EP3098549B1 - Lignite drying with a heat recovery circuit - Google Patents

Lignite drying with a heat recovery circuit Download PDF

Info

Publication number
EP3098549B1
EP3098549B1 EP15290139.3A EP15290139A EP3098549B1 EP 3098549 B1 EP3098549 B1 EP 3098549B1 EP 15290139 A EP15290139 A EP 15290139A EP 3098549 B1 EP3098549 B1 EP 3098549B1
Authority
EP
European Patent Office
Prior art keywords
condensate
line
heater
vapour
lignite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP15290139.3A
Other languages
German (de)
French (fr)
Other versions
EP3098549A1 (en
Inventor
Thierry Pourchot
Frederic Geiger
Didier WANTZ
Thomas EDEL
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Technology GmbH
Original Assignee
General Electric Technology GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Technology GmbH filed Critical General Electric Technology GmbH
Priority to EP15290139.3A priority Critical patent/EP3098549B1/en
Priority to PL15290139T priority patent/PL3098549T3/en
Priority to US15/162,987 priority patent/US9944874B2/en
Priority to AU2016203440A priority patent/AU2016203440B2/en
Priority to CN201610356062.5A priority patent/CN106196894B/en
Publication of EP3098549A1 publication Critical patent/EP3098549A1/en
Application granted granted Critical
Publication of EP3098549B1 publication Critical patent/EP3098549B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L5/00Solid fuels
    • C10L5/02Solid fuels such as briquettes consisting mainly of carbonaceous materials of mineral or non-mineral origin
    • C10L5/04Raw material of mineral origin to be used; Pretreatment thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B3/00Drying solid materials or objects by processes involving the application of heat
    • F26B3/02Drying solid materials or objects by processes involving the application of heat by convection, i.e. heat being conveyed from a heat source to the materials or objects to be dried by a gas or vapour, e.g. air
    • F26B3/06Drying solid materials or objects by processes involving the application of heat by convection, i.e. heat being conveyed from a heat source to the materials or objects to be dried by a gas or vapour, e.g. air the gas or vapour flowing through the materials or objects to be dried
    • F26B3/08Drying solid materials or objects by processes involving the application of heat by convection, i.e. heat being conveyed from a heat source to the materials or objects to be dried by a gas or vapour, e.g. air the gas or vapour flowing through the materials or objects to be dried so as to loosen them, e.g. to form a fluidised bed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K11/00Plants characterised by the engines being structurally combined with boilers or condensers
    • F01K11/02Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K5/00Plants characterised by use of means for storing steam in an alkali to increase steam pressure, e.g. of Honigmann or Koenemann type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/20Methods of steam generation characterised by form of heating method using heat evolved in a solution absorbing steam; Soda steam boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22GSUPERHEATING OF STEAM
    • F22G3/00Steam superheaters characterised by constructional features; Details of component parts thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B23/00Heating arrangements
    • F26B23/001Heating arrangements using waste heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B23/00Heating arrangements
    • F26B23/001Heating arrangements using waste heat
    • F26B23/002Heating arrangements using waste heat recovered from dryer exhaust gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B23/00Heating arrangements
    • F26B23/10Heating arrangements using tubes or passages containing heated fluids, e.g. acting as radiative elements; Closed-loop systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B25/00Details of general application not covered by group F26B21/00 or F26B23/00
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L2270/00Specifically adapted fuels
    • C10L2270/04Specifically adapted fuels for turbines, planes, power generation
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L2290/00Fuel preparation or upgrading, processes or apparatus therefore, comprising specific process steps or apparatus units
    • C10L2290/08Drying or removing water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23KFEEDING FUEL TO COMBUSTION APPARATUS
    • F23K2201/00Pretreatment of solid fuel
    • F23K2201/20Drying
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Definitions

  • the present disclosure relates generally to the thermal Integration of a lignite drying process within a coal power plant having a water / steam power cycle.
  • Such power plants may include CO2 capture units.
  • lignite drying in a lignite fired plant involves using either hot flue gas extraction and/or steam extraction from the water/steam cycle to supply thermal energy to the lignite drying systems comprising beater mills, rotary drum dryer or fluidized bed dryers.
  • So called beater mills technology uses hot flue gas extracted from the top of the furnace and then recirculates this extraction in the mill in order to evaporate the high amount of lignite moisture, which can be up to 60% of lignite content for "B" grade lignites. Drying is an important step as it enables pulverization of lignite necessary for combustion. A problem of such systems is that it results in a very high efficiency penalty due to the need for very high enthalpy heat from the boiler for the drying process. The high heat requirement results in high boiler losses due to the loss of residual sensible heat from the large flue gas flow and zero recovery of the latent heat of removed moisture from the lignite.
  • lignite pre-drying techniques have been developed using medium or low enthalpy heat to achieve partial or high level of lignite pre-drying before pulverization.
  • the techniques can provide efficiency gains of up to 3% points without heat recovery of evaporation vapour of lignite moisture or 5% point with heat recovery of evaporation vapour of lignite moisture.
  • German patent DE 195 18 644 C2 provides a solution utilising so called Waste Heat Utilisation (WTA) type 1 and 2 processes in order to pre-drying lignite.
  • WTA Waste Heat Utilisation
  • the WTA type I process includes a direct heat pump loop with a vapour compressor that utilises the moisture vapour as drying heat. After de-dusting to remove lignite particles, the vapour is compressed with a vapour-compressor and sent in the heat exchanger of the dryer. Remaining heat of the drying vapour condensates exiting the dryer heat exchanger can be integrated in the low pressure condensate heaters of a water steam cycle of a typical steam power plant. The process does not require any steam extraction from the water/ steam cycle and may be operated independently from the power plant.
  • the alternate WTA type 2 process includes a steam extraction from water/ steam cycle of a typical steam power plant for the drying heat source. This process is much simpler and cheaper than WTA type 1, however, optimisation of the location of steam extraction varies with plant load and as such may lead to lower net plant efficiency that the type 1 system if no or limited heat recovery from drying vapour occurs.
  • a further problem can be that the maximization of the heat recovery from drying vapours for plant performance improvement, together with the cleaning of this vapour, for environmental reasons, may require cleaning of the dirty vapour by condensation in order to avoid release of pollutants which would otherwise occur if released directly in the atmosphere in the vapour state.
  • CN 101881191A is relevant as background prior art for the current invention.
  • CN 101881191A describes a thermal power generation system based on a high-moisture lignite pre-drying upgrading and recovering technology.
  • the thermal power generation system comprises a boiler, a turbine, a condenser, a condensation pump, a low pressure heater, a deaerator, a water feed pump, a high pressure heater, a wet coal bin, a wet coal feeder and a coal mill and is characterized in that a lignite pre-drying device, a drain pump, a dry coal feeder, a dust remover and a heat energy and waste water recovering device are additionally arranged in the power generation system.
  • a lignite fired steam power plant is disclosed that can provide improved or at least an alternate means of thermally integrating a lignite drying system into the power plant.
  • the system is such that the risk of fouling, corrosion or erosion of the heat pumps compressors of some prior art system is avoided.
  • a lignite fired steam power plant comprises a water/steam power cycle, a dryer system for drying lignite coal and a heat recovery system for recovery of thermal energy from the vapour outlet line of the dryer system.
  • the water/steam power cycle includes a pressure series of steam turbines, a condenser at a low pressure end of pressure series of steam turbines configured and arranged to condense steam exhausted from the low pressure end of the pressure series of steam turbines, a first condensate line connected to the condenser, and a low pressure condensate preheat system, in the first condensate line, adapted to preheat condensate from the condenser.
  • the dryer system includes a dryer and a vapour outlet line for removing vapour from the dryer.
  • the heat recovery system comprises a second condensate line that fluidly spans between the condenser and the first condensate line so as to at least partially bypass the low pressure condensate preheat system, a third condensate line extending from the condenser to the low pressure condensate preheat system so as to bypass at least a portion of the low pressure condensate preheat system and the second condensate line, a condensate evaporator fluidly connected to the vapour outlet line and the third condensate line so as to enable evaporation of a condensate in the third condensate line against condensing vapour in the vapour outlet line, a first compressor located in the third condensate line downstream of the condensate evaporator and adapted to compress the evaporated condensate from the condensate evaporator, and a first heater connected to and downstream of the first compressor for desuperheating and condensing vapour from the first compressor.
  • the second condensate line additionally passes through the first heater so as to enable condensation of the evaporated condensate of the third condensate line against a condensate of the second condensate line.
  • a yet further aspect further comprises in the second condensate line a second heater that is connected to a first branch of the vapour outlet line branching from the vapour outlet line upstream of the condensate evaporator, so as to enable condensation of the vapour of the first branch against a condensate in the second condensate line.
  • the second heater is located in the second condensate line upstream of the first heater.
  • Another aspect includes a third heater located in the second condensate line downstream of the first heater, and a second compressor that is connected to the third condensate fluidly between the first compressor and the first heater and further connected to the third heater, so as to enable heating of the condensate from the second condensate line with an exhaust from the second compressor.
  • Another aspect comprises a second branch that branches from the vapour outlet line upstream of the condensate evaporator, and a first combustion air heat exchanger in the second branch, so as to enable heating of a combustion air in the first combustion air heat exchanger with a vapour of the second branch.
  • Another aspect further comprises a first combustion air heat exchanger connected to the second heater, so as to enable heating of the combustion air with a fluid of the first branch exiting the second heater.
  • Another aspect further comprises a second combustion air heat exchanger, connected to and downstream of the first compressor and further located downstream of the first combustion air heat exchanger, configured and arranged to further heat the combustion air of the lignite steam power plant.
  • the third condensate line extends to the low pressure condensate preheat system by joining the second condensate line.
  • Fig. 1 shows an exemplary embodiment of a lignite fired steam power plant for drying pulverised lignite utilising an indirect heat pump process.
  • the system comprises a dryer system, a heat recovery system for recovering thermal energy from a vapour exhaust of the dryer 10 and a water / steam power cycle for at least partially receiving recovered thermal energy from the heat recovery system.
  • the water / steam power cycle may additionally provide thermal energy in the form of extraction steam as an energy source for the dryer 10.
  • the drying system includes an inlet line 11 to direct lignite into the dryer 10, a dryer heat exchanger 13 for evaporator drying of the lignite, a vapour outlet line 16 for exhausting moisture laden gas from the dryer 10 and a solids outlet line 12 for discharging dried lignite for use in a combustor.
  • the dryer 10 can be a steam fluidized bed dryer or a steam heated rotary tube dryer and may typically operate at or close to atmospheric pressure.
  • vapour in the vapour outlet line 16 is first de-dusted in a particle removal system, such as a cyclone, electrostatic precipitator, fabric filter or any combination of a cyclone, electrostatic precipitator, fabric filter cycle, when lignite particles removed from the particle removal system are returned to the dryer 10 or the solids outlet line 12.
  • a particle removal system such as a cyclone, electrostatic precipitator, fabric filter or any combination of a cyclone, electrostatic precipitator, fabric filter cycle
  • the water/steam power cycle includes a pressure series of steam turbines 35.
  • a condenser 38 configured and arranged to condense steam exhausted from the pressure series of steam turbines 35, is located at a low pressure end of pressure series of steam turbines 35. Condensed steam from the condenser 38 is then directed through a first condensate line 59 that includes a low pressure condensate preheat system 40 having one or more preheaters,
  • the water / steam power cycle is connected to the dryer heat exchanger 13 by extraction steam provide at about 3-4 Bara and by a condensate return that returns condensate to the low pressure condensate preheat system 40.
  • steam is condensed within the dryer 10 in the dryer heat exchanger 13 causing evaporation of wet lignite moisture, thus producing the vapour that is exhausted from the dryer 10 by a vapour outlet line 16.
  • extraction steam may be de-superheated before entering the dryer heat exchanger 13.
  • the heat recovery system for recovery includes a third condensate line 79, a condensate evaporator 83, a first compressor 85, a first heater 71, and a second condensate line 70.
  • the second condensate line 70 extends from the condenser 38 to the low pressure condensate preheat system 40 so as to bypass at least a portion of the low pressure condensate preheat system 40.
  • the condensate evaporator 83 is fluidly connected to the vapour outlet line 16 and the third condensate line 79 so as to enable evaporation of condensate in the third condensate line 79 against condensing vapour in the vapour outlet line 16.
  • the first compressor 85 which is adapted to compress evaporated condensate from the condensate evaporator 83 to typically between 3-4 Bara. After compression of evaporated condensate, the evaporated condensate is desuperheated and condensed in the first heater 71 located in the third condensate line 79 downstream of the first compressor 85.
  • the first heater 71 is located in the third condensate line 79 and the now condensed evaporated condensate in the third condensate line 79 re-joins the first condensate line 59 either directly or via the second condensate line 70.
  • the second condensate line 70 typically includes a condensate pump at an upstream end to extract condensate from the condenser 38 and boost the condensate pressure and a control valve to modulate the flow-rate through the second condensate line 70
  • the third condensate line 79 includes a condensate pump at an upstream end to extract, boost and/ or control condensate flow, as well as a control valve in the liquid flowing portion of the line, to modulate the flow-rate and control the pressure through the third condensate line 79.
  • the pressure requirements of the first condensate line 59 and second condensate line 70 may be different to that of the third condensate line 79
  • the condensate pump of the third condensate line 79 may be different to the condensate pump of the second condensate line 70.
  • the lignite fired steam power plant further comprises a second heater 72 located in the second condensate line 70, upstream of the first heater 71, and connected to a first branch 31 of the vapour outlet line 16 wherein the first branch branches from the vapour outlet line 16 at a point upstream of the condensate evaporator 83 so as to enable energy transfer from the first branch to the second condensate line 70 in the second heater 72.
  • the second condensate line 70 in addition to the second heater 72 and the first heater 71, includes a third heater 73 in the second condensate line 70 downstream of the first heater 71 as well as a second compressor 95.
  • the second compressor 95 is located in the heat recovery system and is connected to the third condensate line 79, at an upstream end, fluidly between the first compressor 85 and the first heater 71, and at a downstream end, to the third heater 73 so as to enable heating of a condensate in the second condensate line 70 with an exhaust from the second compressor 95.
  • the heat recovery system for recovery includes a third condensate line 79, a condensate evaporator 83, and a first compressor 85, a first heater 71, a second heater 72 and a second condensate line 70.
  • the second condensate line 70 extends from the condenser 38 to the low pressure condensate preheat system 40 so as to bypass at least a portion of the low pressure condensate preheat system 40.
  • the condensate evaporator 83 is fluidly connected to the vapour outlet line 16 and the third condensate line 79 so as to enable evaporation of condensate in the third condensate line 79 against condensing vapour in the vapour outlet line 16.
  • the first compressor 85 which is adapted to compress evaporated condensate from the condensate evaporator 83 to typically between 3-4 Bara. After compression of evaporated condensate, the evaporated condensate is desuperheated and condensed in the first heater 71 located in the third condensate line 79 downstream of the first compressor 85.
  • the first heater 71 is located in the third condensate line 79 and the now condensed evaporated condensate in the third condensate line 79 re-joins the first condensate line 59 either directly or via the second condensate line 70.
  • the second heater 72 is located in the second condensate line 70, upstream of the first heater 71, and connected to a first branch 31 of the vapour outlet line 16 wherein the first branch branches from the vapour outlet line 16 at a point upstream of the condensate evaporator 83 so as to enable energy transfer from the first branch to the second condensate line 70 in the second heater 72.
  • the exemplary embodiment shown in Fig. 3a further includes a second branch 32 of the vapour outlet line 16 that branches from the vapour outlet line 16 upstream of the condensate evaporator 83 as well as a first combustion air heat exchanger 36, connected to the second branch 32 so as to enable heating of a combustion air located in the first combustion air heat exchanger 36 that is used for combustion of lignite using a vapour of the second branch 32
  • An alternate exemplary embodiment, shown in Fig. 3b further includes a second combustion air heat exchanger 37 connected to the third condensate line 79 at a point between the first compressor 85 and the first heater 71 so as to enable heating of a combustion air in the second combustion air heat exchanger 37 using an evaporated condensate from the first compressor 85.
  • condensed evaporator condensate from the second combustion air heat exchanger 37 is returned to the second condensate line 70.
  • the first combustion air heat exchanger 36 preheat combustion air before the second combustion air heat exchanger 37 using condensed vapour of the vapour outlet line 16 from the second heater 72.
  • Fig. 3c shows an exemplary embodiment that does not include a first heater 71, but instead all compressed evaporated condensate from the first compressor 85 flow through the second combustion air heat exchanger 37 while a second branch 32 of the vapour outlet line 16 that branches from the vapour outlet line 16 upstream of the condensate evaporator 83 provides thermal energy to a first combustion air heat exchanger 36 that preheat combustion air upstream of the second combustion air heat exchanger 37.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Sustainable Development (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Thermal Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Sustainable Energy (AREA)
  • Microbiology (AREA)
  • Drying Of Solid Materials (AREA)

Description

    TECHNICAL FIELD
  • The present disclosure relates generally to the thermal Integration of a lignite drying process within a coal power plant having a water / steam power cycle. Such power plants may include CO2 capture units.
  • BACKGROUND INFORMATION
  • The general principle of lignite drying in a lignite fired plant is well known and involves using either hot flue gas extraction and/or steam extraction from the water/steam cycle to supply thermal energy to the lignite drying systems comprising beater mills, rotary drum dryer or fluidized bed dryers.
  • So called beater mills technology uses hot flue gas extracted from the top of the furnace and then recirculates this extraction in the mill in order to evaporate the high amount of lignite moisture, which can be up to 60% of lignite content for "B" grade lignites. Drying is an important step as it enables pulverization of lignite necessary for combustion. A problem of such systems is that it results in a very high efficiency penalty due to the need for very high enthalpy heat from the boiler for the drying process. The high heat requirement results in high boiler losses due to the loss of residual sensible heat from the large flue gas flow and zero recovery of the latent heat of removed moisture from the lignite.
  • To at least mitigate this problem lignite pre-drying techniques have been developed using medium or low enthalpy heat to achieve partial or high level of lignite pre-drying before pulverization. The techniques can provide efficiency gains of up to 3% points without heat recovery of evaporation vapour of lignite moisture or 5% point with heat recovery of evaporation vapour of lignite moisture.
  • German patent DE 195 18 644 C2 provides a solution utilising so called Waste Heat Utilisation (WTA) type 1 and 2 processes in order to pre-drying lignite.
  • The WTA type I process includes a direct heat pump loop with a vapour compressor that utilises the moisture vapour as drying heat. After de-dusting to remove lignite particles, the vapour is compressed with a vapour-compressor and sent in the heat exchanger of the dryer. Remaining heat of the drying vapour condensates exiting the dryer heat exchanger can be integrated in the low pressure condensate heaters of a water steam cycle of a typical steam power plant. The process does not require any steam extraction from the water/ steam cycle and may be operated independently from the power plant. While it maximizes recycle of the drying vapour heat to evaporate the lignite moisture the process can have the disadvantage that as "dirty" drying vapour is used for compression, the required compressor may be large and expensive and further may be fouled and/or eroded and/or corroded if no advanced cleaning of dirty vapour is carried out.
  • The alternate WTA type 2 process includes a steam extraction from water/ steam cycle of a typical steam power plant for the drying heat source. This process is much simpler and cheaper than WTA type 1, however, optimisation of the location of steam extraction varies with plant load and as such may lead to lower net plant efficiency that the type 1 system if no or limited heat recovery from drying vapour occurs. A further problem can be that the maximization of the heat recovery from drying vapours for plant performance improvement, together with the cleaning of this vapour, for environmental reasons, may require cleaning of the dirty vapour by condensation in order to avoid release of pollutants which would otherwise occur if released directly in the atmosphere in the vapour state.
  • Document CN 101881191A is relevant as background prior art for the current invention. CN 101881191A describes a thermal power generation system based on a high-moisture lignite pre-drying upgrading and recovering technology. The thermal power generation system comprises a boiler, a turbine, a condenser, a condensation pump, a low pressure heater, a deaerator, a water feed pump, a high pressure heater, a wet coal bin, a wet coal feeder and a coal mill and is characterized in that a lignite pre-drying device, a drain pump, a dry coal feeder, a dust remover and a heat energy and waste water recovering device are additionally arranged in the power generation system.
  • SUMMARY
  • A lignite fired steam power plant is disclosed that can provide improved or at least an alternate means of thermally integrating a lignite drying system into the power plant.
  • The system is such that the risk of fouling, corrosion or erosion of the heat pumps compressors of some prior art system is avoided.
  • In an aspect a lignite fired steam power plant comprises a water/steam power cycle, a dryer system for drying lignite coal and a heat recovery system for recovery of thermal energy from the vapour outlet line of the dryer system.
  • The water/steam power cycle includes a pressure series of steam turbines, a condenser at a low pressure end of pressure series of steam turbines configured and arranged to condense steam exhausted from the low pressure end of the pressure series of steam turbines, a first condensate line connected to the condenser, and a low pressure condensate preheat system, in the first condensate line, adapted to preheat condensate from the condenser.
  • The dryer system includes a dryer and a vapour outlet line for removing vapour from the dryer.
  • The heat recovery system comprises a second condensate line that fluidly spans between the condenser and the first condensate line so as to at least partially bypass the low pressure condensate preheat system, a third condensate line extending from the condenser to the low pressure condensate preheat system so as to bypass at least a portion of the low pressure condensate preheat system and the second condensate line, a condensate evaporator fluidly connected to the vapour outlet line and the third condensate line so as to enable evaporation of a condensate in the third condensate line against condensing vapour in the vapour outlet line, a first compressor located in the third condensate line downstream of the condensate evaporator and adapted to compress the evaporated condensate from the condensate evaporator, and a first heater connected to and downstream of the first compressor for desuperheating and condensing vapour from the first compressor.
  • In a further aspect the second condensate line additionally passes through the first heater so as to enable condensation of the evaporated condensate of the third condensate line against a condensate of the second condensate line.
  • A yet further aspect further comprises in the second condensate line a second heater that is connected to a first branch of the vapour outlet line branching from the vapour outlet line upstream of the condensate evaporator, so as to enable condensation of the vapour of the first branch against a condensate in the second condensate line.
  • In a further aspect the second heater is located in the second condensate line upstream of the first heater.
  • Another aspect includes a third heater located in the second condensate line downstream of the first heater, and a second compressor that is connected to the third condensate fluidly between the first compressor and the first heater and further connected to the third heater, so as to enable heating of the condensate from the second condensate line with an exhaust from the second compressor.
  • Another aspect comprises a second branch that branches from the vapour outlet line upstream of the condensate evaporator, and a first combustion air heat exchanger in the second branch, so as to enable heating of a combustion air in the first combustion air heat exchanger with a vapour of the second branch.
  • Another aspect further comprises a first combustion air heat exchanger connected to the second heater, so as to enable heating of the combustion air with a fluid of the first branch exiting the second heater.
  • Another aspect further comprises a second combustion air heat exchanger, connected to and downstream of the first compressor and further located downstream of the first combustion air heat exchanger, configured and arranged to further heat the combustion air of the lignite steam power plant.
  • In another aspect the third condensate line extends to the low pressure condensate preheat system by joining the second condensate line.
  • Other aspects and advantages of the present disclosure will become apparent from the following description, taken in connection with the accompanying drawings which by way of example illustrate exemplary embodiments of the present invention.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • By way of example, an embodiment of the present disclosure is described more fully hereinafter with reference to the accompanying drawings, in which:
    • Figure 1 is a schematic of a lignite fired power plant with a heat recovery system that integrates a lignite drying system with a water / steam power cycle;
    • Figure 2 is a schematic the lignite fired power plant of Fig. 1 with an additional compressor in the heat recovery system
    • Figure 3a-c are schematics of a lignite fired power with a heat recovery system that integrates a lignite drying system with a water / steam power cycle and further includes heat recovery through combustion air preheating.
    DETAILED DESCRIPTION
  • Exemplary embodiments of the present disclosure are now described with references to the drawings, wherein like reference numerals are used to refer to like elements throughout. In the following description, for purposes of explanation, numerous specific details are set forth to provide a thorough understanding of the disclosure. However, the present disclosure may be practiced without these specific details, and is not limited to the exemplary embodiment disclosed herein.
  • Fig. 1 shows an exemplary embodiment of a lignite fired steam power plant for drying pulverised lignite utilising an indirect heat pump process. In its simplest form the system comprises a dryer system, a heat recovery system for recovering thermal energy from a vapour exhaust of the dryer 10 and a water / steam power cycle for at least partially receiving recovered thermal energy from the heat recovery system. The water / steam power cycle may additionally provide thermal energy in the form of extraction steam as an energy source for the dryer 10.
  • In an exemplary embodiment shown in Fig. 1-3 the drying system includes an inlet line 11 to direct lignite into the dryer 10, a dryer heat exchanger 13 for evaporator drying of the lignite, a vapour outlet line 16 for exhausting moisture laden gas from the dryer 10 and a solids outlet line 12 for discharging dried lignite for use in a combustor. The dryer 10 can be a steam fluidized bed dryer or a steam heated rotary tube dryer and may typically operate at or close to atmospheric pressure.
  • In an exemplary embodiment vapour in the vapour outlet line 16 is first de-dusted in a particle removal system, such as a cyclone, electrostatic precipitator, fabric filter or any combination of a cyclone, electrostatic precipitator, fabric filter cycle, when lignite particles removed from the particle removal system are returned to the dryer 10 or the solids outlet line 12.
  • In an exemplary embodiment shown in Fig. 1-3 the water/steam power cycle includes a pressure series of steam turbines 35. A condenser 38, configured and arranged to condense steam exhausted from the pressure series of steam turbines 35, is located at a low pressure end of pressure series of steam turbines 35. Condensed steam from the condenser 38 is then directed through a first condensate line 59 that includes a low pressure condensate preheat system 40 having one or more preheaters,
  • In an exemplary embodiment applicable to an atmospheric or low pressure dryer, the water / steam power cycle is connected to the dryer heat exchanger 13 by extraction steam provide at about 3-4 Bara and by a condensate return that returns condensate to the low pressure condensate preheat system 40. In this arrangement steam is condensed within the dryer 10 in the dryer heat exchanger 13 causing evaporation of wet lignite moisture, thus producing the vapour that is exhausted from the dryer 10 by a vapour outlet line 16. As required extraction steam may be de-superheated before entering the dryer heat exchanger 13.
  • In an exemplary embodiment shown in Fig. 1, the heat recovery system for recovery includes a third condensate line 79, a condensate evaporator 83, a first compressor 85, a first heater 71, and a second condensate line 70.
  • The second condensate line 70 extends from the condenser 38 to the low pressure condensate preheat system 40 so as to bypass at least a portion of the low pressure condensate preheat system 40.
  • The condensate evaporator 83 is fluidly connected to the vapour outlet line 16 and the third condensate line 79 so as to enable evaporation of condensate in the third condensate line 79 against condensing vapour in the vapour outlet line 16. In the third condensate line 79 downstream of the condensate evaporator 83 is the first compressor 85, which is adapted to compress evaporated condensate from the condensate evaporator 83 to typically between 3-4 Bara. After compression of evaporated condensate, the evaporated condensate is desuperheated and condensed in the first heater 71 located in the third condensate line 79 downstream of the first compressor 85.
  • In an exemplary embodiment shown in Figs. 1 the first heater 71 is located in the third condensate line 79 and the now condensed evaporated condensate in the third condensate line 79 re-joins the first condensate line 59 either directly or via the second condensate line 70.
  • In an exemplary embodiment shown in Figs. 1 the second condensate line 70 typically includes a condensate pump at an upstream end to extract condensate from the condenser 38 and boost the condensate pressure and a control valve to modulate the flow-rate through the second condensate line 70
  • The third condensate line 79 includes a condensate pump at an upstream end to extract, boost and/ or control condensate flow, as well as a control valve in the liquid flowing portion of the line, to modulate the flow-rate and control the pressure through the third condensate line 79.As the pressure requirements of the first condensate line 59 and second condensate line 70 may be different to that of the third condensate line 79, the condensate pump of the third condensate line 79 may be different to the condensate pump of the second condensate line 70.
  • In an exemplary embodiment shown in Fig. 1 the lignite fired steam power plant further comprises a second heater 72 located in the second condensate line 70, upstream of the first heater 71, and connected to a first branch 31 of the vapour outlet line 16 wherein the first branch branches from the vapour outlet line 16 at a point upstream of the condensate evaporator 83 so as to enable energy transfer from the first branch to the second condensate line 70 in the second heater 72.
  • In an exemplary embodiment shown in Fig. 2, in addition to the second heater 72 and the first heater 71, the second condensate line 70 includes a third heater 73 in the second condensate line 70 downstream of the first heater 71 as well as a second compressor 95. The second compressor 95, is located in the heat recovery system and is connected to the third condensate line 79, at an upstream end, fluidly between the first compressor 85 and the first heater 71, and at a downstream end, to the third heater 73 so as to enable heating of a condensate in the second condensate line 70 with an exhaust from the second compressor 95.
  • In an exemplary embodiment shown in Fig. 3a the heat recovery system for recovery includes a third condensate line 79, a condensate evaporator 83, and a first compressor 85, a first heater 71, a second heater 72 and a second condensate line 70.
  • The second condensate line 70 extends from the condenser 38 to the low pressure condensate preheat system 40 so as to bypass at least a portion of the low pressure condensate preheat system 40.
  • The condensate evaporator 83 is fluidly connected to the vapour outlet line 16 and the third condensate line 79 so as to enable evaporation of condensate in the third condensate line 79 against condensing vapour in the vapour outlet line 16. In the third condensate line 79 downstream of the condensate evaporator 83 is the first compressor 85, which is adapted to compress evaporated condensate from the condensate evaporator 83 to typically between 3-4 Bara. After compression of evaporated condensate, the evaporated condensate is desuperheated and condensed in the first heater 71 located in the third condensate line 79 downstream of the first compressor 85.
  • The first heater 71 is located in the third condensate line 79 and the now condensed evaporated condensate in the third condensate line 79 re-joins the first condensate line 59 either directly or via the second condensate line 70.
  • The second heater 72 is located in the second condensate line 70, upstream of the first heater 71, and connected to a first branch 31 of the vapour outlet line 16 wherein the first branch branches from the vapour outlet line 16 at a point upstream of the condensate evaporator 83 so as to enable energy transfer from the first branch to the second condensate line 70 in the second heater 72.
  • The exemplary embodiment shown in Fig. 3a further includes a second branch 32 of the vapour outlet line 16 that branches from the vapour outlet line 16 upstream of the condensate evaporator 83 as well as a first combustion air heat exchanger 36, connected to the second branch 32 so as to enable heating of a combustion air located in the first combustion air heat exchanger 36 that is used for combustion of lignite using a vapour of the second branch 32
  • An alternate exemplary embodiment, shown in Fig. 3b further includes a second combustion air heat exchanger 37 connected to the third condensate line 79 at a point between the first compressor 85 and the first heater 71 so as to enable heating of a combustion air in the second combustion air heat exchanger 37 using an evaporated condensate from the first compressor 85. In this alternate exemplary embodiment, condensed evaporator condensate from the second combustion air heat exchanger 37 is returned to the second condensate line 70. Additionally, the first combustion air heat exchanger 36 preheat combustion air before the second combustion air heat exchanger 37 using condensed vapour of the vapour outlet line 16 from the second heater 72.
  • In a further alternative to the exemplary embodiment shown in Fig. 3b, Fig. 3c shows an exemplary embodiment that does not include a first heater 71, but instead all compressed evaporated condensate from the first compressor 85 flow through the second combustion air heat exchanger 37 while a second branch 32 of the vapour outlet line 16 that branches from the vapour outlet line 16 upstream of the condensate evaporator 83 provides thermal energy to a first combustion air heat exchanger 36 that preheat combustion air upstream of the second combustion air heat exchanger 37.
  • Although the disclosure has been herein shown and described in what is conceived to be the most practical exemplary embodiment, the present disclosure can be embodied in other specific forms. For example, while exemplary embodiments that included a combustion air heat exchangers (36, 37) connected to condensate or vapour lines, the connection may be by physical connection wherein the condensate or vapour lines pass through the combustion air heat exchangers (36, 37) or else by thermal means by, for example, an intermediate thermal loop. The presently disclosed embodiments are therefore considered in all respects to be illustrative and not restricted. The scope of the disclosure is indicated by the appended claims rather that the foregoing description and all changes that come within the meaning and range and equivalences thereof are intended to be embraced therein.
  • REFERENCE NUMBERS
  • 10
    dryer
    11
    inlet line
    12
    solids outlet line
    13
    dryer heat exchanger
    16
    vapour outlet line
    31
    first branch
    32
    second branch
    35
    pressure series of steam turbines
    36
    first combustion air heat exchanger
    37
    second combustion air heat exchanger
    38
    low pressure condenser
    40
    low pressure condensate preheat system
    59
    first condensate line
    70
    second condensate line
    72
    second heater
    71
    first heater
    72
    second heater
    73
    third heater
    79
    third condensate line
    83
    condensate evaporator
    85
    first compressor
    95
    second compressor

Claims (10)

  1. A lignite fired steam power plant comprising:
    a water/steam power cycle having:
    a pressure series of steam turbines (35);
    a condenser (38) at a low pressure end of pressure series of steam turbines (35) configured and arrange to condense steam exhausted from the low pressure end of the pressure series of steam turbines (35);
    a first condensate line (59) connected to the condenser (38); and
    a low pressure condensate preheat system (40), in the first condensate line (59), adapted to preheat condensate from the condenser (38);
    a dryer system for drying lignite coal, the dryer system having:
    a dryer (10); and
    a vapour outlet line (16) for removing vapour from the dryer (10),
    a heat recovery system for recovery of thermal energy from the vapour outlet line, the heat recovery system comprising:
    a second condensate line (70), fluidly spanning between the condenser (38) and the first condensate line (59) so as to at least partially bypass the low pressure condensate preheat system (40);
    a third condensate line (79) extending from the condenser (38) to the low pressure condensate preheat system (40) so as to bypass at least a portion of the low pressure condensate preheat system (40) and at least a portion of the second condensate line (70);
    a condensate evaporator (83) fluidly connected to the vapour outlet line (16) and the third condensate line (79) so as to enable evaporation of a condensate in the third condensate line (79) against condensing vapour in the vapour outlet line (16);
    a first compressor (85), in the third condensate line (79) downstream of the condensate evaporator (83), adapted to compress the evaporated condensate from the condensate evaporator (83); and
    a first heater (71) connected to and downstream of the first compressor (85) for desuperheating and condensing vapour from the first compressor (85).
  2. The lignite fired steam power plant of claim 1, wherein the second condensate line (70) additionally passes through the first heater (71) so as to enable condensation of the evaporated condensate of the third condensate line (79) against a condensate of the second condensate line (70).
  3. The lignite fired steam power plant of any one of claims 1 or 2, further comprising, in the second condensate line (70), a second heater (72) that is connected to a first branch (31) of the vapour outlet line (16) branching from the vapour outlet line (16) upstream of the condensate evaporator (83), so as to enable condensation of the vapour of the first branch against a condensate in the second condensate line (70).
  4. The lignite fired steam power plant of claim 3, wherein the second heater (72) is located in the second condensate line (70) upstream of the first heater (71).
  5. The lignite fired steam power plant of any one of claims 3 to 4 further comprising:
    a third heater (73) in the second condensate line (70), downstream of the first heater (71); and
    a second compressor (95), connected to the third condensate fluidly between the first compressor (85) and the first heater (71), and further connected to the third heater (73),
    so as to enable heating of the condensate from the second condensate line (70) with an exhaust from the second compressor (95).
  6. The lignite fired steam power plant of any one of claims 3 to 5, further comprising:
    a second branch (32) that branches from the vapour outlet line (16) upstream of the condensate evaporator (83); and
    a first combustion air heat exchanger (36) in the second branch (32), so as to enable heating of a combustion air in the first combustion air heat exchanger (36) with a vapour of the second branch (32).
  7. The lignite fired steam power plant of any one of claims 3 to 5, further comprising a first combustion air heat exchanger (36) connected to the second heater (72) so as to enable heating of a combustion air with a fluid of the first branch (31) exiting the second heater (72).
  8. The lignite fired steam power plant of any one of claims 6 or 7, comprising a second combustion air heat exchanger (37), connected to and downstream of the first compressor (85) and downstream of the first combustion air heat exchanger (36), for desuperheating and condensing vapour from the first compressor (85) and enabling further heating of the combustion air of the lignite steam power plant.
  9. The lignite fired steam power plant of claim 1 wherein the first heater (71) is configured and arranged to heat a combustion air.
  10. The lignite fired steam power plant of claim 1 Wherein the third condensate line (79) extends to the low pressure condensate preheat system (40) by joining the second condensate line (70).
EP15290139.3A 2015-05-26 2015-05-26 Lignite drying with a heat recovery circuit Active EP3098549B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP15290139.3A EP3098549B1 (en) 2015-05-26 2015-05-26 Lignite drying with a heat recovery circuit
PL15290139T PL3098549T3 (en) 2015-05-26 2015-05-26 Lignite drying with a heat recovery circuit
US15/162,987 US9944874B2 (en) 2015-05-26 2016-05-24 Lignite drying with a heat recovery circuit
AU2016203440A AU2016203440B2 (en) 2015-05-26 2016-05-25 Lignite drying with a heat recovery circuit
CN201610356062.5A CN106196894B (en) 2015-05-26 2016-05-26 Utilize the brown coal drying of heat recovery circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP15290139.3A EP3098549B1 (en) 2015-05-26 2015-05-26 Lignite drying with a heat recovery circuit

Publications (2)

Publication Number Publication Date
EP3098549A1 EP3098549A1 (en) 2016-11-30
EP3098549B1 true EP3098549B1 (en) 2018-07-11

Family

ID=53397995

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15290139.3A Active EP3098549B1 (en) 2015-05-26 2015-05-26 Lignite drying with a heat recovery circuit

Country Status (5)

Country Link
US (1) US9944874B2 (en)
EP (1) EP3098549B1 (en)
CN (1) CN106196894B (en)
AU (1) AU2016203440B2 (en)
PL (1) PL3098549T3 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105091546B (en) * 2014-05-20 2017-06-06 天华化工机械及自动化研究设计院有限公司 A kind of generating set high-moisture, low heat value brown coal drying and water recovery method and its device
CN106766854A (en) * 2017-02-27 2017-05-31 西安热工研究院有限公司 A kind of brown coal drying and upgrading electricity generation system
CN107166945A (en) * 2017-06-30 2017-09-15 厦门市特种设备检验检测院 Synthetic leather waste gas recovery wound tube heat exchanger device and its heat-exchange method

Family Cites Families (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE310352C (en) 1915-12-08 1900-01-01
AU1404783A (en) 1978-02-10 1983-08-25 Monash University Power generation system
AU4297078A (en) * 1978-02-10 1979-08-16 Monash University Power generation system
US4601113A (en) 1985-04-26 1986-07-22 Westinghouse Electric Corp. Method and apparatus for fluidized steam drying of low-rank coals
US4601115A (en) 1985-04-26 1986-07-22 Westinghouse Electric Corp. Method and apparatus for steam drying of low-rank coals using a rotary cylindrical vessel
DE4115781C2 (en) 1991-05-15 1994-09-22 Umwelt & Energietech Process and device for drying with use of exhaust steam
DE4220953A1 (en) 1992-06-26 1994-01-05 Metallgesellschaft Ag Process for drying water-containing solids in a fluidized bed
JP2677141B2 (en) 1992-11-17 1997-11-17 日本鋼管株式会社 Combustible drying equipment
DE19601931C2 (en) 1995-02-20 2000-09-21 Ver Energiewerke Ag Method and arrangement for operating a dryer loaded with heating steam
DE19512015C2 (en) 1995-03-31 1998-07-30 Rheinische Braunkohlenw Ag Process for cooling drying systems and system for drying water-containing bulk material
DE19518644C2 (en) 1995-05-20 1998-04-16 Rheinische Braunkohlenw Ag Method and device for generating steam by burning a solid, dried fuel
DE19612186A1 (en) 1996-03-27 1997-10-02 Steinmueller Gmbh L & C Method of drying crude lignite, with fluidised bed dryer
AUPO910097A0 (en) * 1997-09-10 1997-10-02 Generation Technology Research Pty Ltd Power generation process and apparatus
DE19962386A1 (en) * 1999-12-23 2001-06-28 Alstom Power Schweiz Ag Baden Process for retrofitting a saturated steam generating system with at least one steam turbine group and steam power plant retrofitted according to the process
US20060016095A1 (en) * 2000-12-20 2006-01-26 Peter Gibbs Wood steaming apparatus and method of heating wood
DE10319477B4 (en) * 2003-04-29 2006-11-23 Rwe Power Ag Method for operating a steam turbine power plant and device for generating steam
US8062410B2 (en) * 2004-10-12 2011-11-22 Great River Energy Apparatus and method of enhancing the quality of high-moisture materials and separating and concentrating organic and/or non-organic material contained therein
DE102007023336A1 (en) 2007-05-16 2008-11-20 Rwe Power Ag Method for operating a steam turbine power plant and device for generating steam
US9157042B2 (en) * 2008-07-16 2015-10-13 Kellogg Brown & Root Llc Systems and methods for producing substitute natural gas
US8596075B2 (en) * 2009-02-26 2013-12-03 Palmer Labs, Llc System and method for high efficiency power generation using a carbon dioxide circulating working fluid
DE102009019334A1 (en) 2009-04-30 2010-11-04 Rwe Power Ag Method for operating a steam turbine power plant and device for generating steam from lignite
JP5325023B2 (en) 2009-05-28 2013-10-23 三菱重工業株式会社 Apparatus and method for drying hydrous solid fuel
US20100313442A1 (en) * 2009-06-12 2010-12-16 Steven Craig Russell Method of using syngas cooling to heat drying gas for a dry feed system
EP2281627A1 (en) * 2009-07-01 2011-02-09 Total Petrochemicals Research Feluy Process for producing steam using heat recovered from a polymerization reaction
DE102009035062A1 (en) 2009-07-28 2011-02-10 Rwe Power Ag Method for operating steam turbine power station, involves utilizing energy of vapor resulting from drying process of brown coal for preliminary heating of combustion air, where energy is coupled into combustion air by heat exchanger
JP5331890B2 (en) * 2009-09-16 2013-10-30 株式会社日立製作所 Cogeneration plant and biomass reforming combined power plant
US8349036B2 (en) * 2010-01-06 2013-01-08 General Electric Company Systems and method for heating and drying solid feedstock in a gasification system
CN102191956A (en) 2010-03-04 2011-09-21 天华化工机械及自动化研究设计院 Method for reducing coal consumption of coal fired power plant by arranging steam pipe type drying system
CN102192639A (en) 2010-03-09 2011-09-21 天华化工机械及自动化研究设计院 Method for reducing coal consumption of coal-fired power plant by adding fluidized bed drying system
CN101881191B (en) * 2010-05-27 2012-10-17 中国电力工程顾问集团公司 Thermal power generation system based on high-moisture lignite pre-drying upgrading and recovering technology
WO2012005164A1 (en) 2010-07-08 2012-01-12 株式会社大川原製作所 Drying system of dry exhaust gas circulation type equipped with heat pump unit
CN201697441U (en) 2010-07-12 2011-01-05 山东天力干燥设备有限公司 Indirect heat exchanging drying low-rank coal utilization system of pumped steam of thermal power plant
DE102010032266A1 (en) 2010-07-26 2012-01-26 Fritz Egger Gmbh & Co. Og Apparatus and method for hot gas production with integrated heating of a heat transfer medium
US8813471B2 (en) * 2011-06-29 2014-08-26 General Electric Company System for fuel gas moisturization and heating
CN102353237B (en) 2011-08-18 2013-12-11 西安交通大学 High-moisture-content lignite predrying method and system integrated with thermal power plant
FR2984400A1 (en) 2011-12-19 2013-06-21 Suez Environnement METHOD AND INSTALLATION OF COGENERATION WITH THERMOCOMPRESSION
JP6029879B2 (en) 2012-07-10 2016-11-24 シャープ株式会社 Heat pump type heating device
CN102759259B (en) 2012-07-12 2014-06-04 西安交通大学 Brown coal upgrading-power generation co-production system
CN102758657B (en) 2012-07-12 2014-12-10 西安交通大学 Brown coal pre-drying power generating system integrated with jet heat pump
CN103453752B (en) 2013-08-30 2015-10-28 武汉工程大学 A kind of low energy consumption brown coal drying technique and equipment thereof reclaiming brown coal moisture
CN203542782U (en) * 2013-11-19 2014-04-16 黄士苗 Reciprocating veneer dryer capable of recovering waste heat
CN203629203U (en) * 2013-12-25 2014-06-04 山东奥诺能源科技有限公司 Superheat steam drying device
CN204041130U (en) * 2014-08-18 2014-12-24 北京电力设备总厂 The brown coal drying power generation system of Water Sproading in a kind of coal

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
AU2016203440B2 (en) 2018-06-28
AU2016203440A1 (en) 2016-12-15
US20160348019A1 (en) 2016-12-01
EP3098549A1 (en) 2016-11-30
CN106196894B (en) 2019-08-30
US9944874B2 (en) 2018-04-17
CN106196894A (en) 2016-12-07
PL3098549T3 (en) 2018-12-31

Similar Documents

Publication Publication Date Title
CN106196892B (en) Lignite drying using closed loop heat pump
EP3106750B1 (en) Lignite drying in a lignite fired power plant with a heat pump
US9989310B2 (en) Dryer exhaust heat recovery
CN102353237A (en) High-moisture-content lignite predrying method and system integrated with thermal power plant
US20100212320A1 (en) Method for operating a steam turbine power plant and also device for generating steam
US10859257B2 (en) Advanced flash exhaust heat recovery
JP2012202607A5 (en)
JP2012202607A (en) Coal-fired power generation plant and coal-fired power generation method
US9944874B2 (en) Lignite drying with a heat recovery circuit
US20140093828A1 (en) Arrangement and method of drying fuel in a boiler system
US9835056B2 (en) Lignite drying integration with a water/steam power cycle
CN214468540U (en) Sludge mixed combustion system utilizing condensate water of thermal power generating unit for pre-drying

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170530

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: F26B 23/00 20060101AFI20171016BHEP

Ipc: F01K 7/22 20060101ALI20171016BHEP

Ipc: F01K 17/06 20060101ALI20171016BHEP

Ipc: F26B 23/10 20060101ALI20171016BHEP

Ipc: F01K 7/40 20060101ALI20171016BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20171127

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20180420

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1017309

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015013345

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20180711

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1017309

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181111

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181011

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181011

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181012

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015013345

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

26N No opposition filed

Effective date: 20190412

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20190526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190531

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190526

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190531

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181111

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20150526

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20210426

Year of fee payment: 7

Ref country code: DE

Payment date: 20210421

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20210422

Year of fee payment: 7

Ref country code: TR

Payment date: 20210503

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602015013345

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221201

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220526