JP2001026929A - Method for removing underground obstacle - Google Patents

Method for removing underground obstacle

Info

Publication number
JP2001026929A
JP2001026929A JP11201868A JP20186899A JP2001026929A JP 2001026929 A JP2001026929 A JP 2001026929A JP 11201868 A JP11201868 A JP 11201868A JP 20186899 A JP20186899 A JP 20186899A JP 2001026929 A JP2001026929 A JP 2001026929A
Authority
JP
Japan
Prior art keywords
underground obstacle
casing
underground
ground
obstacle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11201868A
Other languages
Japanese (ja)
Other versions
JP4113305B2 (en
Inventor
Takaaki Sakata
貴章 坂田
Shigenori Kato
成典 加藤
Masato Uchiumi
正人 内海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Foundation Engineering Co Ltd
Original Assignee
Japan Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Foundation Engineering Co Ltd filed Critical Japan Foundation Engineering Co Ltd
Priority to JP20186899A priority Critical patent/JP4113305B2/en
Publication of JP2001026929A publication Critical patent/JP2001026929A/en
Application granted granted Critical
Publication of JP4113305B2 publication Critical patent/JP4113305B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily and surely remove an underground obstacle such as existing pile by rotating and advancing a cylindrical casing in the ground while sending excavating water from the tip thereof to form an annular groove surrounding the outside of the underground obstacle, and lifting up the underground obstacle onto the ground. SOLUTION: A hole is drilled by a casing drilling push-in device set on the ground 15 above a reinforced concrete lengthy cylindrical underground obstacle 13 buried in the ground. An anchor hole is formed on the upper part of the underground obstacle 13, and a casing 19 is advanced in the ground 11 so as to surround the underground obstacle 13 in the state where it is rotated while sending excavating water from the tip of the casing 19 by a water feeding apparatus 29 set on the upper end of the casing 19 to form an annular groove 35 surrounding the outside of the underground obstacle 13. An anchor body is drawn upward by a center hole jack, and the anchor body is then lifted up by use of a large crane to lift up the underground obstacle 13 onto the ground.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、杭体等の地中障害
物を地中から除去するための地中障害物の除去工法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for removing an underground obstacle such as a pile from an underground obstacle.

【0002】[0002]

【従来の技術】従来、地上空間の再開発による新規構造
物の構築、あるいは、新たな地下空間開発のために、過
去に構築された杭体等の地中障害物を除去することが行
われている。そして、従来、既存杭の除去は、例えば、
既存杭の外側に、多数の小口径の掘削孔を、既存杭を囲
んで円環状に形成した後、既存杭を引き抜くことにより
行われている。
2. Description of the Related Art Conventionally, in order to construct a new structure by redeveloping a ground space or to develop a new underground space, removal of underground obstacles such as piles constructed in the past has been performed. ing. And conventionally, removal of existing piles, for example,
A large number of small-diameter boreholes are formed outside the existing pile to form a ring around the existing pile, and then the existing pile is pulled out.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、このよ
うな工法では、既存杭の外側に、多数の小口径の掘削孔
を形成する必要があるため、掘削孔の施工に多大な工数
が必要になるという問題があった。本発明は、かかる従
来の問題を解決するためになされたもので、既存杭等の
地中障害物を容易,確実に除去することができる地中障
害物の除去工法を提供することを目的とする。
However, in such a construction method, it is necessary to form a large number of small-diameter excavation holes outside the existing pile, so that a great number of man-hours are required for constructing the excavation holes. There was a problem. The present invention has been made to solve such a conventional problem, and an object of the present invention is to provide an underground obstacle removal method capable of easily and surely removing an underground obstacle such as an existing pile. I do.

【0004】[0004]

【課題を解決するための手段】請求項1の地中障害物の
除去工法は、地中に埋設される地中障害物を除去するた
めの地中障害物の除去工法において、円筒状のケーシン
グを、その先端から掘削水を流出しながら回転させて、
前記地中内を前進させ、前記地中障害物の外側を囲んで
環状溝を形成した後、前記地中障害物を地上に吊り上げ
ることを特徴とする。
According to a first aspect of the present invention, there is provided an underground obstacle removing method for removing an underground obstacle buried underground. Is rotated while drilling water flows out from the tip,
The underground obstacle is lifted up on the ground after moving forward in the ground to form an annular groove surrounding the outside of the underground obstacle.

【0005】請求項2の地中障害物の除去工法は、請求
項1記載の地中障害物の除去工法において、前記地中障
害物にアンカー体を設置し、前記アンカー体を介して前
記地中障害物を地上に吊り上げることを特徴とする。請
求項3の地中障害物の除去工法は、請求項1または請求
項2記載の地中障害物の除去工法において、前記地中障
害物は、柱列式連続壁を構成する杭体であり、予め、杭
体の両側の壁部に前記杭体に沿って掘削孔を形成した
後、前記掘削孔を縦断して前記環状溝を形成することを
特徴とする。
According to a second aspect of the present invention, in the method of removing underground obstacles according to the first aspect, an anchor body is installed on the underground obstacle, and the ground is removed via the anchor body. It is characterized by lifting medium obstacles on the ground. The underground obstacle removing method according to claim 3 is the underground obstacle removing method according to claim 1 or 2, wherein the underground obstacle is a pile that forms a column-type continuous wall. A drilling hole is formed in advance on the wall on both sides of the pile along the pile, and then the annular groove is formed by vertically cutting the drilling hole.

【0006】(作用)請求項1の地中障害物の除去工法
では、先ず、地中障害物の外側を囲んで環状溝が形成さ
れる。そして、この環状溝の形成は、円筒状のケーシン
グを、その先端から掘削水を流出しながら回転させて、
地中内を前進させることにより行われる。
(Operation) In the method of removing an underground obstacle according to the first aspect, first, an annular groove is formed so as to surround the outside of the underground obstacle. And the formation of this annular groove rotates the cylindrical casing while draining water flows out from its tip,
This is done by advancing underground.

【0007】このようにケーシングの先端から掘削水を
流出することにより、掘削水が掘削土とともに、ケーシ
ングの内周および外周を伝わり地表面に排出される。そ
して、この時の掘削水が、ケーシングと掘削土との間の
摩擦力を低減し、ケーシングの地中への前進を容易なも
のにする。また、掘削水が掘削土とともに、ケーシング
の内周を伝わり地表面に排出されるため、ケーシングの
内周と地中障害物との間には、間隙が形成され、この間
隙により、地中障害物を地上に吊り上げる時の摩擦抵抗
が小さくなる。
[0007] As the drilling water flows out from the front end of the casing, the drilling water travels along the inner and outer circumferences of the casing together with the excavated soil and is discharged to the ground surface. The drilling water at this time reduces the frictional force between the casing and the excavated soil, and facilitates the advancement of the casing into the ground. In addition, since the drilling water travels along the excavated soil along the inner circumference of the casing and is discharged to the ground surface, a gap is formed between the inner circumference of the casing and the underground obstacle, and this gap causes an underground obstacle. Friction resistance when lifting objects on the ground is reduced.

【0008】請求項2の地中障害物の除去工法では、地
中障害物にアンカー体が設置され、アンカー体を介して
地中障害物が地上に吊り上げられる。請求項3の地中障
害物の除去工法では、地中障害物が、柱列式連続壁を構
成する杭体とされる。そして、予め、杭体の両側の壁部
に杭体に沿って掘削孔を形成した後、掘削孔を縦断して
環状溝が形成される。
In the method for removing an underground obstacle according to a second aspect, an anchor body is installed on the underground obstacle, and the underground obstacle is lifted to the ground via the anchor body. In the method of removing an underground obstacle according to a third aspect, the underground obstacle is a pile body forming a column-type continuous wall. Then, after an excavation hole is formed in advance on the wall on both sides of the pile body along the pile body, the excavation hole is longitudinally cut to form an annular groove.

【0009】このように、予め、杭体の両側の壁部に掘
削孔を形成することにより、杭体が所定位置に直線状に
配置されているかどうかを事前に確認することが可能に
なる。また、掘削孔を縦断して環状溝を形成することに
より、ケーシングと壁部との間の摩擦力が低減され、ケ
ーシングの地中への前進が容易なものになる。
As described above, by forming excavation holes in the wall portions on both sides of the pile in advance, it is possible to confirm in advance whether the pile is linearly arranged at a predetermined position. Further, by forming the annular groove by traversing the excavation hole, the frictional force between the casing and the wall is reduced, and the casing can be easily advanced into the ground.

【0010】[0010]

【発明の実施の形態】以下、本発明の詳細を図面に示す
実施形態について説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described with reference to the drawings.

【0011】図1ないし図8は、本発明の地中障害物の
除去工法の第1の実施形態を示している。この実施形態
では、図1に示すように、地中11には、既存杭からな
る地中障害物13が埋設されている。地中障害物13
は、例えば、鉄筋コンクリートからなり長尺円柱状をし
ている。
FIGS. 1 to 8 show a first embodiment of a method of removing an underground obstacle according to the present invention. In this embodiment, as shown in FIG. 1, an underground obstacle 13 made of an existing pile is buried in the underground 11. Underground obstacle 13
Is made of reinforced concrete and has a long cylindrical shape.

【0012】そして、長手方向を上下にして垂直に位置
されている。この実施形態では、先ず、図1に示すよう
に、地中障害物13の上方の地面15に、ケーシング削
孔押し込み装置17が設置される。そして、オールケー
シング工法を使用して、ケーシング19による削孔が行
われ、ケーシング19の先端が、地中障害物13の上端
まで前進される。
[0012] The lamp is vertically positioned with its longitudinal direction up and down. In this embodiment, first, as shown in FIG. 1, a casing drilling and pushing device 17 is installed on the ground 15 above the underground obstacle 13. Then, drilling is performed by the casing 19 using the all casing method, and the tip of the casing 19 is advanced to the upper end of the underground obstacle 13.

【0013】なお、この削孔では、ケーシング19内が
中堀りされ、ケーシング19内が中空にされる。次に、
図2に示すように、地中障害物13の上方の地面15か
らケーシング削孔押し込み装置17が撤去され、支持板
21上にボーリングマシン23が設置される。
In this drilling, the inside of the casing 19 is dug and the inside of the casing 19 is hollow. next,
As shown in FIG. 2, the casing drilling and pushing device 17 is removed from the ground 15 above the underground obstacle 13, and the boring machine 23 is installed on the support plate 21.

【0014】そして、ボーリングマシン23を使用し
て、削孔ロッド25による削孔が行われ、地中障害物1
3の上部にアンカー孔13aが形成される。次に、図3
に示すように、アンカー孔13aにアンカー体27が設
置される。次に、図4に示すように、地中障害物13の
上方の地面15からボーリングマシン23が撤去され、
ケーシング削孔押し込み装置17が設置される。
Then, using the boring machine 23, drilling is performed by the drilling rod 25, and the underground obstacle 1 is removed.
An anchor hole 13a is formed at the upper part of the third hole 3. Next, FIG.
As shown in (2), the anchor body 27 is installed in the anchor hole 13a. Next, as shown in FIG. 4, the boring machine 23 is removed from the ground 15 above the underground obstacle 13,
A casing drilling and pushing device 17 is provided.

【0015】そして、ケーシング19の上端に、スイベ
ル機構を用いた送水用器具29が設置される。この送水
用器具29には、送水ポンプ31からのホース33が接
続される。そして、ケーシング19が、図5に概略的に
示すように、その先端から掘削水Wを流出しながら回転
した状態で、地中障害物13を囲むようにして地中11
内を前進される。
At the upper end of the casing 19, a water supply device 29 using a swivel mechanism is installed. The hose 33 from the water pump 31 is connected to the water supply device 29. Then, as shown schematically in FIG. 5, the underground 11 is surrounded by the underground obstacle 13 while the casing 19 is rotated while the excavation water W flows out from the tip thereof.
It is advanced inside.

【0016】このケーシング19の前進により、地中障
害物13の外側を囲んで環状溝35が形成される。この
ようにケーシング19の先端から掘削水Wを流出するこ
とにより、掘削水Wが掘削土Cとともに、ケーシング1
9の内周および外周を伝わり地表面に排出される。
As the casing 19 advances, an annular groove 35 is formed around the underground obstacle 13. As described above, the drilling water W flows out of the casing 19 along with the excavated soil C by flowing out the drilling water W from the tip of the casing 19.
9 is transmitted to the ground surface along the inner and outer circumferences.

【0017】そして、この時の掘削水Wが、ケーシング
19と掘削土Cとの間の摩擦力を低減し、ケーシング1
9の地中11への前進を容易なものにする。また、掘削
水Wが掘削土Cとともに、ケーシング19の内周を伝わ
り地表面に排出されるため、ケーシング19の内周と地
中障害物13との間には、間隙Kが形成され、この間隙
Kにより、後に地中障害物13を地上に吊り上げる時の
摩擦抵抗が小さくなる。
The drilling water W at this time reduces the frictional force between the casing 19 and the excavated soil C, and the casing 1
Facilitates the advance of 9 to the underground 11. In addition, since the drilling water W travels along the excavated soil C along the inner periphery of the casing 19 and is discharged to the ground surface, a gap K is formed between the inner periphery of the casing 19 and the underground obstacle 13. The gap K reduces frictional resistance when the underground obstacle 13 is later lifted on the ground.

【0018】次に、図6に示すように、ケーシング19
の先端が、地中障害物13の下端まで前進したところで
ケーシング19の打ち込みが中止される。そして、地中
障害物13の上方の地面15からケーシング削孔押し込
み装置17が撤去され、アンカー体27に棒状の鋼材3
7が接続され、センターホールジャッキ39が設置され
る。
Next, as shown in FIG.
The driving of the casing 19 is stopped when the leading end of the arm moves forward to the lower end of the underground obstacle 13. Then, the casing drilling and pushing device 17 is removed from the ground 15 above the underground obstacle 13, and the rod-shaped steel 3
7 are connected, and a center hole jack 39 is installed.

【0019】そして、センターホールジャッキ39によ
り、鋼材37を介してアンカー体27が上方に牽引さ
れ、地中障害物13の下端が地盤から分離される。次
に、図7に示すように、地中障害物13の上方からセン
ターホールジャッキ39が撤去され、大型クレーン41
が設置される。そして、大型クレーン41により、アン
カー体27を吊り上げることにより、図8に示すよう
に、地中障害物13が地上に吊り上げられ、地中障害物
13の取り除き作業が完了する。
Then, the anchor body 27 is pulled upward by the center hole jack 39 via the steel material 37, and the lower end of the underground obstacle 13 is separated from the ground. Next, as shown in FIG. 7, the center hole jack 39 is removed from above the underground obstacle 13 and the large crane 41 is removed.
Is installed. Then, by lifting the anchor body 27 by the large crane 41, the underground obstacle 13 is lifted on the ground as shown in FIG. 8, and the operation of removing the underground obstacle 13 is completed.

【0020】なお、大型クレーン41の吊り上げ長よ
り、地中障害物13の長さが長い場合には、地中障害物
13に穴をあけて固定し、地中障害物13を切断しなが
ら、数回に分けて地中障害物13の引き上げが行われ
る。上述した地中障害物の除去工法では、円筒状のケー
シング19を、その先端から掘削水Wを流出しながら回
転させて、地中11内を前進させ、地中障害物13の外
側を囲んで環状溝35を形成した後、地中障害物13を
地上に吊り上げるようにしたので、既存杭等の地中障害
物13を容易,確実に除去することができる。
If the length of the underground obstacle 13 is longer than the lifting length of the large crane 41, the underground obstacle 13 is fixed by making a hole, and the underground obstacle 13 is cut off. The underground obstacle 13 is pulled up several times. In the above-described method of removing the underground obstacle, the cylindrical casing 19 is rotated while the excavating water W flows out from the tip thereof to advance inside the underground 11 and surround the outside of the underground obstacle 13. After the annular groove 35 is formed, the underground obstacle 13 is lifted above the ground, so that the underground obstacle 13 such as an existing pile can be easily and reliably removed.

【0021】すなわち、上述した工法では、円筒状のケ
ーシング19を、その先端から掘削水Wを流出しながら
回転させて、地中11内を前進させるようにしてので、
図5に示したように、掘削水Wが掘削土Cとともに、ケ
ーシング19の内周および外周を伝わり地表面に排出さ
れる。そして、この時の掘削水Wが、ケーシング19の
内外周面と掘削土Cとの間の摩擦力を低減し、ケーシン
グ19の地中11への前進を容易なものにするため、掘
削を非常に容易なものにすることができる。
That is, in the above-mentioned construction method, the cylindrical casing 19 is rotated while the drilling water W flows out from the tip thereof, so that the casing 19 advances in the underground 11.
As shown in FIG. 5, the drilling water W travels along the inner and outer circumferences of the casing 19 together with the excavated soil C and is discharged to the ground surface. Then, the excavation water W at this time reduces the frictional force between the inner and outer peripheral surfaces of the casing 19 and the excavated soil C, and facilitates advancement of the casing 19 into the underground 11, so that excavation is performed extremely. Can be made easier.

【0022】また、掘削水Wが掘削土Cとともに、ケー
シング19の内周を伝わり地表面に排出されるため、ケ
ーシング19の内周と地中障害物13との間には、間隙
Kが形成され、この間隙Kにより、地中障害物13を地
上に吊り上げる時の摩擦抵抗が小さくなり、地中障害物
13を容易に吊り上げることができる。さらに、上述し
た地中障害物13の除去工法では、地中障害物13にア
ンカー体27を設置し、アンカー体27を介して地中障
害物13を地上に吊り上げるようにしたので、地中障害
物13を容易,確実に吊り上げることができる。
Further, since the drilling water W travels along the excavated soil C along the inner periphery of the casing 19 and is discharged to the ground surface, a gap K is formed between the inner periphery of the casing 19 and the underground obstacle 13. The gap K reduces frictional resistance when the underground obstacle 13 is lifted on the ground, and the underground obstacle 13 can be easily lifted. Further, in the above-described method of removing the underground obstacle 13, the anchor body 27 is installed on the underground obstacle 13, and the underground obstacle 13 is lifted to the ground via the anchor body 27. The object 13 can be easily and reliably lifted.

【0023】なお、上述した実施形態では、地中障害物
13にアンカー体27を設置し、アンカー体27を介し
て地中障害物13を地上に吊り上げるようにした例につ
いて説明したが、必ずしもアンカー体27を設置する必
要はない。すなわち、例えば、図9に示すように、大型
クレーン41にコアキャッチ機構43を取り付け、この
コアキャッチ機構43により地中障害物13の上端部を
強固に掴むことにより、地中障害物13の地盤からの腰
切り作業、および、地中障害物13の引き上げを行うこ
とができる。
In the above-described embodiment, an example has been described in which the anchor body 27 is installed on the underground obstacle 13 and the underground obstacle 13 is lifted on the ground via the anchor body 27. There is no need to install the body 27. That is, for example, as shown in FIG. 9, the core catch mechanism 43 is attached to the large crane 41, and the upper end of the underground obstacle 13 is firmly gripped by the core catch mechanism 43, so that the ground of the underground obstacle 13 is grounded. , And lifting of the underground obstacle 13 can be performed.

【0024】また、例えば、図10に示すように、大型
クレーン41にハンマーグラブ45を取り付け、このハ
ンマーグラブ45により地中障害物13の上端部を強固
に掴むことにより、地中障害物13の地盤からの腰切り
作業、および、地中障害物13の引き上げを行うことが
できる。
For example, as shown in FIG. 10, a hammer glove 45 is attached to a large crane 41, and the upper end of the underground obstacle 13 is firmly gripped by the hammer glove 45, so that the underground obstacle 13 It is possible to perform a waist cutting operation from the ground and to lift the underground obstacle 13.

【0025】図11ないし図16は、本発明の地中障害
物の除去工法の第2の実施形態を示している。この実施
形態では、地中11には、図11の(a)に示すよう
に、過去に構築された柱列遮断土留壁構造物の柱列式連
続壁51が埋設されている。この柱列式連続壁51は、
図11の(b)に示すように、例えば、モルタルからな
る壁部53の間に、所定間隔を置いて、応力負担材であ
るH型鋼材等の杭体55を配置して構成されている。
FIGS. 11 to 16 show a second embodiment of the underground obstacle removing method according to the present invention. In this embodiment, as shown in FIG. 11A, a column-type continuous wall 51 of a column-type blocking earth retaining wall structure constructed in the past is buried in the underground 11. This pillar row continuous wall 51
As shown in FIG. 11B, for example, a pile body 55 such as an H-shaped steel material as a stress-bearing material is arranged at predetermined intervals between wall portions 53 made of mortar. .

【0026】これ等の杭体55は、長手方向を上下にし
て地中11に垂直に位置されている。そして、この実施
形態では、その中の一本の杭体55の除去が行われる。
この実施形態では、先ず、図11の(a)に示すよう
に、杭体55の上方の地面15に、削孔機57が設置さ
れる。そして、この削孔機57に削孔ドリル59が取り
付けられ、削孔ドリル59により、図11の(c)に示
すように、杭体55の両側の壁部53に、杭体55に沿
って掘削孔53aが形成される。
The piles 55 are vertically arranged in the ground 11 with the longitudinal direction up and down. In this embodiment, one of the piles 55 is removed.
In this embodiment, first, as shown in FIG. 11A, a drilling machine 57 is installed on the ground 15 above the pile 55. Then, a drill 59 is attached to the drilling machine 57, and the drill 59 is applied to the wall 53 on both sides of the pile 55 along the pile 55 as shown in FIG. A drill hole 53a is formed.

【0027】次に、図12に示すように、削孔機57
に、オールケーシング工法用のケーシング削孔押し込み
装置17Aが設置される。そして、ケーシング19の上
端に、スイベル機構を用いた送水用器具29Aが設置さ
れる。この送水用器具29Aには、送水ポンプ31Aか
らのホース33が接続される。
Next, as shown in FIG.
Then, a casing drilling and pushing device 17A for the all casing method is installed. Then, at the upper end of the casing 19, a water supply device 29A using a swivel mechanism is installed. The hose 33 from the water supply pump 31A is connected to the water supply device 29A.

【0028】この時のケーシング19の位置は、図13
に示すように、杭体55の両側の壁部53に形成される
掘削孔53aを横切るような位置とされる。そして、ケ
ーシング19が、図14に概略的に示すように、その先
端から掘削水Wを流出しながら回転した状態で、杭体5
5を囲むようにして壁部53を前進される。
The position of the casing 19 at this time is shown in FIG.
As shown in the figure, the position is set so as to cross the excavation hole 53a formed in the wall portion 53 on both sides of the pile 55. Then, as shown schematically in FIG. 14, the pile body 5 is rotated in a state where the casing 19 is rotated while the excavation water W flows out from the tip thereof.
The wall 53 is advanced so as to surround the wall 5.

【0029】このケーシング19の前進により、杭体5
5の外側を囲んで環状溝35Aが形成される。このよう
にケーシング19の先端から掘削水Wを流出することに
より、掘削水Wが壁部53のモルタルMとともに、ケー
シング19の内周および外周を伝わり地表面に排出され
る。
As the casing 19 advances, the pile 5
An annular groove 35A is formed so as to surround the outside of 5. As the drilling water W flows out from the tip of the casing 19 in this manner, the drilling water W travels along the inner and outer circumferences of the casing 19 together with the mortar M of the wall 53 and is discharged to the ground surface.

【0030】そして、この時の掘削水Wが、ケーシング
19とモルタルMとの間の摩擦力を低減し、ケーシング
19のモルタルMへの前進を容易なものにする。また、
掘削水WがモルタルMとともに、ケーシング19の内周
を伝わり地表面に排出されるため、ケーシング19の内
周と杭体55との間には、間隙Kが形成され、この間隙
Kにより、後に杭体55を地上に吊り上げる時の摩擦抵
抗が小さくなる。
Then, the drilling water W at this time reduces the frictional force between the casing 19 and the mortar M, and facilitates the advance of the casing 19 to the mortar M. Also,
Since the drilling water W is transmitted to the ground surface along the inner periphery of the casing 19 together with the mortar M, a gap K is formed between the inner periphery of the casing 19 and the pile body 55, and the gap K is formed later by the gap K. Friction resistance when the pile 55 is lifted on the ground is reduced.

【0031】そして、ケーシング19の先端が、杭体5
5の下端まで前進したところでケーシング19の打ち込
みが中止される。この後、図示しないボーリングマシン
を使用して杭体55の上部に小口径の穴が形成され、図
15に示すように、アンカー体27Aが設置される。そ
して、ジャッキ61により、アンカー体27が上方に牽
引され、杭体55の下端が地盤から分離される。
The tip of the casing 19 is
The driving of the casing 19 is stopped when it advances to the lower end of the casing 5. Thereafter, a small-diameter hole is formed in the upper part of the pile body 55 using a boring machine (not shown), and the anchor body 27A is installed as shown in FIG. Then, the anchor 61 is pulled upward by the jack 61, and the lower end of the pile 55 is separated from the ground.

【0032】次に、図16の(a)に示すように、大型
クレーン41が設置される。そして、大型クレーン41
により、アンカー体27を吊り上げることにより、杭体
55が地上に吊り上げられ、杭体55の取り除き作業が
完了する。なお、この実施形態では、大型クレーン41
の吊り上げ長より、杭体55の長さが長いため、図16
の(b)に示すように、ワイヤソーにより杭体55を切
断しながら、数回に分けて杭体55の引き上げが行われ
る。
Next, as shown in FIG. 16A, a large crane 41 is installed. And the large crane 41
Thus, the pile body 55 is lifted on the ground by lifting the anchor body 27, and the work of removing the pile body 55 is completed. In this embodiment, the large crane 41
Since the length of the pile 55 is longer than the lifting length of
(B), the pile 55 is pulled up several times while cutting the pile 55 with a wire saw.

【0033】上述した地中障害物の除去工法では、予
め、柱列式連続壁51を構成する杭体55の両側の壁部
53に掘削孔53aを形成した後、掘削孔53aを縦断
して環状溝35Aを形成するようにしたので、柱列式連
続壁51を構成する杭体55を容易,確実に除去するこ
とができる。すなわち、上述した工法では、円筒状のケ
ーシング19を、その先端から掘削水Wを流出しながら
回転させて、壁部53内を前進させるようにしてので、
図14に示したように、掘削水WがモルタルMととも
に、ケーシング19の内周および外周を伝わり地表面に
排出される。
In the above-mentioned underground obstacle removing method, after excavation holes 53a are formed in advance in the wall portions 53 on both sides of the pile body 55 constituting the column-type continuous wall 51, the excavation holes 53a are cut vertically. Since the annular groove 35A is formed, the pile 55 constituting the column-type continuous wall 51 can be easily and reliably removed. That is, in the above-described construction method, the cylindrical casing 19 is rotated while the excavation water W flows out from the tip thereof, so that the inside of the wall 53 is advanced.
As shown in FIG. 14, the drilling water W travels along the inner and outer circumferences of the casing 19 together with the mortar M and is discharged to the ground surface.

【0034】そして、この時の掘削水Wが、ケーシング
19とモルタルMとの間の摩擦力を低減し、ケーシング
19の地中11への前進を容易なものにするため、掘削
を非常に容易なものにすることができ、また、騒音,振
動の発生を小さなものにすることができる。また、掘削
水WがモルタルMとともに、ケーシング19の内周を伝
わり地表面に排出されるため、ケーシング19の内周と
杭体55との間には、間隙Kが形成され、この間隙Kに
より、杭体55を地上に吊り上げる時の摩擦抵抗が小さ
くなり、杭体55を容易に吊り上げることができる。
The drilling water W at this time reduces the frictional force between the casing 19 and the mortar M, and facilitates the advancement of the casing 19 into the underground 11, so that excavation is very easy. And the generation of noise and vibration can be reduced. Further, since the drilling water W is transmitted to the ground surface along with the mortar M along the inner circumference of the casing 19, a gap K is formed between the inner circumference of the casing 19 and the pile 55, and the gap K is formed by the gap K. Therefore, the frictional resistance when the pile 55 is lifted on the ground is reduced, and the pile 55 can be easily lifted.

【0035】さらに、上述した地中障害物の除去工法で
は、予め、杭体55の両側の壁部53に掘削孔53aを
形成するようにしたので、杭体55が所定位置に直線状
に配置されているかどうかを事前に確認することができ
る。また、掘削孔53aを縦断して環状溝35Aを形成
するようにしたので、ケーシング19と壁部53との間
の摩擦力が低減され、ケーシング19の地中11への前
進をより容易なものにすることができる。
Further, in the above-described underground obstacle removing method, since the excavation holes 53a are formed in the wall portions 53 on both sides of the pile 55 in advance, the pile 55 is linearly arranged at a predetermined position. You can check in advance whether it is done. Further, since the annular groove 35A is formed by vertically cutting the excavation hole 53a, the frictional force between the casing 19 and the wall 53 is reduced, and the casing 19 can be easily advanced into the underground 11. Can be

【0036】図17は、上述したケーシング19の先端
に配置される第1のケーシング63の詳細を示すもの
で、この第1のケーシング63の先端には、所定角度を
置いて多数の削孔用のビット65が配置されている。ま
た、例えば、60度の角度を置いて、掘削水Wを流出す
るためのノズル部67が形成されている。
FIG. 17 shows the details of the first casing 63 disposed at the tip of the above-described casing 19. The tip of the first casing 63 is provided at a predetermined angle with a large number of holes for drilling. Bit 65 is arranged. Further, for example, a nozzle portion 67 for flowing out the drilling water W is formed at an angle of 60 degrees.

【0037】第1のケーシング63の上部には、上側ジ
ョイント部69が形成されている。この上側ジョイント
部69の外周には、ノズル部67に対応する位置に、嵌
合突部71が形成されている。そして、この嵌合突部7
1の上端面に形成される穴部71aから、通水パイプ7
3が挿入され、通水パイプ73の先端がノズル部67に
接続されている。
An upper joint 69 is formed on the upper part of the first casing 63. A fitting projection 71 is formed on the outer periphery of the upper joint 69 at a position corresponding to the nozzle 67. And this fitting projection 7
1 through a hole 71a formed in the upper end face of the water pipe 7
3 is inserted, and the tip of the water pipe 73 is connected to the nozzle 67.

【0038】また、上側ジョイント部69の外周には、
所定角度を置いて螺子穴75が形成されている。この上
側ジョイント部69は、第2のケーシング77の下端に
形成される下側ジョイント部79に接続可能とされてい
る。下側ジョイント部79には、第1のケーシング63
の上側ジョイント部69に形成される嵌合突部71に嵌
合する嵌合凹部81が形成されている。
On the outer periphery of the upper joint 69,
A screw hole 75 is formed at a predetermined angle. The upper joint 69 can be connected to a lower joint 79 formed at the lower end of the second casing 77. The lower casing 79 includes a first casing 63.
A fitting recess 81 that fits into the fitting projection 71 formed in the upper joint 69 is formed.

【0039】この嵌合凹部81の上端面には、穴部が形
成され、通水パイプ83の下端が突出されている。そし
て、第2のケーシング77の下側ジョイント部79に形
成される嵌合凹部81に、第1のケーシング63の上側
ジョイント部69に形成される嵌合突部71を嵌合し、
下側ジョイント部79に形成されるボルト穴85からボ
ルト87を挿入し、ボルト87の先端を上側ジョイント
部69に形成される螺子穴75に螺合することにより、
第1のケーシング63に第2のケーシング77が連結さ
れる。
A hole is formed in the upper end surface of the fitting recess 81, and the lower end of the water pipe 83 projects. Then, the fitting projection 71 formed on the upper joint 69 of the first casing 63 is fitted into the fitting recess 81 formed on the lower joint 79 of the second casing 77,
By inserting a bolt 87 from a bolt hole 85 formed in the lower joint portion 79 and screwing a tip of the bolt 87 into a screw hole 75 formed in the upper joint portion 69,
The second casing 77 is connected to the first casing 63.

【0040】図18は、第2のケーシング77の詳細を
示すもので、この第2のケーシング77の下部には、図
17に示した下側ジョイント部79が形成されている。
また、上部には、上側ジョイント部89が形成されてい
る。この上側ジョイント部89は、図17に示した第1
のケーシング63の上側ジョイント部69と同様に構成
されているため、同一部分には同一符号を付して詳細な
説明を省略する。
FIG. 18 shows the details of the second casing 77. The lower joint 79 shown in FIG. 17 is formed at the lower part of the second casing 77.
Further, an upper joint portion 89 is formed on the upper part. This upper joint portion 89 is formed by the first joint shown in FIG.
, The same portions are denoted by the same reference numerals, and detailed description thereof will be omitted.

【0041】そして、上側ジョイント部89に形成され
る嵌合突部71の上端面に形成される穴部71aから、
通水パイプ83が挿入され、通水パイプ83の先端が、
下側ジョイント部79の嵌合凹部81の上端面に形成さ
れる穴部から突出されている。このように構成される第
2のケーシング77を順次接続することにより、通水パ
イプ83が、先端の通水パイプ73まで延在されるケー
シング19を容易に得ることができる。
Then, from the hole 71a formed on the upper end surface of the fitting projection 71 formed on the upper joint 89,
The water pipe 83 is inserted, and the tip of the water pipe 83 is
It protrudes from a hole formed in the upper end surface of the fitting concave portion 81 of the lower joint portion 79. By sequentially connecting the second casings 77 thus configured, the casing 19 in which the water pipe 83 extends to the water pipe 73 at the tip can be easily obtained.

【0042】なお、上述した実施形態では、杭体からな
る地中障害物の除去に本発明を適用した例について説明
したが、本発明はかかる実施形態に限定されるものでは
なく、地中に埋設される障害物の除去に広く適用するこ
とができる。
In the above-described embodiment, an example in which the present invention is applied to the removal of an underground obstacle composed of a pile body has been described. However, the present invention is not limited to such an embodiment, and is not limited to the underground. It can be widely applied to removal of buried obstacles.

【0043】[0043]

【発明の効果】以上述べたように、請求項1の地中障害
物の除去工法では、円筒状のケーシングを、その先端か
ら掘削水を流出しながら回転させて、地中内を前進さ
せ、地中障害物の外側を囲んで環状溝を形成した後、地
中障害物を地上に吊り上げるようにしたので、既存杭等
の地中障害物を容易,確実に除去することができる。
As described above, in the method of removing an underground obstacle according to the first aspect, the cylindrical casing is rotated while the excavation water flows out from the tip thereof to advance the ground. After forming an annular groove around the outside of the underground obstacle, the underground obstacle is lifted on the ground, so that underground obstacles such as existing piles can be easily and reliably removed.

【0044】請求項2の地中障害物の除去工法では、地
中障害物にアンカー体を設置し、アンカー体を介して地
中障害物を地上に吊り上げるようにしたので、地中障害
物を容易,確実に吊り上げることができる。請求項3の
地中障害物の除去工法では、予め、柱列式連続壁を構成
する杭体の両側の壁部に掘削孔を形成した後、掘削孔を
縦断して環状溝を形成するようにしたので、柱列式連続
壁を構成する杭体を容易,確実に除去することができ
る。
In the method of removing underground obstacles according to the second aspect, an underground obstacle is installed on an underground obstacle, and the underground obstacle is lifted to the ground via the anchor body. Easy and reliable lifting. In the method of removing underground obstacles according to claim 3, after excavation holes are formed in advance on both side walls of the pile body constituting the column-type continuous wall, the excavation holes are longitudinally formed to form an annular groove. Therefore, the piles constituting the column-type continuous wall can be easily and reliably removed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の地中障害物の除去工法の第1の実施形
態における削孔工程を示す説明図である。
FIG. 1 is an explanatory view showing a drilling step in a first embodiment of the underground obstacle removing method according to the present invention.

【図2】図1の後に行われる地中障害物への削孔工程を
示す説明図である。
FIG. 2 is an explanatory view showing a drilling step for an underground obstacle performed after FIG. 1;

【図3】図2の後に行われる地中障害物へのアンカー体
の設置工程を示す説明図である。
FIG. 3 is an explanatory view showing a step of installing an anchor body on an underground obstacle performed after FIG. 2;

【図4】図3の後に行われるケーシング削孔押し込み装
置等の設置工程を示す説明図である。
FIG. 4 is an explanatory view showing an installation process of a casing drilling and pushing device and the like performed after FIG. 3;

【図5】図4の後に行われるケーシングの打ち込み工程
を示す説明図である。
FIG. 5 is an explanatory diagram showing a casing driving step performed after FIG. 4;

【図6】図5の後に行われるアンカー体の牽引工程を示
す説明図である。
FIG. 6 is an explanatory view showing a step of pulling the anchor body performed after FIG. 5;

【図7】図6の後に行われる地中障害物の引き抜き工程
を示す説明図である。
FIG. 7 is an explanatory diagram showing a step of pulling out an underground obstacle performed after FIG. 6;

【図8】図7の後に地中障害物を引き抜いた状態を示す
説明図である。
FIG. 8 is an explanatory diagram showing a state where an underground obstacle is pulled out after FIG. 7;

【図9】コアキャッチ機構を使用した地中障害物の引き
抜き工程を示す説明図である。
FIG. 9 is an explanatory diagram showing a step of pulling out an underground obstacle using a core catch mechanism.

【図10】ハンマーグラブを使用した地中障害物の引き
抜き工程を示す説明図である。
FIG. 10 is an explanatory view showing a step of pulling out an underground obstacle using a hammer grab.

【図11】本発明の地中障害物の除去工法の第2の実施
形態における削孔工程を示す説明図である。
FIG. 11 is an explanatory view showing a drilling step in a second embodiment of the underground obstacle removing method according to the present invention.

【図12】図11の後に行われるケーシング削孔押し込
み装置等の設置工程を示す説明図である。
FIG. 12 is an explanatory view showing an installation step of a casing drilling and pushing device and the like performed after FIG. 11;

【図13】図12におけるケーシングの位置を示す説明
図である。
FIG. 13 is an explanatory diagram showing a position of a casing in FIG.

【図14】図13の後に行われるケーシングの打ち込み
工程を示す説明図である。
FIG. 14 is an explanatory view showing a casing driving step performed after FIG. 13;

【図15】図14の後に行われるアンカー体の牽引工程
を示す説明図である。
FIG. 15 is an explanatory view showing a step of pulling the anchor body performed after FIG. 14;

【図16】図15の後に行われる杭体の引き抜き工程を
示す説明図である。
FIG. 16 is an explanatory view showing a step of pulling out the pile body performed after FIG. 15;

【図17】本発明に使用される第1のケーシングの詳細
を示す説明図である。
FIG. 17 is an explanatory diagram showing details of a first casing used in the present invention.

【図18】第1のケーシングに接続される第2のケーシ
ングの詳細を示す説明図である。
FIG. 18 is an explanatory diagram showing details of a second casing connected to the first casing.

【符号の説明】[Explanation of symbols]

11 地中 13 地中障害物 19 ケーシング 35 環状溝 51 柱列式連続壁 53 壁部 53a 掘削孔 55 杭体 W 掘削水 DESCRIPTION OF SYMBOLS 11 Underground 13 Underground obstacle 19 Casing 35 Annular groove 51 Column type continuous wall 53 Wall 53a Drilling hole 55 Pile W W Drilling water

───────────────────────────────────────────────────── フロントページの続き (72)発明者 内海 正人 大阪府大阪市北区松ケ枝町6番22号 日本 基礎技術株式会社内 Fターム(参考) 2D050 AA03 DA03 DA09 DB02 DB03 DB05 DB08 EE07  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Masato Utsumi 6-22, Matsugaeda-cho, Kita-ku, Osaka-shi, Osaka F-term in Basic Technology Co., Ltd. (Reference) 2D050 AA03 DA03 DA09 DB02 DB03 DB05 DB08 EE07

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地中に埋設される地中障害物を除去する
ための地中障害物の除去工法において、 円筒状のケーシングを、その先端から掘削水を流出しな
がら回転させて、前記地中内を前進させ、前記地中障害
物の外側を囲んで環状溝を形成した後、前記地中障害物
を地上に吊り上げることを特徴とする地中障害物の除去
工法。
In an underground obstacle removal method for removing an underground obstacle buried underground, a cylindrical casing is rotated while excavating water flows out from a tip of the cylindrical casing. A method of removing an underground obstacle, comprising: advancing the inside, forming an annular groove around the outside of the underground obstacle, and lifting the underground obstacle above the ground.
【請求項2】 請求項1記載の地中障害物の除去工法に
おいて、 前記地中障害物にアンカー体を設置し、前記アンカー体
を介して前記地中障害物を地上に吊り上げることを特徴
とする地中障害物の除去工法。
2. The method of removing an underground obstacle according to claim 1, wherein an anchor body is installed on the underground obstacle, and the underground obstacle is lifted to the ground via the anchor body. Underground obstacle removal method.
【請求項3】 請求項1または請求項2記載の地中障害
物の除去工法において、 前記地中障害物は、柱列式連続壁を構成する杭体であ
り、予め、杭体の両側の壁部に前記杭体に沿って掘削孔
を形成した後、前記掘削孔を縦断して前記環状溝を形成
することを特徴とする地中障害物の除去工法。
3. The method of removing an underground obstacle according to claim 1 or 2, wherein the underground obstacle is a pile that forms a column-type continuous wall, and the pile is formed on both sides of the pile in advance. A method for removing an underground obstacle, comprising: forming an excavation hole in a wall portion along the pile body; and forming the annular groove by cutting the excavation hole longitudinally.
JP20186899A 1999-07-15 1999-07-15 Ground obstruction removal method Expired - Fee Related JP4113305B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20186899A JP4113305B2 (en) 1999-07-15 1999-07-15 Ground obstruction removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20186899A JP4113305B2 (en) 1999-07-15 1999-07-15 Ground obstruction removal method

Publications (2)

Publication Number Publication Date
JP2001026929A true JP2001026929A (en) 2001-01-30
JP4113305B2 JP4113305B2 (en) 2008-07-09

Family

ID=16448228

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20186899A Expired - Fee Related JP4113305B2 (en) 1999-07-15 1999-07-15 Ground obstruction removal method

Country Status (1)

Country Link
JP (1) JP4113305B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984624A (en) * 2019-12-20 2020-04-10 中建一局集团建设发展有限公司 Ultralong vertical underground steel pipe pulling-out system and construction method thereof
CN112663612A (en) * 2020-12-15 2021-04-16 陕西建工第六建设集团有限公司 Low-cost pile pulling construction method for collapsible area
CN113047286A (en) * 2021-03-24 2021-06-29 凡天建筑科技有限公司 Pile pulling device and pile pulling construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3759947B1 (en) * 2004-11-02 2006-03-29 株式会社コガネイ Magnet type rodless cylinder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984624A (en) * 2019-12-20 2020-04-10 中建一局集团建设发展有限公司 Ultralong vertical underground steel pipe pulling-out system and construction method thereof
CN110984624B (en) * 2019-12-20 2024-04-05 中建一局集团建设发展有限公司 Ultra-long vertical underground steel pipe pulling-out system and construction method thereof
CN112663612A (en) * 2020-12-15 2021-04-16 陕西建工第六建设集团有限公司 Low-cost pile pulling construction method for collapsible area
CN113047286A (en) * 2021-03-24 2021-06-29 凡天建筑科技有限公司 Pile pulling device and pile pulling construction method

Also Published As

Publication number Publication date
JP4113305B2 (en) 2008-07-09

Similar Documents

Publication Publication Date Title
JP2009263966A (en) Removal method of existing pile
JP3834571B2 (en) Construction method for underground structures
JP2001026929A (en) Method for removing underground obstacle
JP2001146746A (en) Pull-out method for existing pile, and drilling casing to be used therefor
JP2005180112A (en) Ground improvement structure and ground improvement method
JPH09302654A (en) Construction method and device for driving steel pipe pile
JP3388723B2 (en) Drilling device and drilling method
JPH04281991A (en) Method and apparatus for improving ground for connecting shield machine
JP2008174981A (en) Column building-up device and column building-up method
KR20040099714A (en) Sheet Pile and Construction Method thereof
JP2005155209A (en) Universal excavator and ground improvement method
JP2001182496A (en) Water leakage measure of tunnel
JPH11159274A (en) Excavating tool
JP3680963B2 (en) Method of burying main pipe and branch pipe in buried pipe
JPH04124395A (en) Excavator for goelogic survey
JP2000220376A (en) Pipe-roof construction method
JP3829782B2 (en) Excavation method
JP3283392B2 (en) Sheath tube used for reinforcing steel holding method
JPH10115168A (en) Steel tube installing hole forming device and steel tube sheet pile forming method
JP2000337079A (en) Double pipe type drilling method, device therefor, and buried pipe pushing adapter
JPH1046971A (en) Inner and outer bits for location of casing and casing drive bit device equipped with inner and outer bits
JPH07116900B2 (en) Modified boring equipment
JPH0650465A (en) Process of attaching branch pipe to underground main pipe
JPH05295730A (en) Earth anchor driving method
JPH05311646A (en) Pile forming pipe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060616

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080129

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080313

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080408

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080411

R150 Certificate of patent or registration of utility model

Ref document number: 4113305

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110418

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120418

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130418

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130418

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140418

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees