JP2003016568A - Meter controller - Google Patents

Meter controller

Info

Publication number
JP2003016568A
JP2003016568A JP2001196960A JP2001196960A JP2003016568A JP 2003016568 A JP2003016568 A JP 2003016568A JP 2001196960 A JP2001196960 A JP 2001196960A JP 2001196960 A JP2001196960 A JP 2001196960A JP 2003016568 A JP2003016568 A JP 2003016568A
Authority
JP
Japan
Prior art keywords
optical
communication
permission
wireless communication
optical communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001196960A
Other languages
Japanese (ja)
Inventor
Hitoshi Hayashi
均 林
Mamoru Suzuki
守 鈴木
Mitsuhiro Nakamura
充博 中村
Hitoaki Ishino
仁朗 石野
Toshitake Hirasawa
利勇 平沢
Ikuo Maeda
郁雄 前田
Kazuo Kon
一生 今
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Tokyo Gas Co Ltd
Original Assignee
Toshiba Corp
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Gas Co Ltd filed Critical Toshiba Corp
Priority to JP2001196960A priority Critical patent/JP2003016568A/en
Publication of JP2003016568A publication Critical patent/JP2003016568A/en
Pending legal-status Critical Current

Links

Classifications

    • Y02B60/50

Landscapes

  • Selective Calling Equipment (AREA)
  • Measuring Volume Flow (AREA)
  • Details Of Flowmeters (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a gas meter capable of reducing a consumption current by reducing optical communication operation started when it is not required. SOLUTION: The gas meter which calculates a gas flow and performs gas blockage and various warnings and is also configured to enable external optical communication equipment to read and write the present gas flow, gas blockage, various warning states and information of operation setting of the meter with optical radio communication, has an optical communication allowable switch 19 for performing a permission command of optical radio communication, an optical communication permission controlling part 18 for allows optical radio communication when a permission command is received from the switch 19 and inhibiting optical radio communication when a prescribed time elapses since the time when the permission command is received, and a communication controlling part 15 for performing optical radio communication only for the allowed time.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、ガス流量の計測、
ガス遮断や各種の警告を行うと共に、現在のガス流量、
ガス遮断や各種の警告状態、当該メータの動作設定など
の情報を光無線通信により外部の光通信装置から読み出
し及び書き込み可能に構成したガスメータに関する。た
だし、本発明の請求範囲については、ガスメータに限定
したものではなく、水道メータ、電力メータ及びカロリ
ーメータ等の計量器全般の技術に係るものである。
TECHNICAL FIELD The present invention relates to measurement of gas flow rate,
Gas cutoff and various warnings are performed, and the current gas flow rate,
The present invention relates to a gas meter configured such that information such as gas cutoff, various warning states, and operation settings of the meter can be read and written from an external optical communication device by optical wireless communication. However, the scope of the claims of the present invention is not limited to the gas meter, but relates to the technology of general measuring instruments such as a water meter, a power meter, and a calorimeter.

【0002】[0002]

【従来の技術】本発明の請求範囲はガスメータに限定し
たものではないが従来技術の説明においてはガスメータ
の場合を例に説明する。従来のこの種のガスメータの構
成図を図4に示す。図4に示すガスメータ1aは、光通
信装置2との間で光無線通信によりガスメータの情報を
読み出し及び書き込み可能に構成され、制御部11、流
量センサや圧力センサなどの外部センサ12、ガス流量
を計測する流量計測部13、異常発生時に遮断する遮断
弁14、通信制御部15a、光通信装置2から情報を受
信する光通信受光回路16、光通信装置2へ情報を送信
する光通信発光回路17を有して構成されている。
2. Description of the Related Art The scope of the present invention is not limited to a gas meter, but in the description of the prior art, the case of a gas meter will be described as an example. FIG. 4 shows a configuration diagram of a conventional gas meter of this type. The gas meter 1a shown in FIG. 4 is configured to be able to read and write information of the gas meter by optical wireless communication with the optical communication device 2, and controls the controller 11, the external sensor 12 such as a flow sensor and a pressure sensor, and the gas flow rate. A flow rate measuring unit 13 for measuring, a shutoff valve 14 for shutting off when an abnormality occurs, a communication control unit 15a, an optical communication light receiving circuit 16 for receiving information from the optical communication device 2, and an optical communication light emitting circuit 17 for transmitting information to the optical communication device 2. Is configured.

【0003】制御部11は、外部センサ12の状態によ
り異常を検出した場合や、流量計測部13により計測さ
れたガス流量からガスの異常使用を検出した場合に、遮
断弁14を閉じてガス燃焼機器へのガスの供給を停止す
る。また、制御部11は、ガス流量、ガス遮断や各種の
警告状態を記録する。
The control unit 11 closes the shut-off valve 14 to detect gas combustion by detecting an abnormality from the state of the external sensor 12 or when detecting abnormal use of gas from the gas flow rate measured by the flow rate measurement unit 13. Stop the gas supply to the equipment. Further, the control unit 11 records the gas flow rate, gas interruption, and various warning states.

【0004】次に、通信制御部15aの処理を図5のフ
ローチャートを参照して説明する。ここで、光通信の動
作は、光通信装置2からの光通信起動信号を検出するこ
とで、開始するようになっている。この光通信起動信号
は、光通信装置2と光通信を行うためにガスメータに起
動をかけるための信号である。
Next, the processing of the communication controller 15a will be described with reference to the flowchart of FIG. Here, the operation of the optical communication is started by detecting the optical communication activation signal from the optical communication device 2. The optical communication activation signal is a signal for activating the gas meter to perform optical communication with the optical communication device 2.

【0005】まず、光通信装置2からの光通信起動信号
を検出するために、光通信受光回路16の状態を所定の
周期で監視し、所定の周期になったかどうかを判定する
(ステップS101)。所定の周期になった場合には、
光通信受光回路16の状態を取得し(ステップS10
3)、光通信装置2からの光通信起動信号を検出する
(ステップS105)。そして、データ受信の準備を行
った後、光通信受信動作を開始し(ステップS10
7)、光通信受光回路16を介して光通信装置2からデ
ータ(命令)を受信する(ステップS109)。
First, in order to detect the optical communication activation signal from the optical communication device 2, the state of the optical communication light receiving circuit 16 is monitored at a predetermined cycle to determine whether or not the predetermined cycle has been reached (step S101). . If the specified cycle is reached,
The state of the optical communication light receiving circuit 16 is acquired (step S10
3), the optical communication activation signal from the optical communication device 2 is detected (step S105). Then, after preparing for data reception, the optical communication reception operation is started (step S10).
7) Receive data (command) from the optical communication device 2 via the optical communication light receiving circuit 16 (step S109).

【0006】次に、通信異常があるかどうかを判定し
(ステップS111)、通信異常がある場合には受信動
作を停止して(ステップS112)、ステップS101
に戻り、通信異常がない場合には、全データを受信した
かどうかを判定する(ステップS113)。
Next, it is judged whether or not there is a communication abnormality (step S111). If there is a communication abnormality, the receiving operation is stopped (step S112), and step S101.
Returning to, if there is no communication abnormality, it is determined whether all data has been received (step S113).

【0007】次に、全データを受信した場合には受信動
作を停止して(ステップS114)、受信命令を実行す
る(ステップS115)。この場合、受信した命令に従
って、ガスメータの動作設定を行ったり、ガス流量、警
報状態などの情報を取得した後、これら情報を光通信発
光回路17を介して光通信装置2に送信する準備を行い
送信動作を開始する(ステップS117)。その後、デ
ータを送信し(ステップS119)、全データを送信し
たかどうかを判定する(ステップS121)。全データ
を送信していない場合には、ステップS119に戻る。
全データを送信した場合には送信動作を停止して(ステ
ップS122)、ステップS101に戻る。
Next, when all the data are received, the receiving operation is stopped (step S114) and the receiving command is executed (step S115). In this case, the operation of the gas meter is set in accordance with the received instruction, and the information such as the gas flow rate and the alarm state is acquired, and then the information is prepared to be transmitted to the optical communication device 2 via the optical communication light emitting circuit 17. The transmission operation is started (step S117). Then, the data is transmitted (step S119), and it is determined whether all the data have been transmitted (step S121). If all the data has not been transmitted, the process returns to step S119.
When all the data has been transmitted, the transmission operation is stopped (step S122), and the process returns to step S101.

【0008】[0008]

【発明が解決しようとする課題】しかしながら、一般に
ガスメータは屋外に設置されるため、光通信受光回路1
6に太陽光などの外光が入射される。このため、光無線
通信機能を有するガスメータでは、外光を光通信起動信
号と判定して光通信動作を開始する可能性がある。この
場合、正常な光通信が行われないため、光通信は異常終
了し、再度、光通信起動信号の監視からの動作が行われ
る。
However, since the gas meter is generally installed outdoors, the optical communication light receiving circuit 1 is used.
External light such as sunlight is incident on 6. Therefore, in the gas meter having the optical wireless communication function, there is a possibility that the external light is determined as the optical communication start signal and the optical communication operation is started. In this case, since the normal optical communication is not performed, the optical communication ends abnormally, and the operation from the monitoring of the optical communication start signal is performed again.

【0009】本来、光無線通信を使用してガスメータと
の通信を行う必要があるのは、ガスメータの動作設定を
行う時、及び、外部センサやガス流量から異常を検出し
てガスの供給を停止した時などに警告状態を読出す時で
あるため、これら以外の場合に光通信動作を開始する必
要はない。
Originally, it is necessary to communicate with the gas meter by using optical wireless communication when the operation of the gas meter is set and when the abnormality is detected from the external sensor or the gas flow rate, the gas supply is stopped. It is not necessary to start the optical communication operation in other cases, because it is time to read out the warning state when doing so.

【0010】しかし、従来では、常に光通信起動信号の
監視を行っているため、本来不要である時に光通信動作
を開始してしまう。光通信動作を行っている間は、光通
信動作を行っていない場合に比べて消費電流が大きいた
め、電力の消費になる。
However, in the prior art, since the optical communication activation signal is constantly monitored, the optical communication operation is started when it is originally unnecessary. During the optical communication operation, the current consumption is larger than that in the case where the optical communication operation is not performed, so that power consumption is required.

【0011】また、従来では、光通信受光回路16及び
光通信発光回路17に対する電源供給を停止する手段が
ないため、光通信動作を行っていない場合でも、光通信
受光回路16及び光通信発光回路17に電源が供給され
ている。光通信受光回路16又は光通信発光回路17に
電源が供給されていると、光通信を行っていなくてもこ
れらの回路に電流が流れるため、光通信動作を行ってい
ない間の消費電流を低減することができない。
Further, in the prior art, since there is no means for stopping the power supply to the optical communication light receiving circuit 16 and the optical communication light emitting circuit 17, the optical communication light receiving circuit 16 and the optical communication light emitting circuit are not in operation. Power is supplied to 17. When power is supplied to the optical communication light receiving circuit 16 or the optical communication light emitting circuit 17, a current flows through these circuits even if optical communication is not performed, so that current consumption is reduced while the optical communication operation is not performed. Can not do it.

【0012】本発明は、光通信が必要な期間を限定する
ことにより、本来不要である時に開始される光通信動作
を削減し、消費電流を低減することができるガスメータ
を提供することにある。また、本発明は、ガスメータが
光通信動作を行っていない間の消費電流を低減すること
ができるガスメータを提供することにある。
An object of the present invention is to provide a gas meter capable of reducing the current consumption by limiting the period during which optical communication is necessary, thereby reducing the optical communication operation started when it is originally unnecessary. Another object of the present invention is to provide a gas meter that can reduce current consumption while the gas meter is not performing optical communication operation.

【0013】[0013]

【課題を解決するための手段】前記課題を解決するため
に、本発明は、計量値の算出、流路遮断や各種の警告を
行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、光無線通信の許可指令
を行うための許可指令手段と、この許可指令手段から前
記許可指令を受け取った時に光無線通信を許可する通信
許可手段と、前記許可指令手段から前記許可指令を受け
取った時から所定の許可時間が経過した時に光無線通信
を禁止する通信禁止手段と、前記許可時間のみ光無線通
信を行う通信手段とを有することを特徴とする。
In order to solve the above-mentioned problems, the present invention calculates a measured value, cuts off a flow path and various warnings, and at the same time, presents the measured value, cuts off the flow path and various warning states. In a meter controller configured such that the operation setting information of the meter controller can be read and written from an external optical communication device by optical wireless communication, a permission command means for issuing a permission command for optical wireless communication, and this permission Communication permission means for permitting optical wireless communication when the permission instruction is received from the instruction means, and communication prohibition for prohibiting optical wireless communication when a predetermined permission time has elapsed since the permission instruction was received from the permission instruction means And a communication unit that performs optical wireless communication only during the permission time.

【0014】この発明によれば、許可指令手段が光無線
通信の許可指令を行うと、通信許可手段は、許可指令を
受け取った時に光無線通信を許可し、通信手段は、許可
時間のみ光無線通信を行い、通信禁止手段は、許可指令
を受け取った時から所定の許可時間が経過した時に光無
線通信を禁止する。従って、光通信が必要な期間を限定
することにより、本来不要である時に開始される光通信
動作を削減し、消費電流を低減することができる。
According to the present invention, when the permission command means gives the permission command for the optical wireless communication, the communication permission means permits the optical wireless communication when the permission command is received, and the communication means allows the optical wireless communication only during the permission time. The communication prohibition means prohibits the optical wireless communication when a predetermined permission time elapses after the permission command is received. Therefore, by limiting the period in which the optical communication is necessary, it is possible to reduce the optical communication operation that is started when it is originally unnecessary and reduce the current consumption.

【0015】また、本発明は、計量値の算出、流路遮断
や各種の警告を行うと共に、現在の計量値、流路遮断や
各種の警告状態、当該メータ制御器の動作設定の情報を
光無線通信により外部の光通信装置から読み出し及び書
き込み可能に構成したメータ制御器において、前記光通
信装置から情報を受信する光通信受光回路と、この光通
信受光回路に対する電源供給を開始及び停止する電源供
給制御手段と、前記光通信装置からの光通信起動信号の
有無を所定周期で監視する監視手段とを有し、前記電源
供給制御手段は、所定周期で行われる前記光通信起動信
号の監視動作の前に前記光通信受光回路に電源を供給
し、前記光通信起動信号の監視動作の後に前記光通信受
光回路の電源供給を停止することを特徴とする。
Further, according to the present invention, the calculation of the measured value, the cutoff of the flow path and various warnings are performed, and the current measured value, the cutoff of the flow path and various warning states, and the operation setting information of the meter controller are optically read. In a meter controller configured to be readable and writable by an external optical communication device by wireless communication, an optical communication light receiving circuit that receives information from the optical communication device and a power supply that starts and stops power supply to the optical communication light receiving circuit. It has a supply control means and a monitoring means for monitoring the presence or absence of an optical communication start signal from the optical communication device at a predetermined cycle, and the power supply control means has a monitoring operation of the optical communication start signal performed at a predetermined cycle. Power is supplied to the optical communication light receiving circuit before, and power supply to the optical communication light receiving circuit is stopped after the operation of monitoring the optical communication start signal.

【0016】この発明によれば、監視手段が光通信装置
からの光通信起動信号の有無を所定周期で監視し、電源
供給制御手段は、所定周期で行われる光通信起動信号の
監視動作の前に光通信受光回路に電源を供給し、光通信
起動信号の監視動作の後に光通信受光回路の電源供給を
停止するので、メータ制御器が光通信動作を行っていな
い間の消費電流を低減させることができる。
According to the present invention, the monitoring means monitors the presence or absence of the optical communication start signal from the optical communication device in a predetermined cycle, and the power supply control means performs the monitoring operation of the optical communication start signal in the predetermined cycle. Power is supplied to the optical communication light receiving circuit and the power supply to the optical communication light receiving circuit is stopped after the monitoring operation of the optical communication start signal, so that the current consumption is reduced while the meter controller is not performing the optical communication operation. be able to.

【0017】[0017]

【発明の実施の形態】以下、本発明のメータ制御器の一
例であるガスメータの実施の形態を図面を参照しながら
詳細に説明する。図1は実施の形態のガスメータの構成
図である。図1に示すガスメータ1は、光通信装置2と
の間で光無線通信によりガスメータの情報を読み出し及
び書き込み可能に構成され、制御部11、流量センサや
圧力センサなどの外部センサ12、ガス流量を計測する
流量計測部13、異常発生時に遮断する遮断弁14、通
信制御部15、光通信装置2から情報を受信する光通信
受光回路16、光通信装置2へ情報を送信する光通信発
光回路17を有して構成されている。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of a gas meter, which is an example of a meter controller of the present invention, will be described in detail below with reference to the drawings. FIG. 1 is a configuration diagram of a gas meter according to the embodiment. The gas meter 1 shown in FIG. 1 is configured to be able to read and write information of the gas meter by optical wireless communication with the optical communication device 2, and controls the control unit 11, an external sensor 12 such as a flow sensor and a pressure sensor, and a gas flow rate. A flow rate measuring unit 13 for measuring, a shutoff valve 14 for shutting off when an abnormality occurs, a communication control unit 15, an optical communication light receiving circuit 16 for receiving information from the optical communication device 2, and an optical communication light emitting circuit 17 for transmitting information to the optical communication device 2. Is configured.

【0018】制御部11は、外部センサ12の状態によ
り異常を検出した場合や、流量計測部13により計測さ
れたガス流量からガスの異常使用を検出した場合に、遮
断弁14を閉じてガス燃焼機器へのガスの供給を停止す
る。また、制御部11は、ガス流量、ガス遮断や各種の
警告状態を記録する。
The control unit 11 closes the shut-off valve 14 when detecting an abnormality from the state of the external sensor 12 or when detecting an abnormal use of gas from the gas flow rate measured by the flow rate measuring unit 13 to close the gas combustion. Stop the gas supply to the equipment. Further, the control unit 11 records the gas flow rate, gas interruption, and various warning states.

【0019】また、ガスメータ1は、光通信許可制御部
18、光通信許可スイッチ19、光通信許可フラグ2
0、光通信許可期間タイマ21、表示部22、受光回路
制御部23、発光回路制御部24を有して構成されてい
る。
The gas meter 1 also includes an optical communication permission control unit 18, an optical communication permission switch 19, and an optical communication permission flag 2.
0, an optical communication permission period timer 21, a display unit 22, a light receiving circuit control unit 23, and a light emitting circuit control unit 24.

【0020】光通信許可スイッチ(本発明の許可指令手
段に対応)19は、光通信装置2との光無線通信を許可
するための許可指令を入力する。光通信許可制御部(本
発明の通信許可手段に対応)18は、光通信許可スイッ
チ19の状態を監視し、光通信許可スイッチ19の入力
を検出したときに光通信許可フラグ20をONにして光
通信を許可すると共に、光通信許可期間タイマ21に光
通信許可時間(本発明の所定の許可時間に対応)を設定
する。光通信許可フラグ20は、ONの時には光通信が
許可であることを示し、OFFの時には光通信が禁止で
あることを示す情報であり、通常ではOFFとなってい
る。
The optical communication permission switch (corresponding to the permission command means of the present invention) 19 inputs a permission command for permitting optical wireless communication with the optical communication device 2. The optical communication permission control unit (corresponding to the communication permission means of the present invention) 18 monitors the state of the optical communication permission switch 19 and turns on the optical communication permission flag 20 when the input of the optical communication permission switch 19 is detected. The optical communication is permitted and the optical communication permission time (corresponding to the predetermined permission time of the present invention) is set in the optical communication permission period timer 21. The optical communication permission flag 20 is information indicating that the optical communication is permitted when the flag is ON and indicating that the optical communication is prohibited when the flag is OFF, and is normally OFF.

【0021】また、光通信許可制御部18は、制御部1
1からの警告状態を監視し、何らかの警告が発生したと
きには、光通信許可フラグ20をONにして光通信を許
可するとともに、光通信許可期間タイマ21に光通信許
可時間を設定する。
Further, the optical communication permission control unit 18 includes the control unit 1
The warning state from 1 is monitored, and when any warning occurs, the optical communication permission flag 20 is turned on to permit optical communication, and the optical communication permission period timer 21 is set to the optical communication permission time.

【0022】また、光通信許可制御部(本発明の通信禁
止手段に対応)18は、光通信許可フラグ20がONの
間、光通信許可タイマ21により許可時間を計測し、光
通信許可期間の満了を検出すると、光通信許可フラグ2
0をOFFにして光通信を禁止する。
The optical communication permission control unit (corresponding to the communication prohibition means of the present invention) 18 measures the permission time by the optical communication permission timer 21 while the optical communication permission flag 20 is ON, and the optical communication permission period When the expiration is detected, the optical communication permission flag 2
0 is turned off to prohibit optical communication.

【0023】表示部22は、液晶表示素子(LCD)又
は発光ダイオード(LED)等であり、ONにされた光
通信許可フラグ20に基づき、光無線通信が許可されて
いる期間中のみ、光無線通信が許可されていることを示
す通信許可情報を表示するようになっている。
The display unit 22 is a liquid crystal display element (LCD), a light emitting diode (LED), or the like, and based on the optical communication permission flag 20 that is turned on, the optical wireless communication is performed only during the period when the optical wireless communication is permitted. The communication permission information indicating that the communication is permitted is displayed.

【0024】受光回路制御部(本発明の電源供給制御手
段に対応)23は、光通信受光回路16に対する電源供
給を開始及び停止する。通信制御部15(本発明の監視
手段に対応)は、所定周期で光通信起動信号の有無を監
視する。また、受光回路制御部23は、所定周期で行わ
れる光通信起動信号の監視動作の前に光通信受光回路1
6に電源を供給し、光通信起動信号の監視動作の後に光
通信受光回路16の電源供給を停止する。また、受光回
路制御部23は、光無線通信の受信動作開始時に光通信
受光回路16に電源を供給し、光無線通信の受信動作終
了時に光通信受光回路16の電源供給を停止する。
The light receiving circuit control section (corresponding to the power supply control means of the present invention) 23 starts and stops the power supply to the optical communication light receiving circuit 16. The communication control unit 15 (corresponding to the monitoring means of the present invention) monitors the presence / absence of an optical communication start signal at a predetermined cycle. Further, the light receiving circuit control unit 23 sets the optical communication light receiving circuit 1 before the monitoring operation of the optical communication start signal performed in a predetermined cycle.
6 is supplied with power, and after the monitoring operation of the optical communication start signal, the power supply to the optical communication light receiving circuit 16 is stopped. Further, the light receiving circuit control unit 23 supplies power to the optical communication light receiving circuit 16 at the start of the reception operation of the optical wireless communication, and stops the power supply of the optical communication light receiving circuit 16 at the end of the reception operation of the optical wireless communication.

【0025】発光回路制御部24(本発明の電源供給制
御手段に対応)は、光通信発光回路17に対する電源供
給を開始及び停止する。発光回路制御部24は、光無線
通信の送信動作開始時に光通信発光回路17に電源を供
給し、光無線通信の送信動作終了時に光通信発光回路1
7の電源供給を停止する。
The light emitting circuit control section 24 (corresponding to the power supply control means of the present invention) starts and stops the power supply to the optical communication light emitting circuit 17. The light emitting circuit controller 24 supplies power to the optical communication light emitting circuit 17 at the start of the optical wireless communication transmission operation, and at the end of the optical wireless communication transmission operation, the optical communication light emitting circuit 1
The power supply of 7 is stopped.

【0026】次にこのように構成された実施の形態のガ
スメータの動作を説明する。図2は実施の形態のガスメ
ータに設けられた通信制御部の処理を示すフローチャー
トである。図3は実施の形態のガスメータに設けられた
光通信許可制御部の処理を示すフローチャートである。
Next, the operation of the gas meter of the embodiment configured as described above will be described. FIG. 2 is a flowchart showing processing of the communication control unit provided in the gas meter of the embodiment. FIG. 3 is a flowchart showing a process of the optical communication permission control unit provided in the gas meter of the embodiment.

【0027】最初に、図3のフローチャートを参照して
光通信許可制御部18の処理を説明する。まず、制御部
11からの警告状態の情報に基づいて、警告が発生した
かどうかを判定する(ステップS51)。警告が発生し
ていない場合には、次に、光通信許可スイッチ19から
の入力があったかどうかを判定する(ステップS5
3)。光通信許可スイッチ19からの入力がない場合に
は、光通信許可中かどうかを判定する(ステップS5
5)。
First, the processing of the optical communication permission control section 18 will be described with reference to the flowchart of FIG. First, it is determined whether or not a warning has occurred, based on the warning state information from the control unit 11 (step S51). If no warning is issued, it is next determined whether or not there is an input from the optical communication permission switch 19 (step S5).
3). If there is no input from the optical communication permission switch 19, it is determined whether or not the optical communication is permitted (step S5).
5).

【0028】光通信許可中でない場合には、ステップS
51に戻り、光通信許可中である場合には、光通信許可
期間タイマ21の時間を更新し(ステップS57)、光
通信許可期間が満了したかどうかを判定する(ステップ
S59)。光通信許可期間が満了した場合には、光通信
許可フラグをOFFにする(ステップS61)。通信許
可表示を停止する(ステップS62)。これにより、光
通信が禁止される。その後、ステップS51に戻る。
If the optical communication is not permitted, step S
Returning to step 51, when the optical communication is being permitted, the time of the optical communication permission period timer 21 is updated (step S57), and it is determined whether the optical communication permission period has expired (step S59). When the optical communication permission period has expired, the optical communication permission flag is turned off (step S61). The communication permission display is stopped (step S62). This prohibits optical communication. Then, it returns to step S51.

【0029】一方、ステップS53において、光通信許
可スイッチ19からの入力があった場合には、光通信許
可期間タイマ21に第1許可時間を設定し(ステップS
63)、光通信許可フラグをONにする(ステップS6
5)。通信許可表示を開始する(ステップS66)。こ
れにより、光通信が第1許可時間だけ許可されることに
なる。
On the other hand, if there is an input from the optical communication permission switch 19 in step S53, the first permission time is set in the optical communication permission period timer 21 (step S53).
63), the optical communication permission flag is turned on (step S6).
5). Communication permission display is started (step S66). As a result, the optical communication is permitted for the first permission time.

【0030】また、ステップS51において、警告が発
生した場合には、光通信許可期間タイマ21に第2許可
時間を設定し(ステップS67)、光通信許可フラグを
ONにする(ステップS65)。これにより、光通信が
第2許可時間だけ許可されることになる。
When a warning is issued in step S51, the second permission time is set in the optical communication permission period timer 21 (step S67), and the optical communication permission flag is turned on (step S65). As a result, the optical communication is permitted for the second permission time.

【0031】次に、図2のフローチャートを参照して通
信制御部15の処理を説明する。ここで、初期状態とし
て、光通信受光回路16は、受光回路制御部23により
電源供給が停止された状態となっている。光通信発光回
路17は、発光回路制御部24により電源供給が停止さ
れた状態となっている。
Next, the processing of the communication control unit 15 will be described with reference to the flowchart of FIG. Here, as an initial state, the optical communication light receiving circuit 16 is in a state in which power supply is stopped by the light receiving circuit control unit 23. The optical communication light emitting circuit 17 is in a state in which power supply is stopped by the light emitting circuit control unit 24.

【0032】また、光通信の動作は、光通信装置2から
の光通信起動信号を検出することで、開始するようにな
っている。この光通信起動信号は、光通信装置2と光通
信を行うためにガスメータに起動をかけるための信号で
ある。
The optical communication operation is started by detecting an optical communication activation signal from the optical communication device 2. The optical communication activation signal is a signal for activating the gas meter to perform optical communication with the optical communication device 2.

【0033】まず、所定の周期になったかどうかを判定
し(ステップS11)、所定の周期になった場合には、
光通信許可フラグ20がONかどうかを判定する(ステ
ップ13)。光通信許可フラグ20がOFF(光通信禁
止)の場合には、光通信起動信号の監視を行わない。
First, it is judged whether or not a predetermined cycle has been reached (step S11). If the predetermined cycle has been reached,
It is determined whether the optical communication permission flag 20 is ON (step 13). When the optical communication permission flag 20 is OFF (optical communication is prohibited), the optical communication activation signal is not monitored.

【0034】一方、光通信許可フラグ20がON(光通
信許可)の場合には、受光回路制御部23により光通信
受光回路16に電源が供給される(ステップS15)。
その後、光通信受光回路16の状態を取得し(ステップ
S17)、光通信装置2からの光通信起動信号を検出し
たかどうかを判定する(ステップS19)。
On the other hand, when the optical communication permission flag 20 is ON (optical communication permission), the light receiving circuit control section 23 supplies power to the optical communication light receiving circuit 16 (step S15).
Then, the state of the optical communication light receiving circuit 16 is acquired (step S17), and it is determined whether or not the optical communication activation signal from the optical communication device 2 is detected (step S19).

【0035】光通信装置2からの光通信起動信号を検出
した場合には、データ受信の準備を行って、光通信の受
信動作を開始して(ステップS21)、光通信受光回路
16を介して光通信装置2から命令(データ)を受信す
る(ステップS23)。
When the optical communication start signal from the optical communication device 2 is detected, preparations for data reception are made, the optical communication receiving operation is started (step S21), and the optical communication light receiving circuit 16 is used. A command (data) is received from the optical communication device 2 (step S23).

【0036】次に、通信異常があるかどうかを判定し
(ステップS25)、通信異常がある場合には受信動作
を停止して(ステップS26)、ステップS43に進
み、通信異常がない場合には、全データを受信したかど
うかを判定する(ステップS27)。
Next, it is determined whether or not there is a communication abnormality (step S25). If there is a communication abnormality, the receiving operation is stopped (step S26), and the process proceeds to step S43. If there is no communication abnormality, , It is determined whether all data has been received (step S27).

【0037】次に、全データを受信した場合には受信動
作を停止して(ステップS28)、受光回路制御部23
により光通信受光回路16の電源供給を停止する(ステ
ップS29)。その後、受信命令を実行する(ステップ
S31)。この場合、受信した命令に従って、ガスメー
タの動作設定を行ったり、ガス流量、警報状態などの情
報を取得した後、これら情報を光通信発光回路17を介
して光通信装置2に送信する準備を行い送信動作を開始
する(ステップS33)。この時には、発光回路制御部
24により光通信発光回路17に電源を供給する(ステ
ップS35)。
Next, when all the data is received, the receiving operation is stopped (step S28), and the light receiving circuit control section 23 is started.
Thus, the power supply to the optical communication light receiving circuit 16 is stopped (step S29). Then, the reception command is executed (step S31). In this case, the operation of the gas meter is set in accordance with the received instruction, and the information such as the gas flow rate and the alarm state is acquired, and then the information is prepared to be transmitted to the optical communication device 2 via the optical communication light emitting circuit 17. The transmission operation is started (step S33). At this time, the light emitting circuit controller 24 supplies power to the optical communication light emitting circuit 17 (step S35).

【0038】その後にデータの送信を開始し(ステップ
S37)、全データを送信したかどうかを判定する(ス
テップS39)。全データを送信していない場合には、
ステップS37に戻る。全データを送信した場合には送
信動作を停止して(ステップS40)、発光回路制御部
24により光通信発光回路17の電源供給を停止し(ス
テップS41)、ステップS11に戻る。
After that, data transmission is started (step S37), and it is determined whether all data have been transmitted (step S39). If you haven't sent all the data,
It returns to step S37. When all the data has been transmitted, the transmission operation is stopped (step S40), the light emitting circuit controller 24 stops the power supply to the optical communication light emitting circuit 17 (step S41), and the process returns to step S11.

【0039】一方、ステップS19において、光通信装
置2からの光通信起動信号を検出しなかった場合には、
受光回路制御部23により光通信受光回路16の電源供
給を停止する(ステップS43)。光通信起動信号を検
出しない間、この動作は繰り返し行われる。
On the other hand, if the optical communication activation signal from the optical communication device 2 is not detected in step S19,
The light receiving circuit control unit 23 stops the power supply to the optical communication light receiving circuit 16 (step S43). This operation is repeated while the optical communication activation signal is not detected.

【0040】このように実施の形態のガスメータによれ
ば、光通信許可スイッチ19を入力してから所定の許可
時間のみ光通信動作が行われるようになり、また、所定
の許可時間が経過した時には、光通信動作が行われなく
なる。このため、本来不要である時に開始される光通信
動作が削減され、消費電流を低減することができる。一
般にガスメータは、電池を電源としており、消費電流の
低減により電池寿命を延ばすことができる。
As described above, according to the gas meter of the embodiment, the optical communication operation is performed only for a predetermined permission time after the optical communication permission switch 19 is input, and when the predetermined permission time elapses. , Optical communication operation is not performed. Therefore, the optical communication operation which is started when it is originally unnecessary is reduced, and the current consumption can be reduced. Generally, a gas meter uses a battery as a power source, and the life of the battery can be extended by reducing the current consumption.

【0041】また、ガスメータが外部センサ12やガス
流量から異常を検出して何らかの警告が発生した時、こ
の警告が発生した時から所定の許可時間のみ光通信動作
が行われるようになり、また、所定の許可時間が経過し
た時には、光通信動作が行われなくなる。このため、本
来不要である時に開始される光通信動作が削減され、消
費電流を低減することができる。また、ガスメータの動
作設定を行う場合には、外部センサ12に特定の信号を
入力して警告を発生させることで、光通信を許可するこ
とができる。
Further, when the gas meter detects an abnormality from the external sensor 12 or the gas flow rate and some warning is generated, the optical communication operation is performed only for a predetermined permission time from the time when this warning is generated. When the predetermined permission time has elapsed, the optical communication operation is stopped. Therefore, the optical communication operation which is started when it is originally unnecessary is reduced, and the current consumption can be reduced. Further, when setting the operation of the gas meter, optical communication can be permitted by inputting a specific signal to the external sensor 12 to generate a warning.

【0042】また、受光回路制御部23は、所定周期で
行われる光通信起動信号の監視動作の前に光通信受光回
路16に電源を供給し、光通信起動信号の監視動作の後
に光通信受光回路16の電源供給を停止する。これと同
時に、受光回路制御部23が光無線通信の受信動作開始
時に光通信受光回路16に電源を供給し、光無線通信の
受信動作終了時に光通信受光回路16の電源供給を停止
し、発光回路制御部24が光無線通信の送信動作開始時
に光通信発光回路17に電源を供給し、光無線通信の送
信動作終了時に光通信発光回路17の電源供給を停止す
る。
Further, the light receiving circuit control section 23 supplies power to the optical communication light receiving circuit 16 before the operation of monitoring the optical communication start signal performed in a predetermined cycle, and after the operation of monitoring the optical communication start signal, the optical communication light receiving circuit 16 receives light. The power supply to the circuit 16 is stopped. At the same time, the light receiving circuit control unit 23 supplies power to the optical communication light receiving circuit 16 at the start of the reception operation of the optical wireless communication, and stops the power supply of the optical communication light receiving circuit 16 at the end of the reception operation of the optical wireless communication to emit light. The circuit controller 24 supplies power to the optical communication light emitting circuit 17 at the start of the optical wireless communication transmission operation, and stops the power supply of the optical communication light emitting circuit 17 at the end of the optical wireless communication transmission operation.

【0043】すなわち、ガスメータが光通信動作を行っ
ている間のみ、光通信受光回路16及び光通信発光回路
17が動作するため、光通信動作を行っていない間の消
費電流を低減することができる。
That is, since the optical communication light receiving circuit 16 and the optical communication light emitting circuit 17 operate only while the gas meter is performing the optical communication operation, it is possible to reduce the current consumption while the optical communication operation is not performed. .

【0044】また、光無線通信が許可されている期間中
のみ、光無線通信が許可されていることを示す通信許可
情報が表示部22に表示されるので、光通信が可能であ
ることがわかる。
Also, since the communication permission information indicating that the optical wireless communication is permitted is displayed on the display unit 22 only during the period when the optical wireless communication is permitted, it can be seen that the optical communication is possible. .

【0045】なお、本発明は前述した実施の形態のガス
メータに限定されるものではない。実施の形態のガスメ
ータでは、光通信の許可指令を行うための手段である光
通信許可スイッチ19を特別に設けたが、この光通信許
可スイッチ19は、ガスメータに本来搭載されている外
部センサ12や既存のスイッチを流用しても良い。外部
センサ12としては、圧力センサ、ガス流量を検知する
リードスイッチ、ガス漏れ警報器、地震を感知する感震
器等を用いることができる。スイッチとしては、遮断弁
を復帰させる復帰スイッチ等を用いることができる。こ
のような外部センサ12又はスイッチからの信号により
光無線通信の許可指令を行うことで、光通信許可スイッ
チ19を特別に設ける必要がなくなり、コストを低減で
きる。
The present invention is not limited to the gas meter of the above-mentioned embodiment. In the gas meter of the embodiment, the optical communication permission switch 19 which is a means for performing the optical communication permission command is specially provided. However, the optical communication permission switch 19 is provided in the gas sensor. The existing switch may be used. As the external sensor 12, a pressure sensor, a reed switch that detects a gas flow rate, a gas leak alarm, a seismic sensor that detects an earthquake, or the like can be used. As the switch, a return switch for returning the shutoff valve or the like can be used. By issuing an optical wireless communication permission command by a signal from such an external sensor 12 or a switch, it is not necessary to specially provide the optical communication permission switch 19, and the cost can be reduced.

【0046】また、光通信許可制御部18は、外部セン
サ12又はスイッチからの信号に応じて、光通信許可期
間タイマ21の許可時間を変えるようにしても良い。す
なわち、スイッチで起動をかけた時と外部センサ12で
起動をかけた時とによって、光通信の実行許可期間を変
えることができる。
Further, the optical communication permission control section 18 may change the permission time of the optical communication permission period timer 21 according to the signal from the external sensor 12 or the switch. That is, the execution permission period of the optical communication can be changed depending on when the switch is activated and when the external sensor 12 is activated.

【0047】また、実施の形態のガスメータでは、光通
信許可期間タイマ21に設定された許可時間のみ光通信
を行ったが、例えば、光通信装置2との光無線通信が正
常に行われた場合には、光通信許可制御部18は、光通
信許可期間タイマ21に許可時間を再設定して、光無線
通信の実行許可期間を延長するようにしても良い。この
ようにすれば、光通信をより長く行うことができる。
Further, in the gas meter of the embodiment, the optical communication is performed only for the permission time set in the optical communication permission period timer 21, but, for example, when the optical wireless communication with the optical communication device 2 is normally performed. In addition, the optical communication permission control unit 18 may reset the permission time in the optical communication permission period timer 21 to extend the execution permission period of the optical wireless communication. By doing so, optical communication can be performed for a longer time.

【0048】また、実施の形態のガスメータでは、光通
信許可制御部18は、何らかの警告が発生した時に光無
線通信を許可し、光無線通信が許可となった時から所定
の許可時間が経過した時に光無線通信を禁止するように
したが、例えば、光通信許可制御部18は、何らかの警
告が発生した時に光無線通信を許可し、光無線通信を介
して光通信装置2により当該メータ内の警告状態の読出
しが行われた時に光無線通信を禁止しても良い。この場
合にも、本来不要である時に開始される光通信動作が削
減され、消費電流を低減することができる。
Further, in the gas meter of the embodiment, the optical communication permission control unit 18 permits the optical wireless communication when some warning is generated, and a predetermined permission time has elapsed since the optical wireless communication was permitted. Although the optical wireless communication is sometimes prohibited, for example, the optical communication permission control unit 18 permits the optical wireless communication when any warning is generated, and the optical communication device 2 transmits the optical wireless communication via the optical wireless communication. Optical wireless communication may be prohibited when the warning state is read. Also in this case, the optical communication operation started when it is originally unnecessary is reduced, and the current consumption can be reduced.

【0049】また、実施の形態のガスメータでは、何ら
かの警告が発生した時に光無線通信を許可したが、例え
ば、ガスメータが圧力異常やガス流量異常等の各種の異
常を検出して各種の警告状態を発生するが、光通信許可
制御部18は、この各種の警告状態に基づき、特定の警
告が発生した時のみ光無線通信を許可するようにしても
良い。これにより、特定の警告に限定することで、光通
信を許可することができる。
Further, in the gas meter of the embodiment, the optical wireless communication is permitted when some warning is generated. For example, the gas meter detects various abnormalities such as pressure abnormality and gas flow rate abnormality, and various warning states are generated. Although generated, the optical communication permission control unit 18 may permit optical wireless communication only when a specific warning is generated, based on these various warning states. Thereby, optical communication can be permitted by limiting to a specific warning.

【0050】また、実施の形態のガスメータでは、光通
信受光回路16及び光通信発光回路17の両方への電源
供給を停止するようにしたが、例えば、光通信受光回路
16のみ電源供給を停止するようにしても良く、あるい
は、光通信発光回路17のみ電源供給を停止するように
しても良い。
Further, in the gas meter of the embodiment, the power supply to both the optical communication light receiving circuit 16 and the optical communication light emitting circuit 17 is stopped. However, for example, only the optical communication light receiving circuit 16 is stopped from supplying power. Alternatively, the power supply may be stopped only for the optical communication light emitting circuit 17.

【0051】[0051]

【発明の効果】以上詳述したように、本発明によれば、
光通信が必要な期間を限定することにより、本来不要で
ある時に開始される光通信動作が削減されるため、消費
電流を低減することができる。
As described in detail above, according to the present invention,
By limiting the period during which the optical communication is necessary, the optical communication operation started when it is originally unnecessary is reduced, so that the current consumption can be reduced.

【0052】また、本発明によれば、ガスメータが光通
信動作を行っている間のみ光通信受光回路及び光通信発
光回路に電源が供給されるため、ガスメータが光通信動
作を行っていない間の消費電流を低減させることができ
る。
Further, according to the present invention, power is supplied to the optical communication light receiving circuit and the optical communication light emitting circuit only while the gas meter is performing the optical communication operation, so that the gas meter is not performing the optical communication operation. The current consumption can be reduced.

【0053】以上述べた発明の詳細な説明では、ガスメ
ータを例として説明したが、本発明はガスメータに限定
したものではなく、水道メータ、電力メータ及びカロリ
ーメータ等の計量器(メータ)全般に使用されるメータ
制御器に適用できるものである。
In the above detailed description of the invention, the gas meter has been described as an example, but the present invention is not limited to the gas meter, and can be used for general measuring instruments (meters) such as a water meter, an electric power meter and a calorimeter. It is applicable to the meter controller.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施の形態のガスメータの構成図である。FIG. 1 is a configuration diagram of a gas meter according to an embodiment.

【図2】実施の形態のガスメータに設けられた通信制御
部の処理を示すフローチャートである。
FIG. 2 is a flowchart showing a process of a communication control unit provided in the gas meter of the embodiment.

【図3】実施の形態のガスメータに設けられた光通信許
可制御部の処理を示すフローチャートである。
FIG. 3 is a flowchart showing a process of an optical communication permission control unit provided in the gas meter of the embodiment.

【図4】従来のガスメータの構成図である。FIG. 4 is a configuration diagram of a conventional gas meter.

【図5】従来のガスメータの処理を示すフローチャート
である。
FIG. 5 is a flowchart showing a process of a conventional gas meter.

【符号の説明】[Explanation of symbols]

1…ガスメータ、2…光通信装置、11…制御部、12
…外部センサ、13…流量計測部、14…遮断弁、15
…通信制御部、16…光通信受光回路、17…光通信発
光回路、18…光通信許可制御部、19…光通信許可ス
イッチ、20…光通信許可フラグ、21…光通信許可期
間タイマ、22…表示部、23…受光回路制御部、24
…発光回路制御部。
DESCRIPTION OF SYMBOLS 1 ... Gas meter, 2 ... Optical communication device, 11 ... Control part, 12
... external sensor, 13 ... flow rate measuring unit, 14 ... shut-off valve, 15
... communication control unit, 16 ... optical communication light receiving circuit, 17 ... optical communication light emitting circuit, 18 ... optical communication permission control unit, 19 ... optical communication permission switch, 20 ... optical communication permission flag, 21 ... optical communication permission period timer, 22 ... Display unit, 23 ... Light receiving circuit control unit, 24
... Light emitting circuit control section.

フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) H04Q 9/00 341 G01F 1/00 T // G01F 1/00 Y 3/22 B 3/22 D 15/06 15/06 G08C 23/00 A (72)発明者 鈴木 守 東京都港区海岸一丁目5番20号 東京瓦斯 株式会社内 (72)発明者 中村 充博 東京都港区海岸一丁目5番20号 東京瓦斯 株式会社内 (72)発明者 石野 仁朗 神奈川県川崎市幸区柳町70番地 株式会社 東芝柳町事業所内 (72)発明者 平沢 利勇 神奈川県川崎市幸区柳町70番地 株式会社 東芝柳町事業所内 (72)発明者 前田 郁雄 神奈川県川崎市幸区柳町70番地 株式会社 東芝柳町事業所内 (72)発明者 今 一生 神奈川県川崎市幸区柳町70番地 株式会社 東芝柳町事業所内 Fターム(参考) 2F030 CB01 CC13 CE09 CE22 CE27 CE32 CF05 CF11 CF20 2F031 AA01 AB01 AE09 AF10 2F073 AA07 AA08 AA09 AB02 AB12 BB01 BC04 CC01 CC07 CC08 EE11 GG01 GG08 5C086 AA02 AA45 BA11 DA04 5K048 BA34 DB02 EA11 EB02 EB10 HA01 HA02 Front page continuation (51) Int.Cl. 7 Identification code FI theme code (reference) H04Q 9/00 341 G01F 1/00 T // G01F 1/00 Y 3/22 B 3/22 D 15/06 15 / 06 G08C 23/00 A (72) Inventor Mamoru Suzuki 1-5-20 Kaigan, Minato-ku, Tokyo Tokyo Gas Co., Ltd. (72) Inventor Mitsuhiro Nakamura 1-5-20 Kaigan, Minato-ku, Tokyo Tokyo Gas Co., Ltd. Company (72) Inventor Jinro Ishino 70 Yanagi-cho, Saiwai-ku, Kawasaki-shi, Kanagawa 70, Yanagi-cho, Toshiba Works (72) Toshiyu Hirasawa 70, Yanagi-cho, Sachi-ku, Kawasaki-shi, Kanagawa, Japan, Yanagi-cho, Toshiba (72) Inventor Ikuo Maeda 70 Yanagi-cho, Saiwai-ku, Kawasaki-shi, Kanagawa, within the Yanagi-cho business office, Toshiba Corporation (72) Inventor, 70 Yanagi-cho, Sachi-ku, Kawasaki-shi, Kanagawa, Japan F-term (reference) 2F030 CB01 CC13 CE09 CE22 CE27 CE32 CF05 CF11 CF20 2F031 AA01 AB01 AE09 AF10 2F073 AA07 AA08 AA09 AB02 AB12 BB01 BC04 CC01 CC07 CC08 EE 11 GG01 GG08 5C086 AA02 AA45 BA11 DA04 5K048 BA34 DB02 EA11 EB02 EB10 HA01 HA02

Claims (14)

【特許請求の範囲】[Claims] 【請求項1】 計量値の算出、流路遮断や各種の警告を
行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 光無線通信の許可指令を行うための許可指令手段と、こ
の許可指令手段から前記許可指令を受け取った時に光無
線通信を許可する通信許可手段と、前記許可指令手段か
ら前記許可指令を受け取った時から所定の許可時間が経
過した時に光無線通信を禁止する通信禁止手段と、前記
許可時間のみ光無線通信を行う通信手段とを有すること
を特徴とするメータ制御器。
1. The calculation of the measured value, the flow path cutoff and various warnings are performed, and the current measured value, the flow path cutoff and various warning states, and the operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable by the optical communication device, the permission command means for performing the permission command of the optical wireless communication and the optical wireless communication are permitted when the permission command is received from the permission command means. A communication permission unit, a communication prohibition unit that prohibits optical wireless communication when a predetermined permission time has elapsed from the time when the permission command is received from the permission command unit, and a communication unit that performs optical wireless communication only during the permission time. A meter controller characterized by having.
【請求項2】 請求項1記載のメータ制御器において、
前記許可指令手段は、当該メータ制御器に有する外部セ
ンサ又はスイッチであり、前記外部センサ又は前記スイ
ッチからの信号により前記光無線通信の許可指令を行う
ことを特徴とするメータ制御器。
2. The meter controller according to claim 1, wherein
The said permission instruction | command means is an external sensor or switch which the said meter controller has, and performs the permission instruction | indication of the said optical wireless communication by the signal from the said external sensor or said switch, The meter controller characterized by the above-mentioned.
【請求項3】 請求項2記載のメータ制御器において、
前記通信許可手段は、前記外部センサ又は前記スイッチ
からの信号に応じて前記許可時間を変えることを特徴と
するメータ制御器。
3. The meter controller according to claim 2, wherein
The meter controller, wherein the communication permission unit changes the permission time according to a signal from the external sensor or the switch.
【請求項4】 請求項1記載のメータ制御器において、
前記外部の光通信装置との光無線通信が正常に行われた
場合には、前記通信許可手段は、光無線通信の実行許可
期間を延長するように前記許可時間を再設定することを
特徴とするメータ制御器。
4. The meter controller according to claim 1, wherein
When the optical wireless communication with the external optical communication device is normally performed, the communication permission unit resets the permission time so as to extend the execution permission period of the optical wireless communication. The meter controller to be used.
【請求項5】 請求項1記載のメータ制御器において、
光無線通信が許可されている期間中のみ、光無線通信が
許可されていることを示す通信許可情報を表示する表示
手段を有することを特徴とするメータ制御器。
5. The meter controller according to claim 1, wherein
A meter controller comprising a display unit for displaying communication permission information indicating that optical wireless communication is permitted only during a period when optical wireless communication is permitted.
【請求項6】 計量値の算出、流路遮断や各種の警告を
行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 何らかの警告が発生した時に光無線通信を許可する通信
許可手段と、この通信許可手段により光無線通信が許可
となった時から所定の許可時間が経過した時に光無線通
信を禁止する通信禁止手段と、前記許可時間のみ光無線
通信を行なう通信手段とを有することを特徴とするメー
タ制御器。
6. The calculation of the measured value, the flow path cutoff and various warnings are performed, and the current measurement value, the flow path cutoff and various warning states, and the operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable by the optical communication device, the communication permission means for permitting the optical wireless communication when a warning occurs, and the predetermined period from the time when the optical wireless communication is permitted by the communication permission means 2. A meter controller, comprising: a communication prohibiting unit that prohibits optical wireless communication when the permission time of, and a communication unit that performs optical wireless communication only during the permission time.
【請求項7】 計量値の算出、流路遮断や各種の警告を
行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 何らかの警告が発生した時に光無線通信を許可する通信
許可手段と、光無線通信を介して前記外部の光通信装置
により当該メータ制御器内の警告状態の読出しが行われ
た時に光無線通信を禁止する通信禁止手段と、光無線通
信が許可となった時から前記光無線通信が禁止となった
時までの許可時間のみ光無線通信を行う通信手段とを有
することを特徴とするメータ制御器。
7. The calculation of the measured value, the flow path cutoff and various warnings are performed, and the current measurement value, the flow path cutoff and various warning states, and the operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable by the optical communication device, the communication control means for permitting the optical wireless communication when any warning occurs, and the meter control by the external optical communication device via the optical wireless communication. Communication prohibiting means for prohibiting optical wireless communication when the warning state in the device is read, and optical wireless communication only during the permission time from when the optical wireless communication is permitted to when the optical wireless communication is prohibited. A meter controller having a communication means for performing communication.
【請求項8】 請求項6又は請求項7記載のメータ制御
器において、前記通信許可手段は、前記各種の警告状態
に基づき、特定の警告が発生した時のみ光無線通信を許
可することを特徴とするメータ制御器。
8. The meter controller according to claim 6 or 7, wherein the communication permission means permits optical wireless communication only when a specific warning is generated based on the various warning states. And the meter controller.
【請求項9】 請求項6又は請求項7記載のメータ制御
器において、前記外部の光通信装置との光無線通信が正
常に行われた場合には、前記通信許可手段は、光無線通
信の実行許可期間を延長するように前記許可時間を再設
定することを特徴とするメータ制御器。
9. The meter controller according to claim 6 or 7, wherein when the optical wireless communication with the external optical communication device is normally performed, the communication permission unit is configured to perform the optical wireless communication. A meter controller, wherein the permission time is reset so as to extend the execution permission period.
【請求項10】 計量値の算出、流路遮断や各種の警告
を行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 前記光通信装置から情報を受信する光通信受光回路と、
この光通信受光回路に対する電源供給を開始及び停止す
る電源供給制御手段と、前記光通信装置からの光通信起
動信号の有無を所定周期で監視する監視手段とを有し、 前記電源供給制御手段は、所定周期で行われる前記光通
信起動信号の監視動作の前に前記光通信受光回路に電源
を供給し、前記光通信起動信号の監視動作の後に前記光
通信受光回路の電源供給を停止することを特徴とするメ
ータ制御器。
10. The calculation of the measured value, the flow path cutoff and various warnings are performed, and the current measured value, the flow path cutoff and various warning states, and the operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable from the optical communication device of, an optical communication light receiving circuit for receiving information from the optical communication device,
Power supply control means for starting and stopping power supply to the optical communication light receiving circuit, and monitoring means for monitoring the presence or absence of the optical communication start signal from the optical communication device in a predetermined cycle, the power supply control means, Supplying power to the optical communication light receiving circuit before the operation of monitoring the optical communication start signal performed in a predetermined cycle, and stopping power supply to the optical communication light receiving circuit after the operation of monitoring the optical communication start signal Meter controller characterized by.
【請求項11】 計量値の算出、流路遮断や各種の警告
を行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 前記光通信装置から情報を受信する光通信受光回路と、
この光通信受光回路に対する電源供給を開始及び停止す
る電源供給制御手段とを有し、 前記電源供給制御手段は、光無線通信の受信動作開始時
に前記光通信受光回路に電源を供給し、光無線通信の受
信動作終了時に前記光通信受光回路の電源供給を停止す
ることを特徴とするメータ制御器。
11. The calculation of the measured value, the flow path cutoff and various warnings are performed, and the current measured value, the flow path cutoff and various warning states, and the operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable from the optical communication device of, an optical communication light receiving circuit for receiving information from the optical communication device,
And a power supply control means for starting and stopping the power supply to the optical communication light receiving circuit, wherein the power supply control means supplies power to the optical communication light receiving circuit at the start of the reception operation of the optical wireless communication, A meter controller, characterized in that power supply to the optical communication light receiving circuit is stopped at the end of the communication receiving operation.
【請求項12】 計量値の算出、流路遮断や各種の警告
を行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 前記光通信装置へ情報を送信する光通信発光回路と、こ
の光通信発光回路に対する電源供給を開始及び停止する
電源供給制御手段とを有し、 前記電源供給制御手段は、光無線通信の送信動作開始時
に前記光通信発光回路に電源を供給し、光無線通信の送
信動作終了時に前記光通信発光回路の電源供給を停止す
ることを特徴とするメータ制御器。
12. The calculation of the measured value, the flow path cutoff and various warnings are performed, and the current measurement value, the flow path cutoff and various warning states, and the operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable by the optical communication device, an optical communication light emitting circuit that transmits information to the optical communication device, and a power supply control means that starts and stops power supply to the optical communication light emitting circuit. The power supply control means supplies power to the optical communication light emitting circuit at the start of optical wireless communication transmission operation, and stops power supply to the optical communication light emitting circuit at the end of optical wireless communication transmission operation. Meter controller characterized by.
【請求項13】 計量値の算出、流路遮断や各種の警告
を行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 前記光通信装置から情報を受信する光通信受光回路と、
前記光通信装置へ情報を送信する光通信発光回路と、こ
の光通信発光回路及び前記光通信受光回路に対する電源
供給を開始及び停止する電源供給制御手段とを有し、 前記電源供給制御手段は、光無線通信の受信動作開始時
に前記光通信受光回路に電源を供給し、光無線通信の受
信動作終了時に前記光通信受光回路の電源供給を停止
し、光無線通信の送信動作開始時に前記光通信発光回路
に電源を供給し、光無線通信の送信動作終了時に前記光
通信発光回路の電源供給を停止することを特徴とするメ
ータ制御器。
13. A metered value is calculated, a flow path is blocked, and various warnings are performed, and the current measurement value, flow path blocked and various warning states, and operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable from the optical communication device of, an optical communication light receiving circuit for receiving information from the optical communication device,
An optical communication light emitting circuit for transmitting information to the optical communication device, and a power supply control means for starting and stopping power supply to the optical communication light emitting circuit and the optical communication light receiving circuit, the power supply control means, Power is supplied to the optical communication light receiving circuit at the start of the optical wireless communication receiving operation, power supply to the optical communication light receiving circuit is stopped at the end of the optical wireless communication receiving operation, and the optical communication is started at the start of the optical wireless communication transmitting operation. A meter controller characterized in that power is supplied to the light emitting circuit, and power supply to the optical communication light emitting circuit is stopped at the end of the transmission operation of the optical wireless communication.
【請求項14】 計量値の算出、流路遮断や各種の警告
を行うと共に、現在の計量値、流路遮断や各種の警告状
態、当該メータ制御器の動作設定の情報を光無線通信に
より外部の光通信装置から読み出し及び書き込み可能に
構成したメータ制御器において、 光無線通信の許可指令を行うための許可指令手段と、 この許可指令手段から前記許可指令を受け取った時又は
何らかの警告が発生した時に光無線通信を許可する通信
許可手段と、 前記許可指令手段から前記許可指令を受け取った時から
所定の第1許可時間が経過した時又は前記通信許可手段
により光無線通信が許可となった時から所定の第2許可
時間が経過した時に光無線通信を禁止する通信禁止手段
と、 前記第1許可時間又は前記第2許可時間のみ光無線通信
を行う通信手段とを有し、 前記通信許可手段は、前記許可指令を受け取った時の前
記第1許可時間と前記警告発生時の前記第2許可時間と
を変えることを特徴とするメータ制御器。
14. The calculation of the measured value, the flow path cutoff and various warnings are performed, and the current measurement value, the flow path cutoff and various warning states, and the operation setting information of the meter controller are externally transmitted by optical wireless communication. In the meter controller configured to be readable and writable by the optical communication device, the permission command means for performing the permission command of the optical wireless communication, and when the permission command is received from the permission command means or some warning is generated. Communication permission means for permitting optical wireless communication, and when a predetermined first permission time elapses from the time when the permission instruction is received from the permission instruction means or when the optical wireless communication is permitted by the communication permission means A communication prohibiting means for prohibiting optical wireless communication when a predetermined second permitting time has elapsed, and a communication means performing optical wireless communication only for the first permitting time or the second permitting time. The communication permission unit, a meter controller, characterized in that changing said first permission time and the warning said second permission time of the event when receiving the permission instruction.
JP2001196960A 2001-06-28 2001-06-28 Meter controller Pending JP2003016568A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001196960A JP2003016568A (en) 2001-06-28 2001-06-28 Meter controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001196960A JP2003016568A (en) 2001-06-28 2001-06-28 Meter controller

Publications (1)

Publication Number Publication Date
JP2003016568A true JP2003016568A (en) 2003-01-17

Family

ID=19034666

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001196960A Pending JP2003016568A (en) 2001-06-28 2001-06-28 Meter controller

Country Status (1)

Country Link
JP (1) JP2003016568A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006016180A (en) * 2004-07-05 2006-01-19 Mitsubishi Electric Building Techno Service Co Ltd Maintenance system for elevator
JP2008051648A (en) * 2006-08-24 2008-03-06 Ricoh Elemex Corp Gas meter
US9160682B2 (en) 2013-03-14 2015-10-13 Elster Solutions, Llc Wireless network communication nodes with opt out capability
JP2017135983A (en) * 2012-04-27 2017-08-03 株式会社半導体エネルギー研究所 Power reception control device and electronic apparatus
CN111028501A (en) * 2019-12-12 2020-04-17 国网河南省电力公司南阳供电公司 Client electric quantity real-time viewing device based on network video monitoring platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05166092A (en) * 1991-12-13 1993-07-02 Aichi Tokei Denki Co Ltd Handy meter reading system
JPH0869594A (en) * 1994-08-30 1996-03-12 Tokyo Gas Co Ltd Meter reading device
JPH09115084A (en) * 1995-10-17 1997-05-02 T & D:Kk Measuring unit
JP2001074561A (en) * 1999-09-02 2001-03-23 Hioki Ee Corp Measuring device and data collector
WO2001022175A1 (en) * 1999-09-17 2001-03-29 Seiko Epson Corporation Electronic timepiece, method of controlling electronic timepiece, adjusting system of electronic timepiece and adjusting method of electronic timepiece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05166092A (en) * 1991-12-13 1993-07-02 Aichi Tokei Denki Co Ltd Handy meter reading system
JPH0869594A (en) * 1994-08-30 1996-03-12 Tokyo Gas Co Ltd Meter reading device
JPH09115084A (en) * 1995-10-17 1997-05-02 T & D:Kk Measuring unit
JP2001074561A (en) * 1999-09-02 2001-03-23 Hioki Ee Corp Measuring device and data collector
WO2001022175A1 (en) * 1999-09-17 2001-03-29 Seiko Epson Corporation Electronic timepiece, method of controlling electronic timepiece, adjusting system of electronic timepiece and adjusting method of electronic timepiece

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006016180A (en) * 2004-07-05 2006-01-19 Mitsubishi Electric Building Techno Service Co Ltd Maintenance system for elevator
JP4672295B2 (en) * 2004-07-05 2011-04-20 三菱電機ビルテクノサービス株式会社 Elevator maintenance equipment
JP2008051648A (en) * 2006-08-24 2008-03-06 Ricoh Elemex Corp Gas meter
JP2017135983A (en) * 2012-04-27 2017-08-03 株式会社半導体エネルギー研究所 Power reception control device and electronic apparatus
JP2020036531A (en) * 2012-04-27 2020-03-05 株式会社半導体エネルギー研究所 Power reception control device
JP2021141809A (en) * 2012-04-27 2021-09-16 株式会社半導体エネルギー研究所 Power reception control device
US9160682B2 (en) 2013-03-14 2015-10-13 Elster Solutions, Llc Wireless network communication nodes with opt out capability
CN111028501A (en) * 2019-12-12 2020-04-17 国网河南省电力公司南阳供电公司 Client electric quantity real-time viewing device based on network video monitoring platform

Similar Documents

Publication Publication Date Title
JP3670333B2 (en) Boiling unit temperature control device and method
JP2000081348A (en) Gas meter and its safety device
JP2003016568A (en) Meter controller
JP2009210041A (en) Gas cut-off device
JP4674008B2 (en) Gas shut-off device
JP5195566B2 (en) Flow rate measuring device, fluid supply system and program using the same
JP2007327775A (en) Alarm management system
KR200432487Y1 (en) Wireless Transmitter-Receiver for Measuring Instrument
JP2002098568A (en) Gas meter and optical radio communication system
JP2001255191A (en) Gas meter and optical radio communication system
JP2004279096A (en) Gas meter
JP5143608B2 (en) Gas meter, control method thereof and control program
JP2502548B2 (en) Centralized gas meter reading device
JP2007298393A (en) Gas meter and remote monitoring system
JPH1127759A (en) Equipment, system and method for gas central management
JPH0614744U (en) Fuel cutoff control device
JP2004092946A (en) Wireless remote-control device for air conditioner
JP2001159552A (en) Gas meter
JP2009193316A (en) Alarm unit
JPH11173895A (en) Gas meter
JP3876713B2 (en) Gas security system
JP2002039624A (en) Heating equipment
JP2002147850A (en) State memory device for hot-water supplier
JPH11230794A (en) Lp gas measuring device
JP2009237751A (en) Gas alarm cutoff system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061005

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090410

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091208

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100406