FR3108598A1 - Brick Manipulator Arm - Google Patents

Brick Manipulator Arm Download PDF

Info

Publication number
FR3108598A1
FR3108598A1 FR2003155A FR2003155A FR3108598A1 FR 3108598 A1 FR3108598 A1 FR 3108598A1 FR 2003155 A FR2003155 A FR 2003155A FR 2003155 A FR2003155 A FR 2003155A FR 3108598 A1 FR3108598 A1 FR 3108598A1
Authority
FR
France
Prior art keywords
bricks
concrete blocks
handling
load
lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR2003155A
Other languages
French (fr)
Other versions
FR3108598B1 (en
Inventor
Vincent Hertrich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR2003155A priority Critical patent/FR3108598B1/en
Publication of FR3108598A1 publication Critical patent/FR3108598A1/en
Application granted granted Critical
Publication of FR3108598B1 publication Critical patent/FR3108598B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • B66C1/442Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces actuated by lifting force
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/207Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided by wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Manipulator (AREA)

Abstract

La présente invention permet de manutentionner avec un effort très faible une ou deux briques ou parpaings lors de la maçonnerie. Elle réduit ou supprime les troubles musculosquelettiques liés à la manutention des briques et parpaings. Le bras manipulateur de briques peut être replié pour le transport et déployée pour l’utilisation, ceci sans démontage. L'invention est également adaptée à des manutentions autres que la maçonnerie et n'est pas uniquement réservée aux chantiers. Le bras manipulateur de briques ou parpaings, sans contrepoids, peut être ancré dans la dalle. Il est démontable et dans ce cas, il ne nécessite pas de moyen de manutention pour le déplacement. Le dispositif comprend la potence, le palan ou équilibreur motorisé, l’outil de préhension spécifique à la charge à déplacer. FIGURE POUR L’ABREGE : Fig 3The present invention makes it possible to handle one or two bricks or concrete blocks during masonry with very little effort. It reduces or eliminates musculoskeletal disorders linked to the handling of bricks and concrete blocks. The brick handling arm can be folded for transport and deployed for use, without dismantling. The invention is also suitable for handling other than masonry and is not only reserved for construction sites. The brick or concrete block manipulator arm, without counterweight, can be anchored in the slab. It can be dismantled and in this case, it does not require handling means for movement. The device includes the jib, the hoist or motorized balancer, the gripping tool specific to the load to be moved. FIGURE FOR ABSTRACT: Fig 3

Description

Bras Manipulateur de BriquesBrick Manipulator Arm

Domaine technique de l'inventionTechnical field of the invention

La présente invention se situe dans le domaine de l'assistance à la manutention de charges (14) telles que briques ou parpaings plus particulièrement sur les chantiers de maçonnerie.The present invention is in the field of assistance in the handling of loads (14) such as bricks or blocks more particularly on masonry sites.

Pour construire, les maçons manutentionnent à la force de leurs muscles, les briques ou parpaings, partant de la palette de conditionnement des briques ou parpaings pour les poser, une à une, après encollage ou pose de mortier, sur la maçonnerie en cours. Cette manutention est à l'origine de nombreux troubles musculosquelettiques et arrêts de travail, le poids d'une brique ou parpaing varie en général de 12 à 18 kilogrammes, ce qui représente des centaines de kilogrammes de manutention par jour et par personne.To build, the masons use the strength of their muscles to handle the bricks or concrete blocks, starting from the packaging pallet of the bricks or concrete blocks to lay them, one by one, after gluing or laying mortar, on the masonry in progress. This handling is the cause of many musculoskeletal disorders and work stoppages, the weight of a brick or concrete block generally varies from 12 to 18 kilograms, which represents hundreds of kilograms of handling per day and per person.

Certains équipements industriels permettent de manutentionner des briques ou des parpaings en atelier, mais ils ne sont pas adaptés à la manutention d’une ou deux pièces, ni au transport et à l'utilisation sur chantier.Some industrial equipment makes it possible to handle bricks or concrete blocks in the workshop, but they are not suitable for handling one or two pieces, nor for transport and use on site.

Il n'existe pas à ma connaissance d'outil de préhension de briques ou parpaings qui soit simple et sans apport d’énergie extérieure pour le serrage.To my knowledge, there is no tool for gripping bricks or concrete blocks that is simple and without external energy input for tightening.

La présente invention permet aux maçons de manutentionner les briques ou parpaings lors de la maçonnerie sur chantier avec un faible effort. Cette invention permet le déplacement de la charge (14) dans les trois dimensions avec une assistance d'énergie pour le levage. Elle supprime les troubles musculosquelettiques liés à la manutention des briques et parpaings sur chantier. Le bras manipulateur de brique ou parpaing est conçu pour être déplacé d'un poste de travail à un autre sur un même chantier, ou d'un chantier à un autre. L'invention est également adaptée à des manutentions autres que la maçonnerie et n'est pas uniquement réservée aux chantiers.The present invention allows masons to handle bricks or concrete blocks during masonry on site with little effort. This invention allows the movement of the load (14) in three dimensions with energy assistance for lifting. It eliminates musculoskeletal disorders related to the handling of bricks and concrete blocks on site. The brick or block manipulator arm is designed to be moved from one workstation to another on the same site, or from one site to another. The invention is also suitable for handling other than masonry and is not only reserved for building sites.

Les outils de préhension ou pinces de cette invention sont autobloquants et ne nécessitent pas d'énergie ou de manœuvre additionnelle pour le serrage et le maintien du serrage.The gripping tools or pliers of this invention are self-locking and do not require additional energy or maneuver for clamping and maintaining clamping.

Des explications concrètes correspondant à au moins un mode de réalisation, ainsi que la manière dont l’invention est applicable industriellement sont données tout au long de l’exposé.Concrete explanations corresponding to at least one embodiment, as well as the way in which the invention is industrially applicable are given throughout the presentation.

L'invention Fig 1 est composée d'une potence de manutention spéciale, d'un palan (12) alimenté en énergie, d'un outil de préhension (13) de la charge (14). L'ensemble comprend de nombreuses fonctions et est d'une utilisation simple.The invention Fig 1 is composed of a special handling jib, a hoist (12) supplied with energy, a gripping tool (13) of the load (14). The set includes many functions and is easy to use.

L'invention permet, la préhension de briques ou parpaings sur une palette de conditionnement, le soulèvement à la hauteur voulue à l'aide du palan (12) motorisé, le déplacement manuel sans effort pour les translations, la dépose des briques ou parpaings avec précision à l'endroit choisi par le maçon, dans le rayon d'action de la potence.The invention allows the gripping of bricks or concrete blocks on a packaging pallet, the raising to the desired height using the motorized hoist (12), the effortless manual movement for translations, the removal of the bricks or concrete blocks with precision at the location chosen by the mason, within the radius of action of the jib crane.

L'invention permet la préhension, le déplacement dans les trois dimensions et le décrochage de la charge (14) sans effort par une seule personne sans lâcher les poignées de guidage.The invention allows gripping, movement in three dimensions and unhooking of the load (14) effortlessly by a single person without letting go of the guide handles.

L'invention supprime les troubles musculosquelettiques liés à la manutention répétitive de charges (14) mentionnés plus haut.The invention eliminates the musculoskeletal disorders associated with the repetitive handling of loads (14) mentioned above.

L’invention est prévue pour être déplacée d’un poste de travail à un autre et d’un chantier à un autre.The invention is intended to be moved from one workstation to another and from one site to another.

Le bras manipulateur de briques comprend : La potence, Le palan, L'outil de préhension.The brick manipulator arm includes: The jib crane, The hoist, The gripping tool.

La potence Fig 1 comprend plus précisément :The stem Fig 1 includes more precisely:

L'embase (1) fixe qui reçoit le contrepoids principal pour compenser l’effort de basculement résultant de la charge (14) suspendue au palan (12). Pour assurer la stabilité de la potence, selon un autre exemple, non représenté, des contrepoids additionnels pourront être fixés sur le fourreau (4) tournant, les contrepoids additionnels seront toujours à l’opposé de la charge, ce qui réduit le dimensionnement du contrepoids principal.The fixed base (1) which receives the main counterweight to compensate for the tilting force resulting from the load (14) suspended from the hoist (12). To ensure the stability of the stem, according to another example, not shown, additional counterweights can be fixed on the rotating sheath (4), the additional counterweights will always be opposite the load, which reduces the dimensioning of the counterweight major.

Selon une autre variante non illustrée, et dans le cas où le poids de la potence pose un problème de manutention à certains clients, la stabilité de la potence est assurée par un ancrage de l’embase à travers la dalle sur laquelle repose la potence. Par exemple, l’ancrage peut être réalisé par un tirant du type tige filetée, couramment utilisé dans la construction, traversant la dalle. L’effort du tirant sera repris sous la surface de la dalle par une platine de répartition de charge. Dans un autre exemple, la platine (1) est ancrée au sol par les moyens usuels de fixation, tels des chevilles, directement fixées dans le sol qui est en général une dalle de béton. Dans un autre exemple, la platine (1) est reliée par un ou plusieurs tirants à un élément noyé dans la dalle en béton au moment de sa réalisation. La potence n’aura pas besoin de contrepoids pour assurer la stabilité, le déplacement du bras manipulateur de brique dans cette version ne nécessite pas de moyen de levage annexe. Le poids de chaque élément démonté ne dépasse pas 48 kg, ce qui permet une manutention de chaque élément par deux personnes. Dans une application industrielle, on utilisera surtout de l’aluminium.
Cette configuration sera appréciée par les artisans et petites entreprises qui n’ont pas de moyens de manutention.
Le fourreau (4) articulé selon un axe vertical (2) est monté sur l'embase (1) par l'intermédiaire de roulements ou de bagues d'articulation. La platine (3) Fig 7, qui peut être circulaire, est solidaire du fourreau (4). La mise en place d’une ou plusieurs piges de positionnement (24) dans la platine permet le blocage de sécurité en rotation lors du transport ou la limitation de la rotation lors du travail pour éviter toute interférence avec l'environnement de travail. Le freinage de la rotation du fourreau (4) et donc du mât (6) et du bras articulé (9) est réglable grâce à un patin de freinage (21) et un ressort (22) réglable, le freinage permet de limiter l'inertie de l'ensemble tournant et assure plus de confort au déplacement et positionnement de la charge (14).
According to another variant not shown, and in the event that the weight of the jib crane poses a handling problem for certain customers, the stability of the jib crane is ensured by anchoring the base through the slab on which the jib crane rests. For example, the anchoring can be achieved by a tie rod of the threaded rod type, commonly used in construction, passing through the slab. The force of the tie rod will be taken up under the surface of the slab by a load distribution plate. In another example, the plate (1) is anchored to the ground by the usual fixing means, such as dowels, directly fixed in the ground which is generally a concrete slab. In another example, the plate (1) is connected by one or more tie rods to an element embedded in the concrete slab at the time of its production. The jib crane will not need counterweights to ensure stability, the movement of the brick manipulator arm in this version does not require any additional lifting means. The weight of each disassembled element does not exceed 48 kg, which allows handling of each element by two people. In an industrial application, mainly aluminum will be used.
This configuration will be appreciated by craftsmen and small businesses that do not have handling equipment.
The sheath (4) articulated along a vertical axis (2) is mounted on the base (1) by means of bearings or articulation rings. The plate (3) Fig 7, which may be circular, is secured to the sheath (4). The installation of one or more positioning pegs (24) in the plate allows the safety blocking in rotation during transport or the limitation of rotation during work to avoid any interference with the working environment. The braking of the rotation of the sheath (4) and therefore of the mast (6) and of the articulated arm (9) is adjustable thanks to a braking pad (21) and an adjustable spring (22), the braking makes it possible to limit the inertia of the rotating assembly and ensures more comfort in moving and positioning the load (14).

Le mât (6) d'une hauteur d’environ 3 à 5 mètres est guidé à l’intérieur du fourreau (4) en forme de U Fig 7 par une articulation selon un axe horizontal (5). Le mât est verrouillé en position verticale par la fixation rapide non représentée placée dans la zone (7) Fig 1. L'articulation selon l'axe horizontal (5) permet au mât (6) de passer de la position de travail verticale Fig 1 et Fig 3 à la position de transport horizontale Fig 2. Le fourreau en forme de U limite le basculement du mât à la position verticale, et l’empêche de basculer coté charge. Le basculement du mât de la verticale à l’horizontale ne peut se faire qu’à l’opposé de la charge, quelles que soient les situations. C’est un bon élément de sécurité pour les manœuvres de chantier.The mast (6) with a height of about 3 to 5 meters is guided inside the U-shaped sheath (4) Fig 7 by a hinge along a horizontal axis (5). The mast is locked in the vertical position by the quick fastening not shown placed in the area (7) Fig 1. The articulation along the horizontal axis (5) allows the mast (6) to pass from the vertical working position Fig 1 and Fig 3 in the horizontal transport position Fig 2. The U-shaped sheath limits the tilting of the mast to the vertical position, and prevents it from tilting on the load side. The tilting of the mast from vertical to horizontal can only be done opposite the load, whatever the situation. It is a good safety element for site maneuvers.

Dans un exemple de réalisation, le mât (6) et le bras articulé (9) ont des sections rectangulaires Fig4 (25) qui s’emboitent et sont ainsi solidaires en rotation. Le bras articulé (9) peut coulisser verticalement sur le mât grâce au guidage par les galets (26) ou des patins. Pour le mât et le bras, d’autres sections et d’autres guidage, par exemple circulaires peuvent être utilisés.In an exemplary embodiment, the mast (6) and the articulated arm (9) have rectangular sections Fig4 (25) which fit together and are thus integral in rotation. The articulated arm (9) can slide vertically on the mast thanks to the guide by the rollers (26) or pads. For the mast and the arm, other sections and other guides, for example circular can be used.

Le levier de manutention (15) articulé Fig 4, fixé à l'extrémité haute du mât (6), permet de soulever et déplacer l'ensemble du bras manipulateur de briques. Lorsqu’il n’est pas sollicité, ce levier bascule à l'horizontale et laisse ainsi, de par sa longueur, un espace entre la sangle (16) et le mât (6) pour ne pas gêner le réglage en hauteur du bras articulé (9). Le levier est vertical lorsqu’il est sollicité Fig 5. Le déplacement du bras manipulateur de brique d'un poste de travail à un autre se fait à l'aide d'un moyen de levage annexe disponible sur le chantier par accrochage à la sangle (16) ou câble ou chaîne de levage. Cette sangle (16), ou autre moyen de liaison, est fixée à demeure au levier de manutention (15) et est de longueur suffisante pour pouvoir être accessible par un opérateur au sol.The handling lever (15) articulated Fig 4, fixed to the upper end of the mast (6), makes it possible to lift and move the assembly of the brick manipulator arm. When it is not used, this lever tilts to the horizontal and thus leaves, by its length, a space between the strap (16) and the mast (6) so as not to interfere with the height adjustment of the articulated arm. (9). The lever is vertical when it is stressed Fig 5. The movement of the brick manipulator arm from one workstation to another is done using an additional lifting means available on the site by hooking to the strap (16) or lifting cable or chain. This strap (16), or other connecting means, is fixed permanently to the handling lever (15) and is of sufficient length to be accessible by an operator on the ground.

En position déployée, la potence a une hauteur de l’ordre de 4 à 5 mètres pour une hauteur de maçonnerie utile d’environ 3 mètres. Pour aller d’un chantier à un autre, la potence doit pouvoir être transportée par la route, la réduction de la hauteur de l’invention à 2,5m pour le transport Fig 2, se fait par basculement du mât (6) à l’opposé de la charge, selon son axe horizontal (5). Cette limitation de l'encombrement en hauteur du bras manipulateur de briques permet l'utilisation des véhicules de transport routier généralement utilisés dans la profession.In the deployed position, the jib crane has a height of around 4 to 5 meters for a useful masonry height of around 3 meters. To go from one construction site to another, the jib crane must be able to be transported by road, the reduction of the height of the invention to 2.5 m for transport Fig 2, is done by tilting the mast (6) at the opposite the load, along its horizontal axis (5). This limitation of the overall height of the brick manipulator arm allows the use of road transport vehicles generally used in the profession.

Le bras articulé (9) Fig 1, dans notre exemple, comprend en son milieu un double axe vertical (10) permettant au bras articulé d’être plié en son milieu. Le bras articulé peut coulisser verticalement le long du mât (6). Le bras articulé (9) et le mât (6) sont solidaires en rotation. La charge fixée à l'extrémité du bras articulé (9) peut balayer une zone horizontale, ceci grâce aux axes de rotation (2) et (10). Le réglage en hauteur du bras articulé (9) se fait en actionnant le treuil de réglage (8) ou un autre moyen de levage. Dans un exemple d’application le bras articulé peut avoir une longueur d’environ 4 mètres, dans ce cas, la surface desservie par le crochet du palan correspond à celle d’un cercle de diamètre 8 mètres, pour un usage courant dans la construction.
L'opérateur est placé au sol ou sur une plateforme, un échafaudage ou des tréteaux pour la partie haute de la construction. Le bras articulé sera réglé en hauteur Fig 1 de telle manière que l'extrémité du bras articulé (9) et le palan (12) restent à une hauteur d’environ 2 mètres des pieds de l'opérateur. Cette distance étant courte, les manœuvres de déplacement horizontal de la charge (14) ne nécessitent qu’un faible effort.
The articulated arm (9) Fig 1, in our example, comprises in its middle a double vertical axis (10) allowing the articulated arm to be folded in its middle. The articulated arm can slide vertically along the mast (6). The articulated arm (9) and the mast (6) are integral in rotation. The load attached to the end of the articulated arm (9) can sweep a horizontal zone, thanks to the axes of rotation (2) and (10). The height adjustment of the articulated arm (9) is done by operating the adjustment winch (8) or another lifting means. In an example of application the articulated arm can have a length of approximately 4 meters, in this case, the surface served by the hook of the hoist corresponds to that of a circle with a diameter of 8 meters, for common use in construction .
The operator is placed on the ground or on a platform, scaffolding or trestles for the upper part of the construction. The articulated arm will be adjusted in height Fig 1 in such a way that the end of the articulated arm (9) and the hoist (12) remain at a height of approximately 2 meters from the feet of the operator. This distance being short, the maneuvers of horizontal movement of the load (14) require only a small effort.

Une protection intempérie (11) est fixée au-dessus du palan (12) ou de tout autre moyen de levage de la charge. Cela permet l’utilisation de moyens de levage électriques comme dans notre exemple, le palan (12) dont l’usage est prévu à l’abri des intempéries. La protection (11) peut être en matériau rigide ou souple.A weather protection (11) is fixed above the hoist (12) or any other means of lifting the load. This allows the use of electric lifting means as in our example, the hoist (12) whose use is planned sheltered from bad weather. The protection (11) can be made of rigid or flexible material.

Le treuil (8) Fig 1 manuel ou électrique est, dans notre exemple, fixé à la base du mât (6), son câble relie le bras articulé (9) par des poulies de renvois situés en haut du mât (6), (poulies et câble non représentés). L’action sur le treuil permet ainsi le réglage en hauteur du bras articulé (9) en fonction de l'avancement de la hauteur de la construction. Dans notre exemple d’application le treuil est équipé d’un frein de sécurité intégré.The manual or electric winch (8) Fig 1 is, in our example, fixed to the base of the mast (6), its cable connects the articulated arm (9) by return pulleys located at the top of the mast (6), ( pulleys and cable not shown). The action on the winch thus allows the height adjustment of the articulated arm (9) according to the advancement of the height of the construction. In our application example the winch is equipped with an integrated safety brake.

La sécurité antichute est assurée par le levier de sécurité (17) Fig 6 solidaire du bras articulé (9) par l’axe horizontal (18). Dans la position de travail, le levier (17) prend appui sur un des taquets de sécurité (19) qui sont solidaires du mât (6). Lorsque le bras (9) coulisse vers le haut, le levier (17) est basculé au passage de chaque taquet (19) et se met automatiquement en position de sécurité. L’opérateur choisi la hauteur de la position de travail du palan, en redescendant le bras de quelques centimètres, le levier de sécurité (17) sous l’effet de la gravité, ou d’un ressort, se remet en position verticale et est bloqué par le taquet de sécurité (19), ce qui positionne et bloque le bras (9) en hauteur. Les taquets de sécurités sont fixés sur le mât (6) avec un espacement de l'ordre de 500 millimètres, ou autre valeur, ce qui assure une sécurité antichute de tous les éléments soumis à la gravité tels que la charge (14), le palan (12), le bras articulé (9). En cas de rupture du câble reliant le treuil (8) au bras articulé (9), le levier de sécurité stoppe la chute et protège l’opérateur. Le levier de sécurité (17) a une forme symétrique, ce qui évite les erreurs de montage en fabrication ou en après-vente.
Pour abaisser l’ensemble bras articulé et palan, l’opérateur actionne le treuil, monte le bras articulé de quelques centimètres, tire sur la liaison flexible (20), pour dégager le levier de sécurité (17) du taquet (19). L’opérateur placé au sol peut ainsi descendre ou monter le bras (9) en toute sécurité. La liaison flexible, par exemple une cordelette, aura une longueur suffisante pour être accessible par un opérateur au sol.
The fall protection is provided by the safety lever (17) Fig 6 secured to the articulated arm (9) by the horizontal axis (18). In the working position, the lever (17) rests on one of the safety catches (19) which are integral with the mast (6). When the arm (9) slides upwards, the lever (17) is tilted as each cleat (19) passes and automatically goes into the safety position. The operator chooses the height of the working position of the hoist, by lowering the arm a few centimeters, the safety lever (17) under the effect of gravity, or a spring, returns to the vertical position and is blocked by the safety latch (19), which positions and blocks the arm (9) in height. The safety cleats are fixed on the mast (6) with a spacing of the order of 500 millimeters, or another value, which ensures fall protection of all the elements subjected to gravity such as the load (14), the hoist (12), the articulated arm (9). If the cable connecting the winch (8) to the articulated arm (9) breaks, the safety lever stops the fall and protects the operator. The safety lever (17) has a symmetrical shape, which avoids assembly errors during manufacture or after-sales.
To lower the articulated arm and hoist assembly, the operator activates the winch, raises the articulated arm a few centimeters, pulls on the flexible connection (20), to disengage the safety lever (17) from the cleat (19). The operator placed on the ground can thus lower or raise the arm (9) in complete safety. The flexible connection, for example a cord, will have a sufficient length to be accessible by an operator on the ground.

Tous les réglages, manœuvres, accrochages du bras manipulateur de briques se font du sol à hauteur d'homme, et ne nécessitent ni escabeau ni échelle. Le bras manipulateur de brique permet à titre d'exemple de maçonner une hauteur de mur de 3 mètres. L’opérateur et les pièces à maçonner étant sur une hauteur variable, (tréteaux ou plateforme de travail réglable en hauteur), indépendante du bras manipulateur de briques.All adjustments, maneuvers, attachments of the brick manipulator arm are made from the ground at eye level, and do not require a stepladder or ladder. The brick manipulator arm allows for example to build a wall height of 3 meters. The operator and the pieces to be built are at a variable height (trestle or height-adjustable work platform), independent of the brick handling arm.

La contrainte liée à la règlementation de sécurité des moyens de levage est réduite pour cette invention. Le dispositif, peut être déployé pour déplacer la charge (14) Fig 1 et Fig 3 et replié pour le transport Fig 2. Ne nécessitant pas de démontage pour le déplacement, le bras de manutention de briques rentre dans la catégorie des moyens de levage nécessitant une vérification périodique obligatoire tous les six mois. Par opposition, les moyens de levage nécessitant un démontage pour le déplacement sont soumis à une vérification périodique à chaque déplacement sur un même site ou d’un site à l’autre.The constraint related to the safety regulations of lifting means is reduced for this invention. The device can be deployed to move the load (14) Fig 1 and Fig 3 and folded for transport Fig 2. Not requiring dismantling for movement, the brick handling arm falls into the category of lifting means requiring a mandatory periodic check every six months. In contrast, lifting means requiring dismantling for movement are subject to periodic verification each time they are moved to the same site or from one site to another.

Le palan (12)The hoist (12)

Dans cette présentation Fig 1 le palan (12), alimenté en énergie, est fixé à l'extrémité du bras articulé (9), il permet de soulever la charge sans effort. Pour plus de confort, la commande de montée et de descente peut être située près de l’outil de préhension (13), et la vitesse de levée et de descente peut être variable. La commande peut également être radiocommandée. Dans une autre variante, le palan (12) à chaîne ou à câble peut être remplacé par un équilibreur de charge alimenté en énergie, il peut être placé près de l’articulation du bras (10), ou près du mât (6) ou près du fourreau (4) avec des poulies de renvoi d’effort aux articulations.In this presentation Fig 1 the hoist (12), supplied with energy, is attached to the end of the articulated arm (9), it allows the load to be lifted effortlessly. For more comfort, the raising and lowering control can be located near the gripping tool (13), and the lifting and lowering speed can be variable. The control can also be radio controlled. In another variant, the chain or cable hoist (12) can be replaced by a load balancer supplied with energy, it can be placed close to the joint of the arm (10), or close to the mast (6) or close to the sheath (4) with effort return pulleys at the joints.

L'outil de préhension (13) ou aussi appelé pinceThe gripping tool (13) or also called pliers

Points communs aux pincesCommon points to pliers

L’outil (13) Fig 1 est adapté aux différentes dimensions, formes et charges (14) des briques, parpaings ou autres éléments à manipuler. Le serrage de l'outil de préhension (13) sur la charge (14) utilise la gravité de la charge et aucune énergie additionnelle.The tool (13) Fig 1 is adapted to the different dimensions, shapes and loads (14) of the bricks, concrete blocks or other elements to be handled. The clamping of the gripping tool (13) on the load (14) uses the gravity of the load and no additional energy.

Une sangle (37), ou câble ou chaîne ou autre élément mobile tel que un ou deux anneaux, fait la liaison entre l'anneau de levage (26) et le crochet de levage du palan (12), ceci facilite grandement la préhension de la charge et sa dépose.A strap (37), or cable or chain or other movable element such as one or two rings, makes the connection between the lifting ring (26) and the lifting hook of the hoist (12), this greatly facilitates the gripping of the load and its removal.

Toutes les pinces permettent la préhension de briques ou parpaing, le déplacement, le trempé dans la colle de maçonnerie, généralement dans un bac, puis le positionnement de la charge sur le mur à maçonner sans trace de colle sur la pinceAll the clamps allow the gripping of bricks or concrete blocks, the displacement, the dipping in the masonry glue, generally in a tray, then the positioning of the load on the wall to be masonry without trace of glue on the clamp

Dans notre exemple, Il y a essentiellement trois principes d’outils de préhension ou pinces et leurs variantes dimensionnelles. Toutes ces variantes représentées Fig 8 à Fig 13 permettent la prise et la dépose de la charge sans que l’opérateur ne lâche les poignées de manutention (25), cela permet une productivité intéressante.In our example, there are essentially three principles of gripping tools or pliers and their dimensional variants. All these variants shown in Fig 8 to Fig 13 allow the load to be picked up and set down without the operator letting go of the handling handles (25), this allows interesting productivity.

Points particuliers des pincesParticular points of pliers

Pince autobloquante pour briques avec cavités remplies d'isolant(35) Fig 8, 9, 10, 14, 15 Self-locking pliers for bricks with cavities filled with insulation (35) Fig 8, 9, 10, 14, 15

La pince autobloquante pour briques avec cavités remplies d'isolant (35) comprend la poignée (25), l'anneau de levage (26) positionné au droit du centre de gravité de la charge à soulever, le levier autobloquant (27) avec, à sa partie haute, la platine de retenue (31) et à la partie basse, la platine de serrage (28) équipée ou pas de plots de pression (29), l'ensemble forme une unité rigide.The self-locking clamp for bricks with cavities filled with insulation (35) comprises the handle (25), the lifting ring (26) positioned at the right of the center of gravity of the load to be lifted, the self-locking lever (27) with, at its upper part, the retaining plate (31) and at the lower part, the clamping plate (28) equipped or not with pressure pads (29), the assembly forms a rigid unit.

La poignée et le levier peuvent être réalisés en une seule ou plusieurs pièces. La paroi interne de la brique est perpendiculaire à la paroi extérieure. Suivant les modèles de briques, la platine de retenue aura une encoche Fig 15 en son milieu pour laisser le passage de la paroi interne de la brique. L'espace laissé entre la poignée (25) et la platine de retenue (31) protège la main de l'opérateur.The handle and the lever can be made in one or more parts. The inner wall of the brick is perpendicular to the outer wall. Depending on the brick models, the retaining plate will have a notch Fig 15 in the middle to allow the passage of the internal wall of the brick. The space left between the handle (25) and the retaining plate (31) protects the operator's hand.

La platine de retenue (31) qui va être engagée entre la paroi extérieure de la brique et l'isolant intérieur est de faible épaisseur pour ne pas détériorer l'isolant. Un espace d’environ deux fois l'épaisseur de la paroi de la brique sépare la platine de retenue (31) du levier (27) pour faciliter l’engagement. Pour assurer un blocage et coincement lors du soulèvement de la pince, la distance entre la platine de retenue (31) et la platine de serrage (28) correspond à environ 20 ou 25% de la hauteur de la brique.The retaining plate (31) which will be engaged between the exterior wall of the brick and the interior insulation is thin so as not to damage the insulation. A space of approximately twice the thickness of the brick wall separates the retaining plate (31) from the lever (27) to facilitate engagement. To ensure blocking and wedging when the clamp is raised, the distance between the retaining plate (31) and the clamping plate (28) corresponds to approximately 20 or 25% of the height of the brick.

Pour accrocher la charge, l’opérateur, qui tient l’outil de préhension par la poignée (25), engage la platine de retenue dans la cavité de la brique entre la paroi extérieure de la brique et l'isolant intérieur. Lors du soulèvement de l'anneau de levage (26), par inclinaison du levier autobloquant (27), la platine de serrage (28) appuie sur la paroi extérieure de la brique, tandis que la platine de retenue (31), par réaction, appuie sur la paroi intérieure. Ce serrage permet d’entrainer la charge.To attach the load, the operator, who holds the gripping tool by the handle (25), engages the retaining plate in the cavity of the brick between the exterior wall of the brick and the interior insulation. When the lifting ring (26) is raised, by tilting the self-locking lever (27), the clamping plate (28) presses on the outer wall of the brick, while the retaining plate (31), by reaction , presses on the inner wall. This tightening allows the load to be driven.

Pour dégager la pince sans effort, il suffit de relâcher la tension de levage sur l’anneau et dégager la pince par action sur la poignée.To release the clamp effortlessly, simply release the lifting tension on the ring and release the clamp by action on the handle.

Dans un autre exemple Fig 14 et suivant la disposition des briques sur la palette de livraison, les dimensions et formes des platines de retenue (31) et de serrage (28) permettent la préhension de deux briques (35) simultanément, la platine de retenue aura un évidement qui permet le passage des parois extérieures jointives des briques. Cela confère à ce dispositif un gain de productivité exceptionnel lors de la maçonnerie.In another example Fig 14 and depending on the arrangement of the bricks on the delivery pallet, the dimensions and shapes of the retaining (31) and clamping (28) plates allow the gripping of two bricks (35) simultaneously, the retaining plate will have a recess that allows the passage of the adjoining outer walls of the bricks. This gives this device an exceptional gain in productivity during masonry.

Cette pince est adaptée à la préhension de briques avec cavités remplies d’isolant.This gripper is suitable for gripping bricks with cavities filled with insulation.

Pince autobloquante pour briques ou parpaings avec cavités (34)Fig 11 et 12 Self-locking pliers for bricks or concrete blocks with cavities (34) Fig 11 and 12

La pince autobloquante pour briques ou parpaing avec cavités (34) comprend la poignée (25) avec l'anneau de levage (26) positionné au droit du centre de gravité de la charge à soulever. Le levier autobloquant (27) avec deux platines de serrage (28) équipées ou non de plots de pression (29) se situe à l'autre extrémité de la poignée, l'ensemble forme une unité rigide. La poignée et le levier peuvent être réalisés en une ou plusieurs pièces, les plots de pression peuvent être obtenus par une forme en saillie de la platine ou par des pièces rapportées, facilement remplacées par suite de l’usure, comme sur les Fig 11 et 12. Par exemple des vis pointeau ou rivets en inox ou autre matériau peuvent convenir.The self-locking clamp for bricks or concrete blocks with cavities (34) comprises the handle (25) with the lifting ring (26) positioned at the right of the center of gravity of the load to be lifted. The self-locking lever (27) with two clamping plates (28) equipped or not with pressure pads (29) is located at the other end of the handle, the assembly forms a rigid unit. The handle and the lever can be made in one or more parts, the pressure pads can be obtained by a projecting shape of the plate or by added parts, easily replaced as a result of wear, as in Figs 11 and 12. For example grub screws or rivets in stainless steel or other material may be suitable.

Les deux platines de serrage (28) sont fixées en opposition sur le levier autobloquant (27). La distance entre les platines de serrage (28) est déterminante pour le blocage et coincement, et donc pour l'effort de la liaison entre la charge à soulever et l'outil de préhension lors du soulèvement. Dans un exemple d’application, la distance entre les plaques de pression, de l’ordre de 20 à 30% de la hauteur de la brique, convient pour une préhension sécurisée.The two clamping plates (28) are fixed in opposition to the self-locking lever (27). The distance between the clamping plates (28) is decisive for blocking and wedging, and therefore for the force of the connection between the load to be lifted and the gripping tool during lifting. In an example application, the distance between the pressure plates, in the order of 20 to 30% of the height of the brick, is suitable for a secure grip.

Pour soulever la charge, le levier autobloquant est engagé dans la cavité existante de la charge à soulever. Lors du soulèvement de l'anneau de levage (26), par inclinaison du levier autobloquant, les plots de pression (29) des deux platines de serrage (28) appuient sur les parois de la cavité et entraine la pièce. La cale de distance (38), fixée sur la poignée, positionne l'engagement de la pince dans la charge à soulever et protège la main de l'opérateur.To lift the load, the self-locking lever is engaged in the existing cavity of the load to be lifted. When the lifting ring (26) is raised, by tilting the self-locking lever, the pressure pads (29) of the two clamping plates (28) press against the walls of the cavity and drag the part. The spacer (38), fixed to the handle, positions the clamp engagement in the load to be lifted and protects the operator's hand.

Pour dégager la pince (34) sans effort, il suffit de relâcher le moyen de levage, dégager la pince par action sur la poignée (25).To release the clamp (34) effortlessly, simply release the lifting means, release the clamp by action on the handle (25).

Cette pince est adaptée à la préhension de briques avec cavités.This gripper is suitable for gripping bricks with cavities.

Pince articulée pour briques ou parpaings ou autres charges similaires(36) Fig 13 Articulated clamp for bricks or concrete blocks or other similar loads (36) Fig 13

La pince comprend la poignée (25) avec d'un côté l'anneau de levage (26) et l'articulation (30) positionnés au droit du centre de gravité de la charge à soulever, et de l'autre coté la première platine de serrage (28), équipée ou non de plots de pression. La platine de pression appuie horizontalement sur la charge (36) à soulever. L’espace réservé entre la poignée (25) et la cale de distance (38) protège la main de l’opérateur.The clamp comprises the handle (25) with on one side the lifting ring (26) and the articulation (30) positioned at right angles to the center of gravity of the load to be lifted, and on the other side the first plate clamp (28), equipped or not with pressure studs. The pressure plate presses horizontally on the load (36) to be lifted. The space reserved between the handle (25) and the spacer (38) protects the operator's hand.

Le bras (32) réglable en longueur pour différentes dimensions de charges est monté sur l'articulation (30). La deuxième platine de serrage (28), éventuellement équipée de plots de pression, appuie horizontalement sur la charge, à l'opposé de la première platine de serrage (28). La deuxième platine de serrage est solidaire du bras réglable. La cale (39) fixée sur le bras réglable (32), maintient la charge à l'horizontale. Le levier d’ouverture (33) est solidaire du bras réglable (32).The arm (32) adjustable in length for different load sizes is mounted on the joint (30). The second clamping plate (28), optionally equipped with pressure studs, presses horizontally on the load, opposite the first clamping plate (28). The second clamping plate is attached to the adjustable arm. The wedge (39) fixed to the adjustable arm (32), keeps the load horizontal. The opening lever (33) is integral with the adjustable arm (32).

L’opérateur, tout en maintenant la poignée (25), par un appui du pouce sur le levier d'ouverture (33) peut ouvrir la pince pour la préhension, ou la dépose de la charge sans lâcher la poignée.The operator, while holding the handle (25), by pressing the thumb on the opening lever (33) can open the gripper for gripping or depositing the load without letting go of the handle.

Pour saisir la charge, appuyer sur le levier d'ouverture (33) et engager les deux platines de serrage (28) de part et d'autre de la charge à soulever. Lors du soulèvement de l’anneau (26), par l’intermédiaire de l’articulation (30), les deux platines de serrage (28) appuient sur les flancs et entrainent la charge à soulever. La distance des platines de serrage (28) par rapport au bord haut de la charge doit être suffisante pour ne pas casser la brique lors du serrage. A titre d’exemple, le serrage effectif situé entre 20 et 30% de la hauteur de la brique donne de bons résultats.To grip the load, press the opening lever (33) and engage the two clamping plates (28) on either side of the load to be lifted. When the ring (26) is raised, via the joint (30), the two clamping plates (28) press on the sides and cause the load to be lifted. The distance of the clamping plates (28) from the top edge of the load must be sufficient so as not to break the brick during clamping. For example, effective tightening between 20 and 30% of the height of the brick gives good results.

Pour dégager la pince, il suffit de relâcher le moyen de levage, appuyer sur le levier d'ouverture (33) et dégager la pince.To release the clamp, simply release the lifting means, press the opening lever (33) and release the clamp.

Cette pince est adaptée à la préhension de briques, parpaings ou autre charges similaires.This gripper is suitable for gripping bricks, concrete blocks or other similar loads.

Suivant la présentation ci-dessus de cette invention, la préhension, le levage à l'aide de l’énergie du palan (12), le déplacement horizontal, la dépose à l'endroit voulu de la brique, du parpaing ou de toute autre charge, se fait avec peu d’effort et réduit considérablement ou supprime les troubles musculosquelettiques des maçons ou autres opérateurs. According to the above presentation of this invention, the gripping, the lifting using the energy of the hoist (12), the horizontal displacement, the depositing at the desired place of the brick, the block or any other load, is done with little effort and considerably reduces or eliminates musculoskeletal disorders for masons or other operators.

Présentation des figuresPresentation of figures

Représente le bras de manutention de briques, avec la potence, le palan, l’outil de préhension et la charge à manutentionner dans la position de travail en hauteur. Le bras articulé est en position haute, par exemple pour terminer un mur. Represents the brick handling arm, with the jib, the hoist, the gripping tool and the load to be handled in the working position at height. The articulated arm is in the high position, for example to finish a wall.

Représente la potence avec le mât à l’horizontale, en position de transport, le bras articulé (9) est replié selon l’axe (10). Represents the jib crane with the mast horizontal, in the transport position, the articulated arm (9) is folded along the axis (10).

Représente le bras de manutention de briques, avec la potence, le palan, l’outil de préhension et la charge à manutentionner dans la position de travail en bas. Le bras articulé est en position basse, par exemple pour démarrer un mur. Represents the brick handling arm, with the jib, the hoist, the gripping tool and the load to be handled in the working position at the bottom. The articulated arm is in the low position, for example to start a wall.

Représente le levier de manutention et sa sangle en position de repos. Ils sont situés à l’extrémité haute du mât. Represents the handling lever and its strap in the rest position. They are located at the top end of the mast.

Représente le levier de manutention et sa sangle sollicités lors de la manœuvre de déplacement. A titre d’exemple, on peut voir le détail (25) de la section rectangulaire du mât. Represents the handling lever and its strap used during the movement maneuver. By way of example, we can see the detail (25) of the rectangular section of the mast.

Représente le système de sécurité antichute du bras articulé (9). Le haut de la figure représente le levier de sécurité (17) en butée sur le taquet (19) du mât (6) empêchant la descente du bras articulé (9). Represents the fall protection system of the articulated arm (9). The top of the figure shows the safety lever (17) in abutment on the cleat (19) of the mast (6) preventing the lowering of the articulated arm (9).

Le bas de la figure représente le même levier de sécurité, en basculement, poussé par un taquet (19) lors de la montée de l’axe (18) du bras articulé (9). La longueur de la liaison flexible (20) n’est pas représentée complètement.The bottom of the figure shows the same safety lever, tilting, pushed by a cleat (19) when the axis (18) of the articulated arm (9) rises. The length of the flexible link (20) is not shown completely.

Représente le système de blocage, d’indexage et de limitation de rotation du mât. La vue de face permet de voir l’ensemble du système, la vue de dessus montre le détail de la platine de rotation, avec les ouvertures servant à l’indexation. On peut distinguer la platine de freinage et son ressort réglable. Represents the mast rotation locking, indexing and limitation system. The front view shows the entire system, the top view shows the detail of the rotation plate, with the openings used for indexing. We can distinguish the brake plate and its adjustable spring.

Représente la vue de face de la pince pour briques remplies d’isolant Represents the front view of the clamp for bricks filled with insulation

Représente une vue en coupe de la pince pour briques remplies d’isolant. La figure représente la pince en position de préhension de la brique, sans endommager l’isolant. Les hachures représentent l’isolant. Pour une lecture facile, aucune autre hachure n’a été dessinée. Shows a cross-sectional view of the clamp for bricks filled with insulation. The figure shows the pliers in the position of gripping the brick, without damaging the insulation. The hatching represents the insulation. For easy reading, no other hatching has been drawn.

Représente une vue de gauche de la pince pour brique avec isolant. La vue montre les platines de retenue et de serrage qui doivent être assez larges pour maintenir la stabilité de la brique lorsqu’elle est levée. Shows a left view of the clamp for brick with insulation. The view shows the retaining and clamping plates which must be wide enough to keep the brick stable when it is lifted.

Représente une vue de face de la pince pour brique avec cavité Represents a front view of the brick clamp with cavity

Représente une vue en coupe de la pince pour brique avec cavité. La figure représente la pince en position de préhension de la brique. On remarque bien la position de la cale de distance (38) qui repose sur la brique et ménage un espace de protection pour la main de l’opérateur qui tient la poignée (25). Shows a cross-sectional view of the brick clamp with cavity. The figure shows the gripper in the brick gripping position. Note the position of the distance wedge (38) which rests on the brick and provides a protective space for the hand of the operator who holds the handle (25).

Représente une vue de face de la pince articulée pour manutentionner les briques ou charges qui n’ont pas de cavité sur la face supérieure On remarque le levier d’ouverture (33) fixé sur le bras réglable (32) qui est accessible par le pouce de la main qui tient la poignée (25). Represents a front view of the articulated gripper for handling bricks or loads that do not have a cavity on the upper side Note the opening lever (33) fixed to the adjustable arm (32) which is accessible by thumb of the hand holding the handle (25).

Représente en perspective le positionnement de deux briques (35) avec isolant (en hachuré). On peut distinguer la platine de retenue (31) et son encoche permettant le passage des parois des briques jointives (35). Les autres pièces de la pince ne sont pas représentées. Represents in perspective the positioning of two bricks (35) with insulation (shaded). One can distinguish the retaining plate (31) and its notch allowing the passage of the walls of the adjoining bricks (35). The other parts of the gripper are not shown.

Représente en perspective une brique avec isolant, la platine de retenue (31) et son encoche permettant le passage de la parois interne de la briques (35). Les autres pièces de la pince ne sont pas représentées. Represents in perspective a brick with insulation, the retaining plate (31) and its notch allowing the passage of the internal walls of the brick (35). The other parts of the gripper are not shown.

Claims (10)

Dispositif manipulateur de briques et parpaings pour manipuler avec un faible effort les briques et parpaings lors de maçonnerie caractérisé en ce qu'il comporte une potence de manutention dont un mât (6) peut basculer à l'horizontale pour le transport, d'un palan (12) alimenté en énergie, d'un outil de préhension (13) spécifique adapté à une charge (14).Device for handling bricks and concrete blocks for handling bricks and concrete blocks with little effort during masonry, characterized in that it comprises a handling jib, a mast (6) of which can swing horizontally for transport, from a hoist (12) supplied with energy, a gripping tool (13) specific adapted to a load (14). Dispositif manipulateur de briques et parpaings selon la revendication 1 caractérisé en ce qu’une platine (3), le mât (6) et la charge (14) peuvent être bloqués en rotation pendant le transport, ou être limités en rotation grâce à une ou plusieurs piges (24) placée dans la platine (3). La platine (3), le mât (6) et la charge (14) sont freinés en rotation grâce à un patin de freinage (21) fixé sur une embase (1). L’appui du patin de freinage (21) sur la platine (3) est réglable grâce à un ressort (22).Device for handling bricks and concrete blocks according to Claim 1, characterized in that a plate (3), the mast (6) and the load (14) can be locked in rotation during transport, or be limited in rotation thanks to one or several rods (24) placed in the plate (3). The plate (3), the mast (6) and the load (14) are braked in rotation thanks to a brake pad (21) fixed to a base (1). The support of the braking shoe (21) on the plate (3) is adjustable thanks to a spring (22). Dispositif manipulateur de briques et parpaings selon la revendication 1 et la revendication 2 caractérisé en ce que la potence comporte un bras articulé (9) coulissant verticalement, guidé par des patins ou galets (26) sur le mât (6) pour s'adapter à la hauteur de la construction. Le bras articulé (9) est réglable en hauteur à l’aide d’un treuil (8).Device for handling bricks and concrete blocks according to Claim 1 and Claim 2, characterized in that the jib crane comprises an articulated arm (9) sliding vertically, guided by shoes or rollers (26) on the mast (6) to adapt to the height of the building. The articulated arm (9) is adjustable in height using a winch (8). Dispositif manipulateur de briques et parpaings selon l'une quelconque des revendications précédentes caractérisé en ce qu’un levier de sécurité (17), bloqué par un taquet (19) empêche toute descente ou chute du bras articulé (9) et de la charge (14). Lors de la montée du bras articulé, le levier de sécurité (17), par l’action de la gravité, se met automatiquement en position de sécurité. Le levier de sécurité (17) est équipé d’une liaison flexible (20), par exemple cordelette, qui permet le déblocage du levier de sécurité (17) lorsqu’il est situé en hauteur.Device for handling bricks and concrete blocks according to any one of the preceding claims, characterized in that a safety lever (17), blocked by a catch (19) prevents any descent or fall of the articulated arm (9) and of the load ( 14). When the articulated arm rises, the safety lever (17), by the action of gravity, automatically goes into the safety position. The safety lever (17) is equipped with a flexible connection (20), for example cord, which allows the release of the safety lever (17) when it is located high up. Dispositif manipulateur de briques et parpaings selon l'une quelconque des revendications précédentes caractérisé en ce que, en position horizontale, un levier de manutention (15), maintient un espace entre le mât (6) et une sangle (16).Device for handling bricks and concrete blocks according to any one of the preceding claims, characterized in that, in the horizontal position, a handling lever (15) maintains a space between the mast (6) and a strap (16). Dispositif manipulateur de briques et parpaings selon l'une quelconque des revendications précédentes caractérisé en ce que la potence est équipé d'une protection intempérie (11) qui protège le palan (12).Device for handling bricks and concrete blocks according to any one of the preceding claims, characterized in that the jib crane is equipped with weather protection (11) which protects the hoist (12). Dispositif manipulateur de briques et parpaings selon la revendication 1 caractérisé en ce que l’outil de préhension est une pince autobloquante pour briques ou parpaing avec cavités remplies d'isolant (35). La pince comprend une poignée (25), un anneau de levage (26), un levier autobloquant (27), une platine de retenue (31), une platine de serrage (28), des plots de pression (29). La platine de retenue (31), d’épaisseur faible, est engagée dans la brique entre la paroi extérieure et l’isolant. Lors du soulèvement de l’anneau de levage (26), par inclinaison du levier autobloquant (27), la platine de retenue (31) et la platine de serrage (28) appuient sur les faces opposées de la paroi extérieure de la brique et entrainent la pièce.Device for handling bricks and concrete blocks according to Claim 1, characterized in that the gripping tool is a self-locking gripper for bricks or concrete blocks with cavities filled with insulation (35). The clamp comprises a handle (25), a lifting ring (26), a self-locking lever (27), a retaining plate (31), a clamping plate (28), pressure pads (29). The retaining plate (31), thin, is engaged in the brick between the outer wall and the insulation. When the lifting ring (26) is raised, by tilting the self-locking lever (27), the retaining plate (31) and the clamping plate (28) press on the opposite faces of the exterior wall of the brick and lead the room. Dispositif manipulateur de briques et parpaings selon la revendication 1 et la revendication 7 caractérisé en ce que l’outil de préhension est une pince autobloquante pour briques ou parpaings avec cavité (34). La pince comprend la poignée (25), l’anneau de levage (26), le levier autobloquant (27), la platine de serrage (28), les plots de pression (29) et une cale de distance (38). Lors du soulèvement de l'anneau de levage (26), par inclinaison du levier autobloquant (27), les deux platines de serrage (28) appuient sur les parois opposées de la cavité et entrainent la pièce.Device for handling bricks and concrete blocks according to Claim 1 and Claim 7, characterized in that the gripping tool is a self-locking gripper for bricks or concrete blocks with a cavity (34). The clamp includes the handle (25), the lifting ring (26), the self-locking lever (27), the clamping plate (28), the pressure pads (29) and a spacer (38). When the lifting ring (26) is raised, by tilting the self-locking lever (27), the two clamping plates (28) press against the opposite walls of the cavity and drive the part. Dispositif manipulateur de briques et parpaings selon la revendication 1 et les revendications 7 et 8 caractérisé en ce qu’un outil de préhension est une pince autobloquante articulée pour briques ou parpaing (36). La pince comprend la poignée (25), l’anneau de levage (26), le levier autobloquant (27), la platine de serrage (28), les plots de pression (29), la cale de distance (38). Un bras réglable horizontalement (32) munis de platines de serrage (28) est relié par une articulation (30) à la poignée (25). Lorsque l’anneau de levage (26) est sollicité verticalement, il résulte un effort horizontal sur les platines de serrage (28) qui serrent la charge (36) et l’entraine. Le bras (32) est réglable en longueur pour différentes dimensions de charges.
Une cale de maintien (39) fixée sur le bras réglable (32) maintient la charge soulevée dans la position horizontale. Un levier d'ouverture (33) permet d'ouvrir la pince pour la préhension et la dépose de la charge.
Device for handling bricks and concrete blocks according to Claim 1 and Claims 7 and 8, characterized in that a gripping tool is an articulated self-locking gripper for bricks or concrete blocks (36). The clamp comprises the handle (25), the lifting ring (26), the self-locking lever (27), the clamping plate (28), the pressure studs (29), the spacer (38). A horizontally adjustable arm (32) provided with clamping plates (28) is connected by an articulation (30) to the handle (25). When the lifting ring (26) is stressed vertically, a horizontal force results on the clamping plates (28) which clamp the load (36) and drive it. The arm (32) is adjustable in length for different load sizes.
A holding block (39) fixed to the adjustable arm (32) keeps the lifted load in the horizontal position. An opening lever (33) makes it possible to open the gripper for gripping and depositing the load.
Dispositif manipulateur de briques et parpaings selon l'une quelconque des revendications précédentes caractérisé en ce que la potence est maintenue en équilibre par un ancrage au sol. La potence étant posée sur une dalle en béton, une tige filetée traverse la dalle béton et un écrou à chaque extrémité de la tige filetée relie l’embase (1) de la potence à une traverse de reprise située sous la dalle en béton.Device for handling bricks and concrete blocks according to any one of the preceding claims, characterized in that the bracket is kept in balance by an anchor to the ground. As the jib crane is placed on a concrete slab, a threaded rod crosses the concrete slab and a nut at each end of the threaded rod connects the base (1) of the jib crane to a crosspiece located under the concrete slab.
FR2003155A 2020-03-30 2020-03-30 Brick Manipulator Arm Active FR3108598B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR2003155A FR3108598B1 (en) 2020-03-30 2020-03-30 Brick Manipulator Arm

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR2003155A FR3108598B1 (en) 2020-03-30 2020-03-30 Brick Manipulator Arm
FR2003155 2020-03-30

Publications (2)

Publication Number Publication Date
FR3108598A1 true FR3108598A1 (en) 2021-10-01
FR3108598B1 FR3108598B1 (en) 2023-10-13

Family

ID=71784187

Family Applications (1)

Application Number Title Priority Date Filing Date
FR2003155A Active FR3108598B1 (en) 2020-03-30 2020-03-30 Brick Manipulator Arm

Country Status (1)

Country Link
FR (1) FR3108598B1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1957852U (en) * 1966-12-22 1967-03-30 Cornelis Jun Bergshoeff CRANE.
DE3546036A1 (en) * 1985-12-24 1987-06-25 Ernst Ulrich Building machine
DE3604130A1 (en) * 1986-02-10 1987-08-13 Adolf Metz Mechanical bricklayer's aid
DE4236772A1 (en) * 1991-11-01 1993-07-15 Jensen Alex As Transporting and laying groups of paviours - involves machine holding each paving block between two clamps, one of which is multi-sectioned.
EP0559188A1 (en) * 1992-03-04 1993-09-08 Siegfried Bolz Device for manipulating heavy workpieces
WO1997002397A1 (en) * 1995-07-03 1997-01-23 Opferkuch Bau Gesellschaft Mbh Brick-laying robot for rising masonry
FR2930536A1 (en) * 2008-04-28 2009-10-30 Gilles Dubief Hoisting engine for being mounted on transport truck in e.g. construction site, has mast and deflection comprising retraction unit for placing mast and deflection from deployed position to retracted position and vice versa

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1957852U (en) * 1966-12-22 1967-03-30 Cornelis Jun Bergshoeff CRANE.
DE3546036A1 (en) * 1985-12-24 1987-06-25 Ernst Ulrich Building machine
DE3604130A1 (en) * 1986-02-10 1987-08-13 Adolf Metz Mechanical bricklayer's aid
DE4236772A1 (en) * 1991-11-01 1993-07-15 Jensen Alex As Transporting and laying groups of paviours - involves machine holding each paving block between two clamps, one of which is multi-sectioned.
EP0559188A1 (en) * 1992-03-04 1993-09-08 Siegfried Bolz Device for manipulating heavy workpieces
WO1997002397A1 (en) * 1995-07-03 1997-01-23 Opferkuch Bau Gesellschaft Mbh Brick-laying robot for rising masonry
FR2930536A1 (en) * 2008-04-28 2009-10-30 Gilles Dubief Hoisting engine for being mounted on transport truck in e.g. construction site, has mast and deflection comprising retraction unit for placing mast and deflection from deployed position to retracted position and vice versa

Also Published As

Publication number Publication date
FR3108598B1 (en) 2023-10-13

Similar Documents

Publication Publication Date Title
EP0335311B1 (en) Hydraulic scaffold
CA2718785C (en) Apparatus for gripping and lifting construction castings
US20030173149A1 (en) Anchor point devices, systems and methods for use in fall protection
EP1766157A1 (en) Platform support device for lifting loads or persons the height of a structure
FR3042807A1 (en) AUTOLESTING FOR FORMWORK BANK
FR3035134A1 (en) FORMWORK, METHOD FOR DECREASING, AND METHOD FOR MANUFACTURING A PORTION OF BUILDING
EP2450501A1 (en) Device for moving a slab and/or balcony formwork platform
EP2072714A1 (en) Safety gondola
FR3108598A1 (en) Brick Manipulator Arm
US3169604A (en) Scaffold
EP0046099A1 (en) Bracket scaffold and safety apparatus containing this bracket scaffold
EP1482104B1 (en) Adjustable modular safety system for scaffold
EP2569494B1 (en) Device for positioning and clamping planks for form work in the building industry
WO2018178588A1 (en) Worksite load elevator
FR3035132B1 (en) FORMING POROUS AND FORMWORK PROVIDED WITH SUCH A PORTIC
EP3713868B1 (en) Portable hoisting device
FR2700797A1 (en) Lifting jib apparatus for building works
FR2812865A1 (en) Handling equipment for raising hollow elements comprises gripping mechanism and crane trolley hoist
BE1028615B1 (en) Detachable removable system for lifting a load
ITFI20110217A1 (en) DEVICE FOR LIFTING LOADS
EP1878688B1 (en) Device for lifting a load, in particular a framework beam or flashboard, comprising a chassis bearing a tilted mast and comprising means for rigidification and/or stabilisation
US20040251081A1 (en) Scaffolding hoist
KR102479260B1 (en) Carts with upper and lower loads
JP7328136B2 (en) Conveyor, Conveying Method and Conveying Structure
FR3077315A1 (en) METHOD OF LIFTING AND / OR BONDING A FORMWORK BANK PROVIDED WITH A BODY-GUARD AND BANK FOR THIS PROCESS

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20211001

PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4