GB2401406A - Hydroelectric power generator with underground turbine hall fed from bore hole - Google Patents

Hydroelectric power generator with underground turbine hall fed from bore hole Download PDF

Info

Publication number
GB2401406A
GB2401406A GB0310534A GB0310534A GB2401406A GB 2401406 A GB2401406 A GB 2401406A GB 0310534 A GB0310534 A GB 0310534A GB 0310534 A GB0310534 A GB 0310534A GB 2401406 A GB2401406 A GB 2401406A
Authority
GB
United Kingdom
Prior art keywords
turbine
hall
land
subterranean
provisions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
GB0310534A
Other versions
GB0310534D0 (en
Inventor
James Freel Stevenson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to GB0310534A priority Critical patent/GB2401406A/en
Publication of GB0310534D0 publication Critical patent/GB0310534D0/en
Publication of GB2401406A publication Critical patent/GB2401406A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/06Pressure galleries or pressure conduits; Galleries specially adapted to house pressure conduits; Means specially adapted for use therewith, e.g. housings, valves, gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

A hydroelectric power generator comprises an underground turbine hall with turbine/generator S07, which is fed by water from a water source above via a drilled bore hole. The system includes valves S02, S04 between the water source, cased bore hole S03 and turbine feed line S05, as well as regulator S06 and surface access tunnel for the turbine hall. Power is fed to the national grid via substation S10.

Description

DESCRIPTION
Subterranean Ocean Acquired Hydroelectric Power (SOAHP) This process relates to the production of electricity by using the natural forces contained within any ocean.
The process is similar to existing electricity generating methods. The existing methods however, are limited by location, site selection, environmental restrictions, capital expenditure and various technical challenges.
Conventional Hydroelectric power generating stations are dependent upon a volume of water falling from a set height (the head) on to the blades of a turbine, which rotate the generator to produce electricity. This can also be achieved on a smaller scale, by "Run of River" installations, which utilise water wheels to achieve the same results.
The SOAHP process utilises various elements of the Hydroelectric method, however, the main advantage is the constant supply of a head of water, which can be varied according to the design requirements.
In addition, the SOAHP process employs proven (and adapted) technology from other industries that make the process practical, and available within relatively short time periods.
Refer to attached drawing "Sheet Of 1" for the following technical description.
The diagram represents a section (cut) through the land, ocean and subsurface below.
The letters and numbers are references to the descriptive text, and beginning on the surface of the ocean S01 Illustrates a standard, offshore semi submersible, oil exploration drilling rig. (The Rig) The Rig is designed to drill holes in the earth, (from the surface of the ocean) whilst anchored to the seabed. The hole is drilled through the valve S02, to a pre-designed diameter and depth. The hole is cased with tubular steel, which is cemented in position using existing processes and methods from other applications. S03 represents the "cased hole" section through the subsurface layer.
The valve S04 serves the same purpose as S03, only this time at the seawater inlet to the Subterranean Turbine Hall. The cased hole is then converted to the dual cased turbine feed line S05 and associated control valves, governor and regulators S06.
The combined turbine/generator S07 produces high voltage (grid transmission level) AC electricity, to pre-designed capacities, which is then fed through the control switchgear See, and carried to the surface sub station S10 via cables S09: From here the power is fed into the national grid transmission system.
The Surface Access Tunnel, and Subterranean Turbine Hall present mining and civil engineering challenges that already have known solutions. The convergence, depth and gradient of the installation will be pre-designed, as will the valves, turbines and generators.
The installed capacity of "Water to Wire" units is realistically unlimited, as the inlet cased holes can be arranged and drilled to suit the pre-designed requirements.
1. A method of providing Hydroelectric Power without the use of a Dam, Mountain, Elevated Terrestrial Location or River.
2. The production of electrical energy, power and electricity as in claim 1, without the use of pumped i storage elevated dam systems.
3. The provisions of Claim 1 using the natural energy of the oceans without aid from wind, wave or currents.
4. The process as described in the attached drawings and description, utilising proven oilfield technology and equipment in reverse. Such as BOP valves and Cased Holes.
5. The name of the sub surface power station as a Subterranean Ocean Acquired Hydroelectric Power Station.
6. The access tunnel and subterranean turbine hall to house and access all the equipment and systems to provide the claim in claims.

Claims (8)

  1. Amendments to the claims have been filed as follows
    Subterranean Ocean Acquired Hydroelectric Power (SOAHP I Claim 1. A method of providing Hydroelectric Power without the use of a Dam, Mountain, Elevated Terrestrial Location or River, or any other artificial source of primary water storage, and comprising of a turbine, a turbine hall located under the sea bed at some distance from the land, in the region of existing coastal power stations, a hole drilled through the ocean floor and into the turbine hall at some depth below, the hole to be lined with steel tubing known as the casing, (cased hole), cemented in place, and a specialised pressure control valve fitted on the said casing at the sea bed and a similar valve fitted on the opposite end of the casing, at the entrance of the subterranean turbine hall located directly below at some depth, a pumped return system for the tail race or discharged waler from the turbine, and electrical cables to carry the power to the surface through the access tunnel and connect to the main electrical grid network.
  2. 2. The production of electrical energy power and electricity as in claim 1, by placing turbines in a turbine hall, constructed under ground and under the ocean floor, located at a distance and depth offshore away from the land, accessed by a tunnel from the land, commencing near the vicinity of existing coastal power stations.
  3. 3. The production of electrical energy, power and electricity as in claim land 2, by locating turbines in line with the vertical flow of water through the cased hole described in 1 above and in the accompanying drawings, on to the blades of the vertically mounted turbine located in the subterranean turbine hall, thereby applying rotational torque and force to the turbine blades, creating enough force to drive a coupled electrical generator.
  4. 4. The provisions of all the previous Claims using the natural energy of the oceans without aid from the wind, waves or ocean currents, the flow (head) of water being introduced and controlled by specialised pressure control valves situated on both ends of the cased hole, the opening of which will cause the seawater above to flow into the cased hole, and down into the turbine inlet supply piping and onto the rotating blades (vanes).
  5. 5. The provisions of all the previous claims above using the process as described in the attached drawings and description, using an offshore drilling rig to drill, case and cement the hole, and install the specialised pressure control valve on the sea bed.
  6. 6. The provisions of all the previous claims above, whereby the location of the drilled and cased hole shal] intersect the location of the turbine hall and turbines, by using 'measurement while drilling' techniques and global satellite positioning surveys.
  7. 7. The provisions of all the previous claims above by using an access tunnel commencing on the land and, mined under the sea and outwards away from the land to an area to be constructed and described as the subterranean turbine hall, which will house and give access to all the equipment and systems necessary to meet these claims.
  8. 8. The provisions of all the previous claims above to be known as Subterranean Ocean Acquired Hydroelectric Power Station.
GB0310534A 2003-05-08 2003-05-08 Hydroelectric power generator with underground turbine hall fed from bore hole Pending GB2401406A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB0310534A GB2401406A (en) 2003-05-08 2003-05-08 Hydroelectric power generator with underground turbine hall fed from bore hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0310534A GB2401406A (en) 2003-05-08 2003-05-08 Hydroelectric power generator with underground turbine hall fed from bore hole

Publications (2)

Publication Number Publication Date
GB0310534D0 GB0310534D0 (en) 2003-06-11
GB2401406A true GB2401406A (en) 2004-11-10

Family

ID=9957639

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0310534A Pending GB2401406A (en) 2003-05-08 2003-05-08 Hydroelectric power generator with underground turbine hall fed from bore hole

Country Status (1)

Country Link
GB (1) GB2401406A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180372706A1 (en) * 2013-03-15 2018-12-27 Mueller International, Llc Systems for measuring properties of water in a water distribution system
US11041839B2 (en) 2015-06-05 2021-06-22 Mueller International, Llc Distribution system monitoring
US11725366B2 (en) 2020-07-16 2023-08-15 Mueller International, Llc Remote-operated flushing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3808445A (en) * 1972-08-02 1974-04-30 Bailey W Enterprises Wave operated power plant
SU589329A1 (en) * 1973-05-31 1978-01-25 Всесоюзный Ордена Ленина Проектно-Изыскательский И Научно-Исследовательский Институт "Гидропроект" Имени С.Я.Жука Underground water accumulating plant
US4310769A (en) * 1979-10-17 1982-01-12 Bechtel International Corporation Ship lock system with hydroelectric pumped-storage capability
SE465885B (en) * 1990-10-31 1991-11-11 Goeran Lagstroem Method of using cavities in the earth's crust for supplying energy by means of what is known as a pumping power station
WO1997028367A1 (en) * 1996-01-31 1997-08-07 Piesold David D A Helical penstock

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3808445A (en) * 1972-08-02 1974-04-30 Bailey W Enterprises Wave operated power plant
SU589329A1 (en) * 1973-05-31 1978-01-25 Всесоюзный Ордена Ленина Проектно-Изыскательский И Научно-Исследовательский Институт "Гидропроект" Имени С.Я.Жука Underground water accumulating plant
US4310769A (en) * 1979-10-17 1982-01-12 Bechtel International Corporation Ship lock system with hydroelectric pumped-storage capability
SE465885B (en) * 1990-10-31 1991-11-11 Goeran Lagstroem Method of using cavities in the earth's crust for supplying energy by means of what is known as a pumping power station
WO1997028367A1 (en) * 1996-01-31 1997-08-07 Piesold David D A Helical penstock

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180372706A1 (en) * 2013-03-15 2018-12-27 Mueller International, Llc Systems for measuring properties of water in a water distribution system
US11255835B2 (en) 2013-03-15 2022-02-22 Mueller International, Llc Systems for measuring properties of water in a water distribution system
US11307190B2 (en) * 2013-03-15 2022-04-19 Mueller International, Llc Systems for measuring properties of water in a water distribution system
US11041839B2 (en) 2015-06-05 2021-06-22 Mueller International, Llc Distribution system monitoring
US11725366B2 (en) 2020-07-16 2023-08-15 Mueller International, Llc Remote-operated flushing system

Also Published As

Publication number Publication date
GB0310534D0 (en) 2003-06-11

Similar Documents

Publication Publication Date Title
CN101666286B (en) System for integrally exploiting marine energy resource
CN105041271B (en) A kind of buck exploiting ocean natural gas hydrates method and sub-sea production systems
US6263971B1 (en) Multiphase production system suited for great water depths
US11772754B2 (en) Hydroelectricity production facility using changes in water column density to induce vertical flow
US11171543B2 (en) Energy generation from a double wellbore
GB2401406A (en) Hydroelectric power generator with underground turbine hall fed from bore hole
RU2431015C1 (en) Diversion well hydraulic power plant
CN111270994A (en) Casing running process and device for deep sea riser-free pipe following drilling
US11585313B2 (en) Offshore power system that utilizes pressurized compressed air
WO2008072262A1 (en) Geothermal energy system
JP2004084336A (en) Method for constructing foundation of oceanic wind power generator and underground structure of oceanic wind power generator
EP4179270B1 (en) Method and system for storing and recovering offshore renewable energy
WO2017141027A1 (en) Improved subsea hydroelectric generation
RU2377436C1 (en) Well pumped-storage installation
GB2400632A (en) Subsea turbine energy generation apparatus
JP2009264119A (en) Ocean current power generation system dedicated to future of our dear earth and children
GB2388164A (en) Intermediate booster pumping station
JP2015017568A (en) Water (water vapor) circulation type combined power generating system or the like uniting hydraulic power generation using sea bottom (undersea) dam or the like, (seawater or the like-utilizing) geothermal power generation, or the like
RU2373431C2 (en) Downhole hydroelectric station
TWI810300B (en) Seabed foundation construction robot
JP2019112829A (en) Seabed foundation construction robot
KR20110023871A (en) System and method for constructing dsw siphon wells of egs·dsw power plant
Armando Petrobras experience on early production systems
Sheehan West of Shetland development gathers momentum
JP3168416U (en) Ocean current power generation system