ES2361288B1 - Mobile bridge for its support or attachment of railway tracks. - Google Patents
Mobile bridge for its support or attachment of railway tracks. Download PDFInfo
- Publication number
- ES2361288B1 ES2361288B1 ES200601877A ES200601877A ES2361288B1 ES 2361288 B1 ES2361288 B1 ES 2361288B1 ES 200601877 A ES200601877 A ES 200601877A ES 200601877 A ES200601877 A ES 200601877A ES 2361288 B1 ES2361288 B1 ES 2361288B1
- Authority
- ES
- Spain
- Prior art keywords
- beams
- application
- track
- heb
- report
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002184 metal Substances 0.000 claims abstract description 18
- 239000004567 concrete Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 claims description 4
- 241001312293 Selar crumenophthalmus Species 0.000 claims 1
- 230000000284 resting effect Effects 0.000 claims 1
- 238000000926 separation method Methods 0.000 claims 1
- 239000013589 supplement Substances 0.000 claims 1
- 238000003466 welding Methods 0.000 claims 1
- 238000009412 basement excavation Methods 0.000 abstract 1
- 230000001934 delay Effects 0.000 description 2
- 230000000295 complement effect Effects 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B23/00—Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/02—Fastening rails, tie-plates, or chairs directly on sleepers or foundations; Means therefor
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Puente móvil para sustentación o apeo de vías de ferrocarril consiste en la colocación bajo la vía y en el sitio que se pretende hacer la obra, de una estructura metálica que soporta el paso del ferrocarril, mientras se realiza una excavación bajo ella para llevar a cabo distintos tipos de trabajos, como pueden ser: pasos inferiores, drenajes, colocación de tuberías o servicios y saneamientos.Mobile bridge for support or attachment of railway tracks consists of the placement under the track and on the site that the work is intended to be done, of a metal structure that supports the passage of the railroad, while an excavation is carried out under it to carry out different types of work, such as: underpasses, drainage, placement of pipes or services and sanitation.
Description
Los estribos de hormigón serán construidos a 0,70 Concrete stirrups will be built at 0.70
Puente móvil para sustentación o apeo de vías de ferrocarril. Sector de la técnica al que se refiere la invenciónMobile bridge for support or attachment of railway tracks. Sector of the technique to which the invention relates
La ejecución de diferentes tipos de obras bajo el ferrocarril, está comprendida en el sector de la Ingeniería. Estado de la técnica The execution of different types of works under the railroad is included in the Engineering sector. State of the art
En la actualidad cuando se necesita efectuar alguna actividad bajo las vías (paso de canales, pasos inferiores, tuberías, etc.) es necesario cortar el tráfico de esta hasta que se finalicen los trabajos programados, sufriendo los trenes grandes retrasos a causa de las obras y disparándose el coste y causando al ferrocarril grandes trastornos. Con esta invención este problema se elimina, ya que no será necesario cortar el tráfico ferroviario y se podrán realizar los trabajos debajo de las vías con una mayor seguridad para el ferrocarril y con la consiguiente mejora para este sector. Explicación de la invenciónAt present, when it is necessary to carry out some activity under the tracks (passage of canals, underpasses, pipes, etc.) it is necessary to cut the traffic of this until the scheduled works are finished, the trains suffer major delays due to the works and skyrocketing the cost and causing the railroad major disruptions. With this invention this problem is eliminated, since it will not be necessary to cut the rail traffic and work can be carried out under the tracks with greater safety for the railway and with the consequent improvement for this sector. Explanation of the invention.
Puente móvil para sustentación o apeo de vías de ferrocarril consiste en la colocación bajo la vía y en el sitio que se pretende hacer la obra, una construcción metálica que reúne unas características que se detallan mas adelante y que soportará perfectamente el paso del ferrocarril. Mobile bridge for support or attachment of railroad tracks consists of the placement under the track and on the site that the work is intended to be done, a metal construction that brings together characteristics that are detailed below and that will perfectly support the passage of the railroad.
Las dimensiones de esta construcción metálica dependerán del ferrocarril que vaya a pasar sobre ella, aunque manteniendo siempre la forma y mismo tipo de materiales. En principio y como norma general, para las locomotoras y trenes que circulan por las vías de ADIF (como caso más desfavorable, ya que los trenes de FEVE, tranvías, etc., son menos pesados y alcanzan menos velocidades), se utilizarán perfiles metálicos normalizados HEB-280 que llevarán soldados unas pletinas laterales entre las alas, de 15 milímetros de espesor, para darle una mayor rigidez. Estos perfiles irán perfectamente soldados unos a otros, hasta formar un tablero metálico de un ancho que variara entre7y11vigas (1,96 a 2,80 metros). The dimensions of this metal construction will depend on the railroad that will pass over it, while always maintaining the shape and type of materials. In principle and as a general rule, for locomotives and trains that run along the ADIF tracks (as a more unfavorable case, since FEVE trains, trams, etc., are less heavy and reach lower speeds), metal profiles will be used normalized HEB-280 that will carry soldiers side plates between the wings, 15 millimeters thick, to give it greater rigidity. These profiles will be perfectly welded to each other, to form a metal board of a width that will vary between 7 and 11 beams (1.96 to 2.80 meters).
La longitud del conjunto variara de acuerdo con las características de la obra y oscilará entre 4 y 14 metros. The length of the set will vary according to the characteristics of the work and will vary between 4 and 14 meters.
Una vez construido este tablero se sueldan sobre este unos nuevos perfiles metálicos normalizados HEB-240 situados perpendicularmente a los primeros (tal como es la disposición de las traviesas del ferrocarril con respecto a los carriles) y a una distancia de 0,60 metros uno del otro, de forma que al colocar todo el conjunto bajo la vía, encaje perfectamente entre las traviesas que van situadas a esa misma distancia. Un a vez colocada se ancla a los carriles mediante sujeciones especiales diseñadas para tal uso. Once this board is constructed, new HEB-240 standardized metal profiles are welded on it perpendicular to the first ones (such as the arrangement of the railway sleepers with respect to the rails) and at a distance of 0.60 meters from each other. , so that when placing the whole assembly under the track, it fits perfectly between the sleepers that are located at the same distance. Once placed it is anchored to the rails by special fasteners designed for such use.
Esta construcción metálica será trasladada por carretera desde nuestros talleres a su lugar de emplazamiento en un transporte. especial y descargada en obra con la grúa necesaria. This metal construction will be transported by road from our workshops to its location in a transport. special and unloaded on site with the necessary crane.
Cuando llegue a la obra y como ya se habrán construido con anterioridad dos estribos de hormigón armado debajo de las vías a ambos lados de la obra y del ancho del conjunto fabricado y que coincidirán con los extremos del conjunto y donde apoyaremos el mismo. When it arrives at the work and as previously two reinforced concrete stirrups will have been built under the tracks on both sides of the work and the width of the manufactured assembly and that will coincide with the ends of the assembly and where we will support it.
Hay que hacer constar que antes de esta operación habremos retirado el balasto bajo la vía quedando esta solo con los carriles y traviesas con el suficiente hueco para que entre nuestro puente metálico que encajará metros más bajos que la cabeza de carril y toda la carga de la vía se trasmitirá desde los carriles (que apoyaran directamente sobre los perfiles de HEB-240), quedando las traviesas en el aire por tener estas 2 centímetros menos que los perfiles y que a su vez lo hacen sobre el conjunto de HEB-280 situadas como hemos dicho en la parte interior y que será el que soporte todas las cargas. It should be noted that before this operation we will have removed the ballast under the track, leaving it only with the rails and sleepers with enough hollow so that between our metal bridge that will fit meters lower than the rail head and the entire load of the The track will be transmitted from the rails (which will rest directly on the HEB-240 profiles), with the sleepers remaining in the air because they have these 2 centimeters less than the profiles and which in turn do so on the HEB-280 assembly located as We have said on the inside and it will be the one that supports all the loads.
Descripción de los dibujosDescription of the drawings
Para complementar la descripción que se está realizando y al objeto de ayudar a una mejor comprensión de las características del invento, se acompaña a la presente memoria descriptiva, como parte integrante de la misma siete hojas de planos en las cuales con carácter ilustrativo y no limitativo, se ha representado lo siguiente: To complement the description that is being made and in order to help a better understanding of the characteristics of the invention, this descriptive report is attached, as an integral part of it, seven sheets of plans in which with an illustrative and non-limiting nature , the following has been represented:
Figura nº 1 Puente móvil fuera de la vía. Figure nº 1 Mobile bridge out of the way.
Figura nº 2 Puente móvil bajo la vía. Figure nº 2 Mobile bridge under the track.
Figura nº 3 Planta de puente móvil bajo la vía con obra a ejecutar Figure nº 3 Mobile bridge plant under the road with work to be executed
Figura nº 4 Sección transversal de puente móvil con obra a ejecutar. Figure 4 Cross section of mobile bridge with work to be executed.
Figura nº 5 Sección longitudinal del puente móvil sobre estribo. Figure 5 Longitudinal section of the movable bridge over stirrup.
Figura nº 6 Grapa de anclaje de puente móvil a la vía. Modo de realización Figure nº 6 Mobile bridge anchor clamp to the track. Embodiment
La invención consiste en fabricar un puente móvil que se colocará bajo las vías de manera que puedan acometerse trabajos bajo estas de ampliación o mejora de pasos viales existentes o llevar a cabo nuevas obras sin interrupción del tráfico. The invention consists in manufacturing a mobile bridge that will be placed under the tracks so that work can be undertaken under these expansion or improvement of existing road passages or carry out new works without interruption of traffic.
El procedimiento de ejecución será como sigue: The execution procedure will be as follows:
Fase A Phase A
Una vez hemos definido la ubicación y dimensiones del paso inferior a ejecutar o modificar, se procede a determinar la longitud del puente móvil que se necesitará. Once we have defined the location and dimensions of the underpass to be executed or modified, we proceed to determine the length of the mobile bridge that will be needed.
Fase B Phase B
Se construirán unos estribos de hormigón bajo la vía a una cota de 70 centímetros desde la cabeza de carril más bajo, situadas justo en los extremos del puente metálico. Concrete stirrups will be built under the track at a height of 70 centimeters from the lowest rail head, located just at the ends of the metal bridge.
Fase C C phase
El montaje del puente móvil se realiza fuera de la plataforma ferroviaria y en sus inmediaciones. Este se construye colocando vigas metálicas de HEB-280 reforzadas con dos platabandas laterales de 15 milímetros de espesor unidas unas a otras hasta formar un tablero metálico del ancho que requiera el ferrocarril o tranvía que vaya a pasar por encima de dicho punto. Sobre este tablero y paralelos a las traviesas y a la misma distancia que estas se colocarán perfiles metálicos HEB-240 sin reforzar que serán los que trasmitan la carga desde el carril al tablero de HEB280 sobre el que se asientan. The assembly of the mobile bridge is carried out outside the railway platform and in its vicinity. This is constructed by placing metal beams of HEB-280 reinforced with two lateral platforms of 15 millimeters thick joined to each other to form a metal board of the width required by the railway or tram that will pass over that point. On this board and parallel to the sleepers and at the same distance as these, HEB-240 metal profiles will be placed without reinforcement, which will be the ones that transmit the load from the rail to the HEB280 board on which they settle.
Fase D Phase D
Para el montaje, primero será necesario sacar el balasto sobre el que se asienta la vía y las traviesas del ferrocarril de forma que debajo de estas quede un hueco por el que podemos deslizar nuestro tablero metálico y cuyas vigas de HEB-240 puedan deslizarse entre traviesa y traviesa de forma que cuando este situado todo el conjunto debajo de la vía, los carriles apoyen directamente sobre estos perfiles (ya que son 2 centímetros mas altos que la traviesa de hormigón), For assembly, it will first be necessary to take out the ballast on which the railroad track and sleepers sits so that under them there is a gap through which we can slide our metal board and whose HEB-240 beams can slide between sleepers and crossbar so that when the entire assembly is located below the track, the rails rest directly on these profiles (since they are 2 centimeters higher than the concrete crossbar),
en cuyo momento los carriles están trasmitiendo directamente la carga a las HEB-240 y estas al tablero metálico de HEB-280 y situadas todas ellas paralelas a los carriles y perpendiculares a las traviesas y a las vigas de HEB-240. at which time the rails are directly transmitting the load to the HEB-240 and these to the metal board of HEB-280 and located all parallel to the rails and perpendicular to the sleepers and beams of HEB-240.
Fase E E phase
Cuando se han finalizado los trabajos se retirará el puente móvil y los dos estribos de hormigón sobre las que el puente descansaba. Una vez colocada la vía se vierte el balasto, se alinea y se batea quedando esta lista para el paso. When the work is finished, the movable bridge and the two concrete stirrups on which the bridge rested will be removed. Once the track is placed, the ballast is poured, aligned and batted, leaving this list ready for passage.
La diferencia de nuestra invención con respecto a como actualmente se hace, se basa principalmente en que para llevar a cabo este tipo de trabajos es necesario suprimir el tráfico durante largos periodos mientras se realizan estos. Con este método explicado no se interfiere en las circulaciones con lo que se mejoran las condiciones para el tráfico y se minimizan los riesgos tanto para este como para las personas que realizan los trabajos. The difference of our invention with respect to how it is currently done is mainly based on the fact that in order to carry out this type of work it is necessary to suppress traffic for long periods while these are being carried out. With this explained method, traffic is not interfered with, which improves the conditions for traffic and minimizes the risks for both this and the people who carry out the work.
En los planos que se acompañan figura un ejemplo de cómo se lleva a cabo un caso concreto. Las medidas y los planos corresponden a este caso determinado, y podrán variar de acuerdo con los proyectos, lo que no variará es el procedimiento para que los trenes circulen con toda normalidad, eliminando situaciones de peligro, retrasos y costes. In the accompanying drawings, he gives an example of how a specific case is carried out. The measures and plans correspond to this particular case, and may vary according to the projects, which will not vary is the procedure for trains to run normally, eliminating dangerous situations, delays and costs.
Aplicación industrialIndustrial application
La necesidad de cruzar bajo una vía de circulación, principalmente una vía férrea, ha planteado desde un principio problemas inherentes a las circulaciones, y a lo largo del tiempo se han resuelto de acuerdo al desarrollo técnico y a la posibilidad de utilización de maquinaria adecuada. The need to cross under a road, mainly a railroad, has raised problems inherent in traffic from the beginning, and over time they have been resolved according to technical development and the possibility of using suitable machinery.
La premisa fundamental de partida ha sido y es, la imposibilidad de suprimir el tráfico durante la ejecución de la obra y de ahí han partido todas las soluciones. The fundamental premise of departure has been and is, the impossibility of suppressing traffic during the execution of the work and hence all the solutions have started.
Puente móvil para sustentación o apeo de vías de ferrocarril, constituye en sí mismo una evidente novedad dentro de su campo de aplicación ya que conlleva una minimización del riesgo tanto para las personas que llevan a cabo los trabajos como para el tráfico en sí mismo. Mobile bridge for support or attachment of railroad tracks, constitutes in itself an obvious novelty within its field of application since it entails a minimization of risk both for the people who carry out the work and for the traffic itself.
Claims (3)
- INFORME SOBRE EL ESTADO DE LA TECNICA REPORT ON THE STATE OF THE TECHNIQUE
- Fecha de prioridad: Priority Date:
- 51 Int. Cl. : 51 Int. Cl.:
- Ver hoja Adicional See additional sheet
- Categoría Category
- 56 Documentos citados Reivindicaciones afectadas 56 Documents cited Claims Affected
- A TO
- EP 1621671 A2 (ATROS ESPANA S A) 01.02.2006, columna 3, párrafo [13] - columna 8, párrafo [36]; figuras. 1 EP 1621671 A2 (ATROS SPAIN S A) 01.02.2006, column 3, paragraph [13] - column 8, paragraph [36]; figures. one
- A TO
- ES 2151364 A1 (ALICANTINA DE CONSTRUCCIONES I) 16.12.2000, columna 1, línea 42 - columna 4, línea 66; figuras. 1 EN 2151364 A1 (CONSTRUCTION ALICANTINE I) 16.12.2000, column 1, line 42 - column 4, line 66; figures. one
- A TO
- ES 2162523 A1 (ROMO URROZ EDUARDO) 16.12.2001, figuras & Resumen de la base de datos WPI. Recuperado de EPOQUE; Número de acceso: 2002-156763. 1 ES 2162523 A1 (ROMO URROZ EDUARDO) 16.12.2001, figures & Summary of the WPI database. Recovered from EPOQUE; Access number: 2002-156763. one
- A TO
- GB 2086966 A (SERNI LTD) 19.05.1982, figuras & Resumen de la base de datos WPI. Recuperado de EPOQUE; Número de acceso: 1982-F7721E. 2 GB 2086966 A (SERNI LTD) 19.05.1982, figures & Summary of the WPI database. Recovered from EPOQUE; Access number: 1982-F7721E. 2
- A TO
- DE 10148727 A1 (FERD BRASELMANN GMBH & CO KG) 10.04.2003, figuras & Resumen de la base de datos WPI. Recuperado de EPOQUE; Número de acceso: 2003-442445. 2 DE 10148727 A1 (FERD BRASELMANN GMBH & CO KG) 10.04.2003, figures & Summary of the WPI database. Recovered from EPOQUE; Access number: 2003-442445. 2
- Categoría de los documentos citados X: de particular relevancia Y: de particular relevancia combinado con otro/s de la misma categoría A: refleja el estado de la técnica O: referido a divulgación no escrita P: publicado entre la fecha de prioridad y la de presentación de la solicitud E: documento anterior, pero publicado después de la fecha de presentación de la solicitud Category of the documents cited X: of particular relevance Y: of particular relevance combined with other / s of the same category A: reflects the state of the art O: refers to unwritten disclosure P: published between the priority date and the date of priority submission of the application E: previous document, but published after the date of submission of the application
- El presente informe ha sido realizado • para todas las reivindicaciones • para las reivindicaciones nº: This report has been prepared • for all claims • for claims no:
- Fecha de realización del informe 08.02.2010 Date of realization of the report 08.02.2010
- Examinador B. Castañón Chicharro Página 1/4 Examiner B. Castañón Chicharro Page 1/4
- Fecha de Realización de la Opinión Escrita: 08.02.2010 Date of Written Opinion: 08.02.2010
- Declaración Statement
- Novedad (Art. 6.1 LP 11/1986) Novelty (Art. 6.1 LP 11/1986)
- Reivindicaciones Reivindicaciones 1 y 2 _____________________________________ SÍ NO Claims Claims 1 and 2 _____________________________________ IF NOT
- Actividad inventiva (Art. 8.1 LP11/1986) Inventive activity (Art. 8.1 LP11 / 1986)
- Reivindicaciones Reivindicaciones 1 y 2 _____________________________________ SÍ NO Claims Claims 1 and 2 _____________________________________ IF NOT
- Documento Document
- Número Publicación o Identificación Fecha Publicación Publication or Identification Number publication date
- D01 D01
- EP 1621671 A2 01.02.2006 EP 1621671 A2 01.02.2006
- D02 D02
- GB 2086966 A 19.05.1982 GB 2086966 A 05/19/1982
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200601877A ES2361288B1 (en) | 2006-07-13 | 2006-07-13 | Mobile bridge for its support or attachment of railway tracks. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200601877A ES2361288B1 (en) | 2006-07-13 | 2006-07-13 | Mobile bridge for its support or attachment of railway tracks. |
Publications (2)
Publication Number | Publication Date |
---|---|
ES2361288A1 ES2361288A1 (en) | 2011-06-15 |
ES2361288B1 true ES2361288B1 (en) | 2012-02-13 |
Family
ID=44067725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES200601877A Active ES2361288B1 (en) | 2006-07-13 | 2006-07-13 | Mobile bridge for its support or attachment of railway tracks. |
Country Status (1)
Country | Link |
---|---|
ES (1) | ES2361288B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU200212U1 (en) * | 2020-06-18 | 2020-10-13 | Открытое Акционерное Общество "Российские Железные Дороги" | Railroad fall arrest device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2086966A (en) * | 1980-11-01 | 1982-05-19 | Serni Ltd | Railway sleepers with rail clamping devices |
ES2151364B1 (en) * | 1997-10-27 | 2001-06-16 | Alicantina De Construcciones I | APEO OF VIA FERREA FOR EXECUTION OF LOWER STEPS. |
ES2162523B1 (en) * | 1998-01-28 | 2002-07-01 | Urroz Eduardo Romo | MOBILE RAILWAY BRIDGE WITH RETRACTIBLE SUPPORTS FOR THE PERFORMANCE OF WORKS UNDER THE ROAD. |
DE10148727A1 (en) * | 2001-10-02 | 2003-04-10 | Ferd Braselmann Gmbh & Co Kg | Arrangement for mounting rails, in particular, in tunnels comprises a plurality of sleepers which only partially rest on the base structure, and are provided with rail clamping/positioning elements |
ES2261024B1 (en) * | 2004-07-29 | 2007-09-16 | Atros España, S.A. | HIGH SECURITY MODULAR SYSTEM FOR PROVISIONAL SUPPORT OF RAILWAYS IN CIRCULATION DURING WORK UNDER VIA. |
-
2006
- 2006-07-13 ES ES200601877A patent/ES2361288B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
ES2361288A1 (en) | 2011-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2302159T3 (en) | HIGH SECURITY MODULAR SYSTEM FOR PROVISIONAL SUPPORT OF RAILWAYS IN CIRCULATION DURING WORK UNDER VIA. | |
ES2213554T3 (en) | METAL BRIDGE BOARD AND CONSTRUCTION PROCEDURE FOR A BRIDGE THAT INCLUDES SUCH BOARD. | |
CN103938538B (en) | Railroad bridge evacuation platform | |
ES2424774A1 (en) | Movable structure suitable for supporting a formwork of a new bridge section in cantilever | |
ES2371568B1 (en) | CONSTRUCTION SYSTEM IN PLATE ROAD FOR RAILWAY THROUGH THE EMPLOYMENT OF PREFABRICATED UNITS WORKED WITH AUTOCOMPACTABLE CONCRETE. | |
ES2205893T3 (en) | SCALE FOR RAILWAY WAGONS. | |
ES2361288B1 (en) | Mobile bridge for its support or attachment of railway tracks. | |
JP3991067B1 (en) | Temporary bridge between railway platforms | |
ES2283854T3 (en) | DEVICE / CROSS SECTION FOR VIA FERREA. | |
US3317137A (en) | Railroad crossing rail bed unit | |
ES2361309B1 (en) | INSTALLATION PROCEDURE OF V�? A FÉRREA, ON BASKET, WITHOUT AID TO ASSIST. | |
KR100759923B1 (en) | Low height and longspan girder for a railway | |
ES2363849B1 (en) | INSTALLATION PROCEDURE FOR PLATE ROAD IN BITUBO TUNNELS. | |
CN103243662B (en) | Reconstruction and reinforcement method for existing railroad bridge | |
ES2370711B1 (en) | New track attachment for any width of it. | |
ES2895751A1 (en) | Mobile Bridge for Senior Or Railroad Range in Great Vanos (Machine-translation by Google Translate, not legally binding) | |
CN112796232A (en) | Reinforced structure for existing railway underpass frame bridge construction | |
ES2504265T3 (en) | Lift provision | |
CN216839075U (en) | Pass railway box culvert reinforced structure under bevel | |
CN220079699U (en) | Station yard throat area small-radius track line overhead system | |
WO2023175205A1 (en) | Movable bridge for holding up or supporting railways tracks on large spans | |
CN211735108U (en) | Assembling and transporting device for full-bridge arc-shaped steel beam | |
JP3086810U (en) | Railroad track maintenance scaffolding | |
CN217052888U (en) | Railway temporary beam structure for box culvert to pass existing railway downwards | |
CN215561841U (en) | Assembled coal conveying trestle structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Grant refused |
Effective date: 20090721 |
|
FG2A | Definitive protection |
Ref document number: 2361288 Country of ref document: ES Kind code of ref document: B1 Effective date: 20120213 |