JP2002115920A - Refrigerating device - Google Patents

Refrigerating device

Info

Publication number
JP2002115920A
JP2002115920A JP2000308873A JP2000308873A JP2002115920A JP 2002115920 A JP2002115920 A JP 2002115920A JP 2000308873 A JP2000308873 A JP 2000308873A JP 2000308873 A JP2000308873 A JP 2000308873A JP 2002115920 A JP2002115920 A JP 2002115920A
Authority
JP
Japan
Prior art keywords
cooling
temperature
compressor
evaporator
refrigerant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000308873A
Other languages
Japanese (ja)
Other versions
JP3632124B2 (en
Inventor
Masaaki Takegami
雅章 竹上
Terubumi Wada
光史 和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP2000308873A priority Critical patent/JP3632124B2/en
Publication of JP2002115920A publication Critical patent/JP2002115920A/en
Application granted granted Critical
Publication of JP3632124B2 publication Critical patent/JP3632124B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/26Problems to be solved characterised by the startup of the refrigeration cycle

Abstract

PROBLEM TO BE SOLVED: To start an operation with high reliability in a refrigerating device. SOLUTION: The refrigerating device comprises a cooling water circuit (40), a refrigerant circuit (20), a first circuit (50) and a second circuit (60). A high pressure control unit (81) controls to supply prescribed cooling water to a condenser (22) before a compressor (21) is started. A first low pressure control unit (82) opens a first expansion valve (E1) before the start of the compressor (21) when the inlet side pressure of the compressor (21) is lower than a prescribed value upon start of the operation. A first start control unit (84) starts the circulation of the first circuit (50) so that prescribed first brine flows through a first heater (52) before the compressor (21) is started upon start of the operation.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、冷凍装置に関し、
特に、運転開始時の始動対策に係るものである。
[0001] The present invention relates to a refrigeration apparatus,
In particular, it relates to a countermeasure for starting at the start of operation.

【0002】[0002]

【従来の技術】従来より、利用側との間で循環する熱媒
体(ブライン)の冷却を冷凍サイクルにより行う冷凍装
置が、いわゆるチリングユニットとして知られている。
例えば、特開平5−280809号公報には、冷却した
ブラインで工作機械の冷却を行う冷凍装置が開示されて
いる。具体的に、上記冷凍装置は、圧縮機、凝縮器、膨
張機構及び蒸発器を順次接続して構成される冷媒回路を
備え、該冷媒回路の蒸発器と利用側である工作機械との
間でブラインを循環させ、蒸発器において冷媒がブライ
ンから吸熱することによってブラインの冷却を行ってい
る。
2. Description of the Related Art A refrigeration apparatus that cools a heat medium (brine) circulating between the chiller and a utilization side by a refrigeration cycle is known as a so-called chilling unit.
For example, Japanese Patent Application Laid-Open No. 5-280809 discloses a refrigerating apparatus that cools a machine tool with cooled brine. Specifically, the refrigeration apparatus includes a refrigerant circuit configured by sequentially connecting a compressor, a condenser, an expansion mechanism, and an evaporator, and a refrigerant circuit is provided between an evaporator of the refrigerant circuit and a machine tool that is a user side. The brine is circulated, and the refrigerant is cooled by absorbing heat from the brine in the evaporator.

【0003】上記冷凍装置の凝縮器においては、冷却水
を使用して冷媒を冷却することが一般的に行われ、上記
冷凍装置の起動時には、圧縮機を起動させるのと同時に
冷却水を凝縮器に流通させると共に、蒸発器にブライン
を流通させていた。
[0003] In the condenser of the refrigerating apparatus, the refrigerant is generally cooled using cooling water. When the refrigerating apparatus is started, the cooling water is condensed simultaneously with starting the compressor. And brine through the evaporator.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記冷
凍装置において、冷却運転の開始時について何らの対策
も考慮されていないため、運転異常が起こり易いという
問題があった。例えば、圧縮機の起動と同時に冷却水を
凝縮器に供給し始めているので、凝縮器の温度が高くな
ると圧縮機の吐出側の冷媒圧力が上昇する。この結果、
圧縮機に過剰な負荷がかかり、圧縮機の耐久性が低下す
るという問題があった。
However, in the above-mentioned refrigeration system, no measures are taken at the start of the cooling operation, so that there is a problem that an abnormal operation is likely to occur. For example, since the cooling water starts to be supplied to the condenser simultaneously with the activation of the compressor, when the temperature of the condenser increases, the refrigerant pressure on the discharge side of the compressor increases. As a result,
There has been a problem that an excessive load is applied to the compressor and durability of the compressor is reduced.

【0005】本発明は、かかる点に鑑みてなされたもの
であり、信頼性の高い運転開始を行うようにすることを
目的としている。
[0005] The present invention has been made in view of such a point, and an object of the present invention is to perform highly reliable operation start.

【0006】[0006]

【課題を解決するための手段】本発明は、運転開始時
に、圧縮機の起動前に所定の動作を行うようにしたもの
である。
According to the present invention, at the start of operation, a predetermined operation is performed before starting the compressor.

【0007】具体的に、第1の解決手段は、圧縮機(2
1)と凝縮器(22)と膨張機構(71)と蒸発器(72)と
が接続されて冷媒が循環する冷媒回路(20)と、冷却媒
体が流れ、該冷却媒体が上記凝縮器(22)に冷熱を供給
する冷却系統(40)と、上記冷媒回路(20)の蒸発器
(72)で冷却された熱媒体を利用側に供給する利用側系
統(70)と、運転開始時に、上記圧縮機(21)の起動前
に所定の冷却媒体が凝縮器(22)を流れるように上記冷
却系統(40)を制御する高圧制御手段(81)とを備えて
いる。
Specifically, a first solution is a compressor (2
1), a condenser (22), an expansion mechanism (71), and an evaporator (72) connected to a refrigerant circuit (20) through which a refrigerant circulates, a cooling medium flows, and the cooling medium flows through the condenser (22). ), A cooling system (40) for supplying the heat medium cooled by the evaporator (72) of the refrigerant circuit (20) to the cooling system (40). High pressure control means (81) for controlling the cooling system (40) so that a predetermined cooling medium flows through the condenser (22) before the compressor (21) is started.

【0008】また、第2の解決手段は、圧縮機(21)と
凝縮器(22)と膨張機構(71)と蒸発器(72)とが接続
されて冷媒が循環する冷媒回路(20)と、冷却媒体が流
れ、該冷却媒体が上記凝縮器(22)に冷熱を供給する冷
却系統(40)と、上記冷媒回路(20)の蒸発器(72)で
冷却された熱媒体を利用側に供給する利用側系統(70)
と、運転開始時に、上記圧縮機(21)の吸入側圧力が所
定圧力より低いと、該圧縮機(21)の起動前に、上記膨
張機構(71)を連通させる低圧制御手段(74)とを備え
ている。
The second solution is a refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. The cooling medium flows, and the cooling medium supplies cooling heat to the condenser (22) and the heat medium cooled by the evaporator (72) of the refrigerant circuit (20) to the utilization side. Supply side system (70) to supply
At the start of operation, if the suction side pressure of the compressor (21) is lower than a predetermined pressure, a low pressure control means (74) for communicating the expansion mechanism (71) before the compressor (21) is started. It has.

【0009】また、第3の解決手段は、圧縮機(21)と
凝縮器(22)と膨張機構(71)と蒸発器(72)とが接続
されて冷媒が循環する冷媒回路(20)と、冷却媒体が流
れ、該冷却媒体が上記凝縮器(22)に冷熱を供給する冷
却系統(40)と、上記冷媒回路(20)の蒸発器(72)で
冷却された熱媒体を利用側に供給すると共に、熱媒体が
過冷却されると該熱媒体を加熱する加熱手段(73)を備
えた利用側系統(70)と、運転開始時に、圧縮機(21)
の起動前に所定の熱媒体が上記加熱手段(73)を流れる
ように利用側系統(70)の循環を開始する開始制御手段
(75)とを備えている。
A third solution is to provide a refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. The cooling medium flows, and the cooling medium supplies cooling heat to the condenser (22) and the heat medium cooled by the evaporator (72) of the refrigerant circuit (20) to the utilization side. A supply-side system (70) provided with a heating means (73) for heating the heating medium when the heating medium is supercooled, and a compressor (21) for starting operation.
And a start control means (75) for starting circulation of the use side system (70) so that a predetermined heat medium flows through the heating means (73) before the start of the operation.

【0010】また、第4の解決手段は、圧縮機(21)と
凝縮器(22)と膨張機構(71)と蒸発器(72)とが接続
されて冷媒が循環する冷媒回路(20)と、冷却媒体が流
れ、該冷却媒体が上記凝縮器(22)に冷熱を供給すると
共に、冷却熱交換器(41)を有する冷却系統(40)と、
上記冷却熱交換器(41)で、又は冷却熱交換器(41)と
上記冷媒回路(20)の蒸発器(72)とで冷却された熱媒
体を利用側に供給する利用側系統(70)と、上記圧縮機
(21)の起動前に、所定の冷却媒体が凝縮器(22)を流
れるように上記冷却系統(40)を制御する高圧制御手段
(81)とを備えている。
A fourth solution is to provide a refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. A cooling system (40) having a cooling heat exchanger (41), wherein a cooling medium flows, the cooling medium supplies cold heat to the condenser (22);
A utilization side system (70) that supplies a heat medium cooled by the cooling heat exchanger (41) or by the cooling heat exchanger (41) and the evaporator (72) of the refrigerant circuit (20) to a utilization side. And a high-pressure control means (81) for controlling the cooling system (40) so that a predetermined cooling medium flows through the condenser (22) before starting the compressor (21).

【0011】また、第5の解決手段は、圧縮機(21)と
凝縮器(22)と膨張機構(71)と蒸発器(72)とが接続
されて冷媒が循環する冷媒回路(20)と、冷却媒体が流
れ、該冷却媒体が上記凝縮器(22)に冷熱を供給すると
共に、冷却熱交換器(41)を有する冷却系統(40)と、
上記冷却熱交換器(41)で、又は冷却熱交換器(41)と
上記冷媒回路(20)の蒸発器(72)とで冷却された熱媒
体を利用側に供給する利用側系統(70)と、上記圧縮機
(21)の吸入側圧力が所定圧力より低いと、該圧縮機
(21)の起動前に、上記膨張機構(71)を連通させる低
圧制御手段(74)とを備えている。
A fifth solution is to provide a refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. A cooling system (40) having a cooling heat exchanger (41), wherein a cooling medium flows, the cooling medium supplies cold heat to the condenser (22);
A utilization side system (70) that supplies a heat medium cooled by the cooling heat exchanger (41) or by the cooling heat exchanger (41) and the evaporator (72) of the refrigerant circuit (20) to a utilization side. And a low-pressure control means (74) for communicating the expansion mechanism (71) before the compressor (21) starts when the suction side pressure of the compressor (21) is lower than a predetermined pressure. .

【0012】また、第6の解決手段は、圧縮機(21)と
凝縮器(22)と膨張機構(71)と蒸発器(72)とが接続
されて冷媒が循環する冷媒回路(20)と、冷却媒体が流
れ、該冷却媒体が上記凝縮器(22)に冷熱を供給すると
共に、冷却熱交換器(41)を有する冷却系統(40)と、
上記冷却熱交換器(41)で、又は冷却熱交換器(41)と
上記冷媒回路(20)の蒸発器(72)とで冷却された熱媒
体を利用側に供給すると共に、熱媒体が過冷却されると
該熱媒体を加熱する加熱手段(73)を備えた利用側系統
(70)と、運転開始時に、少なくとも圧縮機(21)の起
動前に所定の熱媒体が上記加熱手段(73)を流れるよう
に利用側系統(70)の循環を開始する開始制御手段(7
5)とを備えている。
A sixth solution is to provide a refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. A cooling system (40) having a cooling heat exchanger (41), wherein a cooling medium flows, the cooling medium supplies cold heat to the condenser (22);
The heat medium cooled by the cooling heat exchanger (41) or by the cooling heat exchanger (41) and the evaporator (72) of the refrigerant circuit (20) is supplied to the use side, and the heat medium is cooled. A use-side system (70) provided with a heating means (73) for heating the heat medium when cooled, and at the start of operation, a predetermined heat medium is supplied to the heating means (73) at least before starting the compressor (21). ) To start the circulation of the user side system (70) so as to flow through
5).

【0013】また、第7の解決手段は、上記第6の解決
手段において、開始制御手段(75)は、利用側系統(7
0)の循環を開始すると共に、利用側に供給する熱媒体
の温度が所定温度より高温であると、冷却媒体が冷却熱
交換器(41)を流れるように冷却系統(40)を制御す
る。
A seventh solution is that in the sixth solution, the start control means (75) comprises:
The cooling system (40) is controlled so that the cooling medium flows through the cooling heat exchanger (41) when the circulation of 0) is started and the temperature of the heat medium supplied to the use side is higher than a predetermined temperature.

【0014】また、第8の解決手段は、上記第1から第
3の何れか1つの解決手段において、利用側系統(70)
は、所定温度に冷却された低温側の熱媒体を利用側に供
給する低温側回路(60)に構成され、冷媒回路(20)の
膨張機構(71)及び蒸発器(72)は、低温側回路(60)
の熱媒体を冷却する低温側膨張機構(E2)及び低温側蒸
発器(24)に構成される一方、上記冷媒回路(20)に
は、低温側膨張機構(E2)及び低温側蒸発器(24)と並
列に高温側膨張機構(E1)及び高温側蒸発器(23)が設
けられ、該高温側蒸発器(23)には、低温側回路(60)
の低温側の熱媒体より高温に冷却された高温側の熱媒体
を利用側に供給する高温側回路(50)が接続され、該高
温側回路(50)は、冷却系統(40)に設けられた冷却熱
交換器(41)で、又は該冷却熱交換器(41)と冷媒回路
(20)の高温側蒸発器(23)とで冷却されるように構成
されている。
According to an eighth aspect of the present invention, in any one of the first to third aspects, the utilization side system (70)
Is configured as a low-temperature side circuit (60) for supplying a low-temperature side heat medium cooled to a predetermined temperature to the use side, and an expansion mechanism (71) and an evaporator (72) of the refrigerant circuit (20) are connected to the low-temperature side. Circuit (60)
The refrigerant circuit (20) includes the low-temperature side expansion mechanism (E2) and the low-temperature side evaporator (24). ) Is provided in parallel with the high temperature side expansion mechanism (E1) and the high temperature side evaporator (23), and the high temperature side evaporator (23) has a low temperature side circuit (60).
A high-temperature circuit (50) for supplying a high-temperature heat medium cooled to a higher temperature than the low-temperature heat medium to the use side is connected, and the high-temperature circuit (50) is provided in a cooling system (40). The cooling heat exchanger (41) or the cooling heat exchanger (41) and the high-temperature side evaporator (23) of the refrigerant circuit (20) are configured to be cooled.

【0015】また、第9の解決手段は、上記第4から第
7の何れか1つの解決手段において、利用側系統(70)
は、所定温度に冷却された高温側の熱媒体を利用側に供
給する高温側回路(50)に構成され、冷媒回路(20)の
膨張機構(71)及び蒸発器(72)は、高温側回路(50)
の熱媒体を冷却する高温側膨張機構(E1)及び高温側蒸
発器(23)に構成される一方、上記冷媒回路(20)に
は、高温側膨張機構(E1)及び高温側蒸発器(23)と並
列に低温側膨張機構(E2)及び低温側蒸発器(24)が設
けられ、該低温側蒸発器(24)には、高温側回路(50)
の高温側の熱媒体より低温に冷却された低温側の熱媒体
を利用側に供給する低温側回路(60)が接続されてい
る。
A ninth solving means is the user-side system (70) according to any one of the fourth to seventh solving means.
Is composed of a high-temperature side circuit (50) for supplying a high-temperature side heat medium cooled to a predetermined temperature to the use side, and an expansion mechanism (71) and an evaporator (72) of the refrigerant circuit (20) Circuit (50)
The refrigerant circuit (20) includes a high-temperature side expansion mechanism (E1) and a high-temperature side evaporator (23), while the refrigerant circuit (20) includes a high-temperature side expansion mechanism (E1) and a high-temperature side evaporator (23). ) Is provided in parallel with the low temperature side expansion mechanism (E2) and the low temperature side evaporator (24), and the low temperature side evaporator (24) has a high temperature side circuit (50).
A low-temperature side circuit (60) for supplying a low-temperature side heat medium cooled to a lower temperature than the high-temperature side heat medium to the use side is connected.

【0016】また、第10の解決手段は、上記第1から
第9の何れか1つの解決手段において、冷媒回路(20)
の圧縮機(21)は、該圧縮機(21)の内部の冷媒を加熱
する冷媒加熱手段(21a)が設けられる一方、上記圧縮
機(21)の停止中に、該圧縮機(21)の吐出側温度が第
1の所定温度より低温になると、上記冷媒加熱手段(21
a)を加熱動作させ、且つ圧縮機(21)の吐出側温度が
第1の所定温度より高い第2の所定温度より高温になる
と、上記冷媒加熱手段(21a)の加熱を停止させる冷媒
加熱制御手段(86)を備えている。
According to a tenth aspect of the present invention, there is provided the refrigerant circuit according to any one of the first to ninth aspects.
The compressor (21) is provided with a refrigerant heating means (21a) for heating the refrigerant inside the compressor (21), while the compressor (21) is stopped while the compressor (21) is stopped. When the discharge side temperature becomes lower than the first predetermined temperature, the refrigerant heating means (21)
a) heating operation, and when the discharge side temperature of the compressor (21) becomes higher than a second predetermined temperature higher than the first predetermined temperature, refrigerant heating control for stopping the heating of the refrigerant heating means (21a). Means (86).

【0017】すなわち、上記第1の解決手段では、凝縮
器(22)で冷却系統(40)の冷却媒体から冷熱を受けた
冷媒が、蒸発器(72)において利用側系統(70)の熱媒
体を冷却する。該利用側系統(70)では、冷媒により冷
却された熱媒体を利用側に供給する。運転開始時には、
高圧制御手段(81)が、圧縮機(21)の起動前に、所定
の冷却媒体が凝縮器(22)に流れるように冷却系統(4
0)を制御する。従って、上記圧縮機(21)の起動前に
上記凝縮器(22)が冷却される。
That is, in the first solving means, in the condenser (22), the refrigerant which has received cold heat from the cooling medium of the cooling system (40) is supplied to the evaporator (72) by the heating medium of the utilization side system (70). To cool. The use side system (70) supplies the heat medium cooled by the refrigerant to the use side. At the start of operation,
Before starting the compressor (21), the high-pressure control means (81) controls the cooling system (4) so that a predetermined cooling medium flows to the condenser (22).
0) control. Therefore, the condenser (22) is cooled before the start of the compressor (21).

【0018】また、上記第2の解決手段では、凝縮器
(22)で冷却系統(40)の冷却媒体から冷熱を受けた冷
媒が、蒸発器(72)において利用側系統(70)の熱媒体
を冷却する。該利用側系統(70)では、冷媒により冷却
された熱媒体を利用側に供給する。運転開始時におい
て、冷媒回収したことによって圧縮機(21)の吸入側に
冷媒がなく、該圧縮機(21)の吸入側圧力が所定圧力よ
り低下しているときには、低圧制御手段(74)(82)
が、上記圧縮機(21)を起動する前に膨張機構(71)を
連通させる。従って、運転を開始すると、上記圧縮機
(21)がすぐに冷媒を吸入する。
In the second solution, the refrigerant which has received cold from the cooling medium of the cooling system (40) in the condenser (22) is cooled in the evaporator (72) by the heating medium in the utilization side system (70). To cool. The use side system (70) supplies the heat medium cooled by the refrigerant to the use side. At the start of operation, when there is no refrigerant on the suction side of the compressor (21) due to refrigerant recovery and the suction side pressure of the compressor (21) is lower than a predetermined pressure, the low pressure control means (74) ( 82)
However, before starting the compressor (21), the expansion mechanism (71) is communicated. Therefore, when the operation is started, the compressor (21) immediately sucks the refrigerant.

【0019】また、上記第3の解決手段では、凝縮器
(22)で冷却系統(40)の冷却媒体から冷熱を受けた冷
媒が、蒸発器(72)において利用側系統(70)の熱媒体
を冷却する。該利用側系統(70)では、冷媒により冷却
された熱媒体を利用側に供給する一方、熱媒体が過冷却
されると、加熱手段(73)が熱媒体を加熱する。運転開
始時には、開始制御手段(75)が、圧縮機(21)の起動
前に熱媒体が利用側系統(70)を循環するように制御す
る。従って、圧縮機(21)が起動する前に所定の熱媒体
が加熱手段(73)を冷却し、該加熱手段(73)の余熱を
取り除く。
In the third solution, the refrigerant which has received cold heat from the cooling medium of the cooling system (40) in the condenser (22) is cooled in the evaporator (72) by the heating medium in the utilization side system (70). To cool. In the utilization side system (70), the heating medium cooled by the refrigerant is supplied to the utilization side, and when the heating medium is supercooled, the heating means (73) heats the heating medium. At the start of the operation, the start control means (75) controls the heat medium to circulate in the use side system (70) before the compressor (21) is started. Therefore, before the compressor (21) starts, the predetermined heat medium cools the heating means (73) and removes the residual heat of the heating means (73).

【0020】また、上記第4の解決手段では、冷媒回路
(20)の蒸発器(72)及び冷却系統(40)の冷却熱交換
器(41)のうち、少なくとも冷却熱交換器(41)におい
て熱媒体を冷却する。運転開始時には、高圧制御手段
(81)が、圧縮機(21)の起動前に所定の冷却媒体が凝
縮器(22)に流れるように冷却系統(40)を制御する。
従って、上記圧縮機(21)の起動前に上記凝縮器(22)
が冷却される。
In the fourth solution, at least in the cooling heat exchanger (41) of the evaporator (72) of the refrigerant circuit (20) and the cooling heat exchanger (41) of the cooling system (40). Cool the heating medium. At the start of the operation, the high-pressure control means (81) controls the cooling system (40) so that a predetermined cooling medium flows to the condenser (22) before the compressor (21) is started.
Therefore, before starting the compressor (21), the condenser (22)
Is cooled.

【0021】また、上記第5の解決手段では、冷媒回路
(20)の蒸発器(72)及び冷却系統(40)の冷却熱交換
器(41)のうち、少なくとも冷却熱交換器(41)におい
て熱媒体を冷却する。運転開始時において、冷媒回収し
たことによって圧縮機(21)の吸入側に冷媒がなく、該
圧縮機(21)の吸入側圧力が所定圧力より低下している
ときには、低圧制御手段(74)が、上記圧縮機(21)を
起動する前に膨張機構(71)を連通させる。従って、運
転を開始すると、上記圧縮機(21)がすぐに冷媒を吸入
する。
In the fifth solution, at least the cooling heat exchanger (41) of the evaporator (72) of the refrigerant circuit (20) and the cooling heat exchanger (41) of the cooling system (40). Cool the heating medium. At the start of operation, when there is no refrigerant on the suction side of the compressor (21) due to refrigerant recovery and the suction side pressure of the compressor (21) is lower than a predetermined pressure, the low pressure control means (74) Before starting the compressor (21), the expansion mechanism (71) is connected. Therefore, when the operation is started, the compressor (21) immediately sucks the refrigerant.

【0022】また、上記第6の解決手段では、冷媒回路
(20)の蒸発器(72)及び冷却系統(40)の冷却熱交換
器(41)のうち、少なくとも冷却熱交換器(41)におい
て熱媒体を冷却する。運転開始時には、開始制御手段
(75)が、圧縮機(21)の起動前に熱媒体が利用側系統
(70)を循環するように制御する。従って、圧縮機(2
1)が起動する前に所定の熱媒体が加熱手段(73)を冷
却し、該加熱手段(73)の余熱を取り除く。
Further, in the sixth solution, at least the cooling heat exchanger (41) of the evaporator (72) of the refrigerant circuit (20) and the cooling heat exchanger (41) of the cooling system (40). Cool the heating medium. At the start of the operation, the start control means (75) controls the heat medium to circulate in the use side system (70) before the compressor (21) is started. Therefore, the compressor (2
Before 1) starts, a predetermined heat medium cools the heating means (73) and removes residual heat of the heating means (73).

【0023】また、上記第7の解決手段では、上記第6
の解決手段において、開始制御手段(75)が、圧縮機
(21)の起動前に利用側系統(70)の循環を開始すると
共に、利用側に供給する熱媒体の温度が所定温度より高
温のときに、冷却媒体が冷却熱交換器(41)を流れるよ
うに冷却系統(40)を制御する。従って、熱媒体が加熱
手段(73)の余熱を取り除く一方、所定温度の熱媒体が
利用側系統(70)を流れる。
Further, in the seventh solution means, the sixth solution means
The start control means (75) starts the circulation of the use side system (70) before the start of the compressor (21), and the temperature of the heat medium supplied to the use side is higher than a predetermined temperature. Sometimes, the cooling system (40) is controlled so that the cooling medium flows through the cooling heat exchanger (41). Therefore, the heat medium removes the residual heat of the heating means (73), while the heat medium having a predetermined temperature flows through the use side system (70).

【0024】また、上記第8の解決手段では、上記第1
から第3の何れか1つの解決手段において、凝縮器(2
2)で冷却系統(40)の冷却媒体から冷熱を受けた冷媒
が、低温側蒸発器(24)において低温側回路(60)の熱
媒体を冷却する。該低温側回路(60)では、所定温度に
冷却された低温側の熱媒体を利用側に供給する。特に、
上記第3の解決手段においては、低温側回路(60)の熱
媒体が過冷却されると、加熱手段(73)が熱媒体を加熱
する。
Further, in the above-mentioned eighth solution, the above-mentioned first aspect is provided.
To the third solution, the condenser (2
The refrigerant that has received cold from the cooling medium of the cooling system (40) in 2) cools the heat medium of the low-temperature circuit (60) in the low-temperature evaporator (24). In the low temperature side circuit (60), the low temperature side heat medium cooled to a predetermined temperature is supplied to the use side. In particular,
In the third solution, when the heat medium of the low-temperature side circuit (60) is supercooled, the heating means (73) heats the heat medium.

【0025】一方、冷媒回路(20)の高温側蒸発器(2
3)及び冷却系統(40)の冷却熱交換器(41)のうち、
少なくとも冷却熱交換器(41)において、高温側回路
(50)の熱媒体を冷却する。該高温側回路(50)では、
所定温度に冷却された高温側の熱媒体を利用側に供給す
る。
On the other hand, the high-temperature side evaporator (2) of the refrigerant circuit (20)
3) and the cooling heat exchanger (41) of the cooling system (40)
At least in the cooling heat exchanger (41), the heat medium in the high-temperature side circuit (50) is cooled. In the high temperature side circuit (50),
The high-temperature side heat medium cooled to a predetermined temperature is supplied to the use side.

【0026】また、上記第9の解決手段では、上記第4
から第7の何れか1つの解決手段において、冷媒回路
(20)の高温側蒸発器(23)及び冷却系統(40)の冷却
熱交換器(41)のうち、少なくとも冷却熱交換器(41)
において、高温側回路(50)の熱媒体を冷却する。該高
温側回路(50)では、所定温度に冷却された高温側の熱
媒体を利用側に供給する。特に、上記第6の解決手段に
おいては、高温側回路(50)の熱媒体が過冷却される
と、加熱手段(73)が熱媒体を加熱する。
Further, in the ninth solution means, the fourth solution means
In any one of the seventh to seventh solving means, at least the cooling heat exchanger (41) of the high-temperature side evaporator (23) of the refrigerant circuit (20) and the cooling heat exchanger (41) of the cooling system (40).
In, the heat medium of the high-temperature side circuit (50) is cooled. In the high temperature side circuit (50), the high temperature side heat medium cooled to a predetermined temperature is supplied to the use side. In particular, in the sixth solution, when the heat medium of the high-temperature side circuit (50) is supercooled, the heating means (73) heats the heat medium.

【0027】一方、冷媒回路(20)の冷媒が、低温側蒸
発器(24)において低温側回路(60)の熱媒体を冷却す
る。該低温側回路(60)では、所定温度に冷却された低
温側の熱媒体を利用側に供給する。
On the other hand, the refrigerant in the refrigerant circuit (20) cools the heat medium in the low temperature side circuit (60) in the low temperature side evaporator (24). In the low temperature side circuit (60), the low temperature side heat medium cooled to a predetermined temperature is supplied to the use side.

【0028】また、上記第10の解決手段では、上記第
1から第9の何れか1つの解決手段において、冷媒加熱
制御手段(86)が、圧縮機(21)の停止中に、該圧縮機
(21)の吐出側温度が第1の所定温度より低温になる
と、冷媒加熱手段(21a)により圧縮機(21)の内部の
冷媒を加熱し、上記吐出側温度が第2の所定温度より高
温になると加熱を停止する。従って、上記圧縮機(21)
の停止中に、該圧縮機(21)の内部の冷媒の温度が所定
の範囲内に維持される。
In the tenth aspect, the refrigerant heating control means (86) may be arranged such that the compressor (21) stops the compressor (21) while the compressor (21) is stopped. When the discharge side temperature of (21) becomes lower than the first predetermined temperature, the refrigerant inside the compressor (21) is heated by the refrigerant heating means (21a), and the discharge side temperature becomes higher than the second predetermined temperature. When it becomes, stop heating. Therefore, the compressor (21)
During the stop, the temperature of the refrigerant inside the compressor (21) is maintained within a predetermined range.

【0029】[0029]

【発明の効果】従って、上記第1、第4、第8、第9、
及び第10の解決手段によれば、圧縮機(21)の起動前
に凝縮器(22)を冷却するようにしたために、運転開始
時に、凝縮器(22)の温度が上昇して圧縮機(21)の吐
出側圧力が過剰に高くなるのを防止することができ、信
頼性の高い運転開始を行うことができる。
Accordingly, the first, fourth, eighth, ninth,
According to the tenth solution, the condenser (22) is cooled before the start of the compressor (21). Therefore, at the start of operation, the temperature of the condenser (22) rises and the compressor ( The discharge pressure on the discharge side 21) can be prevented from becoming excessively high, and a highly reliable operation can be started.

【0030】また、上記第2、第5、第8、第9、及び
第10の解決手段によれば、圧縮機(21)の吸入側圧力
が所定圧力より低圧のときに、該圧縮機(21)の起動前
に膨張機構(71)を連通させるようにしたために、運転
開始時に、圧縮機(21)にすぐに冷媒が吸入されて、低
圧が異常に低下するのを防止することができ、信頼性の
高い運転開始を行うことができる。
According to the second, fifth, eighth, ninth, and tenth solving means, when the suction side pressure of the compressor (21) is lower than a predetermined pressure, the compressor ( Since the expansion mechanism (71) is communicated before the start of (21), it is possible to prevent the refrigerant from being sucked into the compressor (21) immediately at the start of operation and the low pressure to drop abnormally. The operation can be started with high reliability.

【0031】また、上記第3、第6、第8、第9、及び
第10の解決手段によれば、圧縮機(21)の起動前に熱
媒体を循環させるようにしたために、加熱手段(73)の
余熱を取り除くことにより、該加熱手段(73)の異常昇
温を防止することができ、信頼性の高い運転開始を行う
ことができる。
According to the third, sixth, eighth, ninth, and tenth solutions, the heating medium is circulated before the compressor (21) is started. By removing the residual heat of 73), abnormal heating of the heating means (73) can be prevented, and a highly reliable operation can be started.

【0032】また、上記第7の解決手段によれば、利用
側に供給する熱媒体の温度が所定温度より高温のとき
に、冷却熱交換器(41)において熱媒体を冷却するよう
にしたために、運転開始時に、確実に所定温度の熱媒体
を利用側に供給することができ、信頼性の高い運転開始
を行うことができる。
According to the seventh aspect, when the temperature of the heat medium supplied to the use side is higher than a predetermined temperature, the heat medium is cooled in the cooling heat exchanger (41). At the start of the operation, the heat medium at a predetermined temperature can be reliably supplied to the user side, and the operation can be started with high reliability.

【0033】また、上記第10の解決手段によれば、圧
縮機(21)の停止中に、冷媒の温度を一定の範囲内に維
持するようにしたために、圧縮機(21)の冷媒が冷凍機
油に溶け込むのを防止し、圧縮機(21)の起動不良の発
生を防止するので、信頼性の高い運転開始を行うことが
できる。
Further, according to the tenth solution, while the compressor (21) is stopped, the temperature of the refrigerant is maintained within a certain range, so that the refrigerant of the compressor (21) is refrigerated. Since it is possible to prevent the compressor (21) from being melted into the machine oil and prevent starting failure of the compressor (21), it is possible to start the operation with high reliability.

【0034】[0034]

【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて詳細に説明する。本実施形態は、本発明に係る
冷凍装置により構成された、ブラインのチリングユニッ
トである。
Embodiments of the present invention will be described below in detail with reference to the drawings. The present embodiment is a brine chilling unit constituted by the refrigeration apparatus according to the present invention.

【0035】図1に示すように、上記チリングユニット
(10)は、冷媒回路(20)、冷却系統である冷却水回路
(40)、高温側回路である第1回路(50)、低温側回路
である第2回路(60)、及びコントローラ(80)を備え
ている。上記第1回路(50)又は第2回路(60)が利用
側系統(70)を構成している。このチリングユニット
(10)は、半導体の製造工程におけるシリコンウェハー
の冷却を行うために、温度レベルの異なる第1ブライン
と第2ブラインとを、利用側である半導体の生産設備に
供給するためのものである。
As shown in FIG. 1, the chilling unit (10) includes a refrigerant circuit (20), a cooling water circuit (40) as a cooling system, a first circuit (50) as a high-temperature circuit, and a low-temperature circuit. And a controller (80). The first circuit (50) or the second circuit (60) constitutes a utilization side system (70). The chilling unit (10) is for supplying first and second brines having different temperature levels to a semiconductor production facility on the user side in order to cool a silicon wafer in a semiconductor manufacturing process. It is.

【0036】《冷媒回路》上記冷媒回路(20)は、圧縮
機(21)、凝縮器(22)、高温側膨張機構である第1膨
張弁(E1)、高温側蒸発器である第1蒸発器(23)、低
温側膨張機構である第2膨張弁(E2)、低温側蒸発器で
ある第2蒸発器(24)及びアキュームレータ(25)を配
管接続して構成されている。上記第1膨張弁(E1)又は
第2膨張弁(E2)が膨張機構(71)を構成している。上
記第1蒸発器(23)又は第2蒸発器(24)が蒸発器(7
2)を構成している。上記第1膨張弁(E1)及び第1蒸
発器(23)と、第2膨張弁(E2)及び第2蒸発器(24)
とは、冷媒回路(20)において並列に接続されている。
この冷媒回路(20)には、R407Cが冷媒として充填
されている。冷媒回路(20)では、この冷媒が相変化し
つつ循環し、冷凍サイクルが行われる。
<< Refrigerant Circuit >> The refrigerant circuit (20) includes a compressor (21), a condenser (22), a first expansion valve (E1) as a high-temperature side expansion mechanism, and a first evaporator as a high-temperature side evaporator. It is constituted by connecting a pipe (23), a second expansion valve (E2) as a low-temperature side expansion mechanism, a second evaporator (24) as a low-temperature side evaporator, and an accumulator (25). The first expansion valve (E1) or the second expansion valve (E2) constitutes an expansion mechanism (71). The first evaporator (23) or the second evaporator (24) is an evaporator (7
2) Make up. The first expansion valve (E1) and the first evaporator (23), the second expansion valve (E2) and the second evaporator (24)
Are connected in parallel in the refrigerant circuit (20).
This refrigerant circuit (20) is filled with R407C as a refrigerant. In the refrigerant circuit (20), the refrigerant circulates while changing its phase, and a refrigeration cycle is performed.

【0037】上記冷媒回路(20)において、圧縮機(2
1)の吐出側は、吐出ガス配管(31)を介して凝縮器(2
2)における冷媒流路(22a)の上端に接続されている。
凝縮器(22)における冷媒流路(22a)の下端には、液
配管(32)の一端が接続されている。液配管(32)は、
他端側で2つの分岐管に分岐されている。液配管(32)
の第1分岐管(32a)は、第1膨張弁(E1)を介して、
第1蒸発器(23)における1次側流路(23a)の上端に
接続されている。一方、液配管(32)の第2分岐管(32
b)は、第2膨張弁(E2)を介して、第2蒸発器(24)
における1次側流路(24a)の上端に接続されている。
In the refrigerant circuit (20), the compressor (2
The discharge side of 1) is connected to the condenser (2) via the discharge gas pipe (31).
It is connected to the upper end of the refrigerant channel (22a) in 2).
One end of a liquid pipe (32) is connected to a lower end of the refrigerant channel (22a) in the condenser (22). The liquid piping (32)
It is branched into two branch pipes at the other end. Liquid piping (32)
Of the first branch pipe (32a) through the first expansion valve (E1)
The first evaporator (23) is connected to the upper end of the primary flow path (23a). On the other hand, the second branch pipe (32) of the liquid pipe (32)
b) the second evaporator (24) via the second expansion valve (E2)
At the upper end of the primary side flow path (24a).

【0038】第1蒸発器(23)と第2蒸発器(24)と
は、吸入ガス配管(33)を介して圧縮機(21)の吸入側
に接続されている。具体的に、吸入ガス配管(33)は、
一端側で2つの分岐管に分岐されている。そして、吸入
ガス配管(33)は、その第1分岐管(33a)が第1蒸発
器(23)における1次側流路(23a)の下端に接続さ
れ、その第2分岐管(33b)が第2蒸発器(24)におけ
る1次側流路(24a)の下端に接続されている。また、
吸入ガス配管(33)の他端は、アキュームレータ(25)
を介して圧縮機(21)の吸入側に接続されている。
The first evaporator (23) and the second evaporator (24) are connected to the suction side of the compressor (21) via a suction gas pipe (33). Specifically, the suction gas pipe (33)
One end is branched into two branch pipes. The first branch pipe (33a) of the suction gas pipe (33) is connected to the lower end of the primary flow path (23a) in the first evaporator (23), and the second branch pipe (33b) is connected to the first branch pipe (33b). The second evaporator (24) is connected to the lower end of the primary flow path (24a). Also,
The other end of the suction gas pipe (33) is the accumulator (25)
Is connected to the suction side of the compressor (21).

【0039】上記第1膨張弁(E1)及び第2膨張弁(E
2)は、モータで駆動されて開度が変更される、いわゆ
る電子膨張弁により構成されている。
The first expansion valve (E1) and the second expansion valve (E1)
2) is constituted by a so-called electronic expansion valve driven by a motor to change the opening degree.

【0040】上記凝縮器(22)は、いわゆるプレート式
熱交換器により構成されている。凝縮器(22)には、冷
媒流路(22a)と冷却水流路(22b)とが区画形成されて
いる。この凝縮器(22)は、冷媒流路(22a)の冷媒と
冷却水流路(22b)の冷却水とを熱交換させ、この熱交
換によって冷媒を凝縮させるためのものである。
The condenser (22) is constituted by a so-called plate heat exchanger. In the condenser (22), a refrigerant channel (22a) and a cooling water channel (22b) are defined. The condenser (22) exchanges heat between the refrigerant in the refrigerant channel (22a) and the cooling water in the cooling water channel (22b), and condenses the refrigerant by the heat exchange.

【0041】上記第1蒸発器(23)は、いわゆるプレー
ト式熱交換器により構成されている。第1蒸発器(23)
には、1次側流路(23a)と2次側流路(23b)とが区画
形成されている。この第1蒸発器(23)は、1次側流路
(23a)の冷媒と2次側流路(23b)のブラインとを熱交
換させ、この熱交換によってブラインを冷却するための
ものである。
The first evaporator (23) is constituted by a so-called plate heat exchanger. First evaporator (23)
, A primary flow path (23a) and a secondary flow path (23b) are defined. The first evaporator (23) exchanges heat between the refrigerant in the primary flow path (23a) and the brine in the secondary flow path (23b), and cools the brine by this heat exchange. .

【0042】上記第2蒸発器(24)は、いわゆるプレー
ト式熱交換器により構成されている。第2蒸発器(24)
には、1次側流路(24a)と2次側流路(24b)とが区画
形成されている。この第2蒸発器(24)は、1次側流路
(24a)の冷媒と2次側流路(24b)のブラインとを熱交
換させ、この熱交換によってブラインを冷却するための
ものである。
The second evaporator (24) is constituted by a so-called plate heat exchanger. Second evaporator (24)
, A primary side flow path (24a) and a secondary side flow path (24b) are defined. The second evaporator (24) exchanges heat between the refrigerant in the primary flow path (24a) and the brine in the secondary flow path (24b), and cools the brine by this heat exchange. .

【0043】上記圧縮機(21)は、全密閉型のスクロー
ル圧縮機(21)によって、容量可変に構成されている。
つまり、この圧縮機(21)の電動機には、図外のインバ
ータを介して電力が供給される。そして、インバータの
出力周波数を調節して電動機の回転数を変更することに
より、圧縮機(21)の容量が変更される。また、上記圧
縮機(21)は、冷媒加熱手段であるクランクケースヒー
タ(21a)を備えている。
The compressor (21) is configured to be variable in capacity by a hermetic scroll compressor (21).
That is, electric power is supplied to the electric motor of the compressor (21) via an inverter (not shown). Then, the capacity of the compressor (21) is changed by adjusting the output frequency of the inverter to change the rotation speed of the electric motor. Further, the compressor (21) includes a crankcase heater (21a) as a refrigerant heating unit.

【0044】更に、上記冷媒回路(20)には、液冷媒導
入管(34)、ガス冷媒導入管(35)、第3膨張弁(E
3)、及び第4膨張弁(E4)が設けられている。
Further, the refrigerant circuit (20) has a liquid refrigerant introduction pipe (34), a gas refrigerant introduction pipe (35), and a third expansion valve (E
3) and a fourth expansion valve (E4).

【0045】上記液冷媒導入管(34)の一端は、上記液
配管(32)における第1及び第2膨張弁(E1,E2)の上
流側に接続されている。また、液冷媒導入管(34)の他
端は、上記吸入ガス配管(33)におけるアキュームレー
タ(25)の上流側に接続されている。液冷媒導入管(3
4)には、第3膨張弁(E3)が設けられている。この第
3膨張弁(E3)は、上述の電子膨張弁によって構成され
ている。
One end of the liquid refrigerant introduction pipe (34) is connected to the liquid pipe (32) on the upstream side of the first and second expansion valves (E1, E2). The other end of the liquid refrigerant introduction pipe (34) is connected to the suction gas pipe (33) on the upstream side of the accumulator (25). Liquid refrigerant introduction pipe (3
4) is provided with a third expansion valve (E3). This third expansion valve (E3) is constituted by the above-mentioned electronic expansion valve.

【0046】上記ガス冷媒導入管(35)の一端は、上記
吐出ガス配管(31)に接続されている。また、液冷媒導
入管(34)の他端は、上記吸入ガス配管(33)における
アキュームレータ(25)の上流側に接続されている。ガ
ス冷媒導入管(35)には、第4膨張弁(E4)が設けられ
ている。この第4膨張弁(E4)は、上述の電子膨張弁に
よって構成されている。
One end of the gas refrigerant introduction pipe (35) is connected to the discharge gas pipe (31). The other end of the liquid refrigerant introduction pipe (34) is connected to the suction gas pipe (33) on the upstream side of the accumulator (25). The gas refrigerant introduction pipe (35) is provided with a fourth expansion valve (E4). This fourth expansion valve (E4) is constituted by the above-mentioned electronic expansion valve.

【0047】《冷却水回路》上記冷却水回路(40)は、
流入配管(42)及び流出配管(43)を備えている。ま
た、冷却水回路(40)には、冷却熱交換器(41)が接続
されている。この冷却水回路(40)では、上記凝縮器
(22)及び冷却熱交換器(41)と、図外の冷却塔との間
で冷却媒体である冷却水が循環する。
<< Cooling Water Circuit >> The cooling water circuit (40)
An inflow pipe (42) and an outflow pipe (43) are provided. Further, a cooling heat exchanger (41) is connected to the cooling water circuit (40). In the cooling water circuit (40), cooling water as a cooling medium circulates between the condenser (22) and the cooling heat exchanger (41) and a cooling tower (not shown).

【0048】上記流入配管(42)の一端は、図外のポン
プを介して冷却塔に接続されている。また、流入配管
(42)は、他端側で2つの分岐管に分岐されている。流
入配管(42)の第1分岐管(42a)は、第1電動弁(S
1)を介して冷却熱交換器(41)における冷却水流路(4
1b)の下端に接続されている。一方、流入配管(42)の
第2分岐管(42b)は、第2電動弁(S2)を介して凝縮
器(22)における冷却水流路(22b)の下端に接続され
ている。
One end of the inflow pipe (42) is connected to a cooling tower via a pump (not shown). The inflow pipe (42) is branched into two branch pipes at the other end. The first branch pipe (42a) of the inflow pipe (42) is connected to the first motor-operated valve (S
1) The cooling water flow path (4) in the cooling heat exchanger (41)
1b) is connected to the lower end. On the other hand, the second branch pipe (42b) of the inflow pipe (42) is connected to the lower end of the cooling water flow path (22b) in the condenser (22) via the second motor-operated valve (S2).

【0049】上記冷却熱交換器(41)と凝縮器(22)と
は、流出配管(43)を介して冷却塔に接続されている。
具体的に、流出配管(43)は、その一端側で2つの分岐
管に分岐されている。流出配管(43)の第1分岐管(43
a)は、冷却熱交換器(41)における冷却水流路(41b)
の上端に接続されている。一方、流入配管(42)の第2
分岐管(43b)は、凝縮器(22)における冷却水流路(2
2b)の上端に接続されている。また、流入配管(42)
は、その他端が図外の冷却塔に接続されている。
The cooling heat exchanger (41) and the condenser (22) are connected to a cooling tower via an outflow pipe (43).
Specifically, the outflow pipe (43) is branched into two branch pipes at one end. The first branch pipe (43) of the outflow pipe (43)
a) The cooling water flow path (41b) in the cooling heat exchanger (41)
Is connected to the upper end. On the other hand, the second inflow pipe (42)
The branch pipe (43b) is connected to the cooling water passage (2) in the condenser (22).
2b) is connected to the upper end. In addition, inflow piping (42)
The other end is connected to a cooling tower (not shown).

【0050】上記冷却熱交換器(41)は、いわゆるプレ
ート式熱交換器により構成されている。冷却熱交換器
(41)には、冷却水流路(41b)とブライン流路(41a)
とが区画形成されている。この冷却熱交換器(41)は、
冷却水流路(41b)の冷却水とブライン流路(41a)のブ
ラインとを熱交換させ、この熱交換によってブラインを
冷却するためのものである。
The cooling heat exchanger (41) is constituted by a so-called plate heat exchanger. The cooling heat exchanger (41) has a cooling water channel (41b) and a brine channel (41a).
Are sectioned. This cooling heat exchanger (41)
The cooling water in the cooling water flow path (41b) and the brine in the brine flow path (41a) are subjected to heat exchange, and the brine is cooled by the heat exchange.

【0051】《第1回路、第2回路》上記第1回路(5
0)は、冷却熱交換器(41)、第1蒸発器(23)、第1
ヒータ(52)、及び第1タンク(53)を順に配管接続し
て構成された閉回路である。この第1回路(50)には、
熱媒体である第1ブラインが充填されている。第1回路
(50)では、第1ブラインは、冷却熱交換器(41)及び
第1蒸発器(23)において冷却され、第1設定温度とな
って利用側に供給される。尚、第1ブラインとして、フ
ッ素系不活性液体である3M社のフロリナート(商標)
が用いられている。また、第1設定温度は、例えば30
℃〜120℃の範囲内の設定温度に設定される。
<< First Circuit, Second Circuit >> The first circuit (5
0) is a cooling heat exchanger (41), a first evaporator (23),
This is a closed circuit configured by connecting a heater (52) and a first tank (53) in order. In this first circuit (50),
The first brine, which is a heat carrier, is filled. In the first circuit (50), the first brine is cooled in the cooling heat exchanger (41) and the first evaporator (23), and is supplied to the use side at a first set temperature. As the first brine, 3M Fluorinert (trademark), which is a fluorine-based inert liquid, is used.
Is used. The first set temperature is, for example, 30
The temperature is set to a set temperature in the range of ° C to 120 ° C.

【0052】上記第1回路(50)において、利用側から
延びるブラインの戻り管(51)は、冷却熱交換器(41)
におけるブライン流路(41a)の下端に接続されてい
る。冷却熱交換器(41)におけるブライン流路(41a)
の上端は、第1蒸発器(23)における2次側流路(23
b)の下端と配管接続されている。つまり、冷却熱交換
器(41)の下流側に第1蒸発器(23)が配置されてい
る。第1蒸発器(23)における2次側流路(23b)の上
端は、第1ヒータ(52)を介して第1タンク(53)の最
下部と配管接続されている。第1ヒータ(52)は、第1
ブラインが過冷却されて、第1設定温度より低温になっ
たときに、第1ブラインを加熱するためのものである。
In the first circuit (50), the brine return pipe (51) extending from the use side is connected to the cooling heat exchanger (41).
At the lower end of the brine flow path (41a). Brine flow path (41a) in cooling heat exchanger (41)
Of the secondary side flow path (23) in the first evaporator (23).
It is connected to the lower end of b) by piping. That is, the first evaporator (23) is arranged downstream of the cooling heat exchanger (41). The upper end of the secondary flow path (23b) in the first evaporator (23) is connected to the lowermost part of the first tank (53) via a first heater (52). The first heater (52) is a first heater (52).
This is for heating the first brine when the brine is supercooled and becomes lower than the first set temperature.

【0053】第1タンク(53)内には、その底部に第1
ブラインポンプ(54)が設置されている。この第1ブラ
インポンプ(54)には、利用側へ延びるブラインの送出
管(55)が接続されている。第1ブラインポンプ(54)
は、第1タンク(53)内の第1ブラインを吸入し、送出
管(55)を通じて利用側へ送り出すことにより、第1回
路(50)に第1ブラインを循環させるためのものであ
る。また、送出管(55)には、第1逆止弁(CV1)が設
けられている。この第1逆止弁(CV1)は、第1タンク
(53)から利用側へ向かう第1ブラインの流通のみを許
容する。
In the first tank (53), a first tank is provided at the bottom thereof.
A brine pump (54) is installed. The first brine pump (54) is connected to a brine delivery pipe (55) extending to the use side. The first brine pump (54)
Is for circulating the first brine in the first circuit (50) by sucking the first brine in the first tank (53) and sending it out to the user side through the delivery pipe (55). The delivery pipe (55) is provided with a first check valve (CV1). The first check valve (CV1) allows only the flow of the first brine from the first tank (53) toward the use side.

【0054】上記第2回路(60)は、第2蒸発器(2
4)、第2ヒータ(62)、及び第2タンク(63)を順に
配管接続して構成された閉回路である。この第2回路
(60)には、熱媒体である第2ブラインが充填されてい
る。第2回路(60)では、第2ブラインは、第2蒸発器
(24)において冷媒回路(20)の冷媒から冷熱を受け、
第2設定温度となって利用側へ供給される。尚、第2ブ
ラインとして、フッ素系不活性液体である3M社のフロ
リナート(商標)が用いられている。また、第2設定温
度は、例えば−30℃〜60℃の範囲内の設定温度に設
定される。ただし、第2ブラインの設定温度は、上記第
1ブラインの設定温度よりも低い値に設定される。
The second circuit (60) includes a second evaporator (2
4) A closed circuit formed by sequentially connecting a second heater (62) and a second tank (63) by piping. The second circuit (60) is filled with a second brine as a heat medium. In the second circuit (60), the second brine receives cold heat from the refrigerant in the refrigerant circuit (20) in the second evaporator (24),
The second set temperature is supplied to the user side. As the second brine, 3M Fluorinert (trademark), which is a fluorine-based inert liquid, is used. The second set temperature is set, for example, to a set temperature in the range of −30 ° C. to 60 ° C. However, the set temperature of the second brine is set to a value lower than the set temperature of the first brine.

【0055】上記第2回路(60)において、利用側から
延びるブラインの戻り管(61)は、第2蒸発器(24)に
おける2次側流路(24b)の下端に接続されている。第
2蒸発器(24)における2次側流路(24b)の上端は、
第2ヒータ(62)を介して第2タンク(63)の最下部と
配管接続されている。第2ヒータ(62)は、第2ブライ
ンが過冷却されて、第2設定温度より低温になったとき
に、第2ブラインを加熱するためのものである。
In the second circuit (60), the brine return pipe (61) extending from the utilization side is connected to the lower end of the secondary flow path (24b) in the second evaporator (24). The upper end of the secondary flow path (24b) in the second evaporator (24)
It is connected to the lowermost part of the second tank (63) via a second heater (62) by piping. The second heater (62) is for heating the second brine when the second brine is supercooled and becomes lower than the second set temperature.

【0056】第2タンク(63)内には、その底部に第2
ブラインポンプ(64)が設置されている。この第2ブラ
インポンプ(64)には、利用側へ延びるブラインの送出
管(65)が接続されている。第2ブラインポンプ(64)
は、第2タンク(63)内の第2ブラインを吸入し、送出
管(65)を通じて利用側へ送り出すことにより、第2回
路(60)に第2ブラインを循環させるためのものであ
る。また、送出管(65)には、第2逆止弁(CV2)が設
けられている。この第2逆止弁(CV2)は、第2タンク
(63)から利用側へ向かう第2ブラインの流通のみを許
容する。
In the second tank (63), the second tank
A brine pump (64) is installed. The second brine pump (64) is connected to a brine delivery pipe (65) extending to the use side. Second brine pump (64)
Is for circulating the second brine through the second circuit (60) by sucking the second brine in the second tank (63) and sending it out to the user side through the delivery pipe (65). The delivery pipe (65) is provided with a second check valve (CV2). The second check valve (CV2) allows only the flow of the second brine from the second tank (63) toward the use side.

【0057】上記第1タンク(53)及び第2タンク(6
3)は、同様の形状に構成され、共に直方体形状の容器
で構成されている。両タンク(53,63)は、容量が18
リットル程度に構成されている。第1タンク(53)に
は、第1ヒータ(52)を通過した第1ブラインが貯留さ
れている。つまり、第1タンク(53)には、第1設定温
度の第1ブラインが貯留されている。第2タンク(63)
には、第2ヒータ(62)を通過した第2ブラインが貯留
されている。つまり、第2タンク(63)には、第2設定
温度の第2ブラインが貯留されている。
The first tank (53) and the second tank (6
3) is configured in a similar shape, and both are configured as rectangular parallelepiped containers. Both tanks (53, 63) have a capacity of 18
It is composed of about 1 liter. The first brine that has passed through the first heater (52) is stored in the first tank (53). That is, the first brine at the first set temperature is stored in the first tank (53). Second tank (63)
, The second brine that has passed through the second heater (62) is stored. That is, the second brine at the second set temperature is stored in the second tank (63).

【0058】上記第1ヒータ(52)又は第2ヒータ(6
2)が加熱手段(73)を構成している。
The first heater (52) or the second heater (6
2) constitutes the heating means (73).

【0059】《各種センサ》上記冷媒回路(20)、第1
回路(50)、及び第2回路(60)には、各種のセンサが
設けられている。
<< Various sensors >> The refrigerant circuit (20), the first
Various sensors are provided in the circuit (50) and the second circuit (60).

【0060】具体的に、上記冷媒回路(20)には、第1
圧力センサ(P1)、第2圧力センサ(P2)、第1サーミ
スタ(T1)、第2サーミスタ(T2)、及び第3サーミス
タ(T3)が設けられている。第1圧力センサ(P1)は、
吸入ガス配管(33)に接続され、圧縮機(21)の吸入側
圧力Lpを検出する。第2圧力センサ(P2)は、吐出ガス
配管(31)に接続され、圧縮機(21)の吐出側圧力を検
出する。第1サーミスタ(T1)は、吸入ガス配管(33)
に取り付けられ、圧縮機(21)の吸入側温度を検出す
る。第2サーミスタ(T2)は、吐出ガス配管(31)に取
り付けられ、圧縮機(21)の吐出側温度t2を検出する。
第3サーミスタ(T3)は、吸入ガス配管(33)の第2分
岐管(33b)に設けられ、この第2分岐管(33b)の温度
を検出することによって、第2蒸発器(24)から流出し
た冷媒の温度を検出する。
Specifically, the refrigerant circuit (20) has a first
A pressure sensor (P1), a second pressure sensor (P2), a first thermistor (T1), a second thermistor (T2), and a third thermistor (T3) are provided. The first pressure sensor (P1)
It is connected to the suction gas pipe (33) and detects the suction side pressure Lp of the compressor (21). The second pressure sensor (P2) is connected to the discharge gas pipe (31) and detects a discharge-side pressure of the compressor (21). The first thermistor (T1) is a suction gas pipe (33)
And detects the suction-side temperature of the compressor (21). The second thermistor (T2) is attached to the discharge gas pipe (31) and detects the discharge-side temperature t2 of the compressor (21).
The third thermistor (T3) is provided in the second branch pipe (33b) of the suction gas pipe (33), and detects the temperature of the second branch pipe (33b) to change the temperature from the second evaporator (24). The temperature of the refrigerant flowing out is detected.

【0061】上記第1回路(50)には、第1白金温度計
(Pt1)、第2白金温度計(Pt2)、第4白金温度計(Pt
4)、及び第3圧力センサ(P3)が設けられている。第
1白金温度計(Pt1)は、第1回路(50)の戻り管(5
1)に設けられ、利用側から戻り、冷却熱交換器(41)
に流入する前の第1ブラインの温度を検出する。第2白
金温度計(Pt2)は、第1回路(50)における冷却熱交
換器(41)の出口付近に設けられ、冷却熱交換器(41)
から流出する第1ブラインの温度を検出する。第4白金
温度計(Pt4)は、第1回路(50)における第1ヒータ
(52)の出口付近に設けられ、第1タンク(53)に流入
する前の第1ブラインの温度を検出する。第3圧力セン
サ(P3)は、第1回路(50)の送出管(55)に接続さ
れ、第1ブラインポンプ(54)から吐出された第1ブラ
インの圧力を検出する。
The first circuit (50) includes a first platinum thermometer (Pt1), a second platinum thermometer (Pt2), and a fourth platinum thermometer (Pt2).
4) and a third pressure sensor (P3). The first platinum thermometer (Pt1) is connected to the return pipe (5) of the first circuit (50).
Installed in 1) and returned from the user side, cooling heat exchanger (41)
The temperature of the first brine before flowing into the air is detected. The second platinum thermometer (Pt2) is provided near the outlet of the cooling heat exchanger (41) in the first circuit (50), and is connected to the cooling heat exchanger (41).
The temperature of the first brine flowing out of the system. The fourth platinum thermometer (Pt4) is provided near the outlet of the first heater (52) in the first circuit (50), and detects the temperature of the first brine before flowing into the first tank (53). The third pressure sensor (P3) is connected to the delivery pipe (55) of the first circuit (50), and detects the pressure of the first brine discharged from the first brine pump (54).

【0062】上記第2回路(60)には、第5白金温度計
(Pt5)、第7白金温度計(Pt7)、及び第4圧力センサ
(P4)が設けられている。第5白金温度計(Pt5)は、
第2回路(60)の戻り管(61)に設けられ、利用側から
戻り、第2蒸発器(24)に流入する前の第2ブラインの
温度を検出する。第7白金温度計(Pt7)は、第2回路
(60)における第2ヒータ(62)の出口付近に設けら
れ、第2タンク(63)に流入する前の第2ブラインの温
度を検出する。第4圧力センサ(P4)は、第2回路(6
0)の送出管(65)に接続され、第2ブラインポンプ(6
4)から吐出された第2ブラインの圧力を検出する。
尚、上記の各白金温度計は、白金測温抵抗体を用いた温
度センサである。
The second circuit (60) is provided with a fifth platinum thermometer (Pt5), a seventh platinum thermometer (Pt7), and a fourth pressure sensor (P4). The fifth platinum thermometer (Pt5)
It is provided in the return pipe (61) of the second circuit (60) and detects the temperature of the second brine before returning from the use side and flowing into the second evaporator (24). The seventh platinum thermometer (Pt7) is provided near the outlet of the second heater (62) in the second circuit (60), and detects the temperature of the second brine before flowing into the second tank (63). The fourth pressure sensor (P4) is connected to the second circuit (6
0) and connected to the second brine pump (6).
The pressure of the second brine discharged from 4) is detected.
Each of the above platinum thermometers is a temperature sensor using a platinum resistance thermometer.

【0063】上記コントローラ(80)は、チリングユニ
ット(10)の運転制御及び停止制御を行うものである。
コントローラ(80)には、上記の各サーミスタ(T1,
…)、各圧力センサ(P1,…)、及び各白金温度計(Pt
1,…)、の検出信号が入力される。そして、コントロー
ラ(80)は、入力された信号に基づき、各膨張弁(E1,
…)の開度調節、各電動弁(S1,S2)の開度調節、圧縮
機(21)の容量調節、各ヒータ(52,62)の出力調節な
どを行うように構成されている。
The controller (80) controls the operation and stop of the chilling unit (10).
Each of the above thermistors (T1,
…), Each pressure sensor (P1,…) and each platinum thermometer (Pt
1, ...) are input. Then, based on the input signal, the controller (80) controls each of the expansion valves (E1,
), The opening of each motor-operated valve (S1, S2), the capacity of the compressor (21), the output of each heater (52, 62), and the like.

【0064】一方、上記コントローラ(80)は、高圧制
御部(81)と第1低圧制御部(82)と第2低圧制御部
(83)と第1開始制御部(84)と第2開始制御部(85)
と冷媒加熱制御部(86)とを備えている。
On the other hand, the controller (80) comprises a high-pressure control section (81), a first low-pressure control section (82), a second low-pressure control section (83), a first start control section (84), and a second start control section. Department (85)
And a refrigerant heating control section (86).

【0065】上記高圧制御部(81)は、高圧制御手段を
構成している。つまり、上記高圧制御部(81)は、運転
開始時に、圧縮機(21)を起動する前に第2電動弁(S
2)を開放することにより、凝縮器(22)に所定の冷却
水が流れるように制御するように構成されている。
The high pressure control section (81) constitutes high pressure control means. That is, at the start of operation, the high-pressure control unit (81) operates the second motor-operated valve (S) before starting the compressor (21).
By opening 2), it is configured such that predetermined cooling water flows to the condenser (22).

【0066】上記第1低圧制御部(82)は、運転開始時
に、圧縮機(21)の吸入側圧力が所定圧力より低圧のと
きに、圧縮機(21)の起動前に第1膨張弁(E1)を所定
開度だけ開放するように構成されている。
At the start of operation, when the suction-side pressure of the compressor (21) is lower than a predetermined pressure at the start of operation, the first low-pressure control section (82) operates the first expansion valve (82) before starting the compressor (21). E1) is opened by a predetermined opening.

【0067】上記第2低圧制御部(83)は、運転開始時
に、圧縮機(21)の吸入側圧力が所定圧力より低圧のと
きに、圧縮機(21)の起動前に第2膨張弁(E2)を所定
開度だけ開放するように構成されている。
At the start of operation, when the suction-side pressure of the compressor (21) is lower than a predetermined pressure at the start of operation, the second low-pressure control section (83) controls the second expansion valve (83) before starting the compressor (21). E2) is opened by a predetermined opening.

【0068】上記所定圧力は、2Kgf/cm2 に設定され、
上記所定開度は、200パルスに設定されている。
The predetermined pressure is set at 2 kgf / cm 2 ,
The predetermined opening is set to 200 pulses.

【0069】上記第1低圧制御部(82)又は第2低圧制
御部(83)が、低圧制御手段(74)を構成している。
The first low pressure control section (82) or the second low pressure control section (83) constitutes a low pressure control means (74).

【0070】上記第1開始制御部(84)は、運転開始時
に、圧縮機(21)の起動前に第1ブラインポンプ(54)
を駆動することにより、第1回路(50)に第1ブライン
を循環させ、第1ヒータ(52)に所定の第1ブラインを
流すように構成されている。また、上記第1開始制御部
(84)は、第1タンク(53)に流入する第1ブラインの
温度が第1設定温度より高温のときは、運転開始時に、
圧縮機(21)の起動前に第1電動弁(S1)を開放するこ
とにより、所定の冷却水が冷却熱交換器(41)を流れる
ように制御するように構成されている。
At the start of operation, the first start control section (84) controls the first brine pump (54) before starting the compressor (21).
, The first brine is circulated through the first circuit (50), and a predetermined first brine is caused to flow through the first heater (52). When the temperature of the first brine flowing into the first tank (53) is higher than the first set temperature, the first start control unit (84) performs the following operations:
The first motor-operated valve (S1) is opened before the compressor (21) is started, so that predetermined cooling water is controlled to flow through the cooling heat exchanger (41).

【0071】上記第2開始制御部(85)は、運転開始時
に、圧縮機(21)の起動前に第2ブラインポンプ(64)
を駆動することにより、第2回路(60)に第2ブライン
を循環させ、第2ヒータ(62)に所定の第2ブラインを
流すように構成されている。
At the start of the operation, the second start control section (85) performs the operation of the second brine pump (64) before the start of the compressor (21).
, The second brine is circulated through the second circuit (60), and a predetermined second brine is caused to flow through the second heater (62).

【0072】上記第1開始制御部(84)又は第2開始制
御部(85)が、開始制御手段(75)を構成している。
The first start control section (84) or the second start control section (85) constitutes a start control means (75).

【0073】上記冷媒加熱制御部(86)は、冷媒加熱制
御手段を構成している。つまり、上記冷媒加熱制御部
(86)は、圧縮機(21)の停止中に、圧縮機(21)の吐
出側温度t2が第1の所定温度より低温となるとクランク
ケースヒータ(21a)をオンさせ、且つ吐出側温度t2が
第2の所定温度より高温となると、クランクケースヒー
タ(21a)をオフさせるように構成されている。上記第
1の所定温度は、70℃に設定され、上記第2の所定温度
は、75℃に設定されている。
The refrigerant heating control section (86) constitutes refrigerant heating control means. That is, the refrigerant heating control section (86) turns on the crankcase heater (21a) when the discharge side temperature t2 of the compressor (21) becomes lower than the first predetermined temperature while the compressor (21) is stopped. When the discharge-side temperature t2 becomes higher than the second predetermined temperature, the crankcase heater (21a) is turned off. The first predetermined temperature is set to 70 ° C., and the second predetermined temperature is set to 75 ° C.

【0074】−運転動作−上記チリングユニット(10)
の運転動作について説明する。
-Operation-The chilling unit (10)
Will be described.

【0075】《冷媒回路、冷却水回路における動作》冷
媒回路(20)において、圧縮機(21)を運転すると、圧
縮されたガス冷媒が圧縮機(21)から吐出される。この
ガス冷媒は、吐出ガス配管(31)を通って凝縮器(22)
の冷媒流路(22a)に導入される。凝縮器(22)の冷媒
流路(22a)では、導入された冷媒が冷却水流路(22b)
の冷却水に放熱して凝縮する。凝縮した冷媒は、凝縮器
(22)から出て液配管(32)を流れる。その後、液配管
(32)の冷媒は、二手に分流されて、一方が第1分岐管
(32a)に流入し、他方が第2分岐管(32b)に流入す
る。
<< Operation in Refrigerant Circuit and Cooling Water Circuit >> In the refrigerant circuit (20), when the compressor (21) is operated, the compressed gas refrigerant is discharged from the compressor (21). This gas refrigerant passes through the discharge gas pipe (31) and enters the condenser (22)
Is introduced into the refrigerant passage (22a). In the refrigerant flow path (22a) of the condenser (22), the introduced refrigerant flows into the cooling water flow path (22b).
Heat is released to the cooling water and condenses. The condensed refrigerant exits the condenser (22) and flows through the liquid pipe (32). Thereafter, the refrigerant in the liquid pipe (32) is divided into two parts, one of which flows into the first branch pipe (32a) and the other flows into the second branch pipe (32b).

【0076】液配管(32)の第1分岐管(32a)に流入
した冷媒は、第1膨張弁(E1)で減圧された後に、第1
蒸発器(23)の1次側流路(23a)に導入される。この
1次側流路(23a)では、導入された冷媒が2次側流路
(23b)の第1ブラインから吸熱して蒸発する。蒸発し
た冷媒は、第1蒸発器(23)から出て吸入ガス配管(3
3)の第1分岐管(33a)に流入する。
The refrigerant flowing into the first branch pipe (32a) of the liquid pipe (32) is depressurized by the first expansion valve (E1),
It is introduced into the primary flow path (23a) of the evaporator (23). In the primary flow path (23a), the introduced refrigerant absorbs heat from the first brine of the secondary flow path (23b) and evaporates. The evaporated refrigerant flows out of the first evaporator (23) and enters the suction gas pipe (3
3) into the first branch pipe (33a).

【0077】一方、液配管(32)の第2分岐管(32b)
に流入した冷媒は、第2膨張弁(E2)で減圧された後
に、第2蒸発器(24)の1次側流路(24a)に導入され
る。この1次側流路(24a)では、導入された冷媒が2
次側流路(24b)の第2ブラインから吸熱して蒸発す
る。蒸発した冷媒は、第2蒸発器(24)から出て吸入ガ
ス配管(33)の第2分岐管(33b)に流入する。
On the other hand, the second branch pipe (32b) of the liquid pipe (32)
The refrigerant that has flowed into the second evaporator (E2) is introduced into the primary flow path (24a) of the second evaporator (24) after being decompressed by the second expansion valve (E2). In this primary flow path (24a), the introduced refrigerant
Heat is absorbed from the second brine in the secondary flow path (24b) to evaporate. The evaporated refrigerant exits from the second evaporator (24) and flows into the second branch pipe (33b) of the suction gas pipe (33).

【0078】吸入ガス配管(33)において、第1分岐管
(33a)の冷媒と第2分岐管(33b)の冷媒とが合流す
る。この合流後の冷媒は、アキュームレータ(25)を通
って圧縮機(21)に吸入される。圧縮機(21)は、吸入
した冷媒を圧縮して再び吐出する。冷媒回路(20)で
は、以上のように冷媒が循環して、冷凍サイクルが行わ
れる。
In the suction gas pipe (33), the refrigerant in the first branch pipe (33a) and the refrigerant in the second branch pipe (33b) merge. The refrigerant after the merging passes through the accumulator (25) and is sucked into the compressor (21). The compressor (21) compresses the sucked refrigerant and discharges it again. In the refrigerant circuit (20), the refrigerant circulates as described above, and a refrigeration cycle is performed.

【0079】冷却水回路(40)において、ポンプ(図
外)を運転すると、冷却塔(図外)で冷却された冷却水
が、流入配管(42)を通じて送り込まれる。流入配管
(42)を流れる冷却水は、二手に分流され、一方が第1
分岐管(42a)に流入し、他方が第2分岐管(42b)に流
入する。
When a pump (not shown) is operated in the cooling water circuit (40), cooling water cooled by a cooling tower (not shown) is sent through an inflow pipe (42). The cooling water flowing through the inflow pipe (42) is divided into two parts, one of which is the first.
The other flows into the branch pipe (42a) and the other flows into the second branch pipe (42b).

【0080】流入配管(42)の第1分岐管(42a)に入
った冷却水は、第1電動弁(S1)を通過して冷却熱交換
器(41)の冷却水流路(41b)に導入される。冷却熱交
換器(41)では、導入された冷却水がブライン流路(41
a)の第1ブラインから吸熱する。吸熱後の冷却水は、
冷却熱交換器(41)から出て流出配管(43)の第1分岐
管(43a)を流れる。
The cooling water entering the first branch pipe (42a) of the inflow pipe (42) passes through the first motor-operated valve (S1) and is introduced into the cooling water flow path (41b) of the cooling heat exchanger (41). Is done. In the cooling heat exchanger (41), the introduced cooling water passes through the brine flow path (41).
Absorb heat from the first brine of a). Cooling water after heat absorption
It goes out of the cooling heat exchanger (41) and flows through the first branch pipe (43a) of the outflow pipe (43).

【0081】一方、流入配管(42)の第2分岐管(42
b)に入った冷却水は、第2電動弁(S2)を通過して凝
縮器(22)の冷却水流路(22b)に導入される。凝縮器
(22)では、導入された冷却水が冷媒流路(22a)の冷
媒から吸熱する。吸熱後の冷却水は、凝縮器(22)から
出て流出配管(43)の第2分岐管(43b)を流れる。
On the other hand, the second branch pipe (42) of the inflow pipe (42)
The cooling water entering b) passes through the second motor-operated valve (S2) and is introduced into the cooling water flow path (22b) of the condenser (22). In the condenser (22), the introduced cooling water absorbs heat from the refrigerant in the refrigerant channel (22a). The cooling water having absorbed the heat exits the condenser (22) and flows through the second branch pipe (43b) of the outflow pipe (43).

【0082】流出配管(43)において、第1分岐管(43
a)の冷却水と第2分岐管(43b)の冷却水とが合流す
る。この合流後の冷却水は、冷却塔(図外)に送られて
冷却され、再び流入配管(42)を通じて送り込まれる。
In the outflow pipe (43), the first branch pipe (43)
The cooling water of a) and the cooling water of the second branch pipe (43b) merge. The cooling water after the merging is sent to a cooling tower (not shown) to be cooled, and is sent again through the inflow pipe (42).

【0083】《第1回路及び第2回路における動作》第
1回路(50)において、第1ブラインポンプ(54)を運
転すると、第1ブラインが循環する。利用側で対象物か
ら吸熱した第1ブラインは、戻り管(51)を流れて冷却
熱交換器(41)のブライン流路(41a)に導入される。
冷却熱交換器(41)では、ブライン流路(41a)の第1
ブラインが冷却水流路(41b)の冷却水と熱交換する。
この熱交換により、第1ブラインは、冷却水に放熱して
冷却される。冷却熱交換器(41)で冷却された第1ブラ
インは、第1蒸発器(23)の2次側流路(23b)に導入
される。第1蒸発器(23)では、2次側流路(23b)の
第1ブラインが1次側流路(23a)の冷媒と熱交換す
る。この熱交換により、第1ブラインは、冷媒に放熱し
て更に冷却される。
<< Operation in First Circuit and Second Circuit >> In the first circuit (50), when the first brine pump (54) is operated, the first brine circulates. The first brine that has absorbed heat from the object on the utilization side flows through the return pipe (51) and is introduced into the brine flow path (41a) of the cooling heat exchanger (41).
In the cooling heat exchanger (41), the first heat of the brine flow path (41a)
The brine exchanges heat with the cooling water in the cooling water flow path (41b).
By this heat exchange, the first brine radiates heat to the cooling water and is cooled. The first brine cooled by the cooling heat exchanger (41) is introduced into the secondary flow path (23b) of the first evaporator (23). In the first evaporator (23), the first brine of the secondary flow path (23b) exchanges heat with the refrigerant of the primary flow path (23a). By this heat exchange, the first brine releases heat to the refrigerant and is further cooled.

【0084】第1蒸発器(23)から出た第1ブライン
は、第1ヒータ(52)に導入される。このとき、第1タ
ンク(53)に流入する前の第1ブラインの温度が第1設
定温度未満のとき、第1ブラインは、第1ヒータ(52)
により、第1設定温度になるように加熱された後、第1
タンク(53)に流入して貯留される。
The first brine from the first evaporator (23) is introduced into the first heater (52). At this time, when the temperature of the first brine before flowing into the first tank (53) is lower than the first set temperature, the first brine is supplied to the first heater (52).
After heating to the first set temperature,
It flows into the tank (53) and is stored.

【0085】第1タンク(53)に貯留された第1設定温
度の第1ブラインは、第1ブラインポンプ(54)に吸入
され、送出管(55)に送り出される。送出管(55)を通
じて供給された第1ブラインは、利用側において対象物
の冷却に利用される。利用側で対象物から吸熱した第1
ブラインは、戻り管(51)を通じて再び冷却熱交換器
(41)へ送り込まれる。
The first brine at the first set temperature stored in the first tank (53) is sucked into the first brine pump (54) and sent out to the delivery pipe (55). The first brine supplied through the delivery pipe (55) is used for cooling the object on the use side. The first that absorbed heat from the object on the user side
The brine is sent back to the cooling heat exchanger (41) through the return pipe (51).

【0086】第2回路(60)において、第2ブラインポ
ンプ(64)を運転すると、第2ブラインが循環する。利
用側で対象物から吸熱した第2ブラインは、戻り管(6
1)を流れて第2蒸発器(24)の2次側流路(24b)に導
入される。第2蒸発器(24)では、2次側流路(24b)
の第2ブラインが1次側流路(24a)の冷媒と熱交換す
る。この熱交換により、第2ブラインは、冷媒に放熱し
て冷却される。
When the second brine pump (64) is operated in the second circuit (60), the second brine circulates. The second brine that absorbed heat from the object on the user side returns to the return pipe (6
After flowing through 1), it is introduced into the secondary flow path (24b) of the second evaporator (24). In the second evaporator (24), the secondary flow path (24b)
The second brine exchanges heat with the refrigerant in the primary flow path (24a). By this heat exchange, the second brine radiates heat to the refrigerant and is cooled.

【0087】第2蒸発器(24)から出た第2ブライン
は、第2ヒータ(62)に導入される。このとき、第2タ
ンク(63)に流入する前の第2ブラインの温度が第2設
定温度未満のとき、第2ブラインは、第2ヒータ(62)
により、第2設定温度になるように加熱された後、第2
タンク(63)に流入して貯留される。
The second brine from the second evaporator (24) is introduced into the second heater (62). At this time, when the temperature of the second brine before flowing into the second tank (63) is lower than the second set temperature, the second brine is supplied to the second heater (62).
Is heated to reach the second set temperature,
It flows into the tank (63) and is stored.

【0088】第2タンク(63)に貯留された所定温度の
第2ブラインは、第2ブラインポンプ(64)に吸入さ
れ、送出管(65)に送り出される。送出管(65)を通じ
て供給された第2ブラインは、利用側において対象物の
冷却に利用される。利用側で対象物から吸熱した第2ブ
ラインは、戻り管(61)を通じて再び第2蒸発器(24)
へ送り込まれる。
The second brine at a predetermined temperature stored in the second tank (63) is sucked into the second brine pump (64) and sent out to the delivery pipe (65). The second brine supplied through the delivery pipe (65) is used for cooling the object on the use side. The second brine that has absorbed heat from the object on the user side returns to the second evaporator (24) through the return pipe (61).
Sent to

【0089】《コントローラの制御動作》上述のよう
に、上記コントローラ(80)は、チリングユニット(1
0)の運転制御を行う。ここでは、その内容について説
明する。
<< Control Operation of Controller >> As described above, the controller (80) is connected to the chilling unit (1).
Perform operation control of 0). Here, the contents will be described.

【0090】上記コントローラ(80)は、冷却熱交換器
(41)における熱交換量の調節を行う。つまり、第1電
動弁(S1)の開度を調節し、冷却熱交換器(41)に対す
る冷却水の供給量を変更することによって、冷却熱交換
器(41)における第1ブラインからの放熱量を調節す
る。
The controller (80) adjusts the amount of heat exchange in the cooling heat exchanger (41). That is, by adjusting the opening of the first motor-operated valve (S1) and changing the supply amount of the cooling water to the cooling heat exchanger (41), the amount of heat radiation from the first brine in the cooling heat exchanger (41) is changed. Adjust

【0091】上記コントローラ(80)は、第1蒸発器
(23)及び第2蒸発器(24)における熱交換量の調節を
行う。つまり、第1膨張弁(E1)の開度を調節し、第1
蒸発器(23)に対する冷媒の供給量を変更することによ
って、第1蒸発器(23)における第1ブラインからの放
熱量を調節する。また、第2膨張弁(E2)の開度を調節
し、第2蒸発器(24)に対する冷媒の供給量を変更する
ことによって、第2蒸発器(24)における第2ブライン
からの放熱量を調節する。その際、コントローラ(80)
は、圧縮機(21)の容量調節も行う。つまり、第2蒸発
器(24)における冷却能力の過不足に応じてインバータ
(図外)の出力周波数を変更し、圧縮機(21)における
電動機の回転数を変更することによって、圧縮機(21)
の容量を調節する。
The controller (80) adjusts the amount of heat exchange in the first evaporator (23) and the second evaporator (24). That is, the opening of the first expansion valve (E1) is adjusted,
The amount of heat released from the first brine in the first evaporator (23) is adjusted by changing the supply amount of the refrigerant to the evaporator (23). Further, by adjusting the opening of the second expansion valve (E2) and changing the supply amount of the refrigerant to the second evaporator (24), the amount of heat radiation from the second brine in the second evaporator (24) is reduced. Adjust. At that time, the controller (80)
Also adjusts the capacity of the compressor (21). That is, the output frequency of the inverter (not shown) is changed according to the excess or deficiency of the cooling capacity of the second evaporator (24), and the rotation speed of the electric motor in the compressor (21) is changed. )
Adjust the volume of the

【0092】尚、上記コントローラ(80)は、冷却熱交
換器(41)の出口において、第1ブラインの温度が既に
所定温度より低温となっている場合には、第1蒸発器
(23)における第1ブラインの冷却を停止する。つま
り、このような場合には、上記コントローラ(80)が第
1膨張弁(E1)を全閉し、第1蒸発器(23)に対する冷
媒の供給を遮断する。
When the temperature of the first brine is already lower than the predetermined temperature at the outlet of the cooling heat exchanger (41), the controller (80) operates the first evaporator (23). Stop cooling the first brine. That is, in such a case, the controller (80) fully closes the first expansion valve (E1) and shuts off the supply of the refrigerant to the first evaporator (23).

【0093】上記コントローラ(80)は、第1ヒータ
(52)及び第2ヒータ(62)の出力調節を行う。つま
り、第1ヒータ(52)については、第4白金温度計(Pt
4)の検出温度が第1設定温度となるように出力を調節
する。また、第2ヒータ(62)については、第7白金温
度計(Pt7)の検出温度が第2設定温度となるように出
力を調節する。
The controller (80) adjusts the output of the first heater (52) and the second heater (62). That is, for the first heater (52), the fourth platinum thermometer (Pt
The output is adjusted so that the detected temperature of 4) becomes the first set temperature. The output of the second heater (62) is adjusted so that the detected temperature of the seventh platinum thermometer (Pt7) becomes the second set temperature.

【0094】《第1回路及び第2回路の起動前制御動
作》上記コントローラ(80)は、第1回路(50)及び第
2回路(60)の起動前制御を行う。ここでは、その内容
について説明する。
<< Pre-Start Control Operation of First and Second Circuits >> The controller (80) performs pre-start control of the first circuit (50) and the second circuit (60). Here, the contents will be described.

【0095】先ず、第1回路(50)の起動前制御動作に
ついて、図2を参照しながら説明する。
First, the pre-startup control operation of the first circuit (50) will be described with reference to FIG.

【0096】この第1回路(50)の起動前制御動作で
は、先ず、ステップST11において、第1タンク(53)に
流入する前の第1ブラインの温度が第1設定温度より高
温のときには、第1電動弁(S1)を開放して、冷却水が
冷却熱交換器(41)を流れるようにし、ステップST12に
移る。従って、起動前に冷却熱交換器(41)において第
1ブラインを冷却する。
In the pre-start control operation of the first circuit (50), first, in step ST11, when the temperature of the first brine before flowing into the first tank (53) is higher than the first set temperature, (1) Open the motor-operated valve (S1) to allow the cooling water to flow through the cooling heat exchanger (41), and then proceed to step ST12. Therefore, the first brine is cooled in the cooling heat exchanger (41) before starting.

【0097】ステップST12では、第1ブラインポンプ
(54)の駆動を開始し、第1回路(50)に第1ブライン
を循環させて、ステップST13に移る。つまり、圧縮機
(21)を起動する前に第1ブラインを循環させることに
より、第1ヒータ(52)に所定の第1ブラインを流し、
該第1ヒータ(52)を冷却して余熱を取り除く。
In step ST12, the driving of the first brine pump (54) is started, the first brine is circulated through the first circuit (50), and the routine goes to step ST13. That is, by circulating the first brine before starting the compressor (21), a predetermined first brine is caused to flow through the first heater (52),
The first heater (52) is cooled to remove residual heat.

【0098】ステップST13では、第2電動弁(S2)を開
放して、凝縮器(22)に冷却水を流し、ステップST14に
移る。つまり、圧縮機(21)の起動前に凝縮器(22)を
冷却することにより、起動時に凝縮器(22)が高温にな
らず、圧縮機(21)の吐出側圧力が過剰に高くなるのを
防止している。
In step ST13, the second motor-operated valve (S2) is opened, cooling water flows into the condenser (22), and the process proceeds to step ST14. That is, by cooling the condenser (22) before starting the compressor (21), the condenser (22) does not become hot at the time of starting, and the discharge pressure of the compressor (21) becomes excessively high. Has been prevented.

【0099】ステップST14では、圧縮機(21)の吸入側
圧力Lpが2Kgf/cm2より低圧となっているか否かを判定
し、吸入側圧力Lpが2Kgf/cm2より低圧のときはステッ
プST15に移り、第1膨張弁(E1)を200パルスだけ開
放する。つまり、圧縮機(21)の停止時に冷媒を回収す
るため、運転開始時には圧縮機(21)の吸入側に冷媒が
なく、低圧が低下する。従って、第1膨張弁(E1)を開
放することによって、圧縮機(21)に冷媒を吸入させ、
吸入側圧力Lpが異常に低下するのを防止している。ま
た、200パルスを越えて第1膨張弁(E1)を開放する
と、液バックが生じ、圧縮機(21)を損傷させてしまう
ため、200パルスだけ開放することにより、液バック
の発生を防止している。
In step ST14, it is determined whether or not the suction side pressure Lp of the compressor (21) is lower than 2 kgf / cm 2. If the suction side pressure Lp is lower than 2 kgf / cm 2, the flow goes to step ST15. Then, the first expansion valve (E1) is opened by 200 pulses. That is, since the refrigerant is collected when the compressor (21) stops, there is no refrigerant on the suction side of the compressor (21) at the start of operation, and the low pressure decreases. Therefore, by opening the first expansion valve (E1), the refrigerant is sucked into the compressor (21),
This prevents the suction side pressure Lp from abnormally lowering. Also, if the first expansion valve (E1) is opened after more than 200 pulses, a liquid back occurs and the compressor (21) is damaged. Therefore, by opening only 200 pulses, the occurrence of the liquid back is prevented. ing.

【0100】一方、吸入側圧力Lpが2Kgf/cm2以上のと
きは、第1膨張弁(E1)を閉じたままにしておき、運転
開始後に第1膨張弁(E1)を開放する。
On the other hand, when the suction side pressure Lp is 2 kgf / cm 2 or more, the first expansion valve (E1) is kept closed, and after the operation is started, the first expansion valve (E1) is opened.

【0101】そして、圧縮機(21)を起動して、第1回
路(50)の運転を行う。
Then, the compressor (21) is started to operate the first circuit (50).

【0102】次に、第2回路(60)の起動前制御動作に
ついて、図3を参照しながら説明する。
Next, the pre-startup control operation of the second circuit (60) will be described with reference to FIG.

【0103】この第2回路(60)の起動前制御動作で
は、先ず、ステップST21において、第2電動弁(S2)を
開放して凝縮器(22)に冷却水を流すことにより、凝縮
器(22)を冷却し、ステップST22に移る。つまり、圧縮
機(21)の起動前に凝縮器(22)を冷却することによ
り、圧縮機(21)の起動時に吐出側圧力が過剰に上昇す
るのを防止している。ステップST22では、第2ブライン
ポンプ(64)の駆動を開始し、第2回路(60)に第2ブ
ラインを循環させて、ステップST23に移る。つまり、第
2ブラインを循環させることにより、第2ヒータ(62)
に所定の第2ブラインを流して余熱を取り除く。
In the pre-start control operation of the second circuit (60), first, in step ST21, the second motor-operated valve (S2) is opened to allow the cooling water to flow through the condenser (22). 22) is cooled, and the routine goes to Step ST22. That is, by cooling the condenser (22) before starting the compressor (21), the discharge-side pressure is prevented from excessively increasing when the compressor (21) is started. In step ST22, the driving of the second brine pump (64) is started, the second brine is circulated in the second circuit (60), and the process proceeds to step ST23. That is, by circulating the second brine, the second heater (62)
A predetermined second brine is flowed through to remove residual heat.

【0104】ステップST23では、圧縮機(21)の吸入側
圧力Lpが2Kgf/cm2より低圧となっているか否かを判定
し、吸入側圧力Lpが2Kgf/cm2より低圧のときはステッ
プST24に移り、第2膨張弁(E2)を200パルスだけ開
放する。つまり、第2膨張弁(E2)を200パルスだけ
開放することにより、液バックの発生を防止すると共
に、吸入側に所定量の冷媒を流し、吸入側圧力Lpが異常
に低下するのを防止している。
In step ST23, it is determined whether or not the suction side pressure Lp of the compressor (21) is lower than 2 kgf / cm 2. If the suction side pressure Lp is lower than 2 kgf / cm 2 , the flow goes to step ST24. Then, the second expansion valve (E2) is opened by 200 pulses. That is, by opening the second expansion valve (E2) by 200 pulses, the occurrence of liquid back is prevented, and a predetermined amount of refrigerant is caused to flow to the suction side, thereby preventing the suction side pressure Lp from abnormally lowering. ing.

【0105】一方、吸入側の圧力Lpが2Kgf/cm2以上の
ときには、第2膨張弁(E2)を閉じたままにしておき、
運転開始後に第2膨張弁(E2)を開放する。
On the other hand, when the pressure Lp on the suction side is 2 kgf / cm 2 or more, the second expansion valve (E2) is kept closed.
After the start of operation, the second expansion valve (E2) is opened.

【0106】そして、圧縮機(21)を起動して、第2回
路(60)の運転を行う。
Then, the compressor (21) is started to operate the second circuit (60).

【0107】《圧縮機の停止中における冷媒加熱制御動
作》上記コントローラ(80)は、圧縮機(21)の停止中
に冷媒加熱制御を行う。ここでは、その内容について、
図4を参照しながら説明する。
<< Operation of Refrigerant Heating While Compressor is Stopped >> The controller (80) performs refrigerant heating control while the compressor (21) is stopped. Here, about the contents,
This will be described with reference to FIG.

【0108】圧縮機(21)を停止させる際には、先ず、
ステップST31において、第2電動弁(S2)を閉鎖するこ
とにより、凝縮器(22)への冷却水の流入を止め、ステ
ップST32において、第1〜第4膨張弁(E1,…)を全て
閉鎖することにより、第1蒸発器(23)における第1ブ
ラインの冷却を停止すると共に、第2蒸発器(24)にお
ける第2ブラインの冷却を停止し、ステップST33におい
て、圧縮機(21)を停止させる。
When stopping the compressor (21), first,
In step ST31, the second electric valve (S2) is closed to stop the flow of the cooling water into the condenser (22), and in step ST32, all of the first to fourth expansion valves (E1,...) Are closed. By doing so, the cooling of the first brine in the first evaporator (23) is stopped, and the cooling of the second brine in the second evaporator (24) is stopped. In step ST33, the compressor (21) is stopped. Let it.

【0109】そして、ステップST34に移り、圧縮機(2
1)の吐出側温度t2が75℃より高温となっているか否か
を判定し、吐出側温度t2が75℃以下のときは、ステップ
ST35に移る。ステップST35では、吐出側温度t2が70℃よ
り低温となっているか否かを判定し、吐出側温度t2が70
℃より低温となっているときは、ステップST37に移り、
クランクケースヒータ(21a)をオンさせ、圧縮機(2
1)の内部の冷媒を加熱して、リターンする。
Then, the process shifts to step ST34 where the compressor (2
It is determined whether the discharge side temperature t2 of 1) is higher than 75 ° C. If the discharge side temperature t2 is 75 ° C or less, the step is performed.
Move on to ST35. In step ST35, it is determined whether or not the discharge side temperature t2 is lower than 70 ° C.
If the temperature is lower than ℃, proceed to step ST37.
Turn on the crankcase heater (21a) and turn on the compressor (2
Heats the refrigerant inside 1) and returns.

【0110】一方、吐出側温度t2が75℃より高温となっ
ているときは、ステップST34の判定がYESとなって、
ステップST36に移り、クランクケースヒータ(21a)を
オフさせる。
On the other hand, when the discharge side temperature t2 is higher than 75 ° C., the determination in step ST34 becomes YES, and
Moving to step ST36, the crankcase heater (21a) is turned off.

【0111】つまり、圧縮機(21)の内部の冷媒温度が
一定範囲内に維持することにより、冷媒の冷凍機油への
溶け込みを防止すると共に、モータコイルの焼損や冷凍
機油の劣化を防止している。
That is, by maintaining the temperature of the refrigerant inside the compressor (21) within a certain range, it is possible to prevent the refrigerant from melting into the refrigerating machine oil and to prevent burning of the motor coil and deterioration of the refrigerating machine oil. I have.

【0112】−実施形態の効果−本実施形態によれば、
圧縮機(21)の起動前に凝縮器(22)を冷却するように
したために、運転開始時に、凝縮器(22)の温度が上昇
して圧縮機(21)の吐出側圧力が過剰に高くなるのを防
止することができ、信頼性の高い運転開始を行うことが
できる。
-Effects of Embodiment- According to this embodiment,
Since the condenser (22) is cooled before starting the compressor (21), the temperature of the condenser (22) rises at the start of operation and the discharge pressure of the compressor (21) becomes excessively high. Can be prevented, and highly reliable operation can be started.

【0113】また、圧縮機(21)の吸入側圧力が所定圧
力より低圧のときに、該圧縮機(21)の起動前に第1膨
張弁(E1)又は第2膨張弁(E2)を開放するようにした
ために、運転開始時に、圧縮機(21)にすぐに冷媒が吸
入されて、低圧が異常に低下するのを防止することがで
き、信頼性の高い運転開始を行うことができる。
When the suction pressure of the compressor (21) is lower than a predetermined pressure, the first expansion valve (E1) or the second expansion valve (E2) is opened before the compressor (21) is started. With this configuration, it is possible to prevent the refrigerant from being immediately sucked into the compressor (21) at the start of the operation, thereby preventing the low pressure from being abnormally reduced, and to start the operation with high reliability.

【0114】また、圧縮機(21)の起動前に第1ブライ
ン又は第2ブラインを循環させるようにしたために、第
1ヒータ(52)又は第2ヒータ(62)の余熱を取り除く
ことにより、第1ヒータ(52)又は第2ヒータ(62)の
異常昇温を防止することができ、信頼性の高い運転開始
を行うことができる。
Since the first brine or the second brine is circulated before the compressor (21) is started, the residual heat of the first heater (52) or the second heater (62) is removed. An abnormal temperature rise of the first heater (52) or the second heater (62) can be prevented, and a highly reliable operation can be started.

【0115】また、利用側に供給する第1ブラインの温
度が第1設定温度より高温のときに、冷却熱交換器(4
1)において第1ブラインを冷却するようにしたため
に、運転開始時に、確実に第1設定温度の第1ブライン
を利用側に供給することができ、信頼性の高い運転開始
を行うことができる。
When the temperature of the first brine supplied to the use side is higher than the first set temperature, the cooling heat exchanger (4
Since the first brine is cooled in 1), the first brine at the first set temperature can be reliably supplied to the use side at the start of the operation, and the operation can be started with high reliability.

【0116】また、圧縮機(21)の停止中に、冷媒の温
度を一定の範囲内に維持するようにしたために、圧縮機
(21)の冷媒が冷凍機油に溶け込むのを防止し、圧縮機
(21)の起動不良の発生を防止するので、信頼性の高い
運転開始を行うことができる。
Further, since the temperature of the refrigerant is kept within a certain range while the compressor (21) is stopped, the refrigerant of the compressor (21) is prevented from melting into the refrigerating machine oil, and Since the occurrence of the start failure in (21) is prevented, the operation can be started with high reliability.

【0117】<発明のその他の実施の形態>本発明は、
上記実施形態と異なり、第2回路(60)を省略し、第1
回路(50)のみを備える構成にしてもよい。斯かる構成
において、コントローラ(80)は、高圧制御部(81)、
第1低圧制御部(82)、又は第1開始制御部(84)のう
ち、何れか1つのみを備える構成にしてもよい。
<Other Embodiments of the Invention>
Unlike the above embodiment, the second circuit (60) is omitted and the first circuit (60) is omitted.
A configuration including only the circuit (50) may be employed. In such a configuration, the controller (80) includes a high-voltage control unit (81),
It may be configured to include only one of the first low-pressure control unit (82) and the first start control unit (84).

【0118】また、第1回路(50)を省略し、第2回路
(60)のみを備える構成にしてもよい。斯かる構成にお
いて、コントローラ(80)は、高圧制御部(81)、第2
低圧制御部(83)、又は第2開始制御部(85)のうち、
何れか1つのみを備える構成にしてもよい。また、第1
回路(50)を省略すると共に、冷却熱交換器(41)を省
略する構成にしてもよい。
Further, the configuration may be such that the first circuit (50) is omitted and only the second circuit (60) is provided. In such a configuration, the controller (80) includes the high-voltage controller (81)
Of the low pressure control unit (83) or the second start control unit (85),
It may be configured to include only one of them. Also, the first
The circuit (50) may be omitted, and the cooling heat exchanger (41) may be omitted.

【0119】また、上記実施形態のコントローラ(80)
は、高圧制御部(81)を省略する構成にしてもよい。
The controller (80) of the above embodiment
May have a configuration in which the high-pressure controller (81) is omitted.

【0120】また、上記実施形態のコントローラ(80)
は、第1低圧制御部(82)及び第2低圧制御部(83)の
少なくとも何れか一方を省略する構成にしてもよい。
The controller (80) of the above embodiment
May be configured to omit at least one of the first low-pressure control section (82) and the second low-pressure control section (83).

【0121】また、上記実施形態のコントローラ(80)
は、第1開始制御部(84)及び第2開始制御部(85)の
少なくとも何れか一方を省略する構成にしてもよい。
The controller (80) of the above embodiment
May be configured to omit at least one of the first start control unit (84) and the second start control unit (85).

【0122】また、第1から第9の発明において、上記
実施形態のコントローラ(80)は、冷媒加熱制御部(8
6)を省略する構成にしてもよい。
In the first to ninth aspects of the present invention, the controller (80) of the above embodiment includes a refrigerant heating controller (8).
6) may be omitted.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施形態に係るチリングユニットの全体構成を
示す配管系統図である。
FIG. 1 is a piping diagram showing an overall configuration of a chilling unit according to an embodiment.

【図2】実施形態に係る第1回路の起動前制御を示すフ
ロー図である。
FIG. 2 is a flowchart illustrating pre-start control of a first circuit according to the embodiment.

【図3】実施形態に係る第2回路の起動前制御を示すフ
ロー図である。
FIG. 3 is a flowchart illustrating pre-start control of a second circuit according to the embodiment.

【図4】実施形態に係る圧縮機の停止中制御を示すフロ
ー図である。
FIG. 4 is a flowchart showing control during stoppage of the compressor according to the embodiment.

【符号の説明】[Explanation of symbols]

(20) 冷媒回路 (21) 圧縮機 (21a) クランクケースヒータ (22) 凝縮器 (23) 第1蒸発器 (24) 第2蒸発器 (40) 冷却水回路 (41) 冷却熱交換器 (50) 第1回路 (60) 第2回路 (70) 利用側系統 (71) 膨張機構 (72) 蒸発器 (73) 加熱手段 (74) 低圧制御手段 (75) 開始制御手段 (81) 高圧制御部 (82) 第1低圧制御部 (83) 第2低圧制御部 (84) 第1開始制御部 (85) 第2開始制御部 (86) 冷媒加熱制御部 (E1) 第1膨張弁 (E2) 第2膨張弁 (20) Refrigerant circuit (21) Compressor (21a) Crankcase heater (22) Condenser (23) First evaporator (24) Second evaporator (40) Cooling water circuit (41) Cooling heat exchanger (50) ) First circuit (60) Second circuit (70) User side system (71) Expansion mechanism (72) Evaporator (73) Heating means (74) Low pressure control means (75) Start control means (81) High pressure control section ( 82) 1st low pressure control section (83) 2nd low pressure control section (84) 1st start control section (85) 2nd start control section (86) Refrigerant heating control section (E1) 1st expansion valve (E2) 2nd Expansion valve

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) F25D 17/02 303 F25D 17/02 303 Fターム(参考) 3L045 AA01 AA02 BA00 CA01 DA02 FA02 HA03 HA07 JA14 LA07 LA17 MA01 MA08 PA03 PA05──────────────────────────────────────────────────続 き Continued on the front page (51) Int.Cl. 7 Identification symbol FI theme coat ゛ (reference) F25D 17/02 303 F25D 17/02 303 F term (reference) 3L045 AA01 AA02 BA00 CA01 DA02 FA02 HA03 HA07 JA14 LA07 LA17 MA01 MA08 PA03 PA05

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】 圧縮機(21)と凝縮器(22)と膨張機構
(71)と蒸発器(72)とが接続されて冷媒が循環する冷
媒回路(20)と、 冷却媒体が流れ、該冷却媒体が上記凝縮器(22)に冷熱
を供給する冷却系統(40)と、 上記冷媒回路(20)の蒸発器(72)で冷却された熱媒体
を利用側に供給する利用側系統(70)と、 運転開始時に、上記圧縮機(21)の起動前に所定の冷却
媒体が凝縮器(22)を流れるように上記冷却系統(40)
を制御する高圧制御手段(81)とを備えていることを特
徴とする冷凍装置。
1. A refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. A cooling system (40) for supplying a cooling medium to the condenser (22) with a cooling medium; and a utilization side system (70) for supplying the heating medium cooled by the evaporator (72) of the refrigerant circuit (20) to the utilization side. At the start of operation, the cooling system (40) so that a predetermined cooling medium flows through the condenser (22) before the compressor (21) is started.
And a high-pressure control means (81) for controlling pressure.
【請求項2】 圧縮機(21)と凝縮器(22)と膨張機構
(71)と蒸発器(72)とが接続されて冷媒が循環する冷
媒回路(20)と、 冷却媒体が流れ、該冷却媒体が上記凝縮器(22)に冷熱
を供給する冷却系統(40)と、 上記冷媒回路(20)の蒸発器(72)で冷却された熱媒体
を利用側に供給する利用側系統(70)と、 運転開始時に、上記圧縮機(21)の吸入側圧力が所定圧
力より低いと、該圧縮機(21)の起動前に、上記膨張機
構(71)を連通させる低圧制御手段(74)とを備えてい
ることを特徴とする冷凍装置。
2. A refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. A cooling system (40) for supplying a cooling medium to the condenser (22) with a cooling medium; and a utilization side system (70) for supplying the heating medium cooled by the evaporator (72) of the refrigerant circuit (20) to the utilization side. If the suction side pressure of the compressor (21) is lower than a predetermined pressure at the start of operation, a low pressure control means (74) for communicating the expansion mechanism (71) before starting the compressor (21). A refrigeration apparatus comprising:
【請求項3】 圧縮機(21)と凝縮器(22)と膨張機構
(71)と蒸発器(72)とが接続されて冷媒が循環する冷
媒回路(20)と、 冷却媒体が流れ、該冷却媒体が上記凝縮器(22)に冷熱
を供給する冷却系統(40)と、 上記冷媒回路(20)の蒸発器(72)で冷却された熱媒体
を利用側に供給すると共に、熱媒体が過冷却されると該
熱媒体を加熱する加熱手段(73)を備えた利用側系統
(70)と、 運転開始時に、圧縮機(21)の起動前に所定の熱媒体が
上記加熱手段(73)を流れるように利用側系統(70)の
循環を開始する開始制御手段(75)とを備えていること
を特徴とする冷凍装置。
3. A refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. A cooling system (40) in which a cooling medium supplies cold energy to the condenser (22); and a heating medium cooled by an evaporator (72) of the refrigerant circuit (20) is supplied to a user side, and the heating medium is A use-side system (70) provided with a heating means (73) for heating the heat medium when it is supercooled; and at the start of operation, a predetermined heat medium is supplied to the heating means (73) before starting the compressor (21). And a start control means (75) for starting circulation of the use side system (70) so as to flow through the refrigerating apparatus.
【請求項4】 圧縮機(21)と凝縮器(22)と膨張機構
(71)と蒸発器(72)とが接続されて冷媒が循環する冷
媒回路(20)と、 冷却媒体が流れ、該冷却媒体が上記凝縮器(22)に冷熱
を供給すると共に、冷却熱交換器(41)を有する冷却系
統(40)と、 上記冷却熱交換器(41)で、又は冷却熱交換器(41)と
上記冷媒回路(20)の蒸発器(72)とで冷却された熱媒
体を利用側に供給する利用側系統(70)と、 上記圧縮機(21)の起動前に、所定の冷却媒体が凝縮器
(22)を流れるように上記冷却系統(40)を制御する高
圧制御手段(81)とを備えていることを特徴とする冷凍
装置。
4. A refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates. A cooling medium for supplying cold to the condenser (22), and a cooling system (40) having a cooling heat exchanger (41); and a cooling heat exchanger (41) or a cooling heat exchanger (41). And a use side system (70) for supplying the heat medium cooled by the evaporator (72) of the refrigerant circuit (20) to the use side, and a predetermined cooling medium before starting the compressor (21). A refrigeration system comprising high-pressure control means (81) for controlling the cooling system (40) so as to flow through the condenser (22).
【請求項5】 圧縮機(21)と凝縮器(22)と膨張機構
(71)と蒸発器(72)とが接続されて冷媒が循環する冷
媒回路(20)と、 冷却媒体が流れ、該冷却媒体が上記凝縮器(22)に冷熱
を供給すると共に、冷却熱交換器(41)を有する冷却系
統(40)と、 上記冷却熱交換器(41)で、又は冷却熱交換器(41)と
上記冷媒回路(20)の蒸発器(72)とで冷却された熱媒
体を利用側に供給する利用側系統(70)と、 上記圧縮機(21)の吸入側圧力が所定圧力より低いと、
該圧縮機(21)の起動前に、上記膨張機構(71)を連通
させる低圧制御手段(74)とを備えていることを特徴と
する冷凍装置。
5. A refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates, a cooling medium flows, A cooling medium for supplying cold to the condenser (22), and a cooling system (40) having a cooling heat exchanger (41); and a cooling heat exchanger (41) or a cooling heat exchanger (41). A use side system (70) for supplying a heat medium cooled by the evaporator (72) of the refrigerant circuit (20) to the use side, and a suction side pressure of the compressor (21) being lower than a predetermined pressure. ,
A refrigeration system comprising: a low-pressure control means (74) for communicating the expansion mechanism (71) before the compressor (21) is started.
【請求項6】 圧縮機(21)と凝縮器(22)と膨張機構
(71)と蒸発器(72)とが接続されて冷媒が循環する冷
媒回路(20)と、 冷却媒体が流れ、該冷却媒体が上記凝縮器(22)に冷熱
を供給すると共に、冷却熱交換器(41)を有する冷却系
統(40)と、 上記冷却熱交換器(41)で、又は冷却熱交換器(41)と
上記冷媒回路(20)の蒸発器(72)とで冷却された熱媒
体を利用側に供給すると共に、熱媒体が過冷却されると
該熱媒体を加熱する加熱手段(73)を備えた利用側系統
(70)と、 運転開始時に、少なくとも圧縮機(21)の起動前に所定
の熱媒体が上記加熱手段(73)を流れるように利用側系
統(70)の循環を開始する開始制御手段(75)とを備え
ていることを特徴とする冷凍装置。
6. A refrigerant circuit (20) in which a compressor (21), a condenser (22), an expansion mechanism (71), and an evaporator (72) are connected and a refrigerant circulates, a cooling medium flows, A cooling medium for supplying cold to the condenser (22), and a cooling system (40) having a cooling heat exchanger (41); and a cooling heat exchanger (41) or a cooling heat exchanger (41). And a heating means (73) for supplying the heat medium cooled by the evaporator (72) of the refrigerant circuit (20) to the use side and heating the heat medium when the heat medium is supercooled. Start control for starting the circulation of the use-side system (70) so that a predetermined heat medium flows through the heating means (73) at least before the start of the compressor (21) at the start of operation; Means (75).
【請求項7】 請求項6において、 開始制御手段(75)は、利用側系統(70)の循環を開始
すると共に、利用側に供給する熱媒体の温度が所定温度
より高温であると、冷却媒体が冷却熱交換器(41)を流
れるように冷却系統(40)を制御することを特徴とする
冷凍装置。
7. The start control means (75) according to claim 6, wherein the start control means (75) starts circulation of the use side system (70), and performs cooling if the temperature of the heat medium supplied to the use side is higher than a predetermined temperature. A refrigeration system characterized by controlling a cooling system (40) so that a medium flows through a cooling heat exchanger (41).
【請求項8】 請求項1から3の何れか1項において、 利用側系統(70)は、所定温度に冷却された低温側の熱
媒体を利用側に供給する低温側回路(60)に構成され、 冷媒回路(20)の膨張機構(71)及び蒸発器(72)は、
低温側回路(60)の熱媒体を冷却する低温側膨張機構
(E2)及び低温側蒸発器(24)に構成される一方、 上記冷媒回路(20)には、低温側膨張機構(E2)及び低
温側蒸発器(24)と並列に高温側膨張機構(E1)及び高
温側蒸発器(23)が設けられ、 該高温側蒸発器(23)には、低温側回路(60)の低温側
の熱媒体より高温に冷却された高温側の熱媒体を利用側
に供給する高温側回路(50)が接続され、 該高温側回路(50)は、冷却系統(40)に設けられた冷
却熱交換器(41)で、又は該冷却熱交換器(41)と冷媒
回路(20)の高温側蒸発器(23)とで冷却されるように
構成されていることを特徴とする冷凍装置。
8. The low-side circuit (60) according to any one of claims 1 to 3, wherein the low-side circuit (70) supplies the low-temperature side heat medium cooled to a predetermined temperature to the low-side side. The expansion mechanism (71) and the evaporator (72) of the refrigerant circuit (20)
The low-temperature side expansion mechanism (E2) for cooling the heat medium of the low-temperature side circuit (60) and the low-temperature side evaporator (24), while the refrigerant circuit (20) includes the low-temperature side expansion mechanism (E2) and A high-temperature-side expansion mechanism (E1) and a high-temperature-side evaporator (23) are provided in parallel with the low-temperature-side evaporator (24), and the high-temperature-side evaporator (23) has a low-temperature side circuit (60). A high-temperature circuit (50) for supplying a high-temperature heat medium cooled to a temperature higher than the heat medium to the use side is connected, and the high-temperature circuit (50) is provided with a cooling heat exchange provided in a cooling system (40). A refrigerating apparatus characterized by being cooled by a cooler (41) or by the cooling heat exchanger (41) and the high-temperature side evaporator (23) of the refrigerant circuit (20).
【請求項9】 請求項4から7の何れか1項において、 利用側系統(70)は、所定温度に冷却された高温側の熱
媒体を利用側に供給する高温側回路(50)に構成され、 冷媒回路(20)の膨張機構(71)及び蒸発器(72)は、
高温側回路(50)の熱媒体を冷却する高温側膨張機構
(E1)及び高温側蒸発器(23)に構成される一方、 上記冷媒回路(20)には、高温側膨張機構(E1)及び高
温側蒸発器(23)と並列に低温側膨張機構(E2)及び低
温側蒸発器(24)が設けられ、 該低温側蒸発器(24)には、高温側回路(50)の高温側
の熱媒体より低温に冷却された低温側の熱媒体を利用側
に供給する低温側回路(60)が接続されていることを特
徴とする冷凍装置。
9. The high temperature side circuit (50) according to any one of claims 4 to 7, wherein the usage side system (70) supplies a high temperature side heat medium cooled to a predetermined temperature to the usage side. The expansion mechanism (71) and the evaporator (72) of the refrigerant circuit (20)
The high temperature side expansion mechanism (E1) for cooling the heat medium of the high temperature side circuit (50) and the high temperature side evaporator (23), while the refrigerant circuit (20) includes the high temperature side expansion mechanism (E1) A low-temperature side expansion mechanism (E2) and a low-temperature side evaporator (24) are provided in parallel with the high-temperature side evaporator (23), and the low-temperature side evaporator (24) is connected to the high-temperature side circuit (50). A refrigeration apparatus, wherein a low-temperature side circuit (60) for supplying a low-temperature side heat medium cooled to a lower temperature than a heat medium to a use side is connected.
【請求項10】 請求項1から9の何れか1項におい
て、 冷媒回路(20)の圧縮機(21)は、該圧縮機(21)の内
部の冷媒を加熱する冷媒加熱手段(21a)が設けられる
一方、 上記圧縮機(21)の停止中に、該圧縮機(21)の吐出側
温度が第1の所定温度より低温になると、上記冷媒加熱
手段(21a)を加熱動作させ、且つ圧縮機(21)の吐出
側温度が第1の所定温度より高い第2の所定温度より高
温になると、上記冷媒加熱手段(21a)の加熱を停止さ
せる冷媒加熱制御手段(86)を備えていることを特徴と
する冷凍装置。
10. The compressor (21) of the refrigerant circuit (20) according to any one of claims 1 to 9, wherein the refrigerant heating means (21a) for heating the refrigerant inside the compressor (21) includes: On the other hand, if the discharge side temperature of the compressor (21) becomes lower than the first predetermined temperature while the compressor (21) is stopped, the refrigerant heating means (21a) is heated and compressed. A refrigerant heating control means (86) for stopping the heating of the refrigerant heating means (21a) when the discharge side temperature of the machine (21) becomes higher than a second predetermined temperature higher than the first predetermined temperature. A refrigeration apparatus characterized by the above-mentioned.
JP2000308873A 2000-10-10 2000-10-10 Refrigeration equipment Expired - Fee Related JP3632124B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000308873A JP3632124B2 (en) 2000-10-10 2000-10-10 Refrigeration equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000308873A JP3632124B2 (en) 2000-10-10 2000-10-10 Refrigeration equipment

Publications (2)

Publication Number Publication Date
JP2002115920A true JP2002115920A (en) 2002-04-19
JP3632124B2 JP3632124B2 (en) 2005-03-23

Family

ID=18789123

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000308873A Expired - Fee Related JP3632124B2 (en) 2000-10-10 2000-10-10 Refrigeration equipment

Country Status (1)

Country Link
JP (1) JP3632124B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005351515A (en) * 2004-06-09 2005-12-22 Daikin Ind Ltd Refrigeration device
JP2007127393A (en) * 2005-11-07 2007-05-24 Sanyo Electric Co Ltd Air conditioner
WO2008007586A1 (en) * 2006-07-10 2008-01-17 Daikin Industries, Ltd. Air conditioning control device
JP2008057862A (en) * 2006-08-31 2008-03-13 Hoshizaki Electric Co Ltd Ice making machine
JP2010203663A (en) * 2009-03-03 2010-09-16 Ntt Facilities Inc Water cooling type air conditioning system, air conditioner and method of operating the system
WO2011113045A2 (en) * 2010-03-12 2011-09-15 Biofuels Automation, Inc. Heat transfer processes and equipment for industrial applications
JP5178842B2 (en) * 2008-10-29 2013-04-10 三菱電機株式会社 Air conditioner
JP2016138696A (en) * 2015-01-27 2016-08-04 オリオン機械株式会社 Temperature control device
US10648713B2 (en) 2017-02-08 2020-05-12 Titan, Llc Industrial heat transfer unit

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005351515A (en) * 2004-06-09 2005-12-22 Daikin Ind Ltd Refrigeration device
JP2007127393A (en) * 2005-11-07 2007-05-24 Sanyo Electric Co Ltd Air conditioner
US8033125B2 (en) 2006-07-10 2011-10-11 Daikin Industries, Ltd. Air conditioner control device
WO2008007586A1 (en) * 2006-07-10 2008-01-17 Daikin Industries, Ltd. Air conditioning control device
CN101490478B (en) * 2006-07-10 2012-04-18 大金工业株式会社 Air conditioning control device
JP2008057862A (en) * 2006-08-31 2008-03-13 Hoshizaki Electric Co Ltd Ice making machine
JP5178842B2 (en) * 2008-10-29 2013-04-10 三菱電機株式会社 Air conditioner
US9958175B2 (en) 2008-10-29 2018-05-01 Mitsubishi Electric Corporation Air-conditioning apparatus
JP2010203663A (en) * 2009-03-03 2010-09-16 Ntt Facilities Inc Water cooling type air conditioning system, air conditioner and method of operating the system
WO2011113045A2 (en) * 2010-03-12 2011-09-15 Biofuels Automation, Inc. Heat transfer processes and equipment for industrial applications
WO2011113045A3 (en) * 2010-03-12 2011-12-29 Biofuels Automation, Inc. Heat transfer processes and equipment for industrial applications
JP2016138696A (en) * 2015-01-27 2016-08-04 オリオン機械株式会社 Temperature control device
US10648713B2 (en) 2017-02-08 2020-05-12 Titan, Llc Industrial heat transfer unit

Also Published As

Publication number Publication date
JP3632124B2 (en) 2005-03-23

Similar Documents

Publication Publication Date Title
JP5639477B2 (en) CO2 refrigerant vapor compression system
KR101192346B1 (en) Heat pump type speed heating apparatus
EP2096378A1 (en) Refrigeration cycle device
KR101155497B1 (en) Heat pump type speed heating apparatus
WO2006120922A1 (en) Refrigeration cycle system
GB2567333A (en) Heat pump device
JP5140398B2 (en) Refrigeration equipment
JP4317793B2 (en) Cooling system
JP2012093054A (en) Refrigerating apparatus
JP2002115920A (en) Refrigerating device
JPH0849930A (en) Heat pump equipment
JP2010084975A (en) Heating device
JP2008276397A (en) Cooling/heating device and automatic vending machine
JP5056026B2 (en) vending machine
JP2005214442A (en) Refrigerator
JP2002022300A (en) Refrigeration apparatus
JP2002022337A (en) Liquid temperature controller of cooler
JP3651370B2 (en) Refrigeration equipment
JP5247335B2 (en) Heating system
JP6455752B2 (en) Refrigeration system
JP3503583B2 (en) Refrigeration equipment
KR101212686B1 (en) Heat pump type speed heating apparatus
JP3721963B2 (en) Refrigeration equipment
JP2008107880A (en) Automatic vending machine
JP3485080B2 (en) Refrigeration equipment

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040831

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041207

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090107

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100107

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100107

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110107

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120107

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130107

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130107

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees