EP2818396B1 - Vessel, docking system and docking structure - Google Patents
Vessel, docking system and docking structure Download PDFInfo
- Publication number
- EP2818396B1 EP2818396B1 EP13173593.8A EP13173593A EP2818396B1 EP 2818396 B1 EP2818396 B1 EP 2818396B1 EP 13173593 A EP13173593 A EP 13173593A EP 2818396 B1 EP2818396 B1 EP 2818396B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- vessel
- buffer
- bumper bar
- docking
- bumper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPINGÂ
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPINGÂ
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
Definitions
- the present invention relates to a docking structure for docking a vessel to at least one bumper bar of a marine structure such as, for example, an offshore wind turbine.
- the invention further relates to a docking system comprising such a docking structure and to a vessel with such a docking structure.
- a transfer vessel is used which docks to the marine structure.
- docking systems are used which fix the vessel relative to the marine structure so as to reduce movements of the vessel relative to the marine structure.
- a docking system is, for example, disclosed in EP 2 316 721 A1 .
- the docking system disclosed therein is fixed to the bow of a vessel and includes a buffer and hydraulic engagement arms with hook portions.
- the engagement arms can be moved towards each other so as to grip bumper bars located at the marine structure.
- the engagement arms comprise hydraulic cylinders by means of which they can draw the vessel firmly against the bumper bars.
- an objective of the present invention to provide an advantageous docking structure and an advantageous docking system which allow for docking a vessel to a marine structure and for the transfer of personal or material from the vessel to the marine structure even with relatively large wave height. It is a second objective of the present invention to provide an advantageous vessel which can be used for transferring personal or material to a marine structure even in case of relatively large wave height.
- the kinematic structure connects the mounting section to the buffer and offers six degrees of freedom for a relative movement between the mounting section and the buffer.
- the kinematic structure comprises a damping structure for damping relative movement between the mounting section and the buffer.
- the buffer with the gripping system allows for securely fixing the buffer to a bumper bar of a marine structure.
- the kinematic structure with the six degrees of freedom allows the mounting section of the docking structure, and thereby a vessel connected to the docking structure by means of the mounting section, to move and rotate within a given range relative to the buffer, and thereby relative to the bumper bar of the marine structure to which the buffer is fixed.
- the kinematic structure may comprise a hydraulic or pneumatic actuator that is able to set a relative orientation of the buffer relative to the mounting section.
- a hydraulic or pneumatic actuator that is able to set a relative orientation of the buffer relative to the mounting section.
- the buffer comprises at least one buffer abutment face, where for each bumper bar a buffer abutment face is present.
- the gripping system comprises at least one pair of engagement arms, where for each bumper bar to be gripped a pair of engagement arms is present and where each engagement arm includes an arm abutment face for contacting the bumper bar.
- the buffer is equipped with at least one moveable gear wheel, where for each bumper bar a gear wheel is present and where each gear wheel is moveable within the buffer from a storage position to a working position in which it contacts the bumper bar when the buffer abutment face and the arm abutment faces are in contact with the bumper bar.
- a gear wheel allows for actively moving the bow of a vessel to which the docking system is fixed up and down along the bumper bar if the bumper bar is equipped with a respective gear rod.
- the gear wheel may be located above or below a roller containing the roller surface forming the buffer abutment face.
- each bumper bar may be present for each bumper bar, where each of the two rollers includes a roller surface forming a buffer abutment face and where the gear wheel is located between the two rollers.
- This arrangement may help to reduce loads on the gear wheel. If a locking mechanism is associated to the gear wheels so that the gear wheels can be locked by use of the locking mechanism. By locking the gear wheels an up or down movement of the along the bumper bar can be suppressed.
- An inventive docking system comprises an inventive docking structure and at least one bumper bar.
- the bumper bar is connected or connectable to a marine structure such as, for example, to an offshore wind turbine.
- the properties and advantages of such a docking system correspond to those that have already been discussed with respect to the inventive docking structure.
- each bumper bar is equipped with a gear rod and the docking structure is a docking structure that is equipped with at least one gear wheel for each bumper bar.
- An inventive vessel has an inventive docking structure fixed to its bow.
- the properties and advantages that can be achieved with a vessel having an inventive docking structure fixed to its bow have already been described with respect to the inventive docking structure.
- Figure 1 shows a buffer which is part of the inventive docking structure in a perspective front view while figure 2 shows the buffer in a perspective rear view.
- the buffer 1 comprises a carrier structure 3 which includes a frame 5 to which an upper carrier plate 7 and a lower carrier plate 9 are fixed.
- Each of the upper carrier plate 7 and the lower carrier plate 9 is equipped with two recesses 11 which form receiving sections, where each recess 11 is in the form of a trapezoid with the open side of the recess being formed by the longer base of the trapezoid and the rear side of the recess being formed by the shorter base of the trapezoid.
- the recesses of the upper carrier plate 7 are located above the recesses 11 of the lower carrier plate 9 so that they together form receptacles 12 for receiving bumper bars 31 (the bumper bars are shown in figure 5 ) of a docking system.
- Rollers 13 are located on the upper and lower carrier plates 7, 9 close to the rear sides of the recesses 11 in such a way that the roller surfaces project over the rear sides towards the open sides of the recesses 11. Thus, the roller surfaces form abutment surfaces which can butt at bumper bars 31.
- the buffer 1 comprises a gripping system, which is formed by engagement arms 15.
- One engagement arm is shown separately in figure 3 .
- the gripping system of the present embodiment includes two pairs of engagement arms 15, one pair for each receptacle 12 of the buffer, i.e. one pair for each bumper bar 31 to be gripped.
- the engagement arms 15 are located between the upper carrier plate 7 and the lower carrier plate 9 at the leg sides of the trapezoid recesses 11. They can be rotated about a rotation axis 17 by means of hydraulic cylinders 19 or any other suitable drive means, such as, e. g., electric motors.
- Engagement rollers 21 are positioned at the free ends of the engagement arms 15 and can project into the respective receptacle 12 formed by the recesses 11 to butt at a bumper bar 31 received in the receptacle when the engagement arms are activated.
- the free ends with the engagement rollers 21 are located between the upper carrier plate 7 and the lower carrier plate 9 so that they do not project into the receptacles 12.
- the engagement arms 15 After being activated the engagement arms 15 are rotated about their respective rotation axis 17 by means of the hydraulic cylinders 19 or any other suitable drive means so that the engagement rollers 21 will project into the receptacles 12 to butt at a bumper bar 31 located within the receptacles 12.
- the bumper bar is engaged at three points which are distributed about the circumference of the bumper bar 31 so that the bumper bar 31 is securely gripped and cannot slip out of the receptacle 12.
- the three points of contact with the bumper bar 31 may substantially form an equilateral triangle.
- Gear wheels are present at the rear side of the receptacles 12. They are located between the upper carrier plate 7 and the lower carrier plate 9 and each gear wheel is moveable from a location outside of the respective receptacle 12 to a location in which it at least partly projects into the receptacle 12.
- a swivel axis 27 is present about which the gear wheel 23 can be swivelled, driven by a hydraulic cylinder 25 or any other suitable drive means such as, e. g., an electric motor.
- gear wheel 23 When the gear wheel 23 is swivelled into the receptacle 12 it can engage a gear rod 29 that is located at a bumper bar 31 of an inventive docking system. Bumper bars 31 of a marine structure 32 which are equipped with gear rods 29 are shown in figure 5 .
- FIG. 4 shows a top view of the inventive docking system that illustrates an inventive docking structure fixed to the bow 33 of a vessel 35. Moreover, the figure shows two bumper bars 31.
- the docking structure includes a Stewart platform 37 one side of which is connected to the rear end of the buffer 1 and the other side of which comprises one or more mounting sections for mounting it to the bow 33 of a vessel 35.
- the mounting sections are formed by three fixing points 39 by which the Stewart platform can be fixed to the bow 33 of a vessel 35.
- the mounting section may also be realised as a fixing platform of the Stewart platform that can be fixed to the bow of a vessel.
- the Stewart platform 37 includes 6 diagonal Hydraulic jacks that are mounted in pairs at the fixing points 39 or at the fixing platform and cross over to three mounting points at the buffer 1 where they are also mounted in pairs but in another configuration than at the fixing pints 39 or at the fixing platform.
- the Stewart platform 37 is a kinematic construction which allows to move the buffer relative to the fixing points 39, and thereby relative to the vessel 35, in six degrees of freedom, i.e. the Stewart platform allows the buffer 1 to be shifted relative to the vessel in three independent directions and to be rotated relative to the vessel 35 about three independent rotational axes.
- the Stewart platform 37 allows the buffer 1 to be freely rotated and shifted relative to the vessel 35 in a given translational range and the given angular range.
- a Stewart platform 37 for connecting the buffer 1 to the bow 33 of a vessel 35. Any other suitable kinematic structure offering six degrees of freedom would be useable as well. However, since the Stewart platform is a parallel kinematics it can achieve a high rigidity with a relatively low weight construction. Moreover, the Stewart platform 37 can also be used as a suitable shock-absorbing means.
- FIG. 6 to 22 show the approach of the vessel 35 to the bumper bars
- FIG. 14 to 22 show how the vessel is moored to the marine structure by use of the inventive docking system.
- Figure 6 shows a vessel 35 to the bow 33 of which a docking structure with a buffer 1 as has been described with respect to figures 1 to 3 and with a Stewart platform 37 is fixed by means of the fixing points 39.
- the figure also shows a tower 43 of an offshore wind turbine which forms the marine structure of the present embodiment.
- the tower 43 is equipped with two bumper bars 31 as they are shown in figure 5 .
- Figures 7 to 13 show the vessel 35 and the tower 43 in a schematic top view, where Figures 6 to 9 show the vessel as it approaches the wind turbine tower 43.
- the vessel 35 approaches the bumper bars 31 not frontally but at an angle so that the buffer 1 will contact one of the bumper bars 31 (the lower bumper bar in figures 6 to 9 ) first.
- the Stewart platform is fully extended, i.e. its hydraulic jacks 41 are fully extended.
- the buffer 1 is oriented in line with the vessel 35.
- the final stage of approaching the bumper bars 31 is shown in figures 10 to 13 .
- the skipper heads for one of the bumper bars 31 so that the respective bumper bar 31 is received within one of the receptacles 12 of the buffer 1.
- the receptacle 12 that is to receive the bumper bar 31 is chosen such that the other receptacle 12 is able to receive the second bumper bar 31.
- the operation of the docking system may be done manually or by means of on board computer aid, which in the latter case will manage the simultaneous operation of the various parts of the docking system and forward and sideward engine generated pull during docking on and docking off operation.
- Auto pilot will control the ships movements with information from the platform (piston position and hydraulic pressure). This gives a safe ship control.
- Figures 14 to 18 show the gripping of the bumper bars 31 by means of the gripping structure that is part of the buffer 1.
- the figures show, in a top view, the bumper bars 31, the buffer 1 and the Stewart platform 37.
- Figure 14 is more or less and enlarged detailed view of figure 13 .
- the rollers 13 of the buffer 1 contact the bumper bars 31 and the vessel 35, the buffer 1 and the wind turbine tower 43 have been aligned relative to each other.
- the engagement arms 15 will be activated, as it is shown in figure 15 .
- Figures 20 to 22 show the final steps of mooring the vessel 35 to the wind turbine tower 43.
- figures 20 and 21 show the buffer 1 in a side view without the side walls so that the interior of the buffer 1 is visible.
- the gear wheels 23 will be swivelled about the swivel axis 27 from a first position in which they are located fully between the upper carrier plate 7 and the lower carrier plate 9 into a second position in which they at least partly project into the receptacles 12 so that they engage the gear rods of the bumper bars 31. Swivelling the gear wheels 23 is done by means of hydraulic cylinders 25.
- a locking mechanism is associated with the gear wheels 23 which allow locking the gear wheels 23 so that freewheeling can be stopped. Locking the gear wheels 23 is done when the vessel 35 is on top of a wave, where the locking is realised, for example, by means of a hydraulic mechanism. Once the gear wheels 23 are locked the bow 33 of the vessel 35 stays at a certain height so that the bow 33 is out of the waves and personal or material can be transferred from the vessel to the wind turbine tower 43. Since the bow 33 of the vessel 35 is always above the waves the risk for personal transferring from the vessel to the wind turbine tower 43 can be reduced, even in case of a relatively large wave height.
- the gear wheels 23 are used to slowly lower the bow 33 into the waves again. Then, the gear wheels 23 are disengaged from the gear rods 29 and the engagement arms 15 are moved out of the recesses 11 so that the vessel 35 is free to move away from the wind turbine tower 43.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Wind Motors (AREA)
- Vibration Dampers (AREA)
Description
- The present invention relates to a docking structure for docking a vessel to at least one bumper bar of a marine structure such as, for example, an offshore wind turbine. The invention further relates to a docking system comprising such a docking structure and to a vessel with such a docking structure.
- After installing a marine structure the structure has to be maintained on a regular basis. For maintaining the structure personal needs to access the structure from time to time. To bring personal to the structure to be maintained a transfer vessel is used which docks to the marine structure. A vessel with a motion compensated platform for transferring personnel and/or equipment between the vessel and an adjacent body, is described in
GB2474374 A - However, the transfer of personal and material to the marine structure might be difficult or even dangerous if the marine structure is more or less fixed relative to the waves while the boat is floating. Therefore, docking systems are used which fix the vessel relative to the marine structure so as to reduce movements of the vessel relative to the marine structure. Such a docking system is, for example, disclosed in
EP 2 316 721 A1 . The docking system disclosed therein is fixed to the bow of a vessel and includes a buffer and hydraulic engagement arms with hook portions. The engagement arms can be moved towards each other so as to grip bumper bars located at the marine structure. Moreover, the engagement arms comprise hydraulic cylinders by means of which they can draw the vessel firmly against the bumper bars. After the vessel is secured to the marine structure by means of the buffer and the engagement arms the personal and material can be transferred from the vessel to the structure. - Docking systems as described above are suitable for use in waves up to a given wave height. If this wave height is exceeded, no personal or material can be transferred to the marine structure. In some situations this may lead to a shutdown of the marine structure until personal and material can reach the marine structure. In particular in case of offshore wind turbines shutting down means losing money since the wind turbine cannot produce energy. It is therefore desirable to have docking systems which allow transfer of personal and material to a marine structure even in case of relative large wave height.
- It is, therefore, an objective of the present invention to provide an advantageous docking structure and an advantageous docking system which allow for docking a vessel to a marine structure and for the transfer of personal or material from the vessel to the marine structure even with relatively large wave height. It is a second objective of the present invention to provide an advantageous vessel which can be used for transferring personal or material to a marine structure even in case of relatively large wave height.
- The first objective is achieved by a docking structure as claimed in
claim 1 and by a docking system as claimed in claim 10. An inventive docking structure that can be used for docking a vessel to at least one bumper bar of a marine structure such as, for example, of an offshore wind turbine comprises a buffer with at least one gripping system suitable for gripping a bumper bar of a marine structure, a mounting section for mounting the docking system to a vessel, and a kinematic structure. The kinematic structure connects the mounting section to the buffer and offers six degrees of freedom for a relative movement between the mounting section and the buffer. The kinematic structure comprises a damping structure for damping relative movement between the mounting section and the buffer. By this measure the vessel, which can move in six degrees of freedom due to the kinematic structure, is prevented from crashing into the bumper bar. The damping structure may, in particular, be the hydraulic or pneumatic damping structure. - In the inventive docking structure the buffer with the gripping system allows for securely fixing the buffer to a bumper bar of a marine structure. At the same time, the kinematic structure with the six degrees of freedom allows the mounting section of the docking structure, and thereby a vessel connected to the docking structure by means of the mounting section, to move and rotate within a given range relative to the buffer, and thereby relative to the bumper bar of the marine structure to which the buffer is fixed. By this measure loads acting on the docking structure due to relative movement between a vessel and the marine structure can be reduced, which in the end allows using the docking structure at relative large wave height.
- Moreover, in the inventive docking structure, the kinematic structure may comprise a hydraulic or pneumatic actuator that is able to set a relative orientation of the buffer relative to the mounting section. By this measure it is possible to suitably orientate the buffer when the vessel calls at the bumper bar of the marine structure. Due to the freedom in orientation of the buffer calling at the bumper bar under various angles becomes possible. Moreover, if controlling of the actuator is fast movements of the vessel during calling at the bumper bar can be compensated by adapting the orientation of the buffer relative to the mounting section.
- In a further development of the inventive docking structure the buffer comprises at least one buffer abutment face, where for each bumper bar a buffer abutment face is present. Moreover, the gripping system comprises at least one pair of engagement arms, where for each bumper bar to be gripped a pair of engagement arms is present and where each engagement arm includes an arm abutment face for contacting the bumper bar. By providing a buffer abutment face and a pair of engagement arms for each bumper bar the bumper bar can be contacted at three points which allows for securely fixing the buffer to the bumper bar. The buffer abutment face and/or the arm abutment faces may be formed by roller surfaces. By this measure moving the buffer up and down the bumper bar can be simplified.
- In a still further development of the inventive docking structure the buffer is equipped with at least one moveable gear wheel, where for each bumper bar a gear wheel is present and where each gear wheel is moveable within the buffer from a storage position to a working position in which it contacts the bumper bar when the buffer abutment face and the arm abutment faces are in contact with the bumper bar. Such a gear wheel allows for actively moving the bow of a vessel to which the docking system is fixed up and down along the bumper bar if the bumper bar is equipped with a respective gear rod. The gear wheel may be located above or below a roller containing the roller surface forming the buffer abutment face. Moreover, two rollers may be present for each bumper bar, where each of the two rollers includes a roller surface forming a buffer abutment face and where the gear wheel is located between the two rollers. This arrangement may help to reduce loads on the gear wheel. If a locking mechanism is associated to the gear wheels so that the gear wheels can be locked by use of the locking mechanism. By locking the gear wheels an up or down movement of the along the bumper bar can be suppressed.
- An inventive docking system comprises an inventive docking structure and at least one bumper bar. The bumper bar is connected or connectable to a marine structure such as, for example, to an offshore wind turbine. The properties and advantages of such a docking system correspond to those that have already been discussed with respect to the inventive docking structure.
- In a special development of the inventive docking system each bumper bar is equipped with a gear rod and the docking structure is a docking structure that is equipped with at least one gear wheel for each bumper bar. The properties and advantages of such an arrangement have already been discussed with respect to the inventive docking structure.
- An inventive vessel has an inventive docking structure fixed to its bow. The properties and advantages that can be achieved with a vessel having an inventive docking structure fixed to its bow have already been described with respect to the inventive docking structure.
- Further features, properties and advantages of the present invention will become clear from the following description of embodiments in conjunction with the accompanying drawings.
-
Figure 1 shows a buffer of the inventive docking structure in a perspective front view. -
Figure 2 shows the buffer offigure 1 in perspective rear view. -
Figure 3 shows an engagement arm used in a gripping system of the buffer shown infigures 1 and2 . -
Figure 4 shows the kinematic structure by which the buffer shown infigures 1 and2 is fixed to the bow of a vessel. -
Figure 5 shows bumper bars of the inventive docking system. -
Figures 6 to 22 show how a vessel is secured to a marine structure by means of the inventive docking system. -
Figure 1 shows a buffer which is part of the inventive docking structure in a perspective front view whilefigure 2 shows the buffer in a perspective rear view. Thebuffer 1 comprises acarrier structure 3 which includes a frame 5 to which anupper carrier plate 7 and alower carrier plate 9 are fixed. Each of theupper carrier plate 7 and thelower carrier plate 9 is equipped with tworecesses 11 which form receiving sections, where eachrecess 11 is in the form of a trapezoid with the open side of the recess being formed by the longer base of the trapezoid and the rear side of the recess being formed by the shorter base of the trapezoid. The recesses of theupper carrier plate 7 are located above therecesses 11 of thelower carrier plate 9 so that they together formreceptacles 12 for receiving bumper bars 31 (the bumper bars are shown infigure 5 ) of a docking system.Rollers 13 are located on the upper andlower carrier plates recesses 11 in such a way that the roller surfaces project over the rear sides towards the open sides of therecesses 11. Thus, the roller surfaces form abutment surfaces which can butt atbumper bars 31. - In addition, the
buffer 1 comprises a gripping system, which is formed byengagement arms 15. One engagement arm is shown separately infigure 3 . The gripping system of the present embodiment includes two pairs ofengagement arms 15, one pair for eachreceptacle 12 of the buffer, i.e. one pair for eachbumper bar 31 to be gripped. Theengagement arms 15 are located between theupper carrier plate 7 and thelower carrier plate 9 at the leg sides of the trapezoid recesses 11. They can be rotated about arotation axis 17 by means ofhydraulic cylinders 19 or any other suitable drive means, such as, e. g., electric motors.Engagement rollers 21 are positioned at the free ends of theengagement arms 15 and can project into therespective receptacle 12 formed by therecesses 11 to butt at abumper bar 31 received in the receptacle when the engagement arms are activated. - When the
engagement arms 15 are not activated the free ends with theengagement rollers 21 are located between theupper carrier plate 7 and thelower carrier plate 9 so that they do not project into thereceptacles 12. After being activated theengagement arms 15 are rotated about theirrespective rotation axis 17 by means of thehydraulic cylinders 19 or any other suitable drive means so that theengagement rollers 21 will project into thereceptacles 12 to butt at abumper bar 31 located within thereceptacles 12. When theengagement rollers 21 and therollers 13 butt at abumper bar 31 the bumper bar is engaged at three points which are distributed about the circumference of thebumper bar 31 so that thebumper bar 31 is securely gripped and cannot slip out of thereceptacle 12. In particular, the three points of contact with thebumper bar 31 may substantially form an equilateral triangle. - Gear wheels are present at the rear side of the
receptacles 12. They are located between theupper carrier plate 7 and thelower carrier plate 9 and each gear wheel is moveable from a location outside of therespective receptacle 12 to a location in which it at least partly projects into thereceptacle 12. For moving thegear wheel 23 into thereceptacle 12 and out of the receptacle 12 aswivel axis 27 is present about which thegear wheel 23 can be swivelled, driven by ahydraulic cylinder 25 or any other suitable drive means such as, e. g., an electric motor. When thegear wheel 23 is swivelled into thereceptacle 12 it can engage agear rod 29 that is located at abumper bar 31 of an inventive docking system. Bumper bars 31 of a marine structure 32 which are equipped withgear rods 29 are shown infigure 5 . -
Figure 4 shows a top view of the inventive docking system that illustrates an inventive docking structure fixed to thebow 33 of avessel 35. Moreover, the figure shows two bumper bars 31. In addition to thebuffer 1 which has been described with respect tofigures 1 to 3 the docking structure includes aStewart platform 37 one side of which is connected to the rear end of thebuffer 1 and the other side of which comprises one or more mounting sections for mounting it to thebow 33 of avessel 35. In the present embodiment, the mounting sections are formed by three fixingpoints 39 by which the Stewart platform can be fixed to thebow 33 of avessel 35. However, the mounting section may also be realised as a fixing platform of the Stewart platform that can be fixed to the bow of a vessel. - The
Stewart platform 37 includes 6 diagonal Hydraulic jacks that are mounted in pairs at the fixing points 39 or at the fixing platform and cross over to three mounting points at thebuffer 1 where they are also mounted in pairs but in another configuration than at the fixingpints 39 or at the fixing platform. TheStewart platform 37 is a kinematic construction which allows to move the buffer relative to the fixing points 39, and thereby relative to thevessel 35, in six degrees of freedom, i.e. the Stewart platform allows thebuffer 1 to be shifted relative to the vessel in three independent directions and to be rotated relative to thevessel 35 about three independent rotational axes. Hence, theStewart platform 37 allows thebuffer 1 to be freely rotated and shifted relative to thevessel 35 in a given translational range and the given angular range. Please note that it is not mandatory to use aStewart platform 37 for connecting thebuffer 1 to thebow 33 of avessel 35. Any other suitable kinematic structure offering six degrees of freedom would be useable as well. However, since the Stewart platform is a parallel kinematics it can achieve a high rigidity with a relatively low weight construction. Moreover, theStewart platform 37 can also be used as a suitable shock-absorbing means. - The use of the inventive docking structure will now be described with reference to
figures 6 to 22 . Whilefigures 6 to 13 show the approach of thevessel 35 to the bumper barsfigures 14 to 22 show how the vessel is moored to the marine structure by use of the inventive docking system. -
Figure 6 shows avessel 35 to thebow 33 of which a docking structure with abuffer 1 as has been described with respect tofigures 1 to 3 and with aStewart platform 37 is fixed by means of the fixing points 39. The figure also shows atower 43 of an offshore wind turbine which forms the marine structure of the present embodiment. Thetower 43 is equipped with twobumper bars 31 as they are shown infigure 5 .Figures 7 to 13 show thevessel 35 and thetower 43 in a schematic top view, whereFigures 6 to 9 show the vessel as it approaches thewind turbine tower 43. As can be seen fromfigures 6 to 9 , thevessel 35 approaches the bumper bars 31 not frontally but at an angle so that thebuffer 1 will contact one of the bumper bars 31 (the lower bumper bar infigures 6 to 9 ) first. In the stage of approaching the bumper bars 31 the Stewart platform is fully extended, i.e. itshydraulic jacks 41 are fully extended. Moreover, thebuffer 1 is oriented in line with thevessel 35. - The final stage of approaching the bumper bars 31 is shown in
figures 10 to 13 . In the final approach, the skipper heads for one of the bumper bars 31 so that therespective bumper bar 31 is received within one of thereceptacles 12 of thebuffer 1. Thereceptacle 12 that is to receive thebumper bar 31 is chosen such that theother receptacle 12 is able to receive thesecond bumper bar 31. Once thefirst bumper bar 31 contacts therollers 13 on the upper andlower carrier plates Stewart platform 37 rotates to engage thesecond bumper bar 31 with the other receptacle 12 (seefigure 11 ). When therollers 13 of theother receptacle 12 contact the second bumper bar (seefigure 12 ) the vessel turns into position so that the bumper bars 31 are straight ahead of thebow 33 of thevessel 35. This last stage of approaching the bumper bars 31 is shown infigure 13 . In the final approach of thevessel 35 to thetower 43, contact between the rollers located at the upper and lower carrier surfaces 7, 9 with the bumper bars 31 can be detected by means of suitable detectors which are known to a person skilled in the art and will, therefore, not be described in further detail here. Moreover, theStewart platform 37 is absorbing the shocks when the rollers butt at the bumper bars 31. The operation of the docking system may be done manually or by means of on board computer aid, which in the latter case will manage the simultaneous operation of the various parts of the docking system and forward and sideward engine generated pull during docking on and docking off operation. Auto pilot will control the ships movements with information from the platform (piston position and hydraulic pressure). This gives a safe ship control. -
Figures 14 to 18 show the gripping of the bumper bars 31 by means of the gripping structure that is part of thebuffer 1. The figures show, in a top view, the bumper bars 31, thebuffer 1 and theStewart platform 37.Figure 14 is more or less and enlarged detailed view offigure 13 . Therollers 13 of thebuffer 1 contact the bumper bars 31 and thevessel 35, thebuffer 1 and thewind turbine tower 43 have been aligned relative to each other. Once contact of therollers 13 of thebuffer 1 with the bumper bars 31 is affirmed, i. e. once contact between the bumper bars 31 and therollers 13 of thebuffer 1 has been detected, theengagement arms 15 will be activated, as it is shown infigure 15 . Upon activation of theengagement arms 15 thehydraulic cylinders 19 expand to rotate theengagement arms 15 about theirrespective rotation axis 17 until theengagement rollers 21 butt at the bumper bars 31 (comparefigures 16 and17 ). Butting of theengagement rollers 21 at the bumper bars can be detected by suitable detectors which are known to a person skilled in the art. When theengagement rollers 21 and therollers 13 butt at the bumper bars 31 thebuffer 1, and thereby thevessel 35, is secured against slipping off from the bumper bars 31. Due to the fact that the abutment faces butting at the bumper bars 31 are roller faces thebuffer 1 can move up and down the bumper bars 31 without great resistance. This stage of the docking process is shown infigures 18 and19 . -
Figures 20 to 22 show the final steps of mooring thevessel 35 to thewind turbine tower 43. In particular,figures 20 and21 show thebuffer 1 in a side view without the side walls so that the interior of thebuffer 1 is visible. After thebuffer 1 has been secured to the bumper bars 31 against slipping off thegear wheels 23 will be swivelled about theswivel axis 27 from a first position in which they are located fully between theupper carrier plate 7 and thelower carrier plate 9 into a second position in which they at least partly project into thereceptacles 12 so that they engage the gear rods of the bumper bars 31. Swivelling thegear wheels 23 is done by means ofhydraulic cylinders 25. After swivelling thegear wheels 27 into the second position, the teeth of thegear wheels 23 are in working contact with the teeth of thegear rods 29 shown infigure 5 . The stage with the teeth of thegear wheels 23 contacting the teeth of thegear rods 29 is shown infigure 21 . In this stage thegear wheels 23 are freewheeling so that thevessel 35 can still move up and down together with the waves. - A locking mechanism is associated with the
gear wheels 23 which allow locking thegear wheels 23 so that freewheeling can be stopped. Locking thegear wheels 23 is done when thevessel 35 is on top of a wave, where the locking is realised, for example, by means of a hydraulic mechanism. Once thegear wheels 23 are locked thebow 33 of thevessel 35 stays at a certain height so that thebow 33 is out of the waves and personal or material can be transferred from the vessel to thewind turbine tower 43. Since thebow 33 of thevessel 35 is always above the waves the risk for personal transferring from the vessel to thewind turbine tower 43 can be reduced, even in case of a relatively large wave height. While thebow 33 of the vessel is located above the waves the stern 45 of thevessel 35 can freely follow the waves since theStewart platform 37 allows for a relative motion between thevessel 35 and thebuffer 1 in six degrees of freedom. Movement of thebow 33 is thereby greatly reduced since the movement of the vessel is more or less a relative movement of its stern 45 about the buffer. - For casting off, the
gear wheels 23 are used to slowly lower thebow 33 into the waves again. Then, thegear wheels 23 are disengaged from thegear rods 29 and theengagement arms 15 are moved out of therecesses 11 so that thevessel 35 is free to move away from thewind turbine tower 43.
Claims (11)
- A vessel (35) with a docking structure for docking the vessel (35) to at least one bumper bar (31) of a marine structure (43), comprising:- a buffer (1) with at least one gripping system (15) suitable for gripping a bumper bar (31) of a marine structure (43);- a mounting section (39) by which the docking system is mounted to the bow of the vessel; and- a kinematic structure (37) which connects the mounting section (39) to the buffer (1) and offers six degrees of freedom for a relative movement between the mounting section (39) and the buffer (1), and- a damping structure for damping the relative movement between the mounting section (39) and the buffer (1)wherein
the kinematic structure is a Stewart platform (37) which includes six hydraulic jacks,
characterized in that
the mounting section is formed by three fixing points (39) or a fixing platform by which the Stewart platform (37) is fixed to the bow (33) of the vessel (35), where the six diagonal hydraulic jacks that are mounted in pairs at the fixing points (39) or at the fixing platform and cross over to three mounting points at the buffer (1) where they are also mounted in pairs but in an other configuration than at the fixing points (39) or at the fixing platform. - The vessel (35) as claimed in claim 1, in which the docking structure is located at the bow (33) of the vessel (35) such that the buffer (1) is located in front of the bow (33) such that it projects towards the at least one bumper bar (31) when the vessel (35) approaches the at least one bumper bar (31).
- The vessel (35) as claimed in claim 1 or claim 2, in which the kinematic structure (37) comprises a hydraulic or pneumatic damping structure.
- The vessel (35) as claimed in any of the claims 1 to 3, in which the buffer (1) comprises at least one buffer abutment face (13), where for each bumper bar (31) a buffer abutment face (13) is present, and the gripping system comprises at least one pair of engagement arms (15), where for each bumper bar (31) to be gripped a pair of engagement arms (15) is present and where each engagement arm (15) includes an arm abutment face (21) for contacting the bumper bar (31).
- The vessel (35) as claimed in claim 4, in which the buffer abutment face and/or arm abutment faces are formed by roller surfaces (13, 21).
- The vessel (35) as claimed in claim 5, in which the buffer (1) is equipped with at least one gear wheel (23), where for each bumper bar (31) a gear wheel (23) is present and where each gear wheel (23) is arranged such at the buffer (1) that it can be moved into contact with the bumper bar (31) when the buffer (1) abutment face (13) and the arm abutment faces (21) are in contact with the bumper bar (31).
- The vessel (35) as claimed in claim 6, in which the gear wheel (23) is located above or below a roller (13) containing the roller surface forming the buffer abutment face.
- The vessel (35) as claimed in claim 7, in which- two rollers (13) are present for each bumper bar (31),- each of the two rollers (13) includes a roller surface forming a buffer abutment face and- the gear wheel (23) is located between the two rollers.
- The vessel (35) as claimed in any of the claims 6 to 8, in which a locking mechanism is associated to the gear wheels (23) so that the gear wheels (23) can be locked by use of the locking mechanism.
- A docking system comprising a vessel (35) as claimed in any of the claims 1 to 9 and at least one bumper bar (31) connected or being connectable to a marine structure (43).
- The docking system as claimed in claim 11, in which each bumper bar (31) is equipped with a gear rod (29) and the docking structure is a docking structure according to any of the claims 6 to 9.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13173593.8A EP2818396B1 (en) | 2013-06-25 | 2013-06-25 | Vessel, docking system and docking structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13173593.8A EP2818396B1 (en) | 2013-06-25 | 2013-06-25 | Vessel, docking system and docking structure |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2818396A1 EP2818396A1 (en) | 2014-12-31 |
EP2818396B1 true EP2818396B1 (en) | 2017-09-27 |
Family
ID=48700346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13173593.8A Not-in-force EP2818396B1 (en) | 2013-06-25 | 2013-06-25 | Vessel, docking system and docking structure |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP2818396B1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB201316490D0 (en) * | 2013-09-17 | 2013-10-30 | Phillips Stephen J | Pole engagement device for marine vessels |
FR3040682B1 (en) | 2015-09-08 | 2019-04-19 | Savoye | DEVICE FOR MOORING A VESSEL TO A MOORING STATION OF A PONTON AND PONTON CORRESPONDING |
EP3190042B1 (en) * | 2016-01-08 | 2018-08-15 | Northern Offshore Services AB | Fender arrangement for docking a marine vessel with a boat landing of a marine offshore structure |
CN111976891B (en) * | 2020-08-20 | 2021-08-20 | ç‡•å±±å¤§å¦ | Energy feedback type mooring device for rapid mooring of large ship |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007120039A1 (en) * | 2006-03-01 | 2007-10-25 | Technische Universiteit Delft | Vessel, motion platform, method for compensating motions of a vessel and use of a stewart platform |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4003473A (en) * | 1974-08-30 | 1977-01-18 | Ryan Ramp, Inc. | Combined marine ramp transfer and mooring system |
NL1016111C2 (en) * | 2000-09-06 | 2002-03-07 | P & R Systems | Method for entering a post placed in the sea, as well as a device to be used thereby. |
FI20095943A0 (en) * | 2009-09-11 | 2009-09-11 | Mobimar Oy | Fastening device and method for attaching a vessel to a wind turbine, as well as vessels |
NL2003728C2 (en) | 2009-10-30 | 2011-05-03 | P & R Systems | METHOD FOR STABILIZING A FLOATING VESSEL AGAINST A STATIONARY OBJECT. |
GB2474374A (en) * | 2010-11-22 | 2011-04-13 | Brynmor Winston Phillips | Vessel with a motion-compensated platform for transferring personnel or equipment |
-
2013
- 2013-06-25 EP EP13173593.8A patent/EP2818396B1/en not_active Not-in-force
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007120039A1 (en) * | 2006-03-01 | 2007-10-25 | Technische Universiteit Delft | Vessel, motion platform, method for compensating motions of a vessel and use of a stewart platform |
Also Published As
Publication number | Publication date |
---|---|
EP2818396A1 (en) | 2014-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2487102B1 (en) | Access apparatus for transferring from vessels to fixed structures | |
DK2450271T3 (en) | A mooring system for a vessel | |
JP4768190B2 (en) | Mooring equipment | |
EP2818396B1 (en) | Vessel, docking system and docking structure | |
EP2316721B1 (en) | Method for stabilizing a floating vessel against a stationary object | |
US6938570B2 (en) | Mooring robot | |
WO2005097590A1 (en) | A mooring device for holding a floating vessel adjacent a mooring facility | |
US9308973B2 (en) | Launch and recovery device | |
CA2943512A1 (en) | Automated mooring device | |
AU2002341632A1 (en) | Mooring robot | |
EP2697111B1 (en) | Vessel comprising a crane | |
US9643691B2 (en) | Launch and recovery device | |
GB2483401A (en) | Pivoting deck vessel for allowing transfer to a fixed structure | |
KR20140145927A (en) | Movable Fender system | |
US6109199A (en) | Capture and alignment mechanism for use on board an ocean going vessel | |
GB2475085A (en) | Pivoting deck vessel for allowing transfer to a fixed structure | |
AU2001236248B2 (en) | Mooring device | |
AU2001236248A1 (en) | Mooring device | |
WO2003055740A1 (en) | Ship-based mooring device | |
WO2023219505A1 (en) | Mooring device and mooring system | |
WO2015148452A1 (en) | Launch and recovery device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20130625 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
R17P | Request for examination filed (corrected) |
Effective date: 20150618 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
17Q | First examination report despatched |
Effective date: 20151104 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170502 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS AKTIENGESELLSCHAFT |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 931669 Country of ref document: AT Kind code of ref document: T Effective date: 20171015 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013027063 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20170927 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 931669 Country of ref document: AT Kind code of ref document: T Effective date: 20170927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171228 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180127 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013027063 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
26N | No opposition filed |
Effective date: 20180628 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20180820 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180630 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180625 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180630 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180630 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180630 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180625 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180630 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602013027063 Country of ref document: DE Owner name: SIEMENS GAMESA RENEWABLE ENERGY A/S, DK Free format text: FORMER OWNER: SIEMENS AKTIENGESELLSCHAFT, 80333 MUENCHEN, DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20190610 Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602013027063 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180625 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130625 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170927 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200625 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200625 |