Info

Publication number
JP2001098585A
JP2001098585A JP28167999A JP28167999A JP2001098585A JP 2001098585 A JP2001098585 A JP 2001098585A JP 28167999 A JP28167999 A JP 28167999A JP 28167999 A JP28167999 A JP 28167999A JP 2001098585 A JP2001098585 A JP 2001098585A
Authority
JP
Japan
Prior art keywords
dimensional
excavation
bucket
terrain
work machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28167999A
Other languages
Japanese (ja)
Inventor
Masahito Kageyama
雅人 影山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP28167999A priority Critical patent/JP2001098585A/en
Publication of JP2001098585A publication Critical patent/JP2001098585A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To accurately excavate even complicated three-dimensional topography changing in a shape of the excavating topography as target topography according to a movement of a construction machine and according to a movement of an excavating work machine such as a bucket. SOLUTION: A crossing line 58 of a plane 57 passing through a three- dimensional position of a present bucket 44 and three-dimensional target topography 51 is arithmetically operated, and a position of the crossing line 58 for showing the three-dimensional target topography 51 and a position of the bucket 44 are diaplayed on the same image screen 24a.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、掘削用作業機を備
えた建設機械に関する。特にバケットなどの掘削用作業
機を作動させて3次元の地形を3次元の目標地形にする
掘削作業を行う際に掘削作業をガイダンスする装置に関
する。また上記掘削用作業機を制御する装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction machine provided with a working machine for excavation. In particular, the present invention relates to a device for guiding an excavation operation when an excavation operation such as a bucket is operated to convert a three-dimensional terrain into a three-dimensional target terrain. The present invention also relates to a device for controlling the excavating work machine.

【0002】[0002]

【従来の技術】土木作業における法面の掘削は、作業者
の技量が最も要求される作業の一つである。たとえば傾
斜地に道路、鉄道またはビルなどの構造物を構築する場
合には、まず最初に切土または盛土などの作業を行って
必要な地盤を形成する。そしてその地盤の周囲の地面の
崩壊を防ぐために法面を形成する。
2. Description of the Related Art Excavation of a slope in civil engineering work is one of the tasks requiring the most skill of workers. For example, when constructing a structure such as a road, a railroad, or a building on a slope, a necessary ground is first formed by performing work such as cutting or embankment. Then, a slope is formed to prevent collapse of the ground around the ground.

【0003】この法面の加工をおこなう際には、高度な
加工精度が要求される。特に切土部分つまり掘削によっ
て得られる斜面に要求される加工精度は極めて高い。
[0003] When machining this slope, a high degree of machining accuracy is required. In particular, the machining accuracy required for the cut portion, that is, the slope obtained by excavation, is extremely high.

【0004】また掘削していない地山と掘削により掘り
起こされた地山とでは、その土の量が変化する。掘り起
こされた地山部分ではその密度が低くなっており、掘削
していない地山と比べてその強度が低下する。したがっ
て余分な掘削(これを余堀りと呼ぶ)を行ってしまうと
地盤の強度が低下する。このため法面の掘削をおこなう
際には、余堀りはできる限り避けねばならない。一旦、
余堀りを行ってしまうと、単に埋め戻すだけでは足り
ず、コンパクタなどを用いて法面を十分に締め固める必
要があり、その分作業の遅延を招くからである。このよ
うに法面の掘削作業は極めて精密に行わねばならず、む
やみに余堀りを行うことはできない。
[0004] In addition, the amount of soil changes between the unexcavated ground and the ground excavated by excavation. The excavated ground part has a low density, and its strength is lower than that of the unexcavated ground. Therefore, if extra excavation is performed (this is called overdigging), the strength of the ground decreases. For this reason, when excavating slopes, overdigging should be avoided as much as possible. Once
This is because, if over-excavation is performed, simply backfilling is not sufficient, and it is necessary to sufficiently compact the slope using a compactor or the like, which delays the work. As described above, the excavation work on the slope has to be performed extremely precisely, and it is impossible to unnecessarily perform the excavation.

【0005】掘削前の原地盤は、掘削後の目標法面より
も当然高いところに位置している。このため目標の法面
を直接水糸などで指示することはできない。そこで従来
より法面の掘削作業は油圧ショベルによってつぎのよう
にして行われていた。
[0005] The original ground before excavation is naturally located higher than the target slope after excavation. For this reason, the target slope cannot be specified directly with a water thread or the like. Therefore, the excavation work of the slope has been conventionally performed by a hydraulic excavator as follows.

【0006】すなわち、 1)原地盤の測量を行う。[0006] That is, 1) the survey of the original ground is performed.

【0007】2)そして測量結果を記した杭と板を、原
地盤に設置する。これは帳張りと呼ばれる。
[0007] 2) Then, a pile and a plate on which the results of the survey are recorded are placed on the original ground. This is called bookkeeping.

【0008】3)そして油圧ショベルのオペレータは、
その板に記された角度と同様の角度の法面となるように
その板より一定距離下方まで(たとえば1メートル下ま
で)掘削する。つまり作業機用操作レバーを操作して油
圧ショベルの作業機を作動させる。
3) The operator of the excavator
Excavation is performed a certain distance below the plate (for example, to one meter below) so that the slope has an angle similar to the angle written on the plate. That is, the operating lever of the hydraulic shovel is operated by operating the operating lever for the working machine.

【0009】しかし上記帳張りを構築するためには、目
標地形に沿って多数点の精密な測量が必要である。この
ため測量作業に多大な時間を要する。さらには、その帳
張りに従って油圧ショベルを操作するオペレータにも極
めて高度な操作技量が要求される。
[0009] However, in order to construct the above-mentioned bookkeeping, precise surveying of many points along the target terrain is required. Therefore, a long time is required for the surveying operation. Further, an operator who operates the hydraulic shovel according to the bookkeeping requires extremely high operation skill.

【0010】しかも法面は傾斜地や山間地に形成される
ことが多く、その形状が単純な平面となることは稀であ
る。構造物(道路など)の形状や地山の形状に合わせた
複雑な3次元的曲面となることが多い。このためたとえ
上記帳張りに従って正確に作業がなされたとしても目標
とする地形に、完全には一致しないという問題点があっ
た。
In addition, the slope is often formed on a slope or mountainous land, and its shape is rarely a simple plane. It often has a complicated three-dimensional curved surface that matches the shape of a structure (such as a road) or the shape of the ground. For this reason, there is a problem that even if the work is correctly performed in accordance with the above-mentioned bookkeeping, it does not completely match the target terrain.

【0011】3次元の目標地形にする土工作業を行う際
にこの土工作業を補助するガイダンス装置に関する発明
が従来より特許出願等され公知になっている。
An invention relating to a guidance device for assisting an earthwork operation when performing an earthwork operation to obtain a three-dimensional target terrain has been conventionally filed and publicly known.

【0012】たとえば特開平2−252825号公報
(従来技術A)には、現場全体を複数のブロックに区切
り、各ブロック毎に現在の地形と目標の地形との偏差を
求め、この偏差に応じた盛土量をそのブロックまで建設
機械に運搬させるという発明が記載されている。
For example, Japanese Patent Application Laid-Open No. 2-252825 (Prior Art A) discloses that the entire site is divided into a plurality of blocks, and a deviation between the current terrain and a target terrain is determined for each block, and the deviation is determined according to the deviation. The invention is described in which the embankment amount is transported to a construction machine to the block.

【0013】また特開平7−180107号公報(従来
技術B)には、道路工事の計画線データを記憶させ、ブ
ルドーザ、アスファルトフィニッシャー等のブレードの
現在の高さが上記工事計画線に沿った高さとなるように
ブレード高さを制御して道路に舗装材を敷設するという
発明が記載されている。
Japanese Patent Application Laid-Open No. 7-180107 (Prior Art B) stores road construction plan line data, and the current height of blades such as bulldozers and asphalt finishers is set along the construction plan line. There is described an invention in which a pavement material is laid on a road by controlling the height of a blade so as to be as follows.

【0014】さらに特開平6−73755号公報(従来
技術C)には、バックホウのバケットの現在位置と、予
め決められた切土計画線とをディスプレイ上に表示する
という発明が記載されている。
Further, Japanese Patent Application Laid-Open No. Hei 6-73755 (prior art C) discloses an invention in which the present position of a backhoe bucket and a predetermined cutting plan line are displayed on a display.

【0015】また特開平10−103925号公報(従
来技術D)には、油圧ショベルの車体に対するバケット
の相対的な位置を計測し、バケットの位置を表示画面上
に表示するという発明が記載されている。
Japanese Patent Application Laid-Open No. 10-103925 (prior art D) discloses an invention in which the relative position of a bucket with respect to the body of a hydraulic shovel is measured and the position of the bucket is displayed on a display screen. I have.

【0016】[0016]

【発明が解決しようとする課題】本発明が対象としてい
る作業は、道路などの構造物の法面を掘削する作業であ
る。この構造物の法面の形状は、場所に応じて変化す
る。つまり油圧ショベルの移動位置、上部旋回体により
バケットを旋回させたときのバケット位置が異なれば、
それに応じて掘削により得られるべき目標3次元地形は
異なる。
The work to which the present invention is directed is the work of excavating a slope of a structure such as a road. The shape of the slope of this structure changes depending on the location. In other words, if the moving position of the excavator and the bucket position when the bucket is swung by the upper swing body are different,
The target three-dimensional terrain to be obtained by excavation differs accordingly.

【0017】これに対して上記従来技術Aには、油圧シ
ョベルで掘削作業を行う場合の適応例については記載さ
れていない。
On the other hand, the above-mentioned prior art A does not describe an example of adaptation when excavating work is performed by a hydraulic shovel.

【0018】また従来技術Bは、ブルドーザ、アスファ
ルトフィニッシャー等により、すでに掘削作業の終了し
た道路上に舗装材を敷設する敷設作業を対象としてい
る。しかもブレードの位置を計測しブレードの高さを計
測位置に合わせるならい制御であり、油圧ショベルには
適用することができない。よって現在の地形から目標地
形になるように地山を下方に掘削する掘削作業を対象と
する本発明とは本質的に異なる。
Further, the prior art B is directed to a laying operation of laying a pavement material on a road which has already been excavated by a bulldozer, an asphalt finisher, or the like. Moreover, the control is performed as long as the position of the blade is measured and the height of the blade is adjusted to the measured position, and cannot be applied to a hydraulic shovel. Therefore, the present invention is essentially different from the present invention, which is directed to an excavation operation of excavating a ground below a current terrain so as to become a target terrain.

【0019】また従来技術Cは、バックホウのバケット
の現在位置と、予め決められた切土計画線とをディスプ
レイ上に表示するものであり、表示内容から掘削作業を
ガイダンスすることができる。しかし従来技術Cは固定
的な切土計画線に沿って掘削することを前提としてい
る。本発明のように油圧ショベルが移動するに応じて、
バケットを旋回により移動させるに応じて、目標とする
法面の形状が変化する複雑な地形を掘削することを前提
とするものはない。目標とする法面の形状が逐次変化す
る複雑な地形を掘削させようとするには、油圧ショベル
が移動する毎に、バケットを旋回により移動させるに応
じて、法面の形状を入力し直す複雑な作業を要する。こ
のため従来技術Cは、場所に応じて法面の形状が変化す
る複雑な3次元地形の掘削に対しては、実用的ではない
という問題がある。
In the prior art C, the current position of the backhoe bucket and a predetermined cutting plan line are displayed on a display, and the excavation work can be guided from the displayed contents. However, the prior art C is premised on excavating along a fixed cut planning line. As the excavator moves as in the present invention,
There is no premise for excavating a complex terrain in which the shape of the target slope changes as the bucket is moved by turning. In order to excavate complicated terrain where the shape of the target slope changes sequentially, it is necessary to re-enter the shape of the slope as the bucket is moved by turning each time the excavator moves. Work is required. For this reason, the prior art C has a problem that it is not practical for excavation of complicated three-dimensional terrain in which the shape of the slope changes depending on the place.

【0020】また従来技術Dは車体との関係でバケット
の位置を表示するものであり、表示内容から掘削作業を
ガイダンスすることができる。しかし従来技術Dは目標
とする地形との関係でバケットを表示するものではな
い。よって単純な形状の法面の掘削作業に対しては有用
ではあろうが、場所によって形状が異なる複雑な形状の
法面の掘削に対しては有用ではない。
In the prior art D, the position of the bucket is displayed in relation to the vehicle body. Excavation work can be guided from the displayed contents. However, the prior art D does not display buckets in relation to the target terrain. Therefore, it may be useful for digging a slope having a simple shape, but is not useful for digging a slope having a complicated shape whose shape varies depending on a place.

【0021】本発明はこうした実状に鑑みてなされたも
のであり、建設機械が移動するに応じてまたバケット等
の掘削用作業機が移動するに応じて、その掘削すべき地
形の形状が変化する複雑な3次元地形であっても、目標
とする地形に精度よく掘削することができるようにする
ことを解決課題とするものである。
The present invention has been made in view of such circumstances, and the shape of the terrain to be excavated changes as the construction machine moves and as the excavating work machine such as a bucket moves. An object of the present invention is to make it possible to excavate on a target terrain with high accuracy even on a complicated three-dimensional terrain.

【0022】[0022]

【課題を解決するための手段および作用効果】上記解決
課題を達成するため、第1発明は、掘削用の作業機を作
動させて3次元の地形を3次元の目標地形にする掘削作
業を行う建設機械に適用され、当該掘削作業をガイダン
スする建設機械の掘削作業ガイダンス装置において、前
記掘削用作業機の3次元位置を計測する位置計測手段
と、前記位置計測手段により計測した掘削用作業機の位
置を通過する平面を演算する平面演算手段と、前記平面
演算手段によって演算された平面を示すデータと、前記
3次元目標地形を示すデータとに基づいて、前記平面と
前記3次元目標地形との交線を演算する交線演算手段
と、前記交線演算手段によって演算された前記3次元目
標地形を示す交線の位置と前記掘削用作業機の位置との
相対位置関係を提示する提示手段とを具えたことを特徴
とする。
In order to achieve the above-mentioned object, a first aspect of the present invention is to perform an excavation operation by operating a work machine for excavation to convert a three-dimensional terrain into a three-dimensional target terrain. An excavation work guidance device for a construction machine applied to a construction machine and guiding the excavation work, wherein a position measurement unit that measures a three-dimensional position of the excavation work machine, and an excavation work machine that is measured by the position measurement unit. Plane calculating means for calculating a plane passing through a position; data indicating the plane calculated by the plane calculating means; and data indicating the three-dimensional target terrain, based on the data indicating the three-dimensional target terrain. Intersection calculation means for calculating the intersection, and a relative positional relationship between the position of the intersection indicating the three-dimensional target terrain calculated by the intersection calculation means and the position of the excavator is presented. And characterized in that it comprises a a presentation means.

【0023】また第2発明は、作業機の先端部にバケッ
トが設けられ、当該作業機を作動させて3次元の地形を
3次元の目標地形にする掘削作業を行う建設機械に適用
され、当該掘削作業をガイダンスする建設機械の掘削作
業ガイダンス装置において、前記バケットの3次元位置
を計測する位置計測手段と、前記位置計測手段により計
測したバケット位置を通過する平面を演算する平面演算
手段と、前記平面演算手段によって演算された平面を示
すデータと、前記3次元目標地形を示すデータとに基づ
いて、前記平面と前記3次元目標地形との交線を演算す
る交線演算手段と、前記交線演算手段によって演算され
た前記3次元目標地形を示す交線の位置と前記バケット
の位置とを同一画面上に表示する表示手段とを具えたこ
とを特徴とする。
Further, the second invention is applied to a construction machine in which a bucket is provided at the tip of the work machine, and the work machine is operated to perform excavation work for converting the three-dimensional terrain to the three-dimensional target terrain. An excavation work guidance device for a construction machine for guiding excavation work, wherein: a position measuring means for measuring a three-dimensional position of the bucket; a plane calculating means for calculating a plane passing through a bucket position measured by the position measuring means; Intersection calculating means for calculating an intersection between the plane and the three-dimensional target terrain based on the data indicating the plane calculated by the plane calculating means and the data indicating the three-dimensional target terrain; A display means for displaying the position of the intersection line indicating the three-dimensional target terrain calculated by the calculation means and the position of the bucket on the same screen.

【0024】第1発明、第2発明によれば、図6(a)
に示すように現在のバケット44の3次元位置を通過す
る平面57と、3次元目標地形51との交線58が演算
され、図6(b)に示すように、3次元目標地形51を
示す交線58の位置とバケット44の位置とが同一画面
24a上に表示される。
According to the first invention and the second invention, FIG.
The intersection line 58 between the plane 57 passing through the current three-dimensional position of the bucket 44 and the three-dimensional target terrain 51 is calculated as shown in FIG. 6 and the three-dimensional target terrain 51 is shown as shown in FIG. The position of the intersection line 58 and the position of the bucket 44 are displayed on the same screen 24a.

【0025】第1発明、第2発明によれば建設機械が移
動するに応じてまたバケット44等の掘削用作業機が移
動するに応じて、掘削すべき地形の形状が変化する複雑
な3次元地形であっても、現在のバケット44の位置に
対応する目標地形51を示す交線58の位置を、バケッ
ト44の位置との関係で表示することができる。複雑な
形状の3次元地形をバケット44との位置関係でオペレ
ータに分かりやすく表示することができる。よって本発
明によれば、場所によって掘削すべき地形の形状が異な
る複雑な3次元地形を、精度よく掘削することができ
る。
According to the first and second aspects of the present invention, the shape of the terrain to be excavated changes as the construction machine moves and as the excavator such as the bucket 44 moves. Even in the case of the terrain, the position of the intersection line 58 indicating the target terrain 51 corresponding to the current position of the bucket 44 can be displayed in relation to the position of the bucket 44. The three-dimensional terrain having a complicated shape can be displayed in an easy-to-understand manner for the operator in the positional relationship with the bucket 44. Therefore, according to the present invention, it is possible to excavate a complicated three-dimensional terrain in which the shape of the terrain to be excavated varies depending on the location.

【0026】なお第1発明の「掘削用作業機」はバケッ
ト以外のあらゆる掘削用作業機を含む概念である。また
第1発明の「提示手段」は表示手段以外のあらゆる情報
提示手段を含む概念である。たとえばグラフィック表示
に限ることなく、交線58とバケット44との相対的な
位置関係を、数値でオペレータに提示してもよい。また
交線58とバケット44との相対的な位置関係を音声に
よってオペレータに提示してもよい。
The "working machine for digging" of the first invention is a concept including all working machines for digging other than buckets. The "presenting means" of the first invention is a concept including all information presenting means other than the display means. For example, without being limited to the graphic display, the relative positional relationship between the intersection line 58 and the bucket 44 may be presented to the operator by numerical values. Further, the relative positional relationship between the intersection line 58 and the bucket 44 may be presented to the operator by voice.

【0027】第3発明は、第2発明において、前記位置
計測手段は、前記バケットの先端の3次元位置を計測す
るものであり、前記平面演算手段は、前記バケットの先
端位置を通過する平面を演算するものであることを特徴
とする。
In a third aspect based on the second aspect, the position measuring means measures a three-dimensional position of a tip of the bucket, and the plane calculating means calculates a plane passing through the tip of the bucket. It is characterized by calculating.

【0028】第3発明によれば、図6(a)に示すよう
に、バケット44の先端44aの3次元位置が計測さ
れ、このバケット先端44aを通過する平面57が演算
される。
According to the third aspect, as shown in FIG. 6A, the three-dimensional position of the tip 44a of the bucket 44 is measured, and the plane 57 passing through the bucket tip 44a is calculated.

【0029】第4発明は、第1発明または第2発明にお
いて、前記掘削用作業機または前記バケットはアクチュ
エータが駆動されることにより作動するものであり、前
記平面演算手段は、前記アクチュエータが駆動されたと
きに前記掘削用作業機または前記バケットが作動する面
を含む平面を演算するものであることを特徴とする。
According to a fourth invention, in the first invention or the second invention, the excavating work machine or the bucket is operated by driving an actuator, and the plane calculating means is configured to drive the actuator. And calculating a plane including a surface on which the excavating work machine or the bucket operates.

【0030】第4発明によれば、図4(a)に示すよう
に掘削用作業機またはバケット44はアクチュエータ
(油圧シリンダ)が駆動されることにより作動する。そ
して図4(b)に示すようにアクチュエータが駆動され
たときに掘削用作業機またはバケット44が作動する面
を含む平面57′が演算される。
According to the fourth invention, as shown in FIG. 4 (a), the excavating work machine or the bucket 44 operates by driving an actuator (hydraulic cylinder). Then, as shown in FIG. 4B, a plane 57 'including the surface on which the excavator or bucket 44 operates when the actuator is driven is calculated.

【0031】このように建設機械40の車体41が地面
に対して傾斜している場合、バケット44はオフセット
されている場合であったとしても、アクチュエータが駆
動されたときのバケット44の移動軌跡に含む平面5
7′が確実に求められる。そしてこの平面57′と3次
元目標地形51との交線58′が求められ、表示画面2
4a上に表示される。このためアクチュエータを駆動さ
せてバケット44を交線58′に沿って移動させれば、
傾斜、オフセット等のバケット位置の変化、ずれがあっ
たとしても、目標地形51を常に精度よく掘削すること
ができる。
As described above, when the vehicle body 41 of the construction machine 40 is inclined with respect to the ground, even if the bucket 44 is offset, the movement path of the bucket 44 when the actuator is driven is determined. Plane 5 including
7 'is definitely required. Then, an intersection line 58 'between the plane 57' and the three-dimensional target terrain 51 is obtained, and the display screen 2
4a. Therefore, by driving the actuator to move the bucket 44 along the intersection line 58 ',
The target terrain 51 can always be excavated with high accuracy even if there is a change or displacement of the bucket position such as inclination or offset.

【0032】第5発明は、第1発明または第2発明にお
いて、現在の3次元地形データと、目標構造物の縁部の
3次元形状を示すデータと、法面の形状データとに基づ
いて、前記目標構造物の縁部を法尻とする3次元目標地
形のデータを作成する3次元目標地形データ作成手段を
さらに具えたことを特徴とする。
In a fifth aspect based on the first or second aspect, the current three-dimensional topographic data, the data indicating the three-dimensional shape of the edge of the target structure, and the shape data of the slope are based on: The apparatus further includes a three-dimensional target terrain data creating unit that creates three-dimensional target terrain data having an edge of the target structure as a bottom.

【0033】第5発明によれば、図5に示すように、現
在の3次元地形50のデータと、目標構造物52の縁部
53の形状を示すデータと、法面54の形状を示すデー
タとに基づいて、目標構造物52の縁部53を法尻とす
る3次元目標地形51のデータが作成される。簡単なデ
ータを入力するだけで複雑な3次元目標地形51を自動
的に作成することができる。
According to the fifth aspect, as shown in FIG. 5, data of the current three-dimensional topography 50, data indicating the shape of the edge 53 of the target structure 52, and data indicating the shape of the slope 54. Based on the above, data of the three-dimensional target terrain 51 with the edge 53 of the target structure 52 as the bottom is created. A complicated three-dimensional target terrain 51 can be automatically created simply by inputting simple data.

【0034】第6発明は、掘削用の作業機を作動させて
3次元の地形を3次元の目標地形にする掘削作業を行う
建設機械に適用され、前記掘削用作業機を制御する建設
機械の掘削制御装置において、前記掘削用作業機の3次
元位置を計測する位置計測手段と、前記位置計測手段に
より計測した掘削用作業機の位置を通過する平面を演算
する平面演算手段と、前記平面演算手段によって演算さ
れた平面を示すデータと、前記3次元目標地形を示すデ
ータとに基づいて、前記平面と前記3次元目標地形との
交線を演算する交線演算手段と、前記交線演算手段によ
って演算された前記3次元目標地形を示す交線を、目標
移動経路とし、当該目標移動経路に沿って前記掘削用作
業機が移動するように当該掘削用作業機を制御する制御
手段とを具えたことを特徴とする。
The sixth invention is applied to a construction machine which performs an excavation operation by operating a work machine for excavation to convert a three-dimensional terrain into a three-dimensional target terrain. In the excavation control device, position measurement means for measuring a three-dimensional position of the work equipment for excavation, plane calculation means for calculating a plane passing through the position of the work equipment for excavation measured by the position measurement means, and the plane calculation Intersection calculating means for calculating a line of intersection between the plane and the three-dimensional target terrain based on the data indicating the plane calculated by the means and the data indicating the three-dimensional target terrain, and the intersection calculating means Control means for controlling the excavation work machine so that the excavation work machine moves along the target movement path, using the intersection line indicating the three-dimensional target terrain calculated by the above as a target movement path. Octopus The features.

【0035】第6発明によれば、図6(a)に示すよう
に現在のバケット44の3次元位置を通過する平面57
と、3次元目標地形51との交線58が演算される。
According to the sixth invention, as shown in FIG. 6A, the plane 57 passing through the current three-dimensional position of the bucket 44 is used.
Then, an intersection line 58 with the three-dimensional target terrain 51 is calculated.

【0036】そして図10に示すように、3次元目標地
形51を示す交線58が目標移動経路Tcとされ、この
目標移動経路Tcに沿ってバケット44が移動するよう
にバケット44が制御される。
As shown in FIG. 10, the intersection line 58 indicating the three-dimensional target terrain 51 is set as the target moving path Tc, and the bucket 44 is controlled so that the bucket 44 moves along the target moving path Tc. .

【0037】よって本発明によれば、場所によって掘削
すべき地形の形状が異なる複雑な3次元地形を、精度よ
く掘削することができる。この場合オペレータがバケッ
ト44を操作せずとも自動的に掘削作業がなされる。よ
って第1発明、第2発明の効果に加えて、オペレータの
労力が軽減されるという効果が得られる。
Therefore, according to the present invention, it is possible to excavate a complicated three-dimensional terrain in which the shape of the terrain to be excavated differs depending on the location with high accuracy. In this case, excavation work is automatically performed without the operator operating the bucket 44. Therefore, in addition to the effects of the first invention and the second invention, an effect that the labor of the operator is reduced is obtained.

【0038】第7発明は、掘削用の作業機を作動させて
3次元の地形を3次元の目標地形にする掘削作業を行う
建設機械に適用され、掘削用操作手段の操作に応じて前
記掘削用作業機を制御する作業機コントローラを備えた
建設機械の掘削制御装置において、前記建設機械に外部
より装着自在であって、前記3次元目標地形のデータ
を、前記作業機コントローラに出力する外部コントロー
ラと、前記掘削用操作手段の操作に応じて前記掘削用作
業機を制御する第1の制御モードと、前記3次元目標地
形データに基づき当該3次元目標地形上の目標移動経路
に沿って前記掘削用作業機が移動するように当該掘削用
作業機を制御する第2の制御モードのいずれかの制御モ
ードを選択する制御モード選択手段と、前記外部コント
ローラが前記建設機械に装着されているか否かを判断す
る判断手段と、前記判断手段によって前記外部コントロ
ーラが前記建設機械に装着されていると判断された場合
には、前記制御モード選択手段の選択結果に応じた制御
モードを前記作業機コントローラで実行させ、前記判断
手段によって前記外部コントローラが前記建設機械に装
着されていないと判断された場合には、前記制御モード
選択手段の選択いかんにかかわらず前記第1の制御モー
ドを前記作業機コントローラで実行させることを特徴と
する。
The seventh invention is applied to a construction machine which performs excavation work by operating a work machine for excavation to convert a three-dimensional terrain into a three-dimensional target terrain. An excavation control device for a construction machine having a work machine controller for controlling a work machine, wherein the external controller is attachable to the construction machine from the outside and outputs the three-dimensional target terrain data to the work machine controller. A first control mode for controlling the excavating work machine in accordance with the operation of the excavating operation means, and the excavation along a target movement path on the three-dimensional target terrain based on the three-dimensional target terrain data. Mode selection means for selecting any one of the second control modes for controlling the excavating work machine so that the work machine moves, and the external controller comprises Determining means for determining whether or not the external controller is mounted on the construction machine; and determining whether or not the external controller is mounted on the construction machine by the control mode selecting means. A mode is executed by the work machine controller, and when the determination unit determines that the external controller is not mounted on the construction machine, the first control is performed regardless of the selection of the control mode selection unit. A mode is executed by the work machine controller.

【0039】第7発明によれば、図1に示すように、外
部コントローラ25が建設機械に装着されていると判断
された場合には、制御モード選択手段13の選択結果に
応じた制御モードが作業機コントローラ21で実行され
る。すなわち第1の制御モードが選択されると、掘削用
操作手段11の操作に応じて掘削用作業機が制御され
る。また第2の制御モードが選択されると外部コントロ
ーラ25から出力される3次元目標地形データに基づき
当該3次元目標地形上の目標移動経路に沿って掘削用作
業機が移動するように当該掘削用作業機が制御される。
According to the seventh aspect, as shown in FIG. 1, when it is determined that the external controller 25 is mounted on the construction machine, the control mode according to the selection result of the control mode selection means 13 is changed. This is executed by the work machine controller 21. That is, when the first control mode is selected, the excavating work machine is controlled in accordance with the operation of the excavating operation means 11. Further, when the second control mode is selected, the excavating work machine moves based on the three-dimensional target terrain data output from the external controller 25 along the target movement path on the three-dimensional target terrain. The work machine is controlled.

【0040】しかし外部コントローラ25が建設機械に
装着されていないと判断された場合には、外部コントロ
ーラ25からは3次元目標地形データが作業機コントロ
ーラ21に出力されていない状態である。このため制御
モード選択手段13の選択いかんにかかわらず第1の制
御モードが作業機コントローラ21で実行される。すな
わち掘削用操作手段11の操作に応じて掘削用作業機が
制御される。
However, when it is determined that the external controller 25 is not mounted on the construction machine, the external controller 25 has not output the three-dimensional target terrain data to the work machine controller 21. Therefore, the first control mode is executed by the work implement controller 21 irrespective of the selection of the control mode selection means 13. That is, the work machine for excavation is controlled according to the operation of the operation means 11 for excavation.

【0041】第7発明によれば、外部コントローラ25
が装着されているときのみ、制御モードの切り替え選択
が有効であると判定し外部コントローラ25が未装着な
場合には操作手段11に応じた制御のみを実行させるよ
うしているので、外部コントローラ25が未装着な場合
の誤動作を防止することができる。
According to the seventh aspect, the external controller 25
Only when is mounted, it is determined that the control mode switching selection is valid, and when the external controller 25 is not mounted, only the control according to the operation means 11 is executed. Can be prevented from malfunctioning when the device is not mounted.

【0042】[0042]

【発明の実施の形態】以下図面を参照して、本発明に係
る掘削作業ガイダンス装置および掘削制御装置の実施の
形態について説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exploded perspective view of an excavation work guidance apparatus and an excavation control apparatus according to the present invention.

【0043】図3は、実施形態の建設機械の幾何的関係
を示す図である。建設機械としては油圧ショベル40を
想定している。図3(a)は油圧ショベル40の側面図
であり、図3(b)は油圧ショベル40の後面図であ
る。
FIG. 3 is a diagram showing a geometric relationship of the construction machine according to the embodiment. The hydraulic excavator 40 is assumed as a construction machine. FIG. 3A is a side view of the excavator 40, and FIG. 3B is a rear view of the excavator 40.

【0044】同図3に示すように油圧ショベル40の車
体41の下部には履帯49が設けられている。履帯49
が回転することにより油圧ショベル40は走行する。車
体41の前方には、ブーム42、アーム43、バケット
44からなる作業機47が設けられている。ブーム4
2、アーム43、バケット44の長さはそれぞれ、L
1、L2、L3である。作業機47は、車体41に対して
ブーム42、アーム43、バケット44が順次連結され
るように構成されている。ブーム42の根元42dは車
体41の前方所定箇所に連結されている。作業機47の
先端部には、土砂を掘削する掘削用作業機としてのバケ
ット44が設けられている。バケット44の先端は44
aで示される。車体41(上部旋回体)は履帯49(下
部旋回体)に対して相対的に旋回移動される。したがっ
て旋回に伴い作業機47の位置、バケット44の位置が
変化する。
As shown in FIG. 3, a crawler belt 49 is provided below the body 41 of the excavator 40. Crawler track 49
The hydraulic excavator 40 travels by rotating. A work machine 47 including a boom 42, an arm 43, and a bucket 44 is provided in front of the vehicle body 41. Boom 4
2, the length of the arm 43 and the bucket 44 are L
1, L2 and L3. The work machine 47 is configured such that the boom 42, the arm 43, and the bucket 44 are sequentially connected to the vehicle body 41. The base 42d of the boom 42 is connected to a predetermined location in front of the vehicle body 41. At the tip of the working machine 47, a bucket 44 as an excavating working machine for excavating earth and sand is provided. The tip of the bucket 44 is 44
a. The vehicle body 41 (upper revolving structure) is revolved relative to the crawler belt 49 (lower revolving structure). Therefore, the position of the work implement 47 and the position of the bucket 44 change with the turning.

【0045】ブーム42、アーム43、バケット44に
は、それぞれ傾斜角センサ27、28、29が設けられ
ている。傾斜角センサ27、28、29ではそれぞれ、
ブーム42の重力方向(鉛直下方)に対する傾斜角θ
1、アーム43の重力方向に対する傾斜角θ2、バケット
44の重力方向に対する傾斜角θ3が検出される。
The boom 42, the arm 43, and the bucket 44 are provided with inclination angle sensors 27, 28, 29, respectively. In the inclination angle sensors 27, 28, 29, respectively,
Tilt angle θ of boom 42 with respect to the direction of gravity (vertical downward)
1. The inclination angle θ2 of the arm 43 with respect to the direction of gravity and the inclination angle θ3 of the bucket 44 with respect to the direction of gravity are detected.

【0046】車体41には、2つのRTK−GPS(Re
aL Time Kinematic-GLobaL Positioning System)用
アンテナ45、46が車体座標系X1−Y1−Z1のY1軸
(水平軸)に沿って一定距離だけ離間して設けられてい
る。GPSアンテナ45、46で受信されたGPS電波
に応じた信号は3次元位置センサ30(GPS位置セン
サ)に入力される。3次元位置センサ30では、GPS
アンテナ45、46の設置位置P1、P2の位置が検出さ
れる。なお図3(b)は車体41が重力方向(鉛直線)
に対してθ0だけ傾斜した状態を示している。
The vehicle body 41 has two RTK-GPSs (Re
aL Time Kinematic-GLobaL Positioning System) antennas 45, 46 are provided at a fixed distance along the Y1 axis (horizontal axis) of the vehicle body coordinate system X1-Y1-Z1. Signals corresponding to the GPS radio waves received by the GPS antennas 45 and 46 are input to the three-dimensional position sensor 30 (GPS position sensor). In the three-dimensional position sensor 30, the GPS
The positions of the installation positions P1, P2 of the antennas 45, 46 are detected. FIG. 3B shows the vehicle body 41 in the direction of gravity (vertical line).
3 shows a state inclined by θ0.

【0047】図4はオフセットブームを備えた油圧ショ
ベル40を示している。図4(a)は側面図であり、図
4(b)は図4(a)の矢視A図である。この作業機
は、車体41に対して第1ブーム42a、第2ブーム4
2b、オフセットブーム42c、アーム43、バケット
44が順次連結されるように構成されている。
FIG. 4 shows a hydraulic excavator 40 having an offset boom. FIG. 4A is a side view, and FIG. 4B is an A view of FIG. This work machine is configured such that a first boom 42a, a second boom 4
2b, the offset boom 42c, the arm 43, and the bucket 44 are sequentially connected.

【0048】図4(b)に示すようにオフセットブーム
42cは車体41に対して左右に回動(オフセット動
作)自在となっている。オフセットブーム42cが第1
ブーム42aに対してオフセット角θ4だけ左右に傾斜
されると、このオフセット角θ4に応じたオフセット分
だけバケットは44から44′へと左右にオフセットさ
れる。オフセット動作前のバケット44が移動する移動
経路を含む平面を57とすると、オフセット動作後のバ
ケット44′が移動する移動経路を含む平面は57′と
なる。平面57と平面57′とはオフセット分だけずれ
ている。
As shown in FIG. 4B, the offset boom 42c is rotatable left and right (offset operation) with respect to the vehicle body 41. Offset boom 42c is the first
When the bucket is inclined left and right by an offset angle θ4 with respect to the boom 42a, the bucket is offset left and right from 44 to 44 ′ by an offset corresponding to the offset angle θ4. Assuming that the plane including the movement path of the bucket 44 before the offset operation is 57, the plane including the movement path of the bucket 44 'after the offset operation is 57'. The plane 57 and the plane 57 'are shifted by an offset.

【0049】図1、図2は油圧ショベル40に搭載され
る制御装置の構成を示すブロック図である。図1は角度
センサ27、28、29が油圧ショベル40に標準で装
着されていない場合に後からこれら角度センサを装着し
たときの構成を示すブロック図である。一方図2は角度
センサ27、28、29が油圧ショベル40に標準で装
着されている場合の構成を示すブロック図である。
FIGS. 1 and 2 are block diagrams showing the configuration of a control device mounted on the excavator 40. FIG. 1 is a block diagram showing a configuration when the angle sensors 27, 28, and 29 are not mounted as standard on the hydraulic excavator 40, and are later mounted. FIG. 2 is a block diagram showing a configuration in which the angle sensors 27, 28, and 29 are mounted on the hydraulic excavator 40 as standard.

【0050】本実施形態では、掘削用操作レバー11の
操作に応じて作業機47を制御する第1の制御モード
と、後述するように目標移動経路に沿ってバケット先端
44aが移動するように作業機47を制御する第2の制
御モードのいずれかが実行される。第1の制御モードお
よび第2の制御モードは作業機制御コントローラ21で
実行される。目標移動経路を演算するために必要な3次
元目標地形データは外部コントローラ25から出力され
る。
In the present embodiment, the first control mode for controlling the work implement 47 in accordance with the operation of the excavating operation lever 11 and the work for moving the bucket tip 44a along the target movement path as described later. One of the second control modes for controlling the machine 47 is executed. The first control mode and the second control mode are executed by the work implement controller 21. The three-dimensional target terrain data necessary for calculating the target movement route is output from the external controller 25.

【0051】油圧ショベル40は汎用機械であり、常時
目標移動経路に沿ってバケット44を自動的に移動させ
るという第2の制御モードを必要とするわけではない。
すなわち特に精度を要求されない掘削作業や、3次元C
ADデータなしで行う掘削作業も同じ油圧ショベルで行
わせる必要がある。そこで本実施形態では、通常の油圧
ショベル40に対して、第2の制御モードの機能を後付
けで装着できるように構成されている。
The hydraulic excavator 40 is a general-purpose machine, and does not necessarily require the second control mode of automatically moving the bucket 44 along the target moving path at all times.
That is, excavation work that does not particularly require precision,
Excavation work performed without AD data also needs to be performed by the same hydraulic excavator. Thus, in the present embodiment, the function of the second control mode can be retrofitted to the normal hydraulic excavator 40.

【0052】第2の制御モードを作業機制御コントロー
ラ21で実行させるのに必要な機能は、外部コントロー
ラ25に分担させている。この外部コントローラ25は
油圧ショベル40の外部より装着自在となっている。
The functions necessary for causing the work implement controller 21 to execute the second control mode are assigned to the external controller 25. The external controller 25 can be mounted from outside the hydraulic excavator 40.

【0053】図1に示すように、油圧ショベル40の作
業機47は油圧シリンダ23が駆動されることにより作
動される。すなわちブーム42、アーム43、バケット
44毎に油圧シリンダが設けられている。作業機47は
作業機用操作レバー11が操作されることに応じて作動
される。ブーム42、アーム43、バケット44毎に操
作レバーが設けられている。操作レバー12は後述する
ように移動経路をオフセットさせるために用いられるレ
バーである。操作切換スイッチ13は第1の制御モード
と第2の制御モードのいずれかの制御モードを選択して
切り換えるスイッチである。操作レバー11、12、操
作切換スイッチ13によって入力装置10が構成されて
いる。
As shown in FIG. 1, the working machine 47 of the excavator 40 is operated by driving the hydraulic cylinder 23. That is, a hydraulic cylinder is provided for each of the boom 42, the arm 43, and the bucket 44. The work machine 47 is operated in response to the operation of the work machine operation lever 11. An operation lever is provided for each of the boom 42, the arm 43, and the bucket 44. The operation lever 12 is a lever used to offset the movement path as described later. The operation changeover switch 13 is a switch for selecting and switching any one of the first control mode and the second control mode. The input device 10 includes the operation levers 11 and 12 and the operation changeover switch 13.

【0054】外部コントローラ25には後述するように
3次元目標地形を示すデータが所定のメモリに記憶され
ている。外部コントローラ25にはグラフィックインタ
ーフェース(GUI)24とセンサ群26が接続されて
いる。センサ群26は角度センサ27〜29と3次元位
置センサ30とからなる。外部コントローラ25では、
3次元位置センサ30の検出結果と角度センサ27〜2
9の検出結果とに基づきバケット先端44aの位置Pgt
が演算される。そしてこのバケット先端44aの位置P
gtと上記メモリに記憶された3次元目標地形51のデー
タとに基づいてバケット先端44aが移動すべき3次元
目標地形51上の交線58が演算される。そしてこれら
バケット44(バケット先端44a)と交線58との相
対位置関係が、グラフィックインターフェース24上に
設けられた表示画面24aに表示される(図6参照)。
またグラフィックインターフェース24上には、自動掘
削開始ボタン24bが設けられている。この自動掘削開
始ボタン24bがオンされている間、移動指令が外部コ
ントローラ25に入力される。グラフィックインターフ
ェース24上には、目標移動経路Tc上の移動方法、移
動速度を指定するスイッチが設けられている。
The external controller 25 stores data indicating a three-dimensional target terrain in a predetermined memory as described later. A graphic interface (GUI) 24 and a sensor group 26 are connected to the external controller 25. The sensor group 26 includes angle sensors 27 to 29 and a three-dimensional position sensor 30. In the external controller 25,
Detection results of three-dimensional position sensor 30 and angle sensors 27-2
9, the position Pgt of the bucket tip 44a
Is calculated. And the position P of this bucket tip 44a
Based on gt and the data of the three-dimensional target terrain 51 stored in the memory, an intersection line 58 on the three-dimensional target terrain 51 to which the bucket tip 44a should move is calculated. Then, the relative positional relationship between the bucket 44 (bucket tip 44a) and the intersection line 58 is displayed on a display screen 24a provided on the graphic interface 24 (see FIG. 6).
On the graphic interface 24, an automatic excavation start button 24b is provided. While the automatic excavation start button 24b is on, a movement command is input to the external controller 25. A switch is provided on the graphic interface 24 for designating a moving method and a moving speed on the target moving path Tc.

【0055】外部コントローラ25から作業機制御コン
トローラ21に対して、3次元目標地形51のデータ、
3次元位置センサ30で検出される車体41上の位置デ
ータP1、P2、目標移動経路Tc上の移動方法および移
動速度を指示する移動方法/移動速度指令データ、自動
掘削開始ボタン24bの操作に応じた移動指令データ、
角度センサ27〜29で検出されたブーム42等の現在
角度データがそれぞれ出力される。
From the external controller 25 to the work machine control controller 21, data of the three-dimensional target terrain 51,
According to the position data P1, P2 on the vehicle body 41 detected by the three-dimensional position sensor 30, the moving method / moving speed command data for instructing the moving method and moving speed on the target moving path Tc, and the operation of the automatic excavation start button 24b. Movement command data,
Current angle data of the boom 42 and the like detected by the angle sensors 27 to 29 are output respectively.

【0056】作業機制御コントローラ21では、入力装
置10から入力された操作指示信号、外部コントローラ
25から入力されたデータに基づき、作業機47を作動
させるための制御信号が生成され、比例制御弁22に出
力される。
The work machine control controller 21 generates a control signal for operating the work machine 47 based on the operation instruction signal input from the input device 10 and the data input from the external controller 25, and generates a proportional control valve 22. Is output to

【0057】すなわち操作切換スイッチ13により第1
の制御モードが選択操作されている場合には、操作レバ
ー11の操作に応じて作業機47を作動させるための制
御信号が生成、出力される。また操作切換スイッチ13
により第2の制御モードが選択操作されている場合に
は、外部コントローラ25から入力された3次元目標地
形データ等に基づいて目標移動経路Tcが作成され、目
標移動経路Tcに沿ってバケット先端44aを自動的に
移動させるための制御指令が生成、出力される。ただし
自動掘削開始ボタン24bがオンされ移動指令が入力さ
れている間だけバケット先端44aが目標移動経路Tc
に沿って自動的に移動される(図10参照)。つまり上
記交線58を目標移動経路Tcとして掘削作業が自動的
に行われる。自動掘削開始ボタン24bがオペレータの
手が離れ移動指令が入力されなくなると、かかる自動的
な掘削作業は行われない。
That is, the operation changeover switch 13 causes the first
When the control mode is selected, a control signal for operating the work implement 47 in accordance with the operation of the operation lever 11 is generated and output. Operation switch 13
When the second control mode is selected, the target travel path Tc is created based on the three-dimensional target terrain data input from the external controller 25, and the bucket tip 44a is formed along the target travel path Tc. Is automatically generated and output. However, only when the automatic excavation start button 24b is turned on and the movement command is input, the bucket tip 44a moves to the target movement path Tc.
(See FIG. 10). That is, excavation work is automatically performed using the intersection line 58 as the target movement path Tc. When the automatic excavation start button 24b leaves the operator's hand and no movement command is input, such automatic excavation work is not performed.

【0058】作業機制御コントローラ21から出力され
た制御指令は、比例制御弁22に加えられる。比例制御
弁22からは加えられた制御指令に応じた流量の圧油が
流出され、油圧シリンダ23に供給される。油圧シリン
ダ23は、比例制御弁22から供給された圧油に応じて
駆動される。油圧シリンダ23が駆動されるに応じて作
業機47が作動される。
The control command output from the work implement control controller 21 is applied to the proportional control valve 22. From the proportional control valve 22, pressure oil of a flow rate according to the applied control command flows out and is supplied to the hydraulic cylinder 23. The hydraulic cylinder 23 is driven according to the pressure oil supplied from the proportional control valve 22. The work implement 47 is operated in response to the driving of the hydraulic cylinder 23.

【0059】なお外部コントローラ25で目標移動経路
Tcを作成して、この目標移動経路Tcを示すデータを作
業機制御コントローラ21に出力してもよい。
The external controller 25 may create the target moving path Tc, and output data indicating the target moving path Tc to the work implement controller 21.

【0060】ただし図2に示すように、角度センサ27
〜29が作業機制御コントローラ21に接続されている
場合には、作業機制御コントローラ21から外部コント
ローラ25に対してブーム42等の現在角度を示すデー
タが出力される。これにより外部コントローラ25にお
いてバケット先端位置Pgtを求め交線58を演算するこ
とが可能となる。
However, as shown in FIG.
In the case where .about.29 are connected to the work implement control controller 21, the work implement control controller 21 outputs data indicating the current angle of the boom 42 and the like to the external controller 25. This allows the external controller 25 to determine the bucket tip position Pgt and calculate the intersection line 58.

【0061】なお外部コントローラ25としては、上述
したように3次元データを記憶する高度なものだけでは
なく、スキャン式レーザなどを用いて2次元データを記
憶する単純なものでもよい。
The external controller 25 is not limited to an advanced controller for storing three-dimensional data as described above, but may be a simple controller for storing two-dimensional data using a scanning laser or the like.

【0062】外部コントローラ25が車体41に装着さ
れているか否かは、外部コントローラ25のコネクタに
接続されているか否かにより車体41に設けた他のコン
トローラにより判断される。車体41内の複数のコント
ローラは信号線によってシリアルに接続されており、信
号線上をフレーム信号が伝送されることにより、コント
ローラ間でデータが授受される。そしてフレーム信号が
信号線上を伝送することにより、各コントローラに接続
されたセンサ、アクチュエータのエラー等の異常判定が
行われる。したがって外部コントローラ25が装着され
ているときには、この外部コントローラ25に接続され
た角度センサ27〜29および3次元位置センサ30な
どの異常判定が行われる。
Whether or not the external controller 25 is mounted on the vehicle body 41 is determined by another controller provided on the vehicle body 41 based on whether or not the external controller 25 is connected to the connector of the external controller 25. A plurality of controllers in the vehicle body 41 are serially connected by signal lines, and data is transmitted and received between the controllers by transmitting a frame signal on the signal lines. Then, by transmitting the frame signal on the signal line, abnormality determination such as an error of a sensor or an actuator connected to each controller is performed. Therefore, when the external controller 25 is mounted, abnormality determination of the angle sensors 27 to 29 and the three-dimensional position sensor 30 connected to the external controller 25 is performed.

【0063】異常があった場合にはその旨がたとえば表
示画面24bに表示される。そしてたとえオペレータが
第2の制御モードを選択操作した場合でも、第2の制御
モードを実行しないように作業機制御コントローラ21
に対して指示される。角度センサ27〜29および3次
元位置センサ30に異常があると第2の制御モードが異
常になるからである。ただし角度センサ27〜29およ
び3次元位置センサ30に異常があったとしても操作レ
バー11の操作に基づく第1の制御モードが可能であ
る。よって操作切換スイッチ13の選択如何にかかわら
ず、第1の制御モードを実行するように作業機制御コン
トローラ21に対して指示が出される。また外部コント
ローラ25が装着されていないと判断された場合には、
外部コントローラ25に関する異常判定はなされない。
When there is an abnormality, the fact is displayed on the display screen 24b, for example. Even if the operator selects and operates the second control mode, the work implement control controller 21 does not execute the second control mode.
Instructed. This is because if the angle sensors 27 to 29 and the three-dimensional position sensor 30 are abnormal, the second control mode becomes abnormal. However, even if the angle sensors 27 to 29 and the three-dimensional position sensor 30 are abnormal, the first control mode based on the operation of the operation lever 11 is possible. Therefore, regardless of the selection of the operation changeover switch 13, an instruction is issued to the work implement controller 21 to execute the first control mode. If it is determined that the external controller 25 is not mounted,
No abnormality is determined for the external controller 25.

【0064】外部コントローラ25が装着されていると
判断された場合には、操作切換スイッチ13の選択結果
に応じた制御モードが作業機制御コントローラ21で実
行される。すなわち操作切換スイッチ13で第1の制御
モードが操作選択されている場合には、操作レバー11
の操作に応じて作業機47が制御される。また操作切換
スイッチ13によって第2の制御モードが操作選択され
ている場合には、目標移動経路Tcに沿ってバケット先
端44aが移動するように作業機47が制御される。
When it is determined that the external controller 25 is mounted, a control mode according to the selection result of the operation changeover switch 13 is executed by the work implement control controller 21. That is, when the first control mode is selected by the operation switch 13, the operation lever 11
The work implement 47 is controlled according to the operation of. When the second control mode is selected by the operation changeover switch 13, the work implement 47 is controlled so that the bucket tip 44a moves along the target movement path Tc.

【0065】しかし外部コントローラ25が装着されて
いないと判断された場合には、外部コントローラ25か
らは3次元目標地形データが作業機制御コントローラ2
1に出力されていない状態である。このため操作切換ス
イッチ13の選択いかんにかかわらず第1の制御モード
が作業機制御コントローラ21で実行される。すなわち
操作レバー11の操作に応じて作業機47が制御され
る。
However, when it is determined that the external controller 25 is not mounted, the three-dimensional target terrain data is transmitted from the external controller 25 to the work implement controller 2.
1 is not output. Therefore, the first control mode is executed by the work implement controller 21 regardless of the selection of the operation changeover switch 13. That is, the work implement 47 is controlled according to the operation of the operation lever 11.

【0066】このように外部コントローラ25が装着さ
れているときのみ、制御モードの切り替え選択が有効で
あると判定し外部コントローラ25が未装着な場合には
操作レバー11に応じた制御のみを実行させるようして
いる。このため外部コントローラ25が未装着な場合の
誤動作を防止することができる。
As described above, only when the external controller 25 is mounted, it is determined that the control mode switching selection is valid, and when the external controller 25 is not mounted, only the control corresponding to the operation lever 11 is executed. Like that. For this reason, it is possible to prevent a malfunction when the external controller 25 is not mounted.

【0067】以下外部コントローラ25、作業機制御コ
ントローラ21で実行される演算内容について説明す
る。
In the following, description will be made on the contents of calculations executed by the external controller 25 and the work implement controller 21.

【0068】・3次元目標地形データの作成 道路という構造物52を例にとり3次元目標地形データ
の作成方法について説明する。
Creation of three-dimensional target terrain data A method of creating three-dimensional target terrain data will be described using a structure 52 as a road as an example.

【0069】図5(a)に示すように現在地形50から
3次元目標地形51を得るためには、3次元の現在地形
50のデータが必要である。たとえばGPSやトータル
ステーションなどの一般的な測量装置を用いて地表の複
数の点の3次元座標位置データが計測される。そして各
点の3次元座標位置データが関連づけられ3次元現在地
形データとされる。なお本実施の形態では、近傍の3点
を選択し3角形ポリゴンとなしこの3角形ポリゴンの集
合が3次元現在地形データとされる。
As shown in FIG. 5A, in order to obtain the three-dimensional target terrain 51 from the current terrain 50, data of the three-dimensional current terrain 50 is required. For example, three-dimensional coordinate position data of a plurality of points on the ground surface is measured using a general surveying device such as a GPS or a total station. Then, the three-dimensional coordinate position data of each point is associated with each other and becomes three-dimensional current terrain data. In the present embodiment, three neighboring points are selected and no triangle polygon is set, and a set of these triangle polygons is used as three-dimensional current terrain data.

【0070】図11は現在地形データから道路という構
造物52を生成するまでの手順を概念的に示している。
FIG. 11 conceptually shows a procedure for generating a structure 52 called a road from the current topographic data.

【0071】図11(a)に示すように、まず3次元現
在地形データが入力され、上方より見た地形図が生成さ
れる。そして上方より見た地形図の上でIP点と呼ばれ
る中間点70が定められる。そしてこの中間点70を結
ぶ直線がクロソイド、単曲線、ヘアピンなどの適当な曲
線で接続され、上方より見た道路の中心線(平面線形)
71が定められる。
As shown in FIG. 11A, first, three-dimensional current terrain data is input, and a terrain map viewed from above is generated. Then, an intermediate point 70 called an IP point is determined on the topographic map viewed from above. A straight line connecting the intermediate points 70 is connected by an appropriate curve such as a clothoid, a single curve, or a hairpin, and the center line of the road viewed from above (horizontal alignment).
71 are defined.

【0072】さらに図11(b)に示すように3次元現
在地形データに基づき、平面線形71に沿った高さ方向
Zの地形データ72が求められる。これは縦断面と呼ば
れる。そしてこの縦断面72上でIP点70が定めら
れ、曲線で補完することによって縦断面で見た道路の中
心線(縦断線形)71′が定められる。こうして道路の
中心線71′の3次元位置が最終的に決定される。
Further, as shown in FIG. 11B, the topographic data 72 in the height direction Z along the horizontal line 71 is obtained based on the three-dimensional current topographic data. This is called a longitudinal section. Then, an IP point 70 is determined on the vertical section 72, and the center line (vertical alignment) 71 'of the road viewed in the vertical section is determined by complementing the IP point 70 with a curve. Thus, the three-dimensional position of the center line 71 'of the road is finally determined.

【0073】つぎに図11(c)に示すように道路中心
線71′に対して、道路の道幅、歩道の有無などを定め
ることによって、構造物52の3次元形状が求められ
る。そして構造物52の縁部53の3次元形状が決定さ
れる。縁部53の3次元形状は曲線を含む複雑な形状と
なる。
Next, as shown in FIG. 11C, the three-dimensional shape of the structure 52 is determined by determining the width of the road, the presence or absence of a sidewalk, and the like with respect to the road center line 71 '. Then, the three-dimensional shape of the edge 53 of the structure 52 is determined. The three-dimensional shape of the edge 53 is a complicated shape including a curve.

【0074】図5(a)は現在地形50を示すデータ
と、構造物52の形状を示すデータと、法面54の角度
等の形状を示すデータと、縁53の形状を示すデータと
に基づき法面54の3次元目標地形51を示すデータを
作成する様子を概念的に示している。
FIG. 5A shows data based on data indicating the current topography 50, data indicating the shape of the structure 52, data indicating the shape of the slope 54 such as the angle, and data indicating the shape of the edge 53. A concept of creating data indicating the three-dimensional target terrain 51 on the slope 54 is conceptually shown.

【0075】まず最初に法面54の角度、法面54、5
4間の小段55を設ける間隔を示すデータが入力され
る。そして現在の3次元地形50のデータと、構造物5
2の縁部53の形状を示すデータと、法面54の角度デ
ータとに基づいて、構造物52の縁部53を法尻とする
3次元目標地形51のデータつまり法面54の形状デー
タが作成される。法面54の形状データを図5(b)に
示す。このように簡単なデータを入力するだけで複雑な
3次元目標地形51を自動的に作成することがで法面5
4の形状データは図5(c)に示すように3角形ポリゴ
ン56の集合として表される。3角形ポリゴン56の集
合が3次元目標地形データとして外部コントローラ25
のメモリに記憶される。
First, the angle of the slope 54, the slopes 54, 5
Data indicating the intervals at which the small steps 55 between the four rows are provided is input. And the data of the current three-dimensional terrain 50 and the structure 5
Based on the data indicating the shape of the edge 53 of the second and the angle data of the slope 54, the data of the three-dimensional target terrain 51 having the edge 53 of the structure 52 as the slope, that is, the shape data of the slope 54 is Created. FIG. 5B shows the shape data of the slope 54. By simply inputting such simple data, a complicated three-dimensional target terrain 51 can be automatically created.
The shape data of No. 4 is represented as a set of triangular polygons 56 as shown in FIG. A set of triangular polygons 56 is used as the three-dimensional target terrain data by the external controller 25.
Is stored in the memory.

【0076】・バケットの現在位置の演算 図3を参照して3次元位置センサ30、傾斜角度センサ
27〜29の検出結果に基づきバケット先端44aの現
在位置を演算する処理の内容を説明する。
Calculation of Current Position of Bucket The contents of processing for calculating the current position of the bucket tip 44a based on the detection results of the three-dimensional position sensor 30 and the inclination angle sensors 27 to 29 will be described with reference to FIG.

【0077】まずブーム42の根元42dの座標位置を
求めるために、車体座標系{X1,Y1,Z1}を求め
る。
First, the body coordinate system {X1, Y1, Z1} is obtained in order to obtain the coordinate position of the root 42d of the boom 42.

【0078】3次元位置センサ30では座標位置P1、
P2が検出される。すると、 Y1=(P1−P2)/|P1−P2| となる。
In the three-dimensional position sensor 30, the coordinate position P1,
P2 is detected. Then, Y1 = (P1-P2) / | P1-P2 |

【0079】そして傾斜角度センサ27〜29では、Y
1を水平軸として重力方向に対する傾きθ1、θ2、θ3
が検出される。
In the inclination angle sensors 27 to 29, Y
Tilts θ1, θ2, θ3 with respect to the direction of gravity with 1 as the horizontal axis
Is detected.

【0080】Y1とZの2つのベクトルで表される平面
を通り、Y1と垂直なベクトルZ’を導入すると、 (Z’,Y1)=0 …(2.1) Z’=(1−a)Z+aY1 …(2.2) という関係が成り立つ。
When a vector Z ′ passing through a plane represented by two vectors Y1 and Z and perpendicular to Y1 is introduced, (Z ′, Y1) = 0 (2.1) Z ′ = (1−a) Z + aY1 … (2.2)

【0081】(2.1)式および(2.2)式より、 Z’=Z+{(Z,Y1)/((Z,Y1)−1)}
(Y1−Z) となり、さらに、Y1およびZ’と垂直なベクトルを
X’とすると、 X’=Y1⊥Z’ となる。
From the equations (2.1) and (2.2), Z ′ = Z + {(Z, Y1) / ((Z, Y1) −1)}
(Y1-Z), and when a vector perpendicular to Y1 and Z ′ is X ′, X ′ = Y1⊥Z ′.

【0082】車体座標系は、これをY1軸周りにθ0だ
け回転させたものであるから、 となる。
The vehicle body coordinate system is obtained by rotating this around the Y1 axis by θ0. Becomes

【0083】この車体座標系内でのバケット先端44a
の位置座標(xLt、yLt、zLt)は、傾斜角度セン
サ27〜29の検出角度θ1、θ2、θ3およびブーム4
2、アーム43、バケット44の長さL1、L2、L3を
用いて、 xLt=0 …(2.4) zLt=−Lb2+L1cosθ1−L2cosθ2−L3cosθ3 …(2.5) yLt=Lb1+L1sinθ1+L2sinθ2+L3sinθ3 …(2.6) と演算することができる。よってグローバル座標系での
バケット先端44aの位置座標Pgtは、 Pgt=xLt・X1+yLt・Y1+zLt・Z1+P1…
(2.7) となる。
The bucket tip 44a in the vehicle body coordinate system
Position coordinates (xLt, yLt, zLt) are determined by the detection angles θ1, θ2, θ3 of the tilt angle sensors 27 to 29 and the boom 4
2. Using the lengths L1, L2, and L3 of the arm 43 and the bucket 44, xLt = 0 (2.4) zLt = -Lb2 + L1cos.theta.1-L2cos.theta.2-L3cos.theta.3 (2.5) it can. Therefore, the position coordinates Pgt of the bucket tip 44a in the global coordinate system are as follows: Pgt = xLt.X1 + yLt.Y1 + zLt.Z1 + P1.
(2.7)

【0084】なお本実施の形態では、2つのGPSアン
テナ45、46を車体41に取り付けた場合を示してい
る。この場合車体41の旋回等に伴うGPSアンテナの
経路を計測して油圧ショベル40の傾きおよび傾斜方向
を計測してもよい。また3つ以上のGPSアンテナを用
いて車体41の位置を計測することもできる。さらにG
PSアンテナを、アーム43やブーム42に取り付けて
もよい。またGPSの代わりにロボティックトータルス
テーションなど他の3次元位置計測装置を用いてもよ
い。
This embodiment shows a case where two GPS antennas 45 and 46 are attached to the vehicle body 41. In this case, the inclination and the inclination direction of the excavator 40 may be measured by measuring the path of the GPS antenna accompanying the turning of the vehicle body 41 and the like. Also, the position of the vehicle body 41 can be measured using three or more GPS antennas. Further G
The PS antenna may be attached to the arm 43 or the boom 42. Another three-dimensional position measuring device such as a robotic total station may be used instead of the GPS.

【0085】また角度センサ27〜29としては、ブー
ム42、アーム43、バケット44の重力方向に対する
傾きを検出する検出器に限ることなく、ポテンショメー
タなどの任意の角度センサを用いることができる。また
レーザ距離計測装置を用いて角度を検出してもよい。
The angle sensors 27 to 29 are not limited to detectors for detecting the inclination of the boom 42, the arm 43, and the bucket 44 with respect to the direction of gravity, and any angle sensor such as a potentiometer can be used. Alternatively, the angle may be detected using a laser distance measuring device.

【0086】・平面と3次元目標地形との交線の演算 オペレータが操作レバー11を操作したとき油圧シリン
ダ23が駆動されバケット44の先端44aは、Y1−
Z1平面内を移動することによって、掘削作業がなされ
る。すなわちバケット先端44aは上記演算された現在
の先端位置Pgtを通るY1−Z1平面内を移動するこ
とによって掘削作業が行われる。
Calculation of the intersection line between the plane and the three-dimensional target terrain When the operator operates the operation lever 11, the hydraulic cylinder 23 is driven and the tip 44a of the bucket 44
Excavation work is performed by moving in the Z1 plane. In other words, the excavation work is performed by moving the bucket tip 44a in the Y1-Z1 plane passing through the calculated current tip position Pgt.

【0087】そこで図6(a)に示すように現在のバケ
ット先端44aの位置Pgtを通過する平面57が演算さ
れる。
Therefore, as shown in FIG. 6A, a plane 57 passing through the current position Pgt of the bucket tip 44a is calculated.

【0088】つぎにメモリに記憶された3次元目標地形
51のデータが読み出され、平面57と目標地形51と
の交線58が演算される。この交線58が、バケット先
端44aが移動すべき目標移動経路Tcとなる。この交
線58に沿ってバケット先端44aを移動させることに
よって、現在のバケット下方における現在地形50を3
次元目標地形51に掘削することができる。3次元目標
地形データは、三角形ポリゴン56の集合として表現さ
れるので、交線58は各三角形ポリゴン56上の線分で
表現されることになる。
Next, the data of the three-dimensional target terrain 51 stored in the memory is read, and an intersection line 58 between the plane 57 and the target terrain 51 is calculated. This intersection line 58 becomes the target movement path Tc to which the bucket tip 44a should move. By moving the bucket tip 44a along the intersection line 58, the current terrain 50 below the current bucket can be changed by three.
Excavation can be performed on the dimensional target terrain 51. Since the three-dimensional target terrain data is represented as a set of triangular polygons 56, the intersection line 58 is represented by a line segment on each triangular polygon 56.

【0089】そして図6(b)に示すように、3次元目
標地形51を示す交線58の位置とバケット44の位置
とが同一の表示画面24a上に表示される。
As shown in FIG. 6B, the position of the intersection line 58 indicating the three-dimensional target terrain 51 and the position of the bucket 44 are displayed on the same display screen 24a.

【0090】油圧ショベル40の走行に伴う移動や車体
41の旋回によってバケット44の現在位置が変化した
としても、表示画面24a上には、現在のバケット44
の位置と現在のバケット44の下方における3次元目標
地形51を示す交線58が表示されることになる。よっ
てオペレータは、この表示画面24aを見ることによっ
て、掘削すべき交線58の位置を、バケット44の位置
との関係で正確に把握することができる。そしてこの表
示画面24aを見ながら操作レバー11を操作すれば現
在地形50を目標地形51に精度よく掘削することがで
きる。なおこのとき操作切換スイッチ13は第1の制御
モードに選択されている。
Even if the current position of the bucket 44 is changed by the movement of the excavator 40 or the turning of the vehicle body 41, the current bucket 44 is displayed on the display screen 24a.
And an intersection line 58 indicating the three-dimensional target terrain 51 below the current bucket 44 is displayed. Therefore, by looking at the display screen 24a, the operator can accurately grasp the position of the intersection line 58 to be excavated in relation to the position of the bucket 44. If the operation lever 11 is operated while looking at the display screen 24a, the current terrain 50 can be excavated on the target terrain 51 with high accuracy. At this time, the operation changeover switch 13 has been selected to the first control mode.

【0091】このように本実施形態によれば油圧ショベ
ル40が移動するに応じてまたバケット44が移動する
に応じて、そのバケット44の下方の掘削すべき地形の
形状が変化する複雑な3次元地形であっても、現在のバ
ケット44の位置に対応する目標地形51を示す交線5
8の位置を、バケット44の位置との関係で表示するこ
とができる。つまり複雑な形状の3次元地形をバケット
44との位置関係でオペレータに分かりやすく表示する
ことができる。よって本実施形態によれば、場所によっ
て掘削すべき地形の形状が異なる複雑な3次元地形であ
っても、精度よく掘削することができる。
As described above, according to the present embodiment, as the excavator 40 moves and the bucket 44 moves, the shape of the terrain to be excavated below the bucket 44 changes. Even if it is a terrain, an intersection line 5 indicating the target terrain 51 corresponding to the current position of the bucket 44
The position of No. 8 can be displayed in relation to the position of the bucket 44. That is, the three-dimensional terrain having a complicated shape can be displayed in an easy-to-understand manner for the operator in the positional relationship with the bucket 44. Therefore, according to the present embodiment, excavation can be accurately performed even for a complicated three-dimensional terrain in which the shape of the terrain to be excavated differs depending on the location.

【0092】なおバケット44と交線58の表示の仕方
は図4(b)に示す表示の仕方に限定されるものではな
い。図6(a)に示すようにバケット44と交線58と
の位置関係を3次元的に表示してもよい。この場合図7
に示すように、バケット44の幅Wを考慮して、バケッ
ト44の幅W分の交線58′を表示してもよい。バケッ
ト44の幅W分の交線58′が掘削すべき部分(これを
斜線にて示す)となる。
Note that the manner of displaying the bucket 44 and the intersection line 58 is not limited to the manner of display shown in FIG. As shown in FIG. 6A, the positional relationship between the bucket 44 and the intersection line 58 may be displayed three-dimensionally. In this case, FIG.
As shown in (5), the intersection line 58 'for the width W of the bucket 44 may be displayed in consideration of the width W of the bucket 44. An intersection line 58 'corresponding to the width W of the bucket 44 is a portion to be excavated (this is indicated by oblique lines).

【0093】またバケット44のみを表示するのではな
くバケット44を含む作業機47全体を表示してもよ
い。さらには図8に示すように表示画面24a上に油圧
ショベル40全体を表示して、車体41に対する作業機
47の現在姿勢を画面24aから認識できるようにして
もよい。
Further, instead of displaying only the bucket 44, the entire work machine 47 including the bucket 44 may be displayed. Further, as shown in FIG. 8, the entire hydraulic excavator 40 may be displayed on the display screen 24a so that the current posture of the work implement 47 with respect to the vehicle body 41 can be recognized from the screen 24a.

【0094】さらには図9(a)に示すようにバケット
先端44aの動作範囲を表示してもよい。この場合ブー
ム42、アーム43、バケット44を動作させたときの
動作範囲59を表示することができる。また特定の作業
機たとえばアーム43、バケット44を動作させたとき
の動作範囲60を表示することができる。さらには図9
(b)に示すようにバケット44の姿勢を一定にしたと
きの動作範囲61を表示してもよい。
Further, as shown in FIG. 9A, the operating range of the bucket tip 44a may be displayed. In this case, the operation range 59 when the boom 42, the arm 43, and the bucket 44 are operated can be displayed. Further, an operation range 60 when a specific work machine such as the arm 43 or the bucket 44 is operated can be displayed. Further, FIG.
As shown in (b), the operation range 61 when the posture of the bucket 44 is fixed may be displayed.

【0095】動作範囲59、60、61を表示すること
で、交線58との関係で油圧ショベル40が掘削作業に
適した位置にいるか否かを判断することができる。
By displaying the operation ranges 59, 60, and 61, it is possible to determine whether or not the excavator 40 is at a position suitable for excavation work in relation to the intersection line 58.

【0096】なお目標地形51を示す交線58だけでは
なく、現在地形50を示す交線、現在地形50の下の土
や岩などの状態を併せて表示してもよい。
In addition to the intersection line 58 indicating the target terrain 51, the intersection line indicating the current terrain 50 and the state of the soil and rocks under the current terrain 50 may also be displayed.

【0097】なお本実施形態では、バケット44と交線
58を表示画面24上にグラフィック表示している。し
かし本発明としては逐次変化する現在のバケット44と
現在の交線58との相対位置関係をオペレータに提示し
て掘削作業をガイダンスすることができればよい。たと
えば交線58とバケット44との相対的な位置関係を、
数値(たとえばバケット先端44aから交線58までの
距離)でオペレータに提示してもよい。また交線58と
バケット44との相対的な位置関係を音声(たとえば
「バケット先端下方Xmに交線あり」)によってオペレ
ータに提示してもよい。
In the present embodiment, the bucket 44 and the intersection line 58 are graphically displayed on the display screen 24. However, according to the present invention, it is only required that the relative positional relationship between the current bucket 44 and the current intersection line 58 that changes sequentially be presented to the operator to guide the excavation work. For example, the relative positional relationship between the intersection line 58 and the bucket 44 is
The numerical value (for example, the distance from the bucket tip 44a to the intersection line 58) may be presented to the operator. Further, the relative positional relationship between the intersection line 58 and the bucket 44 may be presented to the operator by voice (for example, “there is an intersection line below the bucket tip Xm”).

【0098】・掘削制御 上記表示画面24aに表示される交線58は、操作切換
スイッチ13で第2の制御モードが選択されて自動掘削
を行うときの目標移動経路Tcとなる。自動掘削開始ボ
タン24bがオンされている間、作業機制御コントロー
ラ21では自動掘削の制御が実行される。また自動掘削
開始ボタン24bがオフされると、自動掘削制御が中止
される。
Excavation Control The intersection line 58 displayed on the display screen 24a becomes the target movement path Tc when the second control mode is selected by the operation changeover switch 13 and the automatic excavation is performed. While the automatic excavation start button 24b is on, the work implement control controller 21 controls automatic excavation. When the automatic excavation start button 24b is turned off, the automatic excavation control is stopped.

【0099】目標移動経路Tcは車体座標系の2次元平
面Z1−Y1上の点列{Pt1,Pt2,…,Ptm}で表現
される。
The target movement path Tc is represented by a point sequence {Pt1, Pt2,..., Ptm} on the two-dimensional plane Z1-Y1 of the vehicle body coordinate system.

【0100】バケット44の取り付け方法によって掘削
方向が定まる。たとえばバックホウの場合には車体41
に対して遠方から手前に掘削される。このため車体座標
系で原点から遠い点から掘削が開始される。こうして掘
削の方向が求められる。
The direction of excavation is determined by the method of mounting the bucket 44. For example, in the case of a backhoe, the vehicle body 41
It is excavated from a distance. Therefore, excavation is started from a point far from the origin in the vehicle body coordinate system. Thus, the direction of excavation is determined.

【0101】つぎに目標移動経路Tc上の開始点と終了
点が求められる。オペレータはグラフィックインターフ
ェース24で水平掘削を行うか法面掘削を行うかを移動
方法を指示している。
Next, a start point and an end point on the target movement route Tc are obtained. The operator instructs, on the graphic interface 24, a moving method of performing horizontal excavation or slope excavation.

【0102】法面掘削の場合には、図10に示すように
バケット44の現在高さと同じ高さから掘削が開始され
る。目標移動経路Tc中でバケット44の現在のZ1軸
上の座標値と同じ座標値になる点が求められ、これが掘
削開始点Pto1とされる。なお目標移動経路Tcがバケッ
ト44の現在高さよりも低い場合には、目標移動経路T
c中で車体41から最も遠い点が掘削開始点Pto1とされ
る。この掘削開始点が油圧ショベル40の動作範囲内に
入らない場合には、動作範囲内で車体41に最も遠い点
が掘削開始点Pto1とされる。
In the case of slope excavation, excavation is started from the same height as the current height of the bucket 44 as shown in FIG. A point having the same coordinate value as the current coordinate value of the bucket 44 on the Z1 axis in the target movement path Tc is obtained, and this is set as the excavation start point Pto1. If the target travel route Tc is lower than the current height of the bucket 44, the target travel route Tc
The point farthest from the vehicle body 41 in c is set as the excavation start point Pto1. If this excavation start point does not fall within the operation range of the excavator 40, the point farthest from the vehicle body 41 within the operation range is set as the excavation start point Pto1.

【0103】これに対して水平掘削の場合には、バケッ
ト44の現在のY1軸上の座標値と同じ座標値になる点
が求められ、これを掘削開始点Pto1とされる。なお目
標移動経路Tc中に現在のY1軸上の座標値と同じ座標
値になる点が存在しない場合には、法面掘削の場合と同
様に車体41から最も遠い点が掘削開始点Pto1とされ
る。この掘削開始点が油圧ショベル40の動作範囲内に
入らない場合には、動作範囲内で車体41に最も遠い点
が掘削開始点Pto1とされる。
On the other hand, in the case of horizontal excavation, a point having the same coordinate value as the current coordinate value on the Y1 axis of the bucket 44 is obtained, and this point is set as the excavation start point Pto1. If there is no point having the same coordinate value as the current coordinate value on the Y1 axis in the target movement route Tc, the point farthest from the vehicle body 41 is set as the excavation start point Pto1 as in the case of the slope excavation. You. If this excavation start point does not fall within the operation range of the excavator 40, the point farthest from the vehicle body 41 within the operation range is set as the excavation start point Pto1.

【0104】次に終了点が求められる。法面掘削の場合
には図10に示すように油圧ショベル40の履帯49が
接している地面の高さにて掘削が終了される。目標移動
経路Tc中で油圧ショベル40の地面の現在のZ1軸上
の座標値と同じ座標値となる点が求められ、これが掘削
終了点Ptomとされる。なお目標移動経路Tc中に地面の
現在のZ1軸上の座標値と同じ座標値となる点が存在し
ない場合には、車体41に最も近い点が掘削終了点Pto
mとされる。この掘削終了点が油圧ショベル40の動作
範囲内に入らない場合には、動作範囲内で車体41に最
も近い点が掘削終了点Ptomとされる。
Next, an end point is obtained. In the case of slope excavation, as shown in FIG. 10, excavation is completed at the level of the ground where the crawler belt 49 of the excavator 40 is in contact. A point having the same coordinate value as the current coordinate value on the Z1 axis on the ground of the excavator 40 in the target movement path Tc is obtained, and this is set as the excavation end point Ptom. If no point having the same coordinate value as the current coordinate value of the ground on the Z1 axis exists in the target movement path Tc, the point closest to the vehicle body 41 is the excavation end point Pto
m. When the excavation end point does not fall within the operation range of the excavator 40, the point closest to the vehicle body 41 within the operation range is set as the excavation end point Ptom.

【0105】これに対して水平掘削の場合には、油圧シ
ョベル40の履帯49の縁部の現在のY1軸上の座標値
と同じ座標値になる点が求められ、これを掘削終了点P
tomとされる。なお目標移動経路Tc中に現在の履帯縁部
のY1軸上の座標値と同じ座標値になる点が存在しない
場合には、法面掘削の場合と同様に車体41に最も近い
点が掘削終了点Ptomとされる。この掘削終了点が油圧
ショベル40の動作範囲内に入らない場合には、動作範
囲内で車体41に最も近い点が掘削終了点Ptomとされ
る。
On the other hand, in the case of horizontal excavation, a point having the same coordinate value as the current coordinate value on the Y1 axis at the edge of the crawler belt 49 of the excavator 40 is obtained.
tom. If there is no point in the target movement route Tc having the same coordinate value as the current coordinate value on the Y1 axis of the crawler belt edge, the point closest to the vehicle body 41 ends as in the case of the slope excavation. The point is set to Ptom. When the excavation end point does not fall within the operation range of the excavator 40, the point closest to the vehicle body 41 within the operation range is set as the excavation end point Ptom.

【0106】このようにしてバケット先端44aが実際
に移動可能な範囲で、移動開始点Pto1と移動終了点Pt
omが求められ、点列{Pt1,Pt2,…,Ptm}が点列T
c={Pto1,Pto2,…,Ptom}に再構成される。
Thus, within the range in which the bucket tip 44a can actually move, the movement start point Pto1 and the movement end point Pt
om is obtained, and the point sequence {Pt1, Pt2,.
c = {Pto1, Pto2,..., Ptom}.

【0107】各目標点Pto1,Pto2,…,Ptomにおけ
るバケット44の姿勢角度θ3はオペレータにより選択
される。たとえば各目標点におけるバケット44の姿勢
角度θ3を、現在位置における角度に維持してもよい。
また初期の2つの目標点Pto1,Pto2で定まる直線の角
度にバケット44の背面の角度が合うようにバケット姿
勢角度θ3を定めて、この姿勢角度を維持したまま各目
標点を移動させてもよい。なおバケット44の背面の角
度に維持する方法は仕上げ作業に用いられる。
The attitude angle θ3 of the bucket 44 at each of the target points Pto1, Pto2,..., Ptom is selected by the operator. For example, the posture angle θ3 of the bucket 44 at each target point may be maintained at the angle at the current position.
Further, the bucket attitude angle θ3 may be determined so that the angle of the back surface of the bucket 44 matches the angle of the straight line defined by the two initial target points Pto1 and Pto2, and each target point may be moved while maintaining this attitude angle. . The method of maintaining the angle at the back of the bucket 44 is used for finishing work.

【0108】バケット先端44aの現在位置Pgtから目
標移動経路Tcの最初の点Pto1までは、各軸制御により
ブーム42、アーム43、バケット44の各軸(各油圧
シリンダ23)が駆動制御される。すなわち2点Pgt、
Pto1間における油圧シリンダのロッドの移動位置が演
算され、 (油圧シリンダの位置変化量)/(油圧シリンダの最大
移動速度) が最も大きい軸が最大速度で移動される。その他の軸
は、最大速度となる軸と同時に目標点Pto1に到達する
ように制御される。
From the current position Pgt of the bucket tip 44a to the first point Pto1 of the target movement path Tc, the respective axes (the hydraulic cylinders 23) of the boom 42, the arm 43 and the bucket 44 are controlled by the respective axis controls. That is, two points Pgt,
The movement position of the rod of the hydraulic cylinder between Pto1 is calculated, and the axis with the largest ((position change amount of the hydraulic cylinder) / (maximum moving speed of the hydraulic cylinder)) is moved at the maximum speed. The other axes are controlled so as to reach the target point Pto1 at the same time as the axis having the maximum speed.

【0109】このときバケット先端44aの移動経路は
非直線になる。2点間の制御は比較的簡単であり移動速
度は最大となる。油圧シリンダは2点間を等速度で移動
させてもよい。ただし振動を防止するために適当な加減
速パターンを設定して、2点間をこの加減速パターンに
したがって移動させてもよい。
At this time, the movement path of the bucket tip 44a is non-linear. The control between the two points is relatively simple and the movement speed is maximized. The hydraulic cylinder may be moved at a constant speed between two points. However, an appropriate acceleration / deceleration pattern may be set in order to prevent vibration, and movement between two points may be performed according to the acceleration / deceleration pattern.

【0110】各軸制御で移動させる場合に、バケット4
4あるいはアーム43などが、目標移動経路Tcあるい
は現在地形50と干渉する場合には、干渉を避けるよう
に補助点が自動的に作成され、この補助点を経由して目
標点Pto1まで移動される。
When moving by each axis control, the bucket 4
When the arm 4 or the arm 43 interferes with the target movement route Tc or the current terrain 50, an auxiliary point is automatically created so as to avoid the interference, and the auxiliary point is moved to the target point Pto1 via the auxiliary point. .

【0111】バケット先端44aが目標移動経路Tcの
移動開始点Pto1に到達されると、バケット44の姿勢
角度θ3が維持されたまま、バケット先端44aが目標
移動経路Tc上に保って移動される。具体的にはバケッ
ト先端44aが、設定した目標移動速度で移動される。
目標移動速度はグラフィックインターフェース24で設
定される。
When the bucket tip 44a reaches the movement start point Pto1 on the target movement path Tc, the bucket tip 44a is moved while maintaining the attitude angle θ3 of the bucket 44 on the target movement path Tc. Specifically, the bucket tip 44a is moved at the set target moving speed.
The target moving speed is set by the graphic interface 24.

【0112】以下目標移動経路Tcに沿ってバケット先
端44aの移動をサーボ制御する処理の内容について説
明する。
A description will now be given of the contents of the processing for servo-controlling the movement of the bucket tip 44a along the target movement path Tc.

【0113】すなわちバケット先端44aの微少時間ご
との位置(yto,zto)および角度θtoが、目標
移動経路Tcのデータから求められる。そしてこのバケ
ット先端位置および角度に対応する各軸(ブーム42、
アーム43、バケット44)の目標回転角度θ1、θ2、
θ3が求められる。そしてこの目標回転角度になるよう
にブーム42、アーム43、バケット44の各油圧シリ
ンダ23がサーボ制御される。
That is, the position (yto, zto) and angle θto of the bucket tip 44a at every minute time are obtained from the data of the target movement path Tc. Each axis (boom 42, boom 42,
Arm 43, bucket 44) target rotation angles θ1, θ2,
θ3 is required. Then, the hydraulic cylinders 23 of the boom 42, the arm 43, and the bucket 44 are servo-controlled so that the target rotation angle is obtained.

【0114】Y1−Z1平面上におけるバケット先端4
4aの目標位置、角度を{yto,zto ,θto }とす
ると、各軸の回転角度θ1、θ2、θ3が以下に示すよう
に一律に定まる。
The bucket tip 4 on the Y1-Z1 plane
Assuming that the target position and angle of 4a are {yto, zto, θto}, the rotation angles θ1, θ2, θ3 of the respective axes are uniformly determined as shown below.

【0115】{θ1 ,θ2,θ3}=fr{yto,zto,
θto} ただしfrは所定の関数である。この関数frの内容は以
下のとおりである。
{Θ1, θ2, θ3} = fr {yto, zto,
θto} where fr is a predetermined function. The contents of this function fr are as follows.

【0116】θ3=θto (4.1) また、(2.5)式および(2.6)式より yLt−Lb1−L3sinθto=L1sinθ1+L2sinθ2 zLt+Lb2+L3cosθto=L1cosθ1−L2cosθ2 となる。Θ3 = θto (4.1) From the equations (2.5) and (2.6), yLt−Lb1−L3sinθto = L1sinθ1 + L2sinθ2 zLt + Lb2 + L3cosθto = L1cosθ1−L2cosθ2

【0117】ここで、 yLt−Lb1−L3sinθto=m zLt+Lb2+L3cosθto=n とおくと、 m=L1sinθ1+L2sinθ2 n=L1cosθ1−L2cosθ2 となる。Here, if yLt-Lb1-L3 sinθto = mzLt + Lb2 + L3cosθto = n, then m = L1sinθ1 + L2sinθ2n = L1cosθ1-L2cosθ2.

【0118】両辺を2乗して加算すると、 m^2+n^2=L1^2+L2^2−2L1・L2cos(θ1+
θ2) となる。なお^2は2乗を意味するものとする。
When both sides are squared and added, m ^ 2 + n ^ 2 = L1 ^ 2 + L2 ^ 2-2L1 · L2cos (θ1 +
θ2). Note that ^ 2 means a square.

【0119】したがって、 θ1+θ2=cos-1{(L1^2+L2^2−m^2−n^2)/
2L1・L2} が得られる。
Therefore, θ1 + θ2 = cos-1 {(L1 ^ 2 + L2 ^ 2-m ^ 2-n ^ 2) /
2L1 · L2} is obtained.

【0120】(2.5)式より m=L1sinθ1+L2sinθ2 が得られる。これより、 m=(L1−L2cos(θ1+θ2))sinθ1+L2s
in(θ1+θ2)cosθ1 となる。ここで、 とおくと、 1=k1sinθ1+k2cosθ1 となる。よってθ1は、 となる。θ2も同様にして求められる。こうして目標回
転角度θ1,θ2,θ3が演算される。
From equation (2.5), m = L1 sin θ1 + L2 sin θ2 is obtained. From this, m = (L1−L2cos (θ1 + θ2)) sin θ1 + L2s
in (θ1 + θ2) cos θ1. here, Then, 1 = k1 sin θ1 + k2 cos θ1. Therefore θ1 is Becomes θ2 is similarly obtained. Thus, the target rotation angles θ1, θ2, θ3 are calculated.

【0121】つぎに重力方向に対してなす角度θ1,θ
2,θ3が、車体41に対してブーム42がなす相対的
な角度θ′1、ブーム42に対してアーム43がなす相
対的な角度θ′2、アーム43に対してバケット44が
なす相対的な角度θ′3に変換される。これら相対角度
θ′1、θ′2、θ′3は、重力方向に対してなす角度θ
1,θ2,θ3の加減算によって容易に求められる。そ
して現在の相対角度θ′1、θ′2、θ′3が目標とする
相対角度θ′1、θ′2、θ′3となるように、ブーム4
2、アーム43、バケット44の各油圧シリンダ23が
駆動制御される。こうしてバケット先端44aは目標移
動経路Tcに沿って移動され、現在地形50が目標地形
51に精度よく掘削される。
Next, angles θ1, θ formed with respect to the direction of gravity
2 and θ3 are the relative angle θ′1 of the boom 42 with respect to the vehicle body 41, the relative angle θ′2 of the arm 43 with the boom 42, and the relative angle of the bucket 44 with the arm 43. Angle θ'3. These relative angles θ′1, θ′2, and θ′3 form an angle θ with respect to the direction of gravity.
It is easily obtained by addition and subtraction of 1, θ2 and θ3. The boom 4 is moved so that the current relative angles θ′1, θ′2, θ′3 become the target relative angles θ′1, θ′2, θ′3.
2. The drive of each hydraulic cylinder 23 of the arm 43 and the bucket 44 is controlled. Thus, the bucket tip 44a is moved along the target movement path Tc, and the current terrain 50 is excavated on the target terrain 51 with high accuracy.

【0122】そして図10に示すように、3次元目標地
形51を示す交線58が目標移動経路Tcとされ、この
目標移動経路Tcに沿ってバケット44が移動するよう
にバケット44が制御される。
As shown in FIG. 10, the intersection line 58 indicating the three-dimensional target terrain 51 is set as the target moving path Tc, and the bucket 44 is controlled so that the bucket 44 moves along the target moving path Tc. .

【0123】このように第2の制御モードで自動掘削を
行った場合には、表示画面24aを確認しながら手動で
掘削作業を行う第1の制御モードの場合と同様に、現在
のバケット位置下方の目標地形51に沿ってバケット先
端44aが自動的に移動するので、場所によって掘削す
べき地形の形状が異なる複雑な3次元地形であっても、
精度よく掘削することができる。さらに第2の制御の場
合にはオペレータがバケット44を操作せずとも自動的
に掘削作業がなされる。このため第1の制御モードに比
べてオペレータの労力が軽減されるという効果が得られ
る。
As described above, when the automatic excavation is performed in the second control mode, similarly to the case of the first control mode in which the excavation work is manually performed while checking the display screen 24a, the lower part of the current bucket position is used. The bucket tip 44a automatically moves along the target terrain 51, so even if the shape of the terrain to be excavated differs depending on the location,
Excavation can be performed with high accuracy. Further, in the case of the second control, excavation work is automatically performed without the operator operating the bucket 44. Therefore, an effect is obtained that the operator's labor is reduced as compared with the first control mode.

【0124】なお上述した実施の形態では、地面に対し
て垂直なY1−Z1平面内をバケット先端44aが移動
することを前提としている。しかし油圧ショベル40の
車体41は図3(b)に示すように掘削作業の進行に伴
い地面に対して角度θ0だけ傾斜することもある。この
場合には作業機47の油圧シリンダ23が駆動されるこ
とによりバケット44は地面に対して角度θ0だけ傾斜
した平面に沿って移動する。このため傾斜角度θ0に応
じた平面57を新たに求め直して、交線58つまり目標
移動経路Tcを再度演算してもよい。
The above-described embodiment is based on the premise that the bucket tip 44a moves in a Y1-Z1 plane perpendicular to the ground. However, as shown in FIG. 3B, the vehicle body 41 of the excavator 40 may be inclined by an angle θ0 with respect to the ground as the excavation operation proceeds. In this case, when the hydraulic cylinder 23 of the work machine 47 is driven, the bucket 44 moves along a plane inclined by an angle θ0 with respect to the ground. Therefore, the plane 57 corresponding to the inclination angle θ0 may be newly obtained, and the intersection line 58, that is, the target moving path Tc may be calculated again.

【0125】具体的には図6(a)に示すように地面に
対して垂直な平面57に対して角度θ0だけ傾斜されバ
ケット先端44aの現在位置を通過する平面57″が新
たに演算される。そしてこの平面57″と3次元目標地
形51との交線58″が求められ、表示画面24a上に
表示される。また交線58″が目標移動経路Tcとされ
この目標移動経路Tcに沿ってバケット先端44aが移
動されるように各油圧シリンダ23が自動制御される。
More specifically, as shown in FIG. 6 (a), a plane 57 ″ which is inclined by an angle θ0 with respect to a plane 57 perpendicular to the ground and passes through the current position of the bucket tip 44a is newly calculated. Then, an intersection 58 "between the plane 57" and the three-dimensional target terrain 51 is obtained and displayed on the display screen 24a. The intersection 58 "is set as the target movement path Tc and along the target movement path Tc. Each hydraulic cylinder 23 is automatically controlled such that the bucket tip 44a is moved.

【0126】また作業機が車体41に対して左右に傾斜
することができる作業機を備えた建設機械の場合には、
作業機の傾斜に応じてバケット先端44aが移動する平
面が変化する。この場合にも同様にして油圧シリンダ2
3が駆動されたときにバケット先端44aが移動する面
を含む平面57″を求め、この平面57″に応じた交線
58″を求めればよい。平面57″としては主に掘削力
を負担する作業機(アームなど)の油圧シリンダの移動
によって定まる平面を求めればよい。
In the case of a construction machine having a working machine capable of tilting left and right with respect to the vehicle body 41,
The plane on which the bucket tip 44a moves changes according to the inclination of the work machine. In this case, the hydraulic cylinder 2
The plane 57 "including the surface on which the bucket tip 44a moves when the 3 is driven may be obtained, and the intersection 58" corresponding to this plane 57 "may be obtained. The plane 57" mainly bears the excavating force. A plane determined by the movement of the hydraulic cylinder of the working machine (such as an arm) may be obtained.

【0127】また図4に示すようにオフセットブーム4
2cを備えた油圧ショベル40の場合にもオフセット動
作に応じて正確な交線58つまり目標移動経路Tcを求
めることがきる。すなわち図4(b)に示すように車体
41に対してバケット44がオフセットしていない場合
には平面57が演算され、車体41に対してバケット4
4がオフセットされている場合には平面57′が演算さ
れる。オフセットされたときにはバケット先端44aの
現在位置を通過しかつ平面57に対してオフセットされ
た平面57′が新たに演算される。そしてこの平面5
7′と3次元目標地形51との交線58′が求められ、
表示画面24a上に表示される。また交線58′が目標
移動経路Tcとされこの目標移動経路Tcに沿ってバケッ
ト先端44aが移動されるように各油圧シリンダ23が
自動制御される。
Further, as shown in FIG.
In the case of the hydraulic excavator 40 having the hydraulic excavator 2c, an accurate intersection line 58, that is, the target moving path Tc can be obtained in accordance with the offset operation. That is, when the bucket 44 is not offset with respect to the vehicle body 41 as shown in FIG.
If 4 is offset, plane 57 'is computed. When it is offset, a plane 57 'that passes through the current position of the bucket tip 44a and is offset from the plane 57 is newly calculated. And this plane 5
An intersection line 58 'between the 7' and the three-dimensional target terrain 51 is obtained,
It is displayed on the display screen 24a. The intersection line 58 'is used as the target movement path Tc, and the hydraulic cylinders 23 are automatically controlled so that the bucket tip 44a moves along the target movement path Tc.

【0128】このように本実施形態によれば、傾斜、オ
フセット等のバケット位置の変化、ずれがあったとして
も、目標地形51を常に精度よく掘削することができ
る。
As described above, according to the present embodiment, the target terrain 51 can always be excavated with high accuracy even if there is a change or displacement of the bucket position such as inclination or offset.

【0129】・移動速度、移動経路の調整 第2の制御モードで自動掘削を行う場合上述した実施形
態では、移動速度が指定され、一定速度で目標移動経路
Tcに沿ってバケット先端44aが移動されるものとし
て説明した。しかし操作レバー11の操作量に応じた速
度でバケット先端44aを目標移動経路Tcに沿って移
動させるとともに、操作レバー12の操作量に応じた分
だけ目標移動経路Tcをオフセットさせてオフセットさ
れた移動経路T′c上に沿ってバケット先端44aを移
動させてもよい。
Adjustment of Traveling Speed and Traveling Path When Excavation is Performed in the Second Control Mode In the above-described embodiment, the traveling speed is specified, and the bucket tip 44a is moved at a constant speed along the target traveling path Tc. Described as However, the bucket tip 44a is moved along the target movement path Tc at a speed corresponding to the operation amount of the operation lever 11, and the movement is offset by offsetting the target movement path Tc by an amount corresponding to the operation amount of the operation lever 12. The bucket tip 44a may be moved along the path T'c.

【0130】すなわち目標移動経路Tc上の目標点{yt
o,zto}は、目標移動経路Tcの移動開始点Pto1から
の移動距離Sに応じて定まる。これはftを移動距離
S、目標移動経路Tcの関数としてつぎの式で表され
る。
That is, the target point {yt on the target movement route Tc
o, zto} is determined according to the movement distance S from the movement start point Pto1 of the target movement path Tc. This is expressed by the following equation, where ft is a function of the moving distance S and the target moving path Tc.

【0131】 {yto,zto}=ft(S,Tc) …(5) のように求まる。{Yto, zto} = ft (S, Tc) (5)

【0132】目標移動経路Tc上の移動速度vをv0一定
として移動距離Sを求めるとつぎのようになる。
When the moving distance S is determined with the moving speed v on the target moving route Tc being fixed at v0, the following is obtained.

【0133】S=v0・t …(6) となる。ただしv0は定数である。S = v0 · t (6) Here, v0 is a constant.

【0134】また移動速度vを一定とせずに操作レバー
11の操作量(操作角度)φに応じてサンプリング時刻
nにおける移動距離Snを求めると、flever1(φ)を
操作角度φの関数としてつぎのようになる。
When the moving distance Sn at the sampling time n is obtained according to the operation amount (operation angle) φ of the operation lever 11 without keeping the movement speed v constant, flever1 (φ) is calculated as a function of the operation angle φ as follows. Become like

【0135】Sn=Sn-1+flever1(φ) …(7) 移動速度vはv=flever1(φ)/tとなり操作レバー
11の操作角度φに応じて変化する。
Sn = Sn-1 + flever1 (φ) (7) The moving speed v becomes v = flever1 (φ) / t, and changes according to the operation angle φ of the operation lever 11.

【0136】移動速度v0が指定されている場合には上
記(6)式が(5)式に代入されて目標移動経路Tc上
の目標点{yto,zto}が演算される。操作レバー11
が操作された場合には上記(7)式が(5)式に代入さ
れて目標点{yto,zto}が演算される。
When the moving speed v0 is specified, the above equation (6) is substituted into the equation (5), and the target point {yto, zto} on the target moving path Tc is calculated. Operation lever 11
Is operated, the above equation (7) is substituted into the equation (5), and the target point {yto, zto} is calculated.

【0137】また操作レバー12の操作量(操作角度)
ηに応じて、目標移動経路Tcに対する逐次のオフセッ
ト量Fnを求めると、flever2(η)を操作角度ηの関
数としてつぎのようになる。
The operation amount (operation angle) of the operation lever 12
When the successive offset amount Fn with respect to the target movement route Tc is determined according to η, flever2 (η) is obtained as follows as a function of the operation angle η.

【0138】Fn=Fn-1+flever2(η) …(8) 操作レバー12が操作された場合には上記(8)式で得
られたオフセット量Fnが次式に示すようにY1軸上の
座標値ytoに加えられて新たな目標移動経路T′cが生
成される。
Fn = Fn-1 + flever2 (η) (8) When the operation lever 12 is operated, the offset amount Fn obtained by the above equation (8) is represented by the coordinate value on the Y1 axis as shown in the following equation. A new target movement route T'c is generated in addition to yto.

【0139】yto=yto+Fn …(9) Y1軸方向にオフセットする代わりにZ1軸方向にオフ
セットさせてもよい。この場合には上記(8)式で得ら
れたオフセット量Fnが次式に示すようにZ1軸上の座
標値ztoに加えられて新たな目標移動経路T′cが生成
される。
Yto = yto + Fn (9) Instead of offsetting in the Y1 axis direction, it may be offset in the Z1 axis direction. In this case, the offset amount Fn obtained by the above equation (8) is added to the coordinate value zto on the Z1 axis as shown in the following equation to generate a new target movement path T'c.

【0140】zto=zto+Fn …(10) なおY1軸、Z1軸のいずれにオフセットさせるかは、
目標経路Tcの角度によって自動的に決定される。
Zto = zto + Fn (10) Note that which of the Y1 axis and the Z1 axis is to be offset is
It is automatically determined by the angle of the target route Tc.

【0141】なおバケット44の角度θtoに関しては一
定にすることができる。ただし移動終了点Ptomが動作
範囲内に入らない場合には、移動終了点Ptomが動作範
囲内に入るようにバケット44の角度θtoを求め、移動
開始点Pto1から移動終了点Ptomまで一定の速度で補間
してもよい。
The angle θto of the bucket 44 can be made constant. However, when the movement end point Ptom does not fall within the operation range, the angle θto of the bucket 44 is determined so that the movement end point Ptom falls within the operation range, and the speed is constant at a constant speed from the movement start point Pto1 to the movement end point Ptom. Interpolation may be performed.

【0142】なお本実施形態ではブーム、アーム、バケ
ットといったリンク機構によって構成される作業機を備
えた建設機械に適用される場合について説明したが、こ
れに限定されることなく、あらゆる構造、形式の掘削用
作業機を備えた建設機械に適用することができる。
In this embodiment, the case where the present invention is applied to a construction machine having a working machine constituted by a link mechanism such as a boom, an arm, and a bucket has been described. The present invention can be applied to a construction machine having a working machine for excavation.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は実施形態の制御装置の構成例を示すブロ
ック図である。
FIG. 1 is a block diagram illustrating a configuration example of a control device according to an embodiment;

【図2】図2は実施形態の制御装置の他の構成例を示す
ブロック図である。
FIG. 2 is a block diagram illustrating another configuration example of the control device according to the embodiment;

【図3】図3(a)、(b)は、実施形態の油圧ショベ
ルの幾何的関係を示す図である。
FIGS. 3A and 3B are diagrams illustrating a geometric relationship of the excavator according to the embodiment;

【図4】図4(a)、(b)はオフセットブームを備え
た油圧ショベルの構成を示す図である。
FIGS. 4A and 4B are diagrams showing a configuration of a hydraulic shovel provided with an offset boom.

【図5】図5(a)、(b)、(c)は法面の形状のデ
ータの内容を概念的に示す図である。
FIGS. 5A, 5B, and 5C are diagrams conceptually showing the contents of slope surface shape data.

【図6】図6(a)、(b)は表示画面に表示される内
容を説明する図である。
FIGS. 6A and 6B are diagrams illustrating contents displayed on a display screen.

【図7】図7は表示画面に表示される内容を説明する図
である。
FIG. 7 is a diagram for explaining contents displayed on a display screen;

【図8】図8は表示画面に表示される内容を説明する図
である。
FIG. 8 is a diagram for explaining contents displayed on a display screen.

【図9】図9(a)、(b)は表示画面に表示される内
容を説明する図である。
FIGS. 9A and 9B are diagrams illustrating contents displayed on a display screen.

【図10】図10は掘削制御の内容を説明する図であ
る。
FIG. 10 is a diagram illustrating the contents of excavation control.

【図11】図11(a)、(b)、(c)は現在地形デ
ータから道路という構造物を生成するまでの手順を概念
的に示す図である。
FIGS. 11A, 11B, and 11C are diagrams conceptually showing a procedure until a structure called a road is generated from current terrain data.

【符号の説明】[Explanation of symbols]

11、12 操作レバー 13 操作切換スイッチ 21 作業機制御コントローラ 23 油圧シリンダ 25 外部コントローラ 24 グラフィックインターフェース 24a 表示画面 44 バケット 44a バケット先端 50 3次元現在地形 51 3次元目標地形 57 平面 58 交線 11, 12 Operation lever 13 Operation changeover switch 21 Work implement control controller 23 Hydraulic cylinder 25 External controller 24 Graphic interface 24a Display screen 44 Bucket 44a Bucket tip 50 3D current terrain 51 3D target terrain 57 Plane 58 Intersecting line

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 掘削用の作業機を作動させて3次元の地
形を3次元の目標地形にする掘削作業を行う建設機械に
適用され、当該掘削作業をガイダンスする建設機械の掘
削作業ガイダンス装置において、 前記掘削用作業機の3次元位置を計測する位置計測手段
と、 前記位置計測手段により計測した掘削用作業機の位置を
通過する平面を演算する平面演算手段と、 前記平面演算手段によって演算された平面を示すデータ
と、前記3次元目標地形を示すデータとに基づいて、前
記平面と前記3次元目標地形との交線を演算する交線演
算手段と、 前記交線演算手段によって演算された前記3次元目標地
形を示す交線の位置と前記掘削用作業機の位置との相対
位置関係を提示する提示手段とを具えたことを特徴とす
る建設機械の掘削作業ガイダンス装置。
The present invention relates to a construction machine excavation operation guidance apparatus for applying to a construction machine that performs an excavation operation to make a three-dimensional terrain a three-dimensional target terrain by operating an excavation work machine and guiding the excavation operation. Position measuring means for measuring a three-dimensional position of the excavating work machine; plane calculating means for calculating a plane passing through the position of the excavating work machine measured by the position measuring means; Intersection calculating means for calculating a line of intersection between the plane and the three-dimensional target terrain, based on the data indicating the three-dimensional target terrain and the data indicating the three-dimensional target terrain. A digging operation guidance device for a construction machine, comprising: a presentation means for presenting a relative positional relationship between a position of an intersection line indicating the three-dimensional target terrain and a position of the digging work machine. .
【請求項2】 作業機の先端部にバケットが設けられ、
当該作業機を作動させて3次元の地形を3次元の目標地
形にする掘削作業を行う建設機械に適用され、当該掘削
作業をガイダンスする建設機械の掘削作業ガイダンス装
置において、 前記バケットの3次元位置を計測する位置計測手段と、 前記位置計測手段により計測したバケット位置を通過す
る平面を演算する平面演算手段と、 前記平面演算手段によって演算された平面を示すデータ
と、前記3次元目標地形を示すデータとに基づいて、前
記平面と前記3次元目標地形との交線を演算する交線演
算手段と、 前記交線演算手段によって演算された前記3次元目標地
形を示す交線の位置と前記バケットの位置とを同一画面
上に表示する表示手段とを具えたことを特徴とする建設
機械の掘削作業ガイダンス装置。
2. A bucket is provided at a tip of the working machine,
The present invention is applied to a construction machine that performs an excavation operation to convert a three-dimensional terrain into a three-dimensional target terrain by operating the work machine, and a digging operation guidance device for the construction machine that guides the digging operation. , A plane calculating means for calculating a plane passing through the bucket position measured by the position measuring means, data indicating the plane calculated by the plane calculating means, and indicating the three-dimensional target terrain. An intersection calculating means for calculating an intersection between the plane and the three-dimensional target terrain based on the data; a position of the intersection indicating the three-dimensional target terrain calculated by the intersection calculating means; And a display means for displaying the position of the excavator on the same screen.
【請求項3】 前記位置計測手段は、前記バケットの先
端の3次元位置を計測するものであり、 前記平面演算手段は、前記バケットの先端位置を通過す
る平面を演算するものであることを特徴とする請求項2
記載の建設機械の掘削作業ガイダンス装置。
3. The position measuring means measures a three-dimensional position of a tip of the bucket, and the plane calculating means calculates a plane passing through the position of the tip of the bucket. Claim 2
An excavation work guidance device for a construction machine according to the above.
【請求項4】 前記掘削用作業機または前記バケットは
アクチュエータが駆動されることにより作動するもので
あり、 前記平面演算手段は、前記アクチュエータが駆動された
ときに前記掘削用作業機または前記バケットが作動する
面を含む平面を演算するものであることを特徴とする請
求項1または2記載の建設機械の掘削作業ガイダンス装
置。
4. The excavating work machine or the bucket operates when an actuator is driven, and the plane calculating means is configured to control the excavating work machine or the bucket when the actuator is driven. The excavation work guidance device for a construction machine according to claim 1 or 2, wherein a plane including an operating surface is calculated.
【請求項5】 現在の3次元地形データと、目標構造物
の縁部の形状を示すデータと、法面の形状を示すデータ
とに基づいて、前記目標構造物の縁部を法尻とする3次
元目標地形のデータを作成する3次元目標地形データ作
成手段をさらに具えたことを特徴とする請求項1または
2記載の建設機械の掘削作業ガイダンス装置。
5. An edge of the target structure is defined as a bottom based on current three-dimensional topographic data, data indicating the shape of the edge of the target structure, and data indicating the shape of the slope. The excavation work guidance device for a construction machine according to claim 1 or 2, further comprising a three-dimensional target terrain data creating means for creating three-dimensional target terrain data.
【請求項6】 掘削用の作業機を作動させて3次元の地
形を3次元の目標地形にする掘削作業を行う建設機械に
適用され、前記掘削用作業機を制御する建設機械の掘削
制御装置において、 前記掘削用作業機の3次元位置を計測する位置計測手段
と、 前記位置計測手段により計測した掘削用作業機の位置を
通過する平面を演算する平面演算手段と、 前記平面演算手段によって演算された平面を示すデータ
と、前記3次元目標地形を示すデータとに基づいて、前
記平面と前記3次元目標地形との交線を演算する交線演
算手段と、 前記交線演算手段によって演算された前記3次元目標地
形を示す交線を、目標移動経路とし、当該目標移動経路
に沿って前記掘削用作業機が移動するように当該掘削用
作業機を制御する制御手段とを具えたことを特徴とする
建設機械の掘削制御装置。
6. An excavation control device for a construction machine, which is applied to a construction machine that performs an excavation operation by operating a work machine for excavation to convert a three-dimensional terrain into a three-dimensional target terrain, and controls the work machine for excavation. In the above, a position measuring means for measuring a three-dimensional position of the excavating work machine, a plane calculating means for calculating a plane passing through the position of the excavating work machine measured by the position measuring means, and a calculation by the plane calculating means Intersection calculating means for calculating an intersection between the plane and the three-dimensional target terrain, based on the data indicating the obtained plane and the data indicating the three-dimensional target terrain, And control means for controlling the excavating work machine so that the excavating work machine moves along the target moving route. Characteristic Excavation control system for a construction machine to be.
【請求項7】 掘削用の作業機を作動させて3次元の地
形を3次元の目標地形にする掘削作業を行う建設機械に
適用され、掘削用操作手段の操作に応じて前記掘削用作
業機を制御する作業機コントローラを備えた建設機械の
掘削制御装置において、 前記建設機械に外部より装着自在であって、前記3次元
目標地形のデータを、前記作業機コントローラに出力す
る外部コントローラと、 前記掘削用操作手段の操作に応じて前記掘削用作業機を
制御する第1の制御モードと、前記3次元目標地形デー
タに基づき当該3次元目標地形上の目標移動経路に沿っ
て前記掘削用作業機が移動するように当該掘削用作業機
を制御する第2の制御モードのいずれかの制御モードを
選択する制御モード選択手段と、 前記外部コントローラが前記建設機械に装着されている
か否かを判断する判断手段と、 前記判断手段によって前記外部コントローラが前記建設
機械に装着されていると判断された場合には、前記制御
モード選択手段の選択結果に応じた制御モードを前記作
業機コントローラで実行させ、前記判断手段によって前
記外部コントローラが前記建設機械に装着されていない
と判断された場合には、前記制御モード選択手段の選択
いかんにかかわらず前記第1の制御モードを前記作業機
コントローラで実行させることを特徴とする建設機械の
掘削制御装置。
7. A digging work machine which is applied to a construction machine which performs digging work by operating a digging work machine to convert a three-dimensional terrain into a three-dimensional target terrain, and in accordance with an operation of a digging operation means. An excavation control device for a construction machine including a work machine controller for controlling the work machine, an external controller which is attachable to the construction machine from the outside and outputs the three-dimensional target terrain data to the work machine controller, A first control mode for controlling the excavating work machine in accordance with an operation of the excavating operation means, and the excavating work machine along a target movement path on the three-dimensional target terrain based on the three-dimensional target terrain data Control mode selecting means for selecting one of the second control modes for controlling the excavating work machine such that the excavating work machine moves, and the external controller is mounted on the construction machine. Determining means for determining whether or not the external controller is mounted on the construction machine by the determining means, and setting a control mode according to the selection result of the control mode selecting means. The first control mode is executed by the work machine controller, and when the determination unit determines that the external controller is not mounted on the construction machine, the first control mode is set regardless of the selection of the control mode selection unit. An excavation control device for a construction machine, which is executed by the work machine controller.
JP28167999A 1999-10-01 1999-10-01 Excavating work guidance device and excavation control device for construction machine Pending JP2001098585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28167999A JP2001098585A (en) 1999-10-01 1999-10-01 Excavating work guidance device and excavation control device for construction machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28167999A JP2001098585A (en) 1999-10-01 1999-10-01 Excavating work guidance device and excavation control device for construction machine

Publications (1)

Publication Number Publication Date
JP2001098585A true JP2001098585A (en) 2001-04-10

Family

ID=17642483

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28167999A Pending JP2001098585A (en) 1999-10-01 1999-10-01 Excavating work guidance device and excavation control device for construction machine

Country Status (1)

Country Link
JP (1) JP2001098585A (en)

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002181538A (en) * 2000-12-14 2002-06-26 Topcon Corp Worked end position detector using gps
JP2002310652A (en) * 2001-04-18 2002-10-23 Hitachi Constr Mach Co Ltd Position measuring system for traveling construction machine
WO2003000997A1 (en) * 2001-06-20 2003-01-03 Hitachi Construction Machinery Co., Ltd. Remote control system and remote setting system of construction machinery
JP2003064725A (en) * 2001-08-28 2003-03-05 Maeda Corp Unmanned mechanical earth work system
WO2004027164A1 (en) * 2002-09-17 2004-04-01 Hitachi Construction Machinery Co., Ltd. Excavation teaching apparatus for construction machine
WO2004031689A1 (en) 2002-10-02 2004-04-15 Hitachi Construction Machinery Co., Ltd. Position measuring system of working machine
JP2006057448A (en) * 2004-08-23 2006-03-02 Topcon Positioning Systems Inc Dynamic stabilization and control of ground leveling machinery
US7513070B2 (en) 2003-06-19 2009-04-07 Hitachi Construction Machinery Co., Ltd. Work support and management system for working machine
WO2012114872A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Hydraulic shovel display system and method for controlling same
WO2012114871A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Hydraulic shovel position guide system and method for controlling same
WO2012114870A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Hydraulic shovel operability range display device and method for controlling same
WO2012114869A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Display system of hydraulic shovel, and control method therefor
WO2012114873A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Excavator display system and method for controlling same
JP2012215070A (en) * 2012-08-02 2012-11-08 Komatsu Ltd Operational range display unit for hydraulic shovel and control method thereof
JP2012233404A (en) * 2012-08-02 2012-11-29 Komatsu Ltd Display system for excavator and control method thereof
CN103569915A (en) * 2012-08-01 2014-02-12 株式会社多田野 Working range diagram and working range diagram-display apparatus
JP2014148893A (en) * 2014-05-30 2014-08-21 Komatsu Ltd Display system of hydraulic shovel
JP2014224452A (en) * 2014-08-06 2014-12-04 株式会社小松製作所 Excavation control system for hydraulic excavator
WO2015037642A1 (en) 2013-09-12 2015-03-19 日立建機株式会社 Computation device and computation method of basic information for excavation area-limiting control, and construction equipment
CN104781478A (en) * 2012-11-19 2015-07-15 株式会社小松制作所 Excavator display system and excavator
WO2016043270A1 (en) * 2014-09-18 2016-03-24 住友建機株式会社 Shovel
JP2016079677A (en) * 2014-10-16 2016-05-16 日立建機株式会社 Area limited excavation control device and construction machine
WO2016098741A1 (en) * 2014-12-16 2016-06-23 住友建機株式会社 Shovel and shovel control method
JP2016160741A (en) * 2015-03-05 2016-09-05 株式会社小松製作所 Image display system for work machine, remote operation system for work machine, and work machine
JP2016176240A (en) * 2015-03-19 2016-10-06 住友建機株式会社 Shovel
CN106013311A (en) * 2015-03-27 2016-10-12 住友建机株式会社 Excavator
CN106460361A (en) * 2016-05-31 2017-02-22 株式会社小松制作所 A control system for a work machine, the work machine, and a control method of the work machine
US20170175362A1 (en) * 2014-09-09 2017-06-22 Komatsu Ltd. Display system of excavation machine, excavation machine, and image display method
WO2018151310A1 (en) * 2017-02-20 2018-08-23 株式会社小松製作所 Work vehicle and work vehicle control method
JP2018135758A (en) * 2018-06-07 2018-08-30 株式会社小松製作所 Excavation control system for hydraulic shovel
JP2018141363A (en) * 2018-06-20 2018-09-13 住友建機株式会社 Shovel, display method of shovel, and display unit of shovel
KR20190055098A (en) * 2016-09-30 2019-05-22 스미토모 겐키 가부시키가이샤 Shovel
WO2019116842A1 (en) * 2017-12-14 2019-06-20 日立建機株式会社 Work machine
CN110554411A (en) * 2018-06-01 2019-12-10 中国电建集团华东勘测设计研究院有限公司 Tree pit positioning device with automatic lofting system and positioning method thereof
WO2019234908A1 (en) * 2018-06-08 2019-12-12 日本電気株式会社 Shaping device, control method, and recording medium having control program recorded thereon
CN110644563A (en) * 2018-06-26 2020-01-03 卡特彼勒公司 System and method for constructing a mat
JPWO2019012700A1 (en) * 2017-07-14 2020-05-07 株式会社小松製作所 Work machine and work machine control method
WO2020122044A1 (en) * 2018-12-13 2020-06-18 株式会社小松製作所 Work machine, system including work machine, and method for controlling work machine
CN111708067A (en) * 2020-08-04 2020-09-25 中国铁道科学研究院集团有限公司铁道建筑研究所 Automatic guide system of excavator
JP2021038649A (en) * 2020-10-08 2021-03-11 株式会社小松製作所 Image display system for work machine, remote operation system for work machine, work machine, and image display method for work machine
JP2022059042A (en) * 2016-03-16 2022-04-12 住友重機械工業株式会社 Shovel, and measurement system of shovel
CN115110598A (en) * 2022-08-10 2022-09-27 安徽建工集团股份有限公司总承包分公司 Three-dimensional fitting site excavation crushing device
WO2023063131A1 (en) * 2021-10-15 2023-04-20 株式会社小松製作所 Display system and display method for work machine

Cited By (113)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002181538A (en) * 2000-12-14 2002-06-26 Topcon Corp Worked end position detector using gps
JP2002310652A (en) * 2001-04-18 2002-10-23 Hitachi Constr Mach Co Ltd Position measuring system for traveling construction machine
WO2003000997A1 (en) * 2001-06-20 2003-01-03 Hitachi Construction Machinery Co., Ltd. Remote control system and remote setting system of construction machinery
US6782644B2 (en) 2001-06-20 2004-08-31 Hitachi Construction Machinery Co., Ltd. Remote control system and remote setting system for construction machinery
JP2003064725A (en) * 2001-08-28 2003-03-05 Maeda Corp Unmanned mechanical earth work system
WO2004027164A1 (en) * 2002-09-17 2004-04-01 Hitachi Construction Machinery Co., Ltd. Excavation teaching apparatus for construction machine
US7532967B2 (en) * 2002-09-17 2009-05-12 Hitachi Construction Machinery Co., Ltd. Excavation teaching apparatus for construction machine
WO2004031689A1 (en) 2002-10-02 2004-04-15 Hitachi Construction Machinery Co., Ltd. Position measuring system of working machine
US7831362B2 (en) 2002-10-02 2010-11-09 Hitachi Construction Machinery Co., Ltd. Position measuring system for working machine
US7513070B2 (en) 2003-06-19 2009-04-07 Hitachi Construction Machinery Co., Ltd. Work support and management system for working machine
JP2006057448A (en) * 2004-08-23 2006-03-02 Topcon Positioning Systems Inc Dynamic stabilization and control of ground leveling machinery
DE112012000113B4 (en) * 2011-02-22 2014-11-13 Komatsu Ltd. Display system in a hydraulic excavator and control method therefor
US8942895B2 (en) 2011-02-22 2015-01-27 Komatsu Ltd. Display system of hydraulic shovel, and control method therefor
WO2012114870A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Hydraulic shovel operability range display device and method for controlling same
WO2012114869A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Display system of hydraulic shovel, and control method therefor
WO2012114873A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Excavator display system and method for controlling same
JP2012172426A (en) * 2011-02-22 2012-09-10 Komatsu Ltd Display system of hydraulic shovel and control method for the same
JP2012172427A (en) * 2011-02-22 2012-09-10 Komatsu Ltd Workable range display device of hydraulic shovel and control method for the same
JP2012172425A (en) * 2011-02-22 2012-09-10 Komatsu Ltd Display system of hydraulic shovel and control method for the same
JP2012172429A (en) * 2011-02-22 2012-09-10 Komatsu Ltd Display system of excavation machine and control method for the same
JP2012172428A (en) * 2011-02-22 2012-09-10 Komatsu Ltd Position guidance system of hydraulic shovel and control method for position guidance system
WO2012114872A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Hydraulic shovel display system and method for controlling same
US9435106B2 (en) 2011-02-22 2016-09-06 Komatsu Ltd. Display system in an excavator and method for controlling same
CN103080434A (en) * 2011-02-22 2013-05-01 株式会社小松制作所 Hydraulic shovel position guide system and method for controlling same
CN103080437A (en) * 2011-02-22 2013-05-01 株式会社小松制作所 Display system of hydraulic shovel, and control method therefor
CN103080432A (en) * 2011-02-22 2013-05-01 株式会社小松制作所 Hydraulic shovel display system and method for controlling same
CN103080436A (en) * 2011-02-22 2013-05-01 株式会社小松制作所 Hydraulic shovel operability range display device and method for controlling same
KR20130044335A (en) * 2011-02-22 2013-05-02 가부시키가이샤 고마쓰 세이사쿠쇼 Excavator display system and method for controlling same
DE112012000111T5 (en) 2011-02-22 2013-07-04 Komatsu Ltd. Device for indicating a possible working area in a hydraulic excavator and method for controlling the same
DE112012000107T5 (en) 2011-02-22 2013-07-04 Komatsu Ltd. Hydraulic excavator position control system and method for controlling the same
US8498806B2 (en) 2011-02-22 2013-07-30 Komatsu Ltd. Hydraulic shovel positional guidance system and method of controlling same
KR101654113B1 (en) 2011-02-22 2016-09-05 가부시키가이샤 고마쓰 세이사쿠쇼 Excavator display system and method for controlling same
KR101411454B1 (en) 2011-02-22 2014-06-24 가부시키가이샤 고마쓰 세이사쿠쇼 Display system of hydraulic shovel, and control method therefor
DE112012000107B4 (en) * 2011-02-22 2015-10-29 Komatsu Ltd. Hydraulic excavator position control system and method for controlling the same
KR101443769B1 (en) * 2011-02-22 2014-09-23 가부시키가이샤 고마쓰 세이사쿠쇼 Hydraulic shovel position guide system and method for controlling same
US8886416B2 (en) 2011-02-22 2014-11-11 Komatsu Ltd. Hydraulic shovel operability range display device and method for controlling same
US10267020B2 (en) 2011-02-22 2019-04-23 Komatsu Ltd. Display system in an excavator and method for controlling same
US8903604B2 (en) 2011-02-22 2014-12-02 Komatsu Ltd. Display system in hydraulic shovel and control method therefor
DE112012000111B4 (en) * 2011-02-22 2015-05-07 Komatsu Ltd. Device for indicating a possible working area in a hydraulic excavator and method for controlling the same
DE112012000119B4 (en) * 2011-02-22 2014-12-24 Komatsu Ltd. Display system in an excavator and method for controlling the same
DE112012000106B4 (en) * 2011-02-22 2014-12-31 Komatsu Ltd. Display system in a hydraulic excavator and control method therefor
CN103080436B (en) * 2011-02-22 2015-01-21 株式会社小松制作所 Hydraulic shovel operability range display device and method for controlling same
WO2012114871A1 (en) * 2011-02-22 2012-08-30 株式会社小松製作所 Hydraulic shovel position guide system and method for controlling same
CN103080434B (en) * 2011-02-22 2015-04-15 株式会社小松制作所 Hydraulic shovel position guide system and method for controlling same
CN103569915A (en) * 2012-08-01 2014-02-12 株式会社多田野 Working range diagram and working range diagram-display apparatus
JP2012215070A (en) * 2012-08-02 2012-11-08 Komatsu Ltd Operational range display unit for hydraulic shovel and control method thereof
JP2012233404A (en) * 2012-08-02 2012-11-29 Komatsu Ltd Display system for excavator and control method thereof
CN104781478A (en) * 2012-11-19 2015-07-15 株式会社小松制作所 Excavator display system and excavator
US9469969B2 (en) 2013-09-12 2016-10-18 Hitachi Construction Machinery Co., Ltd. Device and method for calculating basic information for area limiting excavation control, and construction machinery
EP3045589A4 (en) * 2013-09-12 2017-04-26 Hitachi Construction Machinery Co., Ltd. Computation device and computation method of basic information for excavation area-limiting control, and construction equipment
WO2015037642A1 (en) 2013-09-12 2015-03-19 日立建機株式会社 Computation device and computation method of basic information for excavation area-limiting control, and construction equipment
JP2014148893A (en) * 2014-05-30 2014-08-21 Komatsu Ltd Display system of hydraulic shovel
JP2014224452A (en) * 2014-08-06 2014-12-04 株式会社小松製作所 Excavation control system for hydraulic excavator
US10161111B2 (en) * 2014-09-09 2018-12-25 Komatsu Ltd. Display system of excavation machine, excavation machine, and image display method
US20170175362A1 (en) * 2014-09-09 2017-06-22 Komatsu Ltd. Display system of excavation machine, excavation machine, and image display method
WO2016043270A1 (en) * 2014-09-18 2016-03-24 住友建機株式会社 Shovel
KR102406097B1 (en) * 2014-09-18 2022-06-07 스미토모 겐키 가부시키가이샤 Shovel
EP3196368A4 (en) * 2014-09-18 2017-09-06 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel
US10100497B2 (en) 2014-09-18 2018-10-16 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel
KR20170056560A (en) * 2014-09-18 2017-05-23 스미토모 겐키 가부시키가이샤 Shovel
CN106715803A (en) * 2014-09-18 2017-05-24 住友建机株式会社 Shovel
JPWO2016043270A1 (en) * 2014-09-18 2017-06-29 住友建機株式会社 Excavator
JP2016079677A (en) * 2014-10-16 2016-05-16 日立建機株式会社 Area limited excavation control device and construction machine
JPWO2016098741A1 (en) * 2014-12-16 2017-09-28 住友建機株式会社 Excavator and control method of excavator
KR20170095890A (en) * 2014-12-16 2017-08-23 스미토모 겐키 가부시키가이샤 Shovel and Shovel Control Method
KR102447168B1 (en) 2014-12-16 2022-09-23 스미토모 겐키 가부시키가이샤 Shovel and Shovel Control Method
US10584466B2 (en) 2014-12-16 2020-03-10 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
JP2018188958A (en) * 2014-12-16 2018-11-29 住友建機株式会社 Shovel and method for controlling the shovel
WO2016098741A1 (en) * 2014-12-16 2016-06-23 住友建機株式会社 Shovel and shovel control method
US11384515B2 (en) 2015-03-05 2022-07-12 Komatsu Ltd. Image display system for work machine, remote operation system for work machine, and work machine
US10829910B2 (en) 2015-03-05 2020-11-10 Komatsu Ltd. Image display system for work machine, remote operation system for work machine, and work machine
JP2016160741A (en) * 2015-03-05 2016-09-05 株式会社小松製作所 Image display system for work machine, remote operation system for work machine, and work machine
JP2016176240A (en) * 2015-03-19 2016-10-06 住友建機株式会社 Shovel
CN106013311A (en) * 2015-03-27 2016-10-12 住友建机株式会社 Excavator
CN106013311B (en) * 2015-03-27 2021-01-29 住友建机株式会社 Excavator
JP7305823B2 (en) 2016-03-16 2023-07-10 住友重機械工業株式会社 Excavator and measurement system for excavator
JP2022059042A (en) * 2016-03-16 2022-04-12 住友重機械工業株式会社 Shovel, and measurement system of shovel
CN106460361A (en) * 2016-05-31 2017-02-22 株式会社小松制作所 A control system for a work machine, the work machine, and a control method of the work machine
CN109804121A (en) * 2016-09-30 2019-05-24 住友建机株式会社 Excavator
KR102463068B1 (en) 2016-09-30 2022-11-02 스미토모 겐키 가부시키가이샤 shovel
CN109804121B (en) * 2016-09-30 2022-03-08 住友建机株式会社 Excavator
KR20190055098A (en) * 2016-09-30 2019-05-22 스미토모 겐키 가부시키가이샤 Shovel
WO2018151310A1 (en) * 2017-02-20 2018-08-23 株式会社小松製作所 Work vehicle and work vehicle control method
JP2018135649A (en) * 2017-02-20 2018-08-30 株式会社小松製作所 Work vehicle and control method of work vehicle
JP7001350B2 (en) 2017-02-20 2022-01-19 株式会社小松製作所 Work vehicle and control method of work vehicle
US11168458B2 (en) 2017-02-20 2021-11-09 Komatsu Ltd. Work vehicle and method of controlling work vehicle
JPWO2019012700A1 (en) * 2017-07-14 2020-05-07 株式会社小松製作所 Work machine and work machine control method
US11047108B2 (en) 2017-07-14 2021-06-29 Komatsu Ltd. Work machine and control method for work machine
KR20200087744A (en) * 2017-12-14 2020-07-21 히다찌 겐끼 가부시키가이샤 Working machine
WO2019116842A1 (en) * 2017-12-14 2019-06-20 日立建機株式会社 Work machine
US11555294B2 (en) 2017-12-14 2023-01-17 Hitachi Construction Machinery Co., Ltd. Work machine
JP2019105137A (en) * 2017-12-14 2019-06-27 日立建機株式会社 Work machine
CN111032967B (en) * 2017-12-14 2022-02-25 日立建机株式会社 Working machine
CN111032967A (en) * 2017-12-14 2020-04-17 日立建机株式会社 Working machine
KR102378143B1 (en) * 2017-12-14 2022-03-24 히다찌 겐끼 가부시키가이샤 working machine
CN110554411A (en) * 2018-06-01 2019-12-10 中国电建集团华东勘测设计研究院有限公司 Tree pit positioning device with automatic lofting system and positioning method thereof
JP2018135758A (en) * 2018-06-07 2018-08-30 株式会社小松製作所 Excavation control system for hydraulic shovel
WO2019234908A1 (en) * 2018-06-08 2019-12-12 日本電気株式会社 Shaping device, control method, and recording medium having control program recorded thereon
JP2018141363A (en) * 2018-06-20 2018-09-13 住友建機株式会社 Shovel, display method of shovel, and display unit of shovel
US11761173B2 (en) 2018-06-26 2023-09-19 Caterpillar Inc. Systems and methods for building a pad
CN110644563A (en) * 2018-06-26 2020-01-03 卡特彼勒公司 System and method for constructing a mat
WO2020122044A1 (en) * 2018-12-13 2020-06-18 株式会社小松製作所 Work machine, system including work machine, and method for controlling work machine
KR102606721B1 (en) 2018-12-13 2023-11-24 가부시키가이샤 고마쓰 세이사쿠쇼 Working machine, system including working machine, and control method of working machine
JP2020094427A (en) * 2018-12-13 2020-06-18 株式会社小松製作所 Work machine, system including work machine, and control method for work machine
JP7197342B2 (en) 2018-12-13 2022-12-27 株式会社小松製作所 WORKING MACHINE, SYSTEM INCLUDING WORKING MACHINE, AND CONTROL METHOD FOR WORKING MACHINE
KR20210068527A (en) * 2018-12-13 2021-06-09 가부시키가이샤 고마쓰 세이사쿠쇼 A working machine, a system comprising the working machine, and a method of controlling the working machine
CN111708067B (en) * 2020-08-04 2022-04-12 中国铁道科学研究院集团有限公司铁道建筑研究所 Automatic guide system of excavator
CN111708067A (en) * 2020-08-04 2020-09-25 中国铁道科学研究院集团有限公司铁道建筑研究所 Automatic guide system of excavator
JP7131779B2 (en) 2020-10-08 2022-09-06 株式会社小松製作所 Image display system for working machine, remote control system for working machine, working machine, and image display method for working machine
JP2021038649A (en) * 2020-10-08 2021-03-11 株式会社小松製作所 Image display system for work machine, remote operation system for work machine, work machine, and image display method for work machine
WO2023063131A1 (en) * 2021-10-15 2023-04-20 株式会社小松製作所 Display system and display method for work machine
CN115110598A (en) * 2022-08-10 2022-09-27 安徽建工集团股份有限公司总承包分公司 Three-dimensional fitting site excavation crushing device
CN115110598B (en) * 2022-08-10 2023-11-28 安徽建工集团股份有限公司总承包分公司 Three-dimensional fitting field excavating and crushing device

Similar Documents

Publication Publication Date Title
JP2001098585A (en) Excavating work guidance device and excavation control device for construction machine
JP5054832B2 (en) Hydraulic excavator display system and control method thereof
KR100353566B1 (en) A slope excavation control device of a hydraulic excavator, a target slope setting device, and a slope excavation forming method
US7079931B2 (en) Positioning system for an excavating work machine
JP5791827B2 (en) Work vehicle
KR101512254B1 (en) Display system of excavating machine and excavating machine
KR101654113B1 (en) Excavator display system and method for controlling same
JP5921692B1 (en) Excavator control system and excavator
US20140064897A1 (en) Single stick operation of a work tool
JPH1088625A (en) Automatic excavation machine and method, and automatic loading method
KR20130069744A (en) Hydraulic shovel position guide system and method for controlling same
US7113105B2 (en) Work machine display system
JP6974217B2 (en) Construction management equipment
JP2012172431A (en) Display system of hydraulic shovel and control method for the same
JPWO2019175917A1 (en) Work machine
JP2001159518A (en) Tool position measuring device of construction machine, yaw angle detecting device, work machine automatic control device and calibration device
JP6918716B2 (en) Construction machinery
JP2024045752A (en) How to control a swing work vehicle
JP4526689B2 (en) Construction machine construction guidance system
WO2019230121A1 (en) Control device and control method
WO2021241258A1 (en) Excavation plan creation device, working machine, and excavation plan creation method
JP6894464B2 (en) Work machine, control method of work machine, control method of construction management device and construction management device
JP7317926B2 (en) Construction management device, display device and construction management method
JP2023122748A (en) Work position instruction system
JP6745839B2 (en) Excavator control system for hydraulic excavator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050906

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070906

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070918

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02