JP2000110173A - Execution of foundation and foundation structure - Google Patents

Execution of foundation and foundation structure

Info

Publication number
JP2000110173A
JP2000110173A JP10285522A JP28552298A JP2000110173A JP 2000110173 A JP2000110173 A JP 2000110173A JP 10285522 A JP10285522 A JP 10285522A JP 28552298 A JP28552298 A JP 28552298A JP 2000110173 A JP2000110173 A JP 2000110173A
Authority
JP
Japan
Prior art keywords
anchor
joint pin
foundation
male screw
screwed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10285522A
Other languages
Japanese (ja)
Inventor
Minoru Yashiro
稔 屋代
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP10285522A priority Critical patent/JP2000110173A/en
Publication of JP2000110173A publication Critical patent/JP2000110173A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve the accuracy of a joint pin easily even at the time of performing cast-in-place at a site of a foundation. SOLUTION: Nuts 25, 26 for adjusting height and a joint pin 27 are screwed successively to an anchor bolt 23 buried into the foundation 21 from a lower section, a cylindrical base-correcting member 32 is installed to the outer circumferences of these nuts and joint pin, an anchor fixture 33 is screwed to the upper section of the joint pin 27, and the part of the anchor fixture 33 is retained to an anchor fixing plate 46 retained to forms 45. Concrete placed into forms 45 is solidified, a digging-in section is formed around the joint pin 27 by removing the base correcting member 32, the upper end of the projecting anchor bolt 23 in the digging-in section is corrected to a formal position, and the digging-in section is buried with a grout material.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、基礎の施工方法
および基礎構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation construction method and a foundation structure.

【0002】[0002]

【従来の技術】例えば、ユニット建物の柱をコンクリー
ト基礎に取付けるために、本願出願人により特開平7−
317156号公報に示すような技術が提案されてい
る。
2. Description of the Related Art For example, in order to attach columns of a unit building to a concrete foundation, the applicant of the present invention has disclosed Japanese Patent Application Laid-Open No.
A technology as disclosed in Japanese Patent Publication No. 317156 is proposed.

【0003】上記出願にかかる技術は、図14、図15
に示すようなものである。即ち、コンクリート基礎など
の基礎1に対しほぼ垂直状態で埋設された鉄筋2の上端
に金属製の有底の短管3が溶接固定され、この短管3に
は雌ネジ部4が形成され、この雌ネジ部4は基礎1の上
面にて開口されている。そして、上方に開口する雌ネジ
孔5を形成され截頭円錐形をした鋼製のジョイントピン
6が設けられ、このジョイントピン6の下端に形成され
た雄ネジ部7を前記雌ネジ部4へ螺着することにより、
基礎1の上面にジョイントピン6が立設されている。
The technology according to the above application is shown in FIGS.
It is as shown in. That is, a short pipe 3 having a metal bottom is fixedly welded to an upper end of a reinforcing bar 2 buried in a substantially vertical state with respect to a foundation 1 such as a concrete foundation, and a female screw portion 4 is formed in the short pipe 3. The female screw portion 4 is opened on the upper surface of the foundation 1. A female joint pin 6 having a female screw hole 5 opening upward and having a truncated cone shape is provided. A male screw part 7 formed at the lower end of the joint pin 6 is connected to the female screw part 4. By screwing,
A joint pin 6 is provided upright on the upper surface of the foundation 1.

【0004】一方、ユニット建物の柱8は中空状をして
おり、この柱8の底部には上記ジョイントピン6に嵌合
する凹部9を形成された底板10が設けられている。上
記凹部9には上記雌ネジ孔5とほぼ同軸の取付孔11が
穿設されており、この取付孔11の上方には座金12を
外嵌されたボルト13が樹脂製のボルト支持材14およ
びボルト保持材15を介して予め仮固定されている。上
記ボルト13は、その頭部に六角孔16が形成されてい
る。また、図15中、17は漏斗状をした工具ガイドで
ある。
On the other hand, the column 8 of the unit building is hollow, and a bottom plate 10 having a concave portion 9 to be fitted to the joint pin 6 is provided at the bottom of the column 8. The recess 9 is provided with a mounting hole 11 substantially coaxial with the female screw hole 5. Above the mounting hole 11, a bolt 13 having a washer 12 externally fitted therein is provided with a resin bolt supporting member 14 and It is temporarily fixed in advance via the bolt holding member 15. The bolt 13 has a hexagonal hole 16 formed in its head. In FIG. 15, reference numeral 17 denotes a funnel-shaped tool guide.

【0005】このような構成によれば、基礎1の上面に
立設されたジョイントピン6に柱8の底板10に設けら
れた凹部9を嵌合させた上、取付孔11を通してジョイ
ントピン6に設けられた雌ネジ孔5へボルト13を捩じ
込ませることにより、柱8が基礎1へ取付けられる。
According to such a configuration, the joint pin 6 erected on the upper surface of the foundation 1 is fitted with the concave portion 9 provided on the bottom plate 10 of the column 8, and the joint pin 6 is inserted through the mounting hole 11. The column 8 is attached to the foundation 1 by screwing the bolt 13 into the provided female screw hole 5.

【0006】このように、予め、基礎1の施工時にジョ
イントピン6を立設させておくことにより、柱8と基礎
1との取付け施工時には、ジョイントピン6に柱8底部
の凹部9を嵌合し、ボルト13を捩じ込むだけで取付け
作業が完了するため、煩雑な作業を行う必要をなくすこ
とができるようになる。
As described above, the joint pin 6 is erected beforehand when the foundation 1 is constructed, so that the recess 9 at the bottom of the column 8 is fitted to the joint pin 6 when the pillar 8 is attached to the foundation 1. However, since the mounting operation is completed only by screwing the bolt 13, it is possible to eliminate the need for performing a complicated operation.

【0007】また、ボルト13を柱8の底板10の上部
に仮固定しておくことにより、現場でボルト13を用意
する必要がなくなるので、作業性を向上することができ
るようになる。
In addition, by temporarily fixing the bolt 13 on the upper portion of the bottom plate 10 of the column 8, it is not necessary to prepare the bolt 13 on site, so that workability can be improved.

【0008】[0008]

【発明が解決しようとする課題】しかしながら、このよ
うな従来の柱と基礎の接合手段では、基礎1がプレキャ
ストコンクリート基礎などのように予め工場で作られた
規格品である場合には良いが、現場打ちされる基礎1に
適用しようとした場合、一度でジョイントピン6の位置
や高さや垂直度などの精度が出るよう基礎1を構築する
ことが難しいため、手直し作業に多大な手間が掛ってし
まうという問題があった。
However, such a conventional means for joining a pillar and a foundation is good when the foundation 1 is a standard product made in advance at a factory such as a precast concrete foundation. When it is attempted to apply the method to the base 1 to be cast in place, it is difficult to construct the base 1 so that the accuracy such as the position, height, and verticality of the joint pin 6 can be obtained at one time. There was a problem that it would.

【0009】そこで、本発明の目的は、上記の問題点を
解消し、基礎を現場打ちする場合であっても容易にジョ
イントピンの精度出しを行わせることのできる基礎の施
工方法および基礎構造を提供することにある。
Accordingly, an object of the present invention is to solve the above-mentioned problems and to provide a foundation construction method and a foundation structure capable of easily setting the accuracy of joint pins even when the foundation is cast in place. To provide.

【0010】[0010]

【課題を解決するための手段】上記課題を解決するため
に、請求項1に記載された発明では、基礎から立設され
たジョイントピンを有する基礎の施工方法において、基
礎に埋設されるアンカーボルト上端の雄ネジ部に高さ調
整用のナットおよび前記ジョイントピンを下から順に螺
着し、ジョイントピンと高さ調整用のナットの外周に筒
状の台直し部材を取付け、ジョイントピン上部に形成さ
れた雌ネジ部にアンカー固定具を螺着し、型枠に係止さ
せたアンカー固定プレートにアンカーボルトおよびジョ
イントピンごと前記アンカー固定具を係止し、型枠内に
コンクリートを打設してコンクリートが固化した後、台
直し部材を取外すことによりジョイントピンの周囲に掘
り込み部分を形成し、掘り込み部分内にて突出している
アンカーボルト上端の雄ネジ部の部分を台直しした後、
掘り込み部分をグラウト材で埋めるようにすることを特
徴としている。
According to a first aspect of the present invention, there is provided a method of constructing a foundation having joint pins erected from the foundation, the anchor bolt being buried in the foundation. A nut for height adjustment and the joint pin are screwed in order from the bottom to the male screw portion at the upper end, and a cylindrical rebuilding member is attached to the outer periphery of the joint pin and the nut for height adjustment, and formed on the upper part of the joint pin. The anchor fixture is screwed into the female screw part, and the anchor fixture together with the anchor bolts and the joint pins is anchored to the anchor plate fixed to the formwork, and concrete is poured into the formwork. After the solidification, the digging part is formed around the joint pin by removing the restoring member, and the anchor bolt protruding in the digging part After a portion of the male threaded portion and the base repair of,
It is characterized in that the dug portion is filled with grout material.

【0011】このように構成された請求項1にかかる発
明によれば、アンカーボルトの雄ネジ部のジョイントピ
ンよりも下側の位置に高さ調整用のナットを螺着したこ
とにより、ジョイントピンの高さを下げる時の余裕代を
確保することができると共に、ジョイントピンをアンカ
ーボルトにセットする際の位置決め、固定を行わせるこ
とができる。
According to the first aspect of the present invention, the nut for adjusting the height is screwed to a position below the joint pin of the male screw portion of the anchor bolt, so that the joint pin is screwed. In addition to securing a margin for lowering the height of the joint pin, positioning and fixing when setting the joint pin to the anchor bolt can be performed.

【0012】ジョイントピンの周囲に取付け可能な台直
し部材を設けたことにより、アンカーボルトの位置修正
を行うためのコンクリートの掘り込み部分を事前に基礎
に確保することができる。
By providing a restoring member that can be attached around the joint pin, a concrete excavated portion for correcting the position of the anchor bolt can be secured on the foundation in advance.

【0013】基礎のアンカーボルトの周囲に台直し部材
による掘り込み部分を形成したことにより、簡単にジョ
イントピンの台直しを行うことができると共に、台直し
後に掘り込み部分にグラウト材などを施工してアンカー
ボルトに曲げが働くことが防止され、且つ、柱などをボ
ルト止めする際のジョイントピンの共廻り防止や、圧縮
力の伝達を行わせることができる。
[0013] By forming a digging portion by a rectifying member around the anchor bolt of the foundation, it is possible to easily rectify the joint pin, and after the rectification, grout material or the like is applied to the digging portion. Thus, the bending of the anchor bolt is prevented, and the joint pin can be prevented from rotating around when the column or the like is bolted, and the compressive force can be transmitted.

【0014】請求項2に記載された発明では、ジョイン
トピンの基礎に埋設される下部外周に面取部を形成し、
アンカー固定具の下端部に所定長さの雄ネジ部およびネ
ジ無し部を設け、アンカー固定具のボルト胴部の雄ネジ
部にアンカー固定プレートを挟着可能な2枚の位置決め
固定用のナットを螺着し、アンカー固定具の頭部外周に
面取部を形成し、アンカー固定プレートを型枠に係止可
能な一対の平行な係止部と、この一対の係止部間を連結
する連結部とで構成したことを特徴としている。
According to the second aspect of the present invention, a chamfered portion is formed on a lower outer periphery buried in a foundation of the joint pin,
A male screw portion and a screwless portion having a predetermined length are provided at the lower end of the anchor fixture, and two positioning and fixing nuts capable of holding the anchor fixing plate are mounted on the male screw portion of the bolt body of the anchor fixture. A pair of parallel locking portions that are screwed together, form a chamfered portion on the outer periphery of the head of the anchor fixing device, and can lock the anchor fixing plate to the formwork, and a connection that connects the pair of locking portions. And a unit.

【0015】このように構成された請求項2にかかる発
明によれば、ジョイントピンの基礎に埋設される下部外
周に面取部を形成することにより、ジョイントピンに対
しレンチなどの工具を使用することが可能となると共
に、柱などとの接続の際に、ジョイントピンの上部へボ
ルトを螺合させる時の共廻りを防止させることができ
る。
According to the second aspect of the present invention, a tool such as a wrench is used for the joint pin by forming the chamfered portion on the outer periphery of the lower portion embedded in the foundation of the joint pin. In addition to this, it is possible to prevent co-rotation when a bolt is screwed onto the joint pin at the time of connection with a pillar or the like.

【0016】アンカー固定具の下端部に所定長さの雄ネ
ジ部およびネジ無し部を設けたことにより、ジョイント
ピンの雌ネジ部に対してアンカー固定具を常に所定量だ
け正確に螺着させることができる。これにより、アンカ
ー固定具の頭部で高さの追い出しを行わせることが可能
となる。
By providing a male screw portion and a screwless portion having a predetermined length at the lower end portion of the anchor fixing device, the anchor fixing device can always be accurately screwed to the female screw portion of the joint pin by a predetermined amount. Can be. This allows the head of the anchor fixture to be flushed out of height.

【0017】アンカー固定具のボルト胴部の雄ネジ部に
アンカー固定プレートを挟着可能な2枚の位置決め固定
用のナットを螺着したことにより、アンカー固定具をア
ンカー固定プレートに容易に係止固定させることができ
る。
[0017] Two anchoring fixing nuts capable of sandwiching the anchor fixing plate are screwed to the male screw portion of the bolt body of the anchor fixing device, so that the anchor fixing device can be easily locked to the anchor fixing plate. Can be fixed.

【0018】アンカー固定具の頭部外周に面取部を形成
したことにより、アンカー固定具をレンチなどの締結用
工具で操作することができる。
Since the chamfered portion is formed on the outer periphery of the head of the anchor fixture, the anchor fixture can be operated with a fastening tool such as a wrench.

【0019】アンカー固定プレートを型枠に係止可能な
一対の平行な係止部と、この一対の係止部間を連結する
連結部とで構成したことにより、型枠にコンクリートを
流し込む際にアンカー固定プレートとの間で必要な開口
を確保することができる。
Since the anchor fixing plate is constituted by a pair of parallel locking portions capable of locking to the formwork and a connecting portion connecting the pair of locking portions, when concrete is poured into the formwork. A necessary opening can be secured between the anchor fixing plate and the anchor fixing plate.

【0020】請求項3に記載された発明では、基礎から
立設されたジョイントピンを有する基礎構造において、
基礎に埋設されるアンカーボルト上端の雄ネジ部に下か
ら順に螺着可能な高さ調整用のナットおよび前記ジョイ
ントピンと、ジョイントピンおよび高さ調整用のナット
の外周に取付け可能な筒状の台直し部材と、ジョイント
ピン上部に形成された雌ネジ部に螺着可能なアンカー固
定具と、アンカーボルトおよびジョイントピンごと前記
アンカー固定具を型枠へ位置決め固定可能なアンカー固
定プレートと、型枠内に打設したコンクリートが固化し
た後、台直し部材を取外すことによりジョイントピンの
周囲に形成される掘り込み部分と、掘り込み部分内にて
突出しているアンカーボルト上端の雄ネジ部の部分を台
直しした後、掘り込み部分を埋めるグラウト材とから成
ることを特徴としている。
According to the invention described in claim 3, in the foundation structure having the joint pins erected from the foundation,
A height-adjusting nut and the joint pin, which can be screwed in order from the bottom to a male screw portion at the upper end of the anchor bolt embedded in the foundation, and a cylindrical base that can be attached to the outer periphery of the joint pin and the height-adjusting nut. A fixing member, an anchor fixture that can be screwed onto a female screw portion formed above the joint pin, an anchor fixing plate that can position and fix the anchor fixture together with the anchor bolt and the joint pin to the mold, After the concrete poured in is solidified, the dug part formed around the joint pin by removing the restoring member and the male screw part at the upper end of the anchor bolt protruding in the dug part It is characterized by being made of a grout material that fills the dug portion after the fixation.

【0021】このように構成された請求項3にかかる発
明によれば、請求項1と同様の作用効果を得ることがで
きる。
According to the third aspect of the present invention, the same function and effect as those of the first aspect can be obtained.

【0022】[0022]

【発明の実施の形態1】以下、本発明の具体的な実施の
形態1について、図示例と共に説明する。
First Embodiment A first embodiment of the present invention will be described below with reference to the drawings.

【0023】図1〜図13は、この発明の実施の形態1
を示すものである。
FIGS. 1 to 13 show a first embodiment of the present invention.
It shows.

【0024】まず、構成を説明すると、この実施の形態
1のものでは、図1に示すように、基礎21の柱取付予
定部分22に対しアンカーボルト23を埋設する。この
アンカーボルト23は、ほぼ垂直上方へ向けられた端部
に雄ネジ部24を有している。そして、上記雄ネジ部2
4には、予め、2枚の高さ調整用のナット25,26を
螺着させ、且つ、その上部に金属製のジョイントピン2
7を螺着させるようにする。
First, the structure will be described. In the first embodiment, as shown in FIG. 1, an anchor bolt 23 is buried in a portion 22 of a foundation 21 where a column is to be mounted. The anchor bolt 23 has a male screw portion 24 at an end which is directed substantially vertically upward. And the male screw part 2
4, two nuts 25 and 26 for height adjustment are screwed in advance, and a metal joint pin 2
7 is screwed.

【0025】このジョイントピン27には、図2、図3
に示すように、前記雄ネジ部24と螺合し下方に開口す
る雌ネジ部28が形成されていると共に、この雌ネジ部
28と同軸で上方に開口する小径の雌ネジ部29が形成
されている。また、前記ジョイントピン27には、下部
の基礎21に埋設される部分の外周に、多角形状となる
ように面取部30が形成されている(図3ではレンチな
どの工具で操作可能なように六角形状などとなってい
る)と共に、上部の基礎21に対する首出部分31がほ
ぼ截頭円錐形に形成されている。
FIGS. 2 and 3 show the joint pin 27.
As shown in FIG. 5, a female screw portion 28 which is screwed with the male screw portion 24 and opens downward is formed, and a small-diameter female screw portion 29 coaxial with the female screw portion 28 and opening upward is formed. ing. In the joint pin 27, a chamfered portion 30 is formed on the outer periphery of a portion embedded in the lower foundation 21 so as to form a polygonal shape so as to be operable with a tool such as a wrench in FIG. Of the upper base 21 is formed in a substantially frustoconical shape.

【0026】そして、前記2枚の高さ調整用のナット2
5,26およびジョイントピン27の面取部30の外周
に対して着脱可能な筒状の台直し部材32が設けられ
る。この台直し部材32は、カッターなどにより所要長
さに切断可能で、基礎21を構成するコンクリートに付
着し難く、且つ、取付け、取外しが容易な樹脂材料など
で構成する。
Then, the two nuts 2 for height adjustment are used.
A cylindrical restoring member 32 that is detachable from the outer periphery of the chamfered portion 30 of the joint pin 27 is provided. The restoring member 32 is made of a resin material that can be cut to a required length by a cutter or the like, does not easily adhere to the concrete forming the foundation 21, and is easily attached and detached.

【0027】また、図4に示すように、上記ジョイント
ピン27の雌ネジ部29に対して所定量だけ螺着可能な
ボルトナットなどのアンカー固定具33が設けられる。
このアンカー固定具33はボルト胴部34の先端部分に
所定長さの雄ネジ部35を有している。そして、ボルト
胴部34の雄ネジ部35よりも頭部36側の部分に2枚
の位置決め固定用のナット37,38を螺着された雄ネ
ジ部39を有し、且つ、雄ネジ部35と雄ネジ部39と
の間にネジ無し部40を有している。2枚の位置決め固
定用のナット37,38は、相対向面が平坦化されてい
る。このアンカー固定具33の頭部36は、レンチなど
の締結用工具で操作可能なよう外周に六角形状などの面
取部41が形成され、鋼製のアンカーメジャーなどの寸
法測定具42(図9など参照)が使えるように所要の大
きさに形成され、且つ、水平器43(図10など参照)
で水平度を測定可能なように上面に扁平部44が形成さ
れている。
As shown in FIG. 4, there is provided an anchor fixture 33 such as a bolt and nut which can be screwed into the female screw portion 29 of the joint pin 27 by a predetermined amount.
The anchor fixture 33 has a male screw portion 35 having a predetermined length at the tip of a bolt body 34. The bolt body 34 has a male screw portion 39 in which two positioning nuts 37 and 38 are screwed on a portion closer to the head 36 than the male screw portion 35 of the male screw portion 35. And a male screw portion 39. Opposing surfaces of the two positioning and fixing nuts 37 and 38 are flattened. The head 36 of the anchor fixture 33 has a hexagonal chamfered portion 41 formed on the outer periphery thereof so as to be operable with a fastening tool such as a wrench, and a dimension measuring tool 42 such as a steel anchor measure (FIG. 9). , Etc.), and is formed in a required size so that it can be used.
The flat part 44 is formed on the upper surface so that the horizontality can be measured by using.

【0028】更に、基礎21を現場打ちするための型枠
45に係止されると共に、前記アンカーボルト23など
を保持可能なアンカー固定プレート46,47が設けら
れる。このアンカー固定プレート46,47には、左右
の型枠45間に架設される平行な一対の係止部48,4
9と、この一対の係止部48,49間を連結する連結部
50,51と、各連結部50,51にそれぞれ複数個ず
つ(図5、図7では2個となっている)形成されたアン
カー係止用切欠部52,53とを有している。隣接する
アンカー係止用切欠部52,53間の寸法は、アンカー
ボルト23の設置距離と等しくなるよう形成されてい
る。なお、基礎21が端基礎(図1参照)の場合には図
5に示すように連結部50が1本のみ設けられて、全体
がローマ数字のI型を呈している。基礎21が中基礎
(図6参照)の場合には図7に示すように連結部51が
2本設けられて、全体がローマ数字のII型を呈してい
る。
Further, anchor fixing plates 46 and 47 are provided, which are locked to a formwork 45 for casting the foundation 21 in place and can hold the anchor bolts 23 and the like. The anchor fixing plates 46 and 47 have a pair of parallel locking portions 48 and 4 provided between the left and right molds 45.
9, connecting portions 50 and 51 for connecting between the pair of locking portions 48 and 49, and a plurality of each (two in FIGS. 5 and 7) are formed on each of the connecting portions 50 and 51. Notches 52 and 53 for anchor locking. The distance between the adjacent anchor notches 52 and 53 is formed to be equal to the installation distance of the anchor bolt 23. In the case where the foundation 21 is an end foundation (see FIG. 1), only one connecting portion 50 is provided as shown in FIG. 5, and the whole has a Roman numeral I type. When the foundation 21 is a middle foundation (see FIG. 6), as shown in FIG. 7, two connecting portions 51 are provided, and the whole has a Roman numeral type II.

【0029】図9中、符号60は万力、図10中、符号
61は先の尖った工具、符号62は基礎21の掘り込み
部分、符号63は押え部材、図11中、符号64はスペ
ーサ、図12中、符号65は水、符号66は高さ調整プ
レート、図13中、符号67はグラウト材(無収縮モル
タル)である。
In FIG. 9, reference numeral 60 denotes a vise, in FIG. 10, reference numeral 61 denotes a pointed tool, reference numeral 62 denotes a dug portion of the foundation 21, reference numeral 63 denotes a pressing member, and reference numeral 64 denotes a spacer in FIG. In FIG. 12, reference numeral 65 denotes water, reference numeral 66 denotes a height adjustment plate, and reference numeral 67 in FIG. 13 denotes a grout material (non-shrink mortar).

【0030】次に、この実施の形態1の作用について説
明する。
Next, the operation of the first embodiment will be described.

【0031】基礎21を現場打ちする場合、図8(a)
に示すように、先ず、アンカーボルト23の雄ネジ部2
4に、2枚の高さ調整用のナット25,26を螺着し、
上側のナット26の上面に対して雄ネジ部24の上端が
所定の長さだけ突出されるようにする。
When the base 21 is cast in place, FIG.
First, as shown in FIG.
4, screw the two nuts 25 and 26 for height adjustment,
The upper end of the male screw portion 24 projects from the upper surface of the upper nut 26 by a predetermined length.

【0032】そして、図8(b)に示すように、前記雄
ネジ部24の突出部分に金属製のジョイントピン27
を、ジョイントピン27の底面が上側のナット26の上
面に接触するまで螺着する。
Then, as shown in FIG. 8B, a metal joint pin 27 is
Is screwed until the bottom surface of the joint pin 27 contacts the upper surface of the upper nut 26.

【0033】更に、図8(c)に示すように、筒状の台
直し部材32を所要の長さに切断し、この台直し部材3
2を2枚の高さ調整用のナット25,26およびジョイ
ントピン27の面取部30の外周に対して取付ける。こ
の際、台直し部材32の上面を、ジョイントピン27の
首出部分31の下限位置に合せるようにする。そして、
ジョイントピン27の首出部分31に生コンクリートな
どが付着するのを防止するための養生テープを巻く。な
お、台直し部材32は、後述するように、アンカーボル
ト23に対する修正必要寸法およびグラウト材67を施
工する際の必要定着長さを確保できる大きさに切断す
る。
Further, as shown in FIG. 8C, the tubular restoring member 32 is cut into a required length, and the restoring member 3 is cut.
2 are attached to the outer circumference of the chamfered portion 30 of the two nuts 25 and 26 for height adjustment and the joint pin 27. At this time, the upper surface of the restoring member 32 is set to the lower limit position of the protruding portion 31 of the joint pin 27. And
A curing tape is wrapped around the protruding portion 31 of the joint pin 27 to prevent fresh concrete or the like from adhering. In addition, as described later, the restoring member 32 is cut into a size that can secure a required dimension for fixing the anchor bolt 23 and a necessary fixing length when the grout material 67 is applied.

【0034】そして、図8(d)に示すように、ジョイ
ントピン27の上方に開口する雌ネジ部29にアンカー
固定具33の雄ネジ部35を螺着する。
Then, as shown in FIG. 8D, the male screw portion 35 of the anchor fixture 33 is screwed to the female screw portion 29 opening above the joint pin 27.

【0035】次に、図9(a)に示すように、基礎21
を現場打ちするための型枠45における柱取付予定部分
22に、アンカー固定プレート46,47をセットし、
水平器43でアンカー固定プレート46,47の水平度
を確認する。アンカー固定プレート46,47が傾いて
いる場合には、スペーサなどで適宜調整する。
Next, as shown in FIG.
Anchor fixing plates 46 and 47 are set on the column mounting portion 22 of the formwork 45 for casting
The level of the anchor fixing plates 46 and 47 is confirmed by the leveler 43. When the anchor fixing plates 46 and 47 are inclined, they are appropriately adjusted with a spacer or the like.

【0036】そして、図9(b)に示すように、アンカ
ー固定プレート46,47のアンカー係止用切欠部5
2,53にアンカー固定具33の2枚の位置決め固定用
のナット37,38を挟着させることによりアンカーボ
ルト23を仮セットする。この状態で、アンカー固定プ
レート46,47を動かしてアンカーボルト23の位置
を微調整し、アンカー固定プレート46,47を万力6
0などで型枠45に固定する。
Then, as shown in FIG. 9 (b), the notch 5 for anchor locking of the anchor fixing plates 46 and 47.
The anchor bolts 23 are temporarily set by sandwiching two positioning and fixing nuts 37 and 38 of the anchor fixture 33 between the anchor bolts 2 and 53. In this state, the anchor fixing plates 46 and 47 are moved to finely adjust the position of the anchor bolt 23, and the anchor fixing plates 46 and 47 are
It is fixed to the formwork 45 with 0 or the like.

【0037】その後、オートレベラーで確認しつつ、ア
ンカー固定具33の頭部36をレンチなどの締結用工具
で操作して台直し部材32の上面が基礎21の天端と同
一レベルとなるようにアンカーボルト23の高さを調節
する。
Thereafter, the head 36 of the anchor fixture 33 is operated with a fastening tool such as a wrench so that the upper surface of the restoring member 32 is at the same level as the top end of the foundation 21 while checking with an auto leveler. Adjust the height of the anchor bolt 23.

【0038】更に、図9(c)に示すように、隣接する
アンカーボルト23間の寸法(ユニット桁寸法、妻寸
法)を鋼製のアンカーメジャーなどの寸法測定具42に
て確認し、最終調整をする。
Further, as shown in FIG. 9 (c), the dimensions between adjacent anchor bolts 23 (unit girder dimensions, end dimensions) are checked with a dimension measuring tool 42 such as a steel anchor measure, and final adjustment is performed. do.

【0039】そして、型枠45に生コンクリートを打設
する。その後は、アンカーボルト23にズレや倒れがな
いかを再確認し、硬化剤を施工して、養生を行う。
Then, ready-mixed concrete is poured into the formwork 45. After that, the anchor bolts 23 are re-checked for displacement or fall, a curing agent is applied, and curing is performed.

【0040】コンクリートが固化したら、図9(d)に
示すように、アンカー固定具33の位置決め固定用のナ
ット37,38を緩め、アンカー固定プレート46,4
7を矢印で示すように横へズラせて取外す。その後、型
枠45を取外す。
When the concrete has solidified, the nuts 37 and 38 for positioning and fixing the anchor fixing tool 33 are loosened as shown in FIG.
7 is shifted sideways as shown by the arrow and removed. Thereafter, the mold 45 is removed.

【0041】型枠45の取外し後、図10(a)に示す
ように、ドライバーなどの先の尖った工具61で台直し
部材32をコジルようにして取り除き、アンカーボルト
23の周囲に基礎21の掘り込み部分62を形成する。
After removing the formwork 45, as shown in FIG. 10 (a), the restoring member 32 is removed in a kozil manner with a pointed tool 61 such as a screwdriver. A dug portion 62 is formed.

【0042】そして、図10(b)に示すように、アン
カーボルト23間の寸法を鋼製のアンカーメジャーなど
の寸法測定具42で確認すると共に、図10(c)に示
すように、アンカーボルト23の垂直度を水平器43で
確認する。アンカーボルト23間の寸法を測定する際に
は、アンカーボルト23が動かないように押え部材63
などを入れておく。
Then, as shown in FIG. 10 (b), the dimension between the anchor bolts 23 is checked with a dimension measuring tool 42 such as a steel anchor measure, and as shown in FIG. The verticality of 23 is confirmed by the horizontal unit 43. When measuring the dimension between the anchor bolts 23, the pressing members 63 are used so that the anchor bolts 23 do not move.
And so on.

【0043】ここで、アンカーボルト23間の寸法や垂
直度などが規格外であった場合には、台直しを行う。
Here, if the dimensions and the verticality between the anchor bolts 23 are out of the standard, the mounting is performed again.

【0044】即ち、図11(a)(b)に示すように、
アンカーボルト23の雄ネジ部24から高さ調整用のナ
ット25,26やジョイントピン27などを外す。次
に、アンカーボルト23を動かしたい方向イとは反対側
にスペーサ64を入れる。
That is, as shown in FIGS. 11A and 11B,
The nuts 25 and 26 for adjusting the height and the joint pin 27 are removed from the male screw portion 24 of the anchor bolt 23. Next, the spacer 64 is inserted on the side opposite to the direction A in which the anchor bolt 23 is to be moved.

【0045】そして、図11(c)に示すように、水道
管などの任意のパイプを用いて、スペーサ64を入れた
側ロへ必要な量だけアンカーボルト23の雄ネジ部24
を曲げる。
Then, as shown in FIG. 11 (c), the male screw portion 24 of the anchor bolt 23 is moved by a necessary amount to the side B in which the spacer 64 is inserted using an arbitrary pipe such as a water pipe.
Bend.

【0046】最後に、図11(d)に示すように、スペ
ーサ64を抜き取り、上記パイプを雄ネジ部24の根元
まで差込み、雄ネジ部24を動かしたい方向イへ所要量
だけ曲げる。そして、雄ネジ部24の位置や垂直度を確
認後、高さ調整用のナット25,26やジョイントピン
27などを再度取付けておく。
Finally, as shown in FIG. 11D, the spacer 64 is removed, the pipe is inserted to the root of the male screw portion 24, and the male screw portion 24 is bent in a desired direction in the desired direction. Then, after confirming the position and verticality of the male screw portion 24, the nuts 25 and 26 for height adjustment, the joint pin 27, and the like are attached again.

【0047】台直しが済んだら、オートレベラーにて基
礎21の天端の高さを測定する。そして、基礎21の天
端の最も高い位置を基準として、ジョイントピン27の
高さを調整する。ジョイントピン27は下部外周に多角
形状の面取部30が形成されているので、レンチなどの
工具で簡単に操作することができる。また、ジョイント
ピン27の高さを下げる場合には、一旦、ジョイントピ
ン27を外して高さ調整用のナット25,26を取外す
ようにする。
After the repair, the height of the top of the foundation 21 is measured by an automatic leveler. Then, the height of the joint pin 27 is adjusted with reference to the highest position of the top end of the foundation 21. Since the joint pin 27 has the polygonal chamfered portion 30 formed on the outer periphery of the lower portion, it can be easily operated with a tool such as a wrench. When lowering the height of the joint pin 27, the joint pin 27 is once removed and the nuts 25 and 26 for height adjustment are removed.

【0048】ジョイントピン27の高さ調整後、アンカ
ーボルト23の周囲の基礎21の掘り込み部分62の塵
をエアーダスターなどで吹き飛ばすことにより清掃す
る。
After adjusting the height of the joint pin 27, the dust on the dug portion 62 of the foundation 21 around the anchor bolt 23 is cleaned by blowing off dust with an air duster or the like.

【0049】そして、図12(a)に示すように、清掃
された掘り込み部分62に水65を溜めて、約1時間程
度水湿しを行う。
Then, as shown in FIG. 12A, water 65 is stored in the cleaned dug portion 62, and dampening is performed for about one hour.

【0050】水湿しが済んだら、掘り込み部分62から
水65を除去し、グラウト材67を施工する。グラウト
材67は、指定水量で十分練り上げるものとし、40分
以内に施工する。この際、グラウト材67が基礎21の
天端と面一となるように軽くコテ押えをして仕上げるよ
うにする。グラウト材67は1日程度養生して、所要の
圧縮強度が得られるようにする。
After the dampening, the water 65 is removed from the dug portion 62, and the grout 67 is applied. The grout 67 is to be sufficiently kneaded with a specified amount of water, and is constructed within 40 minutes. At this time, the grout 67 is lightly ironed so that the grout 67 is flush with the top end of the foundation 21 and finished. The grout material 67 is cured for about one day so that the required compressive strength is obtained.

【0051】グラウト材67の固化後、ジョイントピン
27の首出部分31に巻いた養生テープを外すことによ
り、この部分に付着したコンクリートを除去し、図13
の状態とする。そして、図12(b)に示すように、基
礎21の天端のレベルが低い部分に対し、必要枚数の高
さ調整プレート66をセットする。
After the grout material 67 has solidified, the curing tape wrapped around the protruding portion 31 of the joint pin 27 is removed to remove the concrete adhering to this portion.
State. Then, as shown in FIG. 12 (b), the necessary number of height adjustment plates 66 are set on the lower part of the top end of the foundation 21.

【0052】最終確認をした後、図15の場合と同様に
して建物ユニットの柱を取付ける。
After the final confirmation, the columns of the building unit are mounted in the same manner as in FIG.

【0053】このようにこの実施の形態1によれば、ジ
ョイントピン27に雌ネジ部28を設けてアンカーボル
ト23の雄ネジ部24に螺合させることにより、強度の
伝達と同時に高さ方向の位置調整を行わせることができ
る。また、ジョイントピン27の下部外周に面取部30
を形成することにより、レンチなどの工具を使用するこ
とが可能となると共に、柱との接続の際に、ジョイント
ピン27の上部へボルトを螺合させる時の共廻りを防止
させることができる。
As described above, according to the first embodiment, the joint pin 27 is provided with the female screw portion 28 and is screwed to the male screw portion 24 of the anchor bolt 23, thereby transmitting the strength and simultaneously increasing the height in the height direction. Position adjustment can be performed. Further, a chamfered portion 30 is provided on the outer periphery of the lower portion of the joint pin 27.
By forming, it is possible to use a tool such as a wrench, and it is possible to prevent co-rotation when screwing a bolt to the upper part of the joint pin 27 when connecting with a pillar.

【0054】ジョイントピン27をアンカーボルト23
にセットする前に、アンカーボルト23に高さ調整用の
ナット25,26を螺着しておくことにより、ジョイン
トピン27の高さを下げる時の余裕代を確保することが
できると共に、ジョイントピン27をアンカーボルト2
3にセットする際の位置決め、固定を行わせることがで
きる。
Connect the joint pin 27 to the anchor bolt 23
By screwing nuts 25 and 26 for adjusting the height to the anchor bolt 23 before setting the joint pin 27, it is possible to secure a margin when lowering the height of the joint pin 27, 27 is the anchor bolt 2
3 can be positioned and fixed.

【0055】ジョイントピン27の周囲に台直し部材3
2を取付けることにより、アンカーボルト23の位置修
正を行うためのコンクリートの掘り込み部分62を事前
に基礎21に確保することができる。
Restoring member 3 around joint pin 27
By attaching 2, the concrete digging portion 62 for correcting the position of the anchor bolt 23 can be secured in the foundation 21 in advance.

【0056】ボルトナットなどのアンカー固定具33に
所定長さの雄ネジ部35およびネジ無し部40を設けた
ことにより、ジョイントピン27の雌ネジ部29に対し
てアンカー固定具33を常に所定量だけ正確に螺着させ
ることができる。これにより、アンカー固定具33の頭
部36で高さの追い出しを行わせることが可能となる。
また、ボルト胴部34の雄ネジ部39に螺着した2枚の
位置決め固定用のナット37,38によりアンカー固定
具33をアンカー固定プレート46,47に容易に係止
固定させることができる。アンカー固定具33の頭部3
6外周に六角形状などの面取部41を形成したことによ
り、レンチなどの締結用工具で操作することができる。
アンカー固定具33の頭部36を所要の大きさに形成し
たことにより、鋼製のアンカーメジャーなどの寸法測定
具42が使えるようになる。且つ、アンカー固定具33
の頭部36上面に扁平部44を形成したことにより、水
平器43で直接水平度を測定することができる。
By providing the male screw portion 35 and the screwless portion 40 of a predetermined length to the anchor fixing device 33 such as a bolt and a nut, the anchor fixing device 33 is always fixed to the female screw portion 29 of the joint pin 27 by a predetermined amount. Can be screwed exactly. This allows the head 36 of the anchor fixture 33 to be flushed out of height.
Further, the anchor fixture 33 can be easily locked and fixed to the anchor fixing plates 46 and 47 by the two positioning and fixing nuts 37 and 38 screwed to the male screw portion 39 of the bolt body 34. Head 3 of anchor fixture 33
Since the chamfered portion 41 such as a hexagonal shape is formed on the outer periphery of the device 6, it can be operated with a fastening tool such as a wrench.
By forming the head 36 of the anchor fixture 33 to a required size, a dimension measuring tool 42 such as a steel anchor measure can be used. And the anchor fixture 33
Since the flat portion 44 is formed on the upper surface of the head 36, the levelness can be directly measured by the leveler 43.

【0057】アンカー固定プレート46,47を型枠4
5に係止可能な一対の平行な係止部48,49と、この
一対の係止部48,49間を連結する連結部50,51
とで構成しているので、型枠45にコンクリートを流し
込む際に必要な開口を確保することができる。また、ア
ンカー係止用切欠部52,53にアンカー固定具33を
取付けるようにしているので、アンカー固定具33など
を横からスライドさせるようにして着脱することができ
る。更に、隣接するアンカー係止用切欠部52,53間
の寸法を、アンカーボルト23の設置距離と等しくなる
ように設定しているので、アンカーボルト23を容易に
正しい位置にセットすることができる。
The anchor fixing plates 46 and 47 are connected to the form 4
5 and a pair of connecting portions 50 and 51 for connecting the pair of locking portions 48 and 49 to each other.
Therefore, an opening necessary for pouring concrete into the formwork 45 can be secured. Further, since the anchor fixing tool 33 is attached to the anchor locking notches 52 and 53, the anchor fixing tool 33 and the like can be attached and detached by sliding the anchor fixing tool 33 from the side. Furthermore, since the distance between the adjacent anchor locking notches 52 and 53 is set to be equal to the installation distance of the anchor bolt 23, the anchor bolt 23 can be easily set at a correct position.

【0058】基礎21のアンカーボルト23の周囲に台
直し部材32による掘り込み部分62を形成することに
より、簡単にジョイントピン27の台直しを行うことが
できると共に、台直し後に掘り込み部分62にグラウト
材67などを施工してアンカーボルト23に曲げが働く
ことが防止され、且つ、柱をボルト止めする際のジョイ
ントピン27の共廻り防止や、圧縮力の伝達を行わせる
ことができる。
By forming the dug portion 62 by the rectification member 32 around the anchor bolt 23 of the foundation 21, the rectification of the joint pin 27 can be easily performed, and after the rectification, the digging portion 62 is formed. The bending of the anchor bolt 23 is prevented by constructing the grout material 67 and the like, and the joint pin 27 can be prevented from rotating around when the column is bolted, and the compressive force can be transmitted.

【0059】以上、この発明の実施の形態を図面により
詳述してきたが、具体的な構成はこの実施の形態に限ら
ず、この発明の要旨を逸脱しない範囲の設計の変更等が
あってもこの発明に含まれる。
Although the embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and even if there is a design change or the like without departing from the gist of the present invention. Included in this invention.

【0060】例えば、上記基礎は、柱との接合に限ら
ず、壁パネルや土台(床梁)などとの接合にも適用する
ことができる。
For example, the above-mentioned foundation can be applied not only to the connection with a pillar but also to the connection with a wall panel, a base (floor beam), or the like.

【0061】[0061]

【発明の効果】以上説明してきたように、請求項1の発
明によれば、ジョイントピンが、基礎に埋設されるアン
カーボルト上端の雄ネジ部に螺合される雌ネジ部を有す
ることにより、強度の伝達と同時に高さ方向の位置調整
を行わせることができる。
As described above, according to the first aspect of the present invention, the joint pin has the female screw portion screwed to the male screw portion at the upper end of the anchor bolt embedded in the foundation. The position adjustment in the height direction can be performed simultaneously with the transmission of the strength.

【0062】アンカーボルトの雄ネジ部のジョイントピ
ンよりも下側の位置に高さ調整用のナットを螺着したこ
とにより、ジョイントピンの高さを下げる時の余裕代を
確保することができると共に、ジョイントピンをアンカ
ーボルトにセットする際の位置決め、固定を行わせるこ
とができる。
By screwing a nut for height adjustment at a position below the joint pin of the male screw portion of the anchor bolt, it is possible to secure a margin when lowering the height of the joint pin. The positioning and fixing when setting the joint pin to the anchor bolt can be performed.

【0063】ジョイントピンの周囲に取付け可能な台直
し部材を設けたことにより、アンカーボルトの位置修正
を行うためのコンクリートの掘り込み部分を事前に基礎
に確保することができる。
By providing a restoring member that can be attached around the joint pin, a concrete excavated portion for correcting the position of the anchor bolt can be secured in advance on the foundation.

【0064】基礎のアンカーボルトの周囲に台直し部材
による掘り込み部分を形成したことにより、簡単にジョ
イントピンの台直しを行うことができると共に、台直し
後に掘り込み部分にグラウト材などを施工してアンカー
ボルトに曲げが働くことが防止され、且つ、柱などをボ
ルト止めする際のジョイントピンの共廻り防止や、圧縮
力の伝達を行わせることができる。
By forming the digging portion by the rectification member around the anchor bolt of the foundation, it is possible to easily rectify the joint pin, and after the rectification, grout material or the like is applied to the digging portion. Thus, the bending of the anchor bolt is prevented, and the joint pin can be prevented from rotating around when the column or the like is bolted, and the compressive force can be transmitted.

【0065】請求項2の発明によれば、ジョイントピン
の基礎に埋設される下部外周に面取部を形成することに
より、ジョイントピンに対しレンチなどの工具を使用す
ることが可能となると共に、柱などとの接続の際に、ジ
ョイントピンの上部へボルトを螺合させる時の共廻りを
防止させることができる。
According to the second aspect of the present invention, by forming a chamfered portion on the outer periphery of the lower portion buried in the foundation of the joint pin, it becomes possible to use a tool such as a wrench for the joint pin. In connection with a pillar or the like, it is possible to prevent co-rotation when a bolt is screwed onto the joint pin.

【0066】アンカー固定具の下端部に所定長さの雄ネ
ジ部およびネジ無し部を設けたことにより、ジョイント
ピンの雌ネジ部に対してアンカー固定具を常に所定量だ
け正確に螺着させることができる。これにより、アンカ
ー固定具の頭部で高さの追い出しを行わせることが可能
となる。
By providing a male screw portion and a screwless portion having a predetermined length at the lower end portion of the anchor fixing device, the anchor fixing device can always be accurately screwed to the female screw portion of the joint pin by a predetermined amount. Can be. This allows the head of the anchor fixture to be flushed out of height.

【0067】アンカー固定具のボルト胴部の雄ネジ部に
アンカー固定プレートを挟着可能な2枚の位置決め固定
用のナットを螺着したことにより、アンカー固定具をア
ンカー固定プレートに容易に係止固定させることができ
る。
The anchor fixing device is easily locked to the anchor fixing plate by screwing two positioning fixing nuts capable of holding the anchor fixing plate to the male screw portion of the bolt body of the anchor fixing device. Can be fixed.

【0068】アンカー固定具の頭部外周に面取部を形成
したことにより、アンカー固定具をレンチなどの締結用
工具で操作することができる。
Since the chamfered portion is formed on the outer periphery of the head of the anchor fixture, the anchor fixture can be operated with a fastening tool such as a wrench.

【0069】アンカー固定プレートを型枠に係止可能な
一対の平行な係止部と、この一対の係止部間を連結する
連結部とで構成したことにより、型枠にコンクリートを
流し込む際にアンカー固定プレートとの間で必要な開口
を確保することができる。
When the concrete is poured into the form, the anchor fixing plate is constituted by a pair of parallel locking portions capable of locking to the form and a connecting portion connecting the pair of locks. A necessary opening can be secured between the anchor fixing plate and the anchor fixing plate.

【0070】請求項3の発明によれば、請求項1と同様
の効果を得ることができる、という実用上有益な効果を
発揮し得る。
According to the third aspect of the present invention, a practically useful effect that the same effect as the first aspect can be obtained can be exhibited.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態1の側方断面図である。FIG. 1 is a side sectional view of Embodiment 1 of the present invention.

【図2】ジョイントピンの一部破断した側面図である。FIG. 2 is a partially cutaway side view of a joint pin.

【図3】ジョイントピンの底面図である。FIG. 3 is a bottom view of the joint pin.

【図4】アンカー固定具の側面図である。FIG. 4 is a side view of the anchor fixture.

【図5】アンカー固定プレートの平面図である。FIG. 5 is a plan view of an anchor fixing plate.

【図6】中基礎である場合の図1と同様の図である。FIG. 6 is a view similar to FIG. 1 in the case of a middle foundation.

【図7】図6に用いられるアンカー固定プレートの図5
と同様の図である。
FIG. 7 shows the anchoring plate used in FIG. 6;
FIG.

【図8】(a)〜(d)はアンカーボルトにジョイント
ピンなどをセットする工程を示す図である。
FIGS. 8A to 8D are views showing a process of setting a joint pin or the like on an anchor bolt.

【図9】(a)〜(d)は基礎を打設する工程を示す図
である。
FIGS. 9A to 9D are views showing a step of placing a foundation.

【図10】(a)〜(c)は基礎打設後にジョイントピ
ンの状態を確認する工程を示す図である。
FIGS. 10 (a) to (c) are views showing a process of checking the state of a joint pin after placing a foundation.

【図11】(a)〜(d)は台直しの工程を示す図であ
る。
11 (a) to 11 (d) are views showing a restoring process.

【図12】(a)〜(b)は最終仕上げの工程を示す図
である。
12 (a) and 12 (b) are views showing final finishing steps.

【図13】完成した基礎部分の側方断面図である。FIG. 13 is a side sectional view of a completed foundation portion.

【図14】従来例の側方断面図である。FIG. 14 is a side sectional view of a conventional example.

【図15】図14の基礎に柱を取付ける状態を示す側方
断面図である。
FIG. 15 is a side sectional view showing a state in which a pillar is mounted on the foundation of FIG. 14;

【符号の説明】[Explanation of symbols]

21 基礎 23 アンカーボルト 24 雄ネジ部 25,26 高さ調整用のナット 27 ジョイントピン 28 雌ネジ部 29 雌ネジ部 30 面取部 32 台直し部材 33 アンカー固定具 34 ボルト胴部 35 雄ネジ部 36 頭部 37,38 位置決め固定用のナット 39 雄ネジ部 40 ネジ無し部 41 面取部 42 寸法測定具 43 水平器 44 扁平部 45 型枠 46,47 アンカー固定プレート 48,49 係止部 50,51 連結部 52,53 アンカー係止用切欠部 62 掘り込み部分 67 グラウト材 DESCRIPTION OF SYMBOLS 21 Foundation 23 Anchor bolt 24 Male screw part 25, 26 Nut for height adjustment 27 Joint pin 28 Female screw part 29 Female screw part 30 Chamfer part 32 Restoration member 33 Anchor fixing tool 34 Bolt body 35 Male screw part 36 Head 37,38 Nut for positioning and fixing 39 Male screw part 40 Screwless part 41 Chamfered part 42 Dimension measuring tool 43 Leveler 44 Flat part 45 Formwork 46,47 Anchor fixing plate 48,49 Locking part 50,51 Connection part 52, 53 Notch part for anchor locking 62 Dug part 67 Grout material

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】基礎から立設されたジョイントピンを有す
る基礎の施工方法において、 基礎に埋設されるアンカーボルト上端の雄ネジ部に高さ
調整用のナットおよび前記ジョイントピンを下から順に
螺着し、 ジョイントピンと高さ調整用のナットの外周に筒状の台
直し部材を取付け、 ジョイントピン上部に形成された雌ネジ部にアンカー固
定具を螺着し、 型枠に係止させたアンカー固定プレートにアンカーボル
トおよびジョイントピンごと前記アンカー固定具を係止
し、 型枠内にコンクリートを打設してコンクリートが固化し
た後、台直し部材を取外すことによりジョイントピンの
周囲に掘り込み部分を形成し、 掘り込み部分内にて突出しているアンカーボルト上端の
雄ネジ部の部分を台直しした後、掘り込み部分をグラウ
ト材で埋めるようにすることを特徴とする基礎の施工方
法。
1. A method of constructing a foundation having a joint pin erected from the foundation, wherein a nut for height adjustment and the joint pin are screwed in order from the bottom to a male screw portion at an upper end of an anchor bolt embedded in the foundation. Then, attach a cylindrical restoring member to the outer periphery of the joint pin and the nut for height adjustment, screw the anchor fixture to the female thread formed at the top of the joint pin, and fix the anchor to the formwork Engage the anchor fixture together with the anchor bolt and joint pin on the plate, cast concrete in the formwork and solidify the concrete, then remove the restoring member to form a dug around the joint pin After rebuilding the male screw part at the top of the anchor bolt that protrudes in the digging part, fill the digging part with grout material. Construction method of the foundation which is characterized in that in.
【請求項2】ジョイントピンの基礎に埋設される下部外
周に面取部を形成し、 アンカー固定具の下端部に所定長さの雄ネジ部およびネ
ジ無し部を設け、 アンカー固定具のボルト胴部の雄ネジ部にアンカー固定
プレートを挟着可能な2枚の位置決め固定用のナットを
螺着し、 アンカー固定具の頭部外周に面取部を形成し、 アンカー固定プレートを型枠に係止可能な一対の平行な
係止部と、この一対の係止部間を連結する連結部とで構
成したことを特徴とする請求項1記載の基礎の施工方
法。
2. An anchor fixing device, comprising: a chamfered portion formed on the outer periphery of a lower portion embedded in a foundation of a joint pin; The two fixing nuts capable of holding the anchor fixing plate are screwed into the male screw part of the part, a chamfered part is formed on the outer periphery of the head of the anchor fixing tool, and the anchor fixing plate is engaged with the formwork. The method according to claim 1, characterized in that the method comprises a pair of parallel locking portions that can be stopped and a connecting portion that connects the pair of locking portions.
【請求項3】基礎から立設されたジョイントピンを有す
る基礎構造において、 基礎に埋設されるアンカーボルト上端の雄ネジ部に下か
ら順に螺着可能な高さ調整用のナットおよび前記ジョイ
ントピンと、 ジョイントピンおよび高さ調整用のナットの外周に取付
け可能な筒状の台直し部材と、 ジョイントピン上部に形成された雌ネジ部に螺着可能な
アンカー固定具と、 アンカーボルトおよびジョイントピンごと前記アンカー
固定具を型枠へ位置決め固定可能なアンカー固定プレー
トと、 型枠内に打設したコンクリートが固化した後、台直し部
材を取外すことによりジョイントピンの周囲に形成され
る掘り込み部分と、 掘り込み部分内にて突出しているアンカーボルト上端の
雄ネジ部の部分を台直しした後、掘り込み部分を埋める
グラウト材とから成ることを特徴とする基礎構造。
3. A foundation structure having a joint pin erected from a foundation, comprising: a height-adjusting nut and said joint pin capable of being screwed in order from the bottom into a male screw portion at an upper end of an anchor bolt buried in the foundation; A tubular restoring member that can be attached to the outer periphery of the joint pin and the nut for height adjustment; an anchor fixture that can be screwed to a female screw portion formed on the upper part of the joint pin; An anchor fixing plate capable of positioning and fixing the anchor fixing device to the formwork; a digging portion formed around the joint pin by removing the rectifying member after the concrete poured into the form has solidified; Grout material that fills the dug part after the male screw part at the upper end of the anchor bolt that protrudes in the notch Basic structure characterized in that it consists of.
JP10285522A 1998-10-07 1998-10-07 Execution of foundation and foundation structure Pending JP2000110173A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10285522A JP2000110173A (en) 1998-10-07 1998-10-07 Execution of foundation and foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10285522A JP2000110173A (en) 1998-10-07 1998-10-07 Execution of foundation and foundation structure

Publications (1)

Publication Number Publication Date
JP2000110173A true JP2000110173A (en) 2000-04-18

Family

ID=17692629

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10285522A Pending JP2000110173A (en) 1998-10-07 1998-10-07 Execution of foundation and foundation structure

Country Status (1)

Country Link
JP (1) JP2000110173A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105752863A (en) * 2016-05-13 2016-07-13 中核华兴达丰机械工程有限公司 Walking type tower crane chassis anti-typhoon connecting device
CN105862909A (en) * 2016-06-02 2016-08-17 中国电建集团贵阳勘测设计研究院有限公司 Hydropower house stator foundation structure and pouring method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105752863A (en) * 2016-05-13 2016-07-13 中核华兴达丰机械工程有限公司 Walking type tower crane chassis anti-typhoon connecting device
CN105752863B (en) * 2016-05-13 2024-03-26 中核华兴达丰机械工程有限公司 Typhoon-proof connecting device for underframe of walking tower crane
CN105862909A (en) * 2016-06-02 2016-08-17 中国电建集团贵阳勘测设计研究院有限公司 Hydropower house stator foundation structure and pouring method thereof

Similar Documents

Publication Publication Date Title
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
JP4693299B2 (en) Column base connection structure
JPH09100503A (en) Connecting jig of precast concrete slab
JP2004017645A (en) Form device for pre-cast concrete foundation block, pre-cast concrete foundation block, and foundation technique using pre-cast concrete foundation block
JP2000110173A (en) Execution of foundation and foundation structure
JP3084654B2 (en) Construction foundation, foundation structure using the same, and construction method thereof
JP3185129B2 (en) Column-integrated column base fixed foundation structure and its construction method
JP3622472B2 (en) Steel column base drop construction method
JP3533188B2 (en) Formwork support device
JP3244102U (en) Steel house foundation structure and anchor set used therein
JP4436149B2 (en) Steel frame exposed column base structure
KR200354124Y1 (en) Structure fixing plate
JPH0138947B2 (en)
JPH0532536B2 (en)
JP7290940B2 (en) Seismic isolation device installation member, seismic isolation device stand structure, and construction method for seismic isolation device stand
JPH03437Y2 (en)
JPS6039816B2 (en) Anchor bolt burial method
JPH0711657A (en) Construction of concrete foundation
JP2002147027A (en) Fixing construction method for safety fence column
JPH07247557A (en) Foundation, column mold, and underground beam made of precast reinforced concrete
JPH082164Y2 (en) Bridge slab repair structure
JPH0960302A (en) Erection method for precast concrete column and adjuster metal tool for adjustment of column level
JP2657789B2 (en) Foundation structure of retaining wall block
JP2001059226A (en) Concrete footing level setter and column installation method to concrete footing
JPH0222178B2 (en)