打設に関する主な留意事項として、▲1▼鋼管矢板の連結と、▲2▼打設が困難な場合の処置とがある。
【0004】
本発明が関係する▲1▼鋼管矢板の連結、つまり上下方向の縦継ぎ構造について説明する。図5は、従来のP−P継手の例を示し、鋼管矢板本体1の外周面対称位置にスリット2を有する継手鋼管3が溶接されている。上下の鋼管矢板本体1は、溶接接合部8で未溶接部が残らないように接合される。また、上下の鋼管矢板本体1の各々における継手鋼管3の端部は、前記溶接接合部8から離れた位置にあり、その間隔を埋めるようにスリット2を有する接合部継手鋼管4が配設され、継手鋼管3と接合部継手鋼4の一方または両方の接合端に開先5が設けられていて、該開先5を介して両継手鋼管3、4が溶接接合される。
【0005】
前記の場合、下側の鋼管矢板本体1に上側の鋼管矢板本体1を建て込み、両鋼管矢板本体1を現場円周溶接を行った後、接合部継手鋼管4を上下の継手鋼管3に溶接接合する。
【0006】
図6は、従来のP−T継手の例を示し、鋼管矢板本体1の外周面対称位置にスリット2を有する継手鋼管3とT型継手6が溶接されている。上下の鋼管矢板本体1は、溶接接合部8で未溶接部が残らないように接合される。上下の鋼管矢板本体1の各々における継手鋼管3及びT型継手6の端部は、前記溶接接合部8から離れた位置にあり、その間隔を埋めるように片側はスリット2を有する接合部継手鋼管4が配設され、もう片側には接合部T型継手7が配設される。継手鋼管3と接合部継手鋼管4の一方または両方の接合端に開先5が設けられていて、該開先5を介して継手鋼管3、4が接合される。一方で、T型継手6と接合部T型継手7の一方または両方の接合端に角度θの開先5が設けられていて、この開先5を介して溶接されて両継手6、7が接合される。従来は前述のように開先5を介して継手部を溶接接合する上で特別の不具合はなかった。
【0007】
しかるに、鋼管矢板の継手部の止水性を向上するため、継手鋼管3に可燃性の充填材などを予め充填する方法が開発、研究されている。これを経過をたどって説明する。
【0008】
鋼管矢板の継手部の止水方法としては、鋼管矢板等を地中に打ち込んだ後、打設時に嵌合継手の止水用充填材の充填用ポケット部に進入した土砂をウォタージェット等により洗浄した後、当該ポケット部に止水のためのモルタルやアスファルト混合物等の充填材を充填するのが一般的である。
【0009】
しかし、一度ポケット部に進入した土砂をウォータージェット等により完全に除去することは非常に困難であり、また、一旦侵入土砂を除去したとしても、洗浄した後に充填材を充填するまでの間に、嵌合継手のスリット部分より土砂が再度侵入するため、充填材に残留土砂がかみ込む場合や、充填材の品質の低下につながる。この傾向は、継手の底部やモルタルの打ち継ぎ目において顕著である。土砂が残った部分や、所定のモルタル品質が得られない部分は、止水上の弱点となるため、止水性能が低下するといった問題点があった。
【0010】
このようなことから、鋼矢板及び鋼管矢板などの鋼製矢板の打ち込み後に継手空間に止水材料を充填するのではなく、鋼製矢板の打ち込み前にその継手空間にアスファルトを主成分とする粘弾性材料を充填しておくことにより、打ち込み後に継手空間への土砂の侵入が生じることがなく、厳格な止水性能を有する止水継手を形成する方法が本出願人によって研究されている。
【0011】
【発明が解決しようとする課題】
鋼製矢板を上下方向に溶接接合で継ぎ足し(以下、縦継ぎという)長尺の鋼製矢板を現場施工で構築する場合、可燃性材料であるアスファルトを主成分とする粘弾性材料が雌継手の空間に予め充填されていると、溶接時の熱で充填材料が溶けて継手鋼管の隙間より漏れだし、充填材料に溶接アークが引火して火災が発生し、また、引火すると、そのヒュームにて溶接品質が低下するという問題があった。
【0012】
本発明は、前記の問題を解決した鋼製矢板の止水継手部の縦継ぎ構造と縦継ぎ方法を提供することを目的とする。
【0013】
【課題を解決するための手段】
前記の課題を解決するため、本発明は次のように構成する。
【0014】
第1の発明は、鋼製矢板本体に設けた1対の嵌合継手のうち、矢板打設時の先打ち側(雌側)となり、スリットを有する継手部材の空間に予め止水用充填材としてアスファルトを主成分とする粘弾性材料が充填された鋼製矢板を、縦方向に継ぐ際の前記雌側継手部材の縦継ぎ構造であって、上下の鋼製矢板における前記雌側継手部材の上下方向の端部は上下の鋼製矢板本体の溶接接合位置から離れており、それにより形成される上下の雌側継手部材の間隔に、該間隔を埋める長さ寸法を持ち、かつ前記雌側継手部材と同一径で同一断面構造を持つ接合部雌側継手部材を配置し、両雌側継手部材の接合部を覆うようにして、かつ継手のスリット部を除く位置に所定幅の鋼製の帯板を当てがい、該帯板の端縁部と両雌側継手部材の間を溶接接合したことを特徴とする。
【0015】
第2の発明は、第1発明において、前記雌側継手部材と前記接合部雌側継手部材の各々のスリットには、スリット閉塞用鋼板が仮止めされていることを特徴とする。
【0016】
第3の発明は、第2発明において、前記スリット閉塞用鋼板に溶接アークで膨張した粘弾性材料の漏出用の孔を設けたことを特徴とする。
【0017】
第4の発明は、第1〜第3の何れかの発明において、前記雌側継手部材と前記接合部雌側継手部材の間に生じる空間には、難透水性の粘土またはアスファルトを主成分とする粘弾性材料が充填されていることを特徴とする。
【0018】
第5の発明は、1対の嵌合継手を止水用充填材を介して互いに嵌合させながら、鋼矢板及び鋼管矢板などの鋼製矢板を打設する継手部の止水方法として、矢板打設時の先打ち側(雌側)となりスリットを有する継手部の空間に、止水用充填材としてアスファルトを主成分とする粘弾性材料を予め充填した鋼製矢板を縦方向に継ぐに際して、
▲1▼下矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法下方に控えた位置まで設けた鋼製矢板を用い、
▲2▼上矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法上方に控えた位置まで設けた鋼製矢板を用い、
▲3▼下矢板と上矢板の本体を溶接により接合した後、下矢板と上矢板の雌側継手部材の間を接続する接合部雌側継手部材を溶接により上矢板継手、下矢板継手及び上下矢板本体に固着するにあたり、
接合部雌側継手部材にも予めアスファルトを主成分とする粘弾性材料を充填しておき、下矢板および上矢板継手部材の間に接合部雌側継手部材を挿入し、各継手材の間の接合部を鋼製の縦継ぎ部帯板により外側より覆い、前記帯板と継手部材を溶接により固着させるとともに、接合部雌側継手部材と鋼矢板本体を溶接により固着させたことを特徴とする。
【0019】
第6発明は、第5発明において、継手部の接合面のどちらか片側もしくは両側に開先加工を施してあり、開先により生じる空間に、難透水性の粘土またはアスファルトを主成分とする粘弾性材料を常温にて押し込んだ後、各継手部材の間を鋼製の帯板により、外側より覆い帯板と継手部材を溶接により固着させるとともに、接合部雌側継手部材と鋼矢板を溶接により固着することを特徴とする。
【0020】
第7発明は、第5または第6発明において、縦継ぎ溶接時のスリットからの充填材料の漏出を抑制させる手段として、予め粘弾性材料を充填した接合部雌側継手部材および、上矢板もしくは下矢板の継手部材のスリットに所定長にわたりスリット閉塞用鋼板を当てがうことを特徴とする。
【0021】
第8発明は、鋼製矢板本体に設けた1対の嵌合継手のうち、矢板打設時の先打ち側(雌側)となる嵌合継手の空間に予め止水用充填材としてアスファルトを主成分とする粘弾性材料が充填された鋼製矢板を、縦方向に継ぐ際の前記雌側継手部材の縦継ぎ構造であって、上下の鋼製矢板における前記雌側継手部材の上下方向の端部は上下の鋼製矢板本体の溶接接合位置から離れており、それにより形成される上下の雌側継手部材の間隔に、該間隔を埋める長さ寸法を持ち、かつ前記雌側嵌合継手と同一径で同一断面構造を持つ接合部雌側継手部材を配置し、両雌側継手部材の接合面のどちらか片側もしくは両側に開先加工を施してあり、開先により生じる空間を介して継手部空間に充填された難燃性止水材が、前記開先に上下方向に所定厚さの層をなして存在していることを特徴とする。
【0022】
第9発明は、1対の嵌合継手を止水用充填材を介して互いに嵌合させながら、鋼矢板及び鋼管矢板などの鋼製矢板を打設する継手部の止水方法として、矢板打設時の先打ち側(雌側)となりスリットを有する継手部の空間に、止水用充填材としてアスファルトを主成分とする粘弾性材料を予め充填した鋼製矢板を縦方向に継ぐに際して、
▲1▼下矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法下方に控えた位置まで設けた鋼製矢板を用い、
▲2▼矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法上方に控えた位置まで設けた鋼製矢板を用い、
▲3▼下矢板と上矢板の本体を溶接により接合した後、下矢板と上矢板の雌側継手部材の間を接続する接合部雌側継手部材を溶接により上矢板継手、下矢板継手及び上下矢板本体に固着するにあたり、継手部内空間で、かつ前記開先の上下方向に所定厚さの層をなすように前記開先により生じる空間を介して難燃性止水材を充填し、その後、開先を溶接することを特徴とする。
【0023】
【作用】
第1と第5の発明によると、外側から帯板を当てがい溶接すれば、溶接アークが直接可燃性の粘弾性材料に接触しないため、引火の危険性を著しく低減することができる。
【0024】
第2と第7の発明によると、溶接熱の影響で充填材が軟化し、継手スリット部分から充填材がはみ出してくるという問題に対して、熱影響部のスリット部分に帯板を当てがい、点付け溶接などで固着させておけば、そのような充填材のはらみだしを防止することができる。
【0025】
第3の発明によると、第2発明のように、スリット部分を完全に閉塞してしまうと、溶接熱により溶接部直近部の粘弾性材料の逃げ道がなくなることから、小さな隙間より充填材が噴出し、溶接アークに引火するという問題があったが、スリット部に当てがった帯板に、充填材料の漏出用の孔を設けることで、溶融充填材の逃げ道を作ることができるため、この問題を緩和できる。
【0026】
第4の発明によると、外側から帯板を当てがい溶接すると、継手鋼管の鋼管間の隙間が、溶接後埋らない可能性がある。そこで、開先部を作って充填材と同じ材料もしくは難透水性材料にてその空間を埋めることで、その止水性を確実なものとする。
【0027】
第8、第9の発明によると、両雌側継手部材の接合面の内部空間において、開先により生じる空間を介して充填された難燃性止水材が、前記接合面の上下方向に所定厚さの層をなして存在させることによっても、この粘性土を介して可燃性の粘弾性材料を溶接アークから隔離させることができ、よって、雌継手内の粘弾性材料に溶接アークが引火するおそれを解消でき、円滑な縦継ぎ作業を遂行できる。
【0028】
【発明の実施の形態】
以下本発明の実施形態を図を参照して説明する。
【0029】
図1は、鋼管矢板における上下の鋼管矢板本体11を開先5を介して溶接接合した段階で、上下の継手鋼管12を接合部継手鋼管14で接合する前段階の説明図、図2は、上下の継手鋼管12を接合部継手鋼管14で接合した状態の説明図、図3は継手鋼管12を接合部継手鋼管14を溶接接合する縦継ぎ部帯板22の詳細図である。
【0030】
図1に示すように上下の鋼管矢板本体11の端部を溶接接合位置13で接合したとき、継手鋼管12の端部12aはその鋼管矢板本体11の突合せ端部から離れており、したがって、上下の継手鋼管12における前記端部12aの間には(L)間隔が形成されている。この間隔(L)部に、上下の継手鋼管12と同一径で同一構造の接合部継手鋼管14を配置した後、鋼管矢板本体11に溶接接合したうえ、さらに接合部継手鋼管14と上下の継手鋼管12を溶接接合する(これを本発明では縦継ぎという)。
【0031】
継手鋼管12と接合部継手鋼管14との端部同士を溶接接合する手段として、各継手鋼管12、14内が単なる空間であれば従来の溶接手段で何ら問題はないが、本発明では継手部の止水性を向上させるため、アスファルトを主成分とする粘弾性材料20(図3に示す)が継手鋼管12と接合部継手鋼管14の何れにも充填されている。このアスファルトは可燃性であり、継手鋼管12、14の突合せ部の開先を介して溶接する際、該開先によって形成される内外に通じる間隙から溶接のアークが粘弾性材料20に引火するおそれがある。本発明は縦継ぎ部帯板22(図2以下に示す)を介して両継手部2、14を溶接することでその問題を解決している。
【0032】
さらに説明すると、粘弾性材料20は経時性硬化材であり、継手鋼管12と接合部継手鋼管14に充填した時点では流動性があり、上下の開口やスリット15から流出するおそれがある。このため図1に示すように、両継手鋼管12、14のスリット15は上下に伸長する所定幅のスリット閉塞用鋼板16で閉じ、接着テープなどの仮止め部材17で仮止めする。スリット閉塞用鋼板16の端部、つまり、縦継ぎ溶接部に近い位置では円弧状にえぐることでスリット15との間で小間隙19を形成し、後述の溶接の熱で膨張する粘弾性材料20が膨張し流動化したとき、この小間隙19から流出させ、円滑な溶接を行わせるためである。
【0033】
また、継手鋼管12と接合部継手鋼管14の下端の開口は漏れ防止鋼板18で閉じられていて、鋼管端部との当接部を部分的にスポット溶接することで仮止めされている。こうして容器状に形成された継手鋼管12、14内に流動状の粘弾性材料20を充填し、上端開口も漏れ防止鋼板18で閉じて硬化させる。
【0034】
溶接接合位置13で上下の鋼管矢板本体11を溶接した後、上下の継手鋼管12の間に形成される(L)間隔部に接合部継手鋼管14を配置させる(図2参照)。この時点で粘弾性材料20は硬化しているので、漏れ防止鋼板18は取り外しておく。続いて、接合部継手鋼管14と上下の継手鋼管12の端部の接合部21を覆うように、本発明の主要素である所定幅で半円弧状の2つの縦継ぎ部帯板22を当てがう。縦継ぎ部帯板22の詳細は図3に示されている。同図から理解されるように、2つの縦継ぎ部帯板22は、鋼管矢板本体11と接合部継手鋼管14との溶接部を避けた位置に配置されると共に、スリット閉塞用鋼板16の上下端に形成するスリット15との間の小間隙19を閉じないように、該スリット15の部位を避けて配置する。
【0035】
このように縦継ぎ部帯板22を配置した上、図3(C)に示す▲1▼、▲2▼、▲3▼の順序で縦継ぎ部帯板22の下側縁23と鋼管矢板本体11の一端縁24と上側縁25を両継手鋼管12、14に隅肉溶接で接合する。それにより縦継ぎ部帯板22を介して両継手鋼管12、14が縦継ぎされる。しかもこのとき両継手鋼管12、14の接合部21に開先などの隙間が存在していても、その部位は溶接部位から離れているから溶接のアークが継手鋼管12、14内に進入するおそれがなく、したがって、継手部内の粘弾性材料20に引火せず円滑な縦継ぎ作業が可能となる。
【0036】
前記の作業に際して、接合部継手鋼管14の上下部と上下の継手鋼管12との間には、必然的に小さな空間が生じるので、両継手鋼管12、14の接合部21に形成される開先の間隙を介して前記小空間に難透水性の粘土またはアスファルトを主成分とする粘弾性材料を常温にて押し込み充填した後、その硬化を待って縦継ぎ部帯板22を配置し、両継手鋼管12、14に溶接するとよい。
【0037】
また、縦継ぎ部帯板22を両継手鋼管12、14に溶接する際の熱で、継手部内の粘弾性材料20が軟化し膨張するが、この膨張した粘弾性材料20は、スリット閉塞用鋼板16の上下端に形成するスリット15との間の小間隙19から流出させることで、両継手鋼管12、14を内側から押し広げるような応力が作用せず、円滑な溶接を妨げるような不具合が生じるおそれを解消している。
【0038】
次に、図4は実施形態2を示し、実施形態1の縦継ぎ部帯板22に代えた別の手段により、上下鋼管矢板における両継手鋼管12、14の縦継ぎ溶接の際、継手部に充填の粘弾性材料20に溶接アークが引火する問題点を解決している。
【0039】
実施形態2では、上部側の継手鋼管12の下端と接合部継手鋼管14下端にそれぞれ開先5が形成されている。そして、この開先5により生じる空間を介して両継手鋼管12、14の内部に難燃性止水材である粘性土26押し込み充填されていて、接合部21(開先5でもある)の上下方向に所定厚さ(約5cm)の層をなして存在している。粘性土の押し込み充填範囲は溶接アークの影響範囲のみでよく、図4(D)、(E)に示すように接合部21の開先5に接する部分のみにドーナツ状に存在させてもよい。図4では、鋼管矢板本体11の外周で、継手鋼管12と対称位置にT型継手6が固着されている。
【0040】
この実施形態2おいては、開先5を溶接することで、両継手鋼管12、14を溶接(つまり、縦継ぎ)する。この場合、開先5の空間から継手部内に溶接アークが進入するが、その部位には難燃性止水材である粘性土26が充填されていて、可燃性のアスファルトを主成分とする粘弾性材料20は開先5の位置から見て粘性土26で隔てられた背後に位置しているから、溶接アークにさらされることがなく、したがって円滑な縦継ぎ作業が進行できる。
【0041】
本発明は、実施形態1、2を設計変更して実施することは構わない。
【0042】
【発明の効果】
本発明によると、継手部止水性向上のため、可燃性材料であるアスファルトを主成分とする粘弾性材料が雌継手の空間に予め充填されている鋼製矢板において、現場施工で鋼製矢板本体を縦継ぎすると共に、前記雌継手を接合部雌継手を介して縦継ぎする場合の問題点、つまり溶接時の熱で粘弾性材料が溶けて継手鋼管の隙間より漏れだし、粘弾性材料に溶接アークが引火して火災が発生し、さらに、引火した際そのヒュームにて溶接品質が低下するという問題点を、前記雌継手と接合部雌継手の接合部を覆うように、かつスリット部を除く位置に所定幅の鋼製の帯板を当てがい、該帯板の端縁部と両雌側継手部材を溶接することで解決している。つまり、この鋼製の帯板と両雌継手との溶接位置は両雌継手の接合部から離れているので、該接合部から雌継手内の粘弾性材料に溶接アークが引火するおそれを解消でき、円滑な縦継ぎ作業を遂行できる。
【0043】
また、両雌側継手部材の接合面の内部空間において、開先により生じる空間を介して充填された難燃性止水材が、前記接合面の上下方向に所定厚さの層をなして存在させることによっても、この難燃性止水材を介して可燃性の粘弾性材料を溶接アークから隔離させることができ、よって、雌継手内の粘弾性材料に溶接アークが引火するおそれを解消でき、円滑な縦継ぎ作業を遂行できる。
【図面の簡単な説明】
【図1】図は実施形態1を示し、(A)は、鋼管矢板における上下の鋼管矢板本体を開先を介して溶接接合した段階で、上下の継手鋼管を接合部継手鋼管で接合する前段階の正面図、(B)、(C)は、上下の継手鋼管のスリット側の側面図、(D)は、接合部継手鋼管のスリット側の側面図、(E)は、同(B)の(イ)部の詳細図である。
【図2】(A)は、上下の継手鋼管を接合部継手鋼管で接合した状態の正面図、(B)は、図(A)の右側面図である。
【図3】(A)は、図2(B)の(ロ)部の詳細図、(B)は同(A)の平面図、(C)は同(A)側面図である。
【図4】実施形態2を示し、(A)は、上下の鋼管矢板本体および継手鋼管を接合部継手鋼管で接合した状態の斜視図、(B)は、同(A)の(ハ)部の断面図、(C)は、同(B)のニ−ニ断面図、(D)は、同(B)の変形例の断面図、(E)は、同(D)のホ−ホ断面図である。
【図5】従来例1を示し、(A)はP−P継手を有した鋼管矢板の正面図、(B)は、継手鋼管の平面図、(C)は、継手鋼管の側面図である。
【図6】従来例2を示し、(A)はP−T継手を有した鋼管矢板の正面図、(B)、(C)は、T型継手の平面図と正面図、(D)、(E)は、継手鋼管の平面図と正面図、(F)は、同(A)における(ホ)部の詳細図である。
【符号の説明】
1 鋼管矢板本体
2 スリット
3 継手鋼管
4 接合部継手鋼管
5 開先
6 T型継手
7 接合部T型継手
8 溶接接合部
11 鋼管矢板本体
12 継手鋼管
13 溶接接合位置
14 接合部継手鋼管
15 スリット
16 スリット閉塞用鋼板
17 仮止め部材
18 漏れ防止鋼板
19 小間隙
20 粘弾性材料
21 接合部
22 縦継ぎ部帯板
23 下側縁
24 一端縁
25 上側縁
26 粘性土
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an improvement in a vertical joint structure and a vertical joint method of a water cut-off joint portion of a steel sheet pile such as a steel sheet pile and a steel pipe sheet pile used in a water-blocking seawall construction work, a landfill construction work, and an embankment construction work.
[0002]
[Prior art]
In a general method of joining steel pipe sheet piles, a PP-type joint for joining steel pipe sheet piles welded with a steel pipe welded to a steel pipe sheet pile body at a position symmetrical on the outer peripheral surface of the steel pipe sheet pile body, and a joint with a slit at a position symmetrical on the outer peripheral surface of the steel pipe sheet pile body. It is broadly divided into PT joints that join steel pipe sheet piles obtained by welding steel pipes and T-shaped joints using CT steel. Further, in the case of a normal steel sheet pile, a joint method in which sheet piles are joined to each other by fitting fitting joints having claws on both sides of a steel sheet pile body. In a PP-type joint or a PT-type joint, a joint member having a shape of constructing a circular or square pocket having a slit for fitting in a longitudinal direction which is a first strike side is a female joint, and a second strike side. A circular joint steel pipe or T-shaped joint having a slit becomes a male joint.
[0003]
The main points to be noted regarding the placing of the steel pipe sheet piles are (1) the connection of the steel pipe sheet piles and (2) the measures to be taken when the placing is difficult.
[0004]
The present invention relates to (1) connection of steel pipe sheet piles, that is, a vertical vertical joint structure. FIG. 5 shows an example of a conventional PP joint, in which a joint steel pipe 3 having a slit 2 is symmetrically welded to the outer peripheral surface of a steel sheet pile main body 1. The upper and lower steel pipe sheet pile main bodies 1 are joined at the welded joint portion 8 such that no unwelded portion remains. The end of the joint steel pipe 3 in each of the upper and lower steel pipe sheet pile main bodies 1 is located at a position away from the weld joint 8, and a joint joint steel pipe 4 having a slit 2 is provided so as to fill the gap. A groove 5 is provided at one or both joint ends of the joint steel pipe 3 and the joint steel 4, and the joint steel pipes 3, 4 are welded through the groove 5.
[0005]
In the above case, the upper steel pipe sheet pile main body 1 is erected on the lower steel pipe sheet pile main body 1, and both steel pipe sheet pile main bodies 1 are subjected to in-situ circumferential welding, and then the joint steel pipe 4 is welded to the upper and lower joint steel pipes 3. Join.
[0006]
FIG. 6 shows an example of a conventional PT joint, in which a joint steel pipe 3 having a slit 2 at a position symmetrical to the outer peripheral surface of a steel pipe sheet pile main body 1 and a T-shaped joint 6 are welded. The upper and lower steel pipe sheet pile main bodies 1 are joined at the welded joint portion 8 such that no unwelded portion remains. The end of the joint steel pipe 3 and the end of the T-shaped joint 6 in each of the upper and lower steel pipe sheet pile main bodies 1 are located away from the welded joint 8, and a joint joint steel pipe having a slit 2 on one side to fill the gap therebetween. 4 and a joint T-joint 7 on the other side. A groove 5 is provided at one or both of the joint ends of the joint steel pipe 3 and the joint steel pipe 4, and the joint steel pipes 3 and 4 are joined via the groove 5. On the other hand, a groove 5 having an angle θ is provided at one or both of the joint ends of the T-shaped joint 6 and the joint T-shaped joint 7, and the joints 6 and 7 are welded via the groove 5. Joined. Conventionally, there has been no particular problem in welding the joint portion via the groove 5 as described above.
[0007]
However, in order to improve the water stopping performance of the joint portion of the steel pipe sheet pile, a method of previously filling the joint steel pipe 3 with a flammable filler or the like has been developed and studied. This will be described along the course.
[0008]
As a method of stopping water at the joint of a steel pipe sheet pile, after driving a steel pipe sheet pile etc. into the ground, the soil and sand that entered the filling pocket of the water stopping filler of the fitting joint at the time of casting is washed with a water jet etc. After that, the pocket is generally filled with a filler such as mortar or asphalt mixture for stopping water.
[0009]
However, it is very difficult to completely remove the earth and sand that has once entered the pocket portion by a water jet, etc. Since the earth and sand re-enters from the slit portion of the fitting joint, the residual earth and sand may bite into the filler and the quality of the filler may be deteriorated. This tendency is remarkable at the joint bottom and the joint of the mortar. The portion where the earth and sand remain or the portion where the predetermined mortar quality is not obtained is a weak point in water stoppage, and there is a problem that water stoppage performance is reduced.
[0010]
For this reason, instead of filling the joint space with a waterproof material after driving steel sheet piles such as steel sheet piles and steel pipe sheet piles, the joint space mainly contains asphalt before driving the steel sheet piles. The applicant has studied a method of forming a water-stop joint having strict water-stop performance by filling the elastic material without causing intrusion of earth and sand into the joint space after driving.
[0011]
[Problems to be solved by the invention]
When constructing a long steel sheet pile by on-site construction by adding steel sheet piles vertically by welding (hereinafter referred to as vertical joint), the viscoelastic material mainly composed of asphalt, which is a flammable material, is If the space is pre-filled, the heat of welding melts the filling material and leaks out of the gap between the joint steel pipes, causing a welding arc to ignite the filling material and causing a fire. There was a problem that welding quality deteriorated.
[0012]
An object of the present invention is to provide a vertical joint structure and a vertical joint method of a water cut-off joint portion of a steel sheet pile that have solved the above-mentioned problems.
[0013]
[Means for Solving the Problems]
In order to solve the above problem, the present invention is configured as follows.
[0014]
According to a first aspect of the present invention, among a pair of fitting joints provided on a steel sheet pile main body, a filling material for water stoppage is previously provided in a space of a joint member having a slit, which is a first strike side (female side) at the time of sheet pile driving. A steel sheet pile filled with a viscoelastic material containing asphalt as a main component is a longitudinal joint structure of the female side joint member when vertically splicing, and the female side joint member in upper and lower steel sheet piles. The end in the up-down direction is separated from the welding joint position of the upper and lower steel sheet pile bodies, and has a length dimension to fill the gap between the upper and lower female joint members formed thereby, and the female side A joint part female joint member having the same diameter and the same cross-sectional structure as the joint member is arranged, so as to cover the joint part of both female joint members, and at a position excluding the slit part of the joint, made of steel having a predetermined width. The strip is applied, and the edge of the strip and the female joint members are welded together. It is characterized in.
[0015]
According to a second invention, in the first invention, a slit closing steel plate is temporarily fixed to each slit of the female joint member and the joint female joint member.
[0016]
A third invention is characterized in that, in the second invention, a hole for leaking a viscoelastic material expanded by a welding arc is provided in the slit closing steel plate.
[0017]
According to a fourth aspect of the present invention, in any one of the first to third aspects, a space formed between the female joint member and the joint female joint member is mainly made of poorly permeable clay or asphalt. Is filled with a viscoelastic material.
[0018]
According to a fifth aspect of the present invention, as a method for stopping water at a joint portion, a steel sheet pile and a steel pipe sheet pile are driven while a pair of fitting joints are fitted to each other via a water stopping filler. When joining a steel sheet pile pre-filled with a viscoelastic material mainly composed of asphalt as a water-stopping filler in the space of the joint part which becomes the leading side (female side) at the time of casting and has a slit,
(1) As a lower sheet pile, a steel sheet pile provided with a joint filled with a viscoelastic material up to a position below a connection part of the sheet pile main body by a predetermined dimension is used,
{Circle around (2)} As the upper sheet pile, a steel sheet pile provided with a joint filled with a viscoelastic material up to a position below a connection part of the sheet pile main body by a predetermined dimension is used,
(3) After the main body of the lower sheet pile and the upper sheet pile are joined by welding, the joint part female side joint member connecting between the female joint members of the lower sheet pile and the upper sheet pile is welded to the upper sheet pile joint, the lower sheet pile joint and the upper and lower parts. When sticking to the sheet pile body,
The joint female joint member is also pre-filled with a viscoelastic material mainly composed of asphalt, and the joint female joint member is inserted between the lower sheet pile and the upper sheet pile joint member. The joint is covered from the outside with a steel longitudinal joint strip, the strip and the joint member are fixed by welding, and the joint female side joint member and the steel sheet pile main body are fixed by welding. .
[0019]
According to a sixth aspect of the present invention, in the fifth aspect, a groove is formed on one or both sides of the joint surface of the joint portion, and a space formed by the groove is made of a hardly permeable clay or asphalt as a main component. After pushing the elastic material at room temperature, the steel strip between the joint members is used to secure the covering strip and the joint members from outside by welding, and the joint female side joint member and the steel sheet pile are welded together. It is characterized by sticking.
[0020]
According to a seventh aspect of the present invention, in the fifth or sixth aspect, as a means for suppressing leakage of the filler material from the slit during longitudinal joint welding, a joint female side joint member previously filled with a viscoelastic material, and an upper sheet pile or lower part The slit closing steel plate is applied to the slit of the joint member of the sheet pile over a predetermined length.
[0021]
According to an eighth aspect of the present invention, asphalt is used as a water stopping filler in advance in a space of a fitting joint on a first strike side (female side) at the time of driving a sheet pile among a pair of fitting joints provided in a steel sheet pile main body. A steel sheet pile filled with a viscoelastic material as a main component is a longitudinal joint structure of the female joint member when joining in a vertical direction, and a vertical joint structure of the female joint member in upper and lower steel sheet piles. The end portion is separated from the welding joint position of the upper and lower steel sheet pile bodies, and has a length dimension to fill the interval between the upper and lower female joint members formed thereby, and the female fitting joint. A joint female joint member with the same diameter and the same cross-sectional structure as above is arranged, and one or both sides of the joint surface of both female joint members are grooved, and through the space created by the groove The flame-retardant water-stop material filled in the joint space has a predetermined thickness in the vertical direction at the groove. Characterized in that it exist without a.
[0022]
A ninth aspect of the present invention is a sheet pile driving method in which a pair of fitting joints are fitted with each other via a water stopping filler, and a steel sheet pile, such as a steel sheet pile and a steel pipe sheet pile, is cast. When connecting a steel sheet pile pre-filled with a viscoelastic material mainly composed of asphalt as a water-stopping filler in the space of the joint part having a slit which becomes the first strike side (female side) at the time of installation,
(1) As a lower sheet pile, a steel sheet pile provided with a joint filled with a viscoelastic material up to a position below a connection part of the sheet pile main body by a predetermined dimension is used,
(2) As a sheet pile, a steel sheet pile provided with a joint portion filled with a viscoelastic material up to a position above a connection part of the sheet pile body by a predetermined dimension is used,
(3) After the main body of the lower sheet pile and the upper sheet pile are joined by welding, the joint part female side joint member connecting between the female joint members of the lower sheet pile and the upper sheet pile is welded to the upper sheet pile joint, the lower sheet pile joint and the upper and lower parts. Upon fixing to the sheet pile main body, in the joint portion space, and filling the flame-retardant waterproof material through the space created by the groove so as to form a layer of a predetermined thickness in the vertical direction of the groove, The groove is welded.
[0023]
[Action]
According to the first and fifth aspects of the invention, when the strip is applied and welded from the outside, the welding arc does not directly contact the combustible viscoelastic material, so that the risk of ignition can be significantly reduced.
[0024]
According to the second and seventh aspects of the present invention, the filler is softened by the influence of welding heat, and the filler is protruded from the joint slit. If the filler is fixed by spot welding or the like, it is possible to prevent the filler from protruding.
[0025]
According to the third aspect, as in the second aspect, when the slit portion is completely closed, there is no escape path for the viscoelastic material in the vicinity of the welded portion due to welding heat, so that the filler is ejected from the small gap. However, there was a problem that the welding arc was ignited.However, by providing a hole for the leakage of the filler material in the strip applied to the slit portion, it was possible to create an escape route for the molten filler material. Can ease the problem.
[0026]
According to the fourth invention, when the strip plate is applied and welded from the outside, the gap between the steel pipes of the joint steel pipe may not be filled after the welding. Therefore, a groove is formed and the space is filled with the same material as the filler or a poorly permeable material, so that the waterproofness is ensured.
[0027]
According to the eighth and ninth aspects of the invention, in the internal space of the joint surface of the female joint members, the flame-retardant waterproof material filled through the space created by the groove is provided in the vertical direction of the joint surface. The presence of a thick layer also allows the combustible viscoelastic material to be isolated from the welding arc through this viscous soil, thus causing the welding arc to ignite the viscoelastic material in the female joint The fear can be eliminated and a smooth joining operation can be performed.
[0028]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0029]
FIG. 1 is an explanatory view of a stage prior to joining upper and lower joint steel pipes 12 with a joint joint steel pipe 14 at a stage where upper and lower steel pipe sheet pile main bodies 11 in the steel pipe sheet pile are welded and joined via the groove 5, and FIG. FIG. 3 is an explanatory view of a state in which the upper and lower joint steel pipes 12 are joined by a joint joint steel pipe 14, and FIG. 3 is a detailed view of a vertical joint strip 22 for joining the joint steel pipe 12 by welding the joint joint steel pipe 14.
[0030]
As shown in FIG. 1, when the upper and lower ends of the steel pipe sheet pile main body 11 are joined at the welding joint position 13, the end 12a of the joint steel pipe 12 is separated from the butt end of the steel pipe sheet pile main body 11, and (L) interval is formed between the end portions 12a in the joint steel pipe 12 of (1). After the jointed joint steel pipe 14 having the same diameter and the same structure as the upper and lower jointed steel pipes 12 is disposed in the gap (L), the jointed jointed steel pipe 14 is welded to the steel sheet pile body 11 and further joined to the jointed joint steel pipe 14 and the upper and lower jointed pipes. The steel pipe 12 is welded and joined (this is referred to as longitudinal joint in the present invention).
[0031]
As a means for welding and joining the end portions of the joint steel pipe 12 and the joint steel pipe 14 to each other, there is no problem with the conventional welding means as long as the inside of each joint steel pipe 12, 14 is a mere space. The joint steel pipe 12 and the joint steel pipe 14 are filled with a viscoelastic material 20 (shown in FIG. 3) containing asphalt as a main component to improve the water stopping performance of the joint steel pipe 12. This asphalt is flammable, and when welding through the groove of the butt portion of the joint steel pipes 12 and 14, an arc of welding may ignite the viscoelastic material 20 from a gap formed between the inside and outside formed by the groove. There is. The present invention solves this problem by welding the joints 2 and 14 via the longitudinal joint strip 22 (shown in FIG. 2 and subsequent figures).
[0032]
More specifically, the viscoelastic material 20 is a time-hardening material, has fluidity when filled into the joint steel pipe 12 and the joint steel pipe 14, and may flow out of the upper and lower openings and the slit 15. Therefore, as shown in FIG. 1, the slits 15 of the joint steel pipes 12 and 14 are closed with a slit closing steel plate 16 having a predetermined width extending vertically and temporarily fixed with a temporary fixing member 17 such as an adhesive tape. At the end of the slit closing steel plate 16, that is, at a position close to the longitudinal joint, a small gap 19 is formed between the slit 15 and the viscoelastic material 20 which expands by the heat of welding described later. This is because when the fluid expands and fluidizes, it flows out of the small gap 19 to perform smooth welding.
[0033]
Further, the openings at the lower ends of the joint steel pipe 12 and the joint steel pipe 14 are closed with a leak-proof steel plate 18, and are temporarily fixed by spot welding the contact portion with the end of the steel pipe. The joint steel pipes 12 and 14 thus formed into a container shape are filled with the fluid viscoelastic material 20, and the upper end opening is closed and hardened by the leakage prevention steel plate 18.
[0034]
After welding the upper and lower steel pipe sheet pile main bodies 11 at the welding joint position 13, the joint steel pipe 14 is disposed at the (L) space formed between the upper and lower joint steel pipes 12 (see FIG. 2). At this point, since the viscoelastic material 20 has hardened, the leakage prevention steel plate 18 is removed. Subsequently, two semi-circular longitudinal joint strips 22 having a predetermined width, which are main elements of the present invention, are applied so as to cover the joint 21 at the end of the joint steel pipe 14 and the upper and lower joint steel pipes 12. Gag. The details of the longitudinal joint strip 22 are shown in FIG. As can be understood from the figure, the two longitudinal joint strips 22 are arranged at positions avoiding the welded portion between the steel pipe sheet pile main body 11 and the joint joint steel pipe 14, and the upper and lower portions of the slit closing steel plate 16 In order not to close the small gap 19 between the slit 15 formed at the end, the slit 15 is disposed so as not to be closed.
[0035]
After arranging the longitudinal joint strip 22 in this manner, the lower edge 23 of the longitudinal joint strip 22 and the steel pipe sheet pile main body in the order of (1), (2), and (3) shown in FIG. One end edge 24 and the upper edge 25 of 11 are joined to both joint steel pipes 12 and 14 by fillet welding. Thereby, both joint steel pipes 12 and 14 are longitudinally connected via the vertical joint part strip 22. Moreover, at this time, even if a gap such as a groove is present at the joint 21 between the two joint steel pipes 12, 14, the welding arc may enter the joint steel pipes 12, 14 because the gap is away from the welding part. Therefore, the viscoelastic material 20 in the joint portion can be smoothly joined without firing.
[0036]
At the time of the above operation, a small space is inevitably formed between the upper and lower joint steel pipes 12 and the upper and lower joint steel pipes 12, so that a groove formed at the joint 21 of the two joint steel pipes 12, 14 is formed. After filling the small space with a viscoelastic material mainly composed of poorly permeable clay or asphalt at room temperature through the gap, waiting for the material to harden, the longitudinal joint strip 22 is arranged, and both joints are joined. It is good to weld to the steel pipes 12 and 14.
[0037]
In addition, the viscoelastic material 20 in the joint is softened and expanded by heat generated when the longitudinal joint strip 22 is welded to the joint steel pipes 12 and 14, and the expanded viscoelastic material 20 is formed of a steel sheet for slit closing. By flowing out from the small gap 19 between the slits 15 formed at the upper and lower ends of 16, the stress that pushes the joint steel pipes 12 and 14 from the inside does not act, and there is a problem that the smooth welding is prevented. This eliminates the possibility of occurrence.
[0038]
Next, FIG. 4 shows a second embodiment, in which the joint portion is used for vertical joint welding of both joint steel pipes 12 and 14 in the upper and lower steel pipe sheet piles by another means instead of the longitudinal joint strip 22 of the first embodiment. This solves the problem that a welding arc is ignited in the filled viscoelastic material 20.
[0039]
In the second embodiment, the groove 5 is formed at the lower end of the upper joint steel pipe 12 and the lower end of the joint steel pipe 14. The inside of both joint steel pipes 12 and 14 is filled with a viscous soil 26 which is a flame-retardant water-stopping material through the space formed by the groove 5, and is filled with the joint 21 (which is also the groove 5). It exists in a layer having a predetermined thickness (about 5 cm) in the direction. The range in which the cohesive soil is pushed and filled may be only the range affected by the welding arc, and may be present in a donut shape only in the portion of the joint 21 in contact with the groove 5 as shown in FIGS. 4 (D) and 4 (E). In FIG. 4, the T-shaped joint 6 is fixed at a position symmetrical to the joint steel pipe 12 on the outer periphery of the steel pipe sheet pile main body 11.
[0040]
In the second embodiment, the joint steel pipes 12 and 14 are welded (that is, longitudinal joint) by welding the groove 5. In this case, the welding arc enters the joint from the space of the groove 5, but the portion is filled with the viscous soil 26 which is a flame-retardant waterproof material, and the viscous soil 26 mainly composed of flammable asphalt is used. Since the elastic material 20 is located behind the viscous soil 26 when viewed from the position of the groove 5, the elastic material 20 is not exposed to the welding arc, so that a smooth joining operation can proceed.
[0041]
The present invention may be implemented by modifying the first and second embodiments.
[0042]
【The invention's effect】
According to the present invention, a steel sheet pile body in which a viscoelastic material mainly containing asphalt, which is a flammable material, is pre-filled in the space of the female joint in order to improve the waterproofness of the joint portion, The problem when longitudinal jointing the female joint through the joint female joint is that the viscoelastic material melts due to heat during welding and leaks out from the gap in the joint steel pipe, and is welded to the viscoelastic material. The arc is ignited and a fire occurs, and furthermore, when the fire is ignited, the problem that the welding quality is reduced by the fumes, so as to cover the joint of the female joint and the joint female joint, and excluding the slit portion The problem is solved by applying a steel strip having a predetermined width to the position and welding the edge of the strip to the female joint members. That is, since the welding position of the steel strip and the two female joints is apart from the joint of the two female joints, it is possible to eliminate the possibility that a welding arc is ignited from the joint to the viscoelastic material in the female joint. , Can carry out smooth joining work.
[0043]
In addition, in the internal space of the joint surface of the two female joint members, the flame-retardant waterproof material filled through the space created by the groove is present in a layer of a predetermined thickness in the vertical direction of the joint surface. By doing so, the flammable viscoelastic material can be isolated from the welding arc through the flame-retardant water-stopping material, thereby eliminating the risk of the welding arc igniting the viscoelastic material in the female joint. , Can carry out smooth joining work.
[Brief description of the drawings]
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows a first embodiment, in which (A) shows a state in which upper and lower joint steel pipes of a steel pipe sheet pile are welded and joined via a groove before joining the upper and lower joint steel pipes with a joint joint steel pipe. (B), (C) is a side view on the slit side of the upper and lower joint steel pipes, (D) is a side view on the slit side of the joint steel pipe, and (E) is the same (B). FIG.
FIG. 2A is a front view of a state in which upper and lower joint steel pipes are joined by a joint joint steel pipe, and FIG. 2B is a right side view of FIG.
3A is a detailed view of a portion (b) of FIG. 2B, FIG. 3B is a plan view of FIG. 2A, and FIG. 3C is a side view of FIG.
4A and 4B show a second embodiment, in which FIG. 4A is a perspective view of a state in which upper and lower steel pipe sheet pile main bodies and a joint steel pipe are joined by a joint steel pipe, and FIG. 4B is a section (C) of FIG. (C) is a cross-sectional view taken along the line (B), (D) is a cross-sectional view of the modified example (B), and (E) is a ho-ho cross-section (D). FIG.
FIG. 5 shows Conventional Example 1, in which (A) is a front view of a steel pipe sheet pile having a PP joint, (B) is a plan view of the joint steel pipe, and (C) is a side view of the joint steel pipe. .
6A and 6B show Conventional Example 2, wherein FIG. 6A is a front view of a steel pipe sheet pile having a PT joint, FIGS. 6B and 6C are a plan view and a front view of a T-shaped joint, and FIGS. (E) is a plan view and a front view of the joint steel pipe, and (F) is a detailed view of a part (E) in the same (A).
[Explanation of symbols]
Reference Signs List 1 steel sheet pile main body 2 slit 3 joint steel pipe 4 joint joint steel pipe 5 groove 6 T-shaped joint 7 joint T-joint 8 weld joint 11 steel pipe sheet pile body 12 joint steel pipe 13 weld joint position 14 joint joint steel pipe 15 slit 16 Slit closing steel plate 17 Temporary fixing member 18 Leak prevention steel plate 19 Small gap 20 Viscoelastic material 21 Joint 22 Vertical joint strip 23 Lower edge 24 One edge 25 Upper edge 26 Cohesive soil

Claims (9)

鋼製矢板本体に設けた1対の嵌合継手のうち、矢板打設時の先打ち側(雌側)となり、スリットを有する継手部材の空間に予め止水用充填材としてアスファルトを主成分とする粘弾性材料が充填された鋼製矢板を、縦方向に継ぐ際の前記雌側継手部材の縦継ぎ構造であって、上下の鋼製矢板における前記雌側継手部材の上下方向の端部は上下の鋼製矢板本体の溶接接合位置から離れており、それにより形成される上下の雌側継手部材の間隔に、該間隔を埋める長さ寸法を持ち、かつ前記雌側継手部材と同一径で同一断面構造を持つ接合部雌側継手部材を配置し、両雌側継手部材の接合部を覆うようにして、かつ継手のスリット部を除く位置に所定幅の鋼製の帯板を当てがい、該帯板の端縁部と両雌側継手部材の間を溶接接合したことを特徴とする鋼製矢板の止水継手部の縦継ぎ構造。Of the pair of fitting joints provided on the steel sheet pile main body, the first side is the first side (female side) at the time of sheet pile driving, and asphalt is mainly used as a water stop filler in the space of the joint member having a slit in advance. A steel sheet pile filled with a viscoelastic material to be spliced, the vertical joint structure of the female joint member when joining in the vertical direction, wherein the upper and lower ends of the female joint member in the upper and lower steel sheet piles are The upper and lower steel sheet pile bodies are separated from the welded joint position, and the gap between the upper and lower female joint members formed thereby has a length dimension to fill the gap, and has the same diameter as the female joint member. A joint female joint member having the same cross-sectional structure is arranged, so as to cover the joint portion of both female joint members, and a steel strip having a predetermined width is applied to a position excluding a slit portion of the joint, It is characterized in that the edge portion of the strip and both female joint members are welded and joined. Jointed structure of waterproofing joint of that steel sheet pile. 前記雌側継手部材と前記接合部雌側継手部材の各々のスリットには、スリット閉塞用鋼板が仮止めされていることを特徴とする請求項1記載の鋼製矢板の止水継手部の縦継ぎ構造。The longitudinal section of the water-stop joint portion of the steel sheet pile according to claim 1, wherein a slit closing steel plate is temporarily fixed to each slit of the female joint member and the joint female joint member. Joint structure. 前記スリット閉塞用鋼板に溶接アークで膨張した粘弾性材料の漏出用の孔を設けたことを特徴とする請求項2に記載の鋼製矢板の止水継手部の縦継ぎ構造。The vertical joint structure of a steel sheet pile according to claim 2, wherein a hole for leaking a viscoelastic material expanded by a welding arc is provided in the slit closing steel plate. 前記雌側継手部材と前記接合部雌側継手部材の間に生じる空間には、難透水性の粘土またはアスファルトを主成分とする粘弾性材料が充填されていることを特徴とする請求項1〜3の何れか1項記載の鋼製矢板の止水継手部の縦継ぎ構造。A space formed between the female joint member and the joint female joint member is filled with a viscoelastic material mainly composed of poorly permeable clay or asphalt. 4. The vertical joint structure of a water cut-off joint part of a steel sheet pile according to any one of 3. 1対の嵌合継手を止水用充填材を介して互いに嵌合させながら、鋼矢板及び鋼管矢板などの鋼製矢板を打設する継手部の止水方法として、矢板打設時の先打ち側(雌側)となりスリットを有する継手部の空間に、止水用充填材としてアスファルトを主成分とする粘弾性材料を予め充填した鋼製矢板を縦方向に継ぐに際して、
▲1▼下矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法下方に控えた位置まで設けた鋼製矢板を用い、
▲2▼上矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法上方に控えた位置まで設けた鋼製矢板を用い、
▲3▼下矢板と上矢板の本体を溶接により接合した後、下矢板と上矢板の雌側継手部材の間を接続する接合部雌側継手部材を溶接により上矢板継手、下矢板継手及び上下矢板本体に固着するにあたり、
接合部雌側継手部材にも予めアスファルトを主成分とする粘弾性材料を充填しておき、下矢板および上矢板継手部材の間に接合部雌側継手部材を挿入し、各継手材の間の接合部を鋼製の縦継ぎ部帯板により外側より覆い、前記帯板と継手部材を溶接により固着させるとともに、接合部雌側継手部材と鋼矢板本体を溶接により固着させたことを特徴とする鋼製矢板の止水継手部の縦継ぎ方法。
As a method of stopping water at a joint portion for driving steel sheet piles such as steel sheet piles and steel pipe sheet piles while fitting a pair of fitting joints with each other via a water-stopping filler material, a first strike during sheet pile driving is used. When joining a steel sheet pile pre-filled with a viscoelastic material mainly composed of asphalt as a water-stopping filler in the space of the joint part having a slit on the side (female side),
(1) As a lower sheet pile, a steel sheet pile provided with a joint filled with a viscoelastic material up to a position below a connection part of the sheet pile main body by a predetermined dimension is used,
{Circle around (2)} As the upper sheet pile, a steel sheet pile provided with a joint filled with a viscoelastic material up to a position below a connection part of the sheet pile main body by a predetermined dimension is used,
(3) After the main body of the lower sheet pile and the upper sheet pile are joined by welding, the joint part female side joint member connecting between the female joint members of the lower sheet pile and the upper sheet pile is welded to the upper sheet pile joint, the lower sheet pile joint and the upper and lower parts. When sticking to the sheet pile body,
The joint female joint member is also pre-filled with a viscoelastic material mainly composed of asphalt, and the joint female joint member is inserted between the lower sheet pile and the upper sheet pile joint member. The joint is covered from the outside with a steel longitudinal joint strip, the strip and the joint member are fixed by welding, and the joint female side joint member and the steel sheet pile main body are fixed by welding. Vertical joint method of the water stop joint of steel sheet pile.
継手部の接合面のどちらか片側もしくは両側に開先加工を施してあり、開先により生じる空間に、難透水性の粘土またはアスファルトを主成分とする粘弾性材料を常温にて押し込んだ後、各継手部材の間を鋼製の帯板により、外側より覆い帯板と継手部材を溶接により固着させるとともに、接合部雌側継手部材と鋼矢板を溶接により固着することを特徴とする請求項5に記載の鋼製矢板の止水継手部の縦継ぎ方法。Either one side or both sides of the joint surface of the joint part has been subjected to groove processing, after pushing the viscoelastic material mainly composed of poorly permeable clay or asphalt into the space created by the groove at room temperature, 6. A steel band strip between the joint members is used to secure the band strip and the joint member from the outside by welding, and the joint part female side joint member and the steel sheet pile are fixed by welding. The method for longitudinal jointing of a water stop joint of a steel sheet pile according to the above. 縦継ぎ溶接時のスリットからの充填材料の漏出を抑制させる手段として、予め粘弾性材料を充填した接合部雌側継手部材および、上矢板もしくは下矢板の継手部材のスリットに所定長にわたりスリット閉塞用鋼板を当てがうことを特徴とする請求項5または6記載の鋼製矢板の止水継手部の縦継ぎ方法。As means for suppressing the leakage of the filler material from the slit during longitudinal joint welding, the joint female joint member previously filled with a viscoelastic material and the slit of the joint member of the upper sheet pile or the lower sheet pile for closing the slit over a predetermined length. 7. The method according to claim 5, wherein a steel plate is applied. 鋼製矢板本体に設けた1対の嵌合継手のうち、矢板打設時の先打ち側(雌側)となる嵌合継手の空間に予め止水用充填材としてアスファルトを主成分とする粘弾性材料が充填された鋼製矢板を、縦方向に継ぐ際の前記雌側継手部材の縦継ぎ構造であって、上下の鋼製矢板における前記雌側継手部材の上下方向の端部は上下の鋼製矢板本体の溶接接合位置から離れており、それにより形成される上下の雌側継手部材の間隔に、該間隔を埋める長さ寸法を持ち、かつ前記雌側嵌合継手と同一径で同一断面構造を持つ接合部雌側継手部材を配置し、両雌側継手部材の接合面のどちらか片側もしくは両側に開先加工を施してあり、開先により生じる空間を介して継手部空間に充填された難燃材である粘性土が、前記開先に上下方向に所定厚さの層をなして存在していることを特徴とする鋼製矢板の止水継手部の縦継ぎ構造。Among a pair of fitting joints provided on the steel sheet pile main body, a space containing a bitumen containing asphalt as a main component as a water-stopping filler is preliminarily filled in a space of a fitting joint which is a first strike side (female side) at the time of sheet pile driving. A steel sheet pile filled with an elastic material, the longitudinal joint structure of the female joint member when joining in the vertical direction, the upper and lower ends of the female joint member in the upper and lower steel sheet piles in the vertical direction. It is separated from the welded joint position of the steel sheet pile main body, has a length dimension to fill the gap between the upper and lower female joint members formed thereby, and has the same diameter and the same as the female fitting joint. A joint female joint member with a cross-sectional structure is arranged, and one or both sides of the joint surface of both female joint members are grooved, and the joint space is filled through the space created by the groove. Viscous soil, which is a fire-retardant material, forms a layer of a predetermined thickness in the Jointed structure of waterproofing joints of steel sheet pile, characterized in that is present Te. 1対の嵌合継手を止水用充填材を介して互いに嵌合させながら、鋼矢板及び鋼管矢板などの鋼製矢板を打設する継手部の止水方法として、矢板打設時の先打ち側(雌側)となりスリットを有する継手部の空間に、止水用充填材としてアスファルトを主成分とする粘弾性材料を予め充填した鋼製矢板を縦方向に継ぐに際して、
▲1▼下矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法下方に控えた位置まで設けた鋼製矢板を用い、
▲2▼上矢板として、粘弾性材料を充填した継手部を矢板本体接続部より所定寸法上方に控えた位置まで設けた鋼製矢板を用い、
▲3▼下矢板と上矢板の本体を溶接により接合した後、下矢板と上矢板の雌側継手部材の間を接続する接合部雌側継手部材を溶接により上矢板継手、下矢板継手及び上下矢板本体に固着するにあたり、
継手部内空間で、かつ前記開先の上下方向に所定厚さの層をなすように前記開先により生じる空間を介して難燃性止水材を充填し、その後、開先を溶接することを特徴とする鋼製矢板の止水継手部の縦継ぎ方法。
As a method of stopping water at a joint portion for driving steel sheet piles such as steel sheet piles and steel pipe sheet piles while fitting a pair of fitting joints with each other via a water-stopping filler material, a first strike during sheet pile driving is used. When joining a steel sheet pile pre-filled with a viscoelastic material mainly composed of asphalt as a water-stopping filler in the space of the joint part having a slit on the side (female side),
(1) As a lower sheet pile, a steel sheet pile provided with a joint filled with a viscoelastic material up to a position below a connection part of the sheet pile main body by a predetermined dimension is used,
{Circle around (2)} As the upper sheet pile, a steel sheet pile provided with a joint filled with a viscoelastic material up to a position below a connection part of the sheet pile main body by a predetermined dimension is used,
(3) After the main body of the lower sheet pile and the upper sheet pile are joined by welding, the joint part female side joint member connecting between the female joint members of the lower sheet pile and the upper sheet pile is welded to the upper sheet pile joint, the lower sheet pile joint and the upper and lower parts. When sticking to the sheet pile body,
Filling the flame-retardant waterproof material through the space created by the groove so as to form a layer of a predetermined thickness in the joint part space and in the vertical direction of the groove, and then welding the groove. The method of longitudinal jointing of the water stop joint of a steel sheet pile.
JP2002253705A 2002-08-30 2002-08-30 Longitudinal structure of water-stop joint of steel sheet pile and method of longitudinal connection Expired - Fee Related JP3828846B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002253705A JP3828846B2 (en) 2002-08-30 2002-08-30 Longitudinal structure of water-stop joint of steel sheet pile and method of longitudinal connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002253705A JP3828846B2 (en) 2002-08-30 2002-08-30 Longitudinal structure of water-stop joint of steel sheet pile and method of longitudinal connection

Publications (2)

Publication Number Publication Date
JP2004092151A true JP2004092151A (en) 2004-03-25
JP3828846B2 JP3828846B2 (en) 2006-10-04

Family

ID=32059636

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002253705A Expired - Fee Related JP3828846B2 (en) 2002-08-30 2002-08-30 Longitudinal structure of water-stop joint of steel sheet pile and method of longitudinal connection

Country Status (1)

Country Link
JP (1) JP3828846B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8485059B2 (en) 2009-02-05 2013-07-16 Zf Friedrichshafen Ag Actuating device having force-feedback
JP2015108251A (en) * 2013-12-05 2015-06-11 前田建設工業株式会社 Welding assisting apparatus for steel pipe sheet pile
JP2021014781A (en) * 2019-07-10 2021-02-12 Jfeスチール株式会社 Steel impermeable wall and impermeable method of steel impermeable wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8485059B2 (en) 2009-02-05 2013-07-16 Zf Friedrichshafen Ag Actuating device having force-feedback
JP2015108251A (en) * 2013-12-05 2015-06-11 前田建設工業株式会社 Welding assisting apparatus for steel pipe sheet pile
JP2021014781A (en) * 2019-07-10 2021-02-12 Jfeスチール株式会社 Steel impermeable wall and impermeable method of steel impermeable wall
JP7183218B2 (en) 2019-07-10 2022-12-05 Jfeスチール株式会社 Steel impermeable wall, water impermeable method of steel impermeable wall

Also Published As

Publication number Publication date
JP3828846B2 (en) 2006-10-04

Similar Documents

Publication Publication Date Title
TWI269823B (en) Steel wall and the manufacture method thereof
JP2004092151A (en) Structure and method for longitudinally connecting cutoff joint portions for steel sheet piles
GB2228760A (en) In-ground barrier
JPH09217584A (en) Pipe joint for pipe roof, watertight packing of shaft, and water cutoff method in pipe roof construction method
JP6602676B2 (en) Construction method of underground shell structure
JP2005090151A (en) Tunnel waterproofing construction method
JP2022048819A (en) Connection structure, connection method and segment
JP4260565B2 (en) Resin sheet, resin sheet joint structure, concrete structure construction method, concrete segment and concrete filled steel segment
JP2012112215A (en) Lining material and repair method of lining wall
JP2004232225A (en) Sheet pile type steel wall and steel sheet pile
JP5023891B2 (en) Construction method of underground wall joint, underground wall joint structure, underground wall
JP3298100B2 (en) Waterproof segment for shield tunnel and its construction method
RU2806125C1 (en) Method for installing a protective coating for a butt joint of pipes with a continuous concrete coating and a covering casing
JP3332507B2 (en) How to build underground structures
JP2004244849A (en) Method of manufacturing steel wall
JP7165022B2 (en) Water shielding method and water shielding structure for steel sheet pile joints
JP3633606B2 (en) Sheet pile steel wall
KR200203127Y1 (en) Welding guide
KR100248484B1 (en) Method for constructing protective seat
JP5691110B2 (en) Rehabilitation method of existing impermeable sheet
JP3230174B2 (en) Tunnel waterproofing method and waterproof sheet
JP4203201B2 (en) Pipe burying method
AU2007251904B2 (en) Jointing System for Pipe Lining
JP3242533B2 (en) Auxiliary tool for joining resin sheets
CN113668726A (en) Component for deformation joint of fireproof dike, fireproof dike and construction method of fireproof dike

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041217

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060622

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060627

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060707

R151 Written notification of patent or utility model registration

Ref document number: 3828846

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090714

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100714

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110714

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120714

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130714

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130714

Year of fee payment: 7

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130714

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130714

Year of fee payment: 7

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130714

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533