JP2002165364A - Demand control operation system and its device - Google Patents

Demand control operation system and its device

Info

Publication number
JP2002165364A
JP2002165364A JP2000352656A JP2000352656A JP2002165364A JP 2002165364 A JP2002165364 A JP 2002165364A JP 2000352656 A JP2000352656 A JP 2000352656A JP 2000352656 A JP2000352656 A JP 2000352656A JP 2002165364 A JP2002165364 A JP 2002165364A
Authority
JP
Japan
Prior art keywords
demand
control
demand control
value
time zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000352656A
Other languages
Japanese (ja)
Other versions
JP3742920B2 (en
Inventor
Satoru Hashimoto
哲 橋本
Toshiyuki Akamatsu
敏行 赤松
Tetsuo Iwata
哲郎 岩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP2000352656A priority Critical patent/JP3742920B2/en
Publication of JP2002165364A publication Critical patent/JP2002165364A/en
Application granted granted Critical
Publication of JP3742920B2 publication Critical patent/JP3742920B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/221General power management systems

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

PROBLEM TO BE SOLVED: To minimize contract power demand without much impairing comfort. SOLUTION: This demand control operation system includes a demand control part 1, a non-controlled time demand value estimate part 2, an origin installation extraction part 3, and an installation operation history memory part 4. The origin installation extraction part 3 has a demand peaking time zone extraction part 31 which extracts a demand peaking time zone by making a demand value corresponding to the case the demand control is not made from a non-controlled time demand value output part 24 as its input, and an installation operation history extraction part 32 which extracts the information representing history of the installation operation corresponding to the demand peak time zone by making the information representing the history of the installation operation and the demand peak time zone from the installation operation history memory part 4 as its input, and an inadequate installation operation detection part 33 which detects inadequate installation operation basing on the operation history.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、快適性を大きく
低下させることなく契約電力を最小にすべくデマンド制
御を運用するための方法およびその装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for operating demand control to minimize contract power without greatly reducing comfort.

【0002】[0002]

【従来の技術】各種の設備(電力を消費する設備)を含
むビルなどにおいてデマンド制御を行って契約電力の低
減、消費電力の低減を達成することが行われている。
2. Description of the Related Art In a building or the like including various types of equipment (equipment consuming power), demand control is performed to reduce contract power and power consumption.

【0003】そして、デマンドの実績値を記録し、集計
し、出力するようにしたデマンドコントロール装置が提
案されている(特開昭63−15627号公報参照)。
[0003] A demand control device has been proposed in which actual demand values are recorded, totalized, and output (see Japanese Patent Application Laid-Open No. 63-15627).

【0004】また、目標電力を超過していないか確認で
きるように、全時限のデマンド値を記録・出力する機能
を有するデマンドコントロール装置も提案されている。
[0004] A demand control device having a function of recording and outputting demand values for all time periods so as to confirm whether or not the target power has been exceeded has also been proposed.

【0005】[0005]

【発明が解決しようとする課題】特開昭63−1562
7号公報に示すデマンドコントロール装置を採用した場
合には、デマンド制御を行って、単にデマンド実績値を
記録し、集計し、出力することができるだけであるか
ら、デマンド制御を行わなかった場合におけるデマンド
値を推定することが不可能である。
Problems to be Solved by the Invention Japanese Patent Application Laid-Open No. 63-1562
In the case where the demand control device disclosed in Japanese Patent Application Publication No. 7-222 is adopted, demand control can be performed and demand actual values can be simply recorded, totaled, and output. It is impossible to estimate the value.

【0006】また、全時限のデマンド値を記録・出力す
る機能を有するデマンドコントロール装置において、記
録されるデマンド値は、デマンド制御によって強制的に
目標電力以下に抑制された後の値であるから、記録され
たデマンド値からは、デマンド値が突出していたのか否
かを判定することができない。
In a demand control device having a function of recording and outputting demand values for all time periods, the recorded demand value is a value after being forcibly suppressed to a target power or less by demand control. It cannot be determined from the recorded demand value whether the demand value has protruded.

【0007】したがって、何れの場合にも、デマンド制
御によって強制的に目標電力以下に抑制された後の値し
か記録することができず、デマンド制御を行わなかった
場合におけるデマンド値を検出することができないの
で、デマンドが突出していたか否かを検出することがで
きず、デマンドが突出する時間帯を検出することができ
ないだけでなく、契約電力を押し上げる原因になる不適
切な設備運用を容易には検出することができない。
Therefore, in any case, only the value after the power is forcibly suppressed to the target power or less by the demand control can be recorded, and the demand value when the demand control is not performed can be detected. Since it is not possible to detect whether the demand has protruded, it is not possible to detect the time zone when the demand is prominent, and it is also easy to operate inappropriate equipment that may increase the contract power Not detectable.

【0008】さらに説明する。Further explanation will be given.

【0009】実際上、設備(主に、空調設備)の不適切
な運用が原因となって契約電力が必要以上に押し上げら
れている事例が多く見られる。
In practice, there are many cases in which contract power is pushed up more than necessary due to improper operation of equipment (mainly air conditioning equipment).

【0010】ここで、契約電力を押し上げる不適切な空
調設備の運用とは、デマンド値を突出させるような運用
であり、例えば、夏期の昼間の高デマンドが発生しそう
な時間帯に空気調和機を起動したり、空気調和機の設定
温度を大きく下げたり(冷房運転時の設定温度変更であ
り、暖房運転時には大きく上げたり)するような運用が
例示される。
[0010] Here, the operation of an inappropriate air conditioner that increases the contract power is an operation that causes a demand value to protrude. For example, the air conditioner is operated during a time when high demand is likely to occur during the daytime in summer. Examples of such operations include starting the air conditioner, and greatly reducing the set temperature of the air conditioner (changing the set temperature during the cooling operation and greatly increasing the set temperature during the heating operation).

【0011】そして、このような運用を行うと、特に、
このような運用を複数台の空気調和機に対して同時に行
うと、消費電力のピークが発生し(このようなピークの
継続時間は多くの場合、30分〜1時間程度である)、
このピークが今までの電力に重畳され、この結果、契約
電力が大きく押し上げられてしまうことになる。
When such an operation is performed, in particular,
When such operations are performed simultaneously on a plurality of air conditioners, a peak in power consumption occurs (the duration of such a peak is often about 30 minutes to 1 hour),
This peak is superimposed on the electric power up to now, and as a result, the contract electric power is greatly increased.

【0012】このような不都合は、原因となる設備を特
定できれば改善することが可能であり、例えば、原因と
なる空気調和機を電力に余裕のある時間帯に前倒しして
起動するようにしたり(前倒しした分だけ従量料金が増
加するが、その増加額は基本料金の低減額に比べると僅
かである)、またピークができないように徐々に起動す
るなどの工夫で解決できることが多い。
Such inconvenience can be ameliorated if the causative equipment can be identified. For example, the causative air conditioner can be started up ahead of time in a time zone where there is sufficient power ( The pay-as-you-go fee increases by the amount moved forward, but the increase is small compared to the reduction in the basic fee.) In many cases, the problem can be solved by devising such as gradually activating the system so that no peak occurs.

【0013】したがって、負荷遮断による緊急処置的な
デマンド制御だけでなく、設備の運用の改善を併せて推
進できるようにすることが強く望まれているにも拘わら
ず、このような要望を満足させるようなデマンド制御運
用方法およびその装置は全く知られていなかった。
[0013] Accordingly, it has been strongly desired that not only emergency demand control by load shedding but also improvement of equipment operation be promoted at the same time. Such a demand control operation method and its device have not been known at all.

【0014】[0014]

【発明の目的】この発明は上記の問題点に鑑みてなされ
たものであり、快適性を大きく低下させることなく契約
電力を最小にすることができるデマンド制御運用方法お
よびその装置を提供することを目的としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and an object of the present invention is to provide a demand control operation method and apparatus capable of minimizing contract power without greatly reducing comfort. The purpose is.

【0015】[0015]

【課題を解決するための手段】請求項1のデマンド制御
運用方法は、デマンド制御を行いながら、デマンド制御
を行わなかった場合に対応するデマンド値を推定し、推
定されたデマンド値に基づいてデマンドが突出している
時間帯を検出する方法である。
A demand control operation method according to claim 1 estimates a demand value corresponding to a case where demand control is not performed while performing demand control, and calculates a demand value based on the estimated demand value. This is a method of detecting a time zone in which is projected.

【0016】請求項2のデマンド制御運用方法は、デマ
ンドが突出している時間帯に対応させて設備の運転履歴
を抽出し、運転履歴に基づいて不適切な設備運用を検出
する方法である。
A demand control operation method according to a second aspect is a method for extracting an operation history of equipment corresponding to a time zone where demand is prominent, and detecting an inappropriate equipment operation based on the operation history.

【0017】請求項3のデマンド制御運用方法は、各デ
マンド制御対象において、デマンド制御を行いながら、
デマンド制御を行わなかった場合に対応するデマンド値
を推定し、推定されたデマンド値に基づいてデマンドが
突出している時間帯を検出するとともに、デマンドが突
出している時間帯に対応させて設備の運転履歴を抽出
し、運転履歴に基づいて不適切な設備運用を検出し、各
デマンド制御対象から検出データを遠隔監視センターに
伝送し、遠隔監視センターにおいて、伝送された検出デ
ータに基づいて各デマンド制御対象における不適切な設
備運用を検出し、設備運用の改善情報を対応するデマン
ド制御対象に供給する方法である。
According to a third aspect of the present invention, there is provided a demand control operation method which performs demand control on each demand control object.
Estimating the demand value corresponding to the case where the demand control is not performed, detecting the time zone where the demand is prominent based on the estimated demand value, and operating the equipment in accordance with the time zone where the demand is prominent The history is extracted, inappropriate equipment operation is detected based on the operation history, and the detected data from each demand control target is transmitted to the remote monitoring center, where each demand control is performed based on the transmitted detection data. This is a method of detecting inappropriate equipment operation in a target and supplying improvement information of the equipment operation to a corresponding demand control target.

【0018】請求項4のデマンド制御運用方法は、デマ
ンド制御のための時限毎に、時々刻々予測電力を算出
し、デマンド実績値およびデマンド制御中に算出された
予測電力のうち、最大の予測電力に基づいてデマンド制
御を行わなかった場合に対応するデマンド値を推定する
方法である。
According to a fourth aspect of the present invention, there is provided a demand control operation method, wherein a predicted power is calculated moment by moment for each time period for the demand control, and a maximum predicted power is calculated from the actual demand value and the predicted power calculated during the demand control. Is a method of estimating a demand value corresponding to a case where demand control is not performed based on the demand.

【0019】請求項5のデマンド制御運用方法は、デマ
ンド制御のための時限毎に、時々刻々予測電力を算出
し、デマンド実績値および負荷遮断を実施した時間に基
づいてデマンド制御を行わなかった場合に対応するデマ
ンド値を推定する方法である。
According to a fifth aspect of the present invention, there is provided a demand control operation method in which a predicted power is calculated moment by moment for each time period for the demand control, and the demand control is not performed based on the actual demand value and the time when the load was interrupted. Is a method of estimating the demand value corresponding to the demand value.

【0020】請求項6のデマンド制御運用装置は、デマ
ンド制御を行いながら、デマンド制御を行わなかった場
合に対応するデマンド値を推定する非制御時デマンド値
推定手段と、推定されたデマンド値に基づいてデマンド
が突出している時間帯を検出するデマンド突出時間帯検
出手段とを含むものである。
According to a sixth aspect of the present invention, there is provided a demand control operation device which performs demand control while estimating a demand value corresponding to a case where demand control is not performed, and a demand value estimating means based on the estimated demand value. And a demand protruding time zone detecting means for detecting a time zone where the demand protrudes.

【0021】請求項7のデマンド制御運用装置は、デマ
ンドが突出している時間帯に対応させて設備の運転履歴
を抽出する設備運転履歴抽出手段と、運転履歴に基づい
て不適切な設備運用を検出する不適切設備運用検出手段
とをさらに含むものである。
According to a seventh aspect of the present invention, there is provided a demand control operation device for extracting equipment operation history corresponding to a time zone in which demand is prominent, and detecting inappropriate equipment operation based on the operation history. Means for detecting inappropriate equipment operation.

【0022】請求項8のデマンド制御運用装置は、各デ
マンド制御対象において、デマンド制御を行いながら、
デマンド制御を行わなかった場合に対応するデマンド値
を推定する非制御時デマンド値推定手段と、推定された
デマンド値に基づいてデマンドが突出している時間帯を
検出するデマンド突出時間帯検出手段と、デマンドが突
出している時間帯に対応させて設備の運転履歴を抽出す
る設備運転履歴抽出手段と、運転履歴に基づいて不適切
な設備運用を検出する不適切設備運用検出手段と、各デ
マンド制御対象から検出データを遠隔監視センターに伝
送する検出データ伝送手段と、遠隔監視センターにおい
て、伝送された検出データに基づいて各デマンド制御対
象における不適切な設備運用を検出し、設備運用の改善
情報を対応するデマンド制御対象に供給する改善情報供
給手段とを含むものである。
The demand control operation device of claim 8 performs demand control on each demand control object while performing demand control.
A non-control demand value estimating means for estimating a demand value corresponding to a case where the demand control is not performed; a demand protruding time zone detecting means for detecting a time zone in which the demand protrudes based on the estimated demand value; Equipment operation history extraction means for extracting equipment operation history corresponding to the time zone when demand is prominent, inappropriate equipment operation detection means for detecting inappropriate equipment operation based on operation history, and each demand control target Data transmission means for transmitting detection data from a remote monitoring center to a remote monitoring center, and the remote monitoring center detects inappropriate equipment operation in each demand control target based on the transmitted detection data and responds to information on equipment operation improvement And improvement information supply means for supplying the information to the demand control target.

【0023】請求項9のデマンド制御運用装置は、前記
非制御時デマンド値推定手段として、デマンド制御のた
めの時限毎に、時々刻々予測電力を算出し、デマンド実
績値およびデマンド制御中に算出された予測電力のう
ち、最大の予測電力に基づいてデマンド制御を行わなか
った場合に対応するデマンド値を推定するものを採用す
るものである。
According to a ninth aspect of the present invention, the demand control operation device calculates the predicted power momentarily for each time period for demand control as the non-control demand value estimating means, and calculates the demand actual value and the demand power during the demand control. Among the predicted powers, one that estimates a demand value corresponding to a case where the demand control is not performed based on the maximum predicted power is employed.

【0024】請求項10のデマンド制御運用装置は、前
記非制御時デマンド値推定手段として、デマンド制御の
ための時限毎に、時々刻々予測電力を算出し、デマンド
実績値および負荷遮断を実施した時間に基づいてデマン
ド制御を行わなかった場合に対応するデマンド値を推定
するものを採用するものである。
According to a tenth aspect of the present invention, in the demand control operation device, as the non-control-time demand value estimating means, a predicted power is calculated from time to time for each time period for demand control, and the actual demand value and the time during which the load shedding is performed. Is used for estimating a demand value corresponding to a case where demand control is not performed based on.

【0025】[0025]

【作用】請求項1のデマンド制御運用方法であれば、デ
マンド制御を行いながら、デマンド制御を行わなかった
場合に対応するデマンド値を推定し、推定されたデマン
ド値に基づいてデマンドが突出している時間帯を検出す
るのであるから、従来は両立させることができなかった
デマンド制御と、デマンド制御を行わなかった場合に対
応するデマンド値に基づくデマンド突出時間帯の検出と
を両立させることができる。そして、デマンド制御とデ
マンド突出時間帯の検出とを両立させることができるの
で、よりよいデマンド制御を勧めるためのコンサルティ
ングを実現することができる。
According to the demand control operation method of the present invention, the demand value corresponding to the case where the demand control is not performed is estimated while performing the demand control, and the demand protrudes based on the estimated demand value. Since the time zone is detected, it is possible to achieve both the demand control that could not be achieved conventionally and the detection of the demand protruding time zone based on the demand value corresponding to the case where the demand control is not performed. Since demand control and detection of a demand protruding time zone can be compatible, it is possible to realize consulting for recommending better demand control.

【0026】請求項2のデマンド制御運用方法であれ
ば、デマンドが突出している時間帯に対応させて設備の
運転履歴を抽出し、運転履歴に基づいて不適切な設備運
用を検出するのであるから、請求項1の作用に加え、不
適切な設備運用を簡単に、かつ確実に検出することがで
きる。
According to the demand control operation method of the second aspect, the operation history of the equipment is extracted corresponding to the time zone where the demand is prominent, and inappropriate equipment operation is detected based on the operation history. In addition to the effects of the first aspect, inappropriate equipment operation can be easily and reliably detected.

【0027】請求項3のデマンド制御運用方法であれ
ば、各デマンド制御対象において、デマンド制御を行い
ながら、デマンド制御を行わなかった場合に対応するデ
マンド値を推定し、推定されたデマンド値に基づいてデ
マンドが突出している時間帯を検出するとともに、デマ
ンドが突出している時間帯に対応させて設備の運転履歴
を抽出し、運転履歴に基づいて不適切な設備運用を検出
し、各デマンド制御対象から検出データを遠隔監視セン
ターに伝送し、遠隔監視センターにおいて、伝送された
検出データに基づいて各デマンド制御対象における不適
切な設備運用を検出し、設備運用の改善情報を対応する
デマンド制御対象に供給するのであるから、従来は両立
させることができなかったデマンド制御と、デマンド制
御を行わなかった場合に対応するデマンド値に基づくデ
マンド突出時間帯の検出とを両立させることができると
ともに、遠隔監視センターにおいて複数のデマンド制御
対象における不適切な設備運用の管理および不適切な設
備運用の改善情報の配信を達成することができる。そし
て、デマンド制御とデマンド突出時間帯の検出とを両立
させることができるので、よりよいデマンド制御を勧め
るためのコンサルティングを実現することができる。
In the demand control operation method according to the third aspect, a demand value corresponding to a case where the demand control is not performed is estimated for each demand control object while performing the demand control, and based on the estimated demand value. In addition to detecting the time zone where demand is rising, the equipment operation history is extracted corresponding to the time zone where demand is rising, and inappropriate equipment operation is detected based on the operation history, and each demand control target From the remote monitoring center, the remote monitoring center detects improper equipment operation in each demand control target based on the transmitted detection data, and sends the improvement information of the equipment operation to the corresponding demand control target. Because demand is supplied, demand control that could not be achieved in the past and demand control that was not performed Of the demand prominent time zone based on the demand value corresponding to the demand, and management of inappropriate equipment operation in multiple demand control targets and distribution of inappropriate equipment operation improvement information at the remote monitoring center Can be achieved. Since demand control and detection of a demand protruding time zone can be compatible, it is possible to realize consulting for recommending better demand control.

【0028】請求項4のデマンド制御運用方法であれ
ば、デマンド制御のための時限毎に、時々刻々予測電力
を算出し、デマンド実績値およびデマンド制御中に算出
された予測電力のうち、最大の予測電力に基づいてデマ
ンド制御を行わなかった場合に対応するデマンド値を推
定するのであるから、デマンド制御中に算出された予測
電力を用いてデマンド制御を行わなかった場合に対応す
るデマンド値を推定することにより、請求項1から請求
項3の何れかと同様の作用を達成することができる。
According to the demand control operation method of the present invention, the predicted power is calculated every moment for each time period for the demand control, and the maximum of the demand actual value and the predicted power calculated during the demand control is calculated. Since the demand value corresponding to the case where the demand control is not performed based on the predicted power is estimated, the demand value corresponding to the case where the demand control is not performed is estimated using the predicted power calculated during the demand control. By doing so, the same operation as any one of the first to third aspects can be achieved.

【0029】請求項5のデマンド制御運用方法であれ
ば、デマンド制御のための時限毎に、時々刻々予測電力
を算出し、デマンド実績値および負荷遮断を実施した時
間に基づいてデマンド制御を行わなかった場合に対応す
るデマンド値を推定するのであるから、負荷遮断を実施
した時間を用いてデマンド制御を行わなかった場合に対
応するデマンド値を推定することにより、請求項1から
請求項3の何れかと同様の作用を達成することができ
る。
According to the demand control operation method of the fifth aspect, the predicted power is calculated every moment for each time period for the demand control, and the demand control is not performed based on the actual demand value and the time when the load was cut off. Since the demand value corresponding to the case where the demand control is performed is estimated, the demand value corresponding to the case where the demand control is not performed by using the time when the load shedding is performed is estimated. The same operation as described above can be achieved.

【0030】請求項6のデマンド制御運用装置であれ
ば、非制御時デマンド値推定手段によって、デマンド制
御を行いながら、デマンド制御を行わなかった場合に対
応するデマンド値を推定し、デマンド突出時間帯検出手
段によって、推定されたデマンド値に基づいてデマンド
が突出している時間帯を検出することができる。
According to the demand control operation device of the present invention, the demand value estimating means estimates the demand value corresponding to the case where the demand control is not performed while performing the demand control by the demand value estimating means at the time of non-control. The detecting means can detect a time zone where the demand is prominent based on the estimated demand value.

【0031】したがって、従来は両立させることができ
なかったデマンド制御と、デマンド制御を行わなかった
場合に対応するデマンド値に基づくデマンド突出時間帯
の検出とを両立させることができる。そして、デマンド
制御とデマンド突出時間帯の検出とを両立させることが
できるので、よりよいデマンド制御を勧めるためのコン
サルティングを実現することができる。
Therefore, it is possible to achieve both the demand control that could not be achieved in the past and the detection of the demand protruding time zone based on the demand value corresponding to the case where the demand control was not performed. Since demand control and detection of a demand protruding time zone can be compatible, it is possible to realize consulting for recommending better demand control.

【0032】請求項7のデマンド制御運用装置であれ
ば、デマンドが突出している時間帯に対応させて設備の
運転履歴を抽出する設備運転履歴抽出手段と、運転履歴
に基づいて不適切な設備運用を検出する不適切設備運用
検出手段とをさらに含むのであるから、請求項6の作用
に加え、不適切な設備運用を簡単に、かつ確実に検出す
ることができる。
According to the demand control operation device of the present invention, the equipment operation history extracting means for extracting the operation history of the equipment corresponding to the time zone where the demand is prominent, and the inappropriate equipment operation based on the operation history Therefore, in addition to the function of claim 6, it is possible to easily and reliably detect inappropriate facility operation.

【0033】請求項8のデマンド制御運用装置であれ
ば、各デマンド制御対象において、非制御時デマンド値
推定手段によって、デマンド制御を行いながら、デマン
ド制御を行わなかった場合に対応するデマンド値を推定
し、デマンド突出時間帯検出手段によって、推定された
デマンド値に基づいてデマンドが突出している時間帯を
検出し、設備運転履歴抽出手段によって、デマンドが突
出している時間帯に対応させて設備の運転履歴を抽出
し、不適切設備運用検出手段によって、運転履歴に基づ
いて不適切な設備運用を検出し、検出データ伝送手段に
よって、各デマンド制御対象から検出データを遠隔監視
センターに伝送する。そして、遠隔監視センターにおい
て、改善情報供給手段によって、伝送された検出データ
に基づいて各デマンド制御対象における不適切な設備運
用を検出し、設備運用の改善情報を対応するデマンド制
御対象に供給する。
According to the demand control operation device of claim 8, in each demand control object, the demand value estimating means estimates the demand value corresponding to the case where the demand control is not performed while the demand control is performed while the demand control is being performed. Then, the demand protruding time zone detecting means detects a time zone where the demand protrudes based on the estimated demand value, and the equipment operation history extracting means operates the equipment in accordance with the time zone where the demand protrudes. The history is extracted, the inappropriate equipment operation detection means detects inappropriate equipment operation based on the operation history, and the detection data transmission means transmits the detection data from each demand control target to the remote monitoring center. Then, in the remote monitoring center, the improvement information supply means detects inappropriate equipment operation in each demand control target based on the transmitted detection data, and supplies the equipment operation improvement information to the corresponding demand control target.

【0034】したがって、従来は両立させることができ
なかったデマンド制御と、デマンド制御を行わなかった
場合に対応するデマンド値に基づくデマンド突出時間帯
の検出とを両立させることができるとともに、遠隔監視
センターにおいて複数のデマンド制御対象における不適
切な設備運用の管理および不適切な設備運用の改善情報
の配信を達成することができる。そして、デマンド制御
とデマンド突出時間帯の検出とを両立させることができ
るので、よりよいデマンド制御を勧めるためのコンサル
ティングを実現することができる。
Therefore, it is possible to achieve both the demand control which could not be achieved in the past and the detection of the demand protruding time zone based on the demand value corresponding to the case where the demand control was not performed. Thus, it is possible to achieve management of inappropriate equipment operation and distribution of inappropriate equipment operation improvement information for a plurality of demand control targets. Since demand control and detection of a demand protruding time zone can be compatible, it is possible to realize consulting for recommending better demand control.

【0035】請求項9のデマンド制御運用装置であれ
ば、前記非制御時デマンド値推定手段として、デマンド
制御のための時限毎に、時々刻々予測電力を算出し、デ
マンド実績値およびデマンド制御中に算出された予測電
力のうち、最大の予測電力に基づいてデマンド制御を行
わなかった場合に対応するデマンド値を推定するものを
採用するのであるから、デマンド制御中に算出された予
測電力を用いてデマンド制御を行わなかった場合に対応
するデマンド値を推定することにより、請求項6から請
求項8の何れかと同様の作用を達成することができる。
In the demand control operation device according to the ninth aspect, as the non-control demand value estimating means, a predicted power is calculated moment by moment for each time period for demand control, and the demand actual value and the demand power during the demand control are calculated. Among the calculated predicted powers, the one that estimates the demand value corresponding to the case where the demand control is not performed based on the maximum predicted power is employed, so the predicted power calculated during the demand control is used. By estimating the demand value corresponding to the case where the demand control is not performed, the same operation as any one of the sixth to eighth aspects can be achieved.

【0036】請求項10のデマンド制御運用装置は、前
記非制御時デマンド値推定手段として、デマンド制御の
ための時限毎に、時々刻々予測電力を算出し、デマンド
実績値および負荷遮断を実施した時間に基づいてデマン
ド制御を行わなかった場合に対応するデマンド値を推定
するものを採用するのであるから、負荷遮断を実施した
時間を用いてデマンド制御を行わなかった場合に対応す
るデマンド値を推定することにより、請求項6から請求
項8の何れかと同様の作用を達成することができる。
According to a tenth aspect of the present invention, in the demand control operation device, as the non-control-time demand value estimating means, a predicted power is calculated moment by moment for each time period for demand control, and the actual demand value and the time during which the load shedding is performed. Since the demand value corresponding to the case where the demand control is not performed based on the demand value is adopted, the demand value corresponding to the case where the demand control is not performed is estimated using the time when the load shedding is performed. Thereby, the same operation as any one of claims 6 to 8 can be achieved.

【0037】[0037]

【発明の実施の形態】以下、添付図面を参照して、この
発明のデマンド制御運用方法およびその装置の実施の態
様を詳細に説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing a demand control operation method according to an embodiment of the present invention;

【0038】図1はこの発明のデマンド制御運用方法が
適用されるデマンド制御運用装置の一実施態様を示すブ
ロック図である。
FIG. 1 is a block diagram showing an embodiment of a demand control operation apparatus to which the demand control operation method of the present invention is applied.

【0039】このデマンド制御運用装置は、デマンド制
御部1と、非制御時デマンド値推定部2と、原因設備抽
出部3と、設備運転履歴記憶部4とを含んでいる。
The demand control operation device includes a demand control unit 1, a non-control demand value estimation unit 2, a cause facility extraction unit 3, and a facility operation history storage unit 4.

【0040】前記デマンド制御部1は、デマンドパルス
を入力としてデマンドパルスを積算するパルスカウンタ
11と、デマンド時限から経過時間を減算して残り時間
を算出する残り時間演算部12と、デマンドパルス計数
値および残り時間を入力として予測電力を算出する予測
電力演算部13と、残り時間が0となった時に算出され
た現在電力をデマンド値として保持するデマンド値記憶
部14と、目標電力を保持する目標電力記憶部15と、
目標電力および算出された予測電力を入力として制御の
要否を判定して判定結果を出力する制御要否判定部16
と、判定結果を入力として負荷制御のための処理を行う
負荷制御部17と、制御要否判定部16からの判定結果
を入力として制御履歴(例えば、遮断/復帰指令の出力
時刻、出力遮断レベルなど)を記憶する制御履歴記憶部
18とを有している。
The demand control unit 1 includes a pulse counter 11 for integrating demand pulses with demand pulses as input, a remaining time calculation unit 12 for subtracting the elapsed time from the demand time period, and a demand pulse count value. And a predicted power calculation unit 13 that calculates predicted power using the remaining time as an input, a demand value storage unit 14 that stores the current power calculated when the remaining time becomes 0 as a demand value, and a target that stores the target power. A power storage unit 15,
A control necessity determining unit 16 that determines whether control is necessary by using the target power and the calculated predicted power as inputs and outputs a determination result
And a control history (for example, the output time of the cutoff / return command, the output cutoff level, And the like, and a control history storage unit 18 for storing the same.

【0041】前記予測電力演算部13は、例えば、予め
設定されているパルス重み×パルス積算値×(60÷デ
マンド時限[分])の演算を行って現在電力を算出し、
この現在電力を用いて、現在電力+(過去Δt分間の電
力変化量÷サンプリング時間Δt)×(残り時間)の演
算を行って予測電力を算出する。
The predicted power calculation unit 13 calculates the current power by calculating, for example, a preset pulse weight × pulse integrated value × (60 ÷ demand time [minutes]).
Using this current power, the predicted power is calculated by performing an operation of (current power + (power change amount in past Δt minutes / sampling time Δt) × (remaining time)).

【0042】前記制御要否判定部16は、例えば、目標
電力÷デマンド時限×経過時間の演算を行って目標現在
電力を算出し、経過時間>Tロック時間(時限開始直後
の、遮断指令出力を禁止すべき時間)、かつ予測電力≧
目標電力、かつ現在電力≧目標現在電力である場合に、
遮断指令出力を行って、最大レベルになるまで遮断レベ
ルを1つ上げ、逆に、予測電力<目標電力、かつ現在電
力<目標現在電力である場合に、復帰指令出力を行っ
て、遮断レベル=0になるまで遮断レベルを1つ下げ
る。これら以外の場合には、遮断指令出力、復帰指令出
力の何れも行わない。
The control necessity judging section 16 calculates the target current power by calculating, for example, target power / demand time × elapsed time, and elapse time> T lock time (the shutdown command output immediately after the start of the time period is calculated. Prohibition time) and predicted power ≧
When target power and current power ≧ target current power,
A shutoff command is output, and the shutoff level is increased by one until the maximum level is reached. Conversely, when the predicted power <the target power and the present power <the target current power, the reset command is output and the shutoff level = Lower the cutoff level by one until it reaches zero. In other cases, neither the cutoff command output nor the return command output is performed.

【0043】上記の予測電力は時限開始直後に大きな値
が算出され易いという問題があるが、このようにTロッ
ク時間を制御要否の判定式に加えることで、時限開始直
後に不要な遮断指令が出力されることを阻止している。
Although there is a problem that a large value of the predicted power is likely to be calculated immediately after the start of the time period, by adding the T lock time to the determination formula of the control necessity, an unnecessary shutoff command Is prevented from being output.

【0044】前記負荷制御部17は、制御要否判定部1
6からの遮断レベルを入力として、この遮断レベルに対
応して負荷を制御するための処理を行い、負荷制御デー
タを出力する。
The load control unit 17 includes a control necessity determination unit 1
With the cut-off level from No. 6 as an input, processing for controlling the load corresponding to the cut-off level is performed, and load control data is output.

【0045】前記非制御時デマンド値推定部2は、残り
時間、予測電力、および遮断中/非遮断を示す判定結果
を入力として最大値を抽出する最大値抽出部21と、抽
出された最大値を入力として非制御時に対応するデマン
ド値をを保持する非制御時デマンド値記憶部22と、デ
マンド値記憶部14に保持されているデマンド値に対
し、非制御時デマンド値記憶部22に保持されている非
制御時に対応するデマンド値に基づく置換処理を行うこ
とによって、デマンド制御を行わなかった場合に対応す
るデマンド値を出力する非制御時デマンド値出力部24
とを有している。
The non-control-time demand value estimating unit 2 includes a maximum value extracting unit 21 for extracting a maximum value by inputting a remaining time, a predicted power, and a determination result indicating whether or not the power supply is shut off / non-interrupt; The non-control demand value storage unit 22 that holds the demand value corresponding to the time of non-control by inputting the input and the demand value stored in the demand value storage unit 14 is stored in the non-control demand value storage unit 22. A non-control demand value output unit 24 that outputs a corresponding demand value when demand control is not performed by performing a replacement process based on the demand value corresponding to the non-control time
And

【0046】前記最大値抽出部21は、デマンド制御が
実行された時限について、デマンド制御を行わなかった
場合のデマンド値を推定するものであり、具体的には、
図2に示すフローチャートの処理を行う。
The maximum value extracting section 21 estimates the demand value when the demand control is not performed for the time limit when the demand control is performed.
The processing of the flowchart shown in FIG. 2 is performed.

【0047】ステップSP1において、残り時間が0か
否か(時限が終了したか否か)を判定し、時限が終了し
ていないと判定された場合には、ステップSP2におい
て、遮断中(遮断レベル>0)か否かを判定し、遮断中
と判定された場合には、ステップSP3において、予測
電力の最大値を格納するための変数MaxValueが
算出された予測電力よりも小さいか否かを判定し、変数
MaxValueが算出された予測電力よりも小さいと
判定された場合には、ステップSP4において、算出さ
れた予測電力を変数MaxValueに格納する。
At step SP1, it is determined whether or not the remaining time is 0 (whether or not the time period has expired). > 0), and when it is determined that the power is shut off, in step SP3, it is determined whether a variable MaxValue for storing the maximum value of the predicted power is smaller than the calculated predicted power. If it is determined that the variable MaxValue is smaller than the calculated predicted power, in step SP4, the calculated predicted power is stored in the variable MaxValue.

【0048】逆に、ステップSP1において時限が終了
したと判定された場合には、ステップSP5において、
変数MaxValueの値が0であるか否かを判定し、
変数MaxValueの値が0でないと判定された場合
には、ステップSP6において、変数MaxValue
の値を非制御時のデマンド推定値としてタイムスタンプ
を付けて非制御時デマンド値記憶部22に記憶し、ステ
ップSP7において、変数MaxValueの値を0に
初期化する。
Conversely, when it is determined in step SP1 that the time period has ended, in step SP5,
It is determined whether the value of the variable MaxValue is 0,
If it is determined that the value of the variable MaxValue is not 0, in step SP6, the variable MaxValue
Is stored in the non-control demand value storage unit 22 with a time stamp as a non-control demand estimate value, and the value of the variable MaxValue is initialized to 0 in step SP7.

【0049】また、ステップSP2において遮断中でな
いと判定された場合、ステップSP3において変数Ma
xValueが算出された予測電力よりも小さくないと
判定された場合、ステップSP4の処理が行われた場
合、ステップSP5において変数MaxValueの値
が0であると判定された場合、またはステップSP7の
処理が行われた場合には、再びステップSP1の判定を
行う。
If it is determined in step SP2 that the cutoff is not being performed, the variable Ma is determined in step SP3.
When it is determined that xValue is not smaller than the calculated predicted power, when the processing of step SP4 is performed, when it is determined in step SP5 that the value of the variable MaxValue is 0, or when the processing of step SP7 is performed. If so, the determination in step SP1 is performed again.

【0050】上記の処理は、(1) 時々刻々出力され
る(例えば、10秒毎に出力される)予測電力には、デ
マンド制御が行われなかった場合のデマンド値に近い値
が含まれていること、および(2) 遮断中(遮断レベ
ル>0)に算出された予測電力のうち、最大となる値が
デマンド制御が行われなかった場合のデマンド値に近い
値をとること、を考慮してなされたものである。
In the above processing, (1) the predicted power output every moment (for example, output every 10 seconds) includes a value close to the demand value when the demand control is not performed. And (2) that, among the predicted powers calculated during the interruption (interruption level> 0), the maximum value is close to the demand value when the demand control is not performed. It was done.

【0051】そして、上記の処理を行うことによって、
デマンド制御の実行により低減した値が抽出されること
を防止することができ、しかも、時限開始直後(Tロッ
ク時間の間)は遮断指令の出力が阻止されることに伴っ
て、この期間には大きな予測電力が出力され易いにも拘
わらず、この値が抽出されることを防止することができ
る。
Then, by performing the above processing,
The reduced value can be prevented from being extracted by the execution of the demand control. In addition, immediately after the start of the time limit (during the T lock time), the output of the shutoff command is blocked, This value can be prevented from being extracted although large predicted power is likely to be output.

【0052】したがって、非制御時デマンド値記憶部2
2には、遮断指令の出力があった時限のみに対応して、
タイムスタンプと共に変数MaxValueの値(最大
値)を保持することができる。
Therefore, the non-control-time demand value storage unit 2
2 corresponds only to the time period when the shutoff command is output,
The value (maximum value) of the variable MaxValue can be held together with the time stamp.

【0053】以上を要約すれば、任意に設定された目標
電力に基づいて負荷群のデマンド制御を行って消費電力
を低減するとともに、遮断指令が出力されたことに応答
してタイムスタンプと共に変数MaxValueの値
(最大値)を非制御時デマンド値記憶部22に保持す
る。そして、デマンド値記憶部14にデマンド値(実測
値){例えば、図3中(A)参照}を保持する。
To summarize the above, the demand control of the load group is performed based on the arbitrarily set target power to reduce the power consumption, and in response to the output of the cutoff command, the time stamp and the variable MaxValue are output. (Maximum value) is stored in the non-control demand value storage unit 22. Then, the demand value (actually measured value) {for example, see FIG. 3A) is stored in the demand value storage unit 14.

【0054】そして、非制御時デマンド値出力部24に
て、図3に示すように、デマンド値(実測値){例え
ば、図3中(A)参照}に対し、非制御時デマンド値記
憶部22にタイムスタンプと共に保持されている変数M
axValueの値に基づく置換処理を行うことによっ
て、デマンド制御を行わなかった場合に対応するデマン
ド値{例えば、図3中(B)参照}を得ることができ
る。
Then, as shown in FIG. 3, the non-control demand value output section 24 stores the demand value (actually measured value) {for example, see FIG. Variable M held with time stamp in 22
By performing the replacement process based on the value of axValue, a demand value (for example, see (B) in FIG. 3) corresponding to a case where the demand control is not performed can be obtained.

【0055】前記設備運転履歴記憶部4は、設備の発停
情報、設定温度の変更情報などの設備運転の履歴を表す
情報を保持する。
The equipment operation history storage unit 4 holds information representing the history of equipment operation, such as equipment start / stop information and set temperature change information.

【0056】前記原因設備抽出部3は、非制御時デマン
ド値記憶部22にタイムスタンプと共に保持されている
変数MaxValueの値を入力としてデマンド突出時
間帯を抽出するデマンド突出時間帯抽出部31と、設備
運転の履歴を表す情報とデマンド突出時間帯とを入力と
して、デマンド突出時間帯に対応する設備運転の履歴を
表す情報を抽出する設備運転履歴抽出部32と、運転履
歴に基づいて不適切な設備運用を検出する不適切設備運
用検出部33とを有している。
The cause facility extracting unit 3 includes a demand protruding time zone extracting unit 31 that extracts a demand protruding time zone by inputting a value of a variable MaxValue held together with a time stamp in the non-control demand value storage unit 22, An equipment operation history extraction unit 32 that inputs information indicating the history of equipment operation and the demand protruding time zone and extracts information indicating the history of equipment operation corresponding to the demand prolonging time zone, and an inappropriate operation based on the operation history. It has an inappropriate equipment operation detection unit 33 that detects equipment operation.

【0057】前記デマンド突出時間帯抽出部31は、デ
マンド値が目標電力以上の時限の中からデマンド突出時
間帯を抽出する。さらに詳細にいえば、処理対象となる
時限のデマンド値が、前後のN時限(Nは正の整数であ
り、例えばN=3に設定する)の中で最大値をとり(凸
形であり)、かつ、処理対象となる時限のデマンド値よ
りもTHLdiff(例えば、10kW)以上下回るデ
マンド値が前後のN時限に少なくとも1つ存在すると
き、その時限を突出する時限と判定し、このようにして
判定された突出する時限に基づいてデマンド突出時間帯
を抽出する。
The demand protruding time zone extracting section 31 extracts a demand protruding time zone from time periods in which the demand value is equal to or higher than the target power. More specifically, the demand value of the time period to be processed takes the maximum value (a convex shape) in the preceding and following N time periods (N is a positive integer, for example, N is set to 3). And, when at least one demand value that is at least THLdiff (for example, 10 kW) lower than the demand value of the time period to be processed exists in the preceding and following N time periods, the time period is determined to be a protruding time period. A demand protruding time zone is extracted based on the determined protruding time period.

【0058】前記設備運転履歴抽出部32は、設備の起
動や設定温度の変更が行われてから、実際に消費電力が
増加するまでに、遅延(数分〜30分程度)があること
を考慮して、デマンド突出時間帯の開始時刻の1時間程
度前からデマンド突出時間帯の終了時刻までの時間帯に
おける設備運転履歴を抽出する。
The equipment operation history extraction unit 32 considers that there is a delay (about several minutes to 30 minutes) from when the equipment is started or the set temperature is changed to when the power consumption actually increases. Then, the facility operation history in a time zone from about one hour before the start time of the demand peak time zone to the end time of the demand peak time zone is extracted.

【0059】前記不適切設備運用検出部33は、抽出さ
れた設備運転履歴の中から、設備の起動と設定温度の変
更(冷房運転時は設定温度を下げる操作、暖房運転時は
設定温度を上げる操作)に関する運転履歴を、契約電力
を押し上げる原因になり得る不適切な設備運用として抽
出し、記録する。ただし、契約電力の押し上げが軽微な
ものを除外すべく、設定温度の変更幅が所定幅以上のも
の、設定温度変更後の設定温度が第1所定温度以下(冷
房運転時)(暖房運転時であれば、第2所定温度以上)
のもののみを抽出することが好ましい。
The inappropriate equipment operation detecting unit 33 starts the equipment and changes the set temperature from the extracted equipment operation history (operation of lowering the set temperature during cooling operation, increasing the set temperature during heating operation). The operation history related to (operation) is extracted and recorded as inappropriate equipment operation that may cause the contract power to be boosted. However, in order to exclude a case where the contract power is slightly increased, the set temperature change width is equal to or larger than a predetermined width, and the set temperature after the set temperature change is equal to or lower than the first predetermined temperature (for cooling operation) (for heating operation). If more than the second predetermined temperature)
It is preferable to extract only those.

【0060】図4は原因設備抽出部の処理を説明するフ
ローチャートである。
FIG. 4 is a flowchart for explaining the processing of the cause facility extracting unit.

【0061】非制御時のデマンド値が推定された場合
に、ステップSP1において、デマンド値を1つ抽出
し、ステップSP2において、抽出したデマンド値が目
標電力よりも大きいか否か(デマンド制御がかかったか
否か)を判定し、抽出したデマンド値が目標電力よりも
大きいと判定された場合には、ステップSP3におい
て、その前後の時間帯に比べ、デマンド値が突出して大
きいか否かを判定し、デマンド値が突出して大きいと判
定された場合には、ステップSP4において、突出して
いる時間帯(Tstart〜Tend)を求め、ステッ
プSP5において、求められた時間帯に基づいて定める
時間帯における設備運転の履歴を抽出し、ステップSP
6において、契約電力を押し上げる原因になり得る不適
切な設備運用を抽出して記憶する。
When the demand value at the time of non-control is estimated, one demand value is extracted in step SP1, and in step SP2, it is determined whether the extracted demand value is larger than the target power (demand control is performed). Is determined, and if it is determined that the extracted demand value is larger than the target power, it is determined in step SP3 whether the demand value is remarkably larger than the time periods before and after the demand value. If it is determined that the demand value is prominently large, the protruding time period (Tstart to Tend) is obtained in step SP4, and the equipment operation in the time period determined based on the obtained time period in step SP5. Extract the history of step SP
At 6, an inappropriate facility operation that may cause a rise in contract power is extracted and stored.

【0062】そして、ステップSP2において抽出した
デマンド値が目標電力よりも大きくないと判定された場
合、ステップSP3においてデマンド値が突出して大き
くはないと判定された場合、またはステップSP6の処
理がおこなわれた場合には、ステップSP7において、
全てのデマンドデータに基づく処理が行われたか否かを
判定し、処理が行われていないデマンドデータが存在し
ていると判定された場合には、再びステップSP1の処
理を行う。
Then, if it is determined in step SP2 that the extracted demand value is not larger than the target power, if it is determined in step SP3 that the demand value is not remarkably large, or the processing of step SP6 is performed. In step SP7,
It is determined whether or not processing based on all demand data has been performed. If it is determined that there is demand data for which processing has not been performed, the processing of step SP1 is performed again.

【0063】逆に、ステップSP7において全てのデマ
ンドデータに基づく処理が行われたと判定された場合に
は、ステップSP8において、抽出結果を表示し、その
まま元の処理に戻る。
Conversely, if it is determined in step SP7 that the processing based on all the demand data has been performed, the extraction result is displayed in step SP8, and the process returns to the original processing.

【0064】前記抽出結果の表示は、例えば、図5に示
すように行われる。
The display of the extraction result is performed, for example, as shown in FIG.

【0065】図5においては、年月日、日最大デマンド
としての目標電力、制御時の実績値、非制御時の推定
値、突出時間帯、非制御時のデマンド推定値の経時変化
を表すグラフ、原因設備抽出結果、およびコントロール
ボタンが示されている。そして、不適切な設備運用が複
数個抽出された場合には、例えば、デマンド値が大きい
順に表示する。
FIG. 5 is a graph showing the change over time of the date, the target power as the daily maximum demand, the actual value during control, the estimated value during non-control, the protruding time zone, and the estimated demand value during non-control. , Cause equipment extraction results, and control buttons. When a plurality of inappropriate facility operations are extracted, for example, they are displayed in descending order of demand value.

【0066】したがって、抽出結果の表示を見ることに
より、デマンド値が突出している時間帯を簡単に把握す
ることができるとともに、不適切な設備運用をも簡単に
把握することができる。
Therefore, by looking at the display of the extraction result, it is possible to easily grasp the time zone where the demand value is prominent, and it is also possible to easily grasp inappropriate equipment operation.

【0067】そして、不適切な設備運用を改善すること
により、契約電力の押し上げを解消させることができ、
快適性を大きく低下させることなく契約電力を最小にす
ることができる。
By improving inappropriate equipment operation, it is possible to eliminate the increase in contract power.
The contract power can be minimized without greatly reducing comfort.

【0068】なお、この実施態様において、負荷が空気
調和機である場合に、空気調和機が空調動作を行ってい
る部屋の温度情報(例えば、当日における空気調和機の
室内機の吸い込み温度の1時間毎の計測値)を併せて検
出し、保持しておくことが好ましく、空調動作開始前の
室内温度が高温であったか否かなどを判定することがで
き、ひいては不適切な設備運用か否かの判定精度を高め
ることができる。
In this embodiment, when the load is an air conditioner, the temperature information of the room in which the air conditioner is performing the air-conditioning operation (for example, one of the suction temperatures of the indoor units of the air conditioner on that day). (Measured value for each time) is also preferably detected and held, and it can be determined whether or not the room temperature before the start of the air-conditioning operation was high or not. Can be improved.

【0069】図6は上記の構成のデマンド制御運用装置
が適用されるデマンド制御運用支援システムの構成を示
す概略図である。
FIG. 6 is a schematic diagram showing the configuration of a demand control operation support system to which the demand control operation device having the above configuration is applied.

【0070】このデマンド制御運用支援システムは、遠
隔監視センター5と複数のデマンド制御対象(例えば、
複数のビル)6とをネットワーク7を介して接続してい
る。
This demand control operation support system comprises a remote monitoring center 5 and a plurality of demand control objects (for example,
A plurality of buildings 6 are connected via a network 7.

【0071】前記各デマンド制御対象6は、図1に示す
デマンド制御運用装置が組み込まれているとともに、デ
マンド値が突出している時間帯、原因設備抽出結果、起
動/設定温度変更などの操作内容、デマンド制御履歴
(遮断/復帰指令の出力時刻など)、非制御時デマンド
推定値、および日最大デマンド実績値などをネットワー
ク7を通して遠隔監視センター5に伝送する。
Each of the demand control objects 6 incorporates the demand control operation device shown in FIG. 1 and includes time periods in which the demand value is prominent, extraction of the cause equipment, operation contents such as start / set temperature change, and the like. The demand control history (output time of the cutoff / return command and the like), the non-control demand estimated value, the daily maximum demand actual value, and the like are transmitted to the remote monitoring center 5 through the network 7.

【0072】前記遠隔監視センター5は、各デマンド制
御対象6から伝送されるデータに基づく解析処理を行っ
て原因設備の特定を行って解析結果をネットワーク7を
通して対応するデマンド制御対象6に伝送する。また、
必要に応じて設備運用の改善情報をもネットワーク7を
通して該当するデマンド制御対象6に伝送する。さら
に、必要に応じてネットワーク7を通して各デマンド制
御対象に目標電力を伝送する。
The remote monitoring center 5 performs an analysis process based on the data transmitted from each demand control target 6, specifies the cause equipment, and transmits the analysis result to the corresponding demand control target 6 via the network 7. Also,
If necessary, equipment operation improvement information is also transmitted to the corresponding demand control target 6 through the network 7. Further, the target power is transmitted to each demand control target through the network 7 as needed.

【0073】前記ネットワーク7は、有線のネットワー
クであってもよいが、無線のネットワークであってもよ
く、要はデータの授受を行わせることができるものであ
れば、どのようなものであっても採用することができ
る。
The network 7 may be a wired network or a wireless network. In other words, any network can be used as long as data can be transmitted and received. Can also be employed.

【0074】上記のデマンド制御運用支援システムを採
用した場合には、各デマンド制御対象6において、デマ
ンド値が突出している時間帯、原因設備抽出結果、起動
/設定温度変更などの操作内容、デマンド制御履歴(遮
断/復帰指令の出力時刻など)、非制御時デマンド推定
値、および日最大デマンド実績値などを抽出し、ネット
ワーク7を通してこれらを遠隔監視センター5に伝送す
る。
When the above demand control operation support system is adopted, the time zone where the demand value is prominent, the cause equipment extraction result, the operation contents such as the start / set temperature change, the demand control The history (output time of the shutoff / return command and the like), the non-control demand estimated value, the daily maximum demand actual value, and the like are extracted and transmitted to the remote monitoring center 5 through the network 7.

【0075】そして、遠隔監視センター5においては、
各デマンド制御対象6から伝送されたデータに基づい
て、デマンド制御対象6における「デマンド制御の運用
状態」および「デマンド値の突出の有無」を一覧表示し
(図7参照)、「運用状態」に加え、「不適切な設備運
用の有無」をも容易に確認できるようにする。また、各
デマンド制御対象6に対応させて一覧表示中に設けられ
た「情報表示」ボタンを操作することにより、図5に示
す表示を行わせることができるようにする。
Then, in the remote monitoring center 5,
Based on the data transmitted from each demand control target 6, “operation state of demand control” and “whether or not a demand value protrudes” in the demand control target 6 are displayed in a list (see FIG. 7), and are displayed in “operation state”. In addition, it will be possible to easily confirm whether there is inappropriate equipment operation. By operating the "information display" button provided in the list display corresponding to each demand control target 6, the display shown in FIG. 5 can be performed.

【0076】したがって、複数のデマンド制御対象6に
対して、不適切な設備運用の抽出、設備運用の改善提案
などを少人数で効率よく行うことができる。
Therefore, for a plurality of demand control targets 6, extraction of inappropriate equipment operation, improvement proposal of equipment operation, and the like can be efficiently performed by a small number of people.

【0077】図8はこの発明のデマンド制御運用方法の
他の実施態様が適用されるデマンド制御運用装置の構成
を示すブロック図である。
FIG. 8 is a block diagram showing a configuration of a demand control operation device to which another embodiment of the demand control operation method of the present invention is applied.

【0078】このデマンド制御運用装置が図1のデマン
ド制御運用装置と異なる点は、最大値抽出部21に代え
てデマンド低減量演算部23を採用した点のみである。
This demand control operation device differs from the demand control operation device of FIG. 1 only in that a demand reduction amount calculation unit 23 is employed in place of the maximum value extraction unit 21.

【0079】前記デマンド低減量演算部23は、例え
ば、遮断レベルが1〜8である場合に、数1の演算を行
ってデマンド低減量Drを算出する。
For example, when the cutoff level is 1 to 8, the demand reduction amount calculation unit 23 calculates the demand reduction amount Dr by performing the calculation of Equation 1.

【0080】[0080]

【数1】 (Equation 1)

【0081】ただし、wiは重み係数であり、遮断レベ
ルiで抑制される電力量の概算値を別途算出し、算出し
た値に設定する。
Here, wi is a weighting coefficient, and an approximate value of the amount of power suppressed at the cutoff level i is separately calculated and set to the calculated value.

【0082】数1の演算によってデマンド低減量Drを
算出できるのは、遮断時間が長いほど電力抑制量が多く
なること、および各遮断レベル毎に抑制される電力量が
異なることによる。
The demand reduction amount Dr can be calculated by the calculation of the equation (1) because the power suppression amount increases as the cutoff time is longer, and the power suppression amount differs for each cutoff level.

【0083】したがって、この実施態様においては、デ
マンド実績値とデマンド低減量Drとの和が非制御時の
デマンド値に近似できるので、非制御時デマンド値記憶
部22においてこの和を算出し、非制御時のデマンド推
定値として保持することによって、図1のデマンド制御
運用装置と同様の作用を達成することができる。
Therefore, in this embodiment, since the sum of the actual demand value and the demand reduction amount Dr can be approximated to the demand value at the time of non-control, the sum at the non-control demand value storage unit 22 is calculated, The same operation as the demand control operation device in FIG. 1 can be achieved by holding the demand estimation value at the time of control.

【0084】[0084]

【発明の効果】請求項1の発明は、従来は両立させるこ
とができなかったデマンド制御と、デマンド制御を行わ
なかった場合に対応するデマンド値に基づくデマンド突
出時間帯の検出とを両立させることができ、しかも、デ
マンド制御とデマンド突出時間帯の検出とを両立させる
ことができるので、よりよいデマンド制御を勧めるため
のコンサルティングを実現することができるという特有
の効果を奏する。
According to the first aspect of the present invention, it is possible to achieve both the demand control which could not be achieved conventionally and the detection of the demand protruding time zone based on the demand value corresponding to the case where the demand control is not performed. In addition, since the demand control and the detection of the demand protruding time zone can be made compatible, it is possible to achieve a unique effect that it is possible to realize consulting for recommending better demand control.

【0085】請求項2の発明は、請求項1の効果に加
え、不適切な設備運用を簡単に、かつ確実に検出するこ
とができるという特有の効果を奏する。
The invention of claim 2 has a unique effect that in addition to the effect of claim 1, inappropriate equipment operation can be detected simply and reliably.

【0086】請求項3の発明は、従来は両立させること
ができなかったデマンド制御と、デマンド制御を行わな
かった場合に対応するデマンド値に基づくデマンド突出
時間帯の検出とを両立させることができるとともに、遠
隔監視センターにおいて複数のデマンド制御対象におけ
る不適切な設備運用の管理および不適切な設備運用の改
善情報の配信を達成することができ、しかも、デマンド
制御とデマンド突出時間帯の検出とを両立させることが
できるので、よりよいデマンド制御を勧めるためのコン
サルティングを実現することができるという特有の効果
を奏する。
According to the third aspect of the present invention, it is possible to achieve both demand control, which could not be achieved conventionally, and detection of a demand protruding time zone based on a demand value corresponding to a case where demand control is not performed. At the same time, the remote monitoring center can achieve the management of inappropriate equipment operation and the distribution of information on the improvement of inappropriate equipment operation in multiple demand control targets. Since both can be made compatible, a unique effect that consulting for recommending better demand control can be realized.

【0087】請求項4の発明は、デマンド制御中に算出
された予測電力を用いてデマンド制御を行わなかった場
合に対応するデマンド値を推定することにより、請求項
1から請求項3の何れかと同様の効果を奏する。
According to a fourth aspect of the present invention, a demand value corresponding to a case where the demand control is not performed is estimated by using the predicted power calculated during the demand control. A similar effect is achieved.

【0088】請求項5の発明は、負荷遮断を実施した時
間を用いてデマンド制御を行わなかった場合に対応する
デマンド値を推定することにより、請求項1から請求項
3の何れかと同様の効果を奏する。
According to a fifth aspect of the present invention, a demand value corresponding to a case where the demand control is not performed using the time during which the load shedding is performed is estimated, thereby providing the same effect as any one of the first to third aspects. To play.

【0089】請求項6の発明は、従来は両立させること
ができなかったデマンド制御と、デマンド制御を行わな
かった場合に対応するデマンド値に基づくデマンド突出
時間帯の検出とを両立させることができ、しかも、デマ
ンド制御とデマンド突出時間帯の検出とを両立させるこ
とができるので、よりよいデマンド制御を勧めるための
コンサルティングを実現することができるという特有の
効果を奏する。
According to the sixth aspect of the present invention, it is possible to achieve both demand control which could not be achieved conventionally and detection of a demand protruding time zone based on a demand value corresponding to a case where demand control is not performed. In addition, since the demand control and the detection of the demand protruding time zone can both be achieved, it is possible to achieve a unique effect that consulting for recommending better demand control can be realized.

【0090】請求項7の発明は、請求項6の効果に加
え、不適切な設備運用を簡単に、かつ確実に検出するこ
とができるという特有の効果を奏する。
The invention of claim 7 has a unique effect that in addition to the effect of claim 6, inappropriate equipment operation can be detected simply and reliably.

【0091】請求項8の発明は、従来は両立させること
ができなかったデマンド制御と、デマンド制御を行わな
かった場合に対応するデマンド値に基づくデマンド突出
時間帯の検出とを両立させることができるとともに、遠
隔監視センターにおいて複数のデマンド制御対象におけ
る不適切な設備運用の管理および不適切な設備運用の改
善情報の配信を達成することができ、しかも、デマンド
制御とデマンド突出時間帯の検出とを両立させることが
できるので、よりよいデマンド制御を勧めるためのコン
サルティングを実現することができるという特有の効果
を奏する。
According to the eighth aspect of the present invention, it is possible to achieve both demand control, which could not be achieved conventionally, and detection of a demand protruding time zone based on a demand value corresponding to a case where demand control is not performed. At the same time, the remote monitoring center can achieve the management of inappropriate equipment operation and the distribution of information on the improvement of inappropriate equipment operation in multiple demand control targets. Since both can be made compatible, a unique effect that consulting for recommending better demand control can be realized.

【0092】請求項9の発明は、デマンド制御中に算出
された予測電力を用いてデマンド制御を行わなかった場
合に対応するデマンド値を推定することにより、請求項
6から請求項8の何れかと同様の効果を奏する。
According to a ninth aspect of the present invention, the demand value corresponding to the case where the demand control is not performed is estimated by using the predicted power calculated during the demand control, thereby obtaining the demand value according to any one of the sixth to eighth aspects. A similar effect is achieved.

【0093】請求項10の発明は、負荷遮断を実施した
時間を用いてデマンド制御を行わなかった場合に対応す
るデマンド値を推定することにより、請求項6から請求
項8の何れかと同様の効果を奏する。
According to a tenth aspect of the present invention, a demand value corresponding to a case where the demand control is not performed using the time when the load shedding is performed is estimated, thereby obtaining the same effect as any one of the sixth to eighth aspects. To play.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明のデマンド制御運用方法が適用される
デマンド制御運用装置の一実施態様を示すブロック図で
ある。
FIG. 1 is a block diagram showing an embodiment of a demand control operation device to which a demand control operation method of the present invention is applied.

【図2】最大値抽出部の処理を説明するフローチャート
である。
FIG. 2 is a flowchart illustrating processing of a maximum value extracting unit.

【図3】非制御時デマンド値の推定処理を説明する概略
図である。
FIG. 3 is a schematic diagram illustrating a non-control demand value estimation process.

【図4】原因設備抽出部の処理を説明するフローチャー
トである。
FIG. 4 is a flowchart illustrating a process performed by a cause facility extraction unit.

【図5】抽出結果の表示の一例を示す図である。FIG. 5 is a diagram showing an example of display of an extraction result.

【図6】図1の構成のデマンド制御運用装置が適用され
るデマンド制御運用支援システムの構成を示す概略図で
ある。
FIG. 6 is a schematic diagram showing a configuration of a demand control operation support system to which the demand control operation device having the configuration of FIG. 1 is applied.

【図7】遠隔監視センターにおける一覧表示の一例を示
す図である。
FIG. 7 is a diagram showing an example of a list display in a remote monitoring center.

【図8】この発明のデマンド制御運用方法の他の実施態
様が適用されるデマンド制御運用装置の構成を示すブロ
ック図である。
FIG. 8 is a block diagram showing a configuration of a demand control operation device to which another embodiment of the demand control operation method of the present invention is applied.

【符号の説明】[Explanation of symbols]

5 遠隔監視センター 6 デマンド制御対象 21 最大値抽出部 22 非制御時デマンド値記憶
部 23 デマンド低減量演算部 31 デマンド突出時
間帯抽出部 32 設備運転履歴抽出部 33 不適切設備運用検
出部
5 Remote monitoring center 6 Demand control target 21 Maximum value extraction unit 22 Non-control demand value storage unit 23 Demand reduction amount calculation unit 31 Demand protruding time zone extraction unit 32 Equipment operation history extraction unit 33 Unsuitable equipment operation detection unit

───────────────────────────────────────────────────── フロントページの続き (72)発明者 赤松 敏行 滋賀県草津市岡本町字大谷1000番地の2 株式会社ダイキンシステムソリューション ズ研究所内 (72)発明者 岩田 哲郎 大阪府吹田市垂水町3丁目21番地3号 ダ イキン工業株式会社江坂ビル内 Fターム(参考) 3L060 AA08 CC08 CC10 DD08 EE45 5G064 AA07 AC06 AC09 CB08 CB11 DA05 5G066 AA02 AA03 KA01 KA12 KB01 KB07 KD01 KD04 KD10  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Toshiyuki Akamatsu 1000-2 Oya, Okamotocho, Kusatsu-shi, Shiga Inside Daikin System Solutions Laboratory Co., Ltd. (72) Inventor Tetsuro Iwata 3-21 Tarumicho, Suita-shi, Osaka No. 3 Daikin Industries, Ltd. Esaka Building F-term (reference) 3L060 AA08 CC08 CC10 DD08 EE45 5G064 AA07 AC06 AC09 CB08 CB11 DA05 5G066 AA02 AA03 KA01 KA12 KB01 KB07 KD01 KD04 KD10

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】 デマンド制御を行いながら、デマンド制
御を行わなかった場合に対応するデマンド値を推定し、
推定されたデマンド値に基づいてデマンドが突出してい
る時間帯を検出することを特徴とするデマンド制御運用
方法。
1. While performing demand control, a demand value corresponding to a case where demand control is not performed is estimated,
A demand control operation method, comprising detecting a time zone in which a demand protrudes based on an estimated demand value.
【請求項2】 デマンドが突出している時間帯に対応さ
せて設備の運転履歴を抽出し、運転履歴に基づいて不適
切な設備運用を検出する請求項1に記載のデマンド制御
運用方法。
2. The demand control operation method according to claim 1, wherein an operation history of the equipment is extracted corresponding to a time zone where the demand is prominent, and an inappropriate equipment operation is detected based on the operation history.
【請求項3】 各デマンド制御対象(6)において、デ
マンド制御を行いながら、デマンド制御を行わなかった
場合に対応するデマンド値を推定し、推定されたデマン
ド値に基づいてデマンドが突出している時間帯を検出す
るとともに、デマンドが突出している時間帯に対応させ
て設備の運転履歴を抽出し、運転履歴に基づいて不適切
な設備運用を検出し、 各デマンド制御対象(6)から検出データを遠隔監視セ
ンター(5)に伝送し、 遠隔監視センター(5)において、伝送された検出デー
タに基づいて各デマンド制御対象における不適切な設備
運用を検出し、設備運用の改善情報を対応するデマンド
制御対象(6)に供給することを特徴とするデマンド制
御運用方法。
3. In each demand control target (6), a demand value corresponding to a case where the demand control is not performed is estimated while performing the demand control, and a time during which the demand protrudes based on the estimated demand value. In addition to detecting the band, the operation history of the equipment is extracted corresponding to the time zone where the demand is prominent, the inappropriate equipment operation is detected based on the operation history, and the detection data is obtained from each demand control target (6). Demand control that transmits to the remote monitoring center (5), detects inappropriate equipment operation in each demand control target based on the transmitted detection data, and responds to information on improvement of the equipment operation. A demand control operation method characterized by supplying the object to an object (6).
【請求項4】 デマンド制御のための時限毎に、時々刻
々予測電力を算出し、デマンド実績値およびデマンド制
御中に算出された予測電力のうち、最大の予測電力に基
づいてデマンド制御を行わなかった場合に対応するデマ
ンド値を推定する請求項1から請求項3の何れかに記載
のデマンド制御運用方法。
4. A predicted power is calculated moment by moment for each time period for the demand control, and the demand control is not performed based on the maximum predicted power among the actual demand value and the predicted power calculated during the demand control. The demand control operation method according to any one of claims 1 to 3, wherein a demand value corresponding to the case is estimated.
【請求項5】 デマンド制御のための時限毎に、時々刻
々予測電力を算出し、デマンド実績値および負荷遮断を
実施した時間に基づいてデマンド制御を行わなかった場
合に対応するデマンド値を推定する請求項1から請求項
3の何れかに記載のデマンド制御運用方法。
5. For each time period for demand control, a predicted power is calculated every moment, and a demand value corresponding to a case where demand control is not performed is estimated based on a demand actual value and a time when load shedding was performed. The demand control operation method according to claim 1.
【請求項6】 デマンド制御を行いながら、デマンド制
御を行わなかった場合に対応するデマンド値を推定する
非制御時デマンド値推定手段(21)(22)(23)
と、推定されたデマンド値に基づいてデマンドが突出し
ている時間帯を検出するデマンド突出時間帯検出手段
(31)とを含むことを特徴とするデマンド制御運用装
置。
6. A non-control-time demand value estimating means for estimating a demand value corresponding to a case where demand control is not performed while performing demand control.
And a demand protruding time zone detecting means (31) for detecting a time zone where the demand protrudes based on the estimated demand value.
【請求項7】 デマンドが突出している時間帯に対応さ
せて設備の運転履歴を抽出する設備運転履歴抽出手段
(32)と、運転履歴に基づいて不適切な設備運用を検
出する不適切設備運用検出手段(33)とをさらに含む
請求項6に記載のデマンド制御運用装置。
7. An equipment operation history extracting means (32) for extracting an equipment operation history corresponding to a time zone where demand is prominent, and an inappropriate equipment operation for detecting inappropriate equipment operation based on the operation history. The demand control operation device according to claim 6, further comprising a detection means (33).
【請求項8】 各デマンド制御対象(6)において、デ
マンド制御を行いながら、デマンド制御を行わなかった
場合に対応するデマンド値を推定する非制御時デマンド
値推定手段(21)(22)(23)と、推定されたデ
マンド値に基づいてデマンドが突出している時間帯を検
出するデマンド突出時間帯検出手段(31)と、デマン
ドが突出している時間帯に対応させて設備の運転履歴を
抽出する設備運転履歴抽出手段(32)と、運転履歴に
基づいて不適切な設備運用を検出する不適切設備運用検
出手段(33)と、 各デマンド制御対象(6)から検出データを遠隔監視セ
ンター(5)に伝送する検出データ伝送手段と、 遠隔監視センター(5)において、伝送された検出デー
タに基づいて各デマンド制御対象における不適切な設備
運用を検出し、設備運用の改善情報を対応するデマンド
制御対象に供給する改善情報供給手段とを含むことを特
徴とするデマンド制御運用装置。
8. In each demand control target (6), a non-control demand value estimating means (21) (22) (23) for estimating a demand value corresponding to a case where demand control is not performed while performing demand control. ), A demand protruding time zone detecting means (31) for detecting a time zone where the demand protrudes based on the estimated demand value, and extracting an operation history of the equipment in correspondence with the time zone where the demand protrudes. Equipment operation history extraction means (32); inappropriate equipment operation detection means (33) for detecting inappropriate equipment operation based on the operation history; and remote monitoring center (5) for detecting data from each demand control target (6). ), And in the remote monitoring center (5), inappropriate equipment operation at each demand control target based on the transmitted detection data It detected, the demand control operation device which comprises a refinement information supply means for supplying an improved information facilities operations to the corresponding demand control target.
【請求項9】 前記非制御時デマンド値推定手段(2
1)(22)は、デマンド制御のための時限毎に、時々
刻々予測電力を算出し、デマンド実績値およびデマンド
制御中に算出された予測電力のうち、最大の予測電力に
基づいてデマンド制御を行わなかった場合に対応するデ
マンド値を推定するものである請求項6から請求項8の
何れかに記載のデマンド制御運用装置。
9. The non-control demand value estimating means (2)
1) (22) calculates the predicted power every moment for each time period for the demand control, and performs the demand control based on the maximum predicted power among the actual demand value and the predicted power calculated during the demand control. 9. The demand control operation device according to claim 6, wherein a demand value corresponding to a case where the demand control is not performed is estimated.
【請求項10】 前記非制御時デマンド値推定手段(2
2)(23)は、デマンド制御のための時限毎に、時々
刻々予測電力を算出し、デマンド実績値および負荷遮断
を実施した時間に基づいてデマンド制御を行わなかった
場合に対応するデマンド値を推定するものである請求項
6から請求項8の何れかに記載のデマンド制御運用装
置。
10. The non-control demand value estimating means (2)
2) (23) calculates the predicted power every moment for each time period for demand control, and calculates the demand value corresponding to the case where the demand control is not performed based on the actual demand value and the time when the load shedding was performed. The demand control operation device according to any one of claims 6 to 8, wherein the device is used for estimation.
JP2000352656A 2000-11-20 2000-11-20 Demand control operation method and apparatus Expired - Fee Related JP3742920B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000352656A JP3742920B2 (en) 2000-11-20 2000-11-20 Demand control operation method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000352656A JP3742920B2 (en) 2000-11-20 2000-11-20 Demand control operation method and apparatus

Publications (2)

Publication Number Publication Date
JP2002165364A true JP2002165364A (en) 2002-06-07
JP3742920B2 JP3742920B2 (en) 2006-02-08

Family

ID=18825521

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000352656A Expired - Fee Related JP3742920B2 (en) 2000-11-20 2000-11-20 Demand control operation method and apparatus

Country Status (1)

Country Link
JP (1) JP3742920B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008092320A (en) * 2006-10-03 2008-04-17 Toko Electric Corp Centralized control system
JP2009019853A (en) * 2007-07-13 2009-01-29 Daikin Ind Ltd Demand control device, demand control method and demand control program
JP2011114915A (en) * 2009-11-25 2011-06-09 Nihon Techno Co Ltd Power saving sheet, and device for output of the same
JP2012163301A (en) * 2011-02-09 2012-08-30 Nakano Refrigerators Co Ltd Refrigerator control device and method of controlling refrigerator
JP2012210081A (en) * 2011-03-30 2012-10-25 Sanyo Electric Co Ltd Electric power supply system
JP2013081297A (en) * 2011-10-03 2013-05-02 Seikatsu Kyodo Kumiai Coop Sapporo Power management server and power management processing program
JP2014036564A (en) * 2012-08-10 2014-02-24 Shimizu Corp Forecast data management device, and forecast data management method
WO2019150662A1 (en) * 2018-01-31 2019-08-08 日本電気株式会社 Processing device, processing method, and program

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008092320A (en) * 2006-10-03 2008-04-17 Toko Electric Corp Centralized control system
JP2009019853A (en) * 2007-07-13 2009-01-29 Daikin Ind Ltd Demand control device, demand control method and demand control program
JP4548455B2 (en) * 2007-07-13 2010-09-22 ダイキン工業株式会社 Demand control apparatus, demand control method, and demand control program
JP2011114915A (en) * 2009-11-25 2011-06-09 Nihon Techno Co Ltd Power saving sheet, and device for output of the same
JP2012163301A (en) * 2011-02-09 2012-08-30 Nakano Refrigerators Co Ltd Refrigerator control device and method of controlling refrigerator
JP2012210081A (en) * 2011-03-30 2012-10-25 Sanyo Electric Co Ltd Electric power supply system
JP2013081297A (en) * 2011-10-03 2013-05-02 Seikatsu Kyodo Kumiai Coop Sapporo Power management server and power management processing program
JP2014036564A (en) * 2012-08-10 2014-02-24 Shimizu Corp Forecast data management device, and forecast data management method
WO2019150662A1 (en) * 2018-01-31 2019-08-08 日本電気株式会社 Processing device, processing method, and program
JPWO2019150662A1 (en) * 2018-01-31 2021-01-07 日本電気株式会社 Processing equipment, processing methods and programs
US11451056B2 (en) 2018-01-31 2022-09-20 Nec Corporation Processing apparatus, processing method, and program for inferring demand response

Also Published As

Publication number Publication date
JP3742920B2 (en) 2006-02-08

Similar Documents

Publication Publication Date Title
CN107576002B (en) Air conditioner and control method thereof
US6622926B1 (en) Thermostat with air conditioning load management feature
CN110701759B (en) Operation control method, operation control device, air conditioner, and storage medium
CN108151233B (en) Power consumption control method and device, computer equipment, air conditioner and storage medium
EP2071251A1 (en) Air-conditioning control intermediate device, air-conditioning control system, air-conditioning control method, and air-conditioning control program
EP2476967A1 (en) Air-conditioning control system
CN102252400B (en) Setting value controlling method and device
US20130268126A1 (en) Air conditioning information estimation device, control method of air conditioning information estimation device, and control program
EP2746787A1 (en) Energy management device and program
CN110553365B (en) Control method of air conditioner, air conditioner and storage medium
CN110470029B (en) Method and device for controlling self-cleaning of air conditioner and air conditioner
JP2002165364A (en) Demand control operation system and its device
CN111336657B (en) Control method of air conditioner, air conditioner and readable storage medium
JP2009216283A (en) Air-conditioning control system
WO2020224037A1 (en) Control method and device for multi-split air conditioning system
CN110617601A (en) Air conditioner control method, device, equipment and storage medium
CA2918081C (en) A hvac system, a method for operating the hvac system and a hvac controller configured for the same
JP2012026594A (en) Air conditioning control device
CN108317660B (en) Air conditioner control method and device and air conditioner
JP2002013778A (en) Power control method and device of air conditioner, and computer-readable record medium
CN110715418B (en) Temperature control method and device for air-conditioning robot
CN112254301B (en) Method and device for controlling air conditioner and air conditioner
EP1953473A1 (en) Demand control system and method for multi-type air conditioner
CN113757920B (en) Defrosting control method and device, computer equipment and storage medium
CN111023267A (en) Self-cleaning control method and device and multi-split air conditioner

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040915

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040928

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041129

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050719

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050914

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20050920

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051018

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051031

R151 Written notification of patent or utility model registration

Ref document number: 3742920

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081125

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091125

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101125

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111125

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121125

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121125

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131125

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees