GB2224058A GB8821094A GB8821094A GB2224058A GB 2224058 A GB2224058 A GB 2224058A GB 8821094 A GB8821094 A GB 8821094A GB 8821094 A GB8821094 A GB 8821094A GB 2224058 A GB2224058 A GB 2224058A
Authority
GB
United Kingdom
Prior art keywords
cwp
otec
top platform
noaa
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB8821094A
Other versions
GB8821094D0 (en
Inventor
Martin Giles Brown
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to GB8821094A priority Critical patent/GB2224058A/en
Publication of GB8821094D0 publication Critical patent/GB8821094D0/en
Publication of GB2224058A publication Critical patent/GB2224058A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03GSPRING, WEIGHT, INERTIA OR LIKE MOTORS; MECHANICAL-POWER PRODUCING DEVICES OR MECHANISMS, NOT OTHERWISE PROVIDED FOR OR USING ENERGY SOURCES NOT OTHERWISE PROVIDED FOR
    • F03G7/00Mechanical-power-producing mechanisms, not otherwise provided for or using energy sources not otherwise provided for
    • F03G7/04Mechanical-power-producing mechanisms, not otherwise provided for or using energy sources not otherwise provided for using pressure differences or thermal differences occurring in nature
    • F03G7/05Ocean thermal energy conversion, i.e. OTEC
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/30Energy from the sea, e.g. using wave energy or salinity gradient

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Oceanography (AREA)
  • Sustainable Development (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The new joint which is illustrated in fig. 5 is designed to stop any motions from the top platform being transmitted to the CWP. In very bad weather when there is a danger of damage to the platform and/or the CWP, the CWP can easily be lowered below the surface of the sea where it is no longer exposed to such severe environmental conditions. The new joint can be beneficially applied to a ring semi submersible top platform whose design is optimised for minimum wind and wave induced motions. A laser welded sandwich construction of the CWP is proposed with syntactic foam placed between the inner and outer rings of the sandwich construction. The foam would make the pipe positively buoyant and it would be held in place by tension moorings attached to the sea bed similar to those used in tension leg platforms. (TLPs). <IMAGE>

Description

DESCRIPTION AND APPLICATIONS OF AN EASY DISCONNECT, MOTION DECOUPLING TOP JOINT FOR OTEC.
This invention relates to a new design of joint between the cold water pipe (CWP) and the top platform for an Ocean Thermal Energy Conversion (OTEC) power plant.
OTEC is the general description for the process by which energy can be extracted from the temparature difference availible between the warm surface waters and cool sub surface waters in the world's tropical oceans. It is a subject that has received little publicity in the U.K.
but which has been seriously investigated in the U.S.A. . A good overview of the subject is given by Ford et al (1983) and an illustration of possible OTEC plants is given in Fig. 1 (from ref. 1).
The temparature difference is due to the presence of a stable thermocline which results in a temparature of approximately 25 C in the surface layers and approximately 4 C at a depth of around 1000 m.
Because the temparature difference is so small the process has a low thermal efficiency and in order to produce a large power output, vast quantities of warm and cold water must be processed. However, the cold sub surface water has to be pumped slowly in order to minimise frictional losses and also so as not to disturb the stability of the thermocline.
This means that in order to transport the volume of water required, a large diameter CWP is needed. Calculations show that a pilot plant of approximately 40 MW capacity would require a pipe of 10 m. internal diameter with a length of about 1000 m.
Because of the size of the pipe, the design of the joint between the top of the pipe and the surface platform presents problems. If a fixed joint is used, the pipe will be subjected to forces due to the roll, surge, sway, heave, pitch, and yaw of the top vessel.
In order to reduce these forces a number of different types of joint have been suggested. One idea is to use a flexible pipe which would absorb the platform motion. However, the design of a reliable flexible pipe of 10 m. internal diameter able to withstand a 30 year design life immersed in sea water is far beyond the present state of the art. Alternative ideas which permit a certain degree of movement between the pipe and the top platform are illustrated in figs. 2,3 and 4 (from refs. 5,4 and 5 respectively). However, it is correct to say that no joints based on these principles have ever been constructed to the size that would be required for an OTEC application. Thus the reliability and development costs of such joints cannot easily be predicted.
The new design of joint which is proposed is illustrated in fig.5.
and is described in the following section.
Referring to the drawing the joint comprises of a Pick Up Pipe (PUP) (3), a bowl (2) and the CWP (1). It is possible for the PUP to be of smaller diameter than the CWP since, because of its short length it is possible to pump water fast through it in order to achieve the required flow rate without being subject to to unacceptably high side wall frictional losses.
(4) represents the top platform which for ease of illustration is drawn as a conventional semi-submersible although the ring semi-submersible displayed in fig.6. is likely to be more appropriate due to its superior motion characteristics. (5) represents catenary moorings anchoring the semi-submersible to the sea bed. It is likely that the power cables transmitting the electricity to shore would be run alongside the mooring cables. (6) illustrates the tension moorings holding the positively buoyant CWP to the seabed. (7) represents the mechanism that would be used to lower the CWP below the sea surface as might be required in very bad weather.
This could be achieved by sub sea winches or by altering the buoyancy of the CWP. (8) shows slack mooring chains which might be required if the motion between the CWP and the top platform should get out of phase and there was a danger of collision between the CWP and the top platform.
New Concepts for the Design of the CWP based on the New Joint.
A solid CWP which is sufficiently strong to withstand the bending forces imposed on it by the combined influences of wind, waves and current is too thick to be manufactured and is too expensive due to the mass of material required. Thus a sandwich construction (illustrated in fig.?) is proposed which is far stronger weight for weight than the solid pipe which it replaces. The difficulty of using a sandwich construction for a structure such as the CWP is getting access to the internal joints for the welding equipment. However, laser through welding offers the opportunity of solving this difficulty since (see fig.8, from ref.6) direct access to the internal joints is no longer required.
Using a sandwich construction opens up the possibility of using the space between the inner and outer rings in order to provide internal buoyancy to support the pipe's own weight. This can be achieved by either inserting syntactic foam into the empty spaces or by using compressed air.
Syntactic foam has the advantage of not losing its buoyancy if one of the rings becomes damaged. Also it would increase the strength and stiffness of the pipe as well as helping to inhibit corrosion between the rings.
Compressed air would have the advantage of being able to easily adjust the buoyancy of the pipe if it was necessary to lower the pipe below the surface of the sea in bad weather.

Claims (6)

CLAIMS. I) Since the top platform and CWP are not attached to each other, motion of the top platform is not transmitted to the CWP. This reduces the number and the magnitude of the forces which are imposed on the CWP. 2) In very bad weather when there is a danger of damage to the platform and/or the CWP, the CWP can be lowered below the surface of the sea where it is no longer exposed to such severe environmental conditions. Since the top platform and the pipe are not fixed together this is a simple operation which can be carried out in the middle of a storm. 3) Since no solid parts move against each other there will be very little wear of the components that make up the joint. 4) Because of the simplicity of the joint it will be cheap to manufacture with low development costs. REFERENCES.
1) Cohen, R. 'Energy from the Ocean ' from Marine Technology in the 1990's published 1982 by the Royal Society, London.
2) Ford, G., Nibblett, C., Walker, L., 'Ocean Thermal Energy Conversion,' IEE procs., part A, volume 130, number 2, Mar. 1983, p. 93-100.
3) Pompa, J.A., Lunz, D.F. (Editors), 'NOAA/DOE CWP Structural Analysis Package,' September 1979, ORI Inc., prepared for NOAA under contract NDBO 03-78-G03-0504, U.S. data bank ref. OTEC 1530-1.
4) Science Applications Inc., 'OTEC Modular Experiment Cold Water Pipe Design Study,' prepared for NOAA under contract MO-A01-78-00-4142, SAl Report No. SAI-057-79-1049LJ, Dec. 1979, U.S. data bank ref. OTEC 1900-8.
5) TRW Energy Systems Group, 'OTEC Cold Water Pipe Preliminary Design Project - Final Report,' 20th November 1979, prepared for NOAA/DOE under contract MO-A01-78-00-4141, l-.S. data bank ref., OTEC 2000-17, vol. 1.
6) Vice-Chancellor's Report, 'The University of Newcastle upon Tyne,' availible from the Registrar's Office.
GB8821094A 1988-09-08 1988-09-08 Description and applications of an easy disconnect, motion decoupling top joint for OTEC Withdrawn GB2224058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB8821094A GB2224058A (en) 1988-09-08 1988-09-08 Description and applications of an easy disconnect, motion decoupling top joint for OTEC

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB8821094A GB2224058A (en) 1988-09-08 1988-09-08 Description and applications of an easy disconnect, motion decoupling top joint for OTEC

Publications (2)

Publication Number Publication Date
GB8821094D0 GB8821094D0 (en) 1988-10-05
GB2224058A true GB2224058A (en) 1990-04-25

Family

ID=10643268

Family Applications (1)

Application Number Title Priority Date Filing Date
GB8821094A Withdrawn GB2224058A (en) 1988-09-08 1988-09-08 Description and applications of an easy disconnect, motion decoupling top joint for OTEC

Country Status (1)

Country Link
GB (1) GB2224058A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5286063A (en) * 1993-01-08 1994-02-15 The Babcock & Wilcox Company Ball and socket floating seal assembly
WO2003091092A1 (en) * 2002-04-25 2003-11-06 Xiaoji Yuan A method to decrease wind-wave load for water-surface fixation-site platform and related platform
FR2951802A1 (en) * 2009-10-22 2011-04-29 Total Sa SUBMARINE CONDUCT APPLIED TO THE EXPLOITATION OF THERMAL ENERGY OF THE SEAS
FR2958304A1 (en) * 2010-03-30 2011-10-07 Dcns Offshore installation for producing electrical energy from thermal energy of oceans for driving thermal engine, has suction pipe forming unit whose part is formed of flexible pipes for coupling upper end of rigid pipe to platform
JP2015536401A (en) * 2012-11-07 2015-12-21 ジ アベル ファウンデーション, インコーポレイテッド Ocean thermal energy conversion power plant
CN105431668A (en) * 2013-03-14 2016-03-23 洛克希德马丁公司 Large diameter pipe flexible connection
EP3110589A1 (en) * 2014-02-24 2017-01-04 Lockheed Martin Corporation Friction stir welded pipes
US20190186474A1 (en) * 2016-08-25 2019-06-20 Bardot Group Floating device comprising an interchangeable insert passing through a float and associated electrical production system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5286063A (en) * 1993-01-08 1994-02-15 The Babcock & Wilcox Company Ball and socket floating seal assembly
WO2003091092A1 (en) * 2002-04-25 2003-11-06 Xiaoji Yuan A method to decrease wind-wave load for water-surface fixation-site platform and related platform
FR2951802A1 (en) * 2009-10-22 2011-04-29 Total Sa SUBMARINE CONDUCT APPLIED TO THE EXPLOITATION OF THERMAL ENERGY OF THE SEAS
FR2958304A1 (en) * 2010-03-30 2011-10-07 Dcns Offshore installation for producing electrical energy from thermal energy of oceans for driving thermal engine, has suction pipe forming unit whose part is formed of flexible pipes for coupling upper end of rigid pipe to platform
JP2015536401A (en) * 2012-11-07 2015-12-21 ジ アベル ファウンデーション, インコーポレイテッド Ocean thermal energy conversion power plant
CN105431668A (en) * 2013-03-14 2016-03-23 洛克希德马丁公司 Large diameter pipe flexible connection
CN105431668B (en) * 2013-03-14 2017-12-22 洛克希德马丁公司 Large-diameter pipeline is flexibly connected
EP3110589A1 (en) * 2014-02-24 2017-01-04 Lockheed Martin Corporation Friction stir welded pipes
US20190186474A1 (en) * 2016-08-25 2019-06-20 Bardot Group Floating device comprising an interchangeable insert passing through a float and associated electrical production system

Also Published As

Publication number Publication date
GB8821094D0 (en) 1988-10-05

Similar Documents

Publication Publication Date Title
JP4098724B2 (en) Offshore wind turbine
US11199180B2 (en) Vessel-mounted ocean thermal energy conversion system
US5555838A (en) Ocean thermal energy conversion platform
US8558403B2 (en) Single moored offshore horizontal turbine train
US20180258904A1 (en) Floating moon pool hydraulic pump
Panicker Power resource potential of ocean surface waves
US8567194B2 (en) Floating platform with detachable support modules
AU2017209649A1 (en) Wave power generation apparatus
US20030146628A1 (en) Floating platform to obtain electric power
GB2224058A (en) Description and applications of an easy disconnect, motion decoupling top joint for OTEC
CA2985948C (en) Floating production unit and method of installing a floating production unit
Cohen Energy from the ocean
Simeons Hydro-power: the use of water as an alternative source of energy
EP2141353B1 (en) Submergible system for exploiting the energy of marine currents
WO2024051028A1 (en) Wave energy inertia hydraulic difference power generation device
US20230151789A1 (en) Wave energy converter
Hagerman Wave energy systems for recharging AUV energy supplies
GB2253813A (en) Production buoy
WO2000024004A1 (en) Unmanned seafloor power station and method of employment
Glendenning Wave energy
Brown et al. Conversion of a Redundant Drillship to a Floating OTEC Platform
Crowle et al. Installation Aspects of Floating Offshore Wind Turbines
JPS6053163B2 (en) offshore power plant
EP3097308B1 (en) Vessel-mounted ocean thermal energy conversion system
Vilain et al. Studies of Cold Water Pipe Installation for OTEC Pilot Plant in Tahiti

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)