JP2001347309A - Thickness control device for rolling mill - Google Patents

Thickness control device for rolling mill

Info

Publication number
JP2001347309A
JP2001347309A JP2000169225A JP2000169225A JP2001347309A JP 2001347309 A JP2001347309 A JP 2001347309A JP 2000169225 A JP2000169225 A JP 2000169225A JP 2000169225 A JP2000169225 A JP 2000169225A JP 2001347309 A JP2001347309 A JP 2001347309A
Authority
JP
Japan
Prior art keywords
thickness
rolling
control
sheet
deviation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000169225A
Other languages
Japanese (ja)
Inventor
Takashi Hayashi
孝士 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2000169225A priority Critical patent/JP2001347309A/en
Publication of JP2001347309A publication Critical patent/JP2001347309A/en
Pending legal-status Critical Current

Links

Landscapes

  • Control Of Metal Rolling (AREA)

Abstract

PROBLEM TO BE SOLVED: To obtain a thickness control device for rolling mills with which both in-plate thickness deviation and average thickness deviation are improved by eliminating interference by absolute value control and monitor thickness control with a thickness gage. SOLUTION: This device is provided with an integrator 10 for calculating the amount of absolute thickness deviation based on the measured results with the thickness gage 9, measuring instrument 11 for measuring the length after rolling of a rolled metal plate, tracking means 12 for tracking the position of the rolled metal plate based on the output of the measuring instrument 11 and calculating means 8A with which the thickness of the metal plate 7 is calculated based on the outputs of rolling load detecting means 5 and screw down location detecting means 6, also correction is added to the thickness by the amount of the absolute thickness deviation front the integrator 10 and direction from the tracking means 12 and a screw down device 4 is driven by a specific amount based on the calculated results.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、鋼板圧延におけ
る圧延機の板厚制御装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device for controlling the thickness of a rolling mill in steel plate rolling.

【0002】[0002]

【従来の技術】図9は、例えば特開平11−22661
8号公報に示された、従来の圧延機の板厚制御装置を示
す図である。図において、圧延機1は、ワークロール2
を押圧するバックアップロール3に対して流体圧アクチ
ュエータ又は圧下スクリュウ等(図示略)を介して圧下
力を伝える油圧式または電動式の圧下装置4とバックア
ップ3の動きから圧延中の圧延荷重をロードセル等を用
いて検出可能にした圧延荷重検出手段5と、ワークロー
ル2の圧下位置を圧下装置4の流体圧アクチュエータ又
は圧下スクリュウ等における移動量から適宜位置センサ
等を用いて検出可能にした圧下位置検出手段6と、これ
ら各検出手段5、6から得られた検出データを基にゲー
ジメータ方式を用いて板材7の板厚を算定すると共に、
その算定結果に基いて上記圧下装置4を所定量駆動する
演算手段8と、厚み計9とを備える。
2. Description of the Related Art FIG.
FIG. 8 is a view showing a conventional thickness control device of a rolling mill disclosed in Japanese Patent Publication No. In the figure, a rolling mill 1 has a work roll 2
The hydraulic or electric pressing device 4 that transmits a rolling force to the backup roll 3 that presses through a fluid pressure actuator or a screw (not shown) or the like (not shown), and the rolling load during rolling from the movement of the backup 3 to a load cell or the like. And a roll-down position detecting means 5 capable of detecting the rolling position of the work roll 2 from a moving amount of a hydraulic actuator of the rolling-down device 4 or a screw-down screw using a position sensor or the like. The thickness of the plate 7 is calculated using the gauge 6 based on the means 6 and the detection data obtained from each of the detection means 5 and 6,
A calculating means 8 for driving the pressing-down device 4 by a predetermined amount based on the calculation result and a thickness gauge 9 are provided.

【0003】次に、動作について、図10を参照して説
明する。板材7がワークロール2に噛み込んだ時点で、
まず絶対値制御が開始され、板材7の板厚が目標板厚の
範囲内に入るまで、圧下装置4によって圧下量が制御さ
れる(ステップ500〜503)。この絶対値制御はゲ
一ジメータ方式を用いたもので、圧延荷重検出手段5に
よって検出された圧延荷重を基に求めた負荷時における
圧延機1の変形量と、無負荷時におけるロールギャップ
とから、演算手段8が圧延中におけるワール2のロール
ギャップを求めて、このロールギャップにより圧延後
(出側)における板材7の板厚をさらにこの板厚を基
に、逐次、圧下装置4に制御を加えるものである。
Next, the operation will be described with reference to FIG. When the plate 7 bites into the work roll 2,
First, the absolute value control is started, and the amount of reduction is controlled by the reduction device 4 until the thickness of the plate 7 falls within the range of the target thickness (steps 500 to 503). This absolute value control uses a gage meter method, and is based on a deformation amount of the rolling mill 1 at the time of load obtained based on the rolling load detected by the rolling load detecting means 5 and a roll gap at the time of no load. The calculating means 8 obtains the roll gap of the whirl 2 during rolling, and the roll gap controls the sheet thickness of the sheet material 7 after rolling (outside) based on the sheet thickness to the rolling-down device 4 sequentially. It is in addition.

【0004】この場合、圧延中において刻々と変化する
各種外乱等を取り入れて各種補正を加えるようにすれば
よい。そして、この絶対値制御により、板材7の板厚が
所定の板厚範囲内へ収められたことが確かめられると、
次に、この絶対値制御から定位制御への切り換えが行わ
れ(ステップ503および504)、その後、板材7が
ワークロール2から尻抜けするまでの間にわたり、この
定位制御により、圧下装置4によるワークロール2の圧
下位置が所定位置に制御される。(ステップ504〜5
06)。
In this case, various corrections may be made by incorporating various disturbances that change every moment during rolling. Then, when it is confirmed by this absolute value control that the plate thickness of the plate member 7 is within a predetermined plate thickness range,
Next, switching from the absolute value control to the localization control is performed (steps 503 and 504). Thereafter, until the plate 7 comes off from the work roll 2, the work by the pressing-down device 4 is performed by the localization control. The roll-down position of the roll 2 is controlled to a predetermined position. (Steps 504-5
06).

【0005】図11は、この板厚制御方法における制御
状態を示す。図において、横軸は時間軸であり、縦軸は
それぞれの項目の量である。図11(a)に示す圧延荷
重が発生した位置が、板材7が圧延機1に噛み込んだ時
であり、噛み込みから一定時間後の時点T1に絶対値制
御が開始される。絶対値制御によって図11(b)に示
すゲージメータ板厚偏差は時点T1の時点から0に向か
って制御される。このとき、図11(c)に示すゲージ
メータ板厚制御出力は、時点T1の時点からゲージメー
タ板厚偏差を0に近づけるべく出力される(ここでは正
方向)。厚み計9は圧延機1より下流に設置されるため
に、図11(d)に示すように噛み込みより時点T1〜
T2の間で所定の時間だけ遅れて板材7の板厚偏差を検
出している。絶対値制御によって、ゲージメータ板厚偏
差が0付近になされたならば、時点T2で定位制御に切
り換わり、ゲージメメータ板厚制御出力を保持して板材
7が圧延機1を尻抜けするまで時点TEに亘って定位制
御は行われる。
FIG. 11 shows a control state in this sheet thickness control method. In the figure, the horizontal axis is the time axis, and the vertical axis is the quantity of each item. The position where the rolling load is generated as shown in FIG. 11A is when the sheet material 7 bites into the rolling mill 1, and the absolute value control is started at a time point T1 after a certain time from the biting. By the absolute value control, the gauge meter plate thickness deviation shown in FIG. 11B is controlled from time T1 toward zero. At this time, the gauge meter plate thickness control output shown in FIG. 11C is output from the time point T1 so that the gauge meter plate thickness deviation approaches 0 (here, the positive direction). Since the thickness gauge 9 is installed downstream of the rolling mill 1, as shown in FIG.
The sheet thickness deviation of the sheet material 7 is detected with a predetermined time delay during T2. If the gauge meter thickness deviation is made to be close to 0 by the absolute value control, the control is switched to the localization control at time T2, the gauge meter thickness control output is held, and the time TE is maintained until the plate material 7 passes through the rolling mill 1. Is performed over the period.

【0006】[0006]

【発明が解決しようとする課題】従来の圧延機の板厚制
御装置は、以上のように構成されていたので、定位制御
に切り換わってからは板厚制御がなされないために、図
11に示すように、板内板厚偏差が残る問題点があっ
た。また、ゲージメータ板厚による絶対値制御のみのた
めに厚み計での平均板厚偏差にオフセットが発生する問
題点があった。
Since the conventional plate thickness control device for a rolling mill is constructed as described above, the plate thickness control is not performed after switching to the localization control. As shown, there was a problem that the thickness deviation in the plate remained. Further, there is a problem that an offset is generated in the average thickness deviation in the thickness gauge because only the absolute value control by the gauge thickness is performed.

【0007】この発明は、上記のような課題を解決する
ためになされたものであり、ゲージメータ方式の絶対値
制御と厚み計によるモニタ板厚制御の干渉を無くし、板
内板厚偏差と平均板厚偏差の両方を向上させることがで
きる圧延機の板厚制御装置を提供することを目的とす
る。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-described problems, and eliminates interference between an absolute value control of a gauge meter system and a monitor thickness control by a thickness gauge, thereby achieving an internal plate thickness deviation and an average. An object of the present invention is to provide a sheet thickness control device for a rolling mill that can improve both sheet thickness deviations.

【0008】[0008]

【課題を解決するための手段】請求項1の発明に係る圧
延機の板厚制御装置は、ワークロールを押圧するバック
アップロールに対して圧下力を伝える圧下装置と上記バ
ックアップロールの動きから圧延中の圧延荷重を検出す
る圧延荷重検出手段と、上記ワークロールの圧下位置を
検出する圧下位置検出手段と、圧延された板材の厚みを
測定する厚み計とを有する圧延機の板厚制御装置におい
て、上記厚み計の計測結果に基づいて絶対板厚偏差量を
算出する積分手段と、上記圧延された板材の圧延後の長
さを測定する測定手段と、該測定手段に出力に基づいて
上記圧延された板材の位置をトラッキングするトラッキ
ング手段と、上記圧延荷重検出手段と上記圧下位置検出
手段の出力に基づいて板材の板厚を算定すると共に、上
記積分手段からの絶対板厚偏差量を上記トラッキング手
段からの指示により板厚に補正を加え、その算定結果に
基づいて上記圧下装置を所定量駆動する演算手段とを備
えたものである。
According to a first aspect of the present invention, there is provided a plate thickness control device for a rolling mill, wherein a rolling device for transmitting a rolling force to a backup roll for pressing a work roll and a rolling device for performing rolling during movement of the backup roll. Rolling load detecting means for detecting the rolling load, rolling position detecting means for detecting the rolling position of the work roll, and a thickness control device for a rolling mill having a thickness gauge for measuring the thickness of the rolled sheet material, Integrating means for calculating the absolute thickness deviation amount based on the measurement result of the thickness gauge, measuring means for measuring the length of the rolled sheet material after rolling, and the rolling based on the output to the measuring means Tracking means for tracking the position of the sheet material, and calculating the sheet thickness of the sheet material based on the outputs of the rolling load detecting means and the rolling position detecting means, The TaiitaAtsu deviation correction in thickness applied by an instruction from said tracking means, in which a calculation means for a predetermined amount of driving the reduction device on the basis of the calculation results.

【0009】請求項2の発明に係る圧延機の板厚制御装
置は、請求項1の発明において、圧延材が上記ワークロ
ールに噛み込んだ後に、設定された板厚を目標に絶対値
板厚制御を行ない、板厚が目標板厚に到達したならば、
現在のロールギャップと圧延荷重とミル伸び係数から得
られる板厚を目標板厚に切り換えて、板厚制御を行うと
共に、圧延材の位置を上記トラッキング手段に通知し
て、絶対値制御完了位置のトラッキングを開始し、その
後、絶対値制御位置が上記厚み計に到達したら、上記積
分手段からの絶対板厚偏差量に対する板厚制御を開始す
るものである。
According to a second aspect of the present invention, there is provided a plate thickness control device for a rolling mill according to the first aspect of the present invention, wherein after the rolled material bites into the work roll, an absolute value of the target thickness is set to the set thickness. Perform the control, and when the thickness reaches the target thickness,
The thickness obtained from the current roll gap, rolling load and mill elongation coefficient is switched to the target thickness, and the thickness is controlled, and the position of the rolled material is notified to the tracking means, and the absolute value control completion position is determined. Tracking is started, and thereafter, when the absolute value control position reaches the thickness gauge, the thickness control for the absolute thickness deviation amount from the integrating means is started.

【0010】請求項3の発明に係る圧延機の板厚制御装
置は、請求項1の発明において、絶対値制御中に圧延材
が上記厚み計に到達したときに、絶対値制御における板
厚偏差と上記厚み計の偏差の極性が反対であった場合
は、絶対値制御を中止して、現在のロールギャップと圧
延荷重とミル伸ぴ係数から得られる板厚を目標板厚に切
り換えて板厚制御を行うと共に上記積分手段からの絶対
板厚偏差量に基づいて絶対値制御を行うものである。
According to a third aspect of the present invention, there is provided a sheet thickness control device for a rolling mill according to the first aspect of the present invention, wherein when the rolled material reaches the thickness gauge during the absolute value control, the sheet thickness deviation in the absolute value control. If the polarities of the deviations of the above thickness gauges are opposite to each other, the absolute value control is stopped, and the thickness obtained from the current roll gap, rolling load, and mill elongation coefficient is switched to the target thickness to change the thickness. In addition to the control, the absolute value control is performed based on the absolute thickness deviation amount from the integrating means.

【0011】請求項4の発明に係る圧延機の板厚制御装
置は、請求項1の発明において、圧延材が上記ワークロ
ールに噛み込み後、一定の時間を過ぎても設定板厚と実
績板厚の偏差が一定の範囲内に収まらない場合は絶対板
厚制御を行わず、現在のロールギャップと圧延荷重とミ
ル伸び係数から得られる板厚を目標板厚に切り換えて板
厚制御を行うものである。
According to a fourth aspect of the present invention, there is provided the sheet thickness control device for a rolling mill according to the first aspect of the present invention, wherein the set sheet thickness and the actual sheet thickness are maintained even after a certain period of time has elapsed after the rolled material bites into the work roll. If the thickness deviation does not fall within a certain range, absolute thickness control is not performed, and the thickness obtained from the current roll gap, rolling load and mill elongation coefficient is switched to the target thickness to control the thickness. It is.

【0012】請求項5の発明に係る圧延機の板厚制御装
置は、請求項1の発明において、圧延材が上記ワークロ
ールに噛み込み後、一定の圧延長を過ぎても設定板厚と
実績板厚の偏差が一定の範囲内に収まらない場合は絶対
板厚制御を行わず、現在のロールギャップと圧延荷重と
ミル伸び係数から得られる板厚を目標板厚に切り換えて
板厚制御を行うものである。
According to a fifth aspect of the present invention, there is provided a sheet thickness control device for a rolling mill according to the first aspect of the present invention, wherein a set sheet thickness and an actual result are obtained even after a certain pressure elongation has passed after a rolled material bites into the work roll. If the thickness deviation does not fall within a certain range, absolute thickness control is not performed, and the thickness obtained from the current roll gap, rolling load, and mill elongation coefficient is switched to the target thickness to perform thickness control. Things.

【0013】[0013]

【発明の実施の形態】以下、この発明の実施の形態を、
図を参照して説明する。 実施の形態1.図1は、この発明の実施の形態1を示す
構成図である。なお、図1において、図9と対応する部
分には同一符号を付して説明する。図において、圧延機
1Aは、ワークロール2を押圧するバックアップロール
3に対して流体圧アクチュエータ又は圧下スクリュウ等
(図示略)を介して圧下力を伝える油圧式または電動式
の圧下装置4とバックアップロール3の動きから圧延中
の圧延荷重をロードセル等を用いて検出可能にした圧延
荷重検出手段5と、ワークロール2の圧下位置を圧下装
置4の流体圧アクチュエータ又は圧下スクリュウ等にお
ける移動量から適宜位置センサ等を用いて検出可能にし
た圧下位置検出手段6と、圧延された板材7の厚みを測
定する厚み計9と、厚み計9からの厚み偏差信号を比例
積分する積分手段としての積分器10と、ワークロール
2に接続して圧延された板材7の圧延後の長さを測定す
る測定手段としての測定器11と、測定器11の信号に
て圧延された板材7の位置をトラッキングするトラッキ
ング手段12と、圧延荷重検出手段5と圧下位置検出手
段6から得られた検出データを基にゲージメータ方式を
用いて板材7の板厚を算定すると共に、積分器10から
の絶対板厚偏差量をトラッキング手段12からの指示で
ゲージメータ式の板厚に補正を加え、その算定結果に基
いて圧下装置4を所定量駆動する演算手段8Aとを備え
る。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described.
This will be described with reference to the drawings. Embodiment 1 FIG. FIG. 1 is a configuration diagram showing Embodiment 1 of the present invention. Note that, in FIG. 1, portions corresponding to those in FIG. In the figure, a rolling mill 1A includes a hydraulic or electric rolling device 4 that transmits a rolling force to a backup roll 3 that presses a work roll 2 via a fluid pressure actuator or a rolling screw (not shown) and a backup roll. 3. Rolling load detecting means 5 that can detect the rolling load during rolling using a load cell or the like from the movement of 3, and the rolling position of the work roll 2 is appropriately determined based on the amount of movement of the fluid pressure actuator of the rolling device 4 or the rolling screw or the like. A roll-down position detecting means 6 which can be detected by using a sensor or the like; a thickness gauge 9 for measuring the thickness of the rolled sheet material 7; and an integrator 10 as integrating means for proportionally integrating a thickness deviation signal from the thickness gauge 9. And a measuring device 11 as measuring means for measuring the length of the rolled plate 7 connected to the work roll 2 after rolling, and a signal from the measuring device 11 The thickness of the sheet material 7 is calculated using a gauge meter method based on the tracking means 12 for tracking the position of the sheet material 7 rolled by rolling, the detection data obtained from the rolling load detection means 5 and the rolling position detection means 6. At the same time, the absolute thickness deviation amount from the integrator 10 is corrected by the instruction from the tracking means 12 to the gauge meter type thickness, and the calculating means 8A for driving the screw-down device 4 by a predetermined amount based on the calculation result is provided. Prepare.

【0014】次に、動作について、図2を参照して説明
する。板材7がワークロール2に噛み込んだ時点で、ま
ず絶対値制御が開始され(1次ロックオン)、板材7の
ゲージメータ板厚が目標板厚(=設定板厚)の一定の偏
差範囲内に入るまで、圧下装置4によって圧下量が制御
される(ステップ100〜103)。この絶対値制御は
従来と同じゲージメータ方式である。板材7のゲージメ
ータ板厚が目標板厚の一定の偏差範囲内に入ったなら
ば、この時のゲージメータ板厚に積分器10からの厚み
計9で得られる実績板厚偏差の比例積分を加算して目標
板厚に設定し、ゲージメ一タ式の板内板厚制御を開始す
る(2次ロックオン)、この時、積分器10の比例積分
値はリセットされているので0である。(ステップ10
4)
Next, the operation will be described with reference to FIG. At the time when the plate 7 bites into the work roll 2, the absolute value control is first started (primary lock-on), and the gauge meter plate thickness of the plate 7 is within a certain deviation range from the target plate thickness (= set plate thickness). Until the process enters, the reduction amount is controlled by the reduction device 4 (steps 100 to 103). This absolute value control is the same gauge meter system as in the past. If the gauge meter plate thickness of the plate material 7 falls within a certain deviation range of the target plate thickness, the proportional integral of the actual plate thickness deviation obtained by the thickness meter 9 from the integrator 10 is added to the gauge meter plate thickness at this time. The target plate thickness is set by addition, and the plate thickness control of the gauge meter type is started (secondary lock-on). At this time, since the proportional integral value of the integrator 10 has been reset, it is zero. (Step 10
4)

【0015】2次ロックオンが行われたときトラッキン
グ手段12に2次ロックオンの通知をし、トラッキング
手段12はこの時のワークロール2直下の位置を絶対値
制御完了位置として、長さ測定器11からの信号を基に
板材7の絶対値制御完了位置のトラッキングを開始し、
絶対値制御完了位置が厚み計9位置に到達したことを検
出すると、積分器10に対して厚み計9より得られる実
測板厚偏差の比例積分を開始するように指示する。この
時より、目標板厚に実績板厚偏差の比例積分値が発生し
モニタ板厚制御が開始される(ステップ104〜10
8)。これらの制御は、板材7がワークロール2から尻
抜けするまで行われる(ステップ109)。
When the secondary lock-on is performed, the tracking unit 12 is notified of the secondary lock-on. The tracking unit 12 sets the position immediately below the work roll 2 at this time as the absolute value control completion position, and uses the length measuring device. Tracking of the absolute value control completion position of the plate 7 is started based on the signal from
When it is detected that the absolute value control completion position has reached the thickness gauge 9 position, the integrator 10 is instructed to start the proportional integration of the actually measured plate thickness deviation obtained from the thickness gauge 9. From this time, a proportional integral value of the actual thickness deviation is generated in the target thickness, and monitor thickness control is started (steps 104 to 104).
8). These controls are performed until the plate 7 comes off the work roll 2 (step 109).

【0016】図3は、本実施の形態における制御状態を
示す。図において、横軸は時間軸であり、縦軸はそれぞ
れの項目の量である。図3(a)に示す圧延荷重が発生
した位置で板材7がワークロール2に噛み込み、その噛
み込みから一定時間後の時点T1で絶対値制御を開始
し、図3(b)に示すゲージメータ板厚偏差が0付近に
なるまで絶対値制御を行う。ここまでは従来技術と同じ
である。ゲージメータ板厚偏差が0付近になれば、絶対
値制御を時点T2で中止して、現在のゲージメータ板厚
をロックオンし(2次ロックオン)、図3(c)に示す
板内板厚制御を同じく時点T2で開始する。板内板厚偏
差によってゲージメータ板厚偏差がロックオン時の板厚
になるように制御される(モニタ板厚制御出力とは非干
渉となるように)。
FIG. 3 shows a control state in this embodiment. In the figure, the horizontal axis is the time axis, and the vertical axis is the quantity of each item. The plate 7 bites into the work roll 2 at the position where the rolling load is generated as shown in FIG. 3A, and the absolute value control is started at a time T1 after a certain time from the biting, and the gauge shown in FIG. The absolute value control is performed until the meter plate thickness deviation becomes close to zero. This is the same as the conventional technology. When the gauge meter plate thickness deviation becomes close to 0, the absolute value control is stopped at time T2, the current gauge meter plate thickness is locked on (secondary lock-on), and the inner plate shown in FIG. The thickness control is also started at time T2. The gauge thickness deviation is controlled to be the thickness at the time of lock-on according to the thickness deviation in the plate (so as not to interfere with the monitor thickness control output).

【0017】板材7の2次ロックオン位置が厚み計9に
到達した時点(T3)で板内板厚制御を行いながら、図
3(e)に示すモニタ板厚制御を時点T3で開始して図
3(d)に示す厚み計板厚偏差が0になるようにモニタ
板厚制御を時点TEまで行い、板材7がワークロール2
を尻抜けするまで時点TEに亘って板内板厚制御は行わ
れる。なお、モニタ板厚偏差はここではマイナスとなっ
ている。本制御での圧延の目的は厚み計板厚偏差が0に
なるように制御することである。
At the time (T3) when the secondary lock-on position of the plate 7 reaches the thickness gauge 9 (T3), the monitor thickness control shown in FIG. The monitor thickness control is performed until time point TE so that the thickness gauge thickness deviation shown in FIG.
The thickness control in the board is performed over the time point TE until the bottom is removed. The monitor thickness deviation is negative here. The purpose of the rolling in this control is to control the thickness gauge thickness deviation to be zero.

【0018】このように、本実施の形態では、絶対値制
御部分と板内板厚制御部分で個別に適正なチューニング
率を設定できるので板厚と板内板厚偏差の両方に高精度
を提供できると共に、厚み計からの実績板厚偏差の補正
をゲージメータ板厚の絶対値制御が完了してから行うの
で、厚み計からの実績板厚偏差補正量とゲ一ジメータ板
厚の絶対値制御のぶつかり合いによるハンチングや過補
償といった問題が発生しない。
As described above, in the present embodiment, since an appropriate tuning ratio can be individually set in the absolute value control portion and the plate thickness control portion, high precision is provided for both the plate thickness and the plate thickness deviation. The actual thickness deviation correction from the thickness gauge is performed after the absolute value control of the gauge meter thickness is completed, so the actual thickness deviation correction amount from the thickness gauge and the absolute value control of the gauge meter thickness are controlled. No problems such as hunting and overcompensation due to collisions occur.

【0019】実施の形態2.図4は、この発明の実施の
形態2を示すフローチャートである。なお、その構成に
ついては、上記実施の形態1と同様のものが用いられ
る。上記実施の形態1では、目標板厚の誤差があり、且
つ厚み計と極性が反対になるような場合は絶対値制御が
完了して、完了位置が厚み計に到達してから、更に反対
方向に板厚の補正を行うことになるので、実際の板厚
(厚み計より得られる板厚)に到達するまでに時間がか
かる問題がある。そこで、本実施の形態ではこの問題を
解決するためになされたものである。
Embodiment 2 FIG. 4 is a flowchart showing the second embodiment of the present invention. In addition, about the structure, the thing similar to said Embodiment 1 is used. In the first embodiment, when there is an error in the target thickness and the polarity is opposite to that of the thickness gauge, the absolute value control is completed, and after the completion position reaches the thickness gauge, the direction is further reversed. However, it takes a long time to reach the actual thickness (the thickness obtained from the thickness gauge). Therefore, the present embodiment has been made to solve this problem.

【0020】次に、動作について、図4を参照して説明
する。板材7がワークロール2に噛み込んだ時点で、ま
ず絶対値制御が開始され(1次ロックオン)、板材7の
ゲージメータ板厚(実績板厚)が目標板厚(=設定板
厚)の一定の偏差範囲内に入るまで、圧下装置4によっ
て圧下量が制御される(ステップ200〜203)。こ
の絶対値制御は従来と同じゲージメータ方式である。
Next, the operation will be described with reference to FIG. When the plate 7 is engaged with the work roll 2, the absolute value control is first started (primary lock-on), and the gauge meter plate thickness (actual plate thickness) of the plate 7 is equal to the target plate thickness (= set plate thickness). The reduction amount is controlled by the reduction device 4 until the deviation falls within a certain deviation range (steps 200 to 203). This absolute value control is the same gauge meter system as in the past.

【0021】この時、ゲージメータ板厚が一定の偏差範
囲内に入る前に、圧延材が厚み計を通過した場合は厚み
計9で測定された板厚偏差と、ゲージメータ方式による
絶対板厚と実績板厚の偏差(絶対板厚偏差)の極性を比
較して極性が同じであれば、実施の形態1と同様の処理
を行い、極性が逆であれば即座にゲージメータ絶対板厚
制御を中止して2次ロックオンし、モニタ板厚制御を開
始する(ステップ204〜214)。
At this time, if the rolled material passes through the thickness gauge before the gauge meter thickness falls within a certain deviation range, the sheet thickness deviation measured by the thickness gauge 9 is compared with the absolute thickness by the gauge meter method. If the polarity is the same, the same processing as in the first embodiment is performed, and if the polarity is reversed, the gauge meter absolute thickness control is immediately performed. Is stopped, the secondary lock-on is performed, and monitor thickness control is started (steps 204 to 214).

【0022】図5は、本実施の形態における板厚の制御
状態を示す。図において、横軸は時間軸であり、縦軸は
それぞれの項目の量である。図5(a)に示す圧延荷重
が発生した位置で板材7がワークロール2に噛み込み、
その噛み込みから一定時間後の時点T1で絶対値制御を
開始し、図5(b)に示すゲージメータ板厚偏差が0付
近になるまで絶対値制御を行う。絶対値制御中に厚み計
9に板材7が到達した時(時点T4)に、ゲージメータ
板厚偏差と図5(d)に示す厚み計板厚偏差の極性が反
対であったならば、絶対値制御を中止し(時点T4)、
現在の板厚をロック・オン(2次ロックオン)して図5
(c)の板内板厚制御を開始し(時点T4)、図5
(e)に示すモニタ板厚制御を時点T5で開始する。こ
れは、板材7がワークロール2を尻抜けする時点TEま
で行われる。
FIG. 5 shows a control state of the plate thickness in the present embodiment. In the figure, the horizontal axis is the time axis, and the vertical axis is the quantity of each item. The plate 7 bites into the work roll 2 at the position where the rolling load is generated as shown in FIG.
Absolute value control is started at a time point T1 after a predetermined time from the biting, and the absolute value control is performed until the gauge meter plate thickness deviation shown in FIG. If the polarity of the gauge meter plate thickness deviation and the thickness gauge plate thickness deviation shown in FIG. 5D are opposite when the plate 7 reaches the thickness gauge 9 during the absolute value control (time T4), the absolute Stop the value control (time T4),
Locking on the current plate thickness (secondary lock-on) and FIG.
The thickness control in the plate (c) is started (time T4), and FIG.
The monitor thickness control shown in (e) is started at time T5. This is performed until the time point TE at which the plate material 7 passes through the work roll 2.

【0023】このように、本実施の形態では、設定板厚
と厚み計で測定される実績板厚の極性が反対になるよう
な誤差が発生した場合でも、速やかに補正が行われ、設
定板厚の誤差による板厚不良部分を最小限に抑えること
が可能である。
As described above, in the present embodiment, even when an error occurs in which the polarity of the set plate thickness and the actual plate thickness measured by the thickness gauge are opposite, the correction is quickly performed, and the set plate thickness is corrected. It is possible to minimize the thickness defect portion due to the thickness error.

【0024】実施の形態3.図6は、この発明の実施の
形態3を示すフローチャートである。なお、その構成に
ついては、上記実施の形態1と同様のものが用いられ
る。上記実施の形態1および2においては、板材7がワ
ークロール2に噛み込み、絶対値制御を行う時に、目標
板厚とゲージメータ式から得られる実績板厚との偏差が
大きい場合は、急激にロールギャップが変化するため
に、通板不良などが発生する問題がある。本実施の形態
はこれを解決するためになされたものである。
Embodiment 3 FIG. FIG. 6 is a flowchart showing the third embodiment of the present invention. In addition, about the structure, the thing similar to said Embodiment 1 is used. In the first and second embodiments, when the sheet material 7 bites into the work roll 2 and the absolute value control is performed, if the deviation between the target sheet thickness and the actual sheet thickness obtained from the gauge meter formula is large, the plate material 7 suddenly increases. Since the roll gap changes, there is a problem that a sheet passing failure or the like occurs. The present embodiment has been made to solve this.

【0025】次に、動作について、図6を参照して説明
する。板材7がワークロール2に噛み込んだ時に、タイ
マーを起動する。(ステップ300〜301)。実績板
厚と設定板厚が一定の範囲内に入るまで絶対板厚制御を
開始せずロールギャップ固定で圧延する。(ステップ3
02)。タイマー値が一定の時間を過ぎた時、板厚偏差
が一定の範囲内に収まった場合は実施の形態1と同様の
処理を実行し、収まらない場合は絶対板厚制御をバイパ
スして、実績板厚を目標板厚に設定し板内板厚制御を開
始し(ステップ303〜307)、厚み計に圧延材が到
達すれば、モニタ板厚制御を開始する(ステップ309
〜315)。
Next, the operation will be described with reference to FIG. When the plate member 7 bites into the work roll 2, a timer is started. (Steps 300 to 301). Rolling is performed with the roll gap fixed without starting the absolute thickness control until the actual thickness and the set thickness are within a certain range. (Step 3
02). When the timer value exceeds a certain time, if the thickness deviation falls within a certain range, the same processing as in the first embodiment is executed. The sheet thickness is set to the target sheet thickness and the sheet thickness control in the sheet is started (steps 303 to 307). When the rolled material reaches the thickness gauge, the monitor sheet thickness control is started (step 309).
315).

【0026】図7は、本実施の形態における板厚の制御
状態を示す。図において、横軸は時間軸であり、縦軸は
それぞれの項目の量である。板材7がワークロール2に
噛み込み後、ゲージメータ板厚偏差チエックして、一定
値以上偏差がある場合は絶対値制御を開始せずに、ロー
ルギャッブ固定(定位制御)で待機する。タイマー時間
に到達するまでに、ゲージメータ板厚偏差が一定の範囲
内に入らなければ、現在の板厚をロックオン(2次ロッ
クオン)して板内板厚制御を時点T6で開始し、板材7
が厚み計9に到達すればモニタ板厚制御を時点T7で開
始する。これは、板材7がワークロール2を尻抜けする
時点TEまで行われる。
FIG. 7 shows a control state of the plate thickness in the present embodiment. In the figure, the horizontal axis is the time axis, and the vertical axis is the quantity of each item. After the plate member 7 bites into the work roll 2, the gauge meter plate thickness deviation check is performed. If there is a deviation of a certain value or more, the absolute value control is not started, and the roll gab is fixed (localization control) and waits. If the gauge meter plate thickness deviation does not fall within a certain range before the timer time is reached, the current plate thickness is locked on (secondary lock-on) and the plate thickness control is started at time T6. Plate 7
Reaches the thickness gauge 9, monitor thickness control is started at time T7. This is performed until the time point TE at which the plate material 7 passes through the work roll 2.

【0027】このように、本実施の形態では、設定板厚
と実績板厚の差が大きい時に発生する絶対値制御による
圧延系の乱れが最小におさえられ、絶対値制御の応答ゲ
インをあげることが可能になり、圧延材先端部の板厚の
偏差を少なくできる。
As described above, in the present embodiment, the disturbance of the rolling system due to the absolute value control that occurs when the difference between the set thickness and the actual thickness is large is minimized, and the response gain of the absolute value control is increased. And the deviation of the plate thickness at the leading end of the rolled material can be reduced.

【0028】実施の形態4.図8は、この発明の実施の
形態4を示すフローチャートである。なお、その構成に
ついては、上記実施の形態1と同様のものが用いられ
る。上記実施の形態3においては、実績板厚と目標板厚
の偏差が一定の範囲内に入るまでの監視時間をタイマー
による時間で監視していた為に、圧延速度によって板材
7における板厚制御されない区間にばらつきが発生し、
定量的な調整ができない問題がある。本実施の形態はこ
れを解決するためになされたものである。
Embodiment 4 FIG. 8 is a flowchart showing the fourth embodiment of the present invention. In addition, about the structure, the thing similar to said Embodiment 1 is used. In the third embodiment, since the monitoring time until the deviation between the actual thickness and the target thickness falls within a certain range is monitored by the timer, the thickness of the sheet 7 is not controlled by the rolling speed. Variation occurs in the section,
There is a problem that cannot be adjusted quantitatively. The present embodiment has been made to solve this.

【0029】次に、動作について、図8を参照して説明
する。板材7がワークロール2に噛み込んだ時に、トラ
ッキング手段12に圧延長さ測定の開始を通知する。
(ステップ400〜401)。圧延荷重とロールギャッ
プとミル伸び係数から得られるゲージメータ板厚(実績
板厚)と設定板厚が一定の範囲内に入るまで絶対板厚制
御を開始せず、ロールギャップ固定で圧延する。(ステ
ップ402)。トラッキング手段12より圧延長さを得
て、一定の圧延長さになった時、板厚偏差が一定の範囲
内に収まった場合は上記実施の形態1と同様の処理を実
行し、収まらない場合は絶対板厚制御をバイパスして、
実績板厚を目標板厚に設定し板内板厚制御を開始し(ス
テップ403〜407)、厚み計9に圧延材が到達すれ
ば、モニタ板厚制御を開始する(ステップ409〜41
5)。
Next, the operation will be described with reference to FIG. When the plate material 7 bites into the work roll 2, the tracking means 12 is notified of the start of pressure extension measurement.
(Steps 400 to 401). The absolute thickness control is not started until the gauge meter thickness (actual thickness) and the set thickness obtained from the rolling load, roll gap and mill elongation coefficient are within a certain range, and the roll is fixed and the roll gap is fixed. (Step 402). When the pressure extension is obtained from the tracking means 12 and the pressure extension becomes constant and the plate thickness deviation falls within a certain range, the same processing as in the first embodiment is executed, and Bypasses the absolute thickness control,
The actual plate thickness is set to the target plate thickness and plate thickness control is started (steps 403 to 407). When the rolled material reaches the thickness gauge 9, monitor thickness control is started (steps 409 to 41).
5).

【0030】なお、上記実施の形態3では、タイマ時間
に到達するまでに、ゲージメータ板厚偏差が一定の範囲
内に入らなければ、現在の板厚をロックオンして板内板
厚制御を時点T6で開始したのに対し、本実施の形態で
は一定の圧延長さに到達するまでに、ゲージメータ板厚
偏差が一定の範囲内に入らなければ、現在の板厚をロッ
クオンして板内板厚制御を時点T6で開始する点が異な
る以外は、本実施の形態における板厚の制御状態は、上
記実施の形態3と同様である。
In the third embodiment, if the gauge meter plate thickness deviation does not fall within a certain range before the timer time is reached, the current plate thickness is locked on and the plate thickness control is performed. In contrast to the start at time T6, in the present embodiment, if the gauge meter thickness deviation does not fall within a certain range before reaching a certain pressure elongation, the current thickness is locked on and The control state of the plate thickness in the present embodiment is the same as that in the third embodiment, except that the inner plate thickness control is started at time T6.

【0031】このように、本実施の形態では、上記実施
の形態3の効果に加えて、板厚制御されない区間が距離
で制限されるために圧延速度との関係から開放された調
整が可能になることで、板材7の歩留まりの向上が得ら
れる。
As described above, in the present embodiment, in addition to the effect of the third embodiment, since the section where the thickness is not controlled is limited by the distance, it is possible to perform adjustment that is free from the relationship with the rolling speed. As a result, the yield of the plate member 7 can be improved.

【0032】[0032]

【発明の効果】以上のように、請求項1の発明によれ
ば、ワークロールを押圧するバックアップロールに対し
て圧下力を伝える圧下装置と上記バックアップロールの
動きから圧延中の圧延荷重を検出する圧延荷重検出手段
と、上記ワークロールの圧下位置を検出する圧下位置検
出手段と、圧延された板材の厚みを測定する厚み計とを
有する圧延機の板厚制御装置において、上記厚み計の計
測結果に基づいて絶対板厚偏差量を算出する積分手段
と、上記圧延された板材の圧延後の長さを測定する測定
手段と、該測定手段に出力に基づいて上記圧延された板
材の位置をトラッキングするトラッキング手段と、上記
圧延荷重検出手段と上記圧下位置検出手段の出力に基づ
いて板材の板厚を算定すると共に、上記積分手段からの
絶対板厚偏差量を上記トラッキング手段からの指示によ
り板厚に補正を加え、その算定結果に基づいて上記圧下
装置を所定量駆動する演算手段とを備えたので、絶対値
制御と厚み計によるモニタ板厚制御の干渉を無くし、板
内板厚偏差と平均板厚偏差の両方を向上させることがで
きる、つまり、板内板厚偏差が残らなくなり、また、平
均板厚偏差のオフセットも発生しなくなるという効果が
ある。
As described above, according to the first aspect of the present invention, a rolling device for transmitting a rolling force to a backup roll pressing a work roll and a rolling load during rolling are detected from the movement of the backup roll. Rolling load detecting means, a rolling position detecting means for detecting a rolling position of the work roll, and a thickness control device of a rolling mill having a thickness gauge for measuring the thickness of the rolled sheet material, the measurement results of the thickness gauge Integrating means for calculating the absolute thickness deviation amount based on the above, measuring means for measuring the length of the rolled sheet material after rolling, and tracking the position of the rolled sheet material based on the output from the measuring means. Tracking means to calculate the sheet thickness of the sheet material based on the outputs of the rolling load detecting means and the rolling position detecting means, and calculate the absolute thickness deviation amount from the integrating means. Compensation is applied to the sheet thickness in accordance with instructions from the racking means, and arithmetic means for driving the above-described pressing device by a predetermined amount based on the calculation result is provided, so that interference between absolute value control and monitor thickness control by the thickness gauge is eliminated. In addition, it is possible to improve both the sheet thickness deviation in the sheet and the average sheet thickness deviation. That is, there is an effect that the sheet thickness deviation in the sheet does not remain and the offset of the sheet thickness deviation does not occur.

【0033】また、請求項2の発明によれば、圧延材が
上記ワークロールに噛み込んだ後に、設定された板厚を
目標に絶対値板厚制御を行ない、板厚が目標板厚に到達
したならば、現在のロールギャップと圧延荷重とミル伸
び係数から得られる板厚を目標板厚に切り換えて、板厚
制御を行うと共に、圧延材の位置を上記トラッキング手
段に通知して、絶対値制御完了位置のトラッキングを開
始し、その後、絶対値制御位置が上記厚み計に到達した
ら、上記積分手段からの絶対板厚偏差量に対する板厚制
御を開始するので、板厚と板内板厚偏差の両方に高精度
を提供でき、また、厚み計からの実績板厚偏差補正量と
ゲ一ジメータ板厚の絶対値制御のぶつかり合いによるハ
ンチングや過補償が発生しないという効果がある。
According to the second aspect of the present invention, after the rolled material bites into the work roll, the absolute thickness control is performed with the target thickness set, so that the thickness reaches the target thickness. Then, the sheet thickness obtained from the current roll gap, rolling load, and mill elongation coefficient is switched to the target sheet thickness, the sheet thickness is controlled, and the position of the rolled material is notified to the tracking means, and the absolute value is obtained. Tracking of the control completion position is started, and thereafter, when the absolute value control position reaches the thickness gauge, the thickness control for the absolute thickness deviation amount from the integrating means is started. High accuracy can be provided to both of them, and there is an effect that hunting and overcompensation do not occur due to collision between the actual thickness deviation correction amount from the thickness gauge and the absolute value control of the gauge thickness.

【0034】また、請求項3の発明によれば、絶対値制
御中に圧延材が上記厚み計に到達したときに、絶対値制
御における板厚偏差と上記厚み計の偏差の極性が反対で
あった場合は、絶対値制御を中止して、現在のロールギ
ャップと圧延荷重とミル伸ぴ係数から得られる板厚を目
標板厚に切り換えて板厚制御を行うと共に上記積分手段
からの絶対板厚偏差量に基づいて絶対値制御を行うの
で、設定板厚と厚み計で測定される実績板厚の極性が反
対になるような誤差が発生した場合でも、速やかに補正
が行われ、設定板厚の誤差による板厚不良部分を最小限
に抑えることができるという効果がある。
According to the invention of claim 3, when the rolled material reaches the thickness gauge during the absolute value control, the polarity of the sheet thickness deviation in the absolute value control and the polarity of the deviation of the thickness gauge are opposite. In this case, the absolute value control is stopped, the thickness obtained from the current roll gap, rolling load and mill elongation coefficient is switched to the target thickness to perform the thickness control, and the absolute thickness from the integrating means is controlled. Since the absolute value control is performed based on the deviation amount, even if an error occurs in which the polarity of the set thickness and the actual thickness measured by the thickness gauge are opposite, the correction is quickly performed and the set thickness is corrected. This has the effect of minimizing the part with poor thickness due to the above error.

【0035】また、請求項4の発明によれば、圧延材が
上記ワークロールに噛み込み後、一定の時間を過ぎても
設定板厚と実績板厚の偏差が一定の範囲内に収まらない
場合は絶対板厚制御を行わず、現在のロールギャップと
圧延荷重とミル伸び係数から得られる板厚を目標板厚に
切り換えて板厚制御を行うので、設定板厚と実績板厚の
差が大きい時に発生する絶対値制御による圧延系の乱れ
が最小におさえられ、絶対値制御の応答ゲインをあげる
ことが可能になり、圧延材先端部の板厚の偏差を少なく
できるという効果がある。
According to the fourth aspect of the present invention, when the deviation between the set thickness and the actual thickness does not fall within a certain range even after a certain period of time after the rolled material bites into the work roll. Does not perform absolute thickness control, and performs thickness control by switching the thickness obtained from the current roll gap, rolling load and mill elongation coefficient to the target thickness, so the difference between the set thickness and the actual thickness is large. The disturbance of the rolling system caused by the absolute value control that occurs at the time is minimized, the response gain of the absolute value control can be increased, and the deviation of the thickness of the leading end of the rolled material can be reduced.

【0036】さらに、請求項5の発明によれば、圧延材
が上記ワークロールに噛み込み後、一定の圧延長を過ぎ
ても設定板厚と実績板厚の偏差が一定の範囲内に収まら
ない場合は絶対板厚制御を行わず、現在のロールギャッ
プと圧延荷重とミル伸び係数から得られる板厚を目標板
厚に切り換えて板厚制御を行うので、板厚制御されない
区間が距離で制限されるために圧延速度との関係から開
放された調整が可能になることで、圧延材の歩留まりの
向上が得られるという効果がある。
Further, according to the fifth aspect of the present invention, the deviation between the set plate thickness and the actual plate thickness does not fall within a certain range even after a certain pressure elongation after the rolled material bites into the work roll. In this case, the absolute thickness control is not performed, and the thickness obtained from the current roll gap, rolling load, and mill elongation coefficient is switched to the target thickness, and the thickness is controlled.Thus, the section where the thickness is not controlled is limited by the distance. For this reason, it is possible to perform an adjustment that is free from the relationship with the rolling speed, so that the yield of the rolled material can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1を示す構成図であ
る。
FIG. 1 is a configuration diagram showing a first embodiment of the present invention.

【図2】 この発明の実施の形態1における板厚制御方
法を示すフローチャートである。
FIG. 2 is a flowchart showing a thickness control method according to Embodiment 1 of the present invention.

【図3】 この発明の実施の形態1における板厚の制御
状態を示す図である。
FIG. 3 is a diagram showing a control state of a plate thickness according to the first embodiment of the present invention.

【図4】 この発明の実施の形態2における板厚制御方
法を示すフローチャートである。
FIG. 4 is a flowchart showing a thickness control method according to Embodiment 2 of the present invention.

【図5】 この発明の実施の形態2における板厚の制御
状態を示す図である。
FIG. 5 is a diagram showing a control state of a plate thickness according to a second embodiment of the present invention.

【図6】 この発明の実施の形態3における板厚制御方
法を示すフローチャートである。
FIG. 6 is a flowchart showing a thickness control method according to Embodiment 3 of the present invention.

【図7】 この発明の実施の形態3および4における板
厚の制御状態を示す図である。
FIG. 7 is a diagram illustrating a control state of a plate thickness according to Embodiments 3 and 4 of the present invention.

【図8】 この発明の実施の形態4における板厚制御方
法を示すフローチャートである。
FIG. 8 is a flowchart showing a thickness control method according to Embodiment 4 of the present invention.

【図9】 従来の圧延機の板厚制御装置を示す構成図で
ある。
FIG. 9 is a configuration diagram showing a conventional thickness control device for a rolling mill.

【図10】 従来装置における板厚制御方法を示すフロ
ーチャートである。
FIG. 10 is a flowchart showing a sheet thickness control method in a conventional apparatus.

【図11】 従来装置における板厚の制御状態を示す図
である。
FIG. 11 is a diagram showing a control state of a plate thickness in a conventional apparatus.

【符号の説明】[Explanation of symbols]

1A 圧延機、2 ワークロール、3 バックアップロ
ール、4 圧下装置、5 圧延荷重検出手段、6 圧下
位置検出手段、7 板材、8A 演算手段、9厚み計、
10 積分器、 11 測定器、12 トラッキング手
段。
1A rolling mill, 2 work rolls, 3 backup rolls, 4 rolling device, 5 rolling load detecting means, 6 rolling position detecting means, 7 plate material, 8A calculating means, 9 thickness gauge,
10 integrator, 11 measuring device, 12 tracking means.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 ワークロールを押圧するバックアップロ
ールに対して圧下力を伝える圧下装置と上記バックアッ
プロールの動きから圧延中の圧延荷重を検出する圧延荷
重検出手段と、上記ワークロールの圧下位置を検出する
圧下位置検出手段と、圧延された板材の厚みを測定する
厚み計とを有する圧延機の板厚制御装置において、 上記厚み計の計測結果に基づいて絶対板厚偏差量を算出
する積分手段と、 上記圧延された板材の圧延後の長さを測定する測定手段
と、 該測定手段に出力に基づいて上記圧延された板材の位置
をトラッキングするトラッキング手段と、 上記圧延荷重検出手段と上記圧下位置検出手段の出力に
基づいて板材の板厚を算定すると共に、上記積分手段か
らの絶対板厚偏差量を上記トラッキング手段からの指示
により板厚に補正を加え、その算定結果に基づいて上記
圧下装置を所定量駆動する演算手段とを備えたことを特
徴とする圧延機の板厚制御装置
1. A rolling device for transmitting a rolling force to a backup roll pressing a work roll, rolling load detecting means for detecting a rolling load during rolling from the movement of the backup roll, and detecting a rolling position of the work roll. In a thickness control device of a rolling mill having a thickness reduction device for measuring the thickness of a rolled sheet material, an integrating means for calculating an absolute thickness deviation amount based on the measurement result of the thickness meter. Measuring means for measuring the length of the rolled sheet after rolling; tracking means for tracking the position of the rolled sheet based on the output of the measuring means; rolling load detecting means and the rolling-down position The thickness of the sheet material is calculated based on the output of the detecting means, and the absolute thickness deviation amount from the integrating means is calculated according to an instruction from the tracking means. Correcting the addition, the rolling mill of plate thickness control apparatus characterized by comprising a calculating means for a predetermined amount of driving the reduction device on the basis of the calculation results
【請求項2】 圧延材が上記ワークロールに噛み込んだ
後に、設定された板厚を目標に絶対値板厚制御を行な
い、板厚が目標板厚に到達したならば、現在のロールギ
ャップと圧延荷重とミル伸び係数から得られる板厚を目
標板厚に切り換えて、板厚制御を行うと共に、圧延材の
位置を上記トラッキング手段に通知して、絶対値制御完
了位置のトラッキングを開始し、その後、絶対値制御位
置が上記厚み計に到達したら、上記積分手段からの絶対
板厚偏差量に対する板厚制御を開始することを特徴とす
る請求項1記載の圧延機の板厚制御装置。
2. After the rolled material bites into the work roll, absolute value thickness control is performed with the target thickness set as a target, and when the thickness reaches the target thickness, the current roll gap is set. Switching the sheet thickness obtained from the rolling load and the mill elongation coefficient to the target sheet thickness, performing sheet thickness control, notifying the position of the rolled material to the tracking means, and starting tracking of the absolute value control completion position, 2. The apparatus according to claim 1, wherein when the absolute value control position reaches the thickness gauge, the thickness control for the absolute thickness deviation amount from the integrating means is started.
【請求項3】 絶対値制御中に圧延材が上記厚み計に到
達したときに、絶対値制御における板厚偏差と上記厚み
計の偏差の極性が反対であった場合は、絶対値制御を中
止して、現在のロールギャップと圧延荷重とミル伸ぴ係
数から得られる板厚を目標板厚に切り換えて板厚制御を
行うと共に上記積分手段からの絶対板厚偏差量に基づい
て絶対値制御を行うことを特徴とする請求項1記載の圧
延機の板厚制御装置。
3. When the rolled material reaches the thickness gauge during the absolute value control and the polarity of the sheet thickness deviation in the absolute value control is opposite to the polarity of the deviation of the thickness gauge, the absolute value control is stopped. Then, the sheet thickness obtained from the current roll gap, rolling load, and mill elongation coefficient is switched to the target sheet thickness to perform sheet thickness control, and absolute value control is performed based on the absolute sheet thickness deviation amount from the integrating means. The thickness control device for a rolling mill according to claim 1, wherein the control is performed.
【請求項4】 圧延材が上記ワークロールに噛み込み
後、一定の時間を過ぎても設定板厚と実績板厚の偏差が
一定の範囲内に収まらない場合は絶対板厚制御を行わ
ず、現在のロールギャップと圧延荷重とミル伸び係数か
ら得られる板厚を目標板厚に切り換えて板厚制御を行う
ことを特徴とする請求項1記載の圧延機の板厚制御装
置。
4. If the deviation between the set thickness and the actual thickness does not fall within a certain range even after a certain period of time after the rolled material bites into the work roll, the absolute thickness control is not performed, The thickness control apparatus for a rolling mill according to claim 1, wherein the thickness control is performed by switching a thickness obtained from a current roll gap, a rolling load, and a mill elongation coefficient to a target thickness.
【請求項5】 圧延材が上記ワークロールに噛み込み
後、一定の圧延長を過ぎても設定板厚と実績板厚の偏差
が一定の範囲内に収まらない場合は絶対板厚制御を行わ
ず、現在のロールギャップと圧延荷重とミル伸び係数か
ら得られる板厚を目標板厚に切り換えて板厚制御を行う
ことを特徴とする請求項1記載の圧延機の板厚制御装
置。
5. If the deviation between the set thickness and the actual thickness does not fall within a certain range even after a certain pressure elongation after the rolled material bites into the work roll, the absolute thickness control is not performed. 2. The apparatus for controlling the thickness of a rolling mill according to claim 1, wherein the thickness is controlled by switching a thickness obtained from a current roll gap, a rolling load and a mill elongation coefficient to a target thickness.
JP2000169225A 2000-06-06 2000-06-06 Thickness control device for rolling mill Pending JP2001347309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000169225A JP2001347309A (en) 2000-06-06 2000-06-06 Thickness control device for rolling mill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000169225A JP2001347309A (en) 2000-06-06 2000-06-06 Thickness control device for rolling mill

Publications (1)

Publication Number Publication Date
JP2001347309A true JP2001347309A (en) 2001-12-18

Family

ID=18672113

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000169225A Pending JP2001347309A (en) 2000-06-06 2000-06-06 Thickness control device for rolling mill

Country Status (1)

Country Link
JP (1) JP2001347309A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014210275A (en) * 2013-04-17 2014-11-13 新日鐵住金株式会社 Plate thickness control method and plate thickness control device
KR101466177B1 (en) * 2013-09-26 2014-11-27 현대제철 주식회사 Control method for rolling heavy plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014210275A (en) * 2013-04-17 2014-11-13 新日鐵住金株式会社 Plate thickness control method and plate thickness control device
KR101466177B1 (en) * 2013-09-26 2014-11-27 현대제철 주식회사 Control method for rolling heavy plate

Similar Documents

Publication Publication Date Title
US11383279B2 (en) Plate thickness control device and plate thickness control method
US3938360A (en) Shape control method and system for a rolling mill
CA2325328C (en) Strip thickness control apparatus for rolling mill
JP2001347309A (en) Thickness control device for rolling mill
KR100370471B1 (en) Apparatus and method for controlling thickness of head part of hot rolled strip
JPS61283406A (en) Method for compensating and controlling crown control of multi-stage rolling mill
JP2019098370A (en) Estimation method of gage meter plate thickness error, plate thickness control method, manufacturing method of rolled material and plate thickness controller
JPH06297013A (en) Method for controlling plate bend by using roll gap sensor
JP4288888B2 (en) Strip meander control device and meander control method for tandem rolling mill
JP3016119B2 (en) Thickness control method of taper plate
JPS6011571B2 (en) Slip detection method and inter-stand tension control method and device using the same
JP6943271B2 (en) Welding point tracking correction method and welding point tracking correction device
JPH05220511A (en) Method for controlling thickness in continuous hot rolling mill
JP2001225102A (en) Rolling mill provided with automatic gage control system and rolling method using the same system
JPS587365B2 (en) Rolled plate thickness control method
JPS62137114A (en) Plate width control method for thick plate
JPH06238313A (en) Method for rolling thick plate material
JP3135114B2 (en) Automatic correction method for the distance between dies in a press-type width reduction device
JPH09253724A (en) Plate thickness controller
JPS62197211A (en) Plate thickness control method utilizing mill rigidity detection value
JP3297369B2 (en) Plate thickness control method
JPS5851771B2 (en) Meandering control method in rolling
JPS62130710A (en) Plate thickness control method for steel stock
JPH02151313A (en) Rolling reduction control method for finish rolling mill
JPH0818058B2 (en) Automatic plate thickness control method for plate rolling

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02