Jig for installing anchor bolt in partition foundation

Info

Publication number
JP2003090049A
JP2003090049A JP2001284288A JP2001284288A JP2003090049A JP 2003090049 A JP2003090049 A JP 2003090049A JP 2001284288 A JP2001284288 A JP 2001284288A JP 2001284288 A JP2001284288 A JP 2001284288A JP 2003090049 A JP2003090049 A JP 2003090049A
Authority
JP
Japan
Prior art keywords
anchor bolt
crossing
jig
substrate
installation jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001284288A
Other languages
Japanese (ja)
Inventor
Yoshimori Ueda
義守 植田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2001284288A priority Critical patent/JP2003090049A/en
Publication of JP2003090049A publication Critical patent/JP2003090049A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a jig for installing an anchor bolt in a partition foundation, which enables the anchor bolts or the single anchor bolt to be accurately installed in a form by simple operations, can bring efficiency to the execution of work for the foundation on a building site, and can shorten a construction period. SOLUTION: One-side ends of paired measuring tapes SC1 and SC2 are held at two points in such a manner that points crossing leveling strings serve as measuring standards, respectively, so that a distance between centers of anchor bolt fitting holes of a crossing form X1 can be measured; and the two points, which sandwich the anchor bolt fitting holes, are located on the respective leveling strings passing through the anchor bolt fitting holes serving as standards for a base plate 5 with which the crossing form X1 is bridged. Consequently, the anchor bolt installing jig 3 can be accurately installed, so that the anchor bolts 2 or the single anchor bolt 2 can be accurately installed in the crossing form X1 by the simple operations, so that the efficiency can be brought to the execution of the work for the foundation on the building site, and so that the construction period can be shortened.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、間仕切り基礎における
アンカーボルト設置治具の改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an anchor bolt installation jig for a partition foundation.

【0002】[0002]

【従来の技術】近年における建築物は、耐震、耐火構造
が要求されることから木造建築物に代えて鉄骨構造の建
築物が多くなり、少なくとも建築物の主要部は鉄骨構造
物が採用されている。
2. Description of the Related Art In recent years, earthquake-resistant and fire-resistant structures are required for buildings, and therefore, there are many steel structures instead of wooden structures. At least the main parts of the structures are steel structures. There is.

【0003】このような鉄骨構造物で建築物を構築する
際は、従来の木造建築と同様に型枠にコンクリートを打
設して形成された間仕切り基礎に建築物が支持され、そ
の建築物の基台は予め基礎に植え込まれたアンカーボル
トにより固定される。
When constructing a building with such a steel frame structure, the building is supported on a partition foundation formed by placing concrete in a formwork as in the conventional wooden construction, and the building is supported. The base is fixed by anchor bolts that are previously implanted in the foundation.

【0004】ところが鉄骨構造物の基台は、従来の木造
建築物のように予め基礎に植え込まれたアンカーボルト
に合わせて建築現場で穴加工する施工方法とは異なり、
設計図に合わせて工場で穴加工が行われている。
However, the base of the steel frame structure is different from the conventional construction method in which holes are drilled at the construction site according to the anchor bolts that have been previously implanted in the foundation, as in wooden construction.
Holes are drilled at the factory according to the blueprint.

【0005】しかしながら、従来は、型枠内の所定位置
にアンカーボルトを設置する際に、スケールなどを使用
して位置決めしていた。このため、図9、図10に示さ
れるように型枠301内に設置されるアンカーボルト3
02の垂線Hに対し傾きが生じたり、直線型枠内に複数
のアンカーボルト302a、302bを平面視所定間隔
(ピッチL)離間して直列に配置する際に、直線Tに対
し傾きの誤差が生ずることがある。
However, conventionally, when the anchor bolt is installed at a predetermined position in the mold, it is positioned by using a scale or the like. Therefore, the anchor bolt 3 installed in the mold 301 as shown in FIGS.
When the plurality of anchor bolts 302a and 302b are arranged in series in the linear form at a predetermined interval (pitch L) in plan view, an inclination error with respect to the straight line T occurs. May occur.

【0006】特に、鉄骨構造が使用される建築物の基礎
に予め植え込まれるアンカーボルトは、その位置決め、
垂直度、ピッチ間の距離、列設される複数のアンカーボ
ルトの直線性等の精度が要求されている。
In particular, anchor bolts that are pre-implanted in the foundation of a building where steel structures are used are
Accuracy such as verticality, distance between pitches, and linearity of a plurality of anchor bolts arranged in a row is required.

【0007】[0007]

【発明が解決しようとする課題】そこで従来は、アンカ
ーボルトを型枠内に正確に設置するためにアンカーボル
ト設置治具を使用していた。このアンカーボルト設置治
具は、型枠内に配置されるアンカーボルトの配置に対応
するよう複数の貫通穴を穿設した板材を型枠の天端間に
跨設して、アンカーボルトの位置決めを行う程度のもの
であった。
Therefore, conventionally, an anchor bolt installation jig has been used in order to accurately install the anchor bolt in the mold. This anchor bolt installation jig positions the anchor bolts by straddling a plate material with a plurality of through holes corresponding to the arrangement of the anchor bolts arranged in the formwork, between the top ends of the formwork. It was something to do.

【0008】このアンカーボルト設置治具では、型枠内
に設置されるアンカーボルトの位置決めはできるが、ア
ンカーボルトの垂直度、直列に列設される複数のアンカ
ーボルトの直線度、離間して配置されるアンカーボルト
間の距離、などの精度が悪いため、型枠内に多数のアン
カーボルトを正確に設置するには多くの時間を要してい
た。
With this anchor bolt installation jig, the anchor bolts installed in the mold can be positioned, but the verticality of the anchor bolts, the linearity of the plurality of anchor bolts arranged in series, and the spacing between them Since the distance between the anchor bolts to be used is inaccurate, it took a lot of time to accurately install a large number of anchor bolts in the formwork.

【0009】このようなことから、工場で製作された鉄
骨構造の基台を間仕切り基礎に固定する際、上記基台に
加工された複数のアンカーボルト取付孔に対し、予め基
礎に設置された各アンカーボルトとの間で誤差が生じる
ため、建築現場での基台の孔加工が余儀なくされ、鉄骨
の組立作業に手間が掛かり施工期間が遅延する要因とな
っていた。
Therefore, when fixing a steel-framed base manufactured in a factory to a partition base, the anchor bolt mounting holes formed in the base are installed in advance on the base. Since there is an error with the anchor bolts, it is necessary to drill holes in the base at the construction site, which takes time to assemble the steel frame and causes a delay in the construction period.

【0010】従って、本発明の目的とする所は、型枠内
に複数または単体で設置されるアンカーボルトを、簡単
な操作で精度良く設置することができ、建築現場におけ
る基礎施工の効率化を図り建築施工期間の短縮を図るこ
とができる間仕切り基礎におけるアンカーボルト設置治
具を提供することを目的としている。
Therefore, the object of the present invention is to make it possible to install a plurality of or a single anchor bolt in the formwork with high accuracy by a simple operation, thereby improving the efficiency of foundation construction at a construction site. It is an object of the present invention to provide an anchor bolt installation jig for a partition foundation that can shorten the construction period for planned construction.

【0011】[0011]

【課題を解決するための手段】上記目的を達成する為
に、本発明は次の技術的手段を有する。即ち、発明の実
施の形態に対応する添付図面中の符号を用いてこれを説
明すると、本発明は、所定間隔離間して立設保持された
一対の側枠1a、1bで構成される交叉型枠X1〜X4
と直線型枠Sの組合せから成る間仕切り基礎の交叉型枠
X1〜X4にアンカーボルト2を設置するアンカーボル
ト設置治具3に於いて、アンカーボルト設置治具3は、
一対の側枠1a、1bの中心に沿って張設された水糸W
が互いに交差する交点を基準P1〜P4として上記交叉
型枠X1〜X4内にアンカーボルト2を垂直に位置決め
する治具3であって、上記交叉型枠X1〜X4の両側枠
1a、1b天端間に跨設して水平に支持される基板5
と、上記基準点P1〜P4にアンカーボルト2を立設す
べく上記基板5に穿設されたアンカーボルト嵌合孔6a
と、上記基板5上に水準器8を設け、該水準器8を基準
として基板5の水平度を調整すべく上記交叉型枠X1〜
X4の両側枠1a、1b天端に対応して上記基板5の端
縁に配設された複数の高さ調整ねじ9と、上記間仕切り
基礎に互いに離間して配置された交叉型枠X1〜X4の
アンカーボルト嵌合孔6a芯間の距離を上記両側枠1
a、1b天端に沿って測量すべく、上記基板5に、各水
糸が通過するアンカーボルト嵌合孔6aの両側に上記水
糸Wを横切る点が測量基準となるよう一対の巻き尺SC
1〜SC4の一端をそれぞれ把持する把持具10とから
構成されていることを特徴とする間仕切り基礎における
アンカーボルト設置治具である。上記によれば、一対の
側枠1a、1bで構成される交叉型枠X1〜X4と直線
型枠Sの中心に沿って水糸Wを張設し、互いに交差する
水糸Wの交点に基準となるアンカーボルト嵌合孔6aを
整合させてアンカーボルト設置治具3を交叉型枠X1〜
X4の両側枠1a、1b天端間に跨設し、交叉型枠X1
〜X4の両側枠1a、1b天端に対応して上記基板5の
端縁に配設された複数の高さ調整ねじ9により基板5の
水平度を調整する。次に、各水糸Wが通過するアンカー
ボルト嵌合孔6aの両側に水糸Wを横切る点が測量基準
となるよう一対の巻き尺SC1〜SC4の一端をそれぞ
れ把持して交叉型枠X1〜X4のアンカーボルト嵌合孔
6a芯間の距離を測量する。従って、交叉型枠X1〜X
4に跨設した基板5の基準となるアンカーボルト嵌合孔
6aを通過する各水糸W上のアンカーボルト嵌合孔6a
を挟む2点で、水糸Wを横切る点が測量基準となるよう
一対の巻き尺SC1、SC2の一端をそれぞれ把持して
交叉型枠X1〜X4のアンカーボルト嵌合孔6a芯間の
距離を測量することにより、アンカーボルト設置治具3
が正確に設置できるので、型枠X1〜X4内に複数また
は単体で設置されるアンカーボルト2の位置決め、垂直
度、ピッチ間の距離、複数のアンカーボルトの直線性等
が、簡単な操作で精度良く設置することができることは
勿論、建築現場における基礎施工の効率化を図り建築施
工期間の短縮を図ることができる。
In order to achieve the above object, the present invention has the following technical means. That is, this will be described with reference to the reference numerals in the accompanying drawings corresponding to the embodiments of the present invention. Frame X1 to X4
In the anchor bolt installing jig 3 for installing the anchor bolts 2 on the crossing molds X1 to X4 of the partitioning base, which is composed of the combination of
Water thread W stretched along the center of the pair of side frames 1a, 1b
Is a jig 3 for vertically positioning the anchor bolt 2 in the crossing molds X1 to X4 with intersections intersecting with each other as references P1 to P4, and both side frames 1a, 1b of the crossing molds X1 to X4. Substrate 5 that is horizontally supported by being spanned between
And an anchor bolt fitting hole 6a formed in the substrate 5 so as to stand the anchor bolt 2 at the reference points P1 to P4.
Then, a level 8 is provided on the substrate 5, and the crossing molds X1 to X1 for adjusting the levelness of the substrate 5 with the level 8 as a reference.
A plurality of height adjusting screws 9 arranged at the edges of the substrate 5 corresponding to the tops of both side frames 1a, 1b of X4, and the crossing molds X1 to X4 arranged on the partition base at a distance from each other. The distance between the cores of the anchor bolt fitting holes 6a of
a, 1b In order to measure along the top ends of the base plate 5, a pair of tape measure SC is formed on the base plate 5 such that the points crossing the water thread W on both sides of the anchor bolt fitting hole 6a through which each water thread passes serve as a measurement reference.
1 to SC4, each of which is configured with a gripping tool 10 that grips one end of the anchoring jig. According to the above, the water thread W is stretched along the centers of the crossing molds X1 to X4 and the linear mold S formed by the pair of side frames 1a and 1b, and the reference is made at the intersection of the water threads W intersecting each other. The anchor bolt fitting hole 6a is aligned and the anchor bolt installation jig 3 is crossed over from the formwork X1.
The cross form frame X1 is provided so as to straddle between the tops of both side frames 1a and 1b of X4.
The horizontality of the board 5 is adjusted by a plurality of height adjusting screws 9 provided on the edges of the board 5 corresponding to the tops of the side frames 1a, 1b of X4. Next, one end of each of the pair of tape measures SC1 to SC4 is respectively gripped so that the points crossing the water thread W on both sides of the anchor bolt fitting hole 6a through which each water thread W passes become the measurement reference, and the cross form frames X1 to X4 are held. Measure the distance between the cores of the anchor bolt fitting hole 6a. Therefore, the crossing molds X1 to X
Anchor bolt fitting hole 6a on each water thread W passing through the anchor bolt fitting hole 6a serving as a reference of the substrate 5 spanning 4
The distance between the cores of the anchor bolt fitting holes 6a of the crossing molds X1 to X4 is measured by gripping one end of each of the pair of tape measures SC1 and SC2 so that the point crossing the water thread W is the measurement reference at the two points sandwiching The anchor bolt installation jig 3
Can be installed accurately, positioning of the anchor bolts 2 installed in the formwork X1-X4 or a single unit, verticality, distance between pitches, linearity of multiple anchor bolts, etc. Not only can it be installed well, but also the efficiency of basic construction at the construction site can be improved and the construction construction period can be shortened.

【0012】また本発明のアンカーボルト設置治具3
は、上記基板5に穿設された基準点となるアンカーボル
ト嵌合孔6aを挟んで両側に、互いに交差する水糸W上
に他のアンカーボルト嵌合孔6b〜6eを配設し、これ
ら他のアンカーボルト嵌合孔6b〜6eの外側に上記把
持具10が配設されて成る間仕切り基礎におけるアンカ
ーボルト設置治具である。上記によれば、例えば、矩形
に形成される間仕切り基礎の型枠1四隅の交叉型枠X1
〜X4に立設配置される基準となるアンカーボルト2の
内側に、他の2本のアンカーボルト2が立設配置される
場合には、アンカーボルト設置治具3の基準となるアン
カーボルト嵌合孔6aを各交叉型枠X1〜X4の基準点
P1〜P4に設置することで、他の2本のアンカーボル
ト2が正確に設置される。従って、間仕切り基礎の型枠
1四隅の交叉型枠X1〜X4に基準となるアンカーボル
ト2の内側に他の2本のアンカーボルト2を立設配置す
る場合には、基準点となるアンカーボルト嵌合孔6aを
挟んで両側に、互いに交差する水糸W上に他のアンカー
ボルト嵌合孔6b〜6eを配設することで、1つのアン
カーボルト設置治具3を4箇所の交叉型枠X1〜X4で
共用することができる。
Anchor bolt installation jig 3 of the present invention
The other anchor bolt fitting holes 6b to 6e are provided on the water thread W intersecting with each other on both sides of the anchor bolt fitting hole 6a serving as a reference point formed in the substrate 5, and This is an anchor bolt installation jig in a partition foundation in which the gripping tool 10 is arranged outside the other anchor bolt fitting holes 6b to 6e. According to the above, for example, the formwork 1 of the partitioning base formed in a rectangular shape and the crossing formwork X1 at the four corners
When the other two anchor bolts 2 are erected inside the reference anchor bolts 2 that are erected at X4, the anchor bolt fitting that is the reference of the anchor bolt installation jig 3 By installing the holes 6a at the reference points P1 to P4 of the respective crossing molds X1 to X4, the other two anchor bolts 2 are accurately installed. Therefore, when the other two anchor bolts 2 are erected inside the reference anchor bolts 2 in the crossing molds X1 to X4 at the four corners of the partition base, the anchor bolts fitting as reference points are fitted. By arranging the other anchor bolt fitting holes 6b to 6e on the water threads W crossing each other on both sides of the fitting hole 6a, one anchor bolt installation jig 3 can be installed at the four crossover frames X1. ~ X4 can be shared.

【0013】また本発明は、上記両側枠1a、1bの天
端には、外側に突設するフランジ部F1〜F4が延設形
成されて成り、上記基板5は、高さ調整ねじ9が配置さ
れる上記基板5の端縁部と上記フランジ部F1〜F4が
クランパー12により挟持されており、上記高さ調整ね
じ9がクランパー12のクランプ機能の一部を兼用して
いる間仕切り基礎におけるアンカーボルト設置治具であ
る。上記によれば、交叉型枠X1〜X4上に跨設してア
ンカーボルト設置治具3を載置した状態で、複数の高さ
調整ねじ9を調整して基板5の水平度を出したのち、基
板5の周縁と両側枠1a、1b天端の外側に突設したフ
ランジ部F1〜F4をクランパー12によりアンカーボ
ルト設置治具3を挟持する。従って、複数の高さ調整ね
じ9を調整して基板5の水平度を出した際に、クランパ
ー12の一部である上端が位置決めすることができるの
で、新たに複数のクランパー12をセットしなくても、
そのまま他の一部である下端部のみをクランプするだけ
で挟持することができる。
Further, according to the present invention, flange portions F1 to F4 projecting outward are extendedly formed at the top ends of the both side frames 1a and 1b, and the substrate 5 is provided with a height adjusting screw 9. An anchor bolt in the partition foundation in which the edge portion of the substrate 5 and the flange portions F1 to F4 are sandwiched by the clamper 12, and the height adjusting screw 9 also serves as a part of the clamp function of the clamper 12. It is an installation jig. According to the above, in a state in which the anchor bolt installation jig 3 is placed over the crossing molds X1 to X4, the height adjusting screws 9 are adjusted to obtain the horizontality of the substrate 5. The anchor bolt installation jig 3 is clamped by the clamper 12 between the peripheral edge of the substrate 5 and the flange portions F1 to F4 protruding outside the tops of the side frames 1a and 1b. Therefore, the upper end, which is a part of the clamper 12, can be positioned when the plurality of height adjusting screws 9 are adjusted to bring out the levelness of the substrate 5, so that a plurality of clampers 12 are not newly set Even
It can be sandwiched by just clamping the lower end which is the other part.

【0014】また本発明は、上記基板5のアンカーボル
ト嵌合孔6aより挿通突出したアンカーボルト2に、斜
め測量用治具24の一端に形成された基準孔26が挿通
係止されて成り、上記斜め測量用治具24は、他端側に
所定高さの段差を設けて上記基板上面と平行な支持面2
4bが形成され、上記基準孔26から他端部24aまで
の寸法L1を含めた長さが、対角位置におけるアンカー
ボルト嵌合孔6a芯間の対角距離の測量値となるよう巻
き尺SC5の一端を上記支持面24b上に係脱可能に保
持するよう構成されている間仕切り基礎におけるアンカ
ーボルト設置治具である。上記によれば、特定の交叉型
枠X1〜X4上に設置されたアンカーボルト設置治具の
アンカーボルト嵌合孔6aから挿通突出したアンカーボ
ルト2に基準孔26を挿通係止して斜め測量用治具24
を基板5上面に支持し、上記基準孔26から他端部24
aまでの寸法L1を含めた長さが、対角位置におけるア
ンカーボルト嵌合孔6a芯間の対角距離の測量値となる
よう、巻き尺SC5の一端を上記支持面24b上に係脱
可能に保持して、上記間仕切り基礎の型枠1の対角の交
叉型枠X1〜X4に設置されたアンカーボルト設置治具
3のアンカーボルト嵌合孔6aとの対角距離T1、T2
を測量する。従って、互いに交差する方向から測量され
た各交叉型枠X1〜X4の対角距離T1、T2における
アンカーボルト嵌合孔6a芯間の距離を巻き尺SC5で
測量した値が測量値として得られ、この対角距離T1、
T2の測量により、更に正確なアンカーボルト2の設置
位置を決めることができる。
Further, according to the present invention, a reference hole 26 formed at one end of an oblique surveying jig 24 is inserted and locked into the anchor bolt 2 which is inserted and projected from the anchor bolt fitting hole 6a of the substrate 5, The diagonal surveying jig 24 is provided with a step having a predetermined height on the other end side, and has a supporting surface 2 parallel to the upper surface of the substrate.
4b is formed, and the length including the dimension L1 from the reference hole 26 to the other end 24a is a measured value of the diagonal distance between the cores of the anchor bolt fitting hole 6a at the diagonal position. It is an anchor bolt installation jig in a partition foundation configured to hold one end on the support surface 24b in a detachable manner. According to the above, the reference hole 26 is inserted and locked in the anchor bolt 2 protruding through the anchor bolt fitting hole 6a of the anchor bolt installation jig installed on the specific cross form X1 to X4 for oblique surveying. Jig 24
Is supported on the upper surface of the substrate 5, and the reference hole 26 to the other end 24
One end of the tape measure SC5 can be engaged with and disengaged from the support surface 24b so that the length including the dimension L1 up to a becomes a measured value of the diagonal distance between the cores of the anchor bolt fitting hole 6a at the diagonal position. Holding and diagonal distances T1 and T2 from the anchor bolt fitting hole 6a of the anchor bolt installation jig 3 installed on the diagonal crossing formwork X1 to X4 of the partition base formwork 1.
To measure. Therefore, a value obtained by measuring the distance between the cores of the anchor bolt fitting holes 6a at the diagonal distances T1 and T2 of the crossing formwork X1 to X4 measured from the directions intersecting with each other with the tape measure SC5 is obtained as the measured value. Diagonal distance T1,
A more accurate installation position of the anchor bolt 2 can be determined by measuring T2.

【0015】また本発明は、上記把持具10が、巻き尺
SC1〜SC5の一端を把持する把持部材10の少なく
とも把持面が軟質材15で構成されている間仕切り基礎
におけるアンカーボルト設置治具である。上記によれ
ば、巻き尺SC1〜SC5の一端を把持具10により基
板5との間で把持する際に、巻き尺SC1〜SC5の一
端は軟質材で構成されている把持面により把持される。
従って、測量の都度、巻き尺SC1〜SC5の一端を繰
り返し把持しても巻き尺に損傷を与えることがなく、長
期的に使用することができる。
Further, the present invention is an anchor bolt installation jig for a partition foundation in which the above-mentioned gripping tool 10 has a softening material 15 at least on the gripping surface of the gripping member 10 for gripping one end of the tape measure SC1 to SC5. According to the above, when gripping one end of the tape measure SC1 to SC5 with the substrate 5 by the gripping tool 10, one end of the tape measure SC1 to SC5 is gripped by the gripping surface made of a soft material.
Therefore, even if one end of the tape measure SC1 to SC5 is repeatedly gripped each time the surveying is performed, the tape measure is not damaged and can be used for a long period of time.

【0016】[0016]

【発明の実施の形態】次に、添付図面、図1〜図8に従
い、本発明の間仕切り基礎におけるアンカーボルト設置
治具に係る一実施形態を詳細に説明する。図1は本発明
の実施の形態にける間仕切り基礎の型枠内にアンカーボ
ルトが設置された状態を示す平面図、図2はアンカーボ
ルト設置治具の平面図、図3はアンカーボルト設置治具
の側面図、図4は交叉型枠の天端上に設置されたアンカ
ーボルト設置治具の斜視図、図5は図2のA−A断面
図、図6は図2のB−B断面図、図7はアンカーボルト
設置治具に斜め測量用治具を保持した状態を示す平面図
であり、図8は図7のC矢視図である。
BEST MODE FOR CARRYING OUT THE INVENTION Next, one embodiment of an anchor bolt installation jig for a partition foundation of the present invention will be described in detail with reference to the accompanying drawings and FIGS. FIG. 1 is a plan view showing a state in which anchor bolts are installed in a mold of a partition foundation according to an embodiment of the present invention, FIG. 2 is a plan view of an anchor bolt installation jig, and FIG. 3 is an anchor bolt installation jig. FIG. 4 is a perspective view of an anchor bolt installation jig installed on the top end of the crossing form, FIG. 5 is a sectional view taken along line AA of FIG. 2, and FIG. 6 is a sectional view taken along line BB of FIG. 7 is a plan view showing a state in which an oblique surveying jig is held on an anchor bolt installation jig, and FIG. 8 is a view taken in the direction of arrow C in FIG. 7.

【0017】先ず、図1に示す平面図には、所定間隔離
間して立設保持された一対の側枠で構成される交叉型枠
X1〜X4と直線型枠Sの組合せから成る間仕切り基礎
の型枠1が示されている。
First, in the plan view shown in FIG. 1, there is shown a partition foundation composed of a combination of cross form frames X1 to X4 constituted by a pair of side frames vertically erected and held at a predetermined interval and a linear form S. The formwork 1 is shown.

【0018】本発明のアンカーボルト設置治具3は、間
仕切り基礎の型枠1に於ける各交叉型枠X1〜X4に使
用される。図2には上記型枠1の角部である図1のX部
における交叉型枠X1に設置されたアンカーボルト設置
治具3が示されている。
The anchor bolt installation jig 3 of the present invention is used for each crossing formwork X1 to X4 in the formwork 1 of the partition base. FIG. 2 shows an anchor bolt installation jig 3 installed on the crossing mold X1 at the X portion of FIG. 1, which is a corner of the mold 1.

【0019】このアンカーボルト設置治具3は、各交叉
型枠X1〜X4の所定位置にアンカーボルト2を垂直に
位置決めするのに使用されるもので、本実施形態では、
交叉型枠X1に用いられるアンカーボルト設置治具3に
ついて説明する。
The anchor bolt installation jig 3 is used to vertically position the anchor bolt 2 at a predetermined position of each of the crossing molds X1 to X4, and in this embodiment,
The anchor bolt installation jig 3 used for the cross form X1 will be described.

【0020】図1〜図4に示すように、アンカーボルト
設置治具3は、交叉型枠X1の両側枠1a、1bの天端
間に跨設して水平に支持される方形の基板5と、一対の
側枠1a、1bの中心に沿って張設された水糸Wが互い
に交差する基準点P1にアンカーボルト2を立設すべく
基板5の略中央にに穿設されたアンカーボルト嵌合孔6
aと、基板5の上面に水準器8を設け、この水準器8を
基準として基板5の水平度を調整すべく交叉型枠X1の
両側枠1a、1b天端に対応して基板5の端縁四隅に配
設された4本の高さ調整ねじ9と、間仕切り基礎の型枠
1に互いに離間して配置された交叉型枠X1〜X4のア
ンカーボルト嵌合孔芯P1〜P4間の距離を両側枠1
a、1bの天端に沿って測量すべく、基板5に、各水糸
Wが通過するアンカーボルト嵌合孔6aの両側に水糸W
を横切る点が測量基準となるよう一対の巻き尺(以下巻
き尺のスケールSC1〜SC4と称する)の一端をそれ
ぞれ把持する把持具10とから構成されている。
As shown in FIGS. 1 to 4, the anchor bolt installation jig 3 includes a rectangular base plate 5 which is horizontally supported by extending between the top ends of both side frames 1a and 1b of the cross form frame X1. , Anchor bolt fitting drilled approximately in the center of the substrate 5 so as to erect the anchor bolt 2 at the reference point P1 at which the water threads W stretched along the centers of the pair of side frames 1a, 1b intersect each other. Aperture 6
a and a level 8 on the upper surface of the substrate 5, and the ends of the substrate 5 corresponding to the tops of both side frames 1a, 1b of the cross form X1 for adjusting the levelness of the substrate 5 with the level 8 as a reference. Distances between the four height adjusting screws 9 arranged at the four corners and the anchor bolt fitting hole cores P1 to P4 of the crossing molds X1 to X4 arranged in the mold 1 of the partition base at a distance from each other. On both sides 1
In order to measure along the tops of a and 1b, the water threads W are provided on the substrate 5 on both sides of the anchor bolt fitting hole 6a through which each water thread W passes.
A pair of measuring tapes (hereinafter referred to as measuring tape scales SC1 to SC4) is configured to have a gripping tool 10 that grips one end of each of the measuring tapes so that a point that intersects with each other becomes a measurement reference.

【0021】更に詳しくは、図2に示すように、基板5
に穿設された基準点P1となるアンカーボルト嵌合孔6
aを挟んで両側に、互いに交差する水糸W上に他のアン
カーボルト嵌合孔6b、6c及び6d、6eを配設し、
これら他のアンカーボルト嵌合孔6b、6c及び6d、
6e外側の4箇所にはそれぞれ把持具10が配設されて
いる。
More specifically, as shown in FIG. 2, the substrate 5
Anchor bolt fitting hole 6 serving as a reference point P1 drilled in
Other anchor bolt fitting holes 6b, 6c and 6d, 6e are disposed on the water threads W intersecting each other on both sides of a,
These other anchor bolt fitting holes 6b, 6c and 6d,
Grasping tools 10 are arranged at four locations outside 6e.

【0022】このように構成することで、間仕切り基礎
の型枠1四隅の交叉型枠X1〜X4に、基準となるアン
カーボルト2以外に、基準点P1の内側(P2またはP
3側)に他の2本のアンカーボルト2を立設配置する場
合には、基板5の基準点P1となるアンカーボルト嵌合
孔6aを挟んで両側の対称位置に、互いに交差する水糸
W上に他のアンカーボルト嵌合孔6b、6c及び6e、
6dを形成することで、1つのアンカーボルト設置治具
3を4箇所の交叉型枠X1〜X4で共用することができ
る。
With this configuration, in addition to the anchor bolt 2 serving as the reference, the inside of the reference point P1 (P2 or P2) is provided on the crossing formwork X1 to X4 at the four corners of the formwork 1 of the partition base.
(3 side), when arranging the other two anchor bolts 2 upright, water threads W intersecting each other at symmetrical positions on both sides of the anchor bolt fitting hole 6a serving as the reference point P1 of the substrate 5. Other anchor bolt fitting holes 6b, 6c and 6e,
By forming 6d, one anchor bolt installation jig 3 can be shared by the four cross molds X1 to X4.

【0023】また、基板5上面のアンカーボルト嵌合孔
6b、6c及び6e、6d近傍に係脱可能に取り付けら
れる把持具10は、図5に示すとおり、巻き尺のスケー
ルSC1を把持する帯状の平板で形成される把持板14
と、この把持板14の両端に形成され孔を挿通して基板
5のねじ孔に螺着する一対の蝶ネジ16とから構成さ
れ、把持板14の把持面となる部位には軟質材となる樹
脂テープ15が巻回されている。なお、把持板14は樹
脂テープ15を巻回せずに樹脂で構成しても良く、軟質
材であれば樹脂テープに限定されるものではない。
Further, as shown in FIG. 5, the gripping tool 10 removably attached to the vicinity of the anchor bolt fitting holes 6b, 6c and 6e, 6d on the upper surface of the substrate 5 is a strip-shaped flat plate for gripping the tape scale SC1. Gripping plate 14 formed by
And a pair of thumbscrews 16 which are formed at both ends of the grip plate 14 and which are screwed into the screw holes of the substrate 5 through the holes, and a soft material is provided at the grip surface of the grip plate 14. The resin tape 15 is wound. The grip plate 14 may be made of resin without winding the resin tape 15, and is not limited to the resin tape as long as it is a soft material.

【0024】各把持板14の取付位置に対し、交叉する
水糸Wを挟んで対称位置にそれぞれ一対の蝶ネジ16を
螺着するためのねじ孔13を形成することにより、アン
カーボルト設置治具3を4箇所の交叉型枠X1〜X4で
共用した場合に、向きが逆になるよう配置した巻き尺ス
ケールSC1〜SC4の一端を、各把持板14で把持す
る際に一対の蝶ネジ16を螺着することができる。
Anchor bolt installation jig is formed by forming screw holes 13 for screwing a pair of thumbscrews 16 at symmetrical positions with respect to the mounting position of each grip plate 14 with the intersecting water thread W interposed therebetween. When 3 is shared by the four crossing molds X1 to X4, one pair of thumbscrews 16 is screwed when gripping one end of the tape measure scales SC1 to SC4 arranged in opposite directions with each gripping plate 14. You can wear it.

【0025】更に、図3に示すとおり、間仕切り基礎の
型枠1の少なくとも交叉型枠X1〜X4が設置される箇
所における両側枠1a、1bの天端には、外側に突設す
るフランジ部F1、F2及びF3、F4が延設形成され
ており、基板5は、高さ調整ねじ9が配置される基板5
の端縁部とフランジ部F1、F2及びF3、F4がクラ
ンパー12により挟持されている。
Further, as shown in FIG. 3, flange portions F1 projecting outward are provided at the tops of the side frames 1a and 1b at the positions where at least the crossing molds X1 to X4 of the partition base mold 1 are installed. , F2 and F3, F4 are extendedly formed, and the substrate 5 is the substrate 5 on which the height adjusting screw 9 is arranged.
The end edge portion of and the flange portions F1, F2 and F3, F4 are clamped by the clamper 12.

【0026】このクランパー12は、図6に示すよう
に、帯状の平板をコ字状に折曲したホルダ22と、この
ホルダ22下部の折曲部に螺設されたネジ孔を螺挿して
フランジ部F4を調整ねじ9と共に挟持する蝶ねじ20
とから構成されている。
As shown in FIG. 6, the clamper 12 includes a holder 22 formed by bending a strip-shaped flat plate into a U-shape, and a screw hole screwed in a bent portion below the holder 22 into a flange. Thumbscrew 20 that clamps part F4 together with adjustment screw 9
It consists of and.

【0027】すなわち、ホルダ22上部の折曲部に形成
された挿通孔に調整ねじ9を挿通すると共に、この調整
ねじ9を基板5の四隅に螺設されたねじ孔に螺挿し、4
本の調整ねじ9によって基板5の水平度が出されると、
基板5の裏面がそれぞれナット18によってロックされ
る。
That is, the adjusting screw 9 is inserted through the insertion hole formed in the bent portion of the upper portion of the holder 22, and the adjusting screw 9 is screwed into the screw holes screwed at the four corners of the substrate 5, and 4
When the horizontal level of the substrate 5 is obtained by the book adjusting screw 9,
The back surface of the board 5 is locked by the nuts 18, respectively.

【0028】そこで、ホルダ22上部の折曲部をナット
18によって調整ねじ9にロックした状態で、ホルダ2
2下部の折曲部から螺挿した蝶ねじ20によってフラン
ジ部F4を調整ねじ9と共に挟持することによって、基
板5を水平状態で交叉型枠X1〜X4上に保持すること
ができる。
Therefore, with the bent portion of the upper portion of the holder 22 locked to the adjusting screw 9 by the nut 18, the holder 2
By sandwiching the flange portion F4 together with the adjusting screw 9 with the thumbscrew 20 screwed from the bent portion at the bottom of the second portion, the substrate 5 can be held in a horizontal state on the crossing molds X1 to X4.

【0029】次に、間仕切り基礎の型枠1の対角距離T
1、T2を測量する斜め測量用治具につき図7及び図8
を参照して説明する。
Next, the diagonal distance T of the formwork 1 of the partition foundation
Fig. 7 and Fig. 8 for the diagonal surveying jig for measuring 1, T2
Will be described with reference to.

【0030】図7及び図8には斜め測量用治具が示され
ており、この斜め測量用治具24は、間仕切り基礎の型
枠1の四隅に立設されるアンカーボルト2の基準点P1
〜P4の対角距離T1、T2(図1参照)を巻き尺スケ
ールSC5によって測量するためのものであって、本発
明のアンカーボルト設置治具3に取り付けて使用され
る。
FIG. 7 and FIG. 8 show an oblique surveying jig. This oblique surveying jig 24 is a reference point P1 of the anchor bolt 2 which is erected at the four corners of the mold 1 of the partition foundation.
It is for measuring the diagonal distances T1 and T2 (see FIG. 1) of P4 to P4 by the tape measure SC5, and is used by being attached to the anchor bolt installation jig 3 of the present invention.

【0031】すなわち、斜め測量用治具24は、基板5
のアンカーボルト嵌合孔6aより挿通突出したアンカー
ボルト2に挿通係止すべく、帯板状の平板を側面視鍵型
に折曲して、一端には基準孔26が穿設されると共に、
他端側には所定高さの段差が形成されて基板5の上面に
対し所定の間隔を有する平行な上部支持面24bが形成
されている。
That is, the oblique surveying jig 24 is the substrate 5
In order to insert and lock the anchor bolt 2 which is inserted and protruded from the anchor bolt fitting hole 6a, a flat plate having a strip plate shape is bent into a key shape in a side view, and a reference hole 26 is formed at one end.
On the other end side, a step having a predetermined height is formed, and an upper support surface 24b parallel to the upper surface of the substrate 5 is formed at a predetermined interval.

【0032】斜め測量用治具24の上部支持面24b上
には、基準孔26から他端部24aまでの寸法L1が巻
き尺スケールSC5の測量基準となるよう、この巻き尺
スケールSC5の一端を把持する把持具10が基準孔2
6からL1−L2の位置に係脱可能に蝶ネジ16により
保持されている。
On the upper support surface 24b of the oblique surveying jig 24, one end of the tape measure SC5 is gripped so that the dimension L1 from the reference hole 26 to the other end 24a becomes the measurement reference of the tape measure SC5. The gripper 10 has the reference hole 2
It is retained by a thumbscrew 16 in a disengageable manner at positions 6 to L1-L2.

【0033】従って、この斜め測量用治具24を使用し
て、間仕切り基礎の型枠1四隅に立設されるアンカーボ
ルト2基準点P1〜P4のP1、P4間及びP2、P3
間の対角距離T1、T2は、巻き尺スケールSC5によ
って測量された測定値にL1の寸法が加算された数値と
なる。
Therefore, by using this oblique surveying jig 24, the anchor bolt 2 which is erected at the four corners of the partitioning base 1 between the P1 and P4 of the reference points P1 to P4 and P2 and P3.
The diagonal distances T1 and T2 between them are numerical values obtained by adding the dimension L1 to the measurement values measured by the tape measure SC5.

【0034】尚、基準孔26から他端部24aまでの寸
法L1を、巻き尺スケールSC5の測量基準とするのに
対し、上記基準孔26から他端部24aまでの寸法L1
(例えば10cm)を、巻き尺SC5の目盛り(10c
m)に一致するよう、該巻き尺SC5の一端を上記支持
面24b上に係脱可能に保持するよう構成することもで
きる。このようにすれば、巻き尺SC5によって測量さ
れた値が、そのまま対角距離の測量値となる。この場
合、斜め測量用治具24の上面に基準孔26から他端部
24aまでの寸法L1(例えば10cm)を刻印等によ
り表示して置けば種類に応じて一目で巻き尺スケールS
C5の合わせるべき目盛り位置が判る。
While the dimension L1 from the reference hole 26 to the other end 24a is used as the measurement reference of the tape measure SC5, the dimension L1 from the reference hole 26 to the other end 24a is used.
(For example, 10 cm) with a scale SC5 (10c
m), one end of the tape measure SC5 may be detachably held on the support surface 24b. By doing so, the value measured by the tape measure SC5 becomes the measured value of the diagonal distance as it is. In this case, if the dimension L1 (for example, 10 cm) from the reference hole 26 to the other end portion 24a is displayed on the upper surface of the diagonal surveying jig 24 by marking or the like, the tape measure S can be seen at a glance according to the type.
The scale position to be adjusted for C5 is known.

【0035】次に、上記のように構成された本発明のア
ンカーボルト設置治具の設定手順につき説明する。
Next, the procedure for setting the anchor bolt installation jig of the present invention constructed as described above will be described.

【0036】先ず、図1に示されるように、先ず建築構
造物の間仕切り基礎図に基づいて建築現場で交叉型枠X
1〜X4と直線型枠Sから成る間仕切り基礎の型枠1が
施工されるとともに、工場では設計図に基づいて基台の
所定位置にアンカーボルト用の穴が加工され、型枠1の
内部には設計図に従って複数のアンカーボルトが配置さ
れることになる。
First, as shown in FIG. 1, a crossing form X is first constructed at a construction site based on a partitioning basic diagram of a building structure.
The mold 1 of the partitioning foundation consisting of 1 to X4 and the linear mold S is constructed, and at the factory, holes for anchor bolts are machined at predetermined positions of the base based on the design drawing, and inside the mold 1 A plurality of anchor bolts will be arranged according to the design drawing.

【0037】そこで、図1に示すように、交叉型枠X1
〜X4と直線型枠Sの組合せから成る矩形の間仕切り基
礎の型枠1において、所定間隔離間して立設保持された
一対の側枠1a、1bの中心に沿って張設された水糸W
が張設される。
Therefore, as shown in FIG. 1, the cross form X1
In the formwork 1 of the rectangular partition foundation consisting of the combination of X4 and the linear formwork S, the water thread W stretched along the center of the pair of side frames 1a and 1b which are erected and held upright at predetermined intervals.
Is stretched.

【0038】例えば、水糸Wが互いに交差する基準点P
1となる角部にアンカーボルト2を垂直に位置決めすべ
く、基準点P1にアンカーボルト嵌合孔6aを整合する
ように図2、図4に示すアンカーボルト設置治具3を交
叉型枠X1の両側枠1a、1bの天端間に跨設し、4本
の高さ調整ねじ9を調整しつつ水準器8を基準として基
板5の水平度を設定する。
For example, a reference point P at which the water threads W intersect with each other
The anchor bolt installation jig 3 shown in FIGS. 2 and 4 is aligned with the anchor bolt fitting hole 6a at the reference point P1 in order to vertically position the anchor bolt 2 at the corner portion 1 of the cross form X1. The horizontal level of the substrate 5 is set on the basis of the level 8 while adjusting the four height adjusting screws 9 while straddling between the tops of the side frames 1a and 1b.

【0039】次いで、図6に示すように、水平度が設定
された基板5がナット18により高さ調整ねじ9にロッ
クされると、クランパー12のホルダ22上部の折曲部
がナット18により基板5の上面に保持され、ホルダ2
2下部の折曲部から螺挿した蝶ねじ20によってフラン
ジ部F4を調整ねじ9と共に挟持する。
Next, as shown in FIG. 6, when the board 5 whose levelness is set is locked to the height adjusting screw 9 by the nut 18, the bent portion above the holder 22 of the clamper 12 is moved by the nut 18 to the board. 5 is held on the upper surface of the holder 2
2 The flange portion F4 is clamped together with the adjusting screw 9 by the thumbscrew 20 screwed from the bent portion at the bottom.

【0040】次に、図1に示すように、上記間仕切り基
礎の型枠1の互いに離間する交叉型枠X1、X2のアン
カーボルト嵌合孔6a間の距離を測量するに際し、交叉
型枠X1上に設置されたアンカーボルト設置治具3にお
いて、各水糸Wが通過するアンカーボルト嵌合孔6aの
両側に、上記水糸Wを横切る点が測量基準(0目盛り)
となるよう図2に示す一対の巻き尺スケールSC1、S
C2の一端を把持具10で把持し、基準点P1、P2の
芯間の距離を、両側枠天端1a、1bに沿って測量す
る。
Next, as shown in FIG. 1, when measuring the distance between the anchor bolt fitting holes 6a of the crossing molds X1 and X2 of the mold 1 of the partition base, which are separated from each other, the crossing mold X1 In the anchor bolt installation jig 3 installed in the above, the points crossing the water thread W on both sides of the anchor bolt fitting hole 6a through which each water thread W passes are the measurement standards (0 scale).
The pair of tape measure scales SC1 and S shown in FIG.
One end of C2 is gripped by the gripping tool 10, and the distance between the cores of the reference points P1 and P2 is measured along the both-side frame top ends 1a and 1b.

【0041】同様に、互いに離間する交叉型枠X1、X
3のアンカーボルト嵌合孔6a間の距離を測量するに際
し、交叉型枠X1上に設置されたアンカーボルト設置治
具3において、各水糸Wが通過するアンカーボルト嵌合
孔6aの両側に、上記水糸Wを横切る点が測量基準(0
目盛り)となるよう図2に示す一対の巻き尺スケールS
C3、SC4の一端を把持具10で把持し、基準点P
1、P3の芯間の距離を、両側枠天端1a、1bに沿っ
て測量する。
Similarly, the crossing molds X1 and X are separated from each other.
When measuring the distance between the anchor bolt fitting holes 6a of No. 3, in the anchor bolt installing jig 3 installed on the cross form X1, on both sides of the anchor bolt fitting holes 6a through which each water thread W passes, The point that crosses the water thread W is the measurement reference (0
A pair of tape measure scale S shown in FIG.
Hold one end of C3 and SC4 with the gripping tool 10, and set the reference point P
The distance between the cores of P1 and P3 is measured along the tops 1a and 1b of the both side frames.

【0042】次に、交叉型枠X2に設置されたアンカー
ボルト設置治具3と、交叉型枠X3に設置されたアンカ
ーボルト設置治具3のアンカーボルト嵌合孔6a間の対
角距離T2を測量するに際し、交叉型枠X1上に設置さ
れたアンカーボルト設置治具3において、図7に示すア
ンカーボルト嵌合孔6aより挿通突出したアンカーボル
ト2に斜め測量用治具24の基準孔26を挿通係止し、
上部支持面24b上において、基準孔26から他端部2
4aまでの寸法L1を、巻き尺スケールSC5の目盛り
に一致させて巻き尺スケールSC5の一端を把持具10
によって把持する。
Next, the diagonal distance T2 between the anchor bolt installation jig 3 installed on the cross form X2 and the anchor bolt fitting hole 6a of the anchor bolt installation jig 3 installed on the cross form X3 is set. At the time of measurement, in the anchor bolt installation jig 3 installed on the cross form X1, the reference hole 26 of the oblique survey jig 24 is attached to the anchor bolt 2 which is inserted and projected from the anchor bolt fitting hole 6a shown in FIG. Insert and lock,
From the reference hole 26 to the other end 2 on the upper support surface 24b.
The dimension L1 up to 4a is matched with the scale of the tape measure SC5, and one end of the tape measure SC5 is held by the gripping tool 10.
Hold by.

【0043】そこで、交叉型枠X2、X3の基準となる
アンカーボルト2の中心である基準点P2、P3間の斜
めの距離を測量することによって、基準点P3の位置が
確定する。
Therefore, the position of the reference point P3 is determined by measuring the diagonal distance between the reference points P2 and P3, which are the centers of the anchor bolts 2 serving as the reference of the crossing molds X2 and X3.

【0044】同様にして、重複する説明は省略するが、
基準点P3、P4間の距離ならびに基準点P2、P4間
の距離を、それぞれの交叉型枠X3、X4に設置された
各アンカーボルト設置治具3によって測量する。
In the same manner, although the duplicate description will be omitted,
The distance between the reference points P3 and P4 and the distance between the reference points P2 and P4 are measured by the anchor bolt installation jigs 3 installed on the respective cross forms X3 and X4.

【0045】最後に、交叉型枠X1に設置されたアンカ
ーボルト設置治具3の斜め測量用治具24によって保持
された巻き尺スケールSC5によって交叉型枠X1、X
4の基準となるアンカーボルト2の中心である基準点P
1、P4間の斜めの距離を測量することによって、基準
点P4の位置が確定する。
Finally, the crossing formwork X1, X is crossed by the tape measure scale SC5 held by the diagonal surveying jig 24 of the anchor bolt setting jig 3 installed on the crossing formwork X1.
The reference point P which is the center of the anchor bolt 2 serving as the reference of No. 4
The position of the reference point P4 is determined by measuring the diagonal distance between 1 and P4.

【0046】従って、本発明のアンカーボルト設置治具
によれば、交叉型枠X1〜X4に跨設した基板5の基準
となるアンカーボルト嵌合孔6aを通過する各水糸W上
のアンカーボルト嵌合孔6aを挟む2点で、水糸Wを横
切る点が測量基準となるよう一対の巻き尺スケールSC
1、SC2の一端をそれぞれ把持して交叉型枠X1、X
2のアンカーボルト嵌合孔6aの芯間の距離を測量する
ことにより、アンカーボルト設置治具3が正確に設置で
きるので、型枠1内に複数または単体で設置されるアン
カーボルト2の位置決め、垂直度、ピッチ間の距離、列
設される複数のアンカーボルトの直線性等が、簡単な操
作で精度良く設置することができることは勿論、建築現
場における基礎施工の効率化を図り建築施工期間の短縮
を図ることができる。
Therefore, according to the anchor bolt installation jig of the present invention, the anchor bolt on each water thread W passing through the anchor bolt fitting hole 6a serving as the reference of the substrate 5 extending over the crossing molds X1 to X4. A pair of tape measure scales SC so that the points crossing the water thread W at two points sandwiching the fitting hole 6a become the measurement reference.
Crossing formwork X1, X by grasping one end of SC1 and SC2 respectively
Since the anchor bolt installation jig 3 can be accurately installed by measuring the distance between the cores of the anchor bolt fitting holes 6a of 2, the positioning of the anchor bolts 2 that is installed in the formwork 1 in a plurality or alone. The degree of verticality, the distance between the pitches, and the linearity of the multiple anchor bolts that are lined up make it possible to install them accurately with simple operations. It can be shortened.

【0047】また、高さ調整ねじ9が配置される基板5
四方の端縁部とフランジ部F3、F4をクランプするク
ランパー12は、高さ調整ねじ9がクランプ機能の一部
を兼用しているので、複数の高さ調整ねじ9を調整して
基板5の水平度を出した際に、クランパー12の一部で
ある上端が位置決めすることができるので、新たに複数
のクランパーをセットしなくても、クランプ機能の他の
一部である蝶ねじ20によってフランジ部F4を調整ね
じ9と共に挟持することができる。
The substrate 5 on which the height adjusting screw 9 is arranged
In the clamper 12 that clamps the four edge portions and the flange portions F3 and F4, the height adjusting screw 9 also serves as a part of the clamping function, so that the height adjusting screws 9 are adjusted to adjust the height of the substrate 5 of the board 5. Since the upper end, which is a part of the clamper 12, can be positioned when the horizontality is obtained, the flange is provided by the thumbscrew 20, which is another part of the clamping function, without setting a plurality of new clampers. The part F4 can be clamped together with the adjusting screw 9.

【0048】加えて、基板5の上部支持面24b上に、
基準孔26から他端部までの寸法L1が巻き尺スケール
SC5の測量基準(0目盛り)となるよう巻き尺スケー
ルSC5の一端を把持する斜め測量用治具24が係脱可
能に保持されているので、互いに交差する方向から測量
された各交叉型枠X1〜X4の基準となるアンカーボル
ト嵌合孔6a間の距離に加え、対角距離T1、T2を測
量することにより、さらに正確な測量を行うことができ
る。
In addition, on the upper support surface 24b of the substrate 5,
Since the diagonal surveying jig 24 that holds one end of the tape measure SC5 is detachably held so that the dimension L1 from the reference hole 26 to the other end becomes the survey reference (0 scale) of the tape measure SC5. In addition to the distance between the anchor bolt fitting holes 6a serving as the reference of each of the crossing formwork X1 to X4 measured from the directions intersecting with each other, the diagonal distances T1 and T2 are measured to perform more accurate measurement. You can

【0049】[0049]

【発明の効果】本発明は次の効果を奏する。The present invention has the following effects.

【0050】以上詳述した如く本願の請求項1記載の発
明によると、交叉型枠に跨設した基板の基準となるアン
カーボルト嵌合孔を通過する各水糸上のアンカーボルト
嵌合孔を挟む2点で、水糸を横切る点が測量基準となる
よう一対の巻き尺の一端をそれぞれ把持して交叉型枠の
アンカーボルト嵌合孔芯間の距離を測量することによ
り、アンカーボルト設置治具が正確に設置できるので、
交叉型枠内に複数または単体で設置されるアンカーボル
トの位置決め、垂直度、ピッチ間の距離、列設される複
数のアンカーボルトの直線性等を、簡単な操作で精度良
く設置することができることは勿論、建築現場における
基礎施工の効率化を図り建築施工期間の短縮を図ること
ができる。
As described in detail above, according to the invention of claim 1 of the present application, the anchor bolt fitting hole on each water thread passing through the anchor bolt fitting hole serving as a reference of the substrate laid across the cross form is formed. Anchor bolt installation jig by grasping one end of a pair of tape measure and measuring the distance between the anchor bolt fitting hole cores of the crossing formwork so that the point that crosses the water thread at the two points sandwiched becomes the measurement reference. Can be installed accurately,
Positioning, verticality, distance between pitches, linearity of multiple anchor bolts arranged in a row, etc., can be accurately and easily installed in the crossing formwork with a simple operation. Of course, it is possible to shorten the construction period by improving the efficiency of basic construction at the construction site.

【0051】本願の請求項2記載の発明によると、間仕
切り基礎型枠四隅の交叉型枠に基準となるアンカーボル
トの内側に他の2本のアンカーボルトを立設配置する場
合には、基準点となるアンカーボルト嵌合孔を挟んで両
側に、互いに交差する水糸上に他のアンカーボルト嵌合
孔を配設することで、1つのアンカーボルト設置治具を
4箇所の交叉型枠で共用することができる。
According to the invention of claim 2 of the present application, when two other anchor bolts are erected on the inner side of the reference anchor bolt in the crossing formwork at the four corners of the partition base formwork, the reference point is set. By arranging other anchor bolt fitting holes on the water threads that intersect each other on both sides of the anchor bolt fitting hole that becomes, one anchor bolt installation jig is shared by four crossing formwork can do.

【0052】本願の請求項3記載の発明によると、高さ
調整ねじがクランパーのクランプ機能の一部を兼用して
いるので、複数の高さ調整ねじを調整して基板の水平度
を出した際に、クランパーの一部である上端が位置決め
することができるので、新たに複数のクランパーをセッ
トしなくても、そのまま他の一部である下端部のみをク
ランプするだけで挟持することができる。
According to the invention of claim 3 of the present application, since the height adjusting screw also serves as a part of the clamp function of the clamper, the plurality of height adjusting screws are adjusted to obtain the levelness of the substrate. At this time, since the upper end, which is a part of the clamper, can be positioned, it is possible to sandwich the clamper by simply clamping only the lower end, which is the other part, without newly setting a plurality of clampers. .

【0053】本願の請求項4記載の発明によると、アン
カーボルト設置治具のアンカーボルト嵌合孔を挿通した
アンカーボルトに基準孔を挿通係止して斜め測量用治具
を保持することにより、互いに交差する方向から測量さ
れた各交叉型枠の基準となるアンカーボルト嵌合孔間の
距離に加え、対角距離を測量することにより、さらに正
確なアンカーボルトの設置位置を決めることができる。
According to the invention of claim 4 of the present application, the reference hole is inserted into the anchor bolt inserted through the anchor bolt fitting hole of the anchor bolt installation jig to hold the diagonal surveying jig. By measuring the diagonal distance in addition to the distance between the anchor bolt fitting holes, which is the reference of each crossing form measured from the directions intersecting with each other, the more accurate anchor bolt installation position can be determined.

【0054】本願の請求項5記載の発明によると、巻き
尺の一端を把持する把持部材の少なくとも把持面を軟質
材で構成することにより、測量の都度、巻き尺の一端を
繰り返し把持しても巻き尺に損傷を与えることがなく、
長期的に使用することができる。
According to the invention of claim 5 of the present application, at least the gripping surface of the gripping member for gripping one end of the tape measure is made of a soft material, so that the tape measure can be formed by repeatedly gripping one end of the tape measure at each survey. Without damaging
Can be used in the long term.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態にける間仕切り基礎の型枠
内にアンカーボルトが設置された状態を示す平面図であ
る。
FIG. 1 is a plan view showing a state in which anchor bolts are installed in a mold of a partition foundation according to an embodiment of the present invention.

【図2】アンカーボルト設置治具の平面図、図3はアン
カーボルト設置治具の側面図である。
FIG. 2 is a plan view of the anchor bolt installation jig, and FIG. 3 is a side view of the anchor bolt installation jig.

【図3】アンカーボルト設置治具の側面図である。FIG. 3 is a side view of an anchor bolt installation jig.

【図4】交叉型枠の天端上に設置されたアンカーボルト
設置治具の斜視図である。
FIG. 4 is a perspective view of an anchor bolt installation jig installed on the top end of the crossing formwork.

【図5】図2のA−A断面図である。5 is a cross-sectional view taken along the line AA of FIG.

【図6】図2のB−B断面図である。FIG. 6 is a sectional view taken along line BB of FIG.

【図7】アンカーボルト設置治具に斜め測量用治具を保
持した状態を示す平面図である。
FIG. 7 is a plan view showing a state in which a diagonal surveying jig is held by an anchor bolt setting jig.

【図8】図7のC矢視図である。8 is a view on arrow C of FIG. 7. FIG.

【図9】従来、型枠内に設置されたアンカーボルトの垂
直度を示す説明図である。
FIG. 9 is an explanatory view showing the verticality of an anchor bolt conventionally installed in a mold.

【図10】従来、型枠内に設置されたアンカーボルトの
垂直度を示す説明図である。
FIG. 10 is an explanatory view showing the verticality of an anchor bolt conventionally installed in a mold.

【符号の説明】[Explanation of symbols]

1 型枠 1a、1b 側枠 2 アンカーボルト 3 アンカーボルト設置治具 5 基板 6a アンカーボルト嵌合孔 6b〜6e アンカーボルト嵌合孔 8 水準器 10 把持具 12 クランパー 13 ねじ孔 14 把持板 15 樹脂テープ 16 蝶ネジ 18 ナット 22 ホルダ 24 斜め測量用治具 24a 他端部 24b 上部支持面 26 基準孔 F1〜F4 フランジ部 P1〜P4 基準点 S 直線型枠 SC1〜SC5 巻き尺スケール W 水糸 X1〜X4 交叉型枠 1 formwork 1a, 1b Side frame 2 Anchor bolt 3 Anchor bolt installation jig 5 substrates 6a Anchor bolt fitting hole 6b to 6e Anchor bolt fitting hole 8 level 10 gripping tool 12 clampers 13 screw holes 14 Grip plate 15 Resin tape 16 thumbscrew 18 nuts 22 Holder 24 Oblique Survey Jig 24a the other end 24b Upper support surface 26 Reference hole F1 to F4 flange P1 to P4 reference points S linear formwork SC1-SC5 tape measure scale W water thread X1-X4 Cross Form

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 所定間隔離間して立設保持された一対
の側枠1a、1bで構成される交叉型枠X1〜X4と直
線型枠Sの組合せから成る間仕切り基礎の交叉型枠X1
〜X4にアンカーボルト2を設置するアンカーボルト設
置治具3に於いて、 アンカーボルト設置治具3は、一対の側枠1a、1bの
中心に沿って張設された水糸Wが互いに交差する交点を
基準P1〜P4として上記交叉型枠X1〜X4内にアン
カーボルト2を垂直に位置決めする治具3であって、上
記交叉型枠X1〜X4の両側枠1a、1b天端間に跨設
して水平に支持される基板5と、上記基準点P1〜P4
にアンカーボルト2を立設すべく上記基板5に穿設され
たアンカーボルト嵌合孔6aと、上記基板5上に水準器
8を設け、該水準器8を基準として基板5の水平度を調
整すべく上記交叉型枠X1〜X4の両側枠1a、1b天
端に対応して上記基板5の端縁に配設された複数の高さ
調整ねじ9と、上記間仕切り基礎に互いに離間して配置
された交叉型枠X1〜X4のアンカーボルト嵌合孔6a
芯間の距離を上記両側枠1a、1b天端に沿って測量す
べく、上記基板5に、各水糸が通過するアンカーボルト
嵌合孔6aの両側に上記水糸Wを横切る点が測量基準と
なるよう一対の巻き尺SC1〜SC4の一端をそれぞれ
把持する把持具10とから構成されていることを特徴と
する間仕切り基礎におけるアンカーボルト設置治具。
1. A crossing formwork X1 of a partitioning foundation comprising a combination of a crossing formwork X1 to X4 composed of a pair of side frames 1a and 1b which are vertically erected and held at a predetermined distance and a linear formwork S.
In the anchor bolt installation jig 3 for installing the anchor bolts 2 to X4, in the anchor bolt installation jig 3, the water threads W stretched along the centers of the pair of side frames 1a, 1b intersect each other. A jig 3 for vertically positioning the anchor bolt 2 in the crossing molds X1 to X4 with the intersections as the reference points P1 to P4, which is installed between the tops of both side frames 1a, 1b of the crossing molds X1 to X4. And the substrate 5 supported horizontally, and the reference points P1 to P4
An anchor bolt fitting hole 6a bored in the substrate 5 to vertically set the anchor bolt 2 and a level 8 on the substrate 5 are provided, and the levelness of the substrate 5 is adjusted with the level 8 as a reference. In order to do so, a plurality of height adjusting screws 9 arranged on the edges of the substrate 5 corresponding to the tops of the side frames 1a, 1b of the crossing molds X1 to X4 and the partition base are arranged separately from each other. Anchor bolt fitting hole 6a of crossed formwork X1 to X4
In order to measure the distance between the cores along the tops of the both side frames 1a, 1b, the point of crossing the water thread W on both sides of the anchor bolt fitting hole 6a through which each water thread passes through the board 5 is a measurement standard. An anchor bolt installation jig for a partition foundation, comprising: a gripping tool 10 for gripping one end of each of the pair of tape measures SC1 to SC4.
【請求項2】 上記アンカーボルト設置治具3は、上記
基板5に穿設された基準点となるアンカーボルト嵌合孔
6aを挟んで両側に、互いに交差する水糸W上に他のア
ンカーボルト嵌合孔6b〜6eを配設し、これら他のア
ンカーボルト嵌合孔6b〜6eの外側に上記把持具10
が配設されて成る請求項1に記載の間仕切り基礎におけ
るアンカーボルト設置治具。
2. The anchor bolt installation jig 3 has another anchor bolt on a water thread W which intersects with each other on both sides of an anchor bolt fitting hole 6a serving as a reference point formed in the base plate 5 therebetween. Fitting holes 6b to 6e are provided, and the gripping tool 10 is provided outside the other anchor bolt fitting holes 6b to 6e.
An anchor bolt installation jig for a partition foundation according to claim 1, wherein the anchor bolt installation jig is provided.
【請求項3】 上記両側枠1a、1bの天端には、外側
に突設するフランジ部F1〜F4が延設形成されて成
り、上記基板5は、高さ調整ねじ9が配置される上記基
板5の端縁部と上記フランジ部F1〜F4がクランパー
12により挟持されており、上記高さ調整ねじ9がクラ
ンパー12のクランプ機能の一部を兼用している請求項
1または2に記載の間仕切り基礎におけるアンカーボル
ト設置治具。
3. Flange portions F1 to F4 projecting outward are extendedly formed at the top ends of the side frames 1a, 1b, and the substrate 5 is provided with a height adjusting screw 9. The edge portion of the substrate 5 and the flange portions F1 to F4 are sandwiched by a clamper 12, and the height adjusting screw 9 also serves as a part of the clamp function of the clamper 12. Anchor bolt installation jig for partition foundation.
【請求項4】 上記基板5のアンカーボルト嵌合孔6a
より挿通突出したアンカーボルト2に、斜め測量用治具
24の一端に形成された基準孔26が挿通係止されて成
り、上記斜め測量用治具24は、他端側に所定高さの段
差を設けて上記基板上面と平行な支持面24bが形成さ
れ、上記基準孔26から他端部24aまでの寸法L1を
含めた長さが、対角位置におけるアンカーボルト嵌合孔
6a芯間の対角距離の測量値となるよう巻き尺SC5の
一端を上記支持面24b上に係脱可能に保持するよう構
成されている請求項1〜3の何れかに記載の間仕切り基
礎におけるアンカーボルト設置治具。
4. Anchor bolt fitting hole 6a of the substrate 5
A reference hole 26 formed at one end of the diagonal surveying jig 24 is inserted into and locked by the anchor bolt 2 that is more inserted and projected, and the diagonal surveying jig 24 has a predetermined height difference on the other end side. Is provided to form a support surface 24b parallel to the upper surface of the substrate, and the length including the dimension L1 from the reference hole 26 to the other end portion 24a is a pair between the cores of the anchor bolt fitting holes 6a at diagonal positions. The anchor bolt installation jig for a partition foundation according to any one of claims 1 to 3, wherein one end of the tape measure SC5 is removably held on the support surface 24b so as to be a measured value of an angular distance.
【請求項5】 上記把持具10は、巻き尺SC1〜SC
5の一端を把持する把持部材10の少なくとも把持面が
軟質材15で構成されている請求項1〜4の何れかに記
載の間仕切り基礎におけるアンカーボルト設置治具。
5. The gripping tool 10 comprises tape measures SC1 to SC.
An anchor bolt installation jig for a partition foundation according to any one of claims 1 to 4, wherein at least a gripping surface of a gripping member 10 for gripping one end of 5 is made of a soft material 15.
JP2001284288A 2001-09-19 2001-09-19 Jig for installing anchor bolt in partition foundation Pending JP2003090049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001284288A JP2003090049A (en) 2001-09-19 2001-09-19 Jig for installing anchor bolt in partition foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001284288A JP2003090049A (en) 2001-09-19 2001-09-19 Jig for installing anchor bolt in partition foundation

Publications (1)

Publication Number Publication Date
JP2003090049A true JP2003090049A (en) 2003-03-28

Family

ID=19107637

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001284288A Pending JP2003090049A (en) 2001-09-19 2001-09-19 Jig for installing anchor bolt in partition foundation

Country Status (1)

Country Link
JP (1) JP2003090049A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006342533A (en) * 2005-06-08 2006-12-21 Sekisui Chem Co Ltd Anchor bolt positioning device
KR200475698Y1 (en) * 2014-08-11 2014-12-23 심광섭 Anchor bolt
CN112663651A (en) * 2020-06-19 2021-04-16 杨春娥 Embedded positioning tool suitable for assembled building embedded part

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006342533A (en) * 2005-06-08 2006-12-21 Sekisui Chem Co Ltd Anchor bolt positioning device
KR200475698Y1 (en) * 2014-08-11 2014-12-23 심광섭 Anchor bolt
CN112663651A (en) * 2020-06-19 2021-04-16 杨春娥 Embedded positioning tool suitable for assembled building embedded part

Similar Documents

Publication Publication Date Title
US5313760A (en) Building wall construction method
JP2006307525A (en) Method and implement for constructing wall panel
US6935041B2 (en) Modular framing tool
JP2003090049A (en) Jig for installing anchor bolt in partition foundation
JP5077856B1 (en) Construction method and construction jig
JP2006265830A (en) Construction method for form
JPH01278620A (en) Installation method for anchor bolt and anchor bolt supporting device used therefor
JP7341420B2 (en) Anchor bolt construction jig and foundation formwork structure
JPS63272855A (en) Execution method of free access floor
JP3699548B2 (en) Anchor bolt installation bracket set
JP2023006769A (en) Position confirmation jig, foundation construction jig and foundation construction method
JP2002180474A (en) Sheath pipe holding jig
CN214245404U (en) Assembled supporting device for pouring of bridge cement foundation column
JP3048981B2 (en) Width stopper for foundation concrete formwork
JPH09203210A (en) Mounting device of structural steel erection perpendicular measurement means
JP2022025410A (en) Anchor ruler
JP2549429B2 (en) Formwork for foundation concrete
JPH10147943A (en) Anchor bolt installation metal fitting
JP4567856B2 (en) Sheath tube holding jig, positioning method for sheath tube holding jig, and positioning method for sheath tube holding jig
JP2001279683A (en) Jig for construction of anchor bolt
JPH04228724A (en) Anchor bolt placing jig
JPH0649850A (en) Foundation bolt fixing device
JP2001226981A (en) Surveying gauge for individual footing form, and method for setting the same
JP3965649B2 (en) Fixed hardware holding device
JPH05133748A (en) Inspection method for steel beam/column setting

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040831

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050222