GB2499061A - A top plate template device for subterranean drilling or boring - Google Patents

A top plate template device for subterranean drilling or boring Download PDF

Info

Publication number
GB2499061A
GB2499061A GB1212332.9A GB201212332A GB2499061A GB 2499061 A GB2499061 A GB 2499061A GB 201212332 A GB201212332 A GB 201212332A GB 2499061 A GB2499061 A GB 2499061A
Authority
GB
United Kingdom
Prior art keywords
top plate
frame
plate alignment
template device
set forth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB1212332.9A
Other versions
GB201212332D0 (en
Inventor
Kenneth Doyle Oglesby
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Regency Technologies LLC
Original Assignee
Regency Technologies LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Regency Technologies LLC filed Critical Regency Technologies LLC
Priority to GB1212332.9A priority Critical patent/GB2499061A/en
Publication of GB201212332D0 publication Critical patent/GB201212332D0/en
Publication of GB2499061A publication Critical patent/GB2499061A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/08Underwater guide bases, e.g. drilling templates; Levelling thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • E21B7/128Underwater drilling from floating support with independent underwater anchored guide base

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A top plate alignment template device 10 for subterranean drilling or boring including a frame 12 receivable on a ground site and a plurality of tubular guide bores 14. The bores are provided on the frame, with each of the guide bores arranged at an angle extending downwardly and outwardly from the frame. In the first invention, each of the guide bores has an axis so that the axes (19, figure 2a) of the guide bores extend from a common center point above the frame. The device may form a receptacle for concrete (18, figure 2b) which is poured into the frame and hardened in place. The second invention is characterized by a template device where the guide bores are arranged at an angle between ten and eighty degrees downwardly and outwardly of the frame.

Description

1
TOP PLATE ALIGNMENT TEMPLATE DEVICE
BACKGROUND OF THE INVENTION 1. Field of the Invention.
5 The present invention relates to a top plate alignment template and platform device for simply and easily installing multiple pipes, tubes, hoses or rods at multiple angles into the ground from a small surface site. In particular, the present invention is directed to a top plate alignment template and platform device which may be utilized for ground source heat pump installation applications, for anchoring applications, and for installing geophone equipment in seismic applications. 10 2. Prior Art.
Subterranean pipes, tubes, hoses or rods are used in multiple types of applications. One example is ground source heat pumps used in heating and cooling systems for buildings. The earth is utilized as a heat source in the winter and as a heat sink in the summer. A fluid circulation loop is used to exchange heat between the earth and a building. A pump moves the fluid from a heat 15 exchanger through the loop beneath the surface of the earth to exchange heat with the ground before returning to the surface. The fluid loop pipe will contain a mixture of fluid, such as freon, water and antifreeze. A series of pipes or tubes will typically run somewhat vertically in the ground through holes bored from fifty (50) to five hundred (500) feet deep. Pairs of pipes are joined with a u-shaped connector in order to deliver the fluid downhole and then return the fluid to the surface. The pipes 2 0 are typically installed at regular distances apart from each other, such as twenty (20) feet apart. The
2
bore holes may be filled with a grout surrounding the pipes to provide a thermal connection to the grounding soil or rock. This installation requires moving the drilling equipment multiple times for multiple bores and results in considerable time and surface site disturbance.
Another example is in anchoring applications, where a single or multiple holes are created.
5 A solid core tube or a cable is then installed beneath the surface and grouted into place. Alternatively, rods can be driven into the ground. Anchoring devices can be used for various applications. A non-limiting example would be anchoring of a floating rig or platform to a seabed or to a sea floor.
A further example of another application is detection of seismic signals utilizing sensors in 10 bores beneath the surface of the earth surface. A number of acoustic sensors, such as subterranean geophones convert ground movement to voltage. The geophones are inserted in boreholes delivered to multiple locations beneath the earth. The geophones are utilized to detect seismic activity from the earth or, alternatively, to detect seismic signals that are manmade. The data recovered may be used for tracking seismic activity such as earthquakes. The data may also be utilized for plotting 15 subsurface conditions, such as to predict subterranean oil and gas deposits. Seismic waves produced by explosions or vibration controlled sources are a primary method of underground exploration.
While it is possible to drill multiple holes or bores with drilling or boring equipment, there are costs associated with setting up the drilling equipment and taking down the drilling equipment for each separate bore to be drilled. It would be advantageous to achieve faster mobilization to 2 0 provide a system with less tear down, moving and set up time and expense than required when drilling multiple bores.
It would also be advantageous to provide a system with the smallest possible surface footprint for drilling or boring multiple subterranean bores.
3
It would also be advantageous in anchoring applications to have the firmest grip permissible from a single location.
It would also be advantageous to provide a top plate alignment template device that can be installed in a cavity in the ground and then cemented in place to form a solid platform for drilling 5 or boring equipment for multiple holes or bores.
It would also be advantageous to provide a top plate alignment template device that can be utilized as a temporary form for drilling and boring equipment and that may later be removed.
SUMMARY OF THE INVENTION The present invention is directed to a top plate alignment template and platform device. The device includes a frame receivable on or in a ground site. In one preferred embodiment the frame is constructed from metal plates, beams, tubes or rods.
A plurality of tubular guide bores are arranged around and secured to the frame. Each of the guide bores is arranged at an angle outwardly and/or downwardly from the frame. A central tubular guide bore may also be provided which is substantially perpendicular to the planar frame.
The frame forms a platform for receipt and alignment of drilling or boring equipment used to drill or bore subterranean holes using the tubular guide bores as guides. It is particularly suited for coiled tubing applications.
BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 illustrates a perspective view and Figures 2a and 2b illustrate alternate sectional views of a first preferred embodiment of a top plate alignment template device constructed in accordance with the present invention;
Figure 3 illustrates a top view, Figure 4 illustrates a sectional view and Figures 5 illustrates a perspective view of a second preferred embodiment of a top plate alignment template device;
Figure 6 illustrates a perspective view of a third preferred embodiment of a top plate alignment template device;
Figure 7 illustrates a perspective view of a fourth preferred embodiment of a top plate alignment template device;
Figure 8 illustrates a perspective view, Figure 9 illustrates a side view, Figure 10 illustrates a top view and Figure 11 illustrates a sectional view of a fifth preferred embodiment of a top plate alignment template device: and
Figures 12 through 16 illustrate atop plate alignment template device of the present invention with an articulated injection head.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
The embodiments discussed herein are merely illustrative of specific manners in which to make and use the invention and are not to be interpreted as limiting the scope of the instant
)
invention.
While the invention has been described with a certain degree of particularity, it is to be noted that many modifications may be made in the details of the invention's construction and the arrangement of its components without departing from the spirit and scope of this disclosure. It is understood that the invention is not limited to the embodiments set forth herein for purposes of exemplification.
Referring to the drawings in detail. Figures 1, 2a and 2b show a perspective view of a first preferred embodiment 10 of a top plate alignment template device. The device 10 includes a frame 12 receivable on a ground site. The ground site for the frame 12 may be at ground level, below ground level, such as in an open pit, or on a sea bed. The. frame 12 is constructed from metal plates or beams. The frame 12 may be welded or otherwise secured together.
A plurality of tubular guide bores 14 are arranged around and secured to the framel2. Such guide bores are shown as straight but may also be curved or arcuate. The tubular guide bores 14 may be welded or otherwise secured to the frame 12. Each of the guide bores 14 is arranged at an angle extending outwardly and/or do wnwardly from the frame 12. The frame 12 is substantially planar and the guide bores 14 are arranged at a preferred angle of between thirty degrees (30°) and sixty degrees (60°) from the frame 12. Other angles are possible within the spirit and scope of the present invention.
Each of the guide bores 14 has an axis 19 so that the axes of the guide bores 14 extend from a common center point above the frame 12. In the embodiment shown in Figures 1, 2a and 2b, a
central tubular guide bore 16 is also provided which is substantially perpendicular to the planar frame 12.
The invention may be utilized as a temporary device, in which case it would be removed after drilling and insertion of tubing is complete. Alternatively, the device may be permanently installed
.i and remain in place.
Figures 2a and 2b are alternate sectional views taken along section line 2-2 of Figure 1. The embodiment 10 shown in Figures 1 and 2a are arranged, so that the frame 12 forms a mold form Or receptacle for receipt of concrete 18 which is poured tlierein. Concrete 18 may be poured into the frame 12 and hardened in place. The device 10 with concrete forms a platform for drilling or boring equipment (not shown). In Figure 2b, the device is placed in an open cavity and concrete poured around the device.
Once the drilling or boring equipment is mounted on the frame 12, a hole is drilled or bored by inserting the drill or bore through one of the guide bores 14. The process is repeated through each guide bore 14. The present invention permits drilling of multiple holes from a single position.
Figure 3 illustrates a top view, Figure 4 illustrates a sectional view and Figure 5 illustrates a perspective view of a second preferred embodiment 50 of the top plate alignment template device. The device 50 is formed by pouring concrete or other initially formable material into a mold (not shown). The device 50 has a series of guide bores 52 therethrough. A central, mostly perpendicular, guide bore 54 is also provided. Again, the ground site for the device 50 may be at ground level, below ground level, or on a sea bed.
Figure 6 illustrates a perspective view of a third preferred embodiment 20 of the top plate alignment template device of the present invention. A frame 22 is constructed from a plurality of metal tubes or metal rods. The frame 22 may be welded or otherwise, secured together.
The frame 22 supports a plurality of tubular guide bores 24 which are arranged around the frame 22. The tubular guide bores 24 may be welded or otherwise secured to the frame 22. Each of the guide bores 24 is arranged at an angle extending outwardly and downwardly from the frame 22. The frame 22 is substantially planar and the guide bores 24 are arranged at an angle of between thirty degrees (30°) and sixty degrees (60°) from the frame 22.
Each of the guide bores 24 has an axis so that the axes of the guides bores 24 extend from a 'common center point above the frame 22. The embodiment shown in Figure 6 also includes a central guide bore 26 which is substantially perpendicular to the frame 22.
Figure 7 illustrates a perspective view of a fourth preferred embodiment 30 of the top plate alignment template device of the present invention. A frame 32 is constructed from metal tubes or metal rods. The frame 32 may be welded or otherwise second together.
The frame 32 supports a plurality of tubular guide bores 34 which are secured to and spaced and arranged around the frame. The embodiment 30 shown in Figure 7 also includes a central supporting pin 36 on the frame 32.
The central supporting pin 36 can be used for transportation and alignment of the template device 30 and may also be used as a support and an alignment tool for the drilling or boring equipment to be placed thereon.
Each of the tubular guide bores 34 is arranged at an angle extending outwardly and downwardly from the frame 32.
Figure 8 illustrates a perspective view. Figure 9 illustrates a side view, Figure 10 illustrates atop view, and Figure 11 illustrates a sectional view of a fifth preferred embodiment ofthe top plate alignment template device 40 of the present invention. The embodiment 40 shown in Figures 8 through 11 includes a frame 42 constructed of metal tubes or metal rods. The frame may be welded
or otherwise secured together. The frame 42 supports a plurality of tubular guide bores 44 which are secured to and spaced and arranged around the frame 42. The tubular guide bores 44 may be welded or otherwise secured to the frame 42.
Each of the guide bores 44 is arranged at an angle extending outwardly and downwardly from the frame 42.
While each of the guide bores 44 has an axis, they do not converge at a single point as in the previous embodiments.
Drilling equipment (not shown) may be mounted on the top of the frame 42. A number of holes have already been drilled with tubing 48 inserted through the guide bores 44 and into the drilled holes. The tubing 48 may continue downhole along the same axis as the guide bores or, alternatively, may curve downward or in other directions such as accomplished in directional drilling.
To utilize the top plate alignment device that is proposed in this patent, an articulated injection head is required so that the complete rig, with injection head 104 attached on one end, can be moved onto or near the top plate device only once for drilling multiple bores through the top plate. The completed top plate embodiment 40 in Figures 8 through 11 are shown in Figures 12 through 16 with one embodiment of an articulated head assembly 100. An injection head 104 has wheels or chains, that grab the drill tube 102 for pushing into or pulling out of the ground. It also included additional wheels alternatively positioned within the injection head 104 to straighten the drill tube if in coiled tubing version. The injection head assembly 100 includes a diverter "Y" with seal 103 for allowing the flow back of drilling fluids to a surface tank and a clamp 114 for connecting onto and sealing to the alignment tube 101.
In this embodiment, one rig end or bumper 117 has a slide pin 118 attached for allowing the injection head 104 to slide from side to side. Extension arm 116 with rotatable yoke 115 allows the
injection head 104 to rotate and slide to and from the rig position. This allows full rotation of the injection head 104 to align with all alignment tubes 101. In this rig version manual positioning of the injection head 104 is shown to not interfere with the concept. In other versions, hydraulic or pneumatic cylinders or electric motors with gears would be installed to slide or rotate, each component 115,116 and 118 to position or align the injection head 104 to the correct alignment tube 101. Mechanical, electric, optical sensors (not shown) can be used to help or, with a computional device, automatically align said injection head to each alignment tube 101. With a preset position of all alignment tubes 101 onto the device, only one alignment and 2 other points are needed for automatic positioning onto each tube 101.
The operation to bore holes to install tools (heat exchange tubes, geophone or acoustic sensors, anchor cables or lines) is that a mobile rig with one end or bumper 117 moves near the previously installed top plate. The injection head 104 is extended using sliding of 115 in or out of 116, the side to side movement is controlled by sliding i 16 on 118 and die yoke 115 is rotated to correctly position injection head 104, divertor with seal 103 and clamp 114 to the first alignment tube 101. Injection head 104 then straightens the drill tube 102 and forces it into the alignment tube 101 with cutting tool (not shown) attached. Any number of cutting tools can be used including drill bit, motor, abrasive nozzle, or scraper. The hole or bore is cut as the cutting tools are operated and the injection head 104 advanced the drill tube 102 into the earth. When the total depth or length of the drill tube has been reached, the injection head 104 reverses direction and the drill tube 102 is withdrawn from the newly cut bore. Heat exchange u-tubes or concentric tubes, acoustic sensors or geophones and other such tools can then be installed in the newly cut bore. The injection head 104 is decoupled from clamp 114 and then positioned or aligned onto the next alignment tube 101 on the
11
top plate alignment device. This operation is repeated until all alignment tubes desired have been utilized and bores installed. Alternatively, the drill tube may be cut off at the surface and left in the bore when the desired depth is reached.
Whereas, the present inventionhas been described in relation to the drawings attached hereto, it should be understood that other and further modifications, apart from those show or suggested herein, may be made within the spirit and scope of this invention.

Claims (1)

12
WHAT IS CLAIMED IS:
1 1. A top plate alignment template device for subterranean drilling or boring which
2 comprises:
3 a frame receivable on a ground site; and
4 a plurality of tubular guide bores on said frame, with each of said guide bores
5 arranged at an angle outwardly and downwardly away from said frame wherein each of said guide
6 bores has an axis so that the axes of said guide bores extend from a common center point above the
7 frame.
1 2. A top plate alignment template device for subterranean drilling or boring as set forth
2 in Claim 1 including a central tubular guide bore perpendicular to said frame.
1 3. A top plate alignment template device as set forth in Claim 1 wherein said frame is
2 substantially planar and wherein each of said guide bores is arranged at an angle from ten degrees
3 (10°) to eighty degrees (80°).
1 4. A top plate alignment template device as set forth in Claim 1 wherein said frame is
2 constructed from metal tubes.
1 5. A top plate alignment template device as set forth in Claim 1 wherein said frame is
2 constructed from concrete.
1 6. A top plate alignment template device as set forth in Claim 1 wherein said frame
2 includes a platform.
IB
1 7. A top plate alignment template device as set forth in Claim 6 wherein said platform
2 supports and aligns a drilling rig or boring equipment thereon.
1 8. A top plate alignment template device as set forth in Claim 1 wherein said frame has
2 a central supporting pin.
1 9. A top plate alignment template device as set forth in Claim 1 wherein said ground site
2 is at ground level, is below ground level or is on a sea floor.
1 10. A top plate alignment template device as set forth in Claim 1 wherein each of said
2 plurality of guide bores receives ground source heat pump heat transfer tubes therethrough.
1 11. A top plate alignment template device as set forth in Claim 1 wherein each of said
2 plurality of bores receives anchoring equipment therethrough.
1 12. A top plate alignment template device as set forth in Claim 1 wherein each of said
2 plurality of bores receives acoustic sensor equipment therethrough.
1 13. A top plate alignment template device as set forth in Claim 1 wherein said frame
2 includes a mold receptacle for concrete.
1
2
14. A top plate alignment template device for subterranean drilling or boring which comprises:
14
3 a frame receivable on a ground site; and
4 a plurality of tubular guide bores on said frame, with each of said guide bores
5 arranged at an angle outwardly and downwardly away from said frame wherein said frame is
6 substantially planar and wherein each of said guide bores is arranged at an angle from between ten
7 degrees (10°) and eighty degrees (80°).
1 15. A top plate alignment template device for subterranean drilling or boring as set forth
2 in Claim 14 including a central tubular guide bore perpendicular to said frame.
1 16. A top plate alignment template device as set forth in Claim 14 wherein said frame is
2 constructed from metal tubes.
1 17. A top plate alignment template device as set forth in Claim 14 wherein said frame is
2 constructed from concrete.
1 18. A top plate alignment template device as set forth in Claim 14 wherein said frame
2 includes a platform.
1 19. A top plate alignment template device as set forth in Claim 18 wherein said platform
2 supports and aligns a drilling rig or boring equipment thereon.
1 20. A top plate alignment template device as set forth in Claim 14 including an articulated
2 injection head assembly.
15
1 21. A top plate alignment template device as set forth in Claim 20 wherein said injection
2 head assembly is positioned by hydraulic cylinders.
1 22. A top plate alignment template device as set forth in Claim 20 wherein said injection
2 head assembly is positioned by pneumatic cylinders.
1 23. A top plate alignment template device as set forth in Claim 20 wherein said injection
2 head assembly is positioned by electric motors.
1 24. A top plate alignment template device as set forth in Claim 20 wherein a drill tube
2 is inserted and used to drill a bore to a desired depth and then cut off at the surface and left in the
3 drilled bore.
GB1212332.9A 2012-02-06 2012-02-06 A top plate template device for subterranean drilling or boring Withdrawn GB2499061A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB1212332.9A GB2499061A (en) 2012-02-06 2012-02-06 A top plate template device for subterranean drilling or boring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1212332.9A GB2499061A (en) 2012-02-06 2012-02-06 A top plate template device for subterranean drilling or boring

Publications (2)

Publication Number Publication Date
GB201212332D0 GB201212332D0 (en) 2012-08-22
GB2499061A true GB2499061A (en) 2013-08-07

Family

ID=46766476

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1212332.9A Withdrawn GB2499061A (en) 2012-02-06 2012-02-06 A top plate template device for subterranean drilling or boring

Country Status (1)

Country Link
GB (1) GB2499061A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110039A (en) * 2014-06-25 2014-10-22 中国电建集团华东勘测设计研究院有限公司 Fan base with pressure dispersed type arrangement high-strength pre-stressed anchor rods (cables)
CN106639896A (en) * 2017-02-24 2017-05-10 重庆科技学院 Deep-water drilling guide pipe drilling supporting device and drilling-in parameter design method
US20190218742A1 (en) * 2018-01-16 2019-07-18 Geopier Foundation Company, Inc. Soil Reinforcement System Including Angled Soil Reinforcement Elements To Resist Seismic Shear Forces And Methods Of Making Same
EP3108187B1 (en) * 2014-02-18 2019-09-11 Franz Hilber Anchoring device
US11852008B2 (en) 2019-04-11 2023-12-26 Equinor Energy As Well insert

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3114262A1 (en) * 1981-04-09 1982-11-04 Jürgen 7990 Friedrichshafen Koll Earth collector of heat pumps and device for its manufacture
US5873679A (en) * 1996-11-12 1999-02-23 Cusimano; Matt Seismic foundation pier with ground anchor means
JP2005299215A (en) * 2004-04-12 2005-10-27 Tech Taiyo Kogyo Co Ltd Simplified foundation and assembly thereof
JP2009097200A (en) * 2007-10-15 2009-05-07 Seiwa:Kk Guide plate and construction method for batter pile foundation
DE102009037175A1 (en) * 2009-08-12 2011-02-17 Stahlwerk Annahütte Max Aicher GmbH & Co. KG System for anchoring various building structures e.g. masts, to ground, has fixing part transversely fitted by anchor plate and including end section that projects outside over anchor plate for supporting weight
DE102009029892A1 (en) * 2008-11-01 2011-09-15 Reinhard Klöckner Device i.e. anchorage body, for anchorage of wires or cables of network elements in mountainous region, has grouted bodies merged in area and penetrated mutually such that body has cone or truncated pyramid-shape

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3114262A1 (en) * 1981-04-09 1982-11-04 Jürgen 7990 Friedrichshafen Koll Earth collector of heat pumps and device for its manufacture
US5873679A (en) * 1996-11-12 1999-02-23 Cusimano; Matt Seismic foundation pier with ground anchor means
JP2005299215A (en) * 2004-04-12 2005-10-27 Tech Taiyo Kogyo Co Ltd Simplified foundation and assembly thereof
JP2009097200A (en) * 2007-10-15 2009-05-07 Seiwa:Kk Guide plate and construction method for batter pile foundation
DE102009029892A1 (en) * 2008-11-01 2011-09-15 Reinhard Klöckner Device i.e. anchorage body, for anchorage of wires or cables of network elements in mountainous region, has grouted bodies merged in area and penetrated mutually such that body has cone or truncated pyramid-shape
DE102009037175A1 (en) * 2009-08-12 2011-02-17 Stahlwerk Annahütte Max Aicher GmbH & Co. KG System for anchoring various building structures e.g. masts, to ground, has fixing part transversely fitted by anchor plate and including end section that projects outside over anchor plate for supporting weight

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3108187B1 (en) * 2014-02-18 2019-09-11 Franz Hilber Anchoring device
CN104110039A (en) * 2014-06-25 2014-10-22 中国电建集团华东勘测设计研究院有限公司 Fan base with pressure dispersed type arrangement high-strength pre-stressed anchor rods (cables)
CN104110039B (en) * 2014-06-25 2016-08-31 中国电建集团华东勘测设计研究院有限公司 There is pressure dispersing type and arrange the blower foundation of high-strength prestressed anchor pole (rope)
CN106639896A (en) * 2017-02-24 2017-05-10 重庆科技学院 Deep-water drilling guide pipe drilling supporting device and drilling-in parameter design method
CN106639896B (en) * 2017-02-24 2018-08-10 重庆科技学院 Deepwater drilling conduit is with brill support device and tripping in Parameters design
US20190218742A1 (en) * 2018-01-16 2019-07-18 Geopier Foundation Company, Inc. Soil Reinforcement System Including Angled Soil Reinforcement Elements To Resist Seismic Shear Forces And Methods Of Making Same
US11852008B2 (en) 2019-04-11 2023-12-26 Equinor Energy As Well insert

Also Published As

Publication number Publication date
GB201212332D0 (en) 2012-08-22

Similar Documents

Publication Publication Date Title
US10030349B2 (en) Undersea anchoring system and method
US8127865B2 (en) Method of drilling from a shaft for underground recovery of hydrocarbons
US4396075A (en) Multiple branch completion with common drilling and casing template
CA2639648C (en) System and method for geothermal conduit loop in-ground installation and soil penetrating head therefor
CA2259638C (en) Apparatus and method for installing a pipe in a wellbore
CN105298463B (en) Gas hydrates big well multiple-limb radially horizontal well completion method
US8056251B1 (en) Top plate alignment template device
GB2499061A (en) A top plate template device for subterranean drilling or boring
MXPA05003579A (en) Appartus and methods for installing casing in a borehole.
KR101944023B1 (en) Complex underground thermal exchanger using ground water tube well
CN103134236A (en) Construction method of tilted burying of underground heat exchanger of ground source heat pump
CN110906577B (en) Method and apparatus for installing geothermal heat exchanger
EP0952301A1 (en) Method and apparatus for drilling an offshore underwater well
CN110514184B (en) Simple device for measuring deep stratum deformation and measuring method thereof
RU53790U1 (en) EQUIPMENT KIT FOR DOCUMENTED CONTROL OF TECHNOLOGICAL PROCESSES IN AN OIL OR GAS WELL
Himmerich et al. Crossing the river Amu Darya along 1,800 metres with a 56 “high-pressure gas pipeline using the HDD method
WO2005061837A1 (en) Closed end directional driving shoe
Varghese et al. A Review on Zero Degree Horizontal Directional Drilling
US4339005A (en) Curved well conductors for offshore platform
US8851796B2 (en) Pipe retriever
Nicholas Large Diameter Trenchless Pipeline Construction
SU1747602A1 (en) Method of building radial drains
Rafał et al. INTERSECT DRILLING METHOD
CN116006156A (en) Continuous pipe hydraulic jet radial horizontal well testing system and testing method
CN117823043A (en) Directional drilling method and system for short-vertical-distance short-radius branch hole

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)