JP2000120212A JP10296265A JP29626598A JP2000120212A JP 2000120212 A JP2000120212 A JP 2000120212A JP 10296265 A JP10296265 A JP 10296265A JP 29626598 A JP29626598 A JP 29626598A JP 2000120212 A JP2000120212 A JP 2000120212A
Authority
JP
Japan
Prior art keywords
concrete
corrugated plate
concrete wall
wall
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10296265A
Other languages
Japanese (ja)
Other versions
JP3965644B2 (en
Inventor
Akira Muroboshi
晃 室星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP29626598A priority Critical patent/JP3965644B2/en
Publication of JP2000120212A publication Critical patent/JP2000120212A/en
Application granted granted Critical
Publication of JP3965644B2 publication Critical patent/JP3965644B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Panels For Use In Building Construction (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a placed concrete wall and a construction method of the wall which is constructed in a site or in a factory in advance to solve problems of dew condensation on the concrete wall and realize a light-weight concrete wall and improve heat-insulation, moistureproof, and soundproof effects of the wall further more. SOLUTION: In a placed concrete wall constructed in such a way that a concrete wall 1 previously constructed is combined with other members, a space 4 is defined between a corrugated plate 3 and an indoor side wall plate 2 by connecting the corrugated plate 3 to the inside of the indoor side wall plate 2, and further, anchors 5 fixed on the corrugated plate 3 are projected outward, and concrete 6 is placed by a specified thickness at the outside of the corrugated plate 3.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建築現場または工
場において造成したコンクリート壁を建築物の壁部材に
用いるようにした造成コンクリート壁及びその製造方法
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a formed concrete wall in which a concrete wall formed at a construction site or a factory is used as a wall member of a building, and a method of manufacturing the same.

【0002】[0002]

【従来の技術】従来、鉄筋又は鉄骨等を配設したコンク
リート建築物を構築する場合、鉄筋等を組んだ後、仮枠
を付設してその間にコンクリートを流し込み、コンクリ
ートの硬化後に仮枠を外して建物の床部や壁部を構築す
るようにしていたが、特に壁部を構築する場合、壁部の
鉄筋等を挟んで両側に仮枠を設ける必要があるため、狭
隘な建築現場ではこの仮枠の付設が困難であり、仮枠材
料の使用量が多くなると同時に、多大な作業時間を要
し、生産コストが高騰するものであった。
2. Description of the Related Art Conventionally, when constructing a concrete building in which a reinforcing bar or a steel frame is provided, a temporary frame is attached after a reinforcing bar is assembled, concrete is poured in between, and the temporary frame is removed after the concrete is hardened. The building was designed to build the floor and walls of the building, but in the case of building walls in particular, it is necessary to provide temporary frames on both sides of the wall, etc. It was difficult to attach a temporary frame, and the amount of use of the temporary frame material increased, and at the same time, a large amount of work time was required, and the production cost increased.

【0003】加えて壁部を構築する場合、足場を組んで
の高所作業がほとんどであるため、作業の危険率が高く
なり、作業性が極めて悪いものであった。
[0003] In addition, when constructing a wall, most of the work is carried out at a high place by assembling a scaffold, so that the risk of work is high and workability is extremely poor.

【0004】また、従来のコンクリート壁においては、
冬期において室内を暖めると、外気によって冷やされた
コンクリート壁に高温の室内空気が触れて、室内空気の
湿気が水滴化するという結露の問題がある。
In a conventional concrete wall,
When the room is warmed in winter, there is a problem of dew condensation that the high-temperature room air comes into contact with the concrete wall cooled by the outside air, and the humidity of the room air becomes water droplets.

【0005】[0005]

【発明が解決しようとする課題】本発明は、このような
問題点を解消するために成されたもので、コンクリート
壁を建築現場または工場において予め造成すると共に、
コンクリート壁における結露の問題点を解消し、コンク
リート壁の軽量化、防温、防湿、防音効果をさらに向上
するようにした造成コンクリート壁及びその製造方法を
提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in order to solve such problems, and a concrete wall is formed in advance at a building site or a factory.
It is an object of the present invention to provide a formed concrete wall capable of solving the problem of dew condensation on the concrete wall and further improving the lightening, temperature, moisture and soundproofing effects of the concrete wall, and a method for manufacturing the same.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めに、本発明の造成コンクリート壁は、予め造成したコ
ンクリート壁を用いて他の部材に結合するようにした造
成コンクリート壁において、室内側壁板の外側に波型板
を接合することによって該波型板と前記室内側壁板との
間に空間を設け、さらに前記波型板に固定したアンカー
を外側に突出して前記波型板の外側に所定厚さのコンク
リートを打設したことを特徴とする。
In order to achieve the above-mentioned object, an artificial concrete wall according to the present invention is an artificial concrete wall which is joined to another member by using a concrete wall which has been previously formed. A space is provided between the corrugated plate and the indoor side wall plate by joining the corrugated plate to the outside of the plate, and further, an anchor fixed to the corrugated plate is projected outward to the outside of the corrugated plate. It is characterized by casting concrete of a predetermined thickness.

【0007】また、前記波型板の外側に打設したコンク
リートは鉄筋によって補強されていることを特徴とす
る。
Further, the concrete cast on the outside of the corrugated plate is reinforced by a reinforcing bar.

【0008】また、前記コンクリート壁にはアンカーを
結合した窓枠或は扉枠等の開口枠が設けられ、該開口枠
が前記アンカーによって前記コンクリートに結合されて
いることを特徴とする。
The concrete wall is provided with an opening frame such as a window frame or a door frame to which an anchor is connected, and the opening frame is connected to the concrete by the anchor.

【0009】また、前記コンクリート壁の内部には、電
気配線等を挿通した管、水道管又はガス管等の配管が収
納されていることを特徴とする。
[0009] Further, a pipe such as a pipe through which electric wiring or the like is inserted, a water pipe or a gas pipe is housed inside the concrete wall.

【0010】さらに、前記コンクリート壁の外面にタイ
ルが施されていることを特徴とする。
[0010] Further, a tile is provided on an outer surface of the concrete wall.

【0011】また、本発明の造成コンクリート壁の製造
方法は、予め造成したコンクリート壁を用いて他の部材
に結合するようにした造成コンクリート壁の製造方法に
おいて、水平状に横設した室内側壁板の上側に波型板を
接合することによって該波型板と前記室内側壁板との間
に空間を設け、さらに前記波型板に固定したアンカーを
上側に突出する一方、前記波型板の上方に鉄筋を配置す
ると共に、前記波型板の周囲に仮枠を固定して、該仮枠
の内側の前記波型板の上側に所定厚さのコンクリートを
打設したことを特徴とする。
[0011] The method of manufacturing an artificial concrete wall according to the present invention is a method of manufacturing an artificial concrete wall in which a preformed concrete wall is used to connect to other members. A space is provided between the corrugated plate and the indoor side wall plate by joining the corrugated plate to the upper side of the corrugated plate, and an anchor fixed to the corrugated plate is projected upward while the corrugated plate is projected above the corrugated plate. And a temporary frame is fixed around the corrugated plate, and concrete having a predetermined thickness is cast on the upper side of the corrugated plate inside the temporary frame.

【0012】[0012]

【発明の実施の形態】以下、本発明の実施例を図面を参
照しながら説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0013】本実施例は、予め造成したコンクリート壁
1を用いて他の部材に結合するようにした造成コンクリ
ート壁を構成したもので、図1に示すように、室内側壁
板2の外側に波型板3を接合することによって波型板3
と室内側壁板2との間に空間4を設け、さらに波型板3
に固定したアンカー5を外側に突出して波型板3の外側
に所定厚さのコンクリート6を打設したものである。
In this embodiment, a concrete wall 1 is constructed by using a concrete wall 1 previously formed and connected to another member. As shown in FIG. By joining the template 3, the corrugated plate 3
A space 4 is provided between the inner side wall plate 2 and
A concrete 6 having a predetermined thickness is cast on the outside of the corrugated plate 3 by projecting an anchor 5 fixed to the outside.

【0014】上記の造成コンクリート壁の構成につい
て、その製造工程を説明しながら詳細に述べると、図2
に示すように、建築現場または工場等の地盤または作業
台、或は床等を水平状の土台7として、この土台7の上
面に室内側壁板2を横設する。この室内側壁板2として
は、化粧板等の壁部材を用いてもよい。
The structure of the above-described artificial concrete wall will be described in detail while explaining the manufacturing process thereof.
As shown in (1), the ground or working table at a building site or a factory, or the floor is used as a horizontal base 7, and the indoor side wall plate 2 is laid horizontally on the upper surface of the base 7. A wall member such as a decorative board may be used as the indoor side wall plate 2.

【0015】次いで、図3に示すように、上記の室内側
壁板2の上に波型板3を横設して、この波型板3を室内
側壁板2の上面(外面)に接着剤8等で固定する。この
波型板3としては、不燃性部材による各種の波型部材を
用いるのがよい。
Next, as shown in FIG. 3, a corrugated plate 3 is laid laterally on the indoor side wall plate 2, and the corrugated plate 3 is attached to the upper surface (outer surface) of the indoor side wall plate 2 with an adhesive 8. Fix with etc. As the corrugated plate 3, various corrugated members made of non-combustible members are preferably used.

【0016】このような構成によって、波型板3の形状
に応じて該波型板3と室内側壁板2との間には複数の空
間4、4…が生じる。この空間4が、後述するコンクリ
ート壁1の完成品において、防温、防湿、防音、さらに
は外気と室内温度の干渉を行う結果、結露の発生を緩和
する効果を有することとなる。
With such a configuration, a plurality of spaces 4, 4,... Are formed between the corrugated plate 3 and the indoor side wall plate 2 according to the shape of the corrugated plate 3. This space 4 has an effect of mitigating the occurrence of dew condensation as a result of performing temperature protection, moisture protection, sound insulation, and interference between the outside air and the room temperature in a completed concrete wall 1 described later.

【0017】また、上記の波型板3の複数箇所には間隔
をあけてアンカー5、5…が固定されている。このアン
カー5は、波型板3の所要箇所にアンカー部5aを上方
へ突出した状態で係止されている。アンカー部5aの形
状はU字形に形成してあるが、アンカー部5aが打設コ
ンクリート6に良好に結合する形状であれば他のもので
もよい。
Further, anchors 5, 5... Are fixed at a plurality of positions of the corrugated plate 3 at intervals. The anchor 5 is locked at a required portion of the corrugated plate 3 with the anchor portion 5a protruding upward. The shape of the anchor portion 5a is U-shaped, but any other shape may be used as long as the anchor portion 5a is satisfactorily coupled to the cast concrete 6.

【0018】次いで、図4に示すように、波型板3の所
要箇所にスペーサ9、9…を介して鉄筋10を配置す
る。なお、10aは横筋と縦筋を結束する番線である。
Next, as shown in FIG. 4, a reinforcing bar 10 is arranged at required places of the corrugated plate 3 via spacers 9, 9,. In addition, 10a is a number line which binds the horizontal streak and the vertical streak.

【0019】さらに、上記の横設した室内側壁板2の周
囲に仮枠11、11…を設けて互いに固定する。この仮
枠11の高さは、コンクリート壁1の厚さを規定するも
のである。
Further, temporary frames 11, 11... Are provided around the laterally installed indoor side wall plate 2 and fixed to each other. The height of the temporary frame 11 defines the thickness of the concrete wall 1.

【0020】そして、図5に示すように、仮枠11、1
1…の中にコンクリート6を打設し、仮枠11、11…
の上端の高さでコンクリート6の上面を平坦に均す。こ
の時、打設したコンクリート6は波型板3に付着すると
共に、アンカー5に結合されることによって波型板3と
の結合を十分なものとする。
Then, as shown in FIG.
1. Concrete 6 is cast in 1 ... and temporary frames 11, 11 ...
The upper surface of the concrete 6 is leveled at the height of the upper end of. At this time, the poured concrete 6 adheres to the corrugated plate 3 and is connected to the anchor 5 to make the connection with the corrugated plate 3 sufficient.

【0021】このようなコンクリート打設においては、
横設した波型板3の上部に対してコンクリート6を打設
すると共に、周囲は仮枠11、11…によって囲繞さ
れ、この仮枠11、11…内に水平状にコンクリート6
を打設すればよく、垂直壁に対してコンクリート打設の
作業性が向上する。
In such concrete casting,
Concrete 6 is poured into the upper part of the corrugated plate 3 placed sideways, and the surroundings are surrounded by temporary frames 11, 11...
The workability of concrete placing on a vertical wall is improved.

【0022】また、この打設コンクリート6の上面(外
面)に、壁面の仕上げ材としてタイル13を張り付ける
ようにしてもよい。さらに、タイル13を設けない場
合、外壁の塗装を行うようにしてもよい。
Further, a tile 13 may be attached to the upper surface (outer surface) of the cast concrete 6 as a wall surface finishing material. Further, when the tile 13 is not provided, the outer wall may be painted.

【0023】いずれにしても、コンクリート6が固まっ
た後、仮枠11、11…を取り除くことによって、本実
施例の一体的なコンクリート壁1(図9参照)が完成す
る。
In any case, after the concrete 6 is hardened, the temporary concrete frames 11, 11... Are removed to complete the integral concrete wall 1 of this embodiment (see FIG. 9).

【0024】図6に示すものは、上記の造成コンクリー
ト壁1に、窓枠或は扉枠等の開口枠14を設けたもので
ある。この場合、コンクリート壁1の室内側壁板2と波
型板3との開口枠部分を開設し、この部分に窓枠或は扉
枠等の開口枠14を取付ける。これらの開口枠14には
アンカー5が固定されており、上記の仮枠11内にコン
クリート6が打設された際に、コンクリート壁1に対し
て窓枠或は扉枠等の開口枠14が一体的に結合され、図
9に示すような完成品となる。
FIG. 6 shows an example in which an opening frame 14 such as a window frame or a door frame is provided on the above-described artificial concrete wall 1. In this case, an opening frame portion between the indoor side wall plate 2 and the corrugated plate 3 of the concrete wall 1 is opened, and an opening frame 14 such as a window frame or a door frame is attached to this portion. Anchors 5 are fixed to these opening frames 14, and when concrete 6 is poured into the temporary frame 11, an opening frame 14 such as a window frame or a door frame is attached to the concrete wall 1. They are integrally joined to form a finished product as shown in FIG.

【0025】さらに、図6に示すように、コンクリート
打設の前に波型板3の上方の所定箇所に電気配線等を挿
通した管、水道管又はガス管等の配管15等をスペーサ
9を介して配置し、上記のコンクリート打設によって、
コンクリート壁1の内部にこれらの配管15を収納した
状態にする。なお、この配管15として、蛇腹式の屈曲
性に富むプラスチック管を使用すれば、内部の鉄筋10
等を避けて配置することができる。
Further, as shown in FIG. 6, a spacer 9 is connected to a pipe 15 such as a pipe through which electric wiring or the like is inserted at a predetermined position above the corrugated plate 3 or a pipe such as a water pipe or a gas pipe before the concrete is poured. Placed through and by the above concrete casting
These pipes 15 are stored inside the concrete wall 1. Note that if a bellows-type highly flexible plastic pipe is used as the pipe 15, the internal reinforcing bar 10 can be used.
And so on.

【0026】上記のコンクリート壁1の継手構造は、コ
ンクリート壁1を造成する際に、他のコンクリート壁1
との接合箇所に、図7(a) に示すような蟻溝16を形成
しておくとよい。
When the concrete wall 1 is constructed, the joint structure of the concrete wall 1 can be used for other concrete walls 1.
It is preferable to form a dovetail groove 16 as shown in FIG.

【0027】この蟻溝16の形成方法は、蟻溝形の板材
を形成箇所に配置しておき、コンクリート硬化後にこれ
を抜き取る。そして、図7(b) に示すように、互いに接
合されたコンクリート壁1、1の蟻溝16、16同士を
突合せて一対の蟻溝16、16による空所に縦筋17a
を複数の横筋17bで連結した補強筋17を挿入し、図
7(c) に示すように、コンクリート6を流し込んで硬化
させることにより、コンクリート壁1、1同士を結合す
る。
In the method of forming the dovetail groove 16, a dovetail-shaped plate material is placed at a place where the dovetail groove is formed, and after the concrete is hardened, it is extracted. Then, as shown in FIG. 7 (b), the dovetail grooves 16, 16 of the concrete walls 1, 1 joined to each other are abutted to each other to form a vertical streak 17a in a space formed by the pair of dovetail grooves 16, 16.
The concrete walls 1 and 1 are joined by inserting a reinforcing bar 17 connected by a plurality of horizontal bars 17b and pouring and hardening the concrete 6 as shown in FIG. 7 (c).

【0028】なお、コンクリート壁1、1相互の接合面
を接着剤或はシーリング剤等を介して接合すれば、互い
の接合面の結合力が増強するうえ、水分の浸透を防止す
ることができる。
If the joint surfaces of the concrete walls 1 and 1 are joined with an adhesive or a sealing agent or the like, the joining force of the joint surfaces of the concrete walls 1 and 1 is increased, and the penetration of moisture can be prevented. .

【0029】さらに、コンクリート壁1をコンクリート
床18に結合する場合も、図8(a)に示すように、互い
の接合箇所に蟻溝16、16を形成し、図8(b) に示す
ように、互いに接合されたコンクリート部材の蟻溝1
6、16同士を突合せ、一対の蟻溝16、16による空
所に縦筋17aを複数の横筋17bで連結した補強筋1
7を挿入し、図8(c) に示すように、コンクリート6を
流し込んで硬化させることにより、コンクリート壁1と
コンクリート床18とを結合する。
Further, when the concrete wall 1 is connected to the concrete floor 18, as shown in FIG. 8 (a), dovetail grooves 16 are formed at the joints of each other, and as shown in FIG. 8 (b). The dovetail groove 1 of concrete members joined to each other
Reinforcing bar 1 in which longitudinal streaks 17a are connected to a space formed by a pair of dovetail grooves 16 by a plurality of transverse streaks 17b.
The concrete wall 1 and the concrete floor 18 are joined by inserting the concrete 6 and hardening it by pouring the concrete 6 as shown in FIG.

【0030】この場合も、コンクリート壁1とコンクリ
ート床18との接合面を接着剤或はシーリング剤等を介
して接合すれば、互いの接合面の結合力が増強するう
え、水分の浸透を防止することができる。
Also in this case, if the joining surface between the concrete wall 1 and the concrete floor 18 is joined via an adhesive or a sealing agent, the joining force of the joining surfaces is increased and the penetration of moisture is prevented. can do.

【0031】なお、本発明による造成コンクリート壁
は、コンクリート建築のみならず、木造建築の一部とし
て使用することも可能である。
It should be noted that the formed concrete wall according to the present invention can be used not only as a concrete building but also as a part of a wooden building.

【0032】[0032]

【発明の効果】以上説明したように、本発明の造成コン
クリート壁は、室内側壁板の外側に波型板を接合するこ
とによって該波型板と室内側壁板との間に空間を設け、
さらに波型板に固定したアンカーを外側に突出して波型
板の外側に所定厚さのコンクリートを打設した構成によ
り、このコンクリート壁を建築現場または工場において
予め造成することができるため、建築物の壁部材として
多様に使用することができ、コンクリート壁造成時の安
全性の確保、生産コストの低減等を実現することができ
る。
As described above, in the artificial concrete wall of the present invention, a space is provided between the corrugated plate and the indoor side wall plate by joining the corrugated plate to the outside of the indoor side wall plate.
Furthermore, since the concrete wall having a predetermined thickness is cast on the outside of the corrugated plate by projecting the anchor fixed to the corrugated plate outward, the concrete wall can be formed in advance at a building site or a factory. It can be used variously as a wall member, and can secure safety at the time of constructing a concrete wall, reduce production costs, and the like.

【0033】さらに、上記の構成により、波型板と室内
側壁板との間には複数の空間が生じる。この空間によっ
て、本発明のコンクリート壁の軽量化、防温、防湿、防
音、さらには外気と室内温度の干渉を行うことによる結
露の発生を緩和する効果を発揮することが可能となる。
Further, with the above configuration, a plurality of spaces are created between the corrugated plate and the indoor side wall plate. This space enables the concrete wall of the present invention to exhibit the effects of reducing the weight, preventing heat, preventing moisture, preventing sound, and reducing the occurrence of dew condensation due to interference between the outside air and the room temperature.

【0034】また、本発明のコンクリート壁を造成する
際に窓枠或は扉枠等の開口枠をアンカーによって打設コ
ンクリート中に埋め込んでおくことができ、また、電気
配線を挿通した管、水道管又はガス管等の必要な配管を
すべて埋め込んでおくようにすると、驅体完成後の配管
施行の手間が省け、床又は壁内配管の施行をもコンクリ
ート床及びコンクリート壁の造成時に一括して行うこと
ができる。
When the concrete wall of the present invention is formed, an opening frame such as a window frame or a door frame can be embedded in the cast concrete by an anchor. By embedding all necessary pipes such as pipes or gas pipes, the labor of piping after completion of the driving structure can be saved, and the execution of floor or wall pipes can be performed at the same time when concrete floors and concrete walls are created. It can be carried out.

【0035】本発明の造成コンクリート壁の製造方法に
おいては、水平状に横設した室内側壁板の上側に接合し
た波型板の上部に、周囲を仮枠によって囲繞した状態で
コンクリートを打設するようにしてあるため、コンクリ
ートの打設は仮枠内に水平状態で行えば良く、垂直壁に
対して仮枠の使用数が大幅に軽減し、コンクリート打設
の作業性が向上するものである。
[0035] In the method for manufacturing a newly formed concrete wall according to the present invention, concrete is cast on a corrugated plate joined to the upper side of a horizontally laid indoor side wall plate, with the periphery being surrounded by a temporary frame. Therefore, concrete can be cast in the temporary frame in a horizontal state, and the number of temporary frames used for vertical walls is greatly reduced, and the workability of concrete casting is improved. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の造成コンクリート壁の部分断面図であ
る。
FIG. 1 is a partial cross-sectional view of an artificial concrete wall according to the present invention.

【図2】本発明の造成コンクリート壁の製造工程におい
て室内側壁板2を横設した状態を示す断面図である。
FIG. 2 is a cross-sectional view showing a state in which an indoor side wall plate 2 is laid horizontally in a manufacturing process of a formed concrete wall according to the present invention.

【図3】本発明の造成コンクリート壁の製造工程におい
て波型板を設けた状態を示す断面図である。
FIG. 3 is a cross-sectional view showing a state in which a corrugated plate is provided in the process of manufacturing the artificial concrete wall according to the present invention.

【図4】本発明の造成コンクリート壁の製造工程におい
て鉄筋を設けた状態を示す断面図である。
FIG. 4 is a cross-sectional view showing a state in which a reinforcing bar is provided in the process of manufacturing the artificial concrete wall according to the present invention.

【図5】本発明の造成コンクリート壁の製造工程におい
て仮枠内にコンクリート6を打設した状態を示す断面図
である。
FIG. 5 is a cross-sectional view showing a state in which concrete 6 has been poured into a temporary frame in the process of manufacturing a formed concrete wall according to the present invention.

【図6】本発明の造成コンクリート壁に開口枠と配管を
収納した状態を示す断面図である。
FIG. 6 is a cross-sectional view showing a state in which an open frame and piping are housed in a created concrete wall according to the present invention.

【図7】(a) 乃至(c) は、本発明による造成コンクリー
ト壁同士の継手構造の一例を示す部分的斜視図である。
7 (a) to 7 (c) are partial perspective views showing an example of a joint structure between formed concrete walls according to the present invention.

【図8】(a) 乃至(c) は、本発明による造成コンクリー
ト壁とコンクリート床の継手構造の一例を示す部分的斜
視図である。
8 (a) to 8 (c) are partial perspective views showing an example of a joint structure between a formed concrete wall and a concrete floor according to the present invention.

【図9】本発明のコンクリート壁の完成品の一例を示す
斜視図である。
FIG. 9 is a perspective view showing an example of a finished product of the concrete wall of the present invention.

【符合の説明】[Description of sign]

1…コンクリート壁 2…室内側壁板 3…波型板 4…空間 5…アンカー 6…コンクリート 7…土台 8…接着剤 9…スペーサ 10…鉄筋 11…仮枠 12…コンクリート 13…タイル 14…開口枠 15…配管 16…蟻溝 17…補強筋 18…コンクリート床 DESCRIPTION OF SYMBOLS 1 ... Concrete wall 2 ... Interior side wall board 3 ... Corrugated board 4 ... Space 5 ... Anchor 6 ... Concrete 7 ... Base 8 ... Adhesive 9 ... Spacer 10 ... Reinforcing bar 11 ... Temporary frame 12 ... Concrete 13 ... Tile 14 ... Opening frame 15 ... Piping 16 ... Dovetail 17 ... Reinforcing bar 18 ... Concrete floor

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】予め造成したコンクリート壁を用いて他の
部材に結合するようにした造成コンクリート壁におい
て、室内側壁板の外側に波型板を接合することによって
該波型板と前記室内側壁板との間に空間を設け、さらに
前記波型板に固定したアンカーを外側に突出して前記波
型板の外側に所定厚さのコンクリートを打設したことを
特徴とする造成コンクリート壁。
1. A newly formed concrete wall which is joined to another member using a previously formed concrete wall, wherein the corrugated plate is joined to the outside of the indoor side wall plate to thereby form the corrugated plate and the indoor side wall plate. And a concrete having a predetermined thickness is cast outside the corrugated plate by projecting an anchor fixed to the corrugated plate to the outside.
【請求項2】前記波型板の外側に打設したコンクリート
は鉄筋によって補強されていることを特徴とする請求項
1記載の造成コンクリート壁。
2. The artificial concrete wall according to claim 1, wherein the concrete cast outside the corrugated plate is reinforced by a reinforcing bar.
【請求項3】前記コンクリート壁にはアンカーを結合し
た窓枠或は扉枠等の開口枠が設けられ、該開口枠が前記
アンカーによって前記コンクリートに結合されているこ
とを特徴とする請求項1記載の造成コンクリート壁。
3. The concrete wall according to claim 1, wherein an opening frame such as a window frame or a door frame to which an anchor is connected is provided, and said opening frame is connected to said concrete by said anchor. Created concrete wall as described.
【請求項4】前記コンクリート壁の内部には、電気配線
等を挿通した管、水道管又はガス管等の配管が収納され
ていることを特徴とする請求項1記載の造成コンクリー
ト壁。
4. The artificial concrete wall according to claim 1, wherein a pipe such as a pipe through which electric wiring is inserted, a water pipe or a gas pipe is housed inside the concrete wall.
【請求項5】前記コンクリート壁の外面にタイルが施さ
れていることを特徴とする請求項1記載の造成コンクリ
ート壁。
5. The constructed concrete wall according to claim 1, wherein a tile is provided on an outer surface of said concrete wall.
【請求項6】予め造成したコンクリート壁を用いて他の
部材に結合するようにした造成コンクリート壁の製造方
法において、水平状に横設した室内側壁板の上側に波型
板を接合することによって該波型板と前記室内側壁板と
の間に空間を設け、さらに前記波型板に固定したアンカ
ーを上側に突出する一方、前記波型板の上方に鉄筋を配
置すると共に、前記波型板の周囲に仮枠を固定して、該
仮枠の内側の前記波型板の上側に所定厚さのコンクリー
トを打設したことを特徴とする造成コンクリート壁の製
造方法。
6. A method for manufacturing a reinforced concrete wall in which a preformed concrete wall is used to connect to another member, wherein a corrugated plate is joined to an upper side of a horizontally laid indoor side wall plate. A space is provided between the corrugated plate and the indoor side wall plate, and an anchor fixed to the corrugated plate protrudes upward, while a reinforcing bar is arranged above the corrugated plate and the corrugated plate is provided. Characterized in that a temporary frame is fixed around the periphery of the temporary frame, and concrete having a predetermined thickness is cast on the upper side of the corrugated plate inside the temporary frame.
JP29626598A 1998-10-19 1998-10-19 Construction concrete wall and manufacturing method thereof Expired - Fee Related JP3965644B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29626598A JP3965644B2 (en) 1998-10-19 1998-10-19 Construction concrete wall and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29626598A JP3965644B2 (en) 1998-10-19 1998-10-19 Construction concrete wall and manufacturing method thereof

Publications (2)

Publication Number Publication Date
JP2000120212A true JP2000120212A (en) 2000-04-25
JP3965644B2 JP3965644B2 (en) 2007-08-29

Family

ID=17831342

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29626598A Expired - Fee Related JP3965644B2 (en) 1998-10-19 1998-10-19 Construction concrete wall and manufacturing method thereof

Country Status (1)

Country Link
JP (1) JP3965644B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101863069A (en) * 2010-05-29 2010-10-20 闫丕春 Manufacture method of inner wall plate
CN102900195A (en) * 2011-07-26 2013-01-30 闫丕春 Inner wallboard and its manufacturing method
CN107268679A (en) * 2017-08-03 2017-10-20 中冶京诚工程技术有限公司 Remain silent section steel tubulation corridor and concrete cast-in-situ section connection structure
CN110284618A (en) * 2019-06-03 2019-09-27 上海港城建筑安装工程有限公司 A kind of heat preservation wall construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359428B (en) * 2019-07-17 2021-06-15 华电西藏能源有限公司大古水电分公司 Installation method of shaping frame for mass concrete

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101863069A (en) * 2010-05-29 2010-10-20 闫丕春 Manufacture method of inner wall plate
CN102900195A (en) * 2011-07-26 2013-01-30 闫丕春 Inner wallboard and its manufacturing method
CN107268679A (en) * 2017-08-03 2017-10-20 中冶京诚工程技术有限公司 Remain silent section steel tubulation corridor and concrete cast-in-situ section connection structure
CN110284618A (en) * 2019-06-03 2019-09-27 上海港城建筑安装工程有限公司 A kind of heat preservation wall construction method
CN110284618B (en) * 2019-06-03 2021-06-29 上海港城建筑安装工程有限公司 Construction method of heat insulation wall

Also Published As

Publication number Publication date
JP3965644B2 (en) 2007-08-29

Similar Documents

Publication Publication Date Title
US9151046B1 (en) Concrete slab having integral wall base forms and wall base plates for automated construction and system thereof
US2691291A (en) Building of precast concrete segments
US8607523B2 (en) Building that uses composite light-weight panels for structure and a construction method therefor
US6321496B1 (en) Insulated form assembly for a poured concrete wall
RU2440473C2 (en) Vertical construction joints
RU2459913C2 (en) Set of leave-in-place form by vv podsevalov
JP2007162252A (en) Heat insulating construction method for exterior wall and roof of steel-frame building
JP2002339451A (en) Precast concrete slab, its manufacturing method, precast concrete slab for balcony, and outer thermal insulating structure
JP2000120212A (en) Placed concrete wall and its construction
FI69674B (en) SEAT ATT RESA EN BYGGNAD SAMT ANORDNING FOER UTFOERANDE AV SATTET
JP3983491B2 (en) Method for manufacturing insulated PC concrete board
JP2010112090A (en) Connection member and connection method without requiring temporary member
JP4488371B2 (en) Method for manufacturing pre-insulated precast concrete wall
JP2002322752A (en) Outside heat insulating reinforced-concrete wall structure and construction method therefor
US20060185283A1 (en) Interlocking construction panel showing fabrication thereof and the building system
JP3379065B2 (en) Thermal insulation foundation
JP2010059630A (en) Connection method avoiding use of placing form and temporary material
JP4247482B2 (en) Floor structure
JP3599240B2 (en) External wall forming method and metal fittings used in external insulation building of reinforced concrete wall type structure
KR100504350B1 (en) A method manufacturing of building
KR100540643B1 (en) Wall of building
JP3485521B2 (en) Construction method of concrete structure and its structure
KR20050079383A (en) A mold assembly apparatus for wall construction a building
JPS647143Y2 (en)
JP3689168B2 (en) Insulated foundation block combined with formwork

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051007

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070416

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070418

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070518

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120608

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120608

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120608

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120608

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120608

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130608

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130608

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140608

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees