JP2003331097A - Method and system for managing field work - Google Patents

Method and system for managing field work

Info

Publication number
JP2003331097A
JP2003331097A JP2002143117A JP2002143117A JP2003331097A JP 2003331097 A JP2003331097 A JP 2003331097A JP 2002143117 A JP2002143117 A JP 2002143117A JP 2002143117 A JP2002143117 A JP 2002143117A JP 2003331097 A JP2003331097 A JP 2003331097A
Authority
JP
Japan
Prior art keywords
work
personal identification
worker
area
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002143117A
Other languages
Japanese (ja)
Inventor
Yasushi Yoshimura
康史 吉村
Kuniyuki Fukuzawa
邦之 福沢
Tsuneyoshi Hirano
恒義 平野
Yuji Yokoi
裕司 横井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Plant Technologies Ltd
Original Assignee
Hitachi Plant Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Plant Technologies Ltd filed Critical Hitachi Plant Technologies Ltd
Priority to JP2002143117A priority Critical patent/JP2003331097A/en
Publication of JP2003331097A publication Critical patent/JP2003331097A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To improve productivity by automatically tracking the action of each worker in a work field, grasping the work contents of each worker from the stay area of the worker and calculating the number of workers engaging in specific work and the process time of the specific work. <P>SOLUTION: Each worker is made to carry a transmission tag for transmitting an individual identification signal. Receivers for receiving signals from respective transmission tags are arranged on a plurality of areas of the work field. Personal identification signals received from each receiver are detected, the sort of work linked to the personal identification signals and receiving area stay time information is detected from a previously constructed database, and the number of workers and work time are outputted in each work type or in each work area. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は現場作業管理方法お
よびシステムに係わり、特に建設現場などにおいて、作
業従事者の行動を作業従事者に携帯させた発信タグの信
号(IDデータ)を利用してリアルタイムにデータを収集
して作業管理に利用する現場作業管理方法とシステムに
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a field work management method and system, and in particular, at a construction site or the like, using the signal (ID data) of a transmission tag that carries the activity of the worker to the worker. The present invention relates to a field work management method and system for collecting data in real time and using it for work management.

【0002】[0002]

【従来の技術】一般に、生産性を向上させるためには、
作業別及び作業領域別にどのくらいの人数でどのくらい
の時間を要したかを把握する必要がある。さらに、その
データをもとに、工程再検討、資材置場・道工具置場の
再設定、作業班の入れ替え等の改善を実施する必要があ
る。これには、作業員の現場内の行動を把握することが
必要である。
2. Description of the Related Art Generally, in order to improve productivity,
It is necessary to understand how many people and how much time it took by work and work area. Furthermore, based on the data, it is necessary to carry out improvements such as re-examination of the process, resetting of the material storage area / road tool storage area, and replacement of the work team. To do this, it is necessary to understand the behavior of workers in the field.

【0003】しかし、建設現場は、移動を伴う作業が少
ない工場生産と異なり以下の特徴があり、作業員の行動
を把握することはむずかしい。 作業員は一日中特定場所にとどまって作業を継続する
ことはない。 日々作業場所が異なる。 現場が大きくなるほど、一日の移動する範囲は広くな
る可能性がある。
However, the construction site has the following characteristics, unlike factory production, which involves a small amount of work involving movement, and it is difficult to grasp the behavior of the worker. Workers do not stay in specified locations throughout the day to continue working. Work place is different every day. The larger the site, the greater the range of travel that can be done during the day.

【0004】そのため、一日の作業状況を把握するため
には、作業員に同行して作業を観察したり、作業員に日
々の実施した作業内容を記録してもらう方法がある。前
者は、作業員数、作業班等多いため、各々に同行するの
は困難である。また、後者の場合においても、作業内容
が多岐にわたる場合、例えば作業場所を頻繁に変えた場
合、移動が多い作業、実施作業が多い場合等では、作業
員は詳細を記入しにくいし、記入する時間がない。現状
は、後者の方法を利用しており、日報には作業コードの
みを記入する等、記入項目の標準化を図っている。
Therefore, in order to grasp the work status of one day, there is a method in which a worker is accompanied to observe the work, or the worker records the contents of the work performed every day. It is difficult for the former to accompany each other due to the large number of workers and work teams. Also in the latter case, if the work content is diverse, for example, if the work place is changed frequently, if there is a lot of movement, or if there is much work to be done, it is difficult for the worker to fill in the details, and so do the details. no time. At present, the latter method is used and the daily report is standardized in the entry items such as entering only the work code.

【0005】[0005]

【発明が解決しようとする課題】しかし、記入の簡便化
は図られているが、詳細はわからず、作業員の現場内の
行動を把握することができず、作業の流れを分析する等
のデータとはならない。また、作業員の記憶に頼ったデ
ータであるので、その信憑性にも問題がある。その上、
次期プラント計画時の発注参考データにはなるが、詳細
がわからないので改善データとはならないという問題が
ある。
However, although the entry is simplified, the details are not known, the behavior of the worker in the field cannot be grasped, and the work flow is analyzed. Not data. In addition, since the data depends on the memory of the worker, there is a problem in its authenticity. Moreover,
Although it will be reference data for ordering when planning the next plant, there is a problem that it is not improvement data because details are not known.

【0006】本発明は、建設現場内で作業員個々の行動
を自動的に追跡しつつ、個々の作業従事者の滞在エリア
から作業内容を把握し、もって特定の作業に従事してい
る作業者の人数や工程時間を割り出して生産性の向上に
繋げることができる現場作業管理方法およびシステムを
提供することを目的とする。
The present invention automatically tracks the behavior of each worker in a construction site, grasps the work contents from the stay area of each worker, and thus the worker engaged in a specific work. It is an object of the present invention to provide a field work management method and system capable of determining the number of people and process time and improving productivity.

【0007】[0007]

【課題を解決するための手段】前記目的を解決するた
め、本発明は、建設現場内における作業員の1日の行動
を把握するため、作業員にIDを発信するタグを携帯さ
せ、IDを受信する端末を設置し、受信した端末によっ
て作業員の位置を明確にするとともに、予め作業エリア
における作業内容と対応付けておいて、その場所にいた
時間を把握しつつ従事作業を把握するように構成したも
のである。
[Means for Solving the Problems] In order to solve the above-mentioned object, the present invention allows a worker to carry a tag for transmitting an ID and grasp the ID in order to grasp the daily activity of the worker in a construction site. A terminal for receiving is installed, the position of the worker is clarified by the received terminal, and it is associated with the work content in the work area in advance, so that the engaged work can be grasped while grasping the time at the place. It is composed.

【0008】すなわち、本発明に係る現場作業管理方法
は、作業従事者に個人識別信号を発信する発信タグを携
行させ、前記発信タグからの信号を受信する受信機を作
業現場の複数のエリアに配置し、前記受信機により受信
された個人識別信号を検出し、予め構築されているデー
タベースから前記個人識別信号と受信エリア滞在時間情
報とにリンクされた作業種別を検出して作業種別ごとま
たは作業エリア別ごとの作業従事者数並びに作業従事時
間を出力可能としたものである。
That is, the work site management method according to the present invention allows a worker to carry a transmitter tag for transmitting a personal identification signal, and a receiver for receiving a signal from the transmitter tag in a plurality of areas of the work site. The personal identification signal received by the receiver is arranged, and the work type linked to the personal identification signal and the reception area stay time information is detected from a database built in advance to detect each work type or work. It is possible to output the number of work workers and work time for each area.

【0009】また、具体的には、作業現場において作業
員への作業指示、それに対する達成度、進捗度及び必要
とした作業工数・作業時間を把握する作業管理方法であ
って、作業員の個人識別信号を発信する発信タグを作業
員に携行させ、前記発信タグからの個人識別信号を受信
する受信機を建設現場内の作業員行動領域に設置してお
き、受信機位置データベース、個人識別受信データベー
ス、個人識別データベース、作業指示データベースを備
えているデータ収集装置により複数の受信機が受信した
個人識別信号を自動的に収集し、前記データ収集装置で
は、作業指示データベースにより、指示を与えた作業領
域内の作業別の作業員数を算出し、特定期間における特
定作業領域(受信機を設置した作業領域)内の作業員数を
表示し、要求に応じて、算出した作業領域内の作業員数
と個人識別受信データから得られる特定時間内の作業員
数から特定期間における特定作業領域内の作業員稼働率
を算出し、若しくは作業員別に作業領域移動推移を表示
可能としたものである。
Further, specifically, it is a work management method for grasping a work instruction to a worker at a work site, a degree of achievement for the work, a degree of progress, and required work man-hours / working time. A worker carries an outgoing tag that sends an identification signal, and a receiver that receives the personal identification signal from the outgoing tag is installed in the worker action area within the construction site, and the receiver position database and personal identification reception A data collecting device equipped with a database, a personal identification database, and a work instruction database automatically collects personal identification signals received by a plurality of receivers. Calculate the number of workers for each work in the area, display the number of workers in the specific work area (work area where the receiver is installed) in a specific period, and respond to the request. Then, from the calculated number of workers in the work area and the number of workers in the specified time obtained from the personal identification reception data, calculate the worker utilization rate in the specified work area in the specified period, or change the work area movement for each worker. It can be displayed.

【0010】本発明に係る現場作業管理システムは、作
業従事者に携行させる個人識別信号を発信する発信タグ
と、作業現場の複数のエリアに配置され当該エリア内に
位置する前記発信タグからの信号を受信する受信機と、
前記受信機により受信された個人識別信号が入力される
作業管理システムサーバを有し、当該作業管理システム
サーバには予めエリア滞在時間情報と個人識別信号にリ
ンクされた作業種別データを格納しているデータベース
と、前記個人識別信号と当該信号を受けた受信機の作業
エリアに対応する作業種別を当該データベースから検出
して作業種別ごと又は作業エリア別ごとの作業従事者数
並びに作業従事時間を出力させる処理手段を備えてなる
ことを特徴としている。
The on-site work management system according to the present invention includes a transmission tag for transmitting a personal identification signal to be carried by a worker and a signal from the transmission tag arranged in a plurality of areas of the work site and located in the area. A receiver to receive
There is a work management system server to which the personal identification signal received by the receiver is input, and the work management system server previously stores area stay time information and work type data linked to the personal identification signal. The database, the personal identification signal, and the work type corresponding to the work area of the receiver receiving the signal are detected from the database, and the number of work workers and the work time for each work type or work area are output. It is characterized by comprising a processing means.

【0011】前記個人識別データベースには、請負会社
名、作業員名、職種、資格、作業班が格納されている。
また、受信した個人識別受信データは、ID信号等の個
人識別信号と前記受信機の設置場所名(または受信機
名)、受信時刻とともに格納されている。更に、作業指
示データベースには、指示した日々の作業に関する作業
コードと作業を実施する作業領域コード、指示対象作業
員名が格納されている。
The personal identification database stores a contracting company name, a worker name, a job type, a qualification, and a work group.
Further, the received personal identification reception data is stored together with the personal identification signal such as an ID signal, the installation place name (or receiver name) of the receiver, and the reception time. Further, the work instruction database stores a work code relating to the instructed daily work, a work area code for performing the work, and an instruction target worker name.

【0012】[0012]

【発明の実施の形態】以下に、本発明に係る現場作業管
理方法およびシステムの具体的実施形態について、図面
を参照して、詳細に説明する。図1に、本実施形態に係
わる建設現場の作業管理システムの全体構成を示してい
る。この作業管理システムは、作業従事者に個人識別信
号などの情報を発信する発信タグ10を携行させること
によってデータを収集し、収集データに基づき、特定期
間における特定作業領域内の作業員稼働率などの管理デ
ータを生成するようにしたものである。
BEST MODE FOR CARRYING OUT THE INVENTION Specific embodiments of the method and system for managing on-site work according to the present invention will be described below in detail with reference to the drawings. FIG. 1 shows the overall configuration of a construction site work management system according to the present embodiment. This work management system collects data by causing a worker to carry a transmitting tag 10 that transmits information such as a personal identification signal, and based on the collected data, a worker operation rate in a specific work area in a specific period. The management data of is generated.

【0013】このような作業管理システムは、実際の作
業に携わる作業従事者の作業現場に設備されて作業管理
のためのデータを収集するデータ収集システム12、並
びに、作業現場とは異なる場所に設備されているデータ
処理システム14とを有し、両システム12,14をデ
ータ通信網16により連係してデータ伝送を可能として
いる。データ通信網16はLAN、公衆通信回線、無線
通信回線など任意の手段を取り得るもので、データの伝
送が的確に行えるものであればよい。
Such a work management system is installed at a work site of a worker engaged in actual work and collects data for work management, and a data collection system 12 at a place different from the work site. The data processing system 14 is provided, and both systems 12 and 14 are linked by a data communication network 16 to enable data transmission. The data communication network 16 can be any means such as LAN, public communication line, and wireless communication line, as long as it can transmit data accurately.

【0014】まず、前記発信タグ10は、個人識別信号
としてのIDが付与されたもので、このID信号を定時
間毎に無線発信可能としている。この発信タグ10を常
に作業従事者に常に携行させる必要があるため、作業中
に必ず用いられるもの、例えば作業ヘルメットなどに装
着させればよい。この発信タグ10の発信ID信号を作
業エリア単位に受信するようにして、作業従事者の居る
エリアを特定し、これによって作業管理データを収集す
ることができる。
First, the transmission tag 10 is provided with an ID as a personal identification signal, and the ID signal can be transmitted wirelessly at regular intervals. Since it is necessary to always carry this transmitting tag 10 with a worker, it may be attached to an item that is always used during work, such as a work helmet. By receiving the transmission ID signal of the transmission tag 10 for each work area, the area where the worker is present can be specified, and the work management data can be collected thereby.

【0015】前記データ収集システム12は、建設作業
現場内で、特定の作業すべきエリア内に何人の作業従事
者が存在しているか、従事している作業者は誰であるか
を発信タグ10からの信号として時系列に検出し、これ
をデータとして蓄積しておき、データ通信網16を介し
てデータ処理システム14に収集データを伝送するもの
である。一方、データ処理システム14は、データ収集
システム12から送られてきた収集データに基づき、作
業従事者の個人識別データと受信位置データから、当該
エリアで行っているべき作業を自動的に割り出し、現在
エリアに対応する作業指示データと、作業従事者の職種
を含む個人識別データとから、実質的作業に従事してい
るか否かを判別し、作業現場において作業員への作業指
示に対する達成度、進捗度及び必要とした作業工数・作
業時間を出力する。
In the construction work site, the data collection system 12 transmits the number of workers in a specific work area and the number of workers engaged in the tag. Is detected in time series as a signal from the data, is accumulated as data, and the collected data is transmitted to the data processing system 14 via the data communication network 16. On the other hand, the data processing system 14 automatically determines the work to be performed in the area based on the collected data sent from the data collection system 12 from the personal identification data of the worker and the reception position data, and The work instruction data corresponding to the area and the personal identification data including the job type of the worker are used to determine whether or not the worker is actually engaged in the work, and the achievement level and progress of the work instruction to the worker at the work site. The degree and required work man-hours and work time are output.

【0016】まず、データ収集システム12の具体的構
成を説明する。図1に示しているように、作業現場の作
業エリア内を複数に区画し、各区画エリア18(1
1、182、………18n)にタグID受信機20(2
1、202、………20n)を設置している。このタグ
ID受信機20は、設置エリア内に作業従事者が位置し
ている場合に、当該作業従事者に携行させている発信タ
グ10から定期的に無線発信しているタグID信号を受
信し、当該ID信号と、その受信時間とを記録しておく
ものである。この機能を実現するため、図2に示してい
るように、タグID受信機20は発信タグ10からの無
線信号を受信する受信アンテナ22を備えた受信機2
4、および受信タグID取込部26を有している。そし
て、受信機24にて受信されたタグ信号の受信時間の記
録部28を備え、受信したタグIDと、受信時間、並び
に受信をなしているタグID受信機20の識別番号との
合成処理部30によりデータ合成処理をなしてこれを記
録し、収集データを送信部31を通じて伝送するように
している。合成処理はコンピュータ本体32が、記録は
メモリ部34(図1参照)が、それぞれ担うようになっ
ている。そして、合成データを蓄積し、定時間毎にデー
タ通信網16を介してデータ処理システム14に送信す
るようになっている。
First, a specific configuration of the data collection system 12 will be described. As shown in FIG. 1, the work area of the work site is divided into a plurality of areas, and each divided area 18 (1
8 1 , 18 2 , ... 18 n ) has a tag ID receiver 20 (2
0 1 , 20 2 , ... 20 n ) are installed. This tag ID receiver 20 receives a tag ID signal wirelessly transmitted from the transmission tag 10 carried by the worker when the worker is located in the installation area. , The ID signal and the reception time thereof are recorded. In order to realize this function, as shown in FIG. 2, the tag ID receiver 20 includes a receiver 2 having a receiving antenna 22 for receiving a radio signal from the transmitting tag 10.
4 and the reception tag ID acquisition unit 26. Then, the recording unit 28 for recording the reception time of the tag signal received by the receiver 24 is provided, and the combining processing unit of the received tag ID, the reception time, and the identification number of the tag ID receiver 20 that is receiving Data composition processing is performed by 30 and recorded, and the collected data is transmitted through the transmission unit 31. The computer main body 32 is responsible for the synthesizing process, and the memory unit 34 (see FIG. 1) is responsible for recording. Then, the synthetic data is accumulated and transmitted to the data processing system 14 via the data communication network 16 at regular intervals.

【0017】次に、データ処理システム14は、前記デ
ータ収集システム12からタグID受信機20により受
信された個人識別信号としてのタグIDを含むデータを
入力し、予め構築されているデータベースから前記個人
識別信号と受信エリア滞在時間情報とにリンクされた作
業種別を検出して作業種別ごとまたは作業エリア別ごと
の作業従事者数並びに作業従事時間を時系列に配列して
出力するものである。このため、前記タグID受信機2
0により受信されデータ収集システム12から伝送され
た個人識別信号を含むデータを入力する作業管理システ
ムサーバ36を備えている。当該作業管理システムサー
バ36には予めエリア滞在時間情報と個人識別信号にリ
ンクされた作業種別データを格納しているデータベース
が予め構築されている。このデータベースは、図1に示
すように、個人識別データベース38、受信機位置デー
タベース40、作業指示データベース42、作業別移動
ルート計画データベース44、個人識別受信データベー
ス46から構成されている。
Next, the data processing system 14 inputs data including a tag ID as a personal identification signal received by the tag ID receiver 20 from the data collection system 12, and the personal data is stored in a pre-built database. The work type linked to the identification signal and the reception area stay time information is detected, and the number of work workers and the work working time for each work type or each work area are arranged in time series and output. Therefore, the tag ID receiver 2
A work management system server 36 is provided for inputting data including a personal identification signal received from the data collection system 12 and transmitted from the data collection system 12. The work management system server 36 is pre-built with a database that stores work type data linked to the area stay time information and the personal identification signal. As shown in FIG. 1, this database includes a personal identification database 38, a receiver position database 40, a work instruction database 42, a work-based movement route planning database 44, and a personal identification reception database 46.

【0018】個人識別データベース38は、図3に示す
ように、従事者ID番号、管理元会社、請負会社、氏
名、年齢、職種、経験年数、資格などのデータ項目を有
しているもので(個人識別データI)、作業従事者の基
本データを記録している。基本的には氏名データと職種
データ、並びに資格データがあれば作業管理に利用でき
る。当該個人識別データベース38は、実作業の開始に
際して、作業従事者にID信号を発信する発信タグ10
を携行させるが、この発信タグ10と作業従事者とをリ
ンクさせる必要がある。そのため、本実施形態では、発
信タグ10を作業員ヘルメット等へ取付け、その発信タ
グ10が発信するID番号を前記個人識別データベース
38に入力し、作業員の個人識別データとタグ10が発
信するID番号が照合できるようにして図4に示すよう
な個人識別データIIを作成するようにしている。
As shown in FIG. 3, the personal identification database 38 has data items such as worker ID number, management company, contracting company, name, age, occupation, years of experience, and qualification ( It records personal identification data I) and basic data of workers. Basically, if you have name data, job type data, and qualification data, you can use it for work management. The personal identification database 38 transmits the ID signal to the worker when starting the actual work.
However, it is necessary to link the transmission tag 10 and the worker. Therefore, in this embodiment, the transmission tag 10 is attached to a worker helmet or the like, the ID number transmitted by the transmission tag 10 is input to the personal identification database 38, and the personal identification data of the worker and the ID transmitted by the tag 10 are input. The personal identification data II as shown in FIG. 4 is created so that the numbers can be collated.

【0019】受信機位置データベース40は、図5に示
すように、受信機名、作業領域コード、作業領域内設置
位置データ、設定年月日データの項目名を有するデータ
ベースであり、作業現場を複数に区画した時のエリア単
位に置かれるタグID受信機20に関連するデータであ
る。このデータベースにより、受信機20が特定のID
信号を検出したときには、当該ID信号を持つ作業従事
者が当該受信機20の設置エリアに居ることが判明す
る。
As shown in FIG. 5, the receiver position database 40 is a database having item names such as receiver name, work area code, work area installation position data, and set date data, and there are a plurality of work sites. This is data related to the tag ID receiver 20 placed in the area unit when divided into. This database allows receiver 20 to have a specific ID
When the signal is detected, it is found that the worker having the ID signal is in the installation area of the receiver 20.

【0020】また、作業指示データベース42のデータ
構成を図6に示す。これは作業コード、作業名、作業領
域コード、作業班、作業年月日をデータ項目としてお
り、作業現場での作業領域と作業内容とをリンクさせて
いる。これにより、特定の作業エリアで行うべき作業内
容が特定され、このエリア内に作業内容に対応する職種
を持つ作業従事者が居れば、当該作業従事者が実施して
いる作業を特定することができる。作業従事者が作業内
容を報告しなくとも、自動的に作業が行われているか否
かが判定できるのである。
The data structure of the work instruction database 42 is shown in FIG. This has a work code, a work name, a work area code, a work group, and a work date as data items, and links the work area and work contents at the work site. As a result, the work content to be performed in the specific work area is specified, and if there is a work worker with a job type corresponding to the work content in this area, the work performed by the work worker can be specified. it can. Even if the worker does not report the work content, it can be automatically determined whether the work is being performed.

【0021】次に、作業別移動ルート計画データベース
44は、図7に示しているように、作業コード、作業
名、作業領域コード、機器・系統コード、移動領域など
のデータ項目をもつデータベースである。これによっ
て、各作業の時間的な流れにしたがった移動経路が明確
になるので、作業手順の照合ができ、使用機材の特定な
どの確認解析が可能となっている。
Next, the movement route planning database for each work 44 is a database having data items such as a work code, a work name, a work area code, a device / system code, and a movement area, as shown in FIG. . As a result, the movement route according to the temporal flow of each work is clarified, so that the work procedure can be collated and the confirmation analysis such as the identification of the equipment used can be performed.

【0022】個人識別受信データベース46は、データ
収集システム12から伝送されてきたデータを格納して
おくもので、図8に示しているように、特定のタグID
受信機20が検出したタグIDと、受信時刻、並びに受
信年月日の項目からなる受信機別の個人識別データを入
力するとともに、この受信機別の個人識別データからタ
グID信号別、すなわち作業従事者毎の移動データを作
成するようにしている。これは図9に示しているよう
に、データ配列をタグID信号別にデータの配列を並び
変えたもので、これにより特定の作業従事者が存在して
いた作業エリアと、滞在時間を特定することができ、も
って作業従事者の移動経路が時間データとともに特定さ
れる。
The personal identification reception database 46 stores the data transmitted from the data collection system 12, and as shown in FIG.
The tag ID detected by the receiver 20, the reception time, and the personal identification data for each receiver including the date of reception are input, and the personal identification data for each receiver is used for each tag ID signal, that is, work. I am trying to create movement data for each worker. As shown in FIG. 9, this is a data array in which the data array is rearranged for each tag ID signal, and by this, the work area where a specific worker was present and the stay time can be specified. Then, the movement route of the worker is specified together with the time data.

【0023】このようなデータベースを備えたデータ処
理システム14では、各データベースから必要データを
読み込み、作業管理システムサーバ36が解析処理を行
う。この作業管理システムサーバ36では、図10に示
しているように、データ収集システム12から伝送され
てくるデータを一旦個人識別受信データベース46に格
納するために、個人識別受信データ収集処理部48が設
けられている。この処理部48は図8に示している受信
機別個人識別受信データを入力し、これを図9に示す総
合個人識別受信データに変換処理する。一方、データ処
理システム14では、作業開始に先立ってタグID信号
と作業従事者とをリンク付けするようにしている。作業
管理システムサーバ36にはタグID登録用受信機50
が接続され、これによってリンク処理を行うものとして
いる。このため、作業管理システムサーバ36は、個人
識別データ入力部52とタグID入力部54を有し、そ
のデータ同士をリンクさせる合成処理部55を備えてい
る。このリンク処理により、図4に示す個人識別データ
IIが構築される。
In the data processing system 14 provided with such a database, necessary data is read from each database, and the work management system server 36 performs analysis processing. In this work management system server 36, as shown in FIG. 10, a personal identification reception data collection processing unit 48 is provided in order to temporarily store the data transmitted from the data collection system 12 in the personal identification reception database 46. Has been. The processing unit 48 inputs the receiver-specific personal identification reception data shown in FIG. 8 and converts it into the integrated personal identification reception data shown in FIG. On the other hand, in the data processing system 14, the tag ID signal and the worker are linked before starting the work. The work management system server 36 includes a tag ID registration receiver 50.
Are connected, and link processing is performed by this. For this reason, the work management system server 36 has a personal identification data input section 52 and a tag ID input section 54, and a combination processing section 55 that links the data. By this link processing, the personal identification data shown in FIG.
II is built.

【0024】また、作業管理システムサーバ36はタグ
ID照合処理部56を有し、ここでは収集データから個
人識別受信データとタグID信号との照合をなすように
している。この照合処理はデータベースが格納されてい
る記憶装置58から必要なデータベースを参照・抽出
し、解析処理部60に入力するようにしている。この解
析処理部60では、作業種別ごとまたは作業エリア別ご
との作業従事者数並びに作業従事時間を時系列に配列し
て、画面表示部62、印刷出力部64に出力させるよう
にしている。
Further, the work management system server 36 has a tag ID collation processing section 56, and here, collation is performed between the personal identification received data and the tag ID signal from the collected data. In this collation processing, a required database is referenced / extracted from the storage device 58 in which the database is stored and input to the analysis processing unit 60. In the analysis processing unit 60, the number of work workers and the work working time for each work type or each work area are arranged in time series and are output to the screen display unit 62 and the print output unit 64.

【0025】このように構成された現場作業管理システ
ムによる作業手順を説明する。図11に現場作業管理シ
ステムの利用手順を示す。まず図3に示す個人識別デー
タを入力する(ステップ100)。次に作業員ヘルメッ
ト等ヘタグ10を取付ける(ステップ102)。そのタ
グ10が発信するID番号を入力し(ステップ10
4)、作業員の個人識別データとタグが発信するID番
号が照合できるようにする。すなわち、図4の個人識別
データIIを作成するのである(ステップ106)。次
に、図6に示す作業指示データベースと図7に示す作業
別移動ルート計画データを作成し(ステップ108)、
作業別に解析できるようにする。次に作業現場の所定の
位置、すなわち対象とする作業について作業員の移動を
把握できる位置へ受信機20を設置する(ステップ11
0)。本実施例では、タグID受信機20を有するデー
タ収集システム12と、現場作業管理システムサーバ3
6を有するデータ処理システム14間は、クライアント
サーバ方式のネットワークを構成している。このため、
データ送受信できるように有線方式のデータ通信網16
を設定する(ステップ112)。
A work procedure by the field work management system configured as described above will be described. FIG. 11 shows a procedure for using the on-site work management system. First, the personal identification data shown in FIG. 3 is input (step 100). Next, the tag 10 is attached to the worker helmet or the like (step 102). Enter the ID number sent by the tag 10 (step 10
4) The personal identification data of the worker and the ID number transmitted by the tag can be collated. That is, the personal identification data II of FIG. 4 is created (step 106). Next, the work instruction database shown in FIG. 6 and the movement route planning data for each work shown in FIG. 7 are created (step 108),
Enable analysis by work. Next, the receiver 20 is installed at a predetermined position on the work site, that is, at a position where the movement of the worker can be grasped for the target work (step 11).
0). In this embodiment, the data collection system 12 having the tag ID receiver 20 and the site work management system server 3
Between the data processing systems 14 having the No. 6 system, a client-server type network is configured. For this reason,
Wired data communication network 16 for data transmission and reception
Is set (step 112).

【0026】次いで、受信機20の位置を特定できるよ
うに受信機設置位置を入力する(ステップ114)。以
上の設定を行うことによって現場作業管理システムを稼
動することができる(ステップ116)。解析処理部6
0を稼動することによって解析を行い(ステップ11
8)、解析方法を選択して、表示を実行させればよい
(ステップ120、122)。
Next, the receiver installation position is input so that the position of the receiver 20 can be specified (step 114). By performing the above settings, the on-site work management system can be operated (step 116). Analysis processing unit 6
0 to run the analysis (step 11
8) The display method may be executed by selecting the analysis method (steps 120 and 122).

【0027】図12は、現場作業管理システムの動作フ
ローである。まず、タグID受信機アンテナ22でタグ
IDを受信し取込む(ステップ200)。次にタグID
とともにタグID信号受信時間と受信機名を自動的にデ
ータベース化し(ステップ202)、図8に示している
ようなデータ表を作成する。そのデータを個人識別受信
データとして現場作業管理システムサーバ36ヘ送信す
る(ステップ204)。現場作業管理システムサーバ3
6では、各タグID受信機20から収集したデータをも
とに総合個人識別受信データ(図9)を作成する(ステッ
プ206)。次に個人識別データII(図4)と受信機位
置データベース(図5)から受信機位置別にその場所に
滞在した作業員とその時刻を特定できる(ステップ20
8、210)。次に作業指示データベースに記載されて
いる作業領域コードと所定の期日に行われる作業コード
を参照することにより実施された作業を特定できる(ス
テップ212)。この一連の作業を解析が可能なデータ
数が得られるまで繰り返す(ステップ214)。データ
が揃った後、解析処理とその結果の表示処理を行うので
ある(ステップ216、218)
FIG. 12 is an operation flow of the on-site work management system. First, the tag ID receiver antenna 22 receives and captures the tag ID (step 200). Next is the tag ID
At the same time, the tag ID signal reception time and the receiver name are automatically converted into a database (step 202), and a data table as shown in FIG. 8 is created. The data is transmitted as personal identification reception data to the site work management system server 36 (step 204). Field work management system server 3
In 6, the integrated personal identification reception data (FIG. 9) is created based on the data collected from each tag ID receiver 20 (step 206). Next, from the personal identification data II (FIG. 4) and the receiver position database (FIG. 5), it is possible to identify the worker who stayed at the position and the time of the receiver by the receiver position (step 20).
8, 210). Next, the work performed can be identified by referring to the work area code described in the work instruction database and the work code performed on a predetermined date (step 212). This series of operations is repeated until the number of data that can be analyzed is obtained (step 214). After the data are collected, analysis processing and display processing of the results are performed (steps 216 and 218).

【0028】次に、作業員別の移動状況、作業領域別作
業員数、作業時間、稼働率等を解析する場合は、図13
〜22に示す現場作業管理システムサーバ表示画面によ
り解析できる。図13〜16図は現場作業管理システム
サーバ36の表示画面であり、初期画面(図13)、各
種設定画面(図14)、照合処理画面(図15)、解析
処理画面(図16)を表示可能としている。また、図1
7〜図19は同じくサーバ36の表示画面であるが、こ
れは結果表示画面であり、作業員別移動追跡表示画面
(図17)、作業員別総合移動追跡表示(図18)、作
業エリア別移動追跡表示(図19)を表示できるように
している。更に、図20から図22もサーバ36の表示
画面例を示しており、職種別受信エリア移動表示(図2
0)、業者別受信エリア移動表示(図21)、作業稼働
率解析表示(図22)を表示できるようにしている。な
お、このとき図21、22に示すように目標値を入力で
きるようになっているので、現状と目標の比較ができ改
善対象を絞り込むことが出来る。また、図7に示すよう
にあらかじめ作業別移動ルート計画データを作成してい
るため、このデータと作業員別の移動状況を比較するこ
とにより、作業の流れの良し悪しを判断でき、仮置場設
置位置の不具合、搬入経路の不適当等の改善点の指摘が
行える。また、作業別に作業時間、稼働率を推定できる
のでこのデータをもとに、次期プラントの工程計画の精
度向上を図ることが出来る。
Next, in the case of analyzing the movement status of each worker, the number of workers by work area, work time, operating rate, etc., FIG.
It can be analyzed by the site work management system server display screens shown in FIGS. 13 to 16 are display screens of the site work management system server 36, and display an initial screen (FIG. 13), various setting screens (FIG. 14), a collation processing screen (FIG. 15), and an analysis processing screen (FIG. 16). It is possible. Also, FIG.
7 to 19 are also display screens of the server 36, but this is a result display screen, and is a movement tracking display screen for each worker (FIG. 17), a comprehensive movement tracking display for each worker (FIG. 18), and a work area. The movement tracking display (FIG. 19) can be displayed. Further, FIGS. 20 to 22 also show examples of the display screen of the server 36.
0), trader-specific reception area movement display (FIG. 21), and work availability analysis display (FIG. 22). At this time, since the target value can be input as shown in FIGS. 21 and 22, it is possible to compare the current state with the target and narrow down the improvement target. Further, as shown in FIG. 7, work route planning data for each work is created in advance. Therefore, by comparing this data with the movement situation for each worker, it is possible to judge the quality of the work flow and set up a temporary storage area. It is possible to point out the points to be improved, such as location problems and improper delivery routes. Further, since the work time and the operation rate can be estimated for each work, the accuracy of the process plan of the next plant can be improved based on this data.

【0029】なお、実施形態では発信タグ10とデータ
収集システム12とは無線によりデータ送信を行う構成
とし、データ収集システム12とデータ処理システム1
4間を有線方式によるデータ通信網16によってネット
ワークを構成したが、データ通信網16を無線方式によ
り構成したネットワークとしてもよい。また、携帯電
話、PHS等を利用し外部の通信機関を介したネットワ
ークを利用してもよい。
In the embodiment, the transmission tag 10 and the data collection system 12 are configured to wirelessly transmit data, and the data collection system 12 and the data processing system 1 are used.
Although the network is configured by the data communication network 16 of the wired system between the four, the data communication network 16 may be a network of the wireless system. Alternatively, a mobile phone, PHS or the like may be used to use a network via an external communication institution.

【0030】現場作業管理用のデータ収集装置と現場作
業管理システムサーバは異なるコンピュータとして示し
たが、同一のコンピュータであっても構わない。応用例
では、タグIDと従事者IDは異なる場合を示したが、
同一であってもよい。
Although the data collection device for site work management and the site work management system server are shown as different computers, they may be the same computer. In the application example, the tag ID and the worker ID are different, but
It may be the same.

【0031】このように、本実施形態によれば、作業員
別の移動追跡できることから、作業別や作業班別や作業
員別に従事時間が把握でき、そのデータを過去及び異な
る作業領域のものと比較することによって作業別に作業
の効率を判断できる。その判断結果により、指示された
作業を実施する時の作業の流れ(作業を実施するにあた
り現場内を移動する行動)の良し悪しを定量的に指摘で
きる。それにより作業め流れを改善できる。
As described above, according to the present embodiment, since the movement tracking for each worker can be performed, the working time can be grasped for each work, each work group, and each worker, and the data can be used for the past and different work areas. By comparing, the work efficiency can be judged for each work. From the result of the judgment, it is possible to quantitatively point out the quality of the work flow when performing the instructed work (the action of moving inside the work site when performing the work). This can improve the work flow.

【0032】作業領域によっては人数が集中しその作業
領域における作業の効率が低下する場合がある。作業領
域別作業員数の時間経過を把握できるため、計画した工
程によって作業員数の集中が生じた場合、作業指示の変
更によりそれを回避し、作業の効率を高めるとともに安
全性の向上に結びつけることができる。次期プラント計
画時に完了プラントに関する作業管理データ(本発明で
実現できるデータ)と工程を参照することによって、完
了プラントで生じた作業効率の低下を是正した計画を作
成できる。
Depending on the work area, the number of people may concentrate and the work efficiency in that work area may decrease. Since it is possible to grasp the elapsed time of the number of workers by work area, when the number of workers is concentrated due to the planned process, it is possible to avoid it by changing the work instruction, improve work efficiency and improve safety. it can. By referring to the work management data (data that can be realized by the present invention) and the process regarding the completed plant at the time of planning the next plant, it is possible to create a plan in which the reduction in the work efficiency that has occurred in the completed plant is corrected.

【0033】[0033]

【発明の効果】以上の通り、本発明は、作業従事者に個
人識別信号を発信する発信タグを携行させ、前記発信タ
グからの信号を受信する受信機を作業現場の複数のエリ
アに配置し、前記受信機により受信された個人識別信号
を検出し、予め構築されているデータベースから前記個
人識別信号と受信エリア滞在時間情報とにリンクされた
作業種別を検出して作業種別ごとまたは作業エリア別ご
との作業従事者数並びに作業従事時間を出力する構成と
したので、建設現場内で作業員個々の行動を自動的に追
跡しつつ、個々の作業従事者の滞在エリアから作業内容
を把握し、もって特定の作業に従事している作業者の人
数や工程時間を割り出して生産性の向上に繋げることが
できる。
As described above, according to the present invention, a worker is allowed to carry a transmitting tag for transmitting a personal identification signal, and receivers for receiving the signal from the transmitting tag are arranged in a plurality of areas of a work site. Detecting a personal identification signal received by the receiver, detecting a work type linked to the personal identification signal and reception area stay time information from a pre-built database, and detecting the work type or the work area Since it is configured to output the number of workers and the work hours for each worker, the behavior of each worker is automatically tracked within the construction site, and the work content is grasped from the stay area of each worker, Therefore, it is possible to determine the number of workers who are engaged in a specific work and the process time to improve productivity.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の実施形態に係る作業管理システムの
構成図である。
FIG. 1 is a configuration diagram of a work management system according to an embodiment of the present invention.

【図2】 タグID受信機の構成図である。FIG. 2 is a configuration diagram of a tag ID receiver.

【図3】 従事者IDによる個人識別データの構成例で
ある。
FIG. 3 is a configuration example of personal identification data based on an employee ID.

【図4】 図3の個人識別データにタグID信号を附加
したデータ構成例である。
FIG. 4 is a data configuration example in which a tag ID signal is added to the personal identification data of FIG.

【図5】 受信機位置データベースの構成例である。FIG. 5 is a configuration example of a receiver position database.

【図6】 作業指示データベースの構成例である。FIG. 6 is a configuration example of a work instruction database.

【図7】 作業別移動ルート計画データベースの構成例
である。
FIG. 7 is a configuration example of a movement route planning database for each work.

【図8】 受信機別個人識別受信データ例である。FIG. 8 is an example of personal identification reception data for each receiver.

【図9】 各タグ受信機から収集された個人識別受信デ
ータを総合したデータ例である。
FIG. 9 is a data example in which personal identification reception data collected from each tag receiver is integrated.

【図10】 現場作業管理システムサーバの構成図であ
る。
FIG. 10 is a configuration diagram of a site work management system server.

【図11】 実施形態に係るシステムの利用処理手順で
ある。
FIG. 11 is a utilization processing procedure of the system according to the embodiment.

【図12】 実施形態に係るシステムの動作フローチャ
ートである。
FIG. 12 is an operation flowchart of the system according to the embodiment.

【図13】 現場作業管理システムサーバの初期画面で
ある。
FIG. 13 is an initial screen of the site work management system server.

【図14】 現場作業管理システムサーバの各種設定画
面である。
FIG. 14 shows various setting screens of the site work management system server.

【図15】 現場作業管理システムサーバの照合処理画
面である。
FIG. 15 is a collation processing screen of the field work management system server.

【図16】 現場作業管理システムサーバの解析処理画
面である。
FIG. 16 is an analysis processing screen of the on-site work management system server.

【図17】 現場作業管理システムサーバで解析した作
業員別追跡表示例である。
FIG. 17 is an example of tracking display by worker analyzed by the on-site work management system server.

【図18】 現場作業管理システムサーバ解析した作業
員別総合移動追跡表示例である。
FIG. 18 is an example of an integrated movement tracking display for each worker analyzed by the on-site work management system server.

【図19】 現場作業管理システムサーバで解析した作
業エリア別移動追跡表示例である。
FIG. 19 is an example of movement tracking display for each work area analyzed by the on-site work management system server.

【図20】 現場作業管理システムサーバで解析した職
種別受信エリア移動表示例である。
FIG. 20 is an example of a job type reception area movement display analyzed by the site work management system server.

【図21】 現場作業管理システムサーバで解析した業
者別受信エリア移動表示例である。
FIG. 21 is a display example of movement of reception areas by trader analyzed by the on-site work management system server.

【図22】 現場作業管理システムサーバで解析した作
業稼働率解析表示例である。
FIG. 22 is an example of work operation rate analysis display analyzed by the on-site work management system server.

【符号の説明】[Explanation of symbols]

10………発信タグ、12………データ収集システム、
14………データ処理システム、16………データ通信
網、18(181、182、………18n)………区画エ
リア、20(201、202、………20n)………タグ
ID受信機、22………受信アンテナ、24………受信
機、26………受信ID取込部、28………記録部、3
0………合成処理部、31………送信部、32………コ
ンピュータ本体、34………メモリ部、36………作業
管理システムサーバ、38………個人識別データベー
ス、40………受信機位置データベース、42………作
業指示データベース、44………作業別移動ルート計画
データベース、46………個人識別受信データベース、
48………個人識別受信データ収集処理部、50………
タグID登録用受信機、52………個人識別データ入力
部、54………タグID入力部、55………合成処理
部、56………タグID照合処理部、58………記憶装
置、60………解析処理部、62………画面表示部、6
4………印刷出力部。
10 ………… Transmission tag, 12 ………… Data collection system,
14 ... Data processing system, 16 ... Data communication network, 18 (18 1 , 18 2 , ... 18 n ) ... Partition area, 20 (20 1 , 20 2 , ... 20 n ) ………… Tag ID receiver, 22 ………… Reception antenna, 24 ………… Receiver, 26 ………… Reception ID acquisition unit, 28 ………… Recording unit, 3
0 ......... Synthesis processing unit, 31 ......... Sending unit, 32 ... Computer body, 34 ... Memory unit, 36 ... Work management system server, 38 ......... Personal identification database, 40 ... Receiver position database, 42 ... Work instruction database, 44 ... Work-specific movement route planning database, 46 ... Personal identification reception database,
48 ......... Personal identification reception data collection processing unit, 50 ...
Receiver for tag ID registration, 52 ... Personal identification data input unit, 54 ... Tag ID input unit, 55 ... Synthesis processing unit, 56 ... Tag ID collation processing unit, 58 ... Storage device , 60 ......... Analysis processing unit, 62 ......... Screen display unit, 6
4 ... Print output section.

フロントページの続き (72)発明者 平野 恒義 東京都千代田区内神田一丁目1番14号 日 立プラント建設株式会社内 (72)発明者 横井 裕司 東京都千代田区内神田一丁目1番14号 日 立プラント建設株式会社内 Fターム(参考) 5B035 BB09 BC00 CA23 Continued front page    (72) Inventor Tsuneyoshi Hirano             1-14-1 Kanda, Uchida, Chiyoda-ku, Tokyo             Stand Plant Construction Co., Ltd. (72) Inventor Yuji Yokoi             1-14-1 Kanda, Uchida, Chiyoda-ku, Tokyo             Stand Plant Construction Co., Ltd. F term (reference) 5B035 BB09 BC00 CA23

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 作業従事者に個人識別信号を発信する発
信タグを携行させ、前記発信タグからの信号を受信する
受信機を作業現場の複数のエリアに配置し、前記受信機
により受信された個人識別信号を検出し、予め構築され
ているデータベースから前記個人識別信号と受信エリア
滞在時間情報とにリンクされた作業種別を検出して作業
種別ごとまたは作業エリア別ごとの作業従事者数並びに
作業従事時間を出力することを特徴とする現場作業管理
方法。
1. A worker carrying a transmitter tag for transmitting a personal identification signal, receivers for receiving signals from the transmitter tag are arranged in a plurality of areas of a work site, and received by the receiver. Detecting the personal identification signal, detecting the work type linked to the personal identification signal and the reception area stay time information from a pre-built database to detect the number of work workers and work for each work type or work area A field work management method characterized by outputting the working hours.
【請求項2】 作業員の個人識別信号を発信する発信タ
グを作業員に携帯させ、前記発信タグからの個人識別信
号を受信する受信機を建設現場内の作業員行動領域に設
置しておき、受信機位置データベース、個人識別受信デ
ータベース、個人識別データベース、作業指示データベ
ースを備えているデータ処理システムにより複数の受信
機が受信した個人識別信号を自動的に収集し、前記デー
タ収集装置では、作業指示データベースにより、指示を
与えた作業領域内の作業別の作業員数を算出し、特定期
間における特定作業領域内の作業員数を表示し、要求に
応じて、算出した作業領域内の作業員数と個人識別受信
データから得られる特定時間内の作業員数から特定期間
における特定作業領域内の作業員稼働率を算出し、若し
くは作業員別に作業領域移動推移を出力可能としたこと
を特徴とする現場作業管理方法。
2. A calling tag for sending a personal identification signal of a worker is carried by a worker, and a receiver for receiving a personal identification signal from the sending tag is installed in a worker action area in a construction site. , A receiver position database, a personal identification reception database, a personal identification database, and a work instruction database are used to automatically collect personal identification signals received by a plurality of receivers. The number of workers for each work in the work area given the instruction is calculated by the instruction database, the number of workers in the specific work area in the specific period is displayed, and the number of workers in the calculated work area and the individual number are displayed according to the request. Calculate the operating rate of workers in a specific work area for a specific period from the number of workers in a specific time obtained from identification received data, or perform work for each worker A site work management method characterized by being able to output the area movement transition.
【請求項3】 作業従事者に携行させる個人識別信号を
発信する発信タグと、作業現場の複数のエリアに配置さ
れ当該エリア内に位置する前記発信タグからの信号を受
信する受信機と、前記受信機により受信された個人識別
信号が入力される作業管理システムサーバを有し、当該
作業管理システムサーバには予めエリア滞在時間情報と
個人識別信号にリンクされた作業種別データを格納して
いるデータベースと、前記個人識別信号と当該信号を受
けた受信機の作業エリアに対応する作業種別を当該デー
タベースから検出して作業種別ごと又は作業エリア別ご
との作業従事者数並びに作業従事時間を出力させる処理
手段を備えてなることを特徴とする現場作業管理システ
ム。
3. A transmission tag for transmitting a personal identification signal to be carried by a worker, a receiver arranged in a plurality of areas of a work site and receiving signals from the transmission tags located in the area, and A database having a work management system server to which the personal identification signal received by the receiver is input, and the work management system server previously stores area stay time information and work type data linked to the personal identification signal. And a process for detecting the personal identification signal and the work type corresponding to the work area of the receiver receiving the signal from the database, and outputting the number of work workers and the work time for each work type or work area. A field work management system comprising means.
JP2002143117A 2002-05-17 2002-05-17 Method and system for managing field work Pending JP2003331097A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002143117A JP2003331097A (en) 2002-05-17 2002-05-17 Method and system for managing field work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002143117A JP2003331097A (en) 2002-05-17 2002-05-17 Method and system for managing field work

Publications (1)

Publication Number Publication Date
JP2003331097A true JP2003331097A (en) 2003-11-21

Family

ID=29703217

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002143117A Pending JP2003331097A (en) 2002-05-17 2002-05-17 Method and system for managing field work

Country Status (1)

Country Link
JP (1) JP2003331097A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006209420A (en) * 2005-01-27 2006-08-10 Nishimatsu Constr Co Ltd Work management system and work management apparatus
JP2006209419A (en) * 2005-01-27 2006-08-10 Nishimatsu Constr Co Ltd Work management system and work management apparatus
JP2006285413A (en) * 2005-03-31 2006-10-19 Nec Fielding Ltd Information collection and provision system and information collection and provision method
JP2007004619A (en) * 2005-06-24 2007-01-11 Hitachi Ltd Working state management system, working state management method, and working state management program
WO2010119892A1 (en) * 2009-04-14 2010-10-21 株式会社ホギメディカル Analysis equipment and program for analysis equipment
KR100999041B1 (en) 2007-11-19 2010-12-09 인하대학교 산학협력단 Method of Analizing the Construction Productivity Based on Statistics
JP2011043975A (en) * 2009-08-20 2011-03-03 Nec Soft Ltd Manufacturing service provision system and server
JP2011175384A (en) * 2010-02-23 2011-09-08 Hitachi Plant Technologies Ltd Worker location recognition method, worker location recognition system, worker recognition method and worker recognition system
JP2012118568A (en) * 2010-11-29 2012-06-21 Hitachi Ltd Work management method and work management device using portable terminals
JP2014157616A (en) * 2014-04-03 2014-08-28 Hitachi-Ge Nuclear Energy Ltd Plant construction process creation support system, and plant construction process creation support method and program
JP2015141722A (en) * 2015-03-06 2015-08-03 パナソニックIpマネジメント株式会社 Clerk work management device, clerk work management system, and clerk work management method
US10049333B2 (en) 2014-01-29 2018-08-14 Panasonic Intellectual Property Management Co., Ltd. Sales clerk operation management apparatus, sales clerk operation management system, and sales clerk operation management method
CN109615235A (en) * 2018-12-07 2019-04-12 河北建设集团股份有限公司 A kind of personnel's real-name management system and implementation method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006209419A (en) * 2005-01-27 2006-08-10 Nishimatsu Constr Co Ltd Work management system and work management apparatus
JP2006209420A (en) * 2005-01-27 2006-08-10 Nishimatsu Constr Co Ltd Work management system and work management apparatus
JP2006285413A (en) * 2005-03-31 2006-10-19 Nec Fielding Ltd Information collection and provision system and information collection and provision method
JP4564873B2 (en) * 2005-03-31 2010-10-20 Necフィールディング株式会社 Information collection and provision system and information collection and provision method
JP2007004619A (en) * 2005-06-24 2007-01-11 Hitachi Ltd Working state management system, working state management method, and working state management program
KR100999041B1 (en) 2007-11-19 2010-12-09 인하대학교 산학협력단 Method of Analizing the Construction Productivity Based on Statistics
JP5584201B2 (en) * 2009-04-14 2014-09-03 株式会社ホギメディカル Analysis apparatus and program
JPWO2010119892A1 (en) * 2009-04-14 2012-10-22 株式会社ホギメディカル Analysis device and program for analysis device
WO2010119892A1 (en) * 2009-04-14 2010-10-21 株式会社ホギメディカル Analysis equipment and program for analysis equipment
JP2014209350A (en) * 2009-04-14 2014-11-06 株式会社ホギメディカル Analyzer and program for analyzer
JP2011043975A (en) * 2009-08-20 2011-03-03 Nec Soft Ltd Manufacturing service provision system and server
JP2011175384A (en) * 2010-02-23 2011-09-08 Hitachi Plant Technologies Ltd Worker location recognition method, worker location recognition system, worker recognition method and worker recognition system
JP2012118568A (en) * 2010-11-29 2012-06-21 Hitachi Ltd Work management method and work management device using portable terminals
US10049333B2 (en) 2014-01-29 2018-08-14 Panasonic Intellectual Property Management Co., Ltd. Sales clerk operation management apparatus, sales clerk operation management system, and sales clerk operation management method
JP2014157616A (en) * 2014-04-03 2014-08-28 Hitachi-Ge Nuclear Energy Ltd Plant construction process creation support system, and plant construction process creation support method and program
JP2015141722A (en) * 2015-03-06 2015-08-03 パナソニックIpマネジメント株式会社 Clerk work management device, clerk work management system, and clerk work management method
CN109615235A (en) * 2018-12-07 2019-04-12 河北建设集团股份有限公司 A kind of personnel's real-name management system and implementation method

Similar Documents

Publication Publication Date Title
US8972179B2 (en) Method and apparatus to analyze GPS data to determine if a vehicle has adhered to a predetermined route
JP2003331097A (en) Method and system for managing field work
US9904274B2 (en) Method and apparatus for controlling site-specific operations
US6965876B2 (en) Methods and devices utilizing a tracking system
US6232915B1 (en) System and method for identifying clusters of geographic locations
CN100498869C (en) GPS vehicle monitoring and scheduling system applying in electric power system
JP6651106B1 (en) Garbage collection business management system and its management server
JP6651105B1 (en) Garbage collection business management system and its management server
EP1405041B1 (en) Method for collecting meter reading information and a collection system for consumer data
KR20110109621A (en) Safety management system and method
US6990398B2 (en) System for controlling operating information of construction machine and construction machine therefor
JP2022124845A (en) Work result management system and work result management method
Abdel-Alim et al. Dynamic labor tracking system in construction project using bim technology
JP7112707B2 (en) Worker situation collection system, worker situation collection device and worker situation collection method
JP2010191642A (en) Work management method, program, and work management system
JP6021718B2 (en) Agricultural management support system
CN101136086A (en) Information collection method and information collection device thereof
US20230162110A1 (en) System for collecting and analyzing equipment telematic data
CN111698645A (en) Position information acquisition method and device, computer equipment and storage medium
JP6754522B2 (en) Sensor device for aerial work platforms, data collection system, and method for grasping the operating status of aerial work platforms
US10121212B1 (en) System and method for transportation demand management
CN114660405A (en) Method for rapidly studying and judging fault points of power distribution network based on 5G communication
US20050055262A1 (en) System and a method for distributing assignments and receiving report data
JP2002032896A (en) Vehicle operation business integral information system and recording medium
JPH11345250A (en) Labor time collecting method, its executing device and medium recording its processing program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040910

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061006

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061013

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070219