GB2405459A - A working fluid purification system - Google Patents

A working fluid purification system Download PDF

Info

Publication number
GB2405459A
GB2405459A GB0320026A GB0320026A GB2405459A GB 2405459 A GB2405459 A GB 2405459A GB 0320026 A GB0320026 A GB 0320026A GB 0320026 A GB0320026 A GB 0320026A GB 2405459 A GB2405459 A GB 2405459A
Authority
GB
United Kingdom
Prior art keywords
working fluid
control valve
turbine
expansion tank
purification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0320026A
Other versions
GB2405459B (en
GB0320026D0 (en
Inventor
Richard James Biddle
Mym Biddle
Miriam Simcock
Jonathan Maguire
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Freepower Ltd
Original Assignee
Freepower Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Freepower Ltd filed Critical Freepower Ltd
Priority to GB0320026A priority Critical patent/GB2405459B/en
Publication of GB0320026D0 publication Critical patent/GB0320026D0/en
Priority to AU2004269148A priority patent/AU2004269148A1/en
Priority to PL04764554T priority patent/PL1668226T3/en
Priority to JP2006524335A priority patent/JP2007503546A/en
Priority to PT04764554T priority patent/PT1668226E/en
Priority to US10/569,228 priority patent/US20070007771A1/en
Priority to EP04764554A priority patent/EP1668226B1/en
Priority to ES04764554T priority patent/ES2299856T3/en
Priority to AT04764554T priority patent/ATE382776T1/en
Priority to PCT/EP2004/009580 priority patent/WO2005021936A2/en
Priority to CA002536962A priority patent/CA2536962A1/en
Priority to RU2006109471/06A priority patent/RU2006109471A/en
Priority to DE602004011087T priority patent/DE602004011087T2/en
Priority to BRPI0413986-0A priority patent/BRPI0413986A/en
Publication of GB2405459A publication Critical patent/GB2405459A/en
Priority to IL173934A priority patent/IL173934A0/en
Application granted granted Critical
Publication of GB2405459B publication Critical patent/GB2405459B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K25/00Plants or engines characterised by use of special working fluids, not otherwise provided for; Plants operating in closed cycles and not otherwise provided for
    • F01K25/08Plants or engines characterised by use of special working fluids, not otherwise provided for; Plants operating in closed cycles and not otherwise provided for using special vapours
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/26Drying gases or vapours
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/002Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by condensation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K27/00Plants for converting heat or fluid energy into mechanical energy, not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A working fluid purification system 170 for an energy conversion system, the energy conversion system being a closed system with a circulating working fluid circulating in a path therethrough and including an expansion device, for example a turbine 114. The working fluid purification system comprises an expansion tank 176 and a diaphragm 178 within the expansion tank, thereby defining a variable volume connected for receiving the working fluid. A control valve 174 is disposed between the path and the expansion tank, the control valve being adapted to control the flow of fluid to and/or from the variable volume. The control valve is connected via a conduit to a connection point in the path, the connection point being at the highest point of the path. When the control valve is opened, the working fluid plus impurities (non-condensable gases) move into the variable volume and are allowed to cool. When the control valve is then reopened, the condensed working fluid returns back to the system under gravity, the unwanted gases remaining in the expansion tank. An energy conversion system incorporating the working fluid purification system is also disclosed: removal of impurities improves the performance of such a system.

Description

a__ 2405459 A working fluid purification system The present invention
relates to energy conversion systems employing a working fluid, and more particularly to the removal of impurities from such fluids.
In m any c onventional e nergy c onversions s ystems o perating a s c losed s ystems a nd e mploying a n expansion device such as a turbine, e. g. Rankine cycle systems, a working fluid is employed, which passes through various stages in the system and is normally in liquid form at some point.
Typically, when the system is initially filled, the working fluid is a liquid, and there is therefore the rest of the system that must be filled with a gas, such as nitrogen.
A problem with such systems is that, if there are non-condensable gases present during the running of the system, the overall performance can be substantially reduced. This is because, for example with a turbine-based system, the pressure that the turbine gas expands to on exit must be as low as possible, in order to make the turbine pressure ratio (pressure at input: pressure at exit) as high as possible.
Techniques for attempting to deal with this problem have been disclosed in US patents 5,119,635 and 5,487,765. However, these impose the additional requirement of a separate apparatus for pumping gases out of the condenser, cooling them to condense the working fluid and leave undesirable non- condensable gases, and then pumping the liquid working fluid back into the system.
The present invention seeks to provide a much simpler and easily implemented system for removing impurities from a working fluid.
The present invention provides a working fluid purification system for an energy conversion system, the energy conversion system being a closed system with a circulating working fluid circulating in a path therethrough and including an expansion device, for example a turbine, comprising: an expansion tank; a diaphragm within the expansion tank, thereby defining a variable volume connected for receiving said working fluid; and a control valve disposed between said path and the expansion tank, the control valve being adapted to control the flow of fluid to and/or from said variable volume; wherein the control valve is connected via a conduit to a connection point in the path, said connection point being at the highest point of said path.
Preferably, the control valve is mounted at a higher point than said connection point. Preferably, the expansion tank is mounted at a higher point than said control valve.
The system preferably further includes a controller, the controller being adapted to open and close said control valve. Preferably, the controller is configured to perform a purification cycle, said purification cycle comprising opening the control valve for a first predetermined period and closing the : 2 . . .. c: : . . - 1 - .: . control valve for a second predetermined period. Preferably, the controller is configured to perform, in a start-up sequence of predetermined duration after switch-on of the system, a plurality of said purification cycles. Preferably, the plurality of purification cycles comprises about 3 to 5 purification cycles. Preferably, the first predetermined period is about 1 minute and said second predetermined period is about ten minutes.
The system preferably further includes a pressure sensor coupled to the controller; wherein the controller is configured to perform at least one purification cycle when the pressure indicated by the sensor is above a predetermined level. Preferably the pressure sensor is arranged to sense the pressure at the exit of a turbine (expansion device).
In another aspect of the invention there is provided an energy recovery system for extracting electrical energy from a source of heat, comprising: the working fluid purification system of any of the appended claims, a turbine, a heat exchanger, an electromechanical conversion unit, and a cooling system, the heat exchanger supplying, in use, the working fluid to said turbine.
The present invention will now be described, by way of example, with reference to the accompanying drawings in which: Figure 1 is shows (a) schematic overview of an energy recovery system in accordance with one aspect of the invention, and (b) intermediate electronics modifying the output of the alternator; Figure 2 is a schematic illustration of the derivation of one source of waste in one aspect of the invention; Figure 3 illustrates in more detail the turbine unit and alternator of Fig. 1; Figure 4 is an enlarged view of the turbine bearing in Fig. 3; Figure 5 shows in more detail the bearing member employed in the bearing in Fig. 4, indicating fluid flows; and Figure 6 illustrates an alternative (magnetic) coupling of the turbine unit and alternator of Fig. 1, in another aspect of the invention.
Turning to the drawings, Fig. 1 (a) is a schematic overview of an energy recovery system in accordance with one aspect of the invention. A main heat exchanger 102 has at least one source fluid inlet 104 through which it receives a heated source fluid incorporating the thermal energy that is sought to be recovered by the system. The temperature of the source fluid upon entering the main heat exchanger 102 is designated t1.
The main heat exchanger 102 may be driven by any source of heat, and examples of the source fluid include hot air, steam, hot oil, exhaust gases from engines, manufacturing process waste hot fluid, etc. Alternatively, the heat source may be solar thermal energy that heats a suitable fluid (e.g. heat transfer oil) that forms the source fluid for the main heat exchanger 102.
..:: . '. e: . . . . : . . . 2. : . Referring briefly to Fig. 2, this is a schematic illustration of the derivation of one source of waste in one aspect of the invention: an important example of wasted energy is the ubiquitous internal combustion engine, be it petrol, diesel or gas fuelled, reciprocating or turbine. The best simple cycle fossil fuelled engine (other than very large power stations or marine engines) will be between 35-40% efficient: this means that 60-65% of the energy from the fuel used to drive the engine is lost as waste heat.
Returning to Fig. 1(a), the source fluid exits the main heat exchanger 102, at a reduced temperature t2, via at least one source fluid outlet 106.
The main heat exchanger 102, which is suitably of the cross counter flow type, also has a working fluid inlet 108 and working fluid outlet 110, through which it receives (as a liquid at temperature t3) and despatches (at temperature t4), respectively, the working fluid of the system. The working fluid, which is heated and vapourised within the main heat exchanger 102, is carefully chosen so that its thermodynamic and chemical properties are suitable to the system design and the operational temperatures and pressures. In one embodiment, the working fluid is HFE7100.
After exit from the working fluid outlet 110 of the main heat exchanger 102, the gaseous working fluid flows in the direction of arrows A to the turbine inlet 112 of turbine unit 114. The working fluid arrives at the turbine unit 114 at pressure p1, loses heat and pressure in driving the turbine (not shown) mounted on turbine shaft 116 within the turbine unit 114, and exits the turbine unit 114 via turbine outlets 118 at pressure p2, which is substantially lower than p1. In one embodiment, the pressure p1 is 11.5 bar absolute and the pressure p2 is 1.0 bar absolute.
In one embodiment, the turbine shaft 116 is mounted on a bearing (not shown) and is mechanically coupled to an alternator 120, e.g. the turbine and alternator armature (not shown) are mounted on a common shaft 116. In this way, high-speed rotation of the turbine shaft 116 causes electrical energy to be generated in the alternator 120, the consequent voltage appearing at the alternator output 122. The coupling of the turbine shaft 116 to the alternator 120 is described further hereinbelow with reference to Figs 3 to 5.
After exit from the turbine outlets 118, the working fluid travels in the direction of arrows B to inlet 124 of a s econd h eat e xchanger 1 26, which a cts a s a p reheater of t he working fluid u sing t he t urbine exhaust. The working fluid is therefore input to the second heat exchanger 126 at temperature t5 and exits via outlet 128 at a lower temperature t6. At the same time, the second heat exchanger receives another flow of working fluid (in the direction of arrows C), below its boiling point and in liquid form, via inlet 130 at temperature t7. In the second heat exchanger 126, thermal energy is transferred to the flow of working fluid arriving at inlet 130, the working fluid exits via outlet 132 at temperature t3, and flows (in the direction of arrows D) to the inlet 108 of the main heat exchanger 102.
The system also includes a condensing unit (or water cooler) 134, in which cold water arrives via inlet 136 and exits via outlet 138. In operation, working fluid from the second heat exchanger 126, flowing *: . . . -e e: : .. . .' 3...
in the direction of arrow E, arrives in the condensing unit 134 via inlet 140, is cooled and condensed into a liquid in the condensing unit 134, and then departs via outlet 142. This liquid working fluid (at temperature t7), is forced by pump 144 via valve 146 in the direction of arrows C and forms the second supply of working fluid arriving at second heat exchanger 126, to begin the cycle all over again. In one embodiment, a separate fluid line 160 delivers liquid working fluid to the bearing coupling the turbine unit 114 and the alternator 120, for lubrication.
Thus, the system operates on a Rankine cycle and is sealed, so that there is no escape or consumption of the working fluid, which simply cycles through its various phases.
In one embodiment, the system includes a control system 150, to control the power output by the system. Most existing Rankine cycle machines are low speed units with synchronous alternators, running at the same frequency as the grid supply. Turbine speed and power control is generally by valves to bypass the turbine. However, the system according to one aspect of the present invention employs a high-speed alternator 120, and a power-conditioning unit is preferably used to convert the high frequency alternator output to mains frequency.
More specifically, the control system includes intermediate electronics 151, a power conditioning unit (PCU) 152 and a controller 154. The power output by the alternator 120 at outputs 122 is at a very high frequency, due to the high-speed rotation of the turbine shaft, and is modified by intermediate electronics 151, which is described in more detail in Fig. 1 (b).
Referring to Fig. 1(b), the outputs 122 of the alternator 120 are connected to the inputs 160 (three of them, for a 3-phase alternator) of intermediate electronics, generally designated 151. The first stage of intermediate electronics 151 is an optional transformer stage 162, for boosting the voltage on each of the lines: this ensures, when needed, that there is sufficient do voltage eventually appearing at the PCU 152 that a complete 240 V sine wave (as per UK mains supply) can be generated at the output of the PCU 152. In certain embodiments, however, the voltage level output by the alternator 120 is high enough such that the transformer stage 162 can be omitted.
Next, the voltages output by the transformer stage 162 at 164 pass to a rectification stage 166, comprising a set of six rectification diodes 168, as is well known in the art. Thus, a rectified, near do voltage is supplied at outputs 170 of the rectification stage 166, and this, in normal operating conditions appears at the outputs 172 of the intermediate electronics 151.
In the event of a sudden loss of grid connection all alternator load will be lost. This could cause a significant overspeed of the alternator 120, and so as well as a dump valve (not shown) to bypass the turbine, the intermediate electronics 151 includes a safety stage 174 that includes a dump resistor 158 to supply a load to the alternator 120 in the event of loss of grid connection, to prevent overspend.
e e ee e * e e e e e e e e e ee- 4 e see e A transistor 176 is in series with the dump resistor 158 across the outputs 172, with the base b of the transistor 176 being driven by an overspeed detection unit (not shown). The latter supplies a PWM signal to the transistor 176, the duty cycle of which is proportional to the extent of overspend, so that the higher the overspeed the greater the load applied by the dump resistor 158.
As can be seen in Fig. 1(b), the power supplied at outputs 172 (referred to herein as do bus) is at voltage V and current 1, and this is supplied to the PCU 152. The PCU 152, which is known in the art, is adapted to convert power from do to ac at the mains frequency (50 Hz in UK) and voltage (240 V in UK). The PCU in turn is able to vary the do bus voltage so as to adjust the power output of the system.
Varying the do bus voltage (V in Fig. 1 (b)) in the power conditioning unit 152 controls the speed of the turbine shaft 116. Reducing the bus voltage increases the load on the alternator 120, causing more current to be drawn from the alternator. Conversely, increasing the bus voltage causes the alternator current to drop. By calculating the power (e.g. using P=VI, or using a power measuring device) before and after the bus voltage change, it can be determined whether the power was increased or decreased by the bus voltage change. This allows the point of maximum power output from the alternator 120 to be found and then continually'tracked'by altering the bus voltage.
In one embodiment, the voltage supplied by the alternator at no load is 290Vac (all voltages are measured line-to-line) on each of the three phases at 45,000rpm, the maximum rated speed of the alternator 120. The lowest speed at which power can be generated is 28,000rpm, at which point the voltage is 180 Vac at no load. Increasing the load will also reduce the alternator voltage: for example at 45,000 rpm the voltage will be 210 Vac at 6.3 kW.
The control of power output by varying the bus voltage may be implemented by suitable analog or digital electronics, m icrocontroller, or t he like. l t m ay a Iso b e c ontrolled m anually u sing a p ersonal computer (PC) as the controller 154. Preferably, however, the power output is controlled automatically using a suitably programmed PC or other computing machinery as the controller 154. In either case, the PC communicates with the PCU 152 by means of a RS232 serial communications device, although a RS422 or RS485 adapter could also be used, as is known in the art. The PC may thus, at any time, have a reading of V and 1, thereby enabling the instantaneous power to be known.
In t he c ase o f a utomatic P C c ontrol, t he m ethod o f c ontrol m ay b e b y m eans o f s uitable s oftware implementing the following.
While system is ON do Increase bus voltage by one voltage step Measure new power (=VI) if new power less than or equal to old power then decrease voltage by one voltage step do decrease voltage by one voltage step i: . . . : . :. A- 5. .: . measure new power while new power more than old power else do increase voltage by one voltage step measure new power while new power more than old power.
It will be appreciated by persons skilled in the art that the size of the voltage step is determined by operating conditions and is a suitably determined small fraction (e.g. 1-2.5%) of the mean bus voltage.
In on embodiment, the voltage step change is made about every second.
One other optional feature incorporated in the system is a working fluid purification system, generally designated 170 in Fig. 1. As mentioned hereinabove, if there are non-condensable gases present during the running of the system, overall performance can be substantially reduced, i.e. the pressure ratio of the turbine is lower than it should be. For example, in the turbine mentioned in the examples herein, the input pressure p1 is projected to be 20 bar; and if the output pressure p2 is 2 bar rather than the intended 1 bar, the pressure ratio is 10 rather than 20, giving significantly reduced performance.
A difficulty is that when filling the system initially, the working fluid is a liquid and the rest of the system must be filled with a gas, for example nitrogen. When performing this step the pressure can be reduced to below atmospheric pressure to reduce the mass of nitrogen in the system. However, the pressure cannot be reduced too much, or cavitation will occur in the pump. Therefore, the optimum way to remove the unwanted gas from the system is during the running of the system.
The working fluid purification system 170 includes a conduit 172 connected at one end to a point Q on the second heat exchanger (preheater) 126 and at the other end to control valve 174 which may be at the base entry/exit port 176 of an expansion tank 176, which, in one example, may be the type of expansion tank used in central heating systems. The expansion tank 176 has a flexible membrane or diaphragm 178 so that it may in its lower part contain a variable volume V of gas and/or liquid.
In the example (6kW system) mentioned hereinafter, the measurements are as follows.
System volume 70 litres Fluid volume 18 litres Expansion tank volume 50 litres As can be seen, when the system is initially filled with fluid, there will be 52 litres of nitrogen. Lowering the pressure of this gas with a vacuum pump reduces the amount of gas that has to be held in the expansion tank 176, meaning that it can be made smaller. This pumping also causes the diaphragm 178 expand downwards into the expansion tank, making the whole of the tank, or nearly all of it, available for receiving gases.
: 2 . . .. : : .. . a- 6 - if: . As nitrogen gas has a lower density than that of the working fluid vapour, it tends to accumulate at the highest location within the system. At this point (Q in Fig. 1), the fluid can be taken away to the expansion tank 176, the diaphragm 178 allowing expansion to take place, enlarging volume V; i.e., with the control valve 174 open, the gases are allowed to move slowly into the expansion tank 176. As the nitrogen has a lower density than the working fluid, most of the contents of the expansion tank 176 will be nitrogen, with just a little working fluid.
Once the valve 174 has closed, the expansion tank 176 and its contents cool down naturally, causing the working fluid to condense. The next time the control valve 174 is opened, the (now liquid) working fluid flows back under gravity back into the main circuit of the system (via control valve 174 and conduit 172)), while the non-condensable gases tend to stay in the expansion tank 176 due to their lower density. A cycle of (a) control valve OPEN for a fixed period, followed by (b) control valve CLOSED for a fixed period is used to purify the working fluid, and this cycle may be repeated several times (for example about 3 to 5 times), during the start up of the energy recovery system, to collect as much nitrogen in the expansion tank 176 as possible. In the aforementioned (6kW) system, the control valve 174 is opened for one minute and then closed for ten minutes. The opening and closing of the control valve 1 74 m ay b e performed manually, o r i t may b e performed a utomatically by a s uitable controller, in this case controller 154.
The system preferably also includes a pressure sensor coupled to the controller 154, the pressure sensor being positioned to sense the pressure at the exit of the expansion device (turbine); and the purification cycle may be repeated if pressure starts to build up during normal running of the system and it is detected at the pressure sensor that the pressure has exceeded a predetermined safe threshold.
Figure 3 illustrates in more detail the coupling of the turbine unit and alternator of Fig. 1(a). Here, the turbine unit is generally designated 114 and the alternator generally designated 120. The turbine shaft rotates about an axis 302 and is integral with a section 304 that forms part of the rotor 306 of the alternator 120. Generally partial cylinder permanents magnets 308 are disposed on the section 304 of the shaft 116. Retaining the magnets 308 in position on the shaft 116 is a retaining cylinder 309: this retaining cylinder (made of a non-magnetic material such as CFRP) ensures that the magnets 308 are not dislodged during high- speed rotation of the shaft 116. The stator 311, incorporating a plurality of windings (not shown) in which current is generated, is mounted around the rotor 306, as is well known in the art, and is enclosed within housing 310. The section 304 of the shaft 116 is supported at one end of the housing 310 by journal bearing 312, and at the other end by the bearing generally designated 314, which is described in more detail hereinafter.
Figure 4 is an enlarged view of the turbine-bearing coupling in Fig. 3. As can be seen, the turbine unit 114 includes a first turbine stage 402 and a second turbine stage 404. High pressure heated working fluid present (at pressure p1) in the space 406 within the turbine unit housing 408 enters via inlet port :: 2. . 'e: '. . _ 7 - . : . 410 of the first turbine stage 402 and flows in the direction of arrow F so as to be incident upon a first series of vanes 412 securely mounted on the shaft 116. The fast flowing working fluid thereby imparts rotational energy to the shaft 116. Upon exiting the first turbine stage 402 (at pressure pa), the working fluid flows in the direction of arrows G. Next, the working fluid at (intermediate) pressure pa (which is substantially less than p1, but still relatively high) passes, via conduit 413, to the next turbine stage 404. Here, the working fluid enters via inlet port 414 of the second turbine stage 404 and flows in the direction of arrow H so as to be incident upon a second series of vanes 416 securely mounted on the shaft 116. The fast flowing working fluid thereby imparts further rotational energy to the shaft 116. Upon exiting the second turbine stage 404 (at pressure p2), the working fluid flows in the direction of arrow J. Thus, p1 > pa > p2.
As can be seen, the axial and radial dimensions of the vanes 416 of the second turbine stage 404 are greater than those of the vanes 412 of the first turbine stage 402. In one embodiment, there are two turbine stages of equal diameter, and the axial dimension of the first turbine stage is 3/10 of the diameter, and the axial dimension of the second turbine stage is 4/10 the diameter. In another embodiment, there are three turbine stages. The diameters of the first, second and third turbine stages are in the ratio 4: 5: 6. The axial dimension of the first turbine stage is 0. 375 x the respective diameter. The axial dimension of the second turbine stage is 0.35 x the respective diameter. The axial dimension of the first turbine stage is 0.33 x the respective diameter.
A washer 418 is provided fixedly attached to a shoulder 420 of the turbine stage 404 and has its other surface abutting a bearing member 422, which is described in more detail hereinafter, and in operation, the working fluid permeates the space between the washer 418 and the bearing member 422, so as to provide lubrication.
The bearing member 422 has a generally T-shaped cross-section. It includes a first bearing surface 424 on a raised portion on the top of the T; and in use, this surface is disposed opposite a second bearing s urface 4 26, o f s ubstantially t he s ame a nnular s hape and s ize, o n the s heft 1 16 n ear t he armature section 304. The bearing member 422 has a central cylindrical channel 428, thereby defining a cylindrical third bearing surface 430 on bearing member 422 that is disposed opposite fourth bearing surface 432 on the outside of shaft 116. A fifth bearing surface 434 is provided on the bearing member 422 on the end thereof opposite the first bearing surface 424, and this is disposed opposite a respective surface of the washer 418. In one embodiment, the working fluid permeates all the spaces defined opposite bearing surfaces 424, 430 and 434 of bearing member 422, thereby providing lubrication of the bearing. In one embodiment, the working fluid is provided as a liquid from the pump 144 (see Fig. 1(a)) via a fluid pipe 160, separate from the main flows, communicating with the outer surface of the bearing member 422.
e. e ce, .e It will be appreciated that the bearing in this form provides a bi-directional thrust bearing: the bearing member 422 has two bearing surfaces 424 and 434, enabling it to receive thrust in two directions.
Figure 5 shows in more detail the bearing member 422 employed in the bearing in Fig. 4, indicating fluid flows. Figure 5(a) is an end view showing the first bearing surface 424. The flange 502, forming the top of the T. is provided with two screw holes 504 enabling the bearing member 422 to be screwed or bolted to the housing 310 of the alternator 120. Six equally spaced radially extending first elongate recesses (slots) 506 are disposed in the first bearing surface 424, extending from radial inner extremity of the first bearing surface 424 towards the outer radial extremity of the firs bearing surface 424, enabling the passage of lubricant fluid. As can be seen in Fig. 5(b), each recess 506 does not quite reach the outer extremity 508 of the first bearing surface 424. In the embodiment of Fig. 5(a), each recess 506 is provided with an axially extending second lubrication channels 510, which extend to a circumferential recess (or groove) described hereinafter.
In other embodiments, there may not be a second lubrication channel 510 in each recess 506: for example, Fig. 5(c) illustrates the case where a second lubrication channel 510 is provided in only two of the recesses 506.
Referring to Fig. 5(d), a circumferentially extending recess (groove) 512 is provided in the outer surface 514 of bearing member 422. It can been seen that first lubrication channels 516 (here, four of them, equally circumferentially spaced) extend between the circumferentially extending recess 512 and the interior of the bearing member 422, allowing passage of lubrication fluid. As best seen in Fig. 5(e), the second lubrication channels 510 extend between the first bearing surface 424 and the circumferential recess 512. The ends of the second lubrication channels 510 are also shown in Fig. 5(f). The latter figure also shows a plurality (here six) of second elongate recesses (slots) 516 disposed in the fifth bearing surface 434. Two of the second elongate recesses 516 have second lubrication channels extending therefrom to the aforementioned circumferential recess 512. Figure 5(g) is a partial cross-section showing the recesses and channels in another way.
Returning to Fig. 5(e), the lubrication fluid enters the bearing member 422 in the direction of arrows K. The fluid flows in the direction of arrows L to the first elongate recesses 506 on the first bearing surface 4 24, in t he d irection o f a rrow M t o t he s econd elongate r ecesses 5 16 o n t he f if th b earing surface 434, and in the direction of arrow N (into the paper) to the interior of the bearing member and the third bearing surface 430, thereby lubricating the bearing.
Example 1
The specific values for one example (6kW version) of the system are set out below. All pressures are in bar (absolute). All temperatures are in C. The working fluid is HFE-7100.
t1 t2 t3 t4 t5 t6 t7 180.0 123.4 111.0 165.0 130.0 65.0 55.0 : ... ': ':' '. .' :': ' , : . ' . 9. : . pal 1 p2 1 p 11.5 1 1.0 1 3.4
Example 2
The specific values for a second example (120kW version) of the system are set out below. All pressures are in bar (absolute). All temperatures are in C. The working fluid is hexane.
t1 t2 t3 t4 t5 1 t6 t7 225.0 138.8 123.8 210.0 145.9 74.0 64.0: p1 1 p2 1 P3 19.5 1 1.0 1 1 The results from the system demonstrate a very useful thermodynamic efficiency (usable electricity out to heat in) for the heat recovery and solar thermal industries-10% for a source fluid input at110 C to 22% for a source fluid input at 270 C.
Referring to Figure 6, this illustrates an alternative (magnetic) coupling of the turbine unit and I alternator of Fig. 1 (a), in another aspect of the invention. The view in Fig. 6(a) is an axial cross-section of the coupling, showing a first rotary member 602 formed of turbine shaft 604 and a first magnetic member 606. In turn, the first magnetic member 606 comprises an armature portion 608, made of steel or iron, integral with the shaft, and a plurality of magnet sections 610, to be described further hereinbelow.
The first rotary member 602 is hermetically sealed inside a housing 612 that contains the turbine (not shown) and working fluid, the housing including a cylindrical portion 614 containing the first magnetic member 606. At least the portion 614 is made of a non-magnetic material, such as stainless steel, nimonic alloy or plastic.
A second rotary member 616 comprises a second shaft 618 and a generally cylindrical second magnetic member 620 integral therewith. The second magnetic member in turn comprises an outer supporting member 622 having a plurality of second magnet sections 624 fixedly attached to the interior thereof.
As best shown in Fig. 6(b), the first rotary member 602 may have a composite containment shell 626 around at least the cylindrical part thereof, so as to maintain the first magnet sections 610 in place during high-speed rotation. The containment shell may be made of a composite such as carbon fibre reinforced plastic (CFRP), kevlar, or glass fibre reinforced plastic (GRP).
Figure 6(c) is a transverse cross-section at A-A in Fig. 6(a). This shows the first magnet sections 610 and second magnet sections 624 in me.d, etail: in this case there are four of each. The magnet :: : : : . ' : ... .' 10..
sections are elongate, with a cross-section similar to the sector of a disc. The magnet sections are permanent magnets formed of a suitable material, such as ferrite material, samarium cobalt or neodymium iron boron. The direction of the North-South direction for the magnet sections is radial, as schematically illustrated in Fig. 6(d).
Turning to Fig. 6(e), this shows an alternative embodiment, in which the first magnetic member 606' and the second magnetic member 620' are substantially disc-shaped. The first magnetic member 606' comprises a first mounting section 628 and first magnet sections 610', and the second magnetic member 620' includes a second mounting section 630 and second magnet sections 624'. As before, a non-magnetic portion 614' of the housing (similar to 614 and made of the aforementioned non- magnetic material) separates the faces of the disc-shaped magnetic members 606' and 620', which are in close proximity.
The arrangement of the poles for the magnet sections one or both of the first and second magnetic members 606', 620' is illustrated schematically in Fig. 6(fl. As also illustrated in Fig. 6(9), the polarity of the face of the magnet sections 610' (or 624') alternates as you go tangentially from magnet section to magnet section.
These magnet arrangements permit coupling and transfer of rotational energy and torque from the turbine shaft 604 to the shaft 618 of the alternator, and are adapted to do so at relatively high speeds, e.g. 25, 000 to 50,000 rpm.
* a.
A. ' e. 11 äa

Claims (11)

  1. Claims: 1. A working fluid purification system for an energy conversion
    system, the energy conversion system being a closed system with a circulating working fluid circulating in a path therethrough and including an expansion device, for example a turbine, comprising: an expansion tank; a diaphragm within the expansion tank, thereby defining a variable volume connected for receiving said working fluid; and a control valve disposed between said path and the expansion tank, the control valve being adapted to control the flow of fluid to and/or from said variable volume; wherein the control valve is connected via a conduit to a connection point in the path, said connection point being at the highest point of said path.
  2. 2. The system of claim 1, wherein the control valve is mounted at a higher point than said connection point.
  3. 3. The system of claim 1 or 2, wherein the expansion tank is mounted at a higher point than said control valve.
  4. 4. The system of any of the preceding claims, further including a controller, the controller being adapted to open and close said control valve.
  5. 5. The system of claim 4, wherein the controller is configured to perform a purification cycle, said purification cycle comprising opening the control valve for a first predetermined period and closing the control valve for a second predetermined period.
  6. 6. The system of claim 5, wherein the controller is configured to perform, in a startup sequence of predetermined duration after switch-on of the system, a plurality of said purification cycles.
  7. 7. The system of claim 6, wherein said plurality of purification cycles comprises about 3 to 5 [or what?] purification cycles.
  8. 8. The system of claims 5 to 7, wherein the first predetermined period is about 1 minute and said second predetermined period is about ten minutes.
  9. 9. The system of any of the preceding claims, further including a pressure sensor coupled to the controller; wherein the controller is configured to perform at least one purification cycle when the pressure indicated by the sensor is above a predetermined level.
  10. 10. A working fluid purification system substantially as hereinbefore described with reference to the accompanying drawings.
    ,. -.'12 - ,,' .
    -
  11. 11. An energy recovery system for extracting electrical energy from a source of heat, comprising: the working fluid purification system of any of the preceding claims, a turbine, a heat exchanger, an electromechanical conversion unit, and a cooling system, the heat exchanger supplying, in use, the . .. ; . ; e.13 - ;
GB0320026A 2003-08-27 2003-08-27 A working fluid purification system Expired - Fee Related GB2405459B (en)

Priority Applications (15)

Application Number Priority Date Filing Date Title
GB0320026A GB2405459B (en) 2003-08-27 2003-08-27 A working fluid purification system
AT04764554T ATE382776T1 (en) 2003-08-27 2004-08-27 ENERGY RECOVERY SYSTEM
CA002536962A CA2536962A1 (en) 2003-08-27 2004-08-27 Energy recovery system
JP2006524335A JP2007503546A (en) 2003-08-27 2004-08-27 Energy recovery system
PT04764554T PT1668226E (en) 2003-08-27 2004-08-27 Energy recovery system
US10/569,228 US20070007771A1 (en) 2003-08-27 2004-08-27 Energy recovery system
EP04764554A EP1668226B1 (en) 2003-08-27 2004-08-27 Energy recovery system
ES04764554T ES2299856T3 (en) 2003-08-27 2004-08-27 ENERGY RECOVERY SYSTEM.
AU2004269148A AU2004269148A1 (en) 2003-08-27 2004-08-27 Energy recovery system
PCT/EP2004/009580 WO2005021936A2 (en) 2003-08-27 2004-08-27 Energy recovery system
PL04764554T PL1668226T3 (en) 2003-08-27 2004-08-27 Energy recovery system
RU2006109471/06A RU2006109471A (en) 2003-08-27 2004-08-27 ENERGY REGENERATION SYSTEM
DE602004011087T DE602004011087T2 (en) 2003-08-27 2004-08-27 ENERGY RECOVERY SYSTEM
BRPI0413986-0A BRPI0413986A (en) 2003-08-27 2004-08-27 energy recovery system, uses of hfe-7100 or hexane or water and one of the alkanes, electrical power generation system, radial inflow turbine unit, bearing, rotary magnetic coupling, method performed on an energy recovery system to extract energy from a waste heat source, control method of an energy recovery system, and programmable control and work fluid purification systems for an energy conversion system
IL173934A IL173934A0 (en) 2003-08-27 2006-02-26 Energy recovery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0320026A GB2405459B (en) 2003-08-27 2003-08-27 A working fluid purification system

Publications (3)

Publication Number Publication Date
GB0320026D0 GB0320026D0 (en) 2003-10-01
GB2405459A true GB2405459A (en) 2005-03-02
GB2405459B GB2405459B (en) 2006-09-06

Family

ID=28686405

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0320026A Expired - Fee Related GB2405459B (en) 2003-08-27 2003-08-27 A working fluid purification system

Country Status (1)

Country Link
GB (1) GB2405459B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2436129A (en) * 2006-03-13 2007-09-19 Univ City Vapour power system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111647897B (en) * 2020-05-25 2022-05-10 河北建投能源科学技术研究院有限公司 Purifying agent for supercritical carbon dioxide circulation power generation system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2151504A (en) * 1983-12-20 1985-07-24 Brian James Wills Moisture extractor and air purifier
US5113927A (en) * 1991-03-27 1992-05-19 Ormat Turbines (1965) Ltd. Means for purging noncondensable gases from condensers
US5487765A (en) * 1991-03-27 1996-01-30 Ormat Turbines (1965) Ltd. Apparatus for purging non-condensable gases from condensers

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4385909A (en) * 1981-08-31 1983-05-31 Starr Hydraulic-Electro Controls Co. De-aerator for hydraulic power units
US4982578A (en) * 1989-12-22 1991-01-08 Sporlan Valve Company Refrigerant purge valve

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2151504A (en) * 1983-12-20 1985-07-24 Brian James Wills Moisture extractor and air purifier
US5113927A (en) * 1991-03-27 1992-05-19 Ormat Turbines (1965) Ltd. Means for purging noncondensable gases from condensers
US5487765A (en) * 1991-03-27 1996-01-30 Ormat Turbines (1965) Ltd. Apparatus for purging non-condensable gases from condensers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2436129A (en) * 2006-03-13 2007-09-19 Univ City Vapour power system

Also Published As

Publication number Publication date
GB2405459B (en) 2006-09-06
GB0320026D0 (en) 2003-10-01

Similar Documents

Publication Publication Date Title
EP1668226B1 (en) Energy recovery system
US5628191A (en) Natural gas expansion plant
ZA200602322B (en) Energy recovery system
US8739538B2 (en) Generating energy from fluid expansion
US7211906B2 (en) Rankine—microturbine for generating electricity
CN1913294B (en) Electric power generating device
US8400005B2 (en) Generating energy from fluid expansion
CN102422006A (en) Rankine cycle heat recovery methods and devices
US20100011766A1 (en) Device for recovering electrical energy from the exhaust heat of a combustion engine of a motor vehicle, and method for recovering electrical energy from the exhaust heat of a combustion engine of a motor vehicle
GB2405450A (en) Multi stage series connected radial inflow turbine
WO2023196522A1 (en) Process integration in electrical power generation
Krähenbühl et al. Theoretical and experimental results of a mesoscale electric power generation system from pressurized gas flow
US8350399B2 (en) Microturbine system, and method
GB2405459A (en) A working fluid purification system
WO2024072535A2 (en) Energy recovery from a gas well
GB2405458A (en) Power control
KR20120004362A (en) Power generator
GB2406000A (en) Magnetic coupling for a turbo generator arrangement
GB2405453A (en) A sliding bearing for supporting a shaft
US11611263B1 (en) Electrical power generation
JP2021527775A (en) Compact Rankin turbo generator for thermoelectric distributed cogeneration
KR20070020365A (en) Energy recovery system
US20240026803A1 (en) Cooling gas recovered from a well
US20240027128A1 (en) Conditioning gas for a pipeline
US20230328934A1 (en) Process integration in electrical power generation

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee