JP2003140743A JP2001331553A JP2001331553A JP2003140743A JP 2003140743 A JP2003140743 A JP 2003140743A JP 2001331553 A JP2001331553 A JP 2001331553A JP 2001331553 A JP2001331553 A JP 2001331553A JP 2003140743 A JP2003140743 A JP 2003140743A
Authority
JP
Japan
Prior art keywords
machine
operator
operation history
operating time
history management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001331553A
Other languages
Japanese (ja)
Inventor
Takao Nagai
孝雄 永井
Tadashi Morita
正 守田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP2001331553A priority Critical patent/JP2003140743A/en
Publication of JP2003140743A publication Critical patent/JP2003140743A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2045Guiding machines along a predetermined path
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2054Fleet management

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Operation Control Of Excavators (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an operation history management system for a machine for efficiently operating a machine by grasping the operating time of the machine and the operating time of an operator. SOLUTION: When driving construction machines 1 and 2, an operator inputs operator ID for identifying the operator. When stopping the driving of the construction machines 1 and 2, the operating time is calculated, and the operator ID and machine ID for identifying the construction machines 1 and 2, and the operating time and operation load information when the machines are operated are outputted to a server 10. Then, an operation history form preparing means 27 calculates a cumulative operating time for each operator and each construction machine 1 and 2 based on the acquired information, and calculates points for providing a service from the cumulative operating time, and prepares and stores the operation history form in a result information data base. Then, the operation history form is opened by confirming the membership number in response to a request from the operator or a management system.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、機械を操縦する操
縦者の操縦に係わる操縦履歴を管理するための機械の操
縦履歴管理システム、その操縦履歴管理方法、およびそ
の操縦履歴管理プログラムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a machine operation history management system for managing operation history related to operation of an operator who operates a machine, an operation history management method thereof, and an operation history management program thereof.

【0002】[0002]

【背景技術】例えば、建設機械は、建設作業の内容に対
応した複数の機種がある。そして、建設作業の進行状況
に応じて、所定の作業内容に対応した建設機械が使用さ
れる。このことから、例えば建設機械が所定時間稼働さ
れて点検する場合には、あらかじめ建設作業で使用され
ない期間中に行う必要がある。
BACKGROUND ART For example, there are a plurality of types of construction machines corresponding to the contents of construction work. Then, a construction machine corresponding to a predetermined work content is used according to the progress status of the construction work. For this reason, for example, when the construction machine is operated for a predetermined period of time and inspected, it is necessary to perform the inspection during a period in which the construction machine is not used in advance.

【0003】また、建設機械は複数の機種が有るので、
建設機械を操縦する操縦者においても特定の限られた機
種のみ操縦可能である場合が一般的である。このことか
ら、操縦者が適宜休養を確保した状態で効率よく建設機
械を操縦して、建設作業を中断することなく効率よく進
行させる必要がある。
Since there are several types of construction machines,
It is general that an operator who operates a construction machine can only operate a specific limited model. For this reason, it is necessary for the operator to efficiently operate the construction machine in a state where the operator has a proper rest so that the construction work can proceed efficiently without interruption.

【0004】したがって、効率よく建設作業を実施する
ためには、建設機械の稼働時間および操縦者の操縦時間
を的確に把握、すなわち建設機械が建設作業の進行状況
に対応して使用可能な状態であること、操縦者が適宜休
養を確保した状態で効率よく建設機械を操縦可能な状態
であることなどを的確に把握する必要がある。
Therefore, in order to carry out the construction work efficiently, the operating time of the construction machine and the operating time of the operator are accurately grasped, that is, the construction machine is in a usable state in accordance with the progress of the construction work. In some cases, it is necessary to accurately understand that the operator can efficiently operate the construction machine while properly resting.

【0005】[0005]

【発明が解決しようとする課題】上述したように、効率
よく建設作業を実施するためには、建設機械の稼働時間
および操縦者の操縦時間を的確に判断して、効率よく建
設機械を稼働可能とする必要がある。
As described above, in order to carry out construction work efficiently, it is possible to operate the construction machine efficiently by accurately determining the operating time of the construction machine and the operating time of the operator. And need to.

【0006】本発明は、このような点に鑑みて、機械の
稼働時間および操縦者の操縦時間を把握して機械を効率
よく稼働可能とするための機械の操縦履歴管理システ
ム、その操縦履歴管理方法、および、その操縦履歴管理
プログラムを提供することを目的とする。
In view of the above points, the present invention is a machine operation history management system for grasping the machine operation time and the operator's operation time to enable the machine to operate efficiently, and its operation history management. A method and its operation history management program are provided.

【0007】[0007]

【課題を解決するための手段と作用効果】本発明は、上
記目的を達成するために、以下の構成を採用する。
[Means for Solving the Problems and Functions and Effects] The present invention adopts the following constitution in order to achieve the above object.

【0008】請求項1に記載の機械の操縦履歴管理送シ
ステムは、機械を操縦する操縦者の操縦に係わる操縦履
歴を管理する機械の操縦履歴管理システムであって、前
記操縦者を同定する操縦者同定データを取得する操縦者
情報取得手段と、前記機械を同定する機械同定データを
取得する機械情報取得手段と、前記機械の稼働時間を取
得する稼働時間取得手段と、前記操縦者情報取得手段に
て取得した操縦者同定データ、前記機械情報取得手段に
て取得した機械同定データおよび前記稼働時間取得手段
にて取得した稼働時間に基づいて、前記操縦者および前
記機械毎に稼働時間を累積して前記操縦履歴として蓄積
する累積稼働時間蓄積手段とを具備したことを特徴とす
る。
According to a first aspect of the present invention, there is provided a machine history management and transmission system for a machine, which is a machine history management system for managing a history of operations of an operator who operates the machine. Operator information acquisition means for acquiring operator identification data, machine information acquisition means for acquiring machine identification data for identifying the machine, operating time acquisition means for acquiring operating time of the machine, and the operator information acquisition means The operating time is accumulated for each of the operator and the machine on the basis of the operator identification data obtained by the above, the machine identification data obtained by the machine information obtaining means, and the operating time obtained by the operating time obtaining means. And a cumulative operating time accumulating means for accumulating as the operation history.

【0009】この発明では、累積稼働時間蓄積手段によ
り、操縦者情報取得手段にて取得した操縦者同定データ
と、機械情報取得手段にて取得した機械同定データと、
稼働時間取得手段にて取得した機械の稼働時間とに基づ
いて、操縦者や機械毎に稼働時間を累積して操縦履歴と
して蓄積する。このことにより、例えば複数の操縦者や
複数の建設機械を統括して管理する場合でも、操縦者毎
の操縦時間、機械毎の稼働時間などの操縦履歴を認識で
き、操縦者の就業管理や建設機械の保守管理などが容易
にできる。
According to the present invention, the cumulative operating time accumulating means, the operator identification data acquired by the operator information acquiring means, and the machine identification data acquired by the machine information acquiring means,
Based on the operating time of the machine acquired by the operating time acquisition means, the operating time is accumulated for each operator and each machine and accumulated as the operation history. With this, for example, even when managing multiple operators and multiple construction machines collectively, it is possible to recognize the operation history such as the operation time of each operator and the operating time of each machine, and to manage the employment of the operator and construction. Machine maintenance and management can be done easily.

【0010】請求項2に記載の発明は、請求項1に記載
の機械の操縦履歴管理システムにおいて、累積稼働時間
蓄積手段は、操縦者による機械の操縦を管理する管理機
関毎に前記操縦者および前記機械毎の累積した稼働時間
を蓄積することを特徴とする。
According to a second aspect of the present invention, in the machine operation history management system according to the first aspect, the cumulative operating time accumulating means is provided for each operator managing the operation of the machine by the operator. The accumulated operating time of each machine is accumulated.

【0011】この発明では、累積稼働時間蓄積手段によ
り、操縦者による機械の操縦を管理する管理機関毎に操
縦者や機械毎の累積した稼働時間を蓄積する。このこと
により、例えば、管理機関毎の機械の利用頻度など、機
械の稼働状況の把握が容易となり、機械の保守管理に対
して円滑に対応できる。
In the present invention, the accumulated operating time accumulating means accumulates the accumulated operating time for each operator and each machine for each management organization that controls the operation of the machine by the operator. As a result, for example, the operating status of the machine, such as the frequency of use of the machine for each management organization, can be easily grasped, and the maintenance and management of the machine can be smoothly handled.

【0012】請求項3に記載の発明は、請求項1または
2に記載の機械の操縦履歴管理システムにおいて、稼働
時間をポイントとして算出するポイント換算手段を具備
したことを特徴とする。
The invention described in claim 3 is the machine operation history management system according to claim 1 or 2, characterized by further comprising point conversion means for calculating operating time as points.

【0013】この発明では、ポイント換算手段により、
稼働時間をポイントとして算出する。このことにより、
稼働時間をポイントとして算出するため、幅広く自由度
の高いサービスの提供ができるとともに、機械の利用頻
度を向上できる。そして、例えばポイントに換算する割
合を、外部から可変可能とすることにより、機械を貸し
出す契約の形態などに基づいてポイントに換算する割合
を、コンピュータからの入力にて適宜可変させるなど、
契約の形態に対応して広くかつ細かい設定利用が可能と
なり、利便性を向上できる。さらには、外部からのポイ
ント換算の割合を可変設定する動作に対応してその割合
に対応して機械の駆動状態を制御する構成も容易にで
き、この構成によりさらに利便性を向上できる。
According to the present invention, the point conversion means
Calculate the operating time as a point. By this,
Since the operating time is calculated as a point, it is possible to provide a wide range of services with a high degree of freedom and improve the frequency of use of the machine. Then, for example, by making it possible to change the rate of conversion into points from the outside, the rate of conversion into points can be appropriately changed by input from a computer, etc., based on the form of a contract to rent a machine.
A wide and detailed setting can be used according to the type of contract, and convenience can be improved. Further, it is possible to easily configure the drive state of the machine corresponding to the operation of variably setting the rate of point conversion from the outside, and this configuration can further improve the convenience.

【0014】請求項4に記載の発明は、請求項3に記載
の機械の操縦履歴管理システムにおいて、ポイント換算
手段は、機械の種別に対応した機種別換算係数を有し、
この機種別換算係数に基づいて稼働時間をポイントとし
て算出することを特徴とする。
According to a fourth aspect of the invention, in the machine operation history management system according to the third aspect, the point conversion means has a model-specific conversion coefficient corresponding to the type of machine,
It is characterized in that the operating time is calculated as points based on this model-specific conversion coefficient.

【0015】この発明では、ポイント換算手段により、
機械の種別に対応した機種別換算係数に基づいて稼働時
間をポイントとして算出する。このことにより、例えば
建設機械などのように要求される操縦技能に差がある場
合などでも、適切に稼働時間をポイントに換算でき、よ
り良好なサービスの提供ができる。
According to the present invention, the point converting means
The operating time is calculated as points based on the machine type conversion coefficient corresponding to the machine type. As a result, even when there is a difference in required driving skills, such as in construction machinery, the operating time can be appropriately converted into points, and better service can be provided.

【0016】請求項5に記載の発明は、請求項3または
4に記載の機械の操縦履歴管理システムにおいて、機械
の稼働の際に加わる負荷に対応した稼働負荷情報を取得
する稼働負荷情報取得手段を具備し、ポイント換算手段
は、前記稼働負荷情報取得手段にて取得した稼働負荷情
報に基づいて前記負荷に対応した負荷別換算係数を有
し、この負荷別換算係数に基づいて稼働時間をポイント
として算出することを特徴とする。
According to a fifth aspect of the present invention, in the machine operation history management system according to the third or fourth aspect, the operating load information acquiring means for acquiring the operating load information corresponding to the load applied when the machine is operated. The point conversion means has a load-based conversion coefficient corresponding to the load based on the operating load information acquired by the operating load information acquisition means, and points the operating time based on the load-based conversion coefficient. Is calculated as

【0017】この発明では、ポイント換算手段により、
稼働負荷情報取得手段にて取得した機械の稼働の際に加
わる負荷に対応した稼働負荷情報に基づいて、負荷に対
応した負荷別換算係数により稼働時間をポイントとして
算出する。このことにより、機械への負荷の大小により
保守管理の対応内容が異なるので、機械の稼働の際の負
荷に対応して適切に稼働時間をポイントに換算でき、よ
り良好なサービスの提供ができる。
According to the present invention, the point conversion means
Based on the operating load information corresponding to the load applied during the operation of the machine acquired by the operating load information acquiring means, the operating time is calculated as a point by the load-based conversion coefficient corresponding to the load. As a result, the content of maintenance management varies depending on the load on the machine, so that the operating time can be appropriately converted into points according to the load when the machine is operating, and a better service can be provided.

【0018】請求項6に記載の発明は、請求項1ないし
5のいずれかに記載の機械の操縦履歴管理システムにお
いて、累積稼働時間蓄積手段は、操縦者またはこの操縦
者による機械の操縦を管理する管理機関の要求に応じて
操縦履歴を開示することを特徴とする。
According to a sixth aspect of the present invention, in the machine operation history management system according to any one of the first to fifth aspects, the accumulated operating time storage means manages the operator or the operation of the machine by the operator. It is characterized in that the operation history is disclosed in response to the request of the management institution.

【0019】この発明では、累積稼働時間蓄積手段によ
り、操縦者またはこの操縦者による機械の操縦を管理す
る管理機関の要求に応じて操縦履歴を開示する。このこ
とにより、操縦者および管理機関が容易に操縦履歴を認
識でき、例えば機械の保守管理が容易にできる。
In the present invention, the cumulative operation time accumulating means discloses the operation history in response to a request from the operator or a management organization managing the operation of the machine by the operator. As a result, the operator and the management organization can easily recognize the operation history, and, for example, the maintenance and management of the machine can be facilitated.

【0020】請求項7に記載の発明は、請求項6に記載
の機械の操縦履歴管理システムにおいて、管理機関また
は操縦者の所定機関への会員登録を認識する会員認識手
段を具備し、累積稼働時間蓄積手段は、前記会員認識手
段にて会員登録の認識がなされた管理機関または操縦者
からの要求にのみ応じて操縦履歴を開示することを特徴
とする。
According to a seventh aspect of the invention, in the machine operation history management system according to the sixth aspect, the machine recognition history management system is provided with a member recognition means for recognizing a member registration of a management organization or a driver to a predetermined organization, and cumulative operation is performed. The time storage means is characterized by disclosing the operation history only in response to a request from the management organization or the operator whose member registration has been recognized by the member recognition means.

【0021】この発明では、累積稼働時間蓄積手段によ
り、会員認識手段にて会員登録の認識がなされた管理機
関または操縦者からの要求にのみ応じて操縦履歴を開示
する。このことにより、管理機関や操縦者の固有情報の
漏洩を防止できる。
In the present invention, the operation history is disclosed only in response to a request from the management organization or the operator whose member registration has been recognized by the member recognizing means by the cumulative operating time accumulating means. As a result, it is possible to prevent the leakage of the unique information of the management organization and the operator.

【0022】請求項8に記載の機械の操縦履歴管理方法
は、請求項1に記載の機械の操縦履歴管理システムを機
械の操縦履歴管理方法として展開したもので、コンピュ
ータにより、操縦者を同定する操縦者同定データ、機械
を同定する機械同定データ、および、機械の稼働時間を
取得し、これら操縦者同定データ、機械同定データおよ
び稼働時間に基づいて、操縦者および機械毎に稼働時間
を累積して蓄積するため、請求項1に記載の発明と同様
の作用および効果を享受できる。
A machine operation history management method according to an eighth aspect is the machine operation history management system according to the first aspect developed as a machine operation history management method for identifying a driver by a computer. The operator identification data, the machine identification data that identifies the machine, and the operating time of the machine are acquired, and the operating time is accumulated for each operator and machine based on these operator identification data, the machine identification data, and the operating time. Therefore, the same operation and effect as those of the invention according to claim 1 can be enjoyed.

【0023】請求項9ないし請求項14に記載の発明
は、請求項8に記載の機械の操縦履歴管理方法におい
て、請求項2ないし請求項7に記載の機械の操縦履歴管
理システムに対応する機械の操縦履歴管理方法で、各請
求項2ないし請求項7に記載の発明と同様の作用および
効果を享受できる。
The invention described in claim 9 to claim 14 is the method for managing the operation history of a machine according to claim 8, which corresponds to the operation history management system for a machine according to claim 2 to claim 7. With the operation history management method described above, it is possible to enjoy the same actions and effects as the inventions according to claims 2 to 7.

【0024】請求項15に記載の機械の操縦履歴管理プ
ログラムは、請求項8ないし請求項14に記載の機械の
操縦履歴管理方法をコンピュータに実行させることを特
徴とする。
A machine operation history management program according to a fifteenth aspect of the present invention causes a computer to execute the machine operation history management method according to any one of the eighth to fourteenth aspects.

【0025】この発明によれば、例えば汎用のコンピュ
ータを利用してコンピュータにインストールすることに
より請求項8ないし請求項14に記載の機械の操縦履歴
管理方法をコンピュータに実行させることができ、本発
明の利用促進を大幅に図ることができる。
According to the present invention, the machine operation history management method according to any one of claims 8 to 14 can be executed by a computer by installing the computer in a general-purpose computer, for example. The use of can be greatly promoted.

【0026】なお、請求項8ないし請求項14に記載の
発明および請求項15に記載の発明において、コンピュ
ータは、1つに限らず、例えば複数のコンピュータをネ
ットワーク状に組み合わせた構成なども含む。
In the invention described in claims 8 to 14 and the invention described in claim 15, the number of computers is not limited to one, and includes, for example, a configuration in which a plurality of computers are combined in a network.

【0027】[0027]

【発明の実施の形態】以下、本発明の一実施の形態を図
面に基づいて説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of the present invention will be described below with reference to the drawings.

【0028】〔システム構成〕図1は、本実施の形態の
機械の操縦履歴管理システムの概略構成を示す模式図で
ある。この操縦履歴管理システム100は、機械として
の複数の建設機械1,2、GPS(Global Positioning
System)衛星3、通信衛星4、衛星地球局5、ネット
ワーク管制局6、ネットワーク7、タンクローリ8およ
びサーバ10を備えている。この操縦履歴管理システム
100は、サーバ10にて、建設機械1,2から出力さ
れる位置情報、燃料残量、機械を同定する機械同定デー
タとしての固有情報である例えば機種を表す号機番号で
ある機械ID、および稼働情報を含む機械情報と、建設
機械1,2を操縦する操縦者であるオペレータを同定す
る操縦者同定データであるオペレータIDとを取得す
る。そして、これら取得したオペレータIDと、機械I
Dと、稼働情報に含まれる稼働時間とに基づいて、オペ
レータ毎および建設機械1,2毎の稼働時間を累積して
操縦履歴として蓄積し、操縦履歴に対応して各種サービ
スを提供するシステムである。
[System Configuration] FIG. 1 is a schematic diagram showing a schematic configuration of a machine operation history management system of the present embodiment. The operation history management system 100 includes a plurality of construction machines 1 and 2, GPS (Global Positioning) as machines.
System) satellite 3, communication satellite 4, satellite earth station 5, network control station 6, network 7, tank truck 8 and server 10. The operation history management system 100 is position information output from the construction machines 1 and 2 in the server 10, remaining fuel amount, and unique information as machine identification data for identifying a machine, for example, a machine number representing a model. The machine information including the machine ID and the operation information and the operator ID that is the operator identification data that identifies the operator who is the operator who operates the construction machines 1 and 2 are acquired. Then, the acquired operator ID and the machine I
A system that accumulates the operating time of each operator and each of the construction machines 1 and 2 as an operation history based on D and the operation time included in the operation information, and provides various services corresponding to the operation history. is there.

【0029】建設機械1,2は、所定領域である建設現
場において、掘削、地均し、杭打ちなどの作業をする機
械である。これら建設機械1,2としては、例えば、ブ
ルドーザ1やパワーショベル2などが該当する。
The construction machines 1 and 2 are machines that perform work such as excavation, ground leveling, and pile driving at a construction site in a predetermined area. Examples of the construction machines 1 and 2 include a bulldozer 1 and a power shovel 2.

【0030】これら建設機械1,2は、図2に示すよう
に、駆動部分を電子制御する電子制御コントローラ11
と、この電子制御コントローラ11と接続される通信コ
ントローラ12と、この通信コントローラ12と接続さ
れるGPSセンサ13および通信端末14と、GPSセ
ンサ13に接続されるGPSアンテナ15と、通信端末
14に接続される衛星通信アンテナ16とを備えてい
る。
In these construction machines 1 and 2, as shown in FIG. 2, an electronic controller 11 for electronically controlling the drive part.
A communication controller 12 connected to the electronic controller 11, a GPS sensor 13 and a communication terminal 14 connected to the communication controller 12, a GPS antenna 15 connected to the GPS sensor 13, and a communication terminal 14. The satellite communication antenna 16 is provided.

【0031】電子制御コントローラ11は、建設機械
1,2に搭載された図示しないエンジンの回転数、バッ
テリの電圧、燃料としての軽油の残量、冷却水の水温、
運転時間、その他建設機械1,2を駆動するための要素
である稼働の状態を検出する各種センサから信号を受け
て、これらの要素を電子的に制御する。
The electronic controller 11 is configured to rotate the engine (not shown) mounted on the construction machines 1 and 2, the voltage of the battery, the remaining amount of light oil as fuel, the temperature of the cooling water,
Receiving signals from various sensors that detect the operating time and other operating states that are elements for driving the construction machines 1 and 2, these elements are electronically controlled.

【0032】通信コントローラ12は、電子制御コント
ローラ11で検出された各駆動部分の建設機械1,2の
状態から、建設機械1,2の機械情報を取得する部分で
ある。具体的には、建設機械1,2の燃料残量や稼働情
報などを取得することができる。また、この通信コント
ローラ12は、内部に記憶領域を有する。この記憶領域
には、固有情報である建設機械1,2の所有者や各建設
機械1,2自体の号機番号、あるいは通算稼働時間など
の情報が記憶される。
The communication controller 12 is a part for acquiring the machine information of the construction machines 1 and 2 from the states of the construction machines 1 and 2 of the respective drive parts detected by the electronic controller 11. Specifically, it is possible to obtain the remaining fuel amount and operation information of the construction machines 1 and 2. The communication controller 12 also has a storage area inside. In this storage area, information such as the owner of the construction machines 1 and 2, the machine numbers of the construction machines 1 and 2, or the total operating time, which is unique information, is stored.

【0033】なお、建設機械1,2の所有者は、個人に
限らず、建設会社や建設機械1,2を貸し出すレンタル
会社などの企業や団体などのオペレータによる建設機械
1,2の操縦を管理する管理機関なども含む。ここで、
操縦を管理する管理機関としては、建設会社やレンタル
会社に限らず、オペレータが所属する会社や建設機械
1,2を管理する管理会社なども含む。
The owners of the construction machines 1 and 2 manage the operation of the construction machines 1 and 2 by operators such as companies and groups such as construction companies and rental companies that rent out the construction machines 1 and 2, not limited to individuals. It also includes management institutions that do. here,
The management organization that manages the operation is not limited to the construction company and the rental company, but also includes the company to which the operator belongs and the management company that manages the construction machines 1 and 2.

【0034】さらに、建設機械1,2には、オペレータ
IDが入力される図示しないオペレータID入力手段が
配設されている。このオペレータID入力手段として
は、建設機械1,2の各種性状や状態などを表示すると
ともに適宜設定入力可能なタッチパネル17や、オペレ
ータが所有するIDカードに記憶されたオペレータID
を読み取る図示しないオペレータID読取装置などが用
いられる。このオペレータID入力手段は通信コントロ
ーラ12に接続され、入力されたオペレータIDを機械
情報とともに送信可能となっている。
Further, the construction machines 1 and 2 are provided with operator ID input means (not shown) for inputting an operator ID. As the operator ID input means, a touch panel 17 that can display various properties and states of the construction machines 1 and 2 and can be set and input appropriately, and an operator ID stored in an ID card owned by the operator
An operator ID reader or the like (not shown) for reading This operator ID input means is connected to the communication controller 12, and the input operator ID can be transmitted together with machine information.

【0035】GPSセンサ13は、複数のGPS衛星3
から出力される電波をGPSアンテナ15を介して受信
し、受信した電波の状態に基づいて、自己の現在位置を
計測する。このGPSセンサ13で取得された建設機械
1,2の現在位置情報は、通信コントローラ12に出力
される。また、GPSセンサ13で取得された現在位置
情報は、図示を略した地図データベースと組み合わせる
ことにより、ナビゲーションシステムの画像表示装置で
あるタッチパネル17上にマップ表示させることができ
るようになっている。
The GPS sensor 13 includes a plurality of GPS satellites 3
The radio wave output from the GPS antenna 15 is received via the GPS antenna 15, and the current position of the self is measured based on the state of the received radio wave. The current position information of the construction machines 1 and 2 acquired by the GPS sensor 13 is output to the communication controller 12. Further, the current position information acquired by the GPS sensor 13 can be displayed as a map on the touch panel 17, which is an image display device of the navigation system, by combining it with a map database (not shown).

【0036】このように通信コントローラ12で取得さ
れた建設機械1,2の機械情報およびオペレータID
は、通信端末14を介して衛星通信アンテナ16から出
力され、通信衛星4、衛星地球局5、ネットワーク管制
局6、およびネットワーク7を介して、サーバ10に出
力される。そして、このような通信コントローラ12お
よび通信端末14が機械情報出力手段を構成する。な
お、この通信コントローラ12および通信端末14によ
る機械情報は、任意の時間、間隔で無線出力できるよう
になっているが、通常、通信コストの点で、建設現場の
作業開始時、休憩時、および作業終了時のいずれかに実
施することが好ましい。
The machine information and operator ID of the construction machines 1 and 2 thus acquired by the communication controller 12
Is output from the satellite communication antenna 16 via the communication terminal 14, and is output to the server 10 via the communication satellite 4, the satellite earth station 5, the network control station 6, and the network 7. The communication controller 12 and the communication terminal 14 as described above form a machine information output unit. The machine information by the communication controller 12 and the communication terminal 14 can be wirelessly output at an arbitrary time and at an interval, but normally, in view of communication cost, at the start of work at a construction site, at break, and It is preferable to carry out at any of the end of work.

【0037】ネットワーク7は、例えばTCP/IPな
どの汎用のプロトコルに基づくインターネットとして構
成される。このネットワーク7には、ネットワーク管制
局6、サーバ10の他、建設現場などの管理事務所や建
設機械1,2の所有者としての企業の本社などに設置さ
れる端末コンピュータ9が接続されている。この端末コ
ンピュータ9は、演算処理装置および記憶装置からなる
コンピュータ本体と、このコンピュータ本体に接続され
るキーボード、マウス、IDカードからオペレータID
を読み取るIDカード読取装置などの入力装置と、ディ
スプレイなどの表示装置と、を備えた汎用のコンピュー
タである。そして、端末コンピュータ9は、インターネ
ット上でホームページなどを閲覧するためのブラウザソ
フト、電子メールソフトなどがインストールされ、サー
バ10と通信することができるようになっている。
The network 7 is constructed as the Internet based on a general-purpose protocol such as TCP / IP. In addition to the network control station 6 and the server 10, a terminal computer 9 installed in a management office such as a construction site or the head office of a company as an owner of the construction machines 1 and 2 is connected to the network 7. . The terminal computer 9 includes a computer main body including an arithmetic processing unit and a storage unit, an operator ID from a keyboard, a mouse, and an ID card connected to the computer main body.
It is a general-purpose computer provided with an input device such as an ID card reading device for reading and a display device such as a display. Then, the terminal computer 9 is installed with browser software for browsing homepages and the like on the Internet, e-mail software, etc., and can communicate with the server 10.

【0038】サーバ10は、ネットワーク7と接続され
るWWW(World Wide Web)サーバとして構成される。
このサーバ10は、例えば図3に示すように、種々のプ
ログラムを実行する演算処理装置21と、送受信された
情報を記憶するハードディスクなどの記憶装置22とを
備えている。
The server 10 is configured as a WWW (World Wide Web) server connected to the network 7.
As shown in FIG. 3, for example, the server 10 includes an arithmetic processing unit 21 that executes various programs and a storage unit 22 such as a hard disk that stores transmitted / received information.

【0039】演算処理装置21は、この演算処理装置2
1を含むサーバ10全体の動作制御を行うOS(Operat
ing System)上に展開されるプログラムとしての、機械
情報受付手段23と、操縦者情報取得手段としてのオペ
レータID取得手段24と、機械情報取得手段としての
機械ID取得手段25と、稼働時間取得手段としての稼
働情報取得手段26と、ポイント換算手段としても機能
する操縦履歴フォーム作成手段27と、会員番号認識手
段28と、アイドリング判定手段29と、機械制御信号
出力手段と備えている。
The arithmetic processing unit 21 is equivalent to the arithmetic processing unit 2
OS (Operat) that controls the operation of the entire server 10 including
ing System) as a program developed on the machine information receiving means 23, operator ID acquisition means 24 as operator information acquisition means, machine ID acquisition means 25 as machine information acquisition means, and operating time acquisition means. The operation information acquisition means 26, the operation history form creation means 27 that also functions as a point conversion means, the member number recognition means 28, the idling determination means 29, and the machine control signal output means.

【0040】記憶装置22は、上述した各手段23〜2
7で入出力される情報を蓄積する、オペレータIDデー
タベース31、機械IDデータベース32、稼働情報デ
ータベース33、および実績情報データベース34を備
えている。この他に、各手段23〜27およびOSを含
むプログラムなどを記憶する領域をも備えている。
The storage device 22 includes the above-mentioned means 23-2.
The operator ID database 31, the machine ID database 32, the operation information database 33, and the performance information database 34, which accumulate the information input / output in step 7, are provided. In addition to this, an area for storing programs including the respective units 23 to 27 and the OS is also provided.

【0041】機械情報受付手段23は、各建設機械1,
2の通信端末14から出力された位置情報、燃料残量お
よび稼働情報を含む機械情報と建設機械1,2のオペレ
ータID入力手段で入力されたオペレータIDを受け付
ける部分である。この受け付けられた機械情報は、機械
ID取得手段25および稼働情報取得手段26に出力さ
れる。また、受け付けられたオペレータIDは、オペレ
ータID取得手段24に出力される。
The machine information receiving means 23 is provided for each construction machine 1,
2 is a portion for receiving the machine information including the position information, the remaining fuel amount and the operation information output from the second communication terminal 14 and the operator ID input by the operator ID input means of the construction machines 1 and 2. The received machine information is output to the machine ID acquisition means 25 and the operation information acquisition means 26. Further, the accepted operator ID is output to the operator ID acquisition means 24.

【0042】なお、この機械情報の取得は、種々の方法
でできる。例えば、無線媒体を介して取得したり、燃料
残量を各種センサにより検出した情報信号を無線出力す
るようにしておき、この情報を建設機械1,2が動作す
る建設現場の管理事務所や建設機械1,2の所有者とし
ての企業の本社などに設置される端末コンピュータ9で
受信し、端末コンピュータ9からインターネットなどの
ネットワーク7を介して出力された情報信号を取得した
り、オペレータが認識した情報を端末コンピュータ9の
入力装置から直接入力操作により設定入力し、この設定
入力した情報信号をネットワーク7を介して取得した
り、センサ情報を携帯電話やPHS(Personal Handypho
ne System)などの図示しない携帯移動通信装置で無線出
力するなどが例示できる。
The machine information can be acquired by various methods. For example, an information signal acquired through a wireless medium or an information signal obtained by detecting the remaining fuel amount by various sensors is wirelessly output, and this information is stored in a management office or a construction site where the construction machines 1 and 2 operate. Information signals received by the terminal computer 9 installed at the head office of the company as the owner of the machines 1 and 2 and output from the terminal computer 9 via the network 7 such as the Internet, or recognized by the operator Information is set and input by an input operation directly from the input device of the terminal computer 9, the set and input information signal is acquired via the network 7, and sensor information is obtained from a mobile phone or PHS (Personal Handyphore).
For example, wireless output may be performed by a mobile communication device (not shown) such as a ne System).

【0043】オペレータID取得手段24は、オペレー
タIDを取得する部分である。このオペレータID取得
手段24は、取得したオペレータIDをオペレータID
データベース31に出力する。なお、オペレータID取
得手段24は、機械情報受付手段23にて受け付けたオ
ペレータIDに限られず、上述したように、例えば端末
コンピュータで取得した情報をネットワーク7を介して
取得したり、図示しない形態携帯移動通信装置から出力
するなどしてもできる。
The operator ID acquisition means 24 is a part for acquiring an operator ID. The operator ID acquisition means 24 uses the acquired operator ID as the operator ID.
Output to the database 31. The operator ID acquisition unit 24 is not limited to the operator ID received by the machine information reception unit 23, and as described above, for example, acquires the information acquired by the terminal computer via the network 7 or a portable device not shown. It can also be output from the mobile communication device.

【0044】機械ID取得手段25は、建設機械1,2
の機械IDを取得する部分である。この機械ID取得手
段25は、取得した機械IDを機械IDデータベース3
2に出力する。
The machine ID acquisition means 25 is used for the construction machines 1 and 2.
Is a part for acquiring the machine ID of. The machine ID acquisition means 25 stores the acquired machine ID in the machine ID database 3
Output to 2.

【0045】稼働情報取得手段26は、建設機械1,2
の稼働情報を取得する部分である。この稼働情報取得手
段26は、建設機械1,2の機械IDと、建設機械1,
2の稼働時間、稼働負荷などとを対応づけて稼働情報を
生成し、稼働情報データベース33に出力する。
The operation information acquisition means 26 is used for the construction machines 1 and 2.
Is a part for acquiring the operation information of. The operation information acquisition unit 26 is configured to use the machine IDs of the construction machines 1 and 2, and the construction machines 1 and 1.
The operation information is generated by associating the operation time and the operation load of No. 2 and output to the operation information database 33.

【0046】操縦履歴フォーム作成手段27は、オペレ
ータID、機械IDおよび稼働情報の稼働時間に基づい
て、図4に示す操縦履歴フォーム35を作成する部分で
ある。この操縦履歴フォーム作成手段27は、稼働情報
取得手段26で取得した稼働情報の稼働時間を累積すな
わち積算して操縦履歴としての累積稼働時間を算出す
る。そして、操縦履歴フォーム作成手段27は、累積稼
働時間をオペレータIDおよび機械IDと関連付けて、
オペレータ毎および建設機械1,2毎の操縦履歴として
操縦履歴フォーム35を作成する。
The operation history form creating means 27 is a part for creating the operation history form 35 shown in FIG. 4 based on the operating time of the operator ID, the machine ID and the operation information. The operation history form creating means 27 accumulates or integrates the operation times of the operation information acquired by the operation information acquisition means 26 to calculate the accumulated operation time as the operation history. Then, the operation history form creating means 27 associates the cumulative operating time with the operator ID and the machine ID,
An operation history form 35 is created as an operation history for each operator and each construction machine 1, 2.

【0047】また、操縦履歴フォーム作成手段27は、
オペレータが建設機械1,2を操縦した累積稼働時間に
基づいて技術レベルを設定する。そして、この設定した
技術レベルをも操縦履歴として操縦履歴フォーム35に
盛り込む。
Further, the operation history form creating means 27 is
The skill level is set based on the cumulative operating time during which the operator operates the construction machines 1 and 2. Then, the set technical level is also included in the operation history form 35 as an operation history.

【0048】さらに、操縦履歴フォーム作成手段27
は、累積稼働時間に基づいてポイントをオペレータ毎に
算定するとともに算定したポイントをオペレータ毎およ
び管理機関毎に積算する。この積算したポイントをも操
縦履歴として操縦履歴フォーム35に盛り込む。
Further, the operation history form creating means 27
Calculates points for each operator based on the cumulative operating time and adds the calculated points for each operator and each management organization. The accumulated points are also included in the operation history form 35 as an operation history.

【0049】なお、操縦履歴フォーム35は、実績情報
データベース34に蓄積される。この作成される操縦履
歴フォーム35は、例えばネットワーク7を介して端末
コンピュータ9にて開示、例えば入手可能となってい
る。
The operation history form 35 is stored in the performance information database 34. The created operation history form 35 is disclosed, for example, available on the terminal computer 9 via the network 7, for example.

【0050】会員番号認識手段28は、会員であるオペ
レータや管理会社の会員番号を認識し、オペレータや管
理会社の要求がある場合には、会員番号に基づく操縦履
歴を操縦履歴フォーム作成手段27から出力させる。す
なわち、例えば、会員番号認識手段28は、オペレータ
や管理会社が端末コンピュータ9で設定入力した会員番
号を認識すると、オペレータIDデータベース31に蓄
積された情報と照合させ、パスワードなどの入力を促す
表示を端末コンピュータ9にさせる制御をし、パスワー
ドの設定入力を認識することにより、操縦履歴フォーム
作成手段27にて実績情報データベース34に蓄積され
た操縦履歴フォーム35を端末コンピュータ9に出力す
る。
The member number recognizing means 28 recognizes the member numbers of the operators and management companies who are members, and when there is a request from the operator or management company, the operation history based on the member numbers is generated from the operation history form creating means 27. Output. That is, for example, when the member number recognition means 28 recognizes the member number set and input by the operator or the management company on the terminal computer 9, the member number recognition unit 28 collates the member number with the information stored in the operator ID database 31, and displays a message prompting the user to input a password or the like. By controlling the terminal computer 9 and recognizing the setting input of the password, the operation history form creating unit 27 outputs the operation history form 35 stored in the performance information database 34 to the terminal computer 9.

【0051】アイドリング判定手段29は、稼働情報取
得手段26で取得した稼働情報の特に稼働負荷に基づい
て、建設機械1、2の稼働状態すなわち停止、アイドリ
ング状態、軽負荷や高負荷稼働などの負荷状態を認識す
る。このアイドリング判別手段29は、認識した負荷状
態があらかじめ設定された所定時間を継続して無負荷で
稼働するアイドリング状態か否かを判断し、アイドリン
グ状態と判断した場合、所定の信号を出力する。
The idling judgment means 29 is based on the operating load, particularly the operating information acquired by the operation information acquiring means 26, that is, the operating state of the construction machines 1 and 2, that is, the stopped state, the idling state, the load such as light load or high load operation. Recognize the state. The idling determination means 29 determines whether or not the recognized load state is an idling state in which the load state is continuously operated for a preset predetermined time without load, and when it is determined to be the idling state, a predetermined signal is output.

【0052】機械制御信号出力手段30は、アイドリン
グ判定手段29から出力される所定時間以上アイドリン
グ状態が継続している旨の信号に基づいて、建設機械
1、2にその旨を報知し、さらに所定時間継続する場合
にはエンジンを停止させる制御の信号を対応する建設機
械1,2に出力する。
The machine control signal output means 30 notifies the construction machines 1 and 2 of that fact based on the signal output from the idling determination means 29 indicating that the idling state has continued for a predetermined time or longer, and further predetermined When continuing for a time, a control signal for stopping the engine is output to the corresponding construction machine 1, 2.

【0053】一方、オペレータIDデータベース31
は、オペレータIDを蓄積する部分である。オペレータ
IDデータベース31は、図4の操縦履歴フォーム35
に示すように、例えばオペレータIDと、このオペレー
タIDにて同定されるオペレータの名前などの個人情報
と、このオペレータが所属する会社である管理機関の名
前などの会社情報と、この操縦履歴管理システム100
を管理しサービスを提供する会社などのシステム管理機
関に会員登録されてオペレータIDが付与されたオペレ
ータの会員番号とを1つのレコードとして記録したテー
ブル構造(図4中Aの部分)のデータベースとして構成
される。
On the other hand, the operator ID database 31
Is a part for accumulating the operator ID. The operator ID database 31 is the operation history form 35 of FIG.
As shown in, for example, an operator ID, personal information such as the name of an operator identified by this operator ID, company information such as the name of a management institution to which this operator belongs, and this operation history management system. 100
It is configured as a database of a table structure (A portion in FIG. 4) in which a member number of an operator who has been registered as a member of a system management organization such as a company that manages and provides a service and has an operator ID is recorded as one record. To be done.

【0054】機械IDデータベース37は、各建設機械
1,2の機械IDを蓄積する部分である。この機械ID
データベース37は、図4の操縦履歴フォーム35に示
すように、機械IDとこの機械IDにて同定される建設
機械1,2の機種とが1つのレコードとして記録したテ
ーブル構造(図4中Bの部分)のデータベースとして構
成される。
The machine ID database 37 is a section for storing the machine IDs of the construction machines 1 and 2. This machine ID
As shown in the operation history form 35 of FIG. 4, the database 37 has a table structure in which the machine ID and the models of the construction machines 1 and 2 identified by this machine ID are recorded as one record (see B in FIG. 4). Part) database.

【0055】稼働情報データベース33は、各建設機械
1,2の稼働情報を蓄積する部分である。この稼働情報
データベース33は、図4の操縦履歴フォーム35に示
すように、機械IDにて同定される建設機械1,2毎の
稼働情報のうちの稼働時間と、操縦履歴フォーム作成手
段27にて算出される累積稼働時間とを1つのレコード
として記録したテーブル構造(図4中Cの部分)のデー
タベースとして構成される。なお、この稼働情報データ
ベース33は、稼働時間については稼働情報取得手段2
6で稼働情報を取得した毎に、累積稼働時間については
操縦履歴フォーム作成手段27にて累積稼働時間を算出
した毎に更新される。
The operation information database 33 is a part for accumulating operation information of each construction machine 1, 2. In the operation information database 33, as shown in the operation history form 35 of FIG. 4, the operation time of the operation information for each of the construction machines 1 and 2 identified by the machine ID and the operation history form creating means 27. It is configured as a database having a table structure (C in FIG. 4) in which the calculated cumulative operating time is recorded as one record. It should be noted that this operation information database 33 has the operation information acquisition means 2 for the operation time.
Every time the operation information is acquired in step 6, the cumulative operating time is updated every time the operation history form creating means 27 calculates the cumulative operating time.

【0056】実績情報データベース34は、オペレータ
の建設機械1,2の習熟状態すなわち技術レベルをオペ
レータと機械IDで同定される建設機械1,2とに関連
付けされて1つのレコードとして記録したテーブル構造
(図4中Dの部分)を有したデータベースとして構成さ
れる。
The record information database 34 is a table structure in which the operator's proficiency state of the construction machines 1 and 2, that is, the technical level is recorded as one record in association with the operator and the construction machines 1 and 2 identified by the machine ID. It is configured as a database having (D portion in FIG. 4).

【0057】また、実績情報データベース34は、図5
に示すように、操縦履歴フォーム作成手段27で累積稼
働時間から技術レベルを設定するための設定規則を1つ
のレコードとして記録したテーブル構造を有している。
The record information database 34 is shown in FIG.
As shown in (1), the operation history form creating means 27 has a table structure in which a setting rule for setting the technical level from the accumulated operating time is recorded as one record.

【0058】さらに、実績情報データベース34は、図
6および図7に示すように、操縦履歴フォーム作成手段
27で累積稼働時間から、建設機械1,2の機種および
稼働情報に対応してポイントを算定するための算出規則
を1つのレコードとして記録したテーブル構造を有して
いる。なお、図6に示すテーブル構造は、稼働情報のう
ちの建設機械1,2の稼働の際に加わった平均的な負荷
とポイントの割増率とを関連付けしたものである。図7
に示すテーブル構造は、建設機械1,2の機種と累積稼
働時間からポイントを算出するための係数とを関連付け
したものである。
Further, in the performance information database 34, as shown in FIGS. 6 and 7, points are calculated by the operation history form creating means 27 from the accumulated operating time in correspondence with the models of the construction machines 1 and 2 and the operation information. It has a table structure in which the calculation rule for doing so is recorded as one record. Note that the table structure shown in FIG. 6 associates the average load applied during the operation of the construction machines 1 and 2 in the operation information with the premium rate of points. Figure 7
The table structure shown in (1) associates the models of the construction machines 1 and 2 with the coefficients for calculating points from the cumulative operating time.

【0059】また、実績情報データベース34は、図8
に示すように、ポイントとこのポイントにより提供する
サービス内容とを関連付けして1つのレコードとして記
録したテーブル構造を有している。なお、ポイントは、
サービスの提供を受けることにより、そのサービスの内
容に対応したポイント分が減算される構成となってい
る。
The performance information database 34 is shown in FIG.
As shown in (1), it has a table structure in which points and service contents provided by the points are associated and recorded as one record. In addition, the point is
When the service is provided, points corresponding to the content of the service are subtracted.

【0060】そして、この実績情報データベース34
と、操縦履歴フォーム作成手段27とにて累積稼働時間
蓄積手段38が構成される。
Then, the performance information database 34
And the operation history form creating means 27 constitute an accumulated operating time accumulating means 38.

【0061】〔システムの作用〕次に、上記機械の操縦
履歴管理システム100の作用を図9に示すフローチャ
ートに基づいて説明する。
[Operation of System] Next, the operation of the operation history management system 100 for the machine will be described with reference to the flowchart shown in FIG.

【0062】(ID・稼働時間の特定)まず、オペレー
タが建設機械1,2に乗り込み、キーを操作して電子制
御コントローラ11をオンさせる(ステップ1)。この
電子制御コントローラ11のオンにより、電子制御コン
トローラ11はタッチパネル17を制御してオペレータ
IDの入力を促す表示をする。この表示に従ってタッチ
パネル17を入力操作、あるいはオペレータが所有する
図示しないIDカードをオペレータID読取装置にて読
み取らせ、オペレータIDを設定入力する(ステップ
2)。
(Identification of ID / operating time) First, the operator gets on the construction machines 1 and 2 and operates the keys to turn on the electronic controller 11 (step 1). When the electronic controller 11 is turned on, the electronic controller 11 controls the touch panel 17 to display a message prompting the operator to input the operator ID. In accordance with this display, the touch panel 17 is operated to be input, or an ID card (not shown) owned by the operator is read by the operator ID reader to set and input the operator ID (step 2).

【0063】このステップ2でのオペレータIDの設定
入力を認識した電子制御コントローラ11は、キー操作
によるエンジンスタートを可能とする。そして、オペレ
ータがキー操作してエンジンをスタートさせると(ステ
ップ3)、電子制御コントローラ11の図示しないクロ
ック機構により計時を開始する(ステップ4)。ステッ
プ3でのエンジンスタートにより、オペレータは適宜建
設機械1,2を操作して建設作業を実施する。
When the electronic controller 11 recognizes the operator ID setting input in step 2, the engine can be started by key operation. Then, when the operator operates the keys to start the engine (step 3), clocking is started by a clock mechanism (not shown) of the electronic controller 11 (step 4). By starting the engine in step 3, the operator appropriately operates the construction machines 1 and 2 to carry out the construction work.

【0064】また、オペレータが建設作業の中止や中断
のためにエンジンを停止させると(ステップ5)、電子
制御コントローラ11による計時を停止させ、エンジン
が駆動していた時間、すなわち稼働時間を算出する(ス
テップ6)。そして、このステップ5で稼働時間が算出
されると、建設機械1,2の通信コントローラ12がス
テップ2で設定入力されたオペレータIDと、建設機械
1,2の機械IDと、算出された稼働時間および稼働に
より加わった平均的な負荷情報を含む稼働情報を出力す
る(ステップ7)。このオペレータID、機械IDおよ
び稼働情報の出力後に電子制御コントローラ11がオフ
されて建設機械1,2が停止する。
When the operator stops the engine for the purpose of stopping or interrupting the construction work (step 5), the electronic controller 11 stops the timekeeping, and the time the engine is running, that is, the operating time is calculated. (Step 6). Then, when the operating time is calculated in step 5, the communication controller 12 of the construction machines 1 and 2 sets the operator ID set and input in step 2, the machine ID of the construction machines 1 and 2, and the calculated operating time. And the operation information including the average load information added by the operation is output (step 7). After outputting the operator ID, the machine ID, and the operation information, the electronic controller 11 is turned off and the construction machines 1 and 2 are stopped.

【0065】このように、オペレータのオペレータID
を入力することにより、エンジンがスタート可能とした
ので、確実にオペレータと、稼働時間との関係を認識す
ることができるとともに、建設機械1,2の盗難防止も
できる。
In this way, the operator ID of the operator
Since the engine can be started by inputting, the relationship between the operator and the operating time can be surely recognized, and the construction machines 1 and 2 can be prevented from being stolen.

【0066】また、エンジンを停止して稼働時間を取得
することにより、オペレータID、機械IDおよび稼働
時間をサーバ10に自動的に出力する構成としたため、
1回の通信でサーバ10が必須条件であるオペレータI
D、機械IDおよび稼働時間を自動的に取得でき、効率
よく操縦履歴としての操縦履歴フォーム35を形成でき
る。
Further, since the operator ID, the machine ID and the operating time are automatically output to the server 10 by stopping the engine and acquiring the operating time,
Operator I, which requires server 10 for one communication
The D, the machine ID, and the operating time can be automatically acquired, and the operation history form 35 as an operation history can be efficiently formed.

【0067】(サーバでの操縦履歴フォームの作成)ス
テップ7で建設機械1,2から出力されたオペレータI
D、機械IDおよび稼働情報は、通信端末14を介して
衛星通信アンテナ16から出力され、通信衛星4、衛星
地球局5、ネットワーク管制局6、およびネットワーク
7を介して、サーバ10に出力され、サーバ10の機械
情報受付手段23で取得する(ステップ8)。
(Creation of control history form on server) Operator I output from construction machines 1 and 2 in step 7
D, the machine ID, and the operation information are output from the satellite communication antenna 16 via the communication terminal 14, and output to the server 10 via the communication satellite 4, the satellite earth station 5, the network control station 6, and the network 7. The machine information reception means 23 of the server 10 obtains it (step 8).

【0068】サーバ10の機械情報受付手段23で取得
した情報のうちのオペレータIDをオペレータID取得
手段24にて取得する。このオペレータID取得手段2
4は、取得したオペレータIDをオペレータIDデータ
ベース31に出力させ、このオペレータIDデータベー
ス31に蓄積されたレコードと照合させる。そして、オ
ペレータID取得手段24は、オペレータIDにて同定
されるオペレータの名前などの個人情報と、このオペレ
ータが所属する管理機関の名前などの会社情報と、この
オペレータの会員番号とのオペレータ情報を取得する。
The operator ID of the information acquired by the machine information accepting means 23 of the server 10 is acquired by the operator ID acquiring means 24. This operator ID acquisition means 2
4 outputs the acquired operator ID to the operator ID database 31, and collates it with the record accumulated in this operator ID database 31. Then, the operator ID acquisition unit 24 provides the operator information such as the personal information such as the name of the operator identified by the operator ID, the company information such as the name of the management institution to which the operator belongs, and the member number of the operator. get.

【0069】さらに、サーバ10の機械情報受付手段2
3で取得した情報のうちの機械IDを機械ID取得手段
25にて取得する。この機械ID取得手段25は、取得
した機械IDを機械IDデータベース32に出力させ、
この機械IDデータベース32に蓄積されたレコードと
照合させる。そして、機械ID取得手段25は、機械I
Dにて同定される建設機械1,2の機械情報を取得す
る。
Further, the machine information receiving means 2 of the server 10
The machine ID of the information acquired in step 3 is acquired by the machine ID acquisition means 25. The machine ID acquisition means 25 outputs the acquired machine ID to the machine ID database 32,
The record stored in the machine ID database 32 is collated. Then, the machine ID acquisition means 25 causes the machine I
The machine information of the construction machines 1 and 2 identified in D is acquired.

【0070】また、サーバ10の機械情報受付手段23
で取得した情報のうちの稼働情報を稼働情報取得手段2
6にて取得する。この稼働情報取得手段26は、取得し
た稼働情報を稼働情報データベース33に出力させ、こ
の稼働情報データベース33に蓄積されたレコードの稼
働時間や稼働負荷情報などの稼働情報を適宜更新あるい
は記憶させる。
Further, the machine information receiving means 23 of the server 10
The operation information of the information acquired in 1.
Get at 6. The operation information acquisition unit 26 outputs the acquired operation information to the operation information database 33, and appropriately updates or stores the operation information such as the operation time and the operation load information of the records accumulated in the operation information database 33.

【0071】ここで、例えば建設機械1,2を時間課金
方式でレンタルする場合、稼働情報取得手段26は、無
負荷状態の駆動となるアイドリング時には、課金対象と
なる稼働時間として計数しない構成としてもできる。
Here, for example, in the case of renting the construction machines 1 and 2 by the time-charging system, the operation information acquisition means 26 may not be counted as the operation time to be charged when idling for driving in the no-load state. it can.

【0072】一方、サーバ10は、操縦履歴フォーム作
成手段27にて、オペレータID取得手段24で取得し
たオペレータ情報と、機械ID取得手段25で取得した
機械情報と、稼働情報取得手段26で取得した稼働情報
とに基づいて操縦履歴フォーム35を作成する。
On the other hand, in the server 10, the operation history form creating means 27 acquires the operator information acquired by the operator ID acquiring means 24, the machine information acquired by the machine ID acquiring means 25, and the operation information acquiring means 26. The operation history form 35 is created based on the operation information.

【0073】すなわち、操縦履歴フォーム作成手段27
は、取得した今回の稼働情報の稼働時間と、稼働情報デ
ータベース33に蓄積された従前の累積稼働時間とを加
算し、累積稼働時間を算出する(ステップ9)。そし
て、操縦履歴フォーム作成手段27は、実績情報データ
ベース34に蓄積された図5に示す技術レベルの設定規
則に基づいて、算出した累積稼働時間からオペレータの
技術レベルを設定する(ステップ10)。さらに、操縦
履歴フォーム作成手段27は、実績情報データベース3
4に蓄積された図6に示すポイント割増率と、図7に示
す機種による係数とに基づいて累積稼働時間からオペレ
ータのポイントを算出する(ステップ11)。そして、
算出したポイントを実績情報データベース34に蓄積さ
れた対応するオペレータの操縦履歴フォーム35のポイ
ントと加算してポイントの積算を実施する。
That is, the operation history form creating means 27
Calculates the cumulative operating time by adding the acquired operating time of the current operating information and the previous cumulative operating time accumulated in the operating information database 33 (step 9). Then, the operation history form creating means 27 sets the operator's technical level from the calculated cumulative operating time based on the technical level setting rules stored in the performance information database 34 shown in FIG. 5 (step 10). Further, the operation history form creating means 27 uses the achievement information database 3
The point of the operator is calculated from the cumulative operating time based on the point increase rate shown in FIG. 6 accumulated in No. 4 and the coefficient according to the model shown in FIG. 7 (step 11). And
The calculated points are added to the points on the operation history form 35 of the corresponding operator stored in the record information database 34 to accumulate the points.

【0074】なお、上述したアイドリング時は稼働時間
として計数しない構成とした場合には、アイドリング時
間が稼働時間に含まれていないので、ポイントに算出さ
れない。
When the idling time is not counted as the operating time, the idling time is not included in the operating time and therefore is not calculated as a point.

【0075】そして、操縦履歴フォーム作成手段27
は、これら算出および設定した累積稼働時間、技術レベ
ルおよびポイントを、先にオペレータID取得手段24
で取得したオペレータ情報および機械ID取得手段25
で取得した機械情報とに関連付けて操縦履歴フォーム3
5を作成する(ステップ12)。この後、ステップ12
で作成した操縦履歴フォーム35を実績情報データベー
ス34に出力して更新する(ステップ13)。
Then, the operation history form creating means 27
The operator ID acquisition means 24 first obtains the calculated and set cumulative operating time, technical level and points.
Operator information and machine ID acquisition means 25 acquired in
Operation history form 3 in association with the machine information acquired in
5 is created (step 12). After this, step 12
The operation history form 35 created in step 3 is output to the performance information database 34 and updated (step 13).

【0076】このように、累積稼働時間蓄積手段38の
操縦履歴フォーム作成手段27により、オペレータID
取得手段24にて取得したオペレータIDと、機械ID
取得手段25にて取得した機械IDと、稼働情報取得手
段26にて取得した建設機械1,2の稼働情報の稼働時
間とに基づいて、オペレータ毎および建設機械1,2毎
に稼働時間を累積して累積稼働時間を算出して操縦履歴
として操縦履歴フォーム35を作成し、累積稼働時間蓄
積手段38の実績情報データベース34に蓄積させる。
このため、例えば複数のオペレータや複数で複数種類の
建設機械1,2を統括して管理する場合でも、オペレー
タ毎の操縦時間、建設機械1,2毎の稼働時間などの操
縦履歴を認識でき、オペレータの就業管理や建設機械
1,2の保守管理などのために操縦履歴を利用して効率
よく管理することが容易にできる。
As described above, the operator ID is generated by the operation history form creating means 27 of the cumulative operating time accumulating means 38.
Operator ID and machine ID acquired by the acquisition means 24
The operating time is accumulated for each operator and each of the construction machines 1 and 2 based on the machine ID acquired by the acquisition unit 25 and the operation time of the operation information of the construction machines 1 and 2 acquired by the operation information acquisition unit 26. Then, the cumulative operating time is calculated, a steering history form 35 is created as a steering history, and accumulated in the record information database 34 of the accumulated operating time accumulating means 38.
Therefore, for example, even when collectively managing a plurality of types of construction machines 1 and 2 by a plurality of operators or a plurality, it is possible to recognize the operation history such as the operation time for each operator and the operating time for each construction machine 1, 2. Efficient management can be facilitated by using the operation history for operator work management and maintenance management of the construction machines 1 and 2.

【0077】そして、累積稼働時間蓄積手段38の操縦
履歴フォーム作成手段27により、オペレータに限ら
ず、管理機関毎でも分類して操縦履歴フォーム35を作
成して累積稼働時間を蓄積させる構成としたため、例え
ば管理機関である建設会社やレンタル会社毎の建設機械
1,2の利用頻度など、建設機械1,2の稼働状況を容
易に把握することができ、建設機械1,2を保守管理す
るメンテナンス会社などがあらかじめ保守点検日などを
予測して建設会社やレンタル会社などからのメンテナン
スなどの保守管理要求に対しても円滑に対応でき、効率
よく迅速で円滑な対応やサービスの実施ができる。
Since the operation history form creating means 27 of the accumulated operating time accumulating means 38 is configured not only for the operator but also for each management organization to create the operation history form 35 and accumulate the accumulated operating time, For example, it is possible to easily grasp the operating status of the construction machines 1 and 2, such as the frequency of use of the construction machines 1 and 2 for each construction company or rental company that is a management organization, and to maintain and manage the construction machines 1 and 2. Can predict maintenance dates in advance and smoothly respond to maintenance management requests such as maintenance from construction companies and rental companies, and can efficiently and swiftly respond and perform services.

【0078】また、操縦履歴フォーム作成手段27によ
り、稼働時間をポイントとして算出し、従前のポイント
に積算させて、操縦履歴としてポイント評価するため、
例えば、ポイントにより各種サービスを提供することに
より、メンテナンス費用の割引や無償サービス、レンタ
ルの割引や無償サービス、建設機械1,2の購入時の割
引や付帯品の無償提供サービス、宿泊施設の割引や無償
利用サービス、各種物品の割引や無償提供サービスな
ど、幅広く自由度の高いサービスの提供ができる。さら
に、例えば特定の建設機械1,2のみにポイントの換算
割合を代えることで特定の建設機械1,2の利用頻度を
向上できるなどの提供するサービスの特異性を付与する
こともできる。
In addition, the operation history form creating means 27 calculates the operating time as points, integrates it with the previous points, and evaluates the points as operation history.
For example, by providing various services based on points, maintenance cost discounts and free services, rental discounts and free services, discounts when purchasing construction machinery 1 and 2, free services for incidental items, accommodation facility discounts, etc. It is possible to provide a wide range of services with a high degree of freedom, such as free use services, discounts on various goods, and free provision services. Furthermore, the peculiarity of the service to be provided can be given, for example, by changing the conversion rate of points only to the specific construction machines 1 and 2, the usage frequency of the specific construction machines 1 and 2 can be improved.

【0079】そして、操縦履歴フォーム作成手段27に
より、建設機械1,2の機種別に対応した図7に示すよ
うな機種別換算係数に基づいて稼働時間をポイントとし
て算出することにより、例えば建設機械1,2などのよ
うに操縦に要求される操縦技能に差が生じる場合などで
も、適切に稼働時間をポイントに換算でき、操縦履歴内
容に伴った操縦履歴の評価ができ、例えばポイントをサ
ービスとリンクさせることで、操縦履歴内容に伴った良
好なサービスの提供ができる。
Then, the operation history form creating means 27 calculates the operating time as a point based on the model-specific conversion coefficient as shown in FIG. 7 corresponding to each model of the construction machines 1 and 2, for example, the construction machine 1 , 2, etc., even when there is a difference in maneuvering skill required for maneuvering, the operating time can be appropriately converted into points, and the maneuvering history can be evaluated according to the contents of the maneuvering history. By doing so, it is possible to provide a good service according to the contents of the operation history.

【0080】また、操縦履歴フォーム作成手段27によ
り、建設機械1,2の稼働の際に加わる平均的な負荷に
対応した稼働負荷情報に基づいて、負荷に対応した図6
に示すような負荷別換算係数に基づいて稼働時間をポイ
ントとして算出することにより、例えば建設機械1,2
をより低負荷で操縦したオペレータに対しては、建設機
械1,2の保守管理の負荷が小さくなくなって保守管理
コストを低減できるので、ポイントを増加させてポイン
ト換算するなど、建設機械1,2の稼働の際の負荷に対
応して適切に操縦履歴の評価ができ、ポイントをサービ
スとリンクさせることで、操縦履歴内容に伴った良好な
サービスの提供ができ、建設機械1,2の良好な操縦を
促して保守管理コストの低減もできる。
Further, the operation history form creating means 27 corresponds to the load based on the operating load information corresponding to the average load applied when the construction machines 1 and 2 are operated, as shown in FIG.
By calculating the operating time as a point based on the load-based conversion coefficient as shown in
For the operator who has operated the vehicle with a lower load, the load of maintenance management of the construction machines 1 and 2 can be reduced and the maintenance management cost can be reduced. Therefore, points can be increased and converted into points. The operation history can be appropriately evaluated according to the load during the operation of the, and by linking points with the service, it is possible to provide a good service according to the content of the operation history. It is also possible to reduce the maintenance cost by prompting operation.

【0081】さらに、建設機械1,2毎のオペレータの
累積稼働時間を算出できるので、この累積稼働時間に基
づいて操縦履歴フォーム作成手段27によりオペレータ
の建設機械1,2毎の習熟度、すなわち技能レベルを設
定して操縦履歴として操縦履歴フォーム35を作成する
ため、より良好な操縦履歴を評価できるとともに、例え
ば技術レベルに対応した評価書や証明書などを発行する
ことにより、オペレータの技能レベルの向上意欲を向上
できるとともに、管理機関によるオペレータの待遇評価
などをも容易にできる。
Further, since the cumulative operating time of the operator for each of the construction machines 1 and 2 can be calculated, the proficiency level of the operator for each of the construction machines 1 and 2, that is, the skill, is calculated by the operation history form creating means 27 based on the cumulative operating time. The level is set and the operation history form 35 is created as the operation history, so that a better operation history can be evaluated, and the operator's skill level can be improved by issuing, for example, an evaluation report or a certificate corresponding to the technical level. The motivation for improvement can be improved, and the operator can easily evaluate the treatment of the operator.

【0082】(操縦履歴の確認)一方、オペレータや管
理機関が操縦履歴を確認したい場合には、例えば端末コ
ンピュータ9の入力装置から会員番号を設定入力する。
この設定入力された会員番号を、サーバ10の会員番号
認識手段28にて認識し例えばパスワードなどにて同一
人物である旨を認識した場合、操縦履歴フォーム作成手
段27で実績情報データベース34に蓄積された操縦履
歴フォーム35を端末コンピュータ9に出力させて、操
縦履歴フォーム35を開示して操縦履歴を開示する。
(Confirmation of operation history) On the other hand, when the operator or the management organization wants to confirm the operation history, the member number is set and input from the input device of the terminal computer 9, for example.
When the member number recognizing means 28 of the server 10 recognizes the member number thus input and recognizes that the same person is the same by using a password or the like, the operation history form creating means 27 stores the member number in the performance information database 34. The control history form 35 is output to the terminal computer 9, and the control history form 35 is disclosed to disclose the control history.

【0083】また、端末コンピュータ9の入力操作によ
る要求により、図5に示す記述レベルを設定するための
設定規則を表す情報や、図6に示す稼働負荷とポイント
割増率とのポイント算出規則の関係を表す情報や、図7
に示す機種と機種別換算係数とのポイント算出規則の関
係を表す情報や、図8に示すポイントによるサービス内
容の情報などを開示する。
Further, in response to a request from the input operation of the terminal computer 9, information indicating the setting rule for setting the description level shown in FIG. 5 and the relation between the operating load and the point calculation rule shown in FIG. Information indicating the
Information indicating the relationship of the point calculation rule between the model and the conversion coefficient by model, the information on the service content by points shown in FIG. 8, and the like are disclosed.

【0084】このように、要求に対応して操縦履歴を開
示する構成としたため、オペレータや管理機関が容易に
操縦履歴を認識でき、例えば建設機械1,2の保守点検
日の予測も容易にできるなど、保守管理の対応性を向上
できる。
As described above, since the operation history is disclosed in response to the request, the operator and the management organization can easily recognize the operation history and easily predict the maintenance and inspection date of the construction machines 1 and 2, for example. Therefore, the responsiveness of maintenance management can be improved.

【0085】さらに、会員制として会員番号の設定入力
により、操縦履歴を開示する構成としたため、管理機関
やオペレータの固有情報の漏洩を防止できる。
Furthermore, since the operation history is disclosed as a membership system by setting and inputting the membership number, it is possible to prevent the leakage of the unique information of the management organization or the operator.

【0086】また、図5ないし図8に示すようなポイン
ト換算のための情報やサービス情報などを開示する構成
とすることにより、ポイントに対する意識を向上させる
ことができ、本操縦履歴管理システム100の利用の向
上を図ることができる。
Further, by adopting a configuration in which information for point conversion, service information and the like as shown in FIGS. 5 to 8 are disclosed, awareness of points can be improved and the operation history management system 100 of the present embodiment can be improved. The utilization can be improved.

【0087】〔実施形態の変形〕なお、本発明は、上述
した一実施の形態に限定されるものではなく、本発明の
目的を達成できる範囲で以下に示される変形をも含むも
のである。
[Modification of Embodiment] The present invention is not limited to the above-described embodiment, but includes the following modifications within a range in which the object of the present invention can be achieved.

【0088】すなわち、機械として建設機械1,2を例
示して説明したが、いずれの機械、例えば自動車、燃焼
や乾燥のためのバーナなどの加熱装置、発電機、農工
機、船舶、軌道車両などでもできる。
That is, the construction machines 1 and 2 have been described as examples of the machine, but any machine, for example, an automobile, a heating device such as a burner for combustion or drying, a generator, an agricultural machine, a ship, a rail car, etc. But you can.

【0089】そして、建設機械1,2でオペレータID
を入力することによりサーバ10で取得する構成とした
が、例えばIDカードに記憶手段を設け、建設機械1,
2の稼働時間や機械IDを記憶できるようにし、別途端
末コンピュータ9でサーバ10に出力させる構成とした
り、IDカードなどを用いず、キーボードなどから直接
設定入力したり、携帯電話などから出力するなど、いず
れの方法でサーバ10に取得させてもできる。
Then, in the construction machines 1 and 2, the operator ID
The configuration is such that the server 10 obtains by inputting, but, for example, a storage means is provided in the ID card, and the construction machine 1,
The operation time of 2 and the machine ID can be stored, and the terminal computer 9 can separately output the data to the server 10, the setting can be input directly from a keyboard or the like without using an ID card, or output from a mobile phone or the like. The server 10 can be obtained by any method.

【0090】管理機関毎でも操縦履歴を操縦履歴フォー
ム35として作成して説明したが、管理機関毎にしなく
てもよく、表示形態としては、図4に示す形態に限られ
ない。
Although the operation history is created as the operation history form 35 for each management organization as well, the operation history may not be provided for each management organization, and the display form is not limited to the form shown in FIG.

【0091】操縦者同定データとしてのオペレータID
としては、文字列や指紋照合など、操縦者を同定できる
いずれの構成を利用することができる。
Operator ID as pilot identification data
As the above, any configuration that can identify the operator, such as a character string or fingerprint collation, can be used.

【0092】操縦履歴を構成する稼働時間からポイント
を算出して、ポイントによるサービス提供を実施する構
成としたが、ポイントによるサービスの実施をしなくて
もでき、ポイントに換算しなくてもよい。
Although the points are calculated from the operating time configuring the operation history and the service is provided by the points, the service may not be provided by the points and may not be converted into the points.

【0093】ポイントに換算する方法としては、機種別
や稼働負荷別などの他、いずれの方法でもできる。
As a method of converting points, any method can be used in addition to the type of machine or the operating load.

【0094】なお、上述したように、例えば時間課金方
式のレンタル契約における建設機械1,2の稼働時間を
認識してもできる構成について説明したが、例えば燃料
込みのレンタル契約の場合、同様に、無負荷となるアイ
ドリング時は稼働時間として計数せず、ポイントへ換算
しない構成とする。そして、アイドリング判定手段29
で認識したアイドリング時間が所定時間、例えば10分
程度継続する場合、機械制御信号出力手段30から対象
の建設機械1,2に、アイドリングが長く継続している
旨を報知させる制御の信号を出力し、さらにアイドリン
グが継続する場合、エンジンを停止させる制御の信号を
対応する建設機械1,2に出力する構成としてもでき
る。
As described above, the structure in which the operating hours of the construction machines 1 and 2 can be recognized in the rental contract of the time charging system, for example, has been described. However, in the case of a rental contract including fuel, similarly, When idling with no load, the operation time is not counted and converted into points. Then, the idling determination means 29
When the idling time recognized in step 3 continues for a predetermined time, for example, about 10 minutes, the machine control signal output means 30 outputs a control signal for informing the target construction machines 1 and 2 that idling continues for a long time. Further, when idling is further continued, the control signal for stopping the engine may be output to the corresponding construction machine 1, 2.

【0095】この構成によれば、サーバ10で建設機械
1,2の稼働状態を監視、制御するので、燃料が無用に
消費されることを抑制できる。このように、ポイントの
換算割合を設定するモード、例えばデータベースの設定
レコードを適宜選択設定あるいは入力設定し、この設定
に対応して建設機械1,2の駆動状態を制御する構成と
することにより、より効率的なサービス提供の実行がで
きる。
According to this configuration, the server 10 monitors and controls the operating states of the construction machines 1 and 2, so that unnecessary consumption of fuel can be suppressed. In this way, by the mode for setting the conversion ratio of points, for example, by appropriately setting or inputting the setting record of the database and controlling the driving state of the construction machines 1 and 2 in accordance with this setting, More efficient service provision can be performed.

【0096】そして、これら時間課金方式のレンタルや
燃料込みレンタルなどの各種契約形態が異なる場合に
は、例えばレンタル会社の端末コンピュータ9からサー
バ10に設定された各種ポイントの換算割合を可変設定
可能としたり、新たに設定入力可能としてもよい。この
構成により、より細かく各種形態に対応した広い条件に
も対応でき、利便性を向上できる。
When various types of contracts such as rental of the time-charging system and rental including fuel are different, the conversion ratio of various points set in the server 10 from the terminal computer 9 of the rental company can be variably set. Alternatively, a new setting can be input. With this configuration, it is possible to more finely support a wide range of conditions corresponding to various forms and improve convenience.

【0097】操縦履歴を開示しなくてもよい。そして、
開示する場合には、会員番号を認識して会員登録を認識
する場合に限らず、広く開示してもよい。
It is not necessary to disclose the operation history. And
The disclosure is not limited to the case of recognizing the membership registration by recognizing the membership number, but may be widely disclosed.

【0098】そして、建設機械1,2で取得された情報
は、通信衛星4、衛星地球局5、およびネットワーク管
制局6を介してサーバ10に出力されるように構成され
ていたが、本発明はこれに限られない。すなわち、上述
したように、PHSなどの公衆回線網を利用して機械情
報の無線出力を行ってもよく、無線出力された機械情報
を建設現場の端末コンピュータ9で受信し、端末コンピ
ュータ9からネットワーク7を介してサーバ10に出力
するように構成してもよい。
The information acquired by the construction machines 1 and 2 is configured to be output to the server 10 via the communication satellite 4, the satellite earth station 5, and the network control station 6. Is not limited to this. That is, as described above, the machine information may be wirelessly output using a public line network such as PHS, and the wirelessly output machine information is received by the terminal computer 9 at the construction site, and the network is transmitted from the terminal computer 9 to the network. It may be configured to output to the server 10 via 7.

【0099】その他、本発明の実施の際の具体的な構造
および手順は、本発明の目的を達成できる範囲で他の構
造等としてもよい。
In addition, the specific structure and procedure for carrying out the present invention may be other structures and the like as long as the object of the present invention can be achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施の形態に係る機械の操縦履歴管
理システムの構成を表す模式図である。
FIG. 1 is a schematic diagram showing a configuration of a machine operation history management system according to an embodiment of the present invention.

【図2】前記一実施の形態における建設機械に搭載され
る機械情報出力手段の構造を表すブロック図である。
FIG. 2 is a block diagram showing a structure of machine information output means mounted on the construction machine according to the embodiment.

【図3】前記一実施の形態におけるシステムを構成する
サーバの構造を示すブロック図である。
FIG. 3 is a block diagram showing a structure of a server which constitutes the system according to the exemplary embodiment.

【図4】前記一実施の形態における操縦履歴フォームの
表示形態を示す模式図である。
FIG. 4 is a schematic diagram showing a display form of an operation history form in the one embodiment.

【図5】前記一実施の形態における機種別の稼働時間と
技能レベルとの対応関係の設定規則を示すデータベース
における模式図である。
FIG. 5 is a schematic diagram in a database showing a setting rule of a correspondence relationship between an operating time and a skill level of each model according to the one embodiment.

【図6】前記一実施の形態における稼働負荷とポイント
割増率との対応関係のポイント算出規則を示すデータベ
ースにおける模式図である。
FIG. 6 is a schematic diagram in the database showing a point calculation rule of the correspondence relationship between the operating load and the point premium rate in the one embodiment.

【図7】前記一実施の形態における機種と機種別換算係
数との対応関係のポイント算出規則を示すデータベース
における模式図である。
FIG. 7 is a schematic diagram in a database showing a point calculation rule of a correspondence relationship between a model and a model-specific conversion coefficient in the one embodiment.

【図8】前記一実施の形態におけるポイントとサービス
内容との対応関係を示すデータベースにおける模式図で
ある。
FIG. 8 is a schematic diagram in a database showing a correspondence relationship between points and service contents in the one embodiment.

【図9】前記一実施の形態における操縦履歴管理システ
ムの動作を示すフローチャートである。
FIG. 9 is a flowchart showing an operation of the operation history management system in the one embodiment.

【符号の説明】[Explanation of symbols]

1,2…建設機械(機械)、24…オペレータID取得
手段(操縦者情報取得手段)、25…機械ID取得手段
(機械情報取得手段)、26…稼働情報取得手段(稼働
時間取得手段、稼働負荷情報取得手段)、27…操縦履
歴フォーム作成手段(ポイント換算手段)、28…会員
番号認識手段(会員認識手段)、35…操縦履歴フォー
ム(操縦履歴)、38…累積稼働時間蓄積手段、100
…機械の操縦履歴管理システム
1, 2 ... Construction machine (machine), 24 ... Operator ID acquisition means (pilot information acquisition means), 25 ... Machine ID acquisition means (machine information acquisition means), 26 ... Operation information acquisition means (operation time acquisition means, operation) Load information acquisition means), 27 ... Steering history form creating means (point conversion means), 28 ... Member number recognition means (member recognition means), 35 ... Steering history form (steering history), 38 ... Cumulative operating time storage means, 100
… Machine operation history management system

フロントページの続き Fターム(参考) 2D003 AA00 AB06 BA05 BA07 BA08 DA04 DB03 DB06 DB07 DB08 FA02 5H223 AA17 DD03 DD07 DD09 EE30 FF08 Continued front page    F-term (reference) 2D003 AA00 AB06 BA05 BA07 BA08                       DA04 DB03 DB06 DB07 DB08                       FA02                 5H223 AA17 DD03 DD07 DD09 EE30                       FF08

Claims (15)

【特許請求の範囲】[Claims] 【請求項1】 機械(1,2)を操縦する操縦者の操縦
に係わる操縦履歴(35)を管理する機械(1,2)の
操縦履歴管理システム(100)であって、 前記操縦者を同定する操縦者同定データを取得する操縦
者情報取得手段(24)と、 前記機械(1,2)を同定する機械同定データを取得す
る機械情報取得手段(25)と、 前記機械(1,2)の稼働時間を取得する稼働時間取得
手段(26)と、 前記操縦者情報取得手段(24)にて取得した操縦者同
定データ、前記機械情報取得手段(25)にて取得した
機械同定データおよび前記稼働時間取得手段(26)に
て取得した稼働時間に基づいて、前記操縦者および前記
機械(1,2)毎に稼働時間を累積して前記操縦履歴
(35)として蓄積する累積稼働時間蓄積手段(38)
とを具備したことを特徴とした機械の操縦履歴管理シス
テム。
1. A driving history management system (100) for a machine (1, 2) for managing a driving history (35) relating to the operation of an operator who operates the machine (1, 2), comprising: A pilot information acquisition means (24) for acquiring the pilot identification data to be identified, a machine information acquisition means (25) for obtaining the machine identification data to identify the machine (1, 2), and the machine (1, 2) ) Operating time acquisition means (26) for acquiring the operating time, operator identification data acquired by the operator information acquisition means (24), machine identification data acquired by the machine information acquisition means (25), and Accumulated operating time accumulation for accumulating the operating time for each of the operator and the machine (1, 2) based on the operating time acquired by the operating time acquisition means (26) and accumulating as the operation history (35) Means (38)
A machine operation history management system characterized by comprising:
【請求項2】 請求項1に記載の機械の操縦履歴管理シ
ステム(100)において、 累積稼働時間蓄積手段(38)は、操縦者による機械
(1,2)の操縦を管理する管理機関毎に前記操縦者お
よび前記機械(1,2)毎の累積した稼働時間を蓄積す
ることを特徴とした機械の操縦履歴管理システム。
2. The machine operation history management system (100) according to claim 1, wherein the cumulative operating time storage means (38) is provided for each management organization that manages the operation of the machine (1, 2) by the operator. A machine operation history management system characterized by accumulating accumulated operating time for each of the operator and the machine (1, 2).
【請求項3】 請求項1または2に記載の機械の操縦履
歴管理システム(100)において、 稼働時間をポイントとして算出するポイント換算手段
(27)を具備したことを特徴とした機械の操縦履歴管
理システム。
3. The machine operation history management system (100) according to claim 1 or 2, further comprising point conversion means (27) for calculating operating time as points. system.
【請求項4】 請求項3に記載の機械の操縦履歴管理シ
ステム(100)において、 ポイント換算手段(27)は、機械(1,2)の種別に
対応した機種別換算係数を有し、この機種別換算係数に
基づいて稼働時間をポイントとして算出することを特徴
とした機械の操縦履歴管理システム。
4. The machine operation history management system (100) according to claim 3, wherein the point conversion means (27) has a machine type conversion coefficient corresponding to the machine type (1, 2). A machine operation history management system characterized by calculating operating hours as points based on model-specific conversion factors.
【請求項5】 請求項3または4に記載の機械の操縦履
歴管理システム(100)において、 機械(1,2)の稼働の際に加わる負荷に対応した稼働
負荷情報を取得する稼働負荷情報取得手段(26)を具
備し、 ポイント換算手段(27)は、前記稼働負荷情報取得手
段(26)にて取得した稼働負荷情報に基づいて前記負
荷に対応した負荷別換算係数を有し、この負荷別換算係
数に基づいて稼働時間をポイントとして算出することを
特徴とした機械の操縦履歴管理システム。
5. The machine operation history management system (100) according to claim 3 or 4, wherein operation load information acquisition for acquiring operation load information corresponding to a load applied when the machine (1, 2) is operated. Means (26), and the point conversion means (27) has a load-based conversion coefficient corresponding to the load based on the operating load information acquired by the operating load information acquisition means (26), A machine operation history management system characterized by calculating operating time as points based on different conversion factors.
【請求項6】 請求項1ないし5のいずれかに記載の機
械の操縦履歴管理システム(100)において、 累積稼働時間蓄積手段(38)は、操縦者またはこの操
縦者による機械(1,2)の操縦を管理する管理機関の
要求に応じて操縦履歴(35)を開示することを特徴と
した機械の操縦履歴管理システム。
6. The machine operation history management system (100) according to any one of claims 1 to 5, wherein the cumulative operating time accumulating means (38) is an operator or a machine (1, 2) operated by the operator. An operation history management system for a machine, which discloses an operation history (35) in response to a request from a management organization that manages the operation of the machine.
【請求項7】 請求項6に記載の機械の操縦履歴管理シ
ステム(100)において、 管理機関または操縦者の所定機関への会員登録を認識す
る会員認識手段(28)を具備し、 累積稼働時間蓄積手段(38)は、前記会員認識手段
(28)にて会員登録の認識がなされた管理機関または
操縦者からの要求にのみ応じて開示することを特徴とし
た機械の操縦履歴管理システム。
7. The machine operation history management system (100) according to claim 6, further comprising a member recognition means (28) for recognizing a member registration of a management institution or a driver to a predetermined institution, and cumulative operating time. The operation history management system for a machine, wherein the storage means (38) is disclosed only in response to a request from a management organization or a driver whose member registration has been recognized by the member recognition means (28).
【請求項8】 機械(1,2)を操縦する操縦者の操縦
に係わる操縦履歴(35)を管理する機械の操縦履歴管
理方法であって、 コンピュータにより、前記操縦者を同定する操縦者同定
データ、前記機械(1,2)を同定する機械同定デー
タ、および、前記機械(1,2)の稼働時間を取得し、
これら操縦者同定データ、機械同定データおよび稼働時
間に基づいて、前記操縦者および前記機械(1,2)毎
に稼働時間を累積して蓄積することを特徴とする機械の
操縦履歴管理方法。
8. A machine operation history management method for managing a machine operation history (35) related to the operation of an operator who operates the machine (1, 2), wherein the operator identifies the operator by a computer. Acquiring data, machine identification data for identifying the machine (1, 2), and operating time of the machine (1, 2),
A machine operation history management method characterized by accumulating and accumulating operation time for each of the operator and the machine (1, 2) based on the operator identification data, machine identification data, and operation time.
【請求項9】 請求項8に記載の機械の操縦履歴管理方
法において、 コンピュータは、操縦者による機械(1,2)の操縦を
管理する管理機関毎に前記操縦者および前記機械(1,
2)毎の累積した稼働時間を蓄積することを特徴とする
機械の操縦履歴管理方法。
9. The machine operation history management method according to claim 8, wherein the computer controls the operator and the machine (1, 1) for each management organization that manages the operation of the machine (1, 2) by the operator.
2) A machine operation history management method characterized by accumulating accumulated operating time for each.
【請求項10】 請求項8または9に記載の機械の操縦
履歴管理方法において、 コンピュータは、稼働時間をポイントとして算出するこ
とを特徴とする機械の操縦履歴管理方法。
10. The machine operation history management method according to claim 8, wherein the computer calculates the operating time as a point.
【請求項11】 請求項10に記載の機械の操縦履歴方
法において、 コンピュータは、機械(1,2)の種別に対応して異な
る割合で稼働時間をポイントとして算出することを特徴
とする機械の操縦履歴管理方法。
11. The machine operation history method according to claim 10, wherein the computer calculates the operating time as points at different ratios corresponding to the types of the machines (1, 2). Control history management method.
【請求項12】 請求項10または11に記載の機械の
操縦履歴管理方法において、 コンピュータは、機械(1,2)の稼働の際に加わる負
荷に対応して異なる割合で稼働時間をポイントとして算
出することを特徴とする機械の操縦履歴管理方法。
12. The machine operation history management method according to claim 10 or 11, wherein the computer calculates operating time as points at different rates corresponding to loads applied when the machine (1, 2) is operating. A method for managing the operation history of a machine, which comprises:
【請求項13】 請求項10ないし12のいずれかに記
載の機械の操縦履歴管理方法において、 コンピュータは、管理機関または操縦者の要求に応じて
操縦履歴(35)を開示することを特徴とする機械の操
縦履歴管理方法。
13. The machine operation history management method according to any one of claims 10 to 12, wherein the computer discloses the operation history (35) in response to a request from a management organization or a driver. Machine operation history management method.
【請求項14】 請求項13に記載の機械の操縦履歴管
理方法において、 コンピュータは、所定機関への会員登録がなされた管理
機関または操縦者のみの要求に応じて開示することを特
徴とする機械の操縦履歴管理方法。
14. The machine operation history management method according to claim 13, wherein the computer discloses the machine in response to a request from only a management organization or a driver who is a member registered in a predetermined organization. Control history management method.
【請求項15】 請求項8ないし14のいずれかに記載
の機械の操縦履歴管理方法をコンピュータに実行させる
ことを特徴とする機械の操縦履歴管理プログラム。
15. A machine operation history management program for causing a computer to execute the machine operation history management method according to any one of claims 8 to 14.
JP2001331553A 2001-10-29 2001-10-29 Operation history management system, method and program for machine, Pending JP2003140743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001331553A JP2003140743A (en) 2001-10-29 2001-10-29 Operation history management system, method and program for machine,

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001331553A JP2003140743A (en) 2001-10-29 2001-10-29 Operation history management system, method and program for machine,

Publications (1)

Publication Number Publication Date
JP2003140743A true JP2003140743A (en) 2003-05-16

Family

ID=19147111

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001331553A Pending JP2003140743A (en) 2001-10-29 2001-10-29 Operation history management system, method and program for machine,

Country Status (1)

Country Link
JP (1) JP2003140743A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005054649A1 (en) * 2003-12-02 2005-06-16 Komatsu Ltd. Construction machine
WO2005106139A1 (en) * 2004-04-28 2005-11-10 Komatsu Ltd. Maintenance support system for construction machine
JP2006018810A (en) * 2004-05-27 2006-01-19 Caterpillar Inc System for providing indexed machine utilization metrics
JP2006024189A (en) * 2004-05-27 2006-01-26 Caterpillar Inc Data acquisition system for creating operator index information
JP2008140340A (en) * 2006-12-05 2008-06-19 Toshiba Corp Plant monitoring controller
JP2009235940A (en) * 2008-03-26 2009-10-15 Komatsu Ltd Fuel consumption quantity correction device in transceiving system for construction machine
US7756736B2 (en) 2003-10-31 2010-07-13 Komatsu Ltd Working machine management system
JP2012194624A (en) * 2011-03-15 2012-10-11 Kyokuto Sanki Co Ltd Operation situation management system of wallpaper gluing machine
JP2013016118A (en) * 2011-07-06 2013-01-24 Kubota Corp Information collection system for work machine
WO2013080707A1 (en) * 2011-12-02 2013-06-06 ヤンマー株式会社 Management server for remote monitoring system
WO2015040761A1 (en) * 2013-12-11 2015-03-26 株式会社小松製作所 Work machine management method, management computer program, and management system
JP2015115061A (en) * 2014-11-13 2015-06-22 株式会社小松製作所 Management method of work machine, computer program for management of the work machine, and management system of the work machine
JP2015118482A (en) * 2013-12-17 2015-06-25 株式会社クボタ Work management system
WO2016203795A1 (en) * 2015-06-18 2016-12-22 日立建機株式会社 Replaceable component management system for construction machine
JP2018206203A (en) * 2017-06-07 2018-12-27 株式会社クボタ Work machine management device and management system for work machine
WO2020202896A1 (en) * 2019-03-29 2020-10-08 日立建機株式会社 Site management system
JPWO2020203329A1 (en) * 2019-03-30 2020-10-08

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0950548A (en) * 1995-05-31 1997-02-18 Fujitsu Ltd Terminal equipment loaded of mobile object and mobile object running management system
JPH1128644A (en) * 1997-07-09 1999-02-02 Ogihara:Kk Method and device for controlling cutting machine
JP2000315226A (en) * 1999-04-30 2000-11-14 Central Finance Co Ltd Cash back clearing method and cash back clearing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0950548A (en) * 1995-05-31 1997-02-18 Fujitsu Ltd Terminal equipment loaded of mobile object and mobile object running management system
JPH1128644A (en) * 1997-07-09 1999-02-02 Ogihara:Kk Method and device for controlling cutting machine
JP2000315226A (en) * 1999-04-30 2000-11-14 Central Finance Co Ltd Cash back clearing method and cash back clearing device

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7756736B2 (en) 2003-10-31 2010-07-13 Komatsu Ltd Working machine management system
GB2424964A (en) * 2003-12-02 2006-10-11 Komatsu Mfg Co Ltd Construction machine
WO2005054649A1 (en) * 2003-12-02 2005-06-16 Komatsu Ltd. Construction machine
GB2424964B (en) * 2003-12-02 2007-05-16 Komatsu Mfg Co Ltd Construction machine
US7921000B2 (en) 2004-04-28 2011-04-05 Komatsu Ltd. Maintenance support system for construction machine
WO2005106139A1 (en) * 2004-04-28 2005-11-10 Komatsu Ltd. Maintenance support system for construction machine
JP2006024189A (en) * 2004-05-27 2006-01-26 Caterpillar Inc Data acquisition system for creating operator index information
JP2006018810A (en) * 2004-05-27 2006-01-19 Caterpillar Inc System for providing indexed machine utilization metrics
JP2008140340A (en) * 2006-12-05 2008-06-19 Toshiba Corp Plant monitoring controller
JP4693758B2 (en) * 2006-12-05 2011-06-01 株式会社東芝 Plant monitoring and control device
JP2009235940A (en) * 2008-03-26 2009-10-15 Komatsu Ltd Fuel consumption quantity correction device in transceiving system for construction machine
JP2012194624A (en) * 2011-03-15 2012-10-11 Kyokuto Sanki Co Ltd Operation situation management system of wallpaper gluing machine
JP2013016118A (en) * 2011-07-06 2013-01-24 Kubota Corp Information collection system for work machine
WO2013080707A1 (en) * 2011-12-02 2013-06-06 ヤンマー株式会社 Management server for remote monitoring system
JP2013117853A (en) * 2011-12-02 2013-06-13 Yanmar Co Ltd Management server of remote monitoring system
US10171317B2 (en) 2011-12-02 2019-01-01 Yanmar Co., Ltd. Management server for remote monitoring system
US9354627B2 (en) 2013-12-11 2016-05-31 Komatsu Ltd. Control method, control computer program, and control system for work machine
WO2015040761A1 (en) * 2013-12-11 2015-03-26 株式会社小松製作所 Work machine management method, management computer program, and management system
DE112013000367B4 (en) * 2013-12-11 2015-12-24 Komatsu Ltd. Control method, control computer program and control system for a work machine
KR101632855B1 (en) * 2013-12-11 2016-06-22 가부시키가이샤 고마쓰 세이사쿠쇼 Work machine management method, management computer program, and management system
KR20150070143A (en) 2013-12-11 2015-06-24 가부시키가이샤 고마쓰 세이사쿠쇼 Work machine management method, management computer program, and management system
JP2015118482A (en) * 2013-12-17 2015-06-25 株式会社クボタ Work management system
JP2015115061A (en) * 2014-11-13 2015-06-22 株式会社小松製作所 Management method of work machine, computer program for management of the work machine, and management system of the work machine
US10344455B2 (en) 2015-06-18 2019-07-09 Hitachi Construction Machinery Co., Ltd. Replaceable component management system for construction machine
CN107408227B (en) * 2015-06-18 2021-01-26 日立建机株式会社 Replacement management system for construction machine
JP2017008524A (en) * 2015-06-18 2017-01-12 日立建機株式会社 Construction machine replacement article management system
WO2016203795A1 (en) * 2015-06-18 2016-12-22 日立建機株式会社 Replaceable component management system for construction machine
CN107408227A (en) * 2015-06-18 2017-11-28 日立建机株式会社 The replacing part management system of engineering machinery
JP2018206203A (en) * 2017-06-07 2018-12-27 株式会社クボタ Work machine management device and management system for work machine
WO2020202896A1 (en) * 2019-03-29 2020-10-08 日立建機株式会社 Site management system
JP2020166540A (en) * 2019-03-29 2020-10-08 日立建機株式会社 Field management system
CN112673137A (en) * 2019-03-29 2021-04-16 日立建机株式会社 On-site management system
JP7026076B2 (en) 2019-03-29 2022-02-25 日立建機株式会社 Site management system
CN112673137B (en) * 2019-03-29 2022-07-05 日立建机株式会社 On-site management system
WO2020203329A1 (en) * 2019-03-30 2020-10-08 住友建機株式会社 Information processing device, information processing method, program, and working machine
JPWO2020203329A1 (en) * 2019-03-30 2020-10-08
CN113557341A (en) * 2019-03-30 2021-10-26 住友建机株式会社 Information processing device, information processing method, program, and work machine
EP3951105A4 (en) * 2019-03-30 2022-06-08 Sumitomo Construction Machinery Co., Ltd. Information processing device, information processing method, program, and working machine
JP7404347B2 (en) 2019-03-30 2023-12-25 住友建機株式会社 Information processing systems, information processing methods, programs, working machines
CN113557341B (en) * 2019-03-30 2024-05-10 住友建机株式会社 Information processing device, information processing method, program, and work machine

Similar Documents

Publication Publication Date Title
JP2003140743A (en) Operation history management system, method and program for machine,
JP4901027B2 (en) Construction machine position confirmation method, position display system, and construction machine
JP2006331405A (en) Secondary battery supply system and secondary battery supply method
AU2006205466B2 (en) Lock control system and method for working machine
JP4807356B2 (en) Vehicle information communication system, management server, in-vehicle device, and vehicle information communication method
US9092919B2 (en) Web portal system for managing vehicle usage and mobility
JP4262180B2 (en) Mobile machine management system
JP4021638B2 (en) Fuel delivery system for machine, fuel delivery method therefor, and fuel delivery program therefor
US20070294031A1 (en) Method and apparatus to utilize gps data to replace route planning software
JP2019148928A (en) Rental cycle management system and program
WO2006137137A1 (en) Client managing device
CN110027569A (en) Ancillary service managing device of stopping and its control method, user terminal control method and non-transitory computer-readable storage medium
US11107301B2 (en) Operation management system and method for disclosing operational information
WO2020203170A1 (en) Skill information presentation system and skill information presentation method
JP2013019740A (en) Parking place information providing device and parking place information providing method
JP2013025432A (en) Device for providing information on environmental load reduction
JP2019113919A (en) Valet parking service management device, method of assisting use thereof, and program
US7047220B2 (en) Product trading system, product trading method, and computer program and recording medium for performing the method
JP2008108107A (en) Working machine management system
JP4741114B2 (en) Machine maintenance system, maintenance method, and program for causing computer to execute the method
JP2010287069A (en) Working machine management method in working machine management system
JP2003178155A (en) Management support system for machine, management support method and management support program
JP3964174B2 (en) Machine fuel usage specification creation system, fuel usage specification creation method, and fuel usage specification creation program
US20120150758A1 (en) Efficiency of use of a common product
US20120150551A1 (en) Efficiency of use of a shared product

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040323

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060308

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060322

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060711