GB2408767A - Method of constructing a piled offshore platform - Google Patents

Method of constructing a piled offshore platform Download PDF

Info

Publication number
GB2408767A
GB2408767A GB0327940A GB0327940A GB2408767A GB 2408767 A GB2408767 A GB 2408767A GB 0327940 A GB0327940 A GB 0327940A GB 0327940 A GB0327940 A GB 0327940A GB 2408767 A GB2408767 A GB 2408767A
Authority
GB
United Kingdom
Prior art keywords
pile
platform
topside
section
conduit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB0327940A
Other versions
GB0327940D0 (en
Inventor
Brian Leonard Smith
Paul David Thompson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SLP ENGINEERING Ltd
Original Assignee
SLP ENGINEERING Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SLP ENGINEERING Ltd filed Critical SLP ENGINEERING Ltd
Priority to GB0327940A priority Critical patent/GB2408767A/en
Publication of GB0327940D0 publication Critical patent/GB0327940D0/en
Priority to PCT/GB2004/005034 priority patent/WO2005054585A1/en
Priority to DE602004023230T priority patent/DE602004023230D1/en
Priority to AT04801249T priority patent/ATE443185T1/en
Priority to EP04801249A priority patent/EP1699980B1/en
Publication of GB2408767A publication Critical patent/GB2408767A/en
Priority to TNP2006000163A priority patent/TNSN06163A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0008Methods for grouting offshore structures; apparatus therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0095Connections of subsea risers, piping or wiring with the offshore structure

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)
  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Diaphragms For Electromechanical Transducers (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides a method of constructing an offshore platform (1). The platform includes at least one pile (2) and a topside (4). The pile has at least two pile sections (6,8), one of the pile sections having a sleeve portion (12) and the other pile section including a joining portion (10). The method includes the steps of driving a first pile section (6) into a seabed (16) in the desired location for the platform (1) such that a root portion (18) of the first pile section (6) extends into the seabed (16) and a stem portion (20) extends substantially vertically upwards to a level below a Lowest Astronomical Tide level (22). A second pile section (8) is arranged above the first pile section (6) such that the sleeve portion (12) substantially surrounds the joining portion (10). A grout (14) is inserted between the joining portion (10) and the sleeve portion (12) to form a grouted connection (24) to secure the two pile sections (6,8) together and the topside (4) is supported using the pile (2).

Description

Method and Apparatus The present invention relates to a method of
constructing an offshore platform and to an offshore platform which may be constructed by said method.
Offshore platforms are used to exploit oil and gas reserves that exist below a seabed. A well is drilled into
the seabed in a potential oil or gas field and, if
sufficient oil or gas is found, exploitation of the well may commence. A tree is coupled to the wellhead, the tree comprising safety valves and distribution connections. The tree may be located on the seabed, or on a platform above sea level installed above the wellhead. Oil and gas extracted from the well pass up to the platform and may be processed before being piped to storage on or offshore.
Installing a platform is a complex and expensive operation usually requiring the hiring of specialist installation vessels that have cranes or hoists with the required reach and lift capacity. Typically platforms are only installed over wells that have a comparatively high expected output as this helps to justify the high capital cost of installation. For wells that have a low expected output the tree is often installed on the seabed and the oil or gas pumped to a nearby platform for distribution. This can increase the useful life of a platform and therefore further help to justify the capital cost of platform installation. However, sub-sea trees suffer from comparatively high intervention costs in the event of a - 2 - malfunction as divers and sub-sea vessels are usually required to perform the required intervention.
It is an object of the present invention to provide a method of constructing an offshore platform and an Offshore platform that address some of the above issues.
According to the invention there is provided a method of constructing an offshore platform, the platform comprising at least one pile and a topside, the pile comprising at least two pile sections, one of the pile sections having a sleeve portion attached thereto and the other pile section including a joining portion, the method comprising the steps of; a. driving a first pile section into a seabed in the desired location for the platform such that a root portion of the first pile section extends into the seabed and a stem portion of first pile section extends substantially vertically upwards from the seabed to a level below a Lowest Astronomical Tide level; b. locating a second pile section above the first pile section such that the sleeve portion substantially surrounds the joining portion such that the second pile section extends substantially parallel to the first pile section; c. inserting a grout between the joining portion and the sleeve portion to form a grouted connection to secure the two pile sections together; and d. supporting the topside using the pile.
Building the platform in sections in this way reduces the weight and overall dimensions of each section of the platform and the result is that there are an increased number of vessels that could potentially install each section and this reduces the installation cost as there is increased competition. Each section is smaller and so is more easily manoeuvrable and can more easily be arranged as required and this is likely to reduce the installation time.
By having a first pile section that extends into the seabed and substantially vertically upwards to a level below the Lowest Astronomical Tide (LAT) level the section that is driven into the seabed can be free of non-essential attached apparatus. Any apparatus required can be attached to the second or other section of the pile. This reduces the likelihood of damage to the attached apparatus during the driving operation.
A grouted connection is a rapid and reliable way to secure two sections of pile to one another and does not require sub-sea operations to be carried out. The grout is preferably pumped from above sea level through a pipe into the space between the sleeve portion and the joining portion and allowed to cure to secure the two sections together. It should be understood that other methods of inserting the grout between the two sections could be employed.
The term grout is used herein to refer to an adhesive that - 4 may be pumped into the gap between the sleeve portion and the joining portion and allowed to set to secure the two portions to one another.
The use of a joining portion and a sleeve portion that substantially surrounds the joining portion facilitates the alignment of the sections of the pile.
It is preferred that the sleeve portion is attached to the second pile section as this allows a feed pipe for the grout to be attached to the second pile section which reduces the likelihood of damage to the feed pipe during positioning and also during driving of the first pile section. The second pile section may also comprise an IS integral conduit means for guiding grout between the joining portion and the sleeve The topside may be attached to the second pile section before the second pile section is installed, or it may be installed afterwards. If the topside is installed after the installation of the second pile section then it is preferred that the topside is secured to the second pile section using a second grouted connection. If this is the case, it is preferred that the topside includes a second sleeve portion.
This invention is particularly applicable to a platform which is not normally manned and consequently has a minimal topside having facilities for workers only suitable for use in rare circumstances including a blast - 5 - resistant temporary refuge. It is therefore preferred that the platform comprises only one pile comprising at least two pile sections and a topside.
The pile is preferably substantially hollow as this allows conduits and pipes to be located within the pile which provides protection for those pipes and conduits within the pile. A hollow pile also enables the pile to be installed over an existing wellhead, or for the well to be drilled through the pile once the platform has been installed.
The present invention is particularly intended for a gas platform which includes a riser passing away from the platform, a conduit for passing gas from the wellhead to the topside and a tree on the topside connecting the conduit and the riser. It is preferred that the pile is substantially hollow and the conduit is located within the pile. It is also preferred that the riser passes through the hollow interior of at least some of the second pile section.
The invention also provides an offshore platform comprising a pile embedded in a seabed and extending to a level above sea level, the pile having a substantially hollow interior, the platform further comprising a topside supported by said pile, a tree located on said topside, a riser and a conduit connected to said tree, the riser for passing fluid from the platform and the conduit for passing fluid from a sub-sea wellhead to the tree, wherein the conduit and riser are located within the hollow interior of the pile in a region of the pile vulnerable to ship impact such that the riser and conduit are substantially protected from ship impact.
An offshore platform according to the invention is preferably a not normally manned gas platform comprising only one pile which is most preferably formed by the method of the present invention as described above.
It should be understood that an offshore platform according to the invention may be constructed by a method according to the invention. - 7 -
The invention will now be further described, by way of example, with reference to the accompanying drawings, in which: Figure 1 shows a platform constructed according to the invention; Figure 2 shows a different platform constructed according to the invention.
Figure 1 shows a not normally manned gas platform 1. The platform 1 includes one substantially hollow pile 2 and a topside 4. The pile 2 comprises two sections, a first pile section 6 and a second pile section 8. The first pile section 6 includes a joining portion 10 and the second pile section 8 includes a sleeve portion 12. The sleeve portion 12 is secured over the joining portion 10 using a grout 14 between the portions 10,12.
To construct the platform 1, a root portion 18 of the first pile section 6 is driven into a seabed 16 to a depth of about 25 m below an upper level 17 of the seabed 16. A stem portion 20 extends substantially vertically upwards from the seabed 16 to a level below a Lowest Astronomical Tide (LAT) level 22.
The sleeve portion 12 of the second pile section 8 is then located over the joining portion 10 of the first pile section 6 and the grout 14 is forced into the joint between the portions 10,12 to secure the first pile section 6 to the second pile section 8. This forms a grouted connection 24.
The topside 4 is attached to the second pile section 8 before the second pile section 8 is installed onto the first pile section 6.
A wellhead 26 is located within the hollow pile 2 and a conduit 28 passes within the pile to the topside 4. The conduit 28 is connected to a tree 30 on the topside 4 that connects the conduit 28 to a riser 32. The riser 32 passes down through the interior of the second pile section 8 from the tree 30 until sleeve portion 12 is reached, at which point the riser passes out through the pile 2 and to the seabed 16. In this way, the riser and conduit are protected within the pile at levels above the Lowest Astronomical Tide Level 22 and the riser 32 does not pass though the first pile section 6 and so is protected from damage during the driving operation. It should be noted that the conduit 28 will typically be a substantially rigid vertical pipe, although it may be possible for the conduit to be flexible or take a different form.
The topside includes a helideck 34 at the top and a temporary blast refuge 36 for workers that have to stay on the platform overnight for any reason.
Figure 2 shows a different platform 101 constructed according to the invention. The platform 101 includes a single pile 102 that comprises three pile sections, a - 9 - first pile section 6, a second pile section 108 and a third pile section 38 to which the topside 4 is attached.
As with the platform 1 of Figure 1, the first and second pile sections are joined using a grouted connection 24.
The second and third pile sections 108,38 are also joined using a grouted connection 124 with the third pile section 38 comprising a sleeve portion 112 and the second pile section 108 comprising a joining portion 110. In the platform 101, each sleeve portion 12,112 includes a conduit means 40 through which grout 14 may be forced and guided into the gap between the joining portions 10,110 and the sleeve portions 12,112 to form the connection" 24,124.
It should be understood that the invention has been described above by way of example only and that modifications in detail may be made without departing from the scope of the invention as described in the claims. -

Claims (17)

  1. Claims 1. A method of constructing an offshore platform, the platform
    comprising at least one pile and a topside, the pile comprising at least two pile sections, one of the pile sections having a sleeve portion attached thereto and the other pile section including a joining portion, the method comprising the steps of; a. driving a first pile section into a seabed in the desired location for the platform such that a root portion of the first pile section extends into the seabed and a stem portion of first pile section extends substantially vertically upwards from the seabed to a level below a Lowest Astronomical Tide level; b. locating a second pile section above the first pile section such that the sleeve portion substantially surrounds the joining portion such that the second pile section extends substantially parallel to the first pile section; c. inserting grout between the joining portion and the sleeve portion to form a grouted connection to secure the two pile sections together; and d. supporting the topside using the pile.
  2. 2. A method as claimed in claim 1, in which the sleeve portion is attached to the second pile section.
  3. 3. A method as claimed in claim 1 or claim 2 in which the second pile section includes conduit means which are used for guiding grout between the joining portion and the sleeve portion.
  4. 4. A method as claimed in any preceding claim, in which the topside is secured to the second pile section using a second sleeve portion, a second joining portion and grout to form a second grouted connection.
  5. 5. A method as claimed in any preceding claim, in which the platform comprises only one pile.
  6. 6. A method as claimed in claim 5, in which the pile installed has a substantially hollow interior.
  7. 7. A method as claimed in claim 6, in which the first pile section is driven into the seabed over an existing wellhead.
  8. 8. A method as claimed in claim 7, in which the platform installed is a gas platform and the method includes the steps of installing a riser for passing gas away from the platform, a conduit for passing gas from the wellhead to the topside and a tree on the topsides connecting the conduit and the riser.
  9. 9. A method as claimed in claim 8, in which the conduit is installed within the hollow interior of the pile.
  10. 10. A method as claimed in claim 8 or claim 9, in which the riser is installed so that it passes through the hollow interior of at least some of the second pile - 12 section.
  11. 11. An offshore platform comprising a pile embedded in a seabed and extending to a level above sea level, the pile having a substantially hollow interior, the platform further comprising a topside supported by said pile, a tree located on maid topside, a riser and a conduit connected to said tree, the riser for passing fluid from the platform and the conduit for passing fluid from a sub sea wellhead to the tree, wherein the conduit and riser are located within the hollow interior of the pile in a region of the pile vulnerable to ship impact such that the riser and conduit are substantially protected from ship impact.
  12. 12. An offshore platform as claimed in claim 11, in which the offshore platform comprises only one pile.
  13. 13. An offshore platform as claimed in claim 12, in which the offshore platform is a not normally manned platform and the topside includes a blast resistant temporary refuge.
  14. 14. An offshore platform as claimed in any of claims 11 to 13, in which the topside comprises at least two conduits and two trees.
  15. 15. An offshore platform as claimed in any of claims 11 to 14, in which the pile is embedded into the seabed over an existing wellhead. - 13
  16. 16. A method of constructing an offshore platform substantially as herein described with reference to the accompanying drawings.
  17. 17. An offshore platform substantially as herein described with reference to, or as shown in, the accompanying drawings.
GB0327940A 2003-12-03 2003-12-03 Method of constructing a piled offshore platform Withdrawn GB2408767A (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
GB0327940A GB2408767A (en) 2003-12-03 2003-12-03 Method of constructing a piled offshore platform
PCT/GB2004/005034 WO2005054585A1 (en) 2003-12-03 2004-12-01 Method of constructing an offshore platform comprising at least one pile
DE602004023230T DE602004023230D1 (en) 2003-12-03 2004-12-01 Method of making an offshore platform with a pier.
AT04801249T ATE443185T1 (en) 2003-12-03 2004-12-01 METHOD FOR MAKING AN OFFSHORE PLATFORM WITH A PIER.
EP04801249A EP1699980B1 (en) 2003-12-03 2004-12-01 Method of constructing a single pile offshore platform.
TNP2006000163A TNSN06163A1 (en) 2003-12-03 2006-05-30 Method of constructing an offshore platform comprising at least one pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0327940A GB2408767A (en) 2003-12-03 2003-12-03 Method of constructing a piled offshore platform

Publications (2)

Publication Number Publication Date
GB0327940D0 GB0327940D0 (en) 2004-01-07
GB2408767A true GB2408767A (en) 2005-06-08

Family

ID=29764437

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0327940A Withdrawn GB2408767A (en) 2003-12-03 2003-12-03 Method of constructing a piled offshore platform

Country Status (6)

Country Link
EP (1) EP1699980B1 (en)
AT (1) ATE443185T1 (en)
DE (1) DE602004023230D1 (en)
GB (1) GB2408767A (en)
TN (1) TNSN06163A1 (en)
WO (1) WO2005054585A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400764A (en) * 2016-11-25 2017-02-15 平煤建工集团特殊凿井工程有限公司 Assembled offshore single-pile foundation construction platform and construction process thereof

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20240218625A1 (en) * 2021-04-30 2024-07-04 Shanghai Investigation, Design & Research Institute Co., Ltd. Rotating construction platform based on monopile
CN113216121B (en) * 2021-05-21 2022-08-12 河南城建学院 Stable supporting device of offshore drilling platform and using method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3482408A (en) * 1966-09-02 1969-12-09 Mobil Oil Corp Telescoped caisson
US3881549A (en) * 1973-04-27 1975-05-06 Interseas Associates Production and flare caisson system
GB2327970A (en) * 1997-04-29 1999-02-10 Kvaerner Oil & Gas Ltd Method of installing a tower

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3716994A (en) * 1971-06-28 1973-02-20 Texaco Inc Assembly system for a detachably connected offshore marine structure
US4426173A (en) * 1981-08-27 1984-01-17 Exxon Production Research Co. Remote alignment method and apparatus
US4854779A (en) * 1987-12-14 1989-08-08 Shell Offshore Inc. Installation of multipiece jackets using mating pins
US4934871A (en) * 1988-12-19 1990-06-19 Atlantic Richfield Company Offshore well support system
AU704415B2 (en) * 1995-03-03 1999-04-22 American Oilfield Divers, Inc. Offshore well saving apparatus and method
GB2318141B (en) * 1996-10-11 1999-01-06 Kvaerner Eng Off-shore oil or gas production unit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3482408A (en) * 1966-09-02 1969-12-09 Mobil Oil Corp Telescoped caisson
US3881549A (en) * 1973-04-27 1975-05-06 Interseas Associates Production and flare caisson system
GB2327970A (en) * 1997-04-29 1999-02-10 Kvaerner Oil & Gas Ltd Method of installing a tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400764A (en) * 2016-11-25 2017-02-15 平煤建工集团特殊凿井工程有限公司 Assembled offshore single-pile foundation construction platform and construction process thereof
CN106400764B (en) * 2016-11-25 2018-07-17 平煤建工集团特殊凿井工程有限公司 A kind of pin-connected panel sea single-pile foundation construction platform and its construction technology

Also Published As

Publication number Publication date
EP1699980B1 (en) 2009-09-16
DE602004023230D1 (en) 2009-10-29
GB0327940D0 (en) 2004-01-07
ATE443185T1 (en) 2009-10-15
EP1699980A1 (en) 2006-09-13
TNSN06163A1 (en) 2007-11-15
WO2005054585A1 (en) 2005-06-16

Similar Documents

Publication Publication Date Title
US3881549A (en) Production and flare caisson system
US7021402B2 (en) Method for using a multipurpose unit with multipurpose tower and a surface blow out preventer
US20060118310A1 (en) Subsea petroleum production system method of installation and use of the same
MX2010012373A (en) Offshore unit and method of installing wellhead platform using the offshore unit.
US3488967A (en) Combination deep water storage tank and drilling and production platform
WO2004018826A1 (en) Subsea drilling module for use in drilling of oil and gas wells
NO313340B1 (en) Procedure for piling guide tubes into a water bottom
JPH04285288A (en) Method and equipment for performing sea oil well work
US5379844A (en) Offshore platform well system
US6203248B1 (en) Sliding-resistant bottom-founded offshore structures
EP1699980B1 (en) Method of constructing a single pile offshore platform.
CN109024660A (en) Pile foundation method for dismounting and offshore foundation method for dismounting
EA006866B1 (en) System and method of installing and maintaining an offshore exploration and production system having an adjustable buoyancy chamber
Kibbee et al. The seastar tension-leg platform
US3941189A (en) Subsurface wellhead shield
AU670018B2 (en) Fixed offshore platform structures, using small diameter, tensioned, well casing tiebacks
MXPA06006242A (en) Method of constructing an offshore platform comprising at least one pile
SA520420553B1 (en) Removing top decks of offshore platforms
US6637513B1 (en) Riser pipe construction and module therefor
US3853183A (en) Methods and apparatus for underwater drilling of oil and gas wells
RU2632085C2 (en) Method and system of funt well equipment installation
US3964543A (en) Underwater wellhead completions with portable atmospheric cellar
Homer et al. Deepwater Templates and Cluster Well Manifolds: Is There a Single Correct Approach?
KR200485053Y1 (en) Semi-submersible drilling rig
Aberle et al. THE YAMMADERRY AND COWLE SMALL OFFSHORE FIELD DEVELOPMENTS

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)