EP3743878A1 - Energy generation system, method for operating a computing unit, and retrofit assembly - Google Patents

Energy generation system, method for operating a computing unit, and retrofit assembly

Info

Publication number
EP3743878A1
EP3743878A1 EP19700665.3A EP19700665A EP3743878A1 EP 3743878 A1 EP3743878 A1 EP 3743878A1 EP 19700665 A EP19700665 A EP 19700665A EP 3743878 A1 EP3743878 A1 EP 3743878A1
Authority
EP
European Patent Office
Prior art keywords
computing
computing unit
power
energy
electrical energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19700665.3A
Other languages
German (de)
French (fr)
Inventor
Tobias MADER
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP3743878A1 publication Critical patent/EP3743878A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Definitions

  • the invention relates to a power generation plant with an energy generating device and a computing unit. Furthermore, the invention relates to a method for operating a computing unit. In addition, the invention relates to a retrofit assembly for installation on a power generating device.
  • Electrical energy such as electricity
  • electricity is nowadays provided by different power plants operated by power generators.
  • the electricity generated in the power generation plants (electrical energy) is first through a
  • the generated and counted electrical energy is then fed into a supply network, which is operated by an energy supplier and can also be referred to as a power grid.
  • the power generation plant is coupled on the generator side with the supply network. This means that each energy generating plant is assigned a corresponding energy output counter, which counts the amount of electrical energy that is fed into the supply network.
  • the electrical energy is routed to the respective consumer via the supply network, that is to say to the end customer, who is connected to the supply network on the consumer side.
  • End customers can be households, small and medium-sized enterprises (SMEs) or large enterprises (factories).
  • SMEs small and medium-sized enterprises
  • factories large enterprises
  • the end customer typically consumes the electrical energy made available to it, which has been fed into the respective domestic network via the supply network.
  • data centers are known that include several computing units that provide computing or server performance.
  • mining farms which consist of several mining units, on the basis of which among other checksums or so-called hash values for block-chain applications such as cryptocurrencies are calculated or generated.
  • the checksums or hash values can be used for a decentralized administration, control and / or control of shared bookkeeping, ie a so-called “distributed ledger”.
  • the data centers Due to the high computational effort, the data centers have a high energy requirement.
  • the data centers especially the mining farms, set up in the vicinity of a power plant, so that generated by the power generation plant and fed into the grid electrical energy must travel only a short distance until the electrical energy is transmitted to the consumer side connected to the supply network computing units, in particular mining units. This minimizes transmission losses.
  • the data centers are operated by computational service providers that are independent of the operators of the power generation plant. The operators of the data centers are therefore typical end users who are connected to the supply network into which the electrical energy generated by the power generation plant is fed.
  • the object of the invention is to provide a more energy efficient and cost effective way to operate a computing unit.
  • the object is achieved by a power generation plant with an energy generating device that generates electrical energy for feeding into a supply network, an energy output meter that counts the fed by the power generation device in the supply network electrical energy, and at least one computing unit that has a corresponding Computing power, wherein the computing unit in the direction of current flow between the power generation device and the Energy output counter is arranged, wherein the computing unit is configured to provide server and / or computing power to a computing service provider and / or a computing power user available, in particular wherein the computing service provider is different from the operator of the power generation plant.
  • a method for operating at least one computing unit of a power generation plant comprising the following steps:
  • the computing unit Providing the computing unit with the electrical energy generated by the power generation device, the computing unit providing server and / or computing power to a computing service provider and / or a computing power user,
  • the basic idea of the invention is that the electrical current or the electrical energy generated by the energy generating device is tapped directly in order to supply the at least one computing unit with the required electrical energy (so-called self-supply or self-supply), ie before the electrical energy is counted via the energy output counter and also before the electrical energy is ever fed into the supply network. Therefore, only the unused part of the generated electrical energy is fed into the supply network and only this part of the electrical energy is counted by the energy output counter. Accordingly, the at least one computing unit is not connected to the power supply network in terms of its counterpart or consumer side in contrast to the approaches known from the prior art, but rather is the generator side.
  • the at least one computing unit thus represents an energy consumer, which is not used for power generation, but provides its computing or server power for purposes other than power generation available.
  • the computing or server performance is used by a computing service provider or computing power user who is independent of the operator of the power generation plant.
  • the computing or server power available is used by the computing service provider or by the computing user for artificial intelligence applications.
  • the available computing or server performance can also be used to generate checksums or hash values, which are required, inter alia, for block-chain applications, for example for cryptocurrencies. In general, any compute-intensive applications can be covered by the available computing or server performance.
  • the server and / or computing power provided by the computing unit is thus used independently of the power generation plant.
  • the direction of current flow corresponds to the direction of energy flow, that is to say the direction which indicates the flow of energy, namely in the direction of the supply network.
  • the computing unit is thus part of the power generation plant.
  • the computing unit is integrated in the power generation plant.
  • the integrated into the power generation unit computing unit is therefore arranged in front of an output counter of the power generation plant.
  • the energy generation plant or the energy production facility can be a solar plant, a solar plant park, a wind power plant, a hydroelectric power plant, a biomass power plant, a coal power plant, a gas power plant or a nuclear power plant, so that the generated electrical energy is solar energy, wind energy , Hydroelectric energy, energy from biomass, energy from fossil fuels or nuclear energy.
  • edge computing unit or a so-called edge computing center can be formed via the power generation plant and the computing unit integrated therein, in particular with the assigned or integrated server unit.
  • a computing unit or data center may be provided that provides, for example, server and / or computing power for compute-intensive applications, such as artificial intelligence ("Kl”) applications.
  • Kl artificial intelligence
  • the at least one computing unit or the at least one data center in the vicinity of highways can be installed in a simple manner so that the at least one computing unit or the at least one computer center for vehicle-to-vehicle communication, "Car2Car Communication "or” Car2X Communication "called, or can be used in autonomous driving.
  • the server and / or computing power for communication according to the 5G standard can be made available, which is intended inter alia for inter-vehicle communication.
  • the at least one computing unit can be supplied, in addition to the electrical energy generated by the energy generating device, with electrical energy from another energy generating plant.
  • the computing unit is at least partially operable via a so-called third-party supply.
  • the at least one computing unit is at least partially, in particular mainly, supplied with the required electrical energy by the power generation device that is part of the power generation plant.
  • the at least one computing unit can therefore be mainly self-powered.
  • the electrical energy generated by the energy generating device can be provided in addition to the at least one computing unit and other components of the power generation plant (self-supply), which are, however, usually provided for generating the electrical energy.
  • Rulers can generally be used in shared accounting, also known as Distributed Ledger.
  • Shared accounting usually has decentralized management, control and / or control, for example via a decentralized computer network takes place, in which several computing and / or server units are integrated, among other mining units.
  • the decentralized administration, control and / or control is carried out via a database, which includes all previously made transactions and is continuously updated with new transactions.
  • the previous transactions are secured by so-called checksums ("hash values") in order to prevent subsequent manipulation.
  • checksums are also known as cryptographic checksums.
  • the checksums or hash values used to secure split-book transactions are generated by the mining units, also referred to as miners.
  • the database is not centrally stored, but decentralized, ie via a decentralized computer network.
  • the subscribers (also referred to as nodes) of the decentralized computer network check the other subscribers (nodes), in particular their respective data records, in order to ensure that all subscribers (nodes) provide the same data. This further increases the security of the entire system.
  • the electrical energy fed into the supply network is counted by an energy output counter.
  • the electrical energy fed into the supply network is the electrical energy which has been generated by the energy generating device and has not been consumed by the computing unit (or other components whose own requirements are covered).
  • By counting or quantifying the electrical energy fed into the supply network it is ensured that the amount of electrical energy that has been generated by the energy generation system and has not been used for self-supply can be detected.
  • the counted or quantified electrical energy is the energy that is actually fed into the supply network and thus made available to the various end customers via the supply network.
  • the computing unit is a mining unit that is set up to generate data of a shared bookkeeping system, for example to generate a checksum, in particular the checksum of a block chain.
  • the checksum or so-called hash value is used to ensure integrity.
  • the computation steps that are necessary to generate a checksum are corresponding computationally intensive, so that a high energy demand exists. This can be ensured due to the direct connection to the power generation facility in a simple and energy efficient manner.
  • the computing unit has a communication interface, in particular wherein the computing unit is part of a decentralized computing network via the communication interface, via which transactions are managed, controlled and / or controlled in a decentralized manner.
  • the communication interface may be a wireless or wired interface via which the computing unit can be connected to the Internet.
  • LAN Local Area Network
  • the communication interface can be formed via a wireless local area network (WLAN) interface, via which the computing unit is integrated in the decentralized computer network.
  • WLAN wireless local area network
  • the distributed computing network can be provided to manage, control or control the shared accounting, for example the corresponding block-chain application, in particular that of a crypto-currency.
  • the communication interface to provide the computing power of the computing unit, in particular a third party.
  • the integrated into the power generation unit computing unit which is thus arranged in front of the output counter of the power generation plant, thus represents an interface for external computing power users.
  • the computing unit may comprise a server unit which is set up to set up a decentralized computing network with further server units, in particular transactions being managed, controlled and / or controlled locally via the decentralized computing network.
  • the further server units can be nodes that calculate the transactions, ie the corresponding data records that are backed up by the computing unit designed as a mining unit with a corresponding checksum that the computing unit calculates.
  • the server unit can be coupled to the communication interface or provide the communication interface.
  • the computing service provider and / or authorized persons for example the computing power user, can access the server and / or computing power of the computing unit via the communication interface of the computing unit, in particular via the Internet.
  • a further aspect provides that the computing unit has a current input interface, via which the computing unit receives electrical energy, in particular wherein the energy generating device is coupled to the current input interface.
  • the computing unit receives the electric power generated by the power generation device directly before this is counted over the energy output counter.
  • the computing unit is coupled to the power generation device via the current input interface.
  • a transformer is provided which is assigned to the current input interface of the computing unit.
  • the transformer converts the electrical energy generated by the energy generating device into a voltage level which is required by the at least one computing unit and can be processed, for example a voltage 230 V. This ensures that the computing unit is not damaged.
  • the transformer can also be referred to as an isolating transformer.
  • the transformer can convert a voltage of the power-generating device, for example of 690 V, to a voltage level suitable for the computing unit, for example to a voltage of 230 V or to 400 V.
  • the electrical energy at the voltage level can be used with which the power generating device works. This is also referred to as self-supply or self-supply with regard to the power generation plant.
  • a departure to the power supply of the computing unit is preceded by the output counter of the power generation plant, in particular wherein the transformer is associated with the departure.
  • the own energy consumption meter is provided in addition to the usually provided output counter of the power generation device, which is set up to count the power supply to the public grid.
  • corresponding sensors are provided which monitor the temperature of the at least one computing unit in order to detect impending overheating at an early stage.
  • the sensors can be part of the shelving system.
  • the power management device is filed, for example, to detect the production output of the power generation plant, ie the amount of energy produced. Furthermore, the power management device can be set up to control the at least one arithmetic unit as needed and / or as required, thereby enabling a safety and operationally suitable function of the overall system.
  • the power management device may be configured to monitor the power flows.
  • the power management device can also be set up to communicate, inter alia, via the communication unit or a pool platform with a management server, thereby improving the security and operationally suitable function of the overall system.
  • the computing unit has a remote maintenance component, via which the computing unit can be maintained remotely. Since the computing unit is designed as part of the power generation plant, monitoring of the computing unit can be performed remotely via the remote maintenance component, without entering the power generation plant, in particular by the computing service provider or the computing power user, the computing or Server performance of at least one computing unit receives.
  • the communication interface can be provided.
  • the computing unit includes the necessary intelligence (control computer), sensors and switches that are needed for remote maintenance.
  • the computing unit may comprise at least one application specific integrated circuit (ASIC), a quantum computer, a graph streaming Processor unit (GSP), an artificial intelligence processor unit (Kl processor), a stream processor unit, a vector processor, a graphics processor unit (GPU) or a processor unit (CPU).
  • ASIC application specific integrated circuit
  • GPU graph streaming Processor unit
  • Kl processor artificial intelligence processor unit
  • GPU graphics processor unit
  • CPU processor unit
  • the energy-generating device is an energy-generating device which generates electrical energy from renewable energies.
  • the object is achieved according to the invention by a retrofit module for installation at an energy generating device which generates electrical energy for feeding into a supply network, wherein the retrofit module comprises at least one arithmetic unit which is set up, a computing service provider and / or a computing power user and / or to provide computing power, and wherein the retrofit assembly is arranged to be located upstream of an energy output counter in the direction of current flow.
  • the energy output counter is the energy output counter of the power generation facility.
  • the retrofit assembly may generally include a plurality of computing units, a shelving system, a ventilation system, a power distributor, a transformer, a self-consumption meter and / or a branch line
  • the retrofit module may have a connection interface, which is designed as an output power rail interface and / or a self-supply rail interface, via which the retrofit module can be connected to an output power rail and / or an auxiliary power rail.
  • the retrofit module is designed to be connected to a power generating device, in particular in front of the corresponding energy output counter, which defines the end of the output power rail.
  • the output power rail or the auxiliary power rail interface are terminals that differ from distinguish a power plug that is typically used consumer or end customer side.
  • the output power rail is the rail of a power plant leading to the energy output meter. From the output power rail can branch off at least one self-consumption rail, are connected to the electrical load of the power generation plant, which are used to generate the electrical energy.
  • an electric generator can be considered, via which the electrical energy is generated.
  • Figure 1 is a schematic representation of a power generation system according to the invention with a retrofit module according to the invention
  • Figure 2 is a schematic representation of a computing unit used in the power generation plant of Figure 1.
  • FIG. 1 shows a power generation plant 10, which has an energy generating device 12 in the form of a wind power plant, which is for example part of a wind farm.
  • an energy generating device 12 in the form of a wind power plant, which is for example part of a wind farm.
  • a solar system as part of a solar park
  • a hydroelectric power plant can be provided.
  • the energy generating device 12 generally generates electrical energy, which is fed by the power generation plant 10 into a supply network 14, so that the generated electrical energy can be made available to end customers who are connected to the utility network 14 on the consumer side.
  • the power generation plant 10 is therefore coupled to the supply network 14 on the generator side.
  • the power plant 10 includes an energy output counter 16 which counts the electrical energy generated by the power plant 12 and fed into the utility grid 14.
  • the energy generation plant 10 comprises a computer center 18 designed as a mining farm, which comprises a plurality of computing units 20 designed as mining units, which allocate server and / or computing power to a computing service provider and / or a computing power user Make available.
  • the concretely illustrated embodiment thus depicts a mining farm with a plurality of mining units, so that these terms are also used below when the data center 18 or the computing units 20 is mentioned. Therefore, the corresponding reference numbers are used for the mining farm and the mining units.
  • the computing units 20 and thus the data center 18 can provide the existing server and / or computing power to a computing service provider and / or a computing power user but also for other purposes, as will also be explained below.
  • the calculating units 20 designed as mining units are each set up to generate data of a shared bookkeeping system, in particular a checksum, via which previous transactions of the shared bookkeeping are saved in order to prevent subsequent manipulation.
  • the data is a checksum of a block-chain application, such as a crypto-currency.
  • the computing units 20 are generally arranged in the direction of current flow I between the energy generation device 12 and the energy output counter 16.
  • the computing units 20 are coupled via a branch line 22 to the line 24, which is provided between the power generating device 12 and the energy output counter 16, ie the power line, via which the generated electrical energy is fed into the supply network 14.
  • This line 24 is also referred to as the output power rail.
  • the branch line 22 may be a self-service rail that is connected to the output power rail or the line 24.
  • the branch line 22 can be subsequently connected to the output power rail or the line 24 in order to connect the computing units 20 to the output power rail or the line 24.
  • the multiple computing units 20 are housed in a racking system 26, which is associated with a ventilation system 28 to ensure the ventilation of the computing units 20.
  • the waste heat produced during operation of the computing units 20 can therefore be removed via the ventilation system 28, which ensures that the computing units 20 do not overheat.
  • the ventilation system 28 may be a passive ventilation system.
  • an active ventilation system 28 may be provided which actively cools the at least one computing unit 20.
  • sensors are also provided, via which the temperature of the computing units 20 is monitored.
  • the sensors can be accommodated in the shelving system 26.
  • the multiple computing units 20 are powered directly by means of the generated electrical energy of the power generation device 12, so that a self-supply of the computing units 20 is given, which is also referred to as self-supply.
  • a transformer 30 is provided in the branch line 22, which converts the generated electrical energy to a voltage level which can be processed by the computing units 20, for example to a voltage level of 230 V.
  • the corresponding electrical energy is then distributed via a power distributor 32 to the plurality of computing units 20.
  • the power distributor 32 may include a power management device, which ensures, inter alia, that the available electrical energy is distributed evenly.
  • the power generation plant 10 comprises a self-energy consumption meter 34, which is provided in the branch line 22 in the embodiment shown, in order to receive the data from the arithmetic units 20 to capture used electrical energy.
  • the self-consumption of the mining farm or of the data center 18 is therefore detected, this essentially corresponding to the difference of the generated electrical energy and the electrical energy fed into the supply network 14, provided that there are no further components which have an intrinsic supply.
  • FIG. 2 one of the several computing units 20 is shown in detail.
  • the electrical energy generated by the energy generating device 12 is converted via the transformer 30 to a suitable voltage level.
  • computing unit 20 comprises a computing processor 38 and a server unit 40, so that the computing unit 20 has corresponding computing and / or server performance.
  • computing processor 38 includes an application specific integrated circuit (ASIC).
  • ASIC application specific integrated circuit
  • the computing unit 20 has a communication interface 42, via which the computing unit 20 can be connected to the Internet, for example a wired interface or a wireless interface.
  • the communication interface 42 it is possible via the communication interface 42 for the available computing and / or server performance to be used for other purposes, for example a decentralized accounting.
  • the arithmetic unit 20 may thus be part of a decentralized computer network, via which, for example, transactions are managed, controlled and / or controlled in a decentralized manner, as is the case, inter alia, in the case of block-chain applications or shared-bookkeeping applications in general.
  • the remote computing network may include other server entities, including nodes that provide records associated with corresponding transactions. As already explained, the data records are backed up by the checksums against subsequent manipulation, which are calculated by the computing units 20 designed as mining units.
  • the available computing and / or server performance can be made available for other computationally intensive applications, for example for artificial intelligence applications.
  • the computing unit 20 has a remote maintenance component 44, which is coupled to the communication interface 42 via the server unit 40.
  • the remote maintenance component 44 may also be coupled directly to the communication interface 42 in order, for example, to be able to determine problems with the server unit 40, which would otherwise not be possible if the server unit 40 fails.
  • the remote maintenance component 44 may be coupled to the arithmetic processor 38 in order to be able to remotely maintain it accordingly.
  • the computing or server power provided by the computing processor 38 and / or the server unit 40 can be made available to a computing service provider and / or a computing power user who is independent of the operator of the power generation facility 10.
  • the computing or server performance is used by an external computing service provider and / or an external computing user to provide an artificial intelligence (Kl) application or a block-chain application, such as a cryptocurrency application.
  • Kl artificial intelligence
  • the computation-intensive checksums or hash values can be calculated using the computational units 20 designed as mining units.
  • the energy-intensive computation steps, which are required, for example, to calculate the checksums, can be made directly on site at the operator of the power generation plant 10, wherein the required electrical energy is diverted before it is fed into the supply network 14. In this respect, it is an own or self-supply of the respective computing units 20.
  • the at least one computing unit 20 can be subsequently connected to the energy generating device 12 as part of a retrofit module 46, ie before the energy output counter 16, so that the retrofit module 46 removes its own power from the terminal power of the energy generating device 12 in order to ensure self-supply.
  • the retrofit module 46 is set up to be arranged upstream of an energy output counter 16 in the direction of current flow, as shown in FIG. 1 and already explained.
  • the retrofit module 46 To connect the retrofit module 46 in front of the energy output meter 16 of the energy generating device 12, the retrofit module 46 includes a corresponding connection interface 48, which is also referred to as an output power rail interface and / or a self-service rail interface depending on the connection of the retrofit module 46.
  • the retrofit module 46 is connected to an output power rail and / or a self-consumption rail, which is represented in FIG. 1 by the line 24 or the branch line 22.
  • the retrofit module 46 is thus configured to be connected to the power generating device 12 by subsequently integrating the retrofit module 46 in front of the power output counter 16, which defines the end of the output power rail or line 24.
  • the branch line 22 shown in Figure 1, as already explained, constitute a self-supply rail of the power generating device 12, in addition to the retrofit module 46 further electrical loads (components of the power generation system 10) is supplied with electrical energy passing through the power generating device 12 itself has been generated (self-supply of the other components).
  • the retrofit module 46 to be connected to the energy generating device 12 may comprise all components which are connected to the line 24 before the energy output counter 16, for example also the branch line 22.
  • the retrofit assembly 46 may include a plurality of computing units 20, all of which are configured as described above.
  • the retrofit module 46 includes the shelving system 26 and the (passive) ventilation system 28.
  • the transformer 30, the power distributor 32 and / or the own energy consumption meter 34 may also be part of the retrofit module 46.
  • the retrofit module 46 comprises a self-supply rail (branch line 22) which is connected to the existing output power rail (line 24).
  • the attachment interface 48 would then be an output power rail interface via which the retrofit assembly 46 is connected directly to the output power rail (line 24).
  • the retrofit module 46 is subsequently incorporated into the existing power generation device 12 by connecting the respective components of the retrofit module 46, as shown in FIG. 1, before the energy output counter 16, ie before the end of the output power rail or line 24.

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to an energy generation system (10), comprising an energy generating device (12) that generates electrical energy to be fed into a supply network (14), an energy output counter (16) that counts the electrical energy fed into the supply network (14) by the energy generating device (12), and at least one computing unit (20) that has a corresponding computing power. The computing unit (20) is arranged in the current flow direction between the energy generating device (12) and the energy output counter (16), wherein the computing unit (20) is configured to make the server and/or computing power available to a computer service provider and/or a computing power user, in particular, wherein the computer service provider and/or the computing power user are different from the operator of the energy generation system (10). The invention further relates to a method for operating a computing unit (20), and to a retrofit assembly (46) for installation on an energy generating device (12).

Description

Energieerzeugungsanlage, Verfahren zum Betreiben einer Rechen-Einheit sowie Nachrüstbaugruppe  Power generation plant, method for operating a computing unit and retrofit assembly
Die Erfindung betrifft eine Energieerzeugungsanlage mit einer Energieerzeugungseinrichtung sowie einer Rechen-Einheit. Ferner betrifft die Erfindung ein Verfahren zum Betreiben einer Rechen-Einheit. Zudem betrifft die Erfindung eine Nachrüstbaugruppe zur Installation an einer Energieerzeugungs- einrichtung. The invention relates to a power generation plant with an energy generating device and a computing unit. Furthermore, the invention relates to a method for operating a computing unit. In addition, the invention relates to a retrofit assembly for installation on a power generating device.
Elektrische Energie, beispielsweise Strom, wird heutzutage von unterschiedlichen Energieerzeugungsanlagen bereitgestellt, die von Energieerzeugern betrieben werden. Der in den Energieerzeugungsanlagen erzeugte Strom (elektrische Energie) wird zunächst über einenElectrical energy, such as electricity, is nowadays provided by different power plants operated by power generators. The electricity generated in the power generation plants (electrical energy) is first through a
Energieausgangszähler gezählt, sodass die erzeugte elektrische Energiemenge quantifiziert werden kann. Energy output counter counted so that the amount of electrical energy generated can be quantified.
Die erzeugte und gezählte elektrische Energie wird dann in ein Versorgungs- netz eingespeist, das von einem Energieversorger betrieben wird und auch als Stromnetz bezeichnet werden kann. Die Energieerzeugungsanlage ist dabei erzeugerseitig mit dem Versorgungsnetz gekoppelt. Dies bedeutet, dass jeder Energieerzeugungsanlage ein entsprechender Energieausgangszähler zugeordnet ist, der die Menge der elektrischen Energie zählt, die in das Versorgungsnetz eingespeist wird. The generated and counted electrical energy is then fed into a supply network, which is operated by an energy supplier and can also be referred to as a power grid. The power generation plant is coupled on the generator side with the supply network. This means that each energy generating plant is assigned a corresponding energy output counter, which counts the amount of electrical energy that is fed into the supply network.
Über das Versorgungsnetz wird die elektrische Energie zum jeweiligen Verbraucher geleitet, also dem Endkunden, der verbraucherseitig an das Versorgungsnetz angeschlossen ist. Bei den Endkunden kann es sich um Privathaushalte, Klein- und mittelständische Unternehmen (KMU) oder um Großunternehmen (Fabriken) handeln. Der Endkunde verbraucht typischerweise die ihm zur Verfügung gestellte elektrische Energie, die über das Versorgungsnetz in das jeweilige Hausnetz eingespeist worden ist. Als große Energieverbraucher sind Rechenzentren bekannt, die mehrere Rechen-Einheiten umfassen, die Rechen- bzw. Serverleistung zur Verfügung stellen. The electrical energy is routed to the respective consumer via the supply network, that is to say to the end customer, who is connected to the supply network on the consumer side. End customers can be households, small and medium-sized enterprises (SMEs) or large enterprises (factories). The end customer typically consumes the electrical energy made available to it, which has been fed into the respective domestic network via the supply network. As large energy consumers, data centers are known that include several computing units that provide computing or server performance.
Als Beispiel solcher Rechenzentren sind heutzutage sogenannte „Mining- Farmen“ bekannt, die aus mehreren Mining-Einheiten bestehen, über die unter anderem Prüfsummen bzw. sogenannte Hashwerte für Blockketten-Anwendungen wie Kryptowährungen berechnet bzw. erzeugt werden. Generell können die Prüfsummen bzw. Hashwerte für eine dezentrale Verwaltung, Steuerung und/oder Kontrolle einer geteilten Buchführung verwendet werden, also einem sogenannten „Distributed Ledger“. As an example of such data centers today so-called "mining farms" are known, which consist of several mining units, on the basis of which among other checksums or so-called hash values for block-chain applications such as cryptocurrencies are calculated or generated. In general, the checksums or hash values can be used for a decentralized administration, control and / or control of shared bookkeeping, ie a so-called "distributed ledger".
Aufgrund des hohen Rechenaufwands haben die Rechenzentren einen hohen Energiebedarf. Insofern ist es aus dem Stand der Technik bekannt, die Rechenzentren, insbesondere die Mining-Farmen, in der Nähe einer Energieerzeugungsanlage aufzustellen, sodass die von der Energieerzeugungsanlage erzeugte und in das Versorgungsnetz eingespeiste elektrische Energie nur eine kurze Strecke zurücklegen muss, bis die elektrische Energie an die verbraucherseitig an das Versorgungsnetz angeschlossenen Rechen-Einheiten, insbesondere Mining-Einheiten, übertragen wird. Hierdurch lassen sich die Übertragungsverluste minimieren. Üblicherweise werden die Rechenzentren von Rechen-Dienstleistern betrieben, die unabhängig von den Betreibern der Energieerzeugungsanlage sind. Bei den Betreibern der „Rechenzentren handelt es sich demnach um typische Endkunden, die an das Versorgungsnetz angeschlossen sind, in das die von der Energieerzeugungsanlage erzeugte elektrische Energie eingespeist wird. Due to the high computational effort, the data centers have a high energy requirement. In this respect, it is known from the prior art, the data centers, especially the mining farms, set up in the vicinity of a power plant, so that generated by the power generation plant and fed into the grid electrical energy must travel only a short distance until the electrical energy is transmitted to the consumer side connected to the supply network computing units, in particular mining units. This minimizes transmission losses. Typically, the data centers are operated by computational service providers that are independent of the operators of the power generation plant. The operators of the data centers are therefore typical end users who are connected to the supply network into which the electrical energy generated by the power generation plant is fed.
Die Aufgabe der Erfindung ist es, eine energieeffizientere sowie kostengünstigere Möglichkeit bereitzustellen, eine Rechen-Einheit zu betreiben. The object of the invention is to provide a more energy efficient and cost effective way to operate a computing unit.
Die Aufgabe wird erfindungsgemäß gelöst durch eine Energieerzeugungs- anlage mit einer Energieerzeugungseinrichtung, die elektrische Energie zum Einspeisen in ein Versorgungsnetz erzeugt, einem Energieausgangszähler, der die von der Energieerzeugungseinrichtung in das Versorgungsnetz eingespeiste elektrische Energie zählt, und zumindest einer Rechen-Einheit, die eine entsprechende Rechenleistung aufweist, wobei die Rechen-Einheit in Stromflussrichtung zwischen der Energieerzeugungseinrichtung und dem Energieausgangszähler angeordnet ist, wobei die Rechen-Einheit eingerichtet ist, Server- und/oder Rechenleistung einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer zur Verfügung zu stellen, insbesondere wobei der Rechen- Dienstleister vom Betreiber der Energieerzeugungsanlage verschieden ist. Ferner wird die Aufgabe erfindungsgemäß gelöst durch ein Verfahren zum Betreiben wenigstens einer Rechen-Einheit einer Energieerzeugungsanlage, mit den folgenden Schritten: The object is achieved by a power generation plant with an energy generating device that generates electrical energy for feeding into a supply network, an energy output meter that counts the fed by the power generation device in the supply network electrical energy, and at least one computing unit that has a corresponding Computing power, wherein the computing unit in the direction of current flow between the power generation device and the Energy output counter is arranged, wherein the computing unit is configured to provide server and / or computing power to a computing service provider and / or a computing power user available, in particular wherein the computing service provider is different from the operator of the power generation plant. Furthermore, the object is achieved according to the invention by a method for operating at least one computing unit of a power generation plant, comprising the following steps:
Erzeugen von elektrischer Energie über eine Energieerzeugungs- einrichtung, Generating electrical energy via a power generation device,
Versorgen der Rechen-Einheit mit der von der Energieerzeugungs- einrichtung erzeugten elektrischen Energie, wobei die Rechen-Einheit einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer Server- und/oder Rechenleistung zur Verfügung stellt, Providing the computing unit with the electrical energy generated by the power generation device, the computing unit providing server and / or computing power to a computing service provider and / or a computing power user,
Weiterleiten der von der Rechen-Einheit unverbrauchten elektrischen Energie, und Forwarding the unused by the computing unit electrical energy, and
Einspeisen der von der Rechen-Einheit unverbrauchten elektrischen Energie in ein Versorgungsnetz. Feeding the unused electrical energy from the computing unit into a utility grid.
Der Grundgedanke der Erfindung ist es, dass der von der Energieerzeugungseinrichtung erzeugte elektrische Strom bzw. die erzeugte elektrische Energie direkt abgegriffen wird, um die wenigstens eine Rechen- Einheit mit der benötigten elektrischen Energie zu versorgen (sogenannte Eigenversorgung bzw. Eigenbedarfsversorgung), also bevor die elektrische Energie über den Energieausgangszähler gezählt wird und auch bevor die elektrische Energie überhaupt in das Versorgungsnetz eingespeist wird. Es wird daher lediglich der unverbrauchte Teil der erzeugten elektrischen Energie in das Versorgungsnetz eingespeist und auch nur dieser Teil der elektrischen Energie vom Energieausgangszähler gezählt. Die wenigstens eine Rechen-Einheit ist demnach im Gegensatz zu den aus dem Stand der Technik bekannten Ansätzen nicht künden- bzw. verbraucherseitig am Versorgungsnetz angeschlossen, sondern erzeugerseitig. Die wenigstens eine Rechen-Einheit stellt demnach einen Energieverbraucher dar, der nicht zur Stromerzeugung verwendet wird, sondern seine Rechen- bzw. Serverleistung für andere Zwecke als der Stromerzeugung zur Verfügung stellt. Die Rechen- bzw. Serverleistung wird von einem Rechen-Dienstleister bzw. Rechenleistungsnutzer verwendet, der unabhängig vom Betreiber der Energieerzeugungsanlage ist. Beispielsweise wird die zur Verfügung stehende Rechen- bzw. Serverleistung vom Rechen-Dienstleister bzw. vom Rechenleistungsnutzer für Anwendungen künstlicher Intelligenz verwendet. Auch kann die zur Verfügung stehende Rechen- bzw. Serverleistung zur Erzeugung von Prüfsummen bzw. Hashwerten verwendet werden, die unter anderem für Blockketten-Anwendungen benötigt werden, beispielsweise für Kryptowährungen. Generell können jegliche rechenintensiven Anwendungen über die zur Verfügung stehende Rechen- bzw. Serverleistung abgedeckt werden. Die von der Rechen- Einheit zur Verfügung gestellte Server- und/oder Rechenleistung wird also unabhängig von der Energieerzeugungsanlage verwendet. The basic idea of the invention is that the electrical current or the electrical energy generated by the energy generating device is tapped directly in order to supply the at least one computing unit with the required electrical energy (so-called self-supply or self-supply), ie before the electrical energy is counted via the energy output counter and also before the electrical energy is ever fed into the supply network. Therefore, only the unused part of the generated electrical energy is fed into the supply network and only this part of the electrical energy is counted by the energy output counter. Accordingly, the at least one computing unit is not connected to the power supply network in terms of its counterpart or consumer side in contrast to the approaches known from the prior art, but rather is the generator side. The at least one computing unit thus represents an energy consumer, which is not used for power generation, but provides its computing or server power for purposes other than power generation available. The computing or server performance is used by a computing service provider or computing power user who is independent of the operator of the power generation plant. For example, the computing or server power available is used by the computing service provider or by the computing user for artificial intelligence applications. The available computing or server performance can also be used to generate checksums or hash values, which are required, inter alia, for block-chain applications, for example for cryptocurrencies. In general, any compute-intensive applications can be covered by the available computing or server performance. The server and / or computing power provided by the computing unit is thus used independently of the power generation plant.
Für die Betreiber der Energieerzeugungsanlage kann so ein zweiter Deckungsbetrag vorgesehen sein, der zusätzlich zur Erzeugung und dem Verkauf der elektrischen Energie besteht. For the operators of the power generation plant so a second coverage amount can be provided, which is in addition to the generation and sale of electrical energy.
Die Stromflussrichtung entspricht der Energieflussrichtung, also der Richtung, die den Energiefluss angibt, nämlich in Richtung des Versorgungsnetzes. The direction of current flow corresponds to the direction of energy flow, that is to say the direction which indicates the flow of energy, namely in the direction of the supply network.
Die Rechen-Einheit ist folglich ein Teil der Energieerzeugungsanlage. Mit anderen Worten ist die Rechen-Einheit in der Energieerzeugungsanlage integriert. Die in die Energieerzeugungsanlage integrierte Rechen-Einheit ist also vor einem Ausgangszähler der Energieerzeugungsanlage angeordnet. The computing unit is thus part of the power generation plant. In other words, the computing unit is integrated in the power generation plant. The integrated into the power generation unit computing unit is therefore arranged in front of an output counter of the power generation plant.
Beispielsweise ist der Auf- bzw. Anbau der wenigstens einen Rechen-Einheit an entsprechenden Elektrostationen der Energieerzeugungsanlage vorgesehen. For example, the construction or cultivation of the at least one computing unit is provided at corresponding electrical stations of the power generation plant.
Insofern ist die wenigstens eine Rechen-Einheit im Besitz des Betreibers der Energieerzeugungsanlage. Die wenigstens eine Rechen-Einheit kann sogar das Eigentum des Betreibers der Energieerzeugungsanlage sein. In dieser Konstellation stehen dem Betreiber der Energieerzeugungsanlage Ansprüche aus dem Erneuerbare-Energien-Gesetz (EEG) zu. Alternativ kann vorgesehen sein, dass der Eigentümer der wenigstens einen Rechen-Einheit ein Rechen-Dienstleister ist, der vom Betreiber der Energieerzeugungsanlage unterschiedlich ist, wobei der Betreiber der Energieerzeugungsanlage die Rechen-Einheit des Rechen-Dienstleisters bei sich als Teil der Energieerzeugungsanlage aufstellt. In this respect, the at least one computing unit is owned by the operator of the power generation plant. The at least one computing unit may even be the property of the operator of the power generation plant. In this constellation, the operator of the power generation plant is entitled to claims from the Renewable Energy Sources Act (EEG). Alternatively, it may be provided that the owner of the at least one computing unit is a computing service provider that is different from the operator of the power generation plant, wherein the operator of the power generation plant sets up the computing unit of the computing service provider as part of the power generation plant.
Sofern der Betreiberder Energieerzeugungsanlage gleichzeitig der Eigentümer der wenigstens einen Rechen-Einheit ist, ist es möglich, dass dieser den Eigenstromverbrauch für den Betrieb der wenigstens einen Rechen-Einheit zu günstigen Konditionen verwenden kann, da der Betreiber der Energieerzeugungs- anlage (und somit auch gleichzeitig der Betreiber der wenigstens einen Rechen- Einheit) keine (reduzierten) Zulagen auf den Strompreis zahlen muss, die ansonsten nötig wären, sofern die elektrische Energie zunächst in das Versorgungsnetz eingespeist werden würde. If the operator of the power generation plant at the same time the owner of the at least one computing unit, it is possible that this can use the own power consumption for the operation of the at least one computing unit on favorable terms, since the operator of the power generation plant (and thus simultaneously the operator of the at least one computing unit) must pay any (reduced) allowances on the electricity price, which would otherwise be necessary if the electrical energy would first be fed into the supply network.
Bei der Energieerzeugungsanlage bzw. der Energieerzeugungseinrichtung kann es sich generell um eine Solaranlage, einen Solaranlagenpark, eine Windkraftanlage, ein Wasserkraftwerk, ein Biomassekraftwerk, ein Kohlekraftwerk, ein Gaskraftwerk bzw. ein Atomkraftwerk handeln, sodass es sich bei der erzeugten elektrischen Energie um Solarenergie, Windenergie, Wasserkraftenergie, Energie aus Biomasse, Energie aus fossilen Brennstoffen bzw. Atomenergie handeln kann. In general, the energy generation plant or the energy production facility can be a solar plant, a solar plant park, a wind power plant, a hydroelectric power plant, a biomass power plant, a coal power plant, a gas power plant or a nuclear power plant, so that the generated electrical energy is solar energy, wind energy , Hydroelectric energy, energy from biomass, energy from fossil fuels or nuclear energy.
Über die Energieerzeugungsanlage und die hierin integrierte Rechen-Einheit, insbesondere mit der zugeordneten bzw. integrierten Server-Einheit, lässt sich eine sogenannte Edge-Recheneinheit bzw. ein sogenanntes Edge-Rechen- zentrum ausbilden. The so-called edge computing unit or a so-called edge computing center can be formed via the power generation plant and the computing unit integrated therein, in particular with the assigned or integrated server unit.
Allgemein kann eine Rechen-Einheit oder ein Rechenzentrum bereitgestellt werden, das beispielsweise Server- und/oder Rechenleistung für rechen- bzw. serverleistungsintensive Anwendungen zur Verfügung stellt, wie Anwendungen künstlicher Intelligenz („Kl“). In general, a computing unit or data center may be provided that provides, for example, server and / or computing power for compute-intensive applications, such as artificial intelligence ("Kl") applications.
Beispielsweise lässt sich die wenigstens eine Rechen-Einheit bzw. das wenigstens eine Rechenzentrum in Nähe von Autobahnen in einfacher Weise installieren, sodass die wenigstens eine Rechen-Einheit bzw. das wenigstens eine Rechenzentrum für fahrzeugübergreifende Kommunikation, auch „Car2Car Communication“ bzw.„Car2X Communication“ genannt, oder beim autonomen Fahren verwendet werden kann. For example, the at least one computing unit or the at least one data center in the vicinity of highways can be installed in a simple manner so that the at least one computing unit or the at least one computer center for vehicle-to-vehicle communication, "Car2Car Communication "or" Car2X Communication "called, or can be used in autonomous driving.
Insbesondere kann die Server- und/oder Rechenleistung für Kommunikation nach dem 5G-Standard zur Verfügung gestellt werden, die unter anderem für fahrzeugübergreifende Kommunikation vorgesehen ist. In particular, the server and / or computing power for communication according to the 5G standard can be made available, which is intended inter alia for inter-vehicle communication.
Beispielsweise lässt sich so ein Kommunikationspartner für die kommunikationsfähigen Fahrzeuge bereitstellen, also die Fahrzeuge, die für eine fahrzeugübergreifende Kommunikation eingerichtet sind. For example, it is thus possible to provide a communication partner for the vehicles capable of communication, that is, the vehicles that are set up for communication across vehicles.
Generell kann die wenigstens eine Rechen-Einheit zusätzlich zu der von der Energieerzeugungseinrichtung erzeugten elektrischen Energie mit elektrischer Energie einer anderen Energieerzeugungsanlage versorgt werden. Insofern ist die Rechen-Einheit zumindest teilweise auch über eine sogenannte Fremdbelieferung betreibbar. In jedem Fall wird die wenigstens eine Rechen-Einheit jedoch zumindest teilweise, insbesondere hauptsächlich, von der Energieerzeugungseinrichtung, die Teil der Energieerzeugungsanlage ist, mit der benötigten elektrischen Energie versorgt. In general, the at least one computing unit can be supplied, in addition to the electrical energy generated by the energy generating device, with electrical energy from another energy generating plant. In this respect, the computing unit is at least partially operable via a so-called third-party supply. In any case, however, the at least one computing unit is at least partially, in particular mainly, supplied with the required electrical energy by the power generation device that is part of the power generation plant.
Die wenigstens eine Rechen-Einheit kann demnach hauptsächlich eigenstrombetrieben sein. The at least one computing unit can therefore be mainly self-powered.
Die von der Energieerzeugungseinrichtung erzeugte elektrische Energie kann neben der wenigstens einen Rechen-Einheit auch weiteren Komponenten der Energieerzeugungsanlage zur Verfügung gestellt werden (Eigenversorgung), die jedoch üblicherweise zur Erzeugung der elektrischen Energie vorgesehen sind. The electrical energy generated by the energy generating device can be provided in addition to the at least one computing unit and other components of the power generation plant (self-supply), which are, however, usually provided for generating the electrical energy.
Insofern entspricht das Weiterleiten der von der Rechen-Einheit unverbrauchten elektrischen Energie und das Einspeisen der von der Rechen- Einheit unverbrauchten elektrischen Energie in ein Versorgungsnetz einer Überschusseinspeisung, also der Einspeisung der überschüssigen Energie. In this respect, the forwarding of the unconsumed by the computing unit electrical energy and feeding the unused by the computing unit electrical energy in a supply network of a surplus feed, ie the supply of excess energy.
Rechen-Einheiten können im Allgemeinen bei einer geteilten Buchführung verwendet werden, die auch als„Distributed Ledger“ bezeichnet wird. Die geteilte Buchführung verfügt üblicherweise über eine dezentrale Verwaltung, Steuerung und/oder Kontrolle, die beispielsweise über ein dezentrales Rechennetzwerk erfolgt, in der mehrere Rechen- und/oder Server-Einheiten eingebunden sind, unter anderem Mining-Einheiten. Rulers can generally be used in shared accounting, also known as Distributed Ledger. Shared accounting usually has decentralized management, control and / or control, for example via a decentralized computer network takes place, in which several computing and / or server units are integrated, among other mining units.
Die dezentrale Verwaltung, Steuerung und/oder Kontrolle erfolgt dabei über eine Datenbank, die alle bisher getätigten Transaktionen umfasst und permanent mit neuen Transaktionen fortgeschrieben wird. Die vorherigen Transaktionen werden dabei über sogenannte Prüfsummen („Hashwerte“) gesichert, um einer nachträglichen Manipulation vorzubeugen. Die Prüfsummen werden auch als kryptografische Prüfsummen bezeichnet. The decentralized administration, control and / or control is carried out via a database, which includes all previously made transactions and is continuously updated with new transactions. The previous transactions are secured by so-called checksums ("hash values") in order to prevent subsequent manipulation. The checksums are also known as cryptographic checksums.
Die Prüfsummen bzw. Hashwerte, die zur Absicherung der Transaktionen der geteilten Buchführung dienen, werden von den Mining-Einheiten erzeugt, die kurz auch als Miner bezeichnet werden. The checksums or hash values used to secure split-book transactions are generated by the mining units, also referred to as miners.
Aufgrund der dezentralen Verwaltung, Steuerung und/oder Kontrolle wird die Datenbank nicht zentral gespeichert, sondern dezentral, also über ein dezentrales Rechennetzwerk. Die Teilnehmer (auch als Knoten bezeichnet) des dezentralen Rechennetzwerks überprüfen dabei die anderen Teilnehmer (Knoten), insbesondere deren jeweilige Datensätze, um sicherzustellen, dass alle Teilnehmer (Knoten) die gleichen Daten zur Verfügung stellen. Dies erhöht die Sicherheit des gesamten Systems weiter. Due to the decentralized administration, control and / or control, the database is not centrally stored, but decentralized, ie via a decentralized computer network. The subscribers (also referred to as nodes) of the decentralized computer network check the other subscribers (nodes), in particular their respective data records, in order to ensure that all subscribers (nodes) provide the same data. This further increases the security of the entire system.
Ein Beispiel einer geteilten Buchführung lässt sich über eine sogenannte Blockkette („Blockchain“) darstellen, wobei die entsprechenden Daten Datenblöcke dieser Blockkette sind, die jeweils aneinandergereiht werden, insbesondere in chronologischer Reihenfolge. Die vorherigen Datenblöcke, die die bereits getätigten Transaktionen umfassen, werden dabei über Hashwerte in den neuen Datenblöcken abgebildet, um eine nachträgliche Manipulation zu verhindern. An example of a shared bookkeeping can be represented by a so-called block chain ("blockchain"), the corresponding data being data blocks of this block chain, which are strung together, in particular in chronological order. The previous data blocks, which comprise the transactions already made, are mapped using hash values in the new data blocks in order to prevent subsequent manipulation.
Generell handelt es sich bei einer Blockkette, wie bei einer geteilten Buchführung üblich, um eine verteilte Datenbank, deren Integrität über die Prüfsummen gesichert ist, die von den Mining-Einheiten erzeugt wird. Dies liegt daran, dass die kryptografische Prüfsumme des vorherigen Datensatzes im jeweils nachfolgenden Datensatz gesichert ist, insbesondere über die Hashwerte, wie zuvor bereits ausgeführt wurde. Hierdurch ist sichergestellt, dass die Daten nachträglich nicht mehr manipulierbar sind bzw. die Daten in der korrekten zeitlichen Abfolge hinterlegt sind. Generell besteht die Blockkette aus einer Reihe von einzelnen Datensätzen bzw. Datenblöcken, in denen jeweils eine oder mehrere Transaktionen zusammengefasst und mit einer Prüfsumme („Hashwert“) versehen sind. Generally, as is common in shared bookkeeping, a block chain is a distributed database whose integrity is secured by the checksums generated by the mining units. This is due to the fact that the cryptographic checksum of the previous data set is saved in the respective subsequent data record, in particular via the hash values, as has already been explained above. This ensures that the data is subsequently no longer manipulable or the data in the correct temporal sequence are deposited. In general, the block chain consists of a series of individual data records or data blocks, in each of which one or more transactions are combined and provided with a check sum ("hash value").
Ein Aspekt sieht vor, dass die in das Versorgungsnetz eingespeiste elektrische Energie von einem Energieausgangszähler gezählt wird. Bei der in das Versorgungsnetz eingespeisten elektrischen Energie handelt es sich um die elektrische Energie, die von der Energieerzeugungseinrichtung erzeugt worden ist und nicht von der Rechen-Einheit (bzw. weiteren Komponenten deren Eigenbedarf abgedeckt wird) verbraucht wurde. Über das Zählen bzw. Quantifizieren der in das Versorgungsnetz eingespeisten elektrischen Energie ist sichergestellt, dass die Menge der elektrischen Energie erfasst werden kann, die von der Energie- erzeugungsanlage erzeugt worden und nicht zur Eigenversorgung verwendet worden ist. Bei der gezählten bzw. quantifizierten elektrischen Energie handelt es sich um die Energie, die tatsächlich in das Versorgungsnetz eingespeist wird und somit den verschiedenen Endkunden über das Versorgungsnetz zur Verfügung gestellt wird. One aspect provides that the electrical energy fed into the supply network is counted by an energy output counter. The electrical energy fed into the supply network is the electrical energy which has been generated by the energy generating device and has not been consumed by the computing unit (or other components whose own requirements are covered). By counting or quantifying the electrical energy fed into the supply network, it is ensured that the amount of electrical energy that has been generated by the energy generation system and has not been used for self-supply can be detected. The counted or quantified electrical energy is the energy that is actually fed into the supply network and thus made available to the various end customers via the supply network.
Ein weiterer Aspekt sieht vor, dass die Rechen-Einheit eine Mining-Einheit ist, die eingerichtet ist, Daten einer geteilten Buchführung zu generieren, beispielsweise eine Prüfsumme zu generieren, insbesondere die Prüfsumme einer Blockkette. Wie oben bereits beschrieben, wird die Prüfsumme bzw. der sogenannte Hashwert verwendet, um die Integrität zu gewährleisten. Die Rechenschritte, die nötig sind, um eine Prüfsumme zu generieren, sind entsprechend rechenintensiv, sodass ein hoher Energiebedarf vorliegt. Dieser kann aufgrund der direkten Anbindung an die Energieerzeugungseinrichtung in einfacher und energieeffizienter Weise gewährleistet werden. A further aspect provides that the computing unit is a mining unit that is set up to generate data of a shared bookkeeping system, for example to generate a checksum, in particular the checksum of a block chain. As described above, the checksum or so-called hash value is used to ensure integrity. The computation steps that are necessary to generate a checksum are corresponding computationally intensive, so that a high energy demand exists. This can be ensured due to the direct connection to the power generation facility in a simple and energy efficient manner.
Ein weiterer Aspekt sieht vor, dass die Rechen-Einheit eine Kommunikations- Schnittstelle aufweist, insbesondere wobei die Rechen-Einheit über die Kommunikationsschnittstelle Teil eines dezentralen Rechennetzwerks ist, über das Transaktionen dezentral verwaltet, gesteuert und/oder kontrolliert werden. Bei der Kommunikationsschnittstelle kann es sich um eine kabellose bzw. kabelgebundene Schnittstelle handeln, über die die Rechen-Einheit mit dem Internet verbindbar ist. Beispielsweise kann eine Local Area Network (LAN)- oder Mobilfunkverbindung vorgesehen sein. Auch kann die Kommunikations- Schnittstelle über eine Wireless Local Area Network (WLAN)-Schnittstelle ausgebildet sein, über die die Rechen-Einheit im dezentralen Rechennetzwerk eingebunden ist. A further aspect provides that the computing unit has a communication interface, in particular wherein the computing unit is part of a decentralized computing network via the communication interface, via which transactions are managed, controlled and / or controlled in a decentralized manner. The communication interface may be a wireless or wired interface via which the computing unit can be connected to the Internet. For example, a Local Area Network (LAN) - or Mobile connection may be provided. Also, the communication interface can be formed via a wireless local area network (WLAN) interface, via which the computing unit is integrated in the decentralized computer network.
Das dezentrale Rechennetzwerk kann, wie bereits ausgeführt wurde, vorgesehen sein, um die geteilte Buchführung zu verwalten, zu steuern bzw. zu kontrollieren, beispielsweise die entsprechende Blockketten-Anwendung, insbesondere die einer Kryptowährung. As already stated, the distributed computing network can be provided to manage, control or control the shared accounting, for example the corresponding block-chain application, in particular that of a crypto-currency.
Grundsätzlich ist es aufgrund der Kommunikationsschnittstelle möglich, dass Rechenleistung der Rechen-Einheit zur Verfügung zu stellen, insbesondere einem Dritten. Die in die Energieerzeugungsanlage integrierte Rechen-Einheit, die also vor dem Ausgangszähler der Energieerzeugungsanlage angeordnet ist, stellt demnach eine Schnittstelle für externe Rechenleistungsanwender dar. Basically, it is possible due to the communication interface to provide the computing power of the computing unit, in particular a third party. The integrated into the power generation unit computing unit, which is thus arranged in front of the output counter of the power generation plant, thus represents an interface for external computing power users.
Des Weiteren kann die Rechen-Einheit eine Server-Einheit umfassen, die eingerichtet ist, mit weiteren Server-Einheiten ein dezentrales Rechennetzwerk aufzubauen, insbesondere wobei über das dezentrale Rechennetzwerk Transaktionen dezentral verwaltet, gesteuert und/oder kontrolliert werden. Bei den weiteren Server-Einheiten kann es sich um Knoten handeln, die die Transaktionen berechnen, also die entsprechenden Datensätze, die von der als Mining-Einheit ausgebildeten Rechen-Einheit mit einer entsprechenden Prüfsumme, die die Rechen-Einheit berechnet, gesichert werden. Die Server-Einheit kann mit der Kommunikationsschnittstelle gekoppelt sein bzw. die Kommunikationsschnittstelle bereitstellen. Furthermore, the computing unit may comprise a server unit which is set up to set up a decentralized computing network with further server units, in particular transactions being managed, controlled and / or controlled locally via the decentralized computing network. The further server units can be nodes that calculate the transactions, ie the corresponding data records that are backed up by the computing unit designed as a mining unit with a corresponding checksum that the computing unit calculates. The server unit can be coupled to the communication interface or provide the communication interface.
Über die Kommunikationsschnittstelle der Rechen-Einheit kann der Rechen- Dienstleister und/oder autorisierte Personen, beispielsweise der Rechenleistungsnutzer, auf die Server- und/oder Rechenleistung der Rechen- Einheit zugreifen, insbesondere über das Internet. The computing service provider and / or authorized persons, for example the computing power user, can access the server and / or computing power of the computing unit via the communication interface of the computing unit, in particular via the Internet.
Ein weiterer Aspekt sieht vor, dass die Rechen-Einheit eine Stromeingangsschnittstelle aufweist, über die die Rechen-Einheit elektrische Energie erhält, insbesondere wobei die Energieerzeugungseinrichtung mit der Stromeingangsschnittstelle gekoppelt ist. Insofern erhält die Rechen-Einheit den von der Energieerzeugungseinrichtung erzeugten elektrischen Strom direkt, bevor dieser über den Energieausgangszähler gezählt wird. Hierzu ist die Rechen- Einheit mit der Energieerzeugungseinrichtung über die Stromeingangsschnittstelle entsprechend gekoppelt. A further aspect provides that the computing unit has a current input interface, via which the computing unit receives electrical energy, in particular wherein the energy generating device is coupled to the current input interface. In this respect, the computing unit receives the electric power generated by the power generation device directly before this is counted over the energy output counter. For this purpose, the computing unit is coupled to the power generation device via the current input interface.
Insbesondere ist ein Transformator vorgesehen, der der Stromeingangs- schnittstelle der Rechen-Einheit zugeordnet ist. Der Transformator setzt die von der Energieerzeugungseinrichtung erzeugte elektrische Energie in ein Spannungsniveau um, welches von der wenigstens einen Rechen-Einheit benötigt wird und verarbeitet werden kann, beispielsweise eine Spannung 230 V. Hierdurch ist sichergestellt, dass die Rechen-Einheit nicht beschädigt wird. In particular, a transformer is provided which is assigned to the current input interface of the computing unit. The transformer converts the electrical energy generated by the energy generating device into a voltage level which is required by the at least one computing unit and can be processed, for example a voltage 230 V. This ensures that the computing unit is not damaged.
Der Transformator kann auch als Trenntransformator bezeichnet werden. The transformer can also be referred to as an isolating transformer.
Generell kann der Transformator eine Spannung der Energieerzeugungs- einrichtung, beispielsweise von 690 V, auf ein für die Rechen-Einheit geeignetes Spannungsniveau umsetzen, beispielsweise auf eine Spannung von 230 V oder auf 400 V.Es kann demnach die elektrische Energie auf dem Spannungsniveau genutzt werden, mit dem die Energieerzeugungseinrichtung arbeitet. Dies wird auch als Eigenversorgung bzw. Eigenbedarfsversorgung im Hinblick auf die Energieerzeugungsanlage bezeichnet. In general, the transformer can convert a voltage of the power-generating device, for example of 690 V, to a voltage level suitable for the computing unit, for example to a voltage of 230 V or to 400 V. Thus, the electrical energy at the voltage level can be used with which the power generating device works. This is also referred to as self-supply or self-supply with regard to the power generation plant.
Grundsätzlich ist ein Abgang zur Stromversorgung der Rechen-Einheit dem Ausgangszähler der Energieerzeugungsanlage vorgeschaltet, insbesondere wobei der Transformator dem Abgang zugeordnet ist. In principle, a departure to the power supply of the computing unit is preceded by the output counter of the power generation plant, in particular wherein the transformer is associated with the departure.
Dies gilt für sämtliche Energieerzeugungsanlage. Bei einer Solar- bzw. Photovoltaik-Anlage ist beispielsweise ein Abgang zwischen einem Wechselrichter und dem Ausgangszähler vorgesehen. This applies to all power generation plant. In a solar or photovoltaic system, for example, a departure between an inverter and the output counter is provided.
Ein weiterer Aspekt sieht vor, dass der wenigstens einen Rechen-Einheit ein Eigenenergieverbrauchszähler zugeordnet ist, der den Stromverbrauch der Rechen-Einheit erfasst. Hierdurch kann der Eigenstromverbrauch der wenigstens einen Rechen-Einheit erfasst werden, was im einfachsten Fall (ohne weitere Eigenversorgung weiterer Komponenten) die Differenz der von der Energieerzeugungseinrichtung erzeugten elektrischen Energie und der von der Energieerzeugungsanlage in das Versorgungsnetz eingespeisten elektrischen Energie darstellt. Über den Eigenenergieverbrauchszähler kann die durch die wenigstens eine Rechen-Einheit verbrauchte elektrische Energie erfasst werden, sodass die Zulage gemäß dem Erneuerbare-Energien-Gesetz (EEG-Zulage) bestimmt und entsprechend abgeführt werden kann. A further aspect provides that the at least one computing unit is assigned a self-consumption meter that detects the power consumption of the computing unit. In this way, the own power consumption of the at least one computing unit can be detected, which in the simplest case (without further self-supply of other components) represents the difference between the electrical energy generated by the power generation device and the electrical energy fed into the supply network by the power generation system. The energy consumed by the at least one computing unit can be detected via the own energy consumption counter. so that the allowance can be determined according to the Renewable Energy Sources Act (EEG allowance) and deducted accordingly.
Der Eigenenergieverbrauchszähler ist zusätzlich zu dem üblicherweise vorgesehenen Ausgangszähler der Energieerzeugungseinrichtung vorgesehen, der eingerichtet ist, die Stromeinspeisung in das öffentliche Netz zu zählen. The own energy consumption meter is provided in addition to the usually provided output counter of the power generation device, which is set up to count the power supply to the public grid.
Die wenigstens eine Rechen-Einheit kann zumindest teilweise, insbesondere vollständig, in einem Regalsystem untergebracht sein, dem ein Lüftungssystem zugeordnet ist, insbesondere wobei das Lüftungssystem ein passives oder aktives Lüftungssystem ist. Das Regalsystem stellt sicher, dass die wenigstens eine Rechen-Einheit eine gewünschte Standsicherheit sowie Berührungssicherheit aufweist. Über das entsprechende Lüftungssystem ist sichergestellt, dass die erwärmte Luft abgeführt wird, die beim Betrieb der wenigstens einen Rechen- Einheit entsteht. Hierdurch wird die Betriebssicherheit der Energieerzeugungsanlage, insbesondere der wenigstens einen Rechen-Einheit, entsprechend erhöht, da eine Überhitzung vermieden wird. Es kann auch vorgesehen sein, dass das Lüftungssystem die Rechen-Einheit ausreichend mit Frischluft bzw. gekühlter Luft versorgt. The at least one computing unit may be at least partially, in particular completely, housed in a shelving system to which a ventilation system is associated, in particular wherein the ventilation system is a passive or active ventilation system. The shelving system ensures that the at least one computing unit has a desired stability and security against contact. About the corresponding ventilation system ensures that the heated air is discharged, which arises during operation of at least one computing unit. As a result, the reliability of the power generation plant, in particular the at least one computing unit, increased accordingly, since overheating is avoided. It can also be provided that the ventilation system supplies the computing unit with sufficient fresh air or cooled air.
Alternativ zum passiven Lüftungssystem kann das Lüftungssystem auch als ein aktives Lüftungssystem ausgebildet sein, das beispielsweise einen aktiven Lüfter und/oder eine Klimaanlage umfasst. As an alternative to the passive ventilation system, the ventilation system can also be designed as an active ventilation system, which includes, for example, an active fan and / or an air conditioning system.
Das Lüftungssystem umfasst unter anderem ein Frischluftführungssystem sowie ein Abluftführungssystem. Insofern kann das Lüftungssystem ein Lüftungs- system mit Zu- und Abluft und/oder ein temperatur-geführtes Lüftungssystem sein. The ventilation system includes, among other things, a fresh air duct system and an exhaust air duct system. In this respect, the ventilation system can be a ventilation system with supply and exhaust air and / or a temperature-controlled ventilation system.
Ferner sind entsprechende Sensoren vorgesehen, die die Temperatur der wenigstens einen Rechen-Einheit überwachen, um eine drohende Überhitzung frühzeitig zu erkennen. Somit kann die Überhitzung noch abgewendet werden, wenn rechtzeitig eingeschritten wird. Die Sensoren können Teil des Regalsystems sein. Furthermore, corresponding sensors are provided which monitor the temperature of the at least one computing unit in order to detect impending overheating at an early stage. Thus, the overheating can still be averted if timely intervention. The sensors can be part of the shelving system.
Das Regalsystem kann ferner derart aufgebaut sein, dass es brandhemmende Eigenschaften aufweist. Generell lässt sich das Regalsystem auch als Rack bezeichnen. Zudem können mehrere Rechen-Einheiten vorgesehen sein, denen ein Stromverteiler zugeordnet ist. Die mehreren Rechen-Einheiten stellen demnach ein Rechenzentrum dar, insbesondere im Falle von als Mining-Einheiten ausgebildeten Rechen-Einheiten eine sogenannte Mining-Farm, deren Stromversorgung über den Stromverteiler gewährleistet ist. Der Stromverteiler kann eine Strommanagement-Funktion umfassen, sodass der sichere Betrieb der mehreren Rechen-Einheiten gewährleistet ist. The shelving system may further be constructed to have fire retardant properties. In general, the shelving system can also be described as a rack. In addition, a plurality of computing units may be provided to which a power distributor is assigned. Accordingly, the plurality of computing units represent a data center, in particular in the case of computing units designed as mining units, a so-called mining farm whose power supply is ensured via the power distributor. The power distributor may include a power management function to ensure the safe operation of the multiple computing units.
Die Strommanagementeinrichtung ist beispielsweise eingereicht, die Produktionsleistung der Energieerzeugungsanlage zu erkennen, also die produzierte Energiemenge. Ferner kann die Strommanagementeinrichtung eingerichtet sein, die wenigstens eine Rechen-Einheit bedarfs- und/oder angebotsgerecht anzusteuern, wodurch eine sicherheits- und betriebsgerechte Funktion des Gesamtsystems ermöglicht wird. The power management device is filed, for example, to detect the production output of the power generation plant, ie the amount of energy produced. Furthermore, the power management device can be set up to control the at least one arithmetic unit as needed and / or as required, thereby enabling a safety and operationally suitable function of the overall system.
Zudem kann die Strommanagementeinrichtung eingerichtet sein, die Stromflüsse zu überwachen. In addition, the power management device may be configured to monitor the power flows.
Auch kann die Strommanagementeinrichtung eingerichtet sein, unter anderem über die Kommunikationseinheit bzw. eine Pool-Plattform mit einem Betriebs- führungsserver zu kommunizieren, wodurch die sicherheits- und betriebsgerechte Funktion des Gesamtsystems verbessert wird. The power management device can also be set up to communicate, inter alia, via the communication unit or a pool platform with a management server, thereby improving the security and operationally suitable function of the overall system.
Ein weiterer Aspekt sieht vor, dass die Rechen-Einheit eine Fernwartungskomponente aufweist, über die die Rechen-Einheit ferngewartet werden kann. Da die Rechen-Einheit als Teil der Energieerzeugungsanlage ausgebildet ist, kann über die Fernwartungskomponente ein Monitoring der Rechen-Einheit aus der Ferne vorgenommen werden, ohne die Energieerzeugungsanlage zu betreten, insbesondere durch den Rechen- Dienstleister bzw. den Rechenleistungsnutzer, der die Rechen- bzw. Serverleistung der wenigstens einen Rechen-Einheit erhält. Auch hierzu kann die Kommunikationsschnittstelle vorgesehen sein. Die Rechen-Einheit umfasst dabei die notwendige Intelligenz (Steuerungsrechner), Sensorik und Schalter, die zur Fernwartung benötigt werden. Another aspect provides that the computing unit has a remote maintenance component, via which the computing unit can be maintained remotely. Since the computing unit is designed as part of the power generation plant, monitoring of the computing unit can be performed remotely via the remote maintenance component, without entering the power generation plant, in particular by the computing service provider or the computing power user, the computing or Server performance of at least one computing unit receives. For this purpose, the communication interface can be provided. The computing unit includes the necessary intelligence (control computer), sensors and switches that are needed for remote maintenance.
Generell kann die Rechen-Einheit wenigstens eine anwendungsspezifische integrierte Schaltung (ASIC), einen Quantencomputer, eine Graph-Streaming- Prozessoreinheit (GSP), einen Künstliche Intelligenz Prozessoreinheit (Kl- Prozessor), eine Stream-Prozessoreinheit, ein Vektorprozessor, eine Grafik- prozessoreinheit (GPU) oder eine Prozessoreinheit (CPU) aufweisen. In general, the computing unit may comprise at least one application specific integrated circuit (ASIC), a quantum computer, a graph streaming Processor unit (GSP), an artificial intelligence processor unit (Kl processor), a stream processor unit, a vector processor, a graphics processor unit (GPU) or a processor unit (CPU).
Bei der Energieerzeugungseinrichtung handelt es sich insbesondere um eine Energieerzeugungseinrichtung, die elektrische Energie aus erneuerbaren Energien erzeugt. In particular, the energy-generating device is an energy-generating device which generates electrical energy from renewable energies.
Ferner wird die Aufgabe erfindungsgemäß gelöst durch eine Nachrüstbaugruppe zur Installation an einer Energieerzeugungseinrichtung, die elektrische Energie zum Einspeisen in ein Versorgungsnetz erzeugt, wobei die Nachrüstbaugruppe wenigstens eine Rechen-Einheit umfasst, die eingerichtet ist, einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer Server- und/oder Rechenleistung zur Verfügung zu stellen, und wobei die Nachrüstbaugruppe eingerichtet ist, in Stromflussrichtung vor einem Energieausgangszähler angeordnet zu sein. Beim Energieausgangszähler handelt es sich um den Energieausgangszähler der Energieerzeugungseinrichtung. Furthermore, the object is achieved according to the invention by a retrofit module for installation at an energy generating device which generates electrical energy for feeding into a supply network, wherein the retrofit module comprises at least one arithmetic unit which is set up, a computing service provider and / or a computing power user and / or to provide computing power, and wherein the retrofit assembly is arranged to be located upstream of an energy output counter in the direction of current flow. The energy output counter is the energy output counter of the power generation facility.
Insofern ist es möglich, die oben genannten Vorteile auch bei einer bestehenden Energieerzeugungseinrichtung noch nachträglich zu erzielen, indem die die Nachrüstbaugruppe umfassenden Komponenten an eine bestehende Energieerzeugungseinrichtung angeschlossen werden. In this respect, it is possible to achieve the abovementioned advantages even in the case of an existing power generation device even later by connecting the components comprising the retrofit assembly to an existing power generation device.
Die Nachrüstbaugruppe kann generell mehrere Rechen-Einheiten, ein Regalsystem, ein Lüftungssystem, einen Stromverteiler, einen Transformator, einen Eigenenergieverbrauchszähler und/oder eine Abzweigleitung umfassen The retrofit assembly may generally include a plurality of computing units, a shelving system, a ventilation system, a power distributor, a transformer, a self-consumption meter and / or a branch line
Die Nachrüstbaugruppe kann eine Anbindungsschnittstelle aufweisen, die als eine Ausgangsleistungsschienenschnittstelle und/oder eine Eigenbedarfs- schienenschnittstelle ausgebildet ist, über die die Nachrüstbaugruppe an eine Ausgangsleistungsschiene und/oder eine Eigenbedarfsschiene anschließbar ist. Insofern ist die Nachrüstbaugruppe ausgebildet, an eine Energieerzeugungs- einrichtung angeschlossen zu werden, insbesondere vor dem entsprechenden Energieausgangszähler, der das Ende der Ausgangsleistungsschiene definiert. The retrofit module may have a connection interface, which is designed as an output power rail interface and / or a self-supply rail interface, via which the retrofit module can be connected to an output power rail and / or an auxiliary power rail. In this respect, the retrofit module is designed to be connected to a power generating device, in particular in front of the corresponding energy output counter, which defines the end of the output power rail.
Bei der Ausgangsleistungsschienen- bzw. der Eigenbedarfsschienen- schnittstelle handelt es sich beispielsweise um Anschlussklemmen, die sich von einem Netzstecker unterscheiden, der typischerweise Verbraucher- bzw. endkundenseitig verwendet wird. For example, the output power rail or the auxiliary power rail interface are terminals that differ from distinguish a power plug that is typically used consumer or end customer side.
Die Ausgangsleistungsschiene ist diejenige Schiene einer Energieerzeugungsanlage, die zum Energieausgangszähler führt. Von der Ausgangsleistungsschiene kann zumindest eine Eigenbedarfsschiene abzweigen, an der elektrische Verbraucher der Energieerzeugungsanlage angeschlossen sind, die zur Erzeugung der elektrischen Energie verwendet werden. The output power rail is the rail of a power plant leading to the energy output meter. From the output power rail can branch off at least one self-consumption rail, are connected to the electrical load of the power generation plant, which are used to generate the electrical energy.
Generell kann als Energieerzeugungseinrichtung ein elektrischer Generator angesehen werden, über den die elektrische Energie erzeugt wird. Generally, as an energy generating device, an electric generator can be considered, via which the electrical energy is generated.
Weitere Vorteile und Eigenschaften der Erfindung ergeben sich aus der nachfolgenden Beschreibung und den Zeichnungen, auf die Bezug genommen wird. In den Zeichnungen zeigen: Further advantages and features of the invention will become apparent from the following description and the drawings, to which reference is made. In the drawings show:
Figur 1 eine schematische Darstellung einer erfindungsgemäßen Energieerzeugungsanlage mit einer erfindungsgemäßen Nachrüstbau- gruppe, und Figure 1 is a schematic representation of a power generation system according to the invention with a retrofit module according to the invention, and
Figur 2 eine schematische Darstellung einer bei der Energieerzeugungsanlage gemäß Figur 1 verwendeten Rechen-Einheit. Figure 2 is a schematic representation of a computing unit used in the power generation plant of Figure 1.
In Figur 1 ist eine Energieerzeugungsanlage 10 gezeigt, die eine Energieerzeugungseinrichtung 12 in Form einer Windkraftanlage aufweist, die beispielsweise Teil eines Windkraftparks ist. Alternativ kann auch eine Solaranlage (als Teil eines Solaranlagenparks) oder ein Wasserkraftwerk vorgesehen sein. 1 shows a power generation plant 10, which has an energy generating device 12 in the form of a wind power plant, which is for example part of a wind farm. Alternatively, a solar system (as part of a solar park) or a hydroelectric power plant can be provided.
Die Energieerzeugungseinrichtung 12 erzeugt generell elektrische Energie, welche von der Energieerzeugungsanlage 10 in ein Versorgungsnetz 14 eingespeist wird, sodass die erzeugte elektrische Energie Endkunden zur Verfügung gestellt werden kann, die verbraucherseitig an das Versorgungsnetz 14 angeschlossen sind. Die Energieerzeugungsanlage 10 ist demnach erzeugerseitig mit dem Versorgungsnetz 14 gekoppelt. The energy generating device 12 generally generates electrical energy, which is fed by the power generation plant 10 into a supply network 14, so that the generated electrical energy can be made available to end customers who are connected to the utility network 14 on the consumer side. The power generation plant 10 is therefore coupled to the supply network 14 on the generator side.
Zudem umfasst die Energieerzeugungsanlage 10 einen Energieausgangs- zähler 16, der die elektrische Energie zählt, die von der Energieerzeugungs- einrichtung 12 erzeugt worden ist und in das Versorgungsnetz 14 eingespeist wird. Des Weiteren umfasst die Energieerzeugungsanlage 10 in der gezeigten Ausführungsform ein als eine Mining-Farm ausgebildetes Rechenzentrum 18, das mehrere als Mining-Einheiten ausgebildete Rechen-Einheiten 20 umfasst, die Server- und/oder Rechenleistung einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer zur Verfügung stellen. In addition, the power plant 10 includes an energy output counter 16 which counts the electrical energy generated by the power plant 12 and fed into the utility grid 14. Furthermore, in the embodiment shown, the energy generation plant 10 comprises a computer center 18 designed as a mining farm, which comprises a plurality of computing units 20 designed as mining units, which allocate server and / or computing power to a computing service provider and / or a computing power user Make available.
Die konkret dargestellte Ausführungsform stellt also auf eine Mining-Farm mit mehreren Mining-Einheiten ab, sodass nachfolgend auch auf diese Begriffe abgestellt wird, wenn vom Rechenzentrum 18 bzw. den Rechen-Einheiten 20 die Rede ist. Daher werden für die Mining-Farm und die Mining-Einheiten auch die entsprechenden Bezugszeichen verwendet. The concretely illustrated embodiment thus depicts a mining farm with a plurality of mining units, so that these terms are also used below when the data center 18 or the computing units 20 is mentioned. Therefore, the corresponding reference numbers are used for the mining farm and the mining units.
Generell können die Rechen-Einheiten 20 und somit das Rechenzentrum 18 die vorhandene Server- und/oder Rechenleistung einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer aber auch für andere Zwecke zur Verfügung stellen, wie nachfolgend ebenfalls erläutert wird. In general, the computing units 20 and thus the data center 18 can provide the existing server and / or computing power to a computing service provider and / or a computing power user but also for other purposes, as will also be explained below.
Die als Mining-Einheiten ausgebildeten Rechen-Einheiten 20 sind jeweils eingerichtet, Daten einer geteilten Buchführung zu generieren, insbesondere eine Prüfsumme, über die vorherige T ransaktionen der geteilten Buchführung gesichert werden, um einer nachträglichen Manipulation vorzubeugen. Beispielsweise handelt es sich bei den Daten um eine Prüfsumme einer Blockketten-Anwendung wie einer Kryptowährung. The calculating units 20 designed as mining units are each set up to generate data of a shared bookkeeping system, in particular a checksum, via which previous transactions of the shared bookkeeping are saved in order to prevent subsequent manipulation. For example, the data is a checksum of a block-chain application, such as a crypto-currency.
Die Rechen-Einheiten 20 sind generell, wie in Figur 1 dargestellt, in Stromflussrichtung I zwischen der Energieerzeugungseinrichtung 12 und dem Energieausgangszähler 16 angeordnet. Hierbei sind die Rechen-Einheiten 20 über eine Abzweigleitung 22 mit der Leitung 24 gekoppelt, die zwischen der Energieerzeugungseinrichtung 12 und dem Energieausgangszähler 16 vorgesehen ist, also der Stromleitung, über die die erzeugte elektrische Energie in das Versorgungsnetz 14 eingespeist wird. As is shown in FIG. 1, the computing units 20 are generally arranged in the direction of current flow I between the energy generation device 12 and the energy output counter 16. Here, the computing units 20 are coupled via a branch line 22 to the line 24, which is provided between the power generating device 12 and the energy output counter 16, ie the power line, via which the generated electrical energy is fed into the supply network 14.
Diese Leitung 24 wird auch als Ausgangsleistungsschiene bezeichnet. This line 24 is also referred to as the output power rail.
Bei der Abzweigleitung 22 kann es sich um eine Eigenbedarfsschiene handeln, die mit der Ausgangsleistungsschiene bzw. der Leitung 24 verbunden ist. Alternativ kann die Abzweigleitung 22 nachträglich mit der Ausgangsleistungs- schiene bzw. die Leitung 24 verbunden werden, um die Rechen-Einheiten 20 mit der Ausgangsleistungsschiene bzw. der Leitung 24 zu verbinden. The branch line 22 may be a self-service rail that is connected to the output power rail or the line 24. Alternatively, the branch line 22 can be subsequently connected to the output power rail or the line 24 in order to connect the computing units 20 to the output power rail or the line 24.
Die mehreren Rechen-Einheiten 20 sind in einem Regalsystem 26 untergebracht, dem ein Lüftungssystem 28 zugeordnet ist, um die Be- und Entlüftung der Rechen-Einheiten 20 sicherzustellen. Die während des Betriebs der Rechen-Einheiten 20 entstehende Abwärme kann also über das Lüftungssystem 28 abtransportiert werden, wodurch sichergestellt ist, dass die Rechen-Einheiten 20 nicht überhitzen. The multiple computing units 20 are housed in a racking system 26, which is associated with a ventilation system 28 to ensure the ventilation of the computing units 20. The waste heat produced during operation of the computing units 20 can therefore be removed via the ventilation system 28, which ensures that the computing units 20 do not overheat.
Zum Abtransport der Wärme kann es sich bei dem Lüftungssystem 28 um ein passives Lüftungssystem handeln. To remove the heat, the ventilation system 28 may be a passive ventilation system.
Alternativ kann auch ein aktives Lüftungssystem 28 vorgesehen sein, das die wenigstens eine Rechen-Einheit 20 aktiv kühlt. Alternatively, an active ventilation system 28 may be provided which actively cools the at least one computing unit 20.
Um eine Überhitzung zu verhindern, sind zudem Sensoren vorgesehen, über die die Temperatur der Rechen-Einheiten 20 überwacht wird. Die Sensoren können im Regalsystem 26 untergebracht sein. In order to prevent overheating, sensors are also provided, via which the temperature of the computing units 20 is monitored. The sensors can be accommodated in the shelving system 26.
Die mehreren Rechen-Einheiten 20 werden mittels der erzeugten elektrischen Energie der Energieerzeugungseinrichtung 12 direkt versorgt, sodass eine Selbstversorgung der Rechen-Einheiten 20 gegeben ist, was auch als Eigenversorgung bzw. Eigenbedarfsversorgung bezeichnet wird. The multiple computing units 20 are powered directly by means of the generated electrical energy of the power generation device 12, so that a self-supply of the computing units 20 is given, which is also referred to as self-supply.
Hierzu ist in der Abzweigleitung 22 ein Transformator 30 vorgesehen, der die erzeugte elektrische Energie auf ein Spannungsniveau umsetzt, welches von den Rechen-Einheiten 20 verarbeitet werden kann, beispielsweise auf ein Spannungsniveau von 230 V. For this purpose, a transformer 30 is provided in the branch line 22, which converts the generated electrical energy to a voltage level which can be processed by the computing units 20, for example to a voltage level of 230 V.
Die entsprechende elektrische Energie wird dann über einen Stromverteiler 32 auf die mehreren Rechen-Einheiten 20 verteilt. Der Stromverteiler 32 kann dabei eine Strommanagementeinrichtung umfassen, die unter anderem sicherstellt, dass die zur Verfügung stehende elektrische Energie gleichmäßig verteilt wird. The corresponding electrical energy is then distributed via a power distributor 32 to the plurality of computing units 20. The power distributor 32 may include a power management device, which ensures, inter alia, that the available electrical energy is distributed evenly.
Des Weiteren umfasst die Energieerzeugungsanlage 10 einen Eigenenergieverbrauchszähler 34, der in der gezeigten Ausführungsform in der Abzweigleitung 22 vorgesehen ist, um die von den Rechen-Einheiten 20 verbrauchte elektrische Energie zu erfassen. Der Eigenverbrauch der Mining-Farm bzw. des Rechenzentrums 18 wird also erfasst, wobei dieser im Wesentlichen der Differenz der erzeugten elektrischen Energie und der in das Versorgungsnetz 14 eingespeisten elektrischen Energie entspricht, sofern keine weiteren Komponenten vorhanden sind, die eine Eigenversorgung aufweisen. Furthermore, the power generation plant 10 comprises a self-energy consumption meter 34, which is provided in the branch line 22 in the embodiment shown, in order to receive the data from the arithmetic units 20 to capture used electrical energy. The self-consumption of the mining farm or of the data center 18 is therefore detected, this essentially corresponding to the difference of the generated electrical energy and the electrical energy fed into the supply network 14, provided that there are no further components which have an intrinsic supply.
In Figur 2 ist eine der mehreren Rechen-Einheiten 20 im Detail gezeigt. In FIG. 2, one of the several computing units 20 is shown in detail.
Die Rechen-Einheit 20 weist eine Stromeingangsschnittstelle 36 auf, über die die Rechen-Einheit 20 die elektrische Energie erhält, die zum Betrieb benötigt wird. Die Rechen-Einheit 20 kann über die Stromeingangsschnittstelle 36 demnach mit der Energieerzeugungseinrichtung 12 gekoppelt sein, insbesondere über die Leitung 24 und die Abzweigleitung 22, sodass die Rechen-Einheit 20 die von der Energieerzeugungseinrichtung 12 erzeugte elektrische Energie direkt erhält. The computing unit 20 has a current input interface 36, via which the computing unit 20 receives the electrical energy needed for operation. The arithmetic unit 20 can therefore be coupled to the power generating device 12 via the current input interface 36, in particular via the line 24 and the branch line 22, so that the arithmetic unit 20 receives the electrical energy generated by the power generating device 12 directly.
Wie bereits mit Bezug auf Figur 1 erläutert, wird die von der Energie- erzeugungseinrichtung 12 erzeugte elektrische Energie über den Transformator 30 auf ein geeignetes Spannungsniveau umgesetzt. As already explained with reference to FIG. 1, the electrical energy generated by the energy generating device 12 is converted via the transformer 30 to a suitable voltage level.
Des Weiteren umfasst die Rechen-Einheit 20 einen Rechenprozessor 38 sowie eine Server-Einheit 40, sodass die Rechen-Einheit 20 entsprechende Rechen- und/oder Serverleistung hat. Beispielsweise umfasst der Rechenprozessor 38 eine anwendungsspezifische integrierte Schaltung (ASIC). Furthermore, the computing unit 20 comprises a computing processor 38 and a server unit 40, so that the computing unit 20 has corresponding computing and / or server performance. For example, computing processor 38 includes an application specific integrated circuit (ASIC).
Zudem weist die Rechen-Einheit 20 eine Kommunikationsschnittstelle 42 auf, über die die Rechen-Einheit 20 mit dem Internet verbunden sein kann, beispielsweise eine kabelgebundene Schnittstelle oder eine kabellose Schnittstelle. Über die Kommunikationsschnittstelle 42 ist es unter anderem möglich, dass die zur Verfügung stehende Rechen- und/oder Serverleistung für andere Zwecke, beispielsweise eine dezentrale Buchführung, verwendet werden kann. In addition, the computing unit 20 has a communication interface 42, via which the computing unit 20 can be connected to the Internet, for example a wired interface or a wireless interface. Among other things, it is possible via the communication interface 42 for the available computing and / or server performance to be used for other purposes, for example a decentralized accounting.
Die Rechen-Einheit 20 kann also Teil eines dezentralen Rechennetzwerks sein, über das beispielsweise Transaktionen dezentral verwaltet, gesteuert und/oder kontrolliert werden, wie dies unter anderem bei Blockketten- Anwendungen oder generell Anwendungen einer geteilten Buchführung der Fall ist. Zu dem dezentralen Rechennetzwerk können weitere Server-Einheiten gehören, die unter anderem sogenannte Knoten sind, die Datensätze bereitstellen, die entsprechenden Transaktionen zugeordnet sind. Die Datensätze werden, wie bereits erläutert, von den Prüfsummen gegen eine nachträgliche Manipulation gesichert, die von den als Mining-Einheiten ausgebildeten Rechen-Einheiten 20 berechnet werden. The arithmetic unit 20 may thus be part of a decentralized computer network, via which, for example, transactions are managed, controlled and / or controlled in a decentralized manner, as is the case, inter alia, in the case of block-chain applications or shared-bookkeeping applications in general. The remote computing network may include other server entities, including nodes that provide records associated with corresponding transactions. As already explained, the data records are backed up by the checksums against subsequent manipulation, which are calculated by the computing units 20 designed as mining units.
Ferner kann die zur Verfügung stehende Rechen- und/oder Serverleistung für anderen rechenintensiven Anwendungen zur Verfügung gestellt werden, beispielsweise für Anwendungen künstlicher Intelligenz. Furthermore, the available computing and / or server performance can be made available for other computationally intensive applications, for example for artificial intelligence applications.
Des Weiteren weist die Rechen-Einheit 20 eine Fernwartungskomponente 44 auf, die über die Server-Einheit 40 mit der Kommunikationsschnittstelle 42 gekoppelt ist. Alternativ kann die Fernwartungskomponente 44 auch direkt mit der Kommunikationsschnittstelle 42 gekoppelt sein, um beispielsweise Probleme mit der Server-Einheit 40 feststellen zu können, was ansonsten nicht möglich wäre, sofern die Server-Einheit 40 ausfällt. Furthermore, the computing unit 20 has a remote maintenance component 44, which is coupled to the communication interface 42 via the server unit 40. Alternatively, the remote maintenance component 44 may also be coupled directly to the communication interface 42 in order, for example, to be able to determine problems with the server unit 40, which would otherwise not be possible if the server unit 40 fails.
Ebenso kann die Fernwartungskomponente 44 mit dem Rechenprozessor 38 gekoppelt sein, um diesen entsprechend fernwarten zu können. Likewise, the remote maintenance component 44 may be coupled to the arithmetic processor 38 in order to be able to remotely maintain it accordingly.
Über die Fernwartungskomponente 44 ist es generell möglich, die jeweilige Rechen-Einheit 20 auch aus der Ferne zu warten, da diese als Teil der Energieerzeugungsanlage 10 ausgebildet ist. Via the remote maintenance component 44, it is generally possible to also remotely maintain the respective computing unit 20, since this is designed as part of the energy generation system 10.
Generell kann die vom Rechenprozessor 38 und/oder der Server-Einheit 40 vorgesehene Rechen- bzw. Serverleistung einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer zur Verfügung gestellt werden, der unabhängig vom Betreiber der Energieerzeugungsanlage 10 ist. In general, the computing or server power provided by the computing processor 38 and / or the server unit 40 can be made available to a computing service provider and / or a computing power user who is independent of the operator of the power generation facility 10.
Beispielsweise wird die Rechen- bzw. Serverleistung von einem externen Rechen-Dienstleister und/oder einem externen Rechenleistungsnutzer verwendet, um eine Anwendung künstlicher Intelligenz (Kl) bzw. eine Blockketten-Anwendung bereitzustellen bzw. auszuführen, beispielsweise diejenige einer Kryptowährung. Dabei können vor allem die rechenintensiven Prüfsummen bzw. Hashwerte über die als Mining-Einheiten ausgebildeten Rechen-Einheiten 20 berechnet werden. Die energieintensiven Rechenschritte, die beispielsweise zur Berechnung der Prüfsummen benötigt werden, können so direkt vor Ort beim Betreiber der Energieerzeugungsanlage 10 vorgenommen werden, wobei die hierfür benötigte elektrische Energie abgezweigt wird, bevor sie in das Versorgungsnetz 14 eingespeist wird. Insofern handelt es sich um eine Eigen- oder Selbstversorgung der jeweiligen Rechen-Einheiten 20. For example, the computing or server performance is used by an external computing service provider and / or an external computing user to provide an artificial intelligence (Kl) application or a block-chain application, such as a cryptocurrency application. In particular, the computation-intensive checksums or hash values can be calculated using the computational units 20 designed as mining units. The energy-intensive computation steps, which are required, for example, to calculate the checksums, can be made directly on site at the operator of the power generation plant 10, wherein the required electrical energy is diverted before it is fed into the supply network 14. In this respect, it is an own or self-supply of the respective computing units 20.
Generell kann die wenigstens eine Rechen-Einheit 20 als Teil einer Nachrüstbaugruppe 46 nachträglich an die Energieerzeugungseinrichtung 12 angebunden sein, also vor dem Energieausgangszähler 16, sodass die Nachrüstbaugruppe 46 von der Klemmenleistung der Energieerzeugungs- einrichtung 12 ihren Eigenbedarf entnimmt, um eine Eigenversorgung zu gewährleisten. In general, the at least one computing unit 20 can be subsequently connected to the energy generating device 12 as part of a retrofit module 46, ie before the energy output counter 16, so that the retrofit module 46 removes its own power from the terminal power of the energy generating device 12 in order to ensure self-supply.
Die Nachrüstbaugruppe 46 ist dabei eingerichtet, in Stromflussrichtung vor einem Energieausgangszähler 16 angeordnet zu sein, wie dies in Figur 1 gezeigt und bereits erläutert wurde. The retrofit module 46 is set up to be arranged upstream of an energy output counter 16 in the direction of current flow, as shown in FIG. 1 and already explained.
Zur Anbindung der Nachrüstbaugruppe 46 vor dem Energieausgangszähler 16 der Energieerzeugungseinrichtung 12 umfasst die Nachrüstbaugruppe 46 eine entsprechende Anbindungsschnittstelle 48, die je nach Anbindung der Nachrüstbaugruppe 46 auch als eine Ausgangsleistungsschienenschnittstelle und/oder eine Eigenbedarfsschienenschnittstelle bezeichnet wird. To connect the retrofit module 46 in front of the energy output meter 16 of the energy generating device 12, the retrofit module 46 includes a corresponding connection interface 48, which is also referred to as an output power rail interface and / or a self-service rail interface depending on the connection of the retrofit module 46.
Über die Anbindungsschnittstelle 48 ist die Nachrüstbaugruppe 46 an eine Ausgangsleistungsschiene und/oder eine Eigenbedarfsschiene angeschlossen, die in Figur 1 durch die Leitung 24 bzw. die Abzweigleitung 22 dargestellt ist. Via the connection interface 48, the retrofit module 46 is connected to an output power rail and / or a self-consumption rail, which is represented in FIG. 1 by the line 24 or the branch line 22.
Die Nachrüstbaugruppe 46 ist also ausgebildet, an die Energieerzeugungs- einrichtung 12 angeschlossen zu werden, indem die Nachrüstbaugruppe 46 vor dem Energieausgangszähler 16 nachträglich eingebunden wird, der das Ende der Ausgangsleistungsschiene bzw. der Leitung 24 definiert. The retrofit module 46 is thus configured to be connected to the power generating device 12 by subsequently integrating the retrofit module 46 in front of the power output counter 16, which defines the end of the output power rail or line 24.
Die in Figur 1 gezeigte Abzweigleitung 22 kann, wie bereits erläutert, eine Eigenbedarfsschiene der Energieerzeugungseinrichtung 12 darstellen, über die neben der Nachrüstbaugruppe 46 weitere elektrische Verbraucher (Komponenten der Energieerzeugungsanlage 10) mit elektrischer Energie versorgt wird, die durch die Energieerzeugungseinrichtung 12 selbst erzeugt worden ist (Eigenversorgung der weiteren Komponenten). The branch line 22 shown in Figure 1, as already explained, constitute a self-supply rail of the power generating device 12, in addition to the retrofit module 46 further electrical loads (components of the power generation system 10) is supplied with electrical energy passing through the power generating device 12 itself has been generated (self-supply of the other components).
Die an die Energieerzeugungseinrichtung 12 anzubindende Nachrüst- baugruppe 46 kann alle Komponenten umfassen, die vor dem Energieausgangs- zähler 16 an die Leitung 24 angebunden sind, beispielsweise auch die Abzweigleitung 22. The retrofit module 46 to be connected to the energy generating device 12 may comprise all components which are connected to the line 24 before the energy output counter 16, for example also the branch line 22.
Insofern kann die Nachrüstbaugruppe 46 mehrere Rechen-Einheiten 20 umfassen, die allesamt wie oben beschrieben ausgebildet sind. As such, the retrofit assembly 46 may include a plurality of computing units 20, all of which are configured as described above.
Ebenso ist es möglich, dass die Nachrüstbaugruppe 46 das Regalsystem 26 und das (passive) Lüftungssystem 28 umfasst. It is also possible that the retrofit module 46 includes the shelving system 26 and the (passive) ventilation system 28.
Auch der Transformator 30, der Stromverteiler 32 und/oder der Eigenenergieverbrauchszähler 34 können bzw. kann Teil der Nachrüstbaugruppe 46 sein. The transformer 30, the power distributor 32 and / or the own energy consumption meter 34 may also be part of the retrofit module 46.
Ebenso kann die Nachrüstbaugruppe 46 die Anbindungsschnittstelle 48 umfassen, über die die Nachrüstbaugruppe 46 an die Ausgangsleistungsschiene (Leitung 24) oder eine bereits bestehende Eigenbedarfsschiene (Abzweigleitung 22) angebunden wird. Likewise, the retrofit assembly 46 may include the interface 48 via which the retrofit assembly 46 is connected to the output power rail (line 24) or an existing self-service rail (branch line 22).
Es kann auch vorgesehen sein, dass die Nachrüstbaugruppe 46 eine Eigenbedarfsschiene (Abzweigleitung 22) umfasst, die an die bestehende Ausgangsleistungsschiene (Leitung 24) angebunden wird. Insofern wäre die Anbindungsschnittstelle 48 dann eine Ausgangsleistungsschienenschnittstelle, über die die Nachrüstbaugruppe 46 direkt an die Ausgangsleistungsschiene (Leitung 24) angeschlossen wird. It can also be provided that the retrofit module 46 comprises a self-supply rail (branch line 22) which is connected to the existing output power rail (line 24). As such, the attachment interface 48 would then be an output power rail interface via which the retrofit assembly 46 is connected directly to the output power rail (line 24).
Die Nachrüstbaugruppe 46 wird an die bestehende Energieerzeugungs- einrichtung 12 nachträglich eingebunden, indem die jeweiligen Komponenten der Nachrüstbaugruppe 46, wie in Figur 1 gezeigt, vor dem Energieausgangszähler 16 angeschlossen werden, also vor dem Ende der Ausgangsleistungsschiene bzw. der Leitung 24. The retrofit module 46 is subsequently incorporated into the existing power generation device 12 by connecting the respective components of the retrofit module 46, as shown in FIG. 1, before the energy output counter 16, ie before the end of the output power rail or line 24.

Claims

Patentansprüche  claims
1. Energieerzeugungsanlage (10) mit einer Energieerzeugungseinrichtung (12), die elektrische Energie zum Einspeisen in ein Versorgungsnetz (14) erzeugt, einem Energieausgangszähler (16), der die von der Energieerzeugungseinrichtung (12) in das Versorgungsnetz (14) eingespeiste elektrische Energie zählt, und zumindest einer Rechen-Einheit (20), die eine entsprechende Rechenleistung aufweist, wobei die Rechen-Einheit (20) in Stromflussrichtung zwischen der Energieerzeugungseinrichtung (12) und dem Energieausgangszähler (16) angeordnet ist, wobei die Rechen-Einheit (20) eingerichtet ist, Server- und/oder Rechenleistung einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer zur Verfügung zu stellen, insbesondere wobei der Rechen-Dienstleister und/oder der Rechenleistungsnutzer vom Betreiber der Energieerzeugungsanlage (10) verschieden ist. A power plant (10) having an energy generating device (12) that generates electrical energy for feeding into a utility grid (14), an energy output counter (16) that counts the electrical energy supplied by the power plant (12) to the utility grid (14) and at least one computing unit (20) having a corresponding computing power, wherein the computing unit (20) is arranged in the current flow direction between the energy generating device (12) and the energy output counter (16), wherein the computing unit (20) is set up to provide server and / or computing power to a computing service provider and / or a computing power user, in particular wherein the computing service provider and / or the computing power user different from the operator of the power generation plant (10).
2. Energieerzeugungsanlage (10) nach Anspruch 1 , dadurch gekennzeichnet, dass die Rechen-Einheit (20) eine Mining-Einheit ist, die eingerichtet ist, Daten einer geteilten Buchführung zu generieren, beispielsweise eine Prüfsumme zu generieren, insbesondere die Prüfsumme einer Blockkette. Second energy generating system (10) according to claim 1, characterized in that the arithmetic unit (20) is a mining unit, which is configured to generate data of a shared accounting, for example to generate a checksum, in particular the checksum of a block chain.
3. Energieerzeugungsanlage (10) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Rechen-Einheit (20) eine Kommunikationsschnittstelle (42) aufweist, insbesondere wobei die Rechen-Einheit (20) über die Kommunikationsschnittstelle (42) Teil eines dezentralen Rechennetzwerks ist, insbesondere wobei über das dezentrale Rechennetzwerk Transaktionen dezentral verwaltet, gesteuert und/oder kontrolliert werden. 3. Energy generating system (10) according to claim 1 or 2, characterized in that the computing unit (20) has a communication interface (42), in particular wherein the computing unit (20) via the communication interface (42) is part of a decentralized computing network In particular, transactions are managed, controlled and / or controlled decentrally via the decentralized computer network.
4. Energieerzeugungsanlage (10) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Rechen-Einheit (20) eine Stromeingangsschnittstelle (36) aufweist, über die die Rechen-Einheit (20) elektrische Energie erhält, insbesondere wobei die Energieerzeugungseinrichtung (12) mit der Stromeingangsschnittstelle (36) gekoppelt ist. 4. Energy generating system (10) according to one of the preceding claims, characterized in that the computing unit (20) has a current input interface (36) via which the computing unit (20) receives electrical energy, in particular wherein the energy generating device (12) is coupled to the power input interface (36).
5. Energieerzeugungsanlage (10) nach Anspruch 4, dadurch gekennzeichnet, dass ein Transformator (30) vorgesehen ist, der der Stromeingangsschnittstelle (36) der Rechen-Einheit (20) zugeordnet ist. 5. Power generation plant (10) according to claim 4, characterized in that a transformer (30) is provided, which is associated with the current input interface (36) of the computing unit (20).
6. Energieerzeugungsanlage (10) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der wenigstens einen Rechen-Einheit (20) ein Eigenenergieverbrauchszähler (34) zugeordnet ist, der den Stromverbrauch der Rechen-Einheit (20) erfasst. 7. Energieerzeugungsanlage (10) nach einem der vorhergehenden6. Energy generating system (10) according to any one of the preceding claims, characterized in that the at least one computing unit (20) is associated with a self-energy consumption counter (34) which detects the power consumption of the computing unit (20). 7. Power generation plant (10) according to one of the preceding
Ansprüche, dadurch gekennzeichnet, dass die wenigstens eine Rechen-Einheit (20) zumindest teilweise in einem Regalsystem (26) untergebracht ist, dem ein Lüftungssystem (28) zugeordnet ist, insbesondere wobei das Lüftungssystem (28) ein passives oder aktives Lüftungssystem ist. 8. Energieerzeugungsanlage (10) nach einem der vorhergehendenClaims, characterized in that the at least one computing unit (20) is at least partially accommodated in a shelving system (26) to which a ventilation system (28) is associated, in particular wherein the ventilation system (28) is a passive or active ventilation system. 8. Power generation plant (10) according to one of the preceding
Ansprüche, dadurch gekennzeichnet, dass mehrere Rechen-Einheiten (20) vorgesehen sind, denen ein Stromverteiler (32) zugeordnet ist. Claims, characterized in that a plurality of computing units (20) are provided, which is associated with a power distributor (32).
9. Energieerzeugungsanlage (10) nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Rechen-Einheit (20) eine Fernwartungskomponente (44) aufweist, über die die Rechen-Einheit (20) ferngewartet werden kann. 9. Energy generating system (10) according to any one of the preceding claims, characterized in that the computing unit (20) has a remote maintenance component (44) via which the computing unit (20) can be maintained by remote maintenance.
10. Verfahren zum Betreiben wenigstens einer Rechen-Einheit (20) einer Energieerzeugungsanlage (10), mit den folgenden Schritten: 10. A method for operating at least one computing unit (20) of a power generation plant (10), comprising the following steps:
Erzeugen von elektrischer Energie über eine Energieerzeugungs einrichtung (12), Generating electrical energy via a power generation device (12),
Versorgen der Rechen-Einheit (20) mit der von der Energieerzeugungs einrichtung (12) erzeugten elektrischen Energie, wobei die Rechen-Einheit (20) einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer Server- und/oder Rechenleistung zur Verfügung stellt, Supplying the computing unit (20) with the electrical energy generated by the power generation device (12), the computing unit (20) providing server and / or computing power to a computing service provider and / or a computing power user,
Weiterleiten der von der Rechen-Einheit (20) unverbrauchten elektrischen Energie, und Forwarding the unused by the computing unit (20) electrical energy, and
Einspeisen der von der Rechen-Einheit (20) unverbrauchten elektrischen Energie in ein Versorgungsnetz (14). Feeding the unused electrical energy from the computing unit (20) into a utility network (14).
1 1. Verfahren nach Anspruch 10, dadurch gekennzeichnet, dass die in das Versorgungsnetz (14) eingespeiste elektrische Energie von einem Energieausgangszähler (16) gezählt wird. 1 1. A method according to claim 10, characterized in that in the supply network (14) fed electrical energy is counted by an energy output counter (16).
12. Nachrüstbaugruppe (46) zur Installation an einer Energieerzeugungs- einrichtung (12), die elektrische Energie zum Einspeisen in ein Versorgungsnetz12. retrofit assembly (46) for installation at a power generating device (12), the electrical energy for feeding into a supply network
(14) erzeugt, wobei die Nachrüstbaugruppe (46) wenigstens eine Rechen-Einheit (20) umfasst, die eingerichtet ist, einem Rechen-Dienstleister und/oder einem Rechenleistungsnutzer Server- und/oder Rechenleistung zur Verfügung zu stellen, und wobei die Nachrüstbaugruppe (46) eingerichtet ist, in Stromflussrichtung vor einem Energieausgangszähler (16) angeordnet zu sein. (14), wherein the retrofit module (46) comprises at least one computing unit (20) which is set up to provide server and / or computing power to a computing service provider and / or a computing power user, and wherein the retrofit module (20) 46) is arranged to be arranged in the current flow direction in front of an energy output counter (16).
13. Nachrüstbaugruppe nach Anspruch 12, dadurch gekennzeichnet, dass die Nachrüstbaugruppe (46) eine Anbindungsschnittstelle (48) aufweist, die als eine Ausgangsleistungsschienenschnittstelle und/oder eine Eigenbedarfs- schienenschnittstelle ausgebildet ist, über die die Nachrüstbaugruppe (46) an eine Ausgangsleistungsschiene (24) und/oder eine Eigenbedarfsschiene (22) anschließbar ist. 13. Retrofit assembly according to claim 12, characterized in that the retrofit module (46) has a connection interface (48) which is designed as an output power rail interface and / or a self-consumption rail interface, via which the retrofit module (46) to an output power rail (24). and / or a self-supply rail (22) can be connected.
EP19700665.3A 2018-01-22 2019-01-10 Energy generation system, method for operating a computing unit, and retrofit assembly Withdrawn EP3743878A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102018101327.2A DE102018101327A1 (en) 2018-01-22 2018-01-22 Power generation plant, method for operating a computing unit and retrofit assembly
PCT/EP2019/050573 WO2019141587A1 (en) 2018-01-22 2019-01-10 Energy generation system, method for operating a computing unit, and retrofit assembly

Publications (1)

Publication Number Publication Date
EP3743878A1 true EP3743878A1 (en) 2020-12-02

Family

ID=65031051

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19700665.3A Withdrawn EP3743878A1 (en) 2018-01-22 2019-01-10 Energy generation system, method for operating a computing unit, and retrofit assembly

Country Status (3)

Country Link
EP (1) EP3743878A1 (en)
DE (1) DE102018101327A1 (en)
WO (1) WO2019141587A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115552756A (en) 2020-05-27 2022-12-30 西门子股份公司 Providing local computing power of edge clouds

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8369997B2 (en) * 2010-04-28 2013-02-05 David Valin Solar panel wind turbine communication server network apparatus method and mechanism

Also Published As

Publication number Publication date
WO2019141587A1 (en) 2019-07-25
DE102018101327A1 (en) 2019-07-25

Similar Documents

Publication Publication Date Title
DE102015101738B4 (en) Method for operating a power generation plant and power generation plant
DE102013002078A1 (en) Method for charging battery of e.g. fully electrically driven vehicle, involves considering user requirements, boundary conditions and amount of electrical solar energy during determination and adjustment of loading profiles
EP2528183B1 (en) Method and device for energy transfer
DE102015201085A1 (en) Method for controlling an electrical power distribution network
EP3778292A1 (en) Method for operating a charging station for electric vehicles and charging station
EP3743878A1 (en) Energy generation system, method for operating a computing unit, and retrofit assembly
DE102021104556A1 (en) Distributing electrical power in a local power grid
DE102017118958A1 (en) Energy management system device and an energy management system method
EP2697889A2 (en) Power distribution system and method for operation thereof
WO2019110739A1 (en) Identification device, energy production installation, energy system and method
EP3522324B1 (en) Method and arrangement for load management of electrical devices
DE202018105317U1 (en) Control system for a power grid
EP3751691B1 (en) Electrical power system
AT516213B1 (en) Power system
EP3649717B1 (en) System for reducing load peaks in an electrical system
DE102018215777B4 (en) Control / regulating module for a control / regulating system for a power grid
EP3916944A1 (en) Energy supply system and method for operating an energy supply system
DE102015108764A1 (en) Electricity tariff control and power supply system for a building, electricity tariff control system for a building and billing procedures for powering a building
WO2018078115A1 (en) Storage unit for a load, and storage system
AT520688B1 (en) METHOD OF DISTRIBUTION OF ELECTRICAL ENERGY
EP3621169A1 (en) Isolated network and method for operating same
DE102013005919A1 (en) Device, arrangement and method of an energy storage system for influenceable recording, storage and delivery of electrical energy, for installation in systems in public space
EP3422522A1 (en) Provision of electrical power to an energy supply network by means of a provisioning device with extended range
DE102012216369A1 (en) ELECTRICAL DEVICE FOR CONNECTION TO AN INFRASTRUCTURE POWER NETWORK AND METHOD
WO2019030048A1 (en) Electrical energy storage assembly

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200814

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20220921

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20230202