JP2002092094A - Distributed production and selling management system and its method - Google Patents

Distributed production and selling management system and its method

Info

Publication number
JP2002092094A
JP2002092094A JP2000276016A JP2000276016A JP2002092094A JP 2002092094 A JP2002092094 A JP 2002092094A JP 2000276016 A JP2000276016 A JP 2000276016A JP 2000276016 A JP2000276016 A JP 2000276016A JP 2002092094 A JP2002092094 A JP 2002092094A
Authority
JP
Japan
Prior art keywords
production
sales management
management system
sales
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000276016A
Other languages
Japanese (ja)
Inventor
Hideyori Kurihara
英資 栗原
Tsutomu Morioka
務 森岡
Hiroyuki Iimuro
弘之 飯室
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Teijin Ltd
Original Assignee
Teijin Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Teijin Ltd filed Critical Teijin Ltd
Priority to JP2000276016A priority Critical patent/JP2002092094A/en
Publication of JP2002092094A publication Critical patent/JP2002092094A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce the redundancy of the distributed production and selling management system of each product. SOLUTION: The production plan of respective products is separately performed by systems (12, 14) for performing the production and selling management of the respective products so that it is possible to cope with the demand fluctuation of composite products. Also, the processing of the common part, for example, the part related with shipping is performed by a center system 10 so that it is not necessary to set such processing in the first production and selling management system (12) or the second production and selling management system (14), and that it is not necessary to set any synchronizing mechanism between the first production and selling management system and the second production and selling management system for preventing that the products beyond the inventory are virtually shipped due to the shipping respectively and arbitrarily performed by the first production and selling management system and the second production the selling management system results. Thus, it is possible to eliminate the redundancy of the whole system.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、製品を複数の工程
を使用して生産するための生産販売管理システム及びそ
の方法に関し、特に、前記複数の工程の一部の工程で生
産される第一の製品を原材料として、前記複数の工程の
他の工程で第二の製品を生産するための分散型生産販売
管理システム及びその方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production and sales management system and method for producing a product using a plurality of processes, and more particularly, to a production and sales management system for producing a product using a plurality of processes. The present invention relates to a distributed production / sales management system and a method for producing a second product in another step of the plurality of steps using the above product as a raw material.

【0002】[0002]

【従来の技術】製造業において、品種数が100を越え
るような多品種にわたる製品の生産要求に対して生産計
画を立案する場合には、納期短縮を図りつつ、生産品種
の切り替えにともなう製造準備の段取り費用と在庫費用
などを低減して生産効率を最適化することが大きな課題
である。したがって、そのための生産計画の立て方およ
びシステムが従来より多く提案されている。
2. Description of the Related Art In the manufacturing industry, when a production plan is drafted in response to a production request for a product of a large variety of products of more than 100 types, the production preparation accompanying the switching of the product type while shortening the delivery time is aimed at. A major challenge is to optimize production efficiency by reducing setup costs and inventory costs. Therefore, more methods and systems for making a production plan have been proposed.

【0003】例えば、特開平7−110836号公報に
は、営業部各課からの月単位の生産要求量に重み付けを
行い優先順位を付け、推定在庫および最低必要在庫から
生産要求量の引き当てを行い、必要生産量を生産部門へ
申請する。生産部門は、生産計画に基づき、確定した品
種および日別の入庫予定を通達する。そして、入庫予定
日別にどの課にどれだけ割り当てるという項目データを
挿入し、かつ優先順位データファイルを検索してコンピ
ュータ処理により部課、品種、日別入庫予定ファイルを
作成するシステムが提案されている。
[0003] For example, Japanese Patent Application Laid-Open No. Hei 7-110736 discloses that weights are assigned to production demands on a monthly basis from each section of the sales department, priorities are assigned, and production demands are allocated from estimated stocks and minimum necessary stocks. Apply for the required production volume to the production department. Based on the production plan, the production department notifies the determined product type and daily storage schedule. A system has been proposed in which item data indicating how much is assigned to which section and how much is assigned for each scheduled storage date, and a priority data file is searched to create a department, product, and daily storage scheduled file by computer processing.

【0004】また、特開平7−110835号公報に
は、販売部各課が自分のユーザに対し注文を受けた物品
が何日に出荷可能であるかが判るようにした、物品の生
産要求量の納期紹介・確定システムが提案されている。
そこでは、販売部各課が自分のユーザの注文に基づき、
必要な品種を必要な時に生産要求し、これが何日に出荷
可能であるかをタイムリーに把握でき、納期の出荷日を
容易に確保できることを効果としている。
Japanese Unexamined Patent Publication (Kokai) No. Hei 7-110835 discloses a system for requesting production of an article, which allows each section of the sales department to know on which day an article ordered for its user can be shipped. A delivery date introduction / confirmation system has been proposed.
There, the sales departments are based on their users' orders,
The effect is that a required product is requested for production when needed, and the date on which the product can be shipped can be grasped in a timely manner, and the shipping date of the delivery date can be easily secured.

【0005】さらに、特開平6−162057号公報お
よび特開平6−162058号公報には、コイル状製品
の的確な納期管理を行うために、市場変化によって生じ
る需要家の使用計画の過去の変動バラツキと製造困難さ
によって生じる製造完了予定日の過去の変動バラツキと
から適正在庫をあらかじめ設定する。そして、需要の都
度、適正在庫に不足する量を必要補填量として製造する
方法が提案されている。
Further, Japanese Patent Application Laid-Open Nos. 6-162057 and 6-162058 disclose in the past fluctuations in the usage plan of consumers caused by market changes in order to perform accurate delivery date management of coiled products. The appropriate stock is set in advance based on the past fluctuation variation due to the production completion due to the production difficulty. Then, a method has been proposed in which, each time a demand is made, an amount insufficient for an appropriate stock is used as a necessary supplemental amount.

【0006】特開平10−333708号公報には、複
数の工程が順に並ぶ場合の、原材料や中間原料や生産に
必要な人員数を時間の経過に従い過不足なく算出する生
産管理装置が提案されている。
Japanese Patent Application Laid-Open No. Hei 10-333708 proposes a production management apparatus that calculates the number of raw materials, intermediate raw materials, and the number of personnel required for production in a case where a plurality of processes are arranged in order, with the passage of time. I have.

【0007】特開平6−161512号公報には、運転
する装置の最適な組合せおよびその出力を決定して、最
適な運転計画を立案する方法が提案されている。
Japanese Unexamined Patent Publication No. Hei 6-161512 proposes a method of determining an optimum combination of operating devices and an output thereof to make an optimum operation plan.

【0008】特開平8−190544号公報には、複数
のコンピュータから構成されるシステムにおける情報処
理のコードとデータの関係を一意に保つことを目的とす
る分散処理システムが提案されている。
Japanese Patent Application Laid-Open No. Hei 8-190544 proposes a distributed processing system for maintaining a unique relationship between information processing codes and data in a system including a plurality of computers.

【0009】特開平11−112522号公報には、ロ
ーカルシステムとその統合システムとの間で、いずれか
のシステムの装置の性能や記憶容量の過度の増大を防止
することにより、システムの大規模化、高額化を抑制す
ることができる分散型ビルマネジメントシステムが提案
されている。
Japanese Patent Application Laid-Open No. H11-112522 discloses a technique for increasing the scale of a system between a local system and an integrated system by preventing an excessive increase in the performance or storage capacity of a device in any system. A decentralized building management system capable of suppressing cost increases has been proposed.

【0010】[0010]

【発明が解決しようとする課題】一方、近年ますます市
場が複雑になり、従来の最終製品を原料としてさらに加
工を加えた製品が提供されるようになって来ている。ま
た、これら従来の最終製品と、更に加工を加えた製品を
合わせた複合市場が目まぐるしく変動する傾向にある。
On the other hand, in recent years, the market has become more and more complicated, and products obtained by further processing conventional end products as raw materials have been provided. In addition, the composite market in which these conventional end products are combined with products that have been further processed tends to fluctuate rapidly.

【0011】ここで、上記の各特許出願公開公報に記載
された従来技術を検討すると、第一に、上記特開平7−
110836号公報、上記特開平7−110835号公
報、上記特開平6−162057号公報および特開平6
−162058号公報に記載の技術では、かかる複合市
場に対応した生産販売管理を意図していないため、複合
市場の変動に応じた生産販売管理が困難であるという問
題が生じる。
Here, considering the prior art described in each of the above-mentioned patent application publications, first, the above-mentioned Japanese Patent Application Laid-Open No.
No. 110836, the above-mentioned Japanese Patent Application Laid-Open No. 7-110835, the above-mentioned Japanese Patent Application Laid-Open No. 6-162057, and
The technology disclosed in Japanese Patent No. 162058 does not intend to perform production / sales management corresponding to such a complex market, so that there arises a problem that it is difficult to perform production / sales management according to changes in the complex market.

【0012】又、上記特開平10−333708号公
報、上記特開平6−161512号公報記載の技術で
も、実際の資源推移と生産計画上の資源推移を比較して
生産計画の精度向上を図ることはできるが、この生産計
画に従って生産した製品の生産販売計画処理を意図して
いないため、複合市場の変動に応じた生産販売管理が困
難であるという問題が生じる。
Also, with the techniques described in JP-A-10-333708 and JP-A-6-161512, the accuracy of the production plan is improved by comparing the actual resource transition with the resource transition in the production plan. However, since the production and sales plan processing of products produced according to this production plan is not intended, there arises a problem that it is difficult to manage the production and sales according to the fluctuation of the complex market.

【0013】特開平8−190544号公報では、デー
タを識別するコードをシステム内で一意に割り付ける
が、このような方法は、例えば同一の製品を複数の工程
で生産する場合の工程ごとに配置された分散処理システ
ムでは製品を識別するコードを一意に割り付けることが
できるので有効であるが、異なる製品を複数の工程で生
産する場合には複数の工程に亘って異なる製品を識別す
るコードが(異なる製品の数)*(複数の工程の数)だ
け存在することになり、実用するには適さない。
In Japanese Patent Application Laid-Open No. 8-190544, a code for identifying data is uniquely assigned in a system. Such a method is arranged, for example, for each step when the same product is produced in a plurality of steps. A distributed processing system is effective because a code for identifying a product can be uniquely assigned. However, when a different product is produced in a plurality of processes, a code for identifying a different product in a plurality of processes is different. Only the number of products) * (the number of multiple steps) is present, which is not suitable for practical use.

【0014】更に、特開平11−112522号公報に
は、ローカルシステムでデータを短周期に収集し短期的
に保存し、センターシステムでデータを長周期に収集し
長期的に保存することでシステムの大規模化、高額化を
防ぐ技術が提案されているが、視点が時間のみであり、
時間以外の生産販売管理の視点たとえば製品の受注、製
品の出荷を意図していないため、複合市場の変動に応じ
た生産販売管理が困難であるという問題が生じる。
Further, Japanese Patent Application Laid-Open No. 11-112522 discloses that a local system collects data in a short cycle and stores it for a short period of time, and a center system collects data in a long cycle and stores the data for a long period of time. Techniques for preventing large-scale and high-priced money have been proposed, but the viewpoint is only time,
From the viewpoint of production and sales management other than the time, for example, it is not intended to receive an order for a product or to ship a product.

【0015】したがって、本発明の目的は、第一の生産
工程で生産される製品の生産販売管理と、第一の生産工
程で生産される製品の一部を用いて第二の生産工程で生
産される製品の生産販売管理を行うための複数のコンピ
ュータシステムであって、第一の生産工程で生産される
製品と第二の生産工程で生産される製品が全く異なるに
もかかわらず生産販売管理に共通な項目をセンターシス
テムで行い、第一および第二の生産工程で独自の項目を
おのおののローカルシステムで行うことでシステム全体
の冗長性を削減した分散型生産販売管理システムおよび
その方法を提供することにある。
[0015] Therefore, an object of the present invention is to control the production and sales of products produced in the first production process, and to produce in the second production process using a part of the products produced in the first production process. A plurality of computer systems for performing production and sales management of products to be manufactured and managed, even though products produced in the first production process and products produced in the second production process are completely different. Provide a distributed production and sales management system and method that reduce the redundancy of the entire system by performing common items in the center system and performing unique items in the first and second production processes in each local system. Is to do.

【0016】しかも、本発明の目的は、第一の生産工程
の製品および第二の生産工程の製品のそれぞれの需要が
変動した場合にも容易に生産販売管理を行うことのでき
る分散型生産販売管理システムおよびその方法を提供す
ることにある。
Further, an object of the present invention is to provide a distributed production and sales system capable of easily performing production and sales management even when the demand of each of the products of the first production process and the products of the second production process fluctuates. A management system and a method thereof are provided.

【0017】[0017]

【課題を解決するための手段】このような本発明の目的
は、基本概念として、第一の生産計画で生産販売管理す
る第一の生産販売管理システムと、前記第一の生産計画
と異なる第二の生産計画で生産販売管理する第二の生産
販売管理システムと、前記第一及び第二の生産販売管理
システムに接続され、対象となる生産販売管理期間を定
義して、前記第一及び第二の生産販売管理システムに共
通な処理を実行するセンターシステムとを有する分散型
生産販売管理システムによって達成される。
The object of the present invention is, as a basic concept, to provide a first production and sales management system for managing production and sales in a first production plan, and a second production and sales management system different from the first production plan. A second production / sales management system that performs production / sales management in a second production plan, and is connected to the first and second production / sales management systems, and defines a target production / sales management period; This is achieved by a distributed production and sales management system having a center system that executes processing common to the second production and sales management system.

【0018】本発明は、個々の製品の生産販売管理を行
う第一及び第二の生産販売管理システムを別個に設け、
個々の製品の生産計画を各々ローカルに行い、個々の製
品の需要変動に対応するようにした。これとともに、前
記第一及び第二の生産販売管理システムに接続されたセ
ンターシステムを設け、当該センターシステムにより、
共通部分、例えば出荷に関わる部分の処理を行うように
した。
According to the present invention, first and second production and sales management systems for performing production and sales management of individual products are separately provided,
Production plans for individual products were made locally to respond to fluctuations in demand for individual products. Along with this, a center system connected to the first and second production and sales management systems is provided, and the center system
Processing of common parts, for example, parts related to shipping is performed.

【0019】このため、第一の生産販売管理システムお
よび第二の生産販売管理システムの各々に、かかる出荷
処理を行う機能を設置する必要がない。さらに、第一の
生産販売管理システムと第二の生産販売管理システムが
独立に出荷計画を立案し、従って在庫量を越えた出荷計
画を立案してしまうという事態を防止できる。
Therefore, it is not necessary to install a function for performing the shipping process in each of the first production and sales management system and the second production and sales management system. Further, it is possible to prevent a situation in which the first production and sales management system and the second production and sales management system independently make a shipping plan and thus make a shipping plan that exceeds the stock amount.

【0020】又、このような事態が発生しないようにす
るための第一の生産販売管理システムと第二の生産販売
管理システムとの間の同期機構の設置も必要としない。
このため、システム全体の冗長性を削除できる。
Further, it is not necessary to provide a synchronization mechanism between the first production and sales management system and the second production and sales management system to prevent such a situation from occurring.
Therefore, the redundancy of the entire system can be eliminated.

【0021】又、上記の分散型生産販売管理システムに
加えて、好ましい態様として、前記センターシステム
は、前記生産販売管理期間として、長期間と、前記長期
間を複数に分割した短期間を定義することを特徴とする
分散型生産販売管理システムによって達成される。
In a preferred embodiment, in addition to the distributed production and sales management system, the center system defines, as the production and sales management period, a long period and a short period obtained by dividing the long period into a plurality. This is achieved by a distributed production and sales management system.

【0022】また、上記の分散型生産販売管理システム
に加えて、さらに好ましい態様として、前記センターシ
ステムは、前記第一および第二の生産販売管理システム
からの入力データを、前記共通な処理のための共通フォ
ーマットに変換するコンバータを有することを特徴とす
る分散型生産販売管理システムによって達成される。
In a further preferred embodiment, in addition to the above-mentioned distributed production / sales management system, the center system is configured to input data from the first and second production / sales management systems for the common processing. Is achieved by a distributed production and sales management system having a converter for converting to a common format.

【0023】また、上記の分散型生産販売管理システム
に加えて、さらに好ましい態様として、前記第一の生産
販売管理システムが立案した生産計画に同期して、前記
第二の生産販売管理システムが生産計画を立案すること
を特徴とする分散型生産販売管理システムによって達成
される。
In addition to the above-mentioned distributed production / sales management system, in a further preferred embodiment, the second production / sales management system synchronizes with a production plan drafted by the first production / sales management system. This is achieved by a decentralized production and sales management system characterized by planning.

【0024】また、上記の分散型生産販売管理システム
に加えて、さらに好ましい態様として、前記センターシ
ステムの前記共通処理は、注文に基づく製品の出荷処理
であることを特徴とする分散型生産販売管理システムに
よって達成される。
[0024] In addition to the above-mentioned distributed production and sales management system, in a further preferred aspect, the common processing of the center system is a shipment processing of a product based on an order. Achieved by the system.

【0025】また、上記の分散型生産販売管理システム
に加えて、さらに好ましい態様として、前記第一の生産
販売管理システムは、第一の繊維生産販売管理システム
であり、前記第二の生産販売管理システムは、第二の繊
維生産販売管理システムであることを特徴とする分散型
生産販売管理システムによって達成される。
In a further preferred embodiment, in addition to the above-mentioned distributed production / sales management system, the first production / sales management system is a first textile production / sales management system, and the second production / sales management system. The system is achieved by a distributed production and sales management system, which is a second textile production and sales management system.

【0026】さらに、上記の本発明の目的を達成する分
散型生産販売管理方法として、第一の生産計画で生産販
売管理する第一の生産販売管理工程と、前記第一の生産
計画と異なる第二の生産計画で生産販売管理する第二の
生産販売管理工程と、前記第一および第二の生産販売管
理工程で対象となる生産販売管理期間を定義して前記第
一および第二の生産販売管理工程に共通な処理を実行す
るセンター処理工程とを有することを特徴とする。
Further, as a distributed production / sales management method which achieves the above object of the present invention, a first production / sales management step of performing production / sales management in a first production plan, and a second production / sales management step different from the first production plan. A second production / sales management process for production / sales management in a second production plan; and a first / second production / sales management period defined in the first and second production / sales management processes. And a center processing step for executing processing common to the management step.

【0027】さらに、上記の分散型生産販売管理方法に
加えて、好ましい態様として、前記センター処理工程
は、前記生産販売管理期間として、長期間と、前記長期
間を複数に分割した短期間を定義することを特徴とす
る。
Further, in addition to the above-mentioned distributed production and sales management method, in a preferred embodiment, the center processing step defines a long period and a short period obtained by dividing the long period into a plurality of periods as the production and sales management period. It is characterized by doing.

【0028】さらに、上記の分散型生産販売管理方法に
加えて、好ましい態様として、前記センター処理工程
は、前記第一および第二の生産販売管理工程からの入力
データを、前記共通な処理のための共通フォーマットに
変換する工程を有することを特徴とする。
Further, in addition to the above-mentioned distributed production / sales management method, in a preferred embodiment, the center processing step includes inputting data from the first and second production / sales management steps for the common processing. A step of converting to a common format.

【0029】さらに、上記の分散型生産販売管理方法に
加えて、好ましい態様として、前記第一の生産販売管理
工程で立案した生産計画に基づいて、前記第二の生産販
売管理システムで生産計画を立案することを特徴とす
る。
Further, in addition to the above-mentioned distributed production / sales management method, as a preferred embodiment, a production plan is prepared by the second production / sales management system based on the production plan formulated in the first production / sales management process. It is characterized by planning.

【0030】さらに、上記の分散型生産販売管理方法に
加えて、好ましい態様として、前記センター処理工程の
前記共通処理は、注文に基づく製品の出荷処理であるこ
とを特徴とする。
Further, in addition to the above-mentioned distributed production and sales management method, in a preferred embodiment, the common processing in the center processing step is a shipping processing of a product based on an order.

【0031】さらに、上記の分散型生産販売管理方法に
加えて、好ましい態様として、前記第一の生産販売管理
工程は、第一の繊維生産販売管理工程であり、前記第二
の生産販売管理工程は、第二の繊維生産販売管理工程で
あることを特徴とする。
Further, in addition to the above-mentioned distributed production / sales management method, in a preferred embodiment, the first production / sales management step is a first textile production / sales management step, and the second production / sales management step is Is a second fiber production and sales management process.

【0032】本発明の特徴および効果は、図面を参照し
て以下に説明される発明の実施の形態から更に明らかに
なる。
The features and effects of the present invention will become more apparent from the embodiments of the present invention described below with reference to the drawings.

【0033】[0033]

【発明の実施の形態】以下に、図面に従い本発明の実施
の形態を説明する。なお、図面を参照して説明される実
施の形態は、本発明の理解のためのものであり、本発明
の適用はこれに限定されるものではない。
Embodiments of the present invention will be described below with reference to the drawings. The embodiments described with reference to the drawings are for understanding the present invention, and the application of the present invention is not limited thereto.

【0034】すなわち、以下に説明される実施の形態で
は、製品を繊維産業における原糸および布地を例にする
が、本発明の適用はかかる原糸および布地の生産販売管
理に限定されるものではなく、広く一般製品を製造する
場合に本発明の適用が可能である。
That is, in the embodiment described below, the product is exemplified by yarns and fabrics in the textile industry, but the application of the present invention is not limited to production and sales management of such yarns and fabrics. However, the present invention can be applied to a case where general products are widely manufactured.

【0035】ここで、原糸とは、繊維学会編丸善株式会
社発行の繊維便覧―加工編―に記載されているように、
形態,性能面から布の前段階に位置し、繊維を引きそろ
えるか集合させて長い繊維の束としたものである。原糸
は長い繊維によって構成されるフィラメント糸と比較的
短い繊維によって構成される紡績糸に大別することがで
きる。またフィラメント糸はモノフィラメント糸とマル
チフィラメント糸に分類され、紡績糸も繊維長によって
長、短の区別があるが、ここではこれら全てを総称して
原糸と呼ぶ。
As used herein, the term "yarn" refers to a fiber handbook published by Maruzen Co., Ltd. of the Textile Society of Japan.
It is located in front of the fabric in terms of form and performance, and the fibers are gathered or gathered to form a long fiber bundle. Raw yarns can be broadly classified into filament yarns composed of long fibers and spun yarns composed of relatively short fibers. Filament yarns are classified into monofilament yarns and multifilament yarns, and spun yarns are also classified into long and short yarns depending on the fiber length. Here, all of these yarns are collectively referred to as raw yarns.

【0036】布地とは、日本化学繊維協会編東洋経済新
報社発行の化学繊維の実際知識(第4版)に記載されて
いるように、ステープルを紡績した紡績糸、フィラメン
ト糸、フィラメントをさらに加工した加工糸を用いて、
たて糸、よこ糸を一定の方式で交錯させたもの(織物
など)、糸で作られたループを前後左右につらねたも
の(編物など)、糸をかがり合わせ、透かし目で模様
をあらわしたもの(レースなど)、糸を斜めに組合
せ、ひも状にしたもの(平ひも,丸ひもなど)、糸を
結合させて網目を作り、これをつらね合わせたもの(網
など)のような構造をもち、精練,染色,仕上げ加工を
行ったものである。
As described in the actual knowledge of chemical fibers (4th edition) published by Toyo Keizai Shinposha, edited by the Japan Chemical Fiber Association, spun yarns, filament yarns and filaments obtained by spinning staples are further processed. Using the processed yarn,
Warp yarns and weft yarns interlaced in a certain manner (woven fabric, etc.), loops made of yarns stretched back and forth and left and right (knitted fabrics, etc.) Etc.), threads are combined diagonally to form a string (flat string, round string, etc.), and a mesh is created by combining the threads, and these are joined together (net, etc.). , Dyeing and finishing.

【0037】これらには、糸や綿の状態で染色した後、
上記からの構造を持たせた先染品も含まれる。ま
た、布地に特殊な外観や機能を与える特殊加工が施され
ていても良い。特殊加工は普通の布地に施されるばかり
でなく、後で行う特殊加工に合うように考えて作られた
原糸を用いて行う場合もある。この様な布地は、縫製工
場で衣料品などの最終製品に加工されるほか、そのまま
商品として一般消費者にも販売される。
These are dyed in the form of yarn or cotton,
Pre-dyed products having the above structure are also included. Further, the fabric may be subjected to a special processing for giving a special appearance or function. The special processing is performed not only on ordinary fabrics but also using a raw yarn made in consideration of the special processing performed later. Such a fabric is processed into a final product such as clothing at a garment factory, and is sold as it is to a general consumer.

【0038】図1は、本発明に従う分散型生産販売管理
システムの一実施例構成を示すブロック図である。図1
において、分散型生産販売管理システム1は、センター
システム10と、第一の生産販売管理システム12と、
第二の生産販売管理システム14とを有する。
FIG. 1 is a block diagram showing an embodiment of a distributed production and sales management system according to the present invention. FIG.
In the distributed production and sales management system 1, a center system 10, a first production and sales management system 12,
And a second production and sales management system 14.

【0039】第一の生産販売管理システム12は、例え
ば、原糸を生産販売するための生産販売管理システムで
あり、顧客の注文あるいは顧客の注文を見込んで原糸の
販売計画32を立案し、更にこの販売計画32に応じた
生産計画30を立案する。この生産計画30に従って原
糸の生産が実施される。図1では、かかる原糸の生産工
程を工程Aとして示す。
The first production / sales management system 12 is, for example, a production / sales management system for producing and selling yarns. The first production / sales management system 12 drafts a yarn sales plan 32 in consideration of customer orders or customer orders. Further, a production plan 30 corresponding to the sales plan 32 is drafted. Yarn production is performed according to this production plan 30. In FIG. 1, such a production process of the yarn is shown as a process A.

【0040】第二の生産販売管理システム14は、例え
ば、顧客の注文あるいは顧客の注文を見込んで、第一の
生産販売管理システムの製品である原糸を原料として生
産される布地の販売計画42を立案する。さらに、この
販売計画42に応じた原料の調達計画およびこの原料を
用いた生産計画40を立案する。
The second production and sales management system 14, for example, anticipates a customer's order or a customer's order, and plans to sell a fabric 42 produced from raw yarn, which is a product of the first production and sales management system. Planning. Further, a raw material procurement plan according to the sales plan 42 and a production plan 40 using the raw materials are prepared.

【0041】上記から、第一の生産販売管理システム1
2における顧客とは、市場における原糸の一般需要家及
び、第一の生産販売管理システム1に従い生産される原
糸を原料として布地の生産販売を行う第二の生産販売管
理システム14が該当する。
From the above, the first production and sales management system 1
The customer in 2 corresponds to a general consumer of the yarn in the market and a second production and sales management system 14 for producing and selling fabric using raw yarn produced according to the first production and sales management system 1 as a raw material. .

【0042】また、第二の生産販売管理システム14に
従い原糸を原料として染色仕上加工された化学繊維布地
製品を生産するための工程として、大きく分けて、
(1)原糸を撚糸加工する撚糸工程(工程B)、(2)
撚糸を織り/編みする織・編工程(工程C)、(3)織
・編工程で得られた生機を染色する染色仕上加工工程
(工程D)を有する。
The process for producing a synthetic fiber fabric product dyed and finished using raw yarns as a raw material in accordance with the second production and sales management system 14 is roughly divided into:
(1) Twisting step (step B) for twisting the original yarn, (2)
It has a weaving / knitting step (step C) for weaving / knitting a twisted yarn, and (3) a dyeing finishing step (step D) for dyeing the greige machine obtained in the weaving / knitting step.

【0043】従って、第二の生産販売管理システム14
は、顧客の注文あるいは顧客の注文を見込んで、原料と
なる原糸の使用計画(調達計画)を立案し、この原糸を
使用して撚糸製品の生産計画を立案し、撚糸の生産計画
を使用して織・編製品の生産計画を立案し、織・編製品
の生産計画を使用して染色仕上加工製品の生産計画を立
案することになる。ここで立案した原糸の調達計画に基
づき、第一の生産販売管理システム12に対して第二の
生産販売管理システム14からの需要として調達要求す
ることになる。
Therefore, the second production and sales management system 14
In anticipation of a customer's order or a customer's order, the company drafts a use plan (procurement plan) of raw yarn as a raw material, drafts a production plan of a twisted yarn product using this raw yarn, The production plan of the woven / knitted product is prepared using the production plan, and the production plan of the dyed finished product is prepared using the production plan of the woven / knitted product. Based on the raw yarn procurement plan drafted here, a procurement request is issued to the first production and sales management system 12 as demand from the second production and sales management system 14.

【0044】そして、市場の原糸の一般需要家および布
地の需要家に対して、前記出来上がった原糸製品および
布地製品の各々の注文に基づく出荷処理、及び工程A,
B,C,Dを行う工場に対しての各々の注文に基づく出
荷処理は、後に説明するようにセンターシステム10に
より行われる。
Then, a shipping process based on each order of the finished yarn product and the fabric product to a general customer of the yarn and a customer of the fabric in the market, and a process A,
The shipping process based on each order to the factories that perform B, C, and D is performed by the center system 10 as described later.

【0045】このセンターシステム10は、第一の生産
販売管理システム12の販売計画32とこの販売計画3
2に対応する生産計画30を記憶する記憶装置27及
び、第二の生産販売管理システム14の販売計画42、
この販売計画42に従う第二の生産販売管理システム1
4で用いる原料である原糸の調達計画と原料の原糸を用
いた撚糸の生産計画、撚糸を用いた織・編製品の生産計
画、更に、織・編製品を用いた染色仕上加工の生産計画
などを含む布地の生産計画を記憶する記憶装置28とを
備える。
The center system 10 includes a sales plan 32 of the first production and sales management system 12 and a sales plan 3
A storage device 27 that stores the production plan 30 corresponding to the second production plan 2, a sales plan 42 of the second production and sales management system 14,
Second production and sales management system 1 according to this sales plan 42
Procurement plan of raw yarn as raw material used in 4, planning of production of twisted yarn using raw yarn of raw material, production plan of woven and knitted products using twisted yarn, and production of dyeing and finishing using woven and knitted products A storage device 28 for storing a fabric production plan including a plan and the like.

【0046】さらに、センターシステム10は、これら
の記憶装置27,28内のデータを監視するモニタリン
グ機能部26と、各々の記憶装置27、28内の異なる
フォームのデータから出荷のために共通に扱える共通デ
ータを作成するためのコンバート機能部22,24と、
コンバート機能部22、24により作成された共通デー
タに基づき第一の生産販売管理システム12と第二の生
産販売管理システム14に共通な出荷のための指示を行
うデータを作成する共通機能部20とからなる。
Further, the center system 10 can monitor the data in the storage devices 27 and 28 in common, and can use the data of different forms in the storage devices 27 and 28 in common for shipping. Conversion function units 22 and 24 for creating common data;
A common function unit 20 for creating data for issuing a common shipping instruction to the first production and sales management system 12 and the second production and sales management system 14 based on the common data created by the conversion function units 22 and 24; Consists of

【0047】第一の生産販売管理システム12と第二の
生産販売管理システム14では、図4および図5に示す
ように、一般的に需要家との取引に必要なデータ項目が
異なる。
As shown in FIGS. 4 and 5, the first production and sales management system 12 and the second production and sales management system 14 generally differ in data items required for transactions with customers.

【0048】例えば、第一の生産販売管理システム12
に従い生産される原糸の販売単位はkg単位であり、ま
た原糸を撚糸加工工程に指示する単位もkgである。一
方、布地の販売単位は伝統的に疋や反が用いられるた
め、撚糸製品を織・編工程に生産指示する単位、織・編
製品を染色仕上加工工程に加工指示する単位、更に染色
仕上加工製品である布地を出荷する単位は疋や反なの
で、出荷のために扱う販売数量の単位が異なる。
For example, the first production and sales management system 12
The unit of sale of the yarn produced in accordance with the above is kg, and the unit for instructing the yarn in the twisting process is also kg. On the other hand, the unit of sales of textiles is traditionally used for hibiki and anti-woven fabrics, so a unit that instructs production of twisted yarn products in the weaving and knitting process, a unit that instructs processing of woven and knitted products in the dyeing and finishing process, and a dyeing and finishing process Since the unit for shipping the fabric, which is a product, is the same as the unit, the unit of sales quantity handled for shipping is different.

【0049】一方では、原糸であろうが撚糸製品であろ
うが織・編製品であろうが染色仕上加工製品の布地であ
ろうが、製品を何時までに何処へ納入するかという納期
・納入先などの情報項目は共通である。
On the other hand, regardless of whether it is a raw yarn, a twisted yarn product, a woven or knitted product, or a fabric of a dyed finished product, the delivery date and time of when and where to deliver the product Information items such as delivery destination are common.

【0050】このような一部は異なり、一部は共通であ
る項目のデータから、製品を出荷して顧客に届けるとい
う共通の行為のために、センターシステム10の中心機
能として共通データを作成するモニタリング機能部2
6,コンバート機能部22,24及び共通機能部20が
必要である。
From the data of items that are partially different and partially common, common data is created as a central function of the center system 10 for a common action of shipping a product and delivering it to a customer. Monitoring function part 2
6, the conversion function units 22 and 24 and the common function unit 20 are required.

【0051】もし、センターシステム10が存在しない
場合は、この共通部分、例えば出荷に関わるデータ処理
部分を、第一の生産販売管理システム12および第二の
生産販売管理システム14の各々に設置することが必要
となる。さらに、第一の生産販売管理システム12と第
二の生産販売管理システム14が各々独立して出荷処理
を行う場合は、例えば、第二の生産販売管理システム1
4による生産計画に対応するに必要な原料の在庫量を越
えて出荷してしまうという事態の発生が想定される。
If the center system 10 does not exist, this common part, for example, a data processing part related to shipping is installed in each of the first production and sales management system 12 and the second production and sales management system 14. Is required. Further, when the first production / sales management system 12 and the second production / sales management system 14 independently perform the shipping process, for example, the second production / sales management system 1
It is assumed that a situation occurs in which the raw material is shipped in excess of the stock amount of the raw material necessary for the production plan according to No. 4.

【0052】したがって、かかる不都合を回避するため
に第一の生産販売管理システム12と第二の生産販売管
理システム14との間に同期機能を設置しなければなら
ない。かかる場合は、システム全体が冗長になる。
Therefore, in order to avoid such inconvenience, a synchronization function must be provided between the first production and sales management system 12 and the second production and sales management system 14. In such a case, the entire system becomes redundant.

【0053】さらに、センターシステム10の共通機能
部20内に対象となる生産販売管理期間を定義する機能
を持ち、第一の生産販売管理システム12および第二の
生産販売管理システム14に、定義された生産販売管理
期間を伝える。
Further, the common function unit 20 of the center system 10 has a function of defining a target production and sales management period, and is defined in the first production and sales management system 12 and the second production and sales management system 14. Tell the production and sales management period.

【0054】もし、センターシステム10で生産販売管
理期間を定義せずに、第一の生産販売管理システム12
と第二の生産販売管理システム14の各々が独立に生産
販売管理期間を定義すると不都合が生じる。
If the production and sales management period is not defined in the center system 10, the first production and sales management system 12
If each of the first and second production and sales management systems 14 independently defines the production and sales management period, inconvenience occurs.

【0055】すなわち、第一の生産販売管理システム1
2による生産対象製品の一部を第二の生産販売管理シス
テム14では原料として使用するので、ここでは各々の
システムで定義した生産販売管理期間が矛盾していない
かどうかをチェックするシステムを新たに設置しなけれ
ばならず、システム全体が冗長になる。
That is, the first production and sales management system 1
In the second production and sales management system 14, a part of the products to be produced by the method 2 is used as a raw material. Therefore, here, a new system for checking whether the production and sales management periods defined in each system are consistent is newly provided. Must be installed, making the entire system redundant.

【0056】センターシステム10で行う生産販売管理
期間の定義は、システム内で自動的に行っても良いし、
マンマシンインターフェース50によりセンターシステ
ム10外からオペレータにより入力定義しても良い。要
は、第一の生産販売管理システム12と第二の生産販売
管理システム14が同一の生産販売管理期間を用いて稼
動すれば良いのである。
The definition of the production and sales management period performed by the center system 10 may be automatically performed in the system,
The input may be defined by the operator from outside the center system 10 by the man-machine interface 50. The point is that the first production and sales management system 12 and the second production and sales management system 14 only need to operate using the same production and sales management period.

【0057】さらに、センターシステム10、第一の生
産販売管理システム12および第二の生産販売管理シス
テム14は、それぞれマンマシンインターフェース5
0、51、52、記憶装置56、57、58およびプリ
ンター53、54、55を備える。
Further, the center system 10, the first production and sales management system 12 and the second production and sales management system 14 are
0, 51, 52, storage devices 56, 57, 58 and printers 53, 54, 55.

【0058】これらは、各々のシステムにそれぞれ独立
して設置しても良いし、あるいはセンターシステム10
と第一の生産販売管理システム12に対し兼用としてセ
ンターシステム10のみに設置し、第二の生産販売管理
システム14には単独に設置するというように、一部を
兼用して設置してもよい。あるいは全てのシステムに対
して共通の1台で入力およびプリント出力を行うように
しても一向に構わない。
These may be installed independently in each system, or the center system 10
And the first production / sales management system 12 may be installed in the center system 10 only, and the second production / sales management system 14 may be installed alone, such that it is installed separately. . Alternatively, the input and printout may be performed by a single unit common to all systems.

【0059】要は、センターシステム10と第一の生産
販売管理システム12と第二の生産販売管理システム1
4に対して、各々独立して入力する機能とプリント出力
する機能が満たされれば良い。
The point is that the center system 10, the first production and sales management system 12, and the second production and sales management system 1
It suffices that the functions of input and print output are satisfied for each of the four types.

【0060】顧客の端末60は、インターネット等の通
信網61を介し、第一の生産販売管理システム12と第
二の生産販売管理システム14に接続し、注文、納期回
答等のデータを送受する。また、工程A(原糸生産工
程)、工程B(撚糸工程)、工程C(織・編工程)及
び、工程D(染加工工程)が、個別の工場で行われる場
合、あるいは、独立した外注先工場で行われる場合は、
第一の生産販売管理システム12及びセンターシステム
10が、VAN/WAN等の専用ネットワーク62を通
して、対応する生産/加工工程を実行する工場とデータ
送受のために接続される。
The customer terminal 60 is connected to the first production and sales management system 12 and the second production and sales management system 14 via a communication network 61 such as the Internet, and transmits and receives data such as order, delivery date response, and the like. In addition, when the process A (the raw yarn production process), the process B (the twisting process), the process C (the weaving / knitting process), and the process D (the dyeing process) are performed in individual factories, or an independent outsourcing process If performed at the earlier factory,
The first production / sales management system 12 and the center system 10 are connected through a dedicated network 62 such as a VAN / WAN to a factory that executes a corresponding production / processing step for data transmission / reception.

【0061】この例では、工程A(原糸生産工程)に
は、第一の生産販売管理システム12からネットワーク
62を介し生産指示等を行う。一方、工程B(撚糸),C
(織・編),D(染色)は、第二の生産販売管理システム
14からセンターシステム10を介し生産、加工指示が
行われる。
In this example, in the process A (yarn production process), a production instruction or the like is issued from the first production / sales management system 12 via the network 62. On the other hand, process B (twisted yarn), C
The production and processing of (weaving and knitting) and D (dying) are instructed from the second production and sales management system 14 via the center system 10.

【0062】又、各工程A,B,C,Dへの出荷処理
は、第一の生産販売管理システム12、第二の生産販売
管理システム14とも、センターシステム10の共通機
能部20の出荷処理機能を使用して行う。このため、各
工程A,Bへの出荷処理が独立に行われ、出荷計画が混
乱することを防止できる。
The shipment processing to each of the processes A, B, C, and D is performed by the first production / sales management system 12 and the second production / sales management system 14 by the shipment processing of the common function unit 20 of the center system 10. Perform using the function. For this reason, the shipment processing to each of the processes A and B is performed independently, and confusion of the shipment plan can be prevented.

【0063】さらに、場合によっては、第一の生産販売
管理システム12が、第二の生産販売管理システム14
とは別に、原糸に対し撚糸工程B等を経由させることに
より、付加価値を高めて販売するケースが存在する。
Further, in some cases, the first production and sales management system 12
Separately, there is a case where the raw yarn is sold with added value by passing through the twisting step B or the like.

【0064】このような場合、システム的には、その取
り扱い量の大小にかかわらず、第一、第二の生産販売管
理システム12、14の双方において、工程Bに対する
指示機能が必要になる。これをそれぞれの生産販売管理
システム12、14で持つことは、システム的な冗長を
生じさせる。
In such a case, both the first and second production and sales management systems 12 and 14 need to have an instruction function for the process B regardless of the amount of the system. Having this in each of the production and sales management systems 12 and 14 causes system redundancy.

【0065】また、各々のシステム12、14が指示機
能を持つと、工程Bに対する指示の全体の把握が困難に
なる。この冗長を防ぐため、あるいは、全体の指示の把
握を容易にするためセンターシステム10は前述の出荷
処理のみならず、両システム12、14に共通な処理機
能を有する。
If each of the systems 12 and 14 has an instruction function, it is difficult to grasp the entire instruction for the process B. In order to prevent this redundancy or to make it easy to grasp the entire instruction, the center system 10 has not only the above-described shipping processing but also processing functions common to the two systems 12 and 14.

【0066】同様に、第二の生産販売管理システム14
が、生産指示をセンタ−システム10を介することな
く、直接工程B,C,Dに対して生産指示を行うように
しても良い。この場合も、出荷処理は、センターシステ
ム10が行う。
Similarly, the second production and sales management system 14
However, the production instruction may be directly issued to the processes B, C, and D without passing through the center system 10. Also in this case, the center system 10 performs the shipping process.

【0067】次に、図1のモニタリング機能部26、コ
ンバート機能部22、24、共通機能部20を詳細に説
明する。図2は、図1のモニタリング機能部26の説明
図である。
Next, the monitoring function unit 26, the conversion function units 22, 24, and the common function unit 20 of FIG. 1 will be described in detail. FIG. 2 is an explanatory diagram of the monitoring function unit 26 of FIG.

【0068】図2に示すように、モニタリング機能部2
6では、記憶装置27及び記憶装置28にそれぞれ受信
されたデータに対して、受信順序の早いものから順番に
序列をつける。この処理を受信順序のチェック機能26
−1で行う。
As shown in FIG. 2, the monitoring function unit 2
In step 6, the data received by the storage device 27 and the storage device 28 are arranged in order from the earliest reception order. This processing is performed by the reception order check function 26.
Perform at -1.

【0069】記憶装置27には、第一の生産販売管理シ
ステム12の販売計画32と生産計画30が記憶され
る。一方、記憶装置28には、第二の生産販売管理シス
テム14の販売計画42と、第二の生産販売管理システ
ム14での処理対象とする原料の原糸の調達計画、原料
の原糸を用いた撚糸の生産計画、撚糸を用いた織・編製
品の生産計画および織・編製品を用いた染色仕上加工製
品の生産計画を含む布地の生産計画40を記憶する。
The storage device 27 stores a sales plan 32 and a production plan 30 of the first production and sales management system 12. On the other hand, in the storage device 28, the sales plan 42 of the second production and sales management system 14, the procurement plan of the raw yarn of the raw material to be processed in the second production and sales management system 14, and the raw yarn of the raw material are used. A fabric production plan 40 including a production plan of a twisted yarn, a production plan of a woven / knitted product using the twisted yarn, and a production plan of a dyed finished product using the woven / knitted product is stored.

【0070】こうして受信順序の早いものから順に序列
を付けたデータを、共通処理の単位に区切り、記憶装置
212に格納する。この共通の単位毎に分割することに
より、第一、第二の生産販売管理システムの計画情報の
単位が異なっていても、センターシステム10の共通機
能20を利用することができる。
In this way, the data with the ranks in the order of receiving order is divided into common processing units and stored in the storage device 212. By dividing the common unit, the common function 20 of the center system 10 can be used even if the units of the plan information of the first and second production and sales management systems are different.

【0071】記憶装置212に格納されたデータを監視
制御機能部26−2により処理する。監視制御機能部2
6−2は、監視機能部260と制御機能部261から構
成される。監視機能部260は、記憶装置216にあら
かじめ設定、記憶された時刻または時間間隔で制御機能
部261を稼動させる装置である。ここで、あらかじめ
設定された時刻または時間間隔とは、第一の生産販売管
理システム12及び、第二の生産販売管理システム14
の各々が狙いとする生産販売管理の状況に応じて設定す
ることができる。
The data stored in the storage device 212 is processed by the monitoring control function unit 26-2. Monitoring and control function unit 2
6-2 includes a monitoring function unit 260 and a control function unit 261. The monitoring function unit 260 is a device that operates the control function unit 261 at a time or a time interval set and stored in the storage device 216 in advance. Here, the preset time or time interval refers to the first production and sales management system 12 and the second production and sales management system 14.
Can be set according to the situation of the production and sales management that each aims at.

【0072】例えば、月単位で生産販売管理をすれば十
分であれば、毎月1日あるいは月末日の30日に稼動す
るように設定すれば良いし、週単位で生産販売管理を行
う必要がある場合には、毎週月曜日あるいは金曜日とい
ったように7日の間隔で稼動するように設定すれば良い
し、毎日生産販売管理を行う必要がある場合には、例え
ば毎日8時に稼動するとか14時に稼動するとか18時
に稼動するとかのように24時間間隔で稼動するように
設定すれば良い。
For example, if it is sufficient to manage the production and sales on a monthly basis, it may be set to operate on the first day of every month or the 30th of the last day of the month, and it is necessary to perform the production and sales management on a weekly basis. In this case, it may be set to operate every seven days, such as every Monday or Friday, and when it is necessary to perform daily production and sales management, for example, it may operate every day at 8:00 or at 14:00. It may be set to operate at 24 hour intervals, such as operating at 18:00.

【0073】現実には、顧客の注文は毎日不特定の時刻
に入ってくる場合が多いので、例えば1時間間隔で稼動
するように、より好ましくは30分間隔で、さらに好ま
しくは10分間隔で稼動するように設定する。また、生
産販売管理において、月単位に販売量をまとめる場合に
は毎月一定の日に稼動させれば良いし、週単位に販売量
をまとめる場合には7日間隔で稼動するように設定すれ
ば良い。
In reality, since a customer's order often arrives at an unspecified time every day, it operates at an interval of, for example, one hour, preferably at an interval of 30 minutes, more preferably at an interval of 10 minutes. Set to run. Also, in the production and sales management, if the sales volume is to be summarized on a monthly basis, it may be operated on a fixed day every month, and if the sales volume is to be summarized on a weekly basis, it may be set to operate every seven days. good.

【0074】このように監視機能部260は複数の稼動
間隔を同時に設定することも可能である。また、後者の
ように週単位の販売量をまとめるために稼動させる場合
には、この監視機能部260に週単位の稼動には週単位
の販売量をまとめるために必要な部分のみを稼動させる
ように制御機能部261に指示する機能を付与すること
もできる。
As described above, the monitoring function unit 260 can simultaneously set a plurality of operation intervals. In the latter case, when the operation is performed to summarize the weekly sales volume, the monitoring function unit 260 operates only the portion necessary to summarize the weekly sales volume in the weekly operation. To the control function unit 261.

【0075】逆に、監視機能部260および記憶装置2
16を無くして連続稼動にすると、システムが冗長にな
り、かつ記憶装置212のデータが更新されなくても、
制御機能部261が稼動する確率が高くなり、無駄が発
生するので好ましくない。
On the contrary, the monitoring function unit 260 and the storage device 2
16 and the continuous operation, the system becomes redundant and even if the data in the storage device 212 is not updated,
It is not preferable because the probability that the control function unit 261 operates increases and waste occurs.

【0076】このように監視機能部260が稼動する間
隔の設定は、経験豊富なベテラン作業者が過去の経験に
基づいてマンマシンインターフェース213により人為
的に設定してもよい。あるいは、記憶装置216のデー
タ更新状況により最適の間隔をシステムが自動的に設定
するようにしても本発明の適用を妨げるものではない。
As described above, the interval at which the monitoring function unit 260 operates may be artificially set by the experienced machine operator through the man-machine interface 213 based on past experience. Alternatively, even if the system automatically sets the optimum interval according to the data update status of the storage device 216, this does not prevent application of the present invention.

【0077】監視機能部260により稼動された制御機
能部261は、記憶装置212に記憶されたデータをコ
ンバート処理に必要とされる状態に加工してコンバート
機能部22、24に渡す。
The control function unit 261 operated by the monitoring function unit 260 processes the data stored in the storage device 212 into a state required for the conversion process, and transfers the processed data to the conversion function units 22 and 24.

【0078】ここで、上記記憶装置212は一つである
として説明したが、記憶装置212を複数設け、受信し
たデータを共通処理単位毎に分類して、それぞれの記憶
装置に格納するようにしてもよい。
Although the above description has been made assuming that the number of the storage devices 212 is one, a plurality of the storage devices 212 are provided, and the received data is classified for each common processing unit and stored in each storage device. Is also good.

【0079】また、このモニタリング機能部26までの
段階の処理で第一の生産販売管理システム12または第
二の生産販売管理システム14に連絡しなければならな
い情報は、結果情報出力機能ファイル214に格納され
る。このような連絡しなければならない情報としては、
第一の生産販売管理システム12から送られてきた販売
計画32あるいは第二の生産販売管理システム14から
送られてきたデータが間違っている等の場合である。
Information that must be communicated to the first production and sales management system 12 or the second production and sales management system 14 in the processing up to the monitoring function unit 26 is stored in the result information output function file 214. Is done. Such information that must be communicated includes:
This is the case where the sales plan 32 sent from the first production and sales management system 12 or the data sent from the second production and sales management system 14 is incorrect.

【0080】例えば生産販売管理期間の対象外のデータ
などはエラーとしてこの結果情報出力機能ファイル21
4に出力する。この結果情報出力機能ファイル214に
ファイルされた情報は、後に該当する第一の生産販売管
理システム12あるいは第二の生産販売管理システム1
4に連絡される。
For example, data outside the production / sales management period is regarded as an error and the result information output function file 21
4 is output. The information stored in the result information output function file 214 is stored in the first production and sales management system 12 or the second production and sales management system
Contact 4

【0081】次に、制御機能部261から出力されるデ
ータを所定のデータに変換する図1に示すコンバート機
能部22、24を説明する。図3乃至図7は、モニタリ
ング機能部26で処理されたデータを、引き続いて処理
するコンバート機能部22、24の動作の説明図であ
る。
Next, the conversion function units 22 and 24 shown in FIG. 1 for converting data output from the control function unit 261 into predetermined data will be described. FIG. 3 to FIG. 7 are explanatory diagrams of the operation of the conversion function units 22 and 24 which subsequently process the data processed by the monitoring function unit 26.

【0082】この動作は、先述したように第一の生産販
売管理システム12で必要とするデータの項目と第二の
生産販売管理システム14で必要とするデータの項目
が、同じものもあれば、異なるものもある。したがっ
て、コンバート機能部22、24は、このような種々の
項目のデータを用いて、共通した行為たとえば出荷とい
う共通の行為をするために必要な共通のデータ項目を作
成する機能部である。
As described above, this operation is performed if the data items required by the first production / sales management system 12 and the data items required by the second production / sales management system 14 are the same. Some are different. Therefore, the conversion function units 22 and 24 are function units that use the data of such various items to create common data items necessary for performing a common action such as shipping.

【0083】図3は、上記のコンバート機能部22、2
4におけるデータコンバート処理の原理を説明する図で
ある。図3において、織・編加工(図1,行程C)の工
場で生産された織・編製品を染色仕上加工(図1,行程
D)を行うために染色仕上加工工場に対して染色仕上加
工注文(調達)を行う場合を例に説明する。
FIG. 3 shows the conversion function units 22 and 2
FIG. 4 is a diagram for explaining the principle of data conversion processing in FIG. In FIG. 3, the dyeing / finishing processing factory performs the dyeing / finishing processing (FIG. 1, step D) in order to perform the dyeing / finishing processing (FIG. 1, step D). An example in which an order (procurement) is performed will be described.

【0084】図3において、マンマシンインターフェー
ス50のモニタ画面100上で、染色仕上加工の注文先
(自社工場あるいは、外注先)、納期、数量等の所定の
項目データを入力することにより、画面イメージの固定
長データ101が生成される。入力された項目データ
は、図3の例では織・編製品に対する染色仕上加工注文
であるので第二の生産管理システム14用のコンバート
機能部24による処理対象となる。
In FIG. 3, on the monitor screen 100 of the man-machine interface 50, predetermined item data such as the ordering destination (own factory or subcontractor), the delivery date, the quantity, etc. of the dyeing finish processing is input, thereby displaying the screen image. Is generated. In the example of FIG. 3, the input item data is a dyeing finish order for a woven or knitted product, and is processed by the conversion function unit 24 for the second production management system 14.

【0085】したがって、コンバート機能部24のコン
バートプログラム102により、固定イメージの固定長
データ101から、先ず必要情報が取り出される(ステ
ップS1)。
Therefore, first, necessary information is extracted from the fixed length data 101 of the fixed image by the conversion program 102 of the conversion function unit 24 (step S1).

【0086】ここでは、必要情報として、注文先、納
期、数量及び製品データが取り出される。取り出された
データは、タイプ変換される(ステップS2)。
Here, order destination, delivery date, quantity and product data are taken out as necessary information. The extracted data is type-converted (step S2).

【0087】すなわち、項目データにより表示形式(フ
ォーマット)が異なっている。たとえば、注文先データ
は、数字のみの「0520」で表され、納期は「/」記
号を含み「08/15」で表され、数量は小数点を含み
「100.0」で表され、更に製品は、アルファベット
のみで表されている。
That is, the display format differs depending on the item data. For example, the order destination data is represented by “0520” consisting of only numerals, the delivery date is represented by “08/15” including a “/” symbol, the quantity is represented by “100.0” including a decimal point, and Is represented by the alphabet only.

【0088】したがって、コンバートプログラム102
はタイプ変換により、納期及び数量データをそれぞれ
「0815」及び「000010000」に変換する。
これにより全てデータは、数字またはアルファベット等
の共通機能が処理可能なタイプのデータで表わされる。
このタイプ変換により、各生産販売管理システム12、
14は、共通機能の項目タイプを意識することなく、独
自のタイプで納期、数量等の項目を入力、管理でき、し
かも共通機能を利用できる。
Therefore, the conversion program 102
Converts the delivery date and quantity data to “0815” and “00000010000” by type conversion.
As a result, all data is represented by data of a type capable of processing common functions such as numbers or alphabets.
By this type conversion, each production and sales management system 12,
The item 14 can input and manage items such as delivery date and quantity in a unique type without being aware of the item type of the common function, and can use the common function.

【0089】ついで、コンバートプログラム102は、
タイプ変換されたデータをフォーマット変換する(ステ
ップS3)。図3の例では、注文先、製品、数量、納期
の順のフォーマットに変換される。
Next, the conversion program 102
Format conversion is performed on the type-converted data (step S3). In the example of FIG. 3, the format is converted to the order of order destination, product, quantity, and delivery date.

【0090】このようにコンバート機能部22,24で
入力データは、共通タイプのデータに変換されて共通機
能部20に入力される。
As described above, the input data is converted into common type data by the conversion function units 22 and 24 and input to the common function unit 20.

【0091】図4乃至図8は、上記図3のコンバート機
能部22,24のデータコンバートの原理に基づき実行
される具体例である。
FIGS. 4 to 8 show specific examples executed based on the principle of data conversion of the conversion function units 22 and 24 in FIG.

【0092】図4は、一般需要家から第一の生産販売管
理システム12に対してなされる原糸の注文(調達)に
対し、入力される原糸の注文データをセンターシステム
10に送るためのデータに変換する例を示す。
FIG. 4 is a diagram for sending the input yarn order data to the center system 10 in response to the order (procurement) of the original yarn made by the general customer to the first production and sales management system 12. An example of converting to data is shown.

【0093】注文条件データベース220に予め顧客毎
に注文の条件が登録されている。この注文条件データベ
ース220に従い、顧客の注文条件が画面表示される
(221)。この注文条件にしたがい、注文先、納期、
数量、製品等の注文データが入力される(222)。こ
の入力された注文データに対し、図3に説明したコンバ
ート原理に従い、共通のフォーマットに変換される(2
23)。
Order conditions are registered in advance in the order condition database 220 for each customer. According to the order condition database 220, the order condition of the customer is displayed on the screen (221). According to the order conditions, the order destination, delivery date,
Order data such as quantity and product is input (222). The input order data is converted into a common format according to the conversion principle described in FIG.
23).

【0094】即ち、画面番号、注文先、名称、納期、数
量、製品の注文データから注文先、名称、納期、数量が
取り出され、納期、数量がタイプ変換され、注文先、製
品(名称)、数量、納期に変換される。
That is, the order number, order name, delivery date, quantity, and product order data are extracted from the order data of the product, the delivery date and quantity are type-converted, and the order destination, product (name), It is converted into quantity and delivery date.

【0095】図5は、第二の生産販売管理システム14
から第一の生産販売管理システム12に対してなされる
原糸の注文(調達)のために入力される原糸の注文デー
タを、センターシステム10に送るためのデータに変換
する例を示す。
FIG. 5 shows the second production and sales management system 14.
An example is shown in which the order data of the original yarn inputted for ordering (procurement) of the original yarn made to the first production and sales management system 12 is converted into data to be sent to the center system 10.

【0096】原料所要量データベース230には、予め
生産計画に沿って行われる生機の製造に必要な原料であ
る原糸の所要量が登録され、データベース231には生
機の納期が登録されている。したがって、原糸を注文
(調達)する際は、原糸の所要量230と原糸の在庫量
232から、必要な原糸注文(調達)量が計算される
(233)。
The raw material requirement database 230 registers in advance the required amount of raw yarn which is a raw material necessary for the production of the greige machine according to the production plan, and the database 231 registers the deadline of the greige machine. Therefore, when ordering (procuring) a yarn, a necessary order (procurement) amount of the yarn is calculated from the required amount 230 of the yarn and the stock amount 232 of the yarn (233).

【0097】これにより、モニターから原糸注文に必要
なデータが入力される(234)。さらに、入力された
注文データに先に登録されている生機の納期231を考
慮して、リード期間(納期)データが付加される(23
5)。
As a result, data necessary for ordering the yarn is input from the monitor (234). Further, lead period (delivery date) data is added to the input order data in consideration of the delivery date 231 of the previously registered greige machine (23).
5).

【0098】したがって、入力された注文データ及び納
期が、図3に示したコンバート原理に従い、共通データ
(236)に変換される。
Therefore, the input order data and delivery date are converted into common data (236) according to the conversion principle shown in FIG.

【0099】図6は、第一の生産販売管理システム12
による撚糸の注文処理例であり、一般需要者からの注文
の例である。過去の注文時のデータが雛形としてデータ
ベース240に登録されている。したがって、一般需要
者からの注文があると、注文雛形がモニター上に表示さ
れる(242)。
FIG. 6 shows the first production and sales management system 12.
Is an example of order processing of a twisted yarn according to the above, and is an example of an order from a general consumer. The data at the time of the past order is registered in the database 240 as a model. Therefore, when there is an order from a general consumer, an order template is displayed on the monitor (242).

【0100】この注文雛形241を利用して注文データ
が画面入力される(242)。入力されたデータから、
注文先、納期、数量、製品が抽出され、図3に示すコン
バート原理により注文先、製品(名称)、数量、納期の
共通フォーマットによる注文データ243が作成され
る。また、同時に、出荷先に対する原料である原糸の出
荷予定データ244が示される。
The order data is input on the screen using the order template 241 (242). From the input data,
The order destination, delivery date, quantity, and product are extracted, and order data 243 in a common format of the order destination, product (name), quantity, and delivery date is created according to the conversion principle shown in FIG. At the same time, shipping schedule data 244 of the original yarn as the raw material to the shipping destination is shown.

【0101】図7は、第二の生産販売管理システム14
の処理対象である工程C(織・編加工工程)のための撚
糸注文の例を示す。予め生機の製造に必要な撚糸の所要
量250が登録されている。さらに、相手先(注文元)
の条件がデータベース251に登録されている。
FIG. 7 shows the second production and sales management system 14.
2 shows an example of a twisted yarn order for a process C (weaving / knitting process step) to be processed. A required amount 250 of twisted yarn necessary for manufacturing the greige machine is registered in advance. In addition, the other party (order source)
Are registered in the database 251.

【0102】撚糸の在庫量252を参照して所要量25
0から追加注文(調達)量253が計算される。これに
基づき、モニター上に注文データが入力される(25
4)。入力された注文データに対し、納期等の予め登録
された相手方条件が付加される(255)。そして、図
3に説明したコンバート原理により、変換され注文デー
タ256が得られる。
Referring to the stock amount 252 of the twisted yarn, the required amount 25
From 0, an additional order (procurement) amount 253 is calculated. Based on this, the order data is input on the monitor (25
4). A counterparty condition such as a delivery date registered in advance is added to the input order data (255). Then, the converted order data 256 is obtained according to the conversion principle described in FIG.

【0103】なお、前記のように撚糸の在庫量252を
参照して所要量250から追加注文(調達)量253が
計算されると、追加注文量に見合う原糸所要量230が
得られ、これは先に図5において説明した原糸の所要量
となる。
When the additional order (procurement) amount 253 is calculated from the required amount 250 with reference to the stock amount 252 of the twisted yarn as described above, the required yarn amount 230 corresponding to the additional order amount is obtained. Is the required amount of yarn described above with reference to FIG.

【0104】次に、共通機能部20の例を説明する。図
8は、第一、第二の生産販売管理システム12、14と
センターシステム10の共通機能部20との関係を示す
図である。この例では、共通機能部20は、在庫/在庫
計画処理部20−1と、払出計画処理部20−2と、出
荷処理部20−3とからなる。
Next, an example of the common function unit 20 will be described. FIG. 8 is a diagram showing a relationship between the first and second production / sales management systems 12 and 14 and the common function unit 20 of the center system 10. In this example, the common function unit 20 includes a stock / stock plan processing unit 20-1, a payout plan processing unit 20-2, and a shipping processing unit 20-3.

【0105】先に図3〜図7において説明したコンバー
ト機能部22,24の機能により、注文情報が共通フォ
ーマットのデータに変換され、払出計画処理部20−2
及び在庫/在庫計画処理部20−1に導かれる。
The order information is converted into data in a common format by the functions of the conversion function units 22 and 24 described above with reference to FIGS.
And the inventory / inventory plan processing unit 20-1.

【0106】一方、図8において、第一の生産販売管理
システム12の処理の流れは、注文情報・見込情報から
生産計画処理30により、生産計画ファイル57−1が
更新される。
On the other hand, in FIG. 8, the processing flow of the first production and sales management system 12 is such that the production plan file 57-1 is updated by the production plan processing 30 from the order information / expected information.

【0107】前述のように、工程Aの生産(原糸工程)
33が遂行され、生産により、生産実績、今後の計画フ
ァイル57−2が更新され、入庫処理34により、入庫
実績、今後の計画ファイル57−3が更新される。
As described above, the production of the step A (the yarn step)
33, the production result and the future plan file 57-2 are updated by the production, and the storage result and the future plan file 57-3 are updated by the warehousing process.

【0108】入庫処理34の情報は、前述のモニタリン
グ機能部26を介し在庫/在庫計画処理部20−1に導
かれ在庫管理ファイル20−4が更新処理される。又、
注文情報・見込情報は、前述のモニタリング機能部26
を介し払出計画処理部20−2で払出管理ファイル20
−5が更新処理される。
The information of the stocking process 34 is led to the stock / stock planning processing unit 20-1 via the monitoring function unit 26, and the stock management file 20-4 is updated. or,
The order information / expected information is stored in the monitoring function unit 26 described above.
Payout management file 20 in the payout plan processing unit 20-2 via
-5 is updated.

【0109】更に、センターシステム10での出荷処理
指示入力により、出荷処理部20−3が在庫管理ファイ
ル20−4、払出管理ファイル20−5を参照して、出
荷処理を行う。例えば、出荷処理は、工程A,B,C,
Dに対する出荷指示と、出荷先からの出荷通知により、
出荷実績を更新する処理である。
Further, in response to the input of the shipping processing instruction in the center system 10, the shipping processing unit 20-3 performs the shipping processing with reference to the inventory management file 20-4 and the payout management file 20-5. For example, the shipping process includes steps A, B, C,
According to the shipping instruction to D and the shipping notification from the shipping destination,
This is the process of updating the shipping results.

【0110】さらに図8において、第二の生産販売管理
システム14の処理の流れは、注文情報・見込情報から
調達・生産計画40の調達計画処理40−1により、第
一の生産販売管理システム12の生産計画30に注文
し、調達計画ファイル58−1が更新される。前述のよ
うに、生産(工程A)33が遂行され、生産により、製
品を受け入れると、受け入れ実績、今後の計画ファイル
58−2が更新され、入庫44により、入庫実績、今後
の計画ファイル58−3が更新される。
Further, in FIG. 8, the processing flow of the second production / sales management system 14 is based on the order information / prospect information and the procurement / production plan 40 through the procurement planning process 40-1. And the procurement plan file 58-1 is updated. As described above, when the production (process A) 33 is performed and the product is received by the production, the reception result and the future plan file 58-2 are updated. 3 is updated.

【0111】入庫処理34の情報は、前述のモニタリン
グ機能部26を介し在庫/在庫計画処理部20−1で在
庫管理ファイル20−4が更新処理される。又、注文、
見込情報は、前述のモニタリング機能部26を介し払出
計画処理部20−2で払出管理ファイル20−5が更新
処理される。さらに、センターシステム10での出荷処
理指示入力により、出荷処理部20−3が在庫管理ファ
イル20−4、払出管理ファイル20−5を参照して、
出荷処理する。
The inventory management file 20-4 is updated by the inventory / inventory planning processing section 20-1 via the monitoring function section 26 with respect to the information of the storage processing 34. Also, order,
The expected information is updated in the payout management file 20-5 by the payout plan processing unit 20-2 via the monitoring function unit 26 described above. Further, in response to the input of the shipping processing instruction in the center system 10, the shipping processing unit 20-3 refers to the inventory management file 20-4 and the payout management file 20-5, and
Shipping processing.

【0112】例えば、出荷処理部20−3は、工程A,
B,C,Dに対する出荷指示と、出荷先からの出荷通知
により、出荷実績を更新する処理である。このようにし
て、共通機能部20の出荷処理が利用される。
For example, the shipping processing unit 20-3 performs the process A,
This is a process of updating the shipping result based on a shipping instruction for B, C, and D and a shipping notification from the shipping destination. In this way, the shipping process of the common function unit 20 is used.

【0113】ところで、布地を生産するには先述したよ
うに原糸生産工程,原糸を撚糸する撚糸工程,撚糸を織
ったり編んだりして生機を生産する織・編工程,生機を
染色仕上加工して布地にする染色仕上加工工程といくつ
もの工程を経なければならない。これらの幾多もの工程
を経るために、ある布地の注文を受けて在庫から販売す
る場合を除き、通常は最短でも10日、最長の場合は数
ヶ月の調達期間が必要である。最短の場合は、注文を受
けた布地に対応する生機の在庫があり、この生機を使っ
て染色仕上加工を行い布地を生産することができる時で
ある。最長の場合は、注文を受けた布地を生産するため
に、原糸を製造するための原料から手配しなければなら
ない場合である。
As described above, in order to produce a fabric, a raw yarn production step, a twisting step of twisting the raw yarn, a weaving / knitting step of weaving or knitting the twisted yarn to produce a greige machine, and a dyeing finishing process of the greige machine It has to go through a dyeing finishing process and a number of processes to make the fabric. In order to go through these multiple steps, a procurement period of usually at least 10 days and up to several months is required unless a particular fabric is ordered and sold from stock. In the shortest case, there is a stock of the greige machine corresponding to the ordered fabric, and the greige fabric can be used for dyeing and finishing to produce the fabric. In the longest case, in order to produce the ordered fabric, it must be arranged from raw materials for producing the raw yarn.

【0114】従って、複数の注文を同時に受けなければ
ならない状況では、複数の注文の中で最長の調達期間を
持つ注文に応じるための期間の生産計画は固定してしま
うことになる。つまり、最も長い調達期間である原糸を
製造するための原料から手配するケースに必要な数ヶ月
間の生産計画を固定してしまう事態が出現する。ところ
が、昨今の目まぐるしい市場変動では、数ヶ月先はおろ
か明日の注文変更あるいは追加注文あるいは新規注文が
発生する。これらに対応するためには、毎日全ての生産
計画を立て直さなければならず、途方もない手間がかか
る。
Therefore, in a situation where a plurality of orders must be received at the same time, the production plan for the period for responding to the order having the longest procurement period among the plurality of orders is fixed. In other words, a situation arises in which the production plan for several months required for the case of arranging from the raw material for producing the raw yarn, which is the longest procurement period, is fixed. However, due to the rapidly changing market these days, tomorrow's order changes, tomorrow's orders, additional orders, or new orders will occur several months from now. To cope with these, every production plan must be rebuilt every day, which takes tremendous effort.

【0115】そこで、実際にはある程度の期間にまとめ
て生産計画を立案することが行われるが、これとて期間
が1ケ月程度であれば、1ケ月内に起こる市場の変動に
対応できない。そこで、この様なジレンマを解決するた
めに、本発明では生産販売管理期間を長期間と前記長期
間を複数に分割した短期間を用いる。
Thus, in practice, a production plan is drafted in a certain period of time. However, if the period is about one month, it is impossible to cope with market fluctuation occurring within one month. Therefore, in order to solve such a dilemma, in the present invention, a production and sales management period is used for a long period and a short period obtained by dividing the long period into a plurality of periods.

【0116】ここで、長期間としては、第一の生産販売
管理システム12および第二の生産販売管理システム1
4で各々の製品を生産するために必要な最短の調達期間
よりも長く設定することが好ましい。なぜなら、最短の
調達期間よりも短い場合には生産販売管理計画を立てて
もこの期間内に製品が全く生産されないことになり、製
品の生産販売管理システムとしては機能しない。
Here, as the long term, the first production and sales management system 12 and the second production and sales management system 1
In step 4, it is preferable to set the time longer than the shortest procurement period required to produce each product. This is because if the production and sales management plan is shorter than the shortest procurement period, no product will be produced within this period, and the system will not function as a product production and sales management system.

【0117】そこで、長期間としては最短の調達期間よ
りも長くしなければならない。逆に長くしすぎれば先述
のような変動可能性の大きい近未来に対しても生産販売
管理が固定されてしまうことになり好ましくない。この
欠点を補うために、長期間を複数の短期間に分割した短
期間を用いる。このような、最短の調達期間よりも長い
長期間と、この長期間を複数の短期間に細分した短期間
を用いることにより、前述のようなジレンマを一挙に解
決することができる。
Therefore, the long period must be longer than the shortest procurement period. Conversely, if the length is too long, the production and sales management is fixed even in the near future where there is a great possibility of fluctuation as described above, which is not preferable. In order to compensate for this drawback, a short period obtained by dividing the long period into a plurality of short periods is used. By using such a long period longer than the shortest procurement period and a short period obtained by subdividing the long period into a plurality of short periods, the above-mentioned dilemma can be solved at once.

【0118】この実施例の場合では、第一の生産販売管
理システム12の製品の一部を第二の生産販売管理シス
テム14の原料として使うので、最短の調達期間として
は10日になる。従って、長期間としては10日以上の
期間を、例えば28日あるいは35日を設定する。また
長期間を複数に分割した短期間としては、7日あるいは
5日に設定する。
In this embodiment, since a part of the product of the first production and sales management system 12 is used as a raw material of the second production and sales management system 14, the shortest procurement period is 10 days. Therefore, as the long term, a period of 10 days or more, for example, 28 days or 35 days is set. The short period obtained by dividing the long period into a plurality is set to 7 days or 5 days.

【0119】この長期間および短期間の設定はセンター
システム10内で自動的に設定しても良いし、システム
外で人為的に設定しセンターシステムに入力しても良
い。要は、センターシステム10内に長期間と長期間を
複数の短期間に分割した期間が定義されていれば本発明
の作用は発現できる。そして、第一の生産販売管理シス
テム12内および第二の生産販売管理システム14内に
それぞれ注文情報を格納する記憶装置57、58を設け
る。そして、短期間ごとに注文情報をまとめて各々の生
産販売管理システム12、14およびセンターシステム
10で処理することにより、達成できる。
The setting of the long term and the short term may be automatically set in the center system 10 or artificially set outside the system and input to the center system. In short, if the center system 10 defines a long period and a period obtained by dividing the long period into a plurality of short periods, the operation of the present invention can be realized. Then, storage devices 57 and 58 for storing order information are provided in the first production and sales management system 12 and the second production and sales management system 14, respectively. This can be achieved by collecting the order information for each short period and processing the information in each of the production and sales management systems 12 and 14 and the center system 10.

【0120】図9は、原糸の生産計画30の実施例であ
り、長期間を4つの短期間に分割した例を示し、第一、
第二の生産販売管理システム12、14は、短期間と長
期間の計画需要を計算する。この計画需要を結合処理
(30−2)して、長期間計画時の需要を求める。この
長期間需要の対象期間を抽出処理し(30−3)、在
庫、既計画量等から生産必要量を計算処理し(30−
4)、長期間の生産計画量が得られる。
FIG. 9 shows an embodiment of the raw yarn production plan 30, showing an example in which a long period is divided into four short periods.
The second production and sales management systems 12, 14 calculate short-term and long-term planned demands. This planned demand is combined (30-2) to determine the demand for long-term planning. The target period of the long-term demand is extracted (30-3), and the required production amount is calculated from the inventory, the planned amount, and the like (30-).
4) A long-term production plan quantity can be obtained.

【0121】以下、短期間1−2、1−3、1−4で需
要計画が変更された場合には、長期間の生産計画量が、
短期間毎に修正される。このようにして、長期間と短期
間を設定し、長期間計画を立案しても、長期間内に起こ
る市場の変動に対応できる。
In the following, when the demand plan is changed in the short term 1-2, 1-3, and 1-4, the long-term production plan amount becomes
It is corrected every short period. In this way, even if a long-term and a short-term are set and a long-term plan is drawn up, it is possible to cope with market fluctuations occurring within a long term.

【0122】図9は、工程Aでの生産計画を長期間と短
期間を組み合わせた生産計画実施の例であり、長期間の
生産計画立案のために、その期間と、生産計画立案の時
期が定義される。また、この長期間を複数に区切った短
期間と、その短期間ごとの計画立案のための時期が定義
される。この例では、長期間を4つの短期間に分割して
おり、さらに最初の短期間の計画立案時期は、該当する
長期間の生産計画立案時期に一致している。
FIG. 9 shows an example of a production plan in which the production plan in the process A is a combination of a long term and a short term. Defined. In addition, a short period in which the long period is divided into a plurality of periods, and a period for planning for each short period are defined. In this example, the long term is divided into four short terms, and the first short term planning time coincides with the corresponding long term production planning time.

【0123】長期間およびまたは短期間の生産計画立案
時期になると、第一、第二の生産販売管理システム1
2、14において、対象期間内の生産必要量を算出す
る。第一の生産販売管理システム12では、まず、対象
の長期間内で需要家からの注文が確定した販売確定量を
各々の注文の納期を守ることができる短期間に割り付け
る。ついで、各販売員が需要家からの注文を予測してい
わゆる販売見込み量を入力する。これらは、原糸の量で
入力する。より具体的には品種pの原糸を第2の短期間
に50kgというように入力する。次に、生産計画立案
時点の在庫実績量および在庫予想量を用いて、(販売確
定量+販売見込み量)から(在庫実績および在庫予想
量)を減じた数量を算出して長期間内の複数の短期間ご
とにまとめて、第一の生産販売管理システム12の生産
必要量を作成する(30−1)。
When the long-term and / or short-term production planning time comes, the first and second production and sales management systems 1
In steps 2 and 14, the required production amount within the target period is calculated. In the first production / sales management system 12, first, the determined sales amount in which the order from the customer has been determined within the target long term is allocated to a short period that can keep the delivery date of each order. Next, each salesperson predicts an order from a customer and inputs a so-called expected sales amount. These are entered in terms of the amount of yarn. More specifically, the raw yarn of the type p is input such as 50 kg in the second short period. Next, using the actual amount of inventory and the expected amount of inventory at the time of production planning, a quantity obtained by subtracting (inventory actual amount and expected amount of inventory) from (confirmed sales amount + expected sales amount) is calculated, The required production amount of the first production / sales management system 12 is created for each short period (30-1).

【0124】第二の生産販売管理システム14では、
(販売確定量および販売見込み量)を複数種類の出発原
料(原糸、撚糸、生機)の(在庫実績および在庫予想
量)から引き当てて生産計画を立案する。そして複数種
類の出発原料の適正な補充を行うために、原糸から該当
する出発原料を調達するのに要する調達期間だけ遡った
時点での原糸の必要量を算出する。ここで、第二の生産
販売管理システム14で用いられる単位系から第一の生
産販売管理システム12で用いられる単位系への変換が
あらかじめ設定された変換テーブルを用いて行われる。
この変換後の必要量を第二の生産販売管理システム14
から第一の生産販売管理システム12へ要求する。
In the second production and sales management system 14,
A production plan is created by assigning (the determined sales amount and the estimated sales amount) from the (stock results and expected stock amounts) of a plurality of types of starting materials (yarn, twisted yarn, greige). Then, in order to appropriately replenish the plurality of types of starting materials, the necessary amount of the yarn at a point in time which is traced back by the procurement period required to procure the starting material from the yarn is calculated. Here, conversion from the unit system used in the second production and sales management system 14 to the unit system used in the first production and sales management system 12 is performed using a conversion table set in advance.
The required amount after the conversion is stored in the second production and sales management system 14.
From the first production and sales management system 12.

【0125】図9の例では、第一の生産販売管理システ
ム12は長期間1の各々の短期間に対し50、0,20
0,20の糸量(原糸量)を要求し、第二の生産販売管
理システム14では、50、0,0,80の糸量を要求
している。また、第二の生産販売管理システム14で
は、次の長期間2に対して200の糸量を要求してい
る。生産計画30の結合処理30−2は、これらの両生
産販売管理システム12、14から算出された需要を合
計し、対象の長期間を含む期間の需要量を算出する。
In the example shown in FIG. 9, the first production / sales management system 12 performs the operations of 50, 0, 20
The second production / sales management system 14 requests a yarn amount of 50, 0, 0, and 80, respectively. Further, the second production and sales management system 14 requires 200 yarn amounts for the next long term 2. The combining process 30-2 of the production plan 30 sums up the demands calculated from both the production and sales management systems 12, 14, and calculates the demand amount in the period including the target long term.

【0126】次に、対象期間抽出処理30−3は、今回
対象の長期間に対する需要を抽出する。すなわち、第二
の生産販売管理システム14から要求された長期間2の
要求量200は、今回の計画立案対象期間での生産を行
わなくとも、次の期間での生産で間に合うため、今回の
需要からは省かれる。
Next, the target period extraction process 30-3 extracts the demand for the long period of the target this time. That is, the demand amount 200 of the long term 2 requested from the second production and sales management system 14 can be produced in the next period without performing the production in the current planning period. Is omitted.

【0127】さらに、生産必要量計算処理30−4は、
長期間1までの生産計画と需要から、予測在庫を算出
し、長期間1に必要な短期間ごとの生産必要数量を算出
し、生産計画を立案する。
Further, the required production amount calculation processing 30-4 includes:
From the production plan and demand up to the long term 1, calculate the forecasted inventory, calculate the required quantity for each short term required for the long term 1, and make a production plan.

【0128】以降の表は、同様に算出された短期間ごと
の計画みなおしのための時期での、両生産販売管理シス
テム12、14から算出された需要と短期間ごとの生産
必要数量の例である。左の表は需要の動きを表し、上段
が変動量、下段が累積量である。右の表は、生産必要数
量をあらわし、上段が変動量、下段が累積量を表す。
The following tables are examples of demand and short-term required production quantities calculated from the production and sales management systems 12 and 14 at the same time for the short-term plan re-calculation similarly calculated. is there. The table on the left shows the movement of demand, with the upper row showing the amount of fluctuation and the lower row showing the cumulative amount. The table on the right shows the required quantity of production, the upper row shows the amount of fluctuation, and the lower row shows the cumulative quantity.

【0129】短期間1-2計画見直し時期では、長期間1の
それぞれの短期間に対し50,100,100,0の需
要が増加している。短期間1-1の50は、もはや、計画
変更ができないため対応されないが、短期間1-2,1-3の
それぞれの追加需要100に対しては生産必要量が加算
される。
In the short term 1-2 plan review period, the demand of 50, 100, 100, 0 is increasing for each short term of the long term 1. The 50 in the short period 1-1 is no longer dealt with because the plan can no longer be changed, but the production requirement is added to the additional demand 100 in each of the short periods 1-2 and 1-3.

【0130】短期間1-3計画見直し時期では、それぞれ
の短期間に対し、0、−50、−50,100の需要の
変動が起こっている。短期間1-2に対する50の需要の
減少は、計画変更できないが、この需要の変動により予
想在庫量が50増加するため、短期間1-3の需要減少5
0に対して、生産必要量は100減少する。
In the short-term 1-3 plan review period, demand fluctuations of 0, -50, -50, and 100 occur in each short period. The decrease in demand for 50 in the short term 1-2 cannot be changed, but the fluctuation in demand increases the expected inventory by 50, so the demand decrease in the short term 1-3
For 0, the production requirement is reduced by 100.

【0131】短期間1-4計画見直し時期では、短期間1-4
に対し、100の需要増が発生し、100の生産必要量
が増加している。
In the short-term 1-4 plan review period, the short-term 1-4
On the other hand, an increase in demand of 100 has occurred, and the required production amount of 100 has increased.

【0132】長期間2計画立案時では、対象期間の抽出
の条件が、長期間1から長期間2に変更される。すでに、
要求された需要、たとえば、第二の生産販売管理システ
ム14から要求された長期間2の要求量200の最新の
需要量を用いて、長期間1と同様に生産必要量が算出さ
れるプロセスが繰り返される。
At the time of planning the two long-term plans, the condition for extracting the target period is changed from the long term 1 to the long term 2. Already
The process of calculating the required production amount in the same manner as the long-term 1 using the requested demand, for example, the latest demand of the long-term 2 required amount 200 requested by the second production and sales management system 14 is described. Repeated.

【0133】これらのプロセスにより、長期間の生産計
画を立案しても長期間内に起こる市場の需要の変動に対
応できる。また、ある程度の期間に纏めた生産計画の立
案が可能となる。
By these processes, even if a long-term production plan is prepared, it is possible to cope with fluctuations in market demand that occur within a long period. In addition, it is possible to draft a production plan that is summarized in a certain period.

【0134】また、本発明では、第一の生産販売管理シ
ステム12の製品の一部を第二の生産販売管理システム
14の原料として使用するので、第一の生産販売管理シ
ステム12の立案した生産計画に同期して第二の生産販
売管理システム14が生産計画を立案しなければならな
い。
In the present invention, a part of the product of the first production and sales management system 12 is used as a raw material of the second production and sales management system 14. The second production and sales management system 14 has to make a production plan in synchronization with the plan.

【0135】以上に説明した実施の形態は、製品が繊維
業界の原糸および布地であり、中でも第一の生産販売管
理システム12の対象となる製品が繊維業界の原糸であ
り、第二の生産販売管理システム14の対象となる製品
が第一の生産販売管理システム12の製品である原糸を
原材料として使用した布地である場合について説明した
が、本発明の適用はかかる原糸および布地に限定される
ものではなく、広く一般製品を製造する場合に本発明の
適用が可能である。
In the embodiment described above, the product is a yarn and a textile in the textile industry, and in particular, the product targeted by the first production and sales management system 12 is a yarn in the textile industry, Although the description has been given of the case where the target product of the production / sales management system 14 is a fabric using the raw yarn, which is the product of the first production / sales management system 12, as a raw material, the present invention is applied to the raw yarn and the fabric. The present invention is not limited thereto, and the present invention can be applied to a case where general products are widely manufactured.

【0136】さらに、生産販売管理期間として長期間と
この長期間を複数に分割した短期間とを用いることが好
ましい。より好ましくは、最短の調達期間よりも長い長
期間を用いる。こうすることで、繊維以外の生産販売管
理システムにも適用できる。前述の説明では、長期間/
短期間の例として日の単位で例示したが、これにとらわ
れることは一切なく、長期間/短期間の組合わせとし
て、年/月,半年/月,3ケ月/月,月/旬,月/週,
月/日,日/時,時/分などを例示することができる。
Furthermore, it is preferable to use a long period and a short period obtained by dividing the long period into a plurality of periods as the production and sales management period. More preferably, a long period longer than the shortest procurement period is used. By doing so, it can be applied to a production and sales management system other than fiber. In the above explanation,
Although the short-term example is exemplified in units of days, the present invention is not limited to this, and is not limited to a long-term / short-term combination such as year / month, half-year / month, three months / month, month / season, and month / season. week,
Examples are month / day, day / hour, hour / minute, and the like.

【0137】以上、本発明を実施の形態により説明した
が、本発明の主旨の範囲内で種々の変形が可能であり、
これらを本発明の範囲から排除するものではない。
Although the present invention has been described with reference to the embodiment, various modifications are possible within the scope of the present invention.
They are not excluded from the scope of the present invention.

【0138】[0138]

【発明の効果】以上説明したように、本発明によれば、
次の効果を奏する。 (1)個々の製品の生産販売管理を行うシステムを別個
に設け、個々の製品の生産計画を別個に行い、複合製品
の需要変動に対応するとともに、センターシステムによ
り、共通部分、例えば出荷に関わる部分の処理を行うた
め、第一の生産販売管理システムおよび第二の生産販売
管理システムに各々かかる処理を設置する必要がない。 (2)かつ第一の生産販売管理システムと第二の生産販
売管理システムが各々勝手に出荷処理を行うと、在庫量
を越えた出荷処理が行われる。この事態が発生しないよ
うにするためには、第一の生産販売管理システムと第二
の生産販売管理システムとの間の同期機構の設置が必要
となるが、センターシステムを設けるため、同期機構も
必要としない。このため、システム全体の冗長性を削除
できる。
As described above, according to the present invention,
The following effects are obtained. (1) A separate system for production and sales management of individual products is provided separately, and production plans for individual products are separately performed to cope with fluctuations in demand for composite products. Since the partial processing is performed, it is not necessary to install such processing in each of the first production and sales management system and the second production and sales management system. (2) If the first production / sales management system and the second production / sales management system respectively perform the shipping processing without permission, the shipping processing exceeding the stock amount is performed. In order to prevent this situation from occurring, it is necessary to install a synchronization mechanism between the first production and sales management system and the second production and sales management system. do not need. Therefore, the redundancy of the entire system can be eliminated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態の分散型生産販売管理シ
ステムの構成図である。
FIG. 1 is a configuration diagram of a distributed production and sales management system according to an embodiment of the present invention.

【図2】図1のモニタリング機能の説明図である。FIG. 2 is an explanatory diagram of a monitoring function of FIG. 1;

【図3】図1のシステムのコンバート機能の説明図であ
る。
FIG. 3 is an explanatory diagram of a conversion function of the system of FIG. 1;

【図4】図1の第一の生産販売管理システムの原糸注文
画面の説明図である。
FIG. 4 is an explanatory diagram of a yarn order screen of the first production and sales management system of FIG. 1;

【図5】図1の第二の生産販売管理システムの原糸注文
画面の説明図である。
FIG. 5 is an explanatory diagram of a yarn order screen of the second production and sales management system of FIG. 1;

【図6】図1の第一の生産販売管理システムの加工糸注
文画面の説明図である。
FIG. 6 is an explanatory diagram of a processed yarn order screen of the first production and sales management system of FIG. 1;

【図7】図1の第二の生産販売管理システムの加工糸注
文画面の説明図である。
FIG. 7 is an explanatory diagram of a processed yarn order screen of the second production and sales management system of FIG. 1;

【図8】図1のシステムの各処理の説明図である。FIG. 8 is an explanatory diagram of each process of the system in FIG. 1;

【図9】図1の長期間計画における短期間需要変動の説
明図である。
FIG. 9 is an explanatory diagram of short-term demand fluctuation in the long-term plan of FIG. 1;

【符号の説明】[Explanation of symbols]

1 分散型生産販売管理システム 10 センターシステム 12 第一の生産販売管理システム 14 第二の生産販売管理システム 20 共通機能部 22、24 コンバート機能部 26 モニタリング機能部 DESCRIPTION OF SYMBOLS 1 Distributed production / sales management system 10 Center system 12 First production / sales management system 14 Second production / sales management system 20 Common function part 22, 24 Convert function part 26 Monitoring function part

───────────────────────────────────────────────────── フロントページの続き (72)発明者 飯室 弘之 大阪府大阪市中央区南本町1丁目6番7号 帝人株式会社内 Fターム(参考) 3E038 AA05 BA20 CC01 GA02 HA05 5B049 BB07 CC24 GG07  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Hiroyuki Iimuro 1-6-7 Minamihonmachi, Chuo-ku, Osaka-shi, Osaka Teijin Limited F-term (reference) 3E038 AA05 BA20 CC01 GA02 HA05 5B049 BB07 CC24 GG07

Claims (12)

【特許請求の範囲】[Claims] 【請求項1】第一の生産計画で生産販売管理する第一の
生産販売管理システムと、 前記第一の生産計画と異なる第二の生産計画で生産販売
管理する第二の生産販売管理システムと、 前記第一及び第二の生産販売管理システムに接続され、
対象となる生産販売管理期間を定義して、前記第一及び
第二の生産販売管理システムに共通な処理を実行するセ
ンターシステムとを有することを特徴とする分散型生産
販売管理システム。
A first production and sales management system for managing production and sales in a first production plan; a second production and sales management system for managing production and sales in a second production plan different from the first production plan; Connected to the first and second production and sales management systems,
A distributed production / sales management system, comprising: a center system for defining a target production / sales management period and executing a process common to the first and second production / sales management systems.
【請求項2】前記センターシステムは、 前記生産販売管理期間として、長期間と、前記長期間を
複数に分割した短期間を定義することを特徴とする請求
項1の分散型生産販売管理システム。
2. The distributed production and sales management system according to claim 1, wherein the center system defines, as the production and sales management period, a long period and a short period obtained by dividing the long period into a plurality.
【請求項3】前記センターシステムは、 前記第一及び第二の生産販売管理システムからの入力デ
ータを、前記共通な処理のための共通フォーマットに変
換するコンバータを有することを特徴とする請求項1又
は2の分散型生産販売管理システム。
3. The center system according to claim 1, further comprising a converter for converting input data from the first and second production and sales management systems into a common format for the common processing. Or 2) a distributed production and sales management system.
【請求項4】前記第一の生産販売管理システムが立案し
た生産計画に同期して、前記第二の生産販売管理システ
ムが生産計画を立案することを特徴とする請求項1又は
2又は3の分散型生産販売管理システム。
4. The system according to claim 1, wherein said second production and sales management system drafts a production plan in synchronization with a production plan drafted by said first production and sales management system. Distributed production and sales management system.
【請求項5】前記センターシステムの前記共通処理は、
注文に基づく製品の出荷処理であることを特徴とする請
求項1又は2又は3又は4の分散型生産販売管理システ
ム。
5. The common processing of the center system includes:
5. The distributed production and sales management system according to claim 1, wherein the distributed production and sales management system is a product shipping process based on an order.
【請求項6】前記第一の生産販売管理システムは、第一
の繊維生産販売管理システムであり、 前記第二の生産販売管理システムは、第二の繊維生産販
売管理システムであることを特徴とする請求項1又は2
又は3又は4又は5の分散型生産販売管理システム。
6. The first production and sales management system is a first textile production and sales management system, and the second production and sales management system is a second textile production and sales management system. Claim 1 or 2
Or 3 or 4 or 5 distributed production and sales management systems.
【請求項7】第一の生産計画で生産販売管理する第一の
生産販売管理工程と、 前記第一の生産計画と異なる第二の生産計画で生産販売
管理する第二の生産販売管理工程と、 前記第一及び第二の生産販売管理工程で対象となる生産
販売管理期間を定義して、前記第一及び第二の生産販売
管理工程に共通な処理を実行するセンター処理工程とを
有することを特徴とする分散型生産販売管理方法。
7. A first production and sales management process for managing production and sales in a first production plan, and a second production and sales management process for managing production and sales in a second production plan different from the first production plan. Having a center processing step of defining a production and sales management period to be targeted in the first and second production and sales management steps and executing a process common to the first and second production and sales management steps A distributed production and sales management method.
【請求項8】前記センター処理工程は、 前記生産販売管理期間として、長期間と、前記長期間を
複数に分割した短期間を定義することを特徴とする請求
項7の分散型生産販売管理方法。
8. The distributed production and sales management method according to claim 7, wherein said center processing step defines a long period and a short period obtained by dividing said long period into a plurality of periods as said production and sales management period. .
【請求項9】前記センター処理工程は、 前記第一及び第二の生産販売管理工程からの入力データ
を、前記共通な処理のための共通フォーマットに変換す
る工程を有することを特徴とする請求項7又は8の分散
型生産販売管理方法。
9. The center processing step includes a step of converting input data from the first and second production and sales management steps into a common format for the common processing. 7. A distributed production and sales management method according to 7 or 8.
【請求項10】前記第一の生産販売管理工程で立案した
生産計画に基づいて、前記第二の生産販売管理工程で生
産計画を立案することを特徴とする請求項7又は8又は
9の分散型生産販売管理方法。
10. A distributed system according to claim 7, wherein a production plan is drafted in said second production and sales management process based on a production plan drafted in said first production and sales management process. Mold production and sales management method.
【請求項11】前記センター処理工程の前記共通処理
は、注文に基づく製品の出荷処理であることを特徴とす
る請求項7又は8又は9又は10の分散型生産販売管理
方法。
11. The distributed production and sales management method according to claim 7, wherein the common processing in the center processing step is a shipping processing of a product based on an order.
【請求項12】前記第一の生産販売管理工程は、第一の
繊維生産販売管理工程であり、 前記第二の生産販売管理工程は、第二の繊維生産販売管
理工程であることを特徴とする請求項7又は8又は9又
は10又は11の分散型生産販売管理方法。
12. The first production and sales management process is a first textile production and sales management process, and the second production and sales management process is a second textile production and sales management process. The distributed production and sales management method according to claim 7 or 8 or 9 or 10 or 11.
JP2000276016A 2000-09-12 2000-09-12 Distributed production and selling management system and its method Pending JP2002092094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000276016A JP2002092094A (en) 2000-09-12 2000-09-12 Distributed production and selling management system and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000276016A JP2002092094A (en) 2000-09-12 2000-09-12 Distributed production and selling management system and its method

Publications (1)

Publication Number Publication Date
JP2002092094A true JP2002092094A (en) 2002-03-29

Family

ID=18761552

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000276016A Pending JP2002092094A (en) 2000-09-12 2000-09-12 Distributed production and selling management system and its method

Country Status (1)

Country Link
JP (1) JP2002092094A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013510855A (en) * 2009-11-10 2013-03-28 セルジーン コーポレイション Nanosuspension of sparingly soluble drugs made by microfluidization process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013510855A (en) * 2009-11-10 2013-03-28 セルジーン コーポレイション Nanosuspension of sparingly soluble drugs made by microfluidization process
US9616019B2 (en) 2009-11-10 2017-04-11 Celgene Corporation Nanosuspension of a poorly soluble drug via microfluidization process

Similar Documents

Publication Publication Date Title
JP4587246B2 (en) Computerized supply chain planning methodology
EP1310845B1 (en) Production planning method and system for preparing production plan
US20110224816A1 (en) Multi-agent system for distributed manufacturing scheduling with genetic algorithms and tabu search
CN112818189B (en) Visual processing procedure list scheduling method, system and platform
JP2003228410A (en) Work commencement management system
US7123977B2 (en) Production planning system
CN113487155B (en) Intelligent scheduling system for plastic industry
US20020128930A1 (en) Online order-placement and reception processing method and system
JPH0744631A (en) Inventory automatic adjusting system and inventory automatic adjusting method
JP7178966B2 (en) Production planning support system
US20040093101A1 (en) Production control system, production control method and production control program
Goodwin et al. Evaluating scheduling policies in a multi-level assembly system
EP1312995A1 (en) Production planning method and system for production planning
Guise et al. Development of tools to support the production planning in a textile company
JP2002092094A (en) Distributed production and selling management system and its method
JP2004054678A (en) Method and system for managing production
US6167320A (en) System for control and resource allocation for the manufacturing of a product
US7577627B2 (en) Modular SQL rule-based management of job process flow
JP4318162B2 (en) Production schedule planning management method and production schedule planning management program
CN111784230A (en) Weaving order information storage management system
JP2000067111A (en) Scheduling device and ordered production planning system
Benton Time-and cost-based priorities for job shop scheduling
WO2023144962A1 (en) Warehouse work management system, warehouse work management method, and program
JPH06231138A (en) Cloth design supporting system
JP2003337614A (en) Production reservation system