JP2000199400A - Structure of lining in excavated hole and work execution method thereof - Google Patents
Structure of lining in excavated hole and work execution method thereofInfo
- Publication number
- JP2000199400A JP2000199400A JP11001481A JP148199A JP2000199400A JP 2000199400 A JP2000199400 A JP 2000199400A JP 11001481 A JP11001481 A JP 11001481A JP 148199 A JP148199 A JP 148199A JP 2000199400 A JP2000199400 A JP 2000199400A
- Authority
- JP
- Japan
- Prior art keywords
- board
- hole
- supporting steel
- supporting
- lining body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は、トンネルボーリ
ングマシン(TBM)等の掘削機によって掘削した掘削
孔の内面に施される掘削孔における覆工体の構造及びそ
の施工方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a lining body in an excavation hole formed on an inner surface of an excavation hole excavated by an excavator such as a tunnel boring machine (TBM) and a method of constructing the same.
【0002】[0002]
【従来の技術】トンネルを構築する方法としては、掘削
機によって掘削した掘削孔内面にアンカーを打ち込み、
その後、この掘削孔内面にコンクリートを吹き付けて覆
工体を構築し、底部には、コンクリートを打設してイン
バートを構築する方法が知られている。2. Description of the Related Art As a method of constructing a tunnel, an anchor is driven into an inner surface of a borehole drilled by an excavator,
Thereafter, a method is known in which concrete is sprayed on the inner surface of the excavation hole to construct a lining body, and concrete is cast at the bottom to construct an invert.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上記の
場合、掘削孔内面へのコンクリートの吹き付け及び掘削
孔底部におけるインバートブロックの構築に多大な労力
及び手間を要するため、容易に覆工体を構築することが
できる覆工体の構造及び施工方法が要望されていた。However, in the above case, since a large amount of labor and labor is required for spraying concrete on the inner surface of the excavation hole and constructing the invert block at the bottom of the excavation hole, the lining body is easily constructed. There has been a demand for a structure and a construction method of a lining body that can be used.
【0004】この発明は、上記事情に鑑みてなされたも
ので、極めて容易に構築することができる掘削孔におけ
る覆工体の構造及びその施工方法を提供することを目的
としている。The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a structure of a lining body in an excavation hole which can be extremely easily constructed and a method of constructing the same.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
に、請求項1記載の掘削孔における覆工体の構造は、掘
削機によって掘削した掘削孔の内面に、プレキャスト製
の複数のボードを配設し、これらボードと掘削孔内面と
の間に充填材を充填してなる掘削孔における覆工体の構
造であって、両端部から掘削孔周方向へ連結鋼材が突設
された複数のインバートブロックが、掘削孔軸方向に沿
って掘削孔の底部に配設され、前記インバートブロック
の連結鋼材に、掘削孔内面に沿って周方向へわたって配
設された支持鋼材が連結され、掘削孔軸方向に隣り合う
前記支持鋼材同士に、前記ボードの両端部が係止されて
掘削孔内面に沿って支持され、該ボードと掘削孔内面と
の間に前記充填材が充填されていることを特徴としてい
る。In order to achieve the above object, a structure of a lining body in an excavation hole according to claim 1 comprises a plurality of precast boards mounted on an inner surface of an excavation hole excavated by an excavator. Arranged, the structure of the lining body in the drilling hole filled with filler between the board and the inner surface of the drilling hole, a plurality of connecting steel material projecting from both ends in the drilling hole circumferential direction An inverting block is disposed at the bottom of the drilling hole along the borehole axial direction, and a supporting steel material arranged circumferentially along the inner surface of the drilling hole is connected to the connecting steel material of the inverting block, and the excavation block is excavated. Both ends of the board are locked and supported along the inner surface of the excavation hole between the supporting steel materials adjacent to each other in the hole axis direction, and the filler is filled between the board and the inner surface of the excavation hole. It is characterized by.
【0006】請求項2記載の掘削孔における覆工体の施
工方法は、掘削機によって掘削した掘削孔の内面に、プ
レキャスト製の複数のボードを配設し、これらボードと
掘削孔内面との間に充填材を充填する掘削孔における覆
工体の施工方法であって、両端部から連結鋼材が突設さ
れた複数のインバートブロックを、前記連結鋼材が掘削
孔周方向へ向くように掘削孔軸方向に沿って掘削孔の底
部に配設し、これらインバートブロックの前記連結鋼材
に、支持鋼材を連結することにより、この支持鋼材を掘
削孔内面に沿って周方向へわたって支持させ、掘削孔軸
方向に隣り合う前記支持鋼材同士に、前記ボードの両端
部を係止させて掘削孔内面に沿って支持させ、このボー
ドと掘削孔内面との間に、前記充填材を充填することを
特徴としている。According to a second aspect of the present invention, there is provided a method for constructing a lining body in an excavation hole, wherein a plurality of precast boards are disposed on an inner surface of the excavation hole excavated by the excavator, and a plurality of boards are provided between the boards and the inner surface of the excavation hole. A method of constructing a lining body in an excavation hole for filling a filler material, wherein a plurality of invert blocks provided with connecting steel members protruding from both ends thereof are drilled so that the connecting steel material faces in the circumferential direction of the excavation hole. The supporting steel material is connected to the connecting steel material of these inverting blocks along the direction to support the supporting steel material in the circumferential direction along the inner surface of the drilling hole. The supporting steel members adjacent to each other in the axial direction are locked at both ends of the board and supported along the inner surface of the drilling hole, and the filler is filled between the board and the inner surface of the drilling hole. And
【0007】そして、請求項1記載の掘削孔における覆
工体の構造及び請求項2記載の掘削孔における覆工体の
施工方法によれば、支持鋼材をインバートブロックの両
端部に突設された連結鋼材に連結することにより掘削孔
の内面に沿って支持し、この支持鋼材にボードを支持さ
せ、掘削孔の内面とボードとの間に充填材を充填するこ
とにより、極めて容易に、掘削孔の内面に、ボードと充
填材とが一体化してなる覆工体を構築することができ
る。また、ボードを支持する支持鋼材を、インバートブ
ロックの両端部に設けられた連結鋼材に連結させること
により支持する構造であるので、支持鋼材を支持する支
持部材を別途用いる必要がなく、施工作業の簡略化を図
ることができるとともに、設備費の低減を図ることがで
きる。[0007] According to the structure of the lining body in the excavation hole according to the first aspect and the method of constructing the lining body in the excavation hole according to the second aspect, the supporting steel is protruded from both ends of the invert block. By supporting the board along the inner surface of the borehole by connecting to the connecting steel material, and having the supporting steel support the board, and filling the gap between the inner surface of the borehole and the board, the borehole can be extremely easily formed. A lining body in which the board and the filler are integrated can be constructed on the inner surface of the substrate. In addition, since the supporting steel material supporting the board is connected to the connecting steel materials provided at both ends of the invert block to support the board, it is not necessary to separately use a supporting member for supporting the supporting steel material, and the construction work is not required. Simplification can be achieved, and equipment costs can be reduced.
【0008】請求項3記載の掘削孔における覆工体の施
工方法は、請求項2記載の掘削孔における覆工体の施工
方法において、前記支持鋼材の表面にナットを設け、該
ナットへ仮設板をボルト止めすることにより、前記ボー
ドの端部を前記支持鋼材と前記仮設板とによって挟持し
て前記ボードを支持させ、前記充填材の硬化後に、前記
仮設板を取り外すことを特徴としている。According to a third aspect of the present invention, there is provided a method for constructing a lining body in an excavation hole according to the second aspect, wherein a nut is provided on a surface of the supporting steel material, and a temporary plate is attached to the nut. By bolting, the end of the board is sandwiched between the supporting steel material and the temporary board to support the board, and after the filler is hardened, the temporary board is removed.
【0009】つまり、支持鋼材のナットに仮設板をボル
ト止めすることにより、極めて容易に、ボードの端部を
支持鋼材と仮設板とによって挟持して支持させることが
できる。また、充填材の硬化後に、ボードを支持させる
仮設板を取り外し、他のボードの支持に用いることがで
きる。つまり、仮設板が転用可能であるので、設備費を
削減させることができる。That is, by bolting the temporary plate to the nut of the supporting steel, the end of the board can be very easily sandwiched and supported between the supporting steel and the temporary plate. Further, after the filler is hardened, the temporary plate for supporting the board can be removed and used for supporting another board. That is, since the temporary board can be diverted, the equipment cost can be reduced.
【0010】[0010]
【発明の実施の形態】以下、本発明の掘削孔における覆
工体の構造及びその施工方法の実施の形態を図によって
説明する。図1から図4において、符号1は、掘削孔で
ある。この掘削孔1には、その内面にプレキャスト製の
ボードBを複数配設してなる覆工体が施されている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the structure of a lining body in an excavation hole and a method of constructing the same according to the present invention will be described with reference to the drawings. In FIG. 1 to FIG. 4, reference numeral 1 denotes a borehole. The excavation hole 1 is provided with a lining body having a plurality of precast boards B disposed on the inner surface thereof.
【0011】次に、この覆工体の構造について説明す
る。掘削孔1の底部には、掘削孔軸方向へ沿って複数の
インバートブロック2が設けられている。これらインバ
ートブロック2には、その両端部に、連結鋼材3が突設
されており、これら連結鋼材3には、端部同士が互いに
連結された円弧状の支持鋼材4が連結されている。これ
ら支持鋼材4は、フランジ部4aの略中央にウエブ部4
bを有する断面視T字状に形成された鋼材からなるもの
である。また、連結鋼材3も、支持鋼材4と同一断面形
状とされたもので、フランジ部3aの略中央にウエブ部
3bを有する断面視T字状に形成されている。Next, the structure of the lining will be described. A plurality of invert blocks 2 are provided at the bottom of the borehole 1 along the borehole axis direction. Connected steel members 3 project from both ends of the invert block 2, and an arc-shaped support steel member 4 whose ends are connected to each other is connected to the connected steel members 3. These supporting steel materials 4 are provided at substantially the center of the flange portion 4a at the web portion 4.
It is made of a steel material having a letter "b" and formed in a T-shaped cross section. The connecting steel member 3 also has the same cross-sectional shape as the supporting steel member 4, and is formed in a T-shape in cross section having a web portion 3b substantially at the center of the flange portion 3a.
【0012】これら支持鋼材4同士は、互いに突き合わ
された端部にて、ウエブ部4b同士にわたって継手板5
が設けられ、この継手板5とそれぞれの支持鋼材4のウ
エブ部4bとをボルト・ナットによって締結固定するこ
とにより、これら支持鋼材4同士が互いに連結されてい
る。また、連結鋼材3と支持鋼材4とは、上記と同様
に、これら連結鋼材3のウエブ部3bと支持鋼材4のウ
エブ部4bとにわたって継手板5が設けられ、この継手
板5とそれぞれのウエブ部3b、4bとをボルト・ナッ
トによって締結固定することにより、これら連結鋼材3
と支持鋼材4とが互いに連結されている。そして、これ
ら支持鋼材4同士及び支持鋼材4と連結鋼材3とは、い
ずれも継手板5によって、かく変化することのないよう
に接続されている。The supporting steel members 4 are joined to each other at the ends where the supporting steel members 4 abut each other over the web portions 4b.
The joint plates 5 and the web portions 4b of the respective supporting steel members 4 are fastened and fixed by bolts and nuts, so that the supporting steel members 4 are connected to each other. Similarly, the joint steel plate 3 and the support steel member 4 are provided with a joint plate 5 over the web portion 3b of the connection steel member 3 and the web portion 4b of the support steel member 4, as described above. By fastening and fixing the parts 3b and 4b with bolts and nuts,
And the supporting steel material 4 are connected to each other. The supporting steel members 4 and the supporting steel member 4 and the connecting steel member 3 are all connected by the joint plate 5 so as not to change.
【0013】そして、それぞれのインバートブロック2
の連結鋼材3に連結されて掘削孔周方向へわたって支持
された支持鋼材4のフランジ部4aには、前記ボードB
の端部が固定されている。ボードBは、平面視長方形に
形成されたコンクリート等からなるプレキャスト製であ
り、その両端部が、掘削孔軸方向へ配設されたインバー
トブロック2の連結鋼材3に連結されて、掘削孔軸方向
へ間隔をあけて設けられた支持鋼材4にそれぞれ支持さ
れており、掘削孔周方向へ配設されて、覆工体部分の内
壁を構成している。Then, each invert block 2
The board B is attached to the flange portion 4a of the supporting steel member 4 which is connected to the connecting steel member 3 of FIG.
End is fixed. The board B is made of precast made of concrete or the like formed in a rectangular shape in a plan view. Both ends of the board B are connected to the connecting steel member 3 of the inverting block 2 arranged in the axial direction of the drilling hole. Are supported by supporting steel members 4 provided at an interval from each other, and are disposed in the circumferential direction of the excavation hole to form the inner wall of the lining body portion.
【0014】このボードBには、その両端近傍における
内面側に、係止金具6がボルト7によって固定されてい
る。この係止金具6は、側面視Z字状に形成されたもの
で、その端部側には、ボードBの内面に対して隙間Sが
形成されている。そして、この隙間Sに、支持鋼材4の
フランジ部4aを入り込ませるように、ボードBが支持
鋼材4に支持されている。なお、ボードBの上方側に設
けられた係止金具6は、図5に示すように、係止金具6
を固定しているボルト7が、ボードの表面側から回動可
能とされた構造となっている。On this board B, locking metal members 6 are fixed by bolts 7 on the inner surface near both ends. The locking fitting 6 is formed in a Z-shape when viewed from the side, and a gap S is formed at the end of the locking fitting 6 with respect to the inner surface of the board B. The board B is supported by the supporting steel 4 so that the flange 4a of the supporting steel 4 enters the gap S. Note that, as shown in FIG. 5, the latch 6 provided on the upper side of the board B
Are secured to the board 7 so as to be rotatable from the front side of the board.
【0015】上記のように、配設されたボードBと、掘
削孔1の内面との間には、モルタルあるいはコンクリー
ト等の充填材Cが充填されており、ボードBと充填材C
とによって覆工体が構築されている。また、このボード
B同士の間には、コーキング材8が充填されており、こ
れらボードB同士の隙間が埋められている。As described above, a filler C such as mortar or concrete is filled between the board B provided and the inner surface of the drilling hole 1, and the board B and the filler C are filled.
A lining body is constructed by this. The caulking material 8 is filled between the boards B, and the gap between the boards B is filled.
【0016】次に上記の覆工体を掘削孔1の内面に構築
する場合について、図6を参照しながら説明する。ま
ず、掘削孔1の底部に、掘削孔軸方向へ沿って複数のイ
ンバートブロック2を設置し、これらインバートブロッ
ク2同士を図示しないボルトによって締結固定する。次
いで、これらインバートブロック2の両端部から突出さ
れた連結鋼材3に、継手板5によって支持鋼材4を連結
させる。その後、この連結鋼材3に連結させた支持鋼材
4に、他の支持鋼材4を継手板5によって順に連結する
ことにより、これら支持鋼材4を、掘削孔1の内面に沿
って周方向へ支持させる。Next, a case where the above lining body is constructed on the inner surface of the excavation hole 1 will be described with reference to FIG. First, a plurality of invert blocks 2 are installed at the bottom of the borehole 1 along the borehole axis direction, and these invert blocks 2 are fastened and fixed to each other by bolts (not shown). Next, the supporting steel 4 is connected to the connecting steel 3 protruding from both ends of the invert block 2 by the joint plate 5. Thereafter, the other supporting steel members 4 are sequentially connected to the supporting steel member 4 connected to the connecting steel member 3 by the joint plate 5, so that the supporting steel members 4 are supported in the circumferential direction along the inner surface of the excavation hole 1. .
【0017】このようにすると、掘削孔1の内面には、
掘削孔周方向へわたって支持された支持鋼材4が、掘削
孔軸方向へ沿って互いに間隔をあけて支持される。上記
のように、支持鋼材4を掘削孔1の内面に支持させた
ら、ボードBを、その両端を支持鋼材4に支持させなが
ら設置する。ボードBを設置する場合、このボードBを
傾けた状態にして、支持鋼材4へあてがい、その後、こ
のボードBを水平にする。このようにすると、このボー
ドBの下方側における内面側に設けられた係止金具6が
支持鋼材4のフランジ部4aの裏面側へ入り込んだ状態
となり、この係止金具6によってボードBの下方側が支
持鋼材4に係止される。In this way, the inner surface of the borehole 1
The supporting steel members 4 supported in the circumferential direction of the borehole are supported at intervals along the axial direction of the borehole. As described above, when the supporting steel 4 is supported on the inner surface of the excavation hole 1, the board B is installed while supporting both ends of the board B with the supporting steel 4. When the board B is installed, the board B is tilted and applied to the supporting steel material 4, and thereafter, the board B is leveled. By doing so, the locking metal 6 provided on the inner side of the lower side of the board B enters the back side of the flange portion 4a of the supporting steel material 4, and the lower side of the board B is moved by the locking metal 6. Locked to the supporting steel material 4.
【0018】次いで、ボードBの上方側における内面側
に設けられた係止金具6をボードBの表面側から回動さ
せることにより、これら係止金具6をボードBの両端方
向へ向ける。このようにすると、これら上方側の係止金
具6が支持鋼材4のフランジ部4aの裏面側へ入り込
み、ボードBの上方側が支持鋼材4に支持される。これ
により、このボードB全体が、係止金具6によって支持
鋼材4に支持される。このようにして、掘削孔周方向へ
複数のボードBを支持鋼材4へ支持させて、掘削孔1の
内面をボードBによって覆う。Next, the metal fittings 6 provided on the inner surface on the upper side of the board B are rotated from the front side of the board B, so that the metal fittings 6 are directed toward both ends of the board B. In this way, the upper-side locking metal fittings 6 enter the back surface of the flange portion 4 a of the support steel 4, and the upper side of the board B is supported by the support steel 4. As a result, the entire board B is supported by the supporting steel member 4 by the locking metal members 6. In this way, the plurality of boards B are supported by the supporting steel material 4 in the circumferential direction of the drill hole, and the inner surface of the drill hole 1 is covered with the board B.
【0019】このように、ボードBを、掘削孔1の内面
との間に隙間をあけた状態に確実に支持させたら、これ
らボードBと掘削孔1の内面との隙間へ充填材Cを充填
する。そして、この充填材Cが硬化することにより、掘
削孔1の内面に、ボードBと充填材Cとが一体化した覆
工体が構築される。その後、ボードB同士の隙間へコー
キング材8を充填する。As described above, when the board B is securely supported in a state where a gap is provided between the board B and the inner surface of the drilling hole 1, the filler C is filled in the gap between the board B and the inner surface of the drilling hole 1. I do. Then, when the filler C is hardened, a lining body in which the board B and the filler C are integrated is constructed on the inner surface of the excavation hole 1. After that, the caulking material 8 is filled into the gap between the boards B.
【0020】以上、説明したように、上記掘削孔におけ
る覆工体の構造及びその施工方法によれば、断面視T字
状の支持鋼材4をインバートブロック2の両端部に設け
られた連結鋼材3に連結することにより、掘削孔1の内
面に沿って支持し、この支持鋼材4にボードBを支持さ
せ、掘削孔1の内面とボードBとの間に充填材Cを充填
することにより、極めて容易に、掘削孔1の内面に、ボ
ードBと充填材Cとが一体化してなる覆工体を構築する
ことができる。また、ボードBを支持する支持鋼材4
を、インバートブロック2の両端部に設けられた連結鋼
材3に連結させることにより支持する構造であるので、
支持鋼材4を支持する支持部材を別途用いる必要がな
く、施工作業の簡略化を図ることができるとともに、設
備費の低減を図ることができる。As described above, according to the structure of the lining body in the excavation hole and the method of constructing the same, the supporting steel member 4 having a T-shape in cross section is connected to the connecting steel member 3 provided at both ends of the invert block 2. By supporting the board B along the inner surface of the borehole 1 and supporting the board B with the supporting steel material 4 and filling the filler C between the inner surface of the borehole 1 and the board B, A lining body in which the board B and the filler C are integrated can be easily constructed on the inner surface of the excavation hole 1. Further, a supporting steel material 4 for supporting the board B
Is connected to connecting steel members 3 provided at both ends of the invert block 2 to support the
There is no need to separately use a supporting member for supporting the supporting steel material 4, so that the construction work can be simplified and the equipment cost can be reduced.
【0021】次に、他の実施の形態例を説明する。図7
及び図8に示すように、この構造の覆工体を構成するボ
ードBには、その内面側における下方側に係止板6が設
けられていないボードBが用いられている。支持鋼材4
には、フランジ部4aの表面側に、長手方向へ間隔をあ
けて、例えば、ステンレス等の耐腐食性に優れた金属材
料から形成された高ナット11が溶接固定されている。
この高ナット11には、後述する仮設板12がボルト1
3によって止め付けられるようになっている。なお、こ
の高ナット11に表面処理を施して、耐腐食性を高めて
も良い。Next, another embodiment will be described. FIG.
As shown in FIG. 8 and FIG. 8, a board B having no locking plate 6 on the lower side on the inner surface side is used as the board B constituting the lining body having this structure. Support steel 4
A high nut 11 made of a metal material having excellent corrosion resistance, such as stainless steel, is welded and fixed to the surface of the flange portion 4a at intervals in the longitudinal direction.
The high nut 11 is provided with a temporary plate 12 to be described later.
3 to stop. The high nut 11 may be subjected to a surface treatment to enhance the corrosion resistance.
【0022】そして、ボードBの設置時には、この支持
鋼材4のフランジ部4aに、前記ボードBの下方側にお
ける端部が配設され、フランジ部4aと仮設板12とに
よって挟持されて支持されるようになっている。なお、
ボードBには、その両端部に凹部10が形成されてお
り、ボードBを支持鋼材4に支持させた際に、凹部10
内に、前記高ナット11が配設されるようになってい
る。なお、コーキング材8は、高ナット11のネジ孔に
も充填され、さらに、高ナット11の端面もコーキング
材8によって覆われている。When the board B is installed, the lower end of the board B is disposed on the flange 4a of the supporting steel member 4, and is supported by being sandwiched between the flange 4a and the temporary plate 12. It has become. In addition,
The board B has recesses 10 formed at both ends thereof. When the board B is supported by the supporting steel material 4, the recesses 10 are formed.
The high nut 11 is provided therein. The caulking material 8 is also filled in the screw hole of the high nut 11, and the end face of the high nut 11 is also covered by the caulking material 8.
【0023】つまり、上記ボードBを用いて覆工体を施
す場合は、図9及び図10に示すように、ボードBを支
持鋼材4へ当接させた状態にて、このボードBの上方側
における内面に設けられた係止金具6を表面側から回動
させて、両端方向へ向けることにより、このボードBの
係止金具6を支持鋼材4に係止させ、その後、仮設板1
2に形成された挿通孔12aへボルト13を挿通させ、
このボルト13を高ナット11へ締結させる。このよう
にすると、この仮設板12と支持鋼材4の支持板部4a
との間にて、ボードBの端部が挟持されて、それぞれの
ボードBが確実に支持される。That is, when the lining is applied using the board B, as shown in FIGS. 9 and 10, the board B is brought into contact with the supporting steel material 4 and the upper side of the board B The metal fittings 6 of the board B are locked to the supporting steel material 4 by rotating the metal fittings 6 provided on the inner surface from the front side and turning the metal fittings toward both ends.
2, the bolt 13 is inserted into the insertion hole 12a formed in
The bolt 13 is fastened to the high nut 11. By doing so, the temporary plate 12 and the support plate portion 4a of the support steel member 4 are formed.
In between, the ends of the boards B are sandwiched, and each board B is reliably supported.
【0024】そして、その後、ボードBを支持させてい
た仮設板12を、ボルト13を緩めて取り外し、ボード
B同士の隙間及び高ナット11のネジ孔へコーキング材
8を充填し、さらに、高ナット11の端面をコーキング
材8によって覆う。なお、取り外した仮設板12は、他
のボードBを支持する際に再び用いる。Then, the temporary plate 12 supporting the board B is removed by loosening the bolts 13, and the gap between the boards B and the screw hole of the high nut 11 are filled with the caulking material 8. 11 is covered with a caulking material 8. Note that the removed temporary board 12 is used again when supporting another board B.
【0025】即ち、上記の構造の覆工体によれば、支持
鋼材4のフランジ部4aの高ナット11へ仮設板12を
ボルト13によってボルト止めすることにより、極めて
容易に、ボードBの端部をフランジ部4aと仮設板12
とによって挟持して支持させることができる。また、充
填材Cの硬化後に、ボードBを支持させる仮設板12を
取り外し、他のボードBの支持に用いることができる。
つまり、仮設板12が転用可能であるので、設備費の削
減を図ることができる。なお、上記の例では、支持鋼材
4として、断面視T字状の鋼材を用いたが、この支持鋼
材4としては、断面視H字状等の鋼材を用いても良いこ
とは勿論である。That is, according to the lining body having the above structure, the temporary plate 12 is bolted to the high nut 11 of the flange portion 4a of the supporting steel member 4 with the bolt 13, so that the end portion of the board B can be extremely easily formed. With the flange 4a and the temporary plate 12
And can be supported by being pinched. Further, after the filler C is cured, the temporary board 12 for supporting the board B can be removed and used for supporting another board B.
That is, since the temporary board 12 can be diverted, the equipment cost can be reduced. In the above example, a steel material having a T-shaped cross section is used as the supporting steel material 4, but a steel material having an H-shaped cross section may be used as the supporting steel material 4.
【0026】[0026]
【発明の効果】以上、説明したように、本発明の掘削孔
における覆工体の構造及びその施工方法によれば、下記
の効果を奏することができる。請求項1記載の掘削孔に
おける覆工体の構造及び請求項2記載の掘削孔における
覆工体の施工方法によれば、支持鋼材をインバートブロ
ックの両端部に突設された連結鋼材に連結することによ
り掘削孔の内面に沿って支持し、この支持鋼材にボード
を支持させ、掘削孔の内面とボードとの間に充填材を充
填することにより、極めて容易に、掘削孔の内面に、ボ
ードと充填材とが一体化してなる覆工体を構築すること
ができる。また、ボードを支持する支持鋼材を、インバ
ートブロックの両端部に設けられた連結鋼材に連結させ
ることにより支持する構造であるので、支持鋼材を支持
する支持部材を別途用いる必要がなく、施工作業の簡略
化を図ることができるとともに、設備費の低減を図るこ
とができる。As described above, according to the structure of the lining body in the excavation hole and the method of constructing the same according to the present invention, the following effects can be obtained. According to the structure of the lining body in the excavation hole according to the first aspect and the method of constructing the lining body in the excavation hole according to the second aspect, the supporting steel is connected to the connecting steel protruding from both ends of the invert block. By supporting the board along the inner surface of the borehole, and having the supporting steel support the board and filling the gap between the inner surface of the borehole and the board, the board can be extremely easily placed on the inner surface of the borehole. And a filler can be integrated to form a lining body. In addition, since the supporting steel material supporting the board is connected to the connecting steel materials provided at both ends of the invert block to support the board, it is not necessary to separately use a supporting member for supporting the supporting steel material, and the construction work is not required. Simplification can be achieved, and equipment costs can be reduced.
【0027】請求項3記載の掘削孔における覆工体の構
造の施工方法によれば、支持鋼材のナットに仮設板をボ
ルト止めすることにより、極めて容易に、ボードの端部
を支持鋼材と仮設板とによって挟持して支持させること
ができる。また、充填材の硬化後に、ボードを支持させ
る仮設板を取り外し、他のボードの支持に用いることが
できる。つまり、仮設板が転用可能であるので、設備費
を削減させることができる。According to the method of constructing the structure of the lining body in the excavation hole according to the third aspect of the present invention, the temporary plate is bolted to the nut of the supporting steel, so that the end of the board can be very easily connected to the supporting steel. It can be sandwiched and supported by a plate. Further, after the filler is hardened, the temporary plate for supporting the board can be removed and used for supporting another board. That is, since the temporary board can be diverted, the equipment cost can be reduced.
【図面の簡単な説明】[Brief description of the drawings]
【図1】 本発明の実施の形態の掘削孔における覆工体
の構造を説明する掘削孔の断面図である。FIG. 1 is a cross-sectional view of a drilling hole illustrating a structure of a lining body in the drilling hole according to an embodiment of the present invention.
【図2】 本発明の実施の形態の掘削孔における覆工体
の構造を説明する掘削孔の一部の断面図である。FIG. 2 is a cross-sectional view of a part of the excavation hole illustrating a structure of a lining body in the excavation hole according to the embodiment of the present invention.
【図3】 本発明の実施の形態の掘削孔における覆工体
の構造を説明する掘削孔の一部の軸方向の断面図であ
る。FIG. 3 is an axial cross-sectional view of a part of the excavation hole, illustrating a structure of a lining body in the excavation hole according to the embodiment of the present invention.
【図4】 本発明の実施の形態の掘削孔における覆工体
の構造を説明する掘削孔内面から視た正面図である。FIG. 4 is a front view illustrating the structure of the lining body in the excavation hole according to the embodiment of the present invention, as viewed from the inner surface of the excavation hole.
【図5】 本発明の実施の形態の掘削孔における覆工体
の構造に用いられるボードの構造を説明するボードの一
部の断面図である。FIG. 5 is a cross-sectional view of a part of a board for explaining a structure of a board used for a structure of a lining body in an excavation hole according to an embodiment of the present invention.
【図6】 本発明の実施の形態の掘削孔における覆工体
の構造の施工方法を説明する掘削孔内面から視た正面図
である。FIG. 6 is a front view illustrating the method of constructing the structure of the lining body in the excavation hole according to the embodiment of the present invention, as viewed from the inner surface of the excavation hole.
【図7】 本発明の実施の形態の掘削孔における覆工体
の構造の他の構造を説明する掘削孔内面から視た正面図
である。FIG. 7 is a front view illustrating another structure of the lining body in the excavation hole according to the embodiment of the present invention, as viewed from the inner surface of the excavation hole.
【図8】 本発明の実施の形態の掘削孔における覆工体
の構造の他の構造を説明する掘削孔の一部の軸方向の断
面図である。FIG. 8 is an axial sectional view of a part of the drilling hole for explaining another structure of the lining body in the drilling hole according to the embodiment of the present invention.
【図9】 本発明の実施の形態の掘削孔における覆工体
の構造の他の構造の施工方法を説明する掘削孔内面から
視た正面図である。FIG. 9 is a front view seen from the inner surface of the excavation hole, illustrating a method of constructing another structure of the lining body in the excavation hole according to the embodiment of the present invention.
【図10】 本発明の実施の形態の掘削孔における覆工
体の構造の他の構造を説明する掘削孔の一部の軸方向の
断面図である。FIG. 10 is an axial cross-sectional view of a part of the excavation hole for explaining another structure of the lining body in the excavation hole according to the embodiment of the present invention.
1 掘削孔 2 インバートブロック 3 連結鋼材 4 支持鋼材 11 高ナット(ナット) 12 仮設板 B ボード C 充填材 DESCRIPTION OF SYMBOLS 1 Drilling hole 2 Invert block 3 Connecting steel material 4 Supporting steel material 11 High nut (nut) 12 Temporary board B Board C Filling material
Claims (3)
に、プレキャスト製の複数のボードを配設し、これらボ
ードと掘削孔内面との間に充填材を充填してなる掘削孔
における覆工体の構造であって、 両端部から掘削孔周方向へ連結鋼材が突設された複数の
インバートブロックが、掘削孔軸方向に沿って掘削孔の
底部に配設され、前記インバートブロックの連結鋼材
に、掘削孔内面に沿って周方向へわたって配設された支
持鋼材が連結され、掘削孔軸方向に隣り合う前記支持鋼
材同士に、前記ボードの両端部が係止されて掘削孔内面
に沿って支持され、該ボードと掘削孔内面との間に前記
充填材が充填されていることを特徴とする掘削孔におけ
る覆工体の構造。1. A lining body in a drilling hole in which a plurality of precast boards are disposed on the inner surface of a drilling hole excavated by an excavator, and a filler is filled between the board and the inner surface of the drilling hole. A plurality of invert blocks, each having a connecting steel protruding from both ends in the circumferential direction of the drilling hole, are disposed at the bottom of the drilling hole along the axial direction of the drilling hole, and are connected to the connecting steel material of the invert block. The supporting steel materials arranged circumferentially along the inner surface of the drill hole are connected, and both ends of the board are locked to the supporting steel materials adjacent to each other in the axial direction of the drill hole, and the both ends of the board are locked along the inner surface of the drill hole. Characterized in that the filler is filled between the board and the inner surface of the borehole, and the lining body is formed in the borehole.
に、プレキャスト製の複数のボードを配設し、これらボ
ードと掘削孔内面との間に充填材を充填する掘削孔にお
ける覆工体の施工方法であって、 両端部から連結鋼材が突設された複数のインバートブロ
ックを、前記連結鋼材が掘削孔周方向へ向くように掘削
孔軸方向に沿って掘削孔の底部に配設し、これらインバ
ートブロックの前記連結鋼材に、支持鋼材を連結するこ
とにより、この支持鋼材を掘削孔内面に沿って周方向へ
わたって支持させ、 掘削孔軸方向に隣り合う前記支持鋼材同士に、前記ボー
ドの両端部を係止させて掘削孔内面に沿って支持させ、
このボードと掘削孔内面との間に、前記充填材を充填す
ることを特徴とする掘削孔における覆工体の施工方法。2. Construction of a lining body in an excavation hole in which a plurality of precast boards are arranged on the inner surface of an excavation hole excavated by an excavator and a filler is filled between the board and the inner surface of the excavation hole. A method, wherein a plurality of invert blocks having connecting steel protruding from both ends are disposed at the bottom of the drilling hole along the borehole axis direction so that the connecting steel material faces the circumferential direction of the drilling hole. By connecting a supporting steel member to the connecting steel member of the invert block, the supporting steel member is supported in a circumferential direction along the inner surface of the drilling hole. Lock both ends and support along the inner surface of the borehole,
A method for constructing a lining body in an excavation hole, wherein the filler is filled between the board and the inner surface of the excavation hole.
ナットへ仮設板をボルト止めすることにより、前記ボー
ドの端部を前記支持鋼材と前記仮設板とによって挟持し
て前記ボードを支持させ、前記充填材の硬化後に、前記
仮設板を取り外すことを特徴とする請求項2記載の掘削
孔における覆工体の施工方法。3. A nut is provided on a surface of the supporting steel material, and a temporary plate is bolted to the nut, whereby an end of the board is sandwiched between the supporting steel material and the temporary plate to support the board. 3. The method according to claim 2, wherein the temporary plate is removed after the filler is hardened.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11001481A JP2000199400A (en) | 1999-01-06 | 1999-01-06 | Structure of lining in excavated hole and work execution method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11001481A JP2000199400A (en) | 1999-01-06 | 1999-01-06 | Structure of lining in excavated hole and work execution method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2000199400A true JP2000199400A (en) | 2000-07-18 |
Family
ID=11502640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11001481A Pending JP2000199400A (en) | 1999-01-06 | 1999-01-06 | Structure of lining in excavated hole and work execution method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2000199400A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7159581B2 (en) | 2004-03-31 | 2007-01-09 | Institut Francais Du Petrole | Method of controlling recirculation of the exhaust gas of an internal-combustion supercharged engine and engine using such a method |
JP2018154961A (en) * | 2017-03-15 | 2018-10-04 | 東日本旅客鉄道株式会社 | Reinforcing structure of structure |
CN113622959A (en) * | 2021-09-10 | 2021-11-09 | 清华大学 | Tunnel supporting structure and construction method thereof |
-
1999
- 1999-01-06 JP JP11001481A patent/JP2000199400A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7159581B2 (en) | 2004-03-31 | 2007-01-09 | Institut Francais Du Petrole | Method of controlling recirculation of the exhaust gas of an internal-combustion supercharged engine and engine using such a method |
JP2018154961A (en) * | 2017-03-15 | 2018-10-04 | 東日本旅客鉄道株式会社 | Reinforcing structure of structure |
CN113622959A (en) * | 2021-09-10 | 2021-11-09 | 清华大学 | Tunnel supporting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS6114322A (en) | Method for decorating and supporting natural or artificial inclined surface | |
JP2003064994A (en) | Invert | |
JP2000199400A (en) | Structure of lining in excavated hole and work execution method thereof | |
JP2004183273A (en) | Tunnel structure | |
JPH11310928A (en) | Vibration isolation reinforcing method for existing structure | |
JP3120001B2 (en) | Tunnel lining method | |
JP3896179B2 (en) | Steel joint structure | |
JPH03286029A (en) | Steel underground wall and its construction | |
KR0117559Y1 (en) | Rock bolt | |
KR19990003296A (en) | Precast panel for tunnel lining and installation method thereof | |
JP2552864B2 (en) | Wall panels such as basements | |
JP3584416B2 (en) | Tunnel and its construction method | |
JP3114141B2 (en) | Basement | |
JP2002348891A (en) | Built-up block | |
JP7453174B2 (en) | How to install the support | |
JP2954781B2 (en) | Segment joint structure | |
JPH06180097A (en) | Repairing method of horseshoe type tunnel lining | |
JPH0258699A (en) | Structure of covering cylindrical wall body for excavated hole | |
JP2005068789A (en) | Slab reinforcing structure and slab reinforcing construction method | |
JP3122245B2 (en) | Segment joint structure | |
JPH0455599A (en) | Concrete segment and connecting structure thereof | |
JPH1136334A (en) | Cut-off structure in connection part of pc wall and floor slab concrete | |
JPH0141786Y2 (en) | ||
JPS6124638Y2 (en) | ||
JPH0748799Y2 (en) | Structure of tubular wall for lining of drilling hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051202 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070730 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070807 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20071204 |