JP2000291262A - Erection piece for column erection and column erection method - Google Patents

Erection piece for column erection and column erection method

Info

Publication number
JP2000291262A
JP2000291262A JP11100106A JP10010699A JP2000291262A JP 2000291262 A JP2000291262 A JP 2000291262A JP 11100106 A JP11100106 A JP 11100106A JP 10010699 A JP10010699 A JP 10010699A JP 2000291262 A JP2000291262 A JP 2000291262A
Authority
JP
Japan
Prior art keywords
pillar
erection
column
erection piece
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11100106A
Other languages
Japanese (ja)
Inventor
Yusuke Ueno
勇助 上野
Kiyoshi Nagashima
清 長嶋
Satoshi Sanechika
聡 實近
Toshimi Osawa
敏美 大沢
Ken Yamanouchi
謙 山之内
Takao Kawashima
隆夫 川島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP11100106A priority Critical patent/JP2000291262A/en
Publication of JP2000291262A publication Critical patent/JP2000291262A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To accurately join upper-lower layer columns easily in the erection works of steel-framed columns. SOLUTION: The erection piece for column erection has upper erection pieces 20 with upper plates 21 fixed onto side faces at the lower end of an upper layer column 5 and erection set bolts 23 installed in a position adjustable manner through holding nuts 22 fixed to parts of the upper plates 20, lower erection pieces 10 with guide sections 12 being fixed at positions aligned in the vertical direction with the upper plates 21 on the side faces at the upper ends of a lower layer column 1 and guiding the lower end of the upper layer column 5 at the fixed place of the top face of the lower layer column 1 when the upper layer column 5 is hung to parts of the guide sections and lower plates 11 in which pedestal sections 17 supporting the lower ends of the erection set bolts 23 are formed, and splice plates for joining the upper erection pieces 20 and the lower erection pieces 10 by bolts after the upper layer column 5 is constructed at the fixed position of the top face of the lower layer column 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は柱建方用エレクショ
ンピースに係り、鉄骨柱の建方作業において、建て込み
及び下層柱との連結が精度よく容易に行えるようにした
柱建方用エレクションピースに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an erection piece for column construction, and more particularly, to an erection piece for column construction, which can be easily and accurately assembled and connected to a lower column in the construction work of a steel column. About.

【0002】[0002]

【従来の技術】従来、鉄骨柱の建て込みにおいて、柱同
士の溶接接合が行われるまで柱の上下方向の連結を保持
させるためにエレクションピースが使用されている。こ
のエレクションピースは仮設建方用部材で、通常は、鉄
骨柱の上下端に仮溶接された状態で現場に搬入される。
2. Description of the Related Art Conventionally, in erection of a steel column, an erection piece is used to maintain the vertical connection of the columns until the columns are welded together. This erection piece is a member for temporary construction, and is usually carried to the site in a state where it is temporarily welded to the upper and lower ends of a steel column.

【0003】図8各図は、鉄骨柱の建方に使用される従
来のエレクションピースの一例と、そのエレクションピ
ースを使用した場合の鉄骨柱の建方作業の施工状態を示
した説明図である。同図には一例として角形鋼管柱の接
合状態が示されている。図8(a)には既設の下層柱5
1の上端側面に固着された下部エレクションピース52
と、下層柱51の頂面に載置され接合される上層柱55
の下端において、下部エレクションピース52と対向す
る位置に固着された上部エレクションピース53とが示
されている。上部エレクションピース53と下部エレク
ションピース52とは上下反転したほぼ同形をなす略長
方形状プレートで、柱仕口近傍の一部は四分円状に切欠
かれスカラップ54が形成され、仕口部分の突合わせ溶
接を容易に行えるようになっている。
FIG. 8 is an explanatory view showing an example of a conventional erection piece used for the construction of a steel column and the construction state of the construction work of the steel column when the erection piece is used. . FIG. 1 shows a joining state of rectangular steel pipe columns as an example. FIG. 8A shows an existing lower pillar 5.
1 is a lower erection piece 52 fixed to the upper end side face
And an upper pillar 55 mounted on and joined to the top surface of the lower pillar 51
At the lower end, an upper erection piece 53 fixed to a position facing the lower erection piece 52 is shown. The upper erection piece 53 and the lower erection piece 52 are substantially rectangular plates having substantially the same shape which is turned upside down, and a part near the column connection is cut out in a quadrant to form a scallop 54, and a projection of the connection is formed. The butt welding can be easily performed.

【0004】このエレクションピース52、53を用い
て、柱の建方を行う場合には、下層柱51上端位置に合
わせて上層柱53を建て込み、上部エレクションピース
53と下部エレクションピース52の位置合わせを行
い、上下のエレクションピースに設けられているボルト
孔を利用して帯板形状のスプライスプレート57をボル
ト56により接合することで下層柱51と上層柱53を
仮接合させるようになっている。
When the columns are to be constructed using the erection pieces 52 and 53, the upper columns 53 are erected at the upper ends of the lower columns 51, and the upper and lower erection pieces 53 and 52 are aligned. The lower pillar 51 and the upper pillar 53 are temporarily joined by joining the strip-shaped splice plate 57 with bolts 56 using bolt holes provided in the upper and lower erection pieces.

【0005】[0005]

【発明が解決しようとする課題】しかし、上述した従来
のエレクションピースを使用した場合、吊りワイヤが上
層柱の上端に取り付けられているため、吊り込んで下層
柱上に載置する際に、図8(b)に示したように、目違
いが発生しやすい。このため、上層柱を吊り上げた状態
で設置位置の微調整を行わなければならない。
However, when the above-mentioned conventional erection piece is used, since the hanging wire is attached to the upper end of the upper pillar, when the wire is hung and placed on the lower pillar, it is difficult to mount the wire. As shown in FIG. 8B, misalignment tends to occur. For this reason, the fine adjustment of the installation position must be performed in a state where the upper pillar is suspended.

【0006】また、柱の鉛直度を出す建て起こし作業を
行うためには建て起こしワイヤが用いられている。この
建て起こしワイヤは一方が柱上端に取り付けられ、斜め
に張設された下端がターンバックル等を介して床等にア
ンカーされている。このターンバックルを用いて柱の鉛
直度の調整を行うようになっている。建て起こしワイヤ
の張り具合をターンバックルで調整する方法では十分な
精度を出すことが難しく、調整作業に手間取るという問
題が生じている。また、積層工法等の場合には、張設さ
れたワイヤが高所作業車の作業バケットの操作や高所作
業用のローリングタワー等の走行の邪魔になるおそれも
ある。
[0006] In addition, a erection wire is used to perform an erecting operation for raising the verticality of a pillar. One of the erecting wires is attached to the upper end of a pillar, and the lower end, which is obliquely stretched, is anchored to a floor or the like via a turnbuckle or the like. This turnbuckle is used to adjust the verticality of the column. It is difficult to obtain sufficient accuracy by the method of adjusting the tension of the erecting wire with the turnbuckle, and there is a problem that the adjustment work takes time. In the case of the laminating method or the like, the stretched wire may obstruct the operation of the work bucket of the aerial work vehicle or the running of a rolling tower or the like for aerial work.

【0007】そこで、本発明の目的は上述した従来の技
術が有する問題点を解消し、柱接合部において迅速な建
て込み、精度よく建て起こし調整ができるようにした柱
建方用エレクションピースを提供することにある。
Accordingly, an object of the present invention is to provide an erection piece for column construction which solves the above-mentioned problems of the prior art and which can be quickly erected at a column joint, and can be raised and adjusted accurately. Is to do.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に、本発明は上層柱の下端側面に固着された上部プレー
トと、該上部プレートの一部に固着された保持ナットを
介して位置調整可能に取り付けられた建て起こし調整ボ
ルトとを有する上部エレクションピースと、下層柱の上
端側面で前記上部プレートと上下方向に揃った位置に固
着され、その一部に前記上層柱が吊り込まれた際に、そ
の下端を該下層柱頂面の所定位置に案内するガイド部
と、前記建て起こし調整ボルトの下端を支持する台座部
が設けられた下部プレートとを有する下部エレクション
ピースと、前記上層柱が下層柱頂面の所定位置に建て込
まれた後に、前記上部エレクションピースと下部エレク
ションピースとをボルト接合するためのスプライスプレ
ートとを備えたことを特徴とする。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides an upper plate fixed to a lower end side surface of an upper pillar and a position adjustment through a holding nut fixed to a part of the upper plate. An upper erection piece having a erection adjustment bolt attached so as to be able to be fixed to a position vertically aligned with the upper plate on the upper end side surface of the lower column, and the upper column is hung on a part thereof. A lower erection piece having a guide portion for guiding the lower end thereof to a predetermined position on the lower pillar top surface, a lower plate provided with a pedestal portion for supporting a lower end of the erecting adjustment bolt, and the upper pillar A splice plate for bolting the upper erection piece and the lower erection piece after being erected at a predetermined position on the top surface of the lower column. And it features.

【0009】また、このエレクションピースを用いた柱
建方方法として、あらかじめ上層柱の下端側面に、その
一部に固着された保持ナットを介して位置調整可能な建
て起こし調整ボルトが取り付けられた上部エレクション
ピースを固着する一方、前記上層柱が吊り込まれた際
に、上層柱下端をその頂面の所定位置に案内するガイド
部と、前記建て起こし調整ボルトの下端を支持する台座
部とが設けられた下部エレクションピースを、前記上部
エレクションピースと上下方向に揃った位置の下層柱の
上端側面に固着しておき、前記上層柱を前記下層柱頂面
上に建て込む際に、前記ガイド部により前記上層柱の下
端を前記下層柱頂面上の所定位置に案内するとともに、
前記建て起こし調整ボルトにより建て起こし調整を行
い、上層柱の鉛直が得られた段階で前記上部エレクショ
ンピースと下部エレクションピースとをスプライスプレ
ートを介してボルト接合し、前記上層柱と下層柱との仮
接合を行うようにしたことを特徴とする。
As a method of constructing a pillar using the erection piece, an upper-layer pillar is provided with an erecting adjustment bolt having a position adjustable via a holding nut fixed to a part of a lower end of the upper column in advance. While the erection piece is fixed, a guide portion for guiding the lower end of the upper pillar to a predetermined position on the top surface when the upper pillar is suspended, and a pedestal portion for supporting a lower end of the erecting adjustment bolt are provided. The lower erection piece is fixed to the upper side surface of the lower pillar at a position aligned vertically with the upper erection piece, and when the upper pillar is built on the lower pillar top surface, While guiding the lower end of the upper pillar to a predetermined position on the top surface of the lower pillar,
The erecting adjustment bolt is used to perform erecting adjustment, and when the vertical of the upper pillar is obtained, the upper erection piece and the lower erection piece are bolted together via a splice plate to temporarily connect the upper pillar and the lower pillar. It is characterized in that joining is performed.

【0010】[0010]

【発明の実施の形態】以下、本発明の柱建方用エレクシ
ョンピースの一実施の形態について、添付図面を参照し
て説明する。図1は本発明の下層柱の上端部及び上層柱
の下端部に取り付けられた本発明の柱建方用エレクショ
ンピースを示した斜視図である。同図に示したように本
実施の形態では角形鋼管柱が用いられ、この角形鋼管柱
1、5の上下端にエレクションピース10、20が取り
付けられている。蓋板2で閉塞された下層柱1の上端部
の各側面には下部エレクションピース10が溶接されて
いる。この下部エレクションピース10は後述する上部
エレクションピース20と一対をなし、下部エレクショ
ンピース10と上部エレクションピース20とを、スプ
ライスプレート30を介してボルト接合することにより
下層柱1と上層柱5とを仮接合できるようになってい
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of an erection piece for column construction according to the present invention will be described below with reference to the accompanying drawings. FIG. 1 is a perspective view showing a pillar construction erection piece of the present invention attached to the upper end of a lower pillar of the present invention and the lower end of an upper pillar. As shown in the figure, in this embodiment, rectangular steel pipe columns are used, and erection pieces 10, 20 are attached to the upper and lower ends of the square steel pipe columns 1, 5. A lower erection piece 10 is welded to each side surface of the upper end of the lower pillar 1 closed by the cover plate 2. The lower erection piece 10 forms a pair with an upper erection piece 20 to be described later, and the lower erection piece 10 and the upper erection piece 20 are bolted together via a splice plate 30 to temporarily connect the lower pillar 1 and the upper pillar 5. It can be joined.

【0011】下部エレクションピース10の本体プレー
ト11は柱溶接用の円弧状切欠からなるスカラップ13
の半分より上部が下層柱1の上端側面から上方に突出す
るように柱各辺の中央位置に溶接接合されている。本体
プレート11の柱面側に形成された円弧状切欠(スカラ
ップ)13の上側には円弧状面取りされた吊り込みガイ
ド12が形成されている。さらに本体プレート11には
一例として吊り孔14とボルト孔15とが形成されてい
る。
The main body plate 11 of the lower erection piece 10 has a scallops 13 formed of arc-shaped notches for column welding.
Is welded to the center of each side of the lower column 1 so that the upper portion projects upward from the upper end side surface of the lower column 1. An arc-shaped chamfered suspension guide 12 is formed above an arc-shaped notch (scallop) 13 formed on the column surface of the main body plate 11. Further, a suspension hole 14 and a bolt hole 15 are formed in the main body plate 11 as an example.

【0012】本体プレート11の外側面には台座プレー
ト17がこの台座プレート17を支持する本体プレート
11から突出したブラケット16に溶接されている。台
座プレート17は後述する建て起こし調整ボルトの下端
を支持する。
A pedestal plate 17 is welded to an outer surface of the main body plate 11 to a bracket 16 protruding from the main body plate 11 supporting the pedestal plate 17. The pedestal plate 17 supports a lower end of an erecting adjustment bolt described later.

【0013】蓋板2の中央位置には充填コンクリート打
設用の円形開孔3が形成されており、この円形開孔3を
挟んで蓋板2にはレベル調整ボルト40が蓋板2に溶接
されたナット41を介して螺着されている。このレベル
調整ボルト40を調整することでボルト頭を所定レベル
に設定することができ、上層柱5に取り付けられている
荷重受けプレート42と当接して、上層柱5の吊り込み
時に一時的に柱荷重を支持し、上層柱5の溶接開先6を
保護する役割を果たす。
At the center position of the cover plate 2 is formed a circular opening 3 for casting concrete, and a level adjusting bolt 40 is welded to the cover plate 2 with the circular opening 3 interposed therebetween. It is screwed through a nut 41 provided. By adjusting the level adjusting bolt 40, the bolt head can be set at a predetermined level, and comes into contact with the load receiving plate 42 attached to the upper pillar 5 to temporarily suspend the upper pillar 5 when the upper pillar 5 is suspended. It serves to support the load and protect the welding groove 6 of the upper column 5.

【0014】一方、上層柱5の下端側面には上部エレク
ションピース20の本体プレート21が溶接接合されて
いる。この上部エレクションピース20の下端は下部エ
レクションピース10の本体プレート11の突出部分だ
け柱下端から上方に位置して固着されている。本体プレ
ート21の外側面にはボルト保持ナット22が溶接され
ており、この保持ナット22には建て起こし調整ボルト
23が螺合されている。またプレート面には一例として
3個のボルト孔24が設けられている。なお、図1には
2個の上部エレクションピース20が図示されている
が、下層柱1の下部エレクションピース10の位置に対
応した各4面にそれぞれ上部エレクションピース20が
固着されている。
On the other hand, the main body plate 21 of the upper erection piece 20 is welded to the lower side surface of the upper column 5. The lower end of the upper erection piece 20 is fixed above the lower end of the lower erection piece 10 by protruding from the main body plate 11 from the column lower end. A bolt holding nut 22 is welded to the outer surface of the main body plate 21, and an erecting adjustment bolt 23 is screwed to the holding nut 22. In addition, three bolt holes 24 are provided on the plate surface as an example. Although two upper erection pieces 20 are illustrated in FIG. 1, the upper erection pieces 20 are fixed to four surfaces of the lower pillar 1 corresponding to the positions of the lower erection pieces 10, respectively.

【0015】図2は上述した上部エレクションピース2
0と下部エレクションピース10とを、スプライスプレ
ート30を介して高力ボルト31でボルト接合した状態
を示した斜視図である。同図に示したように建て起こし
調整ボルト23によって下層柱1と上層柱5との鉛直度
が確保されてから、仮締めされたボルト31を本締めす
るようになっている。
FIG. 2 shows the upper erection piece 2 described above.
FIG. 2 is a perspective view showing a state in which 0 and a lower erection piece 10 are bolted together with a high-strength bolt 31 via a splice plate 30. As shown in the figure, after the verticality of the lower pillar 1 and the upper pillar 5 is secured by the erecting adjustment bolt 23, the temporarily tightened bolt 31 is fully tightened.

【0016】本発明のエレクションピースを用いた鉄骨
柱の建方作業について図3〜図6を参照して説明する。
なお、図3各図では図の簡単化のために一部のエレクシ
ョンピースの図示を省略している。図3にはすでに建て
込まれた第n節柱(以下、下層柱1)の上端が示されて
おり、この第n節柱に第(n+1)節柱(以下、上層柱
5)を建て込む状態を示した概略説明図である。上層柱
5は吊り治具45から延びた吊りワイヤWによって図示
しないタワークレーン等の揚重機によって吊り上げられ
ている。吊りワイヤWの下端は上層柱5の下部エレクシ
ョンピース10の吊り孔14に定着されている。また、
エレクションピース10、20の仮接合のために用いら
れるスプライスプレート30はあらかじめ上部エレクシ
ョンピース20のボルト孔を利用して仮留めされてい
る。あらかじめ、下層柱1の天端にあるレベル調整ボル
ト40を調整し、柱脚レベルを設計値に合わせておく。
次いで揚重機による上層柱5の吊り込みを行う。上層柱
5を下層柱1の上方まで吊り込み、下層柱1の下部エレ
クションピース10のガイド12に沿って柱5を降下さ
せる。このとき上層柱5側に取り付けられた2枚のスプ
ライスプレート30で下部エレクションピース10を挟
み込むようにする(図3、図4(a)参照)。
The construction of a steel column using the erection piece of the present invention will be described with reference to FIGS.
In addition, in each drawing of FIG. 3, illustration of some erection pieces is omitted for simplification of the drawing. FIG. 3 shows the upper end of the already-built n-th pillar (hereinafter, lower pillar 1), and the (n + 1) -th pillar (hereinafter, upper pillar 5) is built into this n-th pillar. It is the schematic explanatory drawing which showed the state. The upper pillar 5 is lifted by a lifting machine such as a tower crane (not shown) by a lifting wire W extending from a lifting jig 45. The lower end of the suspension wire W is fixed to the suspension hole 14 of the lower erection piece 10 of the upper pillar 5. Also,
The splice plate 30 used for temporary joining of the erection pieces 10 and 20 is temporarily fixed in advance using bolt holes of the upper erection piece 20. The level adjusting bolt 40 at the top end of the lower pillar 1 is adjusted in advance to adjust the pedestal level to the design value.
Next, the upper pillar 5 is suspended by the hoisting machine. The upper pillar 5 is suspended above the lower pillar 1, and the pillar 5 is lowered along the guide 12 of the lower erection piece 10 of the lower pillar 1. At this time, the lower erection piece 10 is sandwiched between the two splice plates 30 attached to the upper pillar 5 side (see FIGS. 3 and 4A).

【0017】上層柱5を下層柱1の頂面に正確に載置し
たら上部エレクションピース20と下部エレクションピ
ース10とを、スプライスプレート30を介して高力ボ
ルトによって仮留めする。この仮留め状態段階で、建て
込まれた上層柱5の建て起こし調整を行う。この上層柱
5の鉛直度は下げ振りとトランシットとを併用して計測
し、その倒れに対応した方向に位置する建て起こし調整
ボルト23を締め込みあるいは緩めることで鉛直度を出
す。柱の鉛直度が得られたら、高力ボルト31の本締め
を行う(図4(b)参照)。
When the upper pillar 5 is accurately placed on the top surface of the lower pillar 1, the upper erection piece 20 and the lower erection piece 10 are temporarily fastened with a high-strength bolt via a splice plate 30. At this stage of the temporary fixing state, the erecting of the upper pillar 5 is adjusted. The verticality of the upper pillar 5 is measured by using both the down swing and the transit, and the verticality is obtained by tightening or loosening the erection adjusting bolt 23 located in the direction corresponding to the fall. When the verticality of the column is obtained, the high-strength bolt 31 is fully tightened (see FIG. 4B).

【0018】図5は上層柱5を吊り込む際の下部エレク
ションピース10のガイド12の作用について説明した
拡大図である。同図に示したように、上方から降下させ
た上層柱5の下端が正確な位置からずれ、その下端開先
部分が下部エレクションピース10のガイド12に接触
した場合、わずかな横引き力を矢印方向に加えることに
より上層柱5の下端はガイド12に案内され下層柱1の
頂面の定位置に載置される。このとき下層柱1の頂面に
配置されたレベル調整ボルト40の先端は上層柱5の内
面に固着された山形鋼からなる当接プレート42と当接
しボルト40で柱荷重を負担するようになっている。
FIG. 5 is an enlarged view for explaining the operation of the guide 12 of the lower erection piece 10 when the upper column 5 is suspended. As shown in the figure, when the lower end of the upper column 5 lowered from above is displaced from the correct position and the lower end groove contacts the guide 12 of the lower erection piece 10, a slight lateral pulling force is applied by an arrow. By adding in the direction, the lower end of the upper pillar 5 is guided by the guide 12 and is placed at a fixed position on the top surface of the lower pillar 1. At this time, the tip of the level adjusting bolt 40 disposed on the top surface of the lower column 1 comes into contact with a contact plate 42 made of angle iron fixed to the inner surface of the upper column 5 so that the bolt 40 bears the column load. ing.

【0019】図6は上層柱5を建て込んだ際に行う建て
起こし作業の状態を示した概略説明図である。たとえば
図示したように上層柱5がわずかに倒れた状態で建て込
まれたことが計測できたら、その倒れ方向の一対の建て
起こし調整ボルト23を締め込みあるいは緩めることで
脚長部分の長さ調整を行い、柱の鉛直度を修正する。図
6に示した状態から建て起こし調整をする場合には、調
整ボルト23Aを締め込むと同時に調整ボルト23Bを
わずかに緩める。これにより柱は矢印A方向にわずかず
つ傾く。この調整作業は下げ振りあるいはトランシット
等で傾き量を確認しながら行い、柱の鉛直度が許容範囲
内になったら、高力ボルト(図示せず)を本締めする。
FIG. 6 is a schematic explanatory view showing a state of the erecting operation performed when the upper pillar 5 is installed. For example, as shown in the figure, if it can be measured that the upper pillar 5 was built with the top column 5 slightly tilted down, the length adjustment of the leg length portion can be performed by tightening or loosening a pair of erecting adjustment bolts 23 in the falling direction. To correct the verticality of the column. When performing the erecting adjustment from the state shown in FIG. 6, the adjusting bolt 23A is tightened and the adjusting bolt 23B is slightly loosened at the same time. As a result, the column slightly tilts in the direction of arrow A. This adjustment work is performed while checking the amount of inclination with a down swing or transit, and when the verticality of the column falls within an allowable range, a high-strength bolt (not shown) is fully tightened.

【0020】図7は本発明のエレクションピースをH形
鋼柱7、8に適用した例を示した斜視図である。H形鋼
柱の場合にはエレクションピース10、20は下層柱
7、上層柱8のそれぞれフランジ外面7a、8aに設け
ることになり、側方のずれはあらかじめウェブ8bに取
り付けられたスプライスプレート9によって規制するこ
とが好ましい。このように本発明のエレクションピース
は各種の柱形状の鉄骨柱の接合部に適用できる。また、
鉄骨造建物に限らず、鉄骨鉄筋コンクリートの鉄骨柱の
接合にも適用することができることは明らかである。
FIG. 7 is a perspective view showing an example in which the erection piece of the present invention is applied to H-shaped steel columns 7 and 8. In the case of an H-shaped steel column, the erection pieces 10 and 20 will be provided on the flange outer surfaces 7a and 8a of the lower column 7 and the upper column 8, respectively, and the lateral displacement will be caused by the splice plate 9 previously attached to the web 8b. It is preferable to regulate. As described above, the erection piece of the present invention can be applied to joints between steel columns having various column shapes. Also,
It is clear that the present invention can be applied not only to steel-framed buildings, but also to joints of steel-framed reinforced concrete columns.

【0021】[0021]

【発明の効果】以上の説明から明らかなように、本発明
によれば従来の鉄骨柱の建方作業において、ワイヤーや
ターンバックル等で調整を行っていた部分に関し、その
位置決めを容易に行えるようになるとともに、建て起こ
し作業の簡略化、精度向上を図ることができるという効
果を奏する。
As is apparent from the above description, according to the present invention, in the conventional work of constructing a steel column, positioning can be easily performed with respect to a portion which has been adjusted with a wire, a turnbuckle or the like. In addition, there is an effect that the erection work can be simplified and the accuracy can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による柱建方用エレクションピースの一
実施の形態を示した斜視図。
FIG. 1 is a perspective view showing an embodiment of an erection piece for column construction according to the present invention.

【図2】図1に示したエレクションピースによる柱接合
状態を示した斜視図。
FIG. 2 is a perspective view showing a column joining state by the erection piece shown in FIG. 1;

【図3】柱の吊り込み状態とエレクションピースの柱へ
の取付状態を示した説明図。
FIG. 3 is an explanatory view showing a suspended state of a column and an attached state of an erection piece to the column.

【図4】柱の建方作業状態の一部を示した状態説明図。FIG. 4 is a state explanatory view showing a part of a column construction work state.

【図5】柱の建方作業状態の一部を示した状態説明図
(吊り込み時)。
FIG. 5 is a state explanatory view showing a part of a column construction work state (at the time of hanging).

【図6】柱の建方作業状態の一部を示した状態説明図
(建て起こし調整時)。
FIG. 6 is a state explanatory view showing a part of a column construction work state (at the time of erecting adjustment).

【図7】柱建方用エレクションピースを他の形状の柱に
適用した例を示した斜視図。
FIG. 7 is a perspective view showing an example in which the column erection piece is applied to a column having another shape.

【図8】従来のエレクションピースによる鉄骨柱の建方
作業の状態を示した説明図。
FIG. 8 is an explanatory view showing a state of a construction work of a steel column by a conventional erection piece.

【符号の説明】[Explanation of symbols]

1,7 下層柱 5,8 上層柱10 下部エレクションピース 11、21 本体プレート 12 ガイド 17 台座プレート20 上部エレクションピース 22 保持ナット 23 建て起こし調整ボルト 9,30 スプライスプレート 31 高力ボルト 40 レベル調整ボルト 45 吊り治具1,7 Lower layer pillar 5,8 Upper layer pillar 10 Lower erection piece 11,21 Main body plate 12 Guide 17 Pedestal plate 20 Upper erection piece 22 Holding nut 23 Erecting adjustment bolt 9,30 Splice plate 31 High strength bolt 40 Level adjustment bolt 45 Hanging jig

───────────────────────────────────────────────────── フロントページの続き (72)発明者 實近 聡 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 大沢 敏美 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 山之内 謙 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 川島 隆夫 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 Fターム(参考) 2E174 AA01 BA03 CA03 CA13 DA12 DA32 DA33 DA41 DA57 DA58 DA62 DA63 DA67  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Satoshi Nikachi 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Tosumi Osawa 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Ken Yamanouchi 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Takao Kawashima 1-2-3 Shibaura, Minato-ku, Tokyo Shimizu Corporation F term (reference) 2E174 AA01 BA03 CA03 CA13 DA12 DA32 DA33 DA41 DA57 DA58 DA62 DA63 DA67

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】上層柱の下端側面に固着された上部プレー
トと、該上部プレートの一部に固着された保持ナットを
介して位置調整可能に取り付けられた建て起こし調整ボ
ルトとを有する上部エレクションピースと、 下層柱の上端側面で前記上部プレートと上下方向に揃っ
た位置に固着され、その一部に前記上層柱が吊り込まれ
た際に、上層柱下端を該下層柱頂面の所定位置に案内す
るガイド部と、前記建て起こし調整ボルトの下端を支持
する台座部が設けられた下部プレートとを有する下部エ
レクションピースと、 前記上層柱が下層柱頂面の所定位置に建て込まれた後
に、前記上部エレクションピースと下部エレクションピ
ースとをボルト接合するためのスプライスプレートとを
備えたことを特徴とする柱建方用エレクションピース。
1. An upper erection piece having an upper plate fixed to a lower end side surface of an upper pillar, and an erecting adjustment bolt mounted so as to be position-adjustable via a holding nut fixed to a part of the upper plate. When the upper pillar is suspended in a part thereof, the lower end of the upper pillar is fixed to a predetermined position on the top surface of the lower pillar when the upper pillar is suspended in a part thereof. A guide portion for guiding, a lower erection piece having a lower plate provided with a pedestal portion for supporting a lower end of the erecting adjustment bolt, and after the upper column is erected at a predetermined position on the top surface of the lower column, An erection piece for column building, comprising: a splice plate for bolting the upper erection piece and the lower erection piece.
【請求項2】あらかじめ上層柱の下端側面に、その一部
に固着された保持ナットを介して位置調整可能な建て起
こし調整ボルトが取り付けられた上部エレクションピー
スを固着する一方、前記上層柱が吊り込まれた際に、上
層柱下端を下層柱頂面の所定位置に案内するガイド部と
前記建て起こし調整ボルトの下端を支持する台座部とが
設けられた下部エレクションピースを、前記上部エレク
ションピースと上下方向に揃った位置の下層柱の上端側
面に固着しておき、前記上層柱を前記下層柱頂面上に建
て込む際に、前記ガイド部により前記上層柱の下端を前
記下層柱頂面上の所定位置に案内するとともに、前記建
て起こし調整ボルトにより建て起こし調整を行い、上層
柱の鉛直が得られた段階で前記上部エレクションピース
と下部エレクションピースとをスプライスプレートを介
してボルト接合し、前記上層柱と下層柱との接合を行う
ようにしたことを特徴とする柱建方方法。
2. An upper erection piece, to which an erecting adjustment bolt capable of adjusting a position is attached in advance to a lower side surface of an upper pillar through a holding nut fixed to a part of the upper pillar, is fixed. When inserted, a lower erection piece provided with a guide portion for guiding the lower end of the upper pillar to a predetermined position on the top surface of the lower pillar and a pedestal portion for supporting the lower end of the erecting adjustment bolt, the upper erection piece It is fixed to the upper end side surface of the lower pillar at a position aligned in the vertical direction, and when the upper pillar is built on the top surface of the lower pillar, the lower end of the upper pillar is placed on the top surface of the lower pillar by the guide portion. At the predetermined position, and perform the erecting adjustment with the erecting adjustment bolt. When the vertical of the upper pillar is obtained, the upper and lower election pieces and the lower Hashirakenkata method characterized by the pieces and bolted through the splice plates, and to perform the bonding between the upper column and a lower column.
JP11100106A 1999-04-07 1999-04-07 Erection piece for column erection and column erection method Pending JP2000291262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11100106A JP2000291262A (en) 1999-04-07 1999-04-07 Erection piece for column erection and column erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11100106A JP2000291262A (en) 1999-04-07 1999-04-07 Erection piece for column erection and column erection method

Publications (1)

Publication Number Publication Date
JP2000291262A true JP2000291262A (en) 2000-10-17

Family

ID=14265143

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11100106A Pending JP2000291262A (en) 1999-04-07 1999-04-07 Erection piece for column erection and column erection method

Country Status (1)

Country Link
JP (1) JP2000291262A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002349071A (en) * 2001-05-24 2002-12-04 Dai Nippon Construction Erection adjusting tool for pillar and erecting method
KR100487578B1 (en) * 2002-08-02 2005-05-03 최종해 Vertical scaffolding
CN102409866A (en) * 2011-09-22 2012-04-11 中广核工程有限公司 Auxiliary component for vertical butting operation and construction method
JP2012207410A (en) * 2011-03-29 2012-10-25 Taisei Corp Connection structure for column member, and construction method for tower-like structure
JP2013194368A (en) * 2012-03-16 2013-09-30 Technos Kk Method for correcting inclination of core material element
CN108999415A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A kind of method that box column uses high-strength bolt and connecting plate integrated positioning interface
JP2019065509A (en) * 2017-09-29 2019-04-25 株式会社竹中工務店 Separation and re-connection method of skeleton member
CN111550060A (en) * 2020-05-14 2020-08-18 广东粤能工程管理有限公司 Construction method of overhanging steel pipe column
CN113833286A (en) * 2021-11-01 2021-12-24 浙江精工钢结构集团有限公司 Steel pipe column on-site butt joint positioning device and construction method
JP7122052B1 (en) 2021-08-19 2022-08-19 株式会社内田鐵工所 Steel and wood hybrid beams and T-shaped steel frames for beams
CN115419282A (en) * 2022-10-08 2022-12-02 中建八局装饰工程有限公司 Installation device for vertical member of steel structure and construction method thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002349071A (en) * 2001-05-24 2002-12-04 Dai Nippon Construction Erection adjusting tool for pillar and erecting method
KR100487578B1 (en) * 2002-08-02 2005-05-03 최종해 Vertical scaffolding
JP2012207410A (en) * 2011-03-29 2012-10-25 Taisei Corp Connection structure for column member, and construction method for tower-like structure
CN102409866A (en) * 2011-09-22 2012-04-11 中广核工程有限公司 Auxiliary component for vertical butting operation and construction method
JP2013194368A (en) * 2012-03-16 2013-09-30 Technos Kk Method for correcting inclination of core material element
JP2019065509A (en) * 2017-09-29 2019-04-25 株式会社竹中工務店 Separation and re-connection method of skeleton member
CN108999415A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A kind of method that box column uses high-strength bolt and connecting plate integrated positioning interface
CN111550060A (en) * 2020-05-14 2020-08-18 广东粤能工程管理有限公司 Construction method of overhanging steel pipe column
JP7122052B1 (en) 2021-08-19 2022-08-19 株式会社内田鐵工所 Steel and wood hybrid beams and T-shaped steel frames for beams
JP2023029205A (en) * 2021-08-19 2023-03-03 株式会社内田鐵工所 Steel-wood hybrid beam material and beam material t-shaped steel piece
CN113833286A (en) * 2021-11-01 2021-12-24 浙江精工钢结构集团有限公司 Steel pipe column on-site butt joint positioning device and construction method
CN115419282A (en) * 2022-10-08 2022-12-02 中建八局装饰工程有限公司 Installation device for vertical member of steel structure and construction method thereof
CN115419282B (en) * 2022-10-08 2023-10-13 中建八局装饰工程有限公司 Installation device for vertical member of steel structure and construction method thereof

Similar Documents

Publication Publication Date Title
JP2000291262A (en) Erection piece for column erection and column erection method
JP4523869B2 (en) Column fixing member installation method and column fixing member installation device for steel pipe foundation pile
JP3103294B2 (en) Pillar steel frame, jig used for the connection, and steel frame connection method
JP7032051B2 (en) Floor structure construction method and floor structure reuse method
JPH09189132A (en) Fixing method of column base for steel frame column
JP2021195834A (en) Column base anchor structure, trestle, and design method for column base anchor structure
CN115788076B (en) Temporary connecting device for prestressed cable construction arranged in closed steel member
JPH08113982A (en) Device for joining column and beam of steel framed building
JPH10311045A (en) Surface table construction method and device for erecting post
JP4593010B2 (en) Pillar building jig and column building method using the same
JP4639012B2 (en) High-strength bolt joint structure of box-shaped cross section column and H-shaped cross section beam and its construction method
CN211368428U (en) Cable tower box type steel anchor beam pre-assembled jig frame
JP2000017642A (en) Working method for pile head portion of diagonally assembled pile
JPH11336329A (en) Fall preventing joint structure for structure and centering and installation device for structure in carriage
JP3024468U (en) Rigid joint structure of beam in weak axis direction of H-shaped steel column
JP2009002035A (en) Foldable working platform and method of assembling the same
JPH10299004A (en) Positioning method and equipment for steel pipe column in erecting insertion type steel pipe column
JP3802167B2 (en) Joining structure for wooden frame and joint for wooden frame
JPH10299019A (en) Joining method for permanent sub-structural column and main steel in inverted construction method
JPH086374B2 (en) Foundation bolt fixing structure
JP2007039930A (en) Joining structure of structure
JPH10331254A (en) Connecting structure for erection of src girder and pc beam
JP3027555B2 (en) Steel plate and concrete sandwich composite slab and its joint structure
JPH08284167A (en) Installation hook of angle brace block
JP2808228B2 (en) Wood joints made of steel

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050419

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050617

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051108

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060801