JP2003233409A - System for process control of maintenance operation and system for creating of scheduled operation - Google Patents

System for process control of maintenance operation and system for creating of scheduled operation

Info

Publication number
JP2003233409A
JP2003233409A JP2002034691A JP2002034691A JP2003233409A JP 2003233409 A JP2003233409 A JP 2003233409A JP 2002034691 A JP2002034691 A JP 2002034691A JP 2002034691 A JP2002034691 A JP 2002034691A JP 2003233409 A JP2003233409 A JP 2003233409A
Authority
JP
Japan
Prior art keywords
work
scheduled
maintenance work
schedule
work schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002034691A
Other languages
Japanese (ja)
Inventor
Hideyuki Karato
英幸 唐戸
Tetsuya Yamamoto
哲也 山本
Katsumi Tokunaga
克巳 徳永
Takaharu Sugano
隆治 菅野
Atsushi Yamashita
厚 山下
Kenichi Nakabayashi
健一 中林
Takeshi Yamamoto
武志 山本
Takemitsu Imai
武光 今井
Takashi Shimizu
尊史 清水
Kazuki Okano
一樹 岡野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Atomic Power Co Ltd
Mitsubishi Heavy Industries Ltd
Original Assignee
Japan Atomic Power Co Ltd
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Atomic Power Co Ltd, Mitsubishi Heavy Industries Ltd filed Critical Japan Atomic Power Co Ltd
Priority to JP2002034691A priority Critical patent/JP2003233409A/en
Publication of JP2003233409A publication Critical patent/JP2003233409A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a system for process control of maintenance operation capable of browsing a process schedule conveniently. <P>SOLUTION: The system comprises a process database (5) for storing timetable information on scheduled operation (52a) indicating a timetable of scheduled operations for maintenance of facilities in a plant, a terminal (2), and an access means for database (3). The access means (3) extracts information (52a) from the database (5) and displays the information (52a) on the terminal (2). <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、保守作業工程管理
システムに関する。本発明は、特に、予定作業日程を作
成し、更に、保守作業が行われる作業日程を管理するた
めの保守作業工程管理システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a maintenance work process management system. The present invention particularly relates to a maintenance work process management system for creating a scheduled work schedule and managing a work schedule for performing maintenance work.

【0002】[0002]

【従来の技術】プラントに対して保守作業を行う場合、
工程計画を迅速に得ることができ、更に、工程計画を変
更する場合に容易に対処することができることが望まれ
る。このような目的を達成するための工程管理システム
が、公開特許公報(特開平9−230911)に知られ
ている。
2. Description of the Related Art When performing maintenance work on a plant,
It is desired that the process plan can be obtained quickly and that the process plan can be easily dealt with when the process plan is changed. A process control system for achieving such an object is known from Japanese Patent Laid-Open Publication No. 9-230911.

【0003】公知のその工程管理システムは、図7に示
されているように、複数のホストコンピュータマシン1
02−1〜102−Nを備えている。ホストコンピュー
タマシン102−1〜102−Nのそれぞれは、広域ネ
ットワーク103Aに接続されている。ホストコンピュ
ータマシン102−1〜102−Nには、経験者の作成
した実績ある工程データが格納されている。ホストコン
ピュータマシン102−1〜102−Nのそれぞれは、
部門間ネットワーク104を介して、サーバマシン10
1と複数の端末装置103−1〜103−Nに接続され
ている。但し、図7には、部門間ネットワーク104、
サーバマシン101、端末装置103−1〜103−N
は、ホストコンピュータマシン102−Nに接続されて
いるもののみが示されている。
A known process management system is a plurality of host computer machines 1 as shown in FIG.
02-1 to 102-N. Each of the host computer machines 102-1 to 102-N is connected to the wide area network 103A. The host computer machines 102-1 to 102-N store proven process data created by experienced persons. Each of the host computer machines 102-1 to 102-N
Server machine 10 via inter-department network 104
1 and a plurality of terminal devices 103-1 to 103-N. However, in FIG. 7, the inter-department network 104,
Server machine 101, terminal devices 103-1 to 103-N
Are only shown connected to the host computer machine 102-N.

【0004】当該工程管理システムでは、N台のホスト
コンピュータマシン102−1〜102−Nにより、各
機種各分野の工事工程計画作成支援が行われる。更に、
サーバマシン101とN台の端末装置103−1〜10
3−Nにより、各機種各分野の複数の錯綜した工事調整
試験の工程計画や負荷山積み計画等の工事調整試験計画
の作成が支援される。
In the process management system, N host computer machines 102-1 to 102-N support construction process planning for each field of each model. Furthermore,
Server machine 101 and N terminal devices 103-1 to 10-3
3-N supports the creation of construction adjustment test plans such as process plans and load pile plans for multiple complex construction adjustment tests for each model and field.

【0005】当該工程管理システムでは、全体の工程計
画は、幾つかの部分ネットワークに分割されて作成され
る。当該工程管理システムでは、ホストコンピュータマ
シン102−1〜102−N、サーバマシン101、端
末装置103−1〜103−Nにより、経験者の作成し
た実績ある工程データを利用して部分ネットワークが作
成され、その部分ネットワークに基づいて全体の工程計
画が作成される。これにより、全体の工程計画は、短時
間で有用な工程ネットワークを作成することができ、更
に、計画の変更に対して容易に対処することができる
In the process management system, the entire process plan is created by being divided into several partial networks. In the process management system, a partial network is created by the host computer machines 102-1 to 102-N, the server machine 101, and the terminal devices 103-1 to 103-N by using the proven process data created by an experienced person. , An overall process plan is created based on the partial network. As a result, the entire process plan can create a useful process network in a short time, and can easily cope with the plan change.

【0006】このような工程管理システムでは、工程計
画が簡便に閲覧できることが望まれる。
In such a process control system, it is desired that the process plan can be easily viewed.

【0007】また、保守作業に要するコストが抑制され
るように、工程計画が作成されることが望まれる。
Further, it is desired that the process plan is prepared so that the cost required for the maintenance work can be suppressed.

【0008】更に、このような工程管理システムでは、
工程計画を柔軟に修正できることが望まれる。
Further, in such a process control system,
It is desirable to be able to flexibly modify process plans.

【0009】更に、このような工程管理システムでは、
所望の条件に合った工程計画を作成し、又は、工程計画
を所望の条件に合うように修正できることが望まれる。
Further, in such a process control system,
It is desirable to be able to create a process plan that meets the desired conditions or modify the process plan to meet the desired conditions.

【0010】更に、このような工程管理システムでは、
保守工事の現場の実態に即した工程計画が作成され、又
は、工程計画が保守工事の現場の実態に即して修正でき
ることが望まれる。
Further, in such a process control system,
It is desired that a process plan is created in accordance with the actual condition of the maintenance work site, or that the process plan can be modified in accordance with the actual condition of the maintenance work site.

【0011】[0011]

【発明が解決しようとする課題】本発明の目的は、工程
計画が簡便に閲覧できる保守作業工程管理システムを提
供することにある。
SUMMARY OF THE INVENTION An object of the present invention is to provide a maintenance work process management system that allows a process plan to be easily viewed.

【0012】本発明の他の目的は、保守作業に要するコ
ストが抑制されるように、工程計画が作成できる保守作
業工程管理システムを提供することにある。
Another object of the present invention is to provide a maintenance work process management system capable of creating a process plan so that the cost required for the maintenance work can be suppressed.

【0013】本発明の更に他の目的は、工程計画を柔軟
に修正できる保守作業工程管理システムを提供すること
にある。
Still another object of the present invention is to provide a maintenance work process management system capable of flexibly modifying a process plan.

【0014】本発明の更に他の目的は、所望の条件に合
った工程計画を作成し、又は、工程計画を所望の条件に
合うように修正できる保守作業工程管理システムを提供
することにある。
Still another object of the present invention is to provide a maintenance work process management system capable of creating a process plan that meets a desired condition or modifying a process plan so as to meet a desired condition.

【0015】本発明の更に他の目的は、保守工事の現場
の実態に即した工程計画が作成され、又は、工程計画が
保守工事の現場の実態に即して修正できる保守作業工程
管理システムを提供することにある。
Still another object of the present invention is to provide a maintenance work process management system capable of creating a process plan according to the actual condition of the maintenance work site or correcting the process plan according to the actual condition of the maintenance work site. To provide.

【0016】[0016]

【課題を解決するための手段】その課題を解決するため
の手段は、下記のように表現される。その表現中に現れ
る技術的事項には、括弧()つきで、番号、記号等が添
記されている。その番号、記号等は、本発明の複数の実
施の形態のうちの、少なくとも1つの実施の形態を構成
する技術的事項、特に、その実施の形態に対応する図面
に表現されている技術的事項に付せられている参照番
号、参照記号等に一致している。このような参照番号、
参照記号は、請求項記載の技術的事項と実施の形態の技
術的事項との対応・橋渡しを明確にしている。このよう
な対応・橋渡しは、請求項記載の技術的事項が実施の形
態の技術的事項に限定されて解釈されることを意味しな
い。
Means for solving the problem Means for solving the problem are expressed as follows. The technical matters appearing in the expression are accompanied by parentheses (), and numbers, symbols and the like are added. The numbers, symbols and the like are technical matters constituting at least one of the plurality of embodiments of the present invention, particularly technical matters expressed in the drawings corresponding to the embodiment. It corresponds to the reference number, reference symbol, etc. attached to. Reference numbers like this,
The reference symbol clarifies the correspondence / bridge between the technical matters described in the claims and the technical matters of the embodiments. Such correspondence / bridge does not mean that the technical matters described in the claims are interpreted as being limited to the technical matters of the embodiments.

【0017】本発明による保守作業工程管理システム
は、プラントに含まれる設備を保守する保守作業の予定
作業日程を示す予定作業日程情報(52a)が記録され
た工程データベース(5)と、端末(2)と、データベ
ースアクセス手段(3)とを備えている。データベース
アクセス手段(3)は、工程データベース(5)から、
予定作業日程情報(52a)を取り出して、端末(2)
に表示する。
The maintenance work process management system according to the present invention includes a process database (5) in which scheduled work schedule information (52a) indicating a scheduled work schedule of maintenance work for maintaining equipment included in a plant is recorded, and a terminal (2). ) And database access means (3). The database access means (3), from the process database (5),
Taking out the scheduled work schedule information (52a), the terminal (2)
To display.

【0018】このとき、保守作業は、上位保守作業から
構成され、上位保守作業は、少なくとも一以上の単位保
守作業から構成されることがある。即ち、保守作業は、
階層化されていることがある。このとき、データベース
アクセス手段(3)は、端末(2)の操作に応じて上位
保守作業の予定作業日程を表示し、且つ、前記端末の操
作により上位保守作業のうちの一が選択されると、選択
された上位保守作業に含まれる単位保守作業の予定作業
日程を端末(2)に表示することが好ましい。このよう
に表示が階層化されており、予定作業日程を閲覧する作
業員は予定作業日程を把握しやすい。
At this time, the maintenance work may be composed of higher level maintenance work, and the higher level maintenance work may be composed of at least one unit maintenance work. That is, maintenance work is
It may be layered. At this time, the database access means (3) displays the scheduled work schedule of the upper maintenance work according to the operation of the terminal (2), and when one of the higher maintenance work is selected by the operation of the terminal. It is preferable that the scheduled work schedule of the unit maintenance work included in the selected upper maintenance work is displayed on the terminal (2). In this way, the display is hierarchized, and the worker who browses the scheduled work schedule can easily understand the scheduled work schedule.

【0019】また、当該保守作業工程管理システムは、
更に、設備の配置を示す設備配置画面を表示する設備配
置表示手段(3)と、端末(2)になされた操作に応じ
て、設備のうちの選択設備を選択する設備選択手段
(3)とを備えることがある。このとき、設備配置画面
は、設備の設備名称を示す設備名称画面要素(21)を
含み、設備選択手段(3)は、設備名称画面要素(2
1)のうちの一が選択されると、設備のうち選択された
設備名称画面要素(21)が示す設備名称を有するもの
を選択設備として選択し、且つ、データベースアクセス
手段(2)は、選択設備について行われる保守作業の前
記予定作業日程を表示することが好ましい。
Further, the maintenance work process management system is
Further, an equipment arrangement display means (3) for displaying an equipment arrangement screen showing the arrangement of the equipment, and an equipment selecting means (3) for selecting a selected equipment among the equipment according to an operation performed on the terminal (2). May be provided. At this time, the facility arrangement screen includes a facility name screen element (21) indicating the facility name of the facility, and the facility selecting means (3) controls the facility name screen element (2
When one of 1) is selected, the equipment having the equipment name indicated by the selected equipment name screen element (21) is selected as the selected equipment, and the database access means (2) selects It is preferable to display the scheduled work schedule of the maintenance work performed on the equipment.

【0020】また、当該保守作業工程管理システムは、
更に、予定作業日程作成手段(3)を備えることがあ
る。このとき、工程データベース(5)は、保守作業に
要する必要時間と必要作業者数とを含む必要資源情報
(51)と、保守作業に使用可能な資源を示す保有資源
情報(53)とを含み、予定作業日程作成手段(3)
は、必要資源情報(51)と、保有資源情報(53)
と、与えられた工期とに基づいて、予定作業日程を作成
することが好ましい。
The maintenance work process management system is
Further, the scheduled work schedule creating means (3) may be provided. At this time, the process database (5) includes required resource information (51) including the required time required for maintenance work and the number of required workers, and retained resource information (53) indicating resources available for maintenance work. , Scheduled work schedule creation means (3)
Is required resource information (51) and possessed resource information (53)
It is preferable to create a scheduled work schedule based on the given work schedule.

【0021】このとき、予定作業日程作成手段(3)
は、保守作業に従事する従事人員数の最大値の関数であ
る作業効率関数に基づいて予定作業日程を作成すること
が好ましい。
At this time, the scheduled work schedule creating means (3)
Preferably creates the scheduled work schedule based on a work efficiency function that is a function of the maximum value of the number of workers engaged in maintenance work.

【0022】また、予定作業日程作成手段(3)は、与
えられた工期を第1〜第n期間に分割したとして、下記
式:
Further, the planned work schedule creating means (3) divides the given construction period into first to n-th periods, and the following formula:

【数3】 B:前記保守作業が行われるのに必要な延作業量 C:第i期間において一時に前記保守作業に従事した
最大従事者数 D:前記第i期間の長さ で表現される作業効率関数Aに基づいて、予定作業日程
を作成することが好ましい。
[Equation 3] B: Total amount of work required for performing the maintenance work C i : Maximum number of workers engaged in the maintenance work at one time in the i-th period D i : Work efficiency expressed by the length of the i-th period It is preferable to create the scheduled work schedule based on the function A.

【0023】また、端末(2)は、前記保守作業が実際
に行われた実績作業日程が入力され、且つ、実績作業日
程をデータベースアクセス手段(3)に送信し、データ
ベースアクセス手段(3)は、実績作業日程を、工程デ
ータベース(5)に保存することが好ましい。
Further, the terminal (2) receives the actual work schedule in which the maintenance work is actually performed, and transmits the actual work schedule to the database access means (3), and the database access means (3) It is preferable to store the actual work schedule in the process database (5).

【0024】このとき、当該保守作業工程管理システム
は、更に、実績作業日程に基づいて予定作業日程を修正
し、修正予定作業日程を作成する修正予定作業日程作成
手段(3)を備えることが好ましい。
At this time, it is preferable that the maintenance work process management system further includes a scheduled correction work schedule creating means (3) for correcting the scheduled work schedule based on the actual work schedule and creating the scheduled correction work schedule. .

【0025】また、当該保守作業工程管理システムは、
更に、修正予定作業日程作成手段(3)を備え、端末
(2)は、限定条件を示す限定条件情報を修正予定作業
日程作成手段(3)に送信することがある。このとき、
修正予定作業日程作成手段(3)は、限定条件情報に基
づいて予定作業日程を修正し、限定条件を満足する修正
予定作業日程を作成することが好ましい。
Further, the maintenance work process management system is
Furthermore, the scheduled modification work schedule creating means (3) may be provided, and the terminal (2) may send limited condition information indicating the restrictive conditions to the scheduled modification work schedule creating means (3). At this time,
It is preferable that the modified scheduled work schedule creating means (3) modify the scheduled work schedule based on the limited condition information and create a modified scheduled work schedule satisfying the limited conditions.

【0026】また、当該保守作業工程管理システムは、
更に、端末(2)に対して行われる操作に応じて予定作
業日程を修正し、修正予定作業日程を作成する修正予定
作業日程編集手段(3)を備えていることが望ましい。
Further, the maintenance work process management system is
Further, it is preferable that the scheduled work schedule is modified according to the operation performed on the terminal (2), and the scheduled work schedule editing means (3) for creating the scheduled work schedule is preferably provided.

【0027】このとき、当該保守作業工程管理システム
において、更に、修正予定作業日程が実行可能であるか
否かを判断する時系列的整合性判断手段(3)を備えて
いることが望ましい。
At this time, it is desirable that the maintenance work process management system further includes a time-series consistency determination means (3) for determining whether or not the scheduled repair work schedule can be executed.

【0028】[0028]

【発明の実施の形態】以下、添付図面を参照しながら、
本発明による実施の形態の保守作業工程管理システムを
説明する。
DETAILED DESCRIPTION OF THE INVENTION Referring to the accompanying drawings,
A maintenance work process management system according to an embodiment of the present invention will be described.

【0029】図1は、本発明の一実施の形態による保守
作業工程管理システムを示す。当該保守作業工程管理シ
ステムは、ホスト計算機1と、端末2とを備えている。
端末2は、ホスト計算機1に接続されている。端末2は
プラントの保守作業が行われる現場に設けられる。
FIG. 1 shows a maintenance work process management system according to an embodiment of the present invention. The maintenance work process management system includes a host computer 1 and a terminal 2.
The terminal 2 is connected to the host computer 1. The terminal 2 is provided at the site where the maintenance work of the plant is performed.

【0030】ホスト計算機1は、演算器3と工程データ
ベース5とを備えている。演算器3は、端末2から行わ
れる工程データベース5へのアクセスを制御する。更に
演算器3は、当該保守作業工程管理システムで行われる
様々な判断と演算とを行う。
The host computer 1 comprises a computing unit 3 and a process database 5. The computing unit 3 controls access to the process database 5 from the terminal 2. Further, the computing unit 3 performs various judgments and computations performed by the maintenance work process management system.

【0031】工程データベース5は、保守作業手順情報
50と、必要資源情報51と、作業日程情報52とを含
む。
The process database 5 includes maintenance work procedure information 50, necessary resource information 51, and work schedule information 52.

【0032】プラントに含まれる設備それぞれには、そ
れを保守するための保守作業手順が定められている。保
守作業手順情報50は、その保守作業手順を示す情報で
ある。保守作業手順は、複数の保守作業の連鎖により構
成される。保守作業手順情報50は、ある保守作業手順
に含まれる保守作業の連鎖の態様を示す情報を含んでい
る。
A maintenance work procedure for maintaining the equipment is defined for each equipment included in the plant. The maintenance work procedure information 50 is information indicating the maintenance work procedure. The maintenance work procedure is composed of a chain of a plurality of maintenance works. The maintenance work procedure information 50 includes information indicating a mode of a chain of maintenance works included in a certain maintenance work procedure.

【0033】保守作業手順に含まれる保守作業は、階層
化されている。保守作業手順に含まれる保守作業は、最
小の作業単位となる単位保守作業に区分されている。少
なくとも一以上の単位保守作業の集合により、上位保守
作業が構成されている。ある保守作業手順を表現する場
合、その保守作業手順は、上位保守作業の連鎖により表
現されることが可能であり、更に、単位保守作業の連鎖
により表現されることも可能である。
The maintenance work included in the maintenance work procedure is hierarchized. The maintenance work included in the maintenance work procedure is divided into unit maintenance work, which is the smallest work unit. The higher-level maintenance work is composed of a set of at least one unit maintenance work. When expressing a certain maintenance work procedure, the maintenance work procedure can be expressed by a chain of higher level maintenance work, and can also be expressed by a chain of unit maintenance work.

【0034】本実施の形態では、保守作業は、2つの階
層に階層化されているが、更に多数の階層に階層化され
ることも可能である。
In the present embodiment, the maintenance work is hierarchized into two hierarchies, but it is also possible to hierarchize into more hierarchies.

【0035】必要資源情報51は、単位保守作業のそれ
ぞれを実施するのに必要な資源を示す情報である。必要
資源情報51には、単位保守作業のそれぞれに必要な時
間、必要な人員数及び必要なクレーン数を示す情報が含
まれている。
The required resource information 51 is information indicating the resources required to carry out each unit maintenance work. The required resource information 51 includes information indicating the time required for each unit maintenance work, the required number of personnel, and the required number of cranes.

【0036】作業日程情報52は、予定作業日程情報5
2aと実績作業日程情報52bとを含む。予定作業日程
情報52aは、保守作業手順について予定された予定作
業日程を示す情報である。予定作業日程情報52aは、
必要資源情報51に基づいて、演算器3により作成され
る。予定作業日程情報52aが作成される過程は後述さ
れ、ここでは説明されない。
The work schedule information 52 is the scheduled work schedule information 5
2a and actual work schedule information 52b. The scheduled work schedule information 52a is information indicating a scheduled work schedule scheduled for the maintenance work procedure. Scheduled work schedule information 52a is
It is created by the computing unit 3 based on the required resource information 51. The process of creating the scheduled work schedule information 52a will be described later and will not be described here.

【0037】実績作業日程情報52bは、保守作業手順
が実際に実施された実績作業日程を示す。実績作業日程
は、端末2に入力される。入力された実績作業日程は、
ホスト計算機1の工程データベース5に、実績作業日程
情報52bとして書き込まれる。
The actual work schedule information 52b indicates the actual work schedule in which the maintenance work procedure was actually carried out. The actual work schedule is input to the terminal 2. The entered actual work schedule is
The actual work schedule information 52b is written in the process database 5 of the host computer 1.

【0038】保有資源情報53は、保守作業を行うため
に使用可能な資源を示している。保有資源情報53に
は、保守作業を行うために使用可能な作業員の人数と、
使用可能な支援機器の数とが記録されている。支援機器
とは、例えばクレーンのような保守作業を行うために使
用される作業機器をいう。
The possessed resource information 53 indicates resources that can be used for performing maintenance work. The owned resource information 53 includes the number of workers who can be used for performing maintenance work,
The number of assistive devices that can be used is recorded. The support device refers to a work device such as a crane used for performing maintenance work.

【0039】当該保守作業工程管理システムの機能は、
(1)予定作業日程を表示し、更に実績作業日程を工程
データベース5に蓄積する機能と、(2)予定作業日程
を作成し、修正する機能の2つに分類される。まず、
(1)予定作業日程を表示し、更に実績作業日程を工程
データベース5に蓄積する機能について説明する。
The function of the maintenance work process management system is as follows.
(1) A function of displaying the scheduled work schedule and further accumulating the actual work schedule in the process database 5, and (2) a function of creating and correcting the scheduled work schedule. First,
(1) The function of displaying the scheduled work schedule and accumulating the actual work schedule in the process database 5 will be described.

【0040】作業者が、端末2を操作して、予定作業日
程を表示する要求をホスト計算機1に送信すると、ホス
ト計算機1の演算器3は、プラントの設備の配置を示す
設備配置画面を、端末2に表示する。その設備配置画面
には、図2に示されているように、設備の設備名称を示
す名称ボタン21が配置されている。その名称ボタン2
7がクリックされると、クリックされた名称ボタン21
が示す設備名称を有する設備に対して行われる保守作業
の予定作業日程が表示される。このようにプラントの設
備の配置を示す配置画面が使用されることは、プラント
に配置された設備をイメージとして認識しやすくし、当
該保守作業工程管理システムの操作を容易化する。
When the worker operates the terminal 2 and sends a request to display the scheduled work schedule to the host computer 1, the computing unit 3 of the host computer 1 displays an equipment layout screen showing the layout of the equipment of the plant. Display on terminal 2. On the equipment layout screen, as shown in FIG. 2, a name button 21 indicating the equipment name of the equipment is arranged. Its name button 2
When 7 is clicked, the clicked name button 21
The scheduled work schedule of the maintenance work to be performed on the equipment having the equipment name indicated by is displayed. The use of the layout screen showing the layout of the equipment of the plant makes it easy to recognize the equipment arranged in the plant as an image and facilitates the operation of the maintenance work process management system.

【0041】図3は、表示された予定作業日程を示す。
設備配置画面の名称ボタン21がクリックされた直後で
は、前述された上位保守作業の予定作業日程が端末2に
表示される。その表示画面には欄11が設けられ、各欄
には、上位保守作業の開始予定時刻及び終了予定が記載
されたタイムチャートが記載されている。
FIG. 3 shows the displayed scheduled work schedule.
Immediately after the name button 21 on the equipment layout screen is clicked, the scheduled work schedule of the above-described upper maintenance work is displayed on the terminal 2. A column 11 is provided on the display screen, and each column includes a time chart in which the scheduled start time and scheduled finish of the higher-level maintenance work are described.

【0042】欄11の左端がクリックされると、図4に
示されているように、クリックされた欄11に記載され
ている上位保守作業に含まれている単位保守作業の予定
作業日程が表示する欄12が現れる。このとき、上位保
守作業の予定作業日程を示す欄11はそのまま残されて
いる。その欄11を再びクリックすると、欄12が消去
され、図3に示されている表示画面が再び現れる。この
ように予定作業日程の表示が階層化され、予定作業日程
の把握の容易化が図られている。
When the left end of the column 11 is clicked, as shown in FIG. 4, the scheduled work schedule of the unit maintenance work included in the higher-level maintenance work described in the clicked column 11 is displayed. A column 12 appears. At this time, the column 11 indicating the scheduled work schedule of the upper maintenance work is left as it is. Clicking again on column 11 will clear column 12 and redisplay the display screen shown in FIG. In this way, the display of the scheduled work schedule is hierarchized to facilitate the understanding of the scheduled work schedule.

【0043】作業者は、このようにして予定作業日程を
確認するとともに、端末2を使用して、保守作業が実際
に行われた実績である実績作業日程を工程データベース
5の実績作業日程情報52bとして登録することができ
る。
In this way, the worker confirms the scheduled work schedule and uses the terminal 2 to calculate the actual work schedule, which is the actual result of the maintenance work, as the actual work schedule information 52b of the process database 5. Can be registered as.

【0044】端末2に実績作業日程が入力されると、端
末2は、入力された実績作業日程をホスト計算機1に伝
送する。ホスト計算機1の演算器3は、伝送された実績
作業日程を、工程データベース5の実績作業日程情報5
2bとして登録する。実績作業日程情報52bに登録さ
れた実績作業日程は、管理者による実績の管理に使用さ
れ得るとともに、後述されるように、予定作業日程の修
正にも使用される。
When the actual work schedule is input to the terminal 2, the terminal 2 transmits the input actual work schedule to the host computer 1. The arithmetic unit 3 of the host computer 1 uses the transmitted actual work schedule information as the actual work schedule information 5 of the process database 5.
Register as 2b. The actual work schedule registered in the actual work schedule information 52b can be used by the administrator for managing the actual work, and is also used for correcting the scheduled work schedule as described later.

【0045】続いて、(2)予定作業日程を作成し、修
正する機能について説明する。予定作業日程は、工程デ
ータベース5の必要資源情報51と保有資源情報53と
に基づいて、演算器3によって作成される。保守作業の
日程を管理する管理者によってホスト計算機1に所望の
工期が入力されると、ホスト計算機1の演算器3は、必
要資源情報51と保有資源情報53とに基づいて、図5
(b)に示されているようにベースとなる作業日程を作
成する。必要資源情報51には、前述のように、単位保
守作業のそれぞれに必要な時間、必要な人員数及び必要
なクレーン数が記載され、保有資源情報53には、保守
作業に使用可能な作業員数、支援機器の数とが記載され
ている。これらの情報が、作業日程を作成する際に使用
される。ベースとなる作業日程が作成されると、一時に
保守作業に従事する最大の人数である最大従事者数が算
出される。
Next, the function of (2) creating and modifying the scheduled work schedule will be described. The scheduled work schedule is created by the computing unit 3 based on the required resource information 51 and the possessed resource information 53 of the process database 5. When a desired construction period is input to the host computer 1 by the administrator who manages the schedule of maintenance work, the computing unit 3 of the host computer 1 is based on the required resource information 51 and the possessed resource information 53.
As shown in (b), a basic work schedule is created. As described above, the required resource information 51 describes the time required for each unit maintenance work, the required number of personnel and the required number of cranes, and the retained resource information 53 shows the number of workers available for maintenance work. , The number of supporting devices is described. This information is used when creating the work schedule. When the base work schedule is created, the maximum number of workers, which is the maximum number of workers engaged in maintenance work at one time, is calculated.

【0046】管理者は、算出された最大従事者数を参照
して、工期を短縮することや、最大従事者数を減少する
ことを検討することができる。管理者により、より短い
工期が設定されると、図5(a)に示されているよう
に、演算器3は、山積みを行って、より工期が短縮され
た作業日程を作成する。また、管理者により、より少な
い最大従事者数が設定されると、図5(c)に示されて
いるように、演算器3は、山崩しを行って、より最大従
事者数が減少された作業日程を作成する。作成された作
業日程のうちの一が、管理者により予定作業日程として
選択され、予定作業日程が確定する。
The administrator can refer to the calculated maximum number of workers and consider shortening the construction period or reducing the maximum number of workers. When a shorter work period is set by the administrator, as shown in FIG. 5A, the computing unit 3 piles up and creates a work schedule with a shorter work period. Further, when the administrator sets a smaller maximum number of workers, the computing unit 3 performs a landslide as shown in FIG. 5C, and the maximum number of workers is further reduced. Create a work schedule. One of the created work schedules is selected as the planned work schedule by the administrator, and the planned work schedule is fixed.

【0047】予定作業日程の作成の際には、次式で与え
られる作業効率関数Aが使用される:
In creating the scheduled work schedule, the work efficiency function A given by the following equation is used:

【数4】 B: 必要延作業量(人・時間) C:第i期間において一時に前記保守作業に従事した
最大従事者数(人) D:前記第i期間の長さ(時間) 作業効率関数Aを考える際には、工期は、n個の第1〜
第n期間に分割される。第1〜第n期間のそれぞれは、
工期に含まれる日の、昼シフト又は夜シフトのいずれか
を示している。iが奇数であるとき、第i期間は工期の
うちのある1日の昼シフトを示す。iが偶数であると
き、第i期間は工期のうちのある1日の夜シフトを示
す。
[Equation 4] B: Required total amount of work (person / hour) C i : Maximum number of workers engaged in the maintenance work at one time in the i-th period (person) D i : Length of the i-th period (hour) Work efficiency function A When considering, the construction period is
It is divided into the nth period. Each of the first to n-th periods,
The day included in the construction period indicates either a day shift or a night shift. When i is an odd number, the i-th period indicates a day shift of one day of the construction period. When i is even, the i-th period indicates a night shift of one day of the construction period.

【0048】このようにして定められている作業効率関
数Aは、現実に従事者を雇用するために必要な費用をよ
り的確に表現している。即ち、従事者を雇用する場合、
一時に保守作業に従事する最大従事者数に対応して雇用
する従事者数を決定する必要がある。従って、従事者を
雇用するために必要な費用は、昼シフト又は夜シフトに
おいて一時に保守作業に従事する最大従事者数に依存す
ることになる。最大従事者数に依存して定められた作業
効率関数Aは、現実に従事者を雇用するために必要な費
用をより的確に表現する。
The work efficiency function A defined in this way more accurately represents the cost required to actually hire a worker. That is, when hiring workers,
It is necessary to decide the number of workers to hire corresponding to the maximum number of workers engaged in maintenance work at one time. Therefore, the cost required to hire workers will depend on the maximum number of workers engaged in maintenance work at any one time during day or night shifts. The work efficiency function A determined depending on the maximum number of workers more accurately represents the cost required to actually hire workers.

【0049】作業日程は、作業効率関数Aがより大きく
なるように作成される。このとき、作業効率関数Aが最
大になるように作業日程が定められることが好ましい。
このようにして作業日程を作成することにより、従事者
を雇用するために必要な費用を的確に考慮して作業日程
を作成することができる。
The work schedule is created so that the work efficiency function A becomes larger. At this time, the work schedule is preferably set so that the work efficiency function A becomes maximum.
By creating the work schedule in this way, the work schedule can be created in consideration of the cost required to hire the worker.

【0050】上述された作業効率関数Aをより大きくす
るような作業日程を作成するためには、プール制を採用
して作業日程が作成されることが好ましい。プール制と
は、機器・設備毎に専属の従事者を配置するのではな
く、作業員を複数の機器・設備に対してプールし、保守
作業を行うときの作業量に応じて作業員を各現場に配置
する体制をいう。
In order to create a work schedule that makes the above-mentioned work efficiency function A larger, it is preferable that the work schedule is created by adopting a pool system. With the pool system, instead of assigning a dedicated worker for each device / equipment, the worker is pooled for multiple devices / equipment and each worker is assigned according to the amount of work when performing maintenance work. It is a system that is placed on site.

【0051】図6(a)は、機器・設備毎に専属の従事
者を配置して、作業日程を定めた場合の、従事者数の変
動を示し、図6(b)は、プール制を採用して作業日程
が作成された場合の従事者数の変動を示す。このよう
に、プール制を採用することにより、従事者数の変動を
小さくすることができる。従事者数の変動が小さく抑え
られることにより、上述の作業効率関数Aをより大きく
するような作業日程を作成することができる。このよう
にして作成された作業日程は、工期を守りながらも、従
事者を雇用するために必要な費用が抑制されるものにな
る。
FIG. 6 (a) shows fluctuations in the number of workers when a dedicated work staff is assigned to each equipment / equipment to set a work schedule, and FIG. 6 (b) shows a pool system. Changes in the number of workers when the work schedule is adopted and adopted. In this way, by adopting the pool system, it is possible to reduce fluctuations in the number of workers. By suppressing the fluctuation in the number of workers to be small, it is possible to create a work schedule that makes the work efficiency function A larger. The work schedule created in this way keeps the construction period and reduces the cost required to hire workers.

【0052】また、保守作業の日程を管理する管理者
は、必要に応じて、予定作業日程を再度作成し、予定作
業日程情報52aを更新することができる。例えば、作
業者によって入力される実績作業日程をみた管理者は、
予定作業日程を変更し、再度作成する必要を感じること
がある。このような場合、管理者は、端末2を操作し
て、ホスト計算機1に予定作業日程を再度作成する指示
を出すことができる。ホスト計算機1の演算器3は、実
績作業日程情報52bに蓄積されている実績作業日程に
基づいて予定作業日程を再度作成し、予定作業日程情報
52aを更新する。
Further, the administrator who manages the schedule of the maintenance work can recreate the scheduled work schedule and update the scheduled work schedule information 52a, if necessary. For example, the manager who saw the actual work schedule input by the worker,
You may find it necessary to change the scheduled work schedule and create it again. In such a case, the administrator can operate the terminal 2 to issue an instruction to the host computer 1 to recreate the scheduled work schedule. The computing unit 3 of the host computer 1 recreates the scheduled work schedule based on the actual work schedule stored in the actual work schedule information 52b, and updates the scheduled work schedule information 52a.

【0053】演算器3が予定作業日程を作成する際に
は、管理者は、限定条件を課することができる。管理者
は、ある保守作業が、いつ着手可能であるか否かを示す
着手可能情報を端末2に入力し、限定条件を定めること
ができる。更に、管理者は、ある保守作業が、いつ行わ
れるかを強制的に指定する保守作業実行時期指定情報を
端末2に入力し、限定条件を定めることができる。この
ような限定条件は、現場の状況を反映しながら定められ
ることが好ましい。演算器3は、着手可能情報と保守作
業実行時期指定情報とに基づいて、限定条件を満足する
予定作業日程を再度作成する。これにより、現場の状況
を反映した予定作業日程が作成され得ることになる。
When the computing unit 3 creates the scheduled work schedule, the administrator can impose a limiting condition. The administrator can set the limiting condition by inputting into the terminal 2 the workable information indicating when a certain maintenance work can be started. Furthermore, the administrator can set the limiting condition by inputting into the terminal 2 the maintenance work execution time designation information for forcibly designating when a certain maintenance work is performed. Such limiting conditions are preferably set while reflecting the situation at the site. The computing unit 3 re-creates a scheduled work schedule that satisfies the limiting conditions, based on the startable information and the maintenance work execution time designation information. As a result, a scheduled work schedule that reflects the situation at the site can be created.

【0054】更に、管理者は、端末2を操作して自ら予
定作業日程を修正することができる。ホスト計算機1の
演算器3は、端末2の操作に応じて予定作業日程を修正
し、予定作業日程情報52aを更新する。このとき、演
算器3は、修正された予定作業日程が、時系列的に整合
して実行可能であるか否かを判断する。実行可能である
と判断すると、演算器3は、端末2の操作に応じて予定
作業日程を修正し、予定作業日程情報52aを更新す
る。
Furthermore, the administrator can operate the terminal 2 to modify the scheduled work schedule by himself. The computing unit 3 of the host computer 1 corrects the scheduled work schedule according to the operation of the terminal 2 and updates the scheduled work schedule information 52a. At this time, the computing unit 3 determines whether or not the corrected scheduled work schedules can be executed in time series. When it is determined that the operation is executable, the computing unit 3 corrects the scheduled work schedule according to the operation of the terminal 2 and updates the scheduled work schedule information 52a.

【0055】このように、端末2を操作して予定作業日
程を修正することが可能になっていることにより、予定
作業日程を柔軟に変更することができる。更に、修正さ
れた予定作業日程が、時系列的に整合していることが確
認されることにより、実行不可能な予定作業日程が作成
されることが防がれる。
As described above, since the scheduled work schedule can be corrected by operating the terminal 2, the scheduled work schedule can be flexibly changed. Furthermore, by confirming that the corrected scheduled work schedules are consistent in time series, it is possible to prevent the creation of an unexecutable scheduled work schedule.

【0056】以上に説明されているように、当該保守作
業工程管理システムは、工程データベース5に、予定作
業日程と実績作業日程が蓄積され、保守作業を行う作業
日程の正確な管理に寄与する。
As described above, in the maintenance work process management system, the planned work schedule and the actual work schedule are accumulated in the process database 5, which contributes to the accurate management of the work schedule for performing the maintenance work.

【0057】また、当該保守作業工程管理システムは、
上述の作業効率関数Aに基づいて予定作業日程が作成さ
れ、必要な費用がより削減された作業日程を作成でき
る。
Further, the maintenance work process management system is
The scheduled work schedule is created based on the work efficiency function A described above, and the work schedule in which the required cost is further reduced can be created.

【0058】また、当該保守作業工程管理システムは、
現場の実態に即した限定条件を課した上で、実績作業日
程に基づいて予定作業日程が作成され、更に修正される
ことにより、保守工事の現場の実態に即した予定作業日
程の作成が可能である。
Further, the maintenance work process management system is
It is possible to create a scheduled work schedule that matches the actual situation of the maintenance site by imposing limited conditions that match the actual situation of the work site, creating a scheduled work schedule based on the actual work schedule, and further modifying it. Is.

【0059】[0059]

【発明の効果】本発明により、工程計画が簡便に閲覧で
きる保守作業工程管理システムが提供される。
According to the present invention, there is provided a maintenance work process management system capable of easily viewing a process plan.

【0060】また、本発明により、保守作業に要するコ
ストが抑制されるように、工程計画が作成できる保守作
業工程管理システムが提供される。
Further, according to the present invention, there is provided a maintenance work process management system capable of preparing a process plan so that the cost required for the maintenance work can be suppressed.

【0061】また、本発明により、工程計画を柔軟に修
正できる保守作業工程管理システムが提供される。
Further, according to the present invention, there is provided a maintenance work process management system capable of flexibly modifying a process plan.

【0062】また、本発明により、所望の条件に合った
工程計画を作成し、又は、工程計画を所望の条件に合う
ように修正できる保守作業工程管理システムが提供され
る。
Further, according to the present invention, there is provided a maintenance work process management system capable of creating a process plan which meets a desired condition or modifying the process plan so as to meet a desired condition.

【0063】また、本発明により、保守工事の現場の実
態に即した工程計画が作成され、又は、工程計画が保守
工事の現場の実態に即して修正できる保守作業工程管理
システムが提供される。
Further, according to the present invention, there is provided a maintenance work process management system capable of creating a process plan according to the actual condition of the maintenance work site or correcting the process plan according to the actual condition of the maintenance work site. .

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明の一実施の形態の保守作業工程
管理システムを示す。
FIG. 1 shows a maintenance work process management system according to an embodiment of the present invention.

【図2】図2は、端末2に表示される設備配置画面を示
す。
FIG. 2 shows an equipment layout screen displayed on the terminal 2.

【図3】図3は、上位保守作業の予定作業日程を表示す
るための表示画面を示す。
FIG. 3 shows a display screen for displaying a scheduled work schedule of higher-level maintenance work.

【図4】図4は、単位保守作業の予定作業日程を表示す
るための表示画面を示す。
FIG. 4 shows a display screen for displaying a scheduled work schedule of unit maintenance work.

【図5】図22は、予定作業日程が作成される過程を示
す。
FIG. 22 shows a process of creating a scheduled work schedule.

【図6】図6は、機器・設備毎に専属の従事者が配置さ
れた場合の従事者数の変動と、プール制が採用されたと
きの従事者数の変動を示す。
FIG. 6 shows a change in the number of workers when a dedicated worker is assigned to each device / equipment and a change in the number of workers when a pool system is adopted.

【図7】図7は、従来の工程管理システムを示す。FIG. 7 shows a conventional process control system.

【符号の説明】[Explanation of symbols]

1:ホスト計算機 2:端末 5:工程データベース 50:保守作業手順情報 51:必要資源情報 52:作業日程情報 52a:予定作業日程情報 52b:実績作業日程情報 53:保有資源情報 1: Host computer 2: Terminal 5: Process database 50: Maintenance work procedure information 51: Required resource information 52: Work schedule information 52a: Scheduled work schedule information 52b: Actual work schedule information 53: Owned resource information

───────────────────────────────────────────────────── フロントページの続き (72)発明者 唐戸 英幸 兵庫県高砂市荒井町新浜2丁目1番1号 三菱重工業株式会社高砂製作所内 (72)発明者 山本 哲也 兵庫県高砂市荒井町新浜2丁目1番1号 三菱重工業株式会社高砂製作所内 (72)発明者 徳永 克巳 福井県敦賀市明神町1番地 日本原子力発 電株式会社敦賀発電所内 (72)発明者 菅野 隆治 福井県敦賀市明神町1番地 日本原子力発 電株式会社敦賀発電所内 (72)発明者 山下 厚 福井県敦賀市明神町1番地 日本原子力発 電株式会社敦賀発電所内 (72)発明者 中林 健一 福井県敦賀市明神町1番地 日本原子力発 電株式会社敦賀発電所内 (72)発明者 山本 武志 福井県敦賀市明神町1番地 日本原子力発 電株式会社敦賀発電所内 (72)発明者 今井 武光 兵庫県神戸市兵庫区和田崎町一丁目1番1 号 原子力サービスエンジニアリング株式 会社内 (72)発明者 清水 尊史 兵庫県神戸市兵庫区和田崎町一丁目1番1 号 原子力サービスエンジニアリング株式 会社内 (72)発明者 岡野 一樹 兵庫県高砂市荒井町新浜2丁目8−30 大 成エンジニアリング株式会社内 Fターム(参考) 3C100 AA38 AA63 BB13 BB17    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Hideyuki Karato             2-1-1 Niihama, Arai-cho, Takasago, Hyogo Prefecture             Takasago Works, Mitsubishi Heavy Industries, Ltd. (72) Inventor Tetsuya Yamamoto             2-1-1 Niihama, Arai-cho, Takasago, Hyogo Prefecture             Takasago Works, Mitsubishi Heavy Industries, Ltd. (72) Inventor Katsumi Tokunaga             1 Myojin-cho, Tsuruga City, Fukui Prefecture Japan Nuclear Power             Dentsu Co., Ltd. Tsuruga Power Station (72) Inventor Ryuji Kanno             1 Myojin-cho, Tsuruga City, Fukui Prefecture Japan Nuclear Power             Dentsu Co., Ltd. Tsuruga Power Station (72) Inventor Atsushi Yamashita             1 Myojin-cho, Tsuruga City, Fukui Prefecture Japan Nuclear Power             Dentsu Co., Ltd. Tsuruga Power Station (72) Inventor Kenichi Nakabayashi             1 Myojin-cho, Tsuruga City, Fukui Prefecture Japan Nuclear Power             Dentsu Co., Ltd. Tsuruga Power Station (72) Inventor Takeshi Yamamoto             1 Myojin-cho, Tsuruga City, Fukui Prefecture Japan Nuclear Power             Dentsu Co., Ltd. Tsuruga Power Station (72) Inventor Takemitsu Imai             1-1 1-1 Wadasaki-cho, Hyogo-ku, Kobe-shi, Hyogo             No. Nuclear Service Engineering Stock             In the company (72) Inventor Takashi Shimizu             1-1 1-1 Wadasaki-cho, Hyogo-ku, Kobe-shi, Hyogo             No. Nuclear Service Engineering Stock             In the company (72) Inventor Kazuki Okano             2-8-30 Niihama, Arai Town, Takasago City, Hyogo Prefecture             Sei Engineering Co., Ltd. F-term (reference) 3C100 AA38 AA63 BB13 BB17

Claims (14)

【特許請求の範囲】[Claims] 【請求項1】 プラントに含まれる設備を保守する保守
作業の予定作業日程を示す予定作業日程情報が記録され
た工程データベースと、 端末と、 データベースアクセス手段とを備え、 前記データベースアクセス手段は、前記工程データベー
スから、前記予定作業日程情報を取り出して、前記端末
に表示する保守作業工程管理システム。
1. A process database in which scheduled work schedule information indicating a scheduled work schedule of maintenance work for maintaining equipment included in a plant is recorded, a terminal, and a database access unit, wherein the database access unit is the A maintenance work process management system for extracting the scheduled work schedule information from a process database and displaying the information on the terminal.
【請求項2】 請求項1に記載の保守作業工程管理シス
テムにおいて、 前記保守作業は、上位保守作業から構成され、 前記上位保守作業は、少なくとも一以上の単位保守作業
から構成され、 前記データベースアクセス手段は、前記端末になされる
操作に応じて前記上位保守作業の予定作業日程を表示
し、且つ、前記端末になされる操作により前記上位保守
作業のうちの一が選択されると、前記一に含まれる前記
単位保守作業の予定作業日程を前記端末に表示する保守
作業工程管理システム。
2. The maintenance work process management system according to claim 1, wherein the maintenance work is composed of higher order maintenance work, and the higher order maintenance work is composed of at least one or more unit maintenance work. The means displays the scheduled work schedule of the higher-level maintenance work according to the operation performed on the terminal, and when one of the higher-order maintenance work is selected by the operation performed on the terminal, A maintenance work process management system for displaying the scheduled work schedule of the included unit maintenance work on the terminal.
【請求項3】 請求項1に記載の保守作業工程管理シス
テムにおいて、 更に、 前記設備の配置を示す設備配置画面を表示する設備配置
表示手段と、 前記端末になされた操作に応じて、前記設備のうちの選
択設備を選択する設備選択手段とを備え、 前記設備配置画面は、前記設備の設備名称を示す設備名
称画面要素を含み、 前記設備選択手段は、前記設備名称画面要素のうちの一
が選択されると、前記設備のうち、前記一が示す設備名
称を有するものを前記選択設備として選択し、 前記データベースアクセス手段は、前記選択設備につい
て行われる前記保守作業の前記予定作業日程を表示する
保守作業工程管理システム。
3. The maintenance work process management system according to claim 1, further comprising a facility layout display means for displaying a facility layout screen showing a layout of the facility, and the facility according to an operation performed on the terminal. Equipment selection means for selecting a selected equipment of the equipment, the equipment layout screen includes equipment name screen element indicating the equipment name of the equipment, the equipment selection means, one of the equipment name screen element Is selected, the equipment having the equipment name indicated by the one is selected as the selected equipment, and the database access means displays the scheduled work schedule of the maintenance work performed on the selected equipment. Maintenance work process management system.
【請求項4】 請求項1に記載の保守作業工程管理シス
テムにおいて、 更に、予定作業日程作成手段を備え、 前記工程データベースは、 前記保守作業のそれぞれに要する必要時間と必要作業者
数とを含む必要資源情報と、 前記保守作業に使用可能な資源を示す保有資源情報とを
含み、 前記予定作業日程作成手段は、前記保有資源情報と、前
記必要資源情報と、与えられた工期とに基づいて、前記
予定作業日程を作成する保守作業工程管理システム。
4. The maintenance work process management system according to claim 1, further comprising a scheduled work schedule creating means, wherein the process database includes a required time and a required number of workers required for each of the maintenance work. Required resource information and holding resource information indicating resources available for the maintenance work are included, and the scheduled work schedule creating means is based on the holding resource information, the necessary resource information, and a given construction period. A maintenance work process management system for creating the scheduled work schedule.
【請求項5】 請求項4に記載の保守作業工程管理シス
テムにおいて、 前記予定作業日程作成手段は、前記保守作業に従事する
従事人員数の最大値の関数である作業効率関数に基づい
て前記予定作業日程を作成する保守作業工程管理システ
ム。
5. The maintenance work process management system according to claim 4, wherein the scheduled work schedule creation means is based on a work efficiency function which is a function of a maximum value of the number of personnel engaged in the maintenance work. A maintenance work process management system that creates work schedules.
【請求項6】 請求項4に記載の保守作業工程管理シス
テムにおいて、 前記予定作業日程作成手段は、前記工期を第1〜第n期
間に分割したとして、下記式: 【数1】 B:前記保守作業が行われるのに必要な延作業量 C:第i期間において一時に前記保守作業に従事した
最大従事者数 D:前記第i期間の長さ で表現される作業効率関数Aに基づいて、前記予定作業
日程を作成する保守作業工程管理システム。
6. The maintenance work process management system according to claim 4, wherein the scheduled work schedule creating means divides the construction period into first to n-th periods, and the following formula: B: Total amount of work required for performing the maintenance work C i : Maximum number of workers engaged in the maintenance work at one time in the i-th period D i : Work efficiency expressed by the length of the i-th period A maintenance work process management system that creates the scheduled work schedule based on the function A.
【請求項7】 請求項1に記載の保守作業工程管理シス
テムにおいて、 前記端末は、前記保守作業が実際に行われた実績である
実績作業日程が入力され、且つ、前記実績作業日程を前
記データベースアクセス手段に送信し、 前記データベースアクセス手段は、前記工程データベー
スに、前記実績作業日程を保存する保守作業工程管理シ
ステム。
7. The maintenance work process management system according to claim 1, wherein the actual work schedule, which is the actual record of the maintenance work, is input to the terminal, and the actual work schedule is stored in the database. A maintenance work process management system for transmitting the result work schedule to the process database, which is transmitted to an access unit.
【請求項8】 請求項7に記載の保守作業工程管理シス
テムにおいて、 更に、前記実績作業日程に基づいて前記予定作業日程を
修正し、修正予定作業日程を作成する修正予定作業日程
作成手段を備える保守作業工程管理システム。
8. The maintenance work process management system according to claim 7, further comprising: a revised scheduled work schedule creating means for modifying the scheduled work schedule based on the actual work schedule and creating a scheduled revised work schedule. Maintenance work process management system.
【請求項9】 請求項1に記載の保守作業工程管理シス
テムにおいて、 更に、修正予定作業日程作成手段を備え、 前記端末は、限定条件を示す限定条件情報を前記修正予
定作業日程作成手段に送信し、 前記修正予定作業日程作成手段は、前記限定条件情報に
基づいて前記予定作業日程を修正し、前記限定条件を満
足する修正予定作業日程を作成する保守作業工程管理シ
ステム。
9. The maintenance work process management system according to claim 1, further comprising a scheduled repair work schedule creating means, wherein the terminal sends limited condition information indicating a limiting condition to the scheduled repair work schedule creating means. The scheduled scheduled work schedule creating means corrects the scheduled schedule of work based on the limited condition information, and creates a scheduled scheduled work schedule that satisfies the limited conditions.
【請求項10】 請求項1に記載の保守作業工程管理シ
ステムにおいて、 更に、前記端末に対して行われる操作に応じて前記予定
作業日程を修正し、修正予定作業日程を作成する修正予
定作業日程編集手段を備えている保守作業工程管理シス
テム。
10. The scheduled maintenance work schedule according to claim 1, further comprising: modifying the scheduled work schedule according to an operation performed on the terminal and creating a scheduled repair work schedule. Maintenance work process management system equipped with editing means.
【請求項11】 請求項10に記載の保守作業工程管理
システムにおいて、 更に、前記修正予定作業日程が実行可能であるか否かを
判断する時系列的整合性判断手段を備えている保守作業
工程管理システム。
11. The maintenance work process management system according to claim 10, further comprising a time-series consistency judging means for judging whether or not the scheduled repair work schedule is executable. Management system.
【請求項12】 保守作業のそれぞれに要する必要時間
と必要作業者数とを示す必要資源情報が記録された工程
データベースと予定作業日程作成手段とを備え、 予定作業日程作成手段は、前記必要資源情報と、与えら
れた工期とに基づいて、前記保守作業が行われる予定作
業日程を作成する予定作業日程作成システム。
12. A schedule database in which necessary resource information indicating required time and number of required workers for each maintenance work is recorded, and a scheduled work schedule creating means, wherein the scheduled work schedule creating means is the required resource. A scheduled work schedule creation system for creating a scheduled work schedule for performing the maintenance work based on information and a given construction period.
【請求項13】 請求項12に記載の予定作業日程作成
システムにおいて、 前記予定作業日程作成手段は、前記保守作業に従事する
従事人員数の最大値の関数である作業効率関数に基づい
て前記予定作業日程を作成する予定作業日程作成システ
ム。
13. The scheduled work schedule creation system according to claim 12, wherein the scheduled work schedule creation means is based on a work efficiency function which is a function of a maximum value of the number of employees engaged in the maintenance work. Scheduled work schedule creation system that creates work schedules.
【請求項14】 請求項12に記載の予定作業日程作成
システムにおいて、 前記予定作業日程作成手段は、前記工期を第1〜第n期
間に分割したとして、下記式: 【数2】 B:前記保守作業が行われるのに必要な延作業量 C:第i期間において一時に前記保守作業に従事した
最大従事者数 D:前記第i期間の長さ で表現される作業効率関数Aに基づいて、前記予定作業
日程を作成する予定作業日程作成システム。
14. The planned work schedule creating system according to claim 12, wherein the planned work schedule creating means divides the construction period into first to n-th periods, and the following formula: B: Total amount of work required for performing the maintenance work C i : Maximum number of workers engaged in the maintenance work at one time in the i-th period D i : Work efficiency expressed by the length of the i-th period A scheduled work schedule creation system for creating the scheduled work schedule based on the function A.
JP2002034691A 2002-02-12 2002-02-12 System for process control of maintenance operation and system for creating of scheduled operation Pending JP2003233409A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002034691A JP2003233409A (en) 2002-02-12 2002-02-12 System for process control of maintenance operation and system for creating of scheduled operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002034691A JP2003233409A (en) 2002-02-12 2002-02-12 System for process control of maintenance operation and system for creating of scheduled operation

Publications (1)

Publication Number Publication Date
JP2003233409A true JP2003233409A (en) 2003-08-22

Family

ID=27777086

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002034691A Pending JP2003233409A (en) 2002-02-12 2002-02-12 System for process control of maintenance operation and system for creating of scheduled operation

Country Status (1)

Country Link
JP (1) JP2003233409A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009020728A (en) * 2007-07-12 2009-01-29 Toshiba Corp Process control system and method
JP2010527486A (en) * 2007-05-15 2010-08-12 フィッシャー−ローズマウント システムズ, インコーポレイテッド Automatic maintenance estimation in plant environment
JP2015088003A (en) * 2013-10-31 2015-05-07 三菱重工業株式会社 Process plan creation system and method
JP2021149185A (en) * 2020-03-16 2021-09-27 株式会社東芝 Periodic inspection information cooperation system and periodic inspection information cooperation method
JP7116218B1 (en) 2021-06-03 2022-08-09 株式会社バルカー Work management methods, systems and programs

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010527486A (en) * 2007-05-15 2010-08-12 フィッシャー−ローズマウント システムズ, インコーポレイテッド Automatic maintenance estimation in plant environment
CN104914825A (en) * 2007-05-15 2015-09-16 费舍-柔斯芒特***股份有限公司 Automatic maintenance estimation in a plant environment
US10410145B2 (en) 2007-05-15 2019-09-10 Fisher-Rosemount Systems, Inc. Automatic maintenance estimation in a plant environment
JP2009020728A (en) * 2007-07-12 2009-01-29 Toshiba Corp Process control system and method
JP2015088003A (en) * 2013-10-31 2015-05-07 三菱重工業株式会社 Process plan creation system and method
JP2021149185A (en) * 2020-03-16 2021-09-27 株式会社東芝 Periodic inspection information cooperation system and periodic inspection information cooperation method
JP7346337B2 (en) 2020-03-16 2023-09-19 株式会社東芝 Periodic inspection information linkage system and periodic inspection information linkage method
JP7116218B1 (en) 2021-06-03 2022-08-09 株式会社バルカー Work management methods, systems and programs
WO2022254934A1 (en) * 2021-06-03 2022-12-08 株式会社バルカー Work management method, system, and program
JP2022185623A (en) * 2021-06-03 2022-12-15 株式会社バルカー Work management method, system and program

Similar Documents

Publication Publication Date Title
WO2007130180A1 (en) Visual workflow process notation and layout
WO2013038785A1 (en) Maintenance planning system, maintenance planning system server and maintenance planning system client terminal
US20100191568A1 (en) Apparatus and method for managing task information of a plant
JP2019179393A (en) Work support device, work support system, work support method, and work support program
JP6754823B2 (en) Production planning support equipment and methods
JP2009265766A (en) Work management server, work management system, and work management method
JP2003233409A (en) System for process control of maintenance operation and system for creating of scheduled operation
JP2007094494A (en) Production plan support system, production plan support method, and program
JP2010224889A (en) Project management supporting device
JP2009282897A (en) Operation assignment method and operation assignment apparatus
JP3754476B2 (en) Construction process management method and apparatus
JP2006202082A (en) Production line management system, production line management program, recording medium, and method for managing production line
JP2011039996A (en) Work support system
JP2011088554A (en) Block arrangement support system and program for block arrangement support system
JP2001092883A (en) Working manpower assignment supporting device and recording medium storing program
US20130085959A1 (en) Apparatus for presenting task procedures of industrial plant assets
WO2018029642A1 (en) Scenario based scheduling system with predictive intelligence
JPH10185768A (en) Periodic maintenance scheduling system, and periodic maintenance scheduling device using it
JPH11154011A (en) Plant maintenance planning support system
KR20120075556A (en) Vessel mastering schedule management system
JP6912148B2 (en) Personnel management system
JP2021131745A (en) Construction progress management system and method
JP7018677B1 (en) Work status management system
JP2006119917A (en) Process management support system, process management support method, and process management support program
JP2003233419A (en) Plant maintenance support system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050203

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070614

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070618

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070817

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090519

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090928