EP4303402A1 - System and method for consolidating the ground around tunnels - Google Patents

System and method for consolidating the ground around tunnels Download PDF

Info

Publication number
EP4303402A1
EP4303402A1 EP23183954.9A EP23183954A EP4303402A1 EP 4303402 A1 EP4303402 A1 EP 4303402A1 EP 23183954 A EP23183954 A EP 23183954A EP 4303402 A1 EP4303402 A1 EP 4303402A1
Authority
EP
European Patent Office
Prior art keywords
load
walkway
bearing structure
axis
way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP23183954.9A
Other languages
German (de)
French (fr)
Inventor
Elio GUERINI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vexa Srl
Original Assignee
Vexa Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vexa Srl filed Critical Vexa Srl
Publication of EP4303402A1 publication Critical patent/EP4303402A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space

Definitions

  • the present invention generally relates to the field of systems for building infrastructures, and it relates to a system for consolidating the ground near tunnels.
  • Operations for consolidating a tunnel for example in the ground overlying it provide for driving - into such ground - a plurality of longitudinal bars parallel to the extension of the tunnel, so as to reinforce it.
  • a drawback of such known system lies in the fact that it does not allow trains or vehicles to pass through during the consolidation steps due to the presence of the scaffolding. Such characteristic entails the full closing of the stretch over the entire duration of the works.
  • a further disadvantage of the known systems lies in that they are unsafe, require assembling expertise (the scaffolding must support the particularly heavy machine), and require long times for assembling and disassembling the scaffolding.
  • Document CN111794783 discloses a support structure for operations in tunnels.
  • An object of the present invention is to at least partly overcome the drawbacks illustrated above by providing a system for consolidating tunnels that is highly functional and cost-effective.
  • Another object of the invention is to provide a system for consolidating tunnels which allows trains and vehicles to pass through during the consolidation.
  • Another object of the invention is to provide a system for consolidating tunnels that is particularly quick to assemble.
  • Another object of the invention is to provide a system for consolidating tunnels that is safe.
  • Another object of the invention is to provide a system for consolidating tunnels which allows to move the machine for the driving of longitudinal bars into the ground in a simple, quick and safe manner.
  • the latter may have a longitudinal extension along an axis X and at least one opening A for one or more vehicles to pass through.
  • tunnel G may be configured to allow other types of vehicles such as cars, trams or the like to pass through, without departing from the scope of protection of the present invention.
  • the system 1 of the present invention may allow to carry out the consolidation operations without having to close the tunnel G that is without the need to prevent trains from passing through the railway S.
  • there may be provided for trains to pass through the tunnel G.
  • the system 1 may comprise a load-bearing structure 100 for supporting men and/or means during the consolidation operation and a protection wall 200 interposed between the load-bearing structure 100 and the way S for preventing mean or objects from falling on the way S.
  • the means may comprise one or more drilling machines of the per se known type for driving a plurality of metal or plastic bars into the ground near the tunnel G.
  • Due to such configuration of the system 1 may operate and/or move the means at the load-bearing structure 100 safely.
  • men, objects, means or anything else that might fall may impact against the protection wall 200 and this may allow to prevent them from impacting against the way S and/or a passing vehicle.
  • Such aspect further allows a high safety for the operators given that they prevent them from falling for several metres up to the way S.
  • a further advantage of the present invention lies in the fact that the protection wall 200 remains external with respect to cables and pipes, for example electrical cables in case of a railway tunnel. In particular, this may allow to prevent men and/or objects from impacting against the power cables.
  • the electrical cables do not pass through the so-called worksite, that is they do not pass through the support structure and/or the protection wall, but they remain protected in the lower area at the road S.
  • the protection wall 200 may have an extension along an axis Y' intended to be positioned above the way S at the opening A of the tunnel G so that the axes X and Y' are substantially parallel and mutually coincident.
  • the protection wall 200 may have dimensions sufficient to allow one or more vehicles to pass through the tunnel G.
  • the protection wall 200 may be substantially portal-shaped so as to allow the vehicle to pass through the way S below the way in question.
  • the protection wall 200 may have a dimension along a plane substantially perpendicular to the axis Y' substantially equal to or slightly larger than the dimension of the opening A of the tunnel G along the plane.
  • the protection wall 200 may have a substantially semi-circular cross-section.
  • the protection wall 200 may have a pair of substantially planar areas 290 designed to remain on opposite sides with respect to the way S and an upper area 291 for connecting the semi-cylindrical-shaped areas 290.
  • the upper area 291 may be spaced from the way S so as to allow the vehicle to pass through beneath it.
  • the protection wall 200 may be substantially continuous so as to prevent men or objects from falling on the way S.
  • the protection wall 200 may therefore be a solid surface or it may be a net.
  • the meshes of the net may be sufficiently small to prevent men or objects from falling.
  • the protection wall 200 may have a solid surface so as to prevent even small objects such as screws, bolts or the soil possibly even liquids, glue and paint from falling.
  • the protection wall 200 may comprise a plurality of panels 210. Possibly, the protection wall 200 may consist of a plurality of panels 210.
  • the protection wall 200 may be modular, easy to transport and/or assemble on site.
  • panels 210 may be solid or be net-shaped in a manner similar to the description outlined above.
  • the panels 210 may have an extension that is planar or substantially planar, that is slightly curved. This allows to obtain the entire portal structure 200 through a plurality of panels 210 which may have an extension that is different with respect to each other.
  • the panels may allow to obtain the areas 290 while the slightly curved panels may allow to obtain the area 291.
  • the panels 210 may have small overall dimensions, preferably substantially planar overall dimensions. This may allow to facilitate transportation and/or storage.
  • this may advantageously allow to stack the flat panels with the planes and the curved panels with the curves. This may allow to further facilitate the transportation and/or storage.
  • the panels 210 may be removably fixed to each other. Thanks to this characteristic, the entire protection wall 200 may be disassembled once through with its function.
  • the panels may be fixed to each other through systems with plates and fixing screws of the per se known type.
  • each panel 210 may comprise a highly rigid area 211.
  • the panels 210 may comprise the perimeter area 211 thickness greater than the central area 212.
  • the perimeter area 211 may form a perimetric ridge.
  • the protection wall 210 may guarantee a high tensile strength and/or resistance to impacts like in the case of fall of objects or men.
  • the panels 210 may be fixed to each other at the high rigidity areas 211.
  • the load-bearing structure 100 may have an extension along an axis Y intended to be positioned above the way S at the opening A of the tunnel G so that the axes X and Y are substantially parallel and mutually coincident.
  • the load-bearing structure 100 may comprise one or more areas 110 for supporting men and/or means during the operation.
  • Such areas 110 may comprise or consist of support plates 111, 112.
  • the load-bearing structure 100 may comprise a plurality of beams for forming a lattice structure.
  • the load-bearing structure 100 may comprise a plurality of arched beams 102 and a plurality of longitudinal beams 103, that is parallel to the axis Y , for rigidly connecting the arches 102 to each other.
  • the arches 102 may comprise one or more plates 111, 112 defining the areas 110 for supporting men and/or means.
  • plates 111, 112 may be arranged along the entire length of the arches 102, for example as shown in FIG. 2C .
  • the entire lattice girder that is the beams 102 and/or 103 may support men and/or means therefore defining the support areas 110.
  • At least one walkway 150 for supporting the men or means during the operation.
  • the walkway 150 may have an extension along an axis Z.
  • the walkway 150 may comprise a base floor 151 for supporting men and/or means.
  • the walkway 150 may support a drilling machine and/or operators.
  • the walkway 150 may be positioned at the area 110 for supporting the load-bearing structure 100 so that the support areas 110 support the walkway 150.
  • the walkway 150 may be removably positioned on the load-bearing structure 100, for example they may be removably fixed to the support areas 110 as better explained hereinafter.
  • the walkway 150 may be positioned at one or more of the plates 111, 112.
  • the plates 111 may be aligned along an axis parallel to the axis Y and the plates 112 may be aligned an axis parallel to the axis of the plates 111.
  • the walkway 150 may therefore be supported by 3 plates 111, one for each arch 102. In this manner, the walkway 150 may be supported in three points spaced apart conferring high stability thereto.
  • the walkway 150 may therefore be in a longitudinal operative position, that is so that the axis Z is substantially parallel to the axis Y .
  • the walkway 150 may be supported by a different number of plates 111.
  • it may be supported by a pair of plates 111 or by a large number of plates 111, for example 4 plates.
  • the walkway 150 may comprise further plates 152 which may be screwed with the plates 111 and/or 112. Such type of coupling is not exclusive.
  • Connection girder elements 155 may be suitably provided for to connect the walkway 150 with the load-bearing structure 100.
  • such connections 155 may be configured so that the floor 151 of the walkway 150 is substantially horizontal.
  • each walkway 150 may be coupled with a first row of plates 111 and with a second row of plates 112 so that the walkway 150 has a high stability and tensile strength.
  • the plates 111, 112 may support the walkway 150 and therefore the men or means thereon.
  • connection girder 155 may have a classic "triangular" structural configuration with two constraint points on the load-bearing structure 100 therefore guaranteeing high structural strength to the entire structure, and in particular high tensile strength of the walkway 150.
  • connection girder 155 may be fixed to the plates 111 and/or 112 in any manner. For example, by fittingly coupling and/or by using screws and bolts and/or by using further abutment plates 152.
  • the former may be in an operative position such to allow to carry out the consolidation operations.
  • the walkway 150 when it is in an operative position, it may have an end 159 facing the ground to be consolidated.
  • the end 159 may be in proximity of the ground to be consolidated and only slightly spaced apart therefrom.
  • such end 159 may have a distance smaller than 1 metre.
  • This characteristic may allow to position the drilling machine on the floor 151 in proximity of the end 159 to carry out the consolidation operations easily.
  • the consolidation operations may comprise ground drilling operations and/or operations for driving reinforcement materials or means, such as for example consolidation bars, into the ground.
  • the walkway 150 may be coupled with one or more of the plates 111, 112 in a removable manner.
  • the same walkway 150 may be used to carry out ground consolidation operations easily in multiple areas of the ground.
  • connection girder 155 and the plates 111, 112 may be mutually configured so as to allow the mutual coupling/de-coupling.
  • connection girder 155 may be removably fixed to the plates 111 and/or 112 in any manner. For example, by fittingly coupling so as to allow the coupling and/or de-coupling of the walkway 150 by translating the latter along a vertical axis substantially perpendicular to the axis Y . During use, such sliding may be substantially vertical upwards.
  • the walkway 150 may be moved in a plurality of lateral operative positions with respect to the opening A of the tunnel G so as to allow to operate on the ground in a plurality of areas. This may allow to easily drive the consolidation bars into the lateral areas of the ground with respect to the opening A of the tunnel G.
  • the walkway 150 may be in a first operative position in which it is engaged with a plurality of plates 111, for example two or three plates 111 each belonging to a beam 102, and it may then be moved in a second different operative position in which it is engaged with at least one different plurality of plates 112, for example two or three plates 112 each belonging to a beam 102.
  • the beams 102 may comprise a plurality of plates 111, 112, for example 10, so as to allow to move the walkway 150 in a large number of operative positions, which may correspond to a row of plates.
  • the walkways 150 may be symmetrical so that the same walkway 150 may be mounted on the right or left side of the load-bearing structure 110.
  • the walkway 150 may have the entire floor 151 in proximity to the ground. This configuration allows to easily carry out the ground consolidation operations above the opening A of the tunnel G.
  • FIG. 5 shows a system 1 with a pair of walkways 150 arranged longitudinally and a walkway 150 arranged transversely.
  • a base plate 120 positioned above the load-bearing structure 100 so as to remain substantially horizontal.
  • the support areas 110 may therefore also include the base plate 120.
  • Such base plate 120 may facilitate the operations on the area of the ground above the tunnel. Furthermore, such base plate 120 may be used as an area for depositing the equipment.
  • the walkways 150 may be moved between the various operative positions using a crane 140.
  • the crane 140 may be positioned on the base plate 120 and they may be fixed to the latter. Preferably, it may be fixed removably.
  • the crane 140 may have an arm 141 sized so as to allow the positioning of the walkways 150 in all possible operative positions.
  • the crane 140 may be exclusively sized to this end so that it has minimal overall dimensions.
  • the walkways 150 may be moved without blocking the way S and/or prevent the vehicles from passing through.
  • the load-bearing structure 100 may be substantially reticular-shaped as described above with a plurality of arched 102 and longitudinal 103 beams. Should a walkway 150 and/or a drilling machine fall, the weight of the latter will be supported by the load-bearing structure 100 which may therefore also act as protection for the way S.
  • the protection wall 200 and the load-bearing structure 100 are two distinct portal structures.
  • the protection wall 200 may have an inner surface 201 facing the way S and an opposite outer surface 202 facing the load-bearing structure 100.
  • the outer surface 202 and the protection wall 200 may be mutually spaced.
  • load-bearing structure 100 and the protection structure 200 may be connected or they may be integrated in a single continuous portal-like load-bearing structure, without departing from the scope of protection of the present invention.
  • a walkway 150 in an operative position and carry out a ground consolidation operation in a first area, for example drilling such first area. Subsequently, the walkway 150 may be moved from the first operative position to another operative position, to carry out a ground consolidation operation in a different area, for example drilling such second area of the ground.
  • the drilling machine may be subsequently moved to the inoperative position, which may for example be an area near the way S but outside the latter, the walkway 150 may be moved from the first operative position to another operative position, the drilling machine may be moved on the walkway 150 to carry out a new drilling at a different area of the ground.
  • the inoperative position which may for example be an area near the way S but outside the latter
  • the walkway 150 may be moved from the first operative position to another operative position
  • the drilling machine may be moved on the walkway 150 to carry out a new drilling at a different area of the ground.
  • Such operation may be carried out a plurality of times so that the walkway 150 occupies all operative positions so as to allow the drilling of all the ground near the opening A.
  • a walkway 150 may be translated along the arches 102, turned by 180° so as to be positioned on the opposite side and/or turned by 90° so as to be positioned transversal, substantially parallel to the ground.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A system for manufacturing a service structure for the support of men and means working to consolidate the ground around a tunnel (G) overlying a way (S), the latter having a longitudinal extension along a first axis (X) and at least one opening (A) for the passage of one or more vehicles. The system comprises a load-bearing structure (100) having an extension along a second axis (Y) intended to be positioned above the way (S) at the at least one opening (A) of the tunnel (G) which comprises one or more support areas (110) for men or means during the operation, and a protection wall (200) designed to be interposed between the load-bearing structure (100) and the way (S). The protection wall (200) is substantially continuous so as to prevent men or objects from falling on the way (S).

Description

    Technical field
  • The present invention generally relates to the field of systems for building infrastructures, and it relates to a system for consolidating the ground near tunnels.
  • State of the Art
  • Operations for consolidating a tunnel for example in the ground overlying it, provide for driving - into such ground - a plurality of longitudinal bars parallel to the extension of the tunnel, so as to reinforce it.
  • Such operation should be carried out both in the event the ground loses solidity - and therefore there is the risk of landslide - and should there arise the need to widen the gap of the tunnel. In particular, in this latter case there shall initially be consolidated the ground and subsequently widen the gap using milling cutters of the per se known type.
  • In any case, in order to enable the driving of the longitudinal reinforcement bars, there arises the need to provide a specific machine which drives the bars into the ground. Such machine should therefore be moved at the desired points for driving the longitudinal bars into the ground.
  • Therefore, to date there is provided a multistorey scaffolding at the exit of the tunnel to support such machine in multiple positions.
  • A drawback of such known system lies in the fact that it does not allow trains or vehicles to pass through during the consolidation steps due to the presence of the scaffolding. Such characteristic entails the full closing of the stretch over the entire duration of the works.
  • Furthermore, such known system requires particularly long working times due to the movement difficulties of the machine for the driving of the bars into the ground.
  • A further disadvantage of the known systems lies in that they are unsafe, require assembling expertise (the scaffolding must support the particularly heavy machine), and require long times for assembling and disassembling the scaffolding.
  • Document CN111794783 discloses a support structure for operations in tunnels.
  • Summary of the invention
  • An object of the present invention is to at least partly overcome the drawbacks illustrated above by providing a system for consolidating tunnels that is highly functional and cost-effective.
  • Another object of the invention is to provide a system for consolidating tunnels which allows trains and vehicles to pass through during the consolidation.
  • Another object of the invention is to provide a system for consolidating tunnels that is particularly quick to assemble.
  • Another object of the invention is to provide a system for consolidating tunnels that is safe.
  • Another object of the invention is to provide a system for consolidating tunnels which allows to move the machine for the driving of longitudinal bars into the ground in a simple, quick and safe manner.
  • These and other objects which will be more apparent hereinafter are attained by a system for consolidating tunnels as described, illustrated and/or claimed herein.
  • The dependent claims define advantageous embodiments of the invention.
  • Brief description of the drawings
  • Further characteristics and advantages of the invention will be more apparent in light of the detailed description of a preferred but non-exclusive embodiment of the invention, illustrated by way of non-limiting example with reference to the attached drawings, wherein:
    • FIG. 1 is a schematic view of a system 1;
    • FIGS. 2A, 2B and 2C are enlarged views of some details of FIG. 1;
    • FIG. 3 is a schematic view of a protection wall 200 of the system of FIG. 1;
    • FIGS. 4 and 5 are a schematic view of the system 1 in different operating steps.
    Detailed description of a preferred embodiment
  • With reference to the aforementioned figures, herein described is a system 1 for manufacturing a service structure for the support of men and means working to consolidate the ground around a tunnel G overlying a way S.
  • In particular, the latter may have a longitudinal extension along an axis X and at least one opening A for one or more vehicles to pass through.
  • In the attached drawings, there is shown a railway tunnel G in which the way is a two-way traffic railway S and the vehicle is a train.
  • In the description hereinafter, reference will be made to such embodiment. However, it is clear that the tunnel G may be configured to allow other types of vehicles such as cars, trams or the like to pass through, without departing from the scope of protection of the present invention.
  • Essentially, as better explained hereinafter, the system 1 of the present invention may allow to carry out the consolidation operations without having to close the tunnel G that is without the need to prevent trains from passing through the railway S. In other words, there may be provided for trains to pass through the tunnel G.
  • Suitably, the system 1 may comprise a load-bearing structure 100 for supporting men and/or means during the consolidation operation and a protection wall 200 interposed between the load-bearing structure 100 and the way S for preventing mean or objects from falling on the way S.
  • The means may comprise one or more drilling machines of the per se known type for driving a plurality of metal or plastic bars into the ground near the tunnel G.
  • Due to such configuration of the system 1 may operate and/or move the means at the load-bearing structure 100 safely. As a matter of fact, men, objects, means or anything else that might fall may impact against the protection wall 200 and this may allow to prevent them from impacting against the way S and/or a passing vehicle.
  • Such aspect further allows a high safety for the operators given that they prevent them from falling for several metres up to the way S.
  • A further advantage of the present invention lies in the fact that the protection wall 200 remains external with respect to cables and pipes, for example electrical cables in case of a railway tunnel. In particular, this may allow to prevent men and/or objects from impacting against the power cables.
  • Furthermore, unlike the existing scaffolding systems, the electrical cables do not pass through the so-called worksite, that is they do not pass through the support structure and/or the protection wall, but they remain protected in the lower area at the road S.
  • The protection wall 200 may have an extension along an axis Y' intended to be positioned above the way S at the opening A of the tunnel G so that the axes X and Y' are substantially parallel and mutually coincident.
  • The protection wall 200 may have dimensions sufficient to allow one or more vehicles to pass through the tunnel G.
  • Preferably, the protection wall 200 may be substantially portal-shaped so as to allow the vehicle to pass through the way S below the way in question.
  • The protection wall 200 may have a dimension along a plane substantially perpendicular to the axis Y' substantially equal to or slightly larger than the dimension of the opening A of the tunnel G along the plane. For example, as shown in FIG. 3, the protection wall 200 may have a substantially semi-circular cross-section. Preferably, the protection wall 200 may have a pair of substantially planar areas 290 designed to remain on opposite sides with respect to the way S and an upper area 291 for connecting the semi-cylindrical-shaped areas 290. The upper area 291 may be spaced from the way S so as to allow the vehicle to pass through beneath it.
  • These characteristics may allow the vehicle to pass through the way S underlying the protection wall 200 and at the same time the overall dimensions of the latter may be minimum.
  • Suitably, the protection wall 200 may be substantially continuous so as to prevent men or objects from falling on the way S. The protection wall 200 may therefore be a solid surface or it may be a net. In this case, the meshes of the net may be sufficiently small to prevent men or objects from falling.
  • Preferably, the protection wall 200 may have a solid surface so as to prevent even small objects such as screws, bolts or the soil possibly even liquids, glue and paint from falling.
  • According to a particular aspect of the invention, the protection wall 200 may comprise a plurality of panels 210. Possibly, the protection wall 200 may consist of a plurality of panels 210.
  • Thanks to this characteristic, the protection wall 200 may be modular, easy to transport and/or assemble on site.
  • It is clear that the panels 210 may be solid or be net-shaped in a manner similar to the description outlined above.
  • Advantageously, the panels 210 may have an extension that is planar or substantially planar, that is slightly curved. This allows to obtain the entire portal structure 200 through a plurality of panels 210 which may have an extension that is different with respect to each other. For example, the panels may allow to obtain the areas 290 while the slightly curved panels may allow to obtain the area 291.
  • Furthermore, advantageously, thanks to the planar or slightly curved shape, the panels 210 may have small overall dimensions, preferably substantially planar overall dimensions. This may allow to facilitate transportation and/or storage.
  • Furthermore, this may advantageously allow to stack the flat panels with the planes and the curved panels with the curves. This may allow to further facilitate the transportation and/or storage.
  • Preferably, the panels 210 may be removably fixed to each other. Thanks to this characteristic, the entire protection wall 200 may be disassembled once through with its function.
  • For example, the panels may be fixed to each other through systems with plates and fixing screws of the per se known type.
  • As schematically illustrated in FIG. 3, each panel 210 may comprise a highly rigid area 211. For example, the panels 210 may comprise the perimeter area 211 thickness greater than the central area 212. For example, the perimeter area 211 may form a perimetric ridge.
  • Thanks to this characteristic, the protection wall 210 may guarantee a high tensile strength and/or resistance to impacts like in the case of fall of objects or men.
  • Suitably, the panels 210 may be fixed to each other at the high rigidity areas 211.
  • The load-bearing structure 100 may have an extension along an axis Y intended to be positioned above the way S at the opening A of the tunnel G so that the axes X and Y are substantially parallel and mutually coincident.
  • The load-bearing structure 100 may comprise one or more areas 110 for supporting men and/or means during the operation. Such areas 110 may comprise or consist of support plates 111, 112.
  • In greater detail, the load-bearing structure 100 may comprise a plurality of beams for forming a lattice structure. For example, as shown in FIG. 1, the load-bearing structure 100 may comprise a plurality of arched beams 102 and a plurality of longitudinal beams 103, that is parallel to the axis Y, for rigidly connecting the arches 102 to each other.
  • Suitably, the arches 102 may comprise one or more plates 111, 112 defining the areas 110 for supporting men and/or means. Preferably, such plates 111, 112 may be arranged along the entire length of the arches 102, for example as shown in FIG. 2C.
  • However, it is clear that the entire lattice girder, that is the beams 102 and/or 103 may support men and/or means therefore defining the support areas 110.
  • Advantageously, there may also be provided for at least one walkway 150 for supporting the men or means during the operation.
  • The walkway 150 may have an extension along an axis Z. Preferably, the walkway 150 may comprise a base floor 151 for supporting men and/or means. For example, the walkway 150 may support a drilling machine and/or operators.
  • The walkway 150 may be positioned at the area 110 for supporting the load-bearing structure 100 so that the support areas 110 support the walkway 150.
  • Preferably, the walkway 150 may be removably positioned on the load-bearing structure 100, for example they may be removably fixed to the support areas 110 as better explained hereinafter.
  • Suitably, the walkway 150 may be positioned at one or more of the plates 111, 112.
  • For example, in the embodiment shown in FIG. 1 there are provided for 3 arches 102 each one comprising a plurality of plates 111, 112. In particular, with reference to FIG. 1, the plates 111 may be aligned along an axis parallel to the axis Y and the plates 112 may be aligned an axis parallel to the axis of the plates 111.
  • The walkway 150 may therefore be supported by 3 plates 111, one for each arch 102. In this manner, the walkway 150 may be supported in three points spaced apart conferring high stability thereto.
  • In this case, the walkway 150 may therefore be in a longitudinal operative position, that is so that the axis Z is substantially parallel to the axis Y.
  • Although not shown in the attached figures, it is clear that the walkway 150 may be supported by a different number of plates 111. For example, it may be supported by a pair of plates 111 or by a large number of plates 111, for example 4 plates.
  • In order to constrain the walkway 150 to the load-bearing structure 100 at the plates 111 and/or 112 systems of the per se known type may be provided for.
  • For example, the walkway 150 may comprise further plates 152 which may be screwed with the plates 111 and/or 112. Such type of coupling is not exclusive.
  • Connection girder elements 155 may be suitably provided for to connect the walkway 150 with the load-bearing structure 100. Preferably, such connections 155 may be configured so that the floor 151 of the walkway 150 is substantially horizontal.
  • Preferably, each walkway 150 may be coupled with a first row of plates 111 and with a second row of plates 112 so that the walkway 150 has a high stability and tensile strength.
  • For example, the girder 155 may comprise a plurality of pairs of plates 152 designed to be coupled by fittingly coupling with a corresponding pair of plates 111, 112 of the same arch 102.
  • In the light of the above, the plates 111, 112 may support the walkway 150 and therefore the men or means thereon.
  • Furthermore, the connection girder 155 may have a classic "triangular" structural configuration with two constraint points on the load-bearing structure 100 therefore guaranteeing high structural strength to the entire structure, and in particular high tensile strength of the walkway 150.
  • It is clear that the connection girder 155 may be fixed to the plates 111 and/or 112 in any manner. For example, by fittingly coupling and/or by using screws and bolts and/or by using further abutment plates 152.
  • In any case, once the walkway 150 has been coupled with the support structure 100, the former may be in an operative position such to allow to carry out the consolidation operations. In particular, when the walkway 150 is in an operative position, it may have an end 159 facing the ground to be consolidated. Preferably, the end 159 may be in proximity of the ground to be consolidated and only slightly spaced apart therefrom. For example, such end 159 may have a distance smaller than 1 metre.
  • This characteristic may allow to position the drilling machine on the floor 151 in proximity of the end 159 to carry out the consolidation operations easily.
  • The consolidation operations may comprise ground drilling operations and/or operations for driving reinforcement materials or means, such as for example consolidation bars, into the ground.
  • According to a particular aspect of the invention, the walkway 150 may be coupled with one or more of the plates 111, 112 in a removable manner.
  • This may allow to reposition the walkway 150 in a different operative position. That is the walkway 150 may be de-coupled from the plates 111 and the walkway 150 may be coupled with the other plates 112, for example with plates 112 in a higher position.
  • Thanks to this characteristic, the same walkway 150 may be used to carry out ground consolidation operations easily in multiple areas of the ground.
  • Suitably, the connection girder 155 and the plates 111, 112 may be mutually configured so as to allow the mutual coupling/de-coupling.
  • It is clear that the connection girder 155 may be removably fixed to the plates 111 and/or 112 in any manner. For example, by fittingly coupling so as to allow the coupling and/or de-coupling of the walkway 150 by translating the latter along a vertical axis substantially perpendicular to the axis Y. During use, such sliding may be substantially vertical upwards.
  • Thanks to the particular arched shape of the beams 102, the walkway 150 may be moved in a plurality of lateral operative positions with respect to the opening A of the tunnel G so as to allow to operate on the ground in a plurality of areas. This may allow to easily drive the consolidation bars into the lateral areas of the ground with respect to the opening A of the tunnel G.
  • For example, the walkway 150 may be in a first operative position in which it is engaged with a plurality of plates 111, for example two or three plates 111 each belonging to a beam 102, and it may then be moved in a second different operative position in which it is engaged with at least one different plurality of plates 112, for example two or three plates 112 each belonging to a beam 102.
  • It is clear that should there be provided for a connection girder 150 or generally the walkway 150 is supported by two or more plates 111, 112 for each beam 102, once the walkway 150 has been moved to the second operative position, the latter may be supported even by some plates which support the walkway in the first operative position.
  • Preferably, the beams 102 may comprise a plurality of plates 111, 112, for example 10, so as to allow to move the walkway 150 in a large number of operative positions, which may correspond to a row of plates.
  • Suitably, there may be provided for a plurality of walkway 150. For example FIG. 1 shows a pair of longitudinal walkways 150, that is in which the axis Z is substantially parallel to the axis Y.
  • This may allow to operate on the ground from both sides of the tunnel G at the same time.
  • Preferably, the walkways 150 may be symmetrical so that the same walkway 150 may be mounted on the right or left side of the load-bearing structure 110.
  • According to a particular aspect of the invention, the same walkway 150 may be coupled with the load-bearing structure 100 in a substantially transversal operative position, that is in a position in which its axis Z is substantially perpendicular to the axis Y. In other words, in this manner, the axis Z may be substantially parallel to the ground to be consolidated.
  • In this case, the walkway 150 may have the entire floor 151 in proximity to the ground. This configuration allows to easily carry out the ground consolidation operations above the opening A of the tunnel G.
  • For example, FIG. 5 shows a system 1 with a pair of walkways 150 arranged longitudinally and a walkway 150 arranged transversely.
  • Suitably, there may be provided for a base plate 120 positioned above the load-bearing structure 100 so as to remain substantially horizontal. The support areas 110 may therefore also include the base plate 120.
  • Such base plate 120 may facilitate the operations on the area of the ground above the tunnel. Furthermore, such base plate 120 may be used as an area for depositing the equipment.
  • Suitably, there may be provided for ladders 130 or the like to allow operators to move between the walkways 150 and the base plate 120.
  • According to a particular aspect of the invention, the walkways 150 may be moved between the various operative positions using a crane 140. Preferably, the crane 140 may be positioned on the base plate 120 and they may be fixed to the latter. Preferably, it may be fixed removably.
  • In this manner, the crane 140 may move the walkway 150 in a simple manner and without occupying the ground near the way S.
  • Suitably, the crane 140 may have an arm 141 sized so as to allow the positioning of the walkways 150 in all possible operative positions. Preferably, the crane 140 may be exclusively sized to this end so that it has minimal overall dimensions.
  • In this manner, advantageously, the walkways 150 may be moved without blocking the way S and/or prevent the vehicles from passing through.
  • Preferably, the crane 140 may be configured so as to also allow to move the drilling machine, for example for positioning it on a walkway 150 at the end 159.
  • Suitably, the load-bearing structure 100 may be substantially reticular-shaped as described above with a plurality of arched 102 and longitudinal 103 beams. Should a walkway 150 and/or a drilling machine fall, the weight of the latter will be supported by the load-bearing structure 100 which may therefore also act as protection for the way S.
  • Therefore, advantageously, the protection wall 200 may be configured to withstand the impact of men and/or small means, while the load-bearing structure 100 may withstand the impact of large means and, as a result, also men.
  • Furthermore, the portal-liked arched shape of the load-bearing structure 100 and/or of the protection wall 200 may facilitate the exit of men, objects and/or means toward the external, that is towards areas outside the way S. This allows to safeguard the load-bearing structure 100 and/or the protection wall 200 as well as the way S.
  • In the embodiment shown in the attached figures, the protection wall200 and the load-bearing structure 100 are two distinct portal structures. In particular, the protection wall 200 may have an inner surface 201 facing the way S and an opposite outer surface 202 facing the load-bearing structure 100. The outer surface 202 and the protection wall 200 may be mutually spaced.
  • Although not shown, it is clear that the load-bearing structure 100 and the protection structure 200 may be connected or they may be integrated in a single continuous portal-like load-bearing structure, without departing from the scope of protection of the present invention.
  • Operatively, there may therefore be provided for the system 1 described above and carry out one or more ground consolidation operations steps, for example one or more drilling operations. Suitably, such operation steps may be carried out without closing the tunnel G when vehicles pass through, possibly, even when the vehicle passes through, for example when the train passes through.
  • Operatively, there may therefore be positioned a walkway 150 in an operative position and carry out a ground consolidation operation in a first area, for example drilling such first area. Subsequently, the walkway 150 may be moved from the first operative position to another operative position, to carry out a ground consolidation operation in a different area, for example drilling such second area of the ground.
  • The movement of the walkway 150 may be made with or without the drilling machine.
  • Possibly, the drilling machine may therefore be moved from an inoperative position to an operative position on the walkway 150, preferably in proximity of the end 159, so as to drill the ground in a corresponding first area and drill the ground. Suitably, such movement of the walkway 150 and/or of the drilling machine may be carried out using a crane 140.
  • The drilling machine may be subsequently moved to the inoperative position, which may for example be an area near the way S but outside the latter, the walkway 150 may be moved from the first operative position to another operative position, the drilling machine may be moved on the walkway 150 to carry out a new drilling at a different area of the ground.
  • Such operation may be carried out a plurality of times so that the walkway 150 occupies all operative positions so as to allow the drilling of all the ground near the opening A.
  • Suitably, during the movement step, a walkway 150 may be translated along the arches 102, turned by 180° so as to be positioned on the opposite side and/or turned by 90° so as to be positioned transversal, substantially parallel to the ground.
  • The invention is susceptible to numerous modifications and variants, all falling within the scope of protection of the attached claims. All details can be replaced by other technically equivalent elements, and the materials can be different depending on the needs, without departing from the scope of protection of the invention defined by the attached claims.

Claims (14)

  1. A system for manufacturing a service structure for the support of men and means working to consolidate the ground around a tunnel (G) overlying a way (S), such as a roadway, a railway or the like, the way (S) having a longitudinal extension along a first axis (X) and at least one opening (A) for the passage of one or more vehicles, the system comprising:
    - a load-bearing structure (100) having an extension along a second axis (Y) intended to be positioned above the way (S) at the at least one opening (A) of the tunnel (G) so that said first and second axis (X, Y) are substantially parallel or mutually coincident, said load-bearing structure (100) comprising at least one support area (110) for men or means during the operation;
    - a protection wall (200) intended to be interposed between said load-bearing structure (100) and the way (S), said protection wall (200) being substantially continuous so as to prevent men or objects from falling on the way (S).
  2. System according to claim 1, wherein said protection wall (200) has dimensions sufficient to allow one or more vehicles to pass through the tunnel (G).
  3. System according to claim 1 or 2, wherein said protection wall (200) is substantially portal-shaped.
  4. System according to any one of claims 1 to 3, wherein said protection wall (200) has an inner surface (201) facing the way (S) and an opposite outer surface (202) facing said load-bearing structure (100), the latter and said protection wall (200) being mutually spaced.
  5. System according to any one of claims 1 to 4, further comprising at least one walkway (150) for supporting the men or means during the operation, said at least one walkway (150) being suitable to be removably positioned at said at least one support area (110).
  6. System according to the preceding claim, wherein said at least one support area (110) of said load-bearing structure (100) has a first plurality of support plates (111) and at least one second plurality of support plates (112), said at least one walkway (150) having at least one operative portion (152) which can be alternatively selectively removably engaged with said first or second plurality of support plates (111, 112) so that the latter support said at least one walkway (150) in a respective first or second operative position.
  7. System according to the preceding claim, wherein said at least one walkway (150) has a longitudinal shape defining a third axis (Z), said walkway (150) being suitable to be selectively removably engaged with said load-bearing structure (100) in said at least one first or second operative position in which said third axis (Z) is substantially parallel to said second axis (Y) of said load-bearing structure (100) or in at least one third operative position wherein said third axis (Z) is substantially perpendicular to said second axis (Y).
  8. System according to any one of the preceding claims, wherein said protection wall (200) comprises a plurality of panels (210) which can be mutually coupled to each other in a removable fashion.
  9. System according to any one of claims 5 to the preceding, comprising a crane (140) for moving said at least one walkway (150) between at least said first, second or third operative position, said load-bearing structure (100) having a base plate (120), said crane (140) being fixed with said base plate (120).
  10. System according to any one of the preceding claims wherein said load-bearing structure (100) and said protection wall (200) form a single structure.
  11. A method for consolidating the ground around a tunnel (G) overlying a way (S) such as a roadway, a railway or the like, the way (S) having a longitudinal extension along a first axis (X) and at least one opening (A) for the passage of one or more vehicles, the method comprising the steps of:
    - preparing a system (1) which comprises a load-bearing structure (100) having an extension along a second axis (Y) intended to be positioned above the way (S) at the at least one opening (A) of the tunnel (G) so that said first and second axis (X, Y) are substantially parallel or mutually coincident, said load-bearing structure (100) comprising at least one support area (110) for men or means during the operation;
    - consolidating the ground in at least one area thereof;
    wherein said consolidation step can be carried out during the passage of the one or more vehicles through said system (1).
  12. Method according to the preceding claim, wherein said preparation step comprises the preparation of a system according to any one of claims 1 to 10.
  13. Method according to claim 12, wherein said consolidation step comprises a working step for drilling the ground carried out using a drilling machine, the method comprising the steps of:
    - positioning at least one walkway (150) for supporting the men or means during the operation on the load-bearing structure (100) in a first operative position;
    - drilling the ground in a corresponding first area by means of said drilling machine;
    - movement of said at least one walkway (150) from said first operative position to a second operative position on the load-bearing structure (100);
    - drilling the ground in a corresponding second area by means of said drilling machine.
  14. Method according to claim 13, wherein said load-bearing structure (100) has a base plate(120) and a crane (140) fixed with said base plate (120), the movement of said drilling machine and the movement of said at least one walkway (150) being attained by means of said crane (140).
EP23183954.9A 2022-07-07 2023-07-06 System and method for consolidating the ground around tunnels Pending EP4303402A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT202200014413 2022-07-07

Publications (1)

Publication Number Publication Date
EP4303402A1 true EP4303402A1 (en) 2024-01-10

Family

ID=83271185

Family Applications (1)

Application Number Title Priority Date Filing Date
EP23183954.9A Pending EP4303402A1 (en) 2022-07-07 2023-07-06 System and method for consolidating the ground around tunnels

Country Status (1)

Country Link
EP (1) EP4303402A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204984438U (en) * 2015-07-27 2016-01-20 湖南五新隧道智能装备股份有限公司 Tunnel lining platform truck with adjustable
CN109291256A (en) * 2018-10-30 2019-02-01 中铁十局集团第五工程有限公司 The automation ring cutting trolley quickly removed for existing disease tunnel lining concrete
CN110130937A (en) * 2019-06-06 2019-08-16 涪特智能装备(重庆)有限公司 A kind of tunnel construction trolley
CN111794783A (en) 2020-07-29 2020-10-20 中国铁道科学研究院集团有限公司铁道建筑研究所 Tunnel open cut tunnel segment assembling trolley
CN113074005A (en) * 2021-04-19 2021-07-06 中铁工程装备集团有限公司 A operation rack for tunnel supporting construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204984438U (en) * 2015-07-27 2016-01-20 湖南五新隧道智能装备股份有限公司 Tunnel lining platform truck with adjustable
CN109291256A (en) * 2018-10-30 2019-02-01 中铁十局集团第五工程有限公司 The automation ring cutting trolley quickly removed for existing disease tunnel lining concrete
CN110130937A (en) * 2019-06-06 2019-08-16 涪特智能装备(重庆)有限公司 A kind of tunnel construction trolley
CN111794783A (en) 2020-07-29 2020-10-20 中国铁道科学研究院集团有限公司铁道建筑研究所 Tunnel open cut tunnel segment assembling trolley
CN113074005A (en) * 2021-04-19 2021-07-06 中铁工程装备集团有限公司 A operation rack for tunnel supporting construction

Similar Documents

Publication Publication Date Title
US20200149301A1 (en) Architectual climbing system with improved structural stability
JP4504910B2 (en) Dolly and method of erection of temporary pier using it
JP6180376B2 (en) Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method
PL190117B1 (en) Modular set of components for construction of railway station platforms
KR20190140266A (en) The steel formwork for tunnels with workwalk for workers
JP6793542B2 (en) Floor slab erection method and floor slab erection equipment
CN210067544U (en) Prefabricated steel structure protective shed frame for railway business line
KR100926667B1 (en) Self-propelled parking facility using long span beam
CN110184938A (en) High pier is without bracket climbing formwork for construction method
KR101981845B1 (en) Overhead conveying device having a securing element
EP1415057A2 (en) Building and construction method
EP4303402A1 (en) System and method for consolidating the ground around tunnels
DE212021000393U1 (en) Building structure for a thin-walled concrete noise barrier pouring car with a large span
US20080250579A1 (en) Modular Support Catch System
JP2008050811A (en) Movable suspended scaffolding apparatus
JP3991067B1 (en) Temporary bridge between railway platforms
JP5945086B1 (en) Existing waterway repair device and repair method
EP1206611B1 (en) Scaffolding
JP6368628B2 (en) Mobile scaffold and inspection / repair method using the mobile scaffold
CN115058957A (en) Dual-purpose trestle supporting structure
KR20040024358A (en) A working device for assembly tunnel soundproofed wall
JP6873435B2 (en) Suspended scaffolding and its erection method
CN213837279U (en) Assembled sandwich floor
KR200432268Y1 (en) Cover Plate integrated with the Frame
CN217419309U (en) A construction platform for installation of bridge below drainage pipe

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR