JP2001335817A - Method for operating blast furnace - Google Patents

Method for operating blast furnace

Info

Publication number
JP2001335817A
JP2001335817A JP2000151703A JP2000151703A JP2001335817A JP 2001335817 A JP2001335817 A JP 2001335817A JP 2000151703 A JP2000151703 A JP 2000151703A JP 2000151703 A JP2000151703 A JP 2000151703A JP 2001335817 A JP2001335817 A JP 2001335817A
Authority
JP
Japan
Prior art keywords
ore
coke
furnace
charging
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2000151703A
Other languages
Japanese (ja)
Inventor
Makoto Isobe
誠 磯部
Toshihiro Nagane
利弘 長根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2000151703A priority Critical patent/JP2001335817A/en
Publication of JP2001335817A publication Critical patent/JP2001335817A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Manufacture Of Iron (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for operating a blast furnace with which the ratio of O/C(ore/coke) at the center part can be raised without lowering the O/C ratio at the peripheral part by effectively restraining the collapse of the coke in the bell-type blast furnace. SOLUTION: When the ore O and the coke C are charged into the bell-type blast furnace, in the method for operating the blast furnace by charging one charge as five batchs of C1, O1, C2, O2 and O3, in this order, the batch O1 is made to charge 5-15% of the whole ore quantity for one charge and also, at the position of 30-70% of the furnace radius from the furnace wall part.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はベル式高炉の操業方
法に関するものである。
The present invention relates to a method for operating a bell blast furnace.

【0002】[0002]

【従来の技術】高炉操業を安定化する上で高炉内の半径
方向のO/C(すなわち、鉱石/コークス)の分布は重
要である。例えば、中心部のO/Cが低いとガス流は抵
抗の低い中心部に過度に流れるため、ガス利用率が低下
し直接還元量が増大することから高炉操業が不安定化す
る。一方、周辺部のO/Cが低下するとガス流が周辺部
に流れるため、炉体熱負荷が上昇し炉況が不安定化する
と共に高炉炉体の損耗をもたらす。ベル式高炉では、コ
ークス層上に鉱石を1バッチ装入する際、コークスの嵩
密度が鉱石のそれより低いことから、鉱石装入中に鉱石
の自重によってコークスが炉中心部に押し流されるコー
クス崩れ現象が大規模に発生する。そのため中心部のO
/Cが低く、周辺部のO/Cが高い分布が形成される。
その分布改善策として、ムーバブルアーマーを用いて直
接鉱石を炉壁から炉半径30〜50%の位置に装入する
ことで、コークス崩れの量を抑え中心部のO/Cを上げ
る対策を講じてきた。
BACKGROUND OF THE INVENTION The distribution of radial O / C (ie, ore / coke) within a blast furnace is important in stabilizing blast furnace operation. For example, if the O / C in the central portion is low, the gas flow excessively flows to the central portion having a low resistance, so that the gas utilization decreases and the amount of direct reduction increases, so that the blast furnace operation becomes unstable. On the other hand, when the O / C in the peripheral portion decreases, the gas flow flows to the peripheral portion, so that the furnace body heat load increases, the furnace condition becomes unstable, and the blast furnace body is worn. In the bell-type blast furnace, when charging one batch of ore on the coke layer, the coke has a lower bulk density than that of the ore. The phenomenon occurs on a large scale. So O in the center
/ C is low and the O / C of the peripheral portion is high.
As a measure to improve the distribution, measures have been taken to reduce the amount of coke collapse and increase the O / C in the central part by charging the ore directly into the furnace with a radius of 30 to 50% from the furnace wall using movable armor. Was.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、C1、
C2、O1、O2の4バッチ方式では鉱石1バッチの装
入量が全鉱石量の約50%であることから、これを炉内
中間部に装入した際、周辺部に装入される鉱石量が減少
し、周辺部のO/Cが低くなるため周辺ガス流が助長さ
れ、前述のように炉体熱負荷が上昇するものであった。
本発明はベル式高炉においてコークス崩れを効果的に抑
制して周辺部のO/Cを低くすることなく中心部O/C
を上げることを課題とするものである。
However, C1,
In the four-batch system of C2, O1, and O2, the amount of ore charged in one batch is about 50% of the total amount of ore. The amount was reduced, and the O / C in the peripheral portion was reduced, so that the peripheral gas flow was promoted, and as described above, the furnace body heat load was increased.
INDUSTRIAL APPLICABILITY The present invention effectively suppresses coke collapse in a bell-type blast furnace and reduces O / C at the center without lowering O / C at the periphery.
The challenge is to raise

【0004】[0004]

【課題を解決するための手段】本発明は上記課題を解決
するためになされたものであり、第1の発明は、ベル式
高炉内に鉱石O及びコークスCを装入するに際し、1チ
ャージをC1、O1、C2、O2、O3の5バッチとし
て順次装入して高炉を操業する方法において、前記O1
を、全鉱石量の5〜15%とすると共に炉壁部から炉半
径の30〜70%の位置に装入する方法である。また、
第2の発明は、1チャージをC1、C2、O1、O2、
O3の5バッチとし、前記O1を、全鉱石量の5〜15
%とすると共に炉壁部から炉半径の30〜70%の位置
に装入するものである。
Means for Solving the Problems The present invention has been made to solve the above problems, and the first invention is to charge one charge when charging ore O and coke C into a bell type blast furnace. A method of operating a blast furnace by sequentially charging as five batches of C1, O1, C2, O2, and O3, wherein the O1
Is charged to 5 to 15% of the total ore amount and 30 to 70% of the furnace radius from the furnace wall. Also,
In the second invention, one charge is divided into C1, C2, O1, O2,
5 batches of O3, and said O1 was 5 to 15 of the total amount of ore.
% And at a position 30 to 70% of the furnace radius from the furnace wall.

【0005】[0005]

【発明の実施の形態】前述したように、コークス崩れを
効果的に抑制することが周辺部O/Cを下げずに中心部
O/Cを上げるのに有効であるため、本発明者等は、コ
ークス崩れをどのように抑えるかについて1/20冷間
試験装置で種々の試験、検討を行った結果、以下の
(1)〜(3)のことを見い出した。 (1)炉内に装入した鉱石が、先に装入して堆積した堆
積コークスを崩して中心部に押し流すため、この鉱石を
装入する前に鉱石で堰を作り、その後に装入するコーク
スを堰き止めておくことが効果的である。 (2)コークスを中心部に流れ込ませないため、あらか
じめ鉱石でもってコークス層の上を被覆しておき、コー
クスが、自重が小さいことに加え粒径が大きく形状が角
張っていることからくる引っかかりを少なくして、コー
クス崩れを起こさずに鉱石をスムーズに中心部へ流れ込
ませる。 (3)コークスとコークスの間か、またコークス装入後
に少量の鉱石を装入し、自重を大きくして流れ込ませ難
くすることで、その後の鉱石装入の際に発生するコーク
ス崩れ量を少なくする。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS As described above, effective suppression of coke collapse is effective for increasing the central portion O / C without lowering the peripheral portion O / C. As a result of conducting various tests and examinations on how to suppress coke collapse with a 1/20 cold test apparatus, the following (1) to (3) were found. (1) The ore charged in the furnace breaks down the coke deposited and deposited in the furnace, and is washed away to the center. Therefore, a weir is made of ore before charging the ore, and then charged. It is effective to block coke. (2) To prevent coke from flowing into the center, coat the coke layer with ore in advance to prevent the coke from catching due to its small weight, large particle size and angular shape. Reduces the flow of ore smoothly into the center without causing coke collapse. (3) A small amount of ore is charged between coke and after coke is charged, and its own weight is increased to make it difficult to flow, so that the amount of coke collapse generated during subsequent ore charging is reduced. I do.

【0006】この(1)〜(3)を満たす装入モードと
して、1チャージをC1、O1、C2、O2、O3の5
バッチとして順次装入する場合と、1チャージをC1、
C2、O1、O2、O3の5バッチとして順次装入する
場合がある。先ず、装入モードC1、O1、C2、O
2、O3の場合(第1の発明に対応)、コークスC1と
コークスC2との間に鉱石O1を装入するため、コーク
スC1とコークスC2の間に鉱石O1が挟み込まれる形
となる。そのため、鉱石O2の装入時において鉱石の自
重によってコークスを崩して押し流す際に、鉱石O1の
自重によりコークスを含めた重量が大きくなることか
ら、押し流しに時間を要することとなるが、その間にも
鉱石O2は装入され続けるため、最終的にはコークス崩
れが少ない状態で装入が終了する。もう一つの効果は、
鉱石O1が装入された効果でその次のコークスC2が鉱
石O1により堰き止められ、炉内中間部から周辺部に堆
積することから鉱石O2によるコークス崩れ量が減少す
るものである。以上の2つの効果でコークス崩れが減少
することから、鉱石O2装入後の傾斜角が高くなり鉱石
O3が中心部に充分流れ込み中心部O/Cの高い装入物
分布が形成される。
In the charging mode satisfying the conditions (1) to (3), one charge is divided into five charges of C1, O1, C2, O2 and O3.
When charging sequentially as a batch, one charge is C1,
There is a case where five batches of C2, O1, O2, and O3 are sequentially charged. First, charging modes C1, O1, C2, O
In the case of O3 or O3 (corresponding to the first invention), the ore O1 is inserted between the coke C1 and the coke C2 because the ore O1 is charged between the coke C1 and the coke C2. Therefore, when the ore O2 is charged and the coke is broken down by the ore's own weight and pushed away, the weight including the coke becomes large due to the ore O1's own weight. Since the ore O2 continues to be charged, the charging ends with little coke collapse. Another effect is
The coke C2 following the ore O1 is blocked by the ore O1 due to the effect of the ore O1, and the amount of coke collapse due to the ore O2 is reduced because the ore O1 is deposited from the middle part in the furnace to the peripheral part. Since the coke collapse is reduced by the above two effects, the inclination angle after charging the ore O2 is increased, and the ore O3 sufficiently flows into the center to form a charge distribution with a high center O / C.

【0007】また、装入モードC1、C2、O1、O
2、O3の場合(第2の発明に対応)、コークスC2装
入後に鉱石O1を装入することでコークス表層に鉱石O
1が堆積される。そのため、次バッチの鉱石O2の装入
時において鉱石O1の自重の効果から押し流しに時間を
要しコークス崩れ量が減少する。また、コークス層表層
に鉱石が堆積することから、鉱石O2装入においてコー
クスの粒径が大きいことによる引っかかり効果が減少
し、中心部に良好に鉱石が流れ込み中心部O/Cの増大
も期待できるものである。
The charging modes C1, C2, O1, O
In the case of 2, O3 (corresponding to the second invention), the ore O1 is charged after charging the coke C2, so that the ore O
1 is deposited. Therefore, at the time of charging the ore O2 of the next batch, it takes time to flush the ore O1 due to its own weight, and the amount of coke collapse is reduced. Moreover, since the ore is deposited on the surface layer of the coke layer, the trapping effect due to the large particle size of the coke in charging the ore O2 is reduced, and the ore flows into the center well and an increase in O / C at the center can be expected. Things.

【0008】しかし、鉱石O1を装入した際に、その鉱
石O1で先に装入して堆積しているコークスC1又はコ
ークスC1、C2を押し流すと前記目的を達成しないた
めに、本発明者等は、堆積しているコークスC1、C2
を押し流さない様な鉱石O1の装入量(装入位置は炉壁
から炉半径の50%)を1/20冷間試験装置で試験し
た。そして、その結果を図1に示す。この図1から前記
両装入モードにおいても、鉱石O1の装入量を全鉱石量
の5〜15%とすることがコークス崩れを少なくし、こ
の範囲を外れると急速にコークス崩れが大きくなること
が判明した。
However, when the ore O1 is charged, if the coke C1 or the coke C1 or C2 that has been previously charged and deposited with the ore O1 is washed away, the above object is not achieved. Indicates the accumulated coke C1, C2
The amount of ore O1 charged so as not to wash away (the charging position is 50% of the furnace radius from the furnace wall) was tested with a 1/20 cold test apparatus. FIG. 1 shows the result. From FIG. 1, also in the both charging modes, the charging amount of the ore O1 is set to be 5 to 15% of the total ore amount to reduce the coke collapse, and if the amount is out of this range, the coke collapse rapidly increases. There was found.

【0009】5%未満になると、装入モードC1、O
1、C2、O2、O3の場合(第1の発明に対応)にお
いては、鉱石O1の量が少なくなり過ぎて堰が小さくな
ることからコークスの堰き止め効果が少なくなると共
に、自重も少なくなり過ぎてコークスを含めた重量が小
さくなって、鉱石O2装入での押し流しに必要な時間が
短くなることによりコークス崩れ量が急速に増大するも
のと推定される。また、装入モードC1、C2、O1、
O2、O3の場合(第2の発明に対応)においては、鉱
石O1の自重が小さくなることからコークスを含めた重
量が小さくなり、鉱石O2装入での押し流しに必要な時
間が少なくなる。さらに、コークス層表層に堆積する鉱
石量が少なくなることから鉱石O2装入においてコーク
スの引っかかり効果が大きくなることで、前記同様にコ
ークス崩れ量が急速に増大する。また、15%超になる
と、両装入モードにおいても、鉱石O1量が多いことか
らこの装入によるコークス崩れが増大するものと推定さ
れる。
When it is less than 5%, the charging modes C1, O
In the case of 1, C2, O2, and O3 (corresponding to the first invention), the amount of ore O1 is too small and the weir is small, so that the damming effect of coke is reduced and the own weight is too small. It is presumed that the weight including coke is reduced and the time required for flushing with ore O2 charging is shortened, so that the amount of coke collapse increases rapidly. In addition, charging modes C1, C2, O1,
In the case of O2 and O3 (corresponding to the second invention), the weight of the ore O1 including the coke is reduced because the own weight of the ore O1 is reduced, and the time required for flushing the ore O2 is reduced. Further, since the amount of ore deposited on the surface layer of the coke layer is reduced, the effect of catching coke in charging the ore O2 is increased, and the amount of coke collapse rapidly increases as described above. Further, when the content exceeds 15%, even in the both charging modes, it is estimated that coke collapse due to the charging increases due to the large amount of ore O1.

【0010】さらに、本発明者等は、鉱石O1(鉱石O
1量:1チャージの全鉱石の10%)の装入位置を1/
20冷間試験装置で試験、検討した。その結果を図2に
示す。この図2から、鉱石O1の装入位置を炉壁から炉
半径の30〜70%の位置にすることがコークス崩れを
少なくし、この範囲を外れると急速にコークス崩れが大
きくなることが判明した。30%の位置より手前(炉壁
側)に装入した場合、第1の発明に対応した装入モード
では、堰を越え(堰より炉中心側)でコークスC2が装
入されるため、堰き止め効果がなくなり、第2の発明に
対応した装入モードでは被覆領域が狭くなることでコー
クスの引っかかりが大きくなり、コークス崩れ量が大き
くなると推定される。また、70%の位置より炉内中心
側に装入した場合、第1の発明に対応した装入モードで
は、その後に装入するコークスC2が炉周辺側に堰き止
められなくなり、第2の発明に対応した装入モードでは
被覆部が炉内にシフトすることで、その後の鉱石装入位
置が被覆領域から外れて、コークス崩れ量が大きくなる
ものと推定される。
[0010] Further, the present inventors have found that ore O1 (ore
1 charge: 10% of the total charge ore)
The test and examination were conducted with 20 cold test devices. The result is shown in FIG. From FIG. 2, it was found that setting the charging position of the ore O1 to a position 30 to 70% of the furnace radius from the furnace wall reduced coke collapse, and out of this range, the coke collapse rapidly increased. . In the charging mode corresponding to the first aspect of the present invention, when the charging is performed before the 30% position (furnace wall side), the coke C2 is charged over the weir (furnace center side from the weir). In the charging mode according to the second aspect of the present invention, it is presumed that the coke catching becomes large and the coke breaking amount increases in the charging mode corresponding to the second aspect of the present invention because the covering area becomes narrow. Further, when charging is performed on the center side of the furnace from the position of 70%, in the charging mode corresponding to the first invention, the coke C2 to be charged thereafter is not blocked by the furnace peripheral side, and the second invention. In the charging mode corresponding to the above, it is presumed that the ore charging position deviates from the coating region by shifting the coating portion into the furnace, and the coke collapse amount increases.

【0011】図3は、第1の発明、第2の発明におい
て、鉱石O1の装入量を1チャージの全鉱石量の10%
とし装入位置を炉壁から炉内側に50%の位置に装入し
た場合において従来の装入方法と併せて示している。こ
の図より、本発明方法によると、炉周辺部のO/Cを大
きく低下させずに中心部O/Cを上げることが可能であ
ることが分かる。
FIG. 3 shows that in the first invention and the second invention, the charged amount of ore O1 is 10% of the total amount of ore in one charge.
The case where the charging position is 50% inside the furnace from the furnace wall is shown together with the conventional charging method. From this figure, it can be seen that according to the method of the present invention, it is possible to increase the O / C at the center without greatly reducing the O / C at the periphery of the furnace.

【0012】[0012]

【実施例】以下、本発明の実施例を具体的に説明する。
炉内容積5000m3 級のベル式高炉を用いて、表1で
示される各ケースで操業した。また各ケースについて、
高炉に設置されている炉内装入物表面形状を測定するプ
ロフィールメータで測定した結果を図4に示す。なお、
表1において、BV、BT、FRはそれぞれ、送風量、
送風温度、燃料比を示す。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be specifically described below.
Each of the cases shown in Table 1 was operated using a bell-type blast furnace having a furnace capacity of 5000 m 3 class. For each case,
FIG. 4 shows the results of measurement with a profile meter for measuring the surface shape of the interior of a furnace installed in a blast furnace. In addition,
In Table 1, BV, BT, and FR represent the air volume,
Shows blast temperature and fuel ratio.

【0013】[0013]

【表1】 [Table 1]

【0014】表1のベースに示す様に、中心ガス流が過
多になり炉況が不安定になったのでこれを改善するため
の対策として、第1の発明に対応した例を実施例1に示
し、第2の発明に対応した例を実施例2に示す。この実
施例1では、COガス利用率の向上が見られ、燃料比が
低減し炉況が安定した。実施例2でも、COガス利用率
の向上が見られ、燃料比が低減し炉況が安定した。これ
らは図4よりコークス崩れ量がベースより低下したこ
と、周辺部O/Cが大きく低下していないことによるも
のである。一方、比較例1は第1の発明に対応した装入
モードで、鉱石O1の装入量を全鉱石量の20%とした
ものであり、COガス利用率は変化せず、炉体熱負荷の
上昇から燃料比の上昇が見られ、炉況は改善しなかっ
た。これは鉱石O1の装入量が多いため、それ自身によ
るコークス崩れが発生したことによるものである。ま
た、比較例2は、第2の発明に対応した装入モードで、
鉱石O1を炉壁から10%の位置に装入としたものであ
り、COガス利用率は変化せず炉況は改善しなかった。
これはコークスの引っかかり低減効果が減少し、コーク
ス崩れ量が減少しなかったためである。
As shown in the base of Table 1, the central gas flow became excessive and the furnace condition became unstable. As a countermeasure for improving the situation, an embodiment corresponding to the first invention is described in the first embodiment. Example 2 shows an example corresponding to the second invention. In Example 1, an improvement in the CO gas utilization rate was observed, the fuel ratio was reduced, and the reactor condition was stabilized. Also in Example 2, an improvement in the CO gas utilization was observed, the fuel ratio was reduced, and the furnace condition was stabilized. These are due to the fact that the amount of coke collapse is lower than the base as shown in FIG. 4 and that the peripheral portion O / C is not significantly reduced. On the other hand, Comparative Example 1 was a charging mode corresponding to the first invention, in which the charging amount of ore O1 was set to 20% of the total ore amount, the CO gas utilization rate did not change, and the furnace body heat load was changed. As a result, the fuel ratio increased, and the reactor condition did not improve. This is because the amount of ore O1 charged was large and coke collapse occurred by itself. Comparative Example 2 is a charging mode corresponding to the second invention,
The ore O1 was charged at a position 10% from the furnace wall, the CO gas utilization rate did not change, and the furnace condition did not improve.
This is because the effect of reducing the catch of coke was reduced and the amount of coke collapse did not decrease.

【0015】[0015]

【発明の効果】以上説明したように、本発明によれば、
コークス崩れ量を減少させて、炉周辺部のO/Cの大き
な低下を伴わずに中心部のO/Cを上昇させることが可
能となり、炉体熱負荷が抑制出来ると共に炉況の安定を
保ちながらガス利用率の向上による燃料比の低減が実現
できる等の多大の効果を奏するものである。
As described above, according to the present invention,
By reducing the amount of coke collapse, it is possible to raise the O / C at the center without greatly reducing the O / C at the periphery of the furnace, thereby suppressing the heat load of the furnace and keeping the furnace condition stable. However, it has a great effect that the fuel ratio can be reduced by improving the gas utilization rate.

【図面の簡単な説明】[Brief description of the drawings]

【図1】鉱石O1の装入量とコークス崩れ率の関係を示
すグラフである。
FIG. 1 is a graph showing a relationship between a charged amount of ore O1 and a coke collapse rate.

【図2】鉱石O1の装入位置とコークス崩れ率の関係を
示すグラフである。
FIG. 2 is a graph showing a relationship between a charging position of ore O1 and a coke collapse rate.

【図3】炉半径方向の相対O/C分布を示すグラフであ
る。
FIG. 3 is a graph showing a relative O / C distribution in a furnace radial direction.

【図4】コークス崩れ量と周辺部相対O/Cとの関係を
示すグラフである。
FIG. 4 is a graph showing a relationship between a coke collapse amount and a peripheral portion relative O / C.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ベル式高炉内に鉱石O及びコークスCを
装入するに際し、1チャージをC1、O1、C2、O
2、O3の5バッチとして順次装入して高炉を操業する
方法において、前記O1を、全鉱石量の5〜15%とす
ると共に炉壁部から炉半径の30〜70%の位置に装入
することを特徴とする高炉操業方法。
1. When charging ore O and coke C into a bell-type blast furnace, one charge is C1, O1, C2, O
2. A method of operating a blast furnace by sequentially charging as five batches of O3, wherein the O1 is charged to 5 to 15% of the total ore amount and charged to a position 30 to 70% of the furnace radius from the furnace wall. A method for operating a blast furnace, comprising:
【請求項2】 ベル式高炉内に鉱石O及びコークスCを
装入するに際し、1チャージをC1、C2、O1、O
2、O3の5バッチとして順次装入して高炉を操業する
方法において、前記O1を、全鉱石量の5〜15%とす
ると共に炉壁部から炉半径の30〜70%の位置に装入
することを特徴とする高炉操業方法。
2. When charging ore O and coke C into a bell-type blast furnace, one charge is C1, C2, O1, O
2. A method of operating a blast furnace by sequentially charging as five batches of O3, wherein the O1 is charged to 5 to 15% of the total ore amount and charged to a position 30 to 70% of the furnace radius from the furnace wall. A method for operating a blast furnace, comprising:
JP2000151703A 2000-05-23 2000-05-23 Method for operating blast furnace Withdrawn JP2001335817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000151703A JP2001335817A (en) 2000-05-23 2000-05-23 Method for operating blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000151703A JP2001335817A (en) 2000-05-23 2000-05-23 Method for operating blast furnace

Publications (1)

Publication Number Publication Date
JP2001335817A true JP2001335817A (en) 2001-12-04

Family

ID=18657216

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000151703A Withdrawn JP2001335817A (en) 2000-05-23 2000-05-23 Method for operating blast furnace

Country Status (1)

Country Link
JP (1) JP2001335817A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE112004003138B4 (en) 2003-04-30 2019-10-10 Kabushiki Kaisha Kobe Seiko Sho (Kobe Steel, Ltd.) Aluminum oxide protective layer and method of production thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE112004003138B4 (en) 2003-04-30 2019-10-10 Kabushiki Kaisha Kobe Seiko Sho (Kobe Steel, Ltd.) Aluminum oxide protective layer and method of production thereof

Similar Documents

Publication Publication Date Title
JP4269847B2 (en) Raw material charging method for bell-less blast furnace
JP2001335817A (en) Method for operating blast furnace
JP6244874B2 (en) Raw material charging method
JP3948352B2 (en) Blast furnace operation method and bellless charging device
JP5481891B2 (en) Raw material charging method for bell-less blast furnace
JP5375028B2 (en) Raw material charging method for bell-less blast furnace
JP3750405B2 (en) Blast furnace operation method during blast furnace inner wall repair
JP4725168B2 (en) Raw material charging method to blast furnace
JP3779815B2 (en) Blast furnace operation method
KR100919028B1 (en) Method for filling a blast furnace with charging materials
JP2003129123A (en) Method for estimating minor diameter of vacuum vessel in vacuum degassing apparatus and method for controlling height
JP3603776B2 (en) Blast furnace operation method
JP3228083B2 (en) Blast furnace interior interior tracking method
JP6558519B1 (en) Raw material charging method for blast furnace
JP6665443B2 (en) Operating method of flash smelting furnace
JP4680344B2 (en) Raw material charging method to blast furnace
JPH07305103A (en) Method for charging raw material into blast furnace
JP2002194407A (en) Method for operating vertical type furnace
JP2023066757A (en) Operating method of blast furnace
JP2970452B2 (en) Blast furnace operation method
RU2165982C1 (en) Method of charging of blast furnace
JP2024020713A (en) Operation method for blast furnace
JP2005023392A (en) Spray-repairing method for furnace wall refractory in blast furnace
JP3835041B2 (en) Blast furnace raw material charging method
JPS6112967B2 (en)

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20070807