JP2001287881A - Elevator for construction and its installation method - Google Patents

Elevator for construction and its installation method

Info

Publication number
JP2001287881A
JP2001287881A JP2000102489A JP2000102489A JP2001287881A JP 2001287881 A JP2001287881 A JP 2001287881A JP 2000102489 A JP2000102489 A JP 2000102489A JP 2000102489 A JP2000102489 A JP 2000102489A JP 2001287881 A JP2001287881 A JP 2001287881A
Authority
JP
Japan
Prior art keywords
machine room
car
hoistway
construction
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000102489A
Other languages
Japanese (ja)
Other versions
JP3920527B2 (en
Inventor
Ryoetsu Kanayama
良悦 金山
Yoshito Mukoyama
芳人 向山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2000102489A priority Critical patent/JP3920527B2/en
Publication of JP2001287881A publication Critical patent/JP2001287881A/en
Application granted granted Critical
Publication of JP3920527B2 publication Critical patent/JP3920527B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an elevator for construction equipped with a temporary machine room allowing the easy maintenance and inspection of the internal equipment thereof and easy to carry or assemble with a relatively light weight. SOLUTION: The lower machine room 1b of the temporary machine room 1 is attachably and detachably provided with a protruding floor 104b protruded toward the wall surface of an elevator shaft opposed thereto, an upper machine room is mounted on the lower machine room 1b, and the lower machine room 1b is connected to the upper machine room through a pair of connecting columns 1c. Accordingly, an enough space can be formed in the temporary machine room by performing the maintenance and inspection of the equipment within the temporary machine room 1 on the protruding floor 104b. The height and weight of the temporary machine room 1 can be reduced by halving it into the lower machine room 1b and the upper machine room.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、高層ビル等の建築
工事現場で工事進行過程に応じて昇降路内の仮設機械室
を上方へ移設することにより乗りかごを運行するサービ
ス階を順次上方へ拡大していく工事用エレベータおよび
その据付方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a service floor for operating a car by sequentially moving a temporary machine room in a hoistway upward according to the progress of construction at a construction site of a high-rise building or the like. The present invention relates to an expanding construction elevator and its installation method.

【0002】[0002]

【従来の技術】従来、例えば特開平8−133635号
公報や特開平4−243786号公報に開示されている
ように、ビルの建築工事の進行過程に合わせて、昇降路
内に仮設した機械室を上方へ移設していき、乗りかごの
昇降行程を順次延長可能な工事用エレベータが提案され
ている。このような従来の工事用エレベータでは、高層
ビルの建築工事現場であっても、エレベータが未完成の
間に乗りかごを用いて上層階へ建築資材を運搬したり建
設作業者を昇降できるので、ビル建築工事の効率化を図
ることができる。
2. Description of the Related Art Conventionally, as disclosed in, for example, JP-A-8-133635 and JP-A-4-243786, a machine room temporarily installed in a hoistway according to the progress of building construction. There has been proposed a construction elevator capable of moving a car upward and gradually extending a car's ascending and descending strokes. In such a conventional construction elevator, even at the construction work site of a high-rise building, since the elevator can be used to transport building materials to the upper floors using a car while the elevator is not completed or to lift construction workers, The efficiency of building construction can be improved.

【0003】[0003]

【発明が解決しようとする課題】ところで、前述した従
来の工事用エレベータでは、仮設機械室を建築工事の進
行に応じて昇降路内の上方に移設していくため、仮設機
械室内の機器、すなわち制御盤、巻上げ機およびロープ
送出し装置等をすべて昇降路寸法より狭い仮設機械室内
に配置する必要があり、したがって、仮設機械室内にス
ペースの余裕がなくなり仮設機械室内の機器の保守・点
検が困難であった。
By the way, in the above-mentioned conventional construction elevator, since the temporary machine room is moved upward in the hoistway according to the progress of the construction work, the equipment in the temporary machine room, that is, It is necessary to arrange the control panel, hoisting machine, rope sending device, etc. all in the temporary machine room smaller than the hoistway dimension, so there is no room in the temporary machine room, and maintenance and inspection of the equipment in the temporary machine room is difficult. Met.

【0004】また、上述した仮設機械室内の機器を配置
するために仮設機械室の高さ寸法を大きくする必要があ
るが、仮設機械室の高さ寸法を大きくした場合には、工
場から建築現場までの運搬用トラックに載せた際に道路
交通法上の高さ制限以下にすることが難しいため、仮設
機械室を分割して運搬して現地で組み立てるという煩雑
な手間が発生していた。
In order to dispose the above-mentioned equipment in the temporary machine room, it is necessary to increase the height of the temporary machine room. It is difficult to reduce the height to less than the height limit under the Road Traffic Act when the truck is put on a transport truck up to this point, so that the trouble of dividing the temporary machine room, transporting and assembling it on site has occurred.

【0005】また、上述した仮設機械室を建築現場のタ
ワークレーン等の揚重設備により昇降路内に搬入するた
め、この揚重能力の制約を受けないよう、極力軽量化す
る必要があり、同時に、制御盤、巻上げ機等の機器を解
体・搬出する揚重設備を仮設機械室内に設置するために
仮設機械室自体の強度も必要であったが、この点への考
慮が十分でなかった。
Further, since the above-mentioned temporary machine room is carried into the hoistway by a lifting facility such as a tower crane at a construction site, it is necessary to reduce the weight as much as possible so as not to be restricted by the lifting capacity. In order to install lifting equipment for dismantling and carrying out equipment such as a control panel and a hoisting machine in the temporary machine room, the strength of the temporary machine room itself was necessary, but this point was not sufficiently considered.

【0006】また、昇降路の途中階に受けビームを建物
の梁に横架する状態に仮設して、この受けビーム上に上
述した仮設機械室を載置して保持するようになっている
が、仮設機械室の移設の際に、仮設機械室を持ち上げた
状態でこの受けビームを取り外した後、移設先の階で仮
設機械室を吊り上げた状態で再度仮設する作業が発生
し、この受けビームの落下の危険性があった。同様に、
工事用エレベータの乗りかごも、タワークレーン等で搬
入する際に受けビーム上に載置して保持する必要があ
り、この受けビームの落下の危険性があった。
[0006] Further, a receiving beam is temporarily installed on a halfway floor of a hoistway so as to lie on a beam of a building, and the above-mentioned temporary machine room is placed and held on the receiving beam. When the temporary machine room is relocated, the receiving beam is removed while the temporary machine room is lifted, and then the temporary machine room is lifted up on the destination floor, and a temporary re-installation operation is performed. There was a danger of falling. Similarly,
When the elevator car for construction is carried in by a tower crane or the like, it must be placed on the receiving beam and held, and there is a risk of the receiving beam falling.

【0007】また、工事用エレベータの乗りかごが本設
のエレベータと同等の大きさであるため、長尺物である
建築資材、例えば足場板等を乗りかごの寸法上の制約で
運搬できないという問題があった。
In addition, since the car of the construction elevator is the same size as the main elevator, it is difficult to transport long building materials, such as scaffolds, due to the dimensional restrictions of the car. was there.

【0008】また、建築現場における落下事故防止のた
め、昇降路には各階毎に養生板を敷いていたり、建築中
の昇降路の最上部には雨の進入を防ぐ止水板が設置され
ており、このような状態から工事用エレベータを効率良
く据え付けたり、仮設機械室を移設したりする必要への
考慮が十分でなかった。
In order to prevent a fall accident at a construction site, a curing board is laid on the hoistway for each floor, and a waterproof plate for preventing rain from entering is installed at the top of the hoistway under construction. In such a situation, it was not sufficient to consider the necessity of efficiently installing the construction elevator and relocating the temporary machine room.

【0009】本発明は、このような従来技術における実
情に鑑みてなされたもので、その第1の目的は、仮設機
械室内にスペースの余裕を設けることができ、仮設機械
室内の機器の保守・点検作業を容易に行なうことのでき
る工事用エレベータを提供することにある。
The present invention has been made in view of such a situation in the prior art. A first object of the present invention is to provide a space in a temporary machine room and to maintain and maintain equipment in the temporary machine room. An object of the present invention is to provide a construction elevator that can easily perform an inspection operation.

【0010】また、その第2の目的は、仮設機械室が軽
量であり、搬入や移設に際して安全にかつ効率良く位置
決め作業ができ、かつトラックで運搬しやすく現地でも
容易に組立てることのできる工事用エレベータを提供す
ることにある。
A second object of the present invention is that the temporary machine room is light in weight, can be positioned safely and efficiently when carrying in or relocating, and can be easily transported by truck and easily assembled on site. To provide an elevator.

【0011】また、その第3の目的は、完成した昇降路
内から仮設機械室内の機器を効率よく解体・搬出するこ
とのできる工事用エレベータを提供することにある。
A third object of the present invention is to provide a construction elevator capable of efficiently dismantling and carrying out equipment in a temporary machine room from within a completed shaft.

【0012】また、その第4の目的は、乗りかごを載置
し保持するかご受けビームの取付・取外し作業を安全に
行なうことのできる工事用エレベータを提供することに
ある。
A fourth object of the present invention is to provide a construction elevator capable of safely performing a mounting / removing operation of a car receiving beam for placing and holding a car.

【0013】また、その第5の目的は、建築資材の運搬
を乗りかごで効率良く行なうことのできる工事用エレベ
ータを提供することにある。
A fifth object of the present invention is to provide a construction elevator capable of efficiently transporting building materials by using a car.

【0014】また、その第6の目的は、昇降路内に各階
毎に養生を敷いていたり、建築中の昇降路最上部の雨の
進入を防ぐ止水板が設置されている場合でも、効率良く
据え付けることのできる工事用エレベータの据付方法を
提供することにある。
A sixth object of the present invention is to improve the efficiency even when a curing is laid on each floor in the hoistway or a waterproof plate for preventing rain from entering at the top of the hoistway under construction is installed. It is an object of the present invention to provide a construction elevator installation method that can be installed well.

【0015】[0015]

【課題を解決するための手段】上記第1の目的を達成す
るために、本発明の請求項1に係る発明は、建築中の建
物の昇降路内に納められ、前記建物の築造に合わせて順
次上方に移設される仮設機械室と、この仮設機械室に設
けられ、主ロープが巻掛けられる巻上げ機と、前記主ロ
ープを介して駆動力がそれぞれ伝達され、前記昇降路内
を釣瓶式に昇降する乗りかごおよびつり合いおもりと、
前記昇降路内に立設され、これらの乗りかごおよびつり
合いおもりをそれぞれ案内するガイドレールとを有し、
前記仮設機械室の移設に伴い前記乗りかごを運行するサ
ービス階を上方へ拡大するようにした工事用エレベータ
において、前記仮設機械室に、対向する昇降路壁面に向
けて張り出され、前記ガイドレールの立設方向とほぼ直
交する床面を形成する張出し床を着脱可能に備えた構成
にした。
To achieve the first object, the invention according to claim 1 of the present invention is housed in a hoistway of a building under construction, and is adapted to the construction of the building. A temporary machine room sequentially moved upward, a hoisting machine provided in the temporary machine room and around which a main rope is wound, and a driving force is transmitted via the main rope, respectively, and the inside of the hoistway is a fishing bottle type. With the elevator car and counterweight,
Having a guide rail that is erected in the hoistway and guides each of the car and the counterweight;
In a construction elevator in which a service floor for operating the car is expanded upward in accordance with the relocation of the temporary machine room, the guide rail is extended toward a facing hoistway wall surface in the temporary machine room, In this configuration, an overhanging floor that forms a floor surface that is substantially perpendicular to the direction in which it is erected is detachably provided.

【0016】このように構成した本発明の請求項1に係
る発明では、仮設機械室より対向する昇降路壁面に向け
て張出し床が張り出しているので、その張出し床の分だ
け仮設機械室内にスペースの余裕ができ、これによっ
て、仮設機械室内の機器の保守・点検が容易になる。
In the invention according to the first aspect of the present invention, since the overhanging floor projects from the temporary machine room toward the wall surface of the hoistway facing the temporary machine room, the space in the temporary machine room is equal to that of the overhanging floor. This facilitates maintenance and inspection of the equipment in the temporary machine room.

【0017】また、上記第2の目的を達成するために、
本発明の請求項2に係る発明は、建築中の建物の昇降路
内に納められ、前記建物の築造に合わせて順次上方に移
設される仮設機械室と、この仮設機械室に設けられ、主
ロープが巻掛けられる巻上げ機と、前記主ロープを介し
て駆動力がそれぞれ伝達され、前記昇降路内を釣瓶式に
昇降する乗りかごおよびつり合いおもりと、前記昇降路
内に立設され、これらの乗りかごおよびつり合いおもり
をそれぞれ案内するガイドレールとを有し、前記仮設機
械室の移設に伴い前記乗りかごを運行するサービス階を
上方へ拡大するようにした工事用エレベータにおいて、
前記仮設機械室が、前記巻上げ機および乗りかごの昇降
を制御する制御盤、前記乗りかごの異常速度を検出する
ガバナ装置および前記主ロープを保持するロープ固定装
置とが予め組込まれるとともに、対向する昇降路壁面に
向けて張り出され、前記ガイドレールの立設方向とほぼ
直交する床面を形成する着脱可能な張出し床を有する下
部機械室と、前記主ロープを送り出すロープ送出し装
置、および前記制御盤と乗りかごを接続するテールコー
ドを送り出すテールコード送出し装置が予め組込まれる
上部機械室と、上下部にそれぞれ前記ガイドレールに係
合するガイド体を有し、前記上部機械室および下部機械
室を連結する一対の連結柱とから構成した。
Further, in order to achieve the second object,
The invention according to claim 2 of the present invention is provided in a temporary machine room which is housed in a hoistway of a building under construction and which is sequentially moved upward according to the construction of the building, and provided in the temporary machine room. A hoist on which a rope is wound, and a driving force is transmitted through the main rope, respectively, and a car and a counterweight which rises and lowers in a fishing bottle manner in the hoistway, and are erected in the hoistway, and In a construction elevator having a guide rail for guiding a car and a counterweight, respectively, the service floor for operating the car is expanded upward with the relocation of the temporary machine room,
The temporary machine room has a control panel for controlling the lifting and lowering of the hoist and the car, a governor device for detecting an abnormal speed of the car, and a rope fixing device for holding the main rope, which are previously installed and opposed to each other. A lower machine room having a detachable overhanging floor that projects toward the hoistway wall surface and forms a floor surface substantially orthogonal to the direction in which the guide rails are erected, a rope delivery device that sends out the main rope, and An upper machine room in which a tail cord delivery device for delivering a tail cord for connecting the control panel and the car is previously installed, and upper and lower portions each having a guide body that engages with the guide rail, and the upper machine room and the lower machine It consisted of a pair of connecting columns connecting the chambers.

【0018】このように構成した本発明の請求項2に係
る発明では、下部機械室と上部機械室に2分割とし、そ
れぞれに予め機械室内機器を取り付けた状態としたこと
で、道路交通法上の高さ制限にも対応でき、現地での組
立も容易に行える。また、一対の連結柱の上下部ガイド
体を乗りかご用ガイドレールに係合させることにより、
仮設機械室が乗りかご用ガイドレールに沿って円滑に案
内されるので、仮設機械室を精度良く、かつ安全に移設
・設置できる。
In the invention according to claim 2 of the present invention, the lower machine room and the upper machine room are divided into two parts, each of which is provided with a machine room equipment in advance, so that it can be used under the Road Traffic Law. Height restrictions, and on-site assembly can be easily performed. Also, by engaging the upper and lower guide bodies of the pair of connecting columns with the guide rails for the car,
Since the temporary machine room is smoothly guided along the guide rails for the car, the temporary machine room can be accurately and safely relocated and installed.

【0019】また、上記第2の目的を達成するために、
本発明の請求項3に係る発明は、請求項1に係る発明に
おいて、前記仮設機械室が、前記昇降路内に所定間隔を
おいて立設される一対の連結柱と、これらの連結柱の下
端部に連結される床部、この床部の端部にそれぞれ立設
される複数本の下柱、およびこれらの下柱の上端間に設
けられるとともに前記連結柱に連結される下連結梁を有
する下部機械室と、前記連結柱の上端部に連結される天
井部、この天井部の端部よりそれぞれ垂下される複数本
の上柱、およびこれらの上柱の下端間に設けられ、前記
連結柱および下連結梁に連結される上連結梁を有する上
部機械室とから構成した。
In order to achieve the second object,
In the invention according to claim 3 of the present invention, in the invention according to claim 1, the temporary machine room includes a pair of connecting columns erected at predetermined intervals in the hoistway, and A floor connected to the lower end, a plurality of lower pillars respectively erected at the ends of the floor, and a lower connecting beam provided between upper ends of these lower pillars and connected to the connecting pillar; A lower machine room having, a ceiling connected to an upper end of the connection column, a plurality of upper columns respectively suspended from ends of the ceiling, and a connection provided between lower ends of these upper columns. An upper machine room having an upper connecting beam connected to the column and the lower connecting beam.

【0020】このように構成した本発明の請求項3に係
る発明では、一対の連結柱の上下端にそれぞれ天井部お
よび床部を設けるとともに、その中間部に上連結梁およ
び下連結梁を設け、これらの上連結梁と天井部とを連結
する複数本の上柱、および下連結梁と床部とを連結する
複数本の下柱を備えて機械室を構成したため、軽量でか
つ高剛性を有する機械室構造とすることができる。
According to the third aspect of the present invention, a ceiling and a floor are provided at the upper and lower ends of a pair of connecting columns, respectively, and an upper connecting beam and a lower connecting beam are provided at an intermediate portion. Since the machine room is provided with a plurality of upper pillars connecting the upper connecting beam and the ceiling and a plurality of lower pillars connecting the lower connecting beam and the floor, the lightweight and high rigidity is achieved. Machine room structure.

【0021】また、上記第3の目的を達成するために、
本発明の請求項4に係る発明は、請求項2に係る発明に
おいて、前記上部機械室の天井部に、前記巻上げ機、制
御盤、ガバナ装置、およびロープ固定装置のうちの少な
くとも1つを解体・搬出するための揚重用フックを備え
た構成にした。
In order to achieve the third object,
The invention according to claim 4 of the present invention is the invention according to claim 2, wherein at least one of the hoist, the control panel, the governor device, and the rope fixing device is disassembled on the ceiling of the upper machine room. -A structure with a lifting hook for carrying out is provided.

【0022】このように構成した本発明の請求項4に係
る発明では、上部機械室の天井部に設けた揚重用フック
に揚重装置を装着し、この揚重装置で機械室内機器の解
体・搬出を行なうことにより、本解体・搬出作業を効率
良く行なうことができる。
In the invention according to the fourth aspect of the present invention, a lifting device is mounted on a lifting hook provided on the ceiling of the upper machine room. By carrying out, the actual dismantling and carrying out work can be performed efficiently.

【0023】また、上記第4の目的を達成するために、
本発明の請求項5に係る発明は、建築中の建物の昇降路
内に納められ、前記建物の築造に合わせて順次仮設機械
室を上方に移設し乗りかごを運行するサービス階を上方
へ移設するようにした工事用エレベータにおいて、前記
乗りかごの床下に、乗りかごを載置するかご受けビーム
をガイドし、このかご受けビームの落下を防ぐかごビー
ムガイドを設けた構成にした。
In order to achieve the fourth object,
The invention according to claim 5 of the present invention is accommodated in a hoistway of a building under construction, and a temporary service room is sequentially moved upward according to the construction of the building, and a service floor for operating a car is moved upward. In the construction elevator, a car receiving beam on which the car is placed is guided under the floor of the car, and a car beam guide for preventing the falling of the car receiving beam is provided.

【0024】このように構成した本発明の請求項5に係
る発明では、乗りかごの床下に設けたかごビームガイド
により、かご受けビームの落下を防ぐことにより、乗り
かごを載置して保持するかご受けビームの取付・取外し
作業を安全に行なうことができる。
In the invention according to claim 5 of the present invention, a car beam guide provided under the floor of the car prevents the car receiving beam from falling, thereby placing and holding the car. The attachment / detachment work of the car receiving beam can be performed safely.

【0025】また、上記第5の目的を達成するため、本
発明の請求項6に係る発明は、前記乗りかごの天井部の
上部に、長物の建築資材を運搬可能な上部トランクを設
けた構成にした。
Further, in order to achieve the fifth object, the invention according to claim 6 of the present invention is characterized in that an upper trunk capable of transporting long building materials is provided above the ceiling of the car. I made it.

【0026】このように構成した本発明の請求項6に係
る発明では、乗りかごの天井部の上部に設けた上部トラ
ンクで長尺物などの建築資材を運搬することにより、そ
の運搬を効率良く行える。
According to the sixth aspect of the present invention, the construction material such as a long object is transported by the upper trunk provided above the ceiling portion of the car, so that the transportation can be efficiently performed. I can do it.

【0027】また、上記第6の目的を達成するために、
本発明の請求項7に係る発明は、建築中の建物の昇降路
内に納められ、前記建物の築造に合わせて順次上方に移
設される仮設機械室と、この仮設機械室に設けられ、主
ロープが巻掛けられる巻上げ機と、前記主ロープを介し
て駆動力がそれぞれ伝達され、前記昇降路内を釣瓶式に
昇降する乗りかごおよびつり合いおもりと、前記昇降路
内に立設され、これらの乗りかごおよびつり合いおもり
をそれぞれ案内するガイドレールとを有し、前記仮設機
械室の移設に伴い前記乗りかごを運行するサービス階を
上方へ拡大するようにした工事用エレベータの据付方法
において、前記築造中の昇降路に設置されている止水板
および各階の養生板を利用して乗りかご用ガイドレール
およびつり合いおもり用ガイドレールをそれぞれ設置し
た後、前記止水板および各階の養生板を揚重装置の吊上
げにより取り外し、次いで、前記つり合いおもりを前記
揚重装置で吊上げて前記つり合いおもり用ガイドレール
でガイドしながら搬入するとともに、前記つり合いおも
りを前記昇降路の最下部に仮固定し、次いで、予め組み
立てておいた前記乗りかごを前記乗りかご用ガイドレー
ルでガイドしながら搬入して前記昇降路内のかご受けビ
ーム上に載置し、次いで前記仮設機械室を前記揚重装置
で吊上げて前記乗りかご用ガイドレールでガイドしなが
ら搬入して前記昇降路内の機械室受けビーム上に載置
し、次いで、前記主ロープの巻掛け、および電気配線を
行なって前記乗りかごを運行可能とする構成にした。
In order to achieve the sixth object,
The invention according to claim 7 of the present invention is provided in a temporary machine room which is housed in a hoistway of a building under construction and which is sequentially moved upward according to the construction of the building, and provided in the temporary machine room. A hoist on which a rope is wound, and a driving force is transmitted through the main rope, respectively, and a car and a counterweight which rises and lowers in a fishing bottle manner in the hoistway, and are erected in the hoistway, and The installation method of a construction elevator, comprising: a guide rail for guiding a car and a counterweight, respectively, and expanding a service floor for operating the car with the relocation of the temporary machine room. After installing the guide rail for the car and the guide rail for the counterweight using the water stop plate installed in the inside hoistway and the curing plate of each floor, the water stop plate Then, the curing board of each floor is removed by lifting of a lifting device, and then the counterweight is lifted by the lifting device and carried in while being guided by the counterweight guide rail, and the counterweight is moved to the lowermost position of the hoistway. Temporarily fixed to the lower part, then carry in the pre-assembled car while being guided by the car guide rails, place it on the car receiving beam in the hoistway, and then move the temporary machine room Lifted by the lifting device, carried in while being guided by the guide rails for the car, placed on the machine room receiving beam in the hoistway, then wound around the main rope, and performed electrical wiring. The car was configured to be operable.

【0028】このように構成した本発明の請求項7に係
る発明では、養生板および止水板を利用して予め乗りか
ご用ガイドレールおよびつり合いおもり用ガイドレール
を設置できるため、工事用エレベータを効率良く据え付
けることができる。
In the invention according to claim 7 of the present invention, the guide rail for the car and the guide rail for the counterweight can be installed in advance by using the curing plate and the water stop plate. It can be installed efficiently.

【0029】[0029]

【発明の実施の形態】以下、本発明の実施の形態を図に
基づいて説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to the drawings.

【0030】図1は本発明の一実施形態に係る工事用エ
レベータの全体構成を示す縦断面図、図2は本実施形態
に設けられる仮設機械室の側面図、図3は本実施形態に
設けられる下部機械室の平面図、図4は下部機械室の側
面図、図5は本実施形態に設けられる上部機械室の側面
図、図6は仮設機械室の斜視図、図7は本実施形態に設
けられる乗りかごの側面図、図8は乗りかごの斜視図、
図9は昇降路内にガイドレールを立設する工程を示す
図、図10は昇降路内から止水板および養生板を取り外
す工程を示す図、図11は昇降路内に乗りかごおよび仮
設機械室を搬入する工程を示す図、図12は仮設機械室
を下降させた状態を示す図、図13はガイドレールを上
方へ伸ばす工程を示す図、図14は仮設機械室を上方へ
移設した状態を示す図、図15は昇降路頂部に止水板を
設置する工程を示す図である。
FIG. 1 is a longitudinal sectional view showing an entire construction of a construction elevator according to one embodiment of the present invention, FIG. 2 is a side view of a temporary machine room provided in this embodiment, and FIG. 3 is provided in this embodiment. 4 is a side view of the lower machine room, FIG. 5 is a side view of the upper machine room provided in the present embodiment, FIG. 6 is a perspective view of the temporary machine room, and FIG. 7 is the present embodiment. 8 is a side view of the car provided in FIG. 8, FIG. 8 is a perspective view of the car,
FIG. 9 is a view showing a process of erecting a guide rail in a hoistway, FIG. 10 is a view showing a process of removing a water blocking plate and a curing plate from the hoistway, and FIG. 11 is a car and a temporary machine in the hoistway. FIG. 12 is a view showing a state where the temporary machine room is lowered, FIG. 13 is a view showing a process of extending the guide rail upward, and FIG. 14 is a state where the temporary machine room is moved upward. FIG. 15 is a diagram showing a process of installing a water stoppage plate on the top of the hoistway.

【0031】本実施形態の工事用エレベータは、図1に
示すように、機械室受けビーム2を介して所定階床の建
屋梁10に支持される仮設機械室1と、この仮設機械室
1に設置された巻上げ機3と、この巻上げ機3より駆動
力を伝達され、昇降路4内をガイドレール11、12に
よりそれぞれガイドされ釣瓶式に昇降する乗りかご5お
よびつり合いおもり6と、仮設機械室1から送り出され
るとともに乗りかご5上部に設置されたかご上プーリ5
aと巻上げ機シーブ3aとつり合いおもり6の上部に設
置されたつり合いおもりプーリ6aとを巻回したあと仮
設機械室1に固定されるよう張設される主ロープ7と、
乗りかご5と仮設機械室1との間に張設され電力および
制御信号を伝送するテールコード8と、乗りかご5とつ
り合いおもり6との間に張設されるコンペンチェーン9
と、仮設機械室1内に設置され制御信号を発信するとと
もにエレベータ全体の走行制御を行なう制御盤13とを
有している。
As shown in FIG. 1, the construction elevator according to the present embodiment includes a temporary machine room 1 supported on a building beam 10 on a predetermined floor via a machine room receiving beam 2, and a temporary machine room 1. A hoisting machine 3 installed, a driving car 5 and a counterweight 6 which receive driving force transmitted from the hoisting machine 3 and are guided by guide rails 11 and 12 in a hoistway 4 to rise and lower in a fishing bottle manner, respectively, and a temporary machine room. The pulley 5 on the car which is sent out from 1 and is set on the upper part of the car 5
a main rope 7 which is stretched so as to be fixed to the temporary machine room 1 after winding the hoisting sheave 3a and the counterweight pulley 6a installed above the counterweight 6;
A tail cord 8 stretched between the car 5 and the temporary machine room 1 for transmitting power and control signals, and a compensating chain 9 stretched between the car 5 and the counterweight 6
And a control panel 13 installed in the temporary machine room 1 for transmitting a control signal and controlling the traveling of the entire elevator.

【0032】仮設機械室1は、図2に示すように上部機
械室1aおよび下部機械室1bと、昇降路4内に所定間
隔をおいて立設され、上部機械室1aおよび下部機械室
1bを連結する一対の連結柱1cとから構成されてい
る。上部機械室1aには、主ロープ7が送出し可能に巻
回されるロープ送出し装置71と、テールコード8が送
出し可能に巻回されるテールコード送出し装置81とが
設置されている。一方、下部機械室1bに、主ロープ7
が巻掛けられる巻上げ機3と、テールコード8を介して
制御信号を発信するとともにエレベータ全体の走行制御
を行なう制御盤13と、乗りかご5の昇降速度が過速度
となったことを検出するガバナ装置14と、ロープ送出
し装置71から送り出された主ロープ7を保持するロー
プ固定装置72とが設置されている。連結柱1cの上下
部には、それぞれ乗りかご用ガイドレール11に係合
し、仮設機械室1をガイドする上部ガイド体15a、下
部ガイド体15bが設けられている。また、図6に示す
ように、仮設機械室1の底面には機械室受けビーム2の
出し入れをガイドする機械室ビームガイド2aが設けら
れている。
The temporary machine room 1 is erected at predetermined intervals in the hoistway 4 with the upper machine room 1a and the lower machine room 1b as shown in FIG. And a pair of connecting columns 1c to be connected. The upper machine room 1a is provided with a rope delivery device 71 that is wound so that the main rope 7 can be delivered and a tail code delivery device 81 that is wound so that the tail cord 8 can be delivered. . On the other hand, the main rope 7
, A control panel 13 for transmitting a control signal via a tail cord 8 and controlling traveling of the entire elevator, and a governor for detecting that the elevator speed of the car 5 has become excessive. A device 14 and a rope fixing device 72 for holding the main rope 7 sent from the rope sending device 71 are provided. An upper guide body 15a and a lower guide body 15b, which engage with the car guide rails 11 and guide the temporary machine room 1, respectively, are provided at the upper and lower portions of the connecting column 1c. As shown in FIG. 6, a machine room beam guide 2a is provided on the bottom of the temporary machine room 1 to guide the machine room receiving beam 2 in and out.

【0033】上部機械室1aは、連結柱1cの上端部に
連結される天井部101aと、この天井部101aの四
隅よりそれぞれ垂下される複数本の上柱103aと、こ
れらの上柱103aの下端間に設けられ、連結柱1cの
中間部に連結される上連結梁102aとからなってい
る。天井部101aには、揚重用フック16が取付けら
れ、この揚重用フック16に、機械室内機器である巻上
げ機3、制御盤13、ガバナ装置14、およびロープ固
定装置72のうちの少なくとも1つを解体・搬出するた
めの図示しない揚重装置が装着可能である。
The upper machine room 1a has a ceiling 101a connected to the upper end of the connecting pillar 1c, a plurality of upper pillars 103a respectively suspended from four corners of the ceiling 101a, and lower ends of these upper pillars 103a. The upper connecting beam 102a is provided between the connecting columns 1c and is connected to an intermediate portion of the connecting column 1c. A lifting hook 16 is attached to the ceiling 101a, and at least one of the hoist 3, the control panel 13, the governor device 14, and the rope fixing device 72, which is a machine room device, is attached to the lifting hook 16. A lifting device (not shown) for disassembly and removal can be mounted.

【0034】下部機械室1bは、連結柱1cの下端部に
連結される床部101bと、この床部101bの四隅に
それぞれ立設される複数本の下柱103bと、これらの
下柱103bの上端間に設けられるとともに連結柱1c
および上連結梁102aに連結される下連結梁102b
とからなっている。図3に示すように、床101bの端
部に張り出し床104bが着脱可能に設けられており、
この張り出し床104bは対向する昇降路4壁面に向け
て張り出され、ガイドレール11の立設方向とほぼ直交
する床面を形成している。
The lower machine room 1b includes a floor 101b connected to the lower end of the connecting pillar 1c, a plurality of lower pillars 103b erected at four corners of the floor 101b, and a plurality of lower pillars 103b. Connecting column 1c provided between upper ends
And lower connecting beam 102b connected to upper connecting beam 102a
It consists of As shown in FIG. 3, an overhanging floor 104b is provided detachably at an end of the floor 101b.
The overhanging floor 104b extends toward the opposing hoistway 4 wall surface, and forms a floor surface substantially orthogonal to the direction in which the guide rails 11 are erected.

【0035】乗りかご5は、図7、図8に示すように、
枠体5b上に装着され、主ロープ7が巻回されるかご上
プーリ5aを有し、枠体5bの上下端に、乗りかご用ガ
イドレール11と係合して乗りかご5を案内するかご走
行案内体5dが設けられている。乗りかご5の底部に
は、かご受けビーム51が挿入され、かご受けビーム5
1をガイドしその落下を防止するかごビームガイド5c
が設けられており、かご受けビーム51は、建屋梁10
間に設けられ、乗りかご5を支持するようになってい
る。乗りかご5の天井部5eの上部には、図示しない長
物の建築資材を収納し運搬できる上部トランク51aが
設けられている。
The car 5 is, as shown in FIGS. 7 and 8,
A car pulley 5a mounted on the frame 5b and around which the main rope 7 is wound, and a car for guiding the car 5 by engaging the car guide rail 11 at the upper and lower ends of the frame 5b. A traveling guide body 5d is provided. At the bottom of the car 5, a car receiving beam 51 is inserted.
Car beam guide 5c that guides 1 and prevents its fall
Is provided, and the car receiving beam 51 is
It is provided between and supports the car 5. An upper trunk 51a that can store and transport long building materials (not shown) is provided above the ceiling 5e of the car 5.

【0036】次に、本実施形態の工事用エレベータの据
付方法を図9から図12を用いて説明する。すなわち、
図9に示す昇降路4の頂部に、昇降路4内の浸水を防ぐ
止水板17が設けられ、各階床乗場に、昇降路4内への
落下を防ぐ養生板18が設けられている。この状態で、
まず止水板17および養生板18を足場として、乗りか
ご用ガイドレール11およびつり合いおもり用ガイドレ
ール12を昇降路4の全行程に立設するとともに、出入
口装置19を各階床乗場に据え付ける。
Next, a method of installing the construction elevator according to the present embodiment will be described with reference to FIGS. That is,
At the top of the hoistway 4 shown in FIG. 9, a water stop plate 17 for preventing inundation in the hoistway 4 is provided, and a curing plate 18 for preventing falling into the hoistway 4 is provided at each floor landing. In this state,
First, the car guide rails 11 and the counterweight guide rails 12 are erected on the entire path of the hoistway 4 using the water stoppage plate 17 and the curing plate 18 as scaffolds, and the entrance / exit device 19 is installed on each floor landing.

【0037】次に、図10に示すように、止水板17お
よび養生板18を図示しないタワークレーン等を用いて
撤去した後、図11に示すようにつり合いおもり6をタ
ワークレーン等を用いて吊持し、ガイドレール12によ
り案内させながら昇降路4底部まで吊下ろし載置する。
次に乗りかご5を同様に吊持して昇降路4内に吊下ろ
し、乗りかご5を運行するサービス階のうちの最上階
(例えば6階)に前述したかご受けビーム51を用いて
乗りかご5を載置した後、上記のサービス階の上方階
(ここでは8階)に機械室受けビーム2を用いて仮設機
械室1を吊下ろして載置する。このとき、タワークレー
ン等揚重設備の能力に制限がある場合、仮設機械室1を
上部機械室1a、下部機械室1bに2分割して別々に二
度に分けて吊上げて昇降路4内に搬入する。
Next, as shown in FIG. 10, the water stopping plate 17 and the curing plate 18 are removed using a tower crane (not shown) or the like, and as shown in FIG. 11, the counterweight 6 is removed using a tower crane or the like. It is suspended and suspended and placed on the bottom of the hoistway 4 while being guided by the guide rails 12.
Next, the car 5 is similarly suspended and suspended in the hoistway 4, and the car is moved to the top floor (for example, the sixth floor) of the service floors operating the car 5 by using the car receiving beam 51 described above. 5, the temporary machine room 1 is suspended and placed on the upper floor (the eighth floor in this case) of the service floor using the machine room receiving beam 2. At this time, if the capacity of the lifting equipment such as a tower crane is limited, the temporary machine room 1 is divided into two parts, an upper machine room 1a and a lower machine room 1b, and they are separately divided and lifted separately into the hoistway 4. Bring in.

【0038】次に、仮設機械室1内のロープ固定装置7
2による固定を解除し、ロープ送出し装置71から主ロ
ープ7を昇降路4下方に向けてそのロープ端を送出し、
かご上プーリ5aに巻回させ、巻上げ機シーブ3aに巻
回させ、つり合いおもり6のシーブ6aに巻回させた
後、仮設機械室1の床部101bに主ロープ7のロープ
端を連結し、その送出しを抑制するようロープ固定装置
72で主ロープ7を固定することにより主ロープ7のロ
ーピング作業を行なう。
Next, the rope fixing device 7 in the temporary machine room 1
2, the main rope 7 is sent downward from the hoistway 4 and the end of the rope is sent out from the rope sending device 71,
After being wound around the car pulley 5a, wound around the hoist sheave 3a, and wound around the sheave 6a of the counterweight 6, the rope end of the main rope 7 is connected to the floor 101b of the temporary machine room 1, The main rope 7 is roped by fixing the main rope 7 with the rope fixing device 72 so as to suppress the transmission.

【0039】次に、テールコード送出し装置81から乗
りかご5の昇降に必要な行程分(ここでは6階床分)の
テールコード8を引出し、その引出した先端を乗りかご
5に連結する。このテールコード8の他端は制御盤13
および図示しない電源に連結されており、前記の連結を
行なうことにより乗りかご5と仮設機械室1間で電力お
よび制御信号の伝達が可能となる。そして、乗りかご5
に設けた図示しないガバナロープ送出し装置からガバナ
ロープを送出し、仮設機械室1に設けたガバナ装置14
と昇降路4底部に設けた図示しないガバナプーリとに巻
回させることに応じて、乗りかご5の過速度も検出可能
となる。
Next, the tail cord 8 is pulled out from the tail code sending device 81 for the stroke required for raising and lowering the car 5 (here, the floor of the sixth floor), and the drawn tip is connected to the car 5. The other end of the tail cord 8 is connected to the control panel 13
And a power supply (not shown). By performing the above-described connection, transmission of electric power and control signals between the car 5 and the temporary machine room 1 becomes possible. And car 5
The governor rope is delivered from a governor rope delivery device (not shown) provided in the
By being wound around a governor pulley (not shown) provided at the bottom of the hoistway 4, the overspeed of the car 5 can also be detected.

【0040】最後に、かご受けビーム51をかごビーム
ガイド5cから抜き取り、図12に示すように止水板1
7を昇降路4の頂部(ここでは10階)に設置すれば、
乗りかご5は6階から地下階(B1階)の間で運行サー
ビスが可能となる。
Finally, the car receiving beam 51 is extracted from the car beam guide 5c, and as shown in FIG.
If you install 7 at the top of the hoistway 4 (here the 10th floor)
The car 5 can be operated from the sixth floor to the basement floor (B1 floor).

【0041】次に、本実施形態に係る昇降階を上方へ拡
大(以下ステップアップと称する)する際の作業方法を
図13〜図15を用いて説明する。すなわち、まず図1
3に示すように止水板17上に、ガイドレール11、1
2をユニット化したレールユニット91をタワークレー
ン等を用いて吊下ろした後、止水板17上に足場20を
組上げる。この足場20を利用して、先程吊下ろした乗
りかご用ガイドレール11およびつり合いおもり用ガイ
ドレール12を、建築完了した建屋分(ここでは14階
床まで)立設固定した後、足場20および止水板17を
昇降路4内から撤去する。
Next, a working method for expanding an ascending / descending floor according to the present embodiment upward (hereinafter, referred to as step-up) will be described with reference to FIGS. That is, first, FIG.
As shown in FIG. 3, the guide rails 11, 1
After suspending the rail unit 91 obtained by unitizing 2 using a tower crane or the like, the scaffold 20 is assembled on the water stop plate 17. Using this scaffold 20, the car guide rail 11 and the counterweight guide rail 12 suspended earlier are erected and fixed for the completed building (here, up to the 14th floor). The water plate 17 is removed from the hoistway 4.

【0042】次に、ロープ固定装置72の固定状態を解
除してから、仮設機械室1の底部と乗りかご5とをチェ
ーンブロック21にて連結して、止水板17が設置可能
となる階床(ここでは12階)まで吊り上げ、前記の据
付時と同様に、図14に示すように機械室受けビーム2
とかご受けビーム51とを用いて仮設機械室1および乗
りかご5を載置する。この際、ロープ固定装置72はそ
の固定を解除されているため、主ロープ7はロープ送出
し装置71から送り出され、つり合いおもり6と仮設機
械室1間のロープ長さが伸長していくこととなる。同時
に、ガバナロープ送出し装置からもガバナロープが送り
出され、上方へ拡大した分が新たに張設される。
Next, after the fixed state of the rope fixing device 72 is released, the bottom of the temporary machine room 1 and the car 5 are connected by the chain block 21 so that the water stop plate 17 can be installed. The floor is lifted up to the floor (here, the 12th floor), and as in the above-described installation, as shown in FIG.
The temporary machine room 1 and the car 5 are placed using the car receiving beam 51. At this time, since the fixing of the rope fixing device 72 has been released, the main rope 7 is sent out from the rope sending device 71, and the length of the rope between the counterweight 6 and the temporary machine room 1 increases. Become. At the same time, the governor rope is sent out from the governor rope sending device, and the portion expanded upward is newly stretched.

【0043】そして前述した据付時と同様に、テールコ
ード8を昇降工程の拡大分(ここでは2階床分)送出
し、チェーンブロック21による連結を解き、かご受け
ビーム51を抜き取り、ロープ固定装置72による主ロ
ープ7の固定を行い、図15に示すように止水板17を
昇降路4の頂部に設置すればステップアップ作業は終了
し、新たに10階から地下階(B1階)までの乗りかご
5の運行サービスが可能である。なお、この工事用エレ
ベータが据え付けられる建屋における最大サービス階床
が25階床であれば、図1に示したようにステップアッ
プすれば22階からB1階まで乗りかご5の運行サービ
スが可能である。
As in the case of the above-described installation, the tail cord 8 is sent out for the extension of the elevating process (here, the floor of the second floor), the connection by the chain block 21 is released, the car receiving beam 51 is removed, and the rope fixing device is removed. If the main rope 7 is fixed by 72 and the water stop plate 17 is installed on the top of the hoistway 4 as shown in FIG. 15, the step-up work is completed, and the steps from the 10th floor to the basement floor (B1 floor) are newly performed. An operation service for the car 5 is possible. In addition, if the maximum service floor in the building where the construction elevator is installed is 25 floors, the operation service of the car 5 is possible from the 22nd floor to the B1 floor by stepping up as shown in FIG. .

【0044】このように構成した本実施形態の工事用エ
レベータでは、下部機械室1bに必要に応じて張出し可
能な張出し床104bを設けてあるため、仮設機械室1
内の制御盤13、巻上げ機3等の点検保守をする際にそ
のスペースを確保可能であり作業効率を向上できる。
In the construction elevator of the present embodiment configured as described above, since the lower machine room 1b is provided with the overhanging floor 104b which can be extended as necessary, the temporary machine room 1
When inspecting and maintaining the control panel 13 and the hoist 3 in the inside, the space can be secured and the working efficiency can be improved.

【0045】また、本実施形態の工事用エレベータで
は、仮設機械室1の連結柱1cによる連結を解いて上連
結梁102aと下連結梁102bの連結を解けば、図
4、図5に示すように上部機械室1a、下部機械室1b
に2分割可能であるので、工場から建築現場までの運搬
用トラックに載せた際に道路交通法上の高さ制限以下に
することが可能である。また、上部機械室1a、下部機
械室1bの2分割で軽量となるため、建築現場のタワー
クレーン等の揚重能力の制約を受けることなく昇降路4
内に搬入でき、さらに、搬入や移設に際して安全にかつ
効率良く位置決め作業ができる。
In the construction elevator according to the present embodiment, if the connection between the upper connection beam 102a and the lower connection beam 102b is released by disconnecting the connection by the connection column 1c of the temporary machine room 1, as shown in FIGS. Upper machine room 1a, lower machine room 1b
Since it can be divided into two parts, it is possible to make it less than the height limit under the Road Traffic Act when it is placed on a transport truck from the factory to the construction site. Also, since the upper machine room 1a and the lower machine room 1b are divided into two parts to reduce the weight, the hoistway 4 is not restricted by the lifting capacity of a tower crane or the like at a construction site.
The positioning work can be carried out safely and efficiently at the time of carrying in or relocating.

【0046】また、本実施形態の工事用エレベータで
は、仮設機械室1内に揚重用フック16を設けたため、
このフック16に揚重装置を装着すれば、完成した昇降
路4内から仮設機械室1内の機器を効率良く解体・搬出
できる。そして、仮設機械室1に梁102a、102b
および柱103a、103bを設けた構造としたことか
ら、最終的に制御盤13、巻上げ機3等を解体・搬出す
るための揚重装置を仮設機械室1内に設置するための強
度を確保でき、さらにその揚重装置を揚重用フック16
に装着することにより揚重作業の円滑化が図れる。
In the construction elevator according to the present embodiment, the lifting hooks 16 are provided in the temporary machine room 1.
If a lifting device is attached to the hook 16, the equipment in the temporary machine room 1 can be efficiently dismantled and carried out from the completed hoistway 4. Then, the beams 102a and 102b are placed in the temporary machine room 1.
And a structure provided with the pillars 103a and 103b, it is possible to secure strength for installing a lifting device for dismantling and carrying out the control panel 13, the hoist 3 and the like in the temporary machine room 1 finally. And the lifting device is connected to a lifting hook 16.
By attaching to the, smooth lifting work can be achieved.

【0047】また、本実施形態の工事用エレベータで
は、乗りかご5および仮設機械室1の建屋梁10への載
置の際に、それぞれの受けビーム2、51の出し入れを
ガイドするガイド2a、5cを設けたことから、出し入
れ時にビーム2、51を落下させることなく安全に、か
つ円滑に効率よく受けビーム2、51の取付・取外し作
業を行なうことができる。また、ロープ92を介して図
示しないタワークレーンに吊上げられた仮設機械室1の
機械室ビームガイド2aに機械室受けビーム2をガイド
させて出し入れすればビームが落下することなく円滑に
仮設機械室1を機械室ビームガイド2aを介して建屋梁
10へ載置することができる。
Further, in the construction elevator according to the present embodiment, the guides 2a and 5c for guiding the receiving beams 2 and 51 into and out when the car 5 and the temporary machine room 1 are placed on the building beam 10. , The work for attaching and detaching the receiving beams 2 and 51 can be performed safely, smoothly, and efficiently without dropping the beams 2 and 51 when taking in and out. Further, if the machine room receiving beam 2 is guided into and out of the machine room beam guide 2a of the temporary machine room 1 suspended by a tower crane (not shown) via the rope 92, the beam is smoothly dropped without dropping. Can be placed on the building beam 10 via the machine room beam guide 2a.

【0048】また、本実施形態の工事用エレベータで
は、乗りかご5の天井部5e上に設けた上部トランク5
1aで長尺物などの建築資材を運搬することにより、そ
の運搬を効率良く行える。
In the construction elevator according to this embodiment, the upper trunk 5 provided on the ceiling 5e of the car 5
By transporting building materials such as long objects in 1a, the transport can be performed efficiently.

【0049】また、本実施形態の据付方法によれば、止
水板17および養生板18を設置してある建屋状態にお
いても、これらの止水板17および養生板18を利用し
て乗りかご用ガイドレール11、つり合いおもり用ガイ
ドレール12および乗場出入口装置19を据え付けるこ
とができるため、工事用エレベータを効率良く据え付け
ることができる。
Further, according to the installation method of this embodiment, even in a building in which the water blocking plate 17 and the curing plate 18 are installed, the water blocking plate 17 and the curing plate 18 are used for the car. Since the guide rail 11, the counterweight guide rail 12 and the landing entrance / exit device 19 can be installed, the construction elevator can be efficiently installed.

【0050】[0050]

【発明の効果】以上説明したように、本発明の請求項1
に係る発明は、仮設機械室より対向する昇降路壁面に向
けて張出し床が張り出しているので、その張出し床の分
だけ仮設機械室内にスペースの余裕ができ、したがっ
て、仮設機械室内の機器の保守・点検が容易になる。
As described above, according to the first aspect of the present invention,
According to the invention according to the invention, since the overhanging floor projects from the temporary machine room toward the hoistway wall surface facing the temporary machine room, a space can be provided in the temporary machine room by the amount of the overhanging floor, and therefore, the maintenance of the equipment in the temporary machine room is possible.・ Easy inspection.

【0051】また、本発明の請求項2に係る発明は、下
部機械室と上部機械室に2分割としてそれぞれに予め機
械室内機器を取り付けた状態としたことで道路交通法上
の高さ制限にも対応でき、現地での組立も容易に行え
る。また、一対の連結柱の上下部に設けたガイド体によ
り仮設機械室が乗りかご用ガイドレールに沿って円滑に
案内されるのでを精度良く、かつ安全に移設・設置でき
る。
According to the invention of claim 2 of the present invention, the lower machine room and the upper machine room are divided into two parts and each of them is provided with the equipment in the machine room in advance, so that the height is restricted by the road traffic law. Can be installed, and on-site assembly can be easily performed. In addition, since the temporary machine room is smoothly guided along the guide rails for the car by the guide members provided on the upper and lower portions of the pair of connecting columns, the temporary machine room can be relocated and installed accurately and safely.

【0052】また、本発明の請求項3に係る発明は、仮
設機械室の天井部および床部間を連結する複数本の柱や
連結梁を設けて一対の連結柱で連結したため、軽量でか
つ高剛性を有する機械室構造とすることができる。
In the invention according to claim 3 of the present invention, a plurality of pillars and connecting beams for connecting the ceiling and the floor of the temporary machine room are provided and connected by a pair of connecting pillars. A machine room structure having high rigidity can be obtained.

【0053】また、本発明の請求項4に係る発明は、上
部機械室の天井部に設けた揚重用フックに揚重装置を装
着し、この揚重装置で機械室内機器の解体・搬出を行な
うことにより解体・搬出作業を効率良く行なうことがで
きる。
In the invention according to claim 4 of the present invention, a lifting device is mounted on a lifting hook provided on the ceiling of the upper machine room, and the equipment in the machine room is disassembled and carried out by the lifting device. Thus, the dismantling and unloading work can be performed efficiently.

【0054】また、本発明の請求項5に係る発明は、乗
りかごの床下に設けたかごビームガイドにより、かご受
けビームの落下を防ぐことにより、乗りかごを載置して
保持するかご受けビームの取付・取外し作業を安全に行
なうことができる。
According to a fifth aspect of the present invention, there is provided a car receiving beam for holding and supporting a car by preventing a falling of the car receiving beam by a car beam guide provided under the floor of the car. Can be safely mounted and removed.

【0055】また、本発明の請求項6に係る発明は、乗
りかごの天井部の上部に設けた上部トランクで長尺物な
どの建築資材を運搬することにより、その運搬を効率良
く行える。
Further, according to the invention of claim 6 of the present invention, by transporting building materials such as long objects by the upper trunk provided above the ceiling of the car, the transportation can be carried out efficiently.

【0056】また、本発明の請求項7に係る発明は、養
生板および止水板を利用して予め乗りかご用ガイドレー
ルおよびつり合いおもり用ガイドレールを設置できるた
め、工事用エレベータを効率良く据え付けることができ
る。
In the invention according to claim 7 of the present invention, since the guide rails for the car and the guide rails for the counterweight can be installed in advance using the curing plate and the water blocking plate, the construction elevator is efficiently installed. be able to.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係る工事用エレベータの
全体構成を示す縦断面図である。
FIG. 1 is a longitudinal sectional view showing an overall configuration of a construction elevator according to an embodiment of the present invention.

【図2】本実施形態に設けられる仮設機械室の側面図で
ある。
FIG. 2 is a side view of a temporary machine room provided in the embodiment.

【図3】本実施形態に設けられる下部機械室の平面図で
ある。
FIG. 3 is a plan view of a lower machine room provided in the present embodiment.

【図4】下部機械室の側面図である。FIG. 4 is a side view of a lower machine room.

【図5】本実施形態に設けられる上部機械室の側面図で
ある。
FIG. 5 is a side view of an upper machine room provided in the present embodiment.

【図6】仮設機械室の斜視図である。FIG. 6 is a perspective view of a temporary machine room.

【図7】本実施形態に設けられる乗りかごの側面図であ
る。
FIG. 7 is a side view of a car provided in the embodiment.

【図8】乗りかごの斜視図である。FIG. 8 is a perspective view of a car.

【図9】昇降路内にガイドレールを立設する工程を示す
図である。
FIG. 9 is a view showing a step of erecting a guide rail in a hoistway.

【図10】昇降路内から止水板および養生板を取り外す
工程を示す図である。
FIG. 10 is a view showing a step of removing a water stoppage plate and a curing plate from inside the hoistway.

【図11】昇降路内に乗りかごおよび仮設機械室を搬入
する工程を示す図である。
FIG. 11 is a diagram showing a step of carrying a car and a temporary machine room into the hoistway.

【図12】仮設機械室を下降させた状態を示す図であ
る。
FIG. 12 is a view showing a state where a temporary machine room is lowered.

【図13】ガイドレールを上方へ伸ばす工程を示す図で
ある。
FIG. 13 is a view showing a step of extending a guide rail upward.

【図14】仮設機械室を上方へ移設した状態を示す図で
ある。
FIG. 14 is a diagram showing a state where a temporary machine room has been moved upward.

【図15】昇降路頂部に止水板を設置する工程を示す図
である。
FIG. 15 is a view showing a step of installing a water stoppage plate on the top of the hoistway.

【符号の説明】[Explanation of symbols]

1 仮設機械室 1a 上部機械室 1b 下部機械室 1c 連結柱 2 機械室受けビーム 2a 機械室ビームガイド 3 巻上げ機 4 昇降路 5 乗りかご 5c かごビームガイド 5e 天井部 7 主ロープ 8 テールコード 11 ガイドレール 12 ガイドレール 13 制御盤 14 ガバナ装置 15a 上部ガイド体 15b 下部ガイド体 16 揚重用フック 17 止水板 18 養生板 51 かご受けビーム 51a 上部トランク 71 ロープ送出し装置 72 ロープ固定装置 81 テールコード送出し装置 101a 天井部 101b 床部 102a 上連結梁 102b 下連結梁 103a 上柱 103b 下柱 104b 張出し床 DESCRIPTION OF SYMBOLS 1 Temporary machine room 1a Upper machine room 1b Lower machine room 1c Connecting column 2 Machine room receiving beam 2a Machine room beam guide 3 Hoisting machine 4 Hoistway 5 Car 5c Car beam guide 5e Ceiling 7 Main rope 8 Tail cord 11 Guide rail DESCRIPTION OF SYMBOLS 12 Guide rail 13 Control board 14 Governor device 15a Upper guide body 15b Lower guide body 16 Lifting hook 17 Water stop plate 18 Curing plate 51 Car receiving beam 51a Upper trunk 71 Rope sending device 72 Rope fixing device 81 Tail cord sending device 101a Ceiling 101b Floor 102a Upper connecting beam 102b Lower connecting beam 103a Upper pillar 103b Lower pillar 104b Overhanging floor

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 建築中の建物の昇降路内に納められ、前
記建物の築造に合わせて順次上方に移設される仮設機械
室と、この仮設機械室に設けられ、主ロープが巻掛けら
れる巻上げ機と、前記主ロープを介して駆動力がそれぞ
れ伝達され、前記昇降路内を釣瓶式に昇降する乗りかご
およびつり合いおもりと、前記昇降路内に立設され、こ
れらの乗りかごおよびつり合いおもりをそれぞれ案内す
るガイドレールとを有し、前記仮設機械室の移設に伴い
前記乗りかごを運行するサービス階を上方へ拡大するよ
うにした工事用エレベータにおいて、 前記仮設機械室に、対向する昇降路壁面に向けて張り出
され、前記ガイドレールの立設方向とほぼ直交する床面
を形成する張出し床を着脱可能に備えたことを特徴とす
る工事用エレベータ。
1. A temporary machine room which is housed in a hoistway of a building under construction and is sequentially moved upward according to the construction of the building, and a hoist provided in the temporary machine room and around which a main rope is wound. Machine, and a driving force is transmitted through the main rope, respectively, and a car and a counterweight that moves up and down in the hoistway in a fishing bottle manner, and a car and a counterweight that are erected in the hoistway and are mounted on the hoistway. A construction elevator having guide rails for guiding each other, and expanding a service floor for operating the car in accordance with the relocation of the temporary machine room, wherein a hoistway wall facing the temporary machine room is provided. An elevator for construction, comprising a detachable overhanging floor that projects toward the floor and forms a floor surface substantially perpendicular to the direction in which the guide rails are erected.
【請求項2】 建築中の建物の昇降路内に納められ、前
記建物の築造に合わせて順次上方に移設される仮設機械
室と、この仮設機械室に設けられ、主ロープが巻掛けら
れる巻上げ機と、前記主ロープを介して駆動力がそれぞ
れ伝達され、前記昇降路内を釣瓶式に昇降する乗りかご
およびつり合いおもりと、前記昇降路内に立設され、こ
れらの乗りかごおよびつり合いおもりをそれぞれ案内す
るガイドレールとを有し、前記仮設機械室の移設に伴い
前記乗りかごを運行するサービス階を上方へ拡大するよ
うにした工事用エレベータにおいて、 前記仮設機械室が、前記巻上げ機および乗りかごの昇降
を制御する制御盤、前記乗りかごの異常速度を検出する
ガバナ装置、および前記主ロープを保持するロープ固定
装置とが予め組込まれるとともに、対向する昇降路壁面
に向けて張り出され、前記ガイドレールの立設方向とほ
ぼ直交する床面を形成する着脱可能な張出し床を有する
下部機械室と、 前記主ロープを送り出すロープ送出し装置、および前記
制御盤と乗りかごを接続するテールコードを送り出すテ
ールコード送出し装置が予め組込まれる上部機械室と、 上下部にそれぞれ前記ガイドレールに係合するガイド体
を有し、前記上部機械室および下部機械室を連結する一
対の連結柱とから構成されたことを特徴とする工事用エ
レベータ。
2. A temporary machine room which is housed in a hoistway of a building under construction and is sequentially moved upward according to the construction of the building, and a hoist provided in the temporary machine room and around which a main rope is wound. Machine, and a driving force is transmitted through the main rope, respectively, and a car and a counterweight that moves up and down in the hoistway in a fishing bottle manner, and a car and a counterweight that are erected in the hoistway and are mounted on the hoistway. A construction elevator having guide rails for guiding each other, and expanding a service floor for operating the car in accordance with the relocation of the temporary machine room, wherein the temporary machine room includes the hoist and the riding machine. A control panel that controls the elevation of the car, a governor device that detects the abnormal speed of the car, and a rope fixing device that holds the main rope are pre-installed, A lower machine room having a detachable overhanging floor projecting toward the facing hoistway wall surface and forming a floor surface substantially perpendicular to the direction in which the guide rails are erected, and a rope delivery device for delivering the main rope, And an upper machine room in which a tail cord sending device for sending out a tail cord connecting the control panel and the car is pre-installed, and upper and lower parts each having a guide body engaged with the guide rail, and the upper machine room and An elevator for construction, comprising a pair of connecting columns connecting a lower machine room.
【請求項3】 請求項1記載の工事用エレベータにおい
て、 前記仮設機械室は、前記昇降路内に所定間隔をおいて立
設される一対の連結柱と、 これらの連結柱の下端部に連結される床部、この床部の
端部にそれぞれ立設される複数本の下柱、およびこれら
の下柱の上端間に設けられるとともに前記連結柱に連結
される下連結梁とを有する下部機械室と、 前記連結柱の上端部に連結される天井部と、この天井部
の端部よりそれぞれ垂下される複数本の上柱、およびこ
れらの上柱の下端間に設けられ、前記連結柱および下連
結梁に連結される上連結梁を有する上部機械室とから構
成されたことを特徴とする工事用エレベータ。
3. The construction elevator according to claim 1, wherein the temporary machine room is connected to a pair of connecting columns erected at predetermined intervals in the hoistway, and connected to lower ends of the connecting columns. Machine having a floor portion to be erected, a plurality of lower pillars each erected at an end of the floor portion, and a lower connecting beam provided between upper ends of the lower pillars and connected to the connecting pillar. A room, a ceiling connected to an upper end of the connection pillar, a plurality of upper pillars respectively suspended from ends of the ceiling, and provided between lower ends of these upper pillars, the connection pillar and An elevator for construction, comprising: an upper machine room having an upper connecting beam connected to a lower connecting beam.
【請求項4】 請求項2記載の工事用エレベータにおい
て、 前記上部機械室の天井部に、前記巻上げ機、制御盤、ガ
バナ装置およびロープ固定装置のうちの少なくとも1つ
を解体・搬出するための揚重用フックを備えたことを特
徴とする工事用エレベータ。
4. The construction elevator according to claim 2, wherein at least one of the hoist, the control panel, the governor device, and the rope fixing device is disassembled and carried out on a ceiling of the upper machine room. An elevator for construction, comprising a lifting hook.
【請求項5】 建築中の建物の昇降路内に納められ、前
記建物の築造に合わせて順次仮設機械室を上方に移設し
乗りかごを運行するサービス階を上方へ移設するように
した工事用エレベータにおいて、 前記乗りかごの床下に、乗りかごを載置するかご受けビ
ームをガイドし、このかご受けビームの落下を防ぐかご
ビームガイドを設けたことを特徴とする工事用エレベー
タ。
5. Construction work which is stored in a hoistway of a building under construction and in which a temporary machine room is sequentially moved upward according to the construction of the building and a service floor for operating a car is moved upward. An elevator according to claim 1, wherein an elevator is provided with a car beam guide that guides a car receiving beam on which the car is placed and that prevents the car receiving beam from falling under the floor of the car.
【請求項6】 請求項5記載の工事用エレベータにおい
て、 前記乗りかごの天井部の上部に、長物の建築資材を運搬
可能な上部トランクを設けたことを特徴とする工事用エ
レベータ。
6. The construction elevator according to claim 5, wherein an upper trunk capable of transporting a long building material is provided above a ceiling of the car.
【請求項7】 建築中の建物の昇降路内に納められ、前
記建物の築造に合わせて順次上方に移設される仮設機械
室と、この仮設機械室に設けられ、主ロープが巻掛けら
れる巻上げ機と、前記主ロープを介して駆動力がそれぞ
れ伝達され、前記昇降路内を釣瓶式に昇降する乗りかご
およびつり合いおもりと、前記昇降路内に立設され、こ
れらの乗りかごおよびつり合いおもりをそれぞれ案内す
るガイドレールとを有し、前記仮設機械室の移設に伴い
前記乗りかごを運行するサービス階を上方へ拡大するよ
うにした工事用エレベータの据付方法において、 前記築造中の昇降路に設置されている止水板および各階
の養生板を利用して乗りかご用ガイドレールおよびつり
合いおもり用ガイドレールをそれぞれ設置した後、前記
止水板および各階の養生板を揚重装置の吊上げにより取
り外し、 次いで、前記つり合いおもりを前記揚重装置で吊上げて
前記つり合いおもり用ガイドレールでガイドしながら搬
入するとともに、前記つり合いおもりを前記昇降路の最
下部に仮固定し、 次いで、予め組み立てておいた前記乗りかごを前記乗り
かご用ガイドレールでガイドしながら搬入して前記昇降
路内のかご受けビーム上に載置し、次いで前記仮設機械
室を前記揚重装置で吊上げて前記乗りかご用ガイドレー
ルでガイドしながら搬入して前記昇降路内の機械室受け
ビーム上に載置し、 次いで、前記主ロープの巻掛け、および電気配線を行な
って前記乗りかごを運行可能とすることを特徴とする工
事用エレベータの据付方法。
7. A temporary machine room which is housed in a hoistway of a building under construction and is sequentially moved upward according to the construction of the building, and a hoist provided in the temporary machine room and around which a main rope is wound. Machine, and a driving force is transmitted through the main rope, respectively, and a car and a counterweight that moves up and down in the hoistway in a fishing bottle manner, and a car and a counterweight that are erected in the hoistway and are mounted on the hoistway. A guide rail for guiding each, and a method of installing a construction elevator in which a service floor for operating the car is expanded upward with the relocation of the temporary machine room, wherein the elevator is installed on the hoistway under construction. After installing the guide rail for the car and the guide rail for the counterweight by using the waterproofing board and the curing board on each floor, the curing on the waterproofing board and the curing on each floor are performed. Is lifted by a lifting device, and then the counterweight is lifted by the lifting device and carried in while being guided by the counterweight guide rail, and the counterweight is temporarily fixed to the lowermost portion of the hoistway. Next, the pre-assembled car is guided while being guided by the car guide rails, loaded and placed on a car receiving beam in the hoistway, and then the temporary machine room is moved by the lifting device. Lift and carry in while being guided by the car guide rails, place it on the machine room receiving beam in the hoistway, and then operate the car by winding the main rope and performing electrical wiring A method for installing a construction elevator, wherein the method is enabled.
JP2000102489A 2000-04-04 2000-04-04 Elevator for construction Expired - Lifetime JP3920527B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000102489A JP3920527B2 (en) 2000-04-04 2000-04-04 Elevator for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000102489A JP3920527B2 (en) 2000-04-04 2000-04-04 Elevator for construction

Publications (2)

Publication Number Publication Date
JP2001287881A true JP2001287881A (en) 2001-10-16
JP3920527B2 JP3920527B2 (en) 2007-05-30

Family

ID=18616361

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000102489A Expired - Lifetime JP3920527B2 (en) 2000-04-04 2000-04-04 Elevator for construction

Country Status (1)

Country Link
JP (1) JP3920527B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009155089A (en) * 2007-12-27 2009-07-16 Toshiba Elevator Co Ltd Elevator by rise-up method
JP2012206856A (en) * 2011-03-30 2012-10-25 Ohbayashi Corp Elevator, and method for installing elevator
WO2022085061A1 (en) * 2020-10-20 2022-04-28 株式会社日立製作所 Construction elevator and method for extending main rope of construction elevator
WO2023084721A1 (en) 2021-11-12 2023-05-19 株式会社日立製作所 Construction elevator and method of extending compensating rope for construction elevator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6026051Y2 (en) * 1980-12-24 1985-08-05 フジテツク株式会社 Construction elevator machine room
JPH04243786A (en) * 1991-01-25 1992-08-31 Toshiba Corp Installation method for construction work elevator using same component as for actually installed elevator
JPH0776472A (en) * 1993-09-08 1995-03-20 Hitachi Building Syst Eng & Service Co Ltd Method for installing elevator
JPH08133635A (en) * 1994-11-02 1996-05-28 Otis Elevator Co Temporary machine room for jump-up elevator
JPH08175776A (en) * 1994-12-26 1996-07-09 Toshiba Elevator Technos Kk Machine room of elevator
JPH08324932A (en) * 1995-06-01 1996-12-10 Otis Elevator Co Car of elevator
JPH11159128A (en) * 1997-11-25 1999-06-15 Shimizu Corp Multi-purpose stage for construction of building frame body

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6026051Y2 (en) * 1980-12-24 1985-08-05 フジテツク株式会社 Construction elevator machine room
JPH04243786A (en) * 1991-01-25 1992-08-31 Toshiba Corp Installation method for construction work elevator using same component as for actually installed elevator
JPH0776472A (en) * 1993-09-08 1995-03-20 Hitachi Building Syst Eng & Service Co Ltd Method for installing elevator
JPH08133635A (en) * 1994-11-02 1996-05-28 Otis Elevator Co Temporary machine room for jump-up elevator
JPH08175776A (en) * 1994-12-26 1996-07-09 Toshiba Elevator Technos Kk Machine room of elevator
JPH08324932A (en) * 1995-06-01 1996-12-10 Otis Elevator Co Car of elevator
JPH11159128A (en) * 1997-11-25 1999-06-15 Shimizu Corp Multi-purpose stage for construction of building frame body

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009155089A (en) * 2007-12-27 2009-07-16 Toshiba Elevator Co Ltd Elevator by rise-up method
JP2012206856A (en) * 2011-03-30 2012-10-25 Ohbayashi Corp Elevator, and method for installing elevator
WO2022085061A1 (en) * 2020-10-20 2022-04-28 株式会社日立製作所 Construction elevator and method for extending main rope of construction elevator
JP7455221B2 (en) 2020-10-20 2024-03-25 株式会社日立製作所 Construction elevators and how to extend the main rope of construction elevators
WO2023084721A1 (en) 2021-11-12 2023-05-19 株式会社日立製作所 Construction elevator and method of extending compensating rope for construction elevator

Also Published As

Publication number Publication date
JP3920527B2 (en) 2007-05-30

Similar Documents

Publication Publication Date Title
US8485319B2 (en) Method and apparatus for installing an elevator without machine room during construction of a building, and use of a hoisting machine
EP2993153B1 (en) Guide rail installation arrangement and a method for installing guide rails
EP0904247B1 (en) Procedure and apparatus for the installation of an elevator
US8186130B2 (en) Method for installing an elevator and method for installing the guide rails of an elevator
CN103303771A (en) A method for constructing an elevator and an elevator arrangement
JPH03264482A (en) Method for installing elevator
AU2019370583B2 (en) Method for installing a lift installation
WO2020142001A1 (en) A moveable platform
US20230322522A1 (en) Construction arrangement of an elevator and method
JP3920527B2 (en) Elevator for construction
US11396442B2 (en) Low cost roped jump lift concept
JP3844944B2 (en) Demolition method of construction elevator
KR101976724B1 (en) Method for installing elevator guide rails without a machine room
JP2008063873A (en) Transfer mechanism of ceiling and execution method
JPH05262475A (en) Installation method of elevator
JPH05201648A (en) Installation of elevator
JP2005231780A (en) Elevator device, and installation method therefor
JPH021066B2 (en)
JP2000226168A (en) Elevator erection method and its device
CN116812719A (en) Application method of construction lifter and construction lifter
JPH11209027A (en) Installation method for elevator
WO2023160819A1 (en) An elevator construction arrangement and a method
JPH02300081A (en) Installation work method for elevator
JPS63110364A (en) Climbing method and apparatus of lift stand
JPH0132153B2 (en)

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060509

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060705

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070215

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3920527

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100223

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130223

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130223

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150223

Year of fee payment: 8

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term