GB2117432A - Piles - Google Patents

Piles Download PDF

Info

Publication number
GB2117432A
GB2117432A GB08300058A GB8300058A GB2117432A GB 2117432 A GB2117432 A GB 2117432A GB 08300058 A GB08300058 A GB 08300058A GB 8300058 A GB8300058 A GB 8300058A GB 2117432 A GB2117432 A GB 2117432A
Authority
GB
United Kingdom
Prior art keywords
mandrel
pile
cementitious mixture
ground
shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB08300058A
Other versions
GB8300058D0 (en
Inventor
Wilfred George Kenneth Fleming
Ziemowit Jan Sliwinski
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CEMENTATION FRANKIPILE Ltd
Original Assignee
CEMENTATION FRANKIPILE Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CEMENTATION FRANKIPILE Ltd filed Critical CEMENTATION FRANKIPILE Ltd
Publication of GB8300058D0 publication Critical patent/GB8300058D0/en
Publication of GB2117432A publication Critical patent/GB2117432A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The method involves driving into the ground a mandrel (1) carrying a pile shoe (2) and pumping a cementitious mixture (4) into the hole through the interior of the mandrel (1) as it is being driven into the ground. The cementitious mixture (4) leaves the interior of the mandrel (1) and enters the annular gap between the mandrel (1) and the earth surface via one or more holes (34) located at or close to its lower end and generally just above the pile shoe (2). The mixture (4) is maintained at a positive pressure relative to its surroundings, and is allowed to set after the mandrel (1) has reached the desired depth and has been withdrawn leaving the shoe (2) behind. The driving rig need not have the bulk required to exert the massive pulling forces required in conventional piling systems where a temporary casing which has been driven tightly into the soil is withdrawn prior to completion of the pile.

Description

1
GB 2 117 432 A
1
SPECIFICATION Piles
5 The invention relates to piles, and more particularly is concerned with piles which are of the driven cast-in-placetype.
In conventional piling systems of the driven cast-in-place type, the stages of production are: 10 [1] a driving rig is set up at the desired pile position;
[2] a casing or tube [often fitted with an expandi-ble base shoe to pevent entry of soil into the tube] is driven into the ground, the diameter of the tube
15 being the same as that of the pile being formed;
[3] a steel reinforcing cage is placed inside the tube;
[4] concrete is poured into the interior of the tube, usually to ground level or slightly above; and
20 [5] the tube is then withdrawn from the ground, and the driving rig moves on to the next pile position. With current techniques, the time taken to complete these five operations for a single pile is on average around 45 to 50 minutes. The driving rig is 25 also a robust and expensive piece of equipment, since the pulling force required to extract the tube in step [5] is often of the order of 100 to 150 tonnes. The masts of the machines have to be designed to carry this load and some means of transferring this force 30 to the ground must also be provided.
In one prior art piling system, generally termed the "Interpile", a tubular, perforated mandrel carrying at its lower end a detachable pile shoe is driven into the ground. The dimensions of the pile shoe exceed 35 those of the mandrel so that there is an annular gap between the outer surface of the mandrel and the earth wall[s] created by the driving of the pile shoe. A fluid concrete mix is poured into a hopper which surrounds the mandrel as the mandrel is driven into 40 the ground. The gravity-fed concrete flows downwards, moving with the pile-shoe, and enters the interior of the mandrel via a large number of holes. Once the pile shoe and mandrel have reached the desired depth, they are left in place and the concrete 45 is allowed to set. A similar method is described in U.S. Patent No. 779,881 issued January 10th, 1905. Systems of this type are not ideal for the construction of deep piles. Although in theory the hydrostatic pressure at the base of a fluid column will always 50 exceed that at higher levels, in practice this does not always apply to a column of concrete which is to form the pile. For example, if there is significent bleeding of the concrete at the top of the pile, or if a band of concrete in this area sets against the 55 surrounding earth and thus becomes separated from the remainder of the column [known as the "hangup" effect], then the area in question will not contribute, or will not contribute in full, to the hydrostatic pressure acting on the concrete at the 60 base of the pile. The normal frictional forces between concrete and the surrounding earth [which always exist when the concrete moves downwardly to follow the motion of the pile shoe] also contribute to the "hang-up" effect. The reduction of hydrostatic 65 pressure at the base of the pile is accompanied by a proportional reduction in the concrete lateral pressure at the base of the pile, and it may thus become possible for soil to move inwards to fill any void being formed above the pile shoe. In this way the pile section is reduced to a value below that corresponding to the size of the pile shoe. In other words the pile may "neck", and this is highly undesirable. The tendency of the pile shoe to displace earth sideways and upwards also increases the lateral concrete pressure necessary to support the pile at its base.
An object of the present invention is to provide a method of forming piles which makes it possible to reduce the time required to form a pile, to reduce the mass of the machinery involved in producing the pile, and to reduce the possibility of the pile necking.
According to the present invention, there is provided a method of forming a pile in the ground, which comprises:
[a] driving into the ground a tubular mandrel carrying at its lower end a pile shoe the dimensions of which measured in a plane perpendicular to the direction of driving exceed the corresponding dimensions of the mandrel, the mandrel having at its upper end means for introducing a fluid cementi-tious mixture into the interior of the mandrel and having at or close to its lower end one or more holes whereby fluid cementitious mixture can flow outwardly into the space surrounding the lower part of the tubular mandrel;
[b] pumping a cementitious mixture through the interior of the tubular mandrel from the top to the bottom thereof and thence into the hole around the mandrel as the mandrel is being driven into the ground so as to maintain the cementitious mixture at a positive pressure relative to its surroundings; and
[c] when the mandrel has reached the desired depth, leaving the pile shoe in place, withdrawing the mandrel and allowing the cementitious mixture to set.
Because the mandrel is smaller in size than the pile and is surrounded by unset [i.e. fluid] cementitious material, the forces required to extract it at completion of driving a pile are small compared with the pulling forces which are required in conventional cast-in-place driven piling systems to withdraw the temporary casings which have been driven tightly into the soil.
One or more holes are provided at or close to the base of the mandrel, generally just above the pile shoe. A cementitious mixture under pressure is supplied to the interior of the mandrel and passes downwardly under pressure to the hole[s] at the base of the mandrel and thence into the hole around he mandrel. The supply of cementitious mixture in this way ensures that the hole around the mandrel is filled with fluid cementitious mixture as the hole is being generated. The supply of concrete under pressure to the base of the mandrel also means that it enters the pile section just above the shoe position, and accordingly the frictional forces which in conventional piles oppose the downward flow of concrete into the pile do not occur. Advantageously, an open ended concrete reservoir which may be constructed, for example, of steel, is provided at the
70
75
80
85
90
95
100
105
110
115
120
125
130
2
GB 2 117 432 A
2
ground surface and is arranged so that the mandrel passes therethrough as the pile is being formed. If desired, the concrete reservoir can be closed at its upper surface to function as a pressure box. 5 The mandrel can be of square, circular or any other desired cross-section. The mandrel may be solid or tubular and conveniently is formed of steel or other high-strength material. The mandrel may be formed by the co-operation of a plurality of unit 10 lengths joined together, e.g. with flush joints. The driving of the mandrel can be effected through a driving hammer which can be diesel- or hydraulical-ly- driven or can be gravity-acting.
Where a pressure box is present, this can include a 15 gland which, in use abuts the mandrel, and an air release valve. Downward pressure may be applied to maintain the position of the pressure box, e.g. through the weight of the driving rig for the mandrel.
The pile shoe [also known as a driving shoe] may 20 be flat or pointed at its driving end, and may be formed of steel or concrete. The driving shoe may be circular, square or any other shape as viewed in a plane perpendicular to the direction of driving. Furthermore, an extension sleeve may be attached 25 to the upper end of the driving shoe to prevent displacement of soil around the driving shoe into the intended pile section.
It is possible to ensure that adequate pressures can be maintained in the cementitious mix [e.g. 30 concrete] at all times during construction of the pile, thereby to preserve the shape of the pile and to give intimate bonding of the pile to the surrounding ground material.
In all embodiments of the invention, the driving of 35 the mandrel into the ground and the supply of cementitious material [e.g. concrete] to form the pile are concurrent. Also, the need for a temporary casing or tube is obviated so that the high extraction forces normally involved with driven cast-in-place 40 piles are avoided. This means in turn that the pile driving machine or rig can be of simpler construction since its mast need not withstand the normally large forces involved in extracting the casing.
The invention will now be described with refer-45 enceto the accompanying drawings, in which:
Figure 1 illustrates the frictional forces acting during the construction of certain prior types of pile; and
Figure 2 illustrates an embodiment of this inven-50 tion.
Referring now to Figure 1, a prior art arrangement involves a tubular mandrel 1 equipped at its lower end with a pile shoe 2. A fluid concrete mix is supplied under gravity to a hopper 3 located at the 55 ground surface. As the mandrel 1 is driven downwardly [by means not shown], the fluid concrete mix 4 also travels downwardly in the direction of arrow 5. This results in frictional forces indicated by arrows 6; these forces oppose the downward flow of concrete, 60 so that the longer and narrowerthe pile becomes then the less will be the vertical concrete pressure towards the base of the pile. Thus the concrete lateral pressure will also reduce in proportion, and the pile may neck.
65 Referring now to Figure 2, a concrete pile is formed by a method in accordance with this invention using a tubular mandrel 30 of unitary construction and formed of high-strength steel. The mandrel carries at its lower end a steel driving shoe 11 which, 70 like the mandrel 30, is circular in cross-section. The driving shoe 11 has aflat base 12. As can be seen from the drawing, the dimensions of the driving shoe exceed those of the mandrel 30 so that an annular space is formed around the mandrel as the 75 assembly is driven downwardly into the ground. The upper end of mandrel 30 is closed by a pressure-resisting plate 31. Just below this plate there is an aperture 32 in the side wall of the mandrel which aperture carries a shock-absorbing pipe connection 80 33 which receives a pipe for the supply of a fluid concrete mix under pressure. One or more holes 34 are provided in the lower part of the mandrel 30 adjacent to driving shoe 11. A reservior 35 the walls of which are formed of steel is positioned at ground 85 surface level. A tubular extension 36 extends downwardly from the concrete reservoir for a few feet into the hole which is formed as the mandrel 30 is driven into the ground. The driving rig for the mandrel [not shown] carries a hydraulic mechanism for driving 90 hammer 20.
In use, concrete is supplied under pressure through pipe connection 33 and passes downwardly through mandrel 30 to aperture 34. The supply of concrete occurs simultaneously with the driving of 95 the mandrel 30 downwards by action of driving hammer 20. The concrete is at a pressure sufficient to maintain the column of fluid concrete at a positive pressure relative to the earth wall 21. The reservoir 35 is of a height sufficients support the head of 100 concrete which is generated owing to the pressurised concrete supply. Because in this embodiment the concrete is supplied under pressure to the mandrel and enters the pile section just above the driving shoe 11, the frictional forces shown at 6 in 105 Figure 1 which normally oppose the downward flow of concrete into a pile do not apply. In fact, the direction of motion of concrete within the pile can be the reverse of that encountered with conventional gravity feed systems: in these circumstances, the 110 wall friction is also reversed and the pressure of concrete at the base of the pile is enhanced during the driving of the pile. Also, the "hang-up" effect is of no consequence because concrete is always supplied at the right place to fill up the void created 115 by downward motion of the pile shoe. If very high concrete supply pressures are used, the reservoir 35 may be modified so as to resemble a pressure box.
Once the mandrel 30 has reached the desired pile depth, it is withdrawn leaving the pile shoe in place. 120 The driving rig is then removed and the concrete mixture is left to set. During removal of the mandrel, the concrete mixture can be maintained under positive pressure so as to ensure that the mixture moves into the void created as the mandrel is lifted ; 125 in this way the concrete mixture is caused to permeate the whole volume of the pile.
Construction of piles in accordance with the present invention is especially advantageous in soft clays, water-bearing soils and other poor ground. In 130 these conditions, pore water pressures can be high
3
GB 2 117 432 A
3
and soil shear strength iow during the driving of piles. In gravity-fed systems which do not use a temporary casing, these conditions are particularly favourable for soil to re-enter the pile section and to 5 displace any fluid concrete which is still present. By operating in accordance with the invention, this ingress of soil is prevented and thus stronger and deeper piles can be constructed.
It should be noted that, in practising the present 10 invention, the cross-sectional shape of the pile can be round, square, elongate or any other desired shape. Where the pile section is elongate, the mandrel may be twinned.
After the first pile has been completed and the 15 concreate has hardened to a reasonable degree, the continuity and general cross-sectional area of the pile can be tested if desired; in this way the concrete pressure used in the construction of subsequent piles can be adjusted to give the desired structure of 20 full cross-sectional area.

Claims (5)

1. A method of forming a pile in the ground, 25 which comprises:
[a] driving into the ground a tubular mandrel carrying at its lower end a pile shoe the dimensions of which measured in a plane perpendicular to the direction of driving exceed the corresponding
30 dimensions of the mandrel, the mandrel having at its upper end means for introducing a fluid cementitious mixture into the interior of the mandrel and having at or close to its lower end one or more holes whereby fluid cementitious mixture can flow out-35 wardly into the space surrounding the lower part of the tubular mandrel;
[b] pumping a cementitious mixture through the interior of the tubular mandrel from the top to the bottom thereof and thence into the hole around the
40 mandrel as the mandrel is being driven into the ground so as to maintain the cementitious mixture at a positive pressure relative to its surroundings; and
[c] when the mandrel has reached the desired depth, leaving the pile shoe in place, withdrawing
45 the mandrel and allowing the cementitious mixture to set.
2. A method according to claim 1, wherein after the first pile of a series has been completed and the cementitious mixture thereof has hardened, the
50 continuity and cross-sectional area of the pile are tested and the supply pressure of the cementitious mixture used in the construction of subsequent piles is adjusted, if necessary, in order to give the desired pile structure.
55
3. A method according to claim 1 or 2, wherein the cementitous mixture is caused to permeate the whole volume of the pile during removal of the mandrel.
4. A method according to claim 3, wherein the 60 cementitious mixture is maintained at a positive pressure relative to its surroundings during removal of the mandrel.
5. A method of forming a pile in the ground, substantially as hereinbefore described with refer-
65 enceto Figure 2 of the accompanying drawings.
Printed for Her Majesty's Stationery Office, by Croydon Printing Company Limited, Croydon, Surrey, 1983.
Published by The Patent Office, 25 Southampton Buildings, London, WC2A1 AY, from which copies may be obtained.
GB08300058A 1982-01-22 1983-01-04 Piles Withdrawn GB2117432A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB08201845A GB2113748B (en) 1982-01-22 1982-01-22 Piles

Publications (2)

Publication Number Publication Date
GB8300058D0 GB8300058D0 (en) 1983-02-09
GB2117432A true GB2117432A (en) 1983-10-12

Family

ID=10527817

Family Applications (2)

Application Number Title Priority Date Filing Date
GB08201845A Expired GB2113748B (en) 1982-01-22 1982-01-22 Piles
GB08300058A Withdrawn GB2117432A (en) 1982-01-22 1983-01-04 Piles

Family Applications Before (1)

Application Number Title Priority Date Filing Date
GB08201845A Expired GB2113748B (en) 1982-01-22 1982-01-22 Piles

Country Status (4)

Country Link
EP (1) EP0084921B1 (en)
AT (1) ATE16296T1 (en)
DE (1) DE3361079D1 (en)
GB (2) GB2113748B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6773208B2 (en) 2002-12-17 2004-08-10 Dewitt Wayne Method for casting a partially reinforced concrete pile in the ground
NL1031876C2 (en) * 2005-05-25 2007-01-04 Betonson B V Securing reinforcing band around concrete pile, comprises securing band around set pile and then tightening or pressing it into place
NL1029126C2 (en) * 2005-05-25 2006-11-28 Betonson B V Application method for securing reinforcing band to hollow concrete pile, involves securing band around pile once concrete has set
US7726913B1 (en) 2007-08-15 2010-06-01 David Sjogren Method and apparatus for forming in ground piles
CN109868815B (en) * 2019-03-26 2024-02-02 中国石油大学(北京) Shoe type submarine self-disposable self-elevating drilling platform pile shoe and drilling platform
CN113605378A (en) * 2021-08-13 2021-11-05 杭州通达集团有限公司 Construction method of non-pull-out type half-sleeve retaining wall cast-in-situ bored pile

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1160905A (en) * 1965-11-04 1969-08-06 Ludwig Mueller A cast in situ Foundation Pile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3638433A (en) * 1969-03-28 1972-02-01 James L Sherard Method and apparatus for forming structures in the ground
US3851485A (en) * 1972-04-14 1974-12-03 J Steding Method and apparatus for installing concrete piles
US3925998A (en) * 1974-07-22 1975-12-16 Interpile Usa Inc Method for forming cast-in-place caseless concrete piles
US4152089A (en) * 1977-07-07 1979-05-01 Stannard George E Method and apparatus for forming a cast-in-place support column
GB1603425A (en) * 1978-05-30 1981-11-25 Bicc Ltd Piles

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1160905A (en) * 1965-11-04 1969-08-06 Ludwig Mueller A cast in situ Foundation Pile

Also Published As

Publication number Publication date
DE3361079D1 (en) 1985-12-05
GB2113748B (en) 1985-07-10
ATE16296T1 (en) 1985-11-15
GB8300058D0 (en) 1983-02-09
GB2113748A (en) 1983-08-10
EP0084921B1 (en) 1985-10-30
EP0084921A1 (en) 1983-08-03

Similar Documents

Publication Publication Date Title
EP0170503B1 (en) Ground treatment
EP1687488B1 (en) Apparatus for building support piers from one or successive lifts formed in a soil matrix
EP1673509B1 (en) Method of constructing a pile foundation
US20120093590A1 (en) Methods of Providing a Support Column
US9169611B2 (en) Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix
EP0056635A2 (en) Pile installation and removal mechanisms in off-shore rigs and method of using same
US3568452A (en) Method and apparatus for forming bulbular base piles
EP3318677B1 (en) Method for forming a reinforced pile and use of an accessory therein
US12012715B2 (en) Extensible shells and related methods for constructing a ductile support pier
US2342243A (en) Construction of piles, caissons, and the like in situ
US5197827A (en) Method for lowering a basement structure
US3925998A (en) Method for forming cast-in-place caseless concrete piles
US4070869A (en) Method of grouting offshore structure
US20090285637A1 (en) Pile mandrel with extendable reaming members
EP0084921B1 (en) Piles
CN110273413A (en) A kind of efficient construction method of prefabricated pile
CA2641408C (en) Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix
US1164085A (en) Method or process of anchoring steel piles.
CN209339143U (en) A kind of concrete pipe pile construction equipment
US4619558A (en) Apparatus for producing in-situ concreted piles with enlarged bases
US5004375A (en) Basement piles and basement construction method associated therewith
CN109339044A (en) A kind of concrete pipe pile construction equipment
CA3067544A1 (en) Extensible shells and related methods for constructing a ductile support pier
CN109898511A (en) A kind of construction method of static pressed pile and its dedicated Static pressure pile driver
CN110670576A (en) Building foundation reinforcing device and method

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)