EP3268583B1 - Subsea grab system and marine vessel having such subsea grab system - Google Patents
Subsea grab system and marine vessel having such subsea grab system Download PDFInfo
- Publication number
- EP3268583B1 EP3268583B1 EP16722411.2A EP16722411A EP3268583B1 EP 3268583 B1 EP3268583 B1 EP 3268583B1 EP 16722411 A EP16722411 A EP 16722411A EP 3268583 B1 EP3268583 B1 EP 3268583B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- grab
- hoisting
- driver device
- subsea
- driver
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000725 suspension Substances 0.000 claims description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 20
- 208000034699 Vitreous floaters Diseases 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 description 4
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 210000003954 umbilical cord Anatomy 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/88—Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
- E02F3/8858—Submerged units
- E02F3/8866—Submerged units self propelled
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
- B66C23/52—Floating cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C3/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith and intended primarily for transmitting lifting forces to loose materials; Grabs
- B66C3/14—Grabs opened or closed by driving motors thereon
- B66C3/16—Grabs opened or closed by driving motors thereon by fluid motors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00Ā -Ā E02F7/00
- E02F9/06—Floating substructures as supports
- E02F9/062—Advancing equipment, e.g. spuds for floating dredgers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00Ā -Ā E02F7/00
- E02F9/06—Floating substructures as supports
- E02F9/067—Floating substructures as supports with arrangements for heave compensation
Definitions
- the invention relates to a subsea grab system comprising a grab device, a hoisting arrangement configured and arranged for suspending and hoisting the grab device from a marine vessel, and a driver configured and arranged for positioning the grab device.
- a grab system for subsea excavation and subsea earth or rock moving purposes.
- Such grab system can, for instance, be used to excavate a trench in the seabed, in which a pipe is laid, which pipe is subsequently buried by earth or rock that had been excavated first.
- a grab device can be lowered from a ship or another marine vessel using any known type of winch system for lowering the subsea grab device into the sea to the seabed and for raising the grab device again to the marine vessel.
- a driver arrangement mounted on the grab device which may be operated remotely form the marine vessel.
- Such a grab system is disclosed in WO 2014/098913 A1 .
- the driver arrangement adds considerably to the weight of the grab system, leading to a large dynamic load on the hoisting arrangement for suspending, lowering and raising the grab device during movements of the grab device. Having the driver arrangement on the grab device near the digging or excavation process, makes it also more exposed to rising dirt and debris which can be harmful to the system.
- the driver arrangement further has to be provided at a top part of the grab device, which adds to its length and makes it top-heavy. Such grab device therefore is susceptible of falling over when positioned on the seabed.
- subsea grab system for activities below a water surface in a marine environment, the subsea grab system comprising
- the driver device of the subsea grab system of the present invention is a separate device that is separately suspended and separately hoisted (lowered and raised) from the marine vessel.
- the grab device and driver device are each separately suspended and hoisted.
- the capacity of the grab device can be selected independent of the driver device.
- the driver device is suited for several types and capacities grab systems, which provides additional flexibility.
- the driver device can be kept in position, especially at a constant height above the seabed, when operating the grab device, leading to less dynamic loads on the system and marine vessel. Some equipment for operation of the grab device can be positioned on the driver device to further reduce weight of the grab device so as to further reduce dynamic loads.
- the first and second hoisting arrangements and the driver device are configured and arranged such that during operation, the driver device allows positioning of the grab device.
- the driver device is provided with actuators, such as thrusters to control the horizontal position of the driver device, either remotely or automatically. Independently suspended is intended to mean that the grab device is not suspended via the driver device or vice versa.
- the second hoisting arrangement comprises at least one longitudinal suspension element for suspending and hoisting the driver device.
- the longitudinal suspension element comprises at least one of a cable, a chain and a wire.
- the grab device comprises an actuation cylinder, especially an hydraulic or pneumatic cylinder, for actuating the grab device, espedally for actuating a grab of the grab device.
- a pump for actuating the actuation cylinder is provided on the driver device, which both reduces the weight of the grab device and reduces risk of damaging the pump since it is, in operation, located at a distance from the grab device.
- a winch for a hose is provided on the driver device, the hose connecting the actuation cylinder and the pump so as to, during operation, keep the hose taut. Keeping the hose taut reduces any risk of entanglement of the hose and damage thereof.
- one or more buoyancy floaters are connected to the first hoisting arrangement such as to, during operation, keep part of the first hoisting arrangement between driver device, especially between a top part of the driver device, and the grab device taut.
- Such embodiment reduced the risk of the first hoisting arrangement becoming entangled with the driver device or second hoisting arrangement, or that the first hoisting arrangement interferes with the grab device, especially when the grab of the grab device is placed on the seabed.
- one or more buoyancy floaters are connected to the at least one longitudinal suspension element of the first hoisting arrangement such as to, during operation, keep part of the at least one longitudinal suspension element of the first hoisting arrangement between driver device, especially between a top part of the driver device, and the grab device taut.
- the one or more buoyancy floaters are connected to the first hoisting arrangement, especially the at least one longitudinal suspension element of the first hoisting arrangement, such as to, during operation, remain above the driver device.
- Such embodiment effectively provides that the first hoisting arrangement between driver device and grab device remains taut.
- the grab system comprises a heave compensator, especially a passive heave compensator, for the grab device. Having the heave compensator reduces any peak loads on the system due to its use and due to any movements of the marine vessel, for instance due to waves at the sea surface.
- the passive heave compensator is arranged on the grab device and the first hoisting arrangement is connected to the passive heave compensator, which provides the optimum location to compensate for any peak loads.
- the invention provides for a marine vessel comprising such grab system.
- Figure 1 shows a marine vessel 10 on which a subsea grab system 100 according to the invention is provided.
- Winches 122, 142 of first and second hoisting arrangements 120, 140 are arranged on the vessel and are configured for lowering a subsea part of the grab system 100 through a moon pool type opening 11 in the marine vessel.
- the subsea part of the subsea grab system 100 can be lowered towards the seabed SB at a depth SD of, for instance, several hundred meters below the sea surface.
- a ship is shown in figure 1 , but any type of marine vessel can be employed.
- the first hoisting arrangement or system 120 comprises longitudinal suspension elements in the form of chains 121 from which a grab device 110 is suspended though the moon pool 11 into the water W below the sea surface and below the marine vessel.
- the chains 121 can be unwound from and wound onto the winches 122 on the vessel for lowering and raising, respectively, the grab device 110.
- cables, wires or any other suitable means can be used in the first hoisting system.
- the second hoisting arrangement or system 140 comprises longitudinal suspension elements in the form of cables 141 from which a driver device 130 is suspended though the moon pool 11 into the water W below the marine vessel.
- the cables 141 can be unwound from and wound onto the winches 142 on the vessel for lowering and raising, respectively, the driver device 130.
- chains, wires or any other suitable means can be used in the second hoisting system. Hoisting by the first and second hoisting arrangements is done in a coordinated fashion for raising and lowering the grab and driver devices 120, 130. It is required that the grab and driver devices remain within a predetermined distance range from one another, the grab device below the driver device, in the embodiment shown.
- FIG. 2 shows the subsea part when being lowered towards the seabed SB by the chains 121 of the first hoisting system.
- the grab device 110 comprises a grab having two grab parts 112 that can be opened and closed. Opening and closing of the grab is actuated by hydraulic (or pneumatic) cylinders 112. However, any other suitable actuator or means for opening and closing the grab can be employed as well.
- a heave compensator 150 is mounted in the top part of the grab device, which will be described further below.
- the chains 121 of the first hoisting arrangement 120 associated with the grab device 110 are passed through and guided by the driver device 130, which during operation is above the grab device 110.
- the chains can move freely through the driver device.
- the driver device comprises a frame or housing 131 that is suspended from the cables 141 of the second hoisting arrangement 140.
- a propeller system 132 is arranged on the frame 131 and comprises propellers that are driven by motors.
- the propeller system is to be understood as any system that allows propelling (moving) the driver device.
- the propeller system is configured for driving and positioning the driver device in a first horizontal plane along the seabed and below the water surface.
- the driver device may also be referred to as remotely operated vehicle or ROV since its positioning is, generally, remotely operated from the marine vessel 10.
- the propellers shown in the figures act in a direction perpendicular to the plane of the drawing. Further propellers are present, but not shown, which act in a direction parallel to the plane of the drawing.
- the driver device 130 is positioned along the seabed SB using the propeller system 132. Since the chains 121 from which the grab device is suspended are guided through an opening 135 in the driver device, the grab device 110 is positioned in a second horizontal plane and along the seabed as well through positioning of the driver device. The second horizontal plane associated with the grab device is below the first horizontal plane associated with the driver device.
- the grab device is positioned in the vertical direction by the first hoisting arrangement associated with the grab device.
- a foundation plate 134 is mounted in a top part of the central opening 135 of the driver device.
- the individual chains 121 are guided in smaller openings in the foundation plate, which openings are further provided with roller bearings for improved guidance of the chains 121.
- a winch 115 is provided on the foundation platform 134 and is employed for winding and unwinding hoses running towards and connected to the actuation cylinders 112 of the grab device 110.
- the hoses are further connected to pumps 114 provided on the driver device.
- the actuation cylinders 112 are actuated by driving the pumps 114 so as to pump hydraulic fluid towards and away from the actuation cylinders 112, which causes the shells of the grab to open and close.
- the winch 115 keeps the hoses running towards the grab device 110 taut.
- the driver device is at some safe operational height Ho above the seabed SB and grab device 110 to keep any debris from excavation away from the driver device and equipment and components mounted on the driver device. Actual heights and distances H, Ho and D may vary according to the actual equipment employment and circumstances.
- a protection cover 136 is provided over the foundation plate 134 and winch 115.
- An umbilical cord 170 is connected in between vessel 10 and driver device for controlling the various components and equipment on the driver device and to provide power thereto.
- Figure 3 shows a state of the subsea part of the subsea grab system 100 when having been lowered to and resting on the seabed SB.
- the driver device is at an operational height Ho above the grab device and fully suspended from the cables 141 of the second hoisting arrangement.
- the weight of the grab device 110 is actually not being suspended from its chains 121 of the first hoisting arrangement, since the grab device is supported by the seabed. This will cause slack in the chains 121.
- Buoyancy floaters 160 are attached to the chains 121 at a position that will remain above the driver device 130 during operation.
- the set of buoyancy floaters 160 provide an upwards force to the chains 121 below the elements 160 and keep that part of the chains 121 taut so as not to interfere and become entangled with equipment and components of the driver device or the grab device.
- the slack is therefore present in chain parts 121A above the buoyancy floaters 160.
- the number and actual configuration of the buoyancy floaters 160 can be selected dependent on actual circumstances. They may comprise blocks of material having an effective density that is considerably smaller than the density of (sea) water. Each floater 160 can comprise individual block shaped elements that are kept together by mounting plates and connecting rods. Mounting eyes at the end of the mounting rods can be used to connect the buoyancy floaters by further chains, cables or wires to the chains 121 of the hoisting arrangement 120. The buoyancy floaters 160 are connected to the chains 121 at a fixed distance D above the grab device, which allows the driver device to be positioned at a required operational height above the seabed SB and grab device.
- Figure 4 shows a state of the subsea part of the subsea grab system 100 when just having excavated earth from the seabed and being pulled up from the seabed. This will cause a peak load on the system. The seabed may further exert some suction force on the grab system, which will further add to the peak load. It is seen that the parts 121A of the chains 121 above the buoyancy floaters is pulled taut. Figure 4 further shows that the heave compensator is in an extended state to compensate and smooth out any peak loads, which will be explained further below.
- Figures 3 and 4 appear largely identical.
- Figure 3 shows a state in which the grab device is actually not suspended from the first hoisting arrangement 120 and in which there is slack in the chains 121 of the first hoisting arrangement.
- figure 4 shows a state in which the grab device is being pulled from the sea bed SB.
- An upwards force is exerted on the grab device by the chains 121 of the first hoisting arrangement, but the grab device 110 has not yet become released from the seabed.
- the chain parts 121A above the buoyancy floaters 160 have been pulled taut. This may give rise to large forces in the chains 121 and on the marine vessel 10 and the grab device, which will even more so the case when the marine vessel is moving up and down on waves at the sea surface.
- a heave compensator 150 is provided on the grab device 110.
- the heave compensator 150 of the embodiment shown is of the passive type comprising shock absorbing cylinders to absorb forces.
- Such (passive) heave compensators are known as such and will not be further described. They generally have a damped-spring like behavior.
- Figure 5 shows a state of the subsea part of the subsea grab system 100 after excavation of earth from the seabed SB.
- the grab device 110 has been raised from the seabed and the grab is closed to contain the earth excavated. It is shown that the chains 121 of the first hoisting arrangement pulling the grab device 110 upwards have been pulled taut above the buoyancy floaters 160. The grab device is fully suspended from the hoisting arrangement 120.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Description
- The invention relates to a subsea grab system comprising a grab device, a hoisting arrangement configured and arranged for suspending and hoisting the grab device from a marine vessel, and a driver configured and arranged for positioning the grab device.
- It is known to employ a grab system for subsea excavation and subsea earth or rock moving purposes. Such grab system can, for instance, be used to excavate a trench in the seabed, in which a pipe is laid, which pipe is subsequently buried by earth or rock that had been excavated first. A grab device can be lowered from a ship or another marine vessel using any known type of winch system for lowering the subsea grab device into the sea to the seabed and for raising the grab device again to the marine vessel. At larger depths positioning of the grab device at the seabed becomes more difficult or is even impossible, especially when water currents are present. It is therefore proposed to have a driver arrangement mounted on the grab device which may be operated remotely form the marine vessel. Such a grab system is disclosed in
WO 2014/098913 A1 . - However, the driver arrangement adds considerably to the weight of the grab system, leading to a large dynamic load on the hoisting arrangement for suspending, lowering and raising the grab device during movements of the grab device. Having the driver arrangement on the grab device near the digging or excavation process, makes it also more exposed to rising dirt and debris which can be harmful to the system. The driver arrangement further has to be provided at a top part of the grab device, which adds to its length and makes it top-heavy. Such grab device therefore is susceptible of falling over when positioned on the seabed.
- It is an objective of the invention to provide a subsea grab system that is stable when put on the seabed for excavating material from the seabed.
- It is another or alternative objective of the invention to provide a subsea grab system exerting, during operation, limited dynamic loads on the system itself and the marine vessel.
- At least one of the above objectives is achieved by subsea grab system for activities below a water surface in a marine environment, the subsea grab system comprising
- a grab device;
- a first hoisting arrangement configured for suspending and hoisting the grab device from a marine vessel below the water surface and for positioning the grab device in a vertical direction, the first hoisting arrangement comprising at least one longitudinal suspension element for suspending and hoisting the grab device;
- a driver device comprising a propeller system configured for driving and positioning the driver device in a first horizontal plane below the water surface, the grab system being configured such that, in operation, the grab device is positioned below the driver device, and the driver device being configured for positioning the grab device in a second horizontal plane below the water surface by guiding of the first hoisting arrangement by the driver device and by driving and positioning the driver device in the first horizontal plane; and
- a second hoisting arrangement configured for suspending and hoisting the driver device from the marine vessel below the water surface,
- The driver device of the subsea grab system of the present invention is a separate device that is separately suspended and separately hoisted (lowered and raised) from the marine vessel. The grab device and driver device are each separately suspended and hoisted. The capacity of the grab device can be selected independent of the driver device. The driver device is suited for several types and capacities grab systems, which provides additional flexibility. The driver device can be kept in position, especially at a constant height above the seabed, when operating the grab device, leading to less dynamic loads on the system and marine vessel. Some equipment for operation of the grab device can be positioned on the driver device to further reduce weight of the grab device so as to further reduce dynamic loads. The first and second hoisting arrangements and the driver device are configured and arranged such that during operation, the driver device allows positioning of the grab device. The driver device is provided with actuators, such as thrusters to control the horizontal position of the driver device, either remotely or automatically. Independently suspended is intended to mean that the grab device is not suspended via the driver device or vice versa.
- In another practical embodiment the second hoisting arrangement comprises at least one longitudinal suspension element for suspending and hoisting the driver device.
- In yet another practical embodiment the longitudinal suspension element comprises at least one of a cable, a chain and a wire.
- In an embodiment the grab device comprises an actuation cylinder, especially an hydraulic or pneumatic cylinder, for actuating the grab device, espedally for actuating a grab of the grab device.
- Advantageously, a pump for actuating the actuation cylinder is provided on the driver device, which both reduces the weight of the grab device and reduces risk of damaging the pump since it is, in operation, located at a distance from the grab device.
- In a further advantageous embodiment a winch for a hose is provided on the driver device, the hose connecting the actuation cylinder and the pump so as to, during operation, keep the hose taut. Keeping the hose taut reduces any risk of entanglement of the hose and damage thereof.
- In a preferred embodiment one or more buoyancy floaters are connected to the first hoisting arrangement such as to, during operation, keep part of the first hoisting arrangement between driver device, especially between a top part of the driver device, and the grab device taut. Such embodiment reduced the risk of the first hoisting arrangement becoming entangled with the driver device or second hoisting arrangement, or that the first hoisting arrangement interferes with the grab device, especially when the grab of the grab device is placed on the seabed.
- In a practical embodiment one or more buoyancy floaters are connected to the at least one longitudinal suspension element of the first hoisting arrangement such as to, during operation, keep part of the at least one longitudinal suspension element of the first hoisting arrangement between driver device, especially between a top part of the driver device, and the grab device taut.
- In a preferred embodiment the one or more buoyancy floaters are connected to the first hoisting arrangement, especially the at least one longitudinal suspension element of the first hoisting arrangement, such as to, during operation, remain above the driver device. Such embodiment effectively provides that the first hoisting arrangement between driver device and grab device remains taut.
- Advantageously, the grab system comprises a heave compensator, especially a passive heave compensator, for the grab device. Having the heave compensator reduces any peak loads on the system due to its use and due to any movements of the marine vessel, for instance due to waves at the sea surface.
- Preferably, the passive heave compensator is arranged on the grab device and the first hoisting arrangement is connected to the passive heave compensator, which provides the optimum location to compensate for any peak loads.
- In another aspect the invention provides for a marine vessel comprising such grab system.
- Further features and advantages of the invention will become apparent from the description of the invention by way of non-limiting and non-exclusive embodiments. These embodiments are not to be construed as limiting the scope of protection. The person skilled in the art will realize that other alternatives and equivalent embodiments of the invention can be conceived and reduced to practice without departing from the scope of the present invention. Embodiments of the invention will be described with reference to the accompanying drawings, in which like or same reference symbols denote like, same or corresponding parts, and in which
-
Figure 1 shows an embodiment of a subsea grab system according to the invention suspended from a marine vessel; -
Figure 2 shows a detailed view on the subsea part of the grab system offigure 1 in a state when being lowered towards the seabed; -
Figure 3 shows a detailed view on the subsea part of the grab system offigure 1 in a state when having been lowered to and being supported by the seabed; -
Figure 4 shows a detailed view on the subsea part of the grab system offigure 1 in a state when just having excavated earth form and being pulled from the seabed;and -
Figure 5 shows a detailed view on the subsea part of the grab system offigure 1 in a state when being lifted away from the seabed after having excavated earth from the seabed. -
Figure 1 shows amarine vessel 10 on which asubsea grab system 100 according to the invention is provided.Winches second hoisting arrangements grab system 100 through a moon pool type opening 11 in the marine vessel. The subsea part of thesubsea grab system 100 can be lowered towards the seabed SB at a depth SD of, for instance, several hundred meters below the sea surface. A ship is shown infigure 1 , but any type of marine vessel can be employed. - The first hoisting arrangement or
system 120 comprises longitudinal suspension elements in the form ofchains 121 from which agrab device 110 is suspended though the moon pool 11 into the water W below the sea surface and below the marine vessel. Thechains 121 can be unwound from and wound onto thewinches 122 on the vessel for lowering and raising, respectively, thegrab device 110. Alternatively, cables, wires or any other suitable means can be used in the first hoisting system. The second hoisting arrangement orsystem 140 comprises longitudinal suspension elements in the form ofcables 141 from which adriver device 130 is suspended though the moon pool 11 into the water W below the marine vessel. Thecables 141 can be unwound from and wound onto thewinches 142 on the vessel for lowering and raising, respectively, thedriver device 130. Alternatively, chains, wires or any other suitable means can be used in the second hoisting system. Hoisting by the first and second hoisting arrangements is done in a coordinated fashion for raising and lowering the grab anddriver devices - The subsea part of an embodiment of the grab system of the invention is shown in more detail in the
figures 2 to 5 .Figure 2 shows the subsea part when being lowered towards the seabed SB by thechains 121 of the first hoisting system.. Thegrab device 110 comprises a grab having two grabparts 112 that can be opened and closed. Opening and closing of the grab is actuated by hydraulic (or pneumatic)cylinders 112. However, any other suitable actuator or means for opening and closing the grab can be employed as well. Aheave compensator 150 is mounted in the top part of the grab device, which will be described further below. - The
chains 121 of thefirst hoisting arrangement 120 associated with thegrab device 110 are passed through and guided by thedriver device 130, which during operation is above thegrab device 110. The chains can move freely through the driver device. The driver device comprises a frame orhousing 131 that is suspended from thecables 141 of thesecond hoisting arrangement 140. Apropeller system 132 is arranged on theframe 131 and comprises propellers that are driven by motors. The propeller system is to be understood as any system that allows propelling (moving) the driver device. The propeller system is configured for driving and positioning the driver device in a first horizontal plane along the seabed and below the water surface. The driver device may also be referred to as remotely operated vehicle or ROV since its positioning is, generally, remotely operated from themarine vessel 10. The propellers shown in the figures act in a direction perpendicular to the plane of the drawing. Further propellers are present, but not shown, which act in a direction parallel to the plane of the drawing. Thedriver device 130 is positioned along the seabed SB using thepropeller system 132. Since thechains 121 from which the grab device is suspended are guided through anopening 135 in the driver device, thegrab device 110 is positioned in a second horizontal plane and along the seabed as well through positioning of the driver device. The second horizontal plane associated with the grab device is below the first horizontal plane associated with the driver device. The grab device is positioned in the vertical direction by the first hoisting arrangement associated with the grab device. - A
foundation plate 134 is mounted in a top part of thecentral opening 135 of the driver device. Theindividual chains 121 are guided in smaller openings in the foundation plate, which openings are further provided with roller bearings for improved guidance of thechains 121. Awinch 115 is provided on thefoundation platform 134 and is employed for winding and unwinding hoses running towards and connected to theactuation cylinders 112 of thegrab device 110. The hoses are further connected topumps 114 provided on the driver device. Theactuation cylinders 112 are actuated by driving thepumps 114 so as to pump hydraulic fluid towards and away from theactuation cylinders 112, which causes the shells of the grab to open and close. Thewinch 115 keeps the hoses running towards thegrab device 110 taut. During operation, which is especially depicted infigure 3 , the driver device is at some safe operational height Ho above the seabed SB and grabdevice 110 to keep any debris from excavation away from the driver device and equipment and components mounted on the driver device. Actual heights and distances H, Ho and D may vary according to the actual equipment employment and circumstances. Aprotection cover 136 is provided over thefoundation plate 134 andwinch 115. Anumbilical cord 170 is connected in betweenvessel 10 and driver device for controlling the various components and equipment on the driver device and to provide power thereto. -
Figure 3 shows a state of the subsea part of thesubsea grab system 100 when having been lowered to and resting on the seabed SB. The driver device is at an operational height Ho above the grab device and fully suspended from thecables 141 of the second hoisting arrangement. The weight of thegrab device 110 is actually not being suspended from itschains 121 of the first hoisting arrangement, since the grab device is supported by the seabed. This will cause slack in thechains 121.Buoyancy floaters 160 are attached to thechains 121 at a position that will remain above thedriver device 130 during operation. The set ofbuoyancy floaters 160 provide an upwards force to thechains 121 below theelements 160 and keep that part of thechains 121 taut so as not to interfere and become entangled with equipment and components of the driver device or the grab device. The slack is therefore present inchain parts 121A above thebuoyancy floaters 160. - The number and actual configuration of the
buoyancy floaters 160 can be selected dependent on actual circumstances. They may comprise blocks of material having an effective density that is considerably smaller than the density of (sea) water. Eachfloater 160 can comprise individual block shaped elements that are kept together by mounting plates and connecting rods. Mounting eyes at the end of the mounting rods can be used to connect the buoyancy floaters by further chains, cables or wires to thechains 121 of thehoisting arrangement 120. The buoyancy floaters 160 are connected to thechains 121 at a fixed distance D above the grab device, which allows the driver device to be positioned at a required operational height above the seabed SB and grab device. -
Figure 4 shows a state of the subsea part of thesubsea grab system 100 when just having excavated earth from the seabed and being pulled up from the seabed. This will cause a peak load on the system. The seabed may further exert some suction force on the grab system, which will further add to the peak load. It is seen that theparts 121A of thechains 121 above the buoyancy floaters is pulled taut.Figure 4 further shows that the heave compensator is in an extended state to compensate and smooth out any peak loads, which will be explained further below. -
Figures 3 and4 appear largely identical.Figure 3 shows a state in which the grab device is actually not suspended from thefirst hoisting arrangement 120 and in which there is slack in thechains 121 of the first hoisting arrangement. However,figure 4 shows a state in which the grab device is being pulled from the sea bed SB. An upwards force is exerted on the grab device by thechains 121 of the first hoisting arrangement, but thegrab device 110 has not yet become released from the seabed. Thechain parts 121A above thebuoyancy floaters 160 have been pulled taut. This may give rise to large forces in thechains 121 and on themarine vessel 10 and the grab device, which will even more so the case when the marine vessel is moving up and down on waves at the sea surface. To smoothen such forces aheave compensator 150 is provided on thegrab device 110. Theheave compensator 150 of the embodiment shown is of the passive type comprising shock absorbing cylinders to absorb forces. Such (passive) heave compensators are known as such and will not be further described. They generally have a damped-spring like behavior. -
Figure 5 shows a state of the subsea part of thesubsea grab system 100 after excavation of earth from the seabed SB. Thegrab device 110 has been raised from the seabed and the grab is closed to contain the earth excavated. It is shown that thechains 121 of the first hoisting arrangement pulling thegrab device 110 upwards have been pulled taut above thebuoyancy floaters 160. The grab device is fully suspended from the hoistingarrangement 120.
wherein the at least one longitudinal suspension element of the first hoisting arrangement is guided by at least one central opening of the driver device by passing of the at least one longitudinal suspension element through the central opening for guiding the first hoisting arrangement.
Claims (13)
- A subsea grab system (100) for activities below a water surface in a marine environment, the subsea grab system comprising- a grab device (110);- a first hoisting arrangement (120) configured for suspending and hoisting the grab device from a marine vessel (10) below the water surface and for positioning the grab device in a vertical direction, the first hoisting arrangement (120) comprising at least one longitudinal suspension element (121) for suspending and hoisting the grab device (110); and- a driver device (130) comprising a propeller system (132) configured for driving and positioning the driver device in a first horizontal plane below the water surface, the grab system being configured such that, in operation, the grab device (110) is positioned below the driver device (130), and the driver device being configured for positioning the grab device (110) in a second horizontal plane below the water surface by guiding of the first hoisting arrangement by the driver device and by driving and positioning the driver device in the first horizontal plane;
characterized in that the subsea grab system further comprises- a second hoisting arrangement (140) configured for suspending and hoisting the driver device from the marine vessel below the water surface,wherein the first and second hoisting arrangements (120, 140) are configured and arranged such that the grab device (110) and the driver device (130), during operation, are independently suspended from the marine vessel (10), and
wherein the at least one longitudinal suspension element (121) of the first hoisting arrangement (120) is guided by at least one central opening (135) of the driver device (130) by passing of the at least one longitudinal suspension element through the central opening for guiding the first hoisting arrangement (120). - The grab system according to the preceding claim, wherein the second hoisting arrangement comprises at least one longitudinal suspension element (141) for suspending and hoisting the driverdevice (130).
- The grab system according to any one of the preceding claims, wherein the longitudinal suspension element comprises at least one of a cable, a chain (121) and a wire (141).
- The grab system according to any one of the preceding claims, wherein the grab device (110) comprises an actuation cylinder (112), especially an hydraulic or pneumatic cylinder, for actuating the grab device, optionally for actuating a grab (111) of the grab device.
- The grab system according to the preceding claim, wherein a pump (114) for actuating the actuation cylinder (112) is provided on the driver device (130).
- The grab system according to the preceding claim, wherein a winch (115) for a hose (113) is provided on the driver device (130), the hose connecting the actuation cylinder (112) and the pump (114) so as to, during operation, keep the hose taut.
- The grab system according to any one of the preceding claims, wherein one or more buoyancy floaters (160) are connected to the first hoisting arrangement (120) such as to, during operation, keep part of the first hoisting arrangement between driver device (130), optionally between a top part of the driver device, and the grab device (110) taut.
- The grab system according to any one of the preceding claims, wherein one or more buoyancy floaters (160) are connected to the at least one longitudinal suspension element (121) of the first hoisting arrangement (120) such as to, during operation, keep part of the at least one longitudinal suspension element (121) of the first hoisting arrangement between driver device (130), optionally between a top part of the driver device, and the grab device (110) taut.
- The grab system according to any one of claims 7 and 8, wherein the one or more buoyancy floaters (160) are connected to the first hoisting arrangement (120), optionally the at least one longitudinal suspension element (121) of the first hoisting arrangement, such as to, during operation, remain above the driver device (130).
- The grab system according to any one of the preceding claims, wherein the grab system comprises a heave compensator, optionally a passive heave compensator (150), for the grab device (110).
- The grab system according to the preceding claim, wherein the passive heave compensator (150) is arranged on the grab device (110) and the first hoisting arrangement (120) is connected to the passive heave compensator.
- A marine vessel comprising the grab system (100) according to any one of the preceding claims.
- A subsea grab method for activities below a water surface in a marine environment, the subsea grab method comprising- employing a subsea grab system comprising-- a grab device (110);-- a first hoisting arrangement (120) for suspending and hoisting the grab device from a marine vessel (10) below the water surface and for positioning the grab device in a vertical direction, the first hoisting arrangement (120) comprising at least one longitudinal suspension element (121) for suspending and hoisting the grab device (110); and- employing a driver device (130) comprising a propeller system (132) for driving and positioning the driver device in a first horizontal plane below the water surface, such that the grab device (110) is positioned below the driver device (130) for positioning the grab device (110) in a second horizontal plane below the water surface by guiding of the first hoisting arrangement by the driver device and by driving and positioning the driver device in the first horizontal plane; characterized in that the subsea grab method further comprises- employing a second hoisting arrangement (140) for suspending and hoisting the driver device from the marine vessel below the water surface,wherein the grab device (110) and the driver device (130) are independently suspended by the first and second hoisting arrangements (120, 140) from the marine vessel (10), and
wherein the at least one longitudinal suspension element (121) of the first hoisting arrangement (120) is guided by at least one central opening (135) of the driver device (130) by passing of the at least one longitudinal suspension element through the central opening for guiding the first hoisting arrangement(120).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL2014436A NL2014436B1 (en) | 2015-03-11 | 2015-03-11 | Subsea grab system and marine vessel having such subbsea grab system. |
PCT/NL2016/050175 WO2016144177A1 (en) | 2015-03-11 | 2016-03-11 | Subsea grab system and marine vessel having such subsea grab system |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3268583A1 EP3268583A1 (en) | 2018-01-17 |
EP3268583B1 true EP3268583B1 (en) | 2020-01-08 |
Family
ID=53177849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16722411.2A Active EP3268583B1 (en) | 2015-03-11 | 2016-03-11 | Subsea grab system and marine vessel having such subsea grab system |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3268583B1 (en) |
DK (1) | DK3268583T3 (en) |
NL (1) | NL2014436B1 (en) |
WO (1) | WO2016144177A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4282747A1 (en) * | 2022-05-26 | 2023-11-29 | FundaciĆ³n Tecnalia Research & Innovation | Underwater cable robot |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806127A (en) * | 2017-10-30 | 2018-03-16 | äøęµ·ęÆåéå·„åÆäøęµ·ę“å·„ēØč”份ęéå ¬åø | A kind of vertical lifting of all-around mobile reamer arm is from navigating cutter suction dredger |
CN108411921A (en) * | 2018-05-11 | 2018-08-17 | äøęµ·ęÆåéå·„(éå¢)č”份ęéå ¬åø | A kind of jackstone pipe and jackstone system |
CN110453746A (en) * | 2019-08-27 | 2019-11-15 | å¢ęę¶ | Dredger and the husky control method of digging |
CN114088452A (en) * | 2021-11-18 | 2022-02-25 | ęµ·åēå°ēē©ēå¦ä¼ | Visual seabed polymetallic nodule sampling device |
CN115950675B (en) * | 2023-02-21 | 2023-10-24 | äøå½å°č“Ø大å¦ļ¼åäŗ¬ļ¼ | Submarine surface layer rock and soil sampling device |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3693730A (en) * | 1970-07-22 | 1972-09-26 | Inst Geol I Razrabotki Gorjuch | Vibratory device for taking bottom sediments cores |
GB1361296A (en) * | 1971-08-24 | 1974-07-24 | Shell Int Research | Method of placing a pedestal conductor and a conductor string used in drilling an offshore well |
US4010560A (en) * | 1975-05-14 | 1977-03-08 | Diggs Richard E | Deep sea mining apparatus and method |
US4232903A (en) * | 1978-12-28 | 1980-11-11 | Lockheed Missiles & Space Co., Inc. | Ocean mining system and process |
WO2012021813A1 (en) * | 2010-08-13 | 2012-02-16 | Deep Reach Technology Inc. | Subsea excavation systems and methods |
WO2014098913A1 (en) | 2012-12-21 | 2014-06-26 | Neptune Minerals, Inc. | Subsea mining system and method |
-
2015
- 2015-03-11 NL NL2014436A patent/NL2014436B1/en not_active IP Right Cessation
-
2016
- 2016-03-11 WO PCT/NL2016/050175 patent/WO2016144177A1/en active Application Filing
- 2016-03-11 DK DK16722411.2T patent/DK3268583T3/en active
- 2016-03-11 EP EP16722411.2A patent/EP3268583B1/en active Active
Non-Patent Citations (1)
Title |
---|
None * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4282747A1 (en) * | 2022-05-26 | 2023-11-29 | FundaciĆ³n Tecnalia Research & Innovation | Underwater cable robot |
WO2023227700A1 (en) * | 2022-05-26 | 2023-11-30 | FundaciĆ³n Tecnalia Research & Innovation | Underwater cable robot |
Also Published As
Publication number | Publication date |
---|---|
DK3268583T3 (en) | 2020-03-16 |
NL2014436B1 (en) | 2016-10-14 |
EP3268583A1 (en) | 2018-01-17 |
WO2016144177A1 (en) | 2016-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3268583B1 (en) | Subsea grab system and marine vessel having such subsea grab system | |
CN110382346B (en) | Deep water hoisting system and method | |
EP3018087B1 (en) | Hoisting device | |
EP1509672B1 (en) | Apparatuses and methods of deploying and installing subsea equipment | |
EP1433922B1 (en) | Hoisting device with compensator | |
US9540076B1 (en) | System for launch and recovery of remotely operated vehicles | |
US10954652B2 (en) | Assembly and method for installing a subsea cable | |
US9855999B1 (en) | System for launch and recovery of remotely operated vehicles | |
CA2931985C (en) | Device for launching a subsurface mining vehicle into a water mass and recovering the same from the water mass | |
US10153626B2 (en) | Subsea cable installation unit | |
KR102019053B1 (en) | Telescopic boom crane and launch and recovery apparatus for rov lars thereof | |
BR112014031082B1 (en) | method and system to provide control and shutdown capability | |
US6926467B1 (en) | Method and device for replacing equipment on the seabed | |
CN104024561B (en) | For steel wire rope to be adjusted the method and system subsea well from pontoon | |
EP3513106B1 (en) | System, apparatus and method | |
NL2004991C2 (en) | Submersible vehicle for dumping rocks. | |
KR102645617B1 (en) | Mooring device for floating structures with damping unit | |
GB2514773A (en) | Underwater turbine installation apparatus and methods |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20171011 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180504 |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20190723 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016027799 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1222947 Country of ref document: AT Kind code of ref document: T Effective date: 20200215 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20200309 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20200108 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200408 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200508 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200409 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602016027799 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1222947 Country of ref document: AT Kind code of ref document: T Effective date: 20200108 |
|
26N | No opposition filed |
Effective date: 20201009 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200311 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201001 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200108 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230508 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240220 Year of fee payment: 9 Ref country code: IE Payment date: 20240321 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240320 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20240322 Year of fee payment: 9 Ref country code: DK Payment date: 20240326 Year of fee payment: 9 |