JP2003294443A - Verticality monitoring system for building structure - Google Patents

Verticality monitoring system for building structure

Info

Publication number
JP2003294443A
JP2003294443A JP2002099454A JP2002099454A JP2003294443A JP 2003294443 A JP2003294443 A JP 2003294443A JP 2002099454 A JP2002099454 A JP 2002099454A JP 2002099454 A JP2002099454 A JP 2002099454A JP 2003294443 A JP2003294443 A JP 2003294443A
Authority
JP
Japan
Prior art keywords
vertical
point
altitude
reference point
latitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002099454A
Other languages
Japanese (ja)
Inventor
Shokichi Ara
昭吉 荒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHOEI SOKURYO JIMUSHO KK
Original Assignee
SHOEI SOKURYO JIMUSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHOEI SOKURYO JIMUSHO KK filed Critical SHOEI SOKURYO JIMUSHO KK
Priority to JP2002099454A priority Critical patent/JP2003294443A/en
Publication of JP2003294443A publication Critical patent/JP2003294443A/en
Pending legal-status Critical Current

Links

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To measure a change quantity of coordinates thereafter by accurately measuring initial values of three-dimensional positions of points to be vertically monitored (e.g. several points on a roof of a building). <P>SOLUTION: A vertical reference point VS is set on a reference stair, for example, on a first floor in a building structure BLDG. A vertical monitoring point VM is set corresponding to the point VS. A point E is an eccentric survey point. In order to obtain three-dimensional positions of the vertical reference point VS and the vertical monitoring point VM, peripheral reference points A, B and C are set on the periphery of the building BLDG. Further, public reference points P1, P2 and P3 are selected to obtain the three-dimensional positions of the points A, B and C. Electronic data of the points P1, P2 and P3 are down loaded from a server (external server 4) of Geographical Survey Institute. A traverse survey is conducted from a bench mark LP to the points A, B and C and the points VS, and heights above sea level of the respective points are actually measured. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、建築構造物の鉛直
監視システムに関し、特に大規模構造物や高層ビルの鉛
直性が初期の時点からどのように変化するかを監視する
システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a vertical monitoring system for building structures, and more particularly to a system for monitoring how verticality of large-scale structures and high-rise buildings changes from an initial point.

【0002】[0002]

【従来の技術】従来、大規模構造物や高層ビルの鉛直監
視を行うためには、たとえば、下げ振りを使用して、1
階を基準階として2階へ、2階より3階へと1階毎に鉛
直点を上階へ写していく。図6は、下げ振りによる建築
構造物の鉛直監視について説明するための概念図であ
る。まず、基準階において直交座標系を設定し、原点を
鉛直基準点とする。そして、鉛直基準点を鉛直軸上で平
行移動した設計上の点が、点(0,0)となっているか
否かを管理するのが鉛直監視である。
2. Description of the Related Art Conventionally, for example, a plumb bob has been used to vertically monitor a large-scale structure or a high-rise building.
With the floor as the reference floor, the vertical points are copied to the second floor from the second floor to the third floor. FIG. 6 is a conceptual diagram for explaining vertical monitoring of a building structure by swinging down. First, an orthogonal coordinate system is set on the reference floor, and the origin is the vertical reference point. Then, the vertical monitoring manages whether or not the design point obtained by translating the vertical reference point on the vertical axis is the point (0, 0).

【0003】上述した設計上の点(N階)から(N−
1)階に下げ振りを下ろすと、下げ振りの先端は実際に
は、直交座標系の原点すなわち鉛直基準点には一致せ
ず、下ろした点は(X,Y)となる。このX、Yが鉛直
からの誤差である。しかし、下げ振りによる鉛直監視に
は、基準階での求心読みとり誤差、温度差による目盛り
誤差、コンクリートの収縮による誤差、下げ振りの糸の
芯の読み取り誤差、下げ振り本体の芯ずれによる誤差、
横からの風による求心誤差、等の不定誤差(偶然誤差・
消し合い誤差)が存在する。これらの誤差は、原因が分
かっていても除去できないものが複雑に重なって生じる
誤差であり、起こる方向も大きさも一定ではない。ま
た、1回の測定で±Aの誤差が生じれば、N回の測定で
は、±A・Nの不定誤差が生じる。たとえば、仮
に1基準点の測定で1.5mmの誤差が生じたとすると
16階での基準墨に対する不定誤差は±5.8mmにな
る。
From the above design point (N floor), (N-
1) When the plumb bob is lowered to the floor, the tip of the plumb bob actually does not coincide with the origin of the Cartesian coordinate system, that is, the vertical reference point, and the lowered point is (X, Y). These X and Y are the errors from the vertical. However, for vertical monitoring by plumb bob, centering reading error at standard floor, scale error due to temperature difference, error due to concrete shrinkage, bobbin thread core reading error, bob body misalignment error,
Uncertain error such as centripetal error due to wind from the side (accidental error
There is an erasing error). These errors are errors caused by complicated overlapping of things that cannot be removed even if the cause is known, and the directions and sizes of the errors are not constant. In addition, if an error of ± A occurs in one measurement, ± A · N 0 . An uncertain error of 5 occurs. For example, if an error of 1.5 mm occurs in the measurement of one reference point, the indefinite error with respect to the reference black ink on the 16th floor is ± 5.8 mm.

【0004】そこで、このような不定誤差を生じないレ
ーザー鉛直機を使用することも行われている。レーザー
鉛直機を使用する利点は:各フロア毎の誤差が少なくな
る;コンクリートの収縮の影響を受けにくい;スパン調
整が容易にできる;外部基準点から作業できるためスリ
ーブ穴が不要である;鉛直精度下げ振りに比べて格段に
よい;鉛直監視距離が150メートル程度であるので高
層ビルに対応できる;風の影響を受けない;等の点であ
る。レーザー鉛直機を使用する場合は、建造物の外部に
設けた鉛直基準点にレーザー鉛直機を水平に設置すると
ともに、たとえば屋上から建造物外部に上部ターゲット
(反射鏡)を設置し、上部ターゲットからの反射光をレ
ーザー鉛直機に受ければ、上部ターゲットが水平に設置
されているか否か、すなわち屋上の所定の場所が鉛直か
らずれているか否かが分かる。ただし、上部ターゲット
は現場の状況、形によって工夫する必要がある。ところ
で、レーザービームは±10秒程度の発散角があり、1
00mの高さで±4.8mmの誤差を生じる。
Therefore, it is also practiced to use a laser vertical machine which does not cause such an indeterminate error. The advantages of using a laser vertical machine are: less error for each floor; less susceptible to concrete shrinkage; easier span adjustment; no need for sleeve holes since working from an external reference point; vertical accuracy It is much better than swinging down; it has a vertical monitoring distance of about 150 meters, so it can handle high-rise buildings; it is not affected by the wind. When using a laser vertical machine, install the laser vertical machine horizontally at the vertical reference point provided outside the building, and install an upper target (reflecting mirror) from the roof to the outside of the building, for example. When the laser vertical machine receives the reflected light of the above, it is possible to know whether or not the upper target is installed horizontally, that is, whether or not a predetermined place on the roof is displaced from the vertical. However, it is necessary to devise the upper target according to the situation and shape of the site. By the way, the laser beam has a divergence angle of about ± 10 seconds,
An error of ± 4.8 mm occurs at a height of 00 m.

【0005】[0005]

【発明が解決しようとする課題】しかし、下げ振りでは
測定誤差が大きい。また、レーザー鉛直機やトランシッ
トでは視準により鉛直性の良否を判断するだけであるた
め、定量的に建造物等の鉛直監視を行うことはできな
い。そこで、本発明は、鉛直監視すべき点(たとえば建
築構造物の屋上の数点)の3次元位置の初期値を正確に
測定し、その後の座標の変動量を測定して、数値データ
で鉛直監視を行うことを課題としている。また、本発明
は、ジオイドモデルを使用することなく、鉛直監視点の
標高を正確に求めることを課題としている。
However, the measurement error is large in the plumb bob. In addition, laser vertical machines and transits can only quantitatively check the verticality of buildings, etc., because they can only determine the verticality by collimation. Therefore, in the present invention, the initial value of the three-dimensional position of a point to be vertically monitored (for example, several points on the roof of a building structure) is accurately measured, and the amount of change in the coordinates thereafter is measured, and the vertical value is calculated using vertical data. The task is to monitor. Another object of the present invention is to accurately obtain the elevation of the vertical monitoring point without using the geoid model.

【0006】[0006]

【課題を解決するための手段】上記の課題を解決するた
めの本発明の建築構造物の鉛直監視システムは、建築構
造物周辺の少なくとも1つの周辺基準点と、前記建築構
造物の内部の基準階における1又は2以上の鉛直基準点
と、前記鉛直基準点に対応する鉛直監視点の緯度、経度
及び高度を測定するGPS測定装置と、前記周辺基準点
と前記鉛直基準点の標高を測量する測量装置と、前記G
PS測定装置の測定データ及び前記測量装置の測量デー
タを入力し解析するコンピュータとを備えた建築構造物
の鉛直監視システムであって、前記周辺基準点を既知点
とする仮定三次元網平均計算によって、前記鉛直基準点
及び前記鉛直監視点の緯度と経度を計算し、前記鉛直基
準点の標高に基づいて前記鉛直監視点の高度を標高に変
換し、前記鉛直監視点の緯度、経度及び標高を監視す
る。
SUMMARY OF THE INVENTION A vertical monitoring system for a building structure according to the present invention for solving the above-mentioned problems includes at least one peripheral reference point around the building structure and a reference inside the building structure. One or more vertical reference points on the floor, a GPS measuring device that measures the latitude, longitude, and altitude of the vertical monitoring point corresponding to the vertical reference point, and the altitudes of the peripheral reference point and the vertical reference point Surveying device and the G
What is claimed is: 1. A vertical monitoring system for a building structure, comprising: a computer for inputting and analyzing measured data of a PS measuring device and surveying data of the surveying device; , Calculating the latitude and longitude of the vertical reference point and the vertical monitoring point, converting the altitude of the vertical monitoring point to elevation based on the altitude of the vertical reference point, the latitude, longitude and altitude of the vertical monitoring point Monitor.

【0007】また、本発明の鉛直監視システムは、上述
したGPS測定装置と、測量装置と、コンピュータとを
備え、初期時点において、前記周辺基準点、前記鉛直基
準点及び鉛直監視点の緯度、経度及び高度を測定すると
ともに、前記周辺基準点及び前記鉛基準点の標高を測量
し、前記周辺基準点を既知点とする仮定三次元網平均計
算によって、前記鉛直基準点及び前記鉛直監視点の緯度
と経度の初期値を計算し、前記鉛直基準点の標高に基づ
いて前記鉛直監視点の高度を標高の初期値に変換し、監
視時点において、前記周辺基準点及び前記鉛直監視点の
緯度、経度及び高度を測定し、前記周辺基準点を既知と
する仮定三次元網平均計算により前記鉛直監視点の緯度
及び経度を計算し、前記標高の初期値に基づいて前記鉛
直監視点の高度を標高に変換するシステムであってもよ
い。
Further, the vertical monitoring system of the present invention comprises the above-mentioned GPS measuring device, surveying device, and computer, and at an initial point of time, the latitude and longitude of the peripheral reference point, the vertical reference point, and the vertical monitoring point. And the altitude, and the elevations of the peripheral reference point and the lead reference point are measured, and the latitude of the vertical reference point and the vertical monitoring point is calculated by hypothetical three-dimensional network average calculation using the peripheral reference point as a known point. And the initial value of the longitude is calculated, and the altitude of the vertical monitoring point is converted to the initial value of the altitude based on the altitude of the vertical reference point, and at the time of monitoring, the latitude and longitude of the peripheral reference point and the vertical monitoring point. And the altitude is measured, the latitude and longitude of the vertical monitoring point is calculated by the hypothetical three-dimensional network average calculation that the peripheral reference point is known, and the altitude of the vertical monitoring point is calculated based on the initial value of the altitude. It may be a system that converts high.

【0008】また、本発明の鉛直監視方法は、上述した
鉛直監視システムを使用する。本発明においては、建築
構造物の鉛直監視点(たとえば屋上の数点)の3次元位
置をGPS測定装置で測定して、位置変動を監視する。
その際、建築構造物の周辺に3点の周辺基準点をGPS
測定して鉛直監視点の3次元位置を較正する。ただし、
ジオイドモデルを使用すると鉛直間利点の高度は正確に
は求まらない。従って、鉛直監視点の標高は、建築構造
物の基準階の標高を実測して較正する。
Further, the vertical monitoring method of the present invention uses the vertical monitoring system described above. In the present invention, the three-dimensional position of the vertical monitoring point (for example, several points on the roof) of the building structure is measured by the GPS measuring device to monitor the position fluctuation.
At that time, GPS is used to set three peripheral reference points around the building structure.
Measure and calibrate the 3D position of the vertical monitoring point. However,
Using the geoid model, the height of the vertical advantage cannot be determined accurately. Therefore, the elevation of the vertical monitoring point is calibrated by actually measuring the elevation of the standard floor of the building structure.

【0009】[0009]

【発明の実施の形態】以下、図面を参照して本発明の実
施の形態について説明する。図1は、本発明の建築構造
物の鉛直監視システムのブロック図である。このシステ
ムは、測定点の緯度、経度及び高度を測定するためのG
PS測定装置1と、測定点の標高を測定するための測量
装置2と、GPS測定装置1及び測量装置2から測定デ
ータ・測量データを入力し解析するコンピュータ3と、
コンピュータ3にインターネット等の通信網10を介し
て接続された外部サーバ4とを含む。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram of a building structure vertical monitoring system according to the present invention. This system uses G to measure the latitude, longitude and altitude of the measurement point.
A PS measuring device 1, a surveying device 2 for measuring the elevation of a measuring point, a computer 3 for inputting and analyzing measurement data / surveying data from the GPS measuring device 1 and the surveying device 2,
It includes an external server 4 connected to the computer 3 via a communication network 10 such as the Internet.

【0010】GPS測定装置1は、測定点の3次元的な
位置を測定するものであるため、4つ以上のGPS(g
lobal positioning system)
衛星からの電波が到達するのに要した時間を測定する。
GPS測定装置1とコンピュータ3とのインターフェイ
スが可能であれば、コンピュータ3の指示に基づいて測
定を開始し、測定しながら測定データをコンピュータ3
に送信してもよい。測量装置2は、トランシット等の測
角器械や、巻き尺、光学式・電波式の距離測定器具が含
まれる。測角・測距結果は紙面に記録され、キーボード
等からコンピュータ7に入力される。測定器具によって
は、コンピュータ3とインターフェイス可能な測定器具
の場合には、コンピュータ3の指示に基づいて測定を開
始し、測定しながら測定データをコンピュータ3に送信
してもよい。
Since the GPS measuring device 1 measures the three-dimensional position of the measuring point, it has four or more GPS (g
(global positioning system)
Measure the time required for the radio waves from the satellite to arrive.
If the interface between the GPS measuring device 1 and the computer 3 is possible, the measurement is started based on the instruction of the computer 3, and the measurement data is measured by the computer 3 while measuring.
May be sent to. The surveying device 2 includes an angle-measuring device such as a transit, a tape measure, and an optical / radio-type distance measuring instrument. The angle measurement / distance measurement results are recorded on a sheet of paper and input to the computer 7 from a keyboard or the like. In the case of a measuring instrument that can interface with the computer 3, depending on the measuring instrument, the measurement may be started based on an instruction from the computer 3, and the measurement data may be transmitted to the computer 3 while performing the measurement.

【0011】コンピュータ3は、GPS測定データの仮
定三次元網平均計算や、トラバース測量結果の基線解
析、鉛直管理点等の座標変換を行う。また、外部サーバ
4から公共基準点(電子基準点)のデータをダウンロー
ドして、結果仮定三次元網平均計算により、建築構造物
の周辺の基準点(周辺基準点)の位置を較正する。
The computer 3 performs hypothetical three-dimensional network average calculation of GPS measurement data, baseline analysis of traverse survey results, and coordinate conversion of vertical control points and the like. Further, the data of the public reference points (electronic reference points) is downloaded from the external server 4, and the positions of the reference points (peripheral reference points) around the building structure are calibrated by the resultant hypothetical three-dimensional net average calculation.

【0012】外部サーバ4は、たとえば国土地理院のサ
ーバである。このサーバのホームページ(ウエッブペー
ジ;HTML文書ファイル;ただし文書作成言語はHT
MLのみに限定されない)にアクセスし、地区名を入力
すれば、公共基準点の電子データをダウンロードするこ
とができる。通信網10は、インターネット等の通信網
である。
The external server 4 is, for example, a server of the Geographical Survey Institute. Home page of this server (web page; HTML document file; however, document creation language is HT
You can download the electronic data of the public control point by accessing (not limited to ML only) and entering the district name. The communication network 10 is a communication network such as the Internet.

【0013】図2は、GPS測定点の配置を説明するた
めの概念図である。建築構造物BLDGの内部の基準階
たとえば1階には鉛直基準点VSが設定されている。こ
の鉛直基準点VSに対応して鉛直監視点VMが設定され
ている。この例では、VMが屋上に4点設定され、VS
も1階に4点(残り3点は図示を省略している)設定さ
れている。VM、VSの点数は任意であり、たとえばV
Sを1点、VMを3点等としてもよい。VSを1点とす
れば、鉛直基準点の測量は1点のみとなり、全体として
測量回数が少なくなる利点がある。
FIG. 2 is a conceptual diagram for explaining the arrangement of GPS measurement points. A vertical reference point VS is set on a reference floor inside the building structure BLDG, for example, the first floor. A vertical monitoring point VM is set corresponding to this vertical reference point VS. In this example, four VMs are set on the roof and VS
Also, 4 points (the remaining 3 points are not shown) are set on the first floor. The points of VM and VS are arbitrary, for example, V
S may be 1 point and VM may be 3 points. If VS is set to one point, only one vertical reference point is surveyed, which is advantageous in that the number of surveys is reduced as a whole.

【0014】また、偏心測量点Eは、鉛直基準点VSの
周囲に障害物がある等のために、三角測量において点間
の見通しがきかない場合に設ける、三角点の近くの見通
しのきく仮の測点である。また、建築構造物BLDGの
周囲には、鉛直基準点VS及び鉛直監視点VMの3次元
位置を仮定三次元網平均計算で求めるために、周辺基準
点A、B、Cが設定されている。仮定三次元網平均計算
でVSの座標を計算するには、たとえば周辺基準点Aの
座標(X,Y,Z)を既知として、AからVSへ
の基線ベクトル(XAVS,YAVS,ZAVS)を求
め、VSの座標(XVS,YVS,ZVS)を未知とす
る下記の観測方程式を作る。 V=X−X−XAVS=Y−Y−YAVS=Z−Z−ZAVS そして、残差V、V、Vを最小二乗法で最小にす
ることによって、VSの座標(XVS,YVS
VS)が求められる。このように、一つの既知点Aの
みを基準点として固定して行う三次元網平均計算を仮定
三次元網平均計算という。この仮定三次元網平均計算で
は、既知点B、Cは新点として処理されるために、既知
点Aの緯度、経度の成果に以上があればそれを発見する
ことができる。
The eccentric surveying point E is a provisional line of sight near the triangular point, which is provided when the point of sight cannot be seen in the triangulation due to an obstacle around the vertical reference point VS. It is a measurement point. Further, peripheral reference points A, B, and C are set around the building structure BLDG in order to obtain the three-dimensional positions of the vertical reference point VS and the vertical monitoring point VM by the assumed three-dimensional net average calculation. To calculate the VS coordinates by the hypothetical three-dimensional network average calculation, for example, the coordinates (X A , Y A , Z A ) of the peripheral reference point A are known, and the baseline vector (X AVS , Y AVS from A to VS is known. , Z AVS ), and the following observation equation in which the VS coordinates (X VS , Y VS , Z VS ) are unknown is created. V x = X A −X A −X AVS V Y = Y A −Y A −Y AVS V z = Z A −Z A −Z AVS Then, the residuals V x , V Y , and V z are calculated by the least squares method. By minimizing, the VS coordinates (X VS , Y VS ,
ZVS ) is required. In this way, the three-dimensional network average calculation performed by fixing only one known point A as the reference point is referred to as a hypothetical three-dimensional network average calculation. In this hypothetical three-dimensional network average calculation, the known points B and C are processed as new points, and therefore, if the latitude and longitude of the known point A are greater than the result, it can be found.

【0015】さらに、建築構造物BLDGの周辺に、周
辺基準点A、B、Cの3次元位置を求めるための、公共
基準点P1、P2、P3が選定されている。公共基準点
P1、P2、P3は、建築構造物BLDGから数100
m〜数km離れた点であり、たとえば、国土地理院が指
定する点である。公共基準点P1、P2、P3の電子デ
ータは、国土地理院が定めた地点の3次元位置であり、
国土地理院のサーバ(外部サーバ4)からダウンロード
する。また、水準点LPが設定されており、LPから周
辺基準点A、B、C及び鉛直基準点VSにトラバース測
量が行われる。これは、GPS測定を点検するためであ
り、また周辺基準点A、B、C及び鉛直基準点VSの標
高を測定するためである。偏心測量点Eを使用して鉛直
基準点VSの標高を測定するときは、LPからEまでト
ラバース測量が行われる。このように、本発明において
は、点A、B、C、VS、VMが測量及びGPS測定の
対象であり、必要な場合は、点Eも測量及びGPS測定
の対象となる。
Further, public reference points P1, P2, P3 for determining the three-dimensional positions of the peripheral reference points A, B, C are selected around the building structure BLDG. Public reference points P1, P2 and P3 are several hundreds from the building structure BLDG.
It is a point separated from m to several km, for example, a point specified by the Geographical Survey Institute. The electronic data of the public reference points P1, P2, P3 are the three-dimensional positions of the points set by the Geographical Survey Institute,
Download from the GSI server (external server 4). Further, a level point LP is set, and a traverse survey is performed from LP to the peripheral reference points A, B, C and the vertical reference point VS. This is to check the GPS measurement and to measure the elevation of the peripheral reference points A, B, C and the vertical reference point VS. When measuring the elevation of the vertical reference point VS using the eccentric survey point E, a traverse survey is performed from LP to E. As described above, in the present invention, the points A, B, C, VS, and VM are the objects of surveying and GPS measurement, and if necessary, the point E is also the object of surveying and GPS measurement.

【0016】図3は、周辺基準点A、B、Cの座標を決
定するためのフローチャートである。まず、ステップS
31において、GPS測定が可能な周辺基準点A、B、
Cを調査する。具体的には、鉛直監視期間中、常に利用
可能であるか、地盤はしっかりしているか、水準測量し
やすい場所であるかについて調査する。次にステップS
32において、周辺基準点A、B、Cを取り囲む公共基
準点P1、P2、P3を選定する。
FIG. 3 is a flow chart for determining the coordinates of the peripheral reference points A, B and C. First, step S
At 31, reference points A, B, which are capable of GPS measurement,
Investigate C. Specifically, during the vertical monitoring period, it is investigated whether it is always available, whether the ground is solid, and whether it is a place where leveling is easy. Then step S
At 32, public reference points P1, P2, P3 surrounding the peripheral reference points A, B, C are selected.

【0017】公共基準点の選定の際注意すべきことは、
周辺基準点A、B、Cが諸事情によって(たとえば建築
構造物周辺の建物や道路・鉄道・水路の配置の変化によ
って)利用不可能になった場合であっても、新たな周辺
基準点を設定し直し、同じ公共基準点を利用して、その
新たな周辺基準点の3次元位置を精度良く計算すること
ができるように配慮することである。
When selecting public reference points, the following points should be noted:
Even if the surrounding reference points A, B, and C become unavailable due to various circumstances (for example, due to changes in the layout of buildings, roads, railways, and waterways around the building structure), new surrounding reference points can be set. It is necessary to reset and use the same public reference point so that the three-dimensional position of the new peripheral reference point can be accurately calculated.

【0018】次にステップS33において、測量装置2
を使用して水準点LPから周辺基準点A、B、Cへトラ
バース測量を行う。これによって、周辺基準点A、B、
Cの標高と位置が得られる。測量によって標高を求める
理由は、局所のジオイド高が厳密ではなく、正確な標高
が得られないためである。
Next, in step S33, the surveying device 2
Is used to perform the traverse survey from the standard point LP to the peripheral reference points A, B, and C. As a result, the peripheral reference points A, B,
The elevation and position of C are obtained. The reason for obtaining the elevation by surveying is that the local geoid height is not exact and an accurate elevation cannot be obtained.

【0019】次に、ステップS34において、公共基準
点P1、P2、P3の電子データを国土地理院からダウ
ンロードする。次に、ステップS35において、GPS
測定装置1を使用して、周辺基準点A、B、Cの3次元
位置を測定する。この測定は、たとえば連続6時間行わ
れる。次に、ステップS36において、測量装置2によ
る測定データをコンピュータ3に入力し基線解析を行
う。さらに、GPS測定装置1の測定値及び公共基準点
P1、P2、P3の電子データの異常を点検した後、公
共規準点P1、P2、P3を既知点とする仮定三次元網
平均計算により、周辺基準点A、B、Cの3次元位置を
計算する。その際、鉛直線偏差(重力方向に向く鉛直線
と準拠楕円体面の法線との差)の推定を行うが、ジオイ
ドモデルは使用しない。また、このステップS36で
は、国際地球基準座標系(ITRF座標系(inter
national terrestrial refe
rence frame))を使用する。ITRF座標
系の原点は、大気を含む地球重心である。また、楕円体
は、たとえば、GRS80(geodesic ref
erence system80;赤道半径63781
37m、逆扁平率298.257222101)を使用
する。
Next, in step S34, the electronic data of the public reference points P1, P2, P3 are downloaded from the Geographical Survey Institute. Next, in step S35, GPS
The measuring device 1 is used to measure the three-dimensional positions of the peripheral reference points A, B, and C. This measurement is performed, for example, continuously for 6 hours. Next, in step S36, the measurement data from the surveying device 2 is input to the computer 3 to perform a baseline analysis. Further, after checking the measured values of the GPS measuring device 1 and the anomalies in the electronic data of the public reference points P1, P2, P3, by the assumed three-dimensional network average calculation using the public reference points P1, P2, P3 as known points, The three-dimensional positions of the reference points A, B and C are calculated. At that time, the vertical line deviation (difference between the vertical line facing the direction of gravity and the normal line of the reference ellipsoid) is estimated, but the geoid model is not used. In step S36, the international earth reference coordinate system (ITRF coordinate system (inter
national terrestrial refe
rence frame)) is used. The origin of the ITRF coordinate system is the center of gravity of the earth, including the atmosphere. The ellipsoid is, for example, GRS80 (geodesic ref).
erence system80; equatorial radius 63781
37 m, reverse flatness 298.257222101) is used.

【0020】次にステップS37において、計測点A、
B、Cのトラバース測量を行い、GPS測量による点間
距離を点検する。ただし、このステップS37を省略
し、ステップS33で行った測量結果を利用してもよ
い。次にステップS38において、公共基準点P1、P
2、P3、計測点A、B、Cを、たとえば日本測地20
00JGD系座標で表して処理を終了する。なお、偏心
測量が必要な場合には、偏心測量点Eも同様にして得ら
れる。
Next, in step S37, the measurement point A,
Perform B and C traverse surveys and check the distance between points by GPS survey. However, step S37 may be omitted and the survey result obtained in step S33 may be used. Next, in step S38, the public reference points P1 and P
2, P3, measurement points A, B, C are, for example, Japan Geodetic 20
00JGD system coordinates are displayed and the process ends. If eccentricity measurement is required, the eccentricity measurement point E can be obtained in the same manner.

【0021】図4は、鉛直基準点VSを決定するための
フローチャートである。まず、ステップS41におい
て、鉛直基準点VS(たとえば4点)を、建築構造物の
内部の基準階に設定する。次に、ステップS42におい
て、VSのGPS測定を行う。測定は、図3のステップ
S35と同様に、たとえば連続6時間行われる。次に、
ステップS43において、基線ベクトルを求め仮定三次
元網平均計算を行う。計算条件は図2のステップS36
と同様に、GPS測定装置1の測定値の異常を点検した
後、周辺基準点A、B、Cを既知点とする仮定三次元網
平均計算により、鉛直基準点VSの3次元位置を計算す
る。その際、鉛直線偏差の推定を行うが、ジオイドモデ
ルは使用しない。なお、ここでは、公共基準点P1、P
2、P3を使用しないため、国土地理院からのデータダ
ウンロードは必要ない。次にステップS44において、
LPから鉛直基準点VSへトラバース測量を行い、GP
S測量による点間距離を点検する。もし、障害物等のた
めに鉛直基準点VSを直接測量することができない場合
は、図2に示したように、たとえば、水準点LPから周
辺基準点Aまでを測量し、Aから偏心測量点Eまでを測
量し、Eから鉛直基準点VSまでを測量する。次にステ
ップS45において、鉛直基準点VSを、たとえば日本
測地2000JGD系座標で表して処理を終了する。
FIG. 4 is a flow chart for determining the vertical reference point VS. First, in step S41, the vertical reference point VS (for example, 4 points) is set to the reference floor inside the building structure. Next, in step S42, GPS measurement of VS is performed. The measurement is continuously performed for 6 hours, for example, as in step S35 of FIG. next,
In step S43, a baseline vector is obtained and an assumed three-dimensional network average calculation is performed. The calculation condition is step S36 in FIG.
Similarly, after checking the abnormality of the measurement value of the GPS measurement device 1, the three-dimensional position of the vertical reference point VS is calculated by the hypothetical three-dimensional halftone average calculation with the peripheral reference points A, B, and C as known points. . At that time, the vertical line deviation is estimated, but the geoid model is not used. In addition, here, the public reference points P1 and P
2. Since P3 is not used, data download from GSI is not required. Next, in step S44,
Perform a traverse survey from LP to the vertical reference point VS, and
Check the distance between points by S survey. If the vertical reference point VS cannot be directly measured due to an obstacle or the like, for example, as shown in FIG. Measure up to E, and measure from E to the vertical reference point VS. Next, in step S45, the vertical reference point VS is represented by, for example, Japanese geodetic 2000 JGD system coordinates, and the process ends.

【0022】図5は、鉛直監視点VMを決定するための
フローチャートである。まずステップS51において、
建築構造物上部(たとえば屋上)の鉛直監視点VM(た
とえば4点)と、周辺基準点A、B、CのGPS測定を
たとえば連続6時間行う。次にステップS52におい
て、GPS測定値の異常を点検した後、周辺基準点A、
B、Cを既知点と仮定した仮定三次元網平均計算によ
り、鉛直監視点VMの3次元位置の平均値を求める。そ
の際、鉛直線偏差の推定を行うが、ジオイドモデルは使
用しない。また、ここでは、公共基準点P1、P2、P
3を使用しないため、国土地理院からのデータダウンロ
ードは必要ない。最後に、ステップS53において、鉛
直監視点VMを、たとえば日本測地2000JGD系座
標で表し、鉛直監視点成果表や鉛直点変動結果表を作成
して処理を終了する。このように、図5に示したフロー
チャートでは、A、B、C、VSの標高は初期値から変
化していないものと仮定して、測定を簡略化する。すな
わち、VSの標高は、VMの標高の初期値に基づき、G
PS測定データを使って換算する。
FIG. 5 is a flow chart for determining the vertical monitoring point VM. First, in step S51,
The GPS measurement of the vertical monitoring points VM (for example, 4 points) on the upper part of the building structure (for example, the rooftop) and the peripheral reference points A, B, and C is continuously performed for 6 hours, for example. Next, in step S52, after the abnormality of the GPS measurement value is checked, the peripheral reference point A,
The average value of the three-dimensional positions of the vertical monitoring points VM is obtained by the hypothetical three-dimensional mesh average calculation assuming that B and C are known points. At that time, the vertical line deviation is estimated, but the geoid model is not used. In addition, here, public reference points P1, P2, P
Since 3 is not used, data download from GSI is not required. Finally, in step S53, the vertical monitoring point VM is represented by, for example, Japan Geodetic 2000 JGD system coordinates, a vertical monitoring point result table and a vertical point variation result table are created, and the process ends. As described above, in the flowchart shown in FIG. 5, it is assumed that the altitudes of A, B, C, and VS have not changed from the initial values, and the measurement is simplified. That is, the altitude of VS is G based on the initial value of the altitude of VM.
Convert using PS measurement data.

【0023】本発明は、以上説明した実施形態に限定さ
れるものではない。たとえば、鉛直監視点の測定は、図
5に示したフローチャートによるのではなく、各監視時
点において、トラバース測量を行って、周辺基準点及び
鉛直基準点の標高を求めてもよい。すなわち、周辺基準
点を既知点とする仮定三次元網平均計算によって、前記
鉛直基準点及び前記鉛直監視点の緯度と経度を計算し、
鉛直基準点の標高に基づいて前記鉛直監視点の高度を標
高に変換し、前記鉛直監視点の緯度、経度及び標高を監
視することとしてもよい。これによって、各監視時点で
の鉛直基準点の標高に基づいて鉛直監視点の標高が一層
正確に求められる。
The present invention is not limited to the embodiment described above. For example, the measurement of the vertical monitoring points may be performed by traverse surveying at each monitoring time point to obtain the elevations of the peripheral reference points and the vertical reference points, instead of using the flowchart shown in FIG. That is, by the hypothetical three-dimensional halftone average calculation with the peripheral reference point as a known point, the latitude and longitude of the vertical reference point and the vertical monitoring point are calculated,
The altitude of the vertical monitoring point may be converted into an altitude based on the altitude of the vertical reference point, and the latitude, longitude, and altitude of the vertical monitoring point may be monitored. As a result, the elevation of the vertical monitoring point can be obtained more accurately based on the elevation of the vertical reference point at each monitoring point.

【0024】[0024]

【発明の効果】本発明によれば、鉛直監視すべき点(た
とえば建造物の屋上の4点)の3次元位置の初期値を正
確に測定し、その後の座標の変動量を測定して、数値デ
ータで鉛直監視を正確に行うことができる。
According to the present invention, the initial value of the three-dimensional position of a point to be vertically monitored (for example, four points on the roof of a building) is accurately measured, and the amount of change in the coordinates thereafter is measured, Vertical monitoring can be performed accurately with numerical data.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の鉛直監視システムのブロック図FIG. 1 is a block diagram of a vertical monitoring system of the present invention.

【図2】GPS測定を行う点(A、B、C、VS、V
M、E)の設定例を示す図
FIG. 2 Points for performing GPS measurement (A, B, C, VS, V)
Figure showing M, E) setting example

【図3】周辺基準点(A、B、C)の決定のフローチャ
ート
FIG. 3 is a flowchart for determining peripheral reference points (A, B, C).

【図4】鉛直基準点VSの決定のフローチャートFIG. 4 is a flowchart for determining a vertical reference point VS.

【図5】鉛直監視点の決定のフローチャートFIG. 5: Flow chart for determining vertical monitoring points

【図6】従来の下げ振りによる鉛直管理方法を説明する
概念図
FIG. 6 is a conceptual diagram illustrating a conventional vertical management method using a plumb bob.

【符号の説明】[Explanation of symbols]

1 GPS測定装置 2 測量装置 3 コンピュータ 4 外部サーバ 10 通信網 P1、P2、P3 公共基準点 A、B、C 周辺基準点 E 偏心測量点 VS 鉛直基準点 VM 鉛直監視点 LP 水準点 1 GPS measuring device 2 surveying equipment 3 computers 4 External server 10 communication network P1, P2, P3 Public reference points A, B, C peripheral reference points E Eccentricity survey point VS vertical reference point VM vertical monitoring point LP benchmark

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 建築構造物周辺の少なくとも1つの周辺
基準点と、前記建築構造物の内部の基準階における1又
は2以上の鉛直基準点と、前記鉛直基準点に対応する鉛
直監視点の緯度、経度及び高度を測定するGPS測定装
置と、 前記周辺基準点と前記鉛直基準点の標高を測定する測量
装置と、 前記GPS測定装置及び前記測量装置の測定データを入
力し解析するコンピュータとを備えた建築構造物の鉛直
監視システムであって、 前記周辺基準点を既知点とする仮定三次元網平均計算に
よって、前記鉛直基準点及び前記鉛直監視点の緯度と経
度を計算し、 前記鉛直基準点の標高に基づいて前記鉛直監視点の高度
を標高に変換し、 前記鉛直監視点の緯度、経度及び標高を監視することを
特徴とする鉛直監視システム。
1. At least one peripheral reference point around a building structure, one or more vertical reference points on a reference floor inside the building structure, and a latitude of a vertical monitoring point corresponding to the vertical reference point. A GPS measuring device for measuring longitude and altitude, a surveying device for measuring altitudes of the peripheral reference point and the vertical reference point, and a computer for inputting and analyzing the measurement data of the GPS measuring device and the surveying device. A vertical monitoring system for a building structure, wherein the latitude and longitude of the vertical reference point and the vertical monitoring point are calculated by an assumed three-dimensional network average calculation with the peripheral reference point as a known point, and the vertical reference point The altitude of the vertical monitoring point is converted into an altitude based on the altitude of the above, and the latitude, the longitude, and the altitude of the vertical monitoring point are monitored.
【請求項2】 建築構造物周辺の少なくとも1つの周辺
基準点と、前記建築構造物の内部の基準階における1又
は2以上の鉛直基準点と、前記鉛直基準点に対応する鉛
直監視点の緯度、経度及び高度を測定するGPS測定装
置と、 前記周辺基準点と前記鉛基準点の標高を測定する測量装
置と、 前記GPS測定装置及び前記測量装置の測定データを入
力し解析するコンピュータとを備えた建築構造物の鉛直
監視システムであって、 初期時点において、 前記周辺基準点、前記鉛直基準点及び鉛直監視点の緯
度、経度及び高度を測定するとともに、前記周辺基準点
及び前記鉛基準点の標高を測量し、 前記周辺基準点を既知点とする仮定三次元網平均計算に
よって、前記鉛直基準点及び前記鉛直監視点の緯度と経
度の初期値を計算し、 前記鉛直基準点の標高に基づいて前記鉛直監視点の高度
を標高の初期値に変換し、 監視時点において、 前記周辺基準点及び前記鉛直監視点の緯度、経度及び高
度を測定し、 前記周辺基準点を既知とする仮定三次元網平均計算によ
り前記鉛直監視点の緯度及び経度を計算し、 前記標高の初期値に基づいて前記鉛直監視点の高度を標
高に変換し、 前記鉛直監視点の緯度、経度及び標高を監視することを
特徴とする鉛直監視システム。
2. The latitude of at least one peripheral reference point around the building structure, one or more vertical reference points on a reference floor inside the building structure, and a vertical monitoring point corresponding to the vertical reference point. A GPS measuring device for measuring longitude and altitude, a surveying device for measuring elevations of the peripheral reference point and the lead reference point, and a computer for inputting and analyzing measurement data of the GPS measuring device and the surveying device. A vertical monitoring system for a building structure, wherein the latitude, longitude, and altitude of the peripheral reference point, the vertical reference point, and the vertical monitoring point are measured at the initial point, and the peripheral reference point and the vertical reference point are The altitude is measured, and the initial values of the latitude and longitude of the vertical reference point and the vertical monitoring point are calculated by an assumed three-dimensional mesh average calculation with the peripheral reference point as a known point, and the vertical reference is calculated. The altitude of the vertical monitoring point is converted to the initial value of the altitude based on the altitude of the point, and at the time of monitoring, the latitude, longitude and altitude of the peripheral reference point and the vertical monitoring point are measured, and the peripheral reference point is known. Calculate the latitude and longitude of the vertical monitoring point by hypothetical three-dimensional network average calculation, and convert the altitude of the vertical monitoring point to altitude based on the initial value of the altitude, the latitude, longitude and the vertical monitoring point. A vertical monitoring system that monitors the altitude.
【請求項3】 前記コンピュータを外部サーバと接続
し、 前記コンピュータは、 前記建築構造物の周辺の少なくとも1つの公共基準点の
データを前記サーバからダウンロードし、 前記公共基準点を既知とする仮定三次元網平均計算によ
り、前記周辺基準点の緯度と経度を計算することを特徴
とする請求項1又は2記載の鉛直監視システム。
3. A hypothetical cubic system in which the computer is connected to an external server, the computer downloads data of at least one public reference point around the building structure from the server, and the public reference point is known. 3. The vertical monitoring system according to claim 1, wherein the latitude and longitude of the peripheral reference points are calculated by an original network average calculation.
【請求項4】 前記コンピュータは、前記鉛直管理点の
緯度、経度及び標高を所定の座標系に座標変換すること
を特徴とする請求項1又は2記載の鉛直監視システム。
4. The vertical monitoring system according to claim 1, wherein the computer coordinates the latitude, longitude and altitude of the vertical control point into a predetermined coordinate system.
【請求項5】 建築構造物周辺の少なくとも1つの周辺
基準点と、前記建築構造物の内部の基準階における1又
は2以上の鉛直基準点と、前記鉛直基準点に対応する鉛
直監視点の緯度、経度及び高度を測定するGPS測定装
置と、 前記周辺基準点と前記鉛直基準点の標高を測定する測量
装置と、 前記GPS測定装置及び前記測量装置の測定データを入
力し解析するコンピュータとを備えた建築構造物の鉛直
監視システムを使用する鉛直監視方法であって、 前記周辺基準点を既知点とする仮定三次元網平均計算に
よって、前記鉛直基準点及び前記鉛直監視点の緯度と経
度を計算し、 前記鉛直基準点の標高に基づいて前記鉛直監視点の高度
を標高に変換し、 前記鉛直監視点の緯度、経度及び標高を監視することを
特徴とする鉛直監視方法。
5. The latitude of at least one peripheral reference point around a building structure, one or more vertical reference points on a reference floor inside the building structure, and a vertical monitoring point corresponding to the vertical reference point. A GPS measuring device for measuring longitude and altitude, a surveying device for measuring altitudes of the peripheral reference point and the vertical reference point, and a computer for inputting and analyzing the measurement data of the GPS measuring device and the surveying device. A vertical monitoring method using a vertical monitoring system for a building structure, wherein the latitude and longitude of the vertical reference point and the vertical monitoring point are calculated by an assumed three-dimensional network average calculation with the peripheral reference point as a known point. Then, the altitude of the vertical monitoring point is converted into an altitude based on the altitude of the vertical reference point, and the latitude, longitude, and altitude of the vertical monitoring point are monitored.
【請求項6】 建築構造物周辺の少なくとも1つの周辺
基準点と、前記建築構造物の内部の基準階における1又
は2以上の鉛直基準点と、前記鉛直基準点に対応する鉛
直監視点の緯度、経度及び高度を測定するGPS測定装
置と、 前記周辺基準点と前記鉛基準点の標高を測量する測量装
置と、 前記GPS測定装置及び前記測量装置のデータを入力し
解析するコンピュータとを備えた建築構造物の鉛直監視
システムを使用する鉛直監視方法であって、 初期時点において、 前記周辺基準点、前記鉛直基準点及び鉛直監視点の緯
度、経度及び高度を測定するとともに、前記周辺基準点
及び前記鉛基準点の標高を測量し、 前記周辺基準点を既知点とする仮定三次元網平均計算に
よって、前記鉛直基準点及び前記鉛直監視点の緯度と経
度の初期値を計算し、 前記鉛直基準点の標高に基づいて前記鉛直監視点の高度
を標高の初期値に変換し、 監視時点において、 前記周辺基準点及び前記鉛直監視点の緯度、経度及び高
度を測定し、 前記周辺基準点を既知とする仮定三次元網平均計算によ
り前記鉛直監視点の緯度及び経度を計算し、 前記標高の初期値に基づいて前記鉛直監視点の高度を標
高に変換し、 前記鉛直監視点の緯度、経度及び標高を監視することを
特徴とする鉛直監視方法。
6. The latitude of at least one peripheral reference point around the building structure, one or more vertical reference points on a reference floor inside the building structure, and a vertical monitoring point corresponding to the vertical reference point. A GPS measuring device for measuring longitude and altitude, a surveying device for surveying altitudes of the peripheral reference point and the lead reference point, and a computer for inputting and analyzing data of the GPS measuring device and the surveying device. A vertical monitoring method using a vertical monitoring system for a building structure, wherein, at an initial point of time, the latitude, longitude and altitude of the peripheral reference point, the vertical reference point and the vertical monitoring point are measured, and the peripheral reference point and The altitude of the lead control point is measured, and the initial values of the latitude and longitude of the vertical control point and the vertical monitoring point are measured by the hypothetical three-dimensional network average calculation using the peripheral control points as known points. However, the altitude of the vertical monitoring point is converted to an initial value of the altitude based on the altitude of the vertical reference point, and at the time of monitoring, the latitude, longitude and altitude of the peripheral reference point and the vertical monitoring point are measured, Calculate the latitude and longitude of the vertical monitoring point by hypothetical three-dimensional network average calculation assuming that the peripheral reference point is known, and convert the altitude of the vertical monitoring point to an altitude based on the initial value of the altitude, the vertical monitoring point A vertical monitoring method characterized by monitoring the latitude, longitude and altitude of the.
【請求項7】 前記コンピュータを外部サーバと接続
し、 前記コンピュータは、 前記建築構造物の周辺の少なくとも1つの公共基準点の
データを前記サーバからダウンロードし、 前記公共基準点を既知とする仮定三次元網平均計算によ
り、前記周辺基準点の緯度と経度を計算することを特徴
とする請求項4又は5記載の鉛直監視方法。
7. The hypothetical third order in which the computer is connected to an external server, the computer downloads data of at least one public reference point around the building structure from the server, and the public reference point is known. 6. The vertical monitoring method according to claim 4, wherein the latitude and longitude of the peripheral reference points are calculated by the original network average calculation.
【請求項8】 前記コンピュータは、前記鉛直管理点の
緯度、経度及び標高を所定の座標系に座標変換すること
を特徴とする請求項4又は5記載の鉛直監視方法。
8. The vertical monitoring method according to claim 4, wherein the computer coordinate-converts the latitude, longitude, and altitude of the vertical control point into a predetermined coordinate system.
JP2002099454A 2002-04-02 2002-04-02 Verticality monitoring system for building structure Pending JP2003294443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002099454A JP2003294443A (en) 2002-04-02 2002-04-02 Verticality monitoring system for building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002099454A JP2003294443A (en) 2002-04-02 2002-04-02 Verticality monitoring system for building structure

Publications (1)

Publication Number Publication Date
JP2003294443A true JP2003294443A (en) 2003-10-15

Family

ID=29240886

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002099454A Pending JP2003294443A (en) 2002-04-02 2002-04-02 Verticality monitoring system for building structure

Country Status (1)

Country Link
JP (1) JP2003294443A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008175676A (en) * 2007-01-18 2008-07-31 Maeda Corp Temporary structure soundness determination system
JP2009517679A (en) * 2006-01-10 2009-04-30 ライカ ジオシステムズ アクチェンゲゼルシャフト Surveying method and system of high-rise structure
JP2010164380A (en) * 2009-01-14 2010-07-29 Ohbayashi Corp System and method for monitoring position accuracy of reference black ink
JP2012154912A (en) * 2011-06-27 2012-08-16 Ohbayashi Corp Measurement system, computation apparatus and structure
JP2017015400A (en) * 2015-06-26 2017-01-19 アイサンテクノロジー株式会社 System and method for detecting electric wave interference and positioning system
JP2017096867A (en) * 2015-11-27 2017-06-01 株式会社熊谷組 Building damage determination method
JP2017161482A (en) * 2016-03-11 2017-09-14 三井 均 Building diagnostic system for diagnosing degree of soundness of building

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009517679A (en) * 2006-01-10 2009-04-30 ライカ ジオシステムズ アクチェンゲゼルシャフト Surveying method and system of high-rise structure
JP2008175676A (en) * 2007-01-18 2008-07-31 Maeda Corp Temporary structure soundness determination system
JP2010164380A (en) * 2009-01-14 2010-07-29 Ohbayashi Corp System and method for monitoring position accuracy of reference black ink
JP2012154912A (en) * 2011-06-27 2012-08-16 Ohbayashi Corp Measurement system, computation apparatus and structure
JP2017015400A (en) * 2015-06-26 2017-01-19 アイサンテクノロジー株式会社 System and method for detecting electric wave interference and positioning system
JP2017096867A (en) * 2015-11-27 2017-06-01 株式会社熊谷組 Building damage determination method
JP2017161482A (en) * 2016-03-11 2017-09-14 三井 均 Building diagnostic system for diagnosing degree of soundness of building

Similar Documents

Publication Publication Date Title
US7199872B2 (en) Method and apparatus for ground-based surveying in sites having one or more unstable zone(s)
CN107402001A (en) Construction of super highrise building deviation digitlization checking system and method based on 3D scannings
US6934629B1 (en) Method and apparatus for precise positioning of large structures
CN103591944B (en) A kind of arcuate building measures construction method
US11422270B2 (en) GNSS mobile base station and data collector with electronic leveling and hands-free data collection
Kuhlmann et al. Engineering geodesy-definition and core competencies
CN114858140B (en) Point cloud coordinate transformation method and device for deep-buried tunnel structural surface based on target device
Okiemute et al. Comparative analysis of dgps and total station accuracies for static deformation monitoring of engineering structures
JP2003294443A (en) Verticality monitoring system for building structure
Mishra et al. Development of a geoid model by geometric method
Bagherbandi et al. Physical and geometric effects on the classical geodetic observations in small-scale control networks
El-Ashmawy Accuracy, time cost and terrain independence comparisons of levelling techniques
Meisina et al. Choice of surveying methods for landslides monitoring
CN108168517A (en) A kind of building inclination angle method for automatic measurement and system
Chrzanowski Modern surveying techniques for mining and civil engineering
Basil et al. Determination of Deflection of the Vertical Components: Im-plications on Terrestrial Geodetic Measurement
EP3255465B1 (en) Buried asset locate device motion sensing for quality control
Poloprutský Design of a survey net for metric survey documentation of a historical building
US20170316366A1 (en) Buried asset locator retrofit card for motion sensing for quality control
Spasov METHOD FOR BUILDING A WORKING GEODETIC NETWORK OF REFLECTIVE MARKS FOR CONSTRUCTION NEEDS: METHOD FOR BUILDING A WORKING GEODETIC NETWORK OF REFLECTIVE MARKS FOR CONSTRUCTION NEEDS
El-Ashmawy An Efficient Methodology for Detecting the Vertical Movement of Structures
KR102153522B1 (en) System and Method for Measuring Buried material&#39;s Depth
Guyer et al. An Introduction to GPS Real Time Kinematic Topographic Survey Procedures
Kulesza Analysis of the Accuracy of Quasi-geoid Models used in GNSS Altitude Measurements
Even-Tzur et al. Designing a geodetic-geodynamic network: a comparative study of data processing tools

Legal Events

Date Code Title Description
A02 Decision of refusal

Effective date: 20040106

Free format text: JAPANESE INTERMEDIATE CODE: A02