JP2001348952A JP2000167037A JP2000167037A JP2001348952A JP 2001348952 A JP2001348952 A JP 2001348952A JP 2000167037 A JP2000167037 A JP 2000167037A JP 2000167037 A JP2000167037 A JP 2000167037A JP 2001348952 A JP2001348952 A JP 2001348952A
Authority
JP
Japan
Prior art keywords
base plate
screw member
steel column
male screw
hook member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000167037A
Other languages
Japanese (ja)
Other versions
JP3483522B2 (en
Inventor
Kiyokazu Yamamoto
清和 山本
Shinji Okada
信二 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Technos Co Ltd
Original Assignee
Kumagai Technos Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Technos Co Ltd filed Critical Kumagai Technos Co Ltd
Priority to JP2000167037A priority Critical patent/JP3483522B2/en
Publication of JP2001348952A publication Critical patent/JP2001348952A/en
Application granted granted Critical
Publication of JP3483522B2 publication Critical patent/JP3483522B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a device for adjusting the position of a steel-frame column placed through the medium of a base plate on the steel support installed on base concrete. SOLUTION: The steel-frame column (10) placed on the steel support installed on the base concrete is provided with the base plate (14) tacked temporarily to the base concrete through the medium of a plurality of anchor bolts (16) extending upward from the base concrete and a plurality of nuts (20) whereinto the anchor bolts (16) are screwed. The position adjustment device for the column (10) is provided with a hook member (24) capable of being hooked on the anchor bolt (16), a female screw member (26) mounted on the hook member (24), and a male screw member (28) screwed into the screw member (26). The screw member (28) can press the peripheral surface of the base plate (14) by taking the anchor bolt (16), whereon the hook member (24) is hooked, as a reaction force supporting body.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、基礎コンクリート
上に建てられ、仮止めされた鉄骨柱の位置調整装置に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for adjusting the position of a steel column temporarily mounted on a foundation concrete.

【0002】[0002]

【従来の技術】建築予定の建物の一部をなす鉄骨柱は、
その底部に取り付けられたベースプレートを介して、基
礎コンクリート上に設けられたテツダンゴ上に吊り降ろ
され、載置される。このとき、前記ベースプレートに設
けられた複数のボルト穴に前記基礎コンクリートから伸
びる複数のアンカーボルトが通され、さらに該アンカー
ボルトにナットが螺合される。これにより、前記鉄骨柱
が前記基礎コンクリートに仮止めされる。
2. Description of the Related Art Steel columns, which form part of a building to be constructed,
Via a base plate attached to its bottom, it is suspended and placed on a tetango provided on a foundation concrete. At this time, a plurality of anchor bolts extending from the foundation concrete are passed through a plurality of bolt holes provided in the base plate, and a nut is screwed into the anchor bolt. Thereby, the steel column is temporarily fixed to the foundation concrete.

【0003】ところで、前記鉄骨柱を前記基礎コンクリ
ート上の所定位置に配置するため、前記鉄骨柱の吊り降
ろしの間、前記アンカーボルトが通された前記ベースプ
レートのボルト穴に鋼製の楔部材を差し込む。これによ
り、前記アンカーボルトに対する前記鉄骨柱の振れ、す
なわち前記ベースプレートのボルト穴の振れが抑制さ
れ、前記鉄骨柱が所定位置に配置される。
By the way, in order to arrange the steel column at a predetermined position on the foundation concrete, a steel wedge member is inserted into a bolt hole of the base plate through which the anchor bolt is passed while the steel column is suspended. . Thereby, the deflection of the steel column with respect to the anchor bolt, that is, the deflection of the bolt hole of the base plate is suppressed, and the steel column is arranged at a predetermined position.

【0004】しかし、これによれば、前記アンカーボル
トのねじ山がこれに当たる前記楔部材によって損傷を受
けることがあり、これがため、その後に行われる前記ア
ンカーボルトへの前記ナットの螺合が困難になるという
問題があった。
However, according to this, the thread of the anchor bolt may be damaged by the wedge member hitting it, which makes it difficult to screw the nut to the anchor bolt thereafter. There was a problem of becoming.

【0005】また、前記楔部材では、前記鉄骨柱の位置
決めのための微調整が困難であった。
Further, with the wedge member, it has been difficult to make fine adjustments for positioning the steel column.

【0006】[0006]

【発明が解決しようとする課題】本発明の目的は、基礎
コンクリート上に設けられたテツダンゴ上にベースプレ
ートを介して載置された鉄骨柱の位置調整を行うための
装置を提供することにある。
SUMMARY OF THE INVENTION It is an object of the present invention to provide an apparatus for adjusting the position of a steel column mounted on a tetsudango provided on a foundation concrete via a base plate.

【0007】[0007]

【課題を解決するための手段】本発明は、基礎コンクリ
ート上に設けられたテツダンゴ上に載置されかつ前記基
礎コンクリートから上方へ伸びる複数のアンカーボルト
およびこれらに螺合された複数のナットを介して前記基
礎コンクリートに仮止めされたベースプレートを有する
鉄骨柱のための位置調整装置であって、前記アンカーボ
ルトに引掛け可能であるフック部材と、該フック部材に
取り付けられた雌ねじ部材と、該雌ねじ部材に螺合され
た雄ねじ部材とを含み、前記雄ねじ部材が、前記フック
部材が引掛けられたアンカーボルトを反力支持体として
前記ベースプレートの周面を押圧可能である。
According to the present invention, there are provided a plurality of anchor bolts mounted on a tetango provided on a foundation concrete and extending upward from the foundation concrete, and a plurality of nuts screwed thereto. A position adjustment device for a steel column having a base plate temporarily fixed to the foundation concrete, wherein the hook member is hookable to the anchor bolt, a female screw member attached to the hook member, and the female screw A male screw member screwed to the member, wherein the male screw member can press the peripheral surface of the base plate using the anchor bolt on which the hook member is hooked as a reaction force support.

【0008】さらに、前記フック部材に設けられたねじ
穴に螺合された複数の第2の雄ねじ部材であって前記雌
ねじ部材の高さ位置を調整するための第2の雄ねじ部材
を含むものとすることができる。
[0008] Further, a plurality of second male screw members screwed into screw holes provided in the hook member, the second male screw members for adjusting the height position of the female screw members are included. Can be.

【0009】[0009]

【発明の作用および効果】本発明によれば、基礎コンク
リートと、該基礎コンクリートのダンゴ上に載置されか
つこれに仮止めされた鉄骨柱のベースプレートとの間に
位置調整装置を配置し、これを操作することにより、前
記鉄骨柱の位置の調整を行うことができる。すなわち、
前記位置調整装置のフック部材を前記アンカーボルトに
引掛け、前記フック部材に取り付けられた雌ねじ部材に
螺合された雄ねじ部材を回してこれを前記ベースプレー
トの周面に押し当てることにより、前記アンカーボルト
を反力支持体として、前記ベースプレートを介して前記
鉄骨柱を水平方向へ移動させ、その位置を調整すること
ができる。
According to the present invention, a position adjusting device is arranged between a foundation concrete and a base plate of a steel column which is placed on a dango of the foundation concrete and temporarily fixed thereto. By operating, the position of the steel column can be adjusted. That is,
The hook member of the position adjusting device is hooked on the anchor bolt, and the male screw member screwed to the female screw member attached to the hook member is turned to press the outer screw member against the peripheral surface of the base plate, thereby forming the anchor bolt. Can be used as a reaction force support, and the position of the steel column can be adjusted by moving the steel column horizontally through the base plate.

【0010】また、前記鉄骨柱の水平方向移動は、前記
雌ねじ部材に対する前記雄ねじ部材の移動によるため、
比較的精確な位置調整を行うことができる。
The horizontal movement of the steel column is due to the movement of the male screw member with respect to the female screw member.
Relatively accurate position adjustment can be performed.

【0011】前記位置調整装置は、好ましくは、前記基
礎コンクリート上における互いに直角な2直線のそれぞ
れの上に互いに相対するように配置し、これにより、位
置調整後の前記鉄骨柱を不動に維持し、その後に行われ
る梁入れの際の前記鉄骨柱の移動を阻止することができ
る。
The position adjusting device is preferably arranged on each of two straight lines perpendicular to each other on the foundation concrete so as to be opposed to each other, so that the steel column after the position adjustment is kept immovable. In addition, it is possible to prevent the movement of the steel column at the time of beam insertion performed thereafter.

【0012】前記雌ねじ部材は、前記フック部材のねじ
穴に螺合された第2の雄ねじ部材の回転操作により、前
記基礎コンクリートに対する高さ位置を調整することが
でき、これにより、前記雌ねじ部材に螺合された前記雄
ねじ部材を前記ベースプレートの周面に対向するように
容易に位置決めることができる。
The height of the female screw member relative to the foundation concrete can be adjusted by rotating a second male screw member screwed into the screw hole of the hook member. The screwed male screw member can be easily positioned so as to face the peripheral surface of the base plate.

【0013】[0013]

【発明の実施の形態】図1および図2を参照すると、建
築予定の建物の一部をなす鉄骨柱10が基礎コンクリー
ト12上におおよその垂直度をもって建てられ、後記ベ
ースプレート14を介して、基礎コンクリート12に仮
止めされている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to FIGS. 1 and 2, a steel column 10 forming a part of a building to be constructed is erected on a foundation concrete 12 with an approximate verticality, and is attached to a foundation Temporarily fixed to concrete 12.

【0014】本発明に係る位置調整装置15は、仮止め
された鉄骨柱10について、その水平方向に関する位置
の調整を行うために用いられる。
The position adjusting device 15 according to the present invention is used to adjust the position of the temporarily fixed steel column 10 in the horizontal direction.

【0015】鉄骨柱10は、矩形の横断面形状を有す
る。
The steel column 10 has a rectangular cross section.

【0016】鉄骨柱10はその底部に取り付けられたベ
ースプレート14を有する。ベースプレート14は矩形
の周縁部を有し、鉄骨柱10の底部を取り巻きかつ該鉄
骨柱の軸線に対して直交している。
The steel column 10 has a base plate 14 attached to its bottom. The base plate 14 has a rectangular periphery, surrounds the bottom of the steel column 10 and is orthogonal to the axis of the column.

【0017】鉄骨柱10およびベースプレート14は、
図示の例のほか、他の横断面形状、例えば円形の横断面
形状を有するものであってもよい。
The steel column 10 and the base plate 14 are
In addition to the illustrated example, it may have another cross-sectional shape, for example, a circular cross-sectional shape.

【0018】基礎コンクリート12には、コンクリート
製、モルタル製または鋼製のテツダンゴ(図示せず)
と、鉄骨柱10を基礎コンクリート12に固定するため
の複数(図示の例では8つ)のアンカーボルト16とが
部分的に埋め込まれている。
The foundation concrete 12 is made of concrete, mortar or steel tetsudango (not shown).
And a plurality (eight in the illustrated example) of anchor bolts 16 for fixing the steel column 10 to the foundation concrete 12 are partially embedded.

【0019】これらのアンカーボルト16は矩形の四辺
上に互いに間隔をおいて配置されており、また、前記テ
ツダンゴは前記矩形のほぼ中央部に仮設的に配置されて
いる。複数のアンカーボルト16および前記テツダンゴ
は、それぞれ、基礎コンクリート12の平坦面から上方
へ突出している。
The anchor bolts 16 are arranged on the four sides of the rectangle at an interval from each other, and the tetango is temporarily arranged substantially at the center of the rectangle. The plurality of anchor bolts 16 and the tetsudango each project upward from the flat surface of the foundation concrete 12.

【0020】ベースプレート14は前記テツダンゴ上に
載置されている。このため、ベースプレート14と基礎
コンクリート12との間に隙間が存する。
The base plate 14 is mounted on the above-mentioned tetsudango. Therefore, there is a gap between the base plate 14 and the foundation concrete 12.

【0021】ベースプレート14には、複数のアンカー
ボルト16に対応して、その矩形の四隅の位置と両隅間
の位置とに8つのボルト穴18が設けられている。
The base plate 14 has eight bolt holes 18 corresponding to the plurality of anchor bolts 16 at four corners of the rectangle and at a position between both corners.

【0022】アンカーボルト16は、ベースプレート1
4のボルト穴18を経て上方へ伸びている。
The anchor bolt 16 is attached to the base plate 1.
4 extend upward through the bolt holes 18.

【0023】ベースプレート14は、これらのアンカー
ボルト16にそれぞれ螺合された複数のナット20によ
り基礎コンクリート12上に固定されている。これによ
り、鉄骨柱10が、ベースプレート14を介して基礎コ
ンクリート12上に仮止めされている。符号22は、ベ
ースプレート14とナット20との間に配置された滴形
の平面形状を有する座金を示す。
The base plate 14 is fixed on the foundation concrete 12 by a plurality of nuts 20 screwed to the anchor bolts 16 respectively. Thus, the steel column 10 is temporarily fixed on the foundation concrete 12 via the base plate 14. Reference numeral 22 denotes a washer having a drop-shaped planar shape disposed between the base plate 14 and the nut 20.

【0024】鉄骨柱10の仮止めは例えば鉄骨柱10を
クレーンで吊持する間に行われる。
The steel columns 10 are temporarily fixed, for example, while the steel columns 10 are suspended by a crane.

【0025】鉄骨柱10のための位置調整装置15は、
アンカーボルト16に引掛け可能であるフック部材24
と、フック部材24に取り付けられた雌ねじ部材26
と、雌ねじ部材26に螺合された雄ねじ部材28とを有
する。
The position adjusting device 15 for the steel column 10 is
Hook member 24 that can be hooked on anchor bolt 16
And a female screw member 26 attached to the hook member 24.
And a male screw member 28 screwed to the female screw member 26.

【0026】フック部材24は全体に扁平な形態を有
し、また、アンカーボルト16に引掛けられる部分であ
る湾曲した先端部30と、先端部30から末広がりに広
がる基部32とを有する。
The hook member 24 has a flat shape as a whole, and has a curved distal end portion 30 which is a portion to be hooked on the anchor bolt 16 and a base portion 32 which extends from the distal end portion 30 toward the end.

【0027】フック部材24は、基礎コンクリート12
とベースプレート14との間に存する前記隙間に差し込
み可能であるように、その厚さ寸法が選択される。した
がって、フック部材24を前記隙間に差し込み、その先
端部30をアンカーボルト16に引掛けることができ
る。また、フック部材24は、その先端部30をアンカ
ーボルト16に引掛けたとき、その基部32が前記隙間
の外部に位置することとなる長さ寸法が選択される。
The hook member 24 is formed of the base concrete 12.
The thickness dimension is selected so that it can be inserted into the gap existing between the base plate 14 and the base plate 14. Therefore, the hook member 24 can be inserted into the gap, and the distal end portion 30 can be hooked on the anchor bolt 16. The length of the hook member 24 is selected such that the base 32 is located outside the gap when the distal end portion 30 is hooked on the anchor bolt 16.

【0028】雌ねじ部材26はフック部材24の基部3
2に取り付けられている。雌ねじ部材26は、フック部
材24がアンカーボルト16に引掛けられるときに前記
隙間の外部にあり、また、その軸線がベースプレート1
4の周面34に直交しまたアンカーボルト16の軸線と
直交し得るように、フック部材の基部32上に配置され
ている。
The female screw member 26 is connected to the base 3 of the hook member 24.
2 attached. The female screw member 26 is located outside the gap when the hook member 24 is hooked on the anchor bolt 16, and its axis is aligned with the base plate 1.
4 is disposed on the base 32 of the hook member so as to be orthogonal to the peripheral surface 34 and orthogonal to the axis of the anchor bolt 16.

【0029】したがって、雌ねじ部材26に螺合された
雄ねじ部材28は、これを回して雌ねじ部材26の軸線
上をベースプレートの周面34に向けて進めることがで
きる。また、雄ねじ部材28をさらに進めることによ
り、フック部材24が引掛けられたアンカーボルト16
に反力を担わせて、すなわち該アンカー部材を反力支持
体として、雄ねじ部材28からベースプレートの周面3
4に対して押圧力を及ぼすことができる。
Accordingly, the male screw member 28 screwed to the female screw member 26 can be turned to advance the axial line of the female screw member 26 toward the peripheral surface 34 of the base plate. Further, by further advancing the male screw member 28, the anchor bolt 16 on which the hook member 24 is hooked is provided.
To the outer peripheral surface 3 of the base plate from the male screw member 28 by using the anchor member as a reaction force support.
4 can exert a pressing force.

【0030】その結果、前記テツダンゴ上のベースプレ
ート14すなわち鉄骨柱10が水平方向へ移動する。こ
のときの最大移動距離は、ベースプレートのボルト穴1
8の直径と、該穴を貫通するアンカーボルト16の直径
との差により定まる。
As a result, the base plate 14 on the tetsudango, ie, the steel column 10, moves in the horizontal direction. The maximum movement distance at this time is the bolt hole 1 in the base plate.
8 and the diameter of the anchor bolt 16 passing through the hole.

【0031】調整装置15は基礎コンクリート12上に
配置する。好ましくは、図示の例のように、鉄骨柱10
の軸線(より正確には、鉄骨柱の軸線が位置すべき鉛直
線)と交差する水平な2直線上のそれぞれの上に2つ配
置する。
The adjusting device 15 is arranged on the foundation concrete 12. Preferably, as in the illustrated example, the steel column 10
(More precisely, a vertical line on which the axis of the steel column is to be positioned).

【0032】これによれば、各直線上の2つの調整装置
15を操作して、鉄骨柱10を設置すべき所定の箇所に
位置決めることができる。すなわち、一方の装置の雄ね
じ部材28を進めかつ他方の装置の雄ねじ部材28を後
退させて鉄骨柱10を移動させることにより、各直線上
における鉄骨柱10の位置を変え、該鉄骨柱の軸線が両
直線の交差点を通るようにすることができる。
According to this, by operating the two adjusting devices 15 on each straight line, the steel column 10 can be positioned at a predetermined position where the steel column 10 is to be installed. That is, by moving the male screw member 28 of one device and retreating the male screw member 28 of the other device to move the steel column 10, the position of the steel column 10 on each straight line is changed, and the axis of the steel column is It can pass through the intersection of both straight lines.

【0033】また、本発明の装置15によれば、雌ねじ
部材26に対して雄ねじ部材28を進めることによるた
め、鉄骨柱10の位置を微調整することができ、また、
その維持が容易である。
Further, according to the device 15 of the present invention, since the male screw member 28 is advanced with respect to the female screw member 26, the position of the steel column 10 can be finely adjusted.
Its maintenance is easy.

【0034】雄ねじ部材28は、好ましくは、六角の頭
部36と、球面の一部からなる端面38とを有する。六
角の頭部36はレンチのような雄ねじ部材28を回すた
めの工具に適合し、また、球状の端面38とすること
は、これがベースプレートの周面34に対して点状に接
することとなるため、端面38とベースプレートの周面
34との間に生じる摩擦力の低減およびこれに伴う雄ね
じ部材28に及ぼすべき回転力の低減に寄与する。
The externally threaded member 28 preferably has a hexagonal head 36 and an end face 38 which is part of a spherical surface. The hexagonal head 36 is compatible with a tool for turning the male screw member 28 such as a wrench, and the spherical end surface 38 is a point contact with the base plate peripheral surface 34. This contributes to a reduction in the frictional force generated between the end surface 38 and the peripheral surface 34 of the base plate and a reduction in the rotational force to be exerted on the male screw member 28 accompanying this.

【0035】調整装置15は、これを設置したとき、そ
の雄ねじ部材28がベースプレート14の周面34に対
向する高さ位置にあるように、例えばフック部材24の
下に1または複数の板状のスペーサ(図示せず)をお
き、あるいは、図示の例のように、フック部材24に取
り付けられた2つの第2の雄ねじ部材40を回転操作す
る。
When the adjusting device 15 is installed, one or a plurality of plate-like members are provided below the hook member 24, for example, so that the male screw member 28 is at a height position facing the peripheral surface 34 of the base plate 14. A spacer (not shown) is placed, or two second male screw members 40 attached to the hook member 24 are rotated as shown in the example shown.

【0036】第2の両雄ねじ部材40は、フック部材の
基部32に設けられた一対のねじ穴42に螺合されてい
る。図示の例では、両ねじ穴42は雌ねじ部材26の両
側に配置されている。
The second male screw members 40 are screwed into a pair of screw holes 42 provided in the base 32 of the hook member. In the illustrated example, the two screw holes 42 are arranged on both sides of the female screw member 26.

【0037】第2の雄ねじ部材40の回転操作により、
フック部材24からの第2の雄ねじ部材40の突出量を
変え、基礎コンクリート12とフック部材の基部32
(したがってこれに取り付けられた雌ねじ部材26)と
の間の距離を変えることができ、これにより、雌ねじ部
材26およびこれに螺合された雄ねじ部材28の高さ位
置を定めることができる。2つの第2の雄ねじ部材40
で基礎コンクリート12上に支持されたフック部材24
は、雄ねじ部材28をベースプレート14に押し付ける
とき、該ベースプレートと平行に維持される。
By rotating the second male screw member 40,
The amount of protrusion of the second male screw member 40 from the hook member 24 is changed so that the foundation concrete 12 and the base 32 of the hook member are changed.
(Therefore, the distance between the female screw member 26 and the male screw member 28 screwed thereto can be determined. Two second externally threaded members 40
Hook member 24 supported on foundation concrete 12 with
Are maintained parallel to the base plate when the male screw member 28 is pressed against the base plate.

【0038】第2の雄ねじ部材40は、その数量を3以
上としてもよい。
The number of the second male screw members 40 may be three or more.

【0039】調整装置15による鉄骨柱10の水平方向
に関する位置決め後、鉄骨柱10と、これと同様にして
位置決められた他の鉄骨柱(図示せず)との間に鉄骨梁
(図示せず)が配置されかつ両鉄骨柱に接続される(梁
入れ)。
After the positioning of the steel column 10 in the horizontal direction by the adjusting device 15, a steel beam (not shown) is placed between the steel column 10 and another steel column (not shown) positioned similarly. Are arranged and connected to both steel columns (beam insertion).

【0040】通常、ベースプレート14を介して基礎コ
ンクリート12上に仮止めされた鉄骨柱10およびベー
スプレート14にはわずかな傾きが存するため、前記梁
入れに先立ち、この傾きを修正または矯正する。
Usually, since the steel column 10 and the base plate 14 temporarily fixed on the foundation concrete 12 via the base plate 14 have a slight inclination, the inclination is corrected or corrected prior to the beam insertion.

【0041】この傾き矯正(建入れ直し)は、鉄骨柱1
0の頂部に複数のロープを固定し、これらのロープを地
上で引き合うことにより、あるいは、図示の傾き矯正装
置44を用いて行うことができる。
The straightening (rebuilding) of the steel column 1
This can be done by fixing a plurality of ropes to the top of the zero and pulling these ropes on the ground, or by using the illustrated straightening device 44.

【0042】鉄骨柱10の建入れ直しは、前記テツダン
ゴ20とベースプレート14との接点を支点として、鉄
骨柱10を回転させ、傾いた状態にある鉄骨柱10の軸
線を鉛直にすることまたはベースプレート14を水平に
することにより行う。
To rebuild the steel column 10, the steel column 10 is rotated with the contact point between the tetsudango 20 and the base plate 14 as a fulcrum, and the axis of the steel column 10 in an inclined state is made vertical or the base plate 14 is This is done by leveling.

【0043】傾き矯正装置44の使用による鉄骨柱10
の回転は、ベースプレート14の縁部を持ち上げること
により行う。このため、傾き装置44は、ベースプレー
ト14の各縁部のほぼ中央位置に配置されている。
The steel column 10 by using the inclination correcting device 44
Is performed by lifting the edge of the base plate 14. For this reason, the tilting device 44 is disposed substantially at the center of each edge of the base plate 14.

【0044】傾き矯正装置44は、基礎コンクリート1
2上に載置された矩形状のフレーム46と、フレーム4
6に回転可能に支持され鉛直に伸びるボルト48と、フ
レーム46内に保持されかつボルト48に螺合されたナ
ット50とを含む。
The inclination correcting device 44 is used for the basic concrete 1
And a rectangular frame 46 placed on the
6 includes a vertically extending bolt 48 rotatably supported by 6 and a nut 50 retained within frame 46 and screwed to bolt 48.

【0045】フレーム46は、上下方向に互いに相対す
る頂板52および底板54と、これらの頂板52および
底板54に固定され互いに相対する一対の側板56と、
これらの板52,54,56,56が規定する矩形の開
口の一方に配置された一対の背板58とからなる。
The frame 46 includes a top plate 52 and a bottom plate 54 facing each other in the vertical direction, a pair of side plates 56 fixed to the top plate 52 and the bottom plate 54 and facing each other.
It comprises a pair of back plates 58 arranged at one of the rectangular openings defined by these plates 52, 54, 56, 56.

【0046】ボルト48は、その軸部がフレームの頂板
52に設けられた穴57を貫通して底板54に向けて伸
びかつ球面の一部からなるその先端が底板54に接して
いる。ナット50は、全体にブロック状を呈し、その大
部分がフレームの両側板56間にありかつ残りの一部が
両背板間58にあってこれらの側板56および背板58
に摺動可能に接している。このことから、ボルト48を
その軸線の周りに回転させると、ナット50はボルト4
8と共に回転することなく、フレームの両側板56およ
び両背板58をガイドとしてこれらに沿ってフレーム4
6内を上下動する。
The bolt 48 has a shaft portion extending through a hole 57 provided in the top plate 52 of the frame toward the bottom plate 54, and a tip of a part of a spherical surface is in contact with the bottom plate 54. The nut 50 has a block shape as a whole, most of which is between the side plates 56 of the frame, and the remaining part is between the two back plates 58, and these side plates 56 and the back plates 58 are provided.
Slidably in contact with From this, when the bolt 48 is rotated about its axis, the nut 50
Without rotating together with the frame 8, the side plates 56 and both back plates 58 of the frame serve as guides along the frame 4.
6 move up and down.

【0047】ナット50は、背板58とは反対の側へ突
出する突出部60を有する。突出部60はこの上にベー
スプレート14の縁部を受け止めている。
The nut 50 has a protruding portion 60 protruding to the side opposite to the back plate 58. The protrusion 60 receives the edge of the base plate 14 thereon.

【0048】傾き矯正装置44によるベースプレート1
4による建入れ直しは、ベースプレート14の互いに相
対する両縁部にある一対の装置44の一方のボルト48
を回転させてナット50を上昇させて行う。このとき、
各アンカーボルト16に螺合されたナット20を緩めて
おき、また、他方の装置44のナット50は下降させて
おく。
The base plate 1 by the inclination correcting device 44
4, the re-installation is performed by using one of the bolts 48 of the pair of devices 44 on both opposing edges of the base plate 14.
Is rotated to raise the nut 50. At this time,
The nut 20 screwed to each anchor bolt 16 is loosened, and the nut 50 of the other device 44 is lowered.

【0049】ナット50の上昇により、その突出部60
を介して、ベースプレート14の縁部が持ち上げられ
る。ベースプレート14の前記縁部はナット50の突出
部60とフレームの頂板52との間に拘束されるため、
鉄骨柱10の転倒は防止される。
When the nut 50 is raised, the protrusion 60
, The edge of the base plate 14 is lifted. Since the edge of the base plate 14 is restrained between the protrusion 60 of the nut 50 and the top plate 52 of the frame,
The overturn of the steel column 10 is prevented.

【0050】このとき、例えば、垂直器を用いて鉄骨柱
10の垂直度を計る。ナット50の上昇距離は、ボルト
48の回転操作による精密な制御が可能であるため、鉄
骨柱10の垂直精度を高いものとすることができる。そ
の後、他方の装置44のボルト48を回転させてナット
50を上昇させ、その突出部60をベースプレート14
に当接させる。
At this time, for example, the verticality of the steel column 10 is measured using a vertical device. Since the rising distance of the nut 50 can be precisely controlled by rotating the bolt 48, the vertical accuracy of the steel column 10 can be increased. After that, the bolt 48 of the other device 44 is rotated to raise the nut 50, and the protrusion 60 is attached to the base plate 14.
Contact.

【0051】ベースプレート14の残りの両縁部に関し
て設置された装置44についても同様の操作を行い、そ
の後、各アンカーボルト16に螺合されているナット2
0の締め付けを行うことにより、柱10の建入れ直しを
完了する。
The same operation is performed for the device 44 installed on the remaining two edges of the base plate 14, and thereafter, the nut 2 screwed to each anchor bolt 16.
By performing the tightening of 0, the rebuilding of the pillar 10 is completed.

【0052】鉄骨柱10の建入れ直しの完了後、位置調
整装置15および傾き矯正装置44を撤去する。
After the re-installation of the steel column 10 is completed, the position adjusting device 15 and the inclination correcting device 44 are removed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】鉄骨柱およびベースプレートの周囲に配置され
た位置調整装置の平面図である。
FIG. 1 is a plan view of a position adjusting device disposed around a steel column and a base plate.

【図2】図1の線2−2に沿って得た位置調整装置の断
面図である。
FIG. 2 is a sectional view of the position adjustment device taken along line 2-2 in FIG. 1;

【図3】位置調整装置の側面図である。FIG. 3 is a side view of the position adjusting device.

【図4】図1の線4−4に沿って得た傾き矯正装置の断
面図である。
FIG. 4 is a cross-sectional view of the straightening device taken along line 4-4 in FIG. 1;

【図5】傾き矯正装置の側面図である。FIG. 5 is a side view of the inclination correction device.

【符号の説明】[Explanation of symbols]

10 鉄骨柱 12 基礎コンクリート 14 ベースプレート 15 位置調整装置 16,20 アンカーボルトおよびこれに螺合されたナ
ット 24,26,28 位置調整装置のフック部材、雌ねじ
部材および雄ねじ部材 40 第2の雄ねじ部材
DESCRIPTION OF SYMBOLS 10 Steel column 12 Foundation concrete 14 Base plate 15 Position adjustment device 16,20 Anchor bolt and nut screwed to this 24,26,28 Hook member, female screw member and male screw member of position adjustment device 40 Second male screw member

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】基礎コンクリート上に設けられたテツダン
ゴ上に載置されかつ前記基礎コンクリートから上方へ伸
びる複数のアンカーボルトおよびこれらに螺合された複
数のナットを介して前記基礎コンクリートに仮止めされ
たベースプレートを有する鉄骨柱のための位置調整装置
であって、前記アンカーボルトに引掛け可能であるフッ
ク部材と、該フック部材に取り付けられた雌ねじ部材
と、該雌ねじ部材に螺合された雄ねじ部材とを含み、前
記雄ねじ部材が、前記フック部材が引掛けられたアンカ
ーボルトを反力支持体として前記ベースプレートの周面
を押圧可能である、位置調整装置。
1. A temporary fixing device for a concrete base via a plurality of anchor bolts mounted on a tetsudango provided on the basic concrete and extending upward from the basic concrete and a plurality of nuts screwed thereto. A position adjusting device for a steel column having a base plate, a hook member hookable to the anchor bolt, a female screw member attached to the hook member, and a male screw member screwed to the female screw member Wherein the male screw member is capable of pressing the peripheral surface of the base plate using the anchor bolt on which the hook member is hooked as a reaction force support.
【請求項2】さらに、前記フック部材に設けられたねじ
穴に螺合された複数の第2の雄ねじ部材であって前記雌
ねじ部材の高さ位置を調整するための第2の雄ねじ部材
を含む、請求項1に記載の位置調整装置。
And a second male screw member screwed into a screw hole provided in the hook member, the second male screw member adjusting a height position of the female screw member. The position adjusting device according to claim 1.
JP2000167037A 2000-06-05 2000-06-05 Position adjustment device for steel columns Expired - Fee Related JP3483522B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000167037A JP3483522B2 (en) 2000-06-05 2000-06-05 Position adjustment device for steel columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000167037A JP3483522B2 (en) 2000-06-05 2000-06-05 Position adjustment device for steel columns

Publications (2)

Publication Number Publication Date
JP2001348952A true JP2001348952A (en) 2001-12-21
JP3483522B2 JP3483522B2 (en) 2004-01-06

Family

ID=18670255

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000167037A Expired - Fee Related JP3483522B2 (en) 2000-06-05 2000-06-05 Position adjustment device for steel columns

Country Status (1)

Country Link
JP (1) JP3483522B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006144401A (en) * 2004-11-19 2006-06-08 Kyowa Co Ltd Steel-framed pole rebuilding fixture
CN106812212A (en) * 2017-02-16 2017-06-09 中国建筑第八工程局有限公司 Unit truss quick-assembling support and unit truss assembling method
CN106965315A (en) * 2017-05-12 2017-07-21 中冶建工集团有限公司 The double-layered prefabricated thickness adjustment device of wallboard
JP2017160678A (en) * 2016-03-09 2017-09-14 センクシア株式会社 Column base fitting and construction method of column base structure using the same
KR20190076577A (en) * 2017-12-22 2019-07-02 이형기 Foundation pad for water tank which is easy to control the height and level
JP7431673B2 (en) 2020-06-09 2024-02-15 積水化学工業株式会社 Position adjustment jig and building unit position adjustment method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704696B (en) * 2012-06-21 2015-05-20 北京工业大学 Space locator for high, big and heavy steel upright column
CN103924787A (en) * 2014-05-08 2014-07-16 江苏中南建筑产业集团有限责任公司 Steel column butt joint plane position correction device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006144401A (en) * 2004-11-19 2006-06-08 Kyowa Co Ltd Steel-framed pole rebuilding fixture
JP2017160678A (en) * 2016-03-09 2017-09-14 センクシア株式会社 Column base fitting and construction method of column base structure using the same
JP7018253B2 (en) 2016-03-09 2022-02-10 センクシア株式会社 Column base hardware and how to build a column base structure using it
CN106812212A (en) * 2017-02-16 2017-06-09 中国建筑第八工程局有限公司 Unit truss quick-assembling support and unit truss assembling method
CN106965315A (en) * 2017-05-12 2017-07-21 中冶建工集团有限公司 The double-layered prefabricated thickness adjustment device of wallboard
KR20190076577A (en) * 2017-12-22 2019-07-02 이형기 Foundation pad for water tank which is easy to control the height and level
KR102004321B1 (en) * 2017-12-22 2019-07-26 이형기 Foundation pad for water tank which is easy to control the height and level
JP7431673B2 (en) 2020-06-09 2024-02-15 積水化学工業株式会社 Position adjustment jig and building unit position adjustment method

Also Published As

Publication number Publication date
JP3483522B2 (en) 2004-01-06

Similar Documents

Publication Publication Date Title
JP5055332B2 (en) Universal fixing device
JP2001348952A (en) Position adjustment device for steel-frame column
KR100767645B1 (en) Gang form level and vertical adjust apparatus
JP2649781B2 (en) Bridge level adjustment movement limiter
US3771756A (en) Dome-supporting shore assembly for a concrete ceiling slab form
JP7018253B2 (en) Column base hardware and how to build a column base structure using it
JP2008291438A (en) Anchor frame
JP4945230B2 (en) Anchor bolt support
JP3499754B2 (en) Steel column rebuilding device
JP4034778B2 (en) Steel column re-installation jig
JP2002194897A (en) Dislocation correcting jig for steel column
JP4911823B2 (en) Anchor frame anchoring structure
JP2004169546A (en) Supporting device for anchoring bolt
CN219132732U (en) Adjusting device for wedge block and embedded steel plate at bottom of precast beam
JPH06272219A (en) Support device of buffer stop support
CN219568498U (en) Track panel support system
KR200285372Y1 (en) Horizontal Adjustable Underpinning for Wall Foam Panel
JP2005016073A (en) Plumbing correction fixture and plumbing correction method
JP2005016073A6 (en) Rebuilding jig and rebuilding method
JP2003253797A (en) Structure for bearing sleeper on strut
JP2661877B2 (en) Level adjustment device of base stand in gate
JP2001081870A (en) Joint pin mounting device and prefabricated building installation method
JPH071466Y2 (en) Temporary columns for formwork support
KR200285374Y1 (en) Horizontal Adjustable Underpinning for Wall Foam Panel
JPH0674701U (en) Pillar embedding device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees