JP2000008324A - Combined girder structure for floor slab - Google Patents
Combined girder structure for floor slabInfo
- Publication number
- JP2000008324A JP2000008324A JP10181737A JP18173798A JP2000008324A JP 2000008324 A JP2000008324 A JP 2000008324A JP 10181737 A JP10181737 A JP 10181737A JP 18173798 A JP18173798 A JP 18173798A JP 2000008324 A JP2000008324 A JP 2000008324A
- Authority
- JP
- Japan
- Prior art keywords
- girder
- girders
- slab
- floor slab
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、土木,建築,橋梁
分野において、桁と床版とからなる床版合成桁構造に関
するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a composite slab girder structure including a girder and a slab in the fields of civil engineering, construction, and bridges.
【0002】[0002]
【従来の技術】従来、橋における道路床版等を合成桁で
構築する場合にあっては、図13に示すように支間方向
に伸長してH型鋼材等からなる桁(以下主桁という)1
を複数配設し、この主桁1の上面にコンクリートの床版
2を構築している。つまり、床版2の下側に主桁1を固
定することにより合成桁構造を構築してきた。コンクリ
ート床版2の車両走行面の両端には縁石部3が設けられ
ている。2. Description of the Related Art Conventionally, when a road deck or the like in a bridge is constructed by a composite girder, a girder made of H-shaped steel material or the like (hereinafter referred to as a main girder) extending in a span direction as shown in FIG. 1
Are provided, and a concrete floor slab 2 is constructed on the upper surface of the main girder 1. That is, the composite girder structure has been constructed by fixing the main girder 1 below the floor slab 2. Curbstone portions 3 are provided at both ends of the vehicle running surface of the concrete floor slab 2.
【0003】[0003]
【発明が解決しようとする課題】合成桁構造を構成する
場合において、従来の床版下面に下方に向けて床版支間
方向に主桁を固定して構築した桁構造には、下記の問題
点があった。 大きな支間間隔(つまり、橋脚間のスパン)が必要
な場合、この大スパン間の床版を支持するには、より大
きな力が必要であり、このため、床版下面に大きな断面
性能の桁が必要となることから、主桁が例えば鋼桁の場
合、 A.所要の高さの桁が必要となり、床版設置高さが決ま
っているため、おのずから桁下端の位置が下がり、その
ぶん床版下部の利用空間が小さくなる。また、桁高が大
きくなると、この桁のトラックによる道路運搬時に高さ
制限等で道路交通障害をきたす。 B.また、桁高制限をして必要な強度を出すためには、
鋼材の各部の板厚の著るしい増大となり、過大な鋼材量
となってコストアップとなる。 C.特に、製作上桁高限界(900mm)のあるロール
H型鋼を桁として用いる場合、大きな支間間隔(スパン
20m以上)が必要な場合は、適用不可能となる。 コンクリートの床版と鋼H桁を固定して合成桁構造
の橋梁を構築する場合、合成桁に生じる正曲げ部(橋脚
上部の支点とその両側付近)のコンクリート床版には大
きな圧縮力が作用し、また合成桁負曲げ部(つまり、支
点間中間とその両側付近)のコンクリート床版には、大
きな引っ張り力が作用し、これらの大きな力が橋梁にと
って最も重要な車両走行部となるコンクリート床版の亀
裂損傷に繋がる。 車両走行に対応した防音壁やガードレールが、走行
踏面である床版両端に床版より上方に向けて床版梁間方
向に別途必要である。本発明は前記の課題を解決した合
成桁構造を提供することを目的とする。When a composite girder structure is constructed, the conventional girder structure constructed by fixing the main girder downward to the lower surface of the floor slab in the span direction of the floor slab has the following problems. was there. If large span spacing (ie span between piers) is required, more force is needed to support the slab between these large spans, which results in a large cross-section girder underneath the slab. Since it is necessary, when the main girder is, for example, a steel girder, Since the required height of the slab is required, and the floor slab installation height is determined, the lower end of the slab is naturally lowered, and the space used at the bottom of the slab is reduced accordingly. Also, when the girder height is increased, road traffic is obstructed due to height restrictions and the like when the girder is transported by truck. B. Also, in order to obtain the required strength by limiting the digit height,
The thickness of each part of the steel material is remarkably increased, resulting in an excessive amount of the steel material and an increase in cost. C. In particular, when a roll H-shaped steel having a girder height limit (900 mm) is used as a girder, if a large span interval (span of 20 m or more) is required, this method cannot be applied. When constructing a bridge with a composite girder structure by fixing a concrete slab and a steel H-girder, a large compressive force acts on the concrete slab of the positive bending portion (the fulcrum at the upper part of the pier and the vicinity of both sides) generated in the composite girder. In addition, large tensile forces are applied to the concrete slabs at the composite girder's negative bend (ie, between the fulcrums and near both sides), and these large forces are the most important vehicle running parts for the bridge. This leads to plate crack damage. Soundproof walls and guard rails corresponding to the vehicle running are separately required at both ends of the floor slab, which is the running tread, in the direction between the floor slabs and above the floor slab. An object of the present invention is to provide a composite girder structure that solves the above-mentioned problems.
【0004】[0004]
【課題を解決するための手段】前記の課題を解決するた
め、本発明に係る床版合成桁構造は、支間方向に伸長し
て上桁と下桁を設け、この上下の桁間を床版を介在させ
て固定することを特徴とする。本発明において、前記の
上桁を前記床版の車両走行面両端に固定することを特徴
とする。また本発明において、前記の床版が鉄筋コンク
リートよりなり、上桁と下桁が鋼桁よりなることを特徴
とする。また本発明において、前記鋼桁とコンクリート
床版の接合界面には、鋼桁からコンクリート床版に向っ
てシヤーキイが突出固定されていることを特徴とする。
また本発明において、前記鋼上桁がH型鋼材からなり、
そのウエブとフランジがコンクリート床版両端面で接合
界面を持つことを特徴とする。In order to solve the above-mentioned problems, a composite floor girder structure according to the present invention is provided with an upper girder and a lower girder extending in a span direction, and a gap between the upper and lower girder is provided. And is interposed and fixed. In the present invention, the upper girders are fixed to both ends of a vehicle running surface of the floor slab. In the present invention, the floor slab is made of reinforced concrete, and the upper and lower girders are made of steel girders. Further, in the present invention, at the joint interface between the steel girder and the concrete slab, a shear key protrudes from the steel girder toward the concrete slab and is fixed.
In the present invention, the steel upper girder is made of an H-shaped steel material,
The web and the flange have a joint interface at both ends of the concrete slab.
【0005】本発明の床版合成桁構造によると、上桁と
下桁とが床版を介して固定される構造であるので、大き
な桁高性能を持った重ね合成桁に容易に構成でき、しか
も大きな桁高の割りには桁上,桁下の建築限界に妨げら
れず、さらに桁構造が合理化されたことにより、同一支
間間隔(スパン)では従来より桁鋼材重量を少なくで
き、同一桁鋼材重量では支間間隔を従来より長くでき
る。According to the composite slab structure of the present invention, since the upper spar and the lower spar are fixed via the slab, the composite slab can easily be constructed as a composite spar with high girder performance. In addition, the large girder height is not hindered by the building limits above and below the girder, and the girder structure has been rationalized, so that the same girder steel weight can be reduced at the same span (span) and the same girder steel In terms of weight, the span interval can be made longer than before.
【0006】[0006]
【発明の実施の形態】以下、本発明の実施形態を図を参
照して説明する。図1は本発明の第1実施形態を示し、
それぞれウエブ4及び上下のフランジ5,6を有するH
型鋼からなる上桁7と下桁8が、支間方向に伸長して設
けられ、この上下の桁間にコンクリート床版10が介在
され、コンクリート床版10の上下面が、それぞれ上桁
7の下フランジ6および下桁8の上フランジ5に当てが
われ、固定されて床版合成桁構造が構築された例が示さ
れている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 shows a first embodiment of the present invention,
H each having a web 4 and upper and lower flanges 5, 6
An upper girder 7 and a lower girder 8 made of a section steel are provided extending in the span direction, and a concrete floor slab 10 is interposed between the upper and lower girders. An example is shown in which the floor slab composite girder structure is applied to and fixed to the flange 6 and the upper flange 5 of the lower girder 8.
【0007】図示例の場合、上桁7は車両走行路に用い
られるコンクリート床版10の両端に設けられること
で、桁機能に加えて縁石ないし防護,防音壁機能を持た
せている。下桁8はコンクリート床版10を介して上桁
7の直下に設けられているので、上桁7からの荷重はこ
の下桁8で直に受けられる。In the illustrated example, the upper girders 7 are provided at both ends of the concrete floor slab 10 used for the vehicle running path, so that they have a curb, a protection and a soundproof wall function in addition to the girder function. Since the lower girder 8 is provided directly below the upper girder 7 via the concrete floor slab 10, the load from the upper girder 7 is directly received by the lower girder 8.
【0008】図2は第2実施形態を示し、この第2実施
形態に示す床版合成桁構造では、上桁7はコンクリート
床版10に対し、第1実施形態と同様に配設されるのに
対し、下桁8はコンクリート床版10の下側に道路幅方
向に複数平行に並べて設けられている。そして、両外側
の下桁8(これを仮に下外桁8bという)は第1実施形
態と同様に上桁7の直下に設けられていて、上桁7から
の荷重を直に受けるのに対し、内側に設けられる下桁8
(これを仮に下内桁8aという)は、上桁7に対して、
平面的に位置がずれて設けられており、上桁7からの下
向きの力は、上桁7と下内桁8aの間を繋ぐコンクリー
ト床版10を介して、この下内桁8aへ伝えられる。FIG. 2 shows a second embodiment. In the composite slab structure of the second embodiment, the upper spar 7 is disposed on the concrete slab 10 in the same manner as in the first embodiment. On the other hand, a plurality of lower girders 8 are provided below the concrete floor slab 10 in parallel in the road width direction. The lower outer girders 8 (hereinafter, tentatively referred to as lower outer girders 8b) are provided immediately below the upper girders 7 similarly to the first embodiment, and receive the load from the upper girders 7 directly. , Lower girder 8 provided inside
(This is temporarily called lower inner digit 8a) is
A downward force from the upper girder 7 is transmitted to the lower inner girder 8a via the concrete floor slab 10 connecting between the upper girder 7 and the lower inner girder 8a. .
【0009】図3,図4は第3実施形態を示し、この第
3実施形態では、第2実施形態における下外桁8bがな
い床版合成桁構造が示されている。また、第3実施形態
では、上桁7の下フランジ6の下面と下内桁8aの上フ
ランジ5の上面にシエアキーとしてのスタッドジベル1
1が溶接されている。このスタッドジベル11は、所定
の厚み(T)を有し、内部に補強鉄筋12が配筋された
コンクリート床版10内に埋込まれており、このスタッ
ドジベル11を介してコンクリート床版10と、上桁7
と、下内桁8aとが強固に結合されている。このスタッ
ドジベル11による上下の桁とコンクリート床版との結
合構造は第1,第2実施形態でも同様に実施される。FIGS. 3 and 4 show a third embodiment. In the third embodiment, a composite floor girder structure without a lower outer girder 8b in the second embodiment is shown. In the third embodiment, a stud dowel 1 as a shear key is provided on the lower surface of the lower flange 6 of the upper spar 7 and the upper surface of the upper flange 5 of the lower inner spar 8a.
1 is welded. The stud dowel 11 has a predetermined thickness (T) and is embedded in a concrete slab 10 in which a reinforcing reinforcing bar 12 is arranged. , Upper digit 7
And the lower inner spar 8a are firmly connected. The connection structure between the upper and lower girders and the concrete floor slab by the stud dowel 11 is similarly implemented in the first and second embodiments.
【0010】図5,図6は、第4実施形態に係る床版合
成桁構造を示す。この第4実施形態では、コンクリート
床版10の両端下面が、両側の上桁7の下フランジ6の
上面で支持され、かつ両端面をウエブ4の側面に当てが
うことでコンクリート床版10のよこ方向の動きが制限
されて、コンクリート床版10の両端部が上桁7に支持
されている。コンクリート床版10の下面が下桁8の上
フランジ5で支持されるのは、先の実施形態と同じであ
る。さらに、このコンクリート床版10を支える上桁7
の下フランジ6の上面と、ウエブ4の側面にそれぞれス
タッドジベル11が溶接され、この上向きと横向きのス
タッドジベル11がコンクリート床版10の端部に埋設
されることで、コンクリート床版10の両端部と上桁7
の結合が確実になされている。他の構成は第3実施形態
と同じである。FIGS. 5 and 6 show a composite floor girder structure according to a fourth embodiment. In the fourth embodiment, the lower surfaces of both ends of the concrete floor slab 10 are supported by the upper surfaces of the lower flanges 6 of the upper girders 7 on both sides, and both end surfaces are applied to the side surfaces of the web 4, whereby the concrete floor slab 10 is Lateral movement is restricted, and both ends of the concrete slab 10 are supported by the upper beam 7. The lower surface of the concrete floor slab 10 is supported by the upper flange 5 of the lower girder 8 as in the previous embodiment. Further, the upper girders 7 for supporting the concrete slab 10
Stud dowels 11 are welded to the upper surface of the lower flange 6 and the side surface of the web 4, respectively, and the upward and lateral stud dowels 11 are buried in the ends of the concrete slab 10, so that both ends of the concrete slab 10 Division and upper beam 7
The connection is surely made. Other configurations are the same as those of the third embodiment.
【0011】図7,図8は第5実施形態を示す。第1〜
第4実施形態では、上桁7と下桁8はいずれもそれ自体
が鋼桁を構成しているのに対し、この第5実施形態で
は、H型鋼材からなる上桁7と下桁8のそれぞれが桁補
強材としてコンクリート中に埋設されたコンクリート上
桁17およびコンクリート下桁18が構成されており、
コンクリート床版10と上下のコンクリート桁17,1
8とは、コンクリートの一体的打設により構築されてい
る。FIGS. 7 and 8 show a fifth embodiment. First to first
In the fourth embodiment, both the upper girder 7 and the lower girder 8 themselves constitute a steel girder, whereas in the fifth embodiment, the upper girder 7 and the lower girder 8 made of H-shaped steel are used. A concrete upper girder 17 and a concrete lower girder 18 each buried in concrete as a girder reinforcing material are configured,
Concrete slab 10 and upper and lower concrete girder 17,1
8 is constructed by integrally casting concrete.
【0012】第1〜第5実施形態において共通する構成
は、上桁7と下桁8の中間にコンクリート床版10が位
置し、このコンクリート床版10によって上桁7(およ
びコンクリート上桁17)と下桁8(およびコンクリー
ト下桁18)を固着して床版合成桁を構成していること
である。これらの床版合成桁は、例えば図1の施工例と
して図9に示すように、所定の支間間隔をおいて配設の
橋脚13の上端に設けられる。A common configuration of the first to fifth embodiments is that a concrete floor slab 10 is located between an upper girder 7 and a lower girder 8, and the upper girder 7 (and a concrete upper girder 17) is provided by the concrete floor slab 10. And the lower girder 8 (and the concrete lower girder 18) are fixed to form a composite slab girder. These floor slab composite girders are provided at the upper end of a bridge pier 13 provided at a predetermined span interval, for example, as shown in FIG. 9 as a construction example of FIG.
【0013】本発明に係る床版合成桁と、従来構造の床
版合成桁における各コンクリート床版2と10に作用す
る耐曲げ応力の比較例が図10と図11に示されてい
る。各図から分かるように、従来構造(図11に示す)
の床版合成桁では、H型鋼材の主桁1の上フランジ上に
コンクリート床版2が配置されるのに対し、本発明の床
版合成桁(図10に示す)では、コンクリート床版10
の上下にH型鋼材の上桁7と下桁8が位置しているの
で、従来例における各部の寸法関係(以下その記号に
(ィ)を付記する)を(ィ)C・hc ,(ィ)T・ht とし、
本発明における各部の寸法関係(以下その記号に(ロ) を
付記する)を、(ロ) C・hc ,(ロ) T・ht とすると、
(ィ)C・hc <(ロ) C・hc ,(ィ)T・ht <(ロ) C・
hc の関係にある。それ故に、耐曲げ応力であるMR
は、従来例では、MR =(ィ)C・hc +(ィ)T・ht 、
本発明ではMR =(ロ) C・hc +(ロ) T・ht であり、
本発明のコンクリート床版10の耐曲げ応力が従来より
も著るしく増大していることが明らかである。FIGS. 10 and 11 show comparative examples of the bending stress acting on each of the concrete slabs 2 and 10 in the composite slab of the present invention and the composite slab of the conventional structure. As can be seen from each figure, the conventional structure (shown in FIG. 11)
In the composite slab of the present invention, the concrete slab 2 is disposed on the upper flange of the main girder 1 of H-shaped steel, whereas in the composite slab of the present invention (shown in FIG. 10), the concrete slab 10
Since the upper girder 7 and the lower girder 8 of the H-shaped steel material are located above and below, the dimensional relationship of each part in the conventional example (hereinafter the symbol
(Additional (ii)) to (ii) C · hc and (ii) T · ht,
In the present invention, when the dimensional relationship of each part (hereinafter, the symbol is denoted by (b)) is (b) C · hc, (b) T · ht,
(B) C · hc <(b) C · hc, (b) T · ht <(b) C ·
hc. Therefore, the bending stress MR
In the conventional example, MR = () C · hc + (ィ) T · ht,
In the present invention, MR = (b) C · hc + (b) T · ht,
It is clear that the bending stress resistance of the concrete floor slab 10 of the present invention is significantly increased as compared with the conventional case.
【0014】図12には、本発明に係る合成桁構造と、
従来例に係る合成桁構造における主桁鋼材重量比較例が
グラフで示されている。▲は従来タイプ、●は本発明を
示し、この図から分かるように、従来例に比べ本発明で
は、床版の支点間隔が同じ長さであれば、桁の鋼材重量
が30%程度少なくてすみ、鋼材重量が同じであれば、
支点間距離(スパン)を30%程度長くできることが明
らかである。FIG. 12 shows a composite girder structure according to the present invention,
A graph of a comparative example of main girder steel material weight in a composite girder structure according to a conventional example is shown. ▲ indicates the conventional type, and ● indicates the present invention. As can be seen from this figure, in the present invention, if the fulcrum spacing of the floor slabs is the same length, the steel weight of the girder is reduced by about 30% as compared with the conventional example. Corner, if the steel weight is the same,
It is clear that the distance between supports (span) can be increased by about 30%.
【0015】第1〜第5実施形態の構造的特徴にもとづ
く作用効果をまとめて説明する。 (イ)上桁7が車両走行路となる床版両端から上方に向
けて立上り、梁間方向(スパン方向)に伸長して固定し
てあるので、上桁7とコンクリート床版両端での接合固
定は、コンクリート床版10を介して、下桁8と強固に
構造一体化でき、大きな桁高性能を持った重ね合成桁に
容易に構成できる。 (ロ)コンクリート床版10の両端部の上桁7は桁構造
としての大きな構造要素を構成すると同時に、走行車両
のための騒音防止壁やガードレールの機能を果たす。 (ハ)また、図3以下で示すように、床版コンクリート
10に発生する断面力低減のため、上桁7と下桁8との
平面的ずれ配置による適正桁間隔を採っても、床版構造
は、面内剪断力が大きく、上桁7と下桁8の構造一体化
を妨げることはない。特に床版がコンクリートの場合、
その平面剛性は大きく、上桁7と下桁8相互の接合固定
は、容易に構造一体化が可能となる。 (ニ)床版が鉄筋コンクリートからなり、上桁7と下桁
8が鋼桁からなる構成とすることにより、床版として安
価で高性能な鉄筋コンクリートは、上桁7と下桁8を現
場で容易に接合固定できる。 (ホ)上桁7と下桁8が鋼桁よりなり、さらに鋼桁とコ
ンクリート床版の接合界面では、コンクリート床版10
に向って鋼桁に固着したスタッドジベル11や穴あき鋼
板ジベルを取り付けることで両部材を容易に接合固定で
きる。 (へ)図5,図6に示す例では、コンクリート床版10
の両端面と下面が上桁7の下フランジ6の上面とウエブ
4の側面とで接合界面を持つので、打設コンクリートと
鋼面との密着性が高い。The operation and effect based on the structural features of the first to fifth embodiments will be described together. (A) Since the upper girders 7 rise upward from both ends of the floor slab, which is the vehicle running path, and extend and are fixed in the inter-beam direction (span direction), the upper girders 7 are fixedly joined to both ends of the concrete slab. Can be firmly integrated with the lower girder 8 through the concrete floor slab 10, and can easily be constructed as a composite pile with high girder performance. (B) The upper girders 7 at both ends of the concrete floor slab 10 constitute a large structural element as a girder structure, and at the same time, function as noise prevention walls and guardrails for traveling vehicles. (C) As shown in FIG. 3 and subsequent figures, to reduce the section force generated in the concrete floor slab 10, even if an appropriate girder spacing is adopted due to a planar misalignment between the upper spar 7 and the lower spar 8, The structure has a large in-plane shear force and does not prevent the structural integration of the upper and lower girders 7 and 8. Especially when the slab is concrete
The plane stiffness is large, and the upper spar 7 and the lower spar 8 can be easily joined and fixed to each other by structural integration. (D) The floor slab is made of reinforced concrete and the upper and lower girders 7 and 8 are made of steel girders. Can be fixedly bonded. (E) The upper girder 7 and the lower girder 8 are made of steel girders.
The two members can be easily joined and fixed by attaching the stud dowel 11 or the perforated steel plate dowel fixed to the steel girder. (F) In the example shown in FIGS. 5 and 6, the concrete slab 10
Has a joint interface between the upper surface of the lower flange 6 of the upper spar 7 and the side surface of the web 4 so that the adhesion between the cast concrete and the steel surface is high.
【0016】[0016]
【発明の効果】本発明に係る特許請求の範囲に記載する
床版合成桁構造によると次の効果がある。 車両走行に用いられる床版を上桁と下桁の重ね接合
界面構造に兼用させることにより、大きな桁高性能を持
った重ね合成桁に容易に構成できるので、低コストで大
きな支間の合成桁構造を構築できる。 床版から上桁と下桁がそれぞれ別々に上下に突出し
ているので、大きな桁高の割りには、桁上,桁下の建築
限界に妨げられない。また、桁高の低い上桁と下桁を別
々に分離運搬できるので、道路交通制限を受けない。 特に製作上、桁高限界(900mm)のあるロール
H型鋼を桁として用いる場合、より大きな桁高となる上
桁と下桁の重ね桁として用いることができるので、大き
な支間間隔(スパン30m程度)が必要な場合も適用可
能である。According to the composite slab structure of the slab described in the claims of the present invention, the following effects can be obtained. By combining the floor slab used for vehicle traveling with the lap joint interface structure of the upper and lower girders, it can be easily configured as a lap composite girder with large girder high performance, so it is a low cost and large girder composite girder structure Can be constructed. Since the upper and lower girders protrude separately from the floor slab, they are not hindered by the construction limits above and below the girders, even if the girder height is large. In addition, since the upper girder and the lower girder having a low girder height can be separately transported, there is no restriction on road traffic. Particularly, when a roll H-shaped steel having a girder height limit (900 mm) is used as a girder, it can be used as a girder of an upper girder and a lower girder having a larger girder height, so that a large span interval (about 30 m span) is used. Is also applicable when necessary.
【図1】本発明の第1実施形態に係る床版合成桁構造の
破断斜視図である。FIG. 1 is a cutaway perspective view of a slab composite girder structure according to a first embodiment of the present invention.
【図2】第2実施形態に係る床版合成桁構造の破断斜視
図である。FIG. 2 is a cutaway perspective view of a floor slab composite girder structure according to a second embodiment.
【図3】第3実施形態に係る床版合成桁構造の破断斜視
図である。FIG. 3 is a cutaway perspective view of a floor slab composite girder structure according to a third embodiment.
【図4】図3の破断拡大断面図である。FIG. 4 is an enlarged cross-sectional view of FIG.
【図5】第4実施形態に係る床版合成桁構造の破断斜視
図である。FIG. 5 is a cutaway perspective view of a floor slab composite girder structure according to a fourth embodiment.
【図6】図5の破断拡大断面図である。FIG. 6 is an enlarged cross-sectional view of FIG. 5;
【図7】第5実施形態に係る床版合成桁構造の破断斜視
図である。FIG. 7 is a cutaway perspective view of a composite floor girder structure according to a fifth embodiment.
【図8】図7の右側部分の拡大断面図である。FIG. 8 is an enlarged sectional view of a right side portion of FIG. 7;
【図9】本発明の実施形態に係る床版合成桁を用いた橋
の側面図である。FIG. 9 is a side view of a bridge using a composite slab girder according to an embodiment of the present invention.
【図10】本発明に係るコンクリート床版の耐曲げ応力
を示す説明図である。FIG. 10 is an explanatory diagram showing the bending stress resistance of the concrete slab according to the present invention.
【図11】従来の合成桁におけるコンクリート床版の耐
曲げ応力を示す説明図である。FIG. 11 is an explanatory view showing a bending stress resistance of a concrete slab in a conventional composite girder.
【図12】本発明と従来例の合成桁構造において、それ
ぞれの桁に用いられる鋼材重量と、桁を支持できるスパ
ンとの関係をグラフで示す図である。FIG. 12 is a graph showing the relationship between the weight of a steel material used for each girder and the span capable of supporting the girder in the composite girder structures of the present invention and the conventional example.
【図13】従来の床版合成桁構造の破断斜視図である。FIG. 13 is a cutaway perspective view of a conventional slab composite girder structure.
1 主桁 2 コンクリート床版 3 縁石部 4 ウエブ 5 上フランジ 6 下フランジ 7 上桁 8 下桁 10 コンクリート床版 11 スタッドジベル 12 補強鉄筋 13 橋脚 17 コンクリート上桁 18 コンクリート下桁 DESCRIPTION OF SYMBOLS 1 Main girder 2 Concrete floor slab 3 Curb part 4 Web 5 Upper flange 6 Lower flange 7 Upper girder 8 Lower girder 10 Concrete floor slab 11 Stud dowel 12 Reinforcing steel 13 Bridge pier 17 Concrete upper girder 18 Concrete lower girder
Claims (5)
この上下の桁間を床版を介在させて固定することを特徴
とする床版合成桁構造。1. An upper spar and a lower spar are provided extending in the span direction,
A composite floor girder structure wherein the upper and lower girders are fixed with a floor slab interposed therebetween.
に固定することを特徴とする請求項1に記載の床版合成
桁構造。2. The composite slab structure according to claim 1, wherein the upper spar is fixed to both ends of a vehicle running surface of the slab.
と下桁が鋼桁よりなる請求項1または2に記載の床版合
成桁構造。3. The composite slab structure according to claim 1, wherein the slab is made of reinforced concrete, and the upper and lower girders are made of steel girders.
には、鋼桁からコンクリート床版に向ってシヤーキイが
突出固定されている請求項3記載の床版合成桁構造。4. A composite slab girder structure according to claim 3, wherein a shear key protrudes from the steel girder toward the concrete slab at a joint interface between the steel girder and the concrete slab.
エブとフランジがコンクリート床版両端面で接合界面を
持つ請求項3または4のいずれかに記載の床版合成桁構
造。5. The composite slab structure according to claim 3, wherein the steel upper spar is made of an H-shaped steel material, and a web and a flange of the upper slab have a joint interface at both ends of the concrete slab.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10181737A JP2000008324A (en) | 1998-06-29 | 1998-06-29 | Combined girder structure for floor slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10181737A JP2000008324A (en) | 1998-06-29 | 1998-06-29 | Combined girder structure for floor slab |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2000008324A true JP2000008324A (en) | 2000-01-11 |
Family
ID=16106014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10181737A Withdrawn JP2000008324A (en) | 1998-06-29 | 1998-06-29 | Combined girder structure for floor slab |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2000008324A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006299554A (en) * | 2005-04-18 | 2006-11-02 | Jfe Engineering Kk | Structure near intermediate supporting point of continuous i-beam bridge |
JP2007239270A (en) * | 2006-03-07 | 2007-09-20 | Ps Mitsubishi Construction Co Ltd | Pc box girder bridge |
JP2020528503A (en) * | 2018-04-11 | 2020-09-24 | パンディ,べライサミ サバマニ | System and method for construction of composite U-shaped reinforced girder bridge deck |
-
1998
- 1998-06-29 JP JP10181737A patent/JP2000008324A/en not_active Withdrawn
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006299554A (en) * | 2005-04-18 | 2006-11-02 | Jfe Engineering Kk | Structure near intermediate supporting point of continuous i-beam bridge |
JP4492422B2 (en) * | 2005-04-18 | 2010-06-30 | Jfeエンジニアリング株式会社 | Structure near the intermediate fulcrum of continuous I-girder bridge |
JP2007239270A (en) * | 2006-03-07 | 2007-09-20 | Ps Mitsubishi Construction Co Ltd | Pc box girder bridge |
JP4644146B2 (en) * | 2006-03-07 | 2011-03-02 | 株式会社ピーエス三菱 | PC box girder bridge |
JP2020528503A (en) * | 2018-04-11 | 2020-09-24 | パンディ,べライサミ サバマニ | System and method for construction of composite U-shaped reinforced girder bridge deck |
JP2022023107A (en) * | 2018-04-11 | 2022-02-07 | サバマニ パンディ,べライサミ | System for construction of complex u-shaped reinforcement beam bridge deck, and method thereof |
JP7121179B2 (en) | 2018-04-11 | 2022-08-17 | サバマニ パンディ,べライサミ | System and method for construction of composite U-shaped reinforced girder bridge deck |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6807789B1 (en) | Steel-concrete composite beam using asymmetric section steel beam | |
JP3660826B2 (en) | Rigid structure of upper and lower composite members | |
JP2002250009A (en) | Steel-concrete composite beam using corrugated steel plate web | |
KR100447013B1 (en) | Beam system composed of asymmetric steel section with web hole and concrete | |
KR102386206B1 (en) | Composite beam and floor structure | |
JP2001081729A (en) | Composite floor slab | |
JP6042622B2 (en) | Floor slab structure using sandwich type composite slab panel | |
JP4650255B2 (en) | Steel slab reinforcement structure and existing steel slab reinforcement method | |
JP4585614B1 (en) | Method for constructing synthetic steel slab bridge, ribbed steel slab, and synthetic steel slab bridge | |
JP2008088634A (en) | Composite steel-concrete floor slab | |
JP2004218429A (en) | Bridge structure | |
JP2000008324A (en) | Combined girder structure for floor slab | |
JP4492422B2 (en) | Structure near the intermediate fulcrum of continuous I-girder bridge | |
JP2000008325A (en) | Combined girder structure for floor slab | |
JP2759580B2 (en) | Synthetic floorboard construction method and deck plate for synthetic floorboard | |
JPH11293626A (en) | Bridge structure | |
JP7206060B2 (en) | Composite panel construction | |
JP2002227134A (en) | Reinforcing structure for concrete floor board steel girder bridge | |
JPH1096207A (en) | Continuing structure of simple girder bridge | |
JP3950748B2 (en) | Bridge girder | |
JP3950747B2 (en) | Bridge girder | |
JP5503265B2 (en) | Girder bridge connection structure | |
KR102677385B1 (en) | Composite girdir having concrete reinforcing web and construction method for bridge using the same | |
JP2003155707A (en) | Diagonal member fixing part reinforcing structure for cable stayed bridge | |
JP3084242B2 (en) | Bearing structure of precast hollow girder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20050906 |