GB2082652A - Method and apparatus for constructing underground structures - Google Patents

Method and apparatus for constructing underground structures Download PDF

Info

Publication number
GB2082652A
GB2082652A GB8028122A GB8028122A GB2082652A GB 2082652 A GB2082652 A GB 2082652A GB 8028122 A GB8028122 A GB 8028122A GB 8028122 A GB8028122 A GB 8028122A GB 2082652 A GB2082652 A GB 2082652A
Authority
GB
United Kingdom
Prior art keywords
cylindrical body
cylindrical bodies
disposed
cylindrical
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB8028122A
Other versions
GB2082652B (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to GB8028122A priority Critical patent/GB2082652B/en
Publication of GB2082652A publication Critical patent/GB2082652A/en
Application granted granted Critical
Publication of GB2082652B publication Critical patent/GB2082652B/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Various methods and apparati are disclosed for the construction of underground structures such as tunnels, by advancing a plurality of bodies 11, 12, 13,...arranged end-to-end, one-at-a- time. Between certain of the bodies there are disposed advancing facilities, such as pulling/traction jacks 2 between bodies 11 and 12, and thrusting jacks 3 between bodies 12 and 13. Connecting members 4 in conjunction with fasteners 61, 62,...and traction members 5 in conjunction with fixing pieces 7 may be used selectively to link together certain groups of the bodies so as to allow the advancement thereof one-at-a-time. The advancing facilities 2,3, the fasteners 61, 62,...and the fixing pieces 7 are selectively operated such that when one body is being advanced, at least two other of the bodies, or one other body and a fixed facility (not shown), provide a reaction to the force required to advance said one body. <IMAGE>

Description

SPECIFICATION Method and apparatus for constructing underground structures This invention relates to a method and an apparatus for constructing an underground structure by propelling underground a plurality of preformed cylindrical bodies or by constructing an underground structure of a required shape in an underground area in the rear of preformed cylindrical bodies after they have been moved forward underground in a selfrunning manner.
The conventional methods and the apparatuses for advancing more than three cylindrical bodies underground have included many advancing jack arrangements of various types in the advancing facilities thereof. The number of locations at which such advancing jack arrangements must be provided increases according as the number of the cylindrical bodies to be moved forward increases. Hence, the mechanical facilities and the advancing operation of the conventional method and the apparatus are complex, extremely uneconomical and inefficient.
Further, where a starting base is too short to have more than three cylindrical bodies constructed there, the advancing operation must be carried out with a necessary reaction force obtained from somewhere else. However, the conventional thrusting method in which the cylindrical bodies are to be propelled by thrusting jacks through struts with a reaction wall installed in the rear requires many huge struts. The thrusting method is thus inefficient and not only uneconomical but also tends to be hazardous because of the jumping up or bending of the struts that likely takes place during the work there. The conventional pulling method requires many horizontal holes where it is impossible to obtain a necessary reaction force from the rear and is therefore also uneconomical.
Meanwhile, the conventional tunnelling method includes a shield driving method, Messel driving method, etc. However, in accordance with the conventional tunnelling method, boring and excavation work and assembling work on segments and timbering are to be performed in close vicinity to an excavation work area and thus cannot be performed independently of each other. Therefore, the boring and excavation work and the segment and timbering assembling work have to be alternately carried on.
This requires a lengthy period of time for construction work. Besides, it is necessary to increase the strength of the segments and the timbering to make them strong enough against any horizontal axial force that is likely applied thereto. The conventional tunnelling method, therefore, is uneconomical because of such arrangement required. In addition to that, this method often must be carried out at the hazard of the collapse of an excavating ground during the assembling work on the timbering.
It is a general object of the present invention to provide both a method and an apparatus which are capable of at least reducing some of the abovestated drawbacks of the conventional known methods and apparatus. The method and apparatus of this invention allow the construction of an underground structure by propelling a plurality of serially adjoining preformed cylindrical bodies underground either in one direction or from opposite directions at necessary time intervals or by constructing an underground structure of a required shape in an underground area created in the rear of at least three preformed cylindrical bodies after they have been moved forward, in such a manner that the underground structure can be constructed not only with safety but also in a shorter period of time.
According to one aspect of the invention, a method and an apparatus are provided for constructing an underground structure wherein one set of thrusting/pulling jack advancing arrangement and one or two sets of thrusting jack advancing arrangement or one set of pulling jack advancing arrangement and two or three sets of thrusting jack advancing arrangement are arranged in various combinations with traction members, fixing pieces, connecting members and fasteners to have each of three or four or more than four cylindrical bodies advanced by pulling from the front of them with the pulling jack advancing arrangement. Thus, the three or four or more than four cylindrical bodies can be economically and efficiently advanced with these advancing arrangement by just adding the traction members and the fixing pieces as necessary.Further, where the starting base is too short for a self-running advancing operation, the traction members are arranged to penetrate horizontal holes or the like leading to an arrival base and then an underground structure can be constructed by having the cylindrical bodies advanced underground one after another with the pulling jack advancing arrangement, the thrusting jack advancing arrangement, the traction members, the fixing pieces, the connecting members and the fasteners used in combination and with a required reaction force obtained from a sum total of a reaction force available from a reaction facility provided at the arrival base and reaction forces available from other cylindrical bodies that are not moving forward.In this case, a reaction force available from a reaction wali provided in front of these cylindrical bodies is utilized to obtain an additional advancing force through the traction members. Therefore, unlike the conventional thrusting method, the use of huge struts is not necessary.
A further aspect of the invention a method and an apparatus for constructing an underground structure in which two groups each consisting of more than two serially adjoining cylindrical bodies are advanced from two starting bases toward each other with the cylindrical bodies disposed at one starting base utilized as reaction facility for advancing the cylindrical bodies disposed at the other starting base. This arrangement obviates the necessity of having separate reaction facilities and is economical.
According to another aspect of the invention, a method and an apparatus are provided for constructing an underground structure in which, after more than three serially adjoining preformed cylindrical bodies have been moved forward underground with self-running advancing facilities arranged on them, an underground structure of a desired shape is constructed by assembling segments, timbering, etc. within an underground space left in rear of a rearmost cylindrical body. In this case, a ground excavating place is located away from the place where the segments, timbering, etc. are being assembled. Therefore, the construction work and excavating work can be carried on independently of each other with safety to permit reduction in the length of time required for the construction work.
This is an economical method suitable for application to the construction of long tunnels in mountain and urban areas.
In the invented method as will be further defined in the appended claim 1, a plurality of serially adjoining cylindrical bodies are advanced underground to construct an underground structure in the following manner: To bear a reaction force developed in advancing each of the cylindrical bodies one by one, either the sum of reaction forces of other cylindrical bodies or the sum of these reaction forces of other cylindrical bodies and the reaction force of a separately arranged reaction facility is used as reaction bearing force.Meanwhile, facilities for advancing the plurality of serially adjoining cylindrical bodies are formed by combining various advancing jack arrangements including a thrusting jack advancing arrangement, a pulling jack advancing arrangement, a thrusting/pulling jack advancing arrangement, etc. with traction members, fixing pieces which are arranged to be attachable to and detachable from the traction members, connecting members, fasteners which are provided with the connecting members and are attachable to and detachable therefrom, and reaction receiving members. These facilities are arranged in a suitable combination and are arranged in front of, in rear of, in between the cylindrical bodies and/or at a reaction facility as desired. Then, the plurality of the cylindrical bodies are moved forward one after another by operating these advancing arrangements as required.When, so required, an underground structure may be constructed in an underground space which is left behind the hindmost one of more than three cylindrical bodies after they have been moved forward in a self-running manner.
As will be clearly understood from the foregoing description, the reaction to the forward movement of each cylindrical body is obtained from the sum of the reaction forces available from other cylindrical bodies or from the sum of the reaction force of a reaction facility available in addition to those of other cylindrical bodies. Therefore, the invented method and the apparatus normally do not require the use of any separately arranged reaction facility in addition to the reaction forces available from other cylindrical bodies in advancing each cylindrical body and, even where the total reaction force available from other cylindrical bodies is insufficient, provision of only a small reaction facility would make up for such insufficiency.In the case where an underground structure is to be constructed in the underground space left behind the hindmost of, more than three cylindrical bodies after they have been advanced underground in the self-running manner, the ground excavating and boring work and the underground structure constructing work can be performed independently of each other as the locations of the two work areas are separated from each other.
This not only permits reduction in the length of time required for the construction work but also ensures that the excavating and boring work on the front ground can be safely carried on as the workers are protected by the presence of the cylindrical bodies By way of illustration only of the various aspects features and advantages of the invention, specific examples thereof will now be given, reference being made to the accompanying drawings, in which: Figures leave are schematic views showing Example 1 of embodiment of the present invention, Figure la showing the arrangement of the invented apparatus adapted for carrying out the invented cylindrical body advancing method and Figures ib-le respectively showing a sequence of steps of operation for carrying out the invented method.
Figures 2a-2e are schematic views of Embodiment Example 2 showing the arrangement and steps of operation thereof.
Figures 3a-3e are schematic views of Embodiment Example 3 of the invention showing the arrangement and the operation steps thereof.
Figures 4a-4e are schematic views of Embodiment Example 4 of the invention showing the arrangement and the operation steps thereof.
Figures 5a-5d are schematic views of Embodiment Example 5 showing the arrangement and the operation steps of the embodiment.
Figure 6 is a schematic view of Embodiment Example 6 showing the arrangement thereof.
Figures 7a-7e are schematic views of Embodiment Example 7 showing the arrangement and the sequence of operation steps thereof.
Figure 8 is a schematic view of Embodiment Example 8 showing the arrangement thereof.
Figures 9a-9d and 9a 1-9a3 are schematic views of Embodiment Example 9 showing the arrangement and a sequence of operation steps thereof.
Figures lOa- lOd are schematic views of Embodiment Example 10 showing the arrangement and a sequence of operation steps thereof.
Figure ii is a schematic view of Embodiment Example 11 showing the arrangement thereof.
Figures 12a-12e are schematic views of Embodiment Example 12 showing the arrangement and operation steps thereof.
Figures 13 and 13a are schematic views of Embodiment Example 13 showing the arrangement and operation thereof.
Figure 14 is a schematic view of Embodiment Example 14 showing the arrangement thereof.
Figures 15a- 15g are schematic views of Embodiment Example 15 showing the arrangement and operation steps thereof.
Figure 16 is a schematic view of Embodiment Example 16 showing the arrangement thereof.
Figures 17, 18 and 19 are schematic views respectively showing the arrangement of Embodiment Examples 17, 18 and 19.
Figures 20a-20d are schematic views of Embodiment Example 20 showing the arrangement and operation steps thereof.
Figures 2 la and 2 1b are schematic views of Embodiment Example 21 showing the arrangement and operation thereof.
Figure 22 is a schematic view of Embodiment Example 22 showing the arrangement thereof.
Example 1 Figures la-le show an example of suitable arrangement of the various advancing facilities and operation thereof which will be defined in the appended claim 2 based on the method of the appended claim 1 for constructing an underground structure by advancing more than three serially adjoining preformed cylindrical bodies underground. In this example of embodiment, as shown in Figure 1 a, a pulling/thrusting jack advancing arrangement 2 is disposed between first and second cylindrical bodies 11 and 12 of more than three serially adjoining cylindrical bodies 11,12,13 and 14.
Athrusting jack advancing arrangement 3 is disposed between the second and third cylindrical bodies 12 and 13. Traction members 5 are arranged to pierce through the pulling/thrusting jack advancing arrangement 2 and the second and subsequent cylindrical bodies 12,13 and 14. Meanwhile, fixing pieces 7 which are arranged to releasably fix the traction members 5 are attached to the traction members 5 in front of the pulling/thrusting jack advancing arrangement 2 and in the rear of the third and fourth cylindrical bodies 13 and 14.Further, there are provided connecting members 4 which are arranged to pierce through the first, second and third cylindrical bodies 11, 12 and 13 to have them connected to each other and are releasably connected to the front of the first cylindrical body 11 and to the rears of the second and third cylindrical bodies 12 and 13 respectively by means of fasteners 61, 62 and 63. In this manner, a mechanism is formed for advancing the serially adjoining four cylindrical bodies 11,12,13and 14.
In the first step of operation which is shown in Figure 1 b, the first cylindrical body 11 is moved forward in the following manner: The fasteners 62 and 63 of the connecting members 4 disposed in rear of the second and third cylindrical bodies 12 and 13 are set free while the fixing pieces of the traction members 5 disposed in rear of the third and fourth cylindrical bodies 13 and 14 are also set free. Then, the pulling/thrusting jack advancing arrangement 2 is operated to push forward the cylindrical body 11 with a reaction force required for this obtained from the sum of the reaction forces of the second and third cylindrical bodies.
In the second step of operation which is shown in Figure 1 c, the fixing pieces 7 disposed in front of the pulling/thrusting jack advancing arrangement 2 and in the rear of the third cylindrical body 13 are fixed to the traction members 5 while the fixing piece 7 disposed in the rear of the fourth cylindrical body 14 is set free. The fasteners 6, and 62 disposed in front of the first cylindrical body 11 and in the rear of the second cylindrical body 12 are fixed to the connecting members to have the first and second cylindrical bodies thus connected to each other through the connecting members 4.Then, the pulling/thrusting jack advancing arrangement 2 is operated to have the third cylindrical body 13 pulled forward with a reaction force required for this obtained from the sum of the reaction forces available from the first and second cylindrical bodies 11 and 12.
Following this, the fixing pieces 7 disposed in the rear of the third cylindrical body 13 is set free. The fixing pieces 7 disposed in front of the pulling/ thrusting jack advancing arrangement 2 and in the rear of the fourth cylindrical body 14 are fixed to the traction members 5. The pulling/thrusting jack advancing arrangement 2 is then operated to have the fourth cylindrical body 14 pulled forward through the traction member 5 with a reaction force required for this obtained from the sum of the reaction forces of the first and second cylindrical bodies 11 and 12 (see Figure 1d).
In the third step of operation which is shown in Figure 1 e, the fixing pieces 7 of the traction members 5 are set free. The fasteners 61 and 63 which are disposed in front of the first cylindrical body 11 and in the rear of the third cylindrical body 13 are fixed to the connecting members 4 to have the first and third cylindrical bodies connected to each other. Then, the thrusting jack advancing arrangement 3 which is disposed between the second and third cylindrical bodies 12 and 13 is operated to have the second cylindrical body 12 thus pushed forward with a reaction force required for this obtained from the sum of the reaction forces of the first and third cylindrical bodies 11 and 13.
The three steps of operation described in the foregoing are repeated to have more than three serially adjoining cylindrical bodies advanced underground one by one for construction of an underground structure. In the meantime, the excavation, transport and disposal of earth and sand arecarried out in accordance with the conventional method.
The details of such work, therefore, is omitted from description here.
As will be clearly understood from the foregoing description, the reaction force required for moving the first, second and third cylindrical bodies forward one by one is obtained from the sum of the reaction forces of two of the three cylindrical bodies. The fourth and subsequent cylindrical bodies are moved forward with the required reaction force obtained from the sum of the reaction forces of the first and second cylindrical bodies or those of the first, second and third cylindrical bodies. In other words, in accordance with the advancing method of the present invention, all of the cylindrical bodies can be advanced one by one with the advancing facilities including only one set of the pulling/thrusting jack advancing arrangement and one set of the thrusting jack advancing arrangement. Unlike the conventional construction method, the advancing facilities of the invention do not require any additional advancing arrangements even when the number of the cylindrical bodies to be advanced increases. Further, it is not necessary to obtain the reaction force required for advancing the cylindrical bodies from earth, sand and the like but the required reaction force can be obtained from among the cylindrical bodies themselves in moving them forward in a continuous manner over an unlimited distance.
Since the cylindrical bodies are preformed, they can be used as a completed underground structure immediately after removal of the advancing facilities together with excavating and boring facilities. Thus, the invented method obviates the necessity of underground construction work such as cast-inplace concrete piacing work and the like. Further, since the cylindrical bodies are thus prepared not in a place of poor workability such as within a pit but in a place of good workability under, appropriate quality control, they can be prepared to have excellent strength for the construction of the underground structure.
Example 2 In the second embodiment example of the invention which is shown in Figure 2, the method of Example 1 for constructing an underground structure by advancing more than three serially adjoining preformed cylindrical bodies underground as shown in Figure 1 is modified in respect to arrangement of the various advancing facilities as will be further defined in the appended claim 3.
In Example 1, the pulling/thrusting jack advancing arrangement 2 is disposed between the first and second cylindrical bodies. However, in the case of Example 2, this pulling/thrusting jack advancing arrangement is replaced with a pulling jack advancing arrangement 8 which is specialized for pulling and a first thrusting jack advancing arrangement 3 which is specialized for thrusting. Meanwhile, the thrusting jack advancing arrangement 3 which is disposed between the second and third cylindrical bodies 12 and 13 in Example 1 is replaced with a second thrusting jack advancing arrangement 32 in this case. The rest of the advancing facilities for the serially adjoining four cylindrical bodies 11, 12, 13 and 14 are arranged in the same way as in Example 1.The arrangement for obtaining the required reaction forces is also identical with Example 1 and, therefore, is omitted from description here.
In the first step of operation which is shown in Figure 2b, the first thrusting jack advancing arrangement 31 is operated to push forward the first cylindrical body 11 with a required reaction force for this obtained from the sum of the reaction forces of the second and third cylindrical bodies. In the second step of operation which is shown in Figures 2c and 2d, the pulling jack advancing arrangement 8 is operated to have the third and fourth cylindrical bodies moved forward one after another in the same way as in the second step of operation of Example 1.
In the third step of operation which is shown in Figure 2e, the second cylindrical body 12 is moved forward by operating the second thrusting jack advancing arrangement in the same way as in the third step of operation of Example 1.
Then, the first, second and third steps of operation are suitably repeated to advance underground the serially adjoining four cylindrical bodies one by one for constructing an underground structure.
As will be clearly understood from the foregoing description, the first cylindrical body is pushed forward by the thrusting jack advancing arrangement while the third and subsequent cylindrical bodies are pulled forward one by one by operating the pulling jack advancing arrangement. This method of operation simplifies the structural arrangement of the fixing pieces and also simplifies the attaching and detaching operations on the fixing pieces to a great extent. Further, in case the first cylindrical body must be promptly moved forward when there happens a collapse of the earth and sand during excavating and boring work on the natural ground, the first thrusting jack advancing arrange- - ment can be readily operated to promptly advance the first cylindrical body to prevent the collapse of the earth and sand. This is an advantage of this embodiment.Other advantages are identical with Example 1 and, therefore, are omitted from description here.
Example 3 This is the third embodiment of the invention which is shown in Figure 3 and will be further defined in the appended claim 4. The method of the embodiment example 3 is based on the method set forth in the appended claim 1 and is for constructing an underground structure by advancing more than three serially adjoining preformed cylindrical bodies underground with various advancing facilities arranged as described below: The pulling jack advancing arrangement 8 and the fixing pieces 7 which are disposed between the first and second cylindrical bodies 11 and 12 in the preceding embodiment example are changed to be disposed in the front of the first cylindrical body 11.
Meanwhile, the traction members 5 are extended to pierce through the first cylindrical body 11, the pulling jack advancing arrangement 8 and the fixing pieces to complete the arrangement of the advancing facilities for advancing the serially adjoining four cylindrical bodies 11, 12,13 and 14. The first and second steps of operation which are shown in Figures 3b and 3c are performed to advance the first and second cylindrical bodies in the same way as in the first and third steps of operation of Example 2.In the third step of operation which is shown in Figures 3d and 3e, the pulling jack advancing arrangement 8 disposed in front of the first cylindrical body 11 is operated to have forward the third and fourth cylindrical bodies 13 and 14 by pulled forward one by one with a reaction force required for this obtained through the first thrusting jack advancing arrangement 31 from the sum of the reaction forces of the first and second cylindrical bodies 11 and 12. For the third step of operation, the fixing pieces 7 are fixed to the traction members 5 in the rear of the cylindrical body to be pulled forward while other fixing pieces 7 that are disposed in rear of other cylindrical bodies are set free.
The first, second and third steps of operation are repeated as desired to move the serially adjoining cylindrical bodies forward underground for construction of an underground structure.
In addition to the advantages of Example 2, this embodiment example has another advantage in that, with the pulling jack advancing arrangement and the thrusting jack advancing arrangement dis posed in separate locations from each other, their functions are specialized and simplified to enhance the operability of them.
Example 4 This is the fourth embodiment example of the invention which is shown in Figure 4 and will be further defined in the appended claim 5. In this case, the method for constructing an underground struc ture by advancing more than three serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1 is modified in respect to arrangement of the various advancing facilities as described below with reference to Figure 4.
Facilities for advancing the serially adjoining cylin drical bodies 11,12,13 and 14 are arranged in the same manner as in Example 3 with the exception of that the connecting members and the fasteners used in the advancing facilities of the Example 3 are not used in this case.
In advancing the first cylindrical body 11 as shown in Figure 4b, the first thrusting jack advancing arrangement is operated with a reaction force re quired for this obtained through the second thrust ing jack advancing arrangement from the sum of the reaction forces of the second and third cylindrical bodies 12 and 13.To have the second cylindrical body advanced, as shown in Figure 4c, the fixing pieces disposed in the rear of the fourth cylindrical body 14 and in front of the pulling jack advancing arrangement 8 are fixed to the traction members 5 and then the second thrusting jack advancing arrangement 32 is operated with a required reaction force obtained from the sum of the reaction forces of the first and third cylindrical bodies 11 and 13. The third and fourth cylindrical bodies 13 and 14 are advanced in the same manner as in the third step of operation of Example 3. These steps of operation are repeated to have the cylindrical bodies 11, 12, 13 and 14 moved forward one by one underground for construction of an underground structure.
As apparent from the foregoing description, the advancing facilities in this embodiment example do not include the connecting member and the fastener.
This embodiment, therefore, is economical and simplifies the advancing operation. Other advan tages of the embodiment are identical with those of Example 3 and, therefore, are omitted from descrip tion here.
Example 5 This is the fifth embodiment example of the invention which is shown in Figure 5 and will be further defined in the appended claim 6. In this embodiment example, which is a method for con structing an underground structure by advancing more than four serially adjoining preformed cylin drical bodies underground and is based on the method defined in the appended claim 1, arrange ment and operation of the various advancing facili ties are as described below with reference to Figure 5.
As shown in Figure 5a, a first thrusting jack advancing arrangement 3r is disposed between first and second cylindrical bodies 11 and 12. A second thrusting jack advancing arrangement 32 is disposed between third and fourth cylindrical bodies 13 and 14. A pulling/thrusting jack advancing arrangement 2 is disposed between the second and third cylindrical bodies 12 and 13. Then, traction members 5 are arranged to pierce through and protrude from the pulling/thrusting jack advancing arrangement 2 and the third and fourth cylindrical bodies 13 and 14. In front of the pulling/thrusting jack advancing arrangement 2, fixing pieces 71 are releasably attached to the traction member 5 while other fixing pieces 72 are disposed in the rear of the fourth cylindrical body 14.Further, connecting members 4 are arranged to pierce through the second, third and fourth cylindrical bodies 12, 13 and 14. The connecting members 4 are provided with fasteners 6r, 62 and 63 which are attachably and detachably arranged connected to the connecting member 4 in front of the second cylindrical body 12 and in rear of the third and fourth cylindrical bodies to complete the arrangement of advancing facilities to have the serially adjoining four cylindrical bodies moved forward.
In the first step of operation which is as shown in Figure 5a, the first thrusting jack advancing arrangement 31 is operated to move the first cylindrical body 11 forward. A reaction force required for this step of operation is obtained from the sum of the reaction forces available from the two or three or more than three subsequent cylindrical bodies 12, 13 through the pulling/thrusting jack advancing arrangement 2 and the second thrusting jack advancing arrangement 32.
In the second step of operation which is as shown in Figure 5b, the pulling/thrusting jack advancing arrangement 2 is operated to advance the second cylindrical body with a reaction force required for this obtained from the sum of the reaction forces of the third and fourth cylindrical bodies available through the second thrusting jack advancing arrangement 32 disposed between the third and fourth cylindrical bodies 13 and 14. For this step of operation, the fixing pieces 72 disposed in the rear of the fourth cylindrical body 14 and the fasteners disposed in rear of the third and fourth cylindrical bodies are set free.
In the third step of operation which is as shown in Figure 5c, the fixing pieces 71 and 72 are fixed to the traction members 5 while the fasteners 61 and 62 which are disposed in front of the second cylindrical body 12 and in the rear of the third cylindrical body 13 are fixed to the connecting members 4 to have the second and third cylindrical bodies connected to each other. Then, the pulling/thrusting jack advancing arrangement is operated to have the fourth cylindrical body pulled forward with a reaction force required for this obtained from the sum of the reaction forces of the second and third cylindrical bodies 12 and 13.
In the fourth step of operation, the fasteners 61 and 63 which are disposed in front of the second cylindrical body 12 and in the rear of the fourth cylindrical body 14 are fixed to the connecting members 4 and the second thrusting jack advancing arrangement 32 is operated to move forward the third cylindrical body 13 with a reaction force required for this obtained from the sum of the reaction forces of the second and fourth cylindrical bodies 12 and 14.
The four steps of operation are repeated as desired to have more than four serially adjoining preformed cylindrical bodies moved forward underground for construction of an underground structure as will be further described in the appended claim 1.
As will be clearly understood from the above description, the first cylindrical body is not used for obtaining a reaction force for advancing other cylindrical bodies. Therefore, the first cylindrical body is never retracted during the advancing operation performed on other cylindrical bodies, so that the natural ground to be excavated and bored can be kept safe without the fear of being loosened. Further, since the fourth cylindrical body and cylindrical bodies subsequent thereto are arranged to be advanced by operating the pulling/thrusting jack advancing arrangement to pull each of them forward, any increased number of cylindrical bodies can be processed with the same number of jack advancing arrangements. The method of this embodiment is therefore economical.Besides, since the cylindrical bodies are preformed before they are advanced underground, their strength can be ensured and they can be used as a part of a completed underground structure immediately after completion of the advancing operation.
Example 6 This is sixth embodiment example of the invention which is shown in Figure 6 and will be further defined in the appended claim 7. In this embodiment example, which is a method for constructing an underground structure by advancing more than four serially adjoining preformed cylindrical bodies underground and is based on the method defined in the appended claim 1, arrangement and operation of the various advancing facilities are as described below with reference to Figure 6: In this embodiment example, as shown in Figure 6, the pulling/thrusting jack advancing arrangement 2 which is disposed between the second and third cylindrical bodies 12 and 13 in the case of the advancing facilities of Example 5 is replaced with a pulling jack advancing arrangement 8 which is specialized for pulling and a third thrusting jack advancing arrangement which is specialized for thrusting.With the exception of this, the advancing facilities of the embodiment example are identical with those of Example 5. The first step of operation to advance the first cylindrical body 11 and the third step of operation to advance the third cylindrical body 13 are carried out in the same manner as in the first and third steps of operation of Example 5. In the second step of operation to advance the second cylindrical body 1 the third thrusting jack advancing arrangement 33 is operated in place of the pulling/thrusting jack advancing arrangement 2 which is used in Example 5, and the second cylindrical body is moved forward in the same way as in the second step of operation of Example 5.In the fourth step of operation which is arranged to advance the fourth cylindrical body 14, the above stated pulling jack advancing arrangement 8 is operated in place of the pulling/thrusting jack advancing arrangement 2 used in Example 5 and the fourth cylindrical body is thus pulled forward in the same way as in the fourth step of operation of Example 5. Cylindrical bodies 15,16/----a1n which are subsequent to the fourth cylindrical body 14 are advanced in a manner similar to the fourth step of operation.
With these steps of operation repeated as desired, each of the cylindrical bodies are moved forward underground one by one for construction of an underground structure.
As apparent from the above description, in this embodiment example, the arrangement of the advancing facilities of Example 5 is changed by replacing the pulling/thrusting jack advancing arrangement with a pulling jack advancing arrangement which is arranged to serve the sole purpose of pulling and a thrusting jack advancing arrangement which is arranged to serve the sole purpose of thrusting the cylindrical body forward, so that the arrangement of the fixing pieces can be simplified and the advancing operation can be more easily performed. Other advantages of the embodiment example are the same as those of Example 5 and, therefore, are omitted from description here.
Example 7 This embodiment example represents one of variations of the advancing facilities of the method for constructing an underground structure by advancing more than four serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. The method of this example which will be further defined in the appended claim 8 is as described below with reference to Figure 7: A pulling/thrusting jack advancing arrangement 2 is diposed between the first and second cylindrical bodies 11 and 12. First and second thrusting jack advancing arrangements 31 and 32 are respectively disposed between the second and third cylindrical bodies 12 and 13 and between the third and fourth cylindrical bodies 13 and 14.Traction members 5 are arranged to pierce through and to protrude from the pulling/thursting jack advancing arrangement 2 and the second, third and fourth cylindrical bodies 12,13 and 14. Fixing pieces 7 which are arranged to releasably fix the traction members 5 are disposed in front of the pulling/thrusting jack advancing arrangement 2 and in the rear of the fourth cylindrical body 14 to complete arrangement of the advancing facilities of the embodiment example for advancing the four serially adjoining cylindrical bodies 11,12, 13 and 14.
In the first step of operation which is for advancing the first cylindrical body 11 as shown in Figure7b, the pulling/thrusting jack advancing arrangement 2 is operated to thrust the cylindrical body forward with a reaction force required for this obtained from the sum of the reaction forces of the second, third and fourth cylindrical bodies 12,13 and 14 which have the first and second thrusting jack advancing arrangement disposed among them.
In the second step of operation which is for advancing the second cylindrical body 12 as shown in Figure 7c, the first thrusting jack advancing arrangement is operated to have the second cylin drical body thrusted forward with a reaction force required for this obtained from the sum of the -reaction forces of the third and fourth cylindrical bodies which have the second thrusting jack advanc ing arrangement interposed in between them.
In the third step of operation which is for advanc ing the third cylindrical body 13 as shown in Figure 7d, the fixing pieces 7 are fixed to the traction members 5 in a manner as shown in Figure 7d. Then, the second thrusting jack advancing arrangement is operated to have the third cylindrical body pushed forward with a reaction force required for this pushing operation obtained from the sum of the reaction forces of the second and fourth cylindrical bodies 12 and 14 which are available through the traction members 5.
In the fourth step of operation which is for advancing the fourth cylindrical body 14 as shown in Figure 7e, the pulling/thrusting jack advancing arrangement 2 is operated to have the fourth cylindrical body which is connected thereto through the traction members 5 pulled forward with a reaction force required for this obtained from the sum of the reaction forces of the second and third cylindrical bodies which have the first thrusting jack advancing arrangement 31 interposed in between them. Cylindrical bodies subsequent to the fourth cylindrical body 14 are also moved forward in a manner similar to the fourth step of operation.
As will be clearly understood from the above description the arrangement of the embodiment example 7 does not necessitate any increase in jack advancing arrangements for processing any in creased number of cylindrical bodies to be adv anced. Such an increased number of the cylindrical bodies still can be advanced with the use of one set of the pulling/thrusting jack advancing arrangement together with two sets of the thrusting jack advanc ing arrangement. Further, since the first cylindrical body is not used for obtaining a reaction force required for advancing other cylindrical bodies, the first cylindrical body will never be retracted to ensure that excavation and boring work on the natural ground can be performed with safety.
Example 8 This embodiment relates to a method for advanc ing more than four cylindrical bodies and is based on the method for constructing an underground structure by advancing serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. In this example, which will be further defined in the appended claim 9, the advanc ing facilities are arranged as described below with reference to Figure 8: The pulling/thrusting jack advancing arrangement 2 which is disposed between the first and second cylindrical bodies 11 and 12 in Example 7 is replaced with a pulling jack advancing arrangement 8 and a third thrusting jack advancing arrangement 33 which are respectively arranged to perform their specialized functions to pull and push between the first and second cylindrical bodies 11 and 12 in this example of embodiment.With the exception of this, other advancing facilities are arranged in the same manner as in Example 7 to have more than four serially adjoining preformed cylindrical bodies moved forward one by one.
In the first step of operation which is for advancing the first cylindrical body, the third thrusting jack advancing arrangement is operated to push the first cylindrical body 11 forward. In the second and third steps of operation, the second and third cylindrical bodies 12 and 13 are moved forward in the same manner as in the second and third steps of Example 7. In the fourth step of operation which is for advancing the fourth cylindrical body 14, the pulling jack advancing arrangement 8 is operated to have the fourth cylindrical body pulled forward. Cylindrical bodies 1s, 16, 17 1 subsequent to the fourth cylindrical body 14 are also pulled forward in the same manner as in the fourth step.
The manner in which the reaction force required for advancing each cylindrical body at each step of operation is identical with the manner adopted in Example 7.
With these steps of operation repeated as desired, more than four serially adjoining cylindrical bodies 1 1,1 2,1 3,1 4, are moved forward one by one for construction of an underground structure in accordance with the method which will be defined in the appended claim 1.
As apparent from the above description, since the first cylindrical body is arranged to be moved forward by operating the thrusting jack advancing arrangement which is specialized for pushing the first cylindrical body, in case where the natural ground being excavated and bored is in danger of collapse, the first cylindrical body can be immediately pushed forward to prevent it from collapsing.
Other advantages of this embodiment example are identical with those of Example 7.
Example 9 This is one of variations of arrangement of advancing facilities included in the method for constructing an underground structure by advancing more than two serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. The method of this example which will be further defined in the appended claim 10, is as described below with reference to Figure 9: As shown in Figure 9a, between a start base and an arrival base, there is provided a horizontal hole 9 to have them communicate with each other. On the side of the arrival base, there is installed a reaction facility 10. Traction members 5 are arranged to pierce through two cylindrical bodies 11 and 12 disposed on the start base, the horizontal hole 9 and the reaction facility 10. Each of the traction member 5 has a fixing piece 7, which is arranged to attachably and detachably fix the traction memberS, attached thereto at one end thereof either in front of the reaction facility 10 of in the rear of the second cylindrical body 12 while a first pulling jack advanc ing arrangement 81 which is provided with another fixing piece 7 is disposed at the other end of each traction memberS. Between the first and second cylindrical bodies 11 and 12, there is disposed a first thrusting jack advancing arrangement 31. Meanwhile, connecting members 4 are arranged to pierce through and protrude from these cylindrical bodies.
Each of the connecting members 4 has a fastener 6, which is arranged to attachably and detachably fix the connecting member 4, attached thereto at one end thereof either in front of the first cylindrical body 11 or in the rear of the second cylindrical body 12 while a second pulling jack advancing arrangement 82 which is provided with another fastener 6 is disposed at the other end of each connecting member 4. The facilities for having the serially adjoining two cylindrical bodies moved forward are completed in this manner.
In the first step of operation which is for advancing the first cylindrical body 11 as shown in Figure 9b, the fixing pieces 7 which are disposed in front of the reaction facility 10 and at the first pulling jack advancing arrangement 81 are respectively fixed to the traction members 5. Then, with a reaction developed at the reaction facility 10 transmitted to the second cylindrical body 12 through the traction member 5, the first thrusting jack advancing arrangement 31 interposed in between the first and second cylindrical bodies 11 and 12is operated to push forward the first cylindrical body 11 with a reaction force required for this obtained from the sum of the reaction forces developed at the reaction facility 10 and the second cylindrical body 12.
In the second step of operation which is for advancing the second or the hindmost cylindrical body 12 as shown in Figure 9c, the fasteners 6 disposed in front of the first cylindrical body 11 and in the rear of the second pulling jack advancing arrangement 82 are fixed to the connecting members 4, both the first and second pulling jack advancing arrangements 81 and 82 are operated to have the second cylindrical body 12 pulled forward with a reaction force required for this obtained from the sum of a reaction force of the first cylindrical body 1 which is available through the connecting members 4 and a reaction force of the reaction facility 10 which is available through the traction members 5 fixed there by the fixing pieces.
The preformed cylindrical bodies 11 and 12 are advanced underground by repeating the above stated first and second steps of operation for construction of an underground structure in accordance with the method as defined in the appended claim 1.
For advancing three cylindrical bodies instead of two, the second thrusting jack advancing arrangement is disposed between the second and third cylindrical bodies 12 and 13 as shown in Figure 9d.
The connecting members 4 and the traction members 5 are extended to the rear of the third cylindrical body 13. The first and second pulling jack advancing arrangements 81 and 82, the fixing pieces 7 and the fasteners 6 are moved to the rear of the third cylindrical body 13. Then, the first and second cylindrical bodies 11 and 12 are moved forward by the first step of operation as described in the foregoing and the hindmost one 13 is moved forward by the above mentioned second step of operation.
It is an advantage of the embodiment example 9 that two cylindrical bodies can be moved forward even when the start base is too short for accommodating three cylindrical bodies. Another advantage of this embodiment is that each cylindrical body can be advanced underground in the correct direction with a suitable guide provided on the base of the - horizontal hole.
Figure 9a1, 9a2 and 9a3 show variations of the arrangement of Example 9. In each of these cases, the cylindrical bodies can be advanced in the same manner as the steps of operation of Example 9 as described in the foregoing.
Example 10 This is an embodiment example representing one of variations of arrangement of the advancing facilities included in the method for constructing an underground structure by advancing more than two serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. The method of this embodiment which will be further defined in the appended claim 11, is as described below with reference to Figures 1 0a-1 Od: In the arrangement of advancing facilities of this embodiment as shown in Figure 10a, fixing pieces 7 which is the same as the fixing piece 7 disposed in the rear of the hindmost cylindrical body 12 in the case of Figure 9a1 defined in the appended claim 10 are disposed not only at the hindmost cylindrical body 12 but also attached to the traction members 5 in the rear of the other cylindrical body 11.With the exception of this, the advancing facilities for advancing the two serially adjoining cylindrical bodies 1 and 12 are arranged in the same manner as in Example 9.
In the first step of operation which is to advance the first cylindrical body 11 as shown in Figure 10b, the fixing pieces 7 disposed in the rear of the first cylindrical body 11 and in front of the first pulling jack advancing arrangement 81 are fixed to the traction members 5 while other fixing pieces 7 are set free. Then, the first pulling jack advancing arrangement 81 is operated to pull forward the first cylindrical body 11 using a reaction force available from the reaction facility 10 through the traction members 5 and, concurrently with this, the first thrusting jack advancing arrangement 31 is operated to push forward the first cylindrical body 11 with the second cylindrical body 12 used for obtaining a required reaction force for the pushing operation.
In the second step of operation which is for advancing the hindmost cylindrical body 12 as shown in Figure 10c, the fixing pieces 7 disposed in the rear of the second cylindrical body 12 and in front of the first pulling jack advancing arrangement 81 are fixed to the traction members 5 and then the first pulling jack advancing arrangement 81 is operated.
Concurrently with this, the fasteners 6 which are disposed in front of the first cylindrical body 11 and in front of the second pulling jack advancing arrangement 82 are fixed to the connecting members 4 and the second pulling jack advancing arrange ment 82 is operated to move the second cylindrical body 12 forward with the first cylindrical body 11 used for obtaining a required reaction force for this through the connecting members 4.
In case where the number of cylindrical bodies to be moved forward is three as shown in Figure 10d, a second thrusting jack advancing arrangement 32 is disposed between second and third cylindrical bodies. Traction members 5 and connecting mem bers 4 are extended to have them protrude from the rear of the hindmost cylindrical body 13. The second pulling jack advancing arrangement 82, the fastener 6 and the fixing piece 7 are moved to the rear of the hindmost cylindrical body 13. Then, the first and second cylindrical bodies 11 and 12 are moved forward one by one by the above stated first step of operation and the hindmost one 13 by the above stated second step. The same procedures apply to four or more than four cylindrical bodies.With the above stated steps of operation repeated, more than two serially adjoining cylindrical bodies are adv anced underground one by one for construction of an underground structure in accordance with the method which will be defined in the appended claim 1.
As apparent from the above description, since each of the cylindrical bodies is pulled forward by operating the first pulling jack advancing arrange ment which is disposed on the arrival base, the advancing operation can be performed with a small thrusting jack advancing arrangement disposed be tween the cylindrical bodies. The method of the embodiment is, therefore, economical. Other advan tages of the embodiment is, therefore, economical.
Other advantages of the embodiment are the same as those described in Example 9 and, therefore, omitted from description here.
Example 11 This is an embodiment example representing one of variations of arrangement of the advancing facilities included in the method for constructing an underground structure by advancing more than two serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. The method of this embodiment which will be further defined in the appended claim 12 is as described below with reference to Figure 11: As shown in Figure 11, the fixing piece 7 which is disposed at one end of each traction member 5 in the methods of Examples 9 and 10 is replaced with a first pulling jack advancing arrangement 81 which is provided with similar fixing pieces 7.With the exception of this, the facilities for advancing more than two serially adjoining preformed cylindrical bodies are arranged in the same manner as in Examples 9 and 10. In advancing each of the cylindrical bodies 11, 12, 1 no the first pulling jack advancing arrangement 81 which is disposed on one side is operated to have the elongation and/or slack of the traction members 5 absorbed there. After that, each cylindrical body is moved forward under ground in the same manner as the operation steps of Examples 9 and 10 (or the methods defined in the appended claims 10 and 11).
It is an advantage of the embodiment that, in cases where the construction work must be performed over a long distance, slack produced by elongation of the traction member can be absorbed by the pulling jack advancing arrangement disposed on one side of the construction site while a pulling force or a reaction force can be transmitted by another pulling jack advancing arrangement disposed on the other side.
Example 12 This embodiment example is also based on the method for constructing an underground structure by advancing serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. In this case, the arrangement of advancing facilities is for advancing more than three cylindrical bodies and is as described below with reference to Figure 12 and will be further defined in the appended claim 13: As shown in Figure 12a, a horizontal hole 9 is arranged between a start base and an arrival base to have them communicate with each other. On the side of the arrival base, there is installed a reaction facility 10. Then, traction members 5 are arranged to pierce through and protrude from three cylindrical bodies 11, 12 and 13 disposed on the side of the start base, the horizontal hole 9 and the reaction facility 10.In front of the reaction facility 10, there is disposed a first pulling jack advancing arrangement 81 which is provided with a fixing pieces 7 arranged to be releasably fixed to the traction members 5 there. The traction members 5 are further provided with fixing pieces 7 which are disposed in the rear of each of the cylindrical bodies ii, 12 and 13. Further, between the first and second cylindrical bodies 11 and 12, there is disposed a first thrusting jack advancing arrangement 31 A second thrusting jack advancing arrangement 32 is disposed between the second and third cylindrical bodies 12 and 13. The second cylindrical body and cylindrical bodies sub sequentthereto 12, 13, have connecting members 4 pierce through and protrude from them.In front of the second cylindrical body 1 there is disposed a second pulling jack advancing arrangement 82 equipped with fasteners 6 which are arranged to releasably fix the connecting members there. Further fasteners 6 are attached to the connecting members and are disposed in the rear of each of the third and subsequent cylindrical bodies 13 to complete arrangement of the advancing facilities for advancing more than three serially adjoining preformed cylindrical bodies.
In the first step of operation which is for advancing the first cylindrical body 11 as shown in Figure 1 2b, the thrusting jack advancing arrangement 31 which is interposed in between the first and second cylindrical bodies 11 and 12 is operated to have the first cylindrical body 11 pushed forward with a reaction force required for this obtained from the second and third cylindrical bodies 12 and 13 through the second thrusting jack advancing arrangement 32 which is interposed in between the second and third cylindrical bodies. Meanwhile, the fixing pieces7 disposed in front of the first pulling jack advancing arrangement 81 and in the rear of the first cylindrical body 11 are fixed to the traction members 5 while the fixing pieces disposed in the rear of other cylindrical bodies 12, 13 are set free.Then, concurrently with the operation of the thrusting jack advancing arrangement 31, the first pulling jack advancing arrangement 81 is operated to have the first cylindrical body 11 pulled forward through the traction members 5 with a reaction force required for this obtained from the reaction facility 10.
In the second step of operation which is for advancing the second cylindrical body 12 as shown is Figure 1 2c, the second thrusting jack advancing arrangement 32 interposed in between the second and third cylindrical bodies 12 and 13 is operated to have the second cylindrical body 12 pushed forward with a reaction force required for this pushing obtained from the third cylindrical body 13. Meanwhile, the fixing pieces 7 disposed in front of the first pulling jack advancing arrangement 81 and in the rear of the second cylindrical body 12 is fixed to the traction members 5 while the fixing pieces 7 disposed in rear of other cylindrical bodies 11 and 13 are set free.Then, concurrently with the operation of the second thrusting jack advancing arrangement 32, the first pulling jack advancing arrangement 81 is operated to pull the second cylindrical body 12 forward through the traction members 5. In both the first and second steps of operation, the fasteners 6 disposed in the rear of the third cylindrical body 13 are set free.
In the third step of operation which is for advanc ing the third cylindrical body 13 as shown in Figure 12d, the fixing pieces 7 of the traction members 5 and the fasteners 6 of the connecting members 4 are fixed in the rear of the third cylindrical body 13 and the fixing pieces 7 disposed in rear of the first and second cylindrical bodies 11 and 12 are set free.
Then, the second pulling jack advancing arrange ment 82 which has the second cylindrical body 12 as a source of a reaction force is operated to pull the third cylindrical body 13 through the connecting members 4. Then, concurrently with this, the first pulling jack advancing arrangement 81 which has the reaction facility 10 as a reaction source is operated to pull forward the third cylindrical body 13 through the traction members 5.
In case where four cylindrical bodies are to be advanced as shown in Figure 1 2e, the connecting members 4 and the traction members 5 are extended to protrude from the rear of the fourth cylindrical body 14 with additional fasteners 6 and additional fixing pieces 7 attached to the connecting members 4 and the traction members 5. Then, the first cylindrical body 11 is advanced by the first step of operation. The second cylindrical body 12 is adv anced by the second step of operation and then the third and fourth cylindrical bodies 13 and 14 are respectively advanced by the third step of operation.
The same procedures apply also to the advancing operation on five or more than five cylindrical bodies. With the above stated steps of operation repeated as desired, more than three serially adjoin ing cylindrical bodies li, 12, 13 1 are advanced underground for construction of an underground structure in accordance with the method as will be defined in the appended claim 1.
As apparent from the above description, the third and subsequent cylindrical bodies are arranged to be moved forward without using any thrusting jack advancing arrangement but by jointly operating the first and second pulling jack advancing arrangement, so that any increased number of cylindrical bodies can be processed without use of any additional thrusting jack advancing arrangement. This embodiment thus permits reduction in the cost of thrusting jack advancing arrangements.
Example 13 This is a thirteenth example of variation of the advancing facilities included in the method for constructing an underground structure by advancing more than three serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. The arrangement of this embodiment example is as described below with reference to Figure 13 and as will be further defined in the appended claim 14.
As shown in Figure 13, the second pulling jack advancing arrangement 82, which is interposed in between the first and second cylindrical bodies 11 and 12 in Example 12 defined in the appended claim 13, is replaced by a pulling/thrusting jack advancing arrangement 2 in this embodiment example. With the exception of this, advancing facilities for advancing more than three serially adjoining cylindrical bodies li, 12, 13, 1 n are arranged in the same manner as in the case of Example 12.
In the first step of operation which is for advancing the first cylindrical body lithe first pulling jack advancing arrangement 81 is operated to pull the first cylindrical body 11 through the traction members 5; and, at the same time, the thrusting jack advancing arrangement 3, and the above stated pulling/thrusting jack advancing arrangement 2 are simultaneously operated to push forward the first cylindrical body 11. In the second step of operation which is for advancing the second cylindrical body 12, the second cylindrical body 12 is moved forward in the same manner as the second step of operation of Example 12 (or the appended claim 13).In the third step of operation which is for advancing each of the third, fourth and subsequent cylindrical bodies 13, 14 1, the use of the second pulling jack advancing arrangement 82 which is adopted in the third step of Example 12 is replaced by the use of the pulling/thrusting jack advancing arrangement 2.
With the exception of this change, each of the cylindrical bodies 13,14 1n are moved forward in the same manner as in the third step of Example 12. The reaction forces required for the steps of the advancing operation are obtained in the same manner as in Example 12.
With the above stated steps of operation repeated, the serially adjoining cylindrical bodies 11, 12, 13, 1n are advanced underground in accordance with the method as defined in the appended claim 1.
It is an advantage of this embodiment example that the first cylindrical body is arranged to have a pushing force applied thereto from the pulling/ thrusting jack advancing arrangement, so that the use of the thrusting jack advancing arrangement between the first and second cylindrical bodies can be economized accordingly. This advantage is obtainable in addition to the same advantages as those of the appended claim 13 (or Exanmple 12).
Further, Figure 13a shows a modification of the above embodiment example. In this modification, the thrusting jack advancing arrangement 31 which is shown in Figure 13 is not used and the first cylindrical body 11 is pushed forward by operating only the pulling/thrusting jack advancing arrangement 2.
Example 14 This is a fourteenth embodiment example based on the method for constructing an underground structure by advancing more than three serially adjoining preformed cylindrical bodies underground as will be defined in the appended claim 1. In this embodiment example, the arrangement and operation for advancing more than three cylindrical bodies are as described below with reference to Figure 14: In this case, the fixing pieces 7 which are provided on the traction members 5 and are disposed in the rear of the hindmost cylindrical body 13 or 14 in Examples 12 and 13 (or claims 13 and 14) is replaced with a third pulling jack advancing arrangement 83 which is provided with fixing pieces 7.Then, before carrying out the advancing operation on each of the cylindrical bodies 11, 12, 13 and 14, the third pulling jack advancing arrangements 83 is operated to absorb the elongation and slack of the traction members 5. After that, each of the cylindrical bodies 11, 12, 13 and 14 is advanced underground by each of the operation steps of Examples 12 and 13 for construction of an underground structure in accordance with the method defined in the appended claim 1 and claims 13 and 14.
In addition to the advantages of Examples 12 and 13, this embodiment example has another advantage in that: In case the traction members are long, the advancing force can be effectively transmitted to each cylindrical body with the third pulling jack advancing arrangement operated to absorb the elongation and slack of the traction members 5 prior to the advancing operation.
Example 15 This is a fifteenth example of embodiment based on the method for constructing an underground structure by advancing more than two serially adjoining preformed cylindrical bodies underground which will be defined in the appended claim 1. In this embodiment example, the arrangement and operation of cylindrical body advancing facilities are as described below with reference to Figure 15: There is provided a horizontal hole 9 connecting two start bases which are suitable spaced (and which hereinafter will be called the first and second start bases). Two cylindrical bodies 11 and 12 are built on each of the first and second start bases.
Then, traction members 5 are arranged to pierce through and protrude from the horizontal hole 9 and the cylindrical bodies 11 and 12 disposed on each start base. On the first start bases, a first thrusting jack advancing arrangement 31 is disposed between the first and second cylindrical bodies 11 and 12 and is arranged to push the first cylindrical body 11 there.
On the second start base, there is disposed a first pulling jack advancing arrangement 81 which is located in the rear of the hindmost cylindrical body 12 and is provided with attachable and detachable fixing pieces 7 for the traction mem bers 5. The traction members 5 are thus engaged with the fixing pieces 7 in the rear of the cylindrical body 12.
Meanwhile, intermediate members 11 which are made of wood or steel or some other suitable material are interposed in between the first and second cylindrical bodies 11 and 12 disposed on the second start base. The traction members 5 are further arranged to engage with other fixing pieces 7 which are disposed in the rear of each of the first and second cylindrical bodies 11 and 12 located on the first start base on the opposite side. The first and second cylindrical bodies 11 and 12 on this side are connected with each other by connecting members 4 which are provided with attachable and detachable fasteners 6. In the rear of the second cylindrical body 12 which has the connecting members 4 protruding therefrom, there is disposed a second pulling jack advancing arrangement 82.The second pulling jack advancing arrangement 82 is provided with fasteners 6 which are arranged to engage the connecting members 4 protruding there. The arrangement of facilities for advancing the two cylindrical bodies disposed on each of the start bases is completed in this manner. In the first step of operation which is for advancing the first cylindrical body 11 disposed on the first start base as shown in Figure 1 sub, the fasteners 6 disposed in the rear of the second pulling jack advancing arrangement 82 and the fixing pieces 7 disposed in the rear of the second cylindrical body 12 for fixing the traction members 5 there are set free while the fixing pieces 7 disposed in the rear of the first cylindrical body 11 and the fixing pieces 7 disposed in front of the first pulling jack advancing arrangement 81 are fixed to the traction members 5.
Then, the first pulling jack advancing arrangement 8 are fixed to the traction members 5. Then, the first pulling jack advancing arrangement 81 is operated to pull forward the first cylindrical body 11 with a reaction force required for this pulling operation obtained from the sum of reaction forces available from the first and second cylindrical bodies 11 and 12 disposed on the second start base through the intermediate members 11 interposed in between them. Meanwhile, concurrently with this pulling operation, the first thrusting jack advancing arrangement 31 is operated to push the first cylindrical body 11 forward with a reaction force required for the pushing operation obtained from the second cylindrical body 12 disposed on the first base. In the second step of operation which is for advancing the second cylindrical body 12 as shown in Figure 15c, the fixing pieces 7 disposed at the first pulling jack advancing arrangement 81 and the fasteners 6 disposed at the second pulling jack advancing arrangement 82 are fixed respectively to the traction, members 5 and the connecting members 4. Then, the second pulling jack advancing arrangement 82 is operated to move forward the second cylindrical body 12 with a reaction force required for this obtained from the first cylindrical body 11 through the connecting members 4.Concurrently with this, the first pulling jack advancing arrangement 81 is operated to have the second cylindrical body 12 pulled forward to the extent of one stroke with a reaction force required for the pulling operation obtained from the sum of reaction developed at the first and second cylindrical bodies on the second start base through the intermediate members 11 interposed in between them. The first and second cylindrical bodies 11 and 12 disposed on the first start base are moved forward underground with excavation and boring underground up to a predetermined underground point.In moving forward the cylindrical bodies 11 and 12 disposed on the second start base as shown in Figure 15d, the connecting members 4, the fasteners 6, the fixing pieces 7, the first thrusting jack advancing arrangement 31 and the second pulling jack advancing arrangement 82 are removed from the first start base and are installed on the second start base for the first and second cylindrical bodies 11 and 12 of the second start base in the same manner as they have been arranged on the first base. Meanwhile, the intermediate members 11 and the first pulling jack advancing arrangement 81 which is disposed in the rear of the second cylindrical body 12 are transferred to and installed in rear of the cylindrical bodies 11 and 12 of the first start base respectively.After completion of this interchanging transfer, the first and second cylindrical bodies 11 and 12 of the second start base are advanced respectively as shown in Figures 1 sue and 15f in the same manner as the cylindrical bodies 11 and 12 of the first start base. With these procedures performed or repeated as necessary, these cylindrical bodies of the two start bases are moved forward until they come to join with each other.
Figure 15g shows an instance where each of the two start bases has three cylindrical bodies to advance. In this instance, the connecting members 4 on the first start base is extended to pierce through a third cylindrical body 13. In the rear of the third cylindrical body 13, there is disposed a second pulling jack advancing arrangement 82 which is provided with fasteners 6 for engagement with the connecting members 4while other fasteners 6 are disposed in front of the first cylindrical body 11. The traction members 5 are also extended to pierce through and protrude from the third cylindrical body 13 with fixing pieces 7 disposed in the rear of the third cylindrical body 13. Between the second and third cylindrical bodies 12 and 13, there is installed a second thrusting jack advancing arrangement 32.
Meanwhile, on the second start base, the first pulling jack advancing arrangement 81 is installed in the rear of a third cylinder 13 with the traction members 5 engaged therewith. Additional intermediate mem bers 11 are interposed in between the second and third cylindrical bodies 12 and 13 of the second start base. The three cylindrical bodies 11, 12 and 13 of the first start base are advanced in the same manner as the steps employed in advancing the two cylindrical bodies 11 and 12 as described in the foregoing.With the three cylindrical bodies of the first start base having been advanced underground one after another, the connecting members 4, fasteners 6 and the second pulling jack advancing arrangement 82 which are disposed at these three cylindrical bodies of the first start base are transferred to the group of cylindrical bodies 11, 12 and 13 of the second start base while the intermediate members 11 and the first pulling jack advancing arrangement 81 disposed in the rear of the third cylindrical body 13 are transferred to the three cylindrical bodies 11, 12 and 13 of the first start base.With the facilities for advancing the three cylindrical bodies 11,12 and 13 of the second start base arranged in this manner, these cylindrical bodies are advanced underground with excavation and boring one by one in the order of the first one, the second one and the third one in the same manner as the steps of operation described in the foregoing until they come to join the other group. On each of the start bases, the third cylindrical body 13 may be either built there in the beginning concurrently with the first and second ones or built after the first cylindrical body 11 or the first and second cylindrical bodies 11 and 12 have been advanced underground by utilizing a space left behind them. In either case, the third cylindrical body is advanced in the same manner as described above.
In case where four cylindrical bodies are to be advanced from each of the two start bases, they can be also advanced underground in a manner similar to the steps of operation described in the foregoing for construction of an underground structure in accordance with the method as defined in the appended claim 1.
According to the conventional self-running advancing method, each start base must be long enough to accommodate at least three cylindrical bodies in general. However, as apparent from the above description, each start base does not have to have a space for more than two in accordance with the invented method. Besides, since the reaction force required in advancing one cylindrical body is available from more than three other cylindrical bodies, the invented method does not necessitate additional provision of a separate reaction facility.
Further, in case where provision of a conducting hole is necessary for defining a correct cylindrical body advancing direction, the traction members serve this purpose without requiring any additional horizontal hole, so that the length of time required for the construction work can be shortened. It is another advantage in terms of reduction in the length of construction time that, while next cylindric-- al body is being built on one of the two start bases in a space left after two cylindrical bodies have been advanced underground, the cylindrical bodies dis posed on the other start base can be advanced underground with excavation work, so that the length of construction time can be shortened by alternately repeating these processes. Besides, such alternate arrangement of processes also permits full labour utilization. In addition to these advantages, the two groups of cylindrical bodies can be advanced with only one set of advancing facilities. This arrangement thus contributes to reduction in the cost of machinery to a great extent.
Example 16 This is a sixteenth example of embodiment based on the method for constructing an underground structure by advancing underground more than two serially adjoining preformed cylindrical bodies disposed on each of two start bases spaced at a given distance as will be defined in the appended claim 1.
In this embodiment example, the arrangement and operation of cylindrical body advancing facilities are as described below with reference to Figure 16 and as will be further defined in the appended claim 17: In this case, the intermediate members 11 which are interposed in between the two cylindrical bodies 11 and 12 of the second start base in Example 15 (or the appended claim 16) is replaced with a thrusting jack advancing arrangement 3.
With the exception of this change, other advancing facilities are arranged in the same manner as in Example 15. Each of the cylindrical bodies is arranged to be advanced in the same manner as in Example 15. At the time of the interchanging transfer of the advancing facilities, however, the above stated thrusting jack advancing arrangement is not transferred. The two groups of more than two cylindrical bodies disposed on two confronting start bases are thus advanced underground for construction of an underground structure in accordance with the method as defined in the appended claims 1 and 17.As will be apparent from the above description, with the intermediate members 11 replaced with the thrusting jack advancing arrangement, the thrusting jack advancing arrangement does not have to be transferred at the time of the interchanging transfer of advancing facilities between the two groups of cylindrical bodies, so that the length of construction time can be further shortened. Other advantages of this embodiment example are identical with those of Example 15, and, therefore, are omitted from description here.
Example 17 This is a seventeenth example of embodiment based on the method set forth in the appended claim 1 for constructing an underground structure by advancing underground more than two serially adjoining preformed cylindrical bodies disposed on each of two start bases spaced at a given distance. In this embodiment example, arrangement and operation of cylindrical body advancing facilities are as described below with reference to Figure 17 and as will be further defined in the appended claim 18: In addition to the advancing facilities arranged in Example 16 (or the appended claim 17), the first and second cylindrical bodies 11 and 12 on the second start base are also provided with connecting members 4, fasteners 6 and a second pulling jack advancing arrangement 82.With the exception of this change, other advancing facilities are arranged in the same manner as in Example 16 or Example 15.
Each of the cylindrical bodies 11 and 12 disposed on the first start base is advanced in the same manner as in Example 15. However, unlike the preceding examples 15 and 16, the connecting members 4, fasteners 6 and the second pulling jack advancing arrangement of the first start base are not transferred to the cylindrical bodies of the second start base before the start of the advancing operation on the cylindrical bodies 11 and 12 of the second start base.
The group of more than two cylindrical bodies of each of the two start bases is thus advanced underground for construction of an underground structure in accordance with the method as defined in the appended claims 1, 16, 17 and 18.
As will be clearly understood from the above description, with the group of cylindrical bodies on the second start base also provided with the connecting members, fasteners and the second pulling jack advancing arrangement, this embodiment example obviates the necessity of interchanging transfer of these advancing facilities, so that the construction work can be more speedily performed. Since other advantages of the embodiment example are identical with those of Examples 15 and 16, they are omitted from description here.
Example 18 This is an eighteenth example of embodiment based on the method set forth in the appended claim 1 for constructing an underground structure by advancing underground more than two serially adjoining preformed cylindrical bodies disposed on each of two start bases spaced at a given distance. In this embodiment example, the arrangement and operation of advancing facilities are as described below with reference to Figure 18 and as will be further defined in the appended claim 19: In this example, the fixing pieces 7 which are disposed in the rear of the hindmost cylindrical body 12 on the first start base in Examples 15, 16 and 17 are replaced with an additional first pulling jack advancing arrangement 83 which is provided with fixing pieces 7. With the exception of this change, other advancing facilities are arranged in the same manner as in Examples 15-17.The cylindrical bodies disposed on the first start base are advanced in the same manner as in Examples 15-17. Then, the cylindrical bodies 11 and 12 of the second start base are advanced without transferring the first pulling jack advancing arrangement 81 before the advancing operation. Further, in case where the distance of the construction work is long, the elongation of the traction members 5 is absorbed by one of the first pulling jack advancing arrangements and then each of the cylindrical bodies are pulled forward with another set of the first pulling jack advancing arrangement. As apparent from the above description, in this embodiment example, no interchanging transfer of the first pulling jack advancing arrangement is required so that the construction work can be speeded up.Further, where the distance of construction work is long, the elongation of the traction members can be absorbed by one set of the first pulling jack advancing arrangement while another set of the first pulling jack advancing arrangement is operated to exert an advancing force on one of the cylindrical bodies. Other advantages of the embodiment example are identical with those of Examples 17 (or the appended claim 18) and, therefore, are omitted from description here.
Example 19 This is another example of embodiment based on the method set forth in the appended claim 1 for constructing an underground structure by advancing underground more than two serially adjoining preformed cylindrical bodies disposed on each of two start bases, which are spaced at a given distance. In this embodiment, the arrangement and operation of cylindrical body advancing facilities are as described below with reference to Figure 19 and as will be further defined in the appended claim 20: The advancing facilities are arranged in the same manner as in Examples 15-18 with the exception of that: The intermediate members 11 are not interposed in between the cylindrical bodies 11 and 12 of the second start base.Instead of them, there are provided cutaway parts 12 in the front part and the rear part of the cylindrical bodies 11 and 12 on both start bases as shown in Figure 19 for the purpose of accommodating the thrusting jack advancing arrangement 3, the fixing pieces 7 and the fasteners 6. Then, each cylindrical body is advanced in the same manner as in Examples 15-18 (or the appended claims 16-19).
As will be understood from the above description, the arrangement to have the thrusting jack advancing arrangement 3 which is to be disposed between cylindrical bodies 11 and 12 placed within the above stated cutaway parts 12 formed by removing boxes or in some other suitable manner obviate the necessity of having the intermediate members 11 because, with this arrangement, the cylindrical bodies can be made to abut upon each other to serve as united source of a reaction force. This arrangement thus contributes to further reduction in the length of time required for construction. Other advantages of the embodiment example are similar to those of the preceding examples and, therefore, omitted from description here.
Example 20 This is an example of embodiment based on the method set forth in the appended claims 1 to 9 for advancing more than three serially adjoining preformed cylindrical bodies for constructing an underground structure. In this example, a group of these cylindrical bodies are advanced underground in a self-running manner one after another and an underground structure of a desired shape is built within an underground space left in the rear of the hindmost cylindrical body. The arrangement and operation of advancing facilities of this embodiment example are as described below with reference to Figures 20a20d and as will be further defined in the appended claim 21: Thrusting jack advancing arrangements 31 and 32 are disposed between cylindrical bodies 11 and 12 and between cylindrical bodies 12 and 13 as shown in Figure 20a.Traction members 5 are then arranged to pierce through and protrude from these cylindrical bodies 11, 12 and 13. Each traction member 5 is provided with a fixing piece 7 disposed at the fore end thereof while a pulling jack advancing arrangement 8 is disposed at the rear end of the traction memberS.
The front end of the first cylindrical body 11 is provided with a cutting edge arrangement 14. In the hollow part at the fore end of the first cylindrical body 11, there is provided an excavator 13. Further, protection cylinders 151, 152 and 153 are installed in between the cylindrical bodies 11 and 12, between cylindrical bodies 12 and 13 and in the rear of the hindmost cylindrical body 13. With the self-running advancing facilities arranged for the three cylindrical bodies 11; 12, and 13 in the above stated manner, each of the cylindrical bodies is advanced by operating the advancing facilities with a reaction force required for moving it forward obtained from other two cylindrical bodies.In other words, in advancing the first cylindrical body 11, the thrusting jack advancing arrangement 31 is operated with a reaction force required for this obtained from the second and third cylindrical bodies 12 and 13. The second cylindrical body 12 is advanced by operating the thrusting jack advancing arrangement 32 with a reaction force required for this obtained from the first and third cylindrical bodies which are connected to each other by the traction members 5. Then, in advancing the third cylindrical body 13, the pulling jack advancing arrangement 8 is operated to pull the third cylindrical body 13 forward through the traction members 5 with a reaction force required for this obtained from the first and second cylindrical bodies 11 and 12. These steps of operation are repeated to have these cylindrical bodies advanced underground one after another.Following this, by utilizing the underground space which is being created to a suitable length behind the hindmost cylindrical body, an underground structure is gradually constructed there according as the cylindrical bodies are advanced.
In this embodiment example, as mentioned in the foregoing, the group of more than three cylindrical bodies are used as excavating and advancing facilities while the underground structure is constructed within the underground space created by excavation behind these cylindrical bodies. Since the site of construction work is thus separated from the site of the excavating work, the underground excavating work and the underground structure constructing work can be continuously carried on independently of each other. This arrangement not only contributes to reduction in length of time required for construction but, with the underground structure thus being built behind the group of cylindrical bodies, it is also free from the fear of being affected by an axial force (or a thrust) because they are advanced in a self-running manner without requiring a reaction force from the underground structure behind them.
Therefore, the underground structure can be built there without taking into consideration any such axial force in the computation of its strength. Hence, this arrangement contributes to the reduction in the cost of the underground structure because it can be allowed to have only a sectional shape that is capable of withstanding just the pressure of the earth around it. This embodiment example ensures safety because the structure is free from the fear of being damaged. Further, since timberings and segments can be assembled within the protection cylinder behind the hindmost cylindrical body, the assembling work can be performed without the fear of falling stones, collapses, etc. Thus, the embodiment is not only economical but also teems with many advantages.
Example 2 1 This embodiment example is based on the underground structure constructing method as defined in the appended claims 1 and 21. In this embodiment, the arrangement and operation of cylindrical body advancing facilities are as shown in Figure 21 and as will be defined in the appended claim 22. In this case, the number of preformed cylindrical bodies to be advanced underground which is more than three in Example 20 is changed to more than four. At least one counting from the hindmost of the serially adjoining cylindrical bodies is left underground near the entrance of an excavating hole and is used as a part of the underground structure while more than three other cylindrical bodies are further advanced underground.Then, by utilizing an underground space being gradually created in front of the left cylindrical body, an underground structure of a desired shape is constructed behind the advancing group of cylindrical bodies.
Referring to Figure 21, six cylindrical bodies li, 12, 13 16 are disposed on a start base. Then, thrusting jack advancing arrangements 3 are interposed in between the first and second cylindrical bodies 11 and 12, between the second and third bodies 12 and 13, and between the third and fourth bodies 13 and 14 respectively. A pulling jack advancing arrangement 8 is disposed in front of the second cylindrical body 12 and is provided with fixing pieces 7 which are attachable to traction members 5. The traction members 5 are provided with further fixing pieces 7 which are disposed in the rear of each of the fourth, fifth and sixth cylindrical bodies 14, 16 and 16.With self-running advancing facilities arranged in this manner, each of the cylindrical bodies is advanced in the same manner as in Example 8 (or as defined in the appended claim 9). When the last two cylindrical bodies 15 and 16 are moved to an underground point close to the entrance of the excavating hole, they are left there as shown in Figure 21 b while other cylindrical bodies 11, 12, 13 and 14 are allowed to be further advanced underground. Then, an underground structure 16 is gradually constructed in the underground space being created between the two rear cylindrical bodies and the advancing group of four cylindrical bodies.
Since the preformed cylindrical bodies are advanced and left at an underground point near the mouth of an excavating hole as described in the foregoing, this embodiment example obviates the necessity of performing difficult construction work at the entrance of a tunnel, so that the length of time required for construction can be shortened. Other advantages of the embodiment example are the same as those of Example 20.
Example 22 This example of embodiment is based on the underground structure constructing method as defined in the appended claims 1, 21 and 22. In this case, more than three preformed cylindrical bodies 11, 12, 13 and 14 are advanced underground in the same self-running manner as in Examples 20 and 21 (or claims 21 and 22) and, after completion of the advancing operation, these cylindrical bodies are used as a part of an underground structure with the advancing facilities removed therefrom as shown in Figure 22 and as will be further defined in the appended claim 23.
The arrangement to leave the preformed cylindrical bodies for use as a part of the underground structure obviates the necessity of underground construction work such as primary and secondary coating work so that the cost of construction can be further lessened. Other details of the embodiment example are the same as those of Examples 20 and 21 and, therefore, are omitted from description here.
Example 23 This example relates to an underground structure constructing apparatus adapted for carrying out the method of Example 1 as shown in Figure 1 a and as will be defined in the appended claim 24. Referring to Figure la, the apparatus comprises in combination a pulling/thrusting jack advancing arrangement 2 removably attached to the front of a second cylindrical body 12 between first and second cylindrical bodies 11 and 12; a thrusting jack advancing arrangement 3 attached to the front of a third cylindrical body 13 and is disposed between second and third cylindrical bodies 12 and 13; traction members 5 which are arranged to pierce through the above stated pulling/thrusting jack advancing arrangement 2, the cylindrical body 12 and other cylindrical bodies disposed subsequently to the second one; attachable and detachable fixing pieces 7 which are attached to the traction members and are disposed at the head portion of the pulling thrusting jack advancing arrangement 2 and between the third and subsequent cylindrical bodies 13 ; connecting members 4 arranged to pierce through the first, second and third cylindrical bodies 11, 12 and 13; and attachable and detachable fasteners 61, 62 and 63 attached to the connecting members in front of the first cylindrical body 11, between the second and third ones 12 and 13 and in the rear of the third one 13.
Example 24 This example of embodiment is an underground structure constructing apparatus adapted for carrying out the method of Example 2 as shown in Figure 2a and as will be defined in the appended claim 25. Referring to Figure 2a, the apparatus comprises in combination a pulling jack advancing arrangement 8 removably attached to the front of a second cylindrical body 12 and disposed between first and second cylindrical bodies 1, and 12; thrusting jack advancing arrangements 31 and 32 which are disposed between the first and second cylindrical bodies 11 and 12 and between the second and third cylindrical bodies 12 and 13 and are removably attached either to the rear of the first cylindrical body 11 or the front of the second cylindrical body 12 and either to the rear of the second cylindrical body 12 or to the front of the third cylindrical body 13 respectively; traction members 5 arranged to pierce through the above stated pulling jack advancing arrangement 8, the second cylindrical body 12 and all cylindrical bodies subsequent thereto; attachable and detachable fixing pieces 7 attached to the traction members 5 and are disposed at the head portion of the above stated pulling jack advancing arrangement 8 and between one and another among the cylindrical bodies including the third and subsequent cylindrical bodies; connecting members 4 arranged to pierce through each of the first, second and third cylindrical bodies 11, 12 and 13; and attachable and detachable fasteners 61, 62 and 63 attached to the connecting members 4 respectively in front of the first cylindrical body 11, between the second and third ones 12 and 13 and in the rear of the third one 13.
Example 25 This embodiment is an underground structure constructing apparatus adapted for carrying out the method of Example 3 as shown in Figure 3a and as will be defined in the appended claim 26. Referring to Figure 3a, the apparatus comprises in combination: A pulling jack advancing arrangement 8 removably attached to the front part of a first cylindrical body 11; thrusting jack advancing arrangements 31 and 32 which are disposed respectively between first and second cylindrical bodies li and 12 and between second and third cylindrical bodies 12 and 13 and are removably attached either to the rear of the first cylindrical body 11 or to the front of the second cylindrical body 12 and either to the rear of the second cylindrical body 12 or to the front of the third cylindrical body 13; traction members 5 which ar arranged to pierce through the above stated pulling jack advancing arrangement 8, the first cylindrical body 11 and all of cylindrical bodies disposed subsequently to the first one; attachable and detachable fixing pieces 7 which are attached to the traction members 5 at the head portion of the above stated pulling jack advancing arrangement 8 and between one and another among cylindrical bodies including the third one and those subsequent thereto; connecting members 4 arranged to pierce through each of the first, second and third cylindrical bodies 11, 12 and 13; and attachable and detachable fasteners 61, 62 and 63 attached to the connecting members 4 respectively in front of the first cylindrical body 11, between the second and third ones 12 and 13 and in the rear of the third one 13.
Example 26 This embodiment is an underground structure constructing apparatus adapted for carrying out the method of Example 4 as shown in Figure 4a and as will be defined in the appended claim 27. Referring to Figure 4a, the apparatus comprises in combination: A pulling jack advancing arrangement 8 removably attached to the front part of a first cylindrical body 11; thrusting jack advancing arrangements 31 and 32 which are respectively disposed between first and second cylindrical bodies 11 and 12 and between second and third cylindrical bodies 12 and 13 and are removably attached either to the rear of the first cylindrical body 11 or to the front of the second cylindrical body 12 and either to the rear of the second cylindrical body 12 or to the front of the third cylindrical body 13; traction members 5 which are arranged to pierce through the above stated pulling jack advancing arrangement 8, the first cylindrical body 11 and all of cylindrical bodies disposed subsequently to the first one; and attachable and detachable fixing pieces 7 which are attached to the traction members 5 respectively at the head portion of the above stated pulling jack advancing arrangement 8 and between one and another of the cylindrical bodies among the third one and those disposed subsequently thereto.
Example 27 This embodiment is an underground structure constructing apparatus adapted for carrying out the method of Example 5 as shown in Figure 5a and as will be defined in the appended claim 28. Referring to Figure 5a, the apparatus comprises in combination: A pulling/thrusting jack advancing arrangement 2 removably attached to the front of a third cylindrical body 13 and is disposed between second and third cylindrical bodies 12 and 13; thrusting jack advancing arrangements 31 and 33 which are disposed respectively between first and second cylindrical bodies 11 and 12 and between third and fourth cylindrical bodies 13 and 14 and are removably attached respectively either to the rear of the first cylindrical body 11 or to the front of the second cylindrical body 12 and either to the rear of the third cylindrical body 13 or to the front of the fourth cylindrical body 14; traction members 5 which are arranged to pierce through the above stated pulling thrusting jack advancing arrangement 2, the third cylindrical body 13 and all of cylindrical bodies disposed subsequently to the third one; attachable and detachable fixing pieces 71 and 72 which are attached to the traction members 5 respectively at the head portion of the pulling/thrusting jack advancing arrangement 2 and between one cylindrical body and another among the fourth and subsequent cylindrical bodies; connecting members 4 which are arranged to pierce through each of the second cylindrical body 12 and those subsequent thereto; and attachable and detachable fasteners 61, 62,63 63,.....
attached to the connecting members 4 respectively in front of the second cylindrical body 12 and between one cylindrical body and another amontthe third and subsequent cylindrical bodies.
Example 28 This embodiment is an underground structure constructing apparatus adapted for carrying out the method of Example 6 as shown in Figure 6 and as will be defined in the appended claim 29. Referring to FigureS, the apparatus comprises in combination: A pulling jack advancing arrangement 8 disposed between second and third cylindrical bodies 12 and 13 and is removably attached to the front of the third cylindrical body 13; thrusting jack advancing arrangements 31, 32 and 33 which are disposed respectively between one cylindrical body and another among first to fourth cylindrical bodies 11-14 and are removably attached to the rears or fronts of these cylindrical bodies; traction members 5 which are arranged to pierce through the above stated pulling jack advancing arrangement 8, the third cylindrical body 13 and all of cylindrical bodies disposed subsequently to the third one; attachable and detachable fixing pieces 71, 72,----- which are attached to the traction members 5 respectively at the head portion of the pulling jack advancing arrangement 8 and between one and another of cylindrical bodies including the fourth one and those subsequent to the fourth one; connecting members 4 which are arranged to pierce through the second cylindrical body 12 and all of cylindrical bodies disposed subsequently thereto; and attachable and detachable fasteners 61, 62, 63, which are attached to the connecting members 4 respectively in front of the second cylindrical body 12 and between one and another among the third and subsequent cylindrical bodies.
Example 29 This embodiment is an underground structure constructing apparatus adapted for carrying out the method of Example 7 as shown in Figure 7a and as will be defined in the appended claim 30. As shown in Figure 7a, the apparatus comprises in combination: A pulling/thrusting jack advancing arrangement 2 disposed between first and second cylindrical bodies 11 and 12 and is removably attached to the front of the second cylindrical body 12; thrusting jack advancing arrangements 31 and 32 which are disposed between one and another cylindrical bodies among second to fourth cylindrical bodies 12,13 and 14 and are removably attached either to the rears or to the fronts of them; traction members 5, which are arranged to pierce through the above stated pulling thrusting jack advancing arrangement 2, the second cylindrical body 12 and all of cylindrical bodies disposed subsequently thereto; and attachable and detachable fixing members 7 which are attached to the traction members 5 respectively at the head portion of the pulling/thrusting jack advancing arrangement and between one and another cylindrical bodies among the fourth and subsequent ones.
Example 30 This embodiment is an underground structure constructing apparatus adapted for carrying out the method of Example 8 as shown in Figure 8 and as will be defined in the appended claim 31. As shown in Figure 8, the apparatus comprises in combination: A pulling jack advancing arrangement disposed between first and second cylindrical bodies 11 and 12 and is removably attached to the front of the second cylindrical body 12; thrusting jack advancing arrangements 31, 32 and 33 which are disposed between one and another cylindrical bodies among first through fourth cylindrical bodies 11-14 and are removably attached either to the rears or to the fronts of them; traction members 5 which are arranged to pierce through the above stated pulling jack advancing arrangement 8, the second cylindrical body 12 and all cylindrical bodies subsequent thereto; and attachable and detachable fixing pieces 7 which are attached to the traction members 5 respectively at the head portion of the pulling jack advancing arrangement 8 and between one and another cylindrical bodies among the fourth and subsequent ones.
Example 31 This is an underground structure constructing apparatus adapted for carrying out the method of Example 9 as shown in Figure 9a and as will be defined in the appended claim 32. Referring to Figure 9a, the apparatus comprises in combination: A thrusting jack advancing arrangement 3 disposed between cylindrical bodies and is removably attached either to the rear of one cylindrical body or to the front of another; a pulling jack advancing arrangement 82 removably attached either to the front of a first cylindrical body 11 or to the rear of the hindmost cylindrical body; connecting members 4 which are arranged to pierce through the pulling jack advancing arrangement 82 and the first cylindrical body 11 and all of cylindrical bodies disposed subsequently thereto; attachable and detachable fasteners 6 which are attached to the connecting members 4 respectively at the head portion of the pulling jack advancing arrangement 82 and either in front of the first cylindrical body 11 or in the rear of the hindmost cylindrical body; a reaction facility 10 installed on one side of a natural ground opposite to the side thereof from which the cylindrical bodies are to be advanced; another pulling jack advancing arrangement 81 removably attached either to the head portion of the reaction facility 10 or to the rear of the hindmost cylindrical body; traction members 5 which are arranged to pierce through the reaction facility 10, a horizontal hole 9 provided in the natural ground, the first cylindrical body 11 and all of cylindrical bodies subsequent thereto and the pulling jack advancing arrangement 82; and attachable and detachable fixing pieces 7 which are attached to the traction members 5 in front of the reaction facility 10 or in the rear of the hindmost cylindrical body and at the head portion of the pulling jack advancing arrangement 82.
Example 32 This is an underground structure constructing apparatus adapted for carrying out the method of Example 10 as shown in Figure 10a and as will be defined in the appended claim 33. Referring to Figure 10a, the apparatus comprises in combination: Thrusting jack advancing arrangements 31, 32 32,----- disposed between one cylindrical body and another and are removably attached either to the fronts or rears of these cylindrical bodies; a pulling jack advancing arrangement 82 removably attached either to the front of a first cylindrical body 11 or to the rear of the hindmost cylindrical body; connecting members 4 which are arranged to pierce through the pulling jack advancing arrangement 82, the first cylindrical body 11 and all of cylindrical bodies subsequent thereto; attachable and detachable fasteners 6 which are attached to the connecting members 4 at the head portion of the pulling jack advancing arrangement 82 and in front of the first cylindrical body 11; a reaction facility 10 installed on one side of a natural ground opposite to the side thereof from which the cylindrical bodies are to be advanced; another pulling jack advancing arrangement 81 removably attached to the front of the reaction facility 10; traction members 5 which are arranged to pierce through the reaction facility 10, a horizontal hole 9 provided in the natural ground, the first cylindrical body 11 and all of cylindrical bodies subsequent thereto and the pulling jack advancing arrangement 82; and attachable and detachable fixing pieces 7 which are attached to the traction members 5 at the head portion of the pulling jack advancing arrangement 81, between one cylindrical body and another and in the rear of the hindmost cylindrical body.
Example 33 This is an underground structure constructing apparatus adapted for carrying out the method of Example 11 as shown in Figure 11 and as will be defined in the appended claim 34.
Referring to Figure 11, the apparatus is arranged in the same manner as the apparatuses of the preceding example which are adapted for carrying out the methods of Examples 9 and 10 (or claims 10 and 11) with the exception of that: The traction members 5 in this case are not only provided with a pulling/ thrusting jack advancing arrangement at their one end but also provided with another set of pulling thrusting jack advancing arrangement 81 at the other end of them.
Example 34 This is an underground structure constructing apparatus adapted for carrying out the method of Example 12 as shown in Figure 12a and as will be defined in the appended claim 35. Referring to Figure 1 2a, the apparatus comprises in combination: Thrusting jack advancing arrangements 31, 32 32,----- disposed between one cylindrical body and another and are removably attached either to the fronts or rears of these cylindrical bodies; a pulling jack advancing arrangement 82 removably attached to the front of a second cylindrical body 12; connecting members which are arranged to pierce through the above stated pulling jack advancing arrangement 82, the second cylindrical body 12 and all of cylindrical bodies disposed subsequently thereto; attachable and detachable fasteners 6 connected to the connecting members 4 at the head portion of the pulling jack advancing arrangement 82 and in the rear of the hindmost cylindrical body; a reaction facility 10 installed on one side of a natural ground opposite to the side thereof from which the cylindrical bodies are to be advanced; another pulling jack advancing arrangement 81 removably attached to the front of the reaction facility 10; traction members 5 which are arranged to pierce through the pulling jack advancing arrangement 81, the reaction facility 10, a horizontal hole 9 which is provided before-hand in the natural ground, the first cylindrical body and all of cylindrical bodies disposed subsequently thereto; and attachable and detachable fixing pieces 7 which are attached to the traction members 5 at the head portion of the pulling jack advancing arrangement 81, between one cylindrical body and another among the first and subsequent cylindrical bodies and in the rear of the hindmost cylindrical body.
Example 35 This embodiment example is an underground structure constructing apparatus adapted for carrying out the method of Example 13 as shown in Figure 13a and as will be defined in the appended claim 36. Referring to Figure 13a, the apparatus of this embodiment example is arranged in the same manner as the apparatus of Example 33 with the exception of that: The pulling jack advancing arrangement 82 which is disposed between the first and second cylindricat bodies 11 and 12 in the apparatus of Example 33 is replaced with a pulling/ thrusting jack advancing arrangement 2 in this case.
Example 36 This is an underground structure constructing apparatus adapted for carrying out the method of Example 14 as shown in Figure 14 and as will be defined in the appended claim 37. The apparatus of this embodiment example is arranged in the same manner as the apparatus of Example 34 with the exception of that: An additional pulling jack advancing arrangement 83 is disposed between the rear of the hindmost cylindrical body and the fixing pieces 7 and is removably engaged with the traction members 5.
Example 37 This is an underground structure constructing apparatus adapted for carrying out the method of Example 15 as shown in Figure 1 spa and as will be defined in the appended claim 38. Referring to Figure 1 spa, the apparatus comprises in combination: Traction members 5 arranged to pierce through two groups of more than two cylindrical bodies disposed on first and second start bases confronting each other across a natural ground where an underground structure is to be constructed and through a horizontal hole 9 which is provided in the natural ground beforehand; a pulling jack advancing arrangement 8, disposed in the rear of the outermost of the cylindrical body group disposed on the second start base and is removably attached to the traction memberS; attachable and detachable fixing pieces 7 which are attached to the traction members 5 between one cylindrical body and another among the cylindrical body group disposed on the first start base and in the rear of the outermost cylindrical body of the same group; thrusting jack advancing arrangements 31, 32, removably attached to cylindrical bodies of the group on the first start base having the fixing pieces 7 attached to the traction members 5; intermediate members 11 attachably and detachably installed in between one cylindrical body and another on the second start base; another pulling jack advancing arrangement 82 attachably and detachably attached either to the front of the foremost cylindrical body or to the rear of the hindmost one of the cylindrical body group on the first start base, or the group having the above stated thrusting jack advancing arrangements 3, 2 32,.....
attached to the cylindrical bodies group, connecting members 4 which are arranged to pierce through the whole cylindrical body group on the first start base and the pulling jack advancing arrangement 82; and attachable and detachable fasteners 6 attached to both ends of these connecting members 4.
Example 38 This is an underground structure constructing apparatus adapted for carrying out the method of Example 16 as shown in Figure 16 and as will be defined in the appended claim 39. Referring to Figure 16, the apparatus of this embodiment example is arranged in the same manner as the apparatus of Example 37 with the exception of that: The intermediate members 11 which are used in Example 37 are replaced with a thrusting jack advancing arrangement 3.
Example 39 This is an underground structure constructing apparatus adapted for carrying out the method of Example 17 as shown in Figure 17 and as will be defined in the appended claim 40. As shown in Figure 17, the apparatus of this embodiment example is arranged in the same manner as in Example 37 with the exception of that: The intermediate members 11 used in Example 37 are replaced with a thrusting jack advancing arrangement 3; another pulling jack advancing arrangement 82 is attachably and detachably attached to the front of the foremost one or to the rear of the hindmost one of the cylindrical body group on the same start base; and attachable and detachable fixing pieces 7 are further attached to the traction members between one cylindrical body and another among the same cylindrical body group disposed on the second start base.
Example 40 This is an underground structure constructing apparatus adapted for carrying out the method of Example 18 as shown in Figure 18 and as will be defined in the appended claim 41. As shown in Figure 18, the apparatus is arranged in the same manner as in Examples 37, 38 and 39 with the exception of that: An additional pulling jack advancing arrangement 83 is attachably and detachably attached to one end of the traction members in the rear of the hindmost cylindrical body in the same manner as the other end of the traction members.
Example 41 This is an underground structure construcing apparatus adapted for carrying out the method of Example 19 as shown in Figure 19 and as will be defined in the appended claim 42. As shown in Figure 19, the apparatus is arranged in the same manner as in Examples 37, 38, 39 and 40 with the exception of that: The thrusting jack advancing arrangements 31, 32, , the fixing pieces 7 and the fasteners 6 disposed between one cylindrical body and another are arranged to be placed within cutaway parts 12 which are provided in these cylindrical bodies.

Claims (46)

1. A method for constructing an underground structure by advancing underground a plurality of serially adjoining cylindrical bodies one after another, wherein a reaction force required for advancing each cylindrical body is obtained from the sum of reaction forces available from other cylindrical bodies and/or a reaction facility additionally provided; a cylindrical body pushing facility is formed with a thrusting jack advancing arrangement provided between each cylindrical body and another; a cylindrical body connecting facility is formed with connecting members arranged to pierce through a required number of said serially adjoining cylindrical bodies, with fasteners attached to the connecting members at required points and with a pulling jack advancing arrangement or a pulling/ thrusting jack advancing arrangement arranged to engage said cylindrical bodies; a pulling facilities formed with traction members arranged to pierce through a first group of a required number of cylindrical bodies, through a reaction facility or a second group of cylindrical bodies disposed on one side opposite to the side on which the first group are disposed and through a horizontal hole or the like arranged underground beforehand across a distance between said two sides, said traction members being provided with fixing pieces and a pulling jack advancing arrangement or a pulling/thrusting jack advancing arrangement which are attached thereto and are arranged to engage said cylindrical bodies and said reaction facility at desired points; the advancing facilities including said pushing, connecting and pulling facilities are operated as desired to have said cylindrical bodies moved forward underground one by one; then said advancing facilities are removed; and a cylindrical structure is constructed underground either by unifying said cylindrical bodies with each other or by having the cylindrical bodies installed on both ends of the underground structure with intermediate portion thereof constructed by a suitable conventional construction method.
2. A method for constructing an underground structure according to claim 1, wherein facilities for advancing more than three serially adjoining cylindrical bodies are arranged by having a pulling thrusting jack advancing arrangement disposed between first and second cylindrical bodies, a thrusting jack advancing arrangement disposed between second and third cylindrical bodies, traction members arranged to pierce through said pulling/thrusting jack advancing arrangement, the second cylindrical body and each of cylindrical bodies subse quent thereto, attachable and detachable fixing pieces attached to said traction members in front of the pulling/thrusting jack advancing arrangement in the rear of each of the third and subsequent cylindrical bodies, connecting members arranged to pierce through the first, second and third cylindrical bodies and attachable and detachable fasteners attached to said connecting members in front of the first cylindrical body and in the rear of each of the second and third cylindrical bodies; in a first step of operation, the fasteners disposed in the rear of the second and third cylindrical bodies and the fixing pieces disposed in the rear of each of the third and subsequent cylindrical bodies are set free and then said pulling/thrusting jack advancing arrangement is operated to push forward the first cylindrical body with a reaction required for this obtained from the sum of reaction forces available from the second and third cylindrical bodies through the thrusting jack advancing arrangement disposed between the second and third cylindrical bodies; in a second step of operation, the fixing pieces disposed in the rear of one of the third and subsequent cylindrical bodies to be advanced and in front of the pulling/thrusting jack advancing arrangement are fixed to the traction members while the fixing pieces disposed in rear of other cylindrical bodies are set free and then, by fixing the fasteners disposed in front of the first cylindrical body and in rear of the second cylindrical body to the connecting members, the pulling/thrusting jack advancing arrangement is operated to have each of the third and subsequent cylindrical bodies pulled forward one after another with a reaction force requiredforthe pulling operation obtained from the sum of the reaction forces available from the first and second cylindrical bodies; in a third step of operation, the fasteners disposed in front of the first cylindrical body and in the rear of the third cylindrical body are fixed to the connecting members and then the thrusting jack advancing arrangement disposed between the second and third cylindrical bodies is operated to have the second cylindrical body pushed forward with a reaction force required for this pushing operation obtained from the sum of the reaction forces of the first and third cylindrical bodies; and the more than three serially adjoining cylindrical bodies are advanced underground by repeating said three steps of operation as required.
3. A method according to claim 1, wherein advancing facilities are arranged in the same manner as in claim 2 with the exception of that said pulling/thrusting jack advancing arrangement disposed between said first and second cylindrical bodies is replaced with a pulling jack advancing arrangement specialized for pulling and a thrusting jack advancing arrangement specialized for pushing; in the first step of operation which is for advancing said first cylindrical body, said thrusting jack advancing arrangement disposed between the first and second cylindrical bodies is operated to push the first cylindrical body forward; in the second step of operation, the second cylindrical body is moved froward in the same manner as the second step of operation defined in claim 2; and, in the third step of operation, each of the third and subsequent cylindrical bodies is pulled forward by the pulling jack advancing arrangement in the same manner as in the third step of operation of claim 2.
4. A method according to claim 1, wherein advancing facilities are arranged in the same manner as in claim 3 with the exception of that said pulling jack advancing arrangement and said fixing pieces disposed between said first and second cylindrical bodies in claim 3 are installed in front of the first cylindrical body while said traction members are extended to pierce through the first cylindrical body, the pulling jack advancing arrangement and the fixing pieces; each of the third and subsequent cylindrical bodies are pulled forward by operating the pulling jack advancing arrangement with a reaction force required for the pulling operation obtained from the sum of the reaction forces of the first and second cylindrical bodies available through said thrusting jack advancing arrangement disposed between the first and second cylindrical bodies; and the first and second cylindrical bodies are moved forward in the same manner as the first and third steps of operation set forth in claim 2.
5. A method according to claim 1, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 4with the exception of that said connecting members and said fasteners are not used; said second cylindrical body is moved forward by fixing said fixing pieces to said traction members in the rear of said third cylindrical body and in front of said pulling jack advancing arrangement and by operating the thrusting jack advancing arrangement with a reaction force required for this obtained from the sum of the reaction forces of the first and third cylindrical bodies available through said traction members; and the first and third and subsequent cylindrical bodies are advanced in the same manner as the appliable steps of operation set forth in claim 4.
6. A method for constructing an underground structure according to claim 1, wherein said cylindrical body advancing facilities are arranged to have more than four serially adjoining cylindrical bodies advanced underground with thrusting jack advancing arrangements disposed between the first and second cylindrical bodies and between the third and fourth cylindrical bodies, a pulling/thrusting jack advancing arrangement disposed between the second and third cylindrical bodies, the traction members arranged to pierce through said pulling/ thrusting jack advancing arrangement and each of the third and subsequent cylindrical bodies, said attachable and detachable fixing pieces attached to said traction members in front of the pulling/ thrusting jack advancing arrangement and in the rear of each of the fourth and subsequent cylindricaf bodies, said connecting members arranged to pierce through and protrude from the second, third and fourth cylindrical bodies, and said attachable and detachable fasteners attached to the connecting members in front of the second cylindrical body and in the rear of each of the third and fourth cylindrical bodies; in a first step of operation, the thrusting jack advancing arrangement which is disposed between the first and second cylindrical bodies is operated to have the first cylindrical body moved forward with a reaction force required for this obtained from the sum of the reaction forces of the second and third cylindrical bodies or of the second, third and fourth cylindrical bodies available through the various jack advancing arrangements disposed between the second and third cylindrical bodies or the second, third and fourth cylindrical bodies; in a second step of operation, the pulling/thrusting jack advancing arrangement which is disposed between the second and third cylindrical bodies is operated to have the second cylindrical body pushed forward with a reaction force required for this pushing operation obtained from the sum of the reaction forces of the third and fourth cylindrical bodies which are available through the thrusting jack advancing arrangement disposed between the third and fourth cylindrical bodies; in a third step of operation, with said fixing pieces fixed to said traction members in the rear of one of the fourth and subsequent cylindrical bodies to be advanced and in front of the pulling/ thrusting jack advancing arrangement, while other fixing pieces disposed in other places are set free, and with the fasteners fixed to said connecting members in front of the second cylindrical body and in the rear of the third cylindrical body, the pulling/ thrusting jack advancing arrangement which is disposed between the second and third cylindrical bodies is operated to have each of the fourth and subsequent cylindrical bodies pulled forward one by one with a reaction force required forthe pulling operation obtained from the sum of reaction forces of the second and third cylindrical bodies; in a fourth step of operation, the fasteners disposed in front of the second cylindrical body and in the rear of the third cylindrical body are fixed to the connecting members and the thrusting jack advancing arrangement which is disposed between the second and third cylindrical bodies is operated to push forward the third cylindrical body with a reaction force required for this obtained from the sum of the reaction forces of the second and fourth cylindrical bodies; and said more than four serially adjoining cylindrical bodies are advanced underground by repeating said steps of operation as desired.
7. A method according to claim 1, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 6 with the exception of that the pulling/thrusting jack advancing arrangement disposed between the second and third cylindrical bodies is replaced with a pulling jack advancing arrangement specialized for pulling and a thrusting jack advancing arrangement specialized for pushing; then, the second cylindrical body is arranged to be pushed forward by said thrusting jack advancing arrangement; each of the fourth and subsequent cylindrical bodies is arranged to be pulled forward one by one by said pulling jack advancing arrangement; and the first and third cylindrical bodies are moved forward in the same manner as the second and fourth steps of operation set forth in claim 6.
8. A method for constructing an underground structure according to claim 1, wherein said cylindrical body advancing facilities are arranged to have more than four serially adjoining cylindrical bodies advanced underground with a pulling/thrusting jack advancing arrangement disposed between first and second cylindrical bodies, thrusting jack advancing arrangements disposed respectively between second and third cylindrical bodies and between third and fourth cylindrical bodies, said traction members arranged to pierce through and protrude from said pulling/thrusting jack advancing arrangement and each of the second and subsequent cylindrical bodies, and said attachable and detachable fixing pieces attached to the traction members in front of the pulling/thrusting jack advancing arrangement and in the rear of each of the fourth and subsequent cylindrical bodies; then, in a first step of operation, the pulling/thrusting jack advancing arrangement disposed between the second and third cylindrical bodies is operated to have the first cylindrical body pushed forward with a reaction force required for this pushing operation obtained from the sum of the reaction forces of the second and third cylindrical bodies or the second, third and fourth cylindrical bodies through the thrusting jack advancing arrangement disposed between the second and third cylindrical bodies or through the thrusting jack advancing arrangements disposed between the second and third cylindrical bodies and between the third and fourth cylindrical bodies; in a second step of operation, the thrusting jack advancing arrangement disposed between the second and third cylindrical bodies is operated to push forward the second cylindrical body with a reaction force required for this obtained from the sum of the reaction forces of the third and fourth cylindrical bodies through the thrusting jack advancing arrangement disposed between the third and fourth cylindrical bodies; in a third step of operation, the fixing pieces disposed in the rear of some of the fourth and subsequent cylindrical bodies and in front of the pulling/thrusting jack advancing arrangement are fixed to the traction members and then the thrusting jack advancing arrangement disposed between the third and fourth cylindrical bodies is operated to push forward the third cylindrical body with a reaction force required for this pushing operation obtained from the sum of the reaction forces of the second cylindrical body and said some of the fourth and subsequent cylindrical bodies; in a fourth step of operation, the fixing pieces disposed in front of the pulling/thrusting jack advancing arrangement and in the rear of one of the fourth and subsequent cylindrical bodies to be advanced are fixed to the traction members while other fixing pieces are set free and then the pulling jack advancing arrangement is operated to have each of the fourth and subsequent cylindrical bodies pulled forward one by one with a reaction force required for this obtained from the sum of the reaction forces of the second and third cylindrical bodies through the thrusting jack advancing arrangement disposed between the second and third cylindrical bodies; and the more than four serially adjoining cylindrical bodies are advanced underground by repeating said steps of operation as desired.
9. A method according to claim 1, wherein said cylindrical body advancing facilities are arranged in the same manner as set forth in claim 8 with the exception of that said pulling/thrusting jack advancing arrangement which is disposed between the first and second cylindrical bodies in the case of claim 8 is replaced with a pulling jack advancing arrangement specialized for pulling and a thrusting jack advancing arrangement specialized for pushing; then, the first cylindrical body is moved forward by the thrusting jack advancing arrangement; the cylindrical bodies including the fourth one and those subsequent thereto are pulled forward by the pulling jack advancing arrangement one by one; and the second and third cylindrical bodies are then moved forward respectively in the same manner as the second and third steps of operation set forth in claim 8.
10. A method for constructing an underground structure according to claim 1, wherein said cylindrical body advancing facilities are arranged such that: there is provided a horizontal hole piercing through a natural ground between a start base and an arrival base to have the two bases communicating with each other; a reaction facility is installed on the arrival base while more than two cylindrical bodies are disposed on the start base; said traction members are arranged to pierce through the reaction facility, the horizontal hole and the cylindrical bodies, the traction members further piercing through a first pulling jack advancing arrangement which is either attached to the rear of the hindmost cylindrical body or to the front of the reaction facility; attachable and detachable said fixing pieces are attached to both ends of the traction members; a thrusting jack advancing arrangement is disposed between each cylindrical body and another; said connecting members are arranged to pierce through and protrude from more than two cylindrical bodies disposed ahead of the hindmost one; said fasteners are attached to the connecting members and are disposed in front of the cylindrical bodies to be connected; a second pulling jack advancing arrangement which is provided with said fixing pieces is disposed in the rear of the hindmost of the more than two cylindrical bodies; then, with the advancing facilities for the more than two cylindrical bodies arranged in the above stated manner, in a first step of operation, the thrusting jack advancing arrangement disposed in the rear of each cylindrical body is operated to move forward the cylindrical bodies other than the hindmost one by one with a reaction force required for this operation obtained from the sum of the reaction forces available from subsequent cylindrical bodies and a reaction force available from the reaction facility through the traction members; in a second step of operation, the first and second pulling jack advancing arrangements are jointly operated to have the hindmost cylindrical body moved forward with a reaction force required for this obtained from the sum of the reaction force of the reaction facility available through the traction members and the reaction force of one or a plurality of cylindrical bodies connected to each other by the fasteners of the connecting members; and the more than two serially adjoining cylindrical bodies are advanced underground by repeating these steps of operation as desired.
11. A method according to claims 1 and 10, wherein said cylindrical body advancing facilities are arranged in the same manner as set forth in claim 10 with the exception of that said attachable and detachable fixing pieces which are provided in combination with said traction members are not only disposed at the hindmost cylindrical body but also additionally disposed in the rear of each cylindrical body other than the hindmost one to make an additional source of reaction available during an advancing operation on each cylindrical body other than the hindmost one; in the first step of operation, the cylindrical bodies other than the hindmost one are moved forward one by one, with the fixing pieces which are disposed between cylindrical bodies fixed or set free, by operating the thrusting jack advancing arrangement and the pulling jack advancing arrangement; in the second step of operation, the hindmost cylindrical body is advanced in the same manner as the second step of claim 10; and each of the cylindrical bodies is moved forward underground with the first and second steps repeated as desired.
12. A method according to claims 1,10 and 11, wherein said cylindrical body advancing facilities are arranged in the same manner as set forth in claims 10 and 11 with the exception of that the fixing pieces which are disposed at one end of said traction members are replaced with a first pulling jack advancing arrangement which is provided with the fixing pieces to have first pulling jack advancing arrangements disposed at both ends of the traction members; and the elongation and slack of the traction members which happens during a cylindrical body pulling operation is arranged to be absorbed by operating either of the two pulling jack advancing arrangement.
13. A method according to claim 1, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 10 with the exception of that, with said horizontal hole arranged to have the start base and the arrival base communicating with each other and with the reaction facility installed on the arrival base, the traction members are arranged to pierce through more than three cylindrical bodies disposed on the start base, the horizontal hole and the reaction facility; then a first pulling jack advancing arrangement which is provided with fixing pieces attachable to and detachable from the traction members is disposed in front of the reaction facility; further fixing pieces are attached to the traction members and are disposed in the rear of each cylindrical body; thrusting jack advancing arrangements are disposed respectively between the first and second cylindrical bodies and between the second and third cylindrical bodies; the connecting members are arranged to pierce through and protrude from each of the second and subsequent cylindrical bodies; then, in combination with the connecting members, a second pulling jack advancing arrangement which is provided with fasteners attachable to and detachable from the connecting members is disposed in front of the second cylindrical body while other fasteners are disposed in the rear of each of the third and subsequent cylindrical bodies; with the facilities for advancing more than three cylindrical bodies arranged in the above stated manner, in the first step of operation, the thrusting jack advancing arrangement disposed between the first and second cylindrical bodies is operated to have the first cylindrical body pushed forward with a reaction force required for this obtained from the sum of the reaction forces available from the second and third cylindrical bodies through the thrusting jack advancing arrangement disposed between the second and third cylindrical bodies; meanwhile, concurrently with the pushing operation, the fixing pieces disposed in the rear of the first cylindrical body is fixed to the traction members while other fixing pieces disposed in rear of other cylindrical bodies are set free and then the first pulling jack advancing arrangement is also operated to have the first cylindrical body pulled forward through the traction member; in the second step of operation, while the second cylindrical body is pushed by operating the thrusting jack advancing arrangement disposed between the second and third cylindrical bodies with a required reaction force obtained from the third cylindrical body, the fixing pieces disposed in the rear of the second cylindrical body is fixed to the traction members, with other fixing pieces which are disposed in the rear of each of other cylindrical bodies set free, and the first pulling jack advancing arrangement is also operated to have the second cylindrical body pulled forward; in the third step of operation, the fixing pieces and the fasteners disposed in the rear of each of the third and subsequent cylindrical bodies to be advanced are fixed to the traction members and the connecting members while the fixing pieces and fasteners disposed in rear of other cylindrical bodies are set free and then the first and second pulling jack advancing arrangements are jointly operated to move forward each of the third and subsequent cylindrical bodies; and the more than three serially adjoining cylindrical bodies are advanced underground one after another by repeating the first, second and third steps of operation as desired.
14. A method according to claims 1 and 13, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 13 with the exception of that the second pulling jack advancing arrangement employed in the case of claim 13 is replaced with a pulling/thrusting jack advancing arrangement; then, in the first step of operation, the first cylindrical body is advanced by operating said pulling/thrusting jack advancing arrangement jointly with the operation of the thrusting jack advancing arrangement disposed between the first and second cylindrical bodies; and the second and subsequent cylindrical bodies are advanced in the same manner as the second and third steps of operation set forth in claim 13.
15. A method according to claims 1, 13 and 14, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 13 with the exception of that the fixing pieces disposed in the rear of the hindmost cylindrical body for fixing the traction members there in claim 13 is replaced in this case with a third pulling jack advancing arrangement; then, before advancing each cylindrical body, the third pulling jack advancing arrangement disposed in the rear of the hindmost cylindrical body is operated to absorb the elongation and slack of the traction member; and the cylindrical bodies are advanced in the same manner as the steps of operation defined in claim 13 and claim 14 for construction of an underground structure.
16. A method for constructing an underground structure according to claim 1, wherein said cylindrical body advancing facilities are arranged such that a horizontal hole is arranged to connect first and second start bases which confront each other at a predetermined distance; said traction members are arranged to pierce through and protrude from the horizontal hole and more than two cylindrical bodies disposed on each of the start bases; attachable and detachable fixing pieces are attached to the traction members in the rear of each of the cylindrical bodies disposed on the first start base while a first pulling jack advancing arrangement which is provided with the same kind of fixing pieces is disposed in the rear of the hindmost cylindrical body disposed on the second start base; between each cylindrical body and another disposed on the first start base, there is disposed a thrusting jack advancing arrangement while intermediate members are interposed in between each cylindrical body and another disposed on the second start base; said connecting members are arranged to pierce through and protrude from more than two cylindrical bodies disposed in the rear part of the group of cylindrical bodies aligned on the first start base; attachable and detachable fasteners are attached to the connecting members in front of each of more than one cylindrical body disposed ahead of the hindmost one on the first start base while, in the rear of the hindmost one, there is disposed a second pulling jack advancing arrangement which is provided with fasteners of the same kind for fixing the connecting members there; then, with advancing facilities for the confronting two groups each consisting of more than two cylindrical bodies arranged in the above stated manner, in a first step of operation, the fixing pieces disposed in the rear of one cylindrical body to be advanced among cylindrical bodies other than the hindmost one on the first start base are fixed to the traction members while other fixing pieces are set free and then, with the fasteners of the second pulling jack advancing arrangement set free from the connecting members, the first pulling jack advancing arrangement is operated to have each of the cylindrical bodies of the first start base other than the hindmost one pulled forward; then, at the same time, the thrusting jack advancing arrangement disposed in the rear of the cylindrical body to be advanced is also operated to push the cylindrical body forward; in a second step of operation, the fixing pieces disposed in the rear of the hindmost cylindrical body are fixed to the traction members while other fixing pieces are set free and then, with fasteners fixed to the connecting members, the first and second pulling jack advancing arrangements are jointly operated to have the hindmost cylindrical body pulled forward; when the cylindrical bodies disposed on the first start base have been moved forward to a desired underground point by repeating the first and second steps as necessary, the cylindrical body advancing facilities of one start base are interchanged with those of the other base; and the group of cylindrical bodies on the second start base are advanced to an underground point in the same manner as set forth in the foregoing for construction of an underground structure.
17. A method according to claims 1 and 16, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 16 with the exception of that the intermediate members which are disposed between the cylindrical bodies on the second start base in the case of claim 16 are replaced with another thrusting jack advancing arrangement; and the cylindrical body groups on both start bases are advanced in the same manner as the first and second steps of operation defined in claim 16 without transferring the thrusting jack advancing arrangement from one start base to the other start base for construction of an underground structure.
18. A method according to claims 1, 16 and 17, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 17 with the exception of that the cylindrical body group aligned on the second start base are provided with the same connecting members and fasteners as those used on the first start base and also with a second pulling jack advancing arrangement; in addition to that, the traction members are provided with further fixing pieces which are disposed between one cylindrical body and another on the second start base; and the two groups of cylindrical bodies on the two start bases are respectively advanced underground in the same manner as the steps of operation set forth in claims 16 and 17 without interchanging transfer of the connecting members, fasteners and the second pulling jack advancing arrangement from one start base to the other.
19. A method according to claims 1, 16,17 and 18, wherein said cylindrical body advancing facilities are arranged in the same manner as in claim 18 with the exception of that said fixing pieces which are disposed in the rear of the hindmost cylindrical body for fixing said traction members there on the first start base are replaced with a first pulling jack advancing arrangement which is provided with fixing pieces of the same function; with the cylindrical body advancing facilities arranged in this manner, the elongation and slack of the traction members are absorbed by operating either of the two first pulling jack advancing arrangements at each step of the cylindrical body advancing operation; and the groups of cylindrical bodies disposed on the two start bases are advanced underground for construction of an underground structure in the same manner as the steps of operation set forth in claim 18.
20. A method according to claims 16 to 19, wherein said cylindrical body advancing facilities are arranged in the same manner as in claims 16 to 19 with the exception of that the intermediate members interposed in between one cylindrical body and another among the cylindrical bodies aligned on the second start base are replaced with provision of cut-away parts in each cylindrical body for accommodating the thrusting jack advancing arrangement, fixing pieces and fasteners disposed between one cylindrical body and another.
21. A method for constructing an underground structure according to claim 1, wherein advancing.
facilities for advancing more than three serially adjoining cylindrical bodies underground in a selfrunning manner are arranged in the same manner as set forth in any of claims 2 through 11 and are operated such that, with the cylindrical body group provided with an excavating and boring facility, they are advanced underground with excavation and boring in the self-running manner; when the hindmost of the cylindrical bodies comes to a predetermined underground point, the hindmost one is left there while other cylindrical bodies are further advanced underground with excavation and boring to leave an underground space behind them; and then, when the underground space reaches a suitable length, an underground structure of a desired shape is constructed within the underground space.
22. A method according to claims 1 and 21, wherein said group of more than three cylindrical bodies is changed to a group of more than four cylindrical bodies; then, more than one cylindrical body disposed in the rear part of the cylindrical body group are left at an underground point near the entrance of an excavating hole and are used as a part of an underground structure to be constructed; meanwhile more than three other cylindrical bodies are allowed to be further advanced underground; and the underground structure is constructed gra duallywithin an underground space created in front of the cylindrical body or bodies left near the entrance according as other cylindrical bodies are advanced further.
23. A method according to claims 1, 21 and 22, wherein said more than three cylindrical bodies which are further advanced underground in the self-running manner with excavation are also arranged to be used as a part of the underground structure with the self-running advancing facilities removed therefrom upon completion of the advancing operation.
24. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 2, said apparatus comprising in combination: a pulling/thrusting jack advancing arrangement disposed between the first and second cylindrical bodies and is detachably attached to the front of said second cylindrical body; a thrusting jack advancing arrangement disposed between second and third cylindrical bodies and is detachably attached either to the rear of the second cylindrical body or to the front of the third cylindrical body; traction members arranged to pierce through said pulling/thrusting jack advancing arrangement, the second cylindrical body and every cylindrical body disposed subsequently to the second one;; attachable and detachable fixing pieces attached to said traction members at the head portion of said pulling/thrusting jack advancing arrangement and between one cylindrical body and another among the third and subsequent cylindrical bodies; connecting members arranged to pierce through the first, second and third cylindrical bodies; and attachable and detachable fasteners attached to said connecting members in front of the first cylindrical body, between the second and third ones and in the rear of the third one.
25. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 3, said apparatus comprising in combination: a pulling jack advancing arrangement removably attached to the front of a second cylindrical body and disposed between first and second cylindrical bodies; thrusting jack advancing arrangements which are disposed respectively between the first and second cylindrical bodies and between the second and third cylindrical bodies, said thrusting jack advancing arrangements being removably attached either to the rear of the first cylindrical body or the front of the second one and either to the rear of the second cylindrical body or to the front of the third cylindrical body respectively;; traction members arranged to pierce through said pulling jack advancing arrangement, the second cylindrical body and every cylindrical body subsequent thereto; attachable and detachable fixing pieces attached to the traction members and are disposed at the head portion of the pulling jack advancing arrangement and between one cylindrical body and another among the third and subsequent cylindrical bodies; connecting members arranged to pierce through each of the first, second and third cylindrical bodies; and attachable and detachable fasteners attached to the connecting members respectively in front of the first cylindrical body, between the second and third cylindrical bodies and in the rear of the third cylindrical body.
26. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 4, said apparatus comprising in combination: a pulling jack advancing arrangement removably attached to the front part of a first cylindrical body; thrusting jack advancing arrangements which are disposed respectively between first and second cylindrical bodies and between second and third cylindrical bodies, said thrusting jack advancing arrangements being removably attached either to the rear of the first cylindrical body or to the front of the second cylindrical body and either to the rear of the second cylindrical body or to the front of the third cylindrical body; traction members which are arranged to pierce through said pulling jack advancing arrangement, the first cylindrical body and every cylindrical body disposed subsequently to the first one;; attachable and detachable fixing pieces which are attached to the traction members at the head portion of said pulling jack advancing arrangement and between one cylindrical body and another among the third and subsequent cylindrical bodies; connecting members which are arranged to pierce through each of the first, second and third cylindrical bodies; and attachable and detachable fasteners attached to the connecting members respectively in front of the first cylindrical body, between the second and third ones and in the rear of the third cylindrical body.
27. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 5, said apparatus comprising in combination: a pulling jack advancing arrangement removably attached to the front part of a first cylindrical body; thrusting jack advancing arrangements which are respectively disposed between first and second cylindrical bodies and between second and third cylindrical bodies, said thrusting jack advancing arrangements being removably attached either to the rear of the first cylindrical body or to the front of the second cylindrical body and either to the rear of the second cylindrical body or to the front of the third cylindrical body; traction members which are arranged to pierce through said pulling jack advancing arrangement, the first cylindrical body and every cylindrical body disposed subsequently to the first one; and attachable and detachable fixing pieces which are attached to the traction members respectively at the head portion of the pulling jack advancing arrangement and between one cylindrical body and another among the third one and subsequent cylindrical bodies.
28. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 6, said apparatus comprising in combination: a pulling/thrusting jack advancing arrangement removably attached to the front of a third cylindrical body and is disposed between second and third cylindrical bodies; thrusting jack advancing arrangements which are disposed respectively between first and second cylindrical bodies and between third and fourth cylindrical bodies, said thrusting jack advancing arrangement being removably attached respectively either to the rear of the first cylindrical body or to the front of the second cylindrical body and either to the rear of the third cylindrical body or to the front of the fourth cylindrical body;; traction members which are arranged to pierce through the pulling/thrusting jack advancing arrangement, the third cylindrical body and every cylindrical body disposed subsequently to the third cylindrical body; attachable and detachable fixing pieces which are attached to the traction members respectively at the head portion of the pulling/thrusting jack advancing arrangement and between one cylindrical body and another among the fourth and subsequent cylindrical bodies; connecting members which are arranged to pierce through each of the second cylindrical body and those disposed subsequently thereto; and attachable and detachable fasteners attached to the connecting members respectively in front of the second cylindrical body and between one cylindrical body and another among the third and subsequent cylindrical bodies.
29. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 7, said apparatus comprising in combination: a pulling jack advancing arrangement disposed between second and third cylindrical bodies and is removably attached to the front of a third cylindrical body; thrusting jack advancing arrangements which are disposed respectively between one cylindrical body and another among first to fourth cylindrical bodies, said thrusting jack advancing arrangements being removably attached to the rears or fronts of these cylindrical bodies; traction members which are arranged to pierce through said pulling jack advancing arrangement, the third cylindrical body and every cylindrical body disposed subsequently thereto;; attachable and detachable fixing pieces which are attached to the traction members respectively at the head portion of the pulling jack advancing arrangement and between one cylindrical body and another among the fourth and subsequent cylindrical bodies; connecting members which are arranged to pierce through the second cylindrical body and all of cylindrical bodies disposed subsequently thereto; and attachable and detachable fasteners which are attached to the connecting members respectively in front of the second cylindrical body and between one cylindrical body and another among the third and subsequent cylindrical bodies.
30. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 8, said apparatus comprising in combination: a pulling/thrusting jack advancing arrangement disposed between first and second cylindrical bodies and is removably attached to the front of the second cylindrical body; thrusting jack advancing arrangements which are disposed respectively between one cylindrical body and another among second to fourth cylindrical bodies, said thrusting jack advancing arrangements being removably attached to the rears or fronts of them; traction members which are arranged to pierce through said pulling/thrusting jack advancing arrangement, the second cylindrical body and all cylindrical bodies disposed subsequently thereto; and attachable and detachable fixing members which are attached to the traction members respectively at the head portion of the pulling/thrusting jack advancing arrangement and between one cylindrical body and another among the fourth and subsequent cylindrical bodies.
31. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 9, said apparatus comprising in combination: a pulling jack advancing arrangement disposed between first and second cylindrical bodies and is removably attached to the front of the second cylindrical body; thrusting jack advancing arrangements which are disposed respectively between one cylindrical body and another among first through fourth cylindrical bodies, said thrusting jack advancing arrangements being removably attached either to the rears or to the fronts of said cylindrical bodies; traction members which are arranged to pierce through said pulling jack advancing arrangement, the second cylindrical body and every cylindrical body disposed subsequently to the second cylindrical body; and attachable and detachable fixing pieces which are attached to the traction members respectively at the head portion of said pulling jack advancing arrangement and between one cylindrical body and another among fourth and subsequent cylindrical bodies.
32. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 10, said apparatus comprising in combination: a thrusting jack advancing arangement disposed between cylindrical bodies and is removably attached either to the rear of one cylindrical body or to the front of another; a pulling jack advancing arrangement removably attached either to the front of a first cylindrical body or to the rear of a hindmost cylindrical body; connecting members which are arranged to pierce through the pulling jack advancing arrangement and the first cylindrical body and every subsequent one; attachable and detachable fasteners which are attached to the connecting members respectively at the head portion of the pulling jack advancing arrangement and either in front of the first cylindrical body or in the rear of the hindmost cylindrical body;; a reaction facility installed on one side of a natural ground opposite to another side thereof from which the cylindrical bodies are to be advanced; another pulling jack advancing arrangement removably attached either to the head portion of the reaction facility or to the rear of the hindmost cylindrical body; traction members which are arranged to pierce through said reaction facility, a horizontal hole provided in the natural ground, the first cylindrical body and every cylindrical body disposed subsequently thereto and the pulling jack advancing arrangement; and attachable and detachable fixing pieces which are attached to the traction members in front of the reaction facility or in the rear of the hindmost cylindrical body and at the head portion of the pulling jack advancing arrangement.
33. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 11, said apparatus comprising in combination: thrusting jack advancing arrangements disposed between one cylindrical body and another and are removably attached either to the fronts or rears of the cylindrical bodies; a pulling jack advancing arrangement removably attached either to the front of a first cylindrical body or to the rear of a hindmost cylindrical body; connecting members which are arranged to pierce through said pulling jack advancing arrangement, the first cylindrical body and every cylindrical body disposed subsequently thereto; attachable and detachable fasteners which are attached to the connecting members at the head portion of the pulling jack advancing arrangement and in front of the first cylindrical body;; a reaction facility which is installed on one side of a natural ground opposite to another side thereof from which said cylindrical bodies are to be advanced; another pulling jack advancing arrangement which is removably attached to the front of the reaction facility; traction members which are arranged to pierce through the reaction facility, a horizontal hole provided in the natural ground, the first cylindrical body and every cylindrical body subsequent thereto and the pulling jack advancing arrangement; and attachable and detachable pieces which are attached to the traction members at the head portion of the pulling jack advancing arrangement, between one cylindrical body and another and in the rear of the hindmost cylindrical body.
34. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 12, said apparatus being arranged in the same manner as in claims 32 and 33 with the exception of that the traction members are not only provided with a pulling/thrusting jack advancing arrangement at their one end but also provided with another set of pulling/thrusting jack advancing arrangement which is disposed at the other end thereof.
35. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 13, said apparatus comprising in combination: thrusting jack advancing arrangements which are disposed between one cylindrical body and another and are removably attached respectively either to the fronts or to the rears of cylindrical bodies; a pulling jack advancing arrangement removably attached to the front of a second cylindrical body; connecting members which are arranged to pierce through said pulling jack advancing arrangement, the second cylindrical body and every cylindrical body disposed subsequently thereto; attachable and detachable fasteners connected to said connecting members at the head portion of the pulling jack advancing arrangement and in the rear of the hindmost cylindrical body;; a reaction facility which is installed on one side of a natural ground opposite to another side thereof from which the cylindrical bodies are to be advanced; another pulling jack advancing arrangement which is removably attached to the front of the reaction facility; traction members which are arranged to pierce through the pulling jack advancing arrangement, the reaction facility, a horizontal hole which is provided beforehand in the natural ground, the first cylindrical body and all of cylindrical bodies disposed subsequentlythereto; and attachable and detachable fixing pieces which are attached to the traction members at the head portion of the pulling jack arrangement, between one cylindrical body and another among the first and subsequent cylindrical bodies and in the rear of the hindmost cylindrical body.
36. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 14, said apparatus being arranged in the same manner as in claim 34 with the exception of that the pulling jack advancing arrangement which is disposed between said first and second cylindrical bodies is replaced with a pulling/thrusting jack advancing arrangement.
37. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 15, said apparatus being arranged in the same manner as in claim 35 with the exception of that an additional pulling jack advancing arrangement is disposed between the rear of said hindmost cylindrical body and said fixing pieces and is removably engaged with said traction members.
38. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 16, said apparatus comprising in combination: traction members arranged to pierce through two groups each consisting of more than two cylindrical bodies on first and second start bases confronting each other across a natural ground where said underground structure is to be constructed and through a horizontal hole which is provided in the natural ground beforehand; a pulling jack advancing arrangement disposed in the rear of the outermost of the cylindrical body group disposed on the second start base and is removably attached to the traction members;; attachable and detachable fixing pieces which are attached to the traction members between one cylindrical body and another among the group of cylindrical bodies disposed on the first start base and in the rear of the outermost cylindrical body of the same group; thrusting jack advancing arrangements which are removably attached to cylindrical bodies of the group aligned on the start base having the fixing pieces attached to the traction members; intermediate members attachably and detachably installed in between one cylindrical body and another on the second start base;; another pulling jack advancing arrangement attachably and detachably attached either to the front of the foremost cylindrical body or to the rear of the hindmost of the cylindrical body group disposed on the first start base, or the group having said thrusting jack advancing arrangements attached to cylindrical bodies; connecting members which are arranged to pierce through the whole cylindrical body group on the first start base and the pulling jack advancing arrangement; and attachable and detachable fasteners attached to both ends of said connecting members.
39. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 17, said apparatus being arranged in the same manner as in claim 38 with the exception of that said intermediate members are replaced with a thrusting jack advancing arrangement.
40. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 18, said apparatus being arranged in the same manner as in claim 38 with the exception of that said intermediate members are replaced with a thrusting jack advancing arrangement; another pulling jack advancing arrangement is attachably and detachably attached to the front of the foremost one or to the rear of the hindmost of the cylindrical body group on the same start base; and said attachable and detachable fixing pieces are further attached to said traction members between one cylindrical body and another among the same cylindrical body group disposed on the second start base.
41. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 19, said apparatus being arranged in the same manner as in claims 38,39 and 40 with the exception of that an additional pulling jack advancing arrangement is detachably attached to one end of the traction members in the rear of the hindmost cylindrical body in the same manner as the other end of the traction member.
42. An underground structure constructing apparatus adapted for carrying out the method set forth in claim 20, said apparatus being arranged in the same manner as in claims 38,39,40 and 41 with the exception of that said thrusting jack advancing arrangements, said fixing pieces and said fasteners disposed between one cylindrical body and another are arranged to be placed within cut-away parts which are provided in these cylindrical bodies.
43. Each and every novel aspect, taken singly or in any viable combination, of the methods described herein for the construction of an underground structure.
44. A method of constructing an underground structure substantially as described in any one of Examples 1 to 41, referring to the appropriate Figures of the accompanying drawings.
45. Each and every novel aspect, taken singly or in any viable combination, of the apparati described herein for the construction of an underground structure.
46. Apparatus for the construction of an underground structure substantially as hereinbefore described in any one of the Examples and as illustrated in the respective Figures of the accompanying drawings.
GB8028122A 1980-08-30 1980-08-30 Method and apparatus for constructing underground structures Expired GB2082652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB8028122A GB2082652B (en) 1980-08-30 1980-08-30 Method and apparatus for constructing underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB8028122A GB2082652B (en) 1980-08-30 1980-08-30 Method and apparatus for constructing underground structures

Publications (2)

Publication Number Publication Date
GB2082652A true GB2082652A (en) 1982-03-10
GB2082652B GB2082652B (en) 1985-01-03

Family

ID=10515754

Family Applications (1)

Application Number Title Priority Date Filing Date
GB8028122A Expired GB2082652B (en) 1980-08-30 1980-08-30 Method and apparatus for constructing underground structures

Country Status (1)

Country Link
GB (1) GB2082652B (en)

Also Published As

Publication number Publication date
GB2082652B (en) 1985-01-03

Similar Documents

Publication Publication Date Title
US4095435A (en) Method of advancing a plurality of longitudinally arranged movable constructional units forwardly successively in a self-running manner and apparatus for performing same
CN110359934A (en) Hexagonal pipe piece, supporting structure and tunnel construction method
US4352594A (en) Method and apparatus for constructing underground structure
GB2082652A (en) Method and apparatus for constructing underground structures
EP0231655B1 (en) Shield advancing excavator
US3818713A (en) Driving of tunnels
CN114033477B (en) Rapid labor-saving safety rescue method
CN115823349A (en) External circular cutting jacking pipe construction method
JP2006322167A (en) Starting jacking device of shield machine
US3950956A (en) Driving of tunnels
JP2000345790A (en) Shield machine, drive method for shield machine, and construction method for inclined shaft or vertical shaft
JPH0464697A (en) Construction of tunneling space
JP2940402B2 (en) Rock tunnel excavation method using arch machine
JPH05256098A (en) Construction method of underground structure having large section and split block used for said structure and excavator
JP2516582B2 (en) Tunnel construction method
JPS6145037B2 (en)
EP1028226A2 (en) Method and device for constructing an underground tunnel
JPH07331992A (en) Driving method and device for tunnel boring machine used with reaction unit
JPH011894A (en) In-situ lining method for shield tunnels
JP3416758B2 (en) Shield machine
JPH07197770A (en) Tunnel construction method and shield device used therefor
JPH01290893A (en) Construction of underground structure
JP2753750B2 (en) Split vertical shield machine
JP2000136698A (en) Material and method for tunnel timbering
JP2000096979A (en) Shield driving method and segment

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee