JP2002165366A - Control method of voltage control device for distribution system and control device - Google Patents

Control method of voltage control device for distribution system and control device

Info

Publication number
JP2002165366A
JP2002165366A JP2000356317A JP2000356317A JP2002165366A JP 2002165366 A JP2002165366 A JP 2002165366A JP 2000356317 A JP2000356317 A JP 2000356317A JP 2000356317 A JP2000356317 A JP 2000356317A JP 2002165366 A JP2002165366 A JP 2002165366A
Authority
JP
Japan
Prior art keywords
voltage
control
distribution system
control device
change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000356317A
Other languages
Japanese (ja)
Other versions
JP3525107B2 (en
Inventor
Hiromasa Funakoshi
浩昌 船越
Yutaka Mizohata
豊 溝畑
Hisamasa Ohara
久征 大原
Shunji Hamanaka
俊二 濱中
Yukio Shohata
幸雄 庄畑
Hidenori Kuramoto
英憲 蔵本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Chugoku Electric Manufacturing Co Ltd
Original Assignee
Chugoku Electric Power Co Inc
Chugoku Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc, Chugoku Electric Manufacturing Co Ltd filed Critical Chugoku Electric Power Co Inc
Priority to JP2000356317A priority Critical patent/JP3525107B2/en
Publication of JP2002165366A publication Critical patent/JP2002165366A/en
Application granted granted Critical
Publication of JP3525107B2 publication Critical patent/JP3525107B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

PROBLEM TO BE SOLVED: To maximum utilize the capability of a voltage control device by operating the voltage control device coordinating with the movement of SVR, SSC, SSR devices and utilize the voltage compensation of the SVR, SSC, SSR devices. SOLUTION: The voltage control device makes a control to return reactive power output to a targeted value, when the voltage change of a distribution line is slow and the distribution line voltage is within a dead band of the targeted control voltage of the device. The voltage control device makes a control to return the reactive power output to the targeted value by changing the targeted control voltage following the voltage change of the distribution line, when the voltage change of the distribution line is slow and the voltage is out of the dead band of the targeted control voltage of the device. The voltage control device makes a constant voltage control without changing the targeted control voltage, when the voltage change of the distribution line is fast.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、配電系統の電圧を
補償する電圧制御装置の協調制御方法に関し、特にイン
バータ回路,コンデンサ及び変圧器を具備する電圧制御
装置をSVR,SSC,SSR等の電圧補償装置の動作
に協調させて運転制御する方法及び制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cooperative control method of a voltage control device for compensating a voltage of a power distribution system, and more particularly, to a voltage control device having an inverter circuit, a capacitor, and a transformer. The present invention relates to a method and a control device for performing operation control in cooperation with the operation of a compensation device.

【0002】[0002]

【従来の技術】配電線には、一般需要家の様々な負荷が
接続されており、それらの負荷設備が配電線に接続され
ると、負荷と配電線とのリアクトル成分によって、電圧
低下が発生する。このリアクトル成分によって発生する
電圧低下を抑制させるため、従来は配電線の途中にSV
R(負荷時タップ切換変圧器装置)を、配電線末端には
SSC装置(段階制御式コンデンサ装置)を、また需要
家工場内においては力率改善コンデンサを設置し、この
電圧低下を抑制していた。
2. Description of the Related Art Various loads of general consumers are connected to a distribution line. When those load facilities are connected to the distribution line, a voltage drop occurs due to a reactor component between the load and the distribution line. I do. Conventionally, in order to suppress the voltage drop caused by this reactor component, an SV
R (Tap switching transformer device at load), SSC device (Stage controlled capacitor device) at the end of the distribution line, and a power factor improving capacitor installed in the customer factory to suppress this voltage drop. Was.

【0003】また、需要家工場内に設置された力率改善
コンデンサ装置による夜間の電圧上昇を抑制するため、
配電線末端にSSR(段階制御式リアクトル装置)を設
置し、電圧の上昇を抑制していた。図11は配電系統の
電圧制御例を図示したものである。図中、1は配電用変
電所、2は配電線、3は負荷、4はSVR、5はSS
C、6は電圧制御装置、7は電圧補償装置を制御するた
めに配電線の電圧を検出する計器用変圧器を表してい
る。この例ではSSRは設置されていない。
Further, in order to suppress a nighttime voltage rise due to a power factor improving capacitor device installed in a customer factory,
An SSR (Stage Controlled Reactor) was installed at the end of the distribution line to suppress voltage rise. FIG. 11 illustrates an example of voltage control of a distribution system. In the figure, 1 is a distribution substation, 2 is a distribution line, 3 is a load, 4 is an SVR, and 5 is an SS.
C and 6 indicate voltage control devices, and 7 indicates an instrument transformer for detecting the voltage of the distribution line to control the voltage compensation device. In this example, no SSR is installed.

【0004】これらのSVR,SSC,SSRの電圧補
償装置は、搭載している機械式接点やコンデンサ等の寿
命により、1日の動作回数は限られており、頻繁に動作
させることができない。従って、ある程度大きな電圧変
動が、ある程度長い時間継続しないと動作を開始しない
ように、低速度で動作するように設定・運用されてい
た。すなわち、急激な電圧変動を補償できないという問
題があった。
[0004] These SVR, SSC, and SSR voltage compensators are limited in the number of times of operation per day due to the life of the mechanical contacts, capacitors, and the like mounted thereon, and cannot be operated frequently. Therefore, it has been set and operated to operate at a low speed so that the operation does not start unless a relatively large voltage fluctuation continues for a long time. That is, there is a problem that a sudden voltage fluctuation cannot be compensated.

【0005】このため、トランジスタ(IGBT)を使
用して、交流電圧を直流電圧より作りだし、それを多重
変圧器を介して配電線電圧VSと接続させることによ
り、無効電力を発生する構造の電圧制御装置6が配電線
末端に設置されている。電圧制御装置は、配電線電圧V
Sを取り込んで、配電線電圧が固定基準電圧V1となる
ように、PI制御を用いて、配電線電圧との位相角を算
出し、インバ−タの位相角θを制御して無効電力Qを配
電系統に供給することにより瞬時に配電線の電圧制御を
行なっていた。
[0005] For this reason, a voltage control having a structure in which a reactive power is generated by generating an AC voltage from a DC voltage using a transistor (IGBT) and connecting the AC voltage to a distribution line voltage VS through a multiple transformer. The device 6 is installed at the end of the distribution line. The voltage control device determines the distribution line voltage V
S, the phase angle with the distribution line voltage is calculated by using PI control so that the distribution line voltage becomes the fixed reference voltage V1, and the phase angle θ of the inverter is controlled to obtain the reactive power Q. By supplying the power to the distribution system, the voltage of the distribution line was instantaneously controlled.

【0006】電圧制御装置は、1日の制御回数に制限が
なく、何回でも制御を行なうことができるので、従来の
SVR,SSC,SSR装置に比べて、圧倒的に高速な
電圧補償が可能になった。電圧制御装置により高速な電
圧補償を行わせると、電圧変動がその補償可能範囲であ
る限りにおいて、配電線の電圧変動が殆どなくなり、一
定とすることができる。
[0006] The voltage control device has no limit on the number of times of control per day, and can perform control any number of times, so that overwhelmingly high-speed voltage compensation can be performed as compared with conventional SVR, SSC, and SSR devices. Became. When high-speed voltage compensation is performed by the voltage control device, as long as the voltage fluctuation is within the compensable range, the voltage fluctuation of the distribution line hardly occurs and can be kept constant.

【0007】[0007]

【発明が解決しようとする課題】しかし、従来のSV
R,SSC,SSR装置は、それぞれ配電系統電圧と設
定基準電圧とを比較し、両者の電圧が所定時間離れてい
る場合に制御を行なう制御方式となっているため、電圧
変化が殆ど一定となってしまうと、これら既設のSV
R,SSC,SSR装置は全く動作しなくなる。
However, the conventional SV
The R, SSC, and SSR devices each have a control method in which the distribution system voltage is compared with a set reference voltage and control is performed when both voltages are separated by a predetermined time, so that the voltage change is almost constant. If you do, these existing SV
The R, SSC, and SSR devices do not operate at all.

【0008】そこで、電圧制御装置に高速な電圧補償を
行なわせると、電圧変化が電圧制御装置の補償範囲内で
ある限りにおいて、高速応動の電圧制御装置が結果とし
て電圧補償を負担することになる。電圧制御装置の補償
がその調整限度を超えて初めて、SVR,SSC,SS
R装置が電圧補償を負担することになる。これでは、電
圧制御装置を設置したことにより、SVR,SSC,S
SR装置の能力が活かせなくなり、配電系統に設置した
電圧補償装置の総合補償能力が低下し、急激でかつ小さ
な電圧変動なら補償できるが、急激でかつ大きな電圧変
動に対して、電圧制御装置では補償できなくなるという
問題があった。
When the voltage controller performs high-speed voltage compensation, the high-speed responsive voltage controller bears the voltage compensation as long as the voltage change is within the compensation range of the voltage controller. . Only when the compensation of the voltage controller exceeds its regulation limit does SVR, SSC, SS
The R device will be responsible for voltage compensation. In this case, by installing the voltage control device, SVR, SSC, S
The capability of the SR device cannot be used, and the total compensation capability of the voltage compensator installed in the distribution system is reduced. It is possible to compensate for sudden and small voltage fluctuations, but the voltage controller compensates for sudden and large voltage fluctuations. There was a problem that it became impossible.

【0009】本発明は、電圧制御装置の運転制御をSV
R,SSC,SSR装置の動作と協調させてそれぞれの
装置の機能を活かした制御をすることにより、上記問題
を解決する制御方法及び装置に関する。
According to the present invention, the operation control of the voltage
The present invention relates to a control method and an apparatus for solving the above problem by performing control utilizing the functions of the respective apparatuses in cooperation with the operations of R, SSC, and SSR apparatuses.

【0010】[0010]

【課題を解決するための手段】本発明の電圧制御装置の
制御方法は、配電系統の電圧変化が緩やかなときは無効
電力を目標値に戻す制御を行い、電圧変化が急なときに
は所定時間電圧一定制御を行なうように構成することに
より、外部のSVR,SSC,SSR装置の動作を阻害
しないように、制御する方法を提供する。
According to a control method of a voltage control apparatus of the present invention, control is performed to return reactive power to a target value when a voltage change in a power distribution system is gradual, and when a voltage change is sharp, a voltage is controlled for a predetermined time. Provided is a method for performing control so as not to hinder the operation of the external SVR, SSC, and SSR devices by configuring to perform constant control.

【0011】さらに、本発明の制御方法は、配電系統の
電圧変化が緩やかなときは、電圧が制御目標電圧の不感
帯内外を問わず、電圧制御装置の制御目標電圧を配電系
統の電圧変化に追随させて変動させ、無効電力を目標値
に戻す制御を行い、電圧変化が急であるときは、電圧制
御装置の制御目標電圧を変更しないで電圧一定制御を行
なう方法を提供する。
Further, according to the control method of the present invention, when the voltage change of the distribution system is gentle, the control target voltage of the voltage control device follows the voltage change of the distribution system regardless of whether the voltage is inside or outside the dead zone of the control target voltage. The present invention provides a method for performing constant voltage control without changing the control target voltage of the voltage control device when the voltage change is steep.

【0012】また、配電系統の電圧変化が急で、配電系
統の基準電圧の方向に向かうときは、電圧制御装置の制
御目標電圧を配電系統の電圧に、基準電圧を超えるとき
は基準電圧にそれぞれ変更して、電圧改善の行き過ぎを
防止する。配電系統の電圧変化が緩やかで、電圧が配電
系統の基準電圧の上限値、下限値を超えるときは、電圧
制御装置の制御目標電圧を配電系統の基準電圧の上限
値、下限値に変更して、電圧制御装置の協調運転を解除
して、電圧補償を速やかに行なう。
Further, when the voltage of the distribution system changes suddenly and goes in the direction of the reference voltage of the distribution system, the control target voltage of the voltage control device is set to the voltage of the distribution system, and when the voltage exceeds the reference voltage, the control voltage is set to the reference voltage. To prevent overshoot in voltage improvement. If the voltage of the distribution system changes slowly and the voltage exceeds the upper and lower limits of the reference voltage of the distribution system, change the control target voltage of the voltage controller to the upper and lower limits of the reference voltage of the distribution system. Then, the cooperative operation of the voltage control device is released, and the voltage compensation is promptly performed.

【0013】本発明の制御装置は、電圧制御装置の出力
側の配電系統電圧を検出する電圧検出部と、電圧制御装
置の出力無効電力を算出する無効電力算出部と、電圧一
定制御部と、算出された無効電力を所定速度で目標無効
電力に復帰制御させる電力復帰制御部と、インバータ回
路、コンデンサ及び変圧器を含む電圧制御装置のインバ
ータ回路のスイッチング手段を導通制御するスイッチン
グ信号発生部と、配電系統の電圧変化の緩急を判定し、
電圧一定制御部の制御目標電圧を変更し、かつ前記スイ
ッチング信号発生部への出力信号を電力復帰制御部と電
圧一定制御部の制御出力を切換え指令を出力する協調制
御部とを具備する配電系統の電圧制御装置の制御装置で
あって、配電系統の電圧変化が緩やかなときは電力復帰
制御部により無効電力を目標値に戻す制御を行い、配電
系統の電圧変化が急なときには電圧一定制御部により所
定時間電圧一定制御を行なう制御装置を提供する。
[0013] The control device of the present invention includes a voltage detection unit that detects a distribution system voltage on the output side of the voltage control device, a reactive power calculation unit that calculates an output reactive power of the voltage control device, a constant voltage control unit, A power return control unit that controls the calculated reactive power to return to the target reactive power at a predetermined speed, a switching signal generation unit that controls conduction of switching means of the inverter circuit of the voltage control device including the inverter circuit, the capacitor, and the transformer; Judgment of voltage change of distribution system
A power distribution system comprising: a power recovery control unit that changes a control target voltage of a constant voltage control unit and outputs an output signal to the switching signal generation unit; and a cooperative control unit that outputs a command to switch a control output of the constant voltage control unit. A control device for controlling the reactive power to return to a target value by a power restoration control unit when the voltage change in the distribution system is gradual, and a constant voltage control unit when the voltage change in the distribution system is sharp. To provide a control device for performing constant voltage control for a predetermined time.

【0014】[0014]

【発明の実施の形態】本発明を図1〜図9の実施例を参
照して説明する。図1は本発明の電圧制御装置の一制御
装置例の概念図を示している。図中、10は本発明の制
御装置を、11は配電線の電圧を検出する電圧検出部、
12は本発明の制御をコントロールする協調制御部、1
3は配電系統の基準電圧を固定基準電圧(V1)として
記憶される固定基準電圧(V1)設定値、14は電圧制
御装置の制御目標電圧値である変動基準電圧(V0)を
記憶する変動基準電圧(V0)記憶部、15はコンデン
サ6bの電圧を検出する電圧検出部、16は無効電力算
出部、17は電圧一定制御部、18は電力復帰制御部、
19は電力復帰制御部18に設定、記憶される目標無効
電力(Q0)設定値、20は電圧制御装置のインバ−タ
回路のトランジスタに導通信号を供給するスイッチング
信号発生部、21は協調制御部12の切換え指令により
電圧一定制御部17の出力信号と電力復帰制御部18の
出力信号とを切り換えてスイッチング信号発生部20に
出力するスイッチング手段を表し、11〜21は制御装
置10の構成部品である。なお、6a,6b,6cは電
圧制御装置6のインバータ回路、コンデンサ、多重接続
変圧器を表している。以下、本明細書及び図面で同一参
照符号を付したものは同一のものを意味している。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described with reference to the embodiments shown in FIGS. FIG. 1 shows a conceptual diagram of an example of one control device of the voltage control device of the present invention. In the figure, 10 is a control device of the present invention, 11 is a voltage detection unit for detecting the voltage of the distribution line,
Reference numeral 12 denotes a cooperative control unit that controls the control of the present invention;
Reference numeral 3 denotes a fixed reference voltage (V1) set value in which the reference voltage of the distribution system is stored as a fixed reference voltage (V1). Reference numeral 14 denotes a fluctuation reference which stores a fluctuation reference voltage (V0) which is a control target voltage value of the voltage control device. A voltage (V0) storage unit, 15 is a voltage detection unit that detects the voltage of the capacitor 6b, 16 is a reactive power calculation unit, 17 is a constant voltage control unit, 18 is a power recovery control unit,
19 is a target reactive power (Q0) set value which is set and stored in the power recovery control unit 18, 20 is a switching signal generation unit for supplying a conduction signal to a transistor of an inverter circuit of the voltage control device, and 21 is a cooperative control unit. 12 denotes switching means for switching between the output signal of the constant voltage control unit 17 and the output signal of the power recovery control unit 18 according to the switching command 12 and outputting the switching signal to the switching signal generation unit 20. is there. 6a, 6b, 6c represent an inverter circuit, a capacitor, and a multiple connection transformer of the voltage control device 6. Hereinafter, the same reference numerals in the specification and the drawings denote the same components.

【0015】電圧検出部11は配電線の電圧を計器用変
圧器7で変換した測定可能な電圧波形から電圧の実効値
を算出し、VSを出力する。電圧検出部15はコンデン
サ6bの電圧VIの電圧値を検出し、出力する。無効電
力算出部16は電圧検出部11,15から入力された電
圧値VS,VIをもとに、インバータ回路から発生して
いる無効電力QIを計算する。
The voltage detector 11 calculates the effective value of the voltage from the measurable voltage waveform obtained by converting the voltage of the distribution line by the instrument transformer 7, and outputs VS. The voltage detector 15 detects and outputs the voltage value of the voltage VI of the capacitor 6b. The reactive power calculator 16 calculates the reactive power QI generated from the inverter circuit based on the voltage values VS and VI input from the voltage detectors 11 and 15.

【0016】電圧一定制御部17は電圧検出部11から
入力される配電線の電圧VSが変動基準電圧(V0)記
憶部14に記憶された変動基準電圧V0と等しくなるよ
うな位相角をPI制御による所定速度でスイッチング信
号発生部20に出力する。電力復帰制御部18は無効電
力算出部16から入力される無効電力QIを目標無効電
力Q0(例えば、0kvarや遅れ200 kvarに設定す
る。また、プログラマブルコントロール的に単位時間毎
に、かつ3パターンで設定することができる。)にPI
制御による所定速度で復帰させる位相角信号θを出力す
る(QをQ0に戻す制御)。
The constant voltage control section 17 performs PI control on the phase angle such that the voltage VS of the distribution line input from the voltage detection section 11 becomes equal to the fluctuation reference voltage V0 stored in the fluctuation reference voltage (V0) storage section 14. To the switching signal generator 20 at a predetermined speed. The power recovery control unit 18 sets the reactive power QI input from the reactive power calculation unit 16 to the target reactive power Q0 (for example, 0 kvar or a delay of 200 kvar. In addition, in a programmable control, every unit time, and in three patterns) Can be set.)
A phase angle signal θ for returning at a predetermined speed by control is output (control for returning Q to Q0).

【0017】協調制御部12は、本発明の制御方法に基
づいて、配電線電圧VSの電圧変化とその緩急を判定
し、電圧一定制御部17及び電力復帰制御部18の出力
の選択及び変動基準電圧V0を設定し、変動基準電圧
(V0)記憶部14に設定されたV0を記憶させる。固
定基準電圧(V1)設定値13は、接続される配電系統
の基準電圧、例えば6,600Vに設定される。
Based on the control method of the present invention, the coordinating control unit 12 determines a change in the distribution line voltage VS and its steepness, and selects the output of the constant voltage control unit 17 and the output of the power restoration control unit 18 and determines a change standard. The voltage V0 is set, and the set V0 is stored in the fluctuation reference voltage (V0) storage unit 14. The fixed reference voltage (V1) set value 13 is set to the reference voltage of the connected distribution system, for example, 6,600V.

【0018】図2,図3は本発明の電圧制御装置の制御
波形例を模式的に表した図で、図2が負荷変動が緩やか
なとき、図3が負荷変動が急なときにおける電圧制御装
置の制御例である。図のA,B,C,D,E欄は、それ
ぞれ負荷量、配電線電圧VS、SSC装置の動作(ステ
ップアップ)・復帰(ステップダウン)状態、電圧制御
装置の無効電力出力Q・目標無効電力Q0、変動基準電
圧V0=制御目標電圧、時間を表している。
FIG. 2 and FIG. 3 are diagrams schematically showing examples of control waveforms of the voltage control device of the present invention. FIG. 2 shows the voltage control when the load change is gentle, and FIG. It is a control example of an apparatus. The columns A, B, C, D and E in the figure are the load amount, the distribution line voltage VS, the operation (step-up) / return (step-down) state of the SSC device, and the reactive power output Q / target reactive of the voltage control device, respectively. Power Q0, fluctuation reference voltage V0 = control target voltage, and time.

【0019】図2,3により本発明の基本的原理を説明
する。図2のように負荷変動が緩やかなときには、電圧
制御装置の目標制御電圧である変動基準電圧V0を配電
線電圧VSに追随させて変動させ(図2,D欄の変動基
準電圧V0参照)、無効電力を目標値Q0だけ配電系統
に供給する(図2,D欄の出力Q参照)ことで、電圧制
御装置は緩やかな電圧変化に対応する電圧は補償せず、
SSC(SVR,SSR)装置に受け持たさせる(図
2,B欄の配電線電圧VS,C欄のSSC装置の動作・
復帰状態参照)。
The basic principle of the present invention will be described with reference to FIGS. When the load fluctuation is gradual as shown in FIG. 2, the fluctuation reference voltage V0, which is the target control voltage of the voltage control device, is changed to follow the distribution line voltage VS (see the fluctuation reference voltage V0 in column D in FIG. 2). By supplying the reactive power to the distribution system by the target value Q0 (see output Q in column D in FIG. 2), the voltage control device does not compensate for the voltage corresponding to the gradual voltage change.
The SSC (SVR, SSR) device is responsible for the distribution line voltage VS in FIG.
See the return state).

【0020】図3のような急峻な電圧変化であるときは
最初の所定期間(図3,E欄の制御時間Tkeep:t
7〜t8,t11〜t12)中、電圧制御装置の変動基
準電圧V0を変更せず、電圧制御装置の無効電力供給に
より高速に電圧を補償する(図3のD欄の出力Q,B欄
の配電線電圧VS参照)。次いで、最初の所定期間(制
御時間Tkeep)後は、無効電力を目標値Q0に戻す
制御を行なうので、配電線電圧VSは変化する。SSC
装置の動作電圧以上の電圧変化になるとSSC装置が動
作して、配電線電圧を補償する(図3のC欄、t9〜t
10,t13〜t14におけるSSC装置動作、B欄の
配電線電圧VS参照)。なお、図2,図3ではSSC装
置の復帰と電圧制御装置の無効電力出力の目標値Q0に
戻る時点がたまたま一致している場合である。
When the voltage changes steeply as shown in FIG. 3, the first predetermined period (control time Tkeep: t in FIG.
During the period from 7 to t8 and t11 to t12), the voltage is compensated at high speed by supplying the reactive power of the voltage control device without changing the fluctuation reference voltage V0 of the voltage control device (the output Q and B columns in column D in FIG. 3). Distribution line voltage VS). Next, after the first predetermined period (control time Tkeep), control is performed to return the reactive power to the target value Q0, so that the distribution line voltage VS changes. SSC
When the voltage change exceeds the operating voltage of the device, the SSC device operates to compensate for the distribution line voltage (column C in FIG. 3, t9 to t).
10, SSC device operation from t13 to t14, see distribution line voltage VS in column B). Note that FIGS. 2 and 3 show a case where the return of the SSC device coincides with the point in time at which the voltage control device returns to the target value Q0 of the reactive power output.

【0021】図4〜図7は本発明による制御方法例を示
すフロー図を示し、図4はフロー全体を示し、図5は初
期設定ブロック,電圧変化までの時間カウントブロッ
ク,制御期間中判定ブロックを、図6は分岐Aブロック
(処理Bブロックを含む)を、図7は処理Aブロック,
処理Cブロックを、図8は分岐Bブロック(処理Bブロ
ックを含む)に含まれるフローを示している。図4中、
30は開始ステップ、31は初期設定ブロック、32は
電圧変化までの時間カウントブロック、33は制御中か
否かの判定ブロック、34は分岐Aブロック、35は処
理Aブロック、36は分岐Bブロック、37は処理Cブ
ロックを表している。
4 to 7 are flowcharts showing an example of a control method according to the present invention. FIG. 4 shows the entire flow, and FIG. 5 is an initial setting block, a time counting block until voltage change, and a control period determination block. 6 shows a branch A block (including a processing B block), and FIG. 7 shows a processing A block.
FIG. 8 shows a flow included in the processing C block, and FIG. 8 shows a flow included in the branch B block (including the processing B block). In FIG.
30 is a start step, 31 is an initial setting block, 32 is a time count block until voltage change, 33 is a determination block as to whether control is being performed, 34 is a branch A block, 35 is a processing A block, 36 is a branch B block, Reference numeral 37 denotes a processing C block.

【0022】処理Aは電圧制御装置の「QをQ0に戻す
制御」で制御をし、処理Cは電圧制御装置の目標制御電
圧設定値である変動基準電圧V0で電圧一定にする制御
である。図9は、分岐Aブロック34による電圧変化の
判定例を、図10は分岐Bブロックと処理Cブロックに
よる電圧一定制御における変動基準電圧V0の判定例、
制御例を示す。
The process A is controlled by "control to return Q to Q0" of the voltage control device, and the process C is control to make the voltage constant at the fluctuation reference voltage V0 which is the target control voltage set value of the voltage control device. FIG. 9 illustrates an example of determining a voltage change by the branch A block 34, FIG. 10 illustrates an example of determining the fluctuation reference voltage V0 in the constant voltage control by the branch B block and the processing C block,
A control example will be described.

【0023】図5における、初期設定ブロック31のス
テップS1は変動基準電圧V0を例えば6,600Vに
初期設定、ステップS2,S3は制御直後からの経過時
間の監視カウンタJ,電圧変化までの時間カウンタIの
カウント値をそれぞれ「0」に初期設定するステップで
ある。カウンタIは所定間隔時間、例えば1/6サイク
ル(60Hzで2.8mS)毎に電圧検出部11で演算
記憶された配電線電圧VSの実効値を協調制御部12、
電圧一定制御部17、電力復帰制御部18及び無効電力
算出部16に取込み、取込んだ配電線電圧VSの実効値
を制御部及び演算部に取込み、取込んだ配電線電圧VS
の緩急変化の判定に使用される。
In FIG. 5, step S1 of the initial setting block 31 initially sets the fluctuation reference voltage V0 to, for example, 6,600 V. Steps S2 and S3 denote a monitoring counter J for the elapsed time immediately after the control and a time counter for the voltage change. In this step, the count values of I are each initialized to “0”. The counter I calculates the effective value of the distribution line voltage VS calculated and stored by the voltage detection unit 11 at every predetermined interval time, for example, every 1/6 cycle (2.8 ms at 60 Hz),
The effective value of the taken distribution line voltage VS is taken into the control unit and the calculation unit, taken into the constant voltage control unit 17, the power restoration control unit 18, and the reactive power calculation unit 16, and taken into the taken distribution line voltage VS.
It is used for judging the change of speed.

【0024】変動基準電圧V0を例えば6,600Vに
初期設定し、カウンタI,Jを初期設定「0」にする
と、ステップS4で配電線電圧VSを取り込み、ステッ
プS5で1/6サイクル前に取込んだ配電線電圧VS1
と比較し(|VS−VS1|)、VS=VS1ならば電
圧変化なしとしてステップS6に進み、ステップS6で
カウンタIのカウント値iを「1」増やし、ステップS
7でカウンタIのカウント値iが「20」以上であれ
ば、ステップS8でカウンタIのカウント値iを「2
0」とする。また配電線電圧が変化する(VSはVS1
と等しくない。)とステップS9に進み、i1の値を1
/6サイクル前のカウンタIの値iとし、その後、ステ
ップS10で、カウンタの値iを0にリセットして、制
御期間中判定ブロック33のステップS11に進む。
When the fluctuation reference voltage V0 is initially set to, for example, 6,600 V and the counters I and J are set to the initial setting "0", the distribution line voltage VS is taken in step S4, and is taken 1/6 cycle before in step S5. Distribution line voltage VS1
(| VS−VS1 |), and if VS = VS1, it is determined that there is no voltage change, and the process proceeds to step S6. In step S6, the count value i of the counter I is increased by “1”.
If the count value i of the counter I is equal to or greater than "20" in step S7, the count value i of the counter I is set to "2" in step S8.
0 ". Also, the distribution line voltage changes (VS is VS1
Is not equal to ) And step S9, and the value of i1 is set to 1
The value of the counter I is set to i cycle before, and then the value of the counter i is reset to 0 in step S10, and the process proceeds to step S11 of the control block determination block 33.

【0025】ステップS11で、変動基準電圧V0で電
圧を一定にする制御期間中であるか否かをカウンタJの
カウンタ値(この制御期間の時間Tkeepに相当する
カウント値でリセット)で監視する。該制御期間中と判
断されると、処理Cブロック37に進み、そうでないな
らば、分岐Aブロック34(図6)のステップS12に
進む。
In step S11, whether or not a control period for keeping the voltage constant at the fluctuation reference voltage V0 is monitored by the counter value of the counter J (reset by a count value corresponding to the time Tkeep during this control period). If it is determined that the period is during the control period, the process proceeds to the process C block 37, and if not, the process proceeds to step S12 of the branch A block 34 (FIG. 6).

【0026】上記制御時間Tkeepは、電圧制御装置
が配電線電圧を変動基準電圧V0に復帰させるのに必要
な時間(PI制御係数の選び方と、配電系統の定数等に
よって決まる。)に基づいて設定される。例えば、電圧
制御装置による変動基準電圧V0への復帰時間は約10
0mS程度であることから、Tkeepは普通200m
Sに設定される。PI制御係数を変更して、より高速な
制御に変更したいときは、Tkeepを変更する。ま
た、負荷量の増加速度が比較的遅く、又長時間継続する
特性を有する負荷である場合には、制御を200mSで
終了すると都合が悪い場合がある。このような場合Tk
eepを調整して、V0制御が長時間実施されるように
設定する。
The control time Tkeep is set based on a time required for the voltage control device to return the distribution line voltage to the fluctuation reference voltage V0 (determined by a method of selecting a PI control coefficient, a constant of a distribution system, and the like). Is done. For example, the return time to the fluctuation reference voltage V0 by the voltage control device is about 10
Tkeep is usually 200m because it is about 0mS
Set to S. When it is desired to change the PI control coefficient to control at higher speed, Tkeep is changed. If the load has a relatively slow increasing rate and has a characteristic that lasts for a long time, it may not be convenient to terminate the control at 200 mS. In such a case, Tk
The eep is adjusted so that the V0 control is performed for a long time.

【0027】分岐Aブロック34(図6)のステップS
12で、配電線電圧VSと1/6サイクル前の配電線電
圧VS1とを比較し(|VS−VS1|)、VS=VS
1であるならば電圧変化なしとし分岐経由で、ステッ
プS18でVSは不感帯内と判断され(判断分岐)、
処理Aブロック35へ進む。また配電線電圧VSが変化
するとステップS13に進み、i1が電圧変化の緩急を
判定するためのカウンタ設定値isより大きいとき、電
圧変化が緩やかである可能性があるとしてステップS1
4へ進む。isより小さいときは電圧変化が急であると
判断され(判断分岐)、VSが不感帯内(判断分岐
)であれば処理Aブロック35に進み、VSが不感帯
外(判断分岐)であれば分岐Bブロック36へ進む。
Step S of branch A block 34 (FIG. 6)
At 12, the distribution line voltage VS is compared with the distribution line voltage VS1 before 1/6 cycle (| VS−VS1 |), and VS = VS
If it is 1, it is determined that there is no voltage change, and via a branch, VS is determined to be within the dead zone in step S18 (determination branch), and
Proceed to processing A block 35. When the distribution line voltage VS changes, the process proceeds to step S13. When i1 is larger than a counter set value is for determining whether the voltage change is gradual, it is determined that the voltage change may be gradual at step S1.
Proceed to 4. If is smaller than is, it is determined that the voltage change is abrupt (decision branch). If VS is within the dead zone (decision branch), the process proceeds to processing A block 35. If VS is outside the dead zone (decision branch), branch B is performed. Proceed to block 36.

【0028】ステップS14で、1回の電圧変化が所定
値より大きいとき、例えば12V以上のときは、直ちに
電圧変化が急であると判断される(判断分岐)とVS
が不感帯内(判断分岐)であれば処理Aブロック35
へ進み、VSが不感帯外(判断分岐)であれば分岐B
ブロック36へ進む。
In step S14, if one voltage change is larger than a predetermined value, for example, 12V or more, it is immediately determined that the voltage change is abrupt (judgment branch), and VS
Is within the dead zone (decision branch), processing A block 35
If the VS is outside the dead zone (determination branch), branch B
Proceed to block 36.

【0029】また、12V未満のときは、電圧変化が緩
やかとして(判断分岐)ステップS15に進み,変動
基準電圧(V0)記憶部に記憶された制御目標電圧V0
の値を、配電線電圧VSの値に変更し、ステップS16
に進む。続く、ステップS16で、変更後の制御目標電
圧V0が配電線電圧の上下限値を超過している場合はス
テップS17に進み、変動基準電圧(V0)記憶部に記
憶された制御目標電圧V0を上下限値に変更し、VSが
不感帯内(判断分岐)であれば処理Aブロック35へ
進み、VSが不感帯外(判断分岐)であれば分岐Bブ
ロック36へ進む。変更後の制御目標電圧V0が配電線
電圧の上下限値を超過していない場合は、VSは不感帯
内と判断され(判断分岐)、処理Aブロック35へ進
む。配電系統電圧VSが6,600Vの場合、V0の上
限値は7,260V、下限値は5,940Vに設定され
る。
On the other hand, if the voltage is less than 12 V, it is determined that the voltage change is gradual (determination branch), and the flow advances to step S15 to control the control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit.
Is changed to the value of the distribution line voltage VS, and step S16
Proceed to. Subsequently, in step S16, when the changed control target voltage V0 exceeds the upper and lower limit values of the distribution line voltage, the process proceeds to step S17, and the control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit is changed. The upper limit value is changed to the lower limit value. If VS is within the dead zone (decision branch), the process proceeds to processing A block 35. If VS is outside the dead zone (decision branch), the process proceeds to branch B block 36. If the changed control target voltage V0 does not exceed the upper and lower limit values of the distribution line voltage, VS is determined to be within the dead zone (determination branch), and the process proceeds to the processing A block 35. When the distribution system voltage VS is 6,600 V, the upper limit value of V0 is set to 7,260 V, and the lower limit value is set to 5,940 V.

【0030】図9の模式図により分岐Aブロック34の
電圧変化判定の原理を説明する。カウンタIのカウント
値iは「20」(60Hzで55.5mS)で飽和し、
ステップS13のisを「4」に設定した例である。電
圧変化を検出したときのカウント値i1により、電圧変
化の緩急が判定できる。カウンタIのカウント値の飽和
値はこの飽和値以上の時間を表し、1回の電圧変化が所
定値(図中の例では「12V」で、12V以上のとき
(図6のステップS14の分岐の場合)以外は全て電
圧変化は緩やかであると判定する。
The principle of judging the voltage change of the branch A block 34 will be described with reference to the schematic diagram of FIG. The count value i of the counter I saturates at "20" (55.5 mS at 60 Hz),
This is an example in which is is set to “4” in step S13. The speed of the voltage change can be determined based on the count value i1 when the voltage change is detected. The saturation value of the count value of the counter I indicates a time period equal to or longer than the saturation value, and when one voltage change is a predetermined value (“12 V” in the example in the figure and 12 V or more (see the branch of step S14 in FIG. 6). In all other cases, it is determined that the voltage change is gradual.

【0031】分岐Aブロック34(図6)のステップS
18において、配電線電圧VSが制御目標電圧V0の不
感帯内(分岐Aブロックの判断分岐)の場合、処理A
ブロック35(図7)のステップS19へ進む。ステッ
プS19で配電線電圧VSが配電線の上下限値を超過し
ていると判断されると、そのまま電圧変化までの時間カ
ウントブロック32のステップS4に戻る。また、超過
していないと判断されるとステップS20に進む。
Step S of branch A block 34 (FIG. 6)
At 18, when the distribution line voltage VS is within the dead zone of the control target voltage V0 (determination branch of the branch A block), the processing A
The process proceeds to step S19 of block 35 (FIG. 7). If it is determined in step S19 that the distribution line voltage VS exceeds the upper and lower limit values of the distribution line, the process returns to step S4 of the time count block 32 until the voltage change. If it is determined that the number does not exceed the predetermined value, the process proceeds to step S20.

【0032】ステップS20で電圧制御装置が発生して
いる無効電力Qが目標無効電力Q0に等しいと判断され
ると、そのまま電圧変化までの時間カウントブロック3
2のステップS4に戻る。等しくない場合は、協調制御
部12は、スイッチ21を切り換えて電力復帰制御部1
8の出力をスイッチング信号発生部20に接続して、電
力復帰制御部18によりQをQ0に戻す制御が行われ、
電圧変化までの時間カウントブロック32(図5)のス
テップS4に戻る。
If it is determined in step S20 that the reactive power Q generated by the voltage control device is equal to the target reactive power Q0, the time counting block 3 until the voltage changes is used.
It returns to step S4 of No. 2. If not equal, the cooperative control unit 12 switches the switch 21 to switch the power return control unit 1
8 is connected to the switching signal generator 20 and the power recovery controller 18 controls to return Q to Q0.
It returns to step S4 of the time count block 32 (FIG. 5) until a voltage change.

【0033】配電線電圧VSが制御目標電圧V0の不感
帯外(分岐Aブロック34の判断分岐)の場合、分岐
Bブロック36(図8)のステップS22へ進む。ステ
ップS22で制御目標電圧V0と設定基準電圧V1とを
比較し、両者が等しいと判断すると処理Cブロック37
へ進む。等しくなければステップS23へ進む。ステッ
プS23で、電圧変化が配電線の設定基準電圧V1に向
かって変化していると判断される(電圧改善方向)とス
テップS26に進み、ステップS26で、変動基準電圧
(V0)記憶部に記憶された制御目標電圧V0を配電線
電圧VSに変更し、電圧変化までの時間カウントブロッ
ク32(図5)のステップS4に戻る。そうでないとき
(電圧悪化方向)は、変動基準電圧(V0)記憶部に記
憶された制御目標電圧V0を変更することなくステップ
S24へ進む。
If the distribution line voltage VS is outside the dead zone of the control target voltage V0 (determination branch of the branch A block 34), the process proceeds to step S22 of the branch B block 36 (FIG. 8). In step S22, the control target voltage V0 is compared with the set reference voltage V1.
Proceed to. If not equal, the process proceeds to step S23. If it is determined in step S23 that the voltage change is changing toward the set reference voltage V1 of the distribution line (voltage improvement direction), the process proceeds to step S26. In step S26, the voltage is stored in the variable reference voltage (V0) storage unit. The control target voltage V0 is changed to the distribution line voltage VS, and the process returns to the step S4 of the time count block 32 (FIG. 5) until the voltage change. If not (voltage deterioration direction), the process proceeds to step S24 without changing the control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit.

【0034】ステップS24で配電線電圧VSが固定基
準電圧V1を超えたと判断されたとき、ステップS25
に進む(分岐)。ステップS25で、変動基準電圧
(V0)記憶部に記憶された制御目標電圧V0を固定基
準電圧V1に変更し、処理Cブロック37(図7)へ進
む。超えないと判断されれば、変動基準電圧〈V0)記
憶部に記憶された制御目標電圧V0を変更することな
く、処理Cブロック37(図7(b))へ進む。
When it is determined in step S24 that the distribution line voltage VS has exceeded the fixed reference voltage V1, step S25
Proceed to (branch). In step S25, the control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit is changed to the fixed reference voltage V1, and the process proceeds to the processing C block 37 (FIG. 7). If it is determined that it does not exceed, the process proceeds to the processing C block 37 (FIG. 7B) without changing the control target voltage V0 stored in the fluctuation reference voltage <V0) storage unit.

【0035】処理Cブロック37のステップS29へ進
むと、ステップS29で協調制御部12は電圧一定制御
部17の出力をスイッチング信号発生部20に接続し
て、電圧一定制御部17によりV0は変更されず又はV
1に変更された変動基準電圧(V0)記憶部に記憶され
た目標電圧値V0(その時点で配電線電圧VSとは異な
る。)で電圧制御装置を制御する。
When the process proceeds to step S29 of the processing C block 37, the cooperative control unit 12 connects the output of the constant voltage control unit 17 to the switching signal generating unit 20 in step S29, and V0 is changed by the constant voltage control unit 17. Or V
The voltage control device is controlled with the target voltage value V0 (which is different from the distribution line voltage VS at that time) stored in the fluctuation reference voltage (V0) storage unit changed to 1.

【0036】ステップS30でカウンタJが「1」カウ
ントし、ステップS31に進む。ステップS31でカウ
ンタJのカウント値が制御期間の設定値Tkeepに相
当するカウント値を超えたか否かを判断され、超えたと
判断されたときはステップS32に進み「0」にリセッ
トして、超えていないと判断されたときそのまま電圧変
化までの時間カウントブロック32(図5)のステップ
S4に戻る。
In step S30, the counter J counts "1", and the flow advances to step S31. In step S31, it is determined whether or not the count value of the counter J has exceeded a count value corresponding to the set value Tkeep of the control period. If it is determined that the count value has exceeded, the process proceeds to step S32, where the count value is reset to "0" and exceeded. When it is determined that there is no change, the process returns to step S4 of the time count block 32 (FIG. 5) until the voltage change.

【0037】SSC装置の動作や負荷量の増減によって
配電線電圧VSが改善される方向に変化したとき、電圧
制御装置が動作して、この改善方向を相殺するように動
作しSSC装置と電圧制御装置との間でハンチングが発
生する(SSC装置が電圧を改善→電圧制御装置がそれ
を相殺→SSC装置が電圧をさらに改善→電圧制御装置
がそれをさらに相殺→・・・)可能性も考えられる。分
岐Bブロック36(図8)のステップS23の急な電圧
変化が「電圧改善方向」である判断(分岐)は、この
ような現象を防止するために、V0変更、VSに追随と
いうループを設けて、変動基準電圧(V0)記憶部に記
憶された目標電圧V0値を変更せずに制御するのをキャ
ンセルしている。
When the distribution line voltage VS changes in the direction in which the distribution line voltage VS is improved due to the operation of the SSC device or an increase or decrease in the load amount, the voltage control device operates to cancel the improvement direction. Considering the possibility that hunting may occur with the device (SSC device improves voltage → Voltage controller cancels it → SSC device further improves voltage → Voltage controller further cancels it →) Can be The determination (branch) that the sudden voltage change in step S23 of the branch B block 36 (FIG. 8) is the "voltage improvement direction" is provided with a loop of changing V0 and following VS in order to prevent such a phenomenon. Thus, the control without changing the target voltage V0 value stored in the fluctuation reference voltage (V0) storage unit is canceled.

【0038】ステップS23で、電圧変化が配電線の固
定基準電圧V1に向かって変化していると判断される
(電圧改善方向、判断分岐)とステップS26に進
み、ステップS26で、変動基準電圧(V0)記憶部に
記憶された制御目標電圧V0を配電線電圧VSに変更
し、電圧変化までの時間カウントブロック32(図5)
のステップS4に戻る。このループでは、処理Cブロッ
ク37を経由しないので協調制御部12はスイッチ21
をいわば中立状態にして、スイッチング信号発生部20
に位相角制御信号を出力しないことにより、電圧制御装
置を無制御(1/6サイクル前の出力状態)とする。こ
れは電圧改善方向の急激な電圧変化がSSC装置の動作
とのハンチングを発生するのを抑制するためである。
If it is determined in step S23 that the voltage change is changing toward the fixed reference voltage V1 of the distribution line (voltage improvement direction, determination branch), the process proceeds to step S26, and in step S26, the variable reference voltage ( V0) The control target voltage V0 stored in the storage unit is changed to the distribution line voltage VS, and a time count block 32 until the voltage change (FIG. 5)
Return to step S4. In this loop, the cooperative control unit 12 does not go through the processing C block 37,
Into a neutral state, so that the switching signal generator 20
By not outputting the phase angle control signal at this time, the voltage control device is not controlled (output state before 1/6 cycle). This is to prevent a sudden voltage change in the voltage improvement direction from causing hunting with the operation of the SSC device.

【0039】分岐Bブロックと処理Cブロックによる電
圧制御装置の電圧制御例を、配電線の電圧変化が固定基
準電圧V1を超えないとき(イ)、電圧変化がV1を超
えるとき(ロ)、電圧変化がV1から離れる方向(電圧
悪化傾向)であるとき(ハ)の例を図10に示す。
The voltage control example of the voltage control device using the branch B block and the processing C block will be described when the voltage change of the distribution line does not exceed the fixed reference voltage V1 (A), when the voltage change exceeds V1 (B), FIG. 10 shows an example of (c) when the change is in the direction away from V1 (voltage deterioration tendency).

【0040】配電線電圧VSが緩やかに変化しても、配
電線電圧VSが極端に上昇/下降するときは、電圧制御
装置のV0はVSに追随して変更制御され、目標無効電
力以上の無効電力は配電系統に供給されない。しかし、
配電線電圧VSが極端に上昇/下降ということは、電圧
制御装置以外の電圧補償装置の能力では配電線電圧VS
が復旧できなかったことを意味し、このとき、電圧制御
装置は協調運転を解除し、フル運転して配電線電圧VS
の復旧に努める必要がある。
When the distribution line voltage VS rises / falls extremely even if the distribution line voltage VS changes slowly, the voltage control device V0 is controlled to change following the VS, and the reactive voltage V0 exceeds the target reactive power. No power is supplied to the distribution system. But,
The extreme rise / fall of the distribution line voltage VS means that the voltage of the distribution line voltage VS is higher than that of the voltage compensator other than the voltage controller.
At that time, the voltage control device cancels the cooperative operation, performs the full operation, and executes the distribution line voltage VS
It is necessary to strive for restoration.

【0041】このため、分岐Aブロック(図6)のステ
ップS17及び分岐Bブロック(図8)のステップS2
8で、電圧制御装置のV0を上限値又は下限値に固定す
ることにより、追随を中止し、電圧変化が緩やかであっ
ても、電圧制御装置は無効電力を配電系統に供給し、配
電線電圧VSを補償させる。
Therefore, step S17 of the branch A block (FIG. 6) and step S2 of the branch B block (FIG. 8)
In step 8, by following V0 of the voltage control device by fixing the upper limit value or the lower limit value, the following is stopped, and even if the voltage change is gradual, the voltage control device supplies reactive power to the distribution system, and VS is compensated.

【0042】次に、図2,図3の負荷変動例に基づく電
圧変化における電圧制御装置の制御(D欄)を説明す
る。時間t1までは、電圧変化がなく、配電線電圧VS
=目標制御電圧V0=配電線電圧の固定基準電圧V1
で、電圧変化までの時間カウントブロック32のステッ
プS4→S5→S6→S7→S8→S11→分岐Aブロ
ック34のステップS12→S18→処理Aブロック3
5のステップS19→S20→S21→電圧変化までの
時間カウントブロック32のステップS4のループを回
っている。
Next, the control of the voltage control device in the voltage change based on the example of the load variation shown in FIGS. 2 and 3 (column D) will be described. Until time t1, there is no voltage change and the distribution line voltage VS
= Target control voltage V0 = Fixed reference voltage V1 of distribution line voltage
Then, the steps S4 → S5 → S6 → S7 → S8 → S11 → Step S12 → S18 → Processing A block 3 of the branch A block 34 of the time counting block 32 until voltage change
The loop of step S4 of the time counting block 32 from step S19, S20, S21, and voltage change of 5, is performed.

【0043】図2の負荷が緩やかに増加するt1〜t3
期間では、配電線電VSは緩やかに下降する。この期間
の初期では、配電線電圧VSは不感帯内にあるので、分
岐Aブロック34のステップS12→ステップS18→
分岐経由で処理Aブロック35により、電圧制御装置
の無効電力Qを目標無効電力Q0に戻す制御が行われ
る。この例ではt1まで電圧制御装置の無効電力Q=目
標無効電力Q0なので、この状態を維持する。
T1 to t3 at which the load in FIG. 2 gradually increases
In the period, the distribution line power VS gradually decreases. At the beginning of this period, since the distribution line voltage VS is in the dead zone, the branch A block 34 is switched from step S12 to step S18 →
The process A block 35 controls the reactive power Q of the voltage control device to return to the target reactive power Q0 via the branch. In this example, the reactive power Q of the voltage control device = the target reactive power Q0 until t1, so this state is maintained.

【0044】暫らくすると、配電線電圧VSの変化で、
分岐Aブロック34のステップS12→ステップS13
→ステップS14→ステップS15で変動基準電圧(V
0)記憶部に記憶された制御目標電圧V0を配電線電圧
VSに変更する。引続き、ステップS16→ステップS
18→分岐 経由で処理Aブロックにより、電圧制御装
置の無効電力Qを目標無効電力Q0に戻す制御が行われ
る。
After a while, the change in the distribution line voltage VS gives
Step S12 → Step S13 of the branch A block 34
→ Step S14 → In step S15, the reference voltage (V
0) The control target voltage V0 stored in the storage unit is changed to the distribution line voltage VS. Step S16 → Step S
18 → branch Control is performed by the processing A block to return the reactive power Q of the voltage control device to the target reactive power Q0.

【0045】この例ではt1まで電圧制御装置の無効電
力Q=目標無効電力Q0なので、この状態を維持する。
これらを繰返すことにより変動基準電圧(V0)記憶部
に記憶された制御目標電圧V0を配電線電圧VSに追随
させながら、電圧制御装置の無効電力Qを目標無効電力
Q0に戻す制御が行われる。
In this example, since the reactive power Q of the voltage control device = the target reactive power Q0 until t1, this state is maintained.
By repeating these operations, control is performed to return the reactive power Q of the voltage control device to the target reactive power Q0 while causing the control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit to follow the distribution line voltage VS.

【0046】時間t3で外部のSSC装置が動作し、配
電線電圧VSが急激に復帰(上昇)する。このとき、配
電線電圧VSの変化は急なので、分岐Aブロック34の
分岐又は分岐に分岐し、ステップS18で不感帯外
と判断され、分岐経由で分岐Bブロック36の分岐
に進み、ステップS26で、変動基準電圧(V0)記憶
部に記憶された制御目標電圧V0を配電線電圧VSに変
更する。次の処理以降では、V0=VSとなるため、t
1〜t3期間と同様の制御を行う。
At time t3, the external SSC device operates and the distribution line voltage VS suddenly returns (rises). At this time, since the change of the distribution line voltage VS is abrupt, it branches to the branch or the branch of the branch A block 34, it is determined that it is outside the dead zone in step S18, the process proceeds to the branch of the branch B block 36 via the branch, and in step S26, The control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit is changed to the distribution line voltage VS. Since V0 = VS after the next processing, t0
The same control as in the period from 1 to t3 is performed.

【0047】図3の時間t7で、配電線に接続された負
荷が急激に増加し、配電線電圧VSが急激に下降してい
る。このとき、配電線電圧VSの変化は急なので,分岐
Aブロック34の分岐又は分岐に分岐し、ステップ
S18で不感帯外と判断され、分岐経由で分岐Bブロ
ック36のステップS23で電圧変化はV1の方向に向
いていない(電圧悪化傾向)と判断され、分岐経由で
処理Cブロック37に進み、制御目標電圧V0は変更さ
れず、電圧制御装置は制御目標電圧V0が一定で(変更
せず)制御が行われる。
At time t7 in FIG. 3, the load connected to the distribution line sharply increases, and the distribution line voltage VS drops sharply. At this time, since the change of the distribution line voltage VS is abrupt, it branches to a branch or a branch of the branch A block 34, it is determined that the voltage is outside the dead zone in step S18, and the voltage change is V1 in step S23 of the branch B block 36 via the branch. It is determined that it is not oriented in the direction (voltage deterioration tendency), the process proceeds to the processing C block 37 via a branch, the control target voltage V0 is not changed, and the voltage control device controls the control target voltage V0 with a constant (no change). Is performed.

【0048】制御期間Tkeepが経過するまでのt7
〜t8の期間では、ステップS11の判断により、処理
Cの制御ループが繰返される。この期間電圧制御装置に
より電圧上昇に必要な無効電力は、電圧一定制御部での
制御により、配電線に供給されるので、配電線電圧VS
は上昇し、配電線電圧VS制御目標電圧V0の不感帯内
まで引き戻されることになる。
T7 until the control period Tkeep elapses
In the period from to t8, the control loop of the process C is repeated according to the determination in the step S11. During this period, the reactive power required for the voltage increase by the voltage control device is supplied to the distribution line under the control of the constant voltage control unit, so that the distribution line voltage VS
Rises and is returned to within the dead zone of the distribution line voltage VS control target voltage V0.

【0049】時間t8になると配電線電圧VSは制御目
標電圧V0の不感帯内まで引き戻されているので、t8
以降、この例では負荷が変動せず、かつt8〜t10期
間の初期では、配電線電圧VSは不感帯内で、分岐Aブ
ロック34のステップS12→ステップS18→分岐
経由で処理Aブロック35により、電圧制御装置の無効
電力Qを目標無効電力Q0に戻す制御が行われる。
At time t8, the distribution line voltage VS is pulled back to within the dead zone of the control target voltage V0.
Thereafter, in this example, the load does not fluctuate, and at the beginning of the period from t8 to t10, the distribution line voltage VS is within the dead zone, and is controlled by the process A block 35 via the step S12 → step S18 → branch A block 34. Control is performed to return the reactive power Q of the control device to the target reactive power Q0.

【0050】暫くすると、無効電力Qを目標無効電力Q
0に戻す制御により配電線電圧VSの変化で、分岐Aブ
ロック34のステップS12→ステップS13→ステッ
プS14の分岐と進み、次にステップS15で変動基
準電圧(V0)記憶部に記憶された制御目標電圧V0を
配電線電圧VSに変更する。引続き、ステップS16→
ステップS18→分岐経由で処理Aブロック35によ
り、電圧制御装置の無効電力Qを目標無効電力Q0に戻
す制御が行われる。これらを繰返すことにより変動基準
電圧(V0)記憶部に記憶された制御目標電圧V0を配
電線電圧VSに迫随させながら、電圧制御装置の無効電
力Qを目標無効電力Q0に戻す制御が行われ、時間t1
0でQ=Q0となる。
After a while, the reactive power Q is changed to the target reactive power Q
Due to the control of returning to 0, the distribution line voltage VS changes and the branch A block 34 proceeds from step S12 to step S13 to step S14, and then in step S15 the control target stored in the fluctuation reference voltage (V0) storage unit. The voltage V0 is changed to the distribution line voltage VS. Then, step S16 →
In step S18, the control is performed to return the reactive power Q of the voltage control device to the target reactive power Q0 by the processing A block 35 via the branch. By repeating these, control is performed to return the reactive power Q of the voltage control device to the target reactive power Q0 while causing the control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit to follow the distribution line voltage VS. , Time t1
At 0, Q = Q0.

【0051】時間t10で外部のSSC装置が動作し、
配電線電圧VSが急激に復帰(上昇)する。このとき、
配電線電圧VSの変化は急なので、分岐Aブロック34
の分岐又は分岐に分岐し、ステップS18で不感帯
外と判断され、分岐経由で分岐Bブロック36の分岐
に進み、ステップS26で、変動基準電圧(V0)記
憶部に記憶された制御目標電圧V0を配電線電圧VSに
変更する。
At time t10, the external SSC device operates,
The distribution line voltage VS suddenly returns (rises). At this time,
Since the change of the distribution line voltage VS is abrupt, the branch A block 34
Is determined to be outside the dead zone in step S18, and the process proceeds to the branch of the branch B block 36 via the branch. In step S26, the control target voltage V0 stored in the fluctuation reference voltage (V0) storage unit is determined. Change to distribution line voltage VS.

【0052】次の処理以降では、V0=VSとなるた
め、配電線電圧VSは不感帯内にあるので、分岐Aブロ
ック34のステップS12→分岐→ステップS18→
分岐経由で処理Aブロック35により、電圧制御装置
の無効電力Qを目標無効電力Q0に戻す制御が行われ
る。この例では時間t11まで電圧制御装置の無効電力
Q=目標無効電力Q0なので、この状態を維持する。
After the next processing, since V0 = VS, the distribution line voltage VS is within the dead zone, so that step S12 of the branch A block 34 → branch → step S18 →
The process A block 35 controls the reactive power Q of the voltage control device to return to the target reactive power Q0 via the branch. In this example, since the reactive power Q of the voltage control device = the target reactive power Q0 until time t11, this state is maintained.

【0053】[0053]

【発明の効果】本発明の制御方法及び装置は、急な配電
系統の電圧変化に対しては,高速応動の電圧制御装置に
より所定時間、配電系統の基準電圧からの電圧変化に相
当する無効電力を速やかに供給して、電圧を補償させ、
その後に無効電力Qを目標値に戻す制御を行うことによ
りSVR,SSC,SSR装置を動作させ、また、緩や
かな配電系統の電圧変化に対しては遅い動作のSVR,
SSC,SSR装置を動作させて、配電線の電圧を補償
することにより、SVR,SSC,SSR装置の能力を
十分活かせることができ、配電線に設置した電圧補償機
器装置の総合補償能力を向上させることができる。
According to the control method and the apparatus of the present invention, the reactive power corresponding to the voltage change from the reference voltage of the power distribution system for a predetermined time by the voltage control device responding rapidly to the sudden voltage change of the power distribution system. Is supplied quickly to compensate the voltage,
After that, the SVR, SSC, and SSR devices are operated by performing control to return the reactive power Q to the target value, and the SVR, which operates slowly with respect to a gradual voltage change in the distribution system, is operated.
By operating the SSC and SSR devices and compensating the voltage of the distribution lines, the capabilities of the SVR, SSC and SSR devices can be fully utilized and the overall compensation capability of the voltage compensating equipment installed on the distribution lines can be improved. Can be done.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の制御装置を概念的に示す図である。FIG. 1 is a diagram conceptually showing a control device of the present invention.

【図2】本発明の制御例(負荷変動緩の場合)を模式的
に示した図である。
FIG. 2 is a diagram schematically illustrating a control example (in the case of a slow load change) according to the present invention.

【図3】本発明の制御例(負荷変動急の場合)を模式的
に示した図である。
FIG. 3 is a diagram schematically illustrating a control example (in the case of a sudden load change) according to the present invention.

【図4】本発明の制御フロー全体を示す図である。FIG. 4 is a diagram showing the entire control flow of the present invention.

【図5】本発明の制御フローの初期設定,電圧変化まで
の時間カウントブロック,制御期間中判定ブロックのフ
ローを示す図である。
FIG. 5 is a diagram showing a flow of an initialization of a control flow, a time counting block until a voltage change, and a determination block during a control period according to the present invention.

【図6】本発明の分岐Aブロックのフローを示す図であ
る。
FIG. 6 is a diagram showing a flow of a branch A block of the present invention.

【図7】本発明の処理Aブロック,処理Cブロックのフ
ローを示す図である。
FIG. 7 is a diagram showing a flow of a processing A block and a processing C block of the present invention.

【図8】本発明による分岐Bブロックのフロー図を示す
図である。
FIG. 8 is a diagram showing a flow diagram of a branch B block according to the present invention.

【図9】分岐Aブロックよる電圧変化判別を説明する図
である。
FIG. 9 is a diagram illustrating voltage change determination by a branch A block.

【図10】分岐Bブロックと処理Cブロックによる電圧
一定制御例を示す図である。
FIG. 10 is a diagram showing an example of constant voltage control by a branch B block and a processing C block.

【図11】配電系統の電圧制御を説明する図である。FIG. 11 is a diagram illustrating voltage control of a distribution system.

【符号の説明】[Explanation of symbols]

2 配電線 6 電圧制御装置 10 制御装置 12 協調制御部 16 無効電力算出部 17 電圧一定制御部 18 電力復帰制御部 20 スイッチング信号発生部 31 初期設定ブロック 32 電圧変化までの時間カウントブロック 33 制御期間中判定ブロック 34 分岐Aブロック(処理Bを含む) 35 処理Aブロック 36 分岐Bブロック(処理Bを含む) 37 処理Cブロック 2 Distribution line 6 Voltage control device 10 Control device 12 Cooperative control unit 16 Reactive power calculation unit 17 Constant voltage control unit 18 Power restoration control unit 20 Switching signal generation unit 31 Initial setting block 32 Time count block until voltage change 33 During control period Judgment block 34 Branch A block (including process B) 35 Process A block 36 Branch B block (including process B) 37 Process C block

───────────────────────────────────────────────────── フロントページの続き (72)発明者 溝畑 豊 広島県広島市中区小町4番33号 中国電力 株式会社内 (72)発明者 大原 久征 広島県広島市中区小町4番33号 中国電力 株式会社内 (72)発明者 濱中 俊二 広島県広島市南区大州4丁目4番32号 中 国電機製造株式会社内 (72)発明者 庄畑 幸雄 広島県広島市南区大州4丁目4番32号 中 国電機製造株式会社内 (72)発明者 蔵本 英憲 広島県広島市南区大州4丁目4番32号 中 国電機製造株式会社内 Fターム(参考) 5G066 DA04 DA08 FA01 FB13 FC11 5H420 BB03 BB12 BB16 CC04 DD03 EA30 EB39 EB40 FF03  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Yutaka Mizohata 4-33 Komachi, Naka-ku, Hiroshima City, Hiroshima Prefecture Chugoku Electric Power Co., Inc. (72) Inventor Hisayuki Ogawa 4-33 Komachi, Naka-ku, Hiroshima City, Hiroshima Prefecture Chugoku Electric Power Co., Inc. (72) Inventor Shunji Hamanaka 4-4-2 Oshu, Minami-ku, Hiroshima City, Hiroshima Prefecture China Electric Manufacturing Co., Ltd. (72) Inventor Yukio Shobata 4 Oshu, Minami-ku, Hiroshima City, Hiroshima Prefecture Chome 4-32 China Electric Manufacturing Co., Ltd. (72) Inventor Hidenori Kuramoto 4-4-2 Oshu, Minami-ku, Hiroshima-shi, Hiroshima F-term in China Electric Manufacturing Co., Ltd. 5G066 DA04 DA08 FA01 FB13 FC11 5H420 BB03 BB12 BB16 CC04 DD03 EA30 EB39 EB40 FF03

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 少なくとも負荷時タップ切換変圧器装
置、段階制御式コンデンサ装置、段階制御式リアクトル
装置のいずれかの装置とインバータ回路、コンデンサ及
び変圧器を具備する電圧制御装置とにより電圧を補償す
る配電系統において、 配電系統の電圧変化が緩やかなときは無効電力を目標値
に戻す制御を行い、 電圧変化が急なときには所定時間電圧一定制御を行なう
ことを特徴とする配電系統の電圧制御装置の制御方法。
A voltage is compensated by at least one of a load tap change transformer device, a step control capacitor device, and a step control reactor device, and a voltage control device including an inverter circuit, a capacitor, and a transformer. In a distribution system, a voltage control device for a distribution system is characterized by performing control to return reactive power to a target value when the voltage change in the distribution system is gradual, and performing constant voltage control for a predetermined time when the voltage change is rapid. Control method.
【請求項2】 少なくとも負荷時タップ切換変圧器装
置、段階制御式コンデンサ装置、段階制御式リアクトル
装置のいずかの装置とインバータ回路、コンデンサ及び
変圧器を具備する電圧制御装置とにより電圧を補償する
配電系統において、 配電系統の電圧変化が緩やかなときは、電圧が電圧制御
装置の制御目標電圧の不感帯内外を問わず、電圧制御装
置の制御目標電圧を配電系統の電圧変化に追随させ、無
効電力を目標値に戻す制御を行い、 電圧変化が急であるときは、電圧制御装置の制御目標電
圧を変更しないで電圧一定制御を行なうことを特徴とす
る配電系統の電圧制御装置の制御方法。
2. Voltage compensation by at least one of a load tap change transformer device, a step control type capacitor device, a step control type reactor device and a voltage control device having an inverter circuit, a capacitor and a transformer. When the voltage change in the distribution system is gradual in the power distribution system, regardless of whether the voltage is inside or outside the dead zone of the control target voltage of the voltage control device, the control target voltage of the voltage control device follows the voltage change of the distribution system and becomes invalid. A method for controlling a voltage control device in a distribution system, comprising: performing control for returning power to a target value; and performing constant voltage control without changing the control target voltage of the voltage control device when the voltage change is sharp.
【請求項3】 配電系統の電圧変化が急で、配電系統の
基準電圧の方向に向かうときは、電圧制御装置の制御目
標電圧を配電系統の電圧に、基準電圧を超えるときは基
準電圧にそれぞれ変更することを特徴とする請求項2記
載の配電系統の電圧制御装置の制御方法。
3. When the voltage change of the distribution system is abrupt and goes in the direction of the reference voltage of the distribution system, the control target voltage of the voltage controller is set to the voltage of the distribution system, and when the voltage exceeds the reference voltage, the reference voltage is set to the reference voltage. The control method for a voltage control device for a distribution system according to claim 2, wherein the control method is changed.
【請求項4】配電系統の電圧変化が緩やかで、電圧が配
電系統の基準電圧の上限値、下限値を超えるときは、電
圧制御装置の制御目標電圧を配電系統の基準電圧の上限
値、下限値に変更することを特徴とする請求項2ないし
請求項3記載の配電系統の電圧制御装置の制御方法。
4. When the voltage of the distribution system changes slowly and the voltage exceeds the upper and lower limits of the reference voltage of the distribution system, the control target voltage of the voltage controller is changed to the upper and lower limits of the reference voltage of the distribution system. The method according to claim 2 or 3, wherein the value is changed to a value.
【請求項5】電圧制御装置の出力側の配電系統電圧を検
出する電圧検出部と、 電圧制御装置の出力無効電力を算出する無効電力算出部
と、 電圧一定制御部と、 算出された無効電力を所定速度で目標無効電力に復帰制
御させる電力復帰制御部と、 インバータ回路、コンデンサ及び変圧器を含む電圧制御
装置のインバータ回路のスイッチング手段を導通制御す
るスイッチング信号発生部と、 配電系統の電圧変化の緩急を判定し、電圧一定制御部の
制御目標電圧を変更し、かつ前記スイッチング信号発生
部への出力信号を電力復帰制御部と電圧一定制御部の制
御出力を切換え指令を出力する協調制御部とを具備する
配電系統の電圧制御装置の制御装置であって、 配電系統の電圧変化が緩やかなときは電力復帰制御部に
より無効電力を目標値に戻す制御を行い、 配電系統の電圧変化が急なときには電圧一定制御部によ
り所定時間電圧一定制御を行なうことを特徴とする配電
系統の電圧制御装置の制御装置。
5. A voltage detection unit for detecting a distribution system voltage on an output side of a voltage control device, a reactive power calculation unit for calculating an output reactive power of the voltage control device, a constant voltage control unit, and a calculated reactive power. A power recovery control unit that controls the return of the inverter to a target reactive power at a predetermined speed; a switching signal generation unit that controls conduction of switching means of an inverter circuit of a voltage control device including an inverter circuit, a capacitor and a transformer; and a voltage change of a power distribution system. Coordinating control unit that determines whether the voltage is constant or not, changes the control target voltage of the constant voltage control unit, and outputs an output signal to the switching signal generating unit to switch the control output between the power return control unit and the constant voltage control unit. The control device of the voltage control device of the distribution system, comprising: when the voltage change of the distribution system is gentle, the reactive power is returned to the target value by the power restoration control unit. And controls, when the voltage change of the power distribution system steep control device of the voltage constant control unit by a voltage control apparatus for a power distribution system, characterized by performing a predetermined time constant voltage control.
JP2000356317A 2000-11-22 2000-11-22 Control method and control device for voltage control device of distribution system Expired - Lifetime JP3525107B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000356317A JP3525107B2 (en) 2000-11-22 2000-11-22 Control method and control device for voltage control device of distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000356317A JP3525107B2 (en) 2000-11-22 2000-11-22 Control method and control device for voltage control device of distribution system

Publications (2)

Publication Number Publication Date
JP2002165366A true JP2002165366A (en) 2002-06-07
JP3525107B2 JP3525107B2 (en) 2004-05-10

Family

ID=18828593

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000356317A Expired - Lifetime JP3525107B2 (en) 2000-11-22 2000-11-22 Control method and control device for voltage control device of distribution system

Country Status (1)

Country Link
JP (1) JP3525107B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2007094054A1 (en) * 2006-02-15 2009-07-02 三菱電機株式会社 Power system stabilization system and electric water heater
JP2014107987A (en) * 2012-11-28 2014-06-09 Ihi Aerospace Co Ltd Power conversion device
CN107895957A (en) * 2017-12-15 2018-04-10 华北电力科学研究院有限责任公司 A kind of subsynchronous resonance and reactive power complex control system and method
US11942787B2 (en) 2019-07-23 2024-03-26 Mitsubishi Electric Corporation Power conversion device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2007094054A1 (en) * 2006-02-15 2009-07-02 三菱電機株式会社 Power system stabilization system and electric water heater
US7925597B2 (en) 2006-02-15 2011-04-12 Mitsubishi Electric Corporation Power system stabilization system
JP4694614B2 (en) * 2006-02-15 2011-06-08 三菱電機株式会社 Power system stabilization system
JP2014107987A (en) * 2012-11-28 2014-06-09 Ihi Aerospace Co Ltd Power conversion device
CN107895957A (en) * 2017-12-15 2018-04-10 华北电力科学研究院有限责任公司 A kind of subsynchronous resonance and reactive power complex control system and method
US11942787B2 (en) 2019-07-23 2024-03-26 Mitsubishi Electric Corporation Power conversion device

Also Published As

Publication number Publication date
JP3525107B2 (en) 2004-05-10

Similar Documents

Publication Publication Date Title
JP5618022B1 (en) Inverter device
CN100392938C (en) Control system and method for voltage stabilization
US5424627A (en) Modular thyristor controlled series capacitor control system
TWI593213B (en) Uninterruptable power device
JP5589141B2 (en) Operation control device for photovoltaic power generation system
Zhou et al. Time delay compensation-based fast current controller for active power filters
JP5523171B2 (en) Automatic voltage regulator for track
JP2001051734A (en) Reactive power compensation system
JP2002165366A (en) Control method of voltage control device for distribution system and control device
JP4896044B2 (en) Power converter
Zhou et al. Hybrid prediction-based deadbeat control for a high-performance shunt active power filter
WO2018211949A1 (en) Power conversion device
KR20160032348A (en) Apparatus for controlling real time stability of voltage and power in hvdc system
JP5760860B2 (en) Reactive power compensator
JP2013212021A (en) Reactive power compensator
WO2020015442A1 (en) Electrical device and power fluctuation suppression method, apparatus and system therefor
US4122516A (en) Inverter control apparatus
US7411378B2 (en) Power factor controller that computes currents without measuring them
JP2006166585A (en) Power conversion device
JP3404620B2 (en) Inverter control method and inverter device
US11881762B2 (en) Method and apparatus for adaptive control of regulation control parameter
JP6482083B2 (en) Reactive power compensator
Claro et al. A fully digital control employing a dead beat technique for active power filters
JP6398057B2 (en) AC power supply apparatus and instantaneous voltage fluctuation detection method thereof
JP5332229B2 (en) Instantaneous voltage drop compensation device

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20031113

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20031114

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040210

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040216

R150 Certificate of patent or registration of utility model

Ref document number: 3525107

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100220

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130220

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140220

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term