JP2003027429A - Method for constructing arch rib - Google Patents

Method for constructing arch rib

Info

Publication number
JP2003027429A
JP2003027429A JP2001217615A JP2001217615A JP2003027429A JP 2003027429 A JP2003027429 A JP 2003027429A JP 2001217615 A JP2001217615 A JP 2001217615A JP 2001217615 A JP2001217615 A JP 2001217615A JP 2003027429 A JP2003027429 A JP 2003027429A
Authority
JP
Japan
Prior art keywords
arch
arch rib
rib
overhanging
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001217615A
Other languages
Japanese (ja)
Other versions
JP4430267B2 (en
Inventor
Akio Kasuga
昭夫 春日
Hiroshi Masuko
博志 益子
Kazushi Nakamura
收志 中村
Kenichi Saito
謙一 齋藤
Kazuhiko Terajima
一彦 寺島
Kenichi Kata
健一 片
Shigemi Fukushima
重美 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Construction Co Ltd
Original Assignee
Sumitomo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Construction Co Ltd filed Critical Sumitomo Construction Co Ltd
Priority to JP2001217615A priority Critical patent/JP4430267B2/en
Publication of JP2003027429A publication Critical patent/JP2003027429A/en
Application granted granted Critical
Publication of JP4430267B2 publication Critical patent/JP4430267B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To largely reduce the quantity of PC steel bars arranged in the upper floor slab of an arch rib when the arch rib in an arch bridge made of concrete is projected and built. SOLUTION: A projection and building section 14A is constructed by extending a plurality of arch-rib constituting blocks A1, A2, A3 and the like by a projection and a building from an arch abut 12. The front end sections 24b of a plurality of fore stays 24 obliquely hanging the projecting and building section 14A are anchored to the headers A2a to A6a of each arch-rib constituting block A2 to A6 in this case. Accordingly, not only negative bending moment working at the base end section of the projecting and building section 14A accumulating as the projection and the building progress is reduced but also positive bending moment is ensured at the front end section of the projecting and building section 14A, to which negative bending moment works by the weight of a wagon 40 and the placing concrete of the new arch-rib constituting blocks and the front end section is supported properly, and the quantity of the PC steel bars which have been arranged in the upper floor slab of the arch rib in conventional devices can be decreased largely.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本願発明は、コンクリート製
アーチ橋におけるアーチリブの架設方法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing arch ribs in a concrete arch bridge.

【0002】[0002]

【従来の技術】従来より、コンクリート製アーチ橋にお
けるアーチリブを架設する方法の1つとして、張出し架
設工法が知られている。
2. Description of the Related Art Conventionally, an overhanging construction method has been known as one of methods for constructing arch ribs in a concrete arch bridge.

【0003】この張出し架設工法においては、図10に
示すように、アーチリブ102の端部からの張出し架設
により複数のアーチリブ構成ブロックA1´、A2´、
A3´、・・・を継ぎ足して張出し架設部102Aを構
築するようになっている。すなわち、ワーゲン110を
張出し架設部102Aのアーチ軸Ax´に沿ってその先
端部まで前進させ、このワーゲン110を用いて張出し
架設部102Aの小口(先端面)102Aaに新たなア
ーチリブ構成ブロックを施工するようになっている。こ
の施工は、型枠設置、鉄筋PCの組立ておよびコンクリ
ートの打設養生の工程によって行うようになっている。
In this overhanging construction method, as shown in FIG. 10, a plurality of arch rib constituting blocks A1 ', A2', are formed by overhanging from the end of the arch rib 102.
A3 ′, ... Are added to construct the overhanging erected portion 102A. That is, the wagen 110 is advanced to the tip end portion along the arch axis Ax ′ of the overhanging and constructing portion 102A, and a new arch rib forming block is constructed on the small edge (tip face) 102Aa of the overhanging and constructing portion 102A using this wagen 110. It is like this. This construction is carried out by the steps of installing a form, assembling a reinforcing bar PC, and curing the concrete by placing.

【0004】この張出し架設を行う際には、予めアーチ
リブ102の端部近傍にエンドポスト104を構築する
とともに、このエンドポスト104(あるいはその上に
設置されたピロン)の背面側(反アーチリブ側)にバッ
クステー106を構築しておき、その後、張出し架設部
102Aを斜吊りする複数のフォアステー108の基端
部108aを、エンドポスト104(あるいはピロン)
に各々定着するようになっている。そして、この張出し
架設工法においては、エンドポスト104を圧縮部材と
し、フォアステー108およびバックステー106を引
張部材として、張出し架設時の転倒モーメントに抵抗さ
せるようになっている。
When carrying out this overhanging construction, an end post 104 is constructed in the vicinity of the end of the arch rib 102 in advance, and the back side (anti-arch rib side) of this end post 104 (or a pillow mounted on it) is formed. The back stay 106 is constructed in advance, and thereafter, the base end portions 108a of the plurality of fore stays 108 that obliquely suspend the overhanging installation portion 102A are connected to the end posts 104 (or pillows).
It has become established in each. In this overhanging construction method, the end posts 104 are used as compression members, and the forestays 108 and the backstays 106 are used as tension members to resist the overturning moment during overhanging.

【0005】[0005]

【発明が解決しようとする課題】上記従来の張出し架設
工法において、フォアステー108を配置する目的は、
張出し架設の進捗につれて累積するアーチリブ102の
端部(スプリンキング部)に作用する負の曲げモーメン
ト(図示矢印方向のモーメント)を低減させることによ
り架設途中の部材の健全性を保つ、という限られたもの
であるため、次のような問題がある。
In the conventional overhanging construction method described above, the purpose of disposing the forestay 108 is to:
There is a limitation in that the soundness of members in the course of erection is maintained by reducing the negative bending moment (moment in the direction of the arrow in the figure) that acts on the ends (springing portions) of the arch ribs 102 that accumulate as the erection and erection progresses. Therefore, there are the following problems.

【0006】すなわち、上記従来の張出し架設工法にお
いては、フォアステー108の先端部108bは、張出
し架設を行うワーゲン110との干渉を防ぐため、張出
し架設部102Aの小口102Aaから2、3ブロック
後ろに離れた位置で張出し架設部102Aに定着するよ
うになっている。
That is, in the above-mentioned conventional overhanging construction method, in order to prevent the tip portion 108b of the forestay 108 from interfering with the wagon 110 for overhanging, a few blocks behind the small edge 102Aa of the overhanging portion 102A. It is adapted to be fixed to the overhanging installation portion 102A at a distant position.

【0007】この場合、張出し架設部102Aの先端部
には、ワーゲン110の重量と新たなアーチリブ構成ブ
ロックの施工による打設コンクリートの重量とにより、
負の曲げモーメントが作用する。したがって、コンクリ
ート型枠の脱型後においても張出し架設部102Aの先
端部を適正に支えるためには、該先端部上縁の引張りを
キャンセルする正の曲げあるいは軸圧縮力を与える必要
がある。
In this case, due to the weight of the wagon 110 and the weight of the concrete cast by the construction of the new arch rib construction block,
A negative bending moment acts. Therefore, in order to properly support the tip of the overhanging and erected portion 102A even after the concrete form is removed from the mold, it is necessary to apply a positive bending or axial compressive force that cancels the tension of the upper edge of the tip.

【0008】そこで従来の張出し架設工法においては、
この張出し架設部102Aにおける先端部上縁の引張り
をキャンセルするため、アーチリブ102の上床版内に
PC鋼棒を配置することにより軸圧縮力を与えるように
している。
Therefore, in the conventional overhanging construction method,
In order to cancel the pulling of the upper edge of the tip portion of the overhanging portion 102A, a PC steel rod is arranged in the upper floor slab of the arch rib 102 so as to give an axial compressive force.

【0009】しかしながら、このようにPC鋼棒を配置
した場合には、各アーチリブ構成ブロック毎にPC鋼棒
の接合作業が必要となるため作業性が非常に悪い、とい
う問題がある。また、このようにして配置されたPC鋼
棒は後で撤去することが困難であり、その軸圧縮力を解
放することも困難であるが、アーチリブ102の架設後
にPC鋼棒の軸圧縮力が解放されなければ構造上不利な
プレ2次断面力が残留してしまう、という問題もある。
したがって、アーチリブ102の上床版内に配置するP
C鋼棒の量をできるだけ削減することが望まれる。
However, when the PC steel rods are arranged in this way, there is a problem that the workability is extremely poor because the work of joining the PC steel rods is required for each arch rib forming block. Further, it is difficult to remove the PC steel rod arranged in this way later, and it is also difficult to release the axial compression force, but the axial compression force of the PC steel rod after the arch rib 102 is installed. There is also a problem that the pre-secondary sectional force, which is structurally disadvantageous, remains if it is not released.
Therefore, the P placed in the upper floor slab of the arch rib 102
It is desirable to reduce the amount of C steel rods as much as possible.

【0010】本願発明は、このような事情に鑑みてなさ
れたものであって、コンクリート製アーチ橋におけるア
ーチリブを張出し架設する際、アーチリブの上床版内に
配置するPC鋼棒の量を大幅に削減することができるア
ーチリブの架設方法を提供することを目的とするもので
ある。
The present invention has been made in view of the above circumstances, and when the arch rib of a concrete arch bridge is extended and erected, the amount of PC steel rods arranged in the upper floor slab of the arch rib is significantly reduced. It is an object of the present invention to provide an arch rib erection method that can be performed.

【0011】[0011]

【課題を解決するための手段】本願発明は、フォアステ
ーの先端部の張出し架設部への定着位置に工夫を施すこ
とにより、上記目的達成を図るようにしたものである。
According to the present invention, the above object is achieved by devising a fixing position of a tip portion of a forestay to an overhanging installation portion.

【0012】すなわち、本願発明に係るアーチリブの架
設方法は、コンクリート製アーチ橋におけるアーチリブ
の少なくとも一部を、該アーチリブの端部からの張出し
架設により複数のアーチリブ構成ブロックを継ぎ足して
張出し架設部として構築する、アーチリブの架設方法に
おいて、上記張出し架設部を斜吊りする複数のフォアス
テーの基端部を上記アーチリブの端部近傍に構築された
フォアステー支持構体に定着するとともに、上記複数の
フォアステーの先端部を上記各アーチリブ構成ブロック
の小口に定着するようにして上記張出し架設を行う、こ
とを特徴とするものである。
That is, in the arch rib erection method according to the present invention, at least a part of the arch rib in the concrete arch bridge is constructed as a bulging erection portion by extending a plurality of arch rib constituent blocks by erection from the end of the arch rib. In the method of arranging the arch ribs, the base end portions of the plurality of forestays that obliquely suspend the overhanging portion are fixed to the forestay support structure constructed near the end portions of the arch ribs, and the plurality of forestays are installed. It is characterized in that the above-mentioned overhanging construction is carried out so that the tip portion is fixed to the small edge of each of the arch rib constituting blocks.

【0013】上記「アーチリブ」は、その全体が該アー
チリブの端部からの張出し架設により構築されるもので
あってもよいし、その一部のみが該アーチリブの端部か
らの張出し架設により構築されるものであってもよい。
The above-mentioned "arch rib" may be constructed entirely by projecting from the end of the arch rib, or only a part thereof is constructed by projecting from the end of the arch rib. It may be one.

【0014】上記「複数のフォアステー」とは、張出し
架設の工程全体で複数のフォアステーを用いることを意
味するものであって、張出し架設の際、複数のフォアス
テーを常に同時に各翼壁に定着しておくことは必ずしも
必要でなく、張出し架設の段階に応じて適宜定着本数を
変更することが可能であり、一時的に1本のフォアステ
ーのみを定着するようにしてもよい。
The above "plurality of forest stays" means that a plurality of forest stays are used in the entire process of overhanging, and at the time of overhanging, a plurality of forestays are always attached to each wing wall at the same time. It is not always necessary to fix, and the number of fixings can be appropriately changed according to the stage of the overhanging construction, and only one forestay may be fixed temporarily.

【0015】[0015]

【発明の作用効果】上記構成に示すように、本願発明に
係るアーチリブの架設方法は、コンクリート製アーチ橋
におけるアーチリブの少なくとも一部を、該アーチリブ
の端部からの張出し架設により複数のアーチリブ構成ブ
ロックを継ぎ足して張出し架設部として構築するに当た
り、張出し架設部を斜吊りする複数のフォアステーの基
端部をアーチリブの端部近傍に構築されたフォアステー
支持構体に定着するとともに、複数のフォアステーの先
端部を各アーチリブ構成ブロックの小口に定着するよう
にして張出し架設を行うようになっているので、張出し
架設の進捗につれて累積するアーチリブの端部に作用す
る負の曲げモーメントを低減することができるだけでな
く、次のような作用効果を得ることができる。
As described above, according to the method of constructing the arch ribs of the present invention, at least a part of the arch ribs in the concrete arch bridge is projected from the ends of the arch ribs to construct a plurality of arch rib construction blocks. When constructing as a projecting erection part by adding the above, the base ends of a plurality of forestays that obliquely suspend the projecting erection part are fixed to a forestay support structure constructed near the end of the arch rib, and Since the projecting erection is performed so that the tip end is fixed to the small edge of each arch rib building block, it is possible to reduce the negative bending moment acting on the end of the arch rib accumulated as the projecting erection progresses. Instead, the following operational effects can be obtained.

【0016】すなわち、張出し架設の際、張出し架設部
の先端部にはワーゲンの重量と新たなアーチリブ構成ブ
ロックの施工による打設コンクリートの重量とにより負
の曲げモーメントが作用するが、各フォアステーの先端
部を各アーチリブ構成ブロックの小口に定着することに
より張出し架設部の先端部に正の曲げを確保することが
できるので、コンクリート型枠の脱型後においても張出
し架設部の先端部を適正に支えることができる。そして
これにより、従来アーチリブの上床版内に配置していた
PC鋼棒の量を大幅に削減することが可能となる。
That is, at the time of overhanging, a negative bending moment acts on the tip of the overhanging portion due to the weight of the wagon and the weight of the placed concrete by construction of a new arch rib construction block. By fixing the tip to the edge of each arch rib block, a positive bend can be secured at the tip of the overhanging erection part, so the tip of the overhanging erection part can be properly maintained even after the concrete form is removed from the mold. Can support. As a result, it is possible to significantly reduce the amount of PC steel rods that were conventionally arranged in the upper floor slab of the arch rib.

【0017】このように本願発明によれば、コンクリー
ト製アーチ橋におけるアーチリブを張出し架設する際、
アーチリブの上床版内に配置するPC鋼棒の量を大幅に
削減することができる。
As described above, according to the present invention, when the arch rib of the concrete arch bridge is extended and installed,
The amount of PC steel rods arranged in the upper floor slab of the arch rib can be significantly reduced.

【0018】そして、このPC鋼棒の量の大幅削減によ
り、不要な残留2次力を低減させて断面力状態を改善す
ることができるので、張出し架設部における鉄筋の使用
量も削減することができる。
By greatly reducing the amount of this PC steel rod, unnecessary residual secondary force can be reduced and the sectional force state can be improved, so that the amount of rebar used in the overhanging and erection portion can also be reduced. it can.

【0019】上記構成において、各フォアステーを配置
する際の角度は特に限定されるものではないが、アーチ
軸の接線方向に近い角度で配置することが、ワーゲンと
の干渉を未然に防止する観点から好ましい。
In the above structure, the angle when arranging the forestays is not particularly limited, but when arranged at an angle close to the tangential direction of the arch axis, it is possible to prevent interference with the wagon in advance. Is preferred.

【0020】また上記構成において、各フォアステーの
フォアステー支持構体への定着位置は同一位置に設定し
てもよいが、これらを互いに上下方向にずれた位置に設
定すれば、フォアステーの定着作業を容易に行うことが
でき、また、各フォアステーをアーチ軸の接線方向に近
い角度で配置することが容易に可能となる。
Further, in the above structure, the fixing positions of the forestays to the forestay support structure may be set to the same position, but if they are set to positions vertically displaced from each other, the fixing work of the forestays is performed. And the forestays can be easily arranged at an angle close to the tangential direction of the arch axis.

【0021】さらに上記構成において、フォアステー支
持構体をエンドポストおよび該エンドポストから背面側
に延びる1対の翼壁で構成し、これら各翼壁の背面部に
各フォアステーの基端部を定着するようにすれば、張出
し架設時の転倒モーメントに対して効果的に抵抗させる
ことができる。しかも、このようにした場合、エンドポ
ストと1対の翼壁とを同時にコの字形に立ち上げること
ができるので、張出し架設中の横方向の剛性(安定性)
を高めることができる。
Further, in the above structure, the forestay support structure is composed of the end posts and a pair of wing walls extending from the end posts to the back side, and the base end of each forestay is fixed to the back side of each wing wall. By doing so, it is possible to effectively resist the overturning moment during the overhanging and erection. Moreover, in this case, since the end post and the pair of blade walls can be simultaneously raised in a U-shape, the lateral rigidity (stability) during overhanging and erection
Can be increased.

【0022】[0022]

【発明の実施の形態】以下、図面を用いて、本願発明の
実施の形態について説明する。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings.

【0023】図1は、本願発明の一実施形態に係るアー
チリブの架設方法の対象となるコンクリート製アーチ橋
10を、アーチリブ架設完了直後の状態で示す側面図で
ある。
FIG. 1 is a side view showing a concrete arch bridge 10 which is a target of an arch rib erection method according to an embodiment of the present invention, in a state immediately after the completion of erection of the arch ribs.

【0024】図示のように、このアーチ橋10は、アー
チ支間長100m程度の上路式のアーチ橋であって、ア
ーチ橋架設位置における橋軸方向両側の地盤2に施工さ
れた1対のアーチアバット12の間にアーチリブ14を
架設し、このアーチリブ14およびその橋軸方向両側に
構築された1対のエンドポスト16の上方側に上床版2
0を施工することにより、その架設が行われるようにな
っている。そして、このアーチ橋10においては、各エ
ンドポスト16の橋軸直交方向両側に該エンドポスト1
6から背面側(反アーチリブ側)に延びる1対の翼壁
(ウィング)18が各々構築されており、これら各対の
翼壁18により上床版20の両側縁部を支持するように
なっている。
As shown in the figure, the arch bridge 10 is an uphill type arch bridge with an arch span length of about 100 m, and a pair of arch abutments constructed on the ground 2 on both sides in the bridge axial direction at the arch bridge erection position. An arch rib 14 is installed between the upper and the lower ribs 12, and the upper slab 2 is provided above the arch rib 14 and a pair of end posts 16 constructed on both sides in the bridge axial direction.
By constructing 0, the erection is performed. In the arch bridge 10, the end posts 1 are provided on both sides of each end post 16 in the direction orthogonal to the bridge axis.
A pair of wing walls (wings) 18 extending from 6 to the back side (anti-arch rib side) are respectively constructed, and the wing walls 18 of each pair support both side edges of the upper floor slab 20. .

【0025】アーチリブ14は、両アーチアバット12
からの張出し架設により構築される1対の張出し架設部
14A、14Bを径間中央部で閉合することにより架設
されるようになっている。
The arch ribs 14 are both arch abutments 12.
The pair of overhanging portions 14A and 14B constructed by overhanging from the above are closed at the center portion of the span to be erected.

【0026】図2〜9は、アーチリブ14の張出し架設
工程を示す図である。なお、この張出し架設は、アーチ
リブ14の橋軸方向両側において同時進行で同様にして
行われるので、これらの図においては、片側の張出し架
設部14Aを張出し架設する工程について説明する。
2 to 9 are views showing the projecting and constructing process of the arch rib 14. Since this overhanging construction is similarly performed simultaneously on both sides in the bridge axis direction of the arch rib 14, the step of overhanging the overhanging portion 14A on one side will be described in these drawings.

【0027】まず、図2に示すように、アーチリブ14
の端部に位置する地盤2にアーチアバット12の施工を
行い、このアーチアバット12の上端部にエンドポスト
16(フォアステー支持構体)を構築する。その際、こ
のエンドポスト16と共に1対の翼壁18(フォアステ
ー支持構体)も同時に構築する。
First, as shown in FIG. 2, the arch rib 14
The arch abutment 12 is applied to the ground 2 located at the end of the arch abutment 12, and the end post 16 (forestee support structure) is constructed at the upper end of the arch abutment 12. At this time, a pair of wing walls 18 (forestay support structure) is also constructed at the same time as the end posts 16.

【0028】そして、エンドポスト16の背面側の地盤
2に複数のグラウンドアンカー22の基端部22aを定
着するとともに、これらグラウンドアンカー22の先端
部22bを翼壁18の上面部18aに定着する。その
際、これら複数のグラウンドアンカー22は、その先端
部22bから基端部22aへ向けて放射状に広がるよう
に配置するとともに、これら各グラウンドアンカー22
の翼壁18への定着位置を互いに前後方向にずれた位置
に設定する。
Then, the base end portions 22a of the plurality of ground anchors 22 are fixed to the ground 2 on the back side of the end post 16, and the tip end portions 22b of the ground anchors 22 are fixed to the upper surface portion 18a of the wing wall 18. At that time, the plurality of ground anchors 22 are arranged so as to radially spread from the distal end portion 22b to the proximal end portion 22a, and each of the ground anchors 22 is arranged.
The fixing positions of the blades on the blade wall 18 are set at positions displaced from each other in the front-rear direction.

【0029】さらに、アーチアバット12の前面側(ア
ーチリブ側)にスプリンキング支保工30を構築し、ア
ーチリブ14のスプリンキング部を構成するアーチリブ
構成ブロックA1の施工を行う。この施工は、型枠設
置、鉄筋PCの組立ておよびコンクリートの打設養生の
工程によって行う。
Further, a springing support structure 30 is constructed on the front side (arch rib side) of the arch abutment 12, and an arch rib constituting block A1 constituting a springing portion of the arch rib 14 is constructed. This construction is performed by the steps of installing a formwork, assembling a reinforcing bar PC, and curing concrete by placing it.

【0030】次に、図3に示すように、斜吊り用のフォ
アステー24の先端部24bをアーチリブ構成ブロック
A1の小口(先端面)A1aに定着するとともに、フォ
アステー24の基端部24aを翼壁18の背面部18b
に定着する。その際、フォアステー24の翼壁18への
定着位置は、その背面部18bの下部位置に設定する。
この定着を行った後、フォアステー24を緊張すること
により、アーチリブ構成ブロックA1を斜吊り状態に維
持して転倒モーメントに抵抗できるようにする。なお、
フォアステー24の緊張は、その基端部24aおよび先
端部24bのいずれの側で行うようにしてもよい(以下
においても同様である)。その後、ワーゲン40を組み
立てて、これをアーチリブ構成ブロックA1上に設置す
る。
Next, as shown in FIG. 3, the tip end 24b of the forestay 24 for oblique suspension is fixed to the fore edge (tip surface) A1a of the arch rib forming block A1, and the base end 24a of the forestay 24 is fixed. Rear part 18b of the wing wall 18
Settles in. At this time, the fixing position of the forestay 24 on the wing wall 18 is set to the lower position of the back surface portion 18b.
After this fixing is performed, the forestay 24 is tensioned so that the arch rib-constituting block A1 is maintained in an obliquely suspended state so that it can resist the falling moment. In addition,
The tension of the forestay 24 may be performed on either side of the proximal end portion 24a and the distal end portion 24b (the same applies below). Then, the wagon 40 is assembled and installed on the arch rib building block A1.

【0031】次に、図4に示すように、このワーゲン4
0を用いてアーチリブ構成ブロックA1に隣接するアー
チリブ構成ブロックA2を、アーチ軸Axに沿って片持
ち状に張り出すように施工する。この施工は、型枠設
置、鉄筋PCの組立ておよびコンクリートの打設養生の
工程によって行う。
Next, as shown in FIG.
By using 0, the arch rib constituting block A2 adjacent to the arch rib constituting block A1 is constructed so as to project in a cantilever manner along the arch axis Ax. This construction is performed by the steps of installing a formwork, assembling a reinforcing bar PC, and curing concrete by placing it.

【0032】そして、この新たに施工されたアーチリブ
構成ブロックA2の小口A2aにフォアステー24の先
端部24bを定着するとともにその基端部24aを翼壁
18の背面部18bに定着する。その際、フォアステー
24の翼壁18への定着位置は、アーチリブ構成ブロッ
クA1の斜吊りに用いたフォアステー24よりも多少上
方にずれた位置に設定する。この定着を行った後、フォ
アステー24を緊張することにより、アーチリブ構成ブ
ロックA1、A2(張出し架設部14A)を斜吊り状態
に維持して転倒モーメントに抵抗できるようにする。
Then, the tip end portion 24b of the forestay 24 is fixed to the edge A2a of the newly constructed arch rib forming block A2, and the base end portion 24a thereof is fixed to the back surface portion 18b of the wing wall 18. At this time, the fixing position of the forestay 24 on the wing wall 18 is set to a position slightly above the forestay 24 used for obliquely suspending the arch rib forming block A1. After this fixing is performed, the forestay 24 is tensioned so that the arch rib forming blocks A1 and A2 (overhanging erection portion 14A) are maintained in an obliquely suspended state so as to be able to resist the falling moment.

【0033】その後、図5に示すように、ワーゲン40
をアーチ軸Axに沿ってアーチリブ構成ブロックA2上
まで前進させ、次のアーチリブ構成ブロックA3の施工
に備える。
Then, as shown in FIG.
Is advanced along the arch axis Ax onto the arch rib building block A2 to prepare for the next arch rib building block A3.

【0034】以下同様にして、このアーチリブ構成ブロ
ックA2に隣接する各アーチリブ構成ブロックA3、A
4、A5、・・・を順次施工するとともに、これらをフ
ォアステー24の配置・緊張により順次斜吊りすること
により、張出し架設部14Aを伸長施工していく。
Similarly, each arch rib forming block A3, A adjacent to the arch rib forming block A2 is similarly processed.
.. are sequentially installed, and these are sequentially slanted by the arrangement and tension of the forestay 24, so that the overhanging installation portion 14A is extended.

【0035】図6は、張出し架設部14Aの伸長施工が
アーチリブ構成ブロックA6まで完了し、次のアーチリ
ブ構成ブロックA7を施工する直前の様子を示す図であ
り、図7は、張出し架設部14Aの伸長施工がさらにア
ーチリブ構成ブロックA10まで完了し、次のアーチリ
ブ構成ブロックA11を施工する直前の様子を示す図で
ある。また、図8は、アーチクラウンの1つ手前のアー
チリブ構成ブロックA13を施工している様子を示す図
である。
FIG. 6 is a view showing a state where the extension construction of the overhanging construction portion 14A is completed up to the arch rib forming block A6 and immediately before the next arch rib forming block A7 is constructed. FIG. It is a figure which shows a state just before the extension construction is further completed up to the arch rib constituting block A10 and the next arch rib constituting block A11 is constructed. Further, FIG. 8 is a diagram showing a state in which the arch rib forming block A13, which is one before the arch crown, is being constructed.

【0036】これらの図に示すように、各アーチリブ構
成ブロックA3、A4、A5、・・・に対するフォアス
テー24の定着は、該アーチリブ構成ブロックA3、A
4、A5、・・・の小口A3a、A4a、A5a、・・
・に対して行い、また、これら各フォアステー24の翼
壁18への定着位置は、互いに略等間隔をおいて順次上
方側へずれた位置に設定する。そして、すでに配置が完
了したフォアステー24のうち、アーチアバット12寄
りの位置に配置されているフォアステー24について
は、転倒モーメントの抵抗にあまり寄与しないので、張
出し架設部14Aの伸長施工の進捗に伴って順次取り外
していく。
As shown in these figures, the fixation of the forestay 24 to each arch rib constituting block A3, A4, A5, ...
4, A5, ... fore edge A3a, A4a, A5a, ...
The fixing positions of the forestays 24 on the wing wall 18 are set at positions which are sequentially shifted upward with substantially equal intervals. Then, among the forestays 24 that have already been arranged, the forestays 24 arranged near the arch butt 12 do not contribute much to the resistance of the overturning moment, and therefore the progress of the extension construction of the overhanging erection portion 14A can be improved. Along with that, they will be removed in sequence.

【0037】図8に示すように、張出し架設部14Aの
伸長施工がアーチクラウンの1つ手前のアーチリブ構成
ブロックA13まで進捗した時点では、橋軸方向反対側
から張出し架設部14Aと同時進行で張出し架設されて
きた張出し架設部14Bもアーチリブ構成ブロックB1
3まで伸長施工が進捗した状態となっている。
As shown in FIG. 8, when the extension construction of the overhanging erection portion 14A progresses to the arch rib forming block A13 immediately before the arch crown, the ridge overhanging from the opposite side in the axial direction of the bridge simultaneously extends. The overhanging erected portion 14B that has been erected is also an arch rib block B1.
Extension work is in progress up to 3.

【0038】そして、図9に示すように、アーチクラウ
ンに位置する最後のアーチリブ構成ブロックA14(B
14)の施工により、橋軸方向両側の1対の張出し架設
部14A、14Bを閉合してアーチリブ14の架設を完
了させた後、ワーゲン40を撤去し、さらにフォアステ
ー24も撤去する。
Then, as shown in FIG. 9, the last arch rib forming block A14 (B) located in the arch crown is formed.
By the construction of 14), after the pair of overhanging erected portions 14A and 14B on both sides in the bridge axial direction are closed to complete the erection of the arch rib 14, the wagon 40 is removed and the forestay 24 is also removed.

【0039】以上詳述したように、本実施形態に係るア
ーチリブの架設方法は、コンクリート製アーチ橋10に
おけるアーチリブ14を、該アーチリブ14の端部から
の張出し架設により複数のアーチリブ構成ブロックA
1、A2、A3、・・・を継ぎ足して張出し架設部14
A(または14B)として構築するに当たり、張出し架
設部14Aを斜吊りする複数のフォアステー24の基端
部24aをアーチリブ14の端部近傍に構築された1対
の翼壁18の各々に定着するとともに、複数のフォアス
テー24の先端部24bを各アーチリブ構成ブロックA
1、A2、A3、・・・の小口A1a、A2a、A3
a、・・・に定着するようにして張出し架設を行うよう
になっているので、張出し架設の進捗につれて累積する
アーチリブ14Aの端部に作用する負の曲げモーメント
を低減することができるだけでなく、次のような作用効
果を得ることができる。
As described above in detail, in the method of constructing the arch ribs according to this embodiment, the arch ribs 14 in the concrete arch bridge 10 are erected from the end portions of the arch ribs 14 to construct a plurality of arch rib constituting blocks A.
1, A2, A3, ...
In constructing as A (or 14B), the base end portions 24a of the plurality of forestays 24 that obliquely suspend the overhanging installation portion 14A are fixed to each of the pair of wing walls 18 constructed near the end portions of the arch ribs 14. At the same time, the tip portions 24b of the plurality of forestays 24 are connected to the arch rib forming block A.
Fore edge A1a, A2a, A3 of 1, A2, A3, ...
Since the overhanging construction is performed so as to be fixed to a, ..., Not only can the negative bending moment acting on the end portion of the arch rib 14A accumulated as the overhanging construction progresses, be reduced. The following operational effects can be obtained.

【0040】すなわち、張出し架設の際、張出し架設部
14Aの先端部にはワーゲン40の重量と新たなアーチ
リブ構成ブロックの施工による打設コンクリートの重量
とにより負の曲げモーメントが作用するが、各フォアス
テー24の先端部24bを各アーチリブ構成ブロックA
1、A2、A3、・・・の小口A1a、A2a、A3
a、・・・に定着することにより張出し架設部14Aの
先端部に正の曲げを確保することができるので、コンク
リート型枠の脱型後においても張出し架設部14Aの先
端部を適正に支えることができる。そしてこれにより、
従来アーチリブの上床版内に配置していたPC鋼棒の量
を大幅に削減することが可能となる。
That is, at the time of overhanging, a negative bending moment acts on the tip of the overhanging portion 14A due to the weight of the wagon 40 and the weight of the concrete poured by the construction of the new arch rib construction block. The front end portion 24b of the stay 24 is connected to each arch rib forming block A.
Fore edge A1a, A2a, A3 of 1, A2, A3, ...
Since it is possible to secure a positive bend in the tip of the overhanging erection portion 14A by fixing to a, ..., properly support the tip of the overhanging erection portion 14A even after the concrete form is removed from the mold. You can And this
It is possible to significantly reduce the amount of PC steel rods that were conventionally arranged in the upper floor slab of arch ribs.

【0041】このように本実施形態によれば、コンクリ
ート製アーチ橋10におけるアーチリブ14を張出し架
設する際、アーチリブ14Aの上床版内に配置するPC
鋼棒の量を大幅に削減することができる。
As described above, according to the present embodiment, when the arch rib 14 of the concrete arch bridge 10 is erected and installed, the PC placed in the upper floor slab of the arch rib 14A.
The amount of steel rod can be significantly reduced.

【0042】そして、このPC鋼棒の量の大幅削減によ
り、不要な残留2次力を低減させて断面力状態を改善す
ることができるので、張出し架設部14Aにおける鉄筋
の使用量も削減することができる。
By significantly reducing the amount of this PC steel rod, unnecessary residual secondary force can be reduced and the cross-sectional force state can be improved. Therefore, the amount of rebar used in the overhanging erection portion 14A should also be reduced. You can

【0043】しかも本実施形態においては、各フォアス
テー24をアーチ軸Axの接線方向と近い角度で配置す
るようになっているので、これら各フォアステー24を
ワーゲン40と干渉させることなく、その先端部24b
を各アーチリブ構成ブロックA1、A2、A3、・・・
の小口A1a、A2a、A3a、・・・に定着すること
ができる。
Further, in the present embodiment, since each forestay 24 is arranged at an angle close to the tangential direction of the arch axis Ax, the tip of each forestay 24 does not interfere with the wagon 40. Section 24b
The arch rib building blocks A1, A2, A3, ...
Can be fixed to the front edge A1a, A2a, A3a ,.

【0044】また本実施形態においては、各フォアステ
ー24の翼壁18への定着位置が互いに上下方向にずれ
た位置に設定されているので、フォアステー24の定着
作業を容易に行うことができ、また、各フォアステー2
4をアーチ軸Axの接線方向に近い角度で配置すること
が容易に可能となる。
Further, in this embodiment, the fixing positions of the forestays 24 on the wing wall 18 are set at positions vertically displaced from each other, so that the fixing work of the forestays 24 can be easily performed. , Each forestay 2
4 can be easily arranged at an angle close to the tangential direction of the arch axis Ax.

【0045】さら本実施形態においては、エンドポスト
16および該エンドポスト16から背面側に延びる1対
の翼壁18でフォアステー支持構体を構成し、各翼壁1
8の背面部に各フォアステー24の基端部24aを定着
するようになっているので、張出し架設時の転倒モーメ
ントに対して効果的に抵抗させることができる。しか
も、エンドポスト16と1対の翼壁18とを同時にコの
字形に立ち上げることができるので、張出し架設中の横
方向の剛性(安定性)を高めることができる。
Further, in the present embodiment, the forestay support structure is constituted by the end posts 16 and the pair of wing walls 18 extending from the end posts 16 to the back side, and each wing wall 1 is formed.
Since the base end portion 24a of each forestay 24 is fixed to the rear surface portion of the belt 8, it is possible to effectively resist the overturning moment during the overhanging and erection. Moreover, since the end posts 16 and the pair of blade walls 18 can be simultaneously raised in a U-shape, the lateral rigidity (stability) during the overhanging and erection can be increased.

【0046】なお、このようにする代わりに、各フォア
ステー24の基端部24aをエンドポスト16に定着す
ること、あるいはエンドポスト16の上に設置されたピ
ロンに定着することも可能である。
Alternatively, instead of this, the base end portion 24a of each forestay 24 can be fixed to the end post 16 or fixed to the pyrone installed on the end post 16.

【0047】ところで上記実施形態においては、すでに
配置が完了したフォアステー24のうち、アーチアバッ
ト12寄りの位置に配置されているフォアステー24に
ついては、張出し架設部14Aの伸長施工の進捗に伴っ
て順次取り外していくようになっているが、これらフォ
アステー24をアーチリブ14の架設完了まで取り外さ
ないようにしてもよい。
In the above embodiment, of the forestays 24 that have already been arranged, the forestays 24 that are arranged near the arch bat 12 are accompanied by the extension of the overhanging portion 14A. Although the forestays are sequentially removed, these forestays 24 may not be removed until the installation of the arch ribs 14 is completed.

【0048】また実施形態においては、張出し架設部1
4A、14Bを構成する各アーチリブ構成ブロックを場
所打ち工法により施工するものとして説明したが、予め
工場等で製作されたアーチリブ構成ブロックを組み付け
るプレキャストセグメント工法により施工する場合にお
いても、上記実施形態と同様の架設方法を採用すること
により、上記実施形態と同様の作用効果を得ることがで
きる。
Further, in the embodiment, the overhanging erection portion 1
Although it has been described that each of the arch rib constituting blocks constituting 4A and 14B is constructed by the cast-in-place construction method, the case of constructing by the precast segment method of assembling the arch rib constituting blocks manufactured in advance in a factory or the like is similar to the above embodiment. By adopting the erection method described above, it is possible to obtain the same effects as the above-described embodiment.

【0049】さらに上記実施形態においては、橋梁架設
位置の橋軸方向両側からの張出し架設によりアーチリブ
14をその全長にわたって架設する場合について説明し
たが、橋梁架設位置の橋軸方向両側からの張出し架設に
より所定長の張出し架設部を構築した後、アーチリブ1
4の中央部分をメラン材で閉合することによりアーチリ
ブ14を架設するようにした場合においても、その張出
し架設の際に上記実施形態の架設方法を採用することが
可能である。そしてこのようにした場合においても、上
記実施形態と同様の作用効果を得ることができる。
Further, in the above embodiment, the case where the arch ribs 14 are erected over the entire length of the bridge erection position from both sides in the bridge axial direction has been described. After constructing the overhanging part of a predetermined length, arch rib 1
Even when the arch rib 14 is erected by closing the central portion of 4 with the melanin material, the erection method of the above-described embodiment can be adopted when the erection is performed. Even in this case, it is possible to obtain the same effects as those of the above embodiment.

【0050】また上記実施形態においては、アーチリブ
14の架設方法の対象となるコンクリート製アーチ橋1
0が上路式のアーチ橋である場合について説明したが、
中路式のアーチ橋や下路式のアーチ橋である場合におい
ても、上記実施形態と同様の架設方法を採用することに
より、上記実施形態と同様の作用効果を得ることができ
る。
In the above embodiment, the concrete arch bridge 1 to which the method of constructing the arch rib 14 is applied.
I explained the case where 0 is an upper arch bridge,
Even in the case of a middle road type arch bridge or a lower road type arch bridge, by adopting the same erection method as that of the above-described embodiment, it is possible to obtain the same operational effect as that of the above-described embodiment.

【図面の簡単な説明】[Brief description of drawings]

【図1】本願発明の一実施形態に係るアーチリブの架設
方法の対象となるコンクリート製アーチ橋を、アーチリ
ブ架設完了直後の状態で示す側面図
FIG. 1 is a side view showing a concrete arch bridge, which is a target of an arch rib erection method according to an embodiment of the present invention, in a state immediately after completion of arch rib erection.

【図2】上記実施形態におけるアーチリブの張出し架設
工程を示す要部側面図(その1)
FIG. 2 is a side view of a main part (part 1) showing an arch rib overhanging process in the embodiment.

【図3】上記アーチリブの張出し架設工程を示す要部側
面図(その2)
FIG. 3 is a side view of a main part (part 2) showing the projecting and constructing process of the arch rib.

【図4】上記アーチリブの張出し架設工程を示す要部側
面図(その3)
FIG. 4 is a side view of a main part (part 3) showing the projecting and constructing process of the arch rib.

【図5】上記アーチリブの張出し架設工程を示す要部側
面図(その4)
FIG. 5 is a side view of an essential part showing the projecting and constructing process of the arch rib (Part 4).

【図6】上記アーチリブの張出し架設工程を示す要部側
面図(その5)
FIG. 6 is a side view of a main part (part 5) showing the projecting and constructing process of the arch rib.

【図7】上記アーチリブの張出し架設工程を示す要部側
面図(その6)
FIG. 7 is a side view of a main part (part 6) showing the projecting and constructing process of the arch rib.

【図8】上記アーチリブの張出し架設工程を示す要部側
面図(その7)
FIG. 8 is a side view of a main part (part 7) showing the projecting and constructing process of the arch rib.

【図9】上記アーチリブの張出し架設工程が完了した直
後の様子を示す要部側面図
FIG. 9 is a side view of an essential part showing a state immediately after the step of projecting and extending the arch rib is completed.

【図10】従来例を示す、図6と同様の図FIG. 10 is a view similar to FIG. 6 showing a conventional example.

【符号の説明】[Explanation of symbols]

2 地盤 10 コンクリート製アーチ橋 12 アーチアバット 14 アーチリブ 14A、14B 張出し架設部 16 エンドポスト(フォアステー支持構体) 18 翼壁(フォアステー支持構体) 18a 上面部 18b 背面部 20 上床版 22 グラウンドアンカー 22a 基端部 22b 先端部 24 フォアステー 24a 基端部 24b 先端部 30 スプリンキング支保工 40 ワーゲン A1〜A13、A14(B14)、B11〜B13 ア
ーチリブ構成ブロック A1a〜A6a、A10a、A13a、B13a 小口 Ax アーチ軸
2 Ground 10 Concrete arch bridge 12 Archabut 14 Arch ribs 14A, 14B Overhanging installation section 16 End post (Forestay support structure) 18 Wing wall (Forestay support structure) 18a Upper surface section 18b Rear surface section 20 Upper floor plate 22 Ground anchor 22a Base End portion 22b Tip portion 24 Forestay 24a Base end portion 24b Tip portion 30 Springing support 40 Wagens A1 to A13, A14 (B14), B11 to B13 Arch rib configuration blocks A1a to A6a, A10a, A13a, B13a Small edge Ax arch shaft

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中村 收志 東京都新宿区荒木町13番地の4 住友建設 株式会社内 (72)発明者 齋藤 謙一 東京都新宿区荒木町13番地の4 住友建設 株式会社内 (72)発明者 寺島 一彦 東京都新宿区荒木町13番地の4 住友建設 株式会社内 (72)発明者 片 健一 東京都新宿区荒木町13番地の4 住友建設 株式会社内 (72)発明者 福島 重美 東京都新宿区荒木町13番地の4 住友建設 株式会社内 Fターム(参考) 2D059 BB31 BB39 CC04 CC09 DD03   ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Nakamura Reiji             4 Sumitomo Construction, 13 Araki-cho, Shinjuku-ku, Tokyo             Within the corporation (72) Inventor Kenichi Saito             4 Sumitomo Construction, 13 Araki-cho, Shinjuku-ku, Tokyo             Within the corporation (72) Inventor Kazuhiko Terashima             4 Sumitomo Construction, 13 Araki-cho, Shinjuku-ku, Tokyo             Within the corporation (72) Inventor Kenichi Kata             4 Sumitomo Construction, 13 Araki-cho, Shinjuku-ku, Tokyo             Within the corporation (72) Inventor Shigemi Fukushima             4 Sumitomo Construction, 13 Araki-cho, Shinjuku-ku, Tokyo             Within the corporation F term (reference) 2D059 BB31 BB39 CC04 CC09 DD03

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート製アーチ橋におけるアーチ
リブの少なくとも一部を、該アーチリブの端部からの張
出し架設により複数のアーチリブ構成ブロックを継ぎ足
して張出し架設部として構築する、アーチリブの架設方
法において、 上記張出し架設部を斜吊りする複数のフォアステーの基
端部を上記アーチリブの端部近傍に構築されたフォアス
テー支持構体に定着するとともに、上記複数のフォアス
テーの先端部を上記各アーチリブ構成ブロックの小口に
定着するようにして上記張出し架設を行う、ことを特徴
とするアーチリブの架設方法。
1. A method of constructing an arch rib, wherein at least a part of an arch rib of a concrete arch bridge is constructed as a projecting erection portion by adding a plurality of arch rib constituent blocks by projecting from an end portion of the arch rib to construct the arch rib erection method. The base ends of a plurality of forestays for suspending the erected portion are fixed to a forestay support structure constructed near the ends of the arch ribs, and the tip ends of the plurality of forestays are fixed to the front ends of the arch rib building blocks. The method of erection of arch ribs, wherein the above-mentioned projecting erection is carried out so as to be fixed to the
【請求項2】 上記各フォアステーの上記フォアステー
支持構体への定着位置を、互いに上下方向にずれた位置
に設定する、ことを特徴とする請求項1記載のアーチリ
ブの架設方法。
2. The arch rib installation method according to claim 1, wherein fixing positions of the forestays to the forestay support structure are set at positions vertically displaced from each other.
【請求項3】 上記フォアステー支持構体をエンドポス
トおよび該エンドポストから背面側に延びる1対の翼壁
で構成し、これら各翼壁の背面部に上記各フォアステー
の基端部を定着する、ことを特徴とする請求項1または
2記載のアーチリブの架設方法。
3. The forestay support structure comprises an end post and a pair of wing walls extending from the end post to the back side, and the base end of each forestay is fixed to the back face of each wing wall. The method for constructing an arch rib according to claim 1 or 2, wherein:
JP2001217615A 2001-07-18 2001-07-18 How to install arch ribs Expired - Lifetime JP4430267B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001217615A JP4430267B2 (en) 2001-07-18 2001-07-18 How to install arch ribs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001217615A JP4430267B2 (en) 2001-07-18 2001-07-18 How to install arch ribs

Publications (2)

Publication Number Publication Date
JP2003027429A true JP2003027429A (en) 2003-01-29
JP4430267B2 JP4430267B2 (en) 2010-03-10

Family

ID=19051902

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001217615A Expired - Lifetime JP4430267B2 (en) 2001-07-18 2001-07-18 How to install arch ribs

Country Status (1)

Country Link
JP (1) JP4430267B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080355A (en) * 2010-12-10 2011-06-01 中铁大桥局集团第三工程有限公司 Method for installing arch support of steel tube arch bridge
EA017922B1 (en) * 2011-02-21 2013-04-30 Владимир Владимирович Зазвонов Arched groundcovering bridge (embodiments), ribbed slap span of arched groundcovering bridge and use of the ribbed slab span structure
CN106638267A (en) * 2017-01-19 2017-05-10 中铁十局集团有限公司 Suspending structural system for mounting large-span bowstring arch bridge prefabricated middle cross beam
CN111778869A (en) * 2020-07-27 2020-10-16 中交路桥建设有限公司 Camber space arch rib adjusting device of half-through steel structure arch bridge
CN113897850A (en) * 2021-10-18 2022-01-07 贵州省交通规划勘察设计研究院股份有限公司 Arch foot restraint device for connecting steel pipe arch foot embedded section with hoisting section
CN113897871A (en) * 2021-10-18 2022-01-07 贵州省交通规划勘察设计研究院股份有限公司 Precision adjusting equipment for connecting steel pipe arch springing embedded section and hoisting section
CN114016424A (en) * 2021-11-29 2022-02-08 中交武汉港湾工程设计研究院有限公司 Self-propelled platform and method suitable for construction of small-angle oblique crossing overpass bridge
WO2023184679A1 (en) * 2022-03-30 2023-10-05 中铁上海工程局集团有限公司 Large-span space special-shaped arch rib flying-swallow type basket steel box arch bridge and rapid construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702911B (en) * 2017-01-25 2019-04-26 中铁大桥局集团有限公司 A kind of secondary traversing construction method for hanging of cable-carried arch bridge rib-lifting section

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080355A (en) * 2010-12-10 2011-06-01 中铁大桥局集团第三工程有限公司 Method for installing arch support of steel tube arch bridge
CN102080355B (en) * 2010-12-10 2013-02-06 中铁港航局集团第二工程有限公司 Method for installing arch support of steel tube arch bridge
EA017922B1 (en) * 2011-02-21 2013-04-30 Владимир Владимирович Зазвонов Arched groundcovering bridge (embodiments), ribbed slap span of arched groundcovering bridge and use of the ribbed slab span structure
CN106638267A (en) * 2017-01-19 2017-05-10 中铁十局集团有限公司 Suspending structural system for mounting large-span bowstring arch bridge prefabricated middle cross beam
CN111778869A (en) * 2020-07-27 2020-10-16 中交路桥建设有限公司 Camber space arch rib adjusting device of half-through steel structure arch bridge
CN113897850A (en) * 2021-10-18 2022-01-07 贵州省交通规划勘察设计研究院股份有限公司 Arch foot restraint device for connecting steel pipe arch foot embedded section with hoisting section
CN113897871A (en) * 2021-10-18 2022-01-07 贵州省交通规划勘察设计研究院股份有限公司 Precision adjusting equipment for connecting steel pipe arch springing embedded section and hoisting section
CN113897871B (en) * 2021-10-18 2023-08-25 贵州省交通规划勘察设计研究院股份有限公司 Precision adjusting equipment for connecting pre-buried section of arch foot of steel pipe arch with hoisting section
CN114016424A (en) * 2021-11-29 2022-02-08 中交武汉港湾工程设计研究院有限公司 Self-propelled platform and method suitable for construction of small-angle oblique crossing overpass bridge
CN114016424B (en) * 2021-11-29 2024-02-20 中交武汉港湾工程设计研究院有限公司 Self-propelled platform and method suitable for small-angle oblique crossing bridge construction
WO2023184679A1 (en) * 2022-03-30 2023-10-05 中铁上海工程局集团有限公司 Large-span space special-shaped arch rib flying-swallow type basket steel box arch bridge and rapid construction method

Also Published As

Publication number Publication date
JP4430267B2 (en) 2010-03-10

Similar Documents

Publication Publication Date Title
US20080172976A1 (en) Reusable Adjustable Hanger for Use with Joists and/or Double Wales
JP2003027429A (en) Method for constructing arch rib
JP2012524182A (en) Elevated mobile work vehicle and method
JP5184836B2 (en) Construction method of synthetic steel slab girder bridge
CN107060323B (en) A kind of pulling-on piece structure aluminum alloy mould plate early tears system and construction method open
JP2010037725A (en) Method for constructing column capital section of pc bridge
JP4104910B2 (en) How to build arch ribs for concrete arch bridges
KR102216256B1 (en) Concrete slab of bridge with precast cantilever slab and concrete slab of bridge construction method therefor
JP4402856B2 (en) How to install arch ribs
JP3032464B2 (en) Side span closure support
JPH09125318A (en) Construction device of bridge girder
JPH06185013A (en) Construction method of column head section of pc diagonal tension bridge
JP2005009231A (en) Method of constructing steel structure
JPH01290806A (en) Construction method for bridge
JPH11159143A (en) Setting-up method for beam-section concrete reinforcing net
JPH05179647A (en) Supporting structure for earth retaining wall
JPH046450Y2 (en)
JP2000257264A (en) Cast-in-place construction method for pc structure
JPH0517996A (en) Building constructing method
JPH079961Y2 (en) Z separator
JPH07207619A (en) Main tower of long bridge provided with laterally extended beam and side cable
KR200402132Y1 (en) Upper part bracket for constructing median strip side end of bridge slab
JPH0732708Y2 (en) Precast concrete pillar members
JP2700384B2 (en) Mounting device for temporary handrails
JPH11117226A (en) Form device for forming overhang part at head of bridge pier

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091016

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091027

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091215

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091217

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121225

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4430267

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121225

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151225

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term