JP2001055830A - Connecting device - Google Patents

Connecting device

Info

Publication number
JP2001055830A
JP2001055830A JP11230630A JP23063099A JP2001055830A JP 2001055830 A JP2001055830 A JP 2001055830A JP 11230630 A JP11230630 A JP 11230630A JP 23063099 A JP23063099 A JP 23063099A JP 2001055830 A JP2001055830 A JP 2001055830A
Authority
JP
Japan
Prior art keywords
steel pipe
coupling
hole
holder member
flange member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11230630A
Other languages
Japanese (ja)
Other versions
JP4040802B2 (en
Inventor
Eiichi Aikawa
映一 合川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Sangyo Co Ltd
Original Assignee
Asahi Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=16910805&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2001055830(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Asahi Sangyo Co Ltd filed Critical Asahi Sangyo Co Ltd
Priority to JP23063099A priority Critical patent/JP4040802B2/en
Publication of JP2001055830A publication Critical patent/JP2001055830A/en
Application granted granted Critical
Publication of JP4040802B2 publication Critical patent/JP4040802B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a connecting device capable of providing an excellent controllability and workability at the time of connecting and disassembly, reducing a size, and also reducing a clearance from occurring between a side surface of a working scaffold or timbering and a side edge of a scaffolding board. SOLUTION: A hole 5 for connecting is provided in a flange member 1 fixed to the outer periphery of one steel pipe A, and a notch 9 inserted onto a thickness of the flange member 1 is provided in a holder member 2 fixed to the end part of the other steel pipe B. A connecting member 3 inserted into the connecting hole 5 in the flange member 1 is stored in the holder member 2, and a wedge part 10 of the connecting member 3 is inserted into the connecting hole 5. Thus, a tip wall 6 of the holder member 2 is held by the outer peripheral surface of one steel pipe A, and the other steel pipe B is connected to the outer peripheral surface of one steel pipe A.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、鋼管を直角状に
結合して仮設構造物等を構築するために用いる結合装置
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a connecting device for connecting steel pipes at right angles to construct a temporary structure or the like.

【0002】[0002]

【従来の技術】例えば、鋼管を用いて作業足場や支保工
のような仮設構造物は、鋼管の継ぎ足しと共に、鋼管を
直角状に結合して構築するものであり、このため、鋼管
を直角状に結合する結合装置が必要になる。
2. Description of the Related Art For example, temporary structures such as work scaffolds and supports using steel pipes are constructed by connecting steel pipes at right angles together with the addition of steel pipes. A coupling device for coupling to the above is required.

【0003】従来、鋼管を直角状に結合するために用い
られている一般的な結合装置は、互いに結合せんとする
鋼管の一方鋼管の外周に、結合用の孔が設けられたフラ
ンジ部材を固定し、多方鋼管の端部にフランジ部材の厚
みに対して外嵌挿する切り欠きが設けられたホルダー部
材を固定し、このホルダー部材をフランジ部材に外嵌挿
した状態で、ホルダー部材上からフランジ部材の結合用
の孔に楔を打ち込むことにより、両鋼管を直角状に結合
する構造になっている。
Conventionally, a general connecting device used for connecting steel pipes at right angles is to fix a flange member provided with a hole for connection on the outer periphery of one of the steel pipes to be connected to each other. Then, a holder member provided with a notch for external fitting to the thickness of the flange member at the end of the multi-directional steel pipe is fixed, and the holder member is externally fitted to the flange member. The two steel pipes are connected at right angles by driving a wedge into the connection holes of the members.

【0004】[0004]

【発明が解決しようとする課題】ところで、上記のよう
な結合装置は、解体時に結合用の孔に打ち込む楔をホル
ダー部材から完全に抜き取る必要があるため、楔がホル
ダー部材から分離し、その管理が面倒になるだけでな
く、結合や解体時の操作性や作業性が悪く、特に解体時
において、楔の下端を打ち上げる作業と楔を持ち上げる
作業は両手で行わなければならず、作業に両手を取られ
ることは、安全の確保の上から好ましくないという問題
がある。
However, in the above-described connecting device, the wedge to be driven into the connecting hole at the time of disassembly must be completely removed from the holder member. Not only is it troublesome, but also the operability and workability during connection and disassembly are poor.Especially at the time of disassembly, the work of lifting the lower end of the wedge and the work of lifting the wedge must be performed with both hands. There is a problem that taking it is not preferable from the viewpoint of ensuring safety.

【0005】また、作業足場や支保工においては、通路
の確保のために水平材の間に足場板をかけ渡す必要があ
るが、このとき、作業足場や支保工の側面と足場板の側
縁間にできるだけ隙間の発生がないようにしなければな
らないが、上記従来の結合装置においては、全体の形状
が大型化し、ホルダー部材上に楔の広幅となる上端が突
出しているため、足場板の側縁をこのホルダー部材から
内側に逃がさなければならず、従って、作業足場や支保
工の側面と足場板の側縁間に広い隙間が発生し、安全性
の面から好ましくない。
[0005] Further, in the case of working scaffolds and shoring, it is necessary to pass a scaffold plate between horizontal members in order to secure a passage. Although it is necessary to make the gap as small as possible between them, in the above-mentioned conventional coupling device, since the whole shape is enlarged and the wide upper end of the wedge projects on the holder member, the side of the scaffold plate is The rim must be released inward from the holder member, so that a large gap is generated between the side surface of the work scaffold or the shoring and the side edge of the scaffold plate, which is not preferable in terms of safety.

【0006】そこで、この発明の課題は、結合や解体時
の操作性や作業性がよく、コンパクトで作業足場や支保
工の側面と足場板の側縁間の隙間の発生を少なくするこ
とができる結合装置を提供することにある。
SUMMARY OF THE INVENTION An object of the present invention is to improve the operability and workability at the time of connection and disassembly, and to reduce the generation of a gap between the side surface of the work scaffold or the support and the side edge of the scaffold plate. It is to provide a coupling device.

【0007】[0007]

【課題を解決するための手段】上記のような課題を解決
するため、請求項1の発明は、互いに結合せんとする鋼
管の一方鋼管の外周に固定され、結合用の孔が設けられ
たフランジ部材と、他方鋼管の端部に固定され、フラン
ジ部材の厚みに対して外嵌挿する切り欠きが先端部から
他方鋼管の軸方向に沿って設けられ、その先端壁を一方
鋼管の外周に当接させることができるホルダー部材と、
このホルダー部材内でフランジ部材の結合用の孔に差し
込む結合部材とからなり、前記ホルダー部材は切り欠き
をフランジ部材に外嵌挿することにより、他方鋼管の軸
心を中心とする回転を阻止し、前記結合部材が、結合用
の孔に対して差し込むことにより、ホルダー部材の先端
壁を一方鋼管の外周面とで挟持するように形成されてい
る構成を採用したものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, a first aspect of the present invention is a flange which is fixed to an outer periphery of one of steel pipes to be connected to each other and has a hole for connection. A member and a notch fixed to the end of the other steel pipe and externally inserted with respect to the thickness of the flange member are provided from the front end along the axial direction of the other steel pipe, and the front end wall is applied to the outer periphery of the one steel pipe. A holder member that can be in contact with the
A coupling member inserted into a coupling hole of the flange member within the holder member, wherein the holder member prevents rotation around the axis of the other steel pipe by inserting a notch outside the flange member. The coupling member is formed so as to be inserted into the coupling hole so as to sandwich the distal end wall of the holder member with the outer peripheral surface of the steel pipe.

【0008】請求項2の発明は、請求項1の発明におい
て、前記結合部材が、結合用の孔に対して差し込む楔部
と、フランジ部材の外周と他方鋼管の端部間に納まる杆
状部とを二又状の配置で連成し、上記杆状部の楔部に臨
む側縁の途中に、ホルダー部材の下部に設けた仮置き部
に対する係止段部を設けて形成されている構成を採用し
たものである。
According to a second aspect of the present invention, in the first aspect of the present invention, the coupling member has a wedge portion inserted into the coupling hole, and a rod-shaped portion which is fitted between the outer periphery of the flange member and the other end of the steel pipe. Are formed in a bifurcated arrangement, and a locking step is provided in the middle of the side edge facing the wedge portion of the rod-shaped portion with respect to the temporary placing portion provided below the holder member. Is adopted.

【0009】請求項3の発明は、請求項2の発明におい
て、前記結合部材は、杆状部に設けた係止段部を仮置き
部に係止した仮置き姿勢で、楔部の下部先端がホルダー
部材の切り欠きよりも上部に位置し、ホルダー部材の切
り欠きをフランジ部材に外嵌挿すると、フランジ部材に
杆状部が当接して押し込まれ、係止段部が仮置き部から
外れて落下し、楔部がフランジ部材の結合用の孔へ落ち
込んで結合が自動的に生じるようになっている構成を採
用したものである。
According to a third aspect of the present invention, in the second aspect of the present invention, the connecting member has a lower end of the wedge portion in a temporary placement position in which a locking step provided on the rod portion is locked to the temporary placement portion. Is located above the cutout of the holder member, and when the cutout of the holder member is inserted outside the flange member, the rod-shaped part comes into contact with the flange member and is pushed in, and the locking step part comes off from the temporary placement part. Then, the wedge portion falls into the connection hole of the flange member, and the connection is automatically generated.

【0010】請求項4の発明は、請求項2又は3の発明
において、前記結合部材は、楔部をフランジ部材の結合
用の孔へ差し込んだ結合状態で、杆状部の下端がホルダ
ー部材の下部から突出して結合解除用の操作部となり、
この操作部を押し上げることにより片手で結合の解除が
行えるようになっている構成を採用したものである。
According to a fourth aspect of the present invention, in the second or third aspect of the present invention, the connecting member has a wedge portion inserted into a connecting hole of the flange member, and a lower end of the rod-shaped portion is formed of the holder member. It protrudes from the lower part and becomes the operation part for uncoupling,
A configuration is adopted in which the connection can be released with one hand by pushing up the operation unit.

【0011】請求項5の発明は、請求項1乃至4の発明
において、フランジ部材の結合用の孔が四方に等間隔の
配置で設けられ、この結合用の孔は、結合部材の楔部が
納まる長孔に形成されたものと、外側広がりの扇形孔に
形成されたものを組み合わせた構成を採用したものであ
る。
According to a fifth aspect of the present invention, in the first to fourth aspects of the present invention, the connecting holes of the flange member are provided at equal intervals in four directions, and the connecting holes are formed by the wedge portions of the connecting member. The configuration adopts a combination of a hole formed in a long hole that fits therein and a hole formed in a fan-shaped hole that spreads outward.

【0012】[0012]

【発明の実施の形態】以下、この発明の実施の形態を図
示例と共に説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0013】図1乃至図3に示す第1の実施の形態にお
いて、結合装置は、直角状態の配置で互いに結合せんと
する鋼管の一方鋼管A(縦柱材)の外周に固定したフラ
ンジ部材1と、他方鋼管B(水平材)の端部に固定され
たホルダー部材2と、このホルダー部材2内でフランジ
部材1とホルダー部材2を締結する結合部材3との組み
合わせからなり、フランジ部材1は、所定の厚みを有す
る矩形状金属板から、中央に鋼管Aへ外嵌して溶接する
孔4を設けると共に、外周の四箇所を弧状に欠除して平
面十字状に形成され、孔4の周囲で四箇所の位置に、等
間隔で放射状の配置となる結合用の孔5が設けられてい
る。
In the first embodiment shown in FIGS. 1 to 3, the connecting device comprises a flange member 1 fixed to the outer periphery of one of the steel pipes A (vertical column members) to be connected to each other in a right-angled arrangement. And a combination of a holder member 2 fixed to the end of the steel pipe B (horizontal member) and a coupling member 3 for fastening the flange member 1 and the holder member 2 in the holder member 2. A rectangular metal plate having a predetermined thickness is provided at the center with a hole 4 to be externally fitted to and welded to the steel pipe A, and is formed in a plane cruciform shape by removing four places on the outer periphery in an arc shape. At four positions on the periphery, coupling holes 5 are provided at equal intervals and radially arranged.

【0014】他方鋼管Bの端部に溶接で固定されたホル
ダー部材2は、上下に細長い前壁6の両側に後方へ屈曲
し、後端が他方鋼管Bと同径状となる略半円状の側壁
7、7を折り曲げ連成し、該鋼管Bの端部に対して対向
する両側壁7、7の後端を溶接し、両側壁7、7間の上
下面が結合部材3を挿通するための開口8、8になって
いる。
On the other hand, the holder member 2 fixed to the end of the steel pipe B by welding is bent rearward on both sides of the vertically elongated front wall 6, and the rear end has a substantially semicircular shape having the same diameter as the other steel pipe B. Of the steel pipe B, the rear ends of the side walls 7, 7 facing the end of the steel pipe B are welded, and the upper and lower surfaces between the side walls 7, 7 pass through the coupling member 3. Openings 8 and 8.

【0015】このホルダー部材2の前後方向の長さが、
フランジ部材1の結合用の孔5を設けた部分の半径方向
の長さよりも長く形成され、このホルダー部材2には、
フランジ部材1の厚みに対して外嵌挿する切り欠き9が
先端部から他方鋼管Bの軸方向に沿って設けられ、その
先端壁6を一方鋼管Aの外周に当接させることができる
ように切り欠き9の深さが設定されている。上記切り欠
き9をフランジ部材1に外嵌挿すれば、ホルダー部材2
と他方鋼管Bは、該他方鋼管Bの軸心を中心とする回転
が阻止されることになる。
The length of the holder member 2 in the front-rear direction is
The holder member 2 is formed longer than the radial length of a portion of the flange member 1 where the coupling hole 5 is provided.
A notch 9 for external fitting with respect to the thickness of the flange member 1 is provided along the axial direction of the other steel pipe B from the distal end so that the distal end wall 6 can be brought into contact with the outer periphery of the one steel pipe A. The depth of the notch 9 is set. If the notch 9 is externally inserted into the flange member 1, the holder member 2
And the other steel pipe B is prevented from rotating about the axis of the other steel pipe B.

【0016】上記結合部材3は、フランジ部材1の結合
用の孔5に対して上部から差し込む楔部10と、この楔
部10の途中に設けた水平部11と、該水平部11の先
端から直角に垂下してフランジ部材1の外周と他方鋼管
Bの端部間に納まる杆状部12とで二又状に形成され、
楔部10は下端に向けて狭幅となり、ホルダー部材2の
前壁6の内面に当接させる前縁が垂直で結合用の孔5の
端部に当接する後縁が傾斜縁になっている。なお、楔部
10は図示のような下部狭幅形状以外に、ストレートな
形状を採用してもよい。
The coupling member 3 includes a wedge portion 10 inserted from above into the coupling hole 5 of the flange member 1, a horizontal portion 11 provided in the middle of the wedge portion 10, and a front end of the horizontal portion 11. It is formed bifurcated by the outer periphery of the flange member 1 hanging down at a right angle and the rod-shaped portion 12 which is fitted between the ends of the other steel pipe B,
The width of the wedge portion 10 becomes narrower toward the lower end, and the front edge of the wedge portion 10 that is in contact with the inner surface of the front wall 6 of the holder member 2 is vertical, and the rear edge that contacts the end portion of the coupling hole 5 is an inclined edge. . The wedge portion 10 may have a straight shape other than the lower narrow width shape as illustrated.

【0017】この楔部10の上端と杆状部12の下端に
抜け止め用のピン13、14が固定され、ホルダー部材
2内に挿入した結合部材3の楔部10を結合用の孔5に
差し込んだ状態で、楔部10の上端がホルダー部材2の
上面に突出すると共に、杆状部12の下端がホルダー部
材2の下面から下方に突出することになり、ホルダー部
材2の上面には該ホルダー部材2の先端寄りの一部にの
み楔部10が突出するだけであるので、図1に一点鎖線
で示すように、ホルダー部材2の上面に被さるように足
場板Cを載置することができるという利点がある。
Pins 13 and 14 for retaining are fixed to the upper end of the wedge portion 10 and the lower end of the rod portion 12, and the wedge portion 10 of the coupling member 3 inserted into the holder member 2 is inserted into the coupling hole 5. In the inserted state, the upper end of the wedge portion 10 protrudes from the upper surface of the holder member 2 and the lower end of the rod portion 12 protrudes downward from the lower surface of the holder member 2. Since the wedge portion 10 only protrudes at a part near the tip of the holder member 2, it is possible to place the scaffold plate C so as to cover the upper surface of the holder member 2 as shown by a dashed line in FIG. There is an advantage that you can.

【0018】この発明の第1の実施の形態の結合装置は
上記のような構成であり、一方の鋼管Aの途中に他方の
鋼管Bを直角に結合するには、ホルダー部材2内に挿通
した結合部材3を上昇位置に引き上げて保持した状態
で、他方の鋼管Bの先端に固定したホルダー部材2の切
り欠き9を、フランジ部材1の結合用の孔5を設けた部
分に外周縁側から外嵌挿し、ホルダー部材2の先端壁6
を一方の鋼管Aの外面に当接させると共に、ホルダー部
材2をフランジ部材1に載置すれば、結合部材3の楔部
10が丁度結合用の孔5の直上に臨むことになり、この
状態で結合部材3を下降させて楔部10を結合用の孔5
に圧入する。
The connecting device according to the first embodiment of the present invention has the above-described structure. In order to connect the other steel pipe B at a right angle to the middle of one steel pipe A, it is inserted into the holder member 2. With the coupling member 3 pulled up to the raised position and held, the notch 9 of the holder member 2 fixed to the tip of the other steel pipe B is removed from the outer peripheral edge side to the portion of the flange member 1 where the coupling hole 5 is provided. Fitting, tip wall 6 of holder member 2
Is brought into contact with the outer surface of one of the steel pipes A and the holder member 2 is placed on the flange member 1, so that the wedge portion 10 of the connecting member 3 faces just above the hole 5 for connecting. To lower the connecting member 3 so that the wedge portion 10 is
Press-fit.

【0019】楔部10を結合用の孔5に圧入すると、傾
斜縁による楔作用でホルダー部材2の先端壁6が一方の
鋼管Aに向けて押され、該前壁6を楔部10と一方の鋼
管Aで挟圧することにより、一方の鋼管Aに対して他方
の鋼管Bを直角の配置で結合することができる。
When the wedge portion 10 is pressed into the connecting hole 5, the tip wall 6 of the holder member 2 is pushed toward one steel pipe A by the wedge action of the inclined edge, and the front wall 6 is connected to the wedge portion 10 in one direction. Of the steel pipe A, the other steel pipe B can be connected to the one steel pipe A at a right angle.

【0020】このようにして、一方の鋼管Aに対して四
方から他方の鋼管Bを結合することができ、該鋼管Bの
結合と一方の鋼管Aの継ぎ足しを組み合わせることによ
り、建築や土木工事の作業足場や支保工を構築すること
ができる。
In this way, one steel pipe A can be connected to the other steel pipe B from all sides, and the combination of the steel pipe B and the addition of the one steel pipe A can be used for construction and civil engineering work. Work scaffolding and shoring can be constructed.

【0021】上記結合状態で、図1に示すように、結合
部材3はホルダー部材2の上面に対して、楔部10の上
部が一部突出するだけであり、作業足場や支保工を構築
した場合、水平材となる他方の鋼管B上に載置する足場
板Cをホルダー部材2の上面に被る配置とすることがで
き、これにより、足場板Cの側縁を一方の鋼管Aに接近
させることができ、作業足場や支保工の側面と足場板C
の側縁に生じる隙間を少なくすることができ、安全性の
向上が図れる。
In the above-mentioned connected state, as shown in FIG. 1, the connecting member 3 has only a part of the upper part of the wedge portion 10 protruding from the upper surface of the holder member 2, thus constructing a working scaffold or a support. In this case, the scaffold plate C placed on the other steel pipe B serving as a horizontal member can be arranged so as to cover the upper surface of the holder member 2, whereby the side edge of the scaffold plate C approaches one steel pipe A. Can work with the side of the work scaffolding and the shoring
Can be reduced at the side edges of the, and safety can be improved.

【0022】また、結合を解くには、ホルダー部材2の
下面から突出する杆状部12をハンマー等で叩き上げ、
楔部10をフランジ部材1の結合用の孔5から抜き取
り、ホルダー部材2をフランジ部材1から引き離せばよ
く、杆状部12が結合を解くための操作部になってい
る。
In order to release the connection, the rod portion 12 protruding from the lower surface of the holder member 2 is beaten up with a hammer or the like.
The wedge portion 10 may be removed from the coupling hole 5 of the flange member 1 and the holder member 2 may be separated from the flange member 1, and the rod portion 12 is an operation portion for releasing the coupling.

【0023】次に、図4乃至図6の第2の実施の形態
は、結合部材の他の例を示し、杆状部12の楔部10に
臨む側縁の途中に突部15を設けてその下端に係止段部
16を形成し、ホルダー部材2の下部に開口8を跨ぐよ
うに設けた仮置き部17に対して係止段部16を係止す
ることにより、結合部材3を楔部10の下端が切り欠き
9よりも上方に位置する姿勢に保持することができるこ
とにより、結合の自動化と片手での結合の解除操作を可
能にしている。
The second embodiment shown in FIGS. 4 to 6 shows another example of the connecting member, in which a projection 15 is provided in the middle of the side edge of the rod 12 facing the wedge 10. A locking step 16 is formed at the lower end, and the locking step 16 is locked to a temporary placement section 17 provided so as to straddle the opening 8 at the lower part of the holder member 2, so that the coupling member 3 is wedge-shaped. Since the lower end of the portion 10 can be held at a position positioned above the notch 9, the connection can be automated and the connection can be released with one hand.

【0024】この例では、図5に示すように、一方の鋼
管Aに対する他方の鋼管Bの結合前に、結合部材3を引
き上げて係止段部16を仮置き部17に係止しておき、
この状態でホルダー部材2の切り欠き9をフランジ部材
1に対して嵌挿すると、嵌挿途中で突部15がフランジ
部材1に当接し、ホルダー部材2と結合部材3に相対的
な移動が生じて杆状部12が押し込まれ、この結果仮置
き部17から係止段部16が外れ、結合部材3はホルダ
ー部材2内を落下し、その時丁度楔部10の下端がフラ
ンジ部材1の結合用の孔5の真上に臨んでいるので、楔
部10は自動的に結合用の孔5内に落ち込んで進入し、
両鋼管AとBを自動的に結合することになる。
In this example, as shown in FIG. 5, before connecting one steel pipe A to the other steel pipe B, the connecting member 3 is pulled up and the locking step 16 is locked to the temporary placing part 17. ,
In this state, when the notch 9 of the holder member 2 is inserted into the flange member 1, the projection 15 comes into contact with the flange member 1 during the insertion and the relative movement between the holder member 2 and the coupling member 3 occurs. As a result, the locking step 16 is disengaged from the temporary placing section 17 and the connecting member 3 falls down in the holder member 2, and at this time, the lower end of the wedge section 10 just joins the flange member 1. The wedge portion 10 automatically falls into the coupling hole 5 and enters,
The two steel pipes A and B are automatically connected.

【0025】上記結合状態で、ホルダー部材2の下部か
ら杆状部12の下部が突出した状態になり、結合を解く
ときはこの杆状部12の下端を叩き上げ、結合部材3を
上昇動させて楔部10を結合用の孔5から抜き出せば、
係止段部16が仮置き部17に係合し、結合部材3の結
合解除位置への操作が片手で行え、仮設足場や支保工の
解体が安全に能率よく行える。
In the above-mentioned connected state, the lower part of the rod 12 protrudes from the lower part of the holder member 2. To release the connection, the lower end of the rod 12 is knocked up and the connecting member 3 is moved upward. If the wedge part 10 is pulled out from the connecting hole 5,
The locking step 16 is engaged with the temporary placing portion 17, the operation of the connecting member 3 to the uncoupling position can be performed with one hand, and the temporary scaffolding and support work can be safely and efficiently dismantled.

【0026】また、図7乃至図9の第3の実施の形態
は、フランジ部材1に設ける結合用の孔5の他の例を示
し、フランジ部材1に等間隔の配置で設けられた結合用
の孔の内、隣接する二つの孔は、結合部材3の楔部10
が納まる長孔5aに形成され、残る二つの孔を外側広が
りの扇形孔5bに形成したものである。
The third embodiment shown in FIGS. 7 to 9 shows another example of the connecting holes 5 provided in the flange member 1, and the connecting holes 5 provided in the flange member 1 at equal intervals. Of the holes are adjacent to each other,
Is formed in the long hole 5a in which the hole is accommodated, and the remaining two holes are formed in the fan-shaped hole 5b spreading outward.

【0027】長孔5aは楔部10の厚みが丁度納まる幅
になっているので、この長孔5aを使用して結合した他
方の鋼管Bは、一方の鋼管Aの半径方向に沿った配置と
なる。これに対し、扇形孔5bを使用して結合した他方
の鋼管Bは、楔部10が扇形孔5aの幅方向に可動とな
るため、一方の鋼管Aの半径方向に対して角度を持たせ
た結合が可能となる。
Since the long hole 5a has a width just enough to accommodate the thickness of the wedge portion 10, the other steel pipe B connected using the long hole 5a is arranged in the radial direction of the one steel pipe A. Become. On the other hand, the other steel pipe B connected using the sector hole 5b has an angle with respect to the radial direction of the one steel pipe A because the wedge portion 10 is movable in the width direction of the sector hole 5a. Coupling becomes possible.

【0028】図8と図9はこのような角度を持たせた結
合を組み合わせて構築した支保工の平面を示し、長孔5
aを使用して四方に配置した一方の鋼管Aを他方の鋼管
Bで結合することにより、正方形の基本枠を組み立て、
その外側に扇形孔5bを使用して他方の鋼管Bを角度を
持たせて結合することにより、支保工を円弧状や湾曲す
る構築物に沿う配置を可能にすることができる。
FIG. 8 and FIG. 9 show the plane of the shoring constructed by combining such angled joints.
a, a square basic frame is assembled by joining one steel pipe A arranged in four directions with the other steel pipe B,
By connecting the other steel pipe B at an angle by using the fan-shaped hole 5b on the outside thereof, the support can be arranged along an arcuate or curved structure.

【0029】なお、結合装置は、図示の場合、円形鋼管
の結合例を示したが、角形鋼管の結合も同様の構造で行
えると共に、結合装置の用途は鋼管を用いた支保工や足
場のような構造物の構築だけでなく、鋼管の結合を必要
とする部分に広く使用することができる。
Although the connecting device is shown as an example in which circular steel pipes are connected in the drawing, the connection of square steel pipes can be performed in a similar structure, and the connecting device can be used as a support or scaffold using steel pipes. It can be widely used not only for construction of a simple structure but also for a part that requires joining of steel pipes.

【0030】[0030]

【発明の効果】以上のように、この発明によると、一方
鋼管の外周に固定したフランジ部材に結合用の孔を設
け、他方鋼管の端部に固定したホルダー部材に、フラン
ジ部材の厚みに対して外嵌挿する切り欠きを設け、この
ホルダー部材内でフランジ部材の結合用の孔に差し込む
結合部材を、結合用の孔に対して差し込むことにより、
ホルダー部材の先端壁を一方鋼管の外周面とで挟持する
ようにしたので、ホルダー部材内に結合部材を保持して
おくことが可能となり、結合や解体時の操作性や作業性
がよく、しかもホルダー部材内に結合部材を収めること
で、全体の形状をコンパクトにすることができ、作業足
場や支保工を構築した場合、ホルダー部材上に被さるよ
うに足場板を配置することができ、作業足場や支保工の
側面と足場板の側縁間の隙間の発生を少なく、安全性の
向上が図れることになる。
As described above, according to the present invention, the flange member fixed to the outer periphery of the steel pipe is provided with a hole for coupling, and the holder member fixed to the end of the steel pipe is provided with a thickness corresponding to the thickness of the flange member. By providing a notch for external fitting and inserting the coupling member inserted into the coupling hole of the flange member in the holder member, by inserting the coupling member into the coupling hole,
Since the front end wall of the holder member is sandwiched between the outer peripheral surface of the steel pipe and the outer peripheral surface of the steel pipe, the connecting member can be held in the holder member. The overall shape can be made compact by storing the connecting member in the holder member, and when a work scaffold or support is constructed, the scaffold plate can be arranged so as to cover the holder member, and the work scaffold In addition, the generation of a gap between the side surface of the shoring and the side edge of the scaffolding plate is reduced, and safety can be improved.

【0031】また、結合部材の杆状部の側縁の途中に、
ホルダー部材の下部に設けた仮置き部に対する係止段部
を設けたので、結合作業時に結合部材の楔部を結合用の
孔に自動的に嵌挿させることができ、結合の自動化によ
り、結合作業の能率向上が図れる。
Further, in the middle of the side edge of the rod portion of the connecting member,
Since the locking step is provided for the temporary placing portion provided at the lower portion of the holder member, the wedge portion of the coupling member can be automatically fitted into the coupling hole during the coupling operation. Work efficiency can be improved.

【0032】更に、結合の解除が結合部材を叩き上げる
だけでよいので、足場や支保工の解体が片手で行え、作
業時の安全確保ができるので、解体作業の安全性向上が
図れると共に、フランジ部材に設けた結合用の孔を扇形
にしたので、一方鋼管に対して他方鋼管を角度をもって
結合でき、曲線形状に対応できる支保工や足場を構築す
ることができる。
Further, the connection can be released only by knocking up the connecting member, so that the scaffolding and the shoring can be dismantled with one hand, and the safety at the time of work can be ensured. Since the connecting hole provided in the member is formed in a fan shape, the other steel pipe can be connected to one steel pipe at an angle, and a support and a scaffold that can correspond to a curved shape can be constructed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】結合装置の第1の実施の形態を示す結合状態の
縦断正面図
FIG. 1 is a longitudinal sectional front view of a coupling state showing a first embodiment of a coupling device.

【図2】同上の平面図FIG. 2 is a plan view of the above.

【図3】結合装置の第1の実施の形態を示す分解斜視図FIG. 3 is an exploded perspective view showing the first embodiment of the coupling device.

【図4】結合装置の第2の実施の形態を示す結合部材の
斜視図
FIG. 4 is a perspective view of a coupling member according to a second embodiment of the coupling device.

【図5】結合装置の第2の実施の形態を示す結合途中の
縦断正面図
FIG. 5 is a longitudinal sectional front view showing a second embodiment of the coupling device in the middle of coupling.

【図6】結合装置の第2の実施の形態を示す結合状態の
縦断正面図
FIG. 6 is a longitudinal sectional front view of a coupling state showing a second embodiment of the coupling device.

【図7】結合装置の第3の実施の形態を示すフランジ部
材の平面図
FIG. 7 is a plan view of a flange member showing a third embodiment of the coupling device.

【図8】結合装置の第3の実施の形態を示す結合状態の
平面図
FIG. 8 is a plan view showing a third embodiment of the coupling device in a coupled state.

【図9】同上の要部を拡大した平面図FIG. 9 is an enlarged plan view of a main part of the above.

【符号の説明】[Explanation of symbols]

1 フランジ部材 2 ホルダー部材 3 結合部材 5 結合用の孔 6 先端壁 7 側壁 8 開口 9 切り欠き 10 楔部 12 杆状部 A 一方の鋼管 B 他方の鋼管 DESCRIPTION OF SYMBOLS 1 Flange member 2 Holder member 3 Coupling member 5 Hole for coupling 6 Tip wall 7 Side wall 8 Opening 9 Notch 10 Wedge part 12 Rod part A One steel pipe B The other steel pipe

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 互いに結合せんとする鋼管の一方鋼管の
外周に固定され、結合用の孔が設けられたフランジ部材
と、他方鋼管の端部に固定され、フランジ部材の厚みに
対して外嵌挿する切り欠きが先端部から他方鋼管の軸方
向に沿って設けられ、その先端壁を一方鋼管の外周に当
接させることができるホルダー部材と、このホルダー部
材内でフランジ部材の結合用の孔に差し込む結合部材と
からなり、前記ホルダー部材は切り欠きをフランジ部材
に外嵌挿することにより、他方鋼管の軸心を中心とする
回転を阻止し、前記結合部材が、結合用の孔に対して差
し込むことにより、ホルダー部材の先端壁を一方鋼管の
外周面とで挟持するように形成されている結合装置。
1. A flange member fixed to an outer periphery of one steel pipe of steel pipes to be connected to each other and provided with a hole for connection, and is fixed to an end of the other steel pipe and externally fitted to a thickness of the flange member. A notch to be inserted is provided along the axial direction of the other steel pipe from the distal end, and a holder member capable of abutting the distal end wall on the outer periphery of the one steel pipe, and a hole for coupling a flange member in the holder member. The holder member inserts a notch into the flange member so as to prevent rotation around the axis of the other steel pipe, and the holder member is connected to a hole for connection. A coupling device that is formed so as to sandwich the distal end wall of the holder member with the outer peripheral surface of one of the steel pipes by being inserted.
【請求項2】 前記結合部材が、結合用の孔に対して差
し込む楔部と、フランジ部材の外周と他方鋼管の端部間
に納まる杆状部とを二又状の配置で連成し、上記杆状部
の楔部に臨む側縁の途中に、ホルダー部材の下部に設け
た仮置き部に対する係止段部を設けて形成されている請
求項1に記載の結合装置。
2. The coupling member, wherein a wedge portion inserted into the coupling hole, a rod portion fitted between the outer periphery of the flange member and the end of the other steel pipe are coupled in a bifurcated arrangement, The coupling device according to claim 1, wherein a locking step portion for a temporary placing portion provided at a lower portion of the holder member is provided in a middle of a side edge of the rod portion facing the wedge portion.
【請求項3】 前記結合部材は、杆状部に設けた係止段
部を仮置き部に係止した仮置き姿勢で、楔部の下部先端
がホルダー部材の切り欠きよりも上部に位置し、ホルダ
ー部材の切り欠きをフランジ部材に外嵌挿すると、フラ
ンジ部材に杆状部が当接して押し込まれ、係止段部が仮
置き部から外れて落下し、楔部がフランジ部材の結合用
の孔へ落ち込んで結合が自動的に生じるようになってい
る請求項2に記載の結合装置。
3. The connecting member has a temporary placement position in which a locking step provided on a rod-like portion is locked to a temporary storage portion, and a lower end of a wedge portion is positioned above a notch of a holder member. When the notch of the holder member is fitted outside the flange member, the rod-shaped portion comes into contact with the flange member and is pushed in, the locking step portion falls off the temporary placing portion and falls, and the wedge portion is used for coupling the flange member. 3. The coupling device according to claim 2, wherein the coupling is automatically performed by dropping into the hole.
【請求項4】 前記結合部材は、楔部をフランジ部材の
結合用の孔へ差し込んだ結合状態で、杆状部の下端がホ
ルダー部材の下部から突出して結合解除用の操作部とな
り、この操作部を押し上げることにより片手で結合の解
除が行えるようになっている請求項2又は3に記載の結
合装置。
4. The connecting member has a wedge portion inserted into a connecting hole of the flange member, and a lower end of the rod-like portion projects from a lower portion of the holder member to serve as an operating portion for releasing the connection. The coupling device according to claim 2 or 3, wherein the coupling can be released with one hand by pushing up the portion.
【請求項5】 フランジ部材の結合用の孔が四方に等間
隔の配置で設けられ、この結合用の孔は、結合部材の楔
部が納まる長孔に形成されたものと、外側広がりの扇形
孔に形成されたものを組み合わせて採用している請求項
1乃至4の何れかに記載の結合装置。
5. A connecting hole of a flange member is provided at equal intervals on four sides. The connecting hole is formed in a long hole in which a wedge portion of the connecting member is accommodated. The coupling device according to any one of claims 1 to 4, wherein a combination of the holes is used.
JP23063099A 1999-08-17 1999-08-17 Coupling device Expired - Lifetime JP4040802B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23063099A JP4040802B2 (en) 1999-08-17 1999-08-17 Coupling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23063099A JP4040802B2 (en) 1999-08-17 1999-08-17 Coupling device

Publications (2)

Publication Number Publication Date
JP2001055830A true JP2001055830A (en) 2001-02-27
JP4040802B2 JP4040802B2 (en) 2008-01-30

Family

ID=16910805

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23063099A Expired - Lifetime JP4040802B2 (en) 1999-08-17 1999-08-17 Coupling device

Country Status (1)

Country Link
JP (1) JP4040802B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100842111B1 (en) * 2007-08-24 2008-06-30 에스앤피시스템(주) A system support
JP2009155875A (en) * 2007-12-26 2009-07-16 Krh Kk Temporary scaffolding connection structure
CN103089002A (en) * 2013-01-25 2013-05-08 开平市优赢金属制品有限公司 Adaptor of scaffold
CN104372944A (en) * 2014-10-27 2015-02-25 无锡市安捷脚手架有限公司 Scaffold connecting element
JP2016020623A (en) * 2014-07-15 2016-02-04 光洋機械産業株式会社 Connector for scaffold, major assembly method and major disassembly method using the same
JP2018035612A (en) * 2016-09-01 2018-03-08 日建リース工業株式会社 Preceding handrail for curve type scaffold
JP2018150751A (en) * 2017-03-14 2018-09-27 日建リース工業株式会社 Wedge tightening tool
JP2020020127A (en) * 2018-07-31 2020-02-06 株式会社杉孝グループホールディングス Wedge binding device in scaffold
JP2022160513A (en) * 2018-07-31 2022-10-19 株式会社杉孝グループホールディングス Wedge binding device in scaffold
JP7473395B2 (en) 2020-05-25 2024-04-23 アルインコ株式会社 Wedge fastening device for scaffolding
JP7473396B2 (en) 2020-05-25 2024-04-23 アルインコ株式会社 Wedge fastening device for scaffolding

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011231533A (en) * 2010-04-28 2011-11-17 Yuko Maintenance Co Ltd Steel pipe coupling device
CN103216722A (en) * 2013-04-08 2013-07-24 常熟建工建设集团有限公司苏州分公司 Novel universal change-over tube

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100842111B1 (en) * 2007-08-24 2008-06-30 에스앤피시스템(주) A system support
JP2009155875A (en) * 2007-12-26 2009-07-16 Krh Kk Temporary scaffolding connection structure
CN103089002A (en) * 2013-01-25 2013-05-08 开平市优赢金属制品有限公司 Adaptor of scaffold
CN103089002B (en) * 2013-01-25 2015-06-10 开平市优赢金属制品有限公司 Adaptor of scaffold
JP2016020623A (en) * 2014-07-15 2016-02-04 光洋機械産業株式会社 Connector for scaffold, major assembly method and major disassembly method using the same
CN104372944A (en) * 2014-10-27 2015-02-25 无锡市安捷脚手架有限公司 Scaffold connecting element
JP2018035612A (en) * 2016-09-01 2018-03-08 日建リース工業株式会社 Preceding handrail for curve type scaffold
JP2018150751A (en) * 2017-03-14 2018-09-27 日建リース工業株式会社 Wedge tightening tool
JP2020020127A (en) * 2018-07-31 2020-02-06 株式会社杉孝グループホールディングス Wedge binding device in scaffold
JP7141658B2 (en) 2018-07-31 2022-09-26 株式会社杉孝グループホールディングス Wedge binding device in scaffolding
JP2022160513A (en) * 2018-07-31 2022-10-19 株式会社杉孝グループホールディングス Wedge binding device in scaffold
JP7306643B2 (en) 2018-07-31 2023-07-11 株式会社杉孝グループホールディングス Wedge binding device in scaffolding
JP7473395B2 (en) 2020-05-25 2024-04-23 アルインコ株式会社 Wedge fastening device for scaffolding
JP7473396B2 (en) 2020-05-25 2024-04-23 アルインコ株式会社 Wedge fastening device for scaffolding

Also Published As

Publication number Publication date
JP4040802B2 (en) 2008-01-30

Similar Documents

Publication Publication Date Title
JP2001055830A (en) Connecting device
JP3043389B2 (en) Connection head for scaffold
JP2011231533A (en) Steel pipe coupling device
JP3851105B2 (en) Construction method of temporary structure and handrail braiding used for this
JP2670982B2 (en) Pipe connection device
JP2007031987A (en) Joining device
JP5270147B2 (en) Temporary scaffolding connection structure
JP2009264072A (en) Attachment
JP3233728U (en) Pipe connector
JP3051699B2 (en) Scaffold braces and scaffold braid connectors
JPH0711647U (en) Wedge type connection device
JP2019027107A (en) Connection structure of bar and temporary scaffold using connection structure
KR100682136B1 (en) Scissors type scaffolding joint device
JP2005030156A (en) Connection metal fitting for metal concrete mold in vertical and lateral direction
JP3197050U (en) Scaffolding
JP2913136B2 (en) Retaining wall construction method and connection structure using liner plate
JP2007032093A (en) Concrete structure and coupler for constructing concrete structure
CN219261475U (en) Error proofing platform connection structure
JP2000320145A (en) Method and device for stiffening h-steel
JP2525362Y2 (en) Joint structure of temporary structure
JP6749618B2 (en) Temporary scaffolding material
KR200397279Y1 (en) supporter
JP7454306B1 (en) Connector
JP2004360187A (en) Connecting implement for temporary scaffolding
JP3119713U (en) Concrete formwork tilt prevention tool

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060425

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070717

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070831

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071016

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071108

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4040802

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111116

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141116

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term