GB202117698D0 - Construction system for widened section of half-through arch bridge - Google Patents

Construction system for widened section of half-through arch bridge

Info

Publication number
GB202117698D0
GB202117698D0 GBGB2117698.7A GB202117698A GB202117698D0 GB 202117698 D0 GB202117698 D0 GB 202117698D0 GB 202117698 A GB202117698 A GB 202117698A GB 202117698 D0 GB202117698 D0 GB 202117698D0
Authority
GB
United Kingdom
Prior art keywords
construction system
arch bridge
widened section
widened
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
GBGB2117698.7A
Other versions
GB2599295A (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Bridge Engineering Co Ltd
Original Assignee
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN202020612323.7U external-priority patent/CN212561183U/en
Priority claimed from CN202010318658.2A external-priority patent/CN111691298B/en
Application filed by China Railway Guangzhou Engineering Group Co Ltd CRECGZ, CRECGZ Bridge Engineering Co Ltd filed Critical China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Publication of GB202117698D0 publication Critical patent/GB202117698D0/en
Publication of GB2599295A publication Critical patent/GB2599295A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
GB2117698.7A 2020-04-21 2020-12-31 Construction system for widened section of half-through arch bridge Pending GB2599295A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN202020612323.7U CN212561183U (en) 2020-04-21 2020-04-21 Construction system for wide section of half-through arch bridge
CN202010318658.2A CN111691298B (en) 2020-04-21 2020-04-21 Construction method for wide section of half-through arch bridge
PCT/CN2020/142077 WO2021212921A1 (en) 2020-04-21 2020-12-31 Construction system for widened section of half-through arch bridge

Publications (2)

Publication Number Publication Date
GB202117698D0 true GB202117698D0 (en) 2022-01-19
GB2599295A GB2599295A (en) 2022-03-30

Family

ID=78271090

Family Applications (1)

Application Number Title Priority Date Filing Date
GB2117698.7A Pending GB2599295A (en) 2020-04-21 2020-12-31 Construction system for widened section of half-through arch bridge

Country Status (2)

Country Link
GB (1) GB2599295A (en)
WO (1) WO2021212921A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000542A (en) * 2021-12-08 2022-02-01 北京市市政四建设工程有限责任公司 Steel pipe column and Bailey beam combined supporting structure and supporting method
CN114135096A (en) * 2021-12-31 2022-03-04 浙江城建建设集团有限公司 Ultrahigh structure formwork construction platform and implementation method thereof
CN114320367B (en) * 2021-12-31 2023-08-04 安徽水利开发有限公司 City gate opening type small-end-face tunnel and construction method
CN114319149A (en) * 2022-01-19 2022-04-12 中铁二十一局集团第五工程有限公司 Hanging basket structure for cantilever pouring construction for bridge and construction method
CN114892813B (en) * 2022-05-17 2023-11-10 中建二局第三建筑工程有限公司 Large-span building main body supporting steel structure and construction method
CN115784570A (en) * 2022-12-09 2023-03-14 彩虹显示器件股份有限公司 Platinum channel rear half section integral hoisting structure and use method thereof
CN116122190B (en) * 2023-04-13 2023-06-27 山西建投建筑产业有限公司 Construction structure and construction process for assembled integral multi-cabin drainage box culvert

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587293B (en) * 2012-03-22 2014-01-15 中铁大桥局股份有限公司 System and method for cradle cantilever construction of variable-width section concrete girder
CN104631333B (en) * 2015-01-29 2017-01-04 中铁港航局集团有限公司 Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method
CN204825676U (en) * 2015-06-26 2015-12-02 中交一公局厦门工程有限公司 A hang basket device that is used for widen bridge floor variable cross section case roof beam cantilever to pour
CN107100074A (en) * 2017-05-03 2017-08-29 中铁十六局集团第三工程有限公司 A kind of lower bearing arch bridge concrete bridge deck construction method
CN108978478A (en) * 2018-08-06 2018-12-11 广州市第三市政工程有限公司 Bridge cast-in-situ box-beam deck-type bearing frame system and its construction method
CN109137747B (en) * 2018-10-22 2023-09-26 中铁大桥局集团有限公司 Elastic hanging bracket for large-span arch bridge girder construction
CN111691298B (en) * 2020-04-21 2021-11-30 中铁广州工程局集团有限公司 Construction method for wide section of half-through arch bridge

Also Published As

Publication number Publication date
WO2021212921A1 (en) 2021-10-28
GB2599295A (en) 2022-03-30

Similar Documents

Publication Publication Date Title
GB202117698D0 (en) Construction system for widened section of half-through arch bridge
EP4086804A4 (en) Method for determining number of crossed hangers for cooperative system bridge
EP3964647A4 (en) Tool for dismounting travellers for concreting large arches of viaducts
GB202214180D0 (en) Electrophoresis system
GB201905303D0 (en) Multiplex assembly of nucleic acid molecules
IL307832A (en) Engineering of antigen-binding proteins
GB2597353B (en) Construction of an arch
ZA202106824B (en) Method for the purification of acrylamido-2-methyl-2-propanesulphonic acid
GB202106943D0 (en) Construction of an arch
IT201900025186A1 (en) Method for the purification of cysteamine
EP3873879A4 (en) 2-position modification for synthesis of resorcinol scaffolding
SG11202104588TA (en) Multi-degree of freedom elevator ride system
GB202203252D0 (en) Bridge structure
ZA202201614B (en) Fixing support for bridge engineering
CA214775S (en) Block for construction
CA214773S (en) Block for construction
GB202216498D0 (en) Construction system
GB2611395B (en) Crossing bridge
CA215841S (en) Set of levers
CA215842S (en) Set of levers
CA215843S (en) Set of levers
HU5733U (en) Low profile temporary bridge
GB202019607D0 (en) Purification of proteins
ES1236709Y (en) POINT ANCHORING OF CONSTRUCTION PLATES
GB202106811D0 (en) Alignment of map segments