JP2000104485A - Method of extracting existing long size pipe - Google Patents

Method of extracting existing long size pipe

Info

Publication number
JP2000104485A
JP2000104485A JP10274063A JP27406398A JP2000104485A JP 2000104485 A JP2000104485 A JP 2000104485A JP 10274063 A JP10274063 A JP 10274063A JP 27406398 A JP27406398 A JP 27406398A JP 2000104485 A JP2000104485 A JP 2000104485A
Authority
JP
Japan
Prior art keywords
existing
rod
existing long
long pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10274063A
Other languages
Japanese (ja)
Inventor
Tsutomu Katsuta
力 勝田
Masahito Yamaguchi
雅仁 山口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanpai Co Ltd
Original Assignee
Kanpai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kanpai Co Ltd filed Critical Kanpai Co Ltd
Priority to JP10274063A priority Critical patent/JP2000104485A/en
Publication of JP2000104485A publication Critical patent/JP2000104485A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent the breakdown of a locator wire while preventing the turn-off and bend of a long size pipe by fixing a rod to one end of a buried existing long size pipe, and cutting the long size pipe into plural parts, and towing the pipe so that the other end thereof is exposed. SOLUTION: A vertical hole 3 for exposing an existing long size pipe 1 is excavated, and auxiliary holes 4 are provided at corresponding positions of the long size pipe 1 on the way thereof, and the long size pipe 1 is cut for elimination. Stoppers 6 are passed through a rod 5 inside of the vertical hole 3 at a tip thereof and the exposed rod 5 inside of the auxiliary holes 4. A new long size pipe 2 and a locator wire are connected to the tip of the rod 5 inside of the vertical hole 3, and the rod 5 is towed by a pusher 7. The existing long size pipes 1 are moved in order from the pipe far from the pusher 7, and pulled out from the vertical hole 3, in which the pusher 7 is arranged, in order. With this structure, after recovering the existing long size pipe 1, a new long size pipe 2 and the locator wire are laid at the layout position, and turn-off and bend of the existing long size pipe 1 can be prevented.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地中に埋設された
ガス管その他の既設長尺管を地中から引き抜き、或いは
既設長尺管の引き抜きと同時に新たな長尺管を地中へ敷
設するための技術に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to pulling out a gas pipe or other existing long pipe buried underground from the ground, or laying a new long pipe at the same time as pulling out the existing long pipe. Related to technology.

【0002】[0002]

【従来の技術】地中に埋設された長尺管を引き抜いた
り、既設長尺管に換えて新たな長尺管である新設長尺管
を敷設するに際しては、従来から様々な技術が用いられ
ている。既設長尺管を引き抜く工法としては、引き抜き
の対象となる既設長尺管の両端部に対応するようにして
既設長尺管が露出する縦穴を掘り、その基端側から牽引
することによって長尺管を引き抜くという技術が用いら
れている。この場合、引き抜かれる長尺管の先端に新設
長尺管を予め接続しておけば、既設長尺管の引き抜きと
共に新設長尺管の敷設を行うことができる。しかしなが
らこの工法では、引き抜き作業を行う際に、地中に長期
間埋設され周囲の土壌と馴染んでいる既設長尺管へ過大
な付加がかかる場合があり、既設長尺管がその途中部分
で千切れてしまうことがある。
2. Description of the Related Art Various techniques have conventionally been used for pulling out a long tube buried underground or laying a new long tube which is a new long tube in place of an existing long tube. ing. The method of pulling out the existing long pipe is as follows: dig a vertical hole where the existing long pipe is exposed so as to correspond to both ends of the existing long pipe to be extracted, and pull it from the base end side. The technique of pulling out a tube is used. In this case, if a new long pipe is connected in advance to the end of the long pipe to be pulled out, the new long pipe can be laid together with the existing long pipe. However, in this method, when performing the drawing work, an excessive amount of the existing long pipe that has been buried in the ground for a long time and has become familiar with the surrounding soil may be excessively added, and the existing long pipe may be suspended in the middle of the pipe. It may be cut.

【0003】このようなことを考慮して、ロッドと呼ば
れる互いに接続可能な棒状物を用いることによって既設
長尺管の引き抜きを行う工法も実用化されている。この
工法では、引き抜きの対象となる既設長尺管の先端部及
び基端部に対応するようにして既設長尺管が露出する縦
穴を掘り、引き抜き対象となる既設長尺管の中にロッド
を挿入すると共にそのロッドの先端を既設長尺管の先端
と固定し、基端側からロッドを引き抜くことによってそ
の先端側から押出すようにして既設長尺管を引き抜く。
この場合でも、ロッドの先端に新設長尺管を接続してお
くことにより、既設長尺管の引き抜きと共に新設長尺管
の敷設を行うことができる。この工法では、既設長尺管
自体の牽引を行わないため上述の“千切れ”の問題は生
じない。しかしながら、この工法によっても、一定以上
の長さの長尺管を一度に引き抜こうとした場合には、既
設長尺管と周囲の土壌との間に生じる抵抗によって特に
動き初めの際に既設長尺管が座屈してしまう場合があ
り、ロッドの引き抜き力の調節などに煩雑さを残してい
る。
In view of the above, a construction method of drawing out an existing long tube by using rods called rods which can be connected to each other has been put to practical use. In this method, a vertical hole where the existing long pipe is exposed is dug corresponding to the distal end and the base end of the existing long pipe to be drawn, and a rod is inserted into the existing long pipe to be drawn. At the same time as inserting the rod, the distal end of the rod is fixed to the distal end of the existing elongated tube, and the rod is pulled out from the base end side so that the rod is pushed out from the distal end side to pull out the existing elongated tube.
Even in this case, by connecting the newly installed long tube to the tip of the rod, the existing long tube can be pulled out and the new long tube can be laid. In this method, since the existing long pipe itself is not towed, the above-mentioned problem of "breakage" does not occur. However, even if this method is used to pull out a long pipe of a certain length or more at once, the resistance between the existing long pipe and the surrounding soil will cause the existing long pipe to fail, especially at the beginning of movement. In some cases, the tube may buckle, and the adjustment of the pulling force of the rod is complicated.

【0004】また、ロッドを用いる他の工法として既設
長尺管の中に挿入したロッドの先端にパイプカッターを
介して新設長尺間を接続し、ロッドを基端側から引き抜
くことにより既設長尺管を長さ方向に切開しながらその
内部に新設長尺間を敷設していくという工法が用いられ
ている。この工法では、既設長尺管の引き抜きを行わな
いので、既設長尺管の“千切れ”、“座屈”といった不
具合は生じない。しかしながら、既設長尺管の内側に新
設長尺管を配置するこの工法では、新設長尺管の敷設時
にその位置検出用として新設長尺管に沿って敷設される
ロケータワイヤと呼ばれる金属線が、既設長尺管との間
で破損してしまうことがある。
[0004] As another method using a rod, a new long piece is connected to the distal end of a rod inserted into the existing long pipe via a pipe cutter, and the rod is pulled out from the base end side. A method has been used in which a new long space is laid inside the pipe while cutting it in the longitudinal direction. In this method, since the existing long pipe is not pulled out, problems such as "severing" and "buckling" of the existing long pipe do not occur. However, in this method of arranging a new long pipe inside the existing long pipe, a metal wire called a locator wire laid along the new long pipe for position detection at the time of laying the new long pipe, It may be damaged between the existing long tube.

【0005】[0005]

【発明が解決しようとする課題】本発明は、上記のよう
な不具合のない既設長尺管の引き抜き工法を提供せんと
するものであり、引き抜き力の正確な調節をせずとも既
設長尺管の千切れ、座屈などが生じず、且つロケータワ
イヤの破損が生じることがないような既設長尺管の引き
抜き工法を提供するものである。
SUMMARY OF THE INVENTION An object of the present invention is to provide a method for drawing an existing long pipe free of the above-mentioned problems, and to provide an existing long pipe without accurately adjusting the drawing force. It is intended to provide a method for drawing out an existing long pipe, which does not cause breakage, buckling, etc. of the locator wire and breakage of the locator wire.

【0006】[0006]

【課題を解決するための手段】本発明では、埋設された
既設長尺管に挿入され且つ既設長尺管の一端にその一端
が固定されたロッドを、前記既設長尺管の他端を露出さ
せるように掘った縦穴から牽引することによって既設長
尺管を地中から引き抜くという既設長尺管の引き抜き工
法を改良し、既設長尺管を所定長さで複数に切断してか
らロッドの牽引を行うことで上記課題を解決することと
している。
According to the present invention, a rod inserted into a buried existing elongate tube and having one end fixed to one end of the existing elongate tube is exposed to the other end of the existing elongate tube. The existing long pipe is pulled out of the ground by pulling it from the vertical hole dug so that the existing long pipe is pulled out from the ground, and the existing long pipe is cut into multiple pieces of a predetermined length before the rod is pulled. By doing so, the above-mentioned problem is solved.

【0007】この工法では、既設長尺管を所定長さに予
め切断してからロッドの牽引を行うこととしている。従
って、ロッドの牽引を開始する場合には、最も上記一端
側にある既設長尺管に対してのみ引き抜き力による負荷
がかかるためその部分の既設長尺管のみがまず動き出す
ことになり、その後他端側にある既設長尺管が順次動き
出すことになる。上述のように長期間地中に埋設されて
いた既設長尺管は土壌と馴染んでいるため、その動き初
めのときに大きな負荷がかかり、一旦それが動き始めた
後にかかる負荷は初動時にかかる負荷よりも遥かに小さ
なものとなる。従って、本発明による工法では、切断す
ることで予め短くした既設長尺管を上記一端側のものか
ら順次動かし出すようにすることで、その初動時にかか
る負荷を小さくするようにしており、長距離にわたる既
設長尺管を“千切れ”、“座屈”の発生なしに一連の作
業で引き抜けるようなものとなっている。
In this method, an existing long pipe is cut into a predetermined length in advance, and then the rod is pulled. Therefore, when the towing of the rod is started, the load by the pulling force is applied only to the existing elongate pipe at the one end side, and only the existing elongate pipe at that portion starts to move first, and thereafter, The existing long tube at the end side starts to move sequentially. As described above, existing long pipes that have been buried underground for a long period of time are familiar with the soil, so a large load is applied at the beginning of their movement, and the load applied after they have started moving is the load applied at the time of initial movement. It is much smaller than that. Therefore, in the construction method according to the present invention, the existing long pipe, which has been shortened in advance by cutting, is sequentially moved from the one on the one end side, so that the load applied at the time of the initial movement is reduced, and the long distance is reduced. It can be pulled out of the existing long pipe in a series of operations without "shredding" and "buckling".

【0008】また、この既設長尺管の引き抜き工法で
は、ロッドの一端に新たに敷設する新設長尺管を接続す
ることで、引き抜かれた既設長尺管と置き換えて新設長
尺管を敷設することもできる。このような工法によれ
ば、既設長尺管に“千切れ”や“座屈”を発生させるこ
となく既設長尺管引き抜きと同時に新設長尺管の敷設を
行えるようになるが、それだけでなく、残存する既設長
尺管が存在しないことによりワイヤロープの傷つきが生
じないようになるという効果も得られるようになる。
In the method of drawing out an existing long pipe, a new long pipe to be newly laid is connected to one end of the rod, and the new long pipe is laid in place of the drawn long pipe. You can also. According to such a construction method, it becomes possible to lay a new long pipe at the same time as the existing long pipe is pulled out without causing "break" or "buckling" in the existing long pipe. Also, the effect of preventing the wire rope from being damaged due to the absence of the existing existing long tube can be obtained.

【0009】また、以上で説明した既設長尺管の引き抜
き工法では、縦穴の内部に、既設長尺管に当接する刃部
を備える切開手段を設け、ロッドの牽引に伴って引き抜
かれる長尺管を前記刃部によって長さ方向に切開しなが
ら既設長尺管の引き抜きを行うようにするのが好まし
い。このようにすれば、切開することで生じた既設長尺
管の切れ目からロッドを取り出し、ロッドと既設長尺管
とを別々に回収することが可能になる。ロッドは通常多
数本を接続して使用するものであり、ロッドを牽引する
場合には引き抜きを行った部分からその接続を解除して
いくものであるため、ロッドを既設長尺管の内部から取
り出し、既設長尺管と別々に回収できるようにすること
によってロッドの接続解除を容易に行えるようになり、
既設長尺管引き抜き作業の効率をより一層向上させられ
るようになる。
In the above-described method for drawing an existing long tube, a cutting means having a blade portion which comes into contact with the existing long tube is provided inside the vertical hole, and the long tube which is pulled out as the rod is pulled. It is preferable that the existing long tube is pulled out while cutting in the length direction by the blade portion. This makes it possible to take out the rod from the cut of the existing long tube generated by the incision and collect the rod and the existing long tube separately. Usually, a large number of rods are connected and used.When pulling the rod, the connection is released from the part where the rod was pulled out, so take out the rod from the existing long tube. , The rod can be easily disconnected by allowing it to be collected separately from the existing long tube,
The efficiency of the existing long pipe drawing operation can be further improved.

【0010】上述した既設長尺管の切開を行う行う場合
に用いる切開手段は、既設長尺管に当接し、これを長さ
方向に切開できる刃部を備えることが条件となるが、こ
の刃部はロッドに接触することがないようなものとする
のが好ましい。例えば、ロッドと既設長尺管との隙間に
その先端を差込み可能で且つ基端側へ向かって太くされ
た棒部が設けられると共に、該棒部の既設長尺管と当接
する部位に沿って刃部が設けられてなる切開手段を用い
れば、その刃部が既設長尺管のみと接触し、且つロッド
の牽引による既設長尺管の移動によって既設長尺管が自
動的に切開されることになるため好ましい。
[0010] The incision means used for making an incision in the above-mentioned existing long tube is required to have a blade portion which comes into contact with the existing long tube and can cut it in the longitudinal direction. Preferably, the parts do not contact the rod. For example, a rod portion whose tip can be inserted into the gap between the rod and the existing elongated tube and whose thickness is increased toward the base end side is provided, and along a portion of the rod portion that comes into contact with the existing elongated tube. If the incision means provided with the blade portion is used, the blade portion contacts only the existing long tube, and the existing long tube is automatically cut by the movement of the existing long tube by pulling the rod. Is preferable.

【0011】また、上記切開手段には、棒部の基端側
に、既設長尺管の進行方向に向かって上側へ傾斜すると
共に且つ切開された既設長尺管に当接するガイド斜面を
設けるのが良い。こうすることで、切開した既設長尺管
をロッドから強制的に離反させると共に縦穴の開口方向
へと導くことができるようになるため、地中から引き抜
いた長尺管を簡単に回収できるようになる。特に、既設
長尺管をその下面で切開した場合には、ガイドによって
縦穴開口部へと導かれる既設長尺管は切開された部位を
外側として弧を描いて縦穴の外部へと自然に導かれ、最
終的に円弧形状で取り出されることになるので後処理が
より容易になる。
In the cutting means, a guide slope is provided at the base end side of the rod portion, the guide slope being inclined upward in the traveling direction of the existing elongated pipe and abutting on the cut existing elongated pipe. Is good. By doing so, the incised existing long tube can be forcibly separated from the rod and guided in the opening direction of the vertical hole, so that the long tube pulled out from the ground can be easily collected. Become. In particular, when the existing long tube is cut at the lower surface, the existing long tube guided by the guide to the opening of the vertical hole is drawn naturally to the outside of the vertical hole by drawing an arc with the cut portion outside. Finally, since it is finally taken out in an arc shape, post-processing becomes easier.

【0012】[0012]

【発明の実施の形態】以下、図1及び図2を参照して、
本発明による既設長尺管の引き抜き工法の一実施形態に
ついて説明する。図1により、この実施形態による既設
長尺管の引き抜き工法の概要を示している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to FIGS. 1 and 2,
An embodiment of a method for drawing an existing long pipe according to the present invention will be described. FIG. 1 shows an outline of a method for drawing an existing long pipe according to this embodiment.

【0013】この実施形態による既設長尺管の引き抜き
工法では、埋設されているガス用のPE管である既設長
尺管1を引き抜くと同時にそれと置き換えるようにして
新たなPE管である新設長尺管2を配置するものとして
いる。この引き抜き工法では、まず既設長尺管1の両端
部に対応する位置に既設長尺管1が露出するような縦穴
3を掘る。また、既設長尺管1の途中部分に対応する補
助穴4を所定間隔で掘って、補助穴4内に露出した既設
長尺管1を切断、除去する。この状態を図1(a)で示
す。
In the method of drawing out an existing long pipe according to the present embodiment, a new PE pipe, a new long pipe, is drawn out while simultaneously replacing the existing long pipe 1 which is a buried gas PE pipe. The tube 2 is to be arranged. In this drawing method, first, a vertical hole 3 exposing the existing long tube 1 is dug at positions corresponding to both ends of the existing long tube 1. In addition, the auxiliary hole 4 corresponding to the middle part of the existing long tube 1 is dug at a predetermined interval, and the existing long tube 1 exposed in the auxiliary hole 4 is cut and removed. This state is shown in FIG.

【0014】次に、一方の縦穴3内から既設長尺管1の
内部にロッド5を挿入し、他方の縦穴3内まで貫通させ
る。このとき上記他方の縦穴3内に出たロッド5の先端
と及び補助穴4内部で露出した部分のロッド5に、スト
ッパ6を貫通させる。ストッパ6は、その内径がロッド
5の外形より大きく且つその外径が既設長尺管1の外径
とほぼ一致するようにしてドーナツ状に形成されてい
る。この状態を図1(b)で示す。尚、ロッド5は、上
記一方の縦穴A内に配置した推進機7により、多数本接
続しながら既設長尺管1内を送られる。
Next, a rod 5 is inserted into one of the longitudinal holes 3 into the existing elongated tube 1 and penetrates into the other longitudinal hole 3. At this time, the stopper 6 is made to penetrate the tip of the rod 5 protruding into the other vertical hole 3 and the part of the rod 5 exposed inside the auxiliary hole 4. The stopper 6 is formed in a donut shape such that its inner diameter is larger than the outer diameter of the rod 5 and its outer diameter substantially matches the outer diameter of the existing long tube 1. This state is shown in FIG. The rod 5 is fed through the existing long pipe 1 while being connected in large numbers by the propulsion device 7 arranged in the one vertical hole A.

【0015】次に、上記他方の縦穴3内に出たロッド5
の先端に、ストッパ6を介して新設長尺管2及び図示せ
ぬロケータワイヤを接続する。また、推進機7の直前に
切断手段8を固定的に取り付ける。この状態を図1
(c)で示す。尚、切断手段8は図2で示したような形
状になっている。詳述すると、切断手段8は、ロッド5
と既設長尺管1との隙間にその先端を差込み可能で且つ
基端側へ向かって太くされた棒部9と、該棒部9の基端
側に設けられ既設長尺管1の進行方向に向かって上側へ
傾斜すると共に切開された既設長尺管1に当接するガイ
ド斜面10とを備えている。また前記棒部9には、既設
長尺管1と当接する部位に沿うようにして刃部11が設
けられている。
Next, the rod 5 coming out of the other vertical hole 3
The new long pipe 2 and a locator wire (not shown) are connected to the tip of the nip via a stopper 6. Further, the cutting means 8 is fixedly attached immediately before the propulsion device 7. This state is shown in FIG.
This is shown in (c). The cutting means 8 has a shape as shown in FIG. More specifically, the cutting means 8 includes the rod 5
A rod portion 9 whose tip can be inserted into a gap between the rod member 9 and the existing elongated tube 1 and which is thickened toward the base end side, and a traveling direction of the existing elongated tube 1 provided on the base end side of the rod portion 9. And a guide inclined surface 10 that is inclined upward toward the upper surface and abuts on the cut-out existing long tube 1. Further, the rod portion 9 is provided with a blade portion 11 so as to extend along a portion in contact with the existing long tube 1.

【0016】そして以上の下準備が終わったら、推進機
7によってロッド5を牽引する。すると、新設長尺管2
と既設長尺管1との間に挟まれたストッパ6に係止され
ることにより、推進機7から最も遠い位置にある既設長
尺管1が推進機7方向へ移動を開始する。この新設長尺
管1が隣接する既設長尺管1に近づくと、その推進機7
寄りの端部が推進機7から2番目に遠い位置にあるスト
ッパ6に当接し、やがてこのストッパ6が上記隣接する
既設長尺管1に係止される。すると次に、この推進機か
ら2番目に遠い既設長尺管1が推進機7方向へ移動を始
める。この状態を図1(d)に示す。このようにして推
進機7から遠い既設長尺管1から順に移動を開始し、推
進機7が配置された縦穴3から順に抜き出されていく。
尚、既設長尺管1に接続された新設長尺管2は、移動す
る既設長尺管1の後に続くようにして地中に引込まれて
いく。
When the above preparation is completed, the rod 5 is pulled by the propulsion device 7. Then, the new long tube 2
The existing long tube 1 farthest from the propulsion device 7 starts moving toward the propulsion device 7 by being locked by the stopper 6 sandwiched between the propulsion device 7 and the existing long tube 1. When the newly installed long pipe 1 approaches the adjacent existing long pipe 1, the propulsion device 7
The near end abuts against a stopper 6 located at a position farthest from the propulsion device 7, and this stopper 6 is eventually locked to the adjacent existing elongated pipe 1. Then, the existing long pipe 1 which is the second furthest from the propulsion device starts moving toward the propulsion device 7. This state is shown in FIG. In this way, the movement starts in order from the existing long pipe 1 far from the propulsion device 7 and is sequentially extracted from the vertical hole 3 in which the propulsion device 7 is arranged.
In addition, the new long pipe 2 connected to the existing long pipe 1 is drawn into the ground so as to follow the moving existing long pipe 1.

【0017】より詳述すれば、既設長尺管1が推進機7
の配置された縦穴3内に到達すると、推進機7の直前に
配置された切断手段8の棒部9に対して外装状態とな
る。ここで既設長尺管1は、棒部9下面に形成の刃部1
1とその下面で当接しており、ストッパ6による押し出
し力によって押し進められるにつれて端部から押し切ら
れていく。このようにして長手方向に沿って切開された
既設長尺管1は、切断手段8に設けられたガイド斜面1
0に当接し、移動の向きを上方向へと変化させられる。
一方ロッド5は、切断手段7をそのまま通過する。これ
により、既設長尺管1はロッド5から分離させられる。
More specifically, the existing long pipe 1 is connected to the propulsion device 7.
When the rod reaches the inside of the vertical hole 3 in which is disposed, the rod 9 of the cutting means 8 disposed immediately before the propulsion device 7 is in an exterior state. Here, the existing long tube 1 is provided with the blade 1 formed on the lower surface of the rod 9.
1 and the lower surface thereof, and is pushed off from the end as it is pushed forward by the pushing force of the stopper 6. The existing long tube 1 cut in the longitudinal direction in this manner is connected to the guide slope 1 provided on the cutting means 8.
0, and the direction of movement can be changed upward.
On the other hand, the rod 5 passes through the cutting means 7 as it is. Thereby, the existing long tube 1 is separated from the rod 5.

【0018】ガイド斜面10により上方向に導かれた既
設長尺管1は、切開された面を外側に向けながら弧を描
き、縦穴3の開口から外部へと進み、最終的にほぼ円状
の形状となって回収される。一方裸になったロッド5
は、推進機7の後方で接続を解かれ回収される。
The existing long tube 1 guided upward by the guide slope 10 draws an arc while turning the cut surface outward, and proceeds from the opening of the vertical hole 3 to the outside, and finally has a substantially circular shape. Collected in shape. Rod 5 stripped
Is disconnected behind the propulsion device 7 and is recovered.

【0019】全ての既設長尺管1の回収が終わると、既
設長尺管1が敷設された位置に、それと置き換わるよう
にして新設長尺管2及びロケータワイヤが敷設される。
この状態を図1(e)で示す。
When all the existing long tubes 1 have been collected, a new long tube 2 and a locator wire are laid at the position where the existing long tubes 1 were laid, so as to replace them.
This state is shown in FIG.

【0020】[0020]

【発明の効果】本発明の既設長尺管の引き抜き方法は以
上のようなものなので、既設長尺管に“千切れ”、“座
屈”などが生じることがなく、また新設長尺管を敷設す
るにあたってロケータワイヤの損傷がおそれのないもの
となる。また、既設長尺管を引き抜く際に切断手段を用
いることにより、長手方向に切開しながら既設長尺管を
引き抜くことにすれば、接続の解除が必要なロッドを既
設長尺管から引き剥がせるため便利である。特に、切断
手段にガイド斜面を設け、切開後の既設長尺管を強制的
に上側へと導くようにした場合には、引き抜いた既設長
尺管を回収する手間が非常に小さくなる。
As described above, the method for pulling out an existing long pipe according to the present invention is as described above. When laying, the locator wire will not be damaged. Also, by using the cutting means when pulling out the existing long tube, if the existing long tube is pulled out while cutting in the longitudinal direction, the rod that needs to be disconnected can be peeled off from the existing long tube. Because it is convenient. In particular, when a guide slope is provided in the cutting means to force the existing long tube after the incision to be guided upward, the labor for collecting the pulled out existing long tube becomes extremely small.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態による既設長尺管の引き抜
き工法の概要を説明するための側面図。
FIG. 1 is a side view for explaining an outline of an existing long pipe drawing method according to an embodiment of the present invention.

【図2】第1図で示した切断手段を拡大して示した側面
図。
FIG. 2 is an enlarged side view of the cutting means shown in FIG. 1;

【符号の説明】[Explanation of symbols]

1 既設長尺管 2 新設長尺管 3 縦穴 4 補助穴 5 ロッド 6 ストッパ 7 推進機 8 切断手段 9 棒部 10 ガイド斜面 11 刃部 DESCRIPTION OF SYMBOLS 1 Existing long pipe 2 New long pipe 3 Vertical hole 4 Auxiliary hole 5 Rod 6 Stopper 7 Propulsion machine 8 Cutting means 9 Rod part 10 Guide slope 11 Blade part

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 埋設された既設長尺管に挿入され且つ既
設長尺管の一端にその一端が固定されたロッドを、前記
既設長尺管の他端を露出させるように掘った縦穴から牽
引することによって既設長尺管を地中から引き抜くもの
である既設長尺管の引き抜き工法において、 既設長尺管を所定長さで複数に切断してからロッドの牽
引を行うことを特徴とする既設長尺管の引き抜き工法。
A rod inserted into a buried existing elongate tube and having one end fixed to one end of the existing elongate tube is pulled from a vertical hole dug so as to expose the other end of the existing elongate tube. In the method of drawing out an existing long pipe by pulling out the existing long pipe from the ground, the existing long pipe is cut into a plurality of pieces of a predetermined length and then the rod is pulled. Long pipe drawing method.
【請求項2】 ロッドの一端に新たに敷設する新設長尺
管を接続することにより、引き抜かれた既設長尺管と置
き換えて新設長尺管を敷設する請求項1記載の既設長尺
管の引き抜き工法。
2. The existing long pipe according to claim 1, wherein a new long pipe to be newly laid is connected to one end of the rod to replace the pulled-out existing long pipe. Drawing method.
【請求項3】 縦穴の内部に、既設長尺管に当接する刃
部を備える切開手段を設け、ロッドの牽引に伴って引き
抜かれる既設長尺管を前記刃部によって長さ方向に切開
しながら既設長尺管の引き抜きを行うようにした請求項
1又は請求項2のいずれか1項に記載の既設長尺管の引
き抜き工法。
3. A cutting means provided with a blade portion in contact with an existing elongated tube inside the vertical hole, and the existing elongated tube to be pulled out as the rod is pulled is cut in the length direction by the blade portion. The method of drawing out an existing long pipe according to any one of claims 1 and 2, wherein the drawing is performed on the existing long pipe.
【請求項4】 請求項3に記載の既設長尺管の引き抜き
工法に用いる切開手段であって、ロッドと既設長尺管と
の隙間にその先端を差込み可能で且つ基端側へ向かって
太くされた棒部が設けられると共に、該棒部の既設長尺
管と当接する部位に沿って刃部が設けられてなる切開手
段。
4. A cutting means for use in the method for pulling out an existing long pipe according to claim 3, wherein a tip of the cutting means can be inserted into a gap between the rod and the existing long pipe, and becomes thicker toward a base end side. Cutting means provided with a set rod portion, and a blade portion provided along a portion of the rod portion that comes into contact with the existing long tube.
【請求項5】 棒部の基端側に、既設長尺管の進行方向
に向かって上側へ傾斜すると共に切開された既設長尺管
に当接するガイド斜面を設けてなる請求項4記載の切断
手段。
5. The cutting device according to claim 4, wherein a guide slope is provided on the base end side of the rod portion, the guide slope being inclined upward in the traveling direction of the existing elongated tube and abutting on the cut-out existing elongated tube. means.
JP10274063A 1998-09-28 1998-09-28 Method of extracting existing long size pipe Pending JP2000104485A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10274063A JP2000104485A (en) 1998-09-28 1998-09-28 Method of extracting existing long size pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10274063A JP2000104485A (en) 1998-09-28 1998-09-28 Method of extracting existing long size pipe

Publications (1)

Publication Number Publication Date
JP2000104485A true JP2000104485A (en) 2000-04-11

Family

ID=17536460

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10274063A Pending JP2000104485A (en) 1998-09-28 1998-09-28 Method of extracting existing long size pipe

Country Status (1)

Country Link
JP (1) JP2000104485A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105864562A (en) * 2016-06-15 2016-08-17 长春高祥特种管道有限公司 Method for repairing underground steel pipeline by non-excavation insertion

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105864562A (en) * 2016-06-15 2016-08-17 长春高祥特种管道有限公司 Method for repairing underground steel pipeline by non-excavation insertion
CN105864562B (en) * 2016-06-15 2018-08-28 长春高祥特种管道有限公司 A kind of interspersed method for repairing underground steel pipe of no-dig technique

Similar Documents

Publication Publication Date Title
US7997559B2 (en) Method and apparatus for replacing old underground conduits
US11362491B2 (en) Conduit space recovery system
US4626134A (en) Apparatus and method for extracting horizontal underground pipe
JP2000104485A (en) Method of extracting existing long size pipe
US6511260B2 (en) Plow for installing utility lines
EP2561517A2 (en) An apparatus and method for recovering the core of a sheathed electrical cable
JP3261400B2 (en) Pipe splitter method using wire rope
JP4183651B2 (en) Pipe laying method
EP0748971A3 (en) Method and device for removing, without excavation, lead and plastic pipes laid in the ground
JP2022181751A (en) Cable removal method, sheath tube collection method
JP2002295727A (en) Recovery method for existing buried pipe
KR0136296B1 (en) Laying pipes method
JPH09195676A (en) Propulsive method of rod for drilling boring hole pushed in by propulsive machine
US6666434B2 (en) Underground cable retrieval tool
JP2009138483A (en) Extracting and removing method of existing pipe
JPH0220798A (en) Obsolete pipe replacing method
JPH0654151B2 (en) How to replace the existing pipe
JPH0681879B2 (en) Construction method of underground structure
JPH01219292A (en) Piping method of buried pipe
JPH0396783A (en) Non-cut exchanging method for laid pipe
JPH0842280A (en) Pipe roof and construction method thereof
JP2001032681A (en) Advancing pipe laying method
JPS6241485A (en) Method of reducing friction resistance of buried removing pipe
JP2003189435A (en) Drawing method of linear body into protective tube, device thereof and protective tube
JPS6439418A (en) Pulling out device for buried pipe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050927

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20050927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070720

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070727

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071120