EP3386251B1 - Übertragungsverfahren, übertragungsvorrichtung, netzwerkvorrichtung und benutzergerät - Google Patents

Übertragungsverfahren, übertragungsvorrichtung, netzwerkvorrichtung und benutzergerät Download PDF

Info

Publication number
EP3386251B1
EP3386251B1 EP15911746.4A EP15911746A EP3386251B1 EP 3386251 B1 EP3386251 B1 EP 3386251B1 EP 15911746 A EP15911746 A EP 15911746A EP 3386251 B1 EP3386251 B1 EP 3386251B1
Authority
EP
European Patent Office
Prior art keywords
resource
pusch
base station
pusch resource
contention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP15911746.4A
Other languages
English (en)
French (fr)
Other versions
EP3386251A1 (de
EP3386251A4 (de
Inventor
Xun Tang
Wei Quan
Jinhua MIAO
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of EP3386251A1 publication Critical patent/EP3386251A1/de
Publication of EP3386251A4 publication Critical patent/EP3386251A4/de
Application granted granted Critical
Publication of EP3386251B1 publication Critical patent/EP3386251B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W74/00Wireless channel access
    • H04W74/002Transmission of channel access control information
    • H04W74/004Transmission of channel access control information in the uplink, i.e. towards network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/21Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/27Transitions between radio resource control [RRC] states

Definitions

  • the present invention relates to the field of communications technologies, and in particular, to a transmission method, a transmission apparatus, a network device, and user equipment.
  • LTE Long Term Evolution
  • UE user equipment
  • SR uplink scheduling request
  • SR uplink scheduling request
  • PDCH physical downlink control channel
  • PUCCH resources and PUSCH resources are limited.
  • signaling overheads are high and a scheduling process is complex in a conventional dynamic scheduling manner.
  • SPS semi-persistent scheduling
  • a conflict cannot be avoided, and consequently resources are wasted, and a transmission delay is increased.
  • EP2523520 describes a scheduling request method, network side device, terminal device and system, which belong to the field of communications technologies.
  • the method includes: configuring a first shared resource used for a scheduling request (SR), and sending first information to multiple terminal devices to notify of the first shared resource; receiving the SR on the first shared resource; allocating a second shared resource of uplink data to the multiple terminal devices, or allocating a dedicated resource of uplink data to at least one of the multiple terminal devices.
  • the network side device includes: a configuration module, a receiving module and an allocation module.
  • the terminal device includes: a receiving module, a request module and a sending module.
  • the system includes: a network side device and a first terminal device.
  • the present invention provides a transmission method, a transmission apparatus, a network device, and user equipment, so as to increase resource usage in an uplink transmission process, and increase a system capacity.
  • a transmission method is provided according to claim 1.
  • a transmission apparatus is provided according to claim 5.
  • the base station allocates, to the first UE, the first PUSCH resource used for sending resource request information, and allocates, to the first UE after receiving resource request information of the first UE, the second PUSCH resource used for sending data.
  • the first UE can occupy a PUSCH resource allocated to any UE, to send resource request information, so that PUCCH capacity limitation is effectively mitigated, and more UEs can send resource requests.
  • a problem of a conflict between UEs in a contention-based semi-persistent scheduling process can be resolved, so that PUSCH resources are more effectively used, and an uplink transmission delay is reduced.
  • resource usage in an uplink transmission process can be increased, and a system capacity can be increased.
  • a base station configures a resource request parameter for UE, and notifies, to the UE, an available PUSCH resource used for sending resource request information.
  • the base station may allocate, to the UE, any PUSCH resource that is used by another UE to send data, where both the UE and the another UE are scheduled.
  • the UE When the UE needs to send data, the UE first sends, on the PUSCH resource that is allocated by the base station and that is used for sending resource request information, resource request information to the base station based on the resource request parameter configured by the base station, and then sends data on the PUSCH resource that is allocated by the base station to the UE and that is used for sending data. Therefore, in this application, a resource used by the UE to send resource request information is extended to any PUSCH resource, so that available resources used by the UE to send resource request information are increased.
  • the base station can flexibly allocate, to the UE, a PUSCH resource that is used for sending data and that is different from a PUSCH resource of the another UE, so that a conflict caused when a plurality of UEs use a same PUSCH resource can be effectively avoided.
  • transmission resource limitation in an uplink transmission process can be effectively mitigated, resource usage can be increased, and a system capacity can be increased.
  • a system 10 includes a base station 11 and UE 12.
  • the base station 11 is configured to configure a resource request parameter, a PUSCH resource, and the like that are used by the UE 12.
  • the UE 12 is configured to: send a resource request based on configuration of the base station 11, and transmit uplink data.
  • the following describes in detail a transmission method, a transmission apparatus, a network device, and user equipment provided in this application.
  • Embodiment 1 of this application a procedure of a transmission method provided in Embodiment 1 of this application is described as follows.
  • Embodiment 1 an example in which a base station schedules first UE is used for description, and the method provided in Embodiment 1 of this application is applicable to any scheduling scenario.
  • a possible scheduling scenario is as follows: The base station has allocated an SPS resource to the first UE, and the SPS resource may be a contention resource shared by the first UE and another UE. It is assumed that UE that shares, with the first UE, an SPS resource for contention is referred to as contention UE.
  • Step 201 The base station configures a resource request parameter for the first UE, and sends the resource request parameter to the first UE.
  • the base station sends PDCCH information to the first UE, and the base station indicates that the sent PDCCH information is application resource indication information.
  • the application resource indication information includes the resource request parameter, and is used for instructing the first UE to send resource request information based on the resource request parameter.
  • the resource request parameter includes one or more of a cyclic shift value, a time-frequency resource location, a resource request period, and an orthogonal cover code (OCC).
  • OCC orthogonal cover code
  • the cyclic shift value is used to distinguish between channel estimation results of the first UE and another UE in time domain when the first UE and the another UE jointly occupy a PUSCH resource.
  • the time-frequency resource location is used to indicate a time-frequency resource location occupied when the first UE sends resource request information.
  • the base station configures, for the first UE, a pilot symbol that is of a PUSCH resource and that is occupied to send resource request information.
  • the base station may further send scheduling information to non-contention UE.
  • Step 202 The first UE receives the resource request parameter configured by the base station.
  • Step 203 The base station allocates a first PUSCH resource to the first UE, where the first PUSCH resource is used by the first UE to send resource request information.
  • a pilot symbol of the first PUSCH resource is used by the first UE to send resource request information.
  • the first PUSCH resource that is allocated by the base station to the first UE and that is used for sending resource request information may be the SPS resource, or may be a PUSCH resource used by the non-contention UE.
  • a manner in which the base station allocates the first PUSCH resource to the first UE may include but is not limited to the following two manners.
  • the base station sends a UL-grant message to the first UE.
  • the UL-grant message herein is referred to as a first UL-grant message
  • the first UL-grant message includes information about the first PUSCH resource allocated to the first UE.
  • the base station notifies PUSCH scheduling information of second UE to the first UE, where the PUSCH scheduling information of the second UE includes information about a third PUSCH resource that is allocated by the base station to the second UE and that is used for sending data; and instructs the first UE to use the third PUSCH resource as the first PUSCH resource that is used by the first UE to send resource request information.
  • the base station may schedule the non-contention UE while sending scheduling information that includes the resource request parameter to the first UE.
  • the non-contention UE herein is referred to as second UE.
  • the base station may send, to the first UE, a value of a radio network temporary identifier (RNTI) used by the second UE to search for PDCCH information, so that the first UE obtains the PUSCH scheduling information of the second UE based on the RNTI used by the second UE, that is, the first UE can obtain scheduling information such as a time-frequency resource location, an OCC code, and a cyclic shift value of the third PUSCH of the second UE.
  • the RNTI may be but is not limited to a C-RNTI, a semi-persistent scheduling C-RNTI, or a temporary C-RNTI.
  • the base station may alternatively directly notify, to the first UE, the time-frequency resource location of the third PUSCH of the second UE by using the resource request parameter sent to the first UE.
  • the base station instructs the first UE to occupy a pilot symbol of the third PUSCH resource of the second UE, to send resource request information.
  • the base station configures different cyclic shift values for the first UE and the second UE, so that the first UE and the second UE occupy the third PUSCH resource at different times by using the different cyclic shift values.
  • Step 204 The first UE determines the first PUSCH resource allocated by the base station, and sends resource request information to the base station on the first PUSCH resource based on the resource request parameter.
  • the first UE sends resource request information to the base station on the pilot symbol of the first PUSCH resource based on the resource request parameter.
  • the first UE determines, based on the received first uplink scheduling grant UL-grant message sent by the base station, the first PUSCH resource allocated by the base station; or the first UE determines, based on the PUSCH scheduling information that is of the second UE and that is notified by the base station, the third PUSCH resource that is included in the PUSCH scheduling information of the second UE, allocated by the base station to the second UE, and used for sending data as the first PUSCH resource allocated by the base station. Specifically, the first UE obtains the PUSCH scheduling information of the second UE based on the received radio network temporary identifier RNTI that is sent by the base station and that is used by the second UE.
  • the first UE If the first UE needs to send data, the first UE sends, on the first PUSCH resource allocated by the base station, resource request information to the base station based on the resource request parameter before sending data.
  • the first UE determines the third PUSCH resource as the first PUSCH resource, the first UE sends resource request information to the base station on the third PUSCH resource based on a cyclic shift value configured by the base station for the first UE.
  • Step 205 If the base station detects, on the first PUSCH resource, resource request information sent by the first UE based on the resource request parameter, the base station allocates, to the first UE, a second PUSCH resource used for sending data.
  • the base station If the first UE sends resource request information on a pilot symbol of a PUSCH resource of the second UE, the base station detects, based on the different cyclic shift values allocated to the first UE and the second UE, resource request information sent by the first UE. After detecting resource request information sent by the first UE, the base station determines that the first UE needs to send data, and allocates, to the first UE, the second PUSCH resource used for sending data.
  • a case in which the second PUSCH resource is allocated to the first UE may include but is not limited to the following cases.
  • Step 206 The first UE determines the second PUSCH resource that is allocated by the base station and that is used for sending data, and sends data on the second PUSCH resource.
  • the first UE determines, based on a received instruction sent by the base station, that the instruction includes information about the second PUSCH resource; and sends data on the second PUSCH resource based on the instruction.
  • the first UE If the first UE knows an uplink SPS resource that is allocated by the base station to the first UE and that is used for sending data, the first UE receives the second UL-grant message sent by the base station; determines, based on the indication information marked in the bit that can be multiplexed in the second UL-grant message and the mapping relationship between the bit that can be multiplexed and a time resource of the uplink SPS resource, the time resource that is allocated by the base station to the first UE and that is occupied on the uplink SPS resource; and sends data on the time resource occupied on the uplink SPS resource.
  • the first UE sends data on the uplink SPS resource if the first UE knows the uplink SPS resource that is allocated by the base station to the first UE and that is used for sending data, and receives, after sending resource request information to the base station, no information about the second PUSCH resource that is allocated by the base station and that is used for sending data.
  • the base station has allocated an SPS resource for contention to at least one user that includes a user M, and an SPS period is T. It is assumed that an SPS resource of the user M in a subframe n is referred to as a first SPS resource, and an SPS resource of the user M in a subframe n+T is referred to as a second SPS resource.
  • the base station sends scheduling information to the user M and a user A in a subframe n-T.
  • the user A is any non-contention user. To be specific, the user A does not contend for the SPS resource with the user M.
  • the base station notifies, in PDCCH information of the user M, the user M that the PDCCH information is application resource indication information.
  • the PDCCH information carries a resource request parameter, and the resource request parameter includes at least any one of the following: an OCC code, a cyclic shift value, and a used time-frequency resource location.
  • an RNTI of the user A may also be included in the PDCCH information.
  • the reference signal is used as resource request information.
  • the base station may also send, in a subframe n-T+1, scheduling information to the user M and a user B, and the user B is any non-contention user.
  • the user M may send, in a subframe n+1 on a PUSCH resource of the user B, a reference signal based on a cyclic shift value of the user M in a code division manner, and the reference signal is used as resource request information. The same part is not described herein again.
  • the base station detects, in the subframe n on the PUSCH resource of the user A, whether the user M has sent resource request information, and specifically, performs detection based on different cyclic shift values of the user A and the user M. If the base station detects that the user M has sent resource request information, the base station determines that the user M is to send data in the subframe n+T on a subsequent first SPS resource (namely, the second SPS resource) allocated to the user M.
  • the base station If the base station also detects that another user sharing the contention resource with the user A has also sent a resource request message to request to send data on the second SPS resource, the base station allocates different transmission resources to the user A and the another user who contends with the user A.
  • a specific allocation method is described in Embodiment 1, and details are not described herein again.
  • the base station allocates, to the first UE, the first PUSCH resource used for sending resource request information, and allocates, to the first UE after receiving resource request information of the first UE, the second PUSCH resource used for sending data.
  • the first UE can occupy a PUSCH resource allocated to any UE, to send resource request information, so that PUCCH capacity limitation is effectively mitigated, and more UEs can send resource requests.
  • a problem of a conflict between UEs in a contention-based semi-persistent scheduling process can be resolved, so that PUSCH resources are more effectively used, and an uplink transmission delay is reduced.
  • resource usage in an uplink transmission process can be increased, and a system capacity can be increased.
  • Embodiment 1 Considering that in an existing contention-based uplink transmission solution, a conflict occurs when a plurality of UEs use a contention resource, and a base station cannot detect information about any UE, and consequently, transmission resources are wasted and a transmission delay is increased, based on a same inventive concept as Embodiment 1, the method in Embodiment 1 is applied to a specific contention scenario in Embodiment 2 of this application, and the method provided in Embodiment 1 is further described in detail.
  • a main idea is to determine in advance whether a conflict occurs on a contention resource and allocate different transmission resources to conflicting UEs if the conflict occurs, so that a conflict can be completely avoided on the contention resource, and a series of problems such as a resource waste and a delay increase that are caused due to a conflict can be avoided.
  • Step 400 A base station allocates a same physical uplink shared channel PUSCH resource to N UEs, where N ⁇ 2, and N is a positive integer.
  • the base station periodically allocates a same PUSCH resource to UEs through SPS. It is assumed that there are N UEs, and the same PUSCH resource is a contention resource that is used by the N UEs to transmit uplink data. That is, each of the N UEs can send uplink data on the same PUSCH resource.
  • the base station In a process of establishing an RRC connection to each scheduled UE, the base station completes SPS configuration by using an RRC message, where the SPS configuration includes an SPS period; and sends an SPS activation message by using a PDCCH, to activate the SPS configuration.
  • a location of the PUSCH resource allocated to the UE is indicated in the SPS activation message.
  • a separate PDCCH resource may be allocated to each of the N UEs, and the same PUSCH resource is indicated in the separate PDCCH resource.
  • a group RNTI namely, a CB-RNTI may be configured for the N UEs, and the N UEs search for a PDCCH message based on the same CB-RNTI, so as to obtain the same PUSCH resource.
  • the base station allocates a PUSCH resource at intervals based on the SPS period.
  • a PUSCH resource In one subframe, only one UE may be to send data, or no UE may be to send data, or at least two UEs may be to send data. When at least two UEs are to send data, a conflict occurs in the subframe.
  • a quantity of UEs that are to send data in the subframe needs to be determined before the subframe arrives.
  • one symbol of a subframe is used as an indication symbol in Embodiment 2 of this application, the indication symbol is used by the UE to send a reference signal, the reference signal is used to notify the base station that the UE needs to send data in a next subframe, and an interval between the next subframe and the subframe used for sending the reference signal is the SPS period.
  • the SPS period may be a fixed period, or may be an unfixed period.
  • the indication symbol is a pilot symbol.
  • FIG. 5 is a schematic diagram of periodic allocation of a PUSCH resource and a schematic diagram of allocation of an indication symbol.
  • a conventional CP subframe structure is used as an example.
  • One subframe includes 14 symbols, a symbol 3 in a slot 0 and a symbol 10 in a slot 1 are pilot symbols, and other symbols are data symbols.
  • one of the pilot symbols is selected as an indication symbol, for example, the symbol 10 is selected as the indication symbol, and is used by the UE to send a reference signal indicating that data needs to be sent in a next subframe.
  • the symbol 3 is still used as a pilot symbol for channel estimation.
  • the symbol 10 may be used for separately sending.
  • the UE may separately send the reference signal on the indication symbol.
  • a cyclic shift value is allocated to each of the N UEs to detect a plurality of reference signals in Embodiment 2 of this application.
  • the base station In a process of scheduling each UE, the base station needs to notify a corresponding cyclic shift value and notify a location of the indication symbol in the subframe to each of the N UEs.
  • the base station notifies, by using an RRC message, the corresponding cyclic shift value and the location of the indication symbol in the subframe to each UE.
  • the base station may directly notify the corresponding cyclic shift value to each UE; or notify an index value according to Table 5.5.2.1.1-1 in the 3GPP TS36.211 protocol to the UE, and the UE obtains the finally used cyclic shift value based on the index value.
  • the base station may notify a slot location to the UE, such as the slot 0 or the slot 1, of the indication symbol, or may notify a symbol index to the UE, for example, in a case of a conventional CP, the base station notifies the UE that the indication symbol is a symbol 3 or a symbol 10, or in a case of an extended CP, the base station notifies the UE that the indication symbol is a symbol 2 or a symbol 8.
  • Step 401 UE determines a PUSCH resource used for sending data, where the PUSCH resource is multiplexed by at least two UEs.
  • the UE is any one of the N UEs scheduled by the base station. Based on allocation of the base station in step 400, the UE determines the PUSCH resource used for sending uplink data, and the PUSCH resource is a contention resource used by the N UEs to send data. In addition, based on the allocation of the base station in step 400, the UE determines the location of the indication symbol in the subframe and a cyclic shift value corresponding to the UE.
  • Step 402 The UE sends a reference signal to the base station on an indication symbol of a first subframe, where the reference signal is used to notify the base station that the UE needs to send data in a second subframe following the first subframe.
  • Two adjacent sending subframes of the PUSCH resource are used as an example for description, and are respectively referred to as a first subframe and a second subframe, an interval between the first subframe and the second subframe is an SPS period, and the SPS period is a fixed period or an unfixed period.
  • the indication symbol is used by the UE to send the reference signal notifying the base station that the UE needs to send data in the second subframe.
  • the indication symbol is a pilot symbol of the first subframe.
  • the UE sends the reference signal to the base station on the pilot symbol of the first subframe based on the cyclic shift value corresponding to the UE.
  • Step 403 The base station detects the indication symbol of the first subframe in the first subframe of the PUSCH resource based on cyclic shift values separately corresponding to the N UEs, to obtain detection results separately corresponding to the N UEs.
  • the base station separately performs detection on a location of a pilot symbol of the first subframe based on the cyclic shift values corresponding to the N UEs, to obtain channel estimation results separately corresponding to the N UEs.
  • FIG. 6 is a schematic diagram of obtaining a channel estimation result by a base station.
  • N 4.
  • the base station allocates a same reference signal transmission resource and different cyclic shift values to four UEs: UE 1, UE 2, UE 3, and UE 4. It is assumed that the cyclic shift values of the UE 1, the UE 2, the UE 3, and the UE 4 are respectively 0, 3, 6, and 9.
  • the base station performs energy detection on a channel estimation result on a detection window corresponding to a cyclic shift value of each UE, to obtain a detection result of each UE, to be specific, learn whether each UE has sent a reference signal on the indication symbol.
  • Step 404 The base station determines, based on the detection results, that n UEs have sent reference signals in the first subframe, and separately allocates different transmission resources to the n UEs before the second subframe arrives, where 2 ⁇ n ⁇ N, and n is a positive integer.
  • the base station allocates different transmission resources to the n UEs before the second subframe arrives.
  • a specific method for allocating different transmission resources may be but is not limited to the following two methods.
  • n-1 UEs are selected from the n UEs, and other PUSCH resources different from the PUSCH resource are separately allocated to the n-1 UEs.
  • the base station selects one UE from the n UEs to continue to transmit data by using the pre-allocated same PUSCH resource (namely, a contention resource), and sends dedicated scheduling to the other n-1 UEs, for example, sends a UL-grant to the other n-1 UEs.
  • a location of a dedicated PUSCH resource of the UE is indicated in the UL-grant, and the location of the dedicated PUSCH resource is different from a location of the same PUSCH resource.
  • Indication information is separately sent to the n UEs before the second subframe arrives.
  • the indication information is used to indicate a data symbol occupied when the UE sends data in the second subframe on the PUSCH resource.
  • One UE occupies at least one data symbol, and a total quantity of data symbols occupied by the n UEs is not greater than a total quantity of available data symbols of the second subframe.
  • the base station may not allocate other PUSCH resources, but may specifically allocate, on the same PUSCH resource, a symbol resource of the second subframe in time domain to each user for use. In this way, although each UE still transmits data in a same subframe, a conflict is avoided due to separation in time domain.
  • the base station allocates available data symbols of the second subframe to the n UEs for use, and may allocate the data symbols to the UEs on average, or may allocate, based on measurement reports of the UEs and transmission requirements of the UEs, the data symbols to the UEs for use.
  • a manner of sending the indication information to any one of the n UEs by the base station may be but is not limited to the following manner:
  • the base station sends an uplink scheduling grant UL-grant message to any UE; selects, from a bit that can be multiplexed in the UL-grant message and based on a mapping relationship between the bit that can be multiplexed and a data symbol of the second subframe, a bit corresponding to a data symbol allocated to any UE; and marks the indication information in the selected bit.
  • a structure of the UL-grant message is: a hopping flag occupying 1 bit, a resource block allocation indication (Fixed size resource block assignment) occupying 10 bits, a modulation/demodulation scheme indication (Truncated modulation and coding scheme) occupying 4 bits, a power control indication (TPC command for scheduled PUSCH) occupying 3 bits, an uplink delay sending indication (UL delay) occupying 1 bit, and a channel state information request indication (CSI request) occupying 1 bit.
  • the UE knows a resource block location of the PUSCH resource, the 10 bits occupied by the resource block allocation indication may be multiplexed. Because the hopping flag, the uplink delay sending indication, and the channel state information request indication are not mandatory indications, any two bits may be selected for multiplexing.
  • 12 bits may be selected in the UL-grant message to respectively represent 12 data symbol indexes, and indication information indicating whether a mapped data symbol is available is marked in the 12 bits. It is assumed that 1 indicates that a data symbol is available, and 0 indicates that a data symbol is unavailable. For example, the 12 bits are numbered by 0, 1, 2, ..., and 11, and are respectively mapped to data symbols 0, 1, 2, 4 to 9, 11, 12, and 13 in a conventional CP frame structure. If indication information marked in a location of the bit 2 is 0, it indicates that the data symbol 2 is unavailable; or if indication information marked in a location of the bit 5 is 1, it indicates that the data symbol 6 is available.
  • the base station sends the UL-grant message to the UE, to indicate a data symbol that can be occupied by the UE to transmit data in the second subframe.
  • Step 405 Before the second subframe arrives, if the UE receives a transmission resource allocation instruction sent by the base station, the UE sends data on an allocated transmission resource based on the instruction when the second subframe arrives.
  • the UE receives the transmission resource allocation instruction sent by the base station.
  • step 404 based on the two manners of allocating different transmission resources by the base station in step 404, in this step, before the second subframe arrives, if the UE receives an instruction that is sent by the base station and that is used for performing scheduling to another PUSCH resource different from the PUSCH resource, the UE sends data on the another PUSCH resource based on the instruction when the second subframe arrives; or before the second subframe arrives, if the UE receives indication information sent by the base station, the UE sends, on the PUSCH resource based on the indication information when the second subframe arrives, data on a data symbol that is of the second subframe and that is corresponding to the UE.
  • the UE receives the uplink scheduling grant UL-grant message sent by the base station; determines, based on indication information marked in a bit that can be multiplexed in the UL-grant message and a mapping relationship between the bit that can be multiplexed and a data symbol of the second subframe, the data symbol corresponding to the UE; and sends data on the determined data symbol of the second subframe on the PUSCH resource.
  • the first method for allocating different transmission resources is used as an example.
  • an SPS period is fixed, and is 4s.
  • Four UEs scheduled through SPS are respectively UE 1, UE 2, UE 3, and UE 4.
  • the UE 1 has separately sent data in a subframe n.
  • the UE 2 and the UE 3 need to send data in a next subframe n+4, but the UE 1 does not need to send data in the subframe n+4.
  • the UE 2 and the UE 3 send reference signals on an indication symbol of the subframe n, to notify the base station that the UE 2 and the UE 3 need to send data in the subframe n+4.
  • the base station detects, in the subframe n, the indication symbol based on a cyclic shift value corresponding to each UE, and determines that the UE 2 and the UE 3 have sent reference signals. Therefore, it can be determined that a conflict occurs in the subframe n+4.
  • the base station sends a UL-grant message to the UE 2 in a subframe n+2, to indicate a dedicated scheduling resource of the UE 2.
  • the UE 2 After receiving the UL-grant message, the UE 2 sends data on the dedicated scheduling resource indicated by the base station. In this way, a conflict caused when the UE 2 and the UE 3 send data in the subframe n+4 can be completely avoided.
  • the base station periodically allocates a same PUSCH resource to a plurality of UEs, and monitors, on an indication symbol of a current subframe, a quantity of UEs that need to send data in a next subframe. Once the base station determines that a conflict occurs in the next subframe, the base station pre-allocates different transmission resources to conflicting UEs, so that a conflict caused when a plurality of UEs simultaneously use a PUSCH resource can be effectively avoided, resource usage can be increased, and a problem of a transmission delay increase caused due to a conflict can be resolved.
  • the UE When the UE needs to send data in the next subframe, the UE sends a reference signal on the indication symbol of the current subframe, to notify the base station that the UE needs to send data in the next subframe. If before the next subframe arrives, the UE receives dedicated scheduling sent by the base station, or receives indication information that is sent by the base station and that is used to instruct the UE to send data on a data symbol of the next subframe, the UE sends data in the next subframe based on the instruction of the base station. In this way, a conflict caused when the UE shares a same transmission resource with another UE can be avoided, uplink transmission can be more effective and efficient, and a transmission delay can be reduced.
  • Embodiment 3 of this application Based on a same inventive concept as Embodiment 1 and Embodiment 2, another transmission method is further provided in Embodiment 3 of this application, and is applicable to not only an SPS scenario, but also a pre-scheduling scenario.
  • a core idea of the method in Embodiment 3 of this application is as follows: Time resources of a PUSCH resource are divided, and the time resources are separately allocated to a plurality of scheduled UEs, so that the UE can send data only on a specified time resource of the PUSCH resource. Different cyclic shift values are separately allocated to the plurality of UEs.
  • data of the plurality of UEs may be detected based on the different cyclic shift values, so as to effectively avoid a conflict caused when the plurality of UEs simultaneously use the same PUSCH resource.
  • Step 801 A base station allocates, to first UE, a PUSCH resource used for sending data, and the base station configures, for the first UE, a resource request parameter and a time resource occupied to send data on the PUSCH resource, and notifies the resource request parameter and the time resource to the first UE, where the first UE and at least one second UE share the PUSCH resource.
  • the resource request parameter includes a cyclic shift value and a time-frequency resource location.
  • Both the time resource occupied to send data on the PUSCH resource and a cyclic shift value that are of the first UE are different from those of the at least one second UE.
  • the base station notifies, to the first UE by using a radio resource control RRC message or an uplink scheduling grant UL-grant message, the resource request parameter and the time resource occupied to send data on the PUSCH resource.
  • Step 802 If the base station detects, on the PUSCH resource based on the resource request parameter configured for the first UE, resource request information sent by the first UE, the base station processes, on the time resource occupied by the first UE on the PUSCH resource, data sent by the first UE.
  • Embodiment 4 A concept of Embodiment 4 provided in this application is the same as that of Embodiment 3, and the method in Embodiment 3 is applied to a specific scenario, and is described in detail.
  • Step 900 A base station allocates a same physical uplink shared channel PUSCH resource to N UEs, where N ⁇ 2, and N is a positive integer.
  • a method for allocating the same PUSCH resource is the same as that described in the communication method shown in FIG. 2 , and details are not described herein again.
  • the base station completes SPS configuration by using an RRC message, and notifies a corresponding cyclic shift value and a corresponding available data symbol to each UE by using the RRC message; or may send an SPS activation message by using a PDCCH, to activate SPS configuration, and notify, in the SPS activation message, a corresponding cyclic shift value and a corresponding available data symbol to UE.
  • the base station may notify a corresponding cyclic shift value and a corresponding available data symbol to each UE by using an RRC message. Then each UE enables a contention transmission mode by using a PDCCH message corresponding to a contention-dedicated CB-RNTI. The base station adds an enable flag to a separate pre-scheduling message, to enable a function of using only some data symbols. Alternatively, content of a UL-grant message may be extended, so that the UL-grant message includes the corresponding cyclic shift value and the corresponding available data symbol of the UE.
  • One UE occupies at least one data symbol, and a total quantity of data symbols occupied by the N UEs is not greater than a total quantity of available data symbols of a current subframe.
  • Step 910 UE determines a physical uplink shared channel PUSCH resource used for sending data, and determines a data symbol that can be occupied to send data on the PUSCH resource and that is corresponding to the UE and a cyclic shift value corresponding to the UE, where the PUSCH resource is multiplexed by at least two UEs.
  • the UE Before sending data, the UE receives the PUSCH resource notified by the base station, the cyclic shift value corresponding to the UE, and the data symbol that can be occupied and that is corresponding to the UE.
  • Step 920 The UE sends, based on the cyclic shift value corresponding to the UE, data on the data symbol that can be occupied in a current subframe and that is corresponding to the UE.
  • the UE When the UE needs to send data, the UE directly sends, in the current subframe on a latest available transmission resource based on the cyclic shift value corresponding to the UE, data on the data symbol that can be occupied and that is corresponding to the UE.
  • Step 930 The base station detects a pilot symbol of the current subframe in the current subframe of the PUSCH resource based on cyclic shift values separately corresponding to the N UEs, to obtain detection results separately corresponding to the N UEs.
  • the base station can still distinguish between channel estimation results of the UEs, and determine whether the UEs have sent data.
  • Step 940 When determining, based on the detection results, that at least one of the N UEs has sent data in the current subframe, the base station separately processes, on a data symbol that is occupied to send data and that is corresponding to the at least one UE, data sent by the at least one UE.
  • demodulation and decoding are performed on occupied data symbols that are separately corresponding to the UEs that have sent data.
  • Embodiment 3 and Embodiment 4 of this application although a plurality of UEs send data on a same PUSCH resource, a conflict can be completely avoided because the UEs occupy different data symbols. Further, because the UEs have different cyclic shift values, whether each UE has sent data may be accurately detected, and then demodulation and decoding are performed on a data symbol corresponding to the UE, so that a conflict caused when the plurality of UEs use a same PUSCH resource is completely avoided, uplink data transmission is more effective and efficient, and a transmission delay increase caused due to a conflict is avoided.
  • a subframe in a case of a conventional CP is still used as an example.
  • One subframe includes 14 symbols, a symbol 3 and a symbol 10 are used as pilot symbols, and other symbols are data symbols.
  • Different cyclic shift values and different available data symbols are allocated to three UEs (assuming that the three UEs are UE 1, UE 2, and UE 3) scheduled through SPS.
  • a cyclic shift value 0 and available data symbols 0 to 2 are allocated to the UE 1
  • a cyclic shift value 6 and available data symbols 4 to 9 are allocated to the UE 2
  • a cyclic shift value 9 and available data symbols 11 to 13 are allocated to the UE 3.
  • an SPS period is fixed, and is 4s.
  • the UE 1 After SPS configuration is activated, when the UE 1 needs to send data, the UE 1 directly sends data on an available data symbol that is of a latest subframe n and that is corresponding to the UE 1, that is, sends data on the data symbols 0 to 2.
  • the base station detects a pilot symbol based on the different cyclic shift values of the UEs, to determine that the UE 1 has sent data, and performs demodulation and decoding on the data symbols 0 to 2 corresponding to the UE 1.
  • the UE 1 sends data on the data symbols 0 to 2 corresponding to the UE 1
  • the UE 2 sends data on the data symbols 4 to 9 corresponding to the UE 2
  • the UE 3 sends data on the data symbols 11 to 13 corresponding to the UE 3.
  • the base station detects the pilot symbol based on the different cyclic shift values of the UEs, to determine that all the three UEs have sent data, and performs demodulation and decoding on the data symbols separately corresponding to the three UEs.
  • this application further provides a transmission apparatus 1200, configured to perform the transmission method provided in this application.
  • the transmission apparatus 1200 includes a configuration unit 1201, a first allocation unit 1202, a detection unit 1203, a second allocation unit 1204, and a pre-allocation unit 1205.
  • the configuration unit 1201 is configures a resource request parameter for first user equipment UE, and send the resource request parameter to the first UE.
  • the first allocation unit 1202 is configured to allocate a first physical uplink shared channel PUSCH resource to the first UE, where the first PUSCH resource is used by the first UE to send resource request information.
  • the detection unit 1203 is configured to detect, on the first PUSCH resource, resource request information sent by the first UE based on the resource request parameter.
  • the second allocation unit 1204 is configured to: when the detection unit detects, on the first PUSCH resource, the resource request information sent by the first UE based on the resource request parameter, allocate, to the first UE, a second PUSCH resource used for sending data.
  • the first allocation unit 1202 is configured to:
  • the first allocation unit 1202 is configured to: send a radio network temporary identifier RNTI used by the second UE to the first UE, so that the first UE obtains the PUSCH scheduling information of the second UE based on the RNTI used by the second UE.
  • the pre-allocation unit 1205 is configured to pre-allocate a common uplink SPS resource to the first UE and at least one third UE.
  • the pre-allocation unit 1205 pre-allocates the common uplink SPS resource to the first UE and the at least one third UE, and the detection unit 1203 detects resource request information separately sent by the first UE and the at least one third UE, and determines that the first UE and the at least one third UE request to send data on the common uplink SPS resource
  • the second allocation unit 1204 allocates a PUSCH resource that is different from a PUSCH resource used by the at least one third UE to the first UE, and uses the PUSCH resource as the second PUSCH resource used by the first UE to send data.
  • the second PUSCH resource is the common uplink SPS resource.
  • the pre-allocation unit is configured to pre-allocate a common uplink SPS resource to the first UE and at least one third UE.
  • the pre-allocation unit 1205 pre-allocates the common uplink SPS resource to the first UE and the at least one third UE, and the detection unit 1203 detects resource request information separately sent by the first UE and the at least one third UE, and determines that the first UE and the at least one third UE request to send data on the common uplink SPS resource
  • the second allocation unit 1204 indicates time resources on which the first UE and the at least one third UE separately occupy the uplink SPS resource, and uses, as the second PUSCH resource that is allocated to the first UE and that is used for sending data, the uplink SPS resource occupied by the first UE on an indicated time resource.
  • the second allocation unit 1204 is configured to:
  • the resource request parameter includes one or more of a cyclic shift value, a time-frequency resource location, a resource request period, and an orthogonal cover code OCC.
  • a pilot symbol of the first PUSCH resource is used by the first UE to send resource request information.
  • this application further provides another transmission apparatus 1300, configured to perform the transmission method provided in this application.
  • the transmission apparatus 1300 includes a first allocation unit 1301, a notification unit 1302, a detection unit 1303, and a processing unit 1304.
  • the first allocation unit 1301 is configured to: allocate, to first user equipment UE, a physical uplink shared channel PUSCH resource used for sending data, where the first UE and at least one second UE share the PUSCH resource; and configure, for the first UE, a resource request parameter and a time resource occupied to send data on the PUSCH resource.
  • the notification unit 1302 is configured to notify, to the first UE, the resource request parameter and the time resource occupied to send data on the PUSCH resource that are configured by the first allocation unit.
  • the detection unit 1303 is configured to detect, on the PUSCH resource based on the resource request parameter configured for the first UE, resource request information sent by the first UE.
  • the processing unit 1304 is configured to: if the detection unit detects, on the PUSCH resource based on the resource request parameter configured for the first UE, resource request information sent by the first UE, process, on the time resource occupied by the first UE on the PUSCH resource, data sent by the first UE.
  • the resource request parameter includes a cyclic shift value and a time-frequency resource location.
  • Both the time resource occupied to send data on the PUSCH resource and a cyclic shift value that are of the first UE are different from those of the at least one second UE.
  • the notification unit 1302 is configured to: notify, to the first UE by using a radio resource control RRC message or an uplink scheduling grant UL-grant message, the resource request parameter and the time resource occupied to send data on the PUSCH resource.
  • this application further provides another transmission apparatus 1400, applied to first user equipment UE, and including a receiving unit 1401, a first determining unit 1402, a first sending unit 1403, a second determining unit 1404, and a second sending unit 1405.
  • the receiving unit 1401 is configured to receive a resource request parameter configured by a base station.
  • the first determining unit 1402 is configured to determine a first physical uplink shared channel PUSCH resource allocated by the base station.
  • the first sending unit 1403 is configured to send resource request information to the base station on the first PUSCH resource based on the resource request parameter.
  • the second determining unit 1404 is configured to determine a second PUSCH resource that is allocated by the base station and that is used for sending data.
  • the second sending unit 1405 is configured to send data on the second PUSCH resource.
  • the first determining unit 1402 is configured to:
  • the first determining unit 1402 is configured to: obtain the PUSCH scheduling information of the second UE based on a received radio network temporary identifier RNTI that is sent by the base station and that is used by the second UE.
  • the first sending unit 1403 sends resource request information to the base station on the third PUSCH resource based on a cyclic shift value configured by the base station for the first UE, where the cyclic shift value of the first UE is different from a cyclic shift value of the second UE.
  • the second determining unit 1404 is configured to:
  • the second determining unit 1404 is configured to:
  • the first sending unit is further configured to send data on the uplink SPS resource if the first UE knows the uplink SPS resource that is allocated by the base station to the first UE and that is used for sending data, and receives, after sending resource request information to the base station, no information about the second PUSCH resource that is allocated by the base station and that is used for sending data.
  • the resource request parameter includes one or more of a cyclic shift value, a time-frequency resource location, a resource request period, and an orthogonal cover code OCC.
  • the first sending unit 1403 sends resource request information to the base station on a pilot symbol of the first PUSCH resource based on the resource request parameter.
  • this application provides a network device 1500, including a transceiver 1501, a processor 1502, a memory 1503, and a bus 1504.
  • the transceiver 1501, the processor 1502, and the memory 1503 are all connected to the bus 1504, the memory 1503 stores a group of programs, and the processor 1502 is configured to invoke the programs stored in the memory 1503, so that the network device 1500 performs the transmission method in this application.
  • a bus architecture may include any quantity of interconnected buses and bridges, and specifically links various circuits of one or more processors represented by the processor 1502 and a memory represented by the memory 1503.
  • the bus architecture may further link together various other circuits such as a peripheral device, a voltage regulator, and a power management circuit, which is well known in the art, and therefore no further description is provided in this specification.
  • the bus provides an interface.
  • the transceiver 1501 may be a plurality of components. To be specific, the transceiver includes a transmitter and a receiver, and provides a unit configured to communicate with various other apparatuses on a transmission medium.
  • the processor 1502 is responsible for bus architecture management and general processing.
  • the memory 1503 may store data used when the processor 1502 performs an operation.
  • this application provides a network device 1600, including a transceiver 1601, a processor 1602, a memory 1603, and a bus 1604.
  • the transceiver 1601, the processor 1602, and the memory 1603 are all connected to the bus 1604, the memory 1603 stores a group of programs, and the processor 1602 is configured to invoke the programs stored in the memory 1603, so that the network device 1600 performs the transmission method in this application.
  • a bus architecture may include any quantity of interconnected buses and bridges, and specifically links various circuits of one or more processors represented by the processor 1602 and a memory represented by the memory 1603.
  • the bus architecture may further link together various other circuits such as a peripheral device, a voltage regulator, and a power management circuit, which is well known in the art, and therefore no further description is provided in this specification.
  • the bus provides an interface.
  • the transceiver 1601 may be a plurality of components. To be specific, the transceiver includes a transmitter and a transceiver, and provides a unit configured to communicate with various other apparatuses on a transmission medium.
  • the processor 1602 is responsible for bus architecture management and general processing.
  • the memory 1603 may store data used when the processor 1602 performs an operation.
  • this application provides user equipment 1700, including a transceiver 1701, a processor 1702, a memory 1703, and a bus 1704.
  • the transceiver 1701, the processor 1702, and the memory 1703 are all connected to the bus 1704, the memory 1703 stores a group of programs, and the processor 1702 is configured to invoke the programs stored in the memory 1703, so that the user equipment 1700 performs the transmission method in this application.
  • a bus architecture may include any quantity of interconnected buses and bridges, and specifically links various circuits of one or more processors represented by the processor 1702 and a memory represented by the memory 1703.
  • the bus architecture may further link together various other circuits such as a peripheral device, a voltage regulator, and a power management circuit, which is well known in the art, and therefore no further description is provided in this specification.
  • the bus provides an interface.
  • the transceiver 1701 may be a plurality of components. To be specific, the transceiver includes a transmitter and a transceiver, and provides a unit configured to communicate with various other apparatuses on a transmission medium.
  • the processor 1702 is responsible for bus architecture management and general processing.
  • the memory 1703 may store data used when the processor 1702 performs an operation.
  • the embodiments of the present invention may be provided as a method, a system, or a computer program product. Therefore, the present invention may use a form of hardware only embodiments, software only embodiments, or embodiments with a combination of software and hardware. Moreover, the present invention may use a form of a computer program product that is implemented on one or more computer-usable storage media (including but not limited to a disk memory, a CD-ROM, an optical memory, and the like) that include computer-usable program code.
  • computer-usable storage media including but not limited to a disk memory, a CD-ROM, an optical memory, and the like
  • These computer program instructions may be provided for a general-purpose computer, a dedicated computer, an embedded processor, or a processor of another programmable data processing device to generate a machine, so that the instructions executed by the computer or the processor of the another programmable data processing device generate an apparatus for implementing a specific function in one or more processes in the flowcharts and/or in one or more blocks in the block diagrams.
  • These computer program instructions may be stored in a computer readable memory that can instruct the computer or the another programmable data processing device to work in a specific manner, so that the instructions stored in the computer readable memory generate an artifact that includes an instruction apparatus.
  • the instruction apparatus implements a specified function in one or more processes in the flowcharts and/or in one or more blocks in the block diagrams.
  • These computer program instructions may also be loaded onto the computer or the another programmable data processing device, so that a series of operations and steps are performed on the computer or the another programmable device, thereby generating computer-implemented processing. Therefore, the instructions executed on the computer or the another programmable device provide steps for implementing a specific function in one or more processes in the flowcharts and/or in one or more blocks in the block diagrams.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Claims (7)

  1. Übertragungsverfahren, umfassend:
    Konfigurieren (201) eines Ressourcenanforderungsparameters für das erste Benutzergerät UE durch eine Basisstation und Senden des Ressourcenanforderungsparameters an das erste UE;
    Zuweisen (203) einer ersten PUSCH-Ressource (PUSCH = "Physical Uplink Shared Channel") an das erste UE durch die Basisstation, wobei die erste PUSCH-Ressource von dem ersten UE zum Senden von Ressourcenanforderungsinformationen verwendet wird; und
    Zuweisen (205) einer zweiten PUSCH-Ressource, die zum Senden von Daten verwendet wird, durch die Basisstation an das erste EU, wenn die Basisstation auf der ersten PUSCH-Ressource Ressourcenanforderungsinformationen erkennt, die von dem ersten UE basierend auf dem Ressourcenanforderungsparameter gesendet werden, dadurch gekennzeichnet, dass der Schritt des Zuweisens einer zweiten PUSCH-Ressource durch die Basisstation an das erste UE umfasst:
    wenn die Basisstation eine gemeinsame Uplink-SPS-Ressource (SPS = "Semi-Persistent Scheduling") dem ersten UE und mindestens einem Konflikt-UE vorab zuweist, Ressourcenanforderungsinformationen erkennt, die separat von dem ersten UE und dem mindestens einen Konflikt-UE gesendet werden, und bestimmt, dass das erste UE und das mindestens eine Konflikt-UE anfordern, Daten über die gemeinsame Uplink-SPS-Ressource zu senden, wobei sie durch die Basisstation eine PUSCH-Ressource zuweisen, die sich von einer PUSCH-Ressource unterscheidet, die von dem mindestens einen Konflikt-UE zu dem ersten UE verwendet wird, und die PUSCH-Ressource als die zweite PUSCH-Ressource verwenden, die von dem ersten UE zum Senden von Daten verwendet wird.
  2. Verfahren nach Anspruch 1, wobei das Zuweisen einer ersten PUSCH-Ressource zu dem ersten UE durch die Basisstation umfasst:
    Senden einer ersten Uplink-Scheduling-Grant-Nachricht durch die Basisstation an das erste UE, wobei die erste Uplink-Scheduling-Grant-Nachricht Informationen über die erste PUSCH-Ressource umfasst, die dem ersten UE zugewiesen ist; oder
    Benachrichtigen von PUSCH-Planungsinformationen über ein Nicht-Konflikt-UE an das erste UE durch die Basisstation, wobei die PUSCH-Planungsinformationen des Nicht-Konflikt-UE Informationen über eine dritte PUSCH-Ressource umfassen, die von der Basisstation dem Nicht-Konflikt-UE zugewiesen wird und die zum Senden von Daten verwendet wird; und Anweisen des ersten UE, die dritte PUSCH-Ressource als erste PUSCH-Ressource zu verwenden, die von dem ersten UE zum Senden von Ressourcenanforderungsinformationen verwendet wird, wobei die Basisstation verschiedene zyklische Verschiebungswerte für das erste UE und das Nicht-Konflikt-UE konfiguriert, so dass das erste UE und das Nicht-Konflikt-UE die dritte PUSCH-Ressource unter Verwendung der verschiedenen zyklischen Verschiebungswerte verwenden; oder
    Verwenden einer dem ersten UE vorab zugewiesenen Uplink-SPS-Ressource (SPS = "Semi-Persistent Scheduling") als die erste PUSCH-Ressource durch die Basisstation.
  3. Verfahren nach einem der Ansprüche 1 bis 2, wobei der Ressourcenanforderungsparameter einen zyklischen Verschiebungswert und/oder eine Zeit-Frequenz-Ressourcenposition und/oder eine Ressourcenanforderungsperiode und/oder einen orthogonalen Abdeckungscode OCC ("Orthogonal Cover Code") umfasst.
  4. Verfahren nach einem der Ansprüche 1 bis 3, wobei ein Pilotsymbol der ersten PUSCH-Ressource vom ersten UE zum Senden von Ressourcenanforderungsinformationen verwendet wird.
  5. Übertragungsvorrichtung (1200), umfassend:
    eine Konfigurationseinheit (1201), die einen Ressourcenanforderungsparameter für das erste Benutzergerät UE konfiguriert und den Ressourcenanforderungsparameter an das erste UE sendet;
    eine erste Zuweisungseinheit (1202), die zum Zuweisen einer ersten PUSCH-Ressource (PUSCH = "Physical Uplink Shared Channel") an das erste UE konfiguriert ist, wobei die erste PUSCH-Ressource von dem ersten UE zum Senden von Ressourcenanforderungsinformationen verwendet wird;
    eine Erfassungseinheit (1203), die zum Erfassen von Ressourcenanforderungsinformationen, die von dem ersten UE basierend auf dem Ressourcenanforderungsparameter gesendet werden, auf der ersten PUSCH-Ressource konfiguriert ist; und
    eine zweite Zuweisungseinheit (1204), die konfiguriert ist, um: wenn die Erfassungseinheit auf der ersten PUSCH-Ressource die von dem ersten UE gesendeten Ressourcenanforderungsinformationen basierend auf dem Ressourcenanforderungsparameter erfasst, dem ersten UE eine zweite PUSCH-Ressource zuzuweisen, die zum Senden von Daten verwendet wird, dadurch gekennzeichnet, dass die Vorrichtung ferner eine Vorab-Zuweisungseinheit (1205) beinhaltet, die zum Vorab-Zuweisen einer gemeinsamen Uplink-SPS-Ressource (SPS = "Semi-Persistent Scheduling") an das erste UE und mindestens einen Konflikt-UE konfiguriert ist, wobei
    wenn die Vorzuweisungseinheit die gemeinsame Uplink-SPS-Ressource dem ersten UE und dem mindestens einen Konflikt-UE vorab zuweist, und die Erfassungseinheit Ressourcenanforderungsinformationen erfasst, die separat von dem ersten UE und dem mindestens einen Konflikt-UE gesendet werden, und bestimmt, dass das erste UE und das mindestens eine Konflikt-UE anfordern, Daten über die gemeinsame Uplink-SPS-Ressource zu senden, die zweite Zuweisungseinheit eine PUSCH-Ressource, die sich von einer PUSCH-Ressource unterscheidet, die von dem mindestens einen Konflikt-UE verwendet wird, der ersten UE zuweist und die PUSCH-Ressource als die zweite PUSCH-Ressource verwendet, die von dem ersten UE zum Senden von Daten verwendet wird.
  6. Vorrichtung nach Anspruch 5, wobei die erste Zuweisungseinheit konfiguriert ist um:
    eine erste Uplink-Scheduling-Grant-Nachricht an das erste UE zu senden, wobei die erste Uplink-Scheduling-Grant-Nachricht Informationen über die erste PUSCH-Ressource umfasst, die dem ersten UE zugewiesen ist; oder
    PUSCH-Planungsinformationen über einen Nicht-Konflikt-UE an den ersten UE zu benachrichtigen, wobei die PUSCH-Planungsinformationen des Nicht-Konflikt-UE Informationen über eine dritte PUSCH-Ressource umfassen, die von der Vorrichtung dem Nicht-Konflikt-UE zugewiesen wird und die zum Senden von Daten verwendet wird; und das erste UE anzuweisen, die dritte PUSCH-Ressource als die erste PUSCH-Ressource zu verwenden, die von dem ersten UE zum Senden von Ressourcenanforderungsinformationen verwendet wird, wobei die Basisstation verschiedene zyklische Verschiebungswerte für das erste UE und das Nicht-Konflikt-UE konfiguriert, so dass das erste UE und das Nicht-Konflikt-UE die dritte PUSCH-Ressource unter Verwendung der verschiedenen zyklischen Verschiebungswerte verwendet; oder
    als erste PUSCH-Ressource eine Uplink-SPS-Ressource (SPS = "Semi-Persistent Scheduling") zu verwenden, die dem ersten UE vorab zugewiesen wird.
  7. Vorrichtung nach einem der Ansprüche 5 bis 6, wobei ein Pilotsymbol der ersten PUSCH-Ressource vom dem ersten UE zum Senden von Ressourcenanforderungsinformationen verwendet wird.
EP15911746.4A 2015-12-29 2015-12-29 Übertragungsverfahren, übertragungsvorrichtung, netzwerkvorrichtung und benutzergerät Active EP3386251B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2015/099531 WO2017113115A1 (zh) 2015-12-29 2015-12-29 一种传输方法、传输装置、网络设备及用户设备

Publications (3)

Publication Number Publication Date
EP3386251A1 EP3386251A1 (de) 2018-10-10
EP3386251A4 EP3386251A4 (de) 2018-12-12
EP3386251B1 true EP3386251B1 (de) 2019-11-06

Family

ID=59224085

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15911746.4A Active EP3386251B1 (de) 2015-12-29 2015-12-29 Übertragungsverfahren, übertragungsvorrichtung, netzwerkvorrichtung und benutzergerät

Country Status (4)

Country Link
US (1) US10904914B2 (de)
EP (1) EP3386251B1 (de)
CN (1) CN108432310B (de)
WO (1) WO2017113115A1 (de)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180127967A (ko) * 2016-03-30 2018-11-30 광동 오포 모바일 텔레커뮤니케이션즈 코포레이션 리미티드 무선 자원 제어 연결을 설정하기 위한 방법 및 장치
EP3412092B1 (de) * 2016-04-12 2024-07-24 Motorola Mobility LLC Planung von übertragungszeitintervallen
WO2017195815A1 (ja) * 2016-05-12 2017-11-16 シャープ株式会社 基地局装置、端末装置およびその通信方法
CN107770871B (zh) * 2016-08-22 2021-09-14 华为技术有限公司 消息收发方法、终端设备和网络设备
CN117295114A (zh) * 2017-09-18 2023-12-26 三星电子株式会社 用于在无线通信***中处理分组的方法和装置
CN111130726B (zh) 2018-10-31 2022-06-24 华为技术有限公司 一种上行资源请求的通信处理方法和相关设备
US11470615B2 (en) * 2019-03-22 2022-10-11 Qualcomm Incorporated Resource availability indication
WO2022070377A1 (ja) * 2020-10-01 2022-04-07 日本電信電話株式会社 無線通信システム、無線通信方法、および端末装置

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101651601A (zh) * 2008-08-11 2010-02-17 华为技术有限公司 一种资源配置方法、***及相关装置
CN101925107B (zh) * 2009-06-15 2014-12-10 华为技术有限公司 实现资源调度的方法、设备和***
EP2858449B1 (de) * 2009-06-18 2017-10-11 Sharp Kabushiki Kaisha Übertragung gemäß RRC-Signalisierung von Steuerungsinformation der Aufwärtsstrecke bestehend aus Kanalstatusinformation und HARQ-Steuerungsinformation
CN103796320B (zh) * 2010-01-08 2018-01-16 华为技术有限公司 调度请求的方法及装置
CN102123399B (zh) * 2010-01-08 2014-01-01 华为技术有限公司 调度请求的方法及装置
US8478258B2 (en) * 2010-03-05 2013-07-02 Intel Corporation Techniques to reduce false detection of control channel messages in a wireless network
CN102137496B (zh) * 2011-03-11 2013-07-31 电信科学技术研究院 Pusch资源和phich资源的联合调度方法及其装置
US9247563B2 (en) * 2011-12-23 2016-01-26 Blackberry Limited Method implemented in a user equipment
US8964678B2 (en) * 2011-12-23 2015-02-24 Blackberry Limited Method implemented in an eNodeB base station
CN103458513B (zh) * 2012-06-01 2016-09-14 华为技术有限公司 无线通信方法和基站及终端
KR102127320B1 (ko) * 2013-09-27 2020-06-26 주식회사 아이티엘 상향링크 스케줄링 및 harq 타이밍 방법 및 장치
WO2015122739A1 (en) * 2014-02-16 2015-08-20 Lg Electronics Inc. Method and apparatus for transmitting scheduling request using contention-based resources in wireless communication system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
WO2017113115A1 (zh) 2017-07-06
EP3386251A1 (de) 2018-10-10
US10904914B2 (en) 2021-01-26
CN108432310A (zh) 2018-08-21
US20180310335A1 (en) 2018-10-25
EP3386251A4 (de) 2018-12-12
CN108432310B (zh) 2021-05-11

Similar Documents

Publication Publication Date Title
US10904914B2 (en) Transmission method, transmission apparatus, network device, and user equipment
EP3422624B1 (de) Verfahren und vorrichtung zum übertragen eines sondierungsreferenzsignals
KR102123227B1 (ko) 통신 방법 및 통신 장치
EP3654706B1 (de) Ressourcenbestimmungsverfahren, und basisstation
CN105848165B (zh) 非授权资源的使用方法、***、基站及用户设备
CN109921889B (zh) 用于通信***中的公共控制信道的***和方法
JP7036196B2 (ja) 第1のユーザ機器、基地局、第1のユーザ機器による方法、および基地局による方法
EP3860298B1 (de) Informationsübertragungsverfahren, basisstation und benutzergerät
AU2022224700A1 (en) Uplink resource scheduling in multiple time instances
US10499392B2 (en) Method and apparatus for resource allocation
US10903956B2 (en) Uplink data transmission method and related device
US20190182003A1 (en) Data transmission method on unlicensed spectrum, and device
US11122613B2 (en) Wireless communication method, terminal device and network device
US20160242039A1 (en) Methods, Computer Programs, Network Nodes and Communication Device
US20160242200A1 (en) Data Scheduling Method and Apparatus, Base Station, and Terminal
WO2014109686A1 (en) A user equipment, a network node and respective method therein for transmitting sounding reference signals
KR101964104B1 (ko) 자원 할당 방법, 자원 경쟁 방법, 및 관련 장치
WO2018185641A1 (en) Dynamic start for transmission on unlicensed spectrum
CN108029117B (zh) 用于资源分配的方法和设备
CN109586860B (zh) 一种资源复用方法及装置、存储介质、终端、基站
CN111294976A (zh) 上行传输方法、用户终端及计算机可读存储介质

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180702

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20181108

RIC1 Information provided on ipc code assigned before grant

Ipc: H04W 72/04 20090101AFI20181102BHEP

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190527

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1200627

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015041462

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20191106

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200207

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200306

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200206

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200206

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200306

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015041462

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1200627

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191106

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20200807

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191229

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200106

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20151229

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231109

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20231031

Year of fee payment: 9